IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2014-02-18

DGFT Committee Minutes

Document text

Ra埚�fied Minutes of Meeting No.24/14 scheduled on 18.02.2014 of Norms Committee(NC­I) (DES.I Section) The mee埚�ng No. 24/14 of the Norms Commi埤�ee (NC‐I) for the licensing year 2012‐2013 was held on18.02.2014 under the Chairmanship of Dr. L.B. Singhal, Addi埚�onal  Director General of Foreign Trade to consider the applica埚�ons under Duty Exemp埚�on / Remission Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I.  The following Members of the Commi埤�ee were present in the mee埚�ng: ‐ Sl.No Name  of  the  representa埚�ves  &  their Designa埚�on Room No. Telephone No. Dep埤�. 1. Sh K.K. Tiwari I.A 476 23063321 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 428A 23063321 Extn.3318 23063166 DIPP, U.B. 3. Sh. K.K. Funda, Ass埤�. Dir. (Mech) 736A 23063802 Extn.2459 DC(MSME),N.B. 4. Sh. Parveen Sharma, Dy.DGFT 302 23061562 Extn.146 DGFT, U.B. 5. Sh. PriyaRanjan, FTDO 404 23061562 Ext.265 DGFT, U.B. I ‐The Commi埤�ee considered the individual cases of the agenda of this mee埚�ng generated through the online system of NIC. The decisions taken thereon are as under: 1

Case No.:14/38/80­ALC2/2010

Party Name:VASUNDRA MANUFACTURING SYSTEMS PVT.LTD, Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00784/AM11/ RLA File :07/21/040/00786/AM11/ Lic.No/Date:0710077109 03.02.2011 Decision  :The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  DIT  O.  M.  No.  17(115)/2012‐IPHW    dated 13.01.2014 (Copy is to be forwarded to RA and firm).   RLA may take necessary ac埚�on accordingly.   2

Case No.:15/11/80­ALC2/2012

Party Name:YOKOGAWA INDIA LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00229/AM13/ RLA File :07/21/040/00120/AM13/ Lic.No/Date:0710088440 24.05.2012 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC)as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The  Commi埤�ee  decided  to  remind  the  firm  for  furnishing  the  copy  of  essen埚�ality  cer埚�ficate/NOC  issued  by Directorate  of  Hydrocarbons  (DHC)  and  remind  PC‐VI  for  expedi埚�ng  their  inputs/comments.  Case  is  deferred  to 01.04.2014.   3

Case No.:17/11/80­ALC2/2012

Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00231/AM13/ RLA File :05/24/040/00129/AM13/ Lic.No/Date:0510329275 10.07.2012 Defer Date:01.04.2014 Decision  :  The  Commi埤�ee  noted  that  the  case  is  under  examina埚�on  C&PC  and  decided  to  remind  them  for expedi埚�ng their comments. Case is deferred to 01.04.2014.

4

Case No.:21/20/80­ALC2/2012

Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00437/AM13/ RLA File :11/24/040/00024/AM12/ Lic.No/Date:1110027289 19.10.2012 Defer Date:04.03.2014 Decision :The Commi埤�ee noted that the case appears due to technical error which had already been considered in mee埚�ng No. 23/14 dated 04.02.2014. Case is deferred to 04.03.2014 as per the decision taken in the aforesaid mee埚�ng.   5

Case No.:2/24/80­ALC2/2013

Party Name:CMI FPE LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00479/AM14/ RLA File :03/83/040/00367/AM13/ Lic.No/Date:0310714032 31.10.2012 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that hard copy of firm’s applica埚�on has not been received from RA, Mumbai and decided to give reminder to them. Case is deferred to 01.04.2014.   6

Case No.:15/26/80­ALC2/2012

Party Name:LARSEN& TOUBRO LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00576/AM13/ RLA File :03/95/040/00791/AM13/ Lic.No/Date:0310722249 29.01.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The  Commi埤�ee  decided  to  remind  the  firm  for  furnishing  the  copy  of  essen埚�ality  cer埚�ficate/NOC  issued  by Directorate  of  Hydrocarbons  (DHC)  and  remind  PC‐VI  for  expedi埚�ng  their  inputs/comments.  Case  is  deferred  to 01.04.2014.   7

Case No.:21/26/80­ALC2/2012

Party Name:TEXMACO UGL RAIL PRIVATE LIMITED. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00582/AM13/ RLA File :02/24/040/00174/AM13/ Lic.No/Date:0210186293 11.02.2013 Decision :  The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  DHI  U.  O.  No.  3(76)/12/TSW(B)/39    dated 10.02.2014 (Copy is to be forwarded to RA and firm).     8

Case No.:1/26/80­ALC2/2012

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00562/AM13/ RLA File :34/24/040/00249/AM13/ Lic.No/Date:3410036266 26.02.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  noted  that  the  case  is  under  examina埚�on  C&PC  and  decided  to  remind  them  for expedi埚�ng their comments. Case is deferred to 01.04.2014.  

Case No.:26/4/80­ALC2/2013

Party Name:TOSHIBA JSW TURBINE AND GENERATOR PRIVATE LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00073/AM14/ RLA File :04/24/040/00001/AM14/

9 Lic.No/Date:0410144942 10.04.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  06.06.2013  followed  by reminder dated 04.07.2013 and final reminder dated 03.12.2013. The Commi埤�ee further noted that in response of le埤�ers  issued  to  the  firm,  the  firm  has  third  埚�me  requested for20  days  Ɵme  for  furnishing  their  reply.  Case  is deferred to 01.04.2014.   10

Case No.:27/4/80­ALC2/2013

Party Name:TOSHIBA JSW TURBINE AND GENERATOR PRIVATE LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00074/AM14/ RLA File :04/24/040/00272/AM13/ Lic.No/Date:0410144941 10.04.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  06.06.2013  followed  by reminder dated 04.07.2013 and final reminder dated 03.12.2013. The Commi埤�ee further noted that in response of le埤�ers  issued  to  the  firm,  the  firm  has  third  埚�me requested for 20 days Ɵme  for  furnishing  their  reply. Case  is deferred to 01.04.2014.   11

Case No.:34/8/80­ALC2/2013

Party Name:NEO WHEELS LTD (FRMLY KNOWN AS VERSATILE H.C.& ENG Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00144/AM14/ RLA File :03/95/040/00036/AM14/ Lic.No/Date:0310732167 22.04.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  06.06.2013  followed  by reminder dated 04.07.2013 and final reminder dated 03.12.2013. The Commi埤�ee further noted that in response of le埤�ers  issued  to  the  firm,  the  firm  has  third  埚�me requested for 20 days Ɵme  for  furnishing  their  reply. Case  is deferred to 01.04.2014.   12

Case No.:33/8/80­ALC2/2013

Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00143/AM14/ RLA File :03/95/040/00063/AM14/ Lic.No/Date:0310733011 01.05.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the DHI comments has been received but EPCG division inputs has not been received  and  decided  to  remind  EPCG  division  for  forwarding  their  inputs/comments.  Case  is  deferred  to 01.04.2014.   13

Case No.:41/8/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00151/AM14/ RLA File :03/95/040/01030/AM13/ Lic.No/Date:0310733370 06.05.2013 Decision :  The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  DHI  U.  O.  No.  3(57)/11‐TSW(B)/51    dated 14.02.2014 (Copy is to be forwarded to RA and firm).    

