IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2018-09-12

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.22/11 held on 31.08.2010 of Norms Committee NC­I) (DES.I Section)   The meeting No. 22/11 of the Norms Committee (NC­I) for the licensing year 2010­2011 held on 31.08.2010 under the Chairmanship of Ms. Shubhra, Jt. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Aggarwal 3rd Floor   D/o C&PC 5. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 6.      Sh. Rajiva Kumar , Dy. D.G.F.T 207 23061562  Ext. 232 DGFT, UB 7. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases. Tthe decision taken thereon were as under: ­ 1

Case No.:14/50/80­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:22/80­ALC2/2010 31.08.2010 Status: Deferred HQ File :01/80/050/01812/AM09/ RLA File :09/24/040/00427/AM09/ Lic.No/Date:0910037147 24.02.2009 Defer Date:12.10.2010 Decision :The Committee observed that no reply of the firm had not been received by this office despite reminders. The Committee, therefore, decided to issue a final reminder to the firm for expediting the said information, by 08.10.2010 failing which the case will be rejected and no further representation will be entertained.   The case may be re­listed on 12.10.2010.   2

Case No.:25/51/80­ALC2/2009

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:22/80­ ALC2/2010 31.08.2010 Status: Deferred HQ File :01/80/050/00816/AM10/ RLA File :05/23/040/00188/AM10/ Lic.No/Date:0510259390 24.02.2010 Defer Date:12.10.2010 Decision  :The  Committee  observed  that  the  comments  called  for  from  DIT  are  yet  to  be  received.    The  Committee, therefore, decided to remind them to expedite their comments. The case may be re­listed on 12.10.2010.   3

Case No.:25/5/80­ALC2/2010

Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD 31.08.2010 Status: withdrawn HQ File :01/80/050/00058/AM11/ RLA File :31/24/040/00009/AM11/ Lic.No/Date:3110042996 26.04.2010   Decision : The committee noted that the case had already been listed in NC 21/11 held on 24.08.2010. Accordingly the case is withdrawn.   4

Case No.:7/13/80­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, 31.08.2010 Status: Deferred HQ File :01/80/050/00183/AM11/ RLA File :03/94/040/00125/AM11/ Lic.No/Date:0310573839 12.05.2010 Defer Date:12.10.2010 Decision :The Committee observed that no reply of the firm had been received by this office, to the letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information by 08 10 2010 failing which the case will be rejected and no further representation will be entertained The case

by 08.10.2010 failing which the  case will be rejected and no further representation will be entertained.   The case may be re­listed on 12.10.2010.   5

Case No.:13/13/80­ALC2/2010

Party Name:GEA ECOFLEX INDIA PVT.LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00189/AM11/ RLA File :03/94/040/00149/AM11/ Lic.No/Date:0310575748 24.05.2010 Defer Date:12.10.2010 Decision : The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said  information  by  08.10.2010  otherwise  their  case  will  be  rejected  and  no  further  representation  will  be entertained.   The case may be re­listed on 12.10.2010.   6

Case No.:21/22/80­ALC2/2010

Party Name:HTD HEAT TRACE(INDIA)PVT LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00332/AM11/ RLA File :09/24/040/00056/AM11/ Lic.No/Date:0910042150 26.05.2010 Defer Date:12.10.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA (with a copy to firm) to forward the firm’s application at the earliest and on receipt, forward the same to technical authority for examination and comments. The case may be relisted on 12.10.2010.   7

Case No.:1/13/80­ALC2/2010

Party Name:KIRLOSKAR TOYODATEXTILE MACHINERY PVT LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00177/AM11/ RLA File :07/21/040/00161/AM11/ Lic.No/Date:0710072178 10.06.2010 Defer Date:12.10.2010 nor reported the status of the case.  The Committee, therefore, decided to remind RA (with a copy to firm) to forward the firm’s application at the earliest and on receipt, forward the same to technical authority for examination and comments. The case may be relisted on 12.10.2010.   8

Case No.:6/13/80­ALC2/2010

Party Name:TYCO VALVES & CONTROLS INDIA PVT.LT 31.08.2010 Status: Closed HQ File :01/80/050/00182/AM11/ RLA File :34/21/040/00057/AM11/ Lic.No/Date:3410027201 10.06.2010   Decision :The Committee noted that RA neither reported  the  status  of  the  case  nor  forwarded  the  four  sets  of application in response to this office letter and subsequent reminder.  Since, the subject authorization is quite old; the Committee presumed that ratification of norms of the subject authorization is not required and decided to close the case.   Regional Authority may take necessary action accordingly.   9

Case No.:2/13/80­ALC2/2010

Party Name:KIRLOSKAR BROTHERS LTD 31.08.2010 Status: Approved HQ File :01/80/050/00178/AM11/ RLA File :31/24/040/00044/AM11/ Lic.No/Date:3110043541 11.06.2010   Decision :As per the written comments of DIPP communicated vide their U.O. Note dt.31.08.2010, the committee decided to ratify the norms in respect of the subject advance authorization as per GN­4.    

