RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   Minutes of the Norms Committee­II Meeting No. 01/10 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Meeting No. 01/10 of Norms Committee­II was held on 21.04.2009 for the licensing year 2009­2010 under the Chairmanship of Sh. O.P. Hisaria, Joint Director General of Foreign Trade (OPH) to consider the applications under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2004­2009. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.   1. Shri B.D. Ghosh, AIA M/o Steel   2. 3.   4. Sh. N.L. Goswami, Sr. DO Sh. S.K. Jain, D.O. Shri A. K. Mishra, Asst IA DHI DIPP M/o Steel 5. 6. Shri K.K. Funda, AD Shri Narendra Vashista, FTDO DC(SSI) DGFT               The Committee took up the individual cases of the agenda of this meeting for discussion and the decision taken in respect of each case as follows: 1

Case No.:34/1/81­ALC2/2009

Party Name:AERONICS EMAROH PVT.LTD, Meet No/Date:1/81­ALC2/2009 08.04.2009 Status:Case Added HQ File :01/81/050/00802/AM09/ RLA File :07/24/040/00850/AM08/ Lic.No/Date:0710057236 01.05.2008 Defer Date: Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. A copy of the application of the firm was handed over to the representative of DHI present in the meeting. The case stands deferred and to be re­listed on 09.06.2009.     2

Case No.:33/1/81­ALC2/2009

Party Name:ADLEC SYSTEMS (P) LTD., 08.04.2009 Status:Case Added HQ File :01/81/050/00801/AM09/ RLA File :05/24/040/00128/AM09/ Lic.No/Date:0510221998 12.06.2008 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  01/81  scheduled  to  be  held  on  08.04.2009  but  actually  held  on  21.04.2009.  Based  on  the

recommendations of the representative of DHI present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per GN 4.     R/A may take suitable consequential action accordingly.   3

Case No.:37/1/81­ALC2/2009

Party Name:AUTONIX AUTO INDUSTRIES PVT.LTD. 08.04.2009 Status:Case Added HQ File :01/81/050/00805/AM09/ RLA File :05/24/040/00288/AM09/ Lic.No/Date:0510224816 31.07.2008 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. On the recommendation of the  representative  of  DC(SSI)  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1. Drawing/design/specifications of export product. 2. Content/weight of SS Coil as well as bakelite powder separately in the export product. 3. Process of manufacturing with process flow chart and wastage stage wise. 4. Blanking diagram­indicating wastage during blanking operation. 5. Wastage justification for both the imported inputs.   It has also been decided to refer a copy of application of the firm to DHI.     4

Case No.:39/1/81­ALC2/2009

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00807/AM09/ RLA File :04/24/040/00173/AM09/ Lic.No/Date:0410099265 17.10.2008 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1.    Firm may be asked to clarify the value of welding wires which is  very high at approximately 91% of FOB value  of exports. 2.       Firm may also be advised to submit information in respect of S.No.1, 3, 4, 5, 11 & 13 of Standard Deficiency Format.

5

Case No.:38/1/81­ALC2/2009

Party Name:ANCHOR ELECTRICALS PVT.LTD. 08.04.2009 Status:Case Added HQ File :01/81/050/00806/AM09/ RLA File :03/94/040/00709/AM09/ Lic.No/Date:0310491150 21.10.2008 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  01/81  scheduled  to  be  held  on  08.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   After taking clue from Engineering Table 5, quantities of import items may be allowed as under:   1.    Import items at S.Nos. 1, 2 & 3 may be allowed as applied for. 2.    Quantity of import item at. S.No. 4 may be allowed as 2683 Kgs.   R/A may take suitable consequential action accordingly.     6

Case No.:36/1/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 08.04.2009 Status:Case Added HQ File :01/81/050/00804/AM09/ RLA File :03/94/040/00832/AM09/ Lic.No/Date:0310497650 12.12.2008 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 09.06.2009.   7

Case No.:35/1/81­ALC2/2009

Party Name:HEDISA INDIA DIAMOND TOOLS PVT LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00803/AM09/ RLA File :04/24/040/00214/AM09/ Lic.No/Date:0410100821 15.12.2008 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. A copy of the application of

the firm was handed over to the representative of DHI present in the meeting. The case stands deferred and to be re­listed on 09.06.2009.   8

Case No.:40/1/81­ALC2/2009

Party Name:ADVANCE CABLE TECHNOLOGIES PVT.LTD, 08.04.2009 Status:Case Added HQ File :01/81/050/00808/AM09/ RLA File :07/24/040/00520/AM09/ Lic.No/Date:0710062295 07.01.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  01/81  scheduled  to  be  held  on  08.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      Quantity of import item at S.No.1 may be allowed as 73370 Kgs. inclusive of a wastage of 1%. 2.      Quantity of import item at S.No.2 may be allowed as 29996 Kgs. 3.      Quantity of import item at S.No.3 may be allowed as applied for i.e. 49907 Kgs. inclusive of a wastage of 2%.     R/A may take suitable consequential action accordingly.   9

Case No.:7/1/81­ALC2/2009

Party Name:MOLEX (INDIA) PRIVATE LIMITED, Meet No/Date:1/81­ALC2/2009 08.04.2009 Status:Case Added HQ File :01/81/050/00775/AM09/ RLA File :07/24/040/00616/AM09/ Lic.No/Date:0710063351 27.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the application of the firm to DOT for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.   10

Case No.:1/1/81­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 08.04.2009 Status:Case Added HQ File :01/81/050/00769/AM09/ RLA File :04/24/040/00248/AM09/ Lic.No/Date:0410102686 04.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­

1.    Sizes including thickness of  “Grid plate” and “Support Back plate” 2.    Net finished weights of “Grid plate” and “Support Back plate” 3.    Information in respect of S.No. 11 of Standard Deficiency Format     11

Case No.:22/1/81­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 08.04.2009 Status:Case Added HQ File :01/81/050/00790/AM09/ RLA File :31/24/040/00322/AM09/ Lic.No/Date:3110037610 09.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 09.06.2009.   12

Case No.:23/1/81­ALC2/2009

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 08.04.2009 Status:Case Added HQ File :01/81/050/00791/AM09/ RLA File :31/24/040/00328/AM09/ Lic.No/Date:3110037611 09.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   13

Case No.:3/1/81­ALC2/2009

Party Name:MIL INDUSTRIES LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00771/AM09/ RLA File :04/24/040/00258/AM09/ Lic.No/Date:0410102803 09.03.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  01/81  scheduled  to  be  held  on  08.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1. Net export weight of 4150 Kgs. containing 485 Kgs. of PTFE may be specified with the total quantity of export products. 2. Quantity of import item may be allowed as applied for i.e. 499.55 kgs. inclusive of 3% wastage.

R/A may take suitable consequential action accordingly.     14

Case No.:4/1/81­ALC2/2009

Party Name:KAVERI PET AND POLYFORMS PRIVATE LTD. 08.04.2009 Status:Case Added HQ File :01/81/050/00772/AM09/ RLA File :10/24/040/00123/AM09/ Lic.No/Date:1010032879 09.03.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  01/81  scheduled  to  be  held  on  08.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.    Quantity of import item may be allowed as 22443 Kgs.  inclusive of 3% wastage.   R/A may take suitable consequential action accordingly.   15

Case No.:5/1/81­ALC2/2009

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00773/AM09/ RLA File :04/24/040/00278/AM09/ Lic.No/Date:0410102844 09.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1.    Firm may be asked to clarify the value of welding consumables which is very high at approximately 87 % of FOB value  of exports. 2.       Firm may also be advised to submit information in respect of S.No.1, 3, 4, 5, 11 & 13 of Standard Deficiency Format.

16

Case No.:10/1/81­ALC2/2009

Party Name:MOLEX (INDIA) PRIVATE LIMITED, Meet No/Date:1/81­ALC2/2009 08.04.2009 Status:Case Added HQ File :01/81/050/00778/AM09/ RLA File :07/24/040/00617/AM09/ Lic.No/Date:0710063498 11.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the application of the firm to DOT for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.   17

Case No.:24/1/81­ALC2/2009

Party Name:ELECTROLEAD PUNE PVT LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00792/AM09/ RLA File :31/24/040/00323/AM09/ Lic.No/Date:3110037662 12.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   18

Case No.:15/1/81­ALC2/2009

Party Name:VOITH SIEMENS HYDRO PVT LTD. Meet No/Date:1/81­ALC2/2009 08.04.2009 Status:Case Added HQ File :01/81/050/00783/AM09/ RLA File :05/24/040/00694/AM09/ Lic.No/Date:0510237887 13.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 09.06.2009.     19

Case No.:18/1/81­ALC2/2009

Party Name:MID INDIA POWER AND STEEL LIMITED, 08.04.2009 Status:Case Added HQ File :01/81/050/00786/AM09/ RLA File :11/24/040/00080/AM09/ Lic.No/Date:1110019817 13.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 09.06.2009.   20

Case No.:12/1/81­ALC2/2009

Party Name:MAHARASHTRA SEAMLESS LTD 08.04.2009 Status:Case Added

HQ File :01/81/050/00780/AM09/ RLA File :05/24/040/00748/AM09/ Lic.No/Date:0510237974 16.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1.    Outer Diameter (OD), Wall Thickness (WT) and  length of Export product. 2.    Coating thickness & Coating weights in the export product. 3.    Information in respect of S.No. 5 & 11of Standard Deficiency Format.     21

Case No.:13/1/81­ALC2/2009

Party Name:RAAJRATNA FASTENERS PVT. LTD., 08.04.2009 Status:Case Added HQ File :01/81/050/00781/AM09/ RLA File :08/24/040/00232/AM09/ Lic.No/Date:0810078674 16.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   22

Case No.:19/1/81­ALC2/2009

Party Name:INDUSTRIAL METAL POWDERS (INDIA) PVT.LTD. 08.04.2009 Status:Case Added HQ File :01/81/050/00787/AM09/ RLA File :31/24/040/00325/AM09/ Lic.No/Date:3110037694 16.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   23

Case No.:2/1/81­ALC2/2009

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00770/AM09/ RLA File :04/24/040/00291/AM09/ Lic.No/Date:0410102966 16.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. On the recommendation of

the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1.    Information in respect of S.No.1, 3, 4, 5 & 11of Standard Deficiency Format. 2.    Details of import item i.e. “IPE”.       24

Case No.:28/1/81­ALC2/2009

Party Name:RPG CABLES LIMITED, 08.04.2009 Status:Case Added HQ File :01/81/050/00796/AM09/ RLA File :03/95/040/00949/AM09/ Lic.No/Date:0310511509 16.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the     25

Case No.:29/1/81­ALC2/2009

Party Name:TECHNOVA IMAGING SYSTEMS PVT. LTD., 08.04.2009 Status:Case Added HQ File :01/81/050/00797/AM09/ RLA File :03/95/040/00987/AM09/ Lic.No/Date:0310511517 16.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that this case pertains to chemical NC and decided to transfer the case to them.   26

Case No.:30/1/81­ALC2/2009

Party Name:INSTA EXHIBITIONS PVT LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00798/AM09/ RLA File :03/94/040/01079/AM09/ Lic.No/Date:0310511666 16.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   27

Case No.:14/1/81­ALC2/2009

Party Name:MAHARASHTRA SEAMLESS LTD Status:Case Added

08.04.2009 HQ File :01/81/050/00782/AM09/ RLA File :05/24/040/00747/AM09/ Lic.No/Date:0510238133 17.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 09.06.2009.     28

Case No.:8/1/81­ALC2/2009

Party Name:POWER GEAR LTD. 08.04.2009 Status:Case Added HQ File :01/81/050/00776/AM09/ RLA File :07/24/040/00629/AM09/ Lic.No/Date:0710063667 17.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 09.06.2009.   29

Case No.:16/1/81­ALC2/2009

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 08.04.2009 Status:Case Added HQ File :01/81/050/00784/AM09/ RLA File :05/24/040/00771/AM09/ Lic.No/Date:0510238396 19.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1. Export product wise information in respect of item at S.No.  3, 4, 5, 11  & 13 of Standard Deficiency Format.     30

Case No.:17/1/81­ALC2/2009

Party Name:R.M.CONTROLS P LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00785/AM09/ RLA File :05/24/040/00788/AM09/ Lic.No/Date:0510238397 19.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the application of the firm to DHI for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.

31

Case No.:21/1/81­ALC2/2009

Party Name:LENZE MECHATRONICS PVT.LTD. 08.04.2009 Status:Case Added HQ File :01/81/050/00789/AM09/ RLA File :31/21/040/00424/AM09/ Lic.No/Date:3110037761 19.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   32

Case No.:25/1/81­ALC2/2009

Party Name:ROTOMAG MOTORS AND CONTROLS P LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00793/AM09/ RLA File :34/24/040/00224/AM09/ Lic.No/Date:3410023788 20.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   33

Case No.:6/1/81­ALC2/2009

Party Name:AMPHENOL OMNICONNECT INDIA PVT LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00774/AM09/ RLA File :04/24/040/00290/AM09/ Lic.No/Date:0410103223 20.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the     34

Case No.:9/1/81­ALC2/2009

Party Name:CONTROL INFOTECH PRIVATE LIMITED 08.04.2009 Status:Case Added HQ File :01/81/050/00777/AM09/ RLA File :07/24/040/00654/AM09/ Lic.No/Date:0710063746 20.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed

that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   35

Case No.:11/1/81­ALC2/2009

Party Name:POWER GEAR LTD. 08.04.2009 Status:Case Added HQ File :01/81/050/00779/AM09/ RLA File :07/24/040/00675/AM09/ Lic.No/Date:0710063772 23.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   36

Case No.:20/1/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 08.04.2009 Status:Case Added HQ File :01/81/050/00788/AM09/ RLA File :05/24/040/00699/AM09/ Lic.No/Date:0510238811 24.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the     37

Case No.:26/1/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00794/AM09/ RLA File :09/24/040/00456/AM09/ Lic.No/Date:0910037493 25.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   38

Case No.:27/1/81­ALC2/2009

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00795/AM09/ RLA File :04/24/040/00297/AM09/ Lic.No/Date:0410103310 25.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms

Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1.       Firm may be asked to clarify the value of welding flux which is very high at approximately 91% of FOB value  of exports. 2.       Firm may also be advised to submit information in respect of S.No.1, 3, 4, 5, 11 & 13 of Standard Deficiency Format.       39

Case No.:31/1/81­ALC2/2009

Party Name:CORDS CABLE INDUSTRIES LTD. 08.04.2009 Status:Case Added HQ File :01/81/050/00799/AM09/ RLA File :05/24/040/00766/AM09/ Lic.No/Date:0510238969 26.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   40

Case No.:32/1/81­ALC2/2009

Party Name:APAR INDUSTRIES LIMITED 08.04.2009 Status:Case Added HQ File :01/81/050/00800/AM09/ RLA File :34/24/040/00235/AM09/ Lic.No/Date:3410023855 27.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   41

Case No.:41/1/81­ALC2/2009

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 08.04.2009 Status:Case Added HQ File :01/81/050/00809/AM09/ RLA File :07/24/040/00680/AM09/ Lic.No/Date:0710063900 30.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the

42

Case No.:42/1/81­ALC2/2009

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 08.04.2009 Status:Case Added HQ File :01/81/050/00810/AM09/ RLA File :07/24/040/00677/AM09/ Lic.No/Date:0710063901 30.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the     43

Case No.:43/1/81­ALC2/2009

Party Name:MAINI PRECISION PRODUCTS P LTD 08.04.2009 Status:Case Added HQ File :01/81/050/00811/AM09/ RLA File :07/24/040/00673/AM09/ Lic.No/Date:0710063905 30.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   44

Case No.:44/1/81­ALC2/2009

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 08.04.2009 Status:Case Added HQ File :01/81/050/00812/AM09/ RLA File :05/24/040/00798/AM09/ Lic.No/Date:0510239236 31.03.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the

PART ­AR – FRESH  

Case No. AR­1

 M/s Sona Okegawa Precision Forgings Ltd. Gurgoan           Meeting No.01/81/09 F.No.01/81/50/074/ AM04/DES­II Dated 08­04­2009 Advance Licence No.0510080047 dt.05­02­2003   RLA  F.No.05/24/040/675/AM03 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 09.06.2009.    

Case No. AR­2

 M/s Sona Okegawa Precision Forgings Ltd.Gurgoan           Meeting No.01/81/09 F.No.01/81/50/914/ AM07/DES­II Dated 08­04­2009 Advance Licence No.0510199272 dt.09­02­2007   RLA  F.No.05/24/040/762/AM07 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 09.06.2009.    

Case No. AR­3

 M/s Sona Okegawa Precision Forgings Ltd.Gurgoan           Meeting No.01/81/09 F.No.01/81/50/884/ AM06/DES­II Dated 08­04­2009 Advance Licence No.0510175316 dt.27­01­2006   RLA  F.No.05/24/040/842/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 09.06.2009.    

Case No.AR­4

 M/S MEW Electricals Pvt.Ltd.Baroda           Meeting No.01/81/09 F.No.01/80/050/1399/ AM06/DES­I/DES­II Dated 08­04­2009  Advance Licence No.3410015377 dt.03­02­2006     RLA F.No.34/24/040/251/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee decided to examine the case on file. The case stands deferred and to be re­listed on 09.06.2009.

PART –D­ FRESH  

Case No. D­1

 M/S  Technocraft Industries (India) Pvt.Ltd.Mumbai and M/s Advance Ispat (India) Ltd.,New Delhi Through EEPC           Meeting No.01/81/09 F.No.01/81/162/760/AM09/DES­II Dated 08­04­2009    Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DIPP. The case stands deferred and to be re­listed on 09.06.2009.      

Case No. D­2

 M/S  JSW Steel Ltd.Mumbai through EEPC,Kolkata         Meeting No.01/81/09 F.No.01/81/162/773/AM09/DES­II Dated 08­04­2009    Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 01/81 scheduled to be held on 08.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of M/o Steel. The case stands deferred and to be re­listed on 09.06.2009.  