IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2013-10-15

DGFT Committee Minutes

Document text

Ra៝�fied Minutes of Mee៝�ng No.15/14 scheduled on 15.10.2013 of Norms Commiោ�ee(NC‐I) (DES.I Sec៝�on) The mee៝�ng No. 15/14 of the Norms Commiោ�ee (NC‐I) for the licensing year 2012‐2013 was held on 15.10.2013 under the Chairmanship of Dr. L.B. Singhal, Addi៝�onal  Director General of Foreign Trade to consider the applica៝�ons under Duty Exemp៝�on / Remission Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I.  The following Members of the Commiោ�ee were present in the mee៝�ng: ‐ Sl.No Name of the representa៝�ves & their Designa៝�on Room No. Telephone No. Depោ�. 1. Sh K.K. Tiwari I.A 476 23063321 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 428A 23063321 Extn.3318 DIPP, U.B. 3. Sh.  K.K.  Funda,  Assោ�.  Dir. (Mech) 736A 23063802 Extn.2459 DC(MSME),N.B. 4. Sh. Parveen Sharma, Dy.DGFT 302 23061562 Extn.146 DGFT, U.B. 5. Sh. Priya Ranjan, FTDO 404 23061562 Ext.265 DGFT, U.B. I ‐The Commiោ�ee considered the individual cases of the agenda of this mee៝�ng generated through the online system of NIC. The decisions taken thereon are as under: 1

Case No.:14/38/80‐

ALC2/2010 Party Name:VASUNDRA MANUFACTURING SYSTEMS PVT.LTD, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00784/AM11/ RLA File :07/21/040/00786/AM11/ Lic.No/Date:0710077109 03.02.2011 Defer Date:26.11.2013 Decision :The Commiោ�ee noted that the firm has not replied to the deficiency leោ�er dated 30.9.2013 and RA, Ahmedabad has not provided informa៝�on as asked through leោ�er No. 01/80/050/00784/AM11/DES.1/669 dated 09.10.2013. The Commiោ�ee also noted that the message/copy of deficiency leោ�er in respect of the aforesaid has also  been  conveyed  to  both  the  addressee  through  email  dated    11.10.2013  and  10.10.2013  respec៝�vely  and decided to await reply. Case is deferred to 26.11.2013.   2

Case No.:13/15/80‐

ALC2/2013 Party Name:BASIC WATER NEEDS INDIA PRIVATE LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00269/AM14/ RLA File :25/24/040/00015/AM11/ Lic.No/Date:2510003136 22.02.2011 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  MSME  on  10.10.2013  which  is under examina៝�on of MSME and decided to await comments. Case is deferred to 26.11.2013.   3

Case No.:36/7/80‐ALC2/2011

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Approved HQ File :01/80/050/00142/AM12/ RLA File :04/24/040/00051/AM12/ Lic.No/Date:0410124216 20.05.2011   Decision  :  Based  on  the  DHI  wriោ�en  comments  vide  U.O.  3(74)/10‐  TSW(B)/224  dated  15.10.2013  and  U.O. 3(74)/10‐ TSW(B)/168 dated 25.07.2013 received on 05.9.2013, the commiោ�ee decided to ra៝�fy norms (Copies  of

wriោ�en comments are to be forwarded to firm and RLA)   RLA may take necessary ac៝�on accordingly.   4

Case No.:26/14/80‐

ALC2/2012 Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00312/AM13/ RLA File :07/24/040/00043/AM13/ Lic.No/Date:0710088185 14.05.2012 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  dated  12.4.2013  followed  by reminders dated 30.5.2013 and dated 09.7.2013 and final reminder dated 03.10.2013 and decided to await 15 days more to receive reply from the firm failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.   5

Case No.:15/11/80‐

ALC2/2012 Party Name:YOKOGAWA INDIA LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00229/AM13/ RLA File :07/21/040/00120/AM13/ Lic.No/Date:0710088440 24.05.2012 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the maោ�er is under examina៝�on of PC‐VI Sec៝�on and decided to await comments.   6

Case No.:44/14/80‐

ALC2/2012 Party Name:SATTVA ETECH INDIA PRIVATE LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00330/AM13/ RLA File :07/24/040/00149/AM13/ Lic.No/Date:0710089403 02.07.2012 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  issued  from  DIT  directly  dated 01.01.2013, subsequent reminders dated 07.2.2013 and dt.24.07.2013 and decided to send final reminder and decided to send an email for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.   7

Case No.:17/11/80‐ALC2/2012 Party Name:MOTHERSON

SUMI SYSTEMS LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00231/AM13/ RLA File :05/24/040/00129/AM13/ Lic.No/Date:0510329275 10.07.2012 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the hardcopy has been sent to Depោ�. of C&PC on 16.08.2012 and followed reminder dated 21.01.2013 and decided to send another reminder for expedi៝�ng their comments.   8

Case No.:9/11/80‐ALC2/2012 Party Name:BENGAL

INDUSTRIES PVT. LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00223/AM13/ RLA File :05/23/040/00131/AM13/ Lic.No/Date:0510329934 17.07.2012 Defer Date:26.11.2013 Decision : The Commiោ�ee noted  that  the  firm’s  reply  received  to  be  forwarded  to  DIPP  for    examina៝�on and comments.

9

Case No.:27/14/80‐ALC2/2012 Party Name:PRANITA

ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00313/AM13/ RLA File :07/24/040/00180/AM13/ Lic.No/Date:0710090071 03.08.2012 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  dated  12.4.2013  followed  by reminder  dated  30.5.2013  and  final  reminder  dated  9.7.2013  and  decided  to  send  an  email  reminder  for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.   10

Case No.:1/17/80‐ALC2/2012

Party Name:TEMA INDIA LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00366/AM13/ RLA File :03/95/040/00333/AM13/ Lic.No/Date:0310704473 08.08.2012 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 30.09.2013 and decided to remind them for expedi៝�ng their reply.   11

Case No.:19/14/80‐

ALC2/2012 Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00305/AM13/ RLA File :05/23/040/00166/AM13/ Lic.No/Date:0510331795 09.08.2012 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  dated  24.05.2013  followed  by reminder  dated  29.08.2013  and  final  reminder  dated  25.09.2013  and  decided  to  send  an  email  reminder  for expedi៝�ng their reply failing which the commiោ�ee will be constrained to reject the case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.   12

Case No.:5/13/80‐ALC2/2012

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00260/AM13/ RLA File :05/24/040/00199/AM13/ Lic.No/Date:0510333158 30.08.2012 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  firm  has  replied  to  DIT  directly  on  16.09.2013  and  the  case  is  under examina៝�on with DIT.   13

Case No.:2/17/80‐ALC2/2012 Party Name:PLAST TECH

ENGINEERING Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00367/AM13/ RLA File :04/24/040/00136/AM13/ Lic.No/Date:0410140373 11.10.2012 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er issued from C&PC directly dated 18.04.2013, subsequent reminder by DGFT dated 30.09.2013 and decided to send final reminder and also send an email  for  expedi៝�ng  their  reply  failing  which  the  Commiោ�ee  would  be  constrained  to  reject  their  case  with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.

14

Case No.:21/20/80‐

ALC2/2012 Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00437/AM13/ RLA File :11/24/040/00024/AM12/ Lic.No/Date:1110027289 19.10.2012 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 25.09.2013 and decided to remind them for expedi៝�ng their reply.   15

Case No.:13/26/80‐

ALC2/2012 Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Approved HQ File :01/80/050/00574/AM13/ RLA File :07/24/040/00366/AM13/ Lic.No/Date:0710092780 31.12.2012   Decision : Based on DIPP leោ�er dated 15.10.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1.       Net weights of export products may be specified as given below:   Sl. No. Net Export Wt.(Kgs.) Sl. No. Net Export Wt.(Kgs) Sl. No. Net Export Wt.(kgs.) Sl. No. Net Export Wt.(kgs.) 1 403 18 285 35 2450 52 1680 2 104 19 250 36 896 53 820 3 4664 20 4275 37 837 54 10850 4 527 21 1995 38 784 55 3603 5 370 22 553 39 576 56 13000 6 903 23 585 40 775 57 3360 7 1566 24 570 41 660 58 11250 8 6205 25 280 42 125 59 1180 9 6675 26 11309 43 297 60 21960 10 6413 27 545 44 288 61 30875 11 5032 28 600 45 470 62 214.5 12 11573 29 13790 46 345 63 1960 13 2430 30 425 47 68 64 5750 14 335 31 182 48 1095 65 500 15 305 32 3197 49 1320 66 42124.5 16 310 33 2492 50 440 67 337.5 17 265 34 1272 51 18725 68 405 2.       Quan៝�ty of import item at Sl. No. 1 may be allowed as 249499 Kgs. for export products at Sl. No. 1 to 44  inclusive of 153.6 % wastage a៻�er taking 5 % recovery from scrap. 3.       Quan៝�ty of import item at Sl. No. 2 may be allowed as 171069 Kgs. for export products at Sl. No. 45 to 57  inclusive of 206.7 % wastage a៻�er taking 5 % recovery from scrap. 4.       Quan៝�ty of import item at Sl. No. 3 may be allowed as 43992 Kgs. for export product at Sl. No. 58  inclusive of 291 % wastage a៻�er taking 5 % recovery from scrap. 5.       Quan៝�ty of import item at Sl. No. 4 may be allowed as 287682 Kgs. for export products at Sl. No. 59 to 68  inclusive of 173 % wastage a៻�er taking 5 % recovery from scrap.    

Case No.:23/26/80‐

ALC2/2012 Party Name:PSK ENGINEERING PVT LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred

16 HQ File :01/80/050/00584/AM13/ RLA File :07/24/040/00420/AM13/ Lic.No/Date:0710092968 08.01.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  dated  29.08.2013  followed by reminder dated 30.09.2013 and decided to send final reminder and also send an email reminder for expedi៝�ng their reply failing which the commiោ�ee will be constrained to reject the case.   17

Case No.:8/26/80‐ALC2/2012

Party Name:JINDAL RAIL INFRASTRUCTURE LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00569/AM13/ RLA File :05/23/040/00400/AM13/ Lic.No/Date:0510342981 10.01.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  dated  12.4.2013  followed  by reminder  dated  29.5.2013  and  final  reminder  dated  29.7.2013  and  an  email  reminder  on  26.09.2013  for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.   18

Case No.:27/26/80‐

ALC2/2012 Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00588/AM13/ RLA File :31/83/040/00164/AM13/ Lic.No/Date:3110056801 11.01.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  dated  30.4.2013  followed  by reminder  dated  30.5.2013  and  final  reminder  dated  29.7.2013  and  an  email  reminder  on  03.10.2013  for expedi៝�ng their reply failing which the commiោ�ee will be constrained to reject the case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.   19

Case No.:17/26/80‐ALC2/2012 Party Name:BLUE STAR LTD.

Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00578/AM13/ RLA File :03/94/040/00825/AM13/ Lic.No/Date:0310720787 15.01.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that firm has replied vide their leោ�er dated 24.09.2013 and forwarded to DIPP on 25.09.2013 for examina៝�on and comments.   20

Case No.:15/26/80‐

ALC2/2012 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00576/AM13/ RLA File :03/95/040/00791/AM13/ Lic.No/Date:0310722249 29.01.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  representa៝�ve  of  firm    Shri  Ashok  Sajwani,  Senior  Dy.  Manager Corporate Affairs,  aោ�ended  personal  hearing  alongwith  Technical  Officers  before  the  Commiោ�ee  and  the  case discussed in details and decided to defer the case as the maោ�er is under examina៝�on of PC‐VI Sec៝�on.  

Case No.:5/26/80‐ALC2/2012

Party Name:DEE LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred

21 HQ File :01/80/050/00566/AM13/ RLA File :05/23/040/00453/AM13/ Lic.No/Date:0510345480 11.02.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  dated  24.05.2013  followed  by reminder  dated  29.08.2013  and  final  reminder  dated  25.9.2013  and  an  email  reminder  on  26.09.2013  for expedi៝�ng their reply failing which the commiោ�ee will be constrained to reject the case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.   22

Case No.:21/26/80‐ALC2/2012 Party Name:TEXMACO UGL

RAIL PRIVATE LIMITED. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00582/AM13/ RLA File :02/24/040/00174/AM13/ Lic.No/Date:0210186293 11.02.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that reply of the firm already sent to DHI vide ID note dated 07.08.2013 and 02.09.2013. However, the reply is again being sent to DHI for examina៝�on and comments.   23

Case No.:1/26/80‐ALC2/2012

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00562/AM13/ RLA File :34/24/040/00249/AM13/ Lic.No/Date:3410036266 26.02.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on with C&PC for comments.   24

Case No.:34/8/80‐ALC2/2013

Party Name:NEO WHEELS LTD (FRMLY KNOWN AS VERSATILE H.C.& ENG Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00144/AM14/ RLA File :03/95/040/00036/AM14/ Lic.No/Date:0310732167 22.04.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  the  hard  copy  of  firm’s  applica៝�on  to  be  forwarded  again  to  MSME  for examina៝�on and comments.   25

Case No.:33/8/80‐ALC2/2013 Party Name:THYSSENKRUPP

INDUSTRIES INDIA PVT.LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00143/AM14/ RLA File :03/95/040/00063/AM14/ Lic.No/Date:0310733011 01.05.2013 26.11.2013 Decision : The Commiោ�ee noted that the firm is making supply to invalida៝�on leោ�er of EPCG and the maោ�er was referred to EPCG Division for clarifica៝�on and clarifica៝�on from EPCG Division is awaited.       26

Case No.:41/8/80‐ALC2/2013 Party Name:LARSEN &

TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00151/AM14/ RLA File :03/95/040/01030/AM13/ Lic.No/Date:0310733370 06.05.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the representa៝�ve of firm  Shri Ashok Sajwani, Senior Dy. Manager Corporate Affairs, aោ�ended personal hearing alongwith Technical Officers before the Commiោ�ee and the case discussed in details and decided  to defer the case as the maោ�er is under examina៝�on of PC‐VI Sec៝�on.

27

Case No.:35/8/80‐ALC2/2013 Party Name:LARSEN &

TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00145/AM14/ RLA File :03/95/040/00813/AM13/ Lic.No/Date:0310733531 07.05.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  dated  29.08.2013  followed  by reminder dated 25.09.2013 and decided to send final email reminder for expedi៝�ng their reply failing which the commiោ�ee will be constrained to reject the case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.   28

Case No.:36/8/80‐ALC2/2013 Party Name:LARSEN & TOUBRO

LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00146/AM14/ RLA File :03/95/040/01006/AM13/ Lic.No/Date:0310733535 07.05.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  dated  29.08.2013  followed  by reminder dated 25.09.2013 and decided to send final email reminder for expedi៝�ng their reply failing which the commiោ�ee will be constrained to reject the case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.   29

Case No.:43/8/80‐ALC2/2013

Party Name:UNI VTL PRECISION PVT. LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00153/AM14/ RLA File :03/95/040/00095/AM14/ Lic.No/Date:0310733552 07.05.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 19.09.2013 and decided to remind them for expedi៝�ng their reply.   30

Case No.:3/6/80‐ALC2/2013

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00094/AM14/ RLA File :05/23/040/00016/AM14/ Lic.No/Date:0510353884 13.05.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  the  hard  copy  of  applica៝�on  has  been  sent  to  DHI  for  examina៝�on  and comments.   31

Case No.:39/8/80‐ALC2/2013 Party Name:LARSEN &

TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00149/AM14/ RLA File :03/95/040/00055/AM14/ Lic.No/Date:0310734097 13.05.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 19.09.2013 and decided to remind them for expedi៝�ng their reply.  

Case No.:37/8/80‐ALC2/2013 Party Name:LARSEN &

TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 Status: Approved

32 15.10.2013 HQ File :01/80/050/00147/AM14/ RLA File :52/24/040/00051/AM13/ Lic.No/Date:5210039749 16.05.2013   Decision : Based on DIPP leោ�er dated 15.10.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1.       Net Empty weight  of 64.5 MT  may be specified with the quan៝�ty of  export product. 2.       Import items at Sl. No. 1, 2, 3 & 4  shall be of relevant grade and thickness as contained in the export product. 3.       Import items at Sl. No. 1, 3 & 4  may be allowed as 1.03 Kgs./Kg. in the export product as claimed by the firm. 4.       Import item at Sl. No. 2  may be allowed as 18647 Kgs. as  1.05 Kgs./Kg. in the export product.. 5.       Weights of import items at Sl. No. 5 & 6 may be specified as 10856 Kgs.  &   200 Kgs. respec៝�vely. 6.       Quan៝�៝�es of import items at Sl. No.5 & 6 may be allowed on net to net basis with accountability clause. 7.       Import item at Sl. No. 7  shall be of relevant grade and dia. as contained in the export product. 8.       Quan៝�ty   of import item at Sl. No. 7 may be allowed as 18 Meters(1306 Kgs.) inclusive of 2 % wastage. 9.       Quan៝�៝�es of import items at Sl. No. 8 & 9  (welding Consumables) may be allowed as 450 Kgs & 1282 Kgs. respec៝�vely.     33

Case No.:38/8/80‐ALC2/2013 Party Name:LARSEN &

TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00148/AM14/ RLA File :52/24/040/00045/AM13/ Lic.No/Date:5210039748 16.05.2013 Defer Date:26.11.2013 Decision : Based on DIPP UO Note dated 15.10.2013, the Commiោ�ee decided to ask the following informa៝�on from the firm: 1.       Net weight of indigenous items  in the export products. 2.       Informa៝�on in respect of Sl. No. 5 & 11  of Standard Deficiency Format. 3.              For net  weight  of  components  to  be  manufactured  from  import  items  at  Sl.  No.1,  2  &  3,  details  of components with net weights thereof may be indicated. 4.             Weight of Test Coupons  at import item at Sl. No. 8 and jus៝�fica៝�on/basis for the quan៝�៝�es of “Test coupons” .   34

Case No.:2/6/80‐ALC2/2013

Party Name:SHAKTI PUMPS (INDIA) LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Approved HQ File :01/80/050/00093/AM14/ RLA File :56/24/040/00006/AM14/ Lic.No/Date:5610002221 30.05.2013   Decision : Based on DIPP leោ�er dated 15.10.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: Advance  Authoriza៝�on  may  be  ra៝�fied  as  under  on  repeat  basis  as  per  firm’s  Advance  Authoriza៝�on  No. 5610001234 dated 09.11.2012 ra៝�fied in Norms Commiោ�ee Mee៝�ng No.24/80 dated  19/02/2013: 1.             Quan៝�ty of export products at Sl. 1 & 2  may also be specified as 10,000 Nos.  & 20,000 Nos. respec៝�vely  in addi៝�on to their weights. 2.          Words “of relevant grade & thickness” may be prefixed with the descrip៝�on of import items at Sl. No. 1 & 2. 3.          Quan៝�ty of import item at Sl. No 1 may be allowed as applied for i.e. 63070 Kgs. inclusive of 36 % wastage a៻�er 1/3rd recovery from scrap.

4.          Quan៝�ty of import item at Sl. No 2 may be allowed as applied for i.e. 78020 Kgs. inclusive of 48.5 % wastage a៻�er 1/3rd recovery from scrap.     35

Case No.:35/15/80‐

ALC2/2013 Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00291/AM14/ RLA File :05/23/040/00067/AM14/ Lic.No/Date:0510356370 06.06.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to MSME on 10.10.2013 for examina៝�on and comments.   36

Case No.:63/15/80‐

ALC2/2013 Party Name:DEE LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00319/AM14/ RLA File :05/23/040/00091/AM14/ Lic.No/Date:0510357229 17.06.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 10.10.2013 for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 10.10.2013.   37

Case No.:64/15/80‐

ALC2/2013 Party Name:DEE LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00320/AM14/ RLA File :05/23/040/00089/AM14/ Lic.No/Date:0510357228 17.06.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 10.10.2013 for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 10.10.2013.   38

Case No.:3/15/80‐ALC2/2013 Party Name:HYDAC (INDIA)

PVT. LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00259/AM14/ RLA File :03/94/040/00255/AM14/ Lic.No/Date:0310738419 20.06.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that copy of applica៝�on has not been received in NC and decided to request RA/firm to immediately forward copy of applica៝�on for considera៝�on of the case.   39

Case No.:27/15/80‐

ALC2/2013 Party Name:TRELLEBORG INDUSTRIAL PRODUCTS INDIA PRIVATE LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00283/AM14/ RLA File :07/24/040/00088/AM14/ Lic.No/Date:0710096218 26.06.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the hardcopy of the firm’s applica៝�on to be forwarded to DIPP(Chem.) for examina៝�on and comments.  

Case No.:20/15/80‐

ALC2/2013 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 Status: Deferred

40 15.10.2013 HQ File :01/80/050/00276/AM14/ RLA File :03/95/040/00257/AM14/ Lic.No/Date:0310739479 28.06.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  firm’s  applica៝�on  has  been  sent  to  DHI/DIPP  on  10.10.2013  for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 10.10.2013.   41

Case No.:10/15/80‐

ALC2/2013 Party Name:ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00266/AM14/ RLA File :07/21/040/00090/AM14/ Lic.No/Date:0710096369 02.07.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 10.10.2013 for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 10.10.2013.   42

Case No.:11/15/80‐

ALC2/2013 Party Name:ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00267/AM14/ RLA File :07/21/040/00126/AM14/ Lic.No/Date:0710096370 02.07.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 10.10.2013 for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 10.10.2013.   43

Case No.:21/15/80‐

ALC2/2013 Party Name:L&T ‐ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00277/AM14/ RLA File :03/95/040/00170/AM14/ Lic.No/Date:0310739825 02.07.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 10.10.2013 for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 10.10.2013.   44

Case No.:38/15/80‐

ALC2/2013 Party Name:KGR INDUSTRIES Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00294/AM14/ RLA File :09/24/040/00173/AM14/ Lic.No/Date:0910056807 17.07.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  the  firm’s  applica៝�on  has  been  sent  to  DIPP  on  10.10.2013,  the  case pertains to DHI and decided to forward the copy of applica៝�on to DHI for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 10.10.2013.   45

Case No.:37/15/80‐

ALC2/2013 Party Name:ADDAGUDI EXPORTS PVT. LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00293/AM14/ RLA File :09/24/040/00159/AM14/ Lic.No/Date:0910056812 18.07.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  firm’s  applica៝�on  has  been  sent  to  MSME  on  10.10.2013  for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 10.10.2013.

46

Case No.:58/15/80‐

ALC2/2013 Party Name:USHA MARTIN LIMITED, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00314/AM14/ RLA File :02/24/040/00051/AM14/ Lic.No/Date:0210192100 22.07.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 11.10.2013 for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 11.10.2013.   47

Case No.:33/15/80‐

ALC2/2013 Party Name:SEATO AUTO ACCESSORIES (INDIA) PVT. LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00289/AM14/ RLA File :10/24/040/00027/AM14/ Lic.No/Date:1010054266 30.07.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  firm’s  applica៝�on  has  been  sent  to  DIPP  on  10.10.2013.  A៻�er  examina៝�on DIPP informed that, the case pertains to NC‐V and the same may be transfer  to them accordingly.   48

Case No.:59/15/80‐

ALC2/2013 Party Name:WELD FUSE PVT. LTD . Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00315/AM14/ RLA File :09/24/040/00160/AM14/ Lic.No/Date:0910056957 30.07.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DIPP on 11.10.2013 for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 11.10.2013.   49

Case No.:2/15/80‐ALC2/2013 Party Name:ELECTRONIC

INSTRUMENTATION Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00258/AM14/ RLA File :33/24/040/00006/AM14/ Lic.No/Date:3310027177 05.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that copy of applica៝�on has not been received in NC and decided to request RA/firm to immediately forward copy of applica៝�on for considera៝�on of the case.   50

Case No.:28/15/80‐

ALC2/2013 Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00284/AM14/ RLA File :22/21/040/00043/AM14/ Lic.No/Date:2210014079 06.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 11.10.2013 for examina៝�on and comments.   51

Case No.:26/15/80‐

ALC2/2013 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00282/AM14/ RLA File :05/23/040/00177/AM14/ Lic.No/Date:0510362199 07.08.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  the  firm’s  applica៝�on  has  been  sent  to  DIPP  on  10.10.2013,  the  case pertains to DHI and decided to forward the copy of applica៝�on to DHI for examina៝�on and comments and EPCG

clarifica៝�on leោ�er  issued to the firm on 10.10.2013.   52

Case No.:45/15/80‐

ALC2/2013 Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00301/AM14/ RLA File :03/94/040/00305/AM14/ Lic.No/Date:0310744564 07.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DIPP on 10.10.2013 for examina៝�on and comments.   53

Case No.:47/15/80‐

ALC2/2013 Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00303/AM14/ RLA File :31/83/040/00084/AM14/ Lic.No/Date:3110059801 07.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 11.10.2013, the case pertains to DIPP and decided to forward the copy of applica៝�on to DIPP for examina៝�on and comments.   54

Case No.:15/15/80‐

ALC2/2013 Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00271/AM14/ RLA File :05/23/040/00195/AM14/ Lic.No/Date:0510362332 08.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 10.10.2013 for examina៝�on and comments and EPCG clarifica៝�on leោ�er  issued to the firm on 10.10.2013.   55

Case No.:25/15/80‐

ALC2/2013 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00281/AM14/ RLA File :05/23/040/00198/AM14/ Lic.No/Date:0510362325 08.08.2013 Defer Date:26.11.2013 Decision : Based on DIPP UO Note dated 15.10.2013, the Commiោ�ee decided to ask the following informa៝�on from the firm: 1.       Informa៝�on in respect of Sl. No. 3, 4, 5, 11 & 13  of Standard Deficiency Format. 2.       Specific use of import items at Sl. No. 2 & 3  in the export product and basis for their  quan៝�៝�es.   56

Case No.:17/15/80‐

ALC2/2013 Party Name:LIUGONG INDIA PRIVATE LIMITED, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Approved HQ File :01/80/050/00273/AM14/ RLA File :56/24/040/00014/AM14/ Lic.No/Date:5610002660 13.08.2013   Decision : On the recommenda៝�on of  DHI representa៝�ve present in the mee៝�ng, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per General Note‐4 of Engineering Products.    

Case No.:18/15/80‐

ALC2/2013 Party Name:DEE Meet No/Date:15/80‐ ALC2/2013 Status: Deferred

57 LTD. 15.10.2013 HQ File :01/80/050/00274/AM14/ RLA File :05/23/040/00205/AM14/ Lic.No/Date:0510362566 13.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm has not replied to this directorate leោ�er dated 10.10.2013. The commiោ�ee also observed that the number of items which are imported are pipe fi៶�ngs, and the descrip៝�on of the export product also shows Pre‐fabricated pipe, pipe fi៶�ngs. The Commiោ�ee felt that from the descrip៝�on of the EP, words pipe and pipe fi៶�ngs needs to be removed. Accordingly, the Commiោ�ee decided to request firm to get  descrip៝�on  of  the  export  products  amended  from  RA  and  inform  to  the  Commiោ�ee  or  they  may  offer necessary clarifica៝�on in this regard.   58

Case No.:14/15/80‐

ALC2/2013 Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00270/AM14/ RLA File :05/23/040/00199/AM14/ Lic.No/Date:0510362949 20.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on was forwarded to DIPP on 10.10.2013 and observed that this pertains to C&PC and accordingly decided to forward the copy of applica៝�on to C&PC for examina៝�on and comments.   59

Case No.:22/15/80‐

ALC2/2013 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00278/AM14/ RLA File :05/23/040/00202/AM14/ Lic.No/Date:0510363048 20.08.2013 Defer Date:26.11.2013 Decision : Based on DIPP UO Note dated 15.10.2013, the Commiោ�ee decided to ask the following informa៝�on from the firm: 1.       Informa៝�on in respect of Sl. No. 3, 4, 5, 11 & 13  of Standard Deficiency Format. 2.       Quan៝�ty of import item at Sl. No. 3  in Nos. also in addi៝�on to its weight.   60

Case No.:23/15/80‐

ALC2/2013 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00279/AM14/ RLA File :05/23/040/00203/AM14/ Lic.No/Date:0510363049 20.08.2013 Defer Date:26.11.2013 Decision : Based on DIPP UO Note dated 15.10.2013, the Commiោ�ee decided to ask the following informa៝�on from the firm: 1.       Informa៝�on in respect of Sl. No. 3, 4, 5, 11 & 13  of Standard Deficiency Format‐Export Product wise. 2.       Quan៝�៝�es of import items at Sl. Nos. 7 to 11  in Nos. also in addi៝�on to their weights. 3.       Quan៝�៝�es of import items at Sl. No. 12 & 13  in meters also in addi៝�on to their weights.   61

Case No.:29/15/80‐

ALC2/2013 Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00285/AM14/ RLA File :05/24/040/00173/AM14/ Lic.No/Date:0510363177 21.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DIT on 11.10.2013 for examina៝�on and comments.

62

Case No.:1/12/80‐ALC2/2013 Party Name:PRANITA

ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00205/AM14/ RLA File :07/24/040/00144/AM14/ Lic.No/Date:0710097670 22.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that copy of applica៝�on has not been received from RA and decided to request RA/firm to immediately forward hard copy of applica៝�on for considera៝�on of the case.   63

Case No.:1/15/80‐ALC2/2013 Party Name:SARTORIUS

STEDIM INDIA PVT. LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00257/AM14/ RLA File :07/24/040/00125/AM14/ Lic.No/Date:0710097665 22.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that copy of applica៝�on has not been received from RA and decided to request RA/firm to immediately forward hard copy of applica៝�on for considera៝�on of the case.   64

Case No.:24/15/80‐

ALC2/2013 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00280/AM14/ RLA File :05/23/040/00212/AM14/ Lic.No/Date:0510363388 23.08.2013 Defer Date:26.11.2013 Decision : Based on the DIPP UO Note dated 15.10.2013, the Commiោ�ee decided to seek informa៝�on from the firm on the following: 1.           Informa៝�on in respect of Sl. No. 3, 4, 5, 11 & 13  of Standard Deficiency Format‐Export Product wise. 2.           Quan៝�៝�es of import items at Sl. No. 4 to 9, 12 to 14, 16 to 29 & 34  in Nos. also in addi៝�on to their weights. 3.           Quan៝�៝�es of import items at Sl. No. 10, 11 & 15  in meters also in addi៝�on to their weights.   65

Case No.:34/15/80‐

ALC2/2013 Party Name:TERUMO PENPOL LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00290/AM14/ RLA File :53/24/040/00004/AM14/ Lic.No/Date:5310017300 23.08.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  C&PC  on  10.10.2013  which  is  under examina៝�on of C&PC and decided to await comments. Case is deferred to 26.11.2013.   66

Case No.:16/15/80‐

ALC2/2013 Party Name:INDUS PRO AUTO ENGINEERS PVT.LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00272/AM14/ RLA File :05/23/040/00221/AM14/ Lic.No/Date:0510363605 26.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on was forwarded to DIPP on 10.10.2013 and observed that this pertains to MSME and accordingly decided to forward the copy of applica៝�on to MSME for examina៝�on and comments. Case is deferred to 26.11.2013.  

Case No.:30/15/80‐

ALC2/2013 Party Name:TATA HITACHI CONSTRUCTION MACHINERY CO. LTD, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Approved

67 HQ File :01/80/050/00286/AM14/ RLA File :02/24/040/00065/AM14/ Lic.No/Date:0210193371 26.08.2013   Decision : : Based on the DHI wriោ�en comments dated 15.10.2013, the commiោ�ee decided to ra៝�fy norms as per GN‐4.     68

Case No.:31/15/80‐

ALC2/2013 Party Name:TATA HITACHI CONSTRUCTION MACHINERY CO. LTD, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status:  Approved HQ File :01/80/050/00287/AM14/ RLA File :02/24/040/00063/AM14/ Lic.No/Date:0210193369 26.08.2013   Decision : Based on the DHI wriោ�en comments dated 15.10.2013, the commiោ�ee decided to ra៝�fy norms as per GN‐4.     69

Case No.:32/15/80‐

ALC2/2013 Party Name:TATA HITACHI CONSTRUCTION MACHINERY CO. LTD, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Approved HQ File :01/80/050/00288/AM14/ RLA File :02/24/040/00068/AM14/ Lic.No/Date:0210193370 26.08.2013   Decision : Based on the DHI wriោ�en comments dated 15.10.2013, the commiោ�ee decided to ra៝�fy norms as per GN‐4.     70

Case No.:57/15/80‐

ALC2/2013 Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00313/AM14/ RLA File :09/24/040/00246/AM14/ Lic.No/Date:0910057354 26.08.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DHI  on  11.10.2013  which  is  under examina៝�on of DHI and decided to await comments. Case is deferred to 26.11.2013.   71

Case No.:12/15/80‐

ALC2/2013 Party Name:BHARAT PUMPS & COMPRESSORS LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00268/AM14/ RLA File :06/24/040/00011/AM14/ Lic.No/Date:0610033669 27.08.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DIPP  on  10.10.2013  which  is  under examina៝�on of DIPP and decided to await comments. Case is deferred to 26.11.2013.   72

Case No.:54/15/80‐

ALC2/2013 Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred

HQ File :01/80/050/00310/AM14/ RLA File :09/24/040/00218/AM14/ Lic.No/Date:0910057395 28.08.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DHI  on  11.10.2013  which  is  under examina៝�on of DHI and decided to await comments. Case is deferred to 26.11.2013.   73

Case No.:19/15/80‐

ALC2/2013 Party Name:DEE LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00275/AM14/ RLA File :05/23/040/00226/AM14/ Lic.No/Date:0510363870 29.08.2013 Defer Date:26.11.2013 Decision :Based on the DHI representa៝�ve recommenda៝�on, the commiោ�ee decided to call for clarifica៝�on  on export item descrip៝�on. Case is deferred to 26.11.2013.   74

Case No.:67/15/80‐

ALC2/2013 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00323/AM14/ RLA File :03/95/040/00326/AM14/ Lic.No/Date:0310747481 29.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the case has been forwarded to DHI and DIPP both on 11.10.2013  and observed that this pertains to DIPP  which is under examina៝�on of DIPP and decided to await comments. Case is deferred to 26.11.2013.   75

Case No.:68/15/80‐

ALC2/2013 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00324/AM14/ RLA File :03/95/040/00364/AM14/ Lic.No/Date:0310747478 29.08.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DIPP  on  10.10.2013  which  is  under   76

Case No.:5/15/80‐

ALC2/2013 Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00261/AM14/ RLA File :11/24/040/00003/AM14/ Lic.No/Date:1110027643 30.08.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DIPP  on  10.10.2013  which  is  under   77

Case No.:55/15/80‐

ALC2/2013 Party Name:POLMOR STEEL PVT LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00311/AM14/ RLA File :09/24/040/00249/AM14/ Lic.No/Date:0910057433 30.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DHI  and  DIPP  both  on  11.10.2013  and observed that this pertains to DHI which is under examina៝�on of DHI and decided to await comments. Case is   Status:

78

Case No.:56/15/80‐

ALC2/2013 Party Name:POLMOR STEEL PVT LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Deferred HQ File :01/80/050/00312/AM14/ RLA File :09/24/040/00250/AM14/ Lic.No/Date:0910057434 30.08.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the case has been forwarded to DHI and DIPP both on 11.10.2013  and observed that this pertains to DHI which is under examina៝�on of DHI and decided to await comments. Case is   79

Case No.:60/15/80‐

ALC2/2013 Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Approved HQ File :01/80/050/00316/AM14/ RLA File :04/24/040/00096/AM14/ Lic.No/Date:0410149287 30.08.2013   Decision : Based on  the  DHI  wriោ�en  comments  dated  15.10.2013,  the  commiោ�ee  decided  to  ra៝�fy  norms  as under: Item No. 1,2,3 ‐ 1.02 Kg/Kg of relevant pipe. Item No. 5 ‐ 16 MT Item No.15 – 1.03 Kg/Kg of relevant plate. Remaining items net to net under GN‐4.     80

Case No.:61/15/80‐ALC2/2013 Party Name:BHARAT HEAVY

ELECTRICALS LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Approved HQ File :01/80/050/00317/AM14/ RLA File :04/24/040/00097/AM14/ Lic.No/Date:0410149288 30.08.2013   Decision :  Based  on  the  DHI  wriោ�en  comments  dated  15.10.2013,  the  commiោ�ee  decided  to  ra៝�fy  norms  as under: Item No. 1,2,3 ‐ 1.02 Kg/Kg of relevant pipe. Item No. 5 ‐ 24 MT Item No.15 – 1.03 Kg/Kg of relevant plate. Remaining items net to net under GN‐4.     81

Case No.:39/15/80‐ALC2/2013 Party Name:KAMAL

RUBPLAST INDUSTRIES (P) LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00295/AM14/ RLA File :05/23/040/00219/AM14/ Lic.No/Date:0510364089 02.09.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee  noted  that  the  case  has  been  forwarded  to  Shri  S.K.  Jain,  DIPP  on  11.10.2013  and observed that this pertains to Shri Nandlal, DIPP and decided to send the copy of applica៝�on to Shri Nand Lal, Sr. DO, DIPP for examina៝�on and comments. Case is deferred to 26.11.2013.  

Case No.:62/15/80‐ALC2/2013 Party Name:WELD FUSE PVT.

LTD . Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred

82 HQ File :01/80/050/00318/AM14/ RLA File :09/24/040/00238/AM14/ Lic.No/Date:0910057465 02.09.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DIPP  on  11.10.2013  which  is  under   83

Case No.:50/15/80‐ALC2/2013 Party Name:TERACOM

LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00306/AM14/ RLA File :05/24/040/00199/AM14/ Lic.No/Date:0510364316 03.09.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on was forwarded to DHI on 11.10.2013 and observed that this pertains to DEIT and accordingly decided to forward the copy of applica៝�on to DEIT for examina៝�on and comments. The case is to be relisted on 12.11.2013.   84

Case No.:53/15/80‐ALC2/2013 Party Name:TATA HITACHI

CONSTRUCTION MACHINERY CO. LTD, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Approved HQ File :01/80/050/00309/AM14/ RLA File :02/24/040/00072/AM14/ Lic.No/Date:0210193747 03.09.2013   Decision : Based on the DHI wriោ�en comments dated 15.10.2013, the commiោ�ee decided to ra៝�fy norms as per GN‐4.     85

Case No.:6/15/80‐ALC2/2013 Party Name:ISGEC HEAVY

ENGINEERING LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00262/AM14/ RLA File :05/23/040/00234/AM14/ Lic.No/Date:0510364501 04.09.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on was forwarded to DHI on 10.10.2013 and observed that this pertains to DIPP and accordingly decided to forward the copy of applica៝�on to DIPP for examina៝�on and comments. Case is deferred to 26.11.2013.   86

Case No.:65/15/80‐ALC2/2013 Party Name:LARSEN &

TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00321/AM14/ RLA File :03/95/040/00440/AM14/ Lic.No/Date:0310748374 04.09.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DHI  &  DIPP  both  on  10.10.2013  and observed that this pertains to DIPP which is under examina៝�on of DIPP and decided to await comments of DIPP. Case is deferred to 26.11.2013.   87

Case No.:40/15/80‐ALC2/2013 Party Name:DEE

LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00296/AM14/ RLA File :05/23/040/00243/AM14/ Lic.No/Date:0510364684 05.09.2013 Defer Date:26.11.2013

Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DHI  on  10.10.2013  which  is  under examina៝�on of DHI and decided to await comments. Case is deferred to 26.11.2013.   88

Case No.:48/15/80‐

ALC2/2013 Party Name:RHYTHMSOFT ROBOTICS & AUTOMATION PVT.LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00304/AM14/ RLA File :31/82/040/00106/AM14/ Lic.No/Date:3110060245 05.09.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm’s applica៝�on was forwarded to DHI on 11.10.2013 and observed that this pertains to DEIT and accordingly decided to forward the copy of applica៝�on to DEIT for examina៝�on and comments. Case is deferred to 26.11.2013.   89

Case No.:51/15/80‐ALC2/2013 Party Name:OMEGA ICEHILL

PRIVATE LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00307/AM14/ RLA File :05/24/040/00208/AM14/ Lic.No/Date:0510364908 06.09.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DIPP  on  11.10.2013  which  is  under   90

Case No.:7/15/80‐ALC2/2013

Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00263/AM14/ RLA File :05/23/040/00240/AM14/ Lic.No/Date:0510364979 09.09.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DHI  on  10.10.2013  which  is  under examina៝�on of DHI and decided to await comments. Case is deferred to 26.11.2013.   91

Case No.:36/15/80‐ALC2/2013 Party Name:BOTIL OIL TOOLS

INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00292/AM14/ RLA File :05/23/040/00225/AM14/ Lic.No/Date:0510364996 09.09.2013 Defer Date:26.11.2013 Decision :The Commiោ�ee  noted  that  the case  has  been  forwarded  to  Policy  –VI  for  certain  clarifica៝�ons  and decided to await clarifica៝�ons. Case is deferred to 26.11.2013.   92

Case No.:42/15/80‐

ALC2/2013 Party Name:BECTON DICKINSON INDIA PRIVATE LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00298/AM14/ RLA File :05/23/040/00244/AM14/ Lic.No/Date:0510364978 09.09.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  C&PC  on  10.10.2013  which  is  under examina៝�on of C&PC and decided to await comments. Case is deferred to 26.11.2013.  

Case No.:43/15/80‐

ALC2/2013 Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred

93 HQ File :01/80/050/00299/AM14/ RLA File :05/23/040/00238/AM14/ Lic.No/Date:0510364981 09.09.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  MSME  on  10.10.2013  which  is under examina៝�on of MSME and decided to await comments. Case is deferred to 26.11.2013.   94

Case No.:52/15/80‐

ALC2/2013 Party Name:SHARMA PHARMACEUTICAL PVT LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00308/AM14/ RLA File :34/24/040/00131/AM14/ Lic.No/Date:3410037864 11.09.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  firm’s  applica៝�on  was  forwarded  to  C&PC  and  observed  that  this pertains  to  DIPP  and  accordingly  decided  to  forward  the  copy  of  applica៝�on  to  DIPP  for  examina៝�on  and comments. Case is deferred to 26.11.2013.   95

Case No.:9/15/80‐ALC2/2013 Party Name:ISGEC HEAVY

ENGINEERING LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00265/AM14/ RLA File :05/23/040/00235/AM14/ Lic.No/Date:0510365202 12.09.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DIPP  on  10.10.2013  which  is  under   96

Case No.:44/15/80‐

ALC2/2013 Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00300/AM14/ RLA File :03/94/040/00476/AM14/ Lic.No/Date:0310749277 12.09.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DIPP  on  10.10.2013  which  is  under   97

Case No.:4/15/80‐ALC2/2013 Party Name:GRAZIANO

TRASMISSIONI INDIA PVT LTD Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00260/AM14/ RLA File :05/23/040/00248/AM14/ Lic.No/Date:0510365514 13.09.2013 Defer Date:26.11.2013 Decision :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  MSME  on  10.10.2013  which  is under examina៝�on of MSME and decided to await comments. Case is deferred to 26.11.2013.   98

Case No.:41/15/80‐

ALC2/2013 Party Name:DEE LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00297/AM14/ RLA File :05/23/040/00253/AM14/ Lic.No/Date:0510365538 13.09.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the firm has not replied to this directorate leោ�er dated 10.10.2013. The commiោ�ee also observed that the number of items which are imported are pipe fi៶�ngs, and the descrip៝�on of the export product also shows Pre‐fabricated pipe, pipe fi៶�ngs. The Commiោ�ee felt that from the descrip៝�on of

the EP, words pipe and pipe fi៶�ngs needs to be removed. Accordingly, the Commiោ�ee decided to request firm to get  descrip៝�on  of  the  export  products  amended  from  RA  and  inform  to  the  Commiោ�ee  or  they  may  offer necessary clarifica៝�on in this regard.   99

Case No.:66/15/80‐

ALC2/2013 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00322/AM14/ RLA File :03/95/040/00477/AM14/ Lic.No/Date:0310749499 13.09.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DIPP  on  10.10.2013  which  is  under   100

Case No.:49/15/80‐ALC2/2013 Party Name:NETAFIM

IRRIGATION INDIA PVT.LTD. Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00305/AM14/ RLA File :34/24/040/00102/AM14/ Lic.No/Date:3410037946 16.09.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  C&PC  on  11.10.2013  which  is  under examina៝�on of C&PC and decided to await comments. Case is deferred to 26.11.2013.   101

Case No.:8/15/80‐ALC2/2013

Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00264/AM14/ RLA File :05/23/040/00255/AM14/ Lic.No/Date:0510366078 19.09.2013 Defer Date:26.11.2013 Decision : Based on the DIPPUO Note dated 15.10.2013, the Commiោ�ee decided to seek informa៝�on from the firm on the following: 1.           Informa៝�on in respect of Sl. No. 3, 4, 5, 11 & 13  of Standard Deficiency Format‐Export Product wise. 2.           Quan៝�៝�es of import items at Sl. No.  4, 5 & 6  in Nos. also in addi៝�on to their weights.   102

Case No.:46/15/80‐ALC2/2013 Party Name:BOTIL OIL TOOLS

INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00302/AM14/ RLA File :05/23/040/00245/AM14/ Lic.No/Date:0510366074 19.09.2013 Defer Date:26.11.2013 Decision  :  The  Commiោ�ee  noted  that  the  case  has  been  forwarded  to  DHI  on  10.10.2013  which  is  under examina៝�on of DHI and decided to await comments. Case is deferred to 26.11.2013.   103

Case No.:69/15/80‐ALC2/2013 Party Name:ALSTOM INDIA

LIMITED, Meet No/Date:15/80‐ ALC2/2013 15.10.2013 Status: Deferred HQ File :01/80/050/00325/AM14/ RLA File :32/21/040/00102/AM14/ Lic.No/Date:3210067795 26.09.2013 Defer Date:26.11.2013 Decision : The Commiោ�ee noted that the case has been forwarded to DIPP on 10.10.2013 a៻�er  examina៝�on DIPP informed that, the case pertains to DHI and applica៝�on to be forwarded to DHI for examina៝�on. Case is deferred to 26.11.2013.

S.No.352

Case No.  A/R‐70

M/s.  Zenith Precision  Pvt. Ltd., Bangalore HQF.No.01/80/050/00375/AM11/DES.I Lic. No. & date Mee៝�ng No. 15/14 RA.F.No.07/24/040/00207/AM11 (i)    0710073874          dt.27.08.2010 (ii  )  0710072313 dt.07.06.2010 (iii  )  0710070294 dt.17.03.2010 (iv  )  0710075610 dt.24.11.2010 Date: 15.10.2013 Ra៝�fica៝�on of norms The Commiោ�ee noted that the firm has replied vide their e‐mail on 08.10.2013 and forwarded to MSME on 10.10.2013 for examina៝�on and comments. Case is deferred to 26.11.2013.   Sl.No.353

Case No.  A/R‐80

M/s.  Boysen India  Limited Noida HQF.No.01/80/050/00533/AM11/DES.I Lic. No. & date Mee៝�ng No. 15/14 RA.F.No.05/23/040/00204/AM12 0510275831 dt.27.10.2010 Date: 15.10.2013 Revision of norms The  Commiោ�ee  decided  to  ra៝�fy  norms  of  subject  authoriza៝�on  as  per  DC(MSME)  UO  No.  30(246)/11‐ME  dated 03.10.2013 (copy to be forwarded to firm and RA).                 S.No.354

Case No.  A/R‐61

M/s.  United Drilling Tools Ltd., Delhi HQF.No.01/80/050/00397/AM10/DES.I Lic. No. & date Mee៝�ng No. 15/14 RA.F.No.05/24/040/00318/AM10 0510249707 dt.22.09.2009 Date: 15.10.2013 Revision of norms The Commiោ�ee noted that the maោ�er is under examina៝�on of PC‐VI Sec៝�on and decided to await comments. Case is   Sl.No.355

Case No.  A/R –41

M/s. Bharat Heavy Electricals  Ltd., Ranipet HQ F.No.01/80/50/00572/AM12/DES‐I Lic.No. & Date Mee៝�ng No. 15/14 RA F.No.61/24/040/00055/AM12 6110000728 dt.27.12.2011 Date: 15.10.2013 Revision  of  norms The Commiោ�ee noted that the case was already discussed in NC mee៝�ng held on 01.10.2013 and decided to withdraw this case.   S.No.356

Case No.  A/R‐49

M/s.  Larsen  & Toubro  Ltd., Mumbai HQF.No.01/80/050/00245/AM11/DES.I Lic. No. & date Mee៝�ng No. 15/14 RA.F.No.03/95/040/00712/AM10 0310557677 dt.29.01.2010 Date: 15.10.2013 Amendment  in  quan៝�៝�es  /  addi៝�on  of addi៝�onal import items The  Commiោ�ee  noted  that  firm  has  not  replied  to  deficiency  leោ�er  dated  29.05.2013  followed  by  reminder  dated 09.07.2013  and  decided  to  send  final  reminder  and  also  send  an  email  reminder  for  expedi៝�ng  their  reply.  Case  is   S.No.357

Case No.  A/R‐142

  M/s.    Tema India Ltd., HQF.No.01/80/050/00583/AM13/DES.I Lic. No. & date Mee៝�ng No. 15/14 RA.F.No.03/95/040/00543/AM11 0310594253 dt.28.09.2010 Date: 15.10.2013 Ra៝�fica៝�on  of norms The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 30.09.2013 and decided to remind them for expedi៝�ng their reply. Case is deferred to 26.11.2013.

S.No.358

Case No.  A/R‐75

  M/s.    Clyde Pumps  India Pvt.  Ltd.,  New Delhi HQF.No.01/80/050/00246/AM13/DES.I Lic. No. & date Mee៝�ng No. 15/14 RA.F.No.05/23/040/00073/AM13 0510327269 dt.14.06.2012 Date: 15.10.2013 Fixa៝�on  of norms The Commiោ�ee noted that firm’s request has been sent to DHI on 07.10.2013 for examina៝�on and comments. Case is   S.No.359

Case No.  A/R‐76

  M/s.    Vem Technologies Pvt.  Ltd., Hyderabad HQF.No.01/80/050/00617/AM10/DES.I Lic. No. & date Mee៝�ng No. 15/14 RA.F.No.09/24/040/00373/AM10 0910040368 dt.18.12.2009 Date: 15.10.2013 Fixa៝�on  of norms The Commiោ�ee noted that firm’s request has been sent to DC(MSME) on 10.10.2013 for examina៝�on and comments. Case is deferred to 26.11.2013.   S.No.360

Case No.  A/R‐77

 M/s.  Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00054/AM14/DES.I Lic. No. & date Mee៝�ng No. 15/14 RA.F.No.03/94/040/00984/AM13 0310729487 dt.25.03.2013 Date: 15.10.2013 Request for revision  of norms The Commiោ�ee noted that firm’s request has been sent to DIPP on 08.10.2013 for examina៝�on and comments. Case is    Sl.No.361

Case No.  C –07

M/s.  Alpha Technologies  Pvt. Ltd.., Bangalore HQ F.No.01/80/162/00016/AM13/DES‐I Mee៝�ng No. 15/14 Fixa៝�on of input output norms for the export product “Row  &  Heat  Exchanger  and  Des  Kit,  Pre‐processor PCB  Assembly,  Main  Processor  PCB  Assembly,  Power supply Unit PCB Assembly etc” in respect of 100% EOU ‐ reg Date: 15.10.2013 The Commiោ�ee noted that firm’s applica៝�on has been sent to DIT on 09.07.2013 and case is under examina៝�on with DIT. Case is deferred to 26.11.2013.   S.No.362

Case No.  C‐04

Reference  received from  Addl.  DGFT, Kolkata  of  M/s.  Larsen & Toubro Ltd., Kolkata HQF.No.01/80/162/00061/AM14/DES.I Mee៝�ng No. 15/14 Clarifica៝�on  against  SION  at  Sl.  No.  C‐1647 Engineering Product – reg. Date: 15.10.2013 The  Commiោ�ee  noted  that  firm’s  reply  dated  10.09.2013  has  been  sent  to  DHI  on  25.07.2013  for  examina៝�on  and comments. Case is deferred to 26.11.2013.   S.No.363

Case No.  C‐05

M/s.  Bri៝�sh  Engines India  Pvt.  Ltd., Bangalore HQF.No.01/80/162/00222/AM14/DES.I Mee៝�ng No. 15/14 Fixa៝�on  of  input  output  norms  for  the  export product  “Hydraulic  Motor  and  its  parts  and Mul៝�spindle automa៝�c machines spares Valve and its parts” in respect of 100% EOU – reg. Date: 15.10.2013 The Commiោ�ee noted that firm’s applica៝�on has been sent to DHI on 25.07.2013 for examina៝�on and comments. Case is   S.No.364

Case No.  C‐06

M/s.  Raulimex Industries Ltd., Mumbai HQF.No.01/80/162/00226/AM14/DES.I Mee៝�ng No. 15/14 Modifica៝�on of SION C‐1647 in respect of Advance Authoriza៝�on  No.03010748689  dated  06.09.2013 issued under Para 4.7 of HBP (Vol.‐I)  – reg. Date: 15.10.2013 The Commiោ�ee noted that firm’s applica៝�on has been sent to DHI on 03.10.2013 for examina៝�on and comments. Case is   S.No.365

Case No.  A/R‐78

  M/s.    Alstom Projects  India Ltd., Mumbai HQF.No.01/80/050/00305/AM10/DES.I Lic. No. & date Mee៝�ng No. 15/14 RA.F.No.03/94/040/00346/AM10 0310533764 dt.13.08.2009 Date: 15.10.2013 Request for revision  of norms The Commiោ�ee noted that firm’s request has been sent to DHI on 06.10.2013 for examina៝�on and comments. Case is  


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied