RATIFIED  MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE                   (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 50/81 SCHEDULED TO BE HELD ON 08.03.2011 BUT ACTUALLY HELD ON 15.03.2011.  The Meeting No. 50/81 of Norms Committee­II was held on 15.03.2011 for the licensing year 2010­2011 under the Chairmanship of Sh. Hardeep Singh, Joint Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorisations under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2009­2014. The following members were present in the meeting:­       S.No Name of the representatives &             their Designation   Deptt.   1.         Shri B.D.Ghosh, Addl I.A.                                           M/o Steel 2.         Shri Gajraj Singh , Sr. D.O.                                          DHI 3.         Shri. S.K.Jain, Sr.D.O.                                                             DIPP 4.         Shri K.K. Funda, AD                                                   MSME 5.         Ms. R.L.Devi, DDG                                                     DGFT 6.         Sh Raman Kumar, FTDO                                             DGFT 1

Case No.:6/50/81­ALC2/2010

Party Name:PARAMOUNT COMMUNICATIONS LTD. Meet No/Date:50/81­ALC2/2010 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00552/AM11/ RLA File :05/24/040/00333/AM11/ Lic.No/Date:0510281294 12.01.2011 Defer Date:26.04.2011 Decision : NC decided to send a letter to firm to submit following information as per written comments of DIPP vide U.O. dated 15.03.2011 :­ 1.      Voltage rating of cables. 2.      Size of conductors in cables alongwith their quantities in Kms. 3.      Detailed calculations for the requirement of each  raw material, export product wise  and the weight  of cable supported by the Cross sectional diagram of the cable/Buyers data sheet. 4.      Material balancing viz. net content of each imported and indigenous input. export product wise, per KM of export product. alongwith net weight. 5.  Total requirement of each raw material, export product wise, in a tabular form. The case stands deferred and to be relisted on 26.04.2011.     2

Case No :7/50/81 ALC2/2010

Party Name:TORRENT CABLES LTD Meet No/Date:50/81 ALC2/2010 Status:Deferred

2

Case No.:7/50/81­ALC2/2010

Party Name:TORRENT CABLES LTD. 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00553/AM11/ RLA File :08/24/040/00324/AM11/ Lic.No/Date:0810095940 01.02.2011 Defer Date:26.04.2011 Decision : : NC decided to send a letter to firm to submit following information as per written comments of DIPP vide U.O. dated 15.03.2011 :­ 1.      Detailed calculations for the requirement of each  raw material, export product wise  and the weight  of cable supported by the Cross sectional diagram of the cable/Buyers data sheet 2.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. alongwith net weight 3.  Total requirement of each raw material, export product wise, in a tabular form The case stands deferred and to be relisted on 26.04.2011.       3

Case No.:15/50/81­ALC2/2010

Party  Name:LEITNER  SHRIRAM MANUFACTURING LIMITED, 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00561/AM11/ RLA File :04/24/040/00287/AM11/ Lic.No/Date:0410121251 02.02.2011 Defer Date:26.04.2011 Decision : NC observed that the case is under examination of DHI. The case stands deferred and to be relisted on 26.04.2011.   4

Case No.:1/50/81­ALC2/2010

Party Name:KHOSLA ENGINEERING PVT LTD 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00547/AM11/ RLA File :31/24/040/00240/AM11/ Lic.No/Date:3110046930 15.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.   5

Case No.:2/50/81­ALC2/2010

Party Name:MINDA SAI LTD. 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00548/AM11/ RLA File :05/24/040/00390/AM11/ Lic.No/Date:0510284178 17.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.   6

Case No.:3/50/81­ALC2/2010

Party Name:AMELCO KABEL PVT.LTD. 08.03.2011 Status:Approved HQ File :01/81/050/00549/AM11/ RLA File :05/23/040/00327/AM11/ Lic.No/Date:0510284180 Defer Date:

17.02.2011 Decision  :  The  Norms  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorization,  as  per  written comments of DIPP vide U.O. dated 15.03.2011 as under:­ Advance Authorisation may be ratified as under on repeat basis as per A. A.  No. 0510270359 dated 11.08.2010 ratified in NC meeting dated 21/12/2010:   1. Description of export products at Sl. No. 1 & 2 may be modified as under: Sl. No. NAME OF EXPORT ITEM Qty. (MTR.) 1       SINGLE  CORE  PVC  INSULATED CABLES  WITH  COPPER CONDUCTOR  600/  750  V  of FOLLOWING SIZES   5136725           250 MCM     AWG 4\0     AWG 3\0     AWG 2\0     AWG 1\0     AWG 1     AWG 2     AWG 4     AWG 6     AWG 8     AWG 10     AWG 12     AWG 14     AWG 16     AWG 18     AWG 20     AWG 22     AWG 24     AWG 26     120 SQ MM     70 SQ MM     50 SQ MM     40 SQ MM   35 SQ MM

35 SQ MM     25 SQ MM     20 SQ MM     16 SQ MM   2         THREE CORE FLAT PVC INSULATED CABLE WITH COPPER CONDUCTOR ( CONTAINING 2 X 10 AWG + 1 X 22 AWG SINGLE CORE CONDUCTOR)   39000           2. Quantities of import items at Sl. No.1(CC Copper Rod/Wire) and Sl. No. 2 (PVC Compound) may be allowed as under:   1. FOR SINGLE CORE PVC INSULATED CABLES WITH COPPER CONDUCTOR 600/ 750 V   Size of Cable CC Copper Rod/ Wire (Kgs/Km)   PVC Compound   250 MCM 1173.80 1.05  Kgs./Kg  Content  in  the  export product AWG 4\0 990.80 product AWG 3\0 785.71 product AWG 2\0 623.23 product AWG 1\0 494.38 product AWG 1 391.98 product AWG 2 310.73 product AWG 4 195.48 product AWG 6 122.93 product AWG 8 77.33 product AWG 10 48.63 product AWG 12 30.59 product

AWG 14 19.22 product AWG 16 12.11 product AWG 18 7.61 product AWG 20 4.80 product   AWG 22 2.99 product AWG 24 1.89 product AWG 26 1.18 product 120 SQ MM 1109.11 293.95 Kgs./Km 70 SQ MM 646.98 210.43 Kgs./Km 50 SQ MM 462.13 151.59 Kgs./Km 40 SQ MM 369.70 114.57 Kgs./Km 35 SQ MM 323.49 113.56 Kgs./Km 25 SQ MM 231.06 86.90 Kgs./Km 20 SQ MM 184.85 45.09 Kgs./Km 16 SQ MM 147.88 58.73 Kgs./Km 2. For Three Core Flat PVC Insulated  Cable  With Copper Conductor  ( Containing 2 X 10 AWG + 1 X 22 AWG Single Core Conductor   99.48           product             Quantity of import item no. 1 to be mentioned in export product after 1% wastage. R/A may take suitable consequential action accordingly.     7

Case No.:4/50/81­ALC2/2010

Party  Name:PREMIER  INDUSTRIAL CORPORATION LIMITED 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00550/AM11/ RLA File :03/95/040/00800/AM11/ Lic.No/Date:0310616525 17.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter

to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.   8

Case No.:5/50/81­ALC2/2010

Party Name:A­1 FENCE PRODUCTS CO.PVT.LTD. 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00551/AM11/ RLA File :03/94/040/01017/AM11/ Lic.No/Date:0310616579 18.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.   9

Case No.:8/50/81­ALC2/2010

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00554/AM11/ RLA File :04/24/040/00308/AM11/ Lic.No/Date:0410121798 22.02.2011 Defer Date:26.04.2011 Decision : NC observed that the case is under examination of DIPP. The case stands deferred and to be relisted on 26.04.2011.   10

Case No.:9/50/81­ALC2/2010

Party Name:C & S ELECTRIC LIMITED 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00555/AM11/ RLA File :05/23/040/00308/AM11/ Lic.No/Date:0510284517 22.02.2011 Defer Date:26.04.2011 Decision : NC observed that the case is under examination of DHI. The case stands deferred and to be relisted on 26.04.2011.   11

Case No.:10/50/81­ALC2/2010

Party  Name:PREMIER  INDUSTRIAL CORPORATION LIMITED 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00556/AM11/ RLA File :03/95/040/00560/AM11/ Lic.No/Date:0310617210 22.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.   12

Case No.:11/50/81­ALC2/2010

Party Name:AUTO COMP INDIA PVT. LTD 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00557/AM11/ RLA File :31/24/040/00250/AM11/ Lic.No/Date:3110047051 22.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.  

Case No :12/50/81 ALC2/2010

Part Name:ELECTROLEAD PUNE PVT LTD Meet No/Date:50/81 ALC2/2010 St t D f d

13

Case No.:12/50/81­ALC2/2010

Party Name:ELECTROLEAD PUNE PVT LTD 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00558/AM11/ RLA File :31/24/040/00251/AM11/ Lic.No/Date:3110047056 23.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.   14

Case No.:14/50/81­ALC2/2010

Party Name:SWASTIK PIPES LTD 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00560/AM11/ RLA File :05/24/040/00322/AM11/ Lic.No/Date:0510284564 23.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.   15

Case No.:13/50/81­ALC2/2010

Party Name:KOTAK URJA PVT. LTD. 08.03.2011 Status:Case Added HQ File :01/81/050/00559/AM11/ RLA File :07/24/040/00470/AM11/ Lic.No/Date:0710077559 24.02.2011 Defer Date: Decision :NC observed that the case is under examination of MNRE. The case stands deferred and to be relisted on 26.04.2011.   16

Case No.:16/50/81­ALC2/2010

Party  Name:ABIR  INFRASTRUCTURE  PRIVATE LIMITED 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00562/AM11/ RLA File :05/23/040/00336/AM11/ Lic.No/Date:0510284584 24.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.   17

Case No.:17/50/81­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, 08.03.2011 Status:Deferred  and Re­indexed HQ File :01/81/050/00563/AM11/ RLA File :03/94/040/01030/AM11/ Lic.No/Date:0310617885 24.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.  

Case No.:18/50/81­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, 08.03.2011 Status:Deferred and Re­indexed

18 HQ File :01/81/050/00564/AM11/ RLA File :03/94/040/01035/AM11/ Lic.No/Date:0310617887 24.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.   19

Case No.:19/50/81­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, 08.03.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00565/AM11/ RLA File :03/94/040/01052/AM11/ Lic.No/Date:0310618125 25.02.2011 Defer Date:26.04.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 26.04.2011.            PART­ AR ­ FRESH  

CASE NO. AR­ 79

M/s. Abir Infrastructure Pvt. Ltd.,  Gurgoan   Meeting No. 50/81 F.No.01/81/050/157/AM10/DES­II      Dated: 08.03.2011  Advance Licence No. 05102448276 dated 25.08.200911.01.2007   RLA’s F.No.05/23/040/0023/AM10   Decision: NC decided to refer the case to DIPP for comments. The case stands deferred and to be relisted on 26.04.2011.   PART­ C­ FRESH  

CASE NO. C­ 29

M/s. Dolphin Die Cast (P) Ltd., Bangalore   Meeting No. 50/81 F.No.01/81/162/153/AM11/DES­II      Dated: 08.03.2011     Decision: NC decided to send a reminder to EEPC for furnishing all industry data. The case stands deferred and to be relisted on 26.04.2011.

CASE NO. C­ 30

M/s. Nile Limited, Hyderabad

Meeting No. 50/81 F.No.01/81/162/751/AM11/DES­II      Dated: 08.03.2011   Decision: NC observed that the case is under examination of MSME. The case stands deferred and to be relisted on 26.04.2011.   ­­­­­­­­­