DGFT Committee Minutes
RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DESII SECTION) Minutes of the Norms CommitteeII Meeting No. 48/09 scheduled to be held on 24.02.2009 but actually held on 05.03.2009. The Meeting No. 48/09 of Norms CommitteeII was held on 24.02.2009 for the licensing year 20082009 under the Chairmanship of Sh. O.P. Hisaria, Joint Director General of Foreign Trade (OPH) to consider the applications under Duty Exemption Scheme (Chapter4) of Foreign Trade Policy 20042009. The following members were present in the meeting: S.No Name of the representatives & their Designation Deptt. 1. Shri B.D. Ghosh, AIA M/o Steel 2. 3. 4. Sh. N.L. Goswami, Sr. DO Sh. S.K. Jain, D.O. Shri A. K. Mishra, Asst IA DHI DIPP M/o Steel 5. 6. Shri K.K. Funda, AD Shri Narendra Vashista, FTDO DC(SSI) DGFT The Committee took up the individual cases of the agenda of this meeting for discussion and the decision taken in respect of each case as follows: 1
Case No.:1/48/81ALC2/2008
Party Name:HYDRIL JINDAL INTERNATIONAL PVT. LTD. Meet No/Date:48/81ALC2/2008 24.02.2009 Status:Case Added HQ File :01/81/050/00706/AM09/ RLA File :05/24/040/00696/AM09/ Lic.No/Date:0510235573 02.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification: 1. Words “Range 3 ” given in the description of import item at S.No.1 may be replaced with words “Range 2 ” 2. Quantities of import items at S.Nos. 1, 2 & 4 may be allowed as applied for as per SION C391 3. Quantity of import item at S.No.3 may be allowed on net to net basis. R/A may take suitable consequential action accordingly. 2
Case No.:13/48/81ALC2/2008
Party Name:VINDHYA TELELINKS LTD., Status:Case Added
24.02.2009 HQ File :01/81/050/00718/AM09/ RLA File :11/24/040/00072/AM09/ Lic.No/Date:1110019513 02.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The committee decided to refer a copy of the application of the firm to DOT for examination and comments. The case stands deferred and to be relisted on 28.04.2009. 3
Case No.:14/48/81ALC2/2008
Party Name:COPPER STRIPS PVT LTD 24.02.2009 Status:Case Added HQ File :01/81/050/00719/AM09/ RLA File :11/24/040/00074/AM09/ Lic.No/Date:1110019528 03.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification: 1. Quantity of import item may be allowed as 10120.2 Kgs inclusive of 1 % wastage. R/A may take suitable consequential action accordingly. 4
Case No.:2/48/81ALC2/2008
Party Name:MAHENDRA INDUSTRIES 24.02.2009 Status:Case Added HQ File :01/81/050/00707/AM09/ RLA File :07/24/040/00589/AM09/ Lic.No/Date:0710062670 03.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 28.04.2009. 5
Case No.:3/48/81ALC2/2008
Party Name:CAST CRAFT PVT LTD, 24.02.2009 Status:Case Added HQ File :01/81/050/00708/AM09/ RLA File :07/24/040/00550/AM09/ Lic.No/Date:0710062671 03.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not
received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has been issued on net to net basis. The case stands deferred and to be relisted on 28.04.2009. 6
Case No.:4/48/81ALC2/2008
Party Name:L M GLASFIBER (INDIA) PVT LTD 24.02.2009 Status:Case Added HQ File :01/81/050/00709/AM09/ RLA File :07/24/040/00594/AM09/ Lic.No/Date:0710062693 03.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 7
Case No.:5/48/81ALC2/2008
Party Name:ABB LIMITED 24.02.2009 Status:Case Added HQ File :01/81/050/00710/AM09/ RLA File :07/24/040/00597/AM09/ Lic.No/Date:0710062699 03.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if 8
Case No.:6/48/81ALC2/2008
Party Name:SUZLON ENERGY LIMITED 24.02.2009 Status:Case Added HQ File :01/81/050/00711/AM09/ RLA File :31/24/040/00296/AM09/ Lic.No/Date:3110037214 03.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 9
Case No.:7/48/81ALC2/2008
Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 24.02.2009 Status:Case Added HQ File :01/81/050/00712/AM09/ RLA File :05/24/040/00518/AM09/ Lic.No/Date:0510235656 03.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms
Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 10
Case No.:10/48/81ALC2/2008
Party Name:EFD INDUCTION LIMITED, 24.02.2009 Status:Case Added HQ File :01/81/050/00715/AM09/ RLA File :07/24/040/00576/AM09/ Lic.No/Date:0710062737 04.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 11
Case No.:11/48/81ALC2/2008
Party Name:ESSAE ELECTRONICS PVT LTD., 24.02.2009 Status:Case Added HQ File :01/81/050/00716/AM09/ RLA File :07/24/040/00514/AM09/ Lic.No/Date:0710062742 04.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if 12
Case No.:12/48/81ALC2/2008
Party Name:TTP TECHNOLOGIES PRIVATE LIMITED 24.02.2009 Status:Case Added HQ File :01/81/050/00717/AM09/ RLA File :07/24/040/00600/AM09/ Lic.No/Date:0710062743 04.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The committee decided to refer a copy of the application of the firm to DHI for examination and comments. The case stands deferred and to be relisted on 28.04.2009. 13
Case No.:8/48/81ALC2/2008
Party Name:ELINS SWITCH BOARDS PVT. LTD. Meet No/Date:48/81ALC2/2008 24.02.2009 Status:Case Added HQ File :01/81/050/00713/AM09/ RLA File :07/24/040/00598/AM09/ Lic.No/Date:0710062730 04.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms
Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if 14
Case No.:9/48/81ALC2/2008
Party Name:EFD INDUCTION LIMITED, 24.02.2009 Status:Case Added HQ File :01/81/050/00714/AM09/ RLA File :07/24/040/00690/AM08/ Lic.No/Date:0710062735 04.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 15
Case No.:15/48/81ALC2/2008
Party Name:SUNLAND METAL RECYCLING INDUSTRIES 24.02.2009 Status:Case Added HQ File :01/81/050/00720/AM09/ RLA File :03/95/040/00059/AM09/ Lic.No/Date:0310505652 05.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The committee decided to refer a copy of the application of the firm to M/o Mines for examination and comments. The case stands deferred and to be relisted on 28.04.2009. 16
Case No.:16/48/81ALC2/2008
Party Name:KHOSLA ENGINEERING PVT LTD 24.02.2009 Status:Case Added HQ File :01/81/050/00721/AM09/ RLA File :31/24/040/00300/AM09/ Lic.No/Date:3110037253 05.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 17
Case No.:17/48/81ALC2/2008
Party Name:KLAUS UNION ENGINEERING PVT.LTD. 24.02.2009 Status:Case Added HQ File :01/81/050/00722/AM09/ RLA File :31/21/040/00364/AM09/ Lic.No/Date:3110037254 05.02.2009 Defer Date:
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if 18
Case No.:18/48/81ALC2/2008
Party Name:CHANDAN STEEL LIMITED 24.02.2009 Status:Case Added HQ File :01/81/050/00723/AM09/ RLA File :03/94/040/00980/AM09/ Lic.No/Date:0310505840 05.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 19
Case No.:19/48/81ALC2/2008
Party Name:DELTON CABLES LTD. 24.02.2009 Status:Case Added HQ File :01/81/050/00724/AM09/ RLA File :05/24/040/00664/AM09/ Lic.No/Date:0510235840 05.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 20
Case No.:20/48/81ALC2/2008
Party Name:AMELCO KABEL PVT.LTD. 24.02.2009 Status:Case Added HQ File :01/81/050/00725/AM09/ RLA File :05/24/040/00673/AM09/ Lic.No/Date:0510235845 05.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 21
Case No.:21/48/81ALC2/2008
Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 24.02.2009 Status:Case Added HQ File :01/81/050/00726/AM09/ RLA File :05/24/040/00346/AM09/ Lic.No/Date:0510235990 06.02.2009 Defer Date:
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 22
Case No.:22/48/81ALC2/2008
Party Name:ALCAN COMPOSITES INDIA PVT. LTD. 24.02.2009 Status:Case Added HQ File :01/81/050/00727/AM09/ RLA File :03/94/040/00913/AM09/ Lic.No/Date:0310505986 06.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 23
Case No.:23/48/81ALC2/2008
Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 24.02.2009 Status:Case Added HQ File :01/81/050/00728/AM09/ RLA File :31/24/040/00307/AM09/ Lic.No/Date:3110037269 06.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 24
Case No.:24/48/81ALC2/2008
Party Name:INDUSTRIAL METAL POWDERS (INDIA) PVT.LTD. 24.02.2009 Status:Case Added HQ File :01/81/050/00729/AM09/ RLA File :31/24/040/00301/AM09/ Lic.No/Date:3110037275 06.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 25
Case No.:25/48/81ALC2/2008
Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 24.02.2009 Status:Case Added HQ File :01/81/050/00730/AM09/ RLA File :31/24/040/00305/AM09/ Lic.No/Date:3110037276 06.02.2009 Defer Date:
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 26
Case No.:26/48/81ALC2/2008
Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 24.02.2009 Status:Case Added HQ File :01/81/050/00731/AM09/ RLA File :31/24/040/00306/AM09/ Lic.No/Date:3110037277 06.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 27
Case No.:27/48/81ALC2/2008
Party Name:SIEMENS LTD 24.02.2009 Status:Case Added HQ File :01/81/050/00732/AM09/ RLA File :03/95/040/00600/AM09/ Lic.No/Date:0310506218 09.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if 28
Case No.:28/48/81ALC2/2008
Party Name:SIEMENS LTD 24.02.2009 Status:Case Added HQ File :01/81/050/00733/AM09/ RLA File :03/95/040/00566/AM09/ Lic.No/Date:0310506225 09.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if 29
Case No.:29/48/81ALC2/2008
Party Name:SIEMENS LTD 24.02.2009 Status:Case Added
HQ File :01/81/050/00734/AM09/ RLA File :03/95/040/00550/AM09/ Lic.No/Date:0310506227 09.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if 30
Case No.:30/48/81ALC2/2008
Party Name:GENSER AEROSPACE & INFORMATION TECHNOLOGIES P.LTD. 24.02.2009 Status:Case Added HQ File :01/81/050/00735/AM09/ RLA File :07/24/040/00592/AM09/ Lic.No/Date:0710062936 10.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if 31
Case No.:31/48/81ALC2/2008
Party Name:PATEL ENGINEERING LTD. 24.02.2009 Status:Case Added HQ File :01/81/050/00736/AM09/ RLA File :03/95/040/00922/AM09/ Lic.No/Date:0310506468 10.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 32
Case No.:32/48/81ALC2/2008
Party Name:NATIONAL LAMINATION INDUSTRIES 24.02.2009 Status:Case Added HQ File :01/81/050/00737/AM09/ RLA File :03/95/040/00759/AM09/ Lic.No/Date:0310506475 10.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 33
Case No.:33/48/81ALC2/2008
Party Name:EUROBOND INDUSTRIES PVT. LTD. 24.02.2009 Status:Case Added
HQ File :01/81/050/00738/AM09/ RLA File :03/94/040/00999/AM09/ Lic.No/Date:0310506493 10.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 34
Case No.:34/48/81ALC2/2008
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 24.02.2009 Status:Case Added HQ File :01/81/050/00739/AM09/ RLA File :11/21/040/00128/AM09/ Lic.No/Date:1110019619 11.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 35
Case No.:35/48/81ALC2/2008
Party Name:BIRLA ERICSSON OPTICAL LTD., 24.02.2009 Status:Case Added HQ File :01/81/050/00740/AM09/ RLA File :11/24/040/00075/AM09/ Lic.No/Date:1110019620 11.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 36
Case No.:36/48/81ALC2/2008
Party Name:ELINS SWITCH BOARDS PVT. LTD. Meet No/Date:48/81ALC2/2008 24.02.2009 Status:Case Added HQ File :01/81/050/00741/AM09/ RLA File :07/24/040/00603/AM09/ Lic.No/Date:0710062997 12.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if 37
Case No.:37/48/81ALC2/2008
Party Name:EFD INDUCTION LIMITED, 24.02.2009 Status:Case Added
HQ File :01/81/050/00742/AM09/ RLA File :07/24/040/00609/AM09/ Lic.No/Date:0710063002 12.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if 38
Case No.:38/48/81ALC2/2008
Party Name:JINDAL SAW LTD 24.02.2009 Status:Case Added HQ File :01/81/050/00743/AM09/ RLA File :05/24/040/00716/AM09/ Lic.No/Date:0510236321 12.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 39
Case No.:39/48/81ALC2/2008
Party Name:MAHENDRA INDUSTRIES 24.02.2009 Status:Case Added HQ File :01/81/050/00744/AM09/ RLA File :07/24/040/00615/AM09/ Lic.No/Date:0710063033 13.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The committee observed that AA has already been issued on repeat basis. Hence decided to close the case on the part of NC. 40
Case No.:40/48/81ALC2/2008
Party Name:ASTRA LIGHTING LTD., 24.02.2009 Status:Case Added HQ File :01/81/050/00745/AM09/ RLA File :22/24/040/00062/AM09/ Lic.No/Date:2210008650 13.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands
41
Case No.:41/48/81ALC2/2008
Party Name:ALSTOM PROJECTS INDIA LIMITED, 24.02.2009 Status:Case Added HQ File :01/81/050/00746/AM09/ RLA File :03/94/040/01011/AM09/ Lic.No/Date:0310507423 16.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands PART –A FRESH
Case No. A20
M/S Raychem RPG Ltd. Meeting No.48/81 F.No.01/81/162/522/AM09/DESII Dated 24022009 Annual Advance Licence No.0310459698 dt.31022008 RLA.No.03/95/39/0004/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.N0. 48/81 actually held on 05.03.2009. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification: 1. 1. Description of Export products and their weights may be specified as under: Sl.No. Description Export Weight 1 SS Band 304/316 Grade 6.5 mm x 0.5 mm x 30 m 0.77 Kgs 2 SS Band 304/316 Grade 9.5 mm x 0.65 mm x 30 m 1.46 Kgs 3 SS Band 304/316 Grade 12.7 mm x 0.75 mm x 30 m 2.25 Kgs 4 SS Band 304/316 Grade 16 mm x 0.75 mm x 30 m 2.83 Kgs 5 SS Band 304/316 Grade 19 mm x 0.75 mm x 30 m 3.36 Kgs
6 SS Band 304/316 Grade 20 mm x 0.4 mm x 50 m 3.14 Kgs 7 SS Band 304/316 Grade 20 mm x 0.7 mm x 50 m 5.50 Kgs 8 SS Band 304/316 Grade 10 mm x 0.4 mm x 50 m 1.57 Kgs 9 SS Band 304/316 Grade 10 mm x 0.7 mm x 50 m 2.75 Kgs 2. Quantities of import items may be allowed as under: Sl.No. Description Quantity For Export product at Sl No. 1 above 1 SS Strip Gr 304/316 0.5 mm thick 0.785 Kgs inclusive of a wastage of 2 % For Export product at Sl No. 2 above 2 SS Strip Gr 304/316 0.65 mm thick 1.489 Kgs inclusive of a wastage of 2 % For Export product at Sl No. 3 above 3 SS Strip Gr 304/316 0.75 mm thick 2.295 Kgs inclusive of a wastage of 2 % For Export product at Sl No. 4 above 4 SS Strip Gr 304/316 0.75 mm thick 2.887 Kgs inclusive of a wastage of 2 % For Export product at Sl No. 5 above 5 SS Strip Gr 304/316 0.75 mm thick 3.427 Kgs inclusive of a wastage of 2 % For Export product at Sl No. 6 above 6 SS Strip Gr 304/316 0.4 mm thick 3.203 Kgs inclusive of a wastage of 2 % For Export product at Sl No. 7 above 7 SS Strip Gr 304/316 0.7 mm thick 5.61 Kgs inclusive of a wastage of 2 % For Export product at Sl No. 8 above 8 SS Strip Gr 304/316 0.4 mm thick 1.60 Kgs inclusive of a wastage of 2 % For Export product at Sl No. 9 above 9 SS Strip Gr 304/316 0.7 mm thick 2.805 Kgs inclusive of a wastage of 2 % R/A may take suitable consequential action accordingly.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.