Case No.:3/13/80­ALC2/2010 Party

Name:KONECRANES INDIA PRIVATE LIMITED Meet No/Date:22/80­ ALC2/2010 31.08.2010 Status: Approved HQ File :01/80/050/00179/AM11/ RLA File :31/21/040/00079/AM11/ Lic.No/Date:3110043545 11.06.2010

10 Decision : As per the written comments of DIPP communicated vide their U.O. Note dt.31.08.2010, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   Quantities of import items from Sl. No.1 to 242 may be allowed on net­to­net basis with accountability clause.     11

Case No.:4/13/80­ALC2/2010

Party Name:MAGNETI MARELLIUM ELECTRONICS SYSTEMS PVT. LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00180/AM11/ RLA File :05/24/040/00100/AM11/ Lic.No/Date:0510266016 14.06.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application has been sent to DIPP for examination and comments. It was decided to defer the case on 12.10.2010.   12

Case No.:5/13/80­ALC2/2010

Party Name:LIEBHERR MACHINE TOOLS (I) PVT LTD 31.08.2010 Status: Approved HQ File :01/80/050/00181/AM11/ RLA File :07/24/040/00056/AM11/ Lic.No/Date:0710072220 14.06.2010   Decision :On the recommendation of the representative of DHI present in the meeting, the Committee decided to ratify the norms in respect of the subject advance authorization as per GN­4.     13

Case No.:14/13/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00190/AM11/ RLA File :03/94/040/00219/AM11/ Lic.No/Date:0310578752 14.06.2010 Defer Date:12.10.2010 nor reported the status of the case.  The Committee, therefore, decided to remind RA (with a copy to firm) to forward  the  firm’s  application  at  the  earliest  and  to  forward  the  same  if  received  to  technical  authority  for examination and  comments. The case may be relisted on 12.10.2010.   14

Case No.:16/13/80­ALC2/2010

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00192/AM11/ RLA File :03/95/040/00212/AM11/ Lic.No/Date:0310578892 15.06.2010 Defer Date:12.10.2010 nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and to forward the same if received to technical authority for examination and submission of comments. The case may be relisted on 12.10.2010.   15

Case No.:17/13/80­ALC2/2010

Party Name:PERFECT ENGG COMPONENTS P LTD 31.08.2010 Status: Deferred HQ File :01/80/050/00193/AM11/ RLA File :05/24/040/00104/AM11/ Lic.No/Date:0510266164 16.06.2010 Defer Date:12.10.2010 the firm’s application at the earliest and on receipt forward the same to technical authority for examination and  

Case No.:18/13/80­ALC2/2010

Party Name:PAHARPUR COOLING TOWERS LIMITED, 31.08.2010 Status: Approved

16 HQ File :01/80/050/00194/AM11/ RLA File :02/24/040/00039/AM11/ Lic.No/Date:0210143626 17.06.2010   Decision : As per the written comments of DIPP communicated vide their U.O. Note dt.31.08.2010, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   1. Import items from S. Nos. 1 to 9 & 11 may be allowed as SION C­1708. 2. Import items from S. Nos. 10, 12 to 14, 20 & 21 may be allowed on net­to­net basis with accountability clause. 3.      Quantity of import item at Sl. No.15 may be allowed as 21.544 MT (437185 Nos. as per the list submitted by the firm vide their letter dated 22.07.2010) on net­to­net basis with accountability clause. 4. Quantities  of  import  items  from  S.  No.16  to  19  may  be  allowed  as  1.03  Kgs./kg.  content  in  the  export product.     17

Case No.:19/13/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., 31.08.2010 Status: Deferred HQ File :01/80/050/00195/AM11/ RLA File :07/24/040/00053/AM11/ Lic.No/Date:0710072312 17.06.2010 Defer Date:12.10.2010 Decision : On the recommendation of the DC(MSME) vide their UO Note No.30(133)2010­ME dt.12.08.2010, it was decided by the committee to call for the following information /clarification from the firm:­ 1. Weight / Sample use of each export product. 2. Mfg. Operations to be carried out on imported inputs indicating wastage at every stage of operation. 3. Size / Specification and weight of imported input required for each export product. 4. Wastage Justification and the calculation of weight of inputs and Nett component weight, indicating material of import for each export.           The case is to be re­list on 12.10.2010.   18

