RATIFIED   Minutes of Meeting No.32/11 scheduled on 30.11.2010 of Norms Committee(NC­I) (DES.I Section)   The meeting No. 32/11 of the Norms Committee (NC­I) for the licensing year 2010­2011 actually held on 30.11.2010 under the Chairpersonship of Ms. Shubhra, Jt. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A, U.B. 23063321 Extn.3318 DHI 2. Sh  S.K. Jain,  D.O. 429A, U.B. 23063321 Extn.3318 DIPP. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A, N.B. 23063802 Extn.2459 DC(MSME), 4. Sh. A.K. Mishra, AIA 13­A, U.B. 23063332 M/o Steel 5.      Sh. Rajiva Kumar, Dy. D.G.F.T 306, U.B. 23061562  Ext. 388 DGFT 6. Sh. B.K. Sachdeva, FTDO 404, U.B. 23061562 Ext.265 DGFT   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon were as under: ­ 1

Case No.:31/30/80­ALC2/2008

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/01161/AM09/ RLA File :09/24/040/00467/AM08/ Lic.No/Date:0910035538 07.10.2008   Decision  :  As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.3(6)/010­TSW(B)/530    dated 28.10.10, the committee decided to ratify the norms in respect of the subject advance  authorization  as under:­ Export The description of Export product  amended as under:­   1. Steam drum­1 no 2. Super Heater tube Bank­3nos­29.499 MT 3. Economiser­ 4 nos­49.262MT 4. Deareator­ 2 nos 5. Feed water tank­ 1no 6. Blow down tank­1 no 7. Fabricated spares for item no 5 &6 of export­1 lot 8. Evaporator­4 nos­95 MT The total export weight is 199 MT to be incorporated to the license.   Import   1.        Item no1­  Allowed quantity for import of 35 MT with 2% wastage. 2.        Item no 2­ Allowed quantity for import of  80 MT with 2% wastage. 3.        Item no 3­ Allowed quantity for import of 20 MT with 2% wastage.   The Regional Authority may take necessary action accordingly.  

Case No.:32/30/80­ALC2/2008

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/01162/AM09/ RLA File :09/24/040/00468/AM08/ Lic.No/Date:0910035539 07.10.2008   Decision : As per written comments of DHI vide their U.O. Note No.3(6)10­TSW(B)/531  dated 28.10.10, h i d id d if h i f h bj d h i i d

2 the committee decided to ratify the norms in respect of the subject advance authorization as under:­ Export The description of Export product may be amended as given below 1. Steam drum­1 no 2. Super Heater tube Bank­3nos­ 25.332 MT 3. Economiser­ 4 nos­ 42.896 MT 4. Deareator­ 2 nos 5. Feed water tank­ 1no 6. Blow down tank­1 no 7. Fabricated spares for item no 5 &6 of export­1 lot 8. Evaporator­4 nos ­90 MT The total export weight is 180 MT may be incorporated to the license.   Import 1.        Item no1­ Allowed import of 35 MT with 2% wastage. 2.        Item no 2­ Allowed import of 80 MT with 2% wastage. 3.        Item no 3­Allowed import of 20 MT with 2% wastage.     3

Case No.:28/42/80­ALC2/2008

Party Name:THERMAX LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/01652/AM09/ RLA File :31/21/040/00319/AM09/ Lic.No/Date:3110036852 02.01.2009 Deferred date:11.01.2011 Decision :  The Committee handed over the firm’s reply to the representative of DHI for examination & comments.  The case may be relisted on 11.01.2011.   4

Case No.:14/50/80­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/01812/AM09/ RLA File :09/24/040/00427/AM09/ Lic.No/Date:0910037147 24.02.2009 Deferred date:11.01.2011 Decision  :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The Committee, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   5

Case No.:2/1/80­ALC2/2009

Party Name:TERUMO PENPOL LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/01825/AM09/ RLA File :53/24/040/00012/AM09/ Lic.No/Date:5310007800 16.03.2009 Deferred date:11.01.2011 Decision  :  The  Committee  decided  to  examine  the  case  on  file  and  compare  with  earlier  cases.  The Committee also decided to remind the C&PC for expediting their comments  and to relist the case for 11.01.2011.   6

Case No.:1/7/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00068/AM10/ RLA File :03/95/040/00983/AM09/ Lic.No/Date:0310517989 01.05.2009 Deferred date:11.01.2011 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The  

Case No.:14/14/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred

7 30. . 0 0 HQ File :01/80/050/00184/AM10/ RLA File :61/24/040/00012/AM10/ Lic.No/Date:6110000320 19.06.2009 Deferred date:11.01.2011   8

Case No.:16/17/80­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00239/AM10/ RLA File :03/94/040/00300/AM10/ Lic.No/Date:0310529264 16.07.2009 Deferred date:11.01.2011   9

Case No.:23/21/80­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00305/AM10/ RLA File :03/94/040/00396/AM10/ Lic.No/Date:0310533764 13.08.2009 Deferred date:11.01.2011 Decision  :  The  Committee  observed  that  the  firm  has  not  sent  Annexures  with  their  reply  letter  dated 30.11.2010 to this office calling for certain information. The Committee, therefore, decided to remind the firm to send the Annexures for expediting the said information failing which  their case will be rejected without any further notice. The case will relisted on 11.01.2011.   10

Case No.:2/33/80­ALC2/2009

Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00468/AM10/ RLA File :07/24/040/00258/AM10/ Lic.No/Date:0710067933 30.10.2009 Deferred date:11.01.2011   11

Case No.:2/1/80­ALC2/2010

Party Name:APEX TEST TECHNOLOGIES, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00831/AM10/ RLA File :07/21/040/00797/AM10/ Lic.No/Date:0710069015 21.12.2009 Deferred date:11.01.2011 Decision  :  The  Committee  noted  that  firm’s  reply  has  already  sent  to  DC(MSME).    The  Committee directed a copy of firm’s reply again forward to DC(MSME)  for examination and comments and to relist the case for  11.01.2011.   12

Case No.:18/41/80­ALC2/2009

Party Name:KE­BURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00639/AM10/ RLA File :04/24/040/00247/AM10/ Lic.No/Date:0410110339 22.12.2009 Deferred date:11.01.2011 Decision :The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 11.01.2011.   13

Case No.:11/41/80­ALC2/2009

Party Name:UNITED ENGINEERING (EASTERN)CORPN., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00632/AM10/ RLA File :02/24/040/00196/AM10/ Lic.No/Date:0210135971 01.01.2010 Deferred date:11.01.2011 Decision : The Committee observed that the firm’s reply vide their letter dated 26.04.2010  is incomplete.  The Committee therefore decided to remind the firm finally to furnish their reply completed with 10 days

The Committee, therefore, decided to remind the firm finally to furnish their reply completed with 10 days failing which their case will be rejected without any further notice and to re­list the case for 11.01.2011.   14

Case No.:12/47/80­ALC2/2009 Party Name:RAINA

ENGINEERS Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00731/AM10/ RLA File :03/95/040/00641/AM10/ Lic.No/Date:0310553727 05.01.2010 Defer Date:11.01.201128.09.2010 Decision : The Committee noted that the firm has sought time for submission of reply within 2­3 weeks. The Committee, therefore, decided to defer the case and to relist  the case for   27.01.11.   15

Case No.:16/42/80­ALC2/2009

Party Name:KOMET PRECISION TOOLS INDIA PVT LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00662/AM10/ RLA File :07/24/040/00381/AM10/ Lic.No/Date:0710069369 11.01.2010 Deferred date:11.01.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   16

Case No.:10/49/80­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00779/AM10/ RLA File :02/24/040/00176/AM10/ Lic.No/Date:0210136339 11.01.2010   Decision : The Committee noted that the comments of DHI, wherein DHI  has not recommended the case since export & import items are the same in the application.   The Committee members discussed the case in  detail  and  it  was  observed  that  applicant  is  carrying  out  assembling  activity  which  is  a  recognized manufacturing activity.    The value addition proposed in the application is 24.9222%.   Therefore, the Committee decided to ratify the norms in respect of the subject advance authorization  as applied for.      Regional Authority may take necessary action accordingly.   17

Case No.:4/16/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00245/AM11/ RLA File :03/95/040/00712/AM10/ Lic.No/Date:0310557677 29.01.2010 Deferred date:11.01.2011 Decision : The representative of the DIPP informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   18

Case No.:13/51/80­ALC2/2009

Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00804/AM10/ RLA File :34/24/040/00189/AM10/ Lic.No/Date:3410026224 02.02.2010 Deferred date:11.01.2011 Decision :The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   19

Case No.:4/49/80­ALC2/2009

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00773/AM10/ RLA File :09/24/040/00458/AM10/ Lic.No/Date:0910040992 18 02 2010 Deferred d 11 01 2011

18.02.2010 date:11.01.2011 Decision : The representative of the DHI informed the Committee that the case is under study.  The ALC, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   20

Case No.:25/51/80­ALC2/2009

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00816/AM10/ RLA File :05/23/040/00188/AM10/ Lic.No/Date:0510259390 24.02.2010 Deferred date:11.01.2011 Decision : The Committee directed to forward a copy of firm’s request dated 22.11.2010 to DIT as the firm have reduced quantity of import for examination and their comments.  The case may be relisted on 11.01.2011.   21

Case No.:23/51/80­ALC2/2009

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00814/AM10/ RLA File :05/23/040/00179/AM10/ Lic.No/Date:0510259450 25.02.2010 Deferred date:11.01.2011 Decision :  The Committee observed that the comments called for from Ministry of Mines are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 11.01.2011.   22

Case No.:14/11/80­ALC2/2010

Party Name:CORE METAL KRAFTS LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00160/AM11/ RLA File :22/24/040/00056/AM10/ Lic.No/Date:2210009813 25.03.2010 Deferred date:11.01.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   23

Case No.:21/29/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00456/AM11/ RLA File :11/24/040/00050/AM10/ Lic.No/Date:1110022130 29.03.2010 Deferred date:11.01.2011 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on  11.01.2011: ­   1.      Information in respect of Sl.No.5 of the Standard Deficiency Format export product wise. 2.      Information in respect of S.No.11 of SDL for import item No. 14.   24

Case No.:34/5/80­ALC2/2010

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00067/AM11/ RLA File :05/23/040/00232/AM10/ Lic.No/Date:0510261727 05.04.2010 Deferred date:11.01.2011 Decision : The Committee observed that the comments called for from Ministry of Mines  are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 11.01.2011.  

Case No.:3/5/80­ALC2/2010

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:32/80­ ALC2/2010 Status: Approved

25 30.11.2010 HQ File :01/80/050/00036/AM11/ RLA File :05/24/040/00500/AM10/ Lic.No/Date:0510262366 13.04.2010   Decision  :  As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.3(34)09­TSW(B)/523    dated 19.10.10, the committee decided to ratify the norms in respect of the subject advance  authorization  as under:­   Export The total Export weight of 47.7 MT  incorporated in the license. Import The import of item consists of perforated deck plates, Spring & sealing.  Import items allowed as under:­ 1. Item no 1 ­ Weight of 3360 kg as applied for. 2. Item no 2,3& 6 ­ As applied for. 3.  Item no 4 ­ Under GN­4. 4. Item no 5­ With in 0.5 % of fob value of export.   The Regional Authority may take necessary action accordingly   26

Case No.:5/5/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00038/AM11/ RLA File :34/24/040/00096/AM10/ Lic.No/Date:3410026835 16.04.2010   Decision : As per written comments of C&PC  vide their O.M.  No. 46011/55/2010­PC.II dated 25.10.10, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   Item to be exported Quantity Micro  Irrigation  Equipments  (Emmiting  Pipe Systems) Streamline 16080 1.49L/H, 0.30 M, 1000 M 1 Meter (Weight 10.24gm+/­2%) Raw material Recommended for Import Quantity

Raw­material Recommended for Import Quantity 1.      HDPE Granules 2.      Master Batch 3.      Emitters (Drippers) 9.602 gm 0.400 gm 3.4 No. (0.442 gm)   Item to be exported Quantity PE Irrigation Pipe 12/12.5 400 M   1 Meter (Weight 35.32gm+/­2%) Raw­material Recommended for Import Quantity 1.      LLDPE Granules 2.      LDPE Granules 3.      Master Batch 26.866 gm 7.117 gm                 1.601 gm   Item to be exported Quantity DRPNET PC 12250 1.6 L/H0.30 M 350m 1 Meter (Weight 25.5gm+/­2%) Raw­material Recommended for Import Quantity 1.      LLDPE Granules 2.      LDPE Granules 3.      HDPE Granules 4.      Master Batch 5.      Emitters Drippers 13.027 gm 4.695 gm.                 4.695 No.  1.059 gm 3.4 No. (2.55 gm)     27

Case No.:15/11/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00161/AM11/ RLA File :34/24/040/00229/AM09/ Lic.No/Date:3410026834 16.04.2010 Deferred date:11.01.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  The on 11.01.2011   28

Case No.:16/11/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00162/AM11/ RLA File :34/24/040/00217/AM09/ Lic.No/Date:3410026833 16.04.2010 Deferred date:11.01.2011 on 11.01.2011   29

Case No.:30/5/80­ALC2/2010

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00063/AM11/ RLA File :05/24/040/00028/AM11/ Lic.No/Date:0510262877 23.04.2010   Decision  :  As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.3(34)09­TSW(B)/522    dated 19.10.10, the ALC decided to ratify the norms in respect of the subject advance authorization as under:­   Export The total Export weight of 16.25 MT  incorporated in the license. Import All import of item except sealing is component are allowed under GN­4. Sealing is consumables & to be

All import of item except sealing is component are allowed under GN 4. Sealing is consumables & to be allowed with in 0.2 % of fob value of export. However total import quantity of  7.3 MT to be incorporated in the license.   The Regional Authority may take necessary action accordingly   30

Case No.:25/5/80­ALC2/2010

Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00058/AM11/ RLA File :31/24/040/00009/AM11/ Lic.No/Date:3110042996 26.04.2010 Deferred date:11.01.2011 Decision : The Committee observed that the firm has submitted incomplete reply vide their letter dated 05.10.10.&  does  not  answer  to  any  query  raised  by  DHI’s  letter  dated  14.07.2010.    The  firm  has mentioned  about  another  two  licenses  which  has  not  yet  been  referred  by  this  office  (DGFT).    The Committee, therefore, decided to remind the firm for expediting the said information as asked by letter dated 14.07.2010 failing which  their case will be rejected without any further notice and the case may be relisted for 11.1.2011.   31

Case No.:17/18/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00270/AM11/ RLA File :34/24/040/00010/AM11/ Lic.No/Date:3410026891 26.04.2010   Decision :  As per earlier written comments of C&PC of vide their O.M.  No. 46011/55/2010­PC.II dated 25.10.10, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   Micro  Irrigation  Equipments  (Emmiting Pipe  Systems),  Dripline  12007  3.00  L/H 0.40M, 350 M 1 Meter (Weight 23.25gm+/­2% Raw­material Recommended for Import Quantity 1. HDPE Granules 2. LDPE Granules 3. LLDPE Granules 4. Master Batch 5. Relevant  Emitters  (Drippers) Hypertyphoon 5.763 gm 4.610 gm 11.687 gm 0.991 gm 2.55 No. (0.663gm)       32

Case No.:41/5/80­ALC2/2010

Party Name:KINECO PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00074/AM11/ RLA File :17/24/040/00055/AM10/ Lic.No/Date:1710003301 28.04.2010 Deferred date:11.01.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.01.2011.  

Case No.:14/9/80­ALC2/2010

Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:32/80­ ALC2/2010 Status: Deferred

33 30.11.2010 HQ File :01/80/050/00127/AM11/ RLA File :11/24/040/00002/AM11/ Lic.No/Date:1110022305 30.04.2010 Deferred date:11.01.2011 Decision  :  The  Committee  directed  to  forward  a  copy  of  firm’s  reply  to  DIPP  for  examination  and comments and to relist the case for  11.01.2011.   34

Case No.:21/11/80­ALC2/2010

Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00167/AM11/ RLA File :05/23/040/00006/AM11/ Lic.No/Date:0510264179 12.05.2010 Deferred date:11.01.2011 on 11.01.2011.   35

Case No.:22/11/80­ALC2/2010

Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00168/AM11/ RLA File :07/24/040/00033/AM11/ Lic.No/Date:0710071546 14.05.2010 Deferred date:11.01.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   36

Case No.:3/9/80­ALC2/2010

Party Name:MASTER HANDLERS PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00116/AM11/ RLA File :31/21/040/00059/AM11/ Lic.No/Date:3110043269 18.05.2010   Decision :  The representative of the DHI present in the meeting, the committee decided to ratify the norms in respect of the subject advance authorization as per GN­4 under accountability clause.   Regional Authority may take necessary action accordingly.   37

Case No.:5/9/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00118/AM11/ RLA File :03/95/040/00101/AM11/ Lic.No/Date:0310574966 19.05.2010   Decision :  The Committee noted  that firm has requested vide their letter dated 06.10.10 for amendment in  items  of  import.  Some  additional  items  have  been  added  &  some  have  been  deleted.  Quantities  of import of some of the items have also been changed.  As per written comments of DHI  vide their U.O. Note No.3(64)10­TSW(B)  dated 29.11.10, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export The description of export product to be amended as follows: Export product 1­ Pressure parts consisting of two numbers each of furnace, super heater, Reheater & economiser.  The total export weight is 14679.6 MT. Export product 2­ “Piping System” of total export weight 2620.7 MT. Export Product 3 12 numbers of Pulveriser mill

Export Product 3­ 12 numbers of Pulveriser mill Import The following import items are allowed:­ 1. Item no 1­ Quantity of  3168.32 MT of CS seamless pipes. 2. Item no 2­ Quantity of  8089.81 MT of AS seamless pipes. 3. Item no 3­ Quantity of 460.494 MT of plates with wastage of 4.96 % as applied for. 4. Item  no  4­  Quantity  of  20  MT  castings  with  out  any  wastage  as  applied  for.  However  word “Finished” to be prefixed to the description. 5.  Item no 5­ Quantity  for  import  of    251.882  MT  forgings  with  out  any  wastage  as  applied  for. However word “Finished” may be prefixed to the description. 6. Item no 6­ Quantity of 166.98 MT pipe fittings with out any wastage applied for. 7. Item no 7­ Quantity of  2368.13 MT of pipes/pipe bend length. 8. Item no 8­ Quantity of 296.98 MT pipe fittings with out any wastage as applied for. 9. Item no 9­ Quantity of 99.016 MT of AS seamless pipes. 10. Item no 10­ Quantity of  26.34 MT of tubes. 11. Item no 11­ Quantity of  5358 kg of tubes. 12. Item no 12,13 & 15 ­ Deleted as requested by the firm. 13. Item no 14& 16 ­ Under GN­4 as items are components. 14. Item no 17 to 32­ These are welding material. Quantity of  total 219.65 MT i.e.   around 1.2% of the export product weight as applied for.       38

Case No.:13/15/80­ALC2/2010

Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00220/AM11/ RLA File :11/24/040/00001/AM11/ Lic.No/Date:1110022429 19.05.2010 Deferred date:11.01.2011 Decision  :  The  Committee  directed  to  forward  a  copy  of  firm’s  reply  to  DIPP  for  examination  and comments and to relist the case for  11.01.2011.     39

Case No.:21/22/80­ALC2/2010

Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00332/AM11/ RLA File :09/24/040/00056/AM11/ Lic.No/Date:0910042150 26.05.2010   Decision : As per written comments of DIPP vide their U.O. Note  dated 30.11.10, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Words “1 set comprising of 24 Heating modules” to be suffixed with the description of export product. 2.      Net Weight of export product to be specified as 12540 Kgs. 3.      Quantities of import items from Sl. Nos. 1 to 22 to be allowed on net to net basis as claimed by the firm. 4.      Import of components with accountability clause.   

40

Case No.:6/11/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00152/AM11/ RLA File :04/24/040/00033/AM11/ Lic.No/Date:0410114086 28.05.2010 Deferred date:11.01.2011 Decision  :  The  Committee  directed  to  forward  a  copy  of  firm’s  reply  to  DHI  for  examination  and comments and to relist the case for  11.01.2011.   41

Case No.:7/11/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00153/AM11/ RLA File :31/24/040/00031/AM11/ Lic.No/Date:3110043398 28.05.2010 Deferred date:11.01.2011 Decision :  The Committee observed that the firm’s reply is not sufficient and furnished incomplete reply calling for certain information by this office. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice and to relist the case for 11.01.2011.   42

Case No.:19/18/80­ALC2/2010

Party Name:STARION INDIA P.LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00272/AM11/ RLA File :31/24/040/00028/AM11/ Lic.No/Date:3110043412 31.05.2010 Deferred date:11.01.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received.  The ALC,  therefore,  decided  to  remind  them  for  expediting  their  comments.  The  case  may  be  re­listed  on 11.01.2011.   43

Case No.:38/18/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00291/AM11/ RLA File :04/24/040/00018/AM11/ Lic.No/Date:0410114141 31.05.2010 Deferred date:11.01.2011   44

Case No.:11/11/80­ALC2/2010

Party Name:UNITED DRILLING TOOLS LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00157/AM11/ RLA File :05/24/040/00073/AM11/ Lic.No/Date:0510265196 01.06.2010 Deferred date:11.01.2011 Decision : The representative of the DHI informed the Committee that the case is under study.  The ALC, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   45

Case No.:8/11/81­ALC2/2010

Party Name:AUTO COMP INDIA PVT. LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/81/050/00053/AM11/ RLA File :31/24/040/00035/AM11/ Lic.No/Date:3110043464 02.06.2010 Deferred date:11.01.2011 Decision : The representative of the DHI informed the Committee that the case is under study.  The ALC, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   46

Case No.:27/11/80­ALC2/2010

Party Name:FREEDOM OPTHALMIC PRIVATE LIMITED, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00173/AM11/ RLA File :04/24/040/00036/AM11/ Lic.No/Date:0410114329 07.06.2010 Deferred date:11.01.2011

on 11.01.2011.   47

Case No.:1/13/80­ALC2/2010

Party Name:KIRLOSKAR TOYODATEXTILE MACHINERY PVT LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Closed HQ File :01/80/050/00177/AM11/ RLA File :07/21/040/00161/AM11/ Lic.No/Date:0710072178 10.06.2010   Decision :  The Committee noted that R.A. has informed that Advance Authorization  issued to the firm for  import  of  component  on  net­to­net  basis  with  accountability  clause  as  per  GN­4.  The  Committee decided to close the case on the part of NC.   The Regional Authority may take note of the NC decision for information.     48

Case No.:4/13/80­ALC2/2010

Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00180/AM11/ RLA File :05/24/040/00100/AM11/ Lic.No/Date:0510266016 14.06.2010 Deferred date:11.01.2011 Decision : The Committee noted that the firm’s application has been sent to DHI on 04.11.2010.    The Committee directed to forward the firm’s application to DIT for examination and comments and to re­list the case for 11.01.2011.     49

Case No.:17/15/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00224/AM11/ RLA File :04/24/040/00053/AM11/ Lic.No/Date:0410114549 14.06.2010 Deferred date:11.01.2011 Decision : The ALC noted that the firm has sought time for submission of reply. The ALC, therefore, decided to remind the firm for expediting the certain information immediately failing which  their case will be rejected without any further delay and to relist the case for   11.01.2011.   50

Case No.:16/13/80­ALC2/2010

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00192/AM11/ RLA File :03/95/040/00212/AM11/ Lic.No/Date:0310578892 15.06.2010 Deferred date:11.01.2011   51

Case No.:17/13/80­ALC2/2010

Party Name:PERFECT ENGG COMPONENTS P LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00193/AM11/ RLA File :05/24/040/00104/AM11/ Lic.No/Date:0510266164 16.06.2010 Deferred date:11.01.2011 Decision : The Committee noted that the firm’s reply has been sent to DHI.  The Committee also directed to forward a copy of  firm’s reply to DC(MSME) for examination and comments and to relist the case for 11.01.2011.  

Case No.:27/13/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:32/80­ ALC2/2010 30 11 2010 Status: Deferred

52 30.11.2010 HQ File :01/80/050/00203/AM11/ RLA File :53/24/040/00009/AM11/ Lic.No/Date:5310010616 17.06.2010 Deferred date:11.01.2011 Decision  :  The  Committee  decided  to  examine  the  case  on  file  and  compare  with  earlier  cases.  The Committee also decided to remind the C&PC for expediting their comments  and to relist the case for 11.01.2011   53

Case No.:15/18/80­ALC2/2010

Party Name:INDUS PRO AUTO ENGINEERS PVT.LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00268/AM11/ RLA File :05/23/040/00054/AM11/ Lic.No/Date:0510266316 17.06.2010 Deferred date:11.01.2011 Decision :The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   54

Case No.:16/18/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00269/AM11/ RLA File :61/24/040/00023/AM11/ Lic.No/Date:6110000459 17.06.2010   Decision : On the basis of recommendation of the representative of the DIPP present in the meeting, the committee decided to ratify the norms in respect of the subject advance authorization as per GN­4 under accountability clause.   Regional Authority may take necessary action accordingly.   55

Case No.:30/18/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00283/AM11/ RLA File :07/24/040/00080/AM11/ Lic.No/Date:0710072309 17.06.2010 Deferred date:11.01.2011 Decision : The Committee directed to forward the firm’s reply to DIT for examination and comments and to re­list the case for 11.01.2011.   56

Case No.:21/13/80­ALC2/2010

Party Name:WHIRLPOOL OF INDIA LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00197/AM11/ RLA File :05/24/040/00069/AM11/ Lic.No/Date:0510266400 18.06.2010   after taking clue from SION C­1995 to ratify the norms in respect of the subject advance authorization as under:­   1.      Import items from S.No.1 to 4 to be allowed on net to net basis with accountability clause. 2        Import items from S.Nos. 5 to 9 to be allowed on net to net basis as applied for by the firm.    

Case No.:22/13/80­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00198/AM11/ RLA File :03/95/040/00112/AM11/ Lic.No/Date:0310579480 18.06.2010   to  ratify  the  norms  on  repeat  basis  as  per  Advance  Authorization  No.  0310579480  dated  17.12.2009

57 y p p ratified in NC Meeting No. 26/80 dated 28.09.2010 after taking clue from SION at Sl. No. C­548 for Engineering Products in respect of the subject advance authorization as under:­   1.      Total net of export products  to be specified as 78428 Kgs. 2.      Word “Relevant” to be prefixed with the description of import items at S. Nos. 1, 3, 6  & 7. 3.      Quantity of import item S.No. 1  allowed as 5120 Kgs.on net to net basis as claimed by the firm. 4.      Weights of 19978 Kgs. and 5708 Kgs. to  be specified with the quantities of import items at Sl. No. 2 & 8 respectively and the same may be allowed on net to net basis. 5.      Words “ GP Sheet 0.75 mm to 1.25 mm thk.” to be added with the description of import item at Sl. No. 6. 6.      Quantities of import items  S.Nos. 3, 6, 7, 9 & 11  allowed as applied for on net to net basis as claimed by the firm. 7.      Quantity of each import item S.No. 4 & 10   allowed upto 0.5 % of FOB value of exports. 8.      Quantity of import item  S.No. 5 as applied for. 9.      Quantity of import item  S.No. 12 as per packing policy. 10.  Quantities of import items  S.No. 13 & 14 on net to net basis.       11.  Import of components with accountability clause.     58

Case No.:14/18/80­ALC2/2010

Party Name:AUXEIN MEDICAL Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00267/AM11/ RLA File :05/23/040/00062/AM11/ Lic.No/Date:0510266901 24.06.2010   to ratify the norms of Quantity of import item  in respect of the subject advance authorization as 745 Kgs. inclusive of 10 % wastage.     59

Case No.:28/15/80­ALC2/2010

Party Name:SHRIRAM PISTONS & RINGS LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00235/AM11/ RLA File :05/24/040/00067/AM11/ Lic.No/Date:0510267170 30.06.2010 Deferred date:11.01.2011 Decision :  The representative of the DHI informed the Committee that the case is under study.  The ALC, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   60

Case No.:40/18/80­ALC2/2010

Party Name:BOYSEN INDIA LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00293/AM11/ RLA File :05/23/040/00077/AM11/ Lic.No/Date:0510267549 05.07.2010   Decision :  As  per  written  comments  of  DHI  of  vide  their  U.O.  Note  No.3(67)10­TSW(B)/546    dated 04.04.10, the ALC decided to ratify the norms in respect of the subject advance authorization as under:­   Sl no Export item Quantity  in No Weight  per  pc in kg Total Quantity in kg 1 Automotive  Exhaust Systems Part no 31.4­05338.53 1,02,550 0.215 22048.25 2 outer  pipe  right  part  no 35.4­05338.51 51,275 0.165 8,460.375 3 outer pipe left part no 51,275 0.145 7434.875

60 3 outer  pipe  left  part  no 35.4­05338.52 51,275 0.145 7434.875 4 outer pipe II part no 35.4­ 05338.70 1,36,020 0.325 44,206.5   The description of export product quantity of export as mentioned above to be incorporated in the licence. The firm is importing pipes as cut to sizes. The manufacturing process involves bending, flaring, punching and cutting. There is very little loss in the process. The Committee approved 2% wastage on the items. The quantity of import is as given below.   Sl no Import item Total  Quantity  in  kg (Approved) 1 Stainless Steel tube Part no 31.4­05338. 70 (for EP­4) 45,091 2 Stainless Steel tube Part no 31.4­05338.98 (for EP­1 to 3) 38703   The Regional Authority may take necessary action accordingly   61

Case No.:43/18/80­ALC2/2010

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00296/AM11/ RLA File :05/23/040/00091/AM11/ Lic.No/Date:0510267552 05.07.2010 Deferred date:11.01.2011 Decision  :  The  representative  of  the  DHI  informed  the  ALC  that  the  case  is  under  study.    The  ALC, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   62

Case No.:42/18/80­ALC2/2010

INDIA PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00295/AM11/ RLA File :05/23/040/00092/AM11/ Lic.No/Date:0510267568 06.07.2010 Deferred date:11.01.2011 Decision :  The  representative  of  the  DHI  informed  the  ALC  that  the  case  is  under  study.    The  ALC, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   63

Case No.:45/18/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00298/AM11/ RLA File :06/24/040/00018/AM11/ Lic.No/Date:0610018429 07.07.2010 Deferred date:11.01.2011 Decision : The Committee observed that the comments called for from Ministry of Defence (Production), Under Sectary (E.PC) Section,  are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 11.01.2011.   64

Case No.:47/18/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00300/AM11/ RLA File :06/24/040/00017/AM11/ Lic.No/Date:0610018428 07.07.2010 Deferred date:11.01.2011 Decision : The Committee observed that the comments called for from Ministry of Defence (Production), Under Sectary (E.PC) Section,  are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 11.01.2011.  

Case No.:1/16/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00242/AM11/ RLA File :09/24/040/00114/AM11/ Lic.No/Date:0910042665 08.07.2010 Deferred date:11.01.2011

65 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by the  ALC  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on  11.01.2011: ­           1. Information in respect of Sl.No.4,5,9 & 11  of the Standard Deficiency Format.         2.  Specification of item of export.         3. Steam turbine and generator are two different items.  Items proposed for import may be given separately( Sl No. 6 of SDL),         4. Input Weight of each casting/ forging and corresponding finished weight         5. Use of each item of import.         6.Total CIF value of the insulators proposed for import.   66

Case No.:46/18/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00299/AM11/ RLA File :04/24/040/00044/AM11/ Lic.No/Date:0410115366 08.07.2010   Decision : As per written comments of ALC vide their U.O. Note  dated 30.11.10, the ALC decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Description of Export product  modified as  “ Elevator/lifts              Model No. C­MONO­GREEN PW26/10­19­ Quantity 2 Nos.,                                                          Model No. C­MONO­GREEN PW08/10­19­ Quantity 4 No. &                    Model No.  C­MONO­GREEN PW13/10­19­ Quantity 4 Nos.” 2.      Word “relevant” to be prefixed with the description of import items at Sl. Nos. 13,14, 44 &45. 3.      Quantity of import item  Sl. No. 53  reduced to 6 Nos. 4.      Import items from S.No.1 to 54  allowed on ALC basis with accountability clause     67

Case No.:2/16/80­ALC2/2010

Party Name:M M AQUA TECHNOLOGIES LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00243/AM11/ RLA File :05/24/040/00084/AM11/ Lic.No/Date:0510267884 09.07.2010 Deferred date:11.01.2011 Decision :    The Committee  decided  to  examine  the  case  on  file  and  compare  with  earlier  cases.  The Committee also decided to remind the C&PC for expediting their comments  and to relist the case for 11.01.2011.   68

Case No.:3/16/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00244/AM11/ RLA File :06/24/040/00020/AM11/ Lic.No/Date:0610018454 09.07.2010 Deferred date:11.01.2011 on 11.01.2011.   69

Case No.:1/18/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00254/AM11/ RLA File :05/24/040/00126/AM11/ Lic.No/Date:0510267954 12.07.2010 Deferred date:11.01.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, it was decided by 11.01.2011: ­   1 Information in respect of Sl No 3 4 5 11 & 13 of the Standard Deficiency Format

1. Information in respect of Sl.No.3,4,5.11 & 13 of the Standard Deficiency Format.   70

Case No.:9/18/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00262/AM11/ RLA File :03/95/040/00155/AM11/ Lic.No/Date:0310583268 13.07.2010   to ratify the norms in respect of the subject advance authorization as under:­   1.      Total net empty weight of 791.5 MT to be specified with the quantities of export products from Sl .No 1 to 6. 2.      Quantities of import items  S.Nos. 1  & 2  of 1.05 Kgs/Kg content in the export products. 3.      Weights of 186.63 MT, 16.596 MT, 1.5 MT & 0.6 MT  to be specified with the quantities of import items at S.Nos., 3, 6, 7 & 8  respectively on net to net basis. 4.      Weights of 176.26 MT & 2.44 MT to be specified with the quantities of import items at S.Nos., 4 & 5  respectively inclusive of 2% wastage. 5.      Import item  Sl. No. 8   supplied with the export product. 6.      Import item Sl. No. 9 deleted as no details submitted by the firm  for overlay. 7.      Quantities of import items at S.Nos. 10, 11 & 12 of 7000 Kgs., 4868 Kgs. & 4868 Kgs. respectively 8.           Import  items  at  Sl.  Nos.  1,  2,  4  &  5    will  be  of  relevant  grade  and  size(i.e.  thickness/dia) as contained in the export products. 9.      Import of components with accountability clause.     71

Case No.:52/18/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00305/AM11/ RLA File :53/24/040/00011/AM11/ Lic.No/Date:5310010998 13.07.2010 Deferred date:11.01.2011 Decision  :  The  Committee  decided  to  examine  the  case  on  file  and  compare  with  earlier  cases.  The Committee also decided to remind the C&PC for expediting their comments  and to relist the case for 11.01.2011.   72

Case No.:21/18/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00274/AM11/ RLA File :61/24/040/00029/AM11/ Lic.No/Date:6110000472 15.07.2010 Deferred date:11.01.2011 Decision  :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The   73

Case No.:53/18/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00306/AM11/ RLA File :09/24/040/00133/AM11/ Lic.No/Date:0910042746 20.07.2010 Deferred date:11.01.2011 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by 11.01.2011: ­   1. Information in respect of Sl.No.11 of the Standard Deficiency Format.  

Case No.:54/18/80­ALC2/2010

Party Name:THERMAL SYSTEMS Meet No/Date:32/80­ Status:

74

Case No.:54/18/80 ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:32/80 ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00307/AM11/ RLA File :09/24/040/00138/AM11/ Lic.No/Date:0910042748 20.07.2010 Deferred date:11.01.2011 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by 11.01.2011: ­   1. Information in respect of Sl.No.11 of the Standard Deficiency Format.   75

Case No.:55/18/80­ALC2/2010

Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00308/AM11/ RLA File :09/24/040/00130/AM11/ Lic.No/Date:0910042767 20.07.2010 Deferred date:11.01.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, it was decided by 11.01.2011: ­   1.      Information in respect of Sl.No.3 & 11 of the Standard Deficiency Format. 2.      Detailed calculations/basis for the quantities of import items    76

Case No.:1/29/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00436/AM11/ RLA File :09/24/040/00140/AM11/ Lic.No/Date:0910042747 20.07.2010 Deferred date:11.01.2011 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by 11.01.2011: ­   1. Information in respect of Sl.No.11 of the Standard Deficiency Format.   77

Case No.:33/18/80­ALC2/2010

Party Name:LUBI SUBMERSIBLES LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00286/AM11/ RLA File :08/24/040/00084/AM11/ Lic.No/Date:0810090670 21.07.2010   to ratify the norms in respect of the subject advance authorization as under:­   1.      Net weight of export products  Sl. Nos. 1, 2 and 3  specified as 18940 Kgs., 227502 Kgs and 31075 Kgs respectively (Total net export weight 277517 Kgs.) 2.      Word “relevant” to be prefixed with the descriptions of import items at S.Nos. 1 & 2. 3.      Quantity of import item Sl. No. 1 of  52611.6 Kgs. inclusive of 31 % wastage as applied for. 4.      Quantity of import item  Sl. No. 2  of 335200 Kgs. inclusive of 64 % wastage after taking 1/3rd recovery.    

Case No.:29/22/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00340/AM11/ RLA File :06/24/040/00022/AM11/ Lic No/Date:0610018565 Deferred

78 HQ File :01/80/050/00340/AM11/ RLA File :06/24/040/00022/AM11/ Lic.No/Date:0610018565 21.07.2010 Deferred date:11.01.2011 Decision : The Committee observed that the comments called for from Ministry of Defence (Production), Under Sectary (E.PC) Section,  are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 11.01.2011.   79

Case No.:30/22/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00341/AM11/ RLA File :06/24/040/00023/AM11/ Lic.No/Date:0610018566 21.07.2010 Deferred date:11.01.2011 Decision : The ALC observed that the comments called for from Ministry of Defence (Production), Under Sectary  (E.PC)  Section,    are  yet  to  be  received.    The  ALC,  therefore,  decided  to  remind  them  for expediting their comments. The case may be re­listed on 11.01.2011.   80

Case No.:37/18/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00290/AM11/ RLA File :03/95/040/00200/AM11/ Lic.No/Date:0310584600 22.07.2010 Deferred date:11.01.2011   81

Case No.:50/18/80­ALC2/2010

Party Name:APEX TEST TECHNOLOGIES, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00303/AM11/ RLA File :07/24/040/00083/AM11/ Lic.No/Date:0710073162 26.07.2010 Deferred date:11.01.2011 on 11.01.2011.     82

Case No.:23/22/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00334/AM11/ RLA File :07/24/040/00133/AM11/ Lic.No/Date:0710073218 27.07.2010 Deferred date:11.01.2011 on 11.01.2011.   83

Case No.:27/22/80­ALC2/2010

Party Name:THE TATA POWER COMPANY LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00338/AM11/ RLA File :07/24/040/00140/AM11/ Lic.No/Date:0710073216 27.07.2010 Deferred date:11.01.2011 on 11.01.2011.   84

Case No.:8/21/81­ALC2/2010

Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/81/050/00123/AM11/ RLA File :05/24/040/00172/AM11/ Lic.No/Date:0510270168 Deferred

84 HQ File :01/81/050/00123/AM11/ RLA File :05/24/040/00172/AM11/ Lic.No/Date:0510270168 10.08.2010 Deferred date:11.01.2011 Decision : The Committee noted that the firm’s application has been received by DIT on 04.11.2010 for examination & comments.  The case may be relisted on 11.01.2011.   85

Case No.:4/22/80­ALC2/2010

Party Name:SUFFUSUS POLYMER PRIVATE LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00315/AM11/ RLA File :02/24/040/00083/AM11/ Lic.No/Date:0210146259 11.08.2010 Deferred date:11.01.2011 on 11.01.2011.   86

Case No.:7/22/80­

ALC2/2010 Party Name:BANGALORE BIOTECH LABS PVT LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00318/AM11/ RLA File :07/24/040/00143/AM11/ Lic.No/Date:0710073561 11.08.2010   to ratify the norms in respect of the subject advance authorization as under:­   1.  Word “relevant” to be prefixed with the descriptions of import items from S.Nos. 142 to 155, 178 to 180. 2.  Import items at S.No. 83, 87 & 109 to not be allowed as the same already deleted   from  the Advance Authorisation.  3.  Rest of the import items from Sl. Nos. 1 to 82, 84 to 86, 88 to108 & 110 to 180 allowed on net to net basis. 4.  Import of components allowed with accountability clause.   87

Case No.:5/22/80­ALC2/2010

Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00316/AM11/ RLA File :04/24/040/00116/AM11/ Lic.No/Date:0410116212 12.08.2010   to ratify the norms in respect of the subject advance authorization as under:­   1.      Total net empty weight of export products to be specified as  735 MT. . 2.      Word “relevant”  to  be prefixed with the descriptions of import items at S. Nos. 1 & 2. 3.      Quantity of import  item Sl. No. 1 allowed as 1.03 Kgs./kg. content in the export product. 4.      Quantity of import  item Sl. No. 2  allowed as 117423 Kgs. inclusive of a wastage of 3 %. 5.      Weights of 33 MT. & 3 MT to be specified with the quantities of import items at S.No. 3 & 5 respectively and the same to be allowed on net to net basis with accountability clause. 6.      Quantity of import item S.No. 4  allowed on net to net basis with accountability clause.     88

Case No.:9/22/80­ALC2/2010

Party Name:BANGALORE BIOTECH LABS PVT LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00320/AM11/ RLA File :07/21/040/00317/AM11/ Lic.No/Date:0710073574 12.08.2010   Decision  :  On  the  recommendation  of  the  representative  of  the  DIPP  present  in  the  meeting,  the committee decided to ratify the norms in respect of the subject advance authorization as per GN­4.   Regional Authority may take necessary action accordingly

Regional Authority may take necessary action accordingly.     89

Case No.:11/22/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:28/80­ ALC2/2010 12.10.2010 Status: Deferred HQ File :01/80/050/00322/AM11/ RLA File :34/24/040/00062/AM11/ Lic.No/Date:3410027689 12.08.2010 Defer Date:11.01.2011 on 11.01.2011.   90

Case No.:38/22/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00349/AM11/ RLA File :31/24/040/00077/AM11/ Lic.No/Date:3110044345 16.08.2010 Deferred date:11.01.2011 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by 11.01.2011: ­   1.      Information in respect of Sl.No.5 of the Standard Deficiency Format. 2.      Export quantity in number.   91

Case No.:37/22/80­ALC2/2010

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00348/AM11/ RLA File :05/24/040/00181/AM11/ Lic.No/Date:0510270714 17.08.2010 Deferred date:11.01.2011 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by 11.01.2011: ­   1.      Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format Export Product wise 2.      Sample of each export product. 3.      The strip lay out, pitch of blanking with calculation along with dimensions of the key blank.   92

Case No.:42/22/80­ALC2/2010

Party Name:POLY MEDICURE LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00353/AM11/ RLA File :05/24/040/00188/AM11/ Lic.No/Date:0510270734 17.08.2010 Deferred date:11.01.2011 on 11.01.2011.   93

Case No.:43/22/80­ALC2/2010

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00354/AM11/ RLA File :07/24/040/00166/AM11/ Lic.No/Date:0710073648 17.08.2010 Deferred date:11.01.2011 Decision : The Committee noted that the firm’s application has been sent to DHI. The Committee directed to forward a copy of firm’s application to DIPP for examination and comments.  The case may be re­listed on 11.01.2011.

94

Case No.:53/22/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00364/AM11/ RLA File :53/24/040/00013/AM11/ Lic.No/Date:5310011230 17.08.2010 Deferred date:11.01.2011 Decision : The ALC decided to examine the case on file and compare with earlier cases. The ALC also decided to remind the C&PC for expediting their comments  and to relist the case for 11.01.2011.   95

Case No.:46/22/80­ALC2/2010

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00357/AM11/ RLA File :05/24/040/00178/AM11/ Lic.No/Date:0510270834 18.08.2010 Deferred date:11.01.2011 on 11.01.2011.   96

Case No.:47/22/80­ALC2/2010

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00358/AM11/ RLA File :05/24/040/00182/AM11/ Lic.No/Date:0510270937 19.08.2010 Deferred date:11.01.2011 on 11.01.2011.   97

Case No.:49/22/80­ALC2/2010

Party Name:MANATEC ELECTRONICS PRIVATE LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Closed HQ File :01/80/050/00360/AM11/ RLA File :25/24/040/00006/AM11/ Lic.No/Date:2510002952 19.08.2010   Decision :  The Committee noted that R.A. has informed vide their letter dated 1.10.2010 that Advance Authorization was issued to the firm under para 4.7.1. of H.B.P. 2009­2014 so the hard copies has not been forwarded. The Committee decided to close the case on the part of NC.   The Regional Authority may take note of the NC decision for information.   98

Case No.:55/22/80­ALC2/2010

Party Name:ENDRESS AND HAUSER (INDIA) AUTOMATION INSTRU­ Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00366/AM11/ RLA File :03/94/040/00462/AM11/ Lic.No/Date:0310588660 19.08.2010 Deferred date:11.01.2011 on 11.01.2011.   99

Case No.:51/22/80­ALC2/2010

Party Name:PURVA OVERSEAS Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00362/AM11/ RLA File :13/24/040/00018/AM11/ Lic.No/Date:1310033038 20.08.2010 Deferred date:11.01.2011  

Case No.:52/22/80­ALC2/2010

Party Name:VIJAY RAJ POULTRY Meet No/Date:32/80­ Status:

100

Case No.:52/22/80 ALC2/2010

Party Name:VIJAY RAJ POULTRY EQUIPMENTS PVT. LTD., Meet No/Date:32/80 ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00363/AM11/ RLA File :09/24/040/00183/AM11/ Lic.No/Date:0910043152 20.08.2010 Deferred date:11.01.2011 Decision : The Committee observed that the firm has not replied to this office letter dated 3rd Nov., 2011 calling for certain information The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further delay and to re­list the case on  11.01.2011.   101

Case No.:60/22/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00371/AM11/ RLA File :04/24/040/00111/AM11/ Lic.No/Date:0410116559 24.08.2010 Deferred date:11.01.2011 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by 11.01.2011: ­   1.      Information in respect of Sl.No.4,5,9 & 11 of the Standard Deficiency Format. 2.      The details of the Accessories to be exported with quantity in number with details of imported items required for the manufacture of the same. 3.      Use of each component proposed for import in the manufacture of export product. 4.           Input Weight  of  each  casting/  forging  and  corresponding  finished  weight  separately  and quantities of import may be given in both weight and numbers. 5.      Length and weight of different types of pipes like seamless, welded pipes separately for each type of steel types like carbon steel and alloy steel.   102

Case No.:9/24/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00381/AM11/ RLA File :06/24/040/00029/AM11/ Lic.No/Date:0610018941 31.08.2010 Deferred date:11.01.2011 Decision  :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The   103

Case No.:19/29/80­ALC2/2010

Party Name:INTERNATIONAL COIL LIMITED, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00454/AM11/ RLA File :05/23/040/00141/AM11/ Lic.No/Date:0510271769 31.08.2010 Deferred date:11.01.2011 Decision  :  The  Committee  directed  to  forward  a  copy  of  firm’s  application  again  to  DC(MSME)  for examination and comments.  The case may be re­listed on 11.01.2011.   104

Case No.:13/29/80­ALC2/2010

INDIA PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00448/AM11/ RLA File :05/23/040/00152/AM11/ Lic.No/Date:0510272028 01.09.2010 Deferred date:11.01.2011 Decision : The representative of the DHI informed the Committee that the case is under study.  The ALC, therefore, decided to defer the consideration and to relist the case on 11.01.2011.  

Case No.:16/29/80­ALC2/2010

INDIA PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred

105 HQ File :01/80/050/00451/AM11/ RLA File :05/23/040/00153/AM11/ Lic.No/Date:0510272029 01.09.2010 Deferred date:11.01.2011 Decision :The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The   106

Case No.:17/29/80­ALC2/2010

INDIA PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00452/AM11/ RLA File :05/23/040/00151/AM11/ Lic.No/Date:0510272027 01.09.2010 Deferred date:11.01.2011   107

Case No.:20/29/80­ALC2/2010

Party Name:ECOCAT INDIA PVT.LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00455/AM11/ RLA File :05/23/040/00149/AM11/ Lic.No/Date:0510271909 01.09.2010 Deferred date:11.01.2011 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by 11.01.2011: ­   1.      Information in respect of Sl.No.3,4,5,8 & 11 of the Standard Deficiency Format.   108

Case No.:32/29/80­ALC2/2010

Party Name:XYTEL INDIA PVT.LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00467/AM11/ RLA File :31/24/040/00108/AM11/ Lic.No/Date:3110044548 01.09.2010 Deferred date:11.01.2011 Decision : The Committee directed to forward a copy of firm’s application to DIPP for examination and comments.  The case may be re­listed on 11.01.2011.   109

Case No.:12/29/80­ALC2/2010

INDIA PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00447/AM11/ RLA File :05/23/040/00156/AM11/ Lic.No/Date:0510272116 06.09.2010 Deferred date:11.01.2011   110

Case No.:14/29/80­ALC2/2010

INDIA PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00449/AM11/ RLA File :05/23/040/00154/AM11/ Lic.No/Date:0510272109 06.09.2010 Deferred date:11.01.2011   111

Case No.:15/29/80­ALC2/2010

INDIA PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00450/AM11/ RLA File :05/23/040/00155/AM11/ Lic.No/Date:0510272113 06.09.2010 Deferred date:11.01.2011

112

Case No.:22/29/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00457/AM11/ RLA File :07/24/040/00215/AM11/ Lic.No/Date:0710074064 06.09.2010 Deferred date:11.01.2011 Decision : The Committee noted that the firm application has been sent to DIT  for examination  and comments.    The  Committee,  therefore,  decided  to  defer  the  consideration  and  to  relist  the  case  on 11.01.2011.   113

Case No.:25/29/80­ALC2/2010

Party Name:DYNAMATIC TECHNOLOGIES LIMITED, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00460/AM11/ RLA File :07/24/040/00189/AM11/ Lic.No/Date:0710074081 06.09.2010 Deferred date:11.01.2011 Decision :  DGCA has replied vide their letter dated 12.11.2010 that the firm is not approved by DGCA and therefore they can not grant NOC/permission to import the subject Items.         The  Committee, therefore,  decided to forward a copy of firm’s application to DIPP for examination and comments.  The case may be relisted on 11.01.2011.   114

Case No.:26/29/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00461/AM11/ RLA File :07/21/040/00429/AM11/ Lic.No/Date:0710074059 06.09.2010 Deferred date:11.01.2011 Decision : The Committee observed that the comments called for from DHI are yet to be received.  The on 11.01.2011.   115

Case No.:33/29/80­ALC2/2010

Party Name:XYTEL INDIA PVT.LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00468/AM11/ RLA File :31/24/040/00114/AM11/ Lic.No/Date:3110044621 07.09.2010 Deferred date:11.01.2011 Decision : The Committee directed to forward a copy of firm’s application to DIPP for examination and comments.  The case may be re­listed on 11.01.2011.   116

Case No.:19/27/80­ALC2/2010

Party Name:H.L.EQUIPMENTS Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00416/AM11/ RLA File :52/24/040/00016/AM11/ Lic.No/Date:5210031865 08.09.2010 Deferred date:11.01.2011 Decision : On the recommendation of the representative of DC(MSME) present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on  11.01.2011   1.      Process of Manufacturing export product. 2.      Process Manufacturing to be carried out on imported inputs. 3.      Wastage justification for the wastage claimed on imported inputs. 4.      List of plant & machines with unit.   117

Case No.:24/29/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00459/AM11/ RLA File :03/94/040/00501/AM11/ Lic.No/Date:0310591600 Deferred

117 08.09.2010 date:11.01.2011 ALC, therefore, decided to remind them for expediting their comments. The case may be re­listed on 11.01.2011.   118

Case No.:18/29/80­ALC2/2010

Party Name:DENSO HARYANA PVT. LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00453/AM11/ RLA File :05/23/040/00131/AM11/ Lic.No/Date:0510272444 09.09.2010 Deferred date:11.01.2011 Decision : It was observed  that the information furnished is incomplete, therefore the Committee decided to call for the following information from the firm and to re­list the case on  11.01.2011: ­   1.      Information in respect of Sl.. No.3,4,5,8 & 11 of the Standard Deficiency Format. 2.      Drawing of mould (Dimensional).   119

Case No.:11/29/80­ALC2/2010

Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00446/AM11/ RLA File :05/23/040/00159/AM11/ Lic.No/Date:0510272568 10.09.2010 Deferred date:11.01.2011 Decision : The Committee directed to forward a copy of firm’s application to DHI for examination and comments.  The case may be re­listed on 11.01.2011.   120

Case No.:27/29/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00462/AM11/ RLA File :11/24/040/00034/AM11/ Lic.No/Date:1110023193 10.09.2010 Deferred date:11.01.2011 Decision  :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The   121

Case No.:20/27/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00417/AM11/ RLA File :04/24/040/00126/AM11/ Lic.No/Date:0410117133 14.09.2010 Deferred date:11.01.2011 Decision :  The  Committee  noted  that  the  firm  has  sought  time  vide  their  letter  dated  11.11.2010  for submission  of  reply  within  one  month.  The  Committee,  therefore,  decided  to  remind  the  firm  for expediting  the  certain  information  immediately  failing  which    their  case  will  be  rejected  without  any further delay and to relist the case for   11.01.2011.   122

Case No.:31/29/80­ALC2/2010

Party Name:ATHENA INDIA HITECH COMPONENTS PVT.LTD, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00466/AM11/ RLA File :07/24/040/00211/AM11/ Lic.No/Date:0710074162 14.09.2010 Deferred date:11.01.2011 Decision  :    The  Committee  directed  to  forward  a  copy  of  firm’s  application  to  DC(MSME)  for examination and comments.  The case may be re­listed on 11.01.2011.  

Case No.:6/29/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00441/AM11/ RLA File :03/94/040/00551/AM11/ Lic.No/Date:0310592447 Deferred

123 Q 15.09.2010 date:11.01.2011 on 11.01.2011.   124

Case No.:28/29/80­ALC2/2010

Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00463/AM11/ RLA File :11/24/040/00037/AM11/ Lic.No/Date:1110023212 16.09.2010 Deferred date:11.01.2011 on 11.01.2011.   125

Case No.:29/29/80­ALC2/2010

Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00464/AM11/ RLA File :11/24/040/00038/AM11/ Lic.No/Date:1110023211 16.09.2010 Deferred date:11.01.2011 on 11.01.2011.   126

Case No.:2/29/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00437/AM11/ RLA File :03/94/040/00586/AM11/ Lic.No/Date:0310594220 28.09.2010 Deferred date:11.01.2011 on 11.01.2011.   127

Case No.:3/29/80­ALC2/2010

Party Name:IN TRANS ENGINEERING LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00438/AM11/ RLA File :02/24/040/00116/AM11/ Lic.No/Date:0210148724 30.09.2010 Deferred date:11.01.2011 Decision  :  The  Committee  directed  to  forward  a  copy  of  firm’s  application  to  Sh.  Shaish  Kumar, Industrial Adviser, DIPP for examination and comments.  The case may be re­listed on 11.01.2011.   128

Case No.:4/29/80­ALC2/2010

Party Name:SOUTHERN AGRO ENGINE PVT., LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00439/AM11/ RLA File :04/24/040/00177/AM11/ Lic.No/Date:0410117706 30.09.2010 Deferred date:11.01.2011 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case for 11.01.2011            The firm is exporting 30 numbers of 12 hp Power tillers & 16 numbers of 12 hp Power tillers against which it proposes to import 23 number each of 12 hp & 16 hp power tiller chasis. The firm may give reason for the same.    

Case No :8/29/80­ALC2/2010

Party Name:KINECO PVT LTD Meet No/Date:32/80­ Status:

129

Case No.:8/29/80­ALC2/2010

Party Name:KINECO PVT. LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00443/AM11/ RLA File :17/24/040/00017/AM11/ Lic.No/Date:1710003514 30.09.2010 Deferred date:11.01.2011 Decision  :  The  representative  of  the  DHI  informed  the  Committee  that  they  received  the  firm’s application  on  29.10.2010  and  case  is  under  study.  The  Committee,  therefore,  decided  to  defer  the consideration and to relist the case on 11.01.2011.   130

Case No.:9/29/80­ALC2/2010

Party Name:VOLVO BUSES INDIA PVT.LTD, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00444/AM11/ RLA File :07/24/040/00219/AM11/ Lic.No/Date:0710074544 01.10.2010 Deferred date:11.01.2011 Decision : The Committee directed to forward a copy of firm’s application to DHI for examination and comments.  The case may be re­listed on 11.01.2011.   131

Case No.:10/29/80­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00445/AM11/ RLA File :03/95/040/00428/AM11/ Lic.No/Date:0310594871 01.10.2010   to ratify the norms in respect of the subject advance authorization as per SION at Sl. No. C­1829 for Engineering Products.     132

Case No.:38/29/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00473/AM11/ RLA File :53/24/040/00016/AM11/ Lic.No/Date:5310011502 05.10.2010 Deferred date:11.01.2011 Decision :  The  Committee  decided  to  examine  the  case  on  file  and  compare  with  earlier  cases.  The Committee also decided to remind the C&PC for expediting their comments  and to relist the case for 11.01.2011.   133

Case No.:35/29/80­ALC2/2010

Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00470/AM11/ RLA File :09/24/040/00259/AM11/ Lic.No/Date:0910043805 06.10.2010 Deferred date:11.01.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on  11.01.2011: ­   1.      Information in respect of Sl.No.3 & 11 of the Standard Deficiency Format. 2.      Detailed calculations/basis for the quantities of import items.   

Case No.:36/29/80­ALC2/2010

Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00471/AM11/ RLA File :09/24/040/00258/AM11/ Lic.No/Date:0910043816 06 10 2010 Deferred date:11 01 2011

134 06.10.2010 date:11.01.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on  11.01.2011: ­   1. Information in respect of Sl.No.3 & 11 of the Standard Deficiency Format. 2. Detailed calculations/basis for the quantities of import items.   135

Case No.:39/29/80­ALC2/2010

Party Name:CAMFIL FARR AIR FILTRATION INDIA LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00474/AM11/ RLA File :05/23/040/00186/AM11/ Lic.No/Date:0510274386 07.10.2010 Deferred date:11.01.2011 Decision  :  The  Committee  observed  that  the  comments  called  for  from  DC(MSME)  are  yet  to  be received.  The Committee, therefore, decided to remind them for expediting their comments/as per SION 1799. The case may be re­listed on 11.01.2011.   136

Case No.:42/29/80­ALC2/2010

Party Name:G.R.ENGINEERING PRIVATE LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Approved HQ File :01/80/050/00477/AM11/ RLA File :03/94/040/00553/AM11/ Lic.No/Date:0310595643 07.10.2010   to ratify the norms in respect of the subject advance authorization as under:­   1. Net Empty Export weights of 171.876 MT, 166 MT, 65.082 MT, 254.78 MT, & 92.161 MT to be specified with the quantities of export products from S.No.1 to 5 respectively. 2. Word “Relevant” to be prefixed with the description of import items at Sl. No. 1 . 3. Quantity of import item S.No.1 allowed as 1.05 Kgs/ Kg. content in the export products. 4. Weight of “73.5 MT ” added with the quantity of import item at Sl.No.2 and quantity of this item to be allowed on net to net basis.     137

Case No.:43/29/80­ALC2/2010

Party Name:ORIENTAL CONTAINERS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00478/AM11/ RLA File :03/95/040/00525/AM11/ Lic.No/Date:0310596095 11.10.2010 Deferred date:11.01.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on  11.01.2011: ­   1. Information in respect of Sl.No.3,5,11 & 11A of the Standard Deficiency Format.   138

Case No.:2/32/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00543/AM11/ RLA File :03/95/040/00446/AM11/ Lic.No/Date:0310600429 08.11.2010 Defer Date:11.01.2011 Decision : The Committee handed over the firm’s application to DHI for examination and comments and to re­list the case for  11.01.2011.   139

Case No.:3/32/80­ALC2/2010

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00544/AM11/ RLA File :03/95/040/00631/AM11/ Lic.No/Date:0310600433 08 11 2010 Defer 11 01 2011

08.11.2010 Date:11.01.2011 Decision : The Committee handed over the firm’s application to DHI for examination and comments and to re­list the case for  11.01.2011.   140

Case No.:4/32/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00545/AM11/ RLA File :03/94/040/00716/AM11/ Lic.No/Date:0310600460 08.11.2010 Defer Date:11.01.2011 Decision : The Committee noted that the firm’s application has been sent to DIT and    the comments called for from DIT yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed for 11.01.2011.   141

Case No.:5/32/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00546/AM11/ RLA File :03/94/040/00717/AM11/ Lic.No/Date:0310600467 08.11.2010 Defer Date:11.01.2011 Decision : The Committee noted that the firm’s application has been sent to DIT and    the comments called for from DIT yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed for 11.01.2011.   142

Case No.:14/32/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00555/AM11/ RLA File :53/24/040/00020/AM11/ Lic.No/Date:5310011681 08.11.2010 Defer Date:11.01.2011 Decision :  The Committee noted that the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA (with a copy) to the firm to forward the firm’s application at earliest to C&PC for examination and comments and to re­list the case for 11.01.2011.   143

Case No.:15/32/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00556/AM11/ RLA File :53/24/040/00019/AM11/ Lic.No/Date:5310011682 08.11.2010 Defer Date:11.01.2011 Decision :  The  Committee  decided  to  examine  the  case  on  file  and  compare  with  earlier  cases.  The Committee also decided to remind the C&PC for expediting their comments  and to relist the case for 11.01.2011.   144

Case No.:1/32/80­ALC2/2010

Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00542/AM11/ RLA File :04/24/040/00202/AM11/ Lic.No/Date:0410118694 09.11.2010 Defer Date:11.01.2011 Decision : The Committee noted that the firm’s application has been sent to DIPP for examination and comments.  The Committee decided to defer the case and to re­list the case for 11.01.2011.   145

Case No.:7/32/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00548/AM11/ RLA File :03/94/040/00725/AM11/ Lic.No/Date:0310600644 09.11.2010 Defer Date:11.01.2011

Decision : The Committee noted that the firm’s application has been sent to DIT and    the comments called for from DIT yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed for 11.01.2011   146

Case No.:8/32/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00549/AM11/ RLA File :04/24/040/00197/AM11/ Lic.No/Date:0410118712 09.11.2010 Defer Date:11.01.2011 Decision :  The  Committee  noted  that  the  Regional  Authority  has  neither  forwarded  the  hard  copy  of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA (with a copy) to the firm to forward the firm’s application at earliest to DIPP for examination and comments and to re­list the case for 11.01.2011.   147

Case No.:6/32/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00547/AM11/ RLA File :06/24/040/00039/AM11/ Lic.No/Date:0610019661 10.11.2010 Defer Date:11.01.2011 Decision : The Committee noted that the firm’s application has been sent to DHI and    the comments called for from DHI yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed for 11.01.2011   148

Case No.:9/32/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00550/AM11/ RLA File :04/24/040/00204/AM11/ Lic.No/Date:0410118772 10.11.2010 Defer Date:11.01.2011 Decision : The Committee noted that the firm’s application has been sent to DHI for examination and comments.  The Committee decided to defer the case and to re­list the case for 11.01.2011.   149

Case No.:11/32/80­ALC2/2010

Party Name:HIND HIGH VACUUM COMPANY PVT LTD. Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00552/AM11/ RLA File :07/24/040/00312/AM11/ Lic.No/Date:0710075337 10.11.2010 Defer Date:11.01.2011 Decision :  The  Committee  noted  that  the  Regional  Authority  has  neither  forwarded  the  hard  copy  of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA (with a copy) to the firm to forward the firm’s application at earliest to DIPP for examination and comments and to re­list the case for 11.01.2011.   150

Case No.:12/32/80­ALC2/2010

Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00553/AM11/ RLA File :05/24/040/00279/AM11/ Lic.No/Date:0510276727 10.11.2010 Defer Date:11.01.2011 Decision :  The  Committee  noted  that  the  Regional  Authority  has  neither  forwarded  the  hard  copy  of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA (with a copy) to the firm to forward the firm’s application at earliest to DIPP for examination and comments and to re­list the case for 11.01.2011.   151

Case No.:10/32/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00551/AM11/ RLA File :04/24/040/00190/AM11/ Lic.No/Date:0410118791 11.11.2010 Defer Date:11.01.2011

Decision :  The  Committee  noted  that  the  Regional  Authority  has  neither  forwarded  the  hard  copy  of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA (with a copy) to the firm to forward the firm’s application at earliest to DIPP for examination and comments and to re­list the case for 11.01.2011.     152

Case No.:13/32/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:32/80­ ALC2/2010 30.11.2010 Status: Deferred HQ File :01/80/050/00554/AM11/ RLA File :03/95/040/00510/AM11/ Lic.No/Date:0310601141 12.11.2010 Defer Date:11.01.2011         Decision : The Committee handed over the firm’s application at earliest to DIPP examination and comments and to re­list the case for 11.01.2011. S.No.23

Case No. A ­11

M/s. Koch Chemical Technology  Group India  Pvt.  Ltd., Baroda  F.No. 01/80/162/ 00269/AM11/DES.ILic.No. & Date Meeting No. 32/11 RA F.No.34/21/040/00241/AM07 3410016531 dt.21.07.2006 Date: 30.11.2010 Ratification of norms   On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on  11.01.2011: ­   1. Information in respect of Sl.No.3,4,5 & 11 of the Standard Deficiency Format.   S.No.24

Case No. A ­01

M/s.  Larson  & Toubro Ltd.,  F.No. 01/80/050/ 01184/AM10/DES.I Lic.No. & Date Meeting No. 32/11 RA F.No.03/95/039/00001/AM09 0310475712 dt.20.06.2008 Date: 30.11.2010   The representative of the DHI informed the Committee that the case Is under study.  The Committee, therefore, decided to defer the consideration and to relist the case on 11.01.2011.   S.No.325

Case No. A/R­63

M/s.  Thyssenkrup Industries India Ltd.,  F.No. 01/80/50/ 01852/AM09/DES.I Lic.No. & Date Meeting No. 32/11 RA F.No.31/21/040/00399/Am09 3110037568 dt.03.03.2009 Date: 30.11.2010   The representative of DHI has informed that the firm was asked to submit list of items for both the licenses separately  with  their value of import along with  corresponding item of    export  with  its  value  separately  to examine their request.  The Committee noted that firm furnished their reply vide their letter dated 05.10.10, is incomplete  in  which  the  corresponding  export  product  has  not  been  given.    for  certain  information.  The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further delay and to relist the case for 11.01.2011   (The Committee directed to examine the case on file why two licences against 1 Export Product.)                                      S.No.326

Case No.A/R­25

M/s.  Minda  Sai Ltd., Mumbai HQ F.No.01/80/50/00755/AM08/DES–I Lic.  Nos.  & Date Meeting No. 28/11 RLA F.No.05/24/040/00147/AM08 0510204041 dt.24.05.2007 Date: 12.10.2010   The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore,   S.No.327

Case No.A/R­28

M/s.  Larson  & Toubro LTd., HQ F.No.01/80/162/00301/AM08/DES–I   Lic.  Nos.  & Date Meeting No 32/11 RLA FNo 04/24/040/00223/AM08 0410091098

Meeting No. 32/11 RLA F.No.04/24/040/00223/AM08 0410091098 dt.18.09.2007 Date: 30.11.2010   S.No.328

Case No.A/R­75

M/s.  Dee Development Engineers  Pvt. LTd., HQ F.No.01/80/50/00160/AM08/DES–I   Lic.  Nos.  & Date Meeting No. 32/11 RLA F.No.05/24/04000175/AM08 0510204393 dt.01.06.2007 Date: 30.11.2010 Deletion of condition in MTR / No. in different advance authorizations   The Committee directed to ask the firm to furnish a copy of license & amendment sheet and to re­list the case for 11.01.2011.   S.No.329

Case No. A/R­125

M/s.  Larson  & Toubro Ltd.,  F.No. 01/80/50/ 00754/AM10/DES.I Lic.No. & Date Meeting No. 32/11 RA F.No.03/95/040/00718/AM10 0310559390 dt.10.02.2010 Date: 30.11.2010   As per written comments of DIPP vide their U.O. Note  dated 30.11.10, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   Firm’s representation for increase in the quantity of import item at Sl. No. 2 i.e. Clad Plates for formed heads to be rejected as  the  quantity  of  this  import  item  has  been  allowed  after  taking  1/3rd recovery from scrap and there is no justification for higher wastage after taking 1/3rd recovery.     S.No.330

Case No. A/R­ 79

M/s.  Precihole Machine  Tools  Pvt. LTd.,  F.No. 01/80/50/ 00085/AM10/DES.I Lic.No. & Date Meeting No. 32/11 RA F.No.03/95/040/00989/AM09 0310511441 dt.13.03.2009 Date: 30.11.2010     S.No.331

Case No. A/R­ 81

M/s.  Bharat  Heavy Electricals  Ltd., Bhopal  F.No. 01/80/50/ 00184/AM09/DES.I Lic.No. & Date Meeting No. 32/11 RA F.No.11/24/040/00059/AM08 1110016748 dt.04.02.2008 Date: 30.11.2010 Revision of norms     Sl.No.332

Case No. A/R­ 76

M/s.    Delkor Technik India Pvt. Ltd., Bangalore HQ F.No.01/80/50/00945/AM08/DES­I Lic. No. & Date Meeting No. 32/11 RLA No.07/24/040/00457/AM08 0710053565 dt.27.09.2007 Date: 30.11.2010 Ratification  of norms   The  Committee  noted  that  the  case  has  already    referred  to  DIPP.    The  Committee  decided  to  defer  the consideration and to re­list the case for 11.01.2011.   Sl.No.333

Case No. A/R­ 78

M/s.  Botil Oil Tools India Pvt. Ltd., HQ F.No.01/80/50/00918/AM09/DES­I Lic. No. & Date Meeting No. 32/11 RLA No.05/24/040/00940/AM08 0510217768 dt.12.03.2008 Date: 30.11.2010 Revision of norms     Sl.No.334 C N A/R 79 M/ B til Oil T l HQ F N 01/80/50/01157/AM09/DES I Li N & D t

Case No. A/R­ 79

M/s.  Botil Oil Tools India Pvt. Ltd., HQ F.No.01/80/50/01157/AM09/DES­I Lic. No. & Date Meeting No. 32/11 RLA No.05/24/040/00435/AM09 0510228787 dt.03.10.2008 Date: 30.11.2010 Revision of norms     Sl.No.335

Case No. A/R­ 84

M/s.    Larson  & Toubro Ltd., HQ F.No.01/80/50/01664/AM09/DES­I Lic. No. & Date Meeting No. 32/11 RLA No.03/95/040/00828/AM09 0310501993 dt.09.01.2009 Date: 30.11.2010 Revision  of norms     Sl.No.336

Case No.  A/R. ­ 87

M/s. GEA BGR Energy Systems Ltd., Chennai   HQ F.No.01/80/50/01801/AM09/DES.I Lic.No. & Date Meeting No. 32/11  RA.F.No.04/24/040/00260/AM09 0410102466 dt.19.02.2009 Date: 30.11.2010 Ratification of  norms.   As  per  written  comments  of  DHI  of  vide  their  U.O.  Note  No.3(6)10­TSW(B)/531    dated  28.10.10,  the committee decided to ratify the norms in respect of the subject advance authorization as under:­   Import Item No. 1 to 3 – Allowed as per GN­4   Sl.No.337

Case No. A/R­ 88

M/s.  Botil Oil Tools India Pvt. Ltd., HQ F.No.01/80/50/00512/AM10/DES­I Lic. No. & Date Meeting No. 32/11 RLA No.05/23/040/00093/AM10 0510252255 dt.10.11.2009 Date: 30.11.2010 Revision of norms       Sl.No.338

Case No. A/R­ 89

M/s.  Botil Oil Tools India Pvt. Ltd., HQ F.No.01/80/50/00648/AM10/DES­I Lic. No. & Date Meeting No. 32/11 RLA No.05/23/040/00145/AM10 0510255715 dt.06.01.2010 Date: 30.11.2010 Revision of norms     Sl.No.339

Case No. A/R­ 90

M/s.  Botil Oil Tools India Pvt. Ltd., HQ F.No.01/80/50/00535/AM10/DES­I Lic. No. & Date Meeting No. 32/11 RLA No.05/23/040/00099/AM10 0510252923 dt.19.11.2009 Date: 30.11.2010 Revision of norms     S.No.340

Case No.  A/R. ­ 116

M/s. GEA BGR Energy Systems Ltd., Chennai   HQ F.No.01/80/50/01284/AM09/DES.I Lic.No. & Date Meeting No. 32/11  RA.F.No04/24/040/00197/AM09 0410099963 dt.12.11.2008 Date: 30.11.2010 Ratification of  norms.   As  per  written  comments  of  DHI  of  vide  their  U.O.  Note  No.3(6)10­TSW(B)/531    dated  28.10.10,  the committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export The total export weight of 40,686 kg to be incorporated in the license. Import The following import items are allowed:­

e o ow g po t te s a e a owed: 1.       Item no 1 to 11­ Under GN­4.(Quantity of import of item no 6 to be reduced to 8 as clarified by the firm & import as per details given by the firm in their letter dated 28­06­10). 2.       Quantity for import of 21,090 kg for item no 12, 7750 kg for item no 13 & 1960 kg for item no 14 respectively with 3% wastage.     S.No.341

Case No. A/R­118

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar  F.No. 01/80/50/ 00670/AM10/DES.I Lic.No. & Date Meeting No. 32/11 RA F.No.61/24/040/00046/AM10 6110000382 dt.08.01.2010 Date: 30.11.2010         S.No.342

Case No. A/R­119

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad  F.No. 01/80/50/ 01783/AM09/DES.I Lic.No. & Date Meeting No. 32/11 RA F.No.09/24/040/00401/AM09 0910037049 dt.12.02.2009 Date: 30.11.2010     S.No.343

Case No. A/R­120

M/s. WPIL Limited, Kolkata  F.No. 01/81/50/ 00929/AM05/DES.I Lic.No. & Date Meeting No. 32/11 RA F.No.02/24/040/00215/AM05 0210073506 dt.03.01.2005 Date: 30.11.2010   As per written comments of DIPP vide their U.O. Note  dated 30.11.10, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Description and net weight of export products to be specified as under:   Description Quantity Net Export Weight Stainless Steel Forging Machined Shaft Upper  Shaft  Φ  120  x  3696.2 mm 3 Nos. 840 Kgs Lower Shaft Φ 120 x 3633 mm 3 Nos. 810 Kgs Intermediate Shaft Φ 120 x 3205 mm 3 Nos. 750 Kgs Key 25x 14x 46 mm 3 Nos. 0.3Kgs. Key 25x 14x 130 mm 3 Nos. 1.5 Kgs. Key 25x 14x 122 mm 9 Nos. 4.5 Kgs. Key 25x 14x 165 mm 6 Nos. 3.12 Kgs. Total net Export weight 2409.42 Kgs.   2.      Word “relevant’ to be prefixed with the description of import items at Sl. Nos. 1 & 2. 3.      Total quantity of import items at Sl. Nos. 1 & 2 put together to be allowed as 2245 Kgs. as informed by the firm vide their letter dated 17th June, 2010.     S.No.344

Case No. A/R­121

M/s.  Bharat  Heavy Electricals  Ltd., Trichirapalli  F.No. 01/80/50/ 00722/AM10/DES.I Lic.No. & Date Meeting No. 32/11 RA F.No.04/24/040/00255/AM10 0410110779 dt.12.01.2010 Date: 30.11.2010   As  per  written  comments  of  DHI  of  vide  their  U.O.  Note  No.3(40)10­TSW(B)/537  dated  02.11.10,  the committee decided to ratify the norms in respect of the subject advance authorization as under:­

committee decided to ratify the norms in respect of the subject advance authorization as under:   Export The total weight of export product for two sets is 44970 MT & the same may be incorporated in the licence.   Import per unit The following import items are allowed:­   1.         Item no 1­  Quantity  of  746 MT with 3% wastage. 2.         Item no 2­ Quantity of  201 MT with 3% wastage. 3.         Item no 3­ Quantity of 92 MT with 1% wastage as applied by the firm. 4.         Item no 4 ­ Quantity of  9 MT with negligible wastage. 5.         Item no 5­  Quantity of  2 MT with negligible wastage. 6.         Item no 6­ Hollows to be allowed at 916 MT with 10 % wastage. CS tubes at 1377 MT with 2% wastage, CS PIPE (SEAMLESS) at 517 MT & ERW 483 MT with 2% wastage. 7.         Item no 7­ Blooms to be allowed at 301 MT with 30 % wastage (as was Allowed for 0410103660 dtd 03­04­09.).  AS  tubes  at  926  MT  with  2%  wastage,  AS  PIPE  (SEAMLESS)  at  385  MT  with  2% wastage. 8.         Item no 8­   Quantity of   336 MT with 2% wastage. 9.         Item no 9­  Quantity  of 60.2 MT with 2% wastage.. 10.     Item no 10­ Welding wire ­ 35 MT, Electrode­3 MT, Cobalt based powder 2 MT, welding Flux 2 MT as applied for. 11.     Item no 13, 17, 20 & 27 to be deleted as these are not components of the export product. 12.     Item no 16,22,26, 30­ As applied for with accountability clause 13.     Item no 44 to 81 ­ As per spares policy. 14.     All other items are components under GN­4.     S.No.345

Case No. A/R­122

M/s.  Bharat  Heavy Electricals  Ltd., Trichirapalli  F.No. 01/80/50/ 00721/AM10/DES.I Lic.No. & Date Meeting No. 32/11 RA F.No.04/24/040/00254/AM10 0410110778 dt.12.01.2010 Date: 30.11.2010   As  per  written  comments  of  DHI  of  vide  their  U.O.  Note  No.3(40)10­TSW(B)/538  dated  02.11.10,  the committee decided to ratify the norms in respect of the subject advance authorization as under:­ Export The total weight of export product for two sets is 44970 MT & the same to be incorporated in the licence. Import per unit The following import items are allowed:­   1. Item no 1­ Quantity of  746 MT with 3% wastage. 2. Item no 2­ Quantity 201 MT with 3% wastage. 3. Item no 3­ Quantity of  92MT with 1% wastage as applied for. 4. Item no 4 – Quantity of 9 MT with negligible wastage. 5. Item no 5­  Quantity of  2 MT with negligible wastage. 6. Item no 6­ Quantity of 916 MT with 10 % wastage. CS tubes at 1377 MT with 2% wastage, CS PIPE (SEAMLESS) at 517 MT & ERW 483 MT with 2% wastage. 7. Item no 7­ Blooms to be allowed at 301 MT with 30 % wastage (as was recommended for 0410103660 dtd  03­04­09.). AS tubes at 926 MT  with  2%  wastage,  AS  PIPE  (SEAMLESS)  at  385  MT  with  2% wastage. 8. Item no 8­ Allowed at 336 MT with 2% wastage. 9. Item no 9­ Allowed at 60.2 MT with 2% wastage.. 10. Item no 10­ Welding wire­ 35 MT, Electrode­3 MT, Cobalt based powder 2 MT, welding Flux 2 MT as applied for. 11. Item no 13, 17, 20 & 27 to be deleted as these are not components of the export product. 12. Item no 16,22,26, 30 ­ As applied for with accountability clause. 13. Item no 44 to 81­Allowed as per spares policy. 14. All other items are components & to be allowed under GN­4.  

S.No.346

Case No.  A/R­78

M/s.  GEA  BGR Energy  System India  Ltd., Chennai HQ F.No.01/80/50/01099/AM08/DES.I Lic. No. & date Meeting No. 32/11 RA.F.No.04/24/040/00323/Am08 0410092975 dt.02.01.2008 Date: 30.11.2010        

Case  No.    A/R­

132 M/s.  Enmas  GB Power  Systems Projects  Ltd., Chennai HQ F.No.01/80/050/00102/AM10/DES.I HQ F.No.01/80/050/00365/AM10/DES­I Lic. No. & date Meeting No. 32/11 RA.F.No.04/24/040/00323/Am08 0410104770 dt.21.05.2009 & 0410107592 dt.07.09.2009 Date: 30.11.2010   The  representative  of    DHI  recommended  the  case  vide  their  U.O.  No.  3(166)/09­TSW(B)/458  dated 08.09.2010.  However the Committee decided the case to be examined on file with reference to the facts that two licenses obtained same Export Products and the case will be re­listed on 11.01.2011.    

Case  No.    A/R­

133 M/s. Bharat Heavy Electricals  LTd., Trichirapalli HQ F.No.01/80/50/01567/AM09/DES.I Lic. No. & date Meeting  No. 32/11 RA.F.No.04/24/040/00183/AM09 0410100820 dt.15.12.2008 Date: 30.11.2010    

Case  No.    A/R­

134 M/s. Bharat Heavy Electricals  LTd., Trichirapalli HQ F.No.01/80/50/00587/AM10/DES.I Lic. No. & date Meeting  No. 32/11 RA.F.No.04/24/040/00188/AM09 0410109500 dt.18.11.2009 Date: 30.11.2010    

Case  No.    A/R­

135 M/s.  GEA  BGR Energy  System India  LTd., Chennai HQ F.No.01/80/50/00442/AM10/DES.I Lic. No. & date Meeting No. 32/11 RA.F.No.04/24/040/00163/AM10 0410108335 dt.09.10.2009 Date: 30.11.2010    

Case  No.    A/R­

136 M/s.  Bharat Heavy  Electricals LTd., Haridwar HQ F.No.01/80/50/00319/AM10/DES.I Lic. No. & date Meeting No. 32/11 RA.F.No.61/24/040/00020/AM10 6110000343 dt.19.08.2009 Date: 30.11.2010  

Case  No.    A/R­

137 M/s.  Bharat Heavy  Electricals LTd., Hyderabad HQ F.No.01/80/50/01675/AM09/DES.I Lic. No. & date Meeting No. 32/11 RA.F.No.09/24/040/00369/AM09 0910036679 dt.12.01.2009 Date: 30.11.2010   The representative of the DHI informed the Committee that the case is under study The Committee therefore

 

Case  No.    A/R­

138 M/s. Bharat Heavy Electricals  LTd., Trichirapalli HQ F.No.01/80/50/00326/AM10/DES.I Lic. No. & date Meeting  No. 32/11 RA.F.No.04/24/040/00105/AM10 0410107118 dt.21.08.2009 Date: 30.11.2010     S.No.54

Case No. C ­ 14

M/s.  MSS India  Pvt. LTd.,  F.No. 01/80/162/ 00143/AM11/DES.I Meeting No. 32/11 Fixation of ad­hoc wastage norms for “Small fabricated items,  Fabricated  bus  bars,  Press  work  items,  Braided connectors, laminated connectors, Cast connectors, Switch fuse unit HSN, Bolled / Moulded Connector, Moulded Components, DC Busbars. Machined & Forged Components. Battery Charger / Transformer”. Date: 30.11.2010   On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on  11.01.2011: ­   1.      Information in respect of Sl.No.3,4,5 & 11 of the Standard Deficiency.    Format  for the following  items:­   i)        Fabricated Bus Bars: For the products at Sl. No. 17, 71 & 123 ii)       Press Work items: For the products at Sl. No. 40, 251, 454, 655 & 737. iii)     Bolted/Moulded connectors: For the product at Sl. No. 1. iv)     Cast Pillars: For the product at Sl. No. 24. v)      DC Bus Bars: For the product at Sl. No. 14. vi)     Machined & Forged Components: For the product at Sl. No. 69, 137 & 213.     S.No.55

Case No.C­04

  M/s.  Kusalava International LTd., HQ F.No.01/80/162/00021/AM10/DES.I Meeting No. 32/11 Date: 30.11.2010 Fixation of Standard Input Output Norms (SION) for the export of “Cylinder Liners”   The Committee directed to forward the main file of this case to DHI for examination and comments and to relist the case on 11.01.2011.           S.No.56

Case No. C­01

M/s.  BOSCH  Limited, Bangalore  F.No. 01/80/162/1193/AM09/DES.I Meeting No.26/11 Fixation  of SION for the export product “Common Rail Injector Parts” Date: 28.09.2010                                                               *****