Case No.:3/6/80­ALC2/2013

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00094/AM14/ RLA File :05/23/040/00016/AM14/ Lic.No/Date:0510353884 13.05.2013 Defer Date:01.04.2014

14 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 31.01.2014 and ma埤�er is under considera埚�on of PC‐VI. The  Commi埤�ee  decided  to  remind  the  firm  for  furnishing  the  copy  of  essen埚�ality  cer埚�ficate/NOC  issued  by Directorate  of  Hydrocarbons  (DHC)  and  remind  PC‐VI  for  expedi埚�ng  their  inputs/comments.  Case  is  deferred  to 01.04.2014.   15

Case No.:27/15/80­ALC2/2013

Party Name:TRELLEBORG INDUSTRIAL PRODUCTS INDIA PRIVATE LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00283/AM14/ RLA File :07/24/040/00088/AM14/ Lic.No/Date:0710096218 26.06.2013 Defer Date:01.04.2014 Decision :The commi埤�ee noted that the firms reply dated 14.02.2014 has been received and decided to forward the same to DIPP (Sh. NandLal, Sr. DO, DIPP). Case is deferred to 01.04.2014   16

Case No.:38/15/80­ALC2/2013

Party Name:KGR INDUSTRIES Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00294/AM14/ RLA File :09/24/040/00173/AM14/ Lic.No/Date:0910056807 17.07.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  17.12.2013  followed  by reminder dated 30.01.2014 and decided to send final reminder  to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.   17

Case No.:58/15/80­ALC2/2013

Party Name:USHA MARTIN LIMITED, Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00314/AM14/ RLA File :02/24/040/00051/AM14/ Lic.No/Date:0210192100 22.07.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 07.02.2014 and decided to send reminder to the firm. Case is deferred to 01.04.2014.   18

Case No.:2/15/80­ALC2/2013

Party Name:ELECTRONIC INSTRUMENTATION Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00258/AM14/ RLA File :33/24/040/00006/AM14/ Lic.No/Date:3310027177 05.08.2013 Defer Date:01.04.2014 Decision :  The  Commi埤�ee  decided  to  ask  the  firm  to  furnish  the    informa埚�on  according  to  C&PC  Le埤�er  No. 46011/107/2013‐PC‐II dated 17.01.2014 (Copy is to be forwarded to RA and firm). Case is deferred to 01.04.2014.   19

Case No.:28/15/80­ALC2/2013

Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00284/AM14/ RLA File :22/21/040/00043/AM14/ Lic.No/Date:2210014079 06.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 30.01.2014  and decided to  

Case No.:26/15/80­ALC2/2013

Status:

20 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Approved HQ File :01/80/050/00282/AM14/ RLA File :05/23/040/00177/AM14/ Lic.No/Date:0510362199 07.08.2013 Decision  :  The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  DHI  U.  O.  No.  3(85)/13‐TSW(B)/40dated 11.02.2014 (Copy is to be forwarded to RA and firm).     21

Case No.:47/15/80­ALC2/2013

Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00303/AM14/ RLA File :31/83/040/00084/AM14/ Lic.No/Date:3110059801 07.08.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  17.12.2013  followed  by reminder dated 30.01.2014, further communica埚�on dated 31.01.2014 and decided to send final reminder  to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.   22

Case No.:14/15/80­ALC2/2013

Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00270/AM14/ RLA File :05/23/040/00199/AM14/ Lic.No/Date:0510362949 20.08.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  noted  that  the  case  is  under  examina埚�on  C&PC  and  decided  to  remind  them  for expedi埚�ng their comments. Case is deferred to 01.04.2014.   23

Case No.:23/15/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00279/AM14/ RLA File :05/23/040/00203/AM14/ Lic.No/Date:0510363049 20.08.2013 Defer Date:01.04.2014 Decision :The  Commi埤�ee  noted  that  the  firm’s  reply  has  been  sent  to  DIPP  on  09.01.2014  for  examina埚�on  & comments which is under their examina埚�on and decided to await comments of DIPP.Case is deferred to 01.04.2014.   24

Case No.:1/12/80­ALC2/2013

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00205/AM14/ RLA File :07/24/040/00144/AM14/ Lic.No/Date:0710097670 22.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s reply has been sent to MSME on 10.02.2014 for examina埚�on & comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  ofMSME.Case  is  deferred  to 01.04.2014.   25

Case No.:1/15/80­ALC2/2013

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00257/AM14/ RLA File :07/24/040/00125/AM14/ Lic.No/Date:0710097665 22.08.2013 Defer Date:01.04.2014

Decision :The Commi埤�ee noted that RA has been asked to furnish hard copy of the applica埚�on vide le埤�er dated 17.12.2013 but the same has not been received and decided to remind them. Case is deferred to 01.04.2014.   26

Case No.:24/15/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00280/AM14/ RLA File :05/23/040/00212/AM14/ Lic.No/Date:0510363388 23.08.2013 Defer Date:01.04.2014 Decision :The  Commi埤�ee  noted  that  the  firm’s  reply  has  been  sent  to  DIPP  on  08.01.2014  for  examina埚�on  & comments which is under their examina埚�on and decided to await comments of DIPP.Case is deferred to 01.04.2014.   27

Case No.:34/15/80­ALC2/2013

Party Name:TERUMO PENPOL LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00290/AM14/ RLA File :53/24/040/00004/AM14/ Lic.No/Date:5310017300 23.08.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of C&PC O.M. No. 46011/21/2009‐PC‐II  dated 13.01.2014 (Copy is to be forwarded to RA and firm).     28

Case No.:16/15/80­ALC2/2013

Party Name:INDUS PRO AUTO ENGINEERS PVT.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00272/AM14/ RLA File :05/23/040/00221/AM14/ Lic.No/Date:0510363605 26.08.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  noted  that  firm  has  not  replied  to  second  deficiency  le埤�er  dated  06.01.2014    and decided to send reminder to the firm. Case is deferred to 01.04.2014.   29

Case No.:57/15/80­ALC2/2013

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00313/AM14/ RLA File :09/24/040/00246/AM14/ Lic.No/Date:0910057354 26.08.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  01.11.2013  followed  by reminder dated 17.12.2013, final reminder dated 30.01.2014 and decided to await 15 days more to receive reply from  the  firm  failing which  the  Commi埤�ee  would  be  constrained  to  reject  their  case  with  direc埚�on  to  pay  the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.   30

Case No.:12/15/80­ALC2/2013

Party Name:BHARAT PUMPS & COMPRESSORS LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00268/AM14/ RLA File :06/24/040/00011/AM14/ Lic.No/Date:0610033669 27.08.2013 Defer Date:01.04.2014 Decision:  The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  17.12.2013  followed  by reminder dated 30.01.2014 and decided to send  final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.  

Case No.:54/15/80­ALC2/2013

Status:

31 Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Deferred HQ File :01/80/050/00310/AM14/ RLA File :09/24/040/00218/AM14/ Lic.No/Date:0910057395 28.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI  on 30.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI.Case is deferred to 01.04.2014.   32

Case No.:5/15/80­ALC2/2013

Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00261/AM14/ RLA File :11/24/040/00003/AM14/ Lic.No/Date:1110027643 30.08.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s reply dated 01.01.2014  has been sent to DIPP on 10.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP.Case is deferred to 01.04.2014.   33

Case No.:55/15/80­ALC2/2013

Party Name:POLMOR STEEL PVT LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00311/AM14/ RLA File :09/24/040/00249/AM14/ Lic.No/Date:0910057433 30.08.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 14.02.2014  and decided to   34

Case No.:56/15/80­ALC2/2013

Party Name:POLMOR STEEL PVT LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00312/AM14/ RLA File :09/24/040/00250/AM14/ Lic.No/Date:0910057434 30.08.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 30.01.2014  and decided to   35

Case No.:12/18/80­ALC2/2013

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00342/AM14/ RLA File :07/24/040/00176/AM14/ Lic.No/Date:0710097998 03.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 30.01.2014  and decided to   36

Case No.:6/15/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00262/AM14/ RLA File :05/23/040/00234/AM14/ Lic.No/Date:0510364501 04.09.2013 Defer Date:01.04.2014 Decision  :  The Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  17.12.2013  followed  by reminder dated 30.01.2014 and decided to send  final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014

37

Case No.:51/15/80­ALC2/2013

Party Name:OMEGA ICEHILL PRIVATE LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00307/AM14/ RLA File :05/24/040/00208/AM14/ Lic.No/Date:0510364908 06.09.2013 Defer Date:01.04.2014 Decision  :  The Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  17.12.2013  followed  by reminder dated 30.01.2014 and decided to send  final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.   38

Case No.:39/18/80­ALC2/2013

Party Name:PERMANENT MAGNETS LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00369/AM14/ RLA File :03/95/040/00441/AM14/ Lic.No/Date:0310748769 06.09.2013 Defer Date:01.04.2014 Decision  :  The Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  17.12.2013  followed  by reminder dated 30.01.2014 and decided to send  final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.   39

Case No.:7/15/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00263/AM14/ RLA File :05/23/040/00240/AM14/ Lic.No/Date:0510364979 09.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 20.01.2014  and decided to   40

Case No.:36/15/80­ALC2/2013

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00292/AM14/ RLA File :05/23/040/00225/AM14/ Lic.No/Date:0510364996 09.09.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The  Commi埤�ee  decided  to  remind  the  firm  for  furnishing  the  copy  of  essen埚�ality  cer埚�ficate/NOC  issued  by Directorate  of  Hydrocarbons  (DHC)  and  remind  PC‐VI  for  expedi埚�ng  their  inputs/comments.  Case  is  deferred  to 01.04.2014..   41

Case No.:42/15/80­ALC2/2013

Party Name:BECTON DICKINSON INDIA PRIVATE LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00298/AM14/ RLA File :05/23/040/00244/AM14/ Lic.No/Date:0510364978 09.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 28.11.2013 given by C&PC directly followed by DGFT reminder dated 30.01.2014 and decided to send  final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.

42

Case No.:52/15/80­ALC2/2013

Party Name:SHARMA PHARMACEUTICAL PVT LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00308/AM14/ RLA File :34/24/040/00131/AM14/ Lic.No/Date:3410037864 11.09.2013 Defer Date:01.04.2014 Decision  :  The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  17.12.2013  followed  by reminder dated 30.01.2014, further communica埚�on dated 31.01.2014 and decided to send  final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.   43

Case No.:9/15/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00265/AM14/ RLA File :05/23/040/00235/AM14/ Lic.No/Date:0510365202 12.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014  and decided to   44

Case No.:4/15/80­ALC2/2013

Party Name:GRAZIANO TRASMISSIONI INDIA PVT LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00260/AM14/ RLA File :05/23/040/00248/AM14/ Lic.No/Date:0510365514 13.09.2013 Defer Date:01.04.2014 Decision  :  The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  29.10.2013  followed  by reminder  dated  17.12.2013,  final  reminder  dated  30.01.2014,  further  communica埚�on  dated  31.01.2014  and decided to await 15 days more to receive reply from the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.   45

Case No.:1/18/80­ALC2/2013

Party Name:GREATOO MOLDS INDIA PRIVATE LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00331/AM14/ RLA File :04/24/040/00123/AM14/ Lic.No/Date:0410149958 17.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 31.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014.   46

Case No.:41/18/80­ALC2/2013

Party Name:UNDERCARRIAGE AND TRACTOR PARTS PVT.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00371/AM14/ RLA File :03/95/040/00479/AM14/ Lic.No/Date:0310749973 17.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s reply has been sent to MSME on 18.02.2014 for examina埚�on & comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  MSME.  Case  is  deferred  to 01.04.2014.   47

Case No.:8/15/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00264/AM14/ RLA File :05/23/040/00255/AM14/ Lic.No/Date:0510366078 19.09.2013 Defer Date:01.04.2014

Decision : The Commi埤�ee noted that the firm’s reply has been sent to DIPP on 09.01.2014 for examina埚�on & comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  DIPP.  Case  is  deferred  to 01.04.2014.   48

Case No.:46/15/80­ALC2/2013

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00302/AM14/ RLA File :05/23/040/00245/AM14/ Lic.No/Date:0510366074 19.09.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The  Commi埤�ee  decided  to  remind  the  firm  for  furnishing  the  copy  of  essen埚�ality  cer埚�ficate/NOC  issued  by Directorate  of  Hydrocarbons  (DHC)  and  remind  PC‐VI  for  expedi埚�ng  their  inputs/comments.  Case  is  deferred  to 01.04.2014.   49

Case No.:24/18/80­ALC2/2013

Party Name:HELVOET RUBBER AND PLASTIC TECHNOLOGIES INDIA P.L. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00354/AM14/ RLA File :31/83/040/00092/AM14/ Lic.No/Date:3110060381 19.09.2013 Defer Date:01.04.2014 Decision :  The  Commi埤�ee  decided  to  ask  the  firm  to  furnish  the    informa埚�on  according  to  C&PC  Le埤�er  No. 46011/108/2013‐PC‐II dated 17.01.2014 (Copy is to be forwarded to RA and firm). Case is deferred to 01.04.2014.   50

Case No.:11/18/80­ALC2/2013

Party Name:PARKER HANNIFIN INDIA PVT. LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00341/AM14/ RLA File :04/24/040/00129/AM14/ Lic.No/Date:0410150143 20.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 12.02.2014  and decided to   51

Case No.:30/18/80­ALC2/2013

Party Name:AKSH OPTI FIBRE LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00360/AM14/ RLA File :05/23/040/00251/AM14/ Lic.No/Date:0510366271 20.09.2013 Defer Date:01.04.2014 Decision  :  The  Commi埤�ee  noted  that  the  firm’s  reply  has  been  sent  to  DIT  on  12.02.2014  for  examina埚�on  & comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  DIPP.  Case  is  deferred  to 01.04.2014.   52

Case No.:2/18/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00332/AM14/ RLA File :05/23/040/00261/AM14/ Lic.No/Date:0510366710 25.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014  and decided to  

Case No.:20/18/80­ALC2/2013

Party Name:TRELLEBORG INDUSTRIAL PRODUCTS INDIA Meet No/Date:24/80­ ALC2/2013 Status: Deferred

53 PRIVATE LTD 18.02.2014 HQ File :01/80/050/00350/AM14/ RLA File :07/24/040/00207/AM14/ Lic.No/Date:0710098545 25.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s reply has been sent to Technical Authority(Chemical), DIPP on 14.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014.   54

Case No.:27/18/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00357/AM14/ RLA File :05/23/040/00263/AM14/ Lic.No/Date:0510366797 25.09.2013 Defer Date:01.04.2014 Decision  :  The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  03.02.2014,  further communica埚�on dated 07.02.2014 and decided to send reminder to the firm. Case is deferred to 01.04.2014.   55

Case No.:35/18/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00365/AM14/ RLA File :03/95/040/00506/AM14/ Lic.No/Date:0310751135 25.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014  and decided to   56

Case No.:17/18/80­ALC2/2013

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00347/AM14/ RLA File :11/24/040/00004/AM14/ Lic.No/Date:1110027689 26.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 30.12.2013  and decided to   57

Case No.:34/18/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00364/AM14/ RLA File :03/95/040/00268/AM14/ Lic.No/Date:0310751272 26.09.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to Ministry of Defence on 17.12.2014 for examina埚�on & comments which is under their examina埚�on and aŌer that reminder dated 31.01.2014 has been issued to them for expedi埚�ng their comments but their comments have not been received yet. The Commi埤�ee decided to await comments of Ministry of Defence. Case is deferred to 01.04.2014.   58

Case No.:42/18/80­ALC2/2013

Party Name:TRANSASIA BIO MEDICALS LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00372/AM14/ RLA File :03/95/040/00503/AM14/ Lic.No/Date:0310751254 26.09.2013 Decision :  The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  DIT  O.  M.  No.  W‐27/46/2013‐IPHW  dated 06.02.2014 (Copy is to be forwarded to RA and firm).  

59

Case No.:13/18/80­ALC2/2013

Party Name:THERMAX LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00343/AM14/ RLA File :31/83/040/00103/AM14/ Lic.No/Date:3110060492 30.09.2013 Defer Date:01.04.2014 Decision  :  The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  02.01.2014  followed  by reminder dated 30.01.2014 and decided to send  final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.     60

Case No.:21/18/80­ALC2/2013

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00351/AM14/ RLA File :05/23/040/00273/AM14/ Lic.No/Date:0510367148 30.09.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The  Commi埤�ee  decided  to  remind  the  firm  for  furnishing  the  copy  of  essen埚�ality  cer埚�ficate/NOC  issued  by Directorate  of  Hydrocarbons  (DHC)  and  remind  PC‐VI  for  expedi埚�ng  their  inputs/comments.  Case  is  deferred  to 01.04.2014.   61

Case No.:9/18/80­ALC2/2013

Party Name:ALSTOM INDIA LIMITED, Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00339/AM14/ RLA File :32/21/040/00111/AM14/ Lic.No/Date:3210068243 07.10.2013 Defer Date:01.04.2014 Decision  :  The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  24.12.2014  followed  by reminder dated 30.01.2014 and decided to send  final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.   62

Case No.:19/18/80­ALC2/2013

Party Name:VSM VENTURE CONTROL SYSTEMS P.LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00349/AM14/ RLA File :05/24/040/00233/AM14/ Lic.No/Date:0510367680 07.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent again to DIT on 31.01.2014  which is under their examina埚�on and the firm has not furnished the clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 22.11.2013 and decided the following: (i)   to await comments of DIT; (ii)  to send reminder to the firm for expedi埚�ng their reply.  