Case No.:20/13/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., 31.08.2010 Status: Deferred HQ File :01/80/050/00196/AM11/ RLA File :07/24/040/00065/AM11/ Lic.No/Date:0710072313 17.06.2010 Defer Date:12.10.2010 Decision : On the recommendation of the DC(MSME) vide their UO Note No.30(134)2010­ME dt.12.08.2010, it was decided by the committee to call for the following information /clarification from the firm:­ 1. Weight / Sample use of each export product. 2. Mfg. Operations to be carried out on imported inputs indicating wastage at every stage of operation. 3. Size / Specification and weight of imported input required for each export product separately. 4. Wastage Justification and the calculation of weight of inputs and Nett component weight, indicating material of import for each export.           The case is to be re­list on 12.10.2010.   19

Case No.:27/13/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00203/AM11/ RLA File :53/24/040/00009/AM11/ Lic.No/Date:5310010616 17.06.2010 Defer Date:12.10.2010 Decision  :The  Committee  observed  that  the  comments  called  for  from  C&PC  are  yet  to  be  received.    The Committee,  therefore,  decided  to  remind  them  to  expedite  their  comments.  The  case  may  be  re­listed  on 12.10.2010.   20

Case No.:21/13/80­ALC2/2010

Party Name:WHIRLPOOL OF INDIA LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00197/AM11/ RLA File :05/24/040/00069/AM11/ Lic.No/Date:0510266400 18.06.2010 Defer Date:12.10.2010 Decision :On the recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  it  was  decided  by  the

0 Committee to call for the following information/clarification from the firm :­   1. Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format Export Product wise.         The case may be re­listed on  12.10.2010.   21

Case No.:22/13/80­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00198/AM11/ RLA File :03/95/040/00112/AM11/ Lic.No/Date:0310579480 18.06.2010 Defer Date:12.10.2010 Decision :On the recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  it  was  decided  by  the Committee to call for the following information/clarification from the firm :­   1. Information in respect of Sl.No.4,5 & 11 of the Standard Deficiency Format.            The case may be re­listed on  12.10.2010.   22

Case No.:23/13/80­ALC2/2010

Party Name:LIEBHERR MACHINE TOOLS (I) PVT LTD 31.08.2010 Status: Approved HQ File :01/80/050/00199/AM11/ RLA File :07/24/040/00078/AM11/ Lic.No/Date:0710072325 18.06.2010   Decision : On the recommendation of the representative of DHI present in the meeting, the committee decided to ratify the norms in respect of the subject advance authorization as per GN­4.     23

Case No.:26/13/80­ALC2/2010

Party Name:AVASARALA TECHNOLOGIES LIMITED, 31.08.2010 Status: Deferred HQ File :01/80/050/00202/AM11/ RLA File :07/21/040/00191/AM11/ Lic.No/Date:0710072364 21.06.2010 Defer Date:12.10.2010   24

Case No.:29/13/80­ALC2/2010

Party Name:ABB LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00205/AM11/ RLA File :07/24/040/00090/AM11/ Lic.No/Date:0710072375 22.06.2010 Defer Date:12.10.2010 the firm’s application at the earliest and to forward the same to technical authority for examination and comments. The case may be relisted on 12.10.2010.   25

Case No.:30/13/80­ALC2/2010

Party Name:APEX TEST TECHNOLOGIES, 31.08.2010 Status: Deferred HQ File :01/80/050/00206/AM11/ RLA File :07/21/040/00192/AM11/ Lic.No/Date:0710072390 23.06.2010 Defer Date:12.10.2010 the firm’s application at the earliest and to forward the same if received, to technical authority for examination and  

Case No.:31/13/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 31.08.2010 Status: Deferred

26 HQ File :01/80/050/00207/AM11/ RLA File :04/24/040/00060/AM11/ Lic.No/Date:0410114911 24.06.2010 Defer Date:12.10.2010 Decision : The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information. In case no information is received, the case will be rejected and no further representation will be entertained.   The case may be re­listed on 12.10.2010.   27

Case No.:28/22/80­ALC2/2010

Party Name:RINAC INDIA LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00339/AM11/ RLA File :07/24/040/00109/AM11/ Lic.No/Date:0710072773 09.07.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application handed over to DIPP in the meeting for examination and comments. It was decided to defer the case for 12.10.2010.     28

Case No.:22/22/80­ALC2/2010

Party Name:INTERNATIONAL COIL LIMITED, 31.08.2010 Status: Deferred HQ File :01/80/050/00333/AM11/ RLA File :05/23/040/00047/AM11/ Lic.No/Date:0510267977 12.07.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application was sent to DC(MSME). However, it was decided to send a copy of firm’s application DIPP also for their examination and comments, as the subject pertains to them. The case was deferred for 12.10.2010.   29

Case No.:33/22/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00344/AM11/ RLA File :03/94/040/00301/AM11/ Lic.No/Date:0310582926 12.07.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application was sent to DHI. However, it was decided to send a copy of firm’s application DIPP also for their examination and comments, as the subject pertains to them. The case was deferred for 12.10.2010.   30

Case No.:36/22/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00347/AM11/ RLA File :03/95/040/00041/AM11/ Lic.No/Date:0310583261 13.07.2010 Defer Date:12.10.2010 Decision  :  The  Committee  directed  that  the  firm’s  application  be  handed  over  to  DIPP  in  the  meeting  for examination and comments. It was decided to defer the case for 12.10.2010.   31

Case No.:16/22/80­ALC2/2010

Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. 31.08.2010 Status: Approved HQ File :01/80/050/00327/AM11/ RLA File :03/95/040/00272/AM11/ Lic.No/Date:0310583449 14.07.2010   Decision : On the recommendation of the representative of DHI present in the meeting, the committee decided to ratify the norms in respect of advance authorization as per GN­4.     32

Case No.:26/22/80­ALC2/2010

Party Name:WONJIN AUTOPARTS INDIA PVT LTD 31.08.2010 Status: Deferred HQ File :01/80/050/00337/AM11/ RLA File :04/24/040/00084/AM11/ Lic.No/Date:0410115538 14.07.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application has been sent to DHI for examination and comments. It was decided to defer the case for 12.10.2010.

33

Case No.:31/22/80­ALC2/2010

Party Name:TIMKEN INDIA LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00342/AM11/ RLA File :02/24/040/00061/AM11/ Lic.No/Date:0210145200 16.07.2010 Defer Date:12.10.2010 Decision  :  The  committee  directed  that  the  firm’s  application  be  handed  over  to  DIPP  in  the  meeting  for examination and comments. It was decided to defer the case for 12.10.2010.   34

Case No.:17/22/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00328/AM11/ RLA File :04/24/040/00058/AM11/ Lic.No/Date:0410115601 19.07.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application has been sent to DHI for examination and comments. It was decided to defer the case for 12.10.2010.   35

Case No.:18/22/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2010 31.08.2010 Status: Deferred HQ File :01/80/050/00329/AM11/ RLA File :04/24/040/00090/AM11/ Lic.No/Date:0410115602 19.07.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application has been sent to DHI for examination and comments. It was decided to defer the case for 12.10.2010.   36

Case No.:19/22/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2010 31.08.2010 Status: Deferred HQ File :01/80/050/00330/AM11/ RLA File :04/24/040/00091/AM11/ Lic.No/Date:0410115603 19.07.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application has been sent to DHI for examination and comments. It was decided to defer the case for 12.10.2010.   37

Case No.:35/22/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00346/AM11/ RLA File :03/94/040/00335/AM11/ Lic.No/Date:0310584224 20.07.2010 Defer Date:12.10.2010 Decision :The committee noted that the firm’s application was sent to DHI. However, it was decided to send a copy of firm’s application DIPP also for their examination and comments, as the subject pertains to them. The case was deferred for 12.10.2010.   38

Case No.:24/22/80­ALC2/2010

Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:22/80­ ALC2/2010 31.08.2010 Status: Deferred HQ File :01/80/050/00335/AM11/ RLA File :05/23/040/00106/AM11/ Lic.No/Date:0510268585 21.07.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application has been sent to DHI for examination and comments. It was decided to defer the case for 12.10.2010.   39

Case No.:29/22/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:22/80­ ALC2/2010 31.08.2010 Status: Deferred HQ File :01/80/050/00340/AM11/ RLA File :06/24/040/00022/AM11/ Lic.No/Date:0610018565 21.07.2010 Defer Date:12.10.2010 Decision  :  The  committee  noted  that  the  firm’s  application  has  been  sent  to DHI                                                                                                                                                                                                                               for examination and comments. The representative of DIPP has also informed that a copy

of  application may be sent to Ministry of Defence for examination & Comments. It was decided to defer the case for 12.10.2010.   40

Case No.:30/22/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00341/AM11/ RLA File :06/24/040/00023/AM11/ Lic.No/Date:0610018566 21.07.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application has been sent to DHI                    for examination and comments. The representative of DIPP has also informed that a copy of  application may be sent to Ministry of Defence for examination & Comments. It was decided to defer the case for 12.10.2010.   41

Case No.:34/22/80­ALC2/2010

Party Name:ATLAS COPCO (INDIA) LIMITED 31.08.2010 Status: Approved HQ File :01/80/050/00345/AM11/ RLA File :03/94/040/00021/AM11/ Lic.No/Date:0310584762 23.07.2010   Decision : On the recommendation of the representative of DIPP present in the meeting, the committee decided to ratify the norms in respect of the subject advance authorization as per GN­4.     42

Case No.:23/22/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00334/AM11/ RLA File :07/24/040/00133/AM11/ Lic.No/Date:0710073218 27.07.2010 Defer Date:12.10.2010 Decision : The committee noted that the firm’s application has been sent to DHI for examination and comments. It was decided to defer the case for 12.10.2010.   43

Case No.:27/22/80­ALC2/2010

Party Name:THE TATA POWER COMPANY LTD 31.08.2010 Status: Deferred HQ File :01/80/050/00338/AM11/ RLA File :07/24/040/00140/AM11/ Lic.No/Date:0710073216 27.07.2010 Defer Date:12.10.2010 Decision :The Committee noted that the firm’s application handed over to DIPP in the meeting for examination and comments. It was decided to defer the case for 12.10.2010.   44

Case No.:41/22/80­ALC2/2010

Party Name:KINECO PVT. LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00352/AM11/ RLA File :17/24/040/00008/AM11/ Lic.No/Date:1710003421 27.07.2010 Defer Date:12.10.2010 Decision  :  The  committee  noted  that  the  firm’s  application  has  been  sent  to  DHI/DIPP  for  examination  and comments. It was decided to defer the case for 12.10.2010.   45

Case No.:1/22/80­ALC2/2010

Party Name:ABB LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00312/AM11/ RLA File :07/24/040/00158/AM11/ Lic.No/Date:0710073410 05.08.2010 Defer Date:12.10.2010 Decision :The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application the firm’s application at the earliest and to forward the if received,  to technical  authority  for  examination  and   46

Case No.:2/22/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00313/AM11/ RLA File :05/24/040/00157/AM11/ Lic.No/Date:0510269795 05.08.2010 Defer Date:12.10.2010 Decision : The Committee diercted that the firm’s application be handed over to DIPP in the meeting for

Decision  :  The  Committee  diercted  that  the  firm s  application  be  handed  over  to  DIPP  in  the  meeting  for examination and comments. It was decided to defer the case for 12.10.2010.   47

Case No.:3/22/80­ALC2/2010

Party Name:FOWLER WESTRUP (INDIA) PVT LTD ., 31.08.2010 Status: Deferred HQ File :01/80/050/00314/AM11/ RLA File :07/21/040/00350/AM11/ Lic.No/Date:0710073482 09.08.2010 Defer Date:12.10.2010 Decision :The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application the firm’s application at the earliest and forward the same to technical authority for examination and submission of comments. The case may be relisted on 12.10.2010.   48

Case No.:4/22/80­ALC2/2010

Party Name:SUFFUSUS POLYMER PRIVATE LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00315/AM11/ RLA File :02/24/040/00083/AM11/ Lic.No/Date:0210146259 11.08.2010 Defer Date:12.10.2010 Decision : The Committee noted that the firm’s application has been sent to C&PC  for examination and comments. It was decided to defer the case for 12.10.2010.   49

Case No.:6/22/80­ALC2/2010

Party Name:ABB LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00317/AM11/ RLA File :07/24/040/00174/AM11/ Lic.No/Date:0710073560 11.08.2010 Defer Date:12.10.2010   50

Case No.:7/22/80­ALC2/2010

Party Name:BANGALORE BIOTECH LABS PVT LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00318/AM11/ RLA File :07/24/040/00143/AM11/ Lic.No/Date:0710073561 11.08.2010 Defer Date:12.10.2010 Decision :On the recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  it  was  decided  by  the Committee to call for the following information/clarification from the firm:­    1. Information in respect of Sl.No.3,6,9 & 11  of the Standard Deficiency Format export product wise.             The case may be re­list on 12.10.2010.   51

Case No.:8/22/80­ALC2/2010

Party Name:HIND HIGH VACUUM COMPANY PVT LTD. 31.08.2010 Status: Approved HQ File :01/80/050/00319/AM11/ RLA File :07/24/040/00163/AM11/ Lic.No/Date:0710073562 11.08.2010   Decision :As per written comments  of  DIPP  communicated  vide  their  U.O.  note  dt.31.08.2010,  the  committee decided to ratify the norms in respect of the subject advance authorization as under:­   1. Import items from Sl. Nos. 1 to 35 & 40 to 44 may be allowed on net­to­net basis with accountability clause. 2. Import items from Sl. Nos. 36 to 39 (consumable) may be allowed within 2% of FOB value of exports.   The Regional Authority may take necessary action accordingly.  

Case No.:12/22/80­ALC2/2010

Party Name:KSB PUMPS LIMITED 31.08.2010 Status: Approved

52 HQ File :01/80/050/00323/AM11/ RLA File :31/24/040/00079/AM11/ Lic.No/Date:3110044269 11.08.2010   Decision : As per written comments of DIPP communicated vide their U.O. note dt.31.08.2010, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   1. Import items from Sl. Nos. 1 to 89 may be allowed on net­to­net basis with accountability clause. 2. Import items from Sl. Nos. 90 to 115 may be allowed as per policy for spares.     53

Case No.:5/22/80­ALC2/2010

Party Name:BGR ENERGY SYSTEMS LIMITED, 31.08.2010 Status: Deferred HQ File :01/80/050/00316/AM11/ RLA File :04/24/040/00116/AM11/ Lic.No/Date:0410116212 12.08.2010 Defer Date:12.10.2010 Decision :On the recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  it  was  decided  by  the Committee to call for the following information/clarification from the firm:­   1. Quantity of export has been indicated as 66 Nos. and 5 Nos. at two different places and the same may be clarified. 2. Information in respect of S. No. 3 & 11 of Standard Deficiency Format – export product wise.   The case may be  re­list on  12.10.2010.   54

Case No.:9/22/80­ALC2/2010

Party Name:BANGALORE BIOTECH LABS PVT LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00320/AM11/ RLA File :07/21/040/00317/AM11/ Lic.No/Date:0710073574 12.08.2010 Defer Date:12.10.2010 Decision :The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application   55

Case No.:10/22/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00321/AM11/ RLA File :34/24/040/00037/AM11/ Lic.No/Date:3410027688 12.08.2010 Defer Date:12.10.2010   56

Case No.:11/22/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00322/AM11/ RLA File :34/24/040/00062/AM11/ Lic.No/Date:3410027689 12.08.2010 Defer Date:12.10.2010   57

Case No.:15/22/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00326/AM11/ RLA File :05/24/040/00175/AM11/ Lic.No/Date:0510270440 12.08.2010 Defer Date:12.10.2010

Decision  :The  Committee  directed  that  the  firm’s  application  be  handed  over  to  DIPP  in  the  meeting  for examination and comments. It was decided to defer the case for 12.10.2010.   58

Case No.:13/22/80­ALC2/2010

Party Name:INGERSOLL­RAND (INDIA) LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00324/AM11/ RLA File :03/94/040/00425/AM11/ Lic.No/Date:0310587565 13.08.2010 Defer Date:12.10.2010   59

Case No.:14/22/80­ALC2/2010

Party Name:J.D. JONES & CO. PVT. LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00325/AM11/ RLA File :02/24/040/00091/AM11/ Lic.No/Date:0210146504 13.08.2010 Defer Date:12.10.2010   60

Case No.:20/22/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00331/AM11/ RLA File :05/24/040/00176/AM11/ Lic.No/Date:0510270623 16.08.2010 Defer Date:12.10.2010   61

Case No.:32/22/80­ALC2/2010

Party Name:STANDARD RADIATORS PVT.LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00343/AM11/ RLA File :34/24/040/00064/AM11/ Lic.No/Date:3410027717 16.08.2010 Defer Date:12.10.2010   62

Case No.:38/22/80­ALC2/2010

Party Name:ULTRA ENGINEERS 31.08.2010 Status: Deferred HQ File :01/80/050/00349/AM11/ RLA File :31/24/040/00077/AM11/ Lic.No/Date:3110044345 16.08.2010 Defer Date:12.10.2010   63

Case No.:25/22/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD 31.08.2010 Status: Deferred HQ File :01/80/050/00336/AM11/ RLA File :04/24/040/00121/AM11/ Lic.No/Date:0410116336 17.08.2010 Defer Date:12.10.2010 submission of comments The case may be relisted on 12 10 2010

  64

Case No.:37/22/80­ALC2/2010

Party Name:MINDA SILCA ENGINEERING LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00348/AM11/ RLA File :05/24/040/00181/AM11/ Lic.No/Date:0510270714 17.08.2010 Defer Date:12.10.2010   65

Case No.:39/22/80­ALC2/2010

Party Name:ACE MANUFACTURING SYSTEMS LTD., 31.08.2010 Status: Approved HQ File :01/80/050/00350/AM11/ RLA File :07/24/040/00066/AM11/ Lic.No/Date:0710073640 17.08.2010   Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as per GN­4.     66

Case No.:40/22/80­ALC2/2010

Party Name:SOGEFI MNR FILTRATION INDIA PVT LTD, 31.08.2010 Status: Deferred HQ File :01/80/050/00351/AM11/ RLA File :07/24/040/00167/AM11/ Lic.No/Date:0710073641 17.08.2010 Defer Date:12.10.2010   67

Case No.:42/22/80­ALC2/2010

Party Name:POLY MEDICURE LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00353/AM11/ RLA File :05/24/040/00188/AM11/ Lic.No/Date:0510270734 17.08.2010 Defer Date:12.10.2010   68

Case No.:43/22/80­ALC2/2010

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. 31.08.2010 Status: Deferred HQ File :01/80/050/00354/AM11/ RLA File :07/24/040/00166/AM11/ Lic.No/Date:0710073648 17.08.2010 Defer Date:12.10.2010   69

Case No.:44/22/80­ALC2/2010

Party Name:TECHNIP KT INDIA LTD 31.08.2010 Status: Deferred HQ File :01/80/050/00355/AM11/ RLA File :05/24/040/00190/AM11/ Lic.No/Date:0510270760 17.08.2010 Defer Date:12.10.2010

70

Case No.:45/22/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00356/AM11/ RLA File :03/95/040/00318/AM11/ Lic.No/Date:0310587934 17.08.2010 Defer Date:12.10.2010   71

Case No.:53/22/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00364/AM11/ RLA File :53/24/040/00013/AM11/ Lic.No/Date:5310011230 17.08.2010 Defer Date:12.10.2010 Decision : The Committee noted that the firm’s application has been sent to DC(MSME) / C&PC on 27.08.2010 for examination and comments. It was decided to defer the case on 12.10.2010.   72

Case No.:46/22/80­ALC2/2010

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00357/AM11/ RLA File :05/24/040/00178/AM11/ Lic.No/Date:0510270834 18.08.2010 Defer Date:12.10.2010   73

Case No.:54/22/80­ALC2/2010

Party Name:G.R.ENGINEERING PRIVATE LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00365/AM11/ RLA File :03/94/040/00446/AM11/ Lic.No/Date:0310588368 18.08.2010 Defer Date:12.10.2010   74

Case No.:47/22/80­ALC2/2010

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00358/AM11/ RLA File :05/24/040/00182/AM11/ Lic.No/Date:0510270937 19.08.2010 Defer Date:12.10.2010   75

Case No.:48/22/80­ALC2/2010

Party Name:MICRON INSTRUMENTS PVT LTD 31.08.2010 Status: Deferred HQ File :01/80/050/00359/AM11/ RLA File :05/24/040/00189/AM11/ Lic.No/Date:0510270940 19.08.2010 Defer Date:12.10.2010  

Case No.:49/22/80­ALC2/2010

Party Name:MANATEC ELECTRONICS PRIVATE LIMITED 31.08.2010 Status: Deferred

76 HQ File :01/80/050/00360/AM11/ RLA File :25/24/040/00006/AM11/ Lic.No/Date:2510002952 19.08.2010 Defer Date:12.10.2010   77

Case No.:50/22/80­ALC2/2010

Party Name:ACE MANUFACTURING SYSTEMS LTD., 31.08.2010 Status: Approved HQ File :01/80/050/00361/AM11/ RLA File :07/24/040/00154/AM11/ Lic.No/Date:0710073683 19.08.2010   Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as per GN­4.     78

Case No.:55/22/80­ALC2/2010

Party Name:ENDRESS AND HAUSER (INDIA) AUTOMATION INSTRU­ 31.08.2010 Status: Deferred HQ File :01/80/050/00366/AM11/ RLA File :03/94/040/00462/AM11/ Lic.No/Date:0310588660 19.08.2010 Defer Date:12.10.2010   79

Case No.:51/22/80­ALC2/2010

Party Name:PURVA OVERSEAS 31.08.2010 Status: Deferred HQ File :01/80/050/00362/AM11/ RLA File :13/24/040/00018/AM11/ Lic.No/Date:1310033038 20.08.2010 Defer Date:12.10.2010 Decision :The committee noted that the firm’s application has been sent to DIPP.  However, it was decided to send a copy of firm’s application DHI also for their examination and comments, as the subject pertains to them. The case was deferred for 12.10.2010.   80

Case No.:52/22/80­ALC2/2010

Party Name:VIJAY RAJ POULTRY EQUIPMENTS PVT. LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00363/AM11/ RLA File :09/24/040/00183/AM11/ Lic.No/Date:0910043152 20.08.2010 Defer Date:12.10.2010   81

Case No.:56/22/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., 31.08.2010 Status: Deferred HQ File :01/80/050/00367/AM11/ RLA File :03/94/040/00424/AM11/ Lic.No/Date:0310589054 23.08.2010 Defer Date:12.10.2010   82

Case No.:57/22/80­ALC2/2010

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD 31.08.2010 Status: Approved HQ File :01/80/050/00368/AM11/ RLA File :34/24/040/00116/AM11/ Lic.No/Date:3410027769 23.08.2010   D i i Th C itt d id d t tif th i t f th bj t d th i ti GN 4

Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as per GN­4.     83

Case No.:58/22/80­ALC2/2010

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD 31.08.2010 Status: Approved HQ File :01/80/050/00369/AM11/ RLA File :34/24/040/00122/AM11/ Lic.No/Date:3410027770 23.08.2010 0 Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as per GN­4.     84

Case No.:59/22/80­ALC2/2010

Party Name:ASKAR MICRONS PVT. LTD. 31.08.2010 Status: Approved HQ File :01/80/050/00370/AM11/ RLA File :07/24/040/00195/AM11/ Lic.No/Date:0710073767 23.08.2010   Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as per GN­4.     85

Case No.:60/22/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 31.08.2010 Status: Deferred HQ File :01/80/050/00371/AM11/ RLA File :04/24/040/00111/AM11/ Lic.No/Date:0410116559 24.08.2010 Defer Date:12.10.2010   86

Case No.:61/22/80­ALC2/2010

Party Name:INGERSOLL­RAND (INDIA) LIMITED Meet No/Date:22/80­ ALC2/2010 31.08.2010 Status: Deferred HQ File :01/80/050/00372/AM11/ RLA File :03/94/040/00481/AM11/ Lic.No/Date:0310589396 25.08.2010 Defer Date:12.10.2010  

Case No. A ­11

M/s. Koch Chemical Technology  Group India  Pvt.  Ltd., Baroda  F.No. 01/80/162/ 00269/AM11/DES.I Lic.No. & Date Meeting No. 22/11 RA F.No.34/21/040/00241/AM07 3410016531 dt.21.07.2006 Date: 31.08.2010 Ratification of norms The committee noted that the firm’s representation has been sent to DIPP for examination and comments. It was decided to defer the case for 12.10.2010.    

Case No. A/R­ 81

M/s.  Bharat  Heavy Electricals  Ltd., Bhopal  F.No. 01/80/50/ 00184/AM09/DES.I Lic.No. & Date Meeting No. 22/11 RA F.No.11/24/040/00059/AM08 1110016748 dt.04.02.2008 Date: 31.08.2010 Revision of norms The committee noted that the firm’s representation has been sent to DHI for examination and comments. It was decided to defer the case for 12.10.2010.    

Case No. A/R­ 82

M/s.  Delphi­TVS Diesel Systems Ltd., Chennai  F.No. 01/80/50/ 00561/AM08/DES.I Lic.No. & Date Meeting No. 22/11 RA F.No.04/24/040/00245/AM08 0410091902 dt.05.11.2007 Date: 31.08.2010 Revision of norms

As per written comments of DHI vide their U.O. No.3(10)/08­TSW(B)/426 dt.19.08.2010, the committee decided to ratify the norms in respect of the subject advance authorization as under:­ Export The total export weight is 27 MT & the same may be incorporated in the licence.   Import 1. There are 14 items of import out of which item No. 2 to 4 & 9 to 13 are components. These may be allowed under GN­4. 2. Item No.1 – the firm has neither given the calculation of the requirement nor the net weight of component made out of the raw material. Hence it may be deleted. 3. Item No. 5 to 8 – These are consumable & may be allowed up to 2% of FOB value of export. 4. Item No. 14 – This is the filter paper. The firm has not sought any wastage on this item. We may recommend that the each export product should contain 40 gm of filter paper. Total quantity to be recommended is 2000 kg.    

Case No. A/R­ 83

M/s.  Delphi­TVS Diesel Systems Ltd., Chennai  F.No. 01/80/50/ 00330/AM09/DES.I Lic.No. & Date Meeting No. 22/11 RA F.No.04/24/040/00315/AM07 04100943340 dt.11.03.2008 Date: 31.08.2010 Revision of norms   As  per  written  comments  of  DHI  vide  their  U.O.No.3(10)/08­TSW(B)/425  dt.19.08.2010,  the  committee  decided  to ratify the norms in respect of the subject advance authorization   as under:­    Export   The total export weight is 8 kg  each  may be incorporated in the licence.   Import 1. There are 87 items of import out of which item No.7, 16, 76, 77 & 79 are raw materials. All other items are components. These may be allowed under GN­4. 2. Item No.7 (Governor weight) – The firm has sought import of 1050 kg. Six pieces are used in one pump. Raw material  weight  is  35  gm  &  finished  weight  is  27  gms.  This  office  recommends  import  of  1005  kg  with  net wastage of 24% with 20% recovery. 3. Item No. 16 (cam ring) – the firm has sought import of 3950 kg. Raw material weight is 790 gm & finished weight is 277 gms. This office recommends import 3435 kg with net wastage of 148% with 20% recovery. 4. Item No. 76 (cam roller) – The firm has sought import of 60 kg. Two pieces are used in one pump. Raw material weight is 4.3 gm & finished weight  is 3.7 gms. This office recommends import of 42 kg with net wastage  of 13% with 20% recovery. 5. Item No. 77 (Cam Ring Screw) – The firms has sought import of 250 kg. Two pieces are used in one pump. Raw material weight is 25 gm & finished weight is 16 gms. This office recommends import of 232 kg with net wastage of 45% with 20% recovery. 6. Item No. 79 (cam Roller Shoe) – The firm has sought import of 170 kg. This office recommends import of 80 kg with net wastage of 100% with 20% recovery.      

Case No. A/R­ 84

M/s.  Resham Roosen  India  Pvt. Ltd.,  F.No. 01/80/50/ 01045/AM08/DES.I Lic.No. & Date Meeting No. 22/11 RA F.No.06/24/040/00033/AM08 0610012742 dt.10.01.2008 Date: 31.08.2010 Ratification  of norms   The committee noted that the firm’s representation has been sent to DIPP for examination and comments. It was decided to defer the case for 12.10.2010.                                                              *****************

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied