SEEPZ SPECIAL ECONOMIC ZONE ANDHERI (EAST), MUMBAI.

AGENDA FOR MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE OF M/S. EON KHARADI INFRASTRUCTURE PVT. LTD.-SEZ, PHASE I.

Via Video Conferencing

DATE : 17.01.2025

TIME : 11:00 A.M.


MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE, UNDER THE CHAIRMANSHIP OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 17.01.2025 INDEX

Agenda Item No.

Subject Agenda Item No. 01 :- Confirmation of the Minutes of the meeting held on 11.12.2024 Agenda Item No. 02 :- Action taken report for the Minutes of the meeting held on 11.12.2024 Agenda Item No. 03 :- Application for approval of Partial Deletion of area with revision in projections Submitted by M/s. Eaton Technologies Pvt. Ltd. Agenda Item No. 04 :- Monitoring of Performance for M/s. Sears IT & Management Services India Pvt. Ltd.


मैससस ईओएन खराडी इंफ्रास्ट्रक्चर प्रा. लिलमटेड-चरण- I एसईजेड, खराडी, पुणे, के आईटी- आईटीईएस सेक्टर के लिलिष्ट लििेष आलथसक क्षेत्र के लिए क्षेत्रीय लिकास आयुक्त सीप्ज़-एसईजेड, मुंबई की अध्यक्षता में 11.12.2024 को आयोलजत अनुमोदन सलमलत की 123िीं बैठक का लििरण। 1 एसईजेड का नाम मैससस.ईओएन खराडी इंफ्रास्ट्रक्चर प्रा. लिलमटेड- एसईजेड, चरण I 2 क्षेत्र आईटी/आईटीईएस 3 मीलटंग नं 123 िी 4 तारीख 11.12.2024

उपस्थित सदस्य: क्र. नाम और पदनाम (एस/श्री.)

विभाग 1 श्रीमती लमति लिरेमठ संयुक्त लिकास आयुक्त पुणे क्लस्ट्र एसईजेड, पुणे 2 श्री संजीि पालटि, उद्योग अलिकारी,
मिाराष्टर सरकार से नालमत
3 श्रीमती पुष्पा गंगािणे, एफटीडीओ
पुणे डीजीएफटी लिभाग से नालमत
4 श्रीमती मनीषा लबनॉय,
सीमा िुल्क अिीक्षक सीमा िुल्क लिभाग पुणे नालमत

विशेष आमंवित : क्र. नाम एिं पदनाम(श्री/ श्रीमती) विभाग 1 श्री. िम्भू दयाि मीना, लिलनलदसष्ट अलिकारी सीप्ज़-एसई़ेड, पुणे क्लस्ट्र

एजेंडा आइटम नंबर 01: वदनांक 15.10.2024 को आयोवजत 122 िीं बैठक के काययिृत्त की पुवि लिचारलिमिस के बाद, सलमलत ने 15.10.2024 को आयोलजत अनुमोदन सलमलत की 122 िीं बैठक के कायसिृत्त की पुलष्ट की।

एजेंडा आइटम नंबर 02: 15.10.2024 को आयोवजत बैठक के काययिृत्त के विए की गई कारयिाई ररपोटय। लिचार-लिमिस के बाद, सलमलत ने 15.10.2024 को आयोलजत बैठक के लिए की गई कारसिाई ररपोटस नोट की िै।

एजेंडा आइटम नंबर 03: मेससय एिएसआई इंवडया ररसर्य एंड डेििपमेंट प्राइिेट विवमटेड द्वारा प्रस्तुत नई इकाई की थिापना के अनुमोदन के विए आिेदन।
लिचार-लिमिस के बाद, सलमलत ने एसईजेड लनयम, 2006 के लनयम 17 और 18 के संदभस में मेससस ईओएन खराडी इंफ्रास्ट्रक्चर प्राइिेट लिलमटेड-एसईजेड में एक नई इकाई स्थालपत करने के लिए मेससस एिएसआई इंलडया ररसचस एंड डेििपमेंट प्राइिेट लिलमटेड के प्रस्ताि को मंजूरी दे दी। नीचे लदए गए लििरण के अनुसार अनुमोलदत प्रस्ताि:

जगह तीसरी मंवजि, विंग 2, क्लस्टर बी, ईओएन खराडी इंफ्रास्टरक्चर प्राइिेट। विवमटेड-एसईजेड, प्लॉट नंबर 1, सिे नंबर 77, एमआईडीसी खराडी नॉिेज पाकय खरडी पुणे- 411014। क्षेि 19,396 िगय. फुट. वनवमयत वकया जाने िािा उत्पाद/प्रदान की जाने िािी सेिा। सेिा प्रदाता संयंि एिं मशीनरी स्वदेशी
आयावतत कुि
0.00 10.00 10.00 सेिाएं स्वदेशी
आयावतत कुि 10.00 0.00 10.00 रोज़गार कुि 103 (पुरुष - 75, मवहिा – 28)

प्रिम ब्लॉक अिवि के विए अनुमोवदत अनुमान

(करोड रुपये में)

2024- 25 2025- 26 2026- 27 2027- 28 2028- 29 Total US $ (in Thousands) FOB Value of Exports 8.60 32.34 35.58 39.14 43.05 158.71

18893.74 FE outgo 1.72 6.47 7.12 7.83 8061 31.74

3778.74 NFE 6.88 25.87 28.46 31.31 34.44 126.94 15115.00

सलमलत ने यि नोट लकया िै लक प्रस्तालित क्षेत्र, जो नई इकाई द्वारा उपयोग लकया जाना िै, ितसमान में M/s CA (India) Technologies Pvt. Ltd. द्वारा अलिग्रलित िै। उन्ोंने JDC कायासिय में क्षेत्र के आंलिक िटाने के लिए आिेदन प्रस्तुत लकया था, लजसमें लनयासत और रोजगार अनुमान में कोई पररितसन निीं लकया गया था। JDC, पुणे ने इकाई के अनुरोि को स्वीकार कर लिया और इसके अनुसार, लदनांक 09.12.2024 को पत्र संख्या SEEPZ- SEZ/CAITPL/46/EKIPL-SEZ/2019-20/1180 के माध्यम से इकाई को स्वीकृलत प्रदान की गई। सरकारी राजस्व की िालन से बचने के लिए लनम्नलिखखत कदम उठाए जाने चालिए: a) नई इकाई M/s LSI India Research and Development Pvt. Ltd. को LOA की ितों और स्वीकृलत प्रस्तुत करनी िोगी।
b) M/s LSI India Research and Development Pvt. Ltd. को BLUT लनष्पालदत कर प्रस्तुत करना िोगा और Asset Transfer Agreement की प्रलत प्रस्तुत करनी िोगी। c) SO को यि लिखखत प्रमालणत करना िोगा लक M/s CA (India) Technologies Pvt. Ltd. से

नई इकाई को स्थानांतररत की गई संपलत्तयां Asset Transfer Agreement के अनुसार िैं और संपलत्त िस्तांतरण की सभी प्रलियाओं का सिी तरीके से पािन लकया गया िै। अध्यक्ष को िन्यिाद ज्ञापन के साथ बैठक समाप्त हुई।

Minutes of the 123th Meeting of the Approval Committee held under the Chairmanship of Zonal Development Commissioner SEEPZ-SEZ, Mumbai for Sector Specific Special Economic Zone for IT/ITES of M/s. EON Kharadi Infrastructure Pvt. Ltd.–Phase-I SEZ, Kharadi, Pune, held on 11.12.2024 1 Name of the SEZ M/s. EON Kharadi Infrastructure Pvt. Ltd.- SEZ, Phase I 2 Sector IT/ITES 3 Meeting No. 123th Meeting 4 Date 11.12.2024

Members present: Sr No. Name and Designation(S/Shri.) Department 1 Smt. Mital Hiremath Joint Development Commissioner Pune Cluster SEZ, Pune 2 Shri Sanjeev Patil, industries Officer Nominee of Govt. of Maharashtra 3 Smt. Pushpa Gangawane, FTDO Nominee of DGFT, Pune 4 Smt. Manisha Binoy Superintendent Nominee of Customs, Pune

Special Invitee: Sr Name and Designation Department 1 Shri. Shambhu Dayal Meena Specified Officer SEEPZ-SEZ, Pune Cluster

Agenda Item No.01: Confirmation of the Minutes of the 122th meeting held on 15.10.2024

After deliberation, the Committee confirmed the minutes of the 122th meeting of Approval Committee held on 15.10.2024.

Agenda Item No.02: Action taken report for the minutes of the meeting held on 15.10.2024.

After deliberation, the Committee has noted the Action taken report for the meeting held on 15.10.2024.

Agenda Item No.03: Application for approval of Setting up of New Unit submitted by M/s LSI India Research and Development Pvt. Ltd.

After deliberation, Committee approved the proposal of M/s. LSI India Research and Development Pvt. Ltd. for setting up of a new unit in EON Kharadi Infrastructure Pvt. Ltd.-SEZ in terms of Rule 17 & 18 of SEZ Rules, 2006. The details of the approved proposal as detailed below:

Location 3rd Floor, Wing 2, Cluster B, EON Kharadi Infrastructure Pvt. Ltd.-SEZ, Plot No. 1, Survey No 77, MIDC Kharadi Knowledge Park Khardi Pune- 411014. Area 19,396 Sq. ft.

Product to be manufactured /Service to be rendered. Service Provider Plant & Machinery Indigenous
Imported
TOTAL
0.00 10.00 10.00 Services Indigenous
Imported
TOTAL
10.00 0.00 10.00 Employment
Total 103 (Male - 75, Female – 28)

Approved Projections for 1st Block Period

(Rs. In Crores)

2024- 25 2025- 26 2026- 27 2027- 28 2028- 29 Total US $ (in Thousands) FOB Value of Exports 8.60 32.34 35.58 39.14 43.05 158.71

18893.74 FE outgo 1.72 6.47 7.12 7.83 8061 31.74

3778.74 NFE 6.88 25.87 28.46 31.31 34.44 126.94 15115.00

The Committee has noted that proposed area to be occupied by the New Unit is presently occupied by M/s CA (India) Technologies Pvt. Ltd. who had submitted the application to JDC Office for partial deletion of area without change in export and manpower projection. JDC, Pune has accepted the request of the Unit and accordingly approval was conveyed to the Unit vide letter No SEEPZ- SEZ/CAITPL/46/EKIPL-SEZ/2019-20/1180 dated 09.12.2024.

To avoid the loss of Government Revenue following steps to be taken:
a) The New Unit M/s LSI India Research and Development Pvt. Ltd shall submit acceptance of terms and conditions of LOA.
b) M/s LSI India Research and Development Pvt. Ltd shall execute and submit the BLUT and shall submit copy of Asset Transfer Agreement.
c) SO shall certify and submit written confirmation that the Assets transferred from M/s CA (India) Technologies Pvt. Ltd. to the new unit are as per Asset

Transfer Agreement and all procedure for transfer of assets are followed properly.

Meeting ended with a vote of thanks to the Chair.

(ज्ञानेश्वर बी. पावटि, आईएएस) (Dnyaneshwar B. Patil, IAS) अध्यक्ष एिं विकास आयुक्त Chairman-cum- Development Commissioner

ACTION TAKEN REPORT FOR THE APPROVAL COMMITTEE MEETING HELD ON 11.12.2024 IN RESPECT OF M/s. EON KHARADI INFRASTRUCTURE PVT. LTD-SEZ PHASE- I APPROVED ON 18.12.2024

Name of the Unit Subject Action Taken M/s LSI India Research and Development Pvt. Ltd.

Application for setting up New unit. Approval letter for setting up of new unit was issued on 18.12.2024.

OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI


AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE


a. Proposal : Proposal dated 30.12.2024 Received on 08.01.2025 submitted by M/s. Eaton Technologies Pvt. Ltd., an IT/ITES unit located in EON Kharadi Infrastructure Pvt. Ltd.-SEZ, Phase-I for partial deletion of area with revision in projections. b. Specific Issue on which decision of AC is required: -
Approval of the Committee for Partial deletion of area admeasuring 29,676 Sq. with Revision in projection in terms of Rule 19(2) of SEZ Rules, 2006 c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :- As per First Proviso to Rule 19(2) of SEZ Rules,2006 “PROVIDED that the Approval Committee may also approve proposals for broad banding, diversification, enhancement of capacity of production, change in the items of manufacture or service activity, if it meets the requirements of rule 18” d. Other Information: - Location / area proposed to be deleted: Existing Location and Sq.ft. Proposed Partial Deletion of area and Sq.ft. Remaining area after deletion Cluster C, wing 1, 2nd Floor, 4th and 5th Floor and at Cluster B, Wing 3, 6th and 7th Floors at EON Free Zone, Plot No. 1, Survey No. 77, MIDC Kharadi Knowledge Park Kharadi Pune- 411014. Admeasuring area: 150,157 Sq.ft Cluster C, Wing 1, 2nd Floor at EON Free Zone, Plot No. 1, Survey No. 77, MIDC Kharadi Knowledge Park Kharadi Pune- 411014.

Admeasuring area: 29,676 Sq. ft. Cluster C, Wing 1,4th and 5th Floor and at Cluster B, Wing 3, 6th and 7th Floors at EON Free Zone, Plot No. 1, Survey No. 77, MIDC Kharadi Knowledge Park Kharadi Pune-411014 Admeasuring area: 120,481 Sq.ft Projections of Investment and Employment: (Rs. In Crores) Sr.No Item Existing Projection Revised Projection 1. Value of Capital Goods i. Indigenous 16.41 20.62 ii. Imported 15.23 4.02

Total 31.64 24.64 2. Value of Services i. Indigenous 620.08 188.05 ii. Imported 88.57 75.84

Total 708.65 263.89

Employment Men Women Men Women 1069 437 721 414

TOTAL 1506 1135 Approved Projection: (Rs. In Crores) Particulars 2022-23 2023-24 2024-25 2025-26 2026-27 TOTAL FOB Value of exports 368.88 366.30 364.38 362.61 374.84 1837.01 Foreign Exchange outgo 23.52 19.53 19.29 24.56 16.90 103.80 Net Foreign Exchange 345.36 346.77 345.09 338.05 357.94 1733.21 Proposed Revision of Projection: (Rs. In Crores) Particulars 2022-23 2023-24 2024-25 2025-26 2026-27 TOTAL FOB Value of exports 450.53 504.88 546.37 544.82 573.28 2619.88 Foreign Exchange outgo 27.15 30.04 1733.21 26.33 26.66 1843.39 Net Foreign Exchange 423.38 474.84 (1186.84) 518.49 546.62 776.49 Reason for Partial deletion and Revised Projections: The unit has stated that, considering long-term optimization objectives and administrative ease, they are planning to shift some of their business segments from EON SEZ to Magarpatta SEZ. As part of this, the unit wants to reduce one floor at Cluster C, Wing 1, 2nd Floor, which measures 29,675.54 sq. ft. The employees currently on this floor will be relocated to the new SEZ unit at Magarpatta SEZ, for which they are in the process of filing a separate application. Additionally, certain assets, mainly related to employees such as laptops, desktops, monitors, printers, accessories, and other IT equipment, will be transferred to Magarpatta SEZ on a bond-to-bond basis, following the inter-SEZ transfer process. Due to these changes, the unit has revised their projections for the remaining period of the LOA. M/s.Eaton Technologies Pvt. Ltd. bearing LOA No. SEEPZ-SEZ/NEW-SEZ/EON/01/2006-07/1790/07410 Dated 19.04.2017 Date of Commencement: 19.04.2007 LOA is valid up to: 18.04.2027 The Specified officer is requested to submit the No Dues Certificate Vide letter dated 09.01.2025. The unit has submitted the following documents with the application: Copy of LOA Copy of BLUT Copy of No Objection Certificate from the Developer Copy of Form F3 Copy of Revised Projections Copy of List of Assets proposed to be transferred to New SEZ unit Copy of Board Resolution for surrender of SEZ

e. ADC’s Recommendation: Approval Committee may consider the proposal of the unit for partial deletion of area admeasuring 29,676 Sq.ft. with revision in projections in terms of Rule 19(2) of SEZ Rules, 2006 subject to submission of ‘No Dues Certificate’ from the Specified Officer.


OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI


AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE


a. Proposal : Monitoring of the performance of M/s. Sears IT & Management Services India Pvt. Ltd an IT/ITES located at M/s. EON Kharadi Infrastructure Pvt. Ltd.-SEZ, Phase-I for FY 2019-20 to 2023-24 of 3rd Block period. b. Specific Issue on which decision of AC is required: -
Monitoring of the performance of the unit for 5 years from FY 2019-20 to FY 2023-24 of 3rd Block period, in terms of Rule 54 of SEZ Rules, 2006. c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :- As per Rule 54 of SEZ Rules, 2006 “Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in Annexure appended to these rules”. d. Other Information: - Approved Projections: (3rd block Period) (Rs. In Cr.)

2019-20 2020-21 2021-22 2022-23 2023-24 TOTAL FOB Value of Exports 142.66 108.86 113.04 128.91 154.83 648.29 FE Outgo 3.05 2.12 35.41 100.54 100.43 241.55 NFE 139.60 106.74 77.64 28.36 54.39 406.74

Performance as compared to projections: FY 2019-20 to 2023-24
(Rs. In Cr.) Year Export F.E. OUTGO

Projected Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2019-20 142.66 191.76

0.79 0.00

8.22 1.03 2.03 2020-21 108.86 142.66 0.10 0.00 1.17 2021-22 113.04 108.86 0.00 0.00 0.72 2022-23 128.91 113.04 0.00 0.26 34.28 2023-24 154.83 109.47 0.00 0.77 180.45 TOTAL 648.29 665.79 0.79 0.10 8.22 2.07 218.66

Cumulative NFE achieved: (Rs. in Cr.) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2019-20 187.58 97.82% 2020-21 327.09 97.81% 2021-22 433.84 97.87% 2022-23 511.48 91.94% 2023-24 439.42 66.00%

Employment: (As per APR)

Approved Achieved Men 236 316 Women 69 36 Total 305 352

LOA No. & Date SEZ/PUNE/1P/2009-10/5702 Dated 10.12.2009 Location of Unit 4th Floor, wing 2 of Cluster D, EON Free Zone, MIDC Kharadi Knowledge Park, Kharadi Pune-411014. Validity of LOA 15.12.2024 Item(s) of manufacture/ Services IT & ITES Date of commencement of production 16.12.2009 Execution of BLUT Rs 92.86 Cr. (Taken from SO Report) Outstanding Rent dues NA Labour Dues NA Validity of Lease Agreement 10 years Pending CRA Objection, if any NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA Projected employment for the block period

No. of employees as on 31.03.2024 305 (Men-236, Women-69)

352(Men- 316, Women- 36) Area allotted (in sq.ft.) 35,830 Sq.ft Area available for each employee per sq.ft. basis (area / no. of employees) 101.78 Sq. Ft. Investment till date

Building NA Plant & Machinery 37.61 Crore Quantity and value of goods exported under Rule 34 (unutilized goods) NA

Value Addition during the monitoring period NA Whether all the APRs being considered now has been filed well within the time limit, or otherwise. If no, details of the Year along with no of days delayed to be given. Yes The Specified Officer report vide letter dated 10.01.2025 has reported as detailed below: EXPORT (Rs. In Crores)
Year/ Period Figures reported in APR Figures as per Softex/ Customs Records Difference if any Reason for Difference/Remark (1) (2) (3) (4) (5) 2019-20 195.84 190.86 4.98 Difference is due to Exchange Rate 2020-21 142.66 141.05 1.61 2021-22 108.86 107.87 0.99 2022-23 113.04 111.89 1.15 2023-24 109.47 108.53 0.94

IMPORT (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis.)
(Rs. In Crores) Year/Period Figures reported in APR (FOB Value) Figures as per Customs Records Difference if any Reason for Difference/Remark (1) (2) (3) (4) (5) 2019-20 1.03 0.76 0.27 Unit has Considered duty paid procurement value of Rs 0.27 In APR 2020-21 18.83 0.00 18.83 As per APR format the value reported is Cumulative Value, i.e, Total Value of CG Imported for the past 10 years (incl. this year). The Import as per CUSTOMS Records for this Year is Nil. 2021-22 14.02 0.00 14.02 As per APR format the value reported is Cumulative Value, i.e, Total Value of CG Imported for the past 10 years (incl. this year). The Import as per CUSTOMS Records for this Year is Nil.

2022-23 11.21 0.33 10.88 As per APR format the value reported is Cumulative Value, i.e, Total Value of CG Imported for the past 10 years (incl. this year). The Import as per CUSTOMS Records for this Year is 0.33 2023-24 10.07 0.84 9.23 As per APR format the value reported is Cumulative Value, i.e, Total Value of CG Imported for the past 10 years (incl. this year). The Import as per CUSTOMS Records for this Year is 0.84 Raw Material (Rs. In Crores) Year/Period Figures reported in APR (FOB Value) Figures as per Customs Records Difference if any Reason for Difference/Remark (1) (2) (3) (4) (5) 2019-20 0.11

0.11 Salary Paid during the year in Forex has been reported

2020-21 To 2023-24

0.00 0.00 0.00

BLUT (Amount in ‘Crores’) 1 Value of BLUT Executed (Duty foregone) (including for CG/ Raw Material/ Services)

Value of Additional BLUT executed Year: Date of acceptance BLUT amount:

TOTAL value of BLUT Executed Date of Acceptance BLUT Amount 20.02.2010 1.09 24.03.2011 1.65 03.03.2012 2.00 03.06.2015 2.69 20.01.2015 0.40 14.07.2020 73.30 28.10.2021 11.73 Total 92.86

2 Total Duty Foregone on goods & services procured Category Wise:

Year Wise:

FY Goods Imported & Indigenous Services Imported & Indigenous 19-20 0.26 4.68 20-21 0.03 2.94 21-22 0.02 3.09 22-23 0.11 3.29 23-24 0.23 2.92 Total 0.66 16.92 (d) Employment made as on date (31.03.2024) (as on end of block period/ year up to which monitoring is being done) Men: 316 Women: 36 Total No Employment: 352 The unit submitted a declaration for the above staff strength dated 02.01.2025. (e) Details of Pending Foreign Remittance beyond Permissible period, if any (as on 31.03.2023) To cross-check the same and verify whether necessary permission from AD Bank/ RBI has been obtained.

No foreign remittance is pending as on 31.03.2024

(f) Whether all Softex has been filed for the said period. If no, details thereof. SO to also check whether unit has obtained Softex condonation from DC office / RBI and if approved, whether they have filed such pending Softex. Yes

(g) Whether all Softex has been certified, if so till which month has the same been certified. If not, provide details of the Softex and reasons for pendency. All Softex have been certified till 31-03-2024

(h) Whether unit has filed any request for Cancellation of softex No (i) Whether any Services provided in DTA/SEZ/EOU/STPI etc. against payment in INR in r/o IT/ITES Unit during the period. If yes, details thereof (year wise details to be provided)

No (j) SO to verify and certify whether the unit has updated the BLUT ledger Module in SEZ Online. NA

(k) Has the unit cleared any Capital Goods procured duty free in DTA against Payment of Duty, or otherwise? Full details to be provided along with value of assets and duty discharged Yes Sr No Value in Lakhs Duty Lakhs 1 51.02 14.23

(l) Is the unit sharing any of their infrastructure with other units or are utilizing infrastructure of another unit in the same or other SEZ. If so, details thereof, including the details of the unit with whom the sharing is being made, and the payment terms If approval for sharing of common infrastructure has been obtained from UAC/DC office, the date of UAC/ Approval letter to be indicated No (m) Whether all DSPF for services procured during the said monitoring period under consideration has been filed by the unit and whether the same has been processed for approval by the SO Office. Yes, and some are under process (n) Whether unit has filed all DTA procurement w.r.t. the goods procured by them during the monitoring period for the relevant period: If no, details thereof Yes (o) Details of the request IDs pending for OOC in respect of DTA procurement on the date of submission of monitoring report No (p) Has the unit set up any cafeteria/ canteen/ food court in unit premises. If yes, whether permission from UAC/DC office has been issued, or otherwise. Whether unit has availed any duty paid goods/services for setting up such facility? If yes, whether unit has discharged such duty/ tax benefit availed? details to be given including amount of duty/ tax recovered or yet to be recovered No (q) Whether any violation of any of the provisions of law has been noticed/ observed by the Specified Officer during the period under monitoring. NA

e. ADC’s Recommendation: The unit has achieved export revenue of Rs 665.79 Cr. against the projected export of Rs 648.29 Cr. on cumulative basis during 3rd Block period i.e FY 2019-20 to 2023-24. The unit has achieved positive NFE of Rs. 439.42 Cr. i.e., 66.00 % in FY 2023-24 on cumulative basis. The unit has generated employment of 352 (Men-316, Women-36) Approval committee may kindly monitor the performance of the Unit for 5 years from 2019-20 to 2023-24 of 3rd Block period, in terms of Rule 54 of SEZ Rules, 2006.