DGFT Committee Minutes
Ra埚�fied Minutes of Meeting No.24/14 scheduled on 18.02.2014 of Norms Committee(NCI) (DES.I Section) The mee埚�ng No. 24/14 of the Norms Commi埤�ee (NC‐I) for the licensing year 2012‐2013 was held on18.02.2014 under the Chairmanship of Dr. L.B. Singhal, Addi埚�onal Director General of Foreign Trade to consider the applica埚�ons under Duty Exemp埚�on / Remission Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I. The following Members of the Commi埤�ee were present in the mee埚�ng: ‐ Sl.No Name of the representa埚�ves & their Designa埚�on Room No. Telephone No. Dep埤�. 1. Sh K.K. Tiwari I.A 476 23063321 DHI, U.B. 2. Sh S.K. Jain, D.O. 428A 23063321 Extn.3318 23063166 DIPP, U.B. 3. Sh. K.K. Funda, Ass埤�. Dir. (Mech) 736A 23063802 Extn.2459 DC(MSME),N.B. 4. Sh. Parveen Sharma, Dy.DGFT 302 23061562 Extn.146 DGFT, U.B. 5. Sh. PriyaRanjan, FTDO 404 23061562 Ext.265 DGFT, U.B. I ‐The Commi埤�ee considered the individual cases of the agenda of this mee埚�ng generated through the online system of NIC. The decisions taken thereon are as under: 1
Case No.:14/38/80ALC2/2010
Party Name:VASUNDRA MANUFACTURING SYSTEMS PVT.LTD, Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00784/AM11/ RLA File :07/21/040/00786/AM11/ Lic.No/Date:0710077109 03.02.2011 Decision :The Commi埤�ee decided to ra埚�fy norms on the basis of DIT O. M. No. 17(115)/2012‐IPHW dated 13.01.2014 (Copy is to be forwarded to RA and firm). RLA may take necessary ac埚�on accordingly. 2
Case No.:15/11/80ALC2/2012
Party Name:YOKOGAWA INDIA LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00229/AM13/ RLA File :07/21/040/00120/AM13/ Lic.No/Date:0710088440 24.05.2012 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC)as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014. 3
Case No.:17/11/80ALC2/2012
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00231/AM13/ RLA File :05/24/040/00129/AM13/ Lic.No/Date:0510329275 10.07.2012 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the case is under examina埚�on C&PC and decided to remind them for expedi埚�ng their comments. Case is deferred to 01.04.2014.
4
Case No.:21/20/80ALC2/2012
Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00437/AM13/ RLA File :11/24/040/00024/AM12/ Lic.No/Date:1110027289 19.10.2012 Defer Date:04.03.2014 Decision :The Commi埤�ee noted that the case appears due to technical error which had already been considered in mee埚�ng No. 23/14 dated 04.02.2014. Case is deferred to 04.03.2014 as per the decision taken in the aforesaid mee埚�ng. 5
Case No.:2/24/80ALC2/2013
Party Name:CMI FPE LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00479/AM14/ RLA File :03/83/040/00367/AM13/ Lic.No/Date:0310714032 31.10.2012 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that hard copy of firm’s applica埚�on has not been received from RA, Mumbai and decided to give reminder to them. Case is deferred to 01.04.2014. 6
Case No.:15/26/80ALC2/2012
Party Name:LARSEN& TOUBRO LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00576/AM13/ RLA File :03/95/040/00791/AM13/ Lic.No/Date:0310722249 29.01.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014. 7
Case No.:21/26/80ALC2/2012
Party Name:TEXMACO UGL RAIL PRIVATE LIMITED. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00582/AM13/ RLA File :02/24/040/00174/AM13/ Lic.No/Date:0210186293 11.02.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DHI U. O. No. 3(76)/12/TSW(B)/39 dated 10.02.2014 (Copy is to be forwarded to RA and firm). 8
Case No.:1/26/80ALC2/2012
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00562/AM13/ RLA File :34/24/040/00249/AM13/ Lic.No/Date:3410036266 26.02.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the case is under examina埚�on C&PC and decided to remind them for expedi埚�ng their comments. Case is deferred to 01.04.2014.
Case No.:26/4/80ALC2/2013
Party Name:TOSHIBA JSW TURBINE AND GENERATOR PRIVATE LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00073/AM14/ RLA File :04/24/040/00001/AM14/
9 Lic.No/Date:0410144942 10.04.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 06.06.2013 followed by reminder dated 04.07.2013 and final reminder dated 03.12.2013. The Commi埤�ee further noted that in response of le埤�ers issued to the firm, the firm has third 埚�me requested for20 days Ɵme for furnishing their reply. Case is deferred to 01.04.2014. 10
Case No.:27/4/80ALC2/2013
Party Name:TOSHIBA JSW TURBINE AND GENERATOR PRIVATE LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00074/AM14/ RLA File :04/24/040/00272/AM13/ Lic.No/Date:0410144941 10.04.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 06.06.2013 followed by reminder dated 04.07.2013 and final reminder dated 03.12.2013. The Commi埤�ee further noted that in response of le埤�ers issued to the firm, the firm has third 埚�me requested for 20 days Ɵme for furnishing their reply. Case is deferred to 01.04.2014. 11
Case No.:34/8/80ALC2/2013
Party Name:NEO WHEELS LTD (FRMLY KNOWN AS VERSATILE H.C.& ENG Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00144/AM14/ RLA File :03/95/040/00036/AM14/ Lic.No/Date:0310732167 22.04.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 06.06.2013 followed by reminder dated 04.07.2013 and final reminder dated 03.12.2013. The Commi埤�ee further noted that in response of le埤�ers issued to the firm, the firm has third 埚�me requested for 20 days Ɵme for furnishing their reply. Case is deferred to 01.04.2014. 12
Case No.:33/8/80ALC2/2013
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00143/AM14/ RLA File :03/95/040/00063/AM14/ Lic.No/Date:0310733011 01.05.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the DHI comments has been received but EPCG division inputs has not been received and decided to remind EPCG division for forwarding their inputs/comments. Case is deferred to 01.04.2014. 13
Case No.:41/8/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00151/AM14/ RLA File :03/95/040/01030/AM13/ Lic.No/Date:0310733370 06.05.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DHI U. O. No. 3(57)/11‐TSW(B)/51 dated 14.02.2014 (Copy is to be forwarded to RA and firm).
Case No.:3/6/80ALC2/2013
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00094/AM14/ RLA File :05/23/040/00016/AM14/ Lic.No/Date:0510353884 13.05.2013 Defer Date:01.04.2014
14 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 31.01.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014. 15
Case No.:27/15/80ALC2/2013
Party Name:TRELLEBORG INDUSTRIAL PRODUCTS INDIA PRIVATE LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00283/AM14/ RLA File :07/24/040/00088/AM14/ Lic.No/Date:0710096218 26.06.2013 Defer Date:01.04.2014 Decision :The commi埤�ee noted that the firms reply dated 14.02.2014 has been received and decided to forward the same to DIPP (Sh. NandLal, Sr. DO, DIPP). Case is deferred to 01.04.2014 16
Case No.:38/15/80ALC2/2013
Party Name:KGR INDUSTRIES Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00294/AM14/ RLA File :09/24/040/00173/AM14/ Lic.No/Date:0910056807 17.07.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 17.12.2013 followed by reminder dated 30.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014. 17
Case No.:58/15/80ALC2/2013
Party Name:USHA MARTIN LIMITED, Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00314/AM14/ RLA File :02/24/040/00051/AM14/ Lic.No/Date:0210192100 22.07.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 07.02.2014 and decided to send reminder to the firm. Case is deferred to 01.04.2014. 18
Case No.:2/15/80ALC2/2013
Party Name:ELECTRONIC INSTRUMENTATION Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00258/AM14/ RLA File :33/24/040/00006/AM14/ Lic.No/Date:3310027177 05.08.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the informa埚�on according to C&PC Le埤�er No. 46011/107/2013‐PC‐II dated 17.01.2014 (Copy is to be forwarded to RA and firm). Case is deferred to 01.04.2014. 19
Case No.:28/15/80ALC2/2013
Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00284/AM14/ RLA File :22/21/040/00043/AM14/ Lic.No/Date:2210014079 06.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 30.01.2014 and decided to
Case No.:26/15/80ALC2/2013
Status:
20 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Approved HQ File :01/80/050/00282/AM14/ RLA File :05/23/040/00177/AM14/ Lic.No/Date:0510362199 07.08.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DHI U. O. No. 3(85)/13‐TSW(B)/40dated 11.02.2014 (Copy is to be forwarded to RA and firm). 21
Case No.:47/15/80ALC2/2013
Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00303/AM14/ RLA File :31/83/040/00084/AM14/ Lic.No/Date:3110059801 07.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 17.12.2013 followed by reminder dated 30.01.2014, further communica埚�on dated 31.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014. 22
Case No.:14/15/80ALC2/2013
Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00270/AM14/ RLA File :05/23/040/00199/AM14/ Lic.No/Date:0510362949 20.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the case is under examina埚�on C&PC and decided to remind them for expedi埚�ng their comments. Case is deferred to 01.04.2014. 23
Case No.:23/15/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00279/AM14/ RLA File :05/23/040/00203/AM14/ Lic.No/Date:0510363049 20.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s reply has been sent to DIPP on 09.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP.Case is deferred to 01.04.2014. 24
Case No.:1/12/80ALC2/2013
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00205/AM14/ RLA File :07/24/040/00144/AM14/ Lic.No/Date:0710097670 22.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s reply has been sent to MSME on 10.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments ofMSME.Case is deferred to 01.04.2014. 25
Case No.:1/15/80ALC2/2013
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00257/AM14/ RLA File :07/24/040/00125/AM14/ Lic.No/Date:0710097665 22.08.2013 Defer Date:01.04.2014
Decision :The Commi埤�ee noted that RA has been asked to furnish hard copy of the applica埚�on vide le埤�er dated 17.12.2013 but the same has not been received and decided to remind them. Case is deferred to 01.04.2014. 26
Case No.:24/15/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00280/AM14/ RLA File :05/23/040/00212/AM14/ Lic.No/Date:0510363388 23.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s reply has been sent to DIPP on 08.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP.Case is deferred to 01.04.2014. 27
Case No.:34/15/80ALC2/2013
Party Name:TERUMO PENPOL LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00290/AM14/ RLA File :53/24/040/00004/AM14/ Lic.No/Date:5310017300 23.08.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of C&PC O.M. No. 46011/21/2009‐PC‐II dated 13.01.2014 (Copy is to be forwarded to RA and firm). 28
Case No.:16/15/80ALC2/2013
Party Name:INDUS PRO AUTO ENGINEERS PVT.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00272/AM14/ RLA File :05/23/040/00221/AM14/ Lic.No/Date:0510363605 26.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to second deficiency le埤�er dated 06.01.2014 and decided to send reminder to the firm. Case is deferred to 01.04.2014. 29
Case No.:57/15/80ALC2/2013
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00313/AM14/ RLA File :09/24/040/00246/AM14/ Lic.No/Date:0910057354 26.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 01.11.2013 followed by reminder dated 17.12.2013, final reminder dated 30.01.2014 and decided to await 15 days more to receive reply from the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014. 30
Case No.:12/15/80ALC2/2013
Party Name:BHARAT PUMPS & COMPRESSORS LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00268/AM14/ RLA File :06/24/040/00011/AM14/ Lic.No/Date:0610033669 27.08.2013 Defer Date:01.04.2014 Decision: The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 17.12.2013 followed by reminder dated 30.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.
Case No.:54/15/80ALC2/2013
Status:
31 Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Deferred HQ File :01/80/050/00310/AM14/ RLA File :09/24/040/00218/AM14/ Lic.No/Date:0910057395 28.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 30.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI.Case is deferred to 01.04.2014. 32
Case No.:5/15/80ALC2/2013
Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00261/AM14/ RLA File :11/24/040/00003/AM14/ Lic.No/Date:1110027643 30.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s reply dated 01.01.2014 has been sent to DIPP on 10.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP.Case is deferred to 01.04.2014. 33
Case No.:55/15/80ALC2/2013
Party Name:POLMOR STEEL PVT LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00311/AM14/ RLA File :09/24/040/00249/AM14/ Lic.No/Date:0910057433 30.08.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 14.02.2014 and decided to 34
Case No.:56/15/80ALC2/2013
Party Name:POLMOR STEEL PVT LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00312/AM14/ RLA File :09/24/040/00250/AM14/ Lic.No/Date:0910057434 30.08.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 30.01.2014 and decided to 35
Case No.:12/18/80ALC2/2013
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00342/AM14/ RLA File :07/24/040/00176/AM14/ Lic.No/Date:0710097998 03.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 30.01.2014 and decided to 36
Case No.:6/15/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00262/AM14/ RLA File :05/23/040/00234/AM14/ Lic.No/Date:0510364501 04.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 17.12.2013 followed by reminder dated 30.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014
37
Case No.:51/15/80ALC2/2013
Party Name:OMEGA ICEHILL PRIVATE LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00307/AM14/ RLA File :05/24/040/00208/AM14/ Lic.No/Date:0510364908 06.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 17.12.2013 followed by reminder dated 30.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014. 38
Case No.:39/18/80ALC2/2013
Party Name:PERMANENT MAGNETS LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00369/AM14/ RLA File :03/95/040/00441/AM14/ Lic.No/Date:0310748769 06.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 17.12.2013 followed by reminder dated 30.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014. 39
Case No.:7/15/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00263/AM14/ RLA File :05/23/040/00240/AM14/ Lic.No/Date:0510364979 09.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 20.01.2014 and decided to 40
Case No.:36/15/80ALC2/2013
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00292/AM14/ RLA File :05/23/040/00225/AM14/ Lic.No/Date:0510364996 09.09.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014.. 41
Case No.:42/15/80ALC2/2013
Party Name:BECTON DICKINSON INDIA PRIVATE LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00298/AM14/ RLA File :05/23/040/00244/AM14/ Lic.No/Date:0510364978 09.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 28.11.2013 given by C&PC directly followed by DGFT reminder dated 30.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.
42
Case No.:52/15/80ALC2/2013
Party Name:SHARMA PHARMACEUTICAL PVT LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00308/AM14/ RLA File :34/24/040/00131/AM14/ Lic.No/Date:3410037864 11.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 17.12.2013 followed by reminder dated 30.01.2014, further communica埚�on dated 31.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014. 43
Case No.:9/15/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00265/AM14/ RLA File :05/23/040/00235/AM14/ Lic.No/Date:0510365202 12.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014 and decided to 44
Case No.:4/15/80ALC2/2013
Party Name:GRAZIANO TRASMISSIONI INDIA PVT LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00260/AM14/ RLA File :05/23/040/00248/AM14/ Lic.No/Date:0510365514 13.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 29.10.2013 followed by reminder dated 17.12.2013, final reminder dated 30.01.2014, further communica埚�on dated 31.01.2014 and decided to await 15 days more to receive reply from the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014. 45
Case No.:1/18/80ALC2/2013
Party Name:GREATOO MOLDS INDIA PRIVATE LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00331/AM14/ RLA File :04/24/040/00123/AM14/ Lic.No/Date:0410149958 17.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 31.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014. 46
Case No.:41/18/80ALC2/2013
Party Name:UNDERCARRIAGE AND TRACTOR PARTS PVT.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00371/AM14/ RLA File :03/95/040/00479/AM14/ Lic.No/Date:0310749973 17.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s reply has been sent to MSME on 18.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of MSME. Case is deferred to 01.04.2014. 47
Case No.:8/15/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00264/AM14/ RLA File :05/23/040/00255/AM14/ Lic.No/Date:0510366078 19.09.2013 Defer Date:01.04.2014
Decision : The Commi埤�ee noted that the firm’s reply has been sent to DIPP on 09.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014. 48
Case No.:46/15/80ALC2/2013
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00302/AM14/ RLA File :05/23/040/00245/AM14/ Lic.No/Date:0510366074 19.09.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014. 49
Case No.:24/18/80ALC2/2013
Party Name:HELVOET RUBBER AND PLASTIC TECHNOLOGIES INDIA P.L. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00354/AM14/ RLA File :31/83/040/00092/AM14/ Lic.No/Date:3110060381 19.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the informa埚�on according to C&PC Le埤�er No. 46011/108/2013‐PC‐II dated 17.01.2014 (Copy is to be forwarded to RA and firm). Case is deferred to 01.04.2014. 50
Case No.:11/18/80ALC2/2013
Party Name:PARKER HANNIFIN INDIA PVT. LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00341/AM14/ RLA File :04/24/040/00129/AM14/ Lic.No/Date:0410150143 20.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 12.02.2014 and decided to 51
Case No.:30/18/80ALC2/2013
Party Name:AKSH OPTI FIBRE LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00360/AM14/ RLA File :05/23/040/00251/AM14/ Lic.No/Date:0510366271 20.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s reply has been sent to DIT on 12.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014. 52
Case No.:2/18/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00332/AM14/ RLA File :05/23/040/00261/AM14/ Lic.No/Date:0510366710 25.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014 and decided to
Case No.:20/18/80ALC2/2013
Party Name:TRELLEBORG INDUSTRIAL PRODUCTS INDIA Meet No/Date:24/80 ALC2/2013 Status: Deferred
53 PRIVATE LTD 18.02.2014 HQ File :01/80/050/00350/AM14/ RLA File :07/24/040/00207/AM14/ Lic.No/Date:0710098545 25.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s reply has been sent to Technical Authority(Chemical), DIPP on 14.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014. 54
Case No.:27/18/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00357/AM14/ RLA File :05/23/040/00263/AM14/ Lic.No/Date:0510366797 25.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014, further communica埚�on dated 07.02.2014 and decided to send reminder to the firm. Case is deferred to 01.04.2014. 55
Case No.:35/18/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00365/AM14/ RLA File :03/95/040/00506/AM14/ Lic.No/Date:0310751135 25.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014 and decided to 56
Case No.:17/18/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00347/AM14/ RLA File :11/24/040/00004/AM14/ Lic.No/Date:1110027689 26.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 30.12.2013 and decided to 57
Case No.:34/18/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00364/AM14/ RLA File :03/95/040/00268/AM14/ Lic.No/Date:0310751272 26.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to Ministry of Defence on 17.12.2014 for examina埚�on & comments which is under their examina埚�on and aŌer that reminder dated 31.01.2014 has been issued to them for expedi埚�ng their comments but their comments have not been received yet. The Commi埤�ee decided to await comments of Ministry of Defence. Case is deferred to 01.04.2014. 58
Case No.:42/18/80ALC2/2013
Party Name:TRANSASIA BIO MEDICALS LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00372/AM14/ RLA File :03/95/040/00503/AM14/ Lic.No/Date:0310751254 26.09.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DIT O. M. No. W‐27/46/2013‐IPHW dated 06.02.2014 (Copy is to be forwarded to RA and firm).
59
Case No.:13/18/80ALC2/2013
Party Name:THERMAX LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00343/AM14/ RLA File :31/83/040/00103/AM14/ Lic.No/Date:3110060492 30.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 02.01.2014 followed by reminder dated 30.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014. 60
Case No.:21/18/80ALC2/2013
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00351/AM14/ RLA File :05/23/040/00273/AM14/ Lic.No/Date:0510367148 30.09.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014. 61
Case No.:9/18/80ALC2/2013
Party Name:ALSTOM INDIA LIMITED, Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00339/AM14/ RLA File :32/21/040/00111/AM14/ Lic.No/Date:3210068243 07.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 24.12.2014 followed by reminder dated 30.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014. 62
Case No.:19/18/80ALC2/2013
Party Name:VSM VENTURE CONTROL SYSTEMS P.LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00349/AM14/ RLA File :05/24/040/00233/AM14/ Lic.No/Date:0510367680 07.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent again to DIT on 31.01.2014 which is under their examina埚�on and the firm has not furnished the clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 22.11.2013 and decided the following: (i) to await comments of DIT; (ii) to send reminder to the firm for expedi埚�ng their reply.
Case No.:3/18/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00333/AM14/ RLA File :05/23/040/00277/AM14/
63 Lic.No/Date:0510367785 08.10.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DHI U. O. No. 3(85)/13‐TSW(B)/41 dated 11.02.2014 (Copy is to be forwarded to RA and firm). 64
Case No.:10/18/80ALC2/2013
Party Name:TITAGARH WAGONS LIMITED. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00340/AM14/ RLA File :02/24/040/00104/AM14/ Lic.No/Date:0210195330 10.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent to DHI on 14.02.2014 which is under their examina埚�on and decided to await their comments. Case is deferred to 01.04.2014. 65
Case No.:40/18/80ALC2/2013
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00370/AM14/ RLA File :34/24/040/00154/AM14/ Lic.No/Date:3410038167 10.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the case is under examina埚�on C&PC and decided to remind them for expedi埚�ng their comments. Case is deferred to 01.04.2014. 66
Case No.:14/18/80ALC2/2013
Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00344/AM14/ RLA File :31/83/040/00117/AM14/ Lic.No/Date:3110060803 22.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 30.01.2014 and decided to 67
Case No.:16/18/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00346/AM14/ RLA File :04/24/040/00147/AM14/ Lic.No/Date:0410151200 23.10.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DHI U. O. No. 3(73)/12‐TSW(B)/8 dated 06.01.2014 (Copy is to be forwarded to RA and firm). 68
Case No.:36/19/81ALC2/2013
Party Name:SAI LINKS (INDIA) P.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/81/050/00350/AM14/ RLA File :31/83/040/00129/AM14/ Lic.No/Date:3110060918 25.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to DIPP by DES‐II which actually pertains to DHI and decided to send the firm’s applica埚�on to DHI. Case is deferred to 01.04.2014.
69
Case No.:10/21/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00406/AM14/ RLA File :03/95/040/00553/AM14/ Lic.No/Date:0310755792 28.10.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee decided to ask the firm to furnish the following informa埚�on according to DIPP ID Note No. 12/25/2014‐TSW/69 dated 18.02.2014: 1.Net weight of indigenous items in the export product. 2.Informa埚�on in respect of Sl. No. 5, 11 & 14 of Standard Deficiency Format. 3.Informa埚�on in respect of Sl. No.12 of Standard Deficiency Format, for import item at Sl. No. 1. 70
Case No.:5/21/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00401/AM14/ RLA File :03/95/040/00555/AM14/ Lic.No/Date:0310755956 29.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the following informa埚�on according to DIPP ID Note No. 12/25/2014‐TSW/70 dated 18.02.2014: 1. Net weight of indigenous items in the export products. 2. Informa埚�on in respect of Sl. No. 5 & 11 of Standard Deficiency Format. 3. Informa埚�on in respect of Sl. No.12 of Standard Deficiency Format, for import items at Sl. No. 2 & 4. 71
Case No.:7/21/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00403/AM14/ RLA File :03/95/040/00525/AM14/ Lic.No/Date:0310756062 29.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the following informa埚�on according to DIPP ID Note No. 12/25/2014‐TSW/71 dated 18.02.2014: 1. Net weight of indigenous items in the export products. 2. Informa埚�on in respect of Sl. No. 5 & 11 of Standard Deficiency Format. 3. Informa埚�on in respect of Sl. No.12 of Standard Deficiency Format, for import item at Sl. No. 2. 72
Case No.:8/21/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00404/AM14/ RLA File :03/95/040/00551/AM14/ Lic.No/Date:0310755966 29.10.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DIPP U.O. Note No. 12/18/2014‐TSW/72 dated 07.01.2014 which are as under: 1. Net Empty weight of 265 MT may be specified with the quan埚�ty of export product. 2. Import items at Sl. No. 1 & 2 shall be of relevant grade and thickness as contained in the export product. 3. Quan埚�ty of import item at Sl. No. 1 may be allowed as 1.05 Kgs./Kg. content in the export product. 4. Quan埚�ty of import item at Sl. No. 2 may be allowed as 490 Kgs. as 1.03 Kgs./Kg. content in the export product.
5. Weights of 85.4 MT, 0.1 MT, 0.1 MT & 0.469 MT may be specified with the quan埚�埚�es of import items at Sl. No. 3, 5, 6 & 7 respec埚�vely. 6. Quan埚�ty of import item at Sl. No. 3, 5, 6 & 7 may be allowed on net to net basis. 7. Import item at Sl. No. 4 shall be of relevant grade and dia. as contained in the export product. 8. Quan埚�ty of import item at Sl. No. 4 may be allowed as 31000 Meters(84 MT) inclusive of 2 % wastage. 9. Import item at Sl. No. 7 to be supplied with the export product. 10.Import item at Sl. No. 8 may be deleted as weld overlay details/ calcula埚�ons not submi埤�ed by the firm. 11.Quan埚�埚�es of import items at Sl. No. 9 to 11 (welding consumables) may be allowed as 1802 Kgs. each. 73
Case No.:11/21/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00407/AM14/ RLA File :03/95/040/00583/AM14/ Lic.No/Date:0310755972 29.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014 and decided to 74
Case No.:31/18/80ALC2/2013
Party Name:GE INDIA INDUSTRIAL PRIVATE LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00361/AM14/ RLA File :31/83/040/00126/AM14/ Lic.No/Date:3110060945 30.10.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has informed that they have received the DGFT le埤�er dated 25.11.2013 on 18.02.2014 and requested for more 埚�me for forwarding their reply vide their e‐mail message dated 18.02.2014 and decided to give 埚�me.Case is deferred to 01.04.2014. 75
Case No.:4/21/80ALC2/2013
Party Name:CARDINAL YACHTS Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00400/AM14/ RLA File :03/94/040/00516/AM14/ Lic.No/Date:0310756453 31.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent to DG, Shipping, Mumbai on 31.01.2014 for their examina埚�on/comments which is under their examina埚�on and decided to send reminder to them. Case is deferred to 01.04.2014. 76
Case No.:6/21/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00402/AM14/ RLA File :03/95/040/00523/AM14/ Lic.No/Date:0310756649 01.11.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DIPP U.O. Note No. 12/25/2014‐TSW/76 dated 07.01.2014 which are as under: 1. Net Fabricated weight of 179 MT may be specified with the quan埚�ty of export product. 2. Import items at Sl. No. 1 & 2 shall be of relevant grade and thickness as contained in the export product and their quan埚�埚�es may be allowed as 1.03 Kgs./Kg. content in the export product as claimed by the firm. 3. Quan埚�ty of import item at Sl. No. 3 may be allowed on net to net basis with accountability clause. 4. Quan埚�埚�es of import items at Sl. No. 4 &5 (welding consumables) may be allowed as applied for i.e. 6433 Kgs. & 900 Kgs. respec埚�vely .
5. Quan埚�埚�es of import items at Sl. No. 6 & 7 (welding consumables) may be allowed as 11514 Kgs. & 17947 Kgs. respec埚�vely 77
Case No.:19/24/80ALC2/2013
Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00496/AM14/ RLA File :07/24/040/00232/AM14/ Lic.No/Date:0710099452 07.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent again to MSME on 14.02.2014 which is under their examina埚�on and the firm has not furnished the clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 14.02.2014 and decided the following: (i) to await comments of MSME and (ii) to send reminder to the firm for expedi埚�ng their reply. 78
Case No.:20/24/80ALC2/2013
Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00497/AM14/ RLA File :07/24/040/00248/AM14/ Lic.No/Date:0710099453 07.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent again to MSME on 14.02.2014 which is under their examina埚�on and the firm has not furnished the clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 14.02.2014 and decided the following: (i) to await comments of MSME and (ii) to send reminder to the firm for expedi埚�ng their reply. 79
Case No.:16/21/80ALC2/2013
Party Name:LICRA GREEN TECHNOLOGIES Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00412/AM14/ RLA File :07/24/040/00215/AM14/ Lic.No/Date:0710099590 13.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on which had been earlier sent to MSME has been sent to DHI on 31.01.2014 and the aforesaid is under their examina埚�on. The Commi埤�ee decided to await comments of DHI. 80
Case No.:1/21/80ALC2/2013
Party Name:ANALYSER INSTRUMENT CO.PVT.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00397/AM14/ RLA File :13/24/040/00023/AM14/ Lic.No/Date:1310045080 18.11.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee decided to ask the firm to furnish the following informa埚�on according to DIPP ID Note No. 12/25/2014‐TSW/80 dated 18.02.2014: 1. Details of manufacturing opera埚�ons on import items. 2. Difference in export and import items 3. Details of any other inputs in export products, imported or indigenous, if any.
81
Case No.:13/21/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00409/AM14/ RLA File :04/24/040/00163/AM14/ Lic.No/Date:0410152111 21.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent to DHI on 02.01.2014 which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014. 82
Case No.:21/24/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00498/AM14/ RLA File :09/24/040/00156/AM14/ Lic.No/Date:0910058293 22.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent to DHI on 14.02.2014 which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014. 83
Case No.:2/21/80ALC2/2013
Party Name:FREEDOM OPTHALMIC PRIVATE LIMITED, Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00398/AM14/ RLA File :04/24/040/00185/AM14/ Lic.No/Date:0410152213 26.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the informa埚�on according to DEIT Le埤�er No. W‐ 27/5/2014‐IPHW dated 24.01.2014 (Copy of the aforesaid communica埚�on is to be forwarded to firm and RA). Case is deferred to 01.04.2014. 84
Case No.:23/21/80ALC2/2013
Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00419/AM14/ RLA File :05/24/040/00303/AM14/ Lic.No/Date:0510371924 26.11.2013 Defer Date:01.04.2014 Decision : The commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 02.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of C&PC. Case is deferred to 01.04.2014. 85
Case No.:25/21/80ALC2/2013
Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00421/AM14/ RLA File :05/24/040/00305/AM14/ Lic.No/Date:0510372015 27.11.2013 Defer Date:01.04.2014 Decision :The commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 02.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of C&PC. Case is deferred to 01.04.2014. 86
Case No.:28/21/80ALC2/2013
Party Name:BANCO PRODUCTS (INDIA) LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00424/AM14/ RLA File :34/24/040/00214/AM14/ Lic.No/Date:3410038563 27.11.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DHI U. O. No. 3(02)/14‐TSW(B)/30 dated 27.01.2014 (Copy is to be forwarded to RA and firm).
87
Case No.:14/21/80ALC2/2013
Party Name:ALSTOM INDIA LIMITED, Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00410/AM14/ RLA File :32/21/040/00141/AM14/ Lic.No/Date:3210070400 28.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the informa埚�on according to DHI U.O. No. 3(32)/13‐ TSW(B)/33 dated 17.01.2014 (Copy is to be forwarded to RA and firm). Case is deferred to 01.04.2014. 88
Case No.:3/24/80ALC2/2013
Party Name:PRECISION OVERSEAS INC. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00480/AM14/ RLA File :06/24/040/00029/AM14/ Lic.No/Date:0610035149 28.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that hard copy of firm’s applica埚�on has not been received from CLA, Delhi and decided to give reminder to CLA, Delhi. Case is deferred to 01.04.2014. 89
Case No.:20/21/80ALC2/2013
Party Name:BORG WARNER EMISSIONS SYSTEMS INDIA PVT. LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00416/AM14/ RLA File :05/23/040/00352/AM14/ Lic.No/Date:0510372322 29.11.2013 Decision :The Commi埤�ee decided to ra埚�fy norms on repeat basis i.e. according to the ra埚�fied norms of AA 0510353076 dated 03‐05‐2013, on the basis of DHI U. O. No. 3(03)/14‐TSW(B)/54dated 14.02.2014 (Copy is to be forwarded to RA and firm). 90
Case No.:22/21/80ALC2/2013
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00418/AM14/ RLA File :05/23/040/00343/AM14/ Lic.No/Date:0510372329 29.11.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014. 91
Case No.:27/21/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00423/AM14/ RLA File :07/24/040/00288/AM14/ Lic.No/Date:0710100119 29.11.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 29.01.2014 given by DEIT directly and decided to send reminder to the firm for expedi埚�ng their reply. Case is deferred to 01.04.2014.
Case No.:8/24/80ALC2/2013
Status:
92 Party Name:INJECTOPLASTPVT.LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Deferred HQ File :01/80/050/00485/AM14/ RLA File :06/24/040/00027/AM14/ Lic.No/Date:0610035232 04.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 14.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of C&PC. Case is deferred to 01.04.2014. 93
Case No.:15/21/80ALC2/2013
Party Name:INTERNATIONAL COMBUSTION (INDIA) LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00411/AM14/ RLA File :02/24/040/00147/AM14/ Lic.No/Date:0210197350 05.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014 and decided to send reminder to the firm for expedi埚�ng their reply. Case is deferred to 01.04.2014. 94
Case No.:26/21/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Withdrawn HQ File :01/80/050/00422/AM14/ RLA File :04/24/040/00177/AM14/ Lic.No/Date:0410152624 05.12.2013 Decision : The Commi埤�ee noted that the firm has informed that they have surrendered the subject AA to RA, Chennai vide their le埤�er dated 14.02.2014 and decided to close the case. 95
Case No.:19/21/80ALC2/2013
Party Name:GLOBE HIFABS Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00415/AM14/ RLA File :05/23/040/00363/AM14/ Lic.No/Date:0510373038 10.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to MSME on 31.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of MSME.Case is deferred to 01.04.2014. 96
Case No.:21/21/80ALC2/2013
Party Name:GLOBE HIFABS Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00417/AM14/ RLA File :05/23/040/00364/AM14/ Lic.No/Date:0510373033 10.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee decided to ask the firm to furnish the informa埚�on according to MSME U.O. No. 30(123)2013‐ME dated 09.01.2014 (Copy is to be forwarded to RA and firm). Case is deferred to 01.04.2014. 97
Case No.:4/24/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00481/AM14/ RLA File :05/23/040/00366/AM14/ Lic.No/Date:0510373260 11.12.2013 Defer Date:01.04.2014
Decision : The Commi埤�ee noted that hard copy of firm’s applica埚�on has not been received from CLA, Delhi and decided to give reminder to them. Case is deferred to 01.04.2014. 98
Case No.:17/21/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00413/AM14/ RLA File :05/23/040/00373/AM14/ Lic.No/Date:0510373370 12.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 02.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI.Case is deferred to 01.04.2014. 99
Case No.:9/24/80ALC2/2013
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00486/AM14/ RLA File :06/24/040/00018/AM14/ Lic.No/Date:0610035401 12.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 14.02.2014 for examina埚�on and comments. The Commi埤�ee further noted that firm’s clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 14.02.2014 has not been received and decided the following: (i) to await comments of C&PC; (ii) to send reminder to the firm for expedi埚�ng their reply. 100
Case No.:24/21/80ALC2/2013
Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00420/AM14/ RLA File :05/24/040/00316/AM14/ Lic.No/Date:0510373490 13.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 02.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of C&PC. Case is deferred to 01.04.2014. 101
Case No.:13/24/80ALC2/2013
Party Name:JAYANITA EXPORTS PVT. LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00490/AM14/ RLA File :05/23/040/00386/AM14/ Lic.No/Date:0510373917 18.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DIPP on 14.02.2014 for examina埚�on & comments which actually pertains to MSME and decided to send the same to MSME. Case is deferred to 01.04.2014. 102
Case No.:31/24/80ALC2/2013
Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00508/AM14/ RLA File :03/94/040/00764/AM14/ Lic.No/Date:0310762309 18.12.2013 Defer Date:01.04.2014 & comments which is under their examina埚�on and decided to await comments of DIPP.Case is deferred to 01.04.2014.
103
Case No.:33/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00510/AM14/ RLA File :03/95/040/00539/AM14/ Lic.No/Date:0310762319 18.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 14.02.2014 for examina埚�on & comments which actually pertains to DIPP and decided to send the same to DIPP. Case is deferred to 01.04.2014. 104
Case No.:35/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00512/AM14/ RLA File :03/95/040/00704/AM14/ Lic.No/Date:0310762323 18.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DIPPon 14.02.2014 for examina埚�on and comments. The Commi埤�ee further noted that firm’s clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 14.02.2014 has not been received and decided the following: (i) to await comments of C&PC; (ii) to send reminder to the firm for expedi埚�ng their reply. 105
Case No.:38/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00515/AM14/ RLA File :03/95/040/00693/AM14/ Lic.No/Date:0310762352 18.12.2013 Defer Date:01.04.2014 & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014. 106
Case No.:43/24/80ALC2/2013
Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00520/AM14/ RLA File :03/94/040/00780/AM14/ Lic.No/Date:0310762306 18.12.2013 Defer Date:01.04.2014 01.04.2014. 107
Case No.:7/24/80ALC2/2013
Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00484/AM14/ RLA File :05/24/040/00340/AM14/ Lic.No/Date:0510373960 19.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 14.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of C&PC. Case is deferred to 01.04.2014.
Case No.:11/24/80ALC2/2013
Party Name:HIMENVIRO ENVIRONMENTAL ENGG.CO.P.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred
108 HQ File :01/80/050/00488/AM14/ RLA File :05/23/040/00367/AM14/ Lic.No/Date:0510374103 19.12.2013 Defer Date:01.04.2014 01.04.2014. 109
Case No.:25/24/80ALC2/2013
Party Name:GRAPHITE INDIA LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00502/AM14/ RLA File :03/94/040/00682/AM14/ Lic.No/Date:0310762888 20.12.2013 Defer Date:01.04.2014 01.04.2014. 110
Case No.:6/24/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00483/AM14/ RLA File :05/23/040/00379/AM14/ Lic.No/Date:0510374256 23.12.2013 Defer Date:01.04.2014 01.04.2014. 111
Case No.:16/24/80ALC2/2013
Party Name:BAXTER (INDIA) PVT.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00493/AM14/ RLA File :05/23/040/00389/AM14/ Lic.No/Date:0510374257 23.12.2013 Defer Date:01.04.2014 01.04.2014. 112
Case No.:34/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00511/AM14/ RLA File :03/95/040/00718/AM14/ Lic.No/Date:0310762935 23.12.2013 Defer Date:01.04.2014 01.04.2014. 113
Case No.:10/24/80ALC2/2013
Party Name:BOYSEN INDIA LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00487/AM14/ RLA File :05/23/040/00391/AM14/ Lic.No/Date:0510374424 24.12.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to MSME on 14.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of MSME. Case is deferred to 01.04.2014.
114
Case No.:17/24/80ALC2/2013
Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00494/AM14/ RLA File :05/23/040/00370/AM14/ Lic.No/Date:0510374413 24.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 14.02.2014 for examina埚�on and comments. The Commi埤�ee further noted that firm’s clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 14.02.2014 has not been received and decided the following: (i) to await comments of DHI; (ii) to send reminder to the firm for expedi埚�ng their reply. 115
Case No.:18/24/80ALC2/2013
Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00495/AM14/ RLA File :05/23/040/00371/AM14/ Lic.No/Date:0510374411 24.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 14.02.2014 for examina埚�on and comments. The Commi埤�ee further noted that firm’s clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 14.02.2014 has not been received and decided the following: (i) to await comments of DHI; (ii) to send reminder to the firm for expedi埚�ng their reply. 116
Case No.:27/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00504/AM14/ RLA File :03/95/040/00737/AM14/ Lic.No/Date:0310763270 24.12.2013 Defer Date:01.04.2014 01.04.2014. 117
Case No.:29/21/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00425/AM14/ RLA File :61/24/040/00063/AM14/ Lic.No/Date:6110001114 30.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that hard copy of firm’s applica埚�on has not been received from RA, Dehradun and decided to give reminder to them. Case is deferred to 01.04.2014. 118
Case No.:36/24/80ALC2/2013
Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00513/AM14/ RLA File :03/94/040/00841/AM14/ Lic.No/Date:0310763636 30.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 14.02.2014 for examina埚�on & comments which actually pertains to DIPP and decided to send the same to DIPP. Case is deferred to 01.04.2014.
119
Case No.:12/24/80ALC2/2013
Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00489/AM14/ RLA File :05/23/040/00401/AM14/ Lic.No/Date:0510374928 31.12.2013 Decision :The Commi埤�ee decided to ra埚�fy norms on the basis of MSME U. O. No. 30(127)/2013‐ME dated 17.02.2014 (Copy is to be forwarded to RA and firm). 120
Case No.:24/24/80ALC2/2013
Party Name:ALLIED INSTRUMENTS PVT LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00501/AM14/ RLA File :03/94/040/00837/AM14/ Lic.No/Date:0310763989 01.01.2014 Decision :The Commi埤�ee decided to ra埚�fy norms on the basis of MSME U. O. No. 30(128)/2011‐ME dated 18.02.2014 (Copy is to be forwarded to RA and firm). 121
Case No.:15/24/80ALC2/2013
Party Name:GLOBE HIFABS Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00492/AM14/ RLA File :05/23/040/00407/AM14/ Lic.No/Date:0510375539 06.01.2014 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to MSME on 14.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of MSME. Case is deferred to 01.04.2014. 122
Case No.:23/24/80ALC2/2013
Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00500/AM14/ RLA File :03/94/040/00802/AM14/ Lic.No/Date:0310764591 06.01.2014 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to DIPP on 14.02.2014 for examina埚�on 01.04.2014. 123
Case No.:39/24/80ALC2/2013
Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00516/AM14/ RLA File :03/94/040/00787/AM14/ Lic.No/Date:0310764594 06.01.2014 Defer Date:01.04.2014 01.04.2014.
Case No.:44/24/80ALC2/2013
Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred
124 HQ File :01/80/050/00521/AM14/ RLA File :03/94/040/00773/AM14/ Lic.No/Date:0310764595 06.01.2014 Defer Date:01.04.2014 01.04.2014. 125
Case No.:14/24/80ALC2/2013
Party Name:CAMFIL FARR AIR FILTRATION INDIA PVT. LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00491/AM14/ RLA File :05/23/040/00410/AM14/ Lic.No/Date:0510375669 08.01.2014 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to MSME on 14.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of MSME. Case is deferred to 01.04.2014. 126
Case No.:5/24/80ALC2/2013
ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00482/AM14/ RLA File :05/23/040/00408/AM14/ Lic.No/Date:0510375761 09.01.2014 Defer Date:01.04.2014 01.04.2014. 127
Case No.:42/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00519/AM14/ RLA File :03/95/040/00789/AM14/ Lic.No/Date:0310765262 09.01.2014 Defer Date:01.04.2014 01.04.2014. 128
Case No.:37/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00514/AM14/ RLA File :03/95/040/00781/AM14/ Lic.No/Date:0310766034 13.01.2014 Defer Date:01.04.2014 & comments which actually pertains to DHI and decided to send the same to DHI for examina埚�on and comments.Case is deferred to 01.04.2014. 129
Case No.:22/24/80ALC2/2013
Party Name:DIEHL METAL INDIA PRIVATE LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00499/AM14/ RLA File :31/83/040/00191/AM14/ Lic.No/Date:3110062134 15.01.2014 Defer Date:01.04.2014 & comments which actually pertains to DHI and decided to send the same to DHI for examina埚�on and comments.Case is deferred to 01.04.2014.
130
Case No.:30/24/80ALC2/2013
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00507/AM14/ RLA File :03/94/040/00891/AM14/ Lic.No/Date:0310766311 15.01.2014 Defer Date:01.04.2014 01.04.2014. 131
Case No.:45/24/80ALC2/2013
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00522/AM14/ RLA File :03/94/040/00880/AM14/ Lic.No/Date:0310766285 15.01.2014 Defer Date:01.04.2014 01.04.2014. 132
Case No.:28/24/80ALC2/2013
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00505/AM14/ RLA File :03/94/040/00874/AM14/ Lic.No/Date:0310766542 16.01.2014 Defer Date:01.04.2014 01.04.2014. 133
Case No.:29/24/80ALC2/2013
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00506/AM14/ RLA File :03/94/040/00915/AM14/ Lic.No/Date:0310766545 16.01.2014 Defer Date:01.04.2014 01.04.2014. 134
Case No.:26/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00503/AM14/ RLA File :03/95/040/00817/AM14/ Lic.No/Date:0310766666 17.01.2014 Defer Date:01.04.2014 01.04.2014.
Case No.:32/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred
135 HQ File :01/80/050/00509/AM14/ RLA File :03/95/040/00794/AM14/ Lic.No/Date:0310766777 17.01.2014 Defer Date:01.04.2014 & comments which actually pertains to DHI and decided to send the same to DHI for examina埚�on and comments.Case is deferred to 01.04.2014. 136
Case No.:40/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00517/AM14/ RLA File :03/95/040/00830/AM14/ Lic.No/Date:0310766662 17.01.2014 Defer Date:01.04.2014 01.04.2014. 137
Case No.:41/24/80ALC2/2013
LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00518/AM14/ RLA File :03/95/040/00829/AM14/ Lic.No/Date:0310766650 17.01.2014 Defer Date:01.04.2014 01.04.2014. 138
Case No.:46/24/80ALC2/2013
Party Name:GREATOO MOLDS INDIA PRIVATE LIMITED Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00523/AM14/ RLA File :04/24/040/00229/AM14/ Lic.No/Date:0410154390 20.01.2014 Defer Date:01.04.2014 & comments which actually pertains to DHI and decided to send the same to DHI for examina埚�on and comments.Case is deferred to 01.04.2014. 139
Case No.:47/24/80ALC2/2013
Party Name:BRAKES INDIA LIMITED, Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00524/AM14/ RLA File :04/24/040/00224/AM14/ Lic.No/Date:0410154676 29.01.2014 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 14.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014. 140
Case No.:1/24/80ALC2/2013
Party Name:NASH INDUSTRIES (I) PVT LTD Meet No/Date:24/80 ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00478/AM14/ RLA File :07/24/040/00392/AM14/ Lic.No/Date:0710101822 31.01.2014 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that hard copy of firm’s applica埚�on has not been received from RA, Bengaluru and decided to give reminder to them. Case is deferred to 01.04.2014.
Sl.No.554
Case No. A/R‐61
M/s. United Drilling Tools Ltd., Delhi HQF.No.01/80/050/00397/AM10/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.05/24/040/00318/AM10 0510249707 dt.22.09.2009 Date: 18.02.2014 Revision of norms Decision : The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014. S.No.555
Case No. A/R‐49
M/s. Larsen & Toubro Ltd., Mumbai HQF.No.01/80/050/00245/AM11/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.03/95/040/00712/AM10 0310557677 dt.29.01.2010 Date: 18.02.2014 Amendment in quan埚�埚�es / addi埚�on of addi埚�onal import items Decision : The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014. S.No.556
Case No. A/R‐75
M/s. Clyde Pumps India Pvt. Ltd., New Delhi HQF.No.01/80/050/00246/AM13/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.05/23/040/00073/AM13 0510327269 dt.14.06.2012 Date: 18.02.2014 Fixa埚�on of norms Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DHI U. O. No. 03(01)/14‐TSW(B)/20 dated 16.01.2014 (Copy is to be forwarded to RA and firm). S.No.557
Case No. A/R‐76
M/s. Vem Technologies Pvt. Ltd., Hyderabad HQF.No.01/80/050/00617/AM10/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.09/24/040/00373/AM10 0910040368 dt.18.12.2009 Date: 18.02.2014 Fixa埚�on of norms Decision : The Commi埤�ee decided to ask the firm to furnish the informa埚�on according to MSME ID UO Note No. 30(58)/13‐ME dated 06.01.2014(copy of the aforesaid communica埚�on to be forward to firm and RA). Case is deferred to 01.04.2014. S.No.558
Case No. A/R‐
111 M/s. Gastek Engineering (P) Ltd., New Delhi HQF.No.01/80/050/01125/AM07/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.05/24/040/00812/AM07 0510196934 dt.28.12.2006 Date: 18.02.2014 Request for amendment of norms Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014 and decided to send reminder to the firm for expedi埚�ng their reply. Case is deferred to 01.04.2014. S.No.559
Case No. A/R‐112
M/s. Kern‐ Liebers Springs & Stampings Pvt. Ltd., Tumkur HQF.No.01/81/050/00443/AM12/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.07/24/040/00367/AM12 0710084702 dt.15.12.2011 Date: 18.02.2014 Request for amendment of norms Decision : The Commi埤�ee noted that neither the firm nor the RA has furnished their comments on MSME UO Note No. 30(168)/11‐ME dated 03.01.2014 forwarded to them and decided to send them reminder. Case is deferred to 01.04.2014. S.No.560
Case No. A/R‐
113 M/s. Echaar Equipments Pvt. Ltd., Thane HQF.No.01/80/050/00542/AM12/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.03/94/040/01018/AM12 0310682257 dt.16.02.2012 Date: 18.02.2014 Request for revision of norms Decision : The firm’s representa埚�ve, Shri Kir埚� H. Panchal, Director has a埤�ended the mee埚�ng and replied the queries of Technical Authori埚�es(TAs) present in the mee埚�ng. The Commi埤�ee have asked them to submit the wastage calcula埚�on, drawing & dimension details, etc., which they have noted down and requested for 埚�me for furnishing the requisite informa埚�on. The Commi埤�ee decided to give them 埚�me for furnishing their reply/requisite informa埚�on. Case is deferred to 01.04.2014. S.No.561 Case No. A/R‐114 M/s. CIM Tools Pvt. Ltd., Bangalore HQF.No.01/80/050/01010/AM08/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.07/24/040/00580/AM08 (1)0710048323dt.09.11.2006 (2)0710048324 dt.09.11.2006 (3) 0710048325 dt.09.11.2006 (4) 0710051914 dt.07.06.2007 (5) 0710052885 dt.14.08.2007 (6) 0710052703 dt.03.08.2007 (7) 0710053664 dt.03.10.2007 (8) 0710054332 dt.05.11.2007 (9) 0710054469 dt.13.11.2007 (10)0710054547dt.16.11.2007 (11)0710055797dt.12.02.2008 (12)0710056335dt.11.03.2008 (13)0710057833dt.11.06.2008 (14)0710058366dt.08.07.2008 (15)0710059201dt.19.09.2008 (16)0710059704dt.11.09.2008 (17)0710065141dt.02.06.2009 (18)0710065366dt.12.06.2009 (19)0710065365dt.12.06.2009 Date: 18.02.2014 Request for revision of norms Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DIPP I.D. No. 12/25/2014‐TSW/114‐A/R dated 18.02.2014 (Copy is to be forwarded to RA and firm). S.No.562
Case No. A/R‐117
M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00223/AM14/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.03/94/040/00295/AM14 0310740370 dt.04.07.2013 Date: 18.02.2014 Request for addi埚�on of import items of norms Decision : The Commi埤�ee noted that firm’s reply has been forwarded to DIPP on 05.2.2014 which is under their considera埚�on. Meanwhile the firm has forwarded their subsequent reply with requests to add four items in import item list and change in the descrip埚�on of two import items at Sl. No. 7 & 9 vide their le埤�er dated 13.02.2014 received in this office on 18.02.2014. Case is deferred to 01.04.2014. S.No.563
Case No. A/R‐118
Request received from RA, Mumbai of M/s. L & T‐MHI turbine Generators Pvt. Ltd., Mumbai HQF.No.01/80/050/00060/AM14/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.03/95/040/00966/AM13 0310729651 dt.26.03.2013 Date: 18.02.2014 Request for amendment sheet No.3 of norms. Decision : The Commi埤�ee decided to amend the export descrip埚�on according to DHI UO No. 3(104)/10‐TSW(B)/38 dated 11.02.2014(copy of the aforesaid communica埚�on to be forward to firm and RA).
S.No.564
Case No. A/R‐119
M/s. Brakes India Ltd., Chennai HQF.No.01/80/050/00366/AM12/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.04/24/040/00136/AM12 0410129812 dt.31.10.2011 Date: 18.02.2014 Request for inclusion of import item in norms Decision : The Commi埤�ee decided to ask the firm to furnish the informa埚�on according to DHI UO No. 3(67)/11‐ TSW(B)/34 dated 30.01.2014 (copy of the aforesaid communica埚�on to be forward to firm and RA). Case is deferred to 01.04.2014. S.No.565
Case No. A/R‐131
M/s. ISGEC Heavy Engineering Ltd., Noida HQF.No.01/80/050/00011/AM13/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.05/23/040/00477/AM12 0510319555 dt.06.03.2012 Date: 18.02.2014 Request for revision of norms Decision : The Commi埤�ee noted that the firm’s request has been sent to DIPP on 04.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014. S.No.566
Case No. A/R‐132
M/s. A Plus Projects & Technology (P) Ltd., Pune HQF.No.01/80/050/01091/AM06/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.31/24/040/00137/AM06 3110022702 dt.17.11.2005 Date: 18.02.2014 Request for Fixa埚�on of norms Decision : The Commi埤�ee noted that the firm’s request has been sent to DIPP on 04.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. The Commi埤�ee further noted that the firm is doing deemed export and supplying goods to M/s. Oil & Natural Gas Corpora埚�on Ltd., Mumbai required for petroleum opera埚�ons and also decided to ask the firm to furnish copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons(DHC). Case is deferred to 01.04.2014. S.No.567
Case No. A/R‐133
M/s. Tema India Ltd., Navi Mumbai HQF.No.01/80/050/00729/AM11/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.03/95/040/00704/AM11 0310603295 dt.26.11.2010 Date: 18.02.2014 Request for Fixa埚�on of norms Decision : The Commi埤�ee noted that the firm’s representa埚�on has been sent to DIPP on 18.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014. S.No.568
Case No. A/R‐134
M/s. Micro‐Tech C.N.C. Ltd., Hosur(TN) HQF.No.01/80/050/00377/AM12/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.07/24/040/00237/AM12 0710082914 dt.29.09.2011 Date: 18.02.2014 Request for revision of norms Decision : The Commi埤�ee noted that the firm’s request has been sent to DHI on 11.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014. S.No.569
Case No. A/R‐135
M/s. Micro‐Tech C.N.C. Ltd., Hosur(TN) HQF.No.01/80/050/00155/AM13/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.07/24/040/00009/AM13 0710087899 dt.26.04.2012 Date: 18.02.2014 Request for revision of norms Decision : The Commi埤�ee noted that the firm’s request has been sent to DHI on 11.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014. S.No.570
Case No. A/R‐136
M/s. Micro‐Tech C.N.C. Ltd., Hosur(TN) HQF.No.01/80/050/00295/AM12/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.07/24/040/00215/AM12 0710082069 dt.06.09.2011 Date: 18.02.2014 Request for revision of norms Decision : The Commi埤�ee noted that the firm’s request has been sent to DHI on 11.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014.
S.No.571
Case No. A/R‐
137 M/s. XomoxSanmar Ltd., Chennai HQF.No.01/80/050/00670/AM11/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.04/24/040/00247/AM11 0410120050 dt.23.12.2010 Date: 18.02.2014 Ra埚�fica埚�on of norms Decision : The Commi埤�ee noted that the firm’s request has been sent to DIPP on 10.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014. S.No.572
Case No. A/R‐
138 M/s. Thyssenkrupp Industries India Pvt. Ltd., HQF.No.01/80/050/00491/AM13/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.03/95/040/00710/AM13 3110717487 dt.18.12.2012 Date: 18.02.2014 Revision of norms Decision : The Commi埤�ee noted that the firm’s representa埚�on has been sent to DHI on 30.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI.Case is deferred to 01.04.2014. S.No.573
Case No. A/R‐139
M/s. Tema India Ltd., Mumbai HQF.No.01/80/050/00495/AM13/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.03/95/040/00751/AM13 0310718335 dt.27.12.2012 Date: 18.02.2014 Revision of norms Decision : The Commi埤�ee noted that the firm’s representa埚�on has been sent to DIPP on 18.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014. S.No.574
Case No. A/R‐
140 M/s. ISGEC Heavy Engineering Ltd., Yamunanagar (Haryana) HQF.No.01/80/050/00065/AM14/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.05/23/040/00534/AM13 0510350891 dt.08.04.2013 Date: 18.02.2014 Request for revision of norms Decision : The Commi埤�ee noted that the firm’s request has been sent to DIPP on 11.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014. S.No.575
Case No. A/R‐141
M/s. Reference received from Addl. DGFT, Mumbai of M/s. Larsen & Toubro Ltd., Mumbai HQF.No.01/80/050/00170/AM14/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.03/95/040/00190/AM14 0310738812 dt.24.06.2013 Date: 18.02.2014 Request for amendment of import at sl. No.10 & to amend the ITC(HS) code of import item Sl. No. 8,9, & 10 of norms Decision : The Commi埤�ee noted that the reference received from Addl. DGFT, Mumbai in respect of the subject AA has been sent to DIPP on 11.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014. S.No.576
Case No. A/R‐
142 M/s. VEM Technologies Pvt. Ltd., Hyderabad HQF.No.01/80/050/00047/AM14/DES.I Lic. No. & date Mee埚�ng No. 24/14 RA.F.No.09/24/040/00491/AM13 0910054874 dt.31.01.2013 Date: 18.02.2014 Request for fixa埚�on of norms Decision : The Commi埤�ee decided to modify norms on the basis of MSME U.O. note No. 30(58)/13‐ME dated 20.01.2014 (Copy is to be forwarded to RA and firm). Sl.No.577
Case No. C –07
HQ F.No.01/80/162/00016/AM13/DES‐I
M/s. Alpha Technologies Pvt. Ltd.., Bangalore Mee埚�ng No. 24/14 Fixa埚�on of input output norms for the export product “Row &Heat Exchanger and Des Kit, Pre‐processor PCB Assembly, Main Processor PCB Assembly, Power supply Unit PCB Assembly etc.” in respect of 100% EOU – reg. Date: 18.02.2014 Decision : The Commi埤�ee decided to refer the case to MSME according to DIT le埤�er No. 8(134)/2012‐IPHW dated 21.1.2012 forwarded by DIT e‐mail dated 09.01.2014 for their examina埚�on and comments. Case is deferred to 01.04.2014. S.No.578
Case No. C‐04
Reference received from Addl. DGFT, Kolkata of M/s. Larsen & Toubro Ltd., Kolkata HQF.No.01/80/162/00061/AM14/DES.I Mee埚�ng No. 24/14 Clarifica埚�on against SION at Sl. No. C‐1647 Engineering Product – reg. Date: 18.02.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 17.12.2013 followed by reminder dated 30.01.2014 and decided to send final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014. S.No.579
Case No. C‐05
M/s. Bri埚�sh Engines India Pvt. Ltd., Bangalore HQF.No.01/80/162/00222/AM14/DES.I Mee埚�ng No. 24/14 Fixa埚�on of input output norms for the export product “Hydraulic Motor and its parts and Mul埚�spindle automa埚�c machines spares Valve and its parts” in respect of 100% EOU – reg. Date: 18.02.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the informa埚�on according to DHI UO No. 1(05)/13‐ TSW(B)/55 dated 14.02.2014 (copy of the aforesaid communica埚�on to be forward to firm and RA). Case is deferred to 01.04.2014. SUPLEMENTRY AGENDA Sl. No. 580
Case No. AR143
M/s. Siria Impex Pvt. Ltd. HQF. No. 01/80/050/00193/AM14/DES.I Meeting No. 24/14 RLA No. 05/24/040/00007/AM14/DESI Date: 18.02.2014 Lic. No. 0510351414 dated 11.04.2013 Revision of Norms. Decision : The Commi埤�ee noted that the descrip埚�on of export and import items furnished by the firm are same. The Commi埤�ee further noted that the firm’s submission that they have no problem in accep埚�ng the decision of NC‐ I mee埚�ng No. 16/80 dated 29.10.2013 i.e. suffixing the word “Unannealed” with the descrip埚�on of import item and the word “Annealed” with the descrip埚�on of export product the firm. They have further requested NC‐I to direct CLA for redemp埚�on of their said AA according to old descrip埚�on of their case as according to them, they have completed the export obliga埚�on against the said AA. The Commi埤�ee aŌer having delibera埚�ons on this issue decided to ask the firm to furnish duly filled in and cer埚�fied A.R.E.1 form by Central Excise Officer which shows that they have already made export aŌer annealing the imported items. Case is deferred to 01.04.2014. Sl. No. 581
Case No. AR144
M/s. Undercarriage And Tractor Parts Pvt. Ltd. HQF. No. 01/80/050/00067/AM14/DES.I Meeting No. 24/14 RLA No. 03/95/040/01027/AM13/DESI Date: 18.02.2014 Lic. No. 0310728824 dated 20.03.2013 Ratification of Norms
Decision : The Commi埤�ee decided to modify norms on the basis of MSME U.O. note No. 30(28)/2013‐ME dated 05.02.2014 (Copy is to be forwarded to RA and firm).
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.