Case No.:3/18/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00333/AM14/ RLA File :05/23/040/00277/AM14/

63 Lic.No/Date:0510367785 08.10.2013 Decision :  The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  DHI  U.  O.  No.  3(85)/13‐TSW(B)/41    dated 11.02.2014 (Copy is to be forwarded to RA and firm).       64

Case No.:10/18/80­ALC2/2013

Party Name:TITAGARH WAGONS LIMITED. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00340/AM14/ RLA File :02/24/040/00104/AM14/ Lic.No/Date:0210195330 10.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent to DHI on 14.02.2014  which is under their examina埚�on and decided to await their comments. Case is deferred to 01.04.2014.      65

Case No.:40/18/80­ALC2/2013

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00370/AM14/ RLA File :34/24/040/00154/AM14/ Lic.No/Date:3410038167 10.10.2013 Defer Date:01.04.2014 Decision  :  The  Commi埤�ee  noted  that  the  case  is  under  examina埚�on  C&PC  and  decided  to  remind  them  for expedi埚�ng their comments. Case is deferred to 01.04.2014.   66

Case No.:14/18/80­ALC2/2013

Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00344/AM14/ RLA File :31/83/040/00117/AM14/ Lic.No/Date:3110060803 22.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 30.01.2014  and decided to   67

Case No.:16/18/80­ALC2/2013

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00346/AM14/ RLA File :04/24/040/00147/AM14/ Lic.No/Date:0410151200 23.10.2013 Decision  :  The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  DHI  U.  O.  No.  3(73)/12‐TSW(B)/8    dated 06.01.2014 (Copy is to be forwarded to RA and firm).     68

Case No.:36/19/81­ALC2/2013

Party Name:SAI LINKS (INDIA) P.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/81/050/00350/AM14/ RLA File :31/83/040/00129/AM14/ Lic.No/Date:3110060918 25.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to DIPP by DES‐II which actually pertains to DHI and decided to send the firm’s applica埚�on to DHI. Case is deferred to 01.04.2014.

69

Case No.:10/21/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00406/AM14/ RLA File :03/95/040/00553/AM14/ Lic.No/Date:0310755792 28.10.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee decided to ask the firm to furnish the following  informa埚�on according to DIPP ID Note No. 12/25/2014‐TSW/69 dated 18.02.2014: 1.Net weight of indigenous items  in the export product. 2.Informa埚�on in respect of Sl. No. 5, 11 & 14  of Standard Deficiency Format. 3.Informa埚�on in respect of Sl. No.12  of Standard Deficiency Format, for import item at Sl. No. 1.     70

Case No.:5/21/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00401/AM14/ RLA File :03/95/040/00555/AM14/ Lic.No/Date:0310755956 29.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the following  informa埚�on according to DIPP ID Note No. 12/25/2014‐TSW/70 dated 18.02.2014: 1. Net weight of indigenous items  in the export products. 2. Informa埚�on in respect of Sl. No. 5 &  11 of Standard Deficiency Format. 3. Informa埚�on in respect of Sl. No.12  of Standard Deficiency Format, for import items at Sl. No. 2 & 4.     71

Case No.:7/21/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00403/AM14/ RLA File :03/95/040/00525/AM14/ Lic.No/Date:0310756062 29.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the following  informa埚�on according to DIPP ID Note No. 12/25/2014‐TSW/71 dated 18.02.2014: 1.       Net weight of indigenous items  in the export products. 2.       Informa埚�on in respect of Sl. No. 5 &  11 of Standard Deficiency Format. 3.       Informa埚�on in respect of Sl. No.12  of Standard Deficiency Format, for import item at Sl. No. 2.     72

Case No.:8/21/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00404/AM14/ RLA File :03/95/040/00551/AM14/ Lic.No/Date:0310755966 29.10.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DIPP U.O. Note No. 12/18/2014‐TSW/72 dated 07.01.2014 which are as under: 1.    Net Empty weight  of 265 MT may be specified with the quan埚�ty  of  export product. 2.    Import items at Sl. No. 1 & 2 shall be of relevant grade and thickness as contained in the export product. 3.    Quan埚�ty of import item at Sl. No. 1 may be allowed as 1.05 Kgs./Kg. content in the export product. 4.    Quan埚�ty of import item at Sl. No. 2 may be allowed as 490 Kgs. as 1.03 Kgs./Kg. content in the export product.

5.    Weights of 85.4 MT,  0.1 MT,  0.1 MT & 0.469 MT  may be specified with the quan埚�埚�es of import items at Sl. No. 3, 5, 6 & 7 respec埚�vely. 6.    Quan埚�ty of import item at  Sl. No. 3, 5, 6  & 7 may be allowed on net to net basis. 7.    Import item at Sl. No. 4 shall be of relevant grade and dia. as contained in the export product. 8.    Quan埚�ty of import item at Sl. No.  4    may be allowed as 31000 Meters(84 MT) inclusive of 2 % wastage. 9.    Import item at Sl. No. 7 to be supplied with the export product. 10.Import item at Sl. No. 8 may be deleted as weld overlay details/ calcula埚�ons not submi埤�ed by the firm. 11.Quan埚�埚�es of import items at Sl. No. 9 to 11  (welding consumables) may be allowed as  1802 Kgs. each.   73

Case No.:11/21/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00407/AM14/ RLA File :03/95/040/00583/AM14/ Lic.No/Date:0310755972 29.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014  and decided to   74

Case No.:31/18/80­ALC2/2013

Party Name:GE INDIA INDUSTRIAL PRIVATE LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00361/AM14/ RLA File :31/83/040/00126/AM14/ Lic.No/Date:3110060945 30.10.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  noted  that  the  firm  has  informed  that  they  have  received  the  DGFT  le埤�er  dated 25.11.2013 on 18.02.2014 and requested for more 埚�me for forwarding their reply vide their e‐mail message dated 18.02.2014 and decided to give 埚�me.Case is deferred to 01.04.2014.   75

Case No.:4/21/80­ALC2/2013

Party Name:CARDINAL YACHTS Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00400/AM14/ RLA File :03/94/040/00516/AM14/ Lic.No/Date:0310756453 31.10.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent to DG, Shipping, Mumbai on 31.01.2014 for their  examina埚�on/comments  which  is  under  their  examina埚�on  and  decided  to  send  reminder  to  them.  Case is deferred to 01.04.2014.   76

Case No.:6/21/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00402/AM14/ RLA File :03/95/040/00523/AM14/ Lic.No/Date:0310756649 01.11.2013 Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DIPP U.O. Note No. 12/25/2014‐TSW/76 dated 07.01.2014 which are as under: 1.       Net Fabricated weight  of 179 MT may be specified with the quan埚�ty  of  export product. 2.       Import items at Sl. No. 1 & 2   shall be of relevant grade and thickness as contained in the export product and their quan埚�埚�es may be allowed as 1.03 Kgs./Kg. content in the export product as claimed by the firm. 3.       Quan埚�ty  of import item at  Sl. No. 3 may be allowed on net to net basis with accountability clause. 4.       Quan埚�埚�es of import items at Sl. No. 4 &5  (welding consumables) may be allowed as  applied for i.e. 6433 Kgs. & 900 Kgs. respec埚�vely .

5.       Quan埚�埚�es of import items at Sl. No. 6 & 7  (welding consumables) may be allowed as  11514 Kgs. & 17947  Kgs. respec埚�vely     77

Case No.:19/24/80­ALC2/2013

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00496/AM14/ RLA File :07/24/040/00232/AM14/ Lic.No/Date:0710099452 07.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent again to MSME on 14.02.2014  which is under their examina埚�on and the firm has not furnished the clarifica埚�on on type of export (whether physical export or  deemed  export  against  invalida埚�on  le埤�er  to  EPCG  license)  as  asked  vide  DES‐I  le埤�er  dated  14.02.2014  and decided the following: (i)   to await comments of MSME and (ii)  to send reminder to the firm for expedi埚�ng their reply.   78

Case No.:20/24/80­ALC2/2013

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00497/AM14/ RLA File :07/24/040/00248/AM14/ Lic.No/Date:0710099453 07.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has been sent again to MSME on 14.02.2014  which is under their examina埚�on and the firm has not furnished the clarifica埚�on on type of export (whether physical export or  deemed  export  against  invalida埚�on  le埤�er  to  EPCG  license)  as  asked  vide  DES‐I  le埤�er  dated  14.02.2014  and decided the following: (i)   to await comments of MSME and (ii)  to send reminder to the firm for expedi埚�ng their reply.   79

Case No.:16/21/80­ALC2/2013

Party Name:LICRA GREEN TECHNOLOGIES Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00412/AM14/ RLA File :07/24/040/00215/AM14/ Lic.No/Date:0710099590 13.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on which had been earlier sent to MSME has  been sent to DHI on 31.01.2014 and the aforesaid is under their examina埚�on. The Commi埤�ee decided to await comments of DHI.   80

Case No.:1/21/80­ALC2/2013

Party Name:ANALYSER INSTRUMENT CO.PVT.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00397/AM14/ RLA File :13/24/040/00023/AM14/ Lic.No/Date:1310045080 18.11.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee decided to ask the firm to furnish the following  informa埚�on according to DIPP ID Note No. 12/25/2014‐TSW/80 dated 18.02.2014: 1.       Details of manufacturing opera埚�ons on import items. 2.       Difference  in export and import items 3.       Details of any other inputs in export products, imported or indigenous, if any.

81

Case No.:13/21/80­ALC2/2013

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00409/AM14/ RLA File :04/24/040/00163/AM14/ Lic.No/Date:0410152111 21.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has  been sent to DHI on 02.01.2014 which  is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014.   82

Case No.:21/24/80­ALC2/2013

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00498/AM14/ RLA File :09/24/040/00156/AM14/ Lic.No/Date:0910058293 22.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that firm’s applica埚�on has  been sent to DHI on 14.02.2014 which  is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014.   83

Case No.:2/21/80­ALC2/2013

Party Name:FREEDOM OPTHALMIC PRIVATE LIMITED, Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00398/AM14/ RLA File :04/24/040/00185/AM14/ Lic.No/Date:0410152213 26.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the  informa埚�on according to DEIT Le埤�er No. W‐ 27/5/2014‐IPHW dated 24.01.2014 (Copy of the aforesaid communica埚�on is to be forwarded to firm and RA). Case is deferred to 01.04.2014.   84

Case No.:23/21/80­ALC2/2013

Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00419/AM14/ RLA File :05/24/040/00303/AM14/ Lic.No/Date:0510371924 26.11.2013 Defer Date:01.04.2014 Decision : The commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 02.01.2014 for examina埚�on &  comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  C&PC.  Case  is  deferred  to 01.04.2014. 85

Case No.:25/21/80­ALC2/2013

Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00421/AM14/ RLA File :05/24/040/00305/AM14/ Lic.No/Date:0510372015 27.11.2013 Defer Date:01.04.2014 Decision :The commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 02.01.2014 for examina埚�on & comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  C&PC.  Case  is  deferred  to 01.04.2014.   86

Case No.:28/21/80­ALC2/2013

Party Name:BANCO PRODUCTS (INDIA) LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00424/AM14/ RLA File :34/24/040/00214/AM14/ Lic.No/Date:3410038563 27.11.2013 Decision :  The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  DHI  U.  O.  No.  3(02)/14‐TSW(B)/30    dated 27.01.2014 (Copy is to be forwarded to RA and firm).

  87

Case No.:14/21/80­ALC2/2013

Party Name:ALSTOM INDIA LIMITED, Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00410/AM14/ RLA File :32/21/040/00141/AM14/ Lic.No/Date:3210070400 28.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee decided to ask the firm to furnish the  informa埚�on according to DHI U.O. No. 3(32)/13‐ TSW(B)/33 dated 17.01.2014 (Copy is to be forwarded to RA and firm). Case is deferred to 01.04.2014.   88

Case No.:3/24/80­ALC2/2013

Party Name:PRECISION OVERSEAS INC. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00480/AM14/ RLA File :06/24/040/00029/AM14/ Lic.No/Date:0610035149 28.11.2013 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that hard copy of firm’s applica埚�on has not been received from CLA, Delhi and decided to give reminder to CLA, Delhi. Case is deferred to 01.04.2014.   89

Case No.:20/21/80­ALC2/2013

Party Name:BORG WARNER EMISSIONS SYSTEMS INDIA PVT. LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00416/AM14/ RLA File :05/23/040/00352/AM14/ Lic.No/Date:0510372322 29.11.2013 Decision :The  Commi埤�ee  decided  to  ra埚�fy  norms  on  repeat  basis  i.e.  according  to  the  ra埚�fied  norms  of  AA 0510353076 dated 03‐05‐2013, on the basis of DHI U. O. No. 3(03)/14‐TSW(B)/54dated 14.02.2014 (Copy is to be forwarded to RA and firm).     90

Case No.:22/21/80­ALC2/2013

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00418/AM14/ RLA File :05/23/040/00343/AM14/ Lic.No/Date:0510372329 29.11.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm has not furnished the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The  Commi埤�ee  decided  to  remind  the  firm  for  furnishing  the  copy  of  essen埚�ality  cer埚�ficate/NOC  issued  by Directorate  of  Hydrocarbons  (DHC)  and  remind  PC‐VI  for  expedi埚�ng  their  inputs/comments.  Case  is  deferred  to 01.04.2014.   91

Case No.:27/21/80­ALC2/2013

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00423/AM14/ RLA File :07/24/040/00288/AM14/ Lic.No/Date:0710100119 29.11.2013 Defer Date:01.04.2014 Decision :The  Commi埤�ee  noted  that  firm  has  not  replied  to  deficiency  le埤�er  dated  29.01.2014  given  by  DEIT directly and decided to send reminder to the firm for expedi埚�ng their reply. Case is deferred to 01.04.2014.  

Case No.:8/24/80­ALC2/2013

Status:

92 Party Name:INJECTOPLASTPVT.LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Deferred HQ File :01/80/050/00485/AM14/ RLA File :06/24/040/00027/AM14/ Lic.No/Date:0610035232 04.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 14.02.2014 for examina埚�on & comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  C&PC.  Case  is  deferred  to 01.04.2014.   93

Case No.:15/21/80­ALC2/2013

Party Name:INTERNATIONAL COMBUSTION (INDIA) LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00411/AM14/ RLA File :02/24/040/00147/AM14/ Lic.No/Date:0210197350 05.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014 and decided to send reminder to the firm for expedi埚�ng their reply. Case is deferred to 01.04.2014.   94

Case No.:26/21/80­ALC2/2013

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Withdrawn HQ File :01/80/050/00422/AM14/ RLA File :04/24/040/00177/AM14/ Lic.No/Date:0410152624 05.12.2013 Decision : The Commi埤�ee noted that the firm has informed that they have surrendered the subject AA to RA, Chennai vide their le埤�er dated 14.02.2014 and decided to close the case.     95

Case No.:19/21/80­ALC2/2013

Party Name:GLOBE HI­FABS Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00415/AM14/ RLA File :05/23/040/00363/AM14/ Lic.No/Date:0510373038 10.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to MSME on 31.01.2014 for examina埚�on &  comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  MSME.Case  is  deferred  to 01.04.2014.   96

Case No.:21/21/80­ALC2/2013

Party Name:GLOBE HI­FABS Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00417/AM14/ RLA File :05/23/040/00364/AM14/ Lic.No/Date:0510373033 10.12.2013 Defer Date:01.04.2014 Decision  :The  Commi埤�ee  decided  to  ask  the  firm  to  furnish  the    informa埚�on  according  to  MSME  U.O.  No. 30(123)2013‐ME dated 09.01.2014 (Copy is to be forwarded to RA and firm). Case is deferred to 01.04.2014.   97

Case No.:4/24/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00481/AM14/ RLA File :05/23/040/00366/AM14/ Lic.No/Date:0510373260 11.12.2013 Defer Date:01.04.2014

Decision : The Commi埤�ee noted that hard copy of firm’s applica埚�on has not been received from CLA, Delhi and decided to give reminder to them. Case is deferred to 01.04.2014.   98

Case No.:17/21/80­ALC2/2013

Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00413/AM14/ RLA File :05/23/040/00373/AM14/ Lic.No/Date:0510373370 12.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 02.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI.Case is deferred to 01.04.2014.   99

Case No.:9/24/80­ALC2/2013

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00486/AM14/ RLA File :06/24/040/00018/AM14/ Lic.No/Date:0610035401 12.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 14.02.2014 for examina埚�on and comments. The Commi埤�ee further noted that firm’s clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 14.02.2014 has not been received and decided the following: (i)   to await comments of C&PC; (ii)  to send reminder to the firm for expedi埚�ng their reply.   100

Case No.:24/21/80­ALC2/2013

Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00420/AM14/ RLA File :05/24/040/00316/AM14/ Lic.No/Date:0510373490 13.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 02.01.2014 for examina埚�on &  comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  C&PC.  Case  is  deferred  to 01.04.2014.   101

Case No.:13/24/80­ALC2/2013

Party Name:JAYANITA EXPORTS PVT. LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00490/AM14/ RLA File :05/23/040/00386/AM14/ Lic.No/Date:0510373917 18.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DIPP on 14.02.2014 for examina埚�on & comments  which  actually  pertains  to  MSME  and  decided  to  send  the  same  to  MSME.  Case  is  deferred  to 01.04.2014.   102

Case No.:31/24/80­ALC2/2013

Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00508/AM14/ RLA File :03/94/040/00764/AM14/ Lic.No/Date:0310762309 18.12.2013 Defer Date:01.04.2014 &  comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  DIPP.Case  is  deferred  to 01.04.2014.

103

Case No.:33/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00510/AM14/ RLA File :03/95/040/00539/AM14/ Lic.No/Date:0310762319 18.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 14.02.2014 for examina埚�on & comments which actually pertains to DIPP and decided to send the same to DIPP. Case is deferred to 01.04.2014. 104

Case No.:35/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00512/AM14/ RLA File :03/95/040/00704/AM14/ Lic.No/Date:0310762323 18.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DIPPon 14.02.2014 for examina埚�on and comments. The Commi埤�ee further noted that firm’s clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 14.02.2014 has not been received and decided the following: (i)   to await comments of C&PC; (ii)  to send reminder to the firm for expedi埚�ng their reply.   105

Case No.:38/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00515/AM14/ RLA File :03/95/040/00693/AM14/ Lic.No/Date:0310762352 18.12.2013 Defer Date:01.04.2014 &  comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  DIPP.  Case  is  deferred  to 01.04.2014.   106

Case No.:43/24/80­ALC2/2013

Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00520/AM14/ RLA File :03/94/040/00780/AM14/ Lic.No/Date:0310762306 18.12.2013 Defer Date:01.04.2014 01.04.2014.   107

Case No.:7/24/80­ALC2/2013

Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00484/AM14/ RLA File :05/24/040/00340/AM14/ Lic.No/Date:0510373960 19.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to C&PC on 14.02.2014 for examina埚�on &  comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  C&PC.  Case  is  deferred  to 01.04.2014.  

Case No.:11/24/80­ALC2/2013

Party Name:HIMENVIRO ENVIRONMENTAL ENGG.CO.P.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred

108 HQ File :01/80/050/00488/AM14/ RLA File :05/23/040/00367/AM14/ Lic.No/Date:0510374103 19.12.2013 Defer Date:01.04.2014 01.04.2014.   109

Case No.:25/24/80­ALC2/2013

Party Name:GRAPHITE INDIA LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00502/AM14/ RLA File :03/94/040/00682/AM14/ Lic.No/Date:0310762888 20.12.2013 Defer Date:01.04.2014 01.04.2014.   110

Case No.:6/24/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00483/AM14/ RLA File :05/23/040/00379/AM14/ Lic.No/Date:0510374256 23.12.2013 Defer Date:01.04.2014 01.04.2014.   111

Case No.:16/24/80­ALC2/2013

Party Name:BAXTER (INDIA) PVT.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00493/AM14/ RLA File :05/23/040/00389/AM14/ Lic.No/Date:0510374257 23.12.2013 Defer Date:01.04.2014 01.04.2014.   112

Case No.:34/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00511/AM14/ RLA File :03/95/040/00718/AM14/ Lic.No/Date:0310762935 23.12.2013 Defer Date:01.04.2014 01.04.2014.   113

Case No.:10/24/80­ALC2/2013

Party Name:BOYSEN INDIA LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00487/AM14/ RLA File :05/23/040/00391/AM14/ Lic.No/Date:0510374424 24.12.2013 Defer Date:01.04.2014 Decision  :  The  Commi埤�ee  noted  that  the  firm’s  applica埚�on  has  been  sent  to  MSME  on  14.02.2014  for examina埚�on & comments which is under their examina埚�on and decided to await comments of MSME. Case is deferred to 01.04.2014.

114

Case No.:17/24/80­ALC2/2013

Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00494/AM14/ RLA File :05/23/040/00370/AM14/ Lic.No/Date:0510374413 24.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 14.02.2014 for examina埚�on and comments. The Commi埤�ee further noted that firm’s clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 14.02.2014 has not been received and decided the following: (i)   to await comments of DHI; (ii)  to send reminder to the firm for expedi埚�ng their reply.   115

Case No.:18/24/80­ALC2/2013

Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00495/AM14/ RLA File :05/23/040/00371/AM14/ Lic.No/Date:0510374411 24.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 14.02.2014 for examina埚�on and comments. The Commi埤�ee further noted that firm’s clarifica埚�on on type of export (whether physical export or deemed export against invalida埚�on le埤�er to EPCG license) as asked vide DES‐I le埤�er dated 14.02.2014 has not been received and decided the following: (i)   to await comments of DHI; (ii)  to send reminder to the firm for expedi埚�ng their reply.   116

Case No.:27/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00504/AM14/ RLA File :03/95/040/00737/AM14/ Lic.No/Date:0310763270 24.12.2013 Defer Date:01.04.2014 01.04.2014.   117

Case No.:29/21/80­ALC2/2013

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00425/AM14/ RLA File :61/24/040/00063/AM14/ Lic.No/Date:6110001114 30.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that hard copy of firm’s applica埚�on has not been received from RA, Dehradun and decided to give reminder to them. Case is deferred to 01.04.2014.   118

Case No.:36/24/80­ALC2/2013

Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00513/AM14/ RLA File :03/94/040/00841/AM14/ Lic.No/Date:0310763636 30.12.2013 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 14.02.2014 for examina埚�on & comments which actually pertains to DIPP and decided to send the same to DIPP. Case is deferred to 01.04.2014.

119

Case No.:12/24/80­ALC2/2013

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00489/AM14/ RLA File :05/23/040/00401/AM14/ Lic.No/Date:0510374928 31.12.2013 Decision :The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  MSME  U.  O.  No.  30(127)/2013‐ME    dated 17.02.2014 (Copy is to be forwarded to RA and firm).     120

Case No.:24/24/80­ALC2/2013

Party Name:ALLIED INSTRUMENTS PVT LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Approved HQ File :01/80/050/00501/AM14/ RLA File :03/94/040/00837/AM14/ Lic.No/Date:0310763989 01.01.2014 Decision :The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  MSME  U.  O.  No.  30(128)/2011‐ME    dated 18.02.2014 (Copy is to be forwarded to RA and firm).     121

Case No.:15/24/80­ALC2/2013

Party Name:GLOBE HI­FABS Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00492/AM14/ RLA File :05/23/040/00407/AM14/ Lic.No/Date:0510375539 06.01.2014 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to MSME on 14.02.2014 for examina埚�on & comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  MSME. Case  is  deferred  to 01.04.2014.   122

Case No.:23/24/80­ALC2/2013

Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00500/AM14/ RLA File :03/94/040/00802/AM14/ Lic.No/Date:0310764591 06.01.2014 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to DIPP on 14.02.2014 for examina埚�on 01.04.2014.   123

Case No.:39/24/80­ALC2/2013

Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00516/AM14/ RLA File :03/94/040/00787/AM14/ Lic.No/Date:0310764594 06.01.2014 Defer Date:01.04.2014 01.04.2014.  

Case No.:44/24/80­ALC2/2013

Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred

124 HQ File :01/80/050/00521/AM14/ RLA File :03/94/040/00773/AM14/ Lic.No/Date:0310764595 06.01.2014 Defer Date:01.04.2014 01.04.2014.   125

Case No.:14/24/80­ALC2/2013

Party Name:CAMFIL FARR AIR FILTRATION INDIA PVT. LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00491/AM14/ RLA File :05/23/040/00410/AM14/ Lic.No/Date:0510375669 08.01.2014 Defer Date:01.04.2014 Decision :The Commi埤�ee noted that the firm’s applica埚�on has been sent to MSME on 14.02.2014 for examina埚�on & comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  MSME. Case  is  deferred  to 01.04.2014.   126

Case No.:5/24/80­ALC2/2013

ENGINEERING LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00482/AM14/ RLA File :05/23/040/00408/AM14/ Lic.No/Date:0510375761 09.01.2014 Defer Date:01.04.2014 01.04.2014.   127

Case No.:42/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00519/AM14/ RLA File :03/95/040/00789/AM14/ Lic.No/Date:0310765262 09.01.2014 Defer Date:01.04.2014 01.04.2014.   128

Case No.:37/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00514/AM14/ RLA File :03/95/040/00781/AM14/ Lic.No/Date:0310766034 13.01.2014 Defer Date:01.04.2014 &  comments  which  actually  pertains  to  DHI  and  decided  to  send  the  same  to  DHI  for  examina埚�on  and comments.Case is deferred to 01.04.2014.   129

Case No.:22/24/80­ALC2/2013

Party Name:DIEHL METAL INDIA PRIVATE LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00499/AM14/ RLA File :31/83/040/00191/AM14/ Lic.No/Date:3110062134 15.01.2014 Defer Date:01.04.2014 &  comments  which  actually  pertains  to  DHI  and  decided  to  send  the  same  to  DHI  for  examina埚�on  and comments.Case is deferred to 01.04.2014.

130

Case No.:30/24/80­ALC2/2013

Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00507/AM14/ RLA File :03/94/040/00891/AM14/ Lic.No/Date:0310766311 15.01.2014 Defer Date:01.04.2014 01.04.2014.   131

Case No.:45/24/80­ALC2/2013

Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00522/AM14/ RLA File :03/94/040/00880/AM14/ Lic.No/Date:0310766285 15.01.2014 Defer Date:01.04.2014 01.04.2014.   132

Case No.:28/24/80­ALC2/2013

Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00505/AM14/ RLA File :03/94/040/00874/AM14/ Lic.No/Date:0310766542 16.01.2014 Defer Date:01.04.2014 01.04.2014.   133

Case No.:29/24/80­ALC2/2013

Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00506/AM14/ RLA File :03/94/040/00915/AM14/ Lic.No/Date:0310766545 16.01.2014 Defer Date:01.04.2014 01.04.2014.   134

Case No.:26/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00503/AM14/ RLA File :03/95/040/00817/AM14/ Lic.No/Date:0310766666 17.01.2014 Defer Date:01.04.2014 01.04.2014.  

Case No.:32/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred

135 HQ File :01/80/050/00509/AM14/ RLA File :03/95/040/00794/AM14/ Lic.No/Date:0310766777 17.01.2014 Defer Date:01.04.2014 &  comments  which  actually  pertains  to  DHI  and  decided  to  send  the  same  to  DHI  for  examina埚�on  and comments.Case is deferred to 01.04.2014.   136

Case No.:40/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00517/AM14/ RLA File :03/95/040/00830/AM14/ Lic.No/Date:0310766662 17.01.2014 Defer Date:01.04.2014 01.04.2014.   137

Case No.:41/24/80­ALC2/2013

LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00518/AM14/ RLA File :03/95/040/00829/AM14/ Lic.No/Date:0310766650 17.01.2014 Defer Date:01.04.2014 01.04.2014.   138

Case No.:46/24/80­ALC2/2013

Party Name:GREATOO MOLDS INDIA PRIVATE LIMITED Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00523/AM14/ RLA File :04/24/040/00229/AM14/ Lic.No/Date:0410154390 20.01.2014 Defer Date:01.04.2014 &  comments  which  actually  pertains  to  DHI  and  decided  to  send  the  same  to  DHI  for  examina埚�on  and comments.Case is deferred to 01.04.2014.   139

Case No.:47/24/80­ALC2/2013

Party Name:BRAKES INDIA LIMITED, Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00524/AM14/ RLA File :04/24/040/00224/AM14/ Lic.No/Date:0410154676 29.01.2014 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that the firm’s applica埚�on has been sent to DHI on 14.02.2014 for examina埚�on & comments  which  is  under  their  examina埚�on  and  decided  to  await  comments  of  DHI.  Case  is  deferred  to 01.04.2014.   140

Case No.:1/24/80­ALC2/2013

Party Name:NASH INDUSTRIES (I) PVT LTD Meet No/Date:24/80­ ALC2/2013 18.02.2014 Status: Deferred HQ File :01/80/050/00478/AM14/ RLA File :07/24/040/00392/AM14/ Lic.No/Date:0710101822 31.01.2014 Defer Date:01.04.2014 Decision : The Commi埤�ee noted that hard copy of firm’s applica埚�on has not been received from RA, Bengaluru and decided to give reminder to them. Case is deferred to 01.04.2014.

Sl.No.554

Case No.  A/R‐61

M/s.  United Drilling  Tools Ltd., Delhi HQF.No.01/80/050/00397/AM10/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.05/24/040/00318/AM10 0510249707 dt.22.09.2009 Date: 18.02.2014 Revision of norms Decision : The  Commi埤�ee  noted  that  the  firm  has  not  furnished  the  copy  of  essen埚�ality  cer埚�ficate/NOC  issued  by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014.   S.No.555

Case No.  A/R‐49

M/s.  Larsen  & Toubro  Ltd., Mumbai HQF.No.01/80/050/00245/AM11/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.03/95/040/00712/AM10 0310557677 dt.29.01.2010 Date: 18.02.2014 Amendment  in  quan埚�埚�es  /  addi埚�on  of addi埚�onal import items Decision : The  Commi埤�ee  noted  that  the  firm  has  not  furnished  the  copy  of  essen埚�ality  cer埚�ficate/NOC  issued  by Directorate of Hydrocarbons (DHC) as asked vide le埤�er dated 03.02.2014 and ma埤�er is under considera埚�on of PC‐VI. The Commi埤�ee decided to remind the firm for furnishing the copy of essen埚�ality cer埚�ficate/NOC issued by Directorate of Hydrocarbons (DHC) and remind PC‐VI for expedi埚�ng their inputs/comments. Case is deferred to 01.04.2014.   S.No.556

Case No.  A/R‐75

  M/s.    Clyde Pumps  India Pvt.  Ltd.,  New Delhi HQF.No.01/80/050/00246/AM13/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.05/23/040/00073/AM13 0510327269 dt.14.06.2012 Date: 18.02.2014 Fixa埚�on  of norms Decision : The Commi埤�ee decided to ra埚�fy norms on the basis of DHI U. O. No. 03(01)/14‐TSW(B)/20  dated 16.01.2014 (Copy is to be forwarded to RA and firm).      S.No.557

Case No.  A/R‐76

  M/s.    Vem Technologies Pvt.  Ltd., Hyderabad HQF.No.01/80/050/00617/AM10/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.09/24/040/00373/AM10 0910040368 dt.18.12.2009 Date: 18.02.2014 Fixa埚�on  of norms Decision :  The  Commi埤�ee  decided  to  ask  the  firm  to  furnish  the    informa埚�on  according  to  MSME  ID  UO  Note  No. 30(58)/13‐ME dated 06.01.2014(copy of the aforesaid communica埚�on to be forward to firm and RA). Case is deferred to 01.04.2014.   S.No.558

Case  No.    A/R‐

111   M/s.    Gastek Engineering  (P) Ltd., New Delhi HQF.No.01/80/050/01125/AM07/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.05/24/040/00812/AM07 0510196934 dt.28.12.2006 Date: 18.02.2014 Request for amendment  of norms Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 03.02.2014 and decided to send reminder to the firm for expedi埚�ng their reply. Case is deferred to 01.04.2014.   S.No.559

Case No.  A/R‐112

  M/s.    Kern‐ Liebers  Springs &  Stampings Pvt.  Ltd., Tumkur HQF.No.01/81/050/00443/AM12/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.07/24/040/00367/AM12 0710084702 dt.15.12.2011 Date: 18.02.2014 Request for amendment  of norms Decision : The Commi埤�ee noted that neither the firm nor the RA has furnished their comments on  MSME UO Note No. 30(168)/11‐ME dated 03.01.2014 forwarded to them and decided to send them reminder. Case is deferred to 01.04.2014.   S.No.560

Case  No.    A/R‐

113   M/s.    Echaar Equipments  Pvt. Ltd., Thane HQF.No.01/80/050/00542/AM12/DES.I Lic. No. & date     Mee埚�ng  No. 24/14 RA.F.No.03/94/040/01018/AM12 0310682257 dt.16.02.2012 Date: 18.02.2014 Request for revision of norms Decision : The firm’s representa埚�ve, Shri Kir埚� H. Panchal, Director has a埤�ended the mee埚�ng and replied the queries of Technical Authori埚�es(TAs) present in the mee埚�ng. The Commi埤�ee have asked them to submit the wastage calcula埚�on, drawing  &  dimension  details,  etc.,  which  they  have  noted  down  and  requested  for  埚�me  for  furnishing  the  requisite informa埚�on. The Commi埤�ee decided to give them 埚�me for furnishing their reply/requisite informa埚�on. Case is deferred to 01.04.2014.   S.No.561 Case  No.  A/R‐114  M/s.  CIM Tools  Pvt. Ltd., Bangalore HQF.No.01/80/050/01010/AM08/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.07/24/040/00580/AM08 (1)0710048323dt.09.11.2006 (2)0710048324  dt.09.11.2006 (3)  0710048325  dt.09.11.2006 (4)  0710051914  dt.07.06.2007 (5)  0710052885  dt.14.08.2007 (6)  0710052703  dt.03.08.2007 (7)  0710053664  dt.03.10.2007 (8)  0710054332  dt.05.11.2007 (9)  0710054469  dt.13.11.2007 (10)0710054547dt.16.11.2007 (11)0710055797dt.12.02.2008 (12)0710056335dt.11.03.2008 (13)0710057833dt.11.06.2008 (14)0710058366dt.08.07.2008 (15)0710059201dt.19.09.2008 (16)0710059704dt.11.09.2008 (17)0710065141dt.02.06.2009   (18)0710065366dt.12.06.2009 (19)0710065365dt.12.06.2009 Date: 18.02.2014 Request for revision of norms Decision :  The  Commi埤�ee  decided  to  ra埚�fy  norms  on  the  basis  of  DIPP  I.D.  No.  12/25/2014‐TSW/114‐A/R    dated 18.02.2014 (Copy is to be forwarded to RA and firm).     S.No.562

Case No.  A/R‐117

  M/s.    Godrej  & Boyce  Mfg.  Co. Ltd., Mumbai HQF.No.01/80/050/00223/AM14/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.03/94/040/00295/AM14 0310740370 dt.04.07.2013 Date: 18.02.2014 Request  for  addi埚�on  of  import  items of norms Decision  :  The  Commi埤�ee  noted  that  firm’s  reply  has  been  forwarded  to  DIPP  on  05.2.2014  which  is  under  their considera埚�on. Meanwhile the firm has forwarded their subsequent reply  with requests to add four items in import item list and change in the descrip埚�on of two import items at Sl. No. 7 & 9  vide their le埤�er dated 13.02.2014 received in this office on 18.02.2014. Case is deferred to 01.04.2014.   S.No.563

Case No.  A/R‐118

  Request  received from  RA,  Mumbai of  M/s.  L  &  T‐MHI turbine Generators Pvt. Ltd., Mumbai HQF.No.01/80/050/00060/AM14/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.03/95/040/00966/AM13 0310729651 dt.26.03.2013 Date: 18.02.2014 Request  for  amendment  sheet  No.3  of norms. Decision : The  Commi埤�ee  decided  to  amend  the  export  descrip埚�on  according  to  DHI  UO  No.  3(104)/10‐TSW(B)/38 dated 11.02.2014(copy of the aforesaid communica埚�on to be forward to firm and RA).  

S.No.564

Case No.  A/R‐119

  M/s.    Brakes India  Ltd., Chennai HQF.No.01/80/050/00366/AM12/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.04/24/040/00136/AM12 0410129812 dt.31.10.2011 Date: 18.02.2014 Request  for  inclusion  of  import  item  in norms Decision  :  The  Commi埤�ee  decided  to  ask  the  firm  to  furnish  the    informa埚�on  according  to  DHI  UO  No.  3(67)/11‐ TSW(B)/34 dated 30.01.2014 (copy of the aforesaid communica埚�on to be forward to firm and RA). Case is deferred to 01.04.2014.   S.No.565

Case No.  A/R‐131

  M/s.    ISGEC Heavy Engineering  Ltd., Noida HQF.No.01/80/050/00011/AM13/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.05/23/040/00477/AM12 0510319555 dt.06.03.2012 Date: 18.02.2014 Request for revision of norms Decision  :  The  Commi埤�ee  noted  that  the  firm’s  request  has  been  sent  to  DIPP  on  04.02.2014  for  examina埚�on  & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014.   S.No.566

Case No.  A/R‐132

  M/s.    A  Plus Projects  & Technology  (P) Ltd., Pune HQF.No.01/80/050/01091/AM06/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.31/24/040/00137/AM06 3110022702 dt.17.11.2005 Date: 18.02.2014 Request for Fixa埚�on  of norms Decision  :  The  Commi埤�ee  noted  that  the  firm’s  request  has  been  sent  to  DIPP  on  04.02.2014  for  examina埚�on  & comments which is under their examina埚�on and decided to await comments of DIPP.  The Commi埤�ee further noted that the firm is doing deemed export and supplying goods to M/s. Oil & Natural Gas Corpora埚�on Ltd., Mumbai required for petroleum  opera埚�ons  and  also  decided  to  ask  the  firm  to  furnish  copy  of  essen埚�ality  cer埚�ficate/NOC  issued  by Directorate of Hydrocarbons(DHC). Case is deferred to 01.04.2014.   S.No.567

Case No.  A/R‐133

 M/s.  Tema India Ltd.,  Navi Mumbai HQF.No.01/80/050/00729/AM11/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.03/95/040/00704/AM11 0310603295 dt.26.11.2010 Date: 18.02.2014 Request for Fixa埚�on  of norms Decision : The Commi埤�ee noted that the firm’s representa埚�on has been sent to DIPP on 18.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014.       S.No.568

Case No.  A/R‐134

 M/s.  Micro‐Tech C.N.C.  Ltd., Hosur(TN) HQF.No.01/80/050/00377/AM12/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.07/24/040/00237/AM12 0710082914 dt.29.09.2011 Date: 18.02.2014 Request for revision  of norms Decision  :  The  Commi埤�ee  noted  that  the  firm’s  request  has  been  sent  to  DHI  on  11.02.2014  for  examina埚�on  & comments which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014.   S.No.569

Case No.  A/R‐135

 M/s.  Micro‐Tech C.N.C.  Ltd., Hosur(TN) HQF.No.01/80/050/00155/AM13/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.07/24/040/00009/AM13 0710087899 dt.26.04.2012 Date: 18.02.2014 Request for revision  of norms Decision  :  The  Commi埤�ee  noted  that  the  firm’s  request  has  been  sent  to  DHI  on  11.02.2014  for  examina埚�on  & comments which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014.   S.No.570

Case No.  A/R‐136

 M/s.  Micro‐Tech C.N.C.  Ltd., Hosur(TN) HQF.No.01/80/050/00295/AM12/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.07/24/040/00215/AM12 0710082069 dt.06.09.2011 Date: 18.02.2014 Request for revision  of norms Decision  :  The  Commi埤�ee  noted  that  the  firm’s  request  has  been  sent  to  DHI  on  11.02.2014  for  examina埚�on  & comments which is under their examina埚�on and decided to await comments of DHI. Case is deferred to 01.04.2014.

S.No.571

Case  No.    A/R‐

137   M/s.  XomoxSanmar Ltd., Chennai HQF.No.01/80/050/00670/AM11/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.04/24/040/00247/AM11 0410120050 dt.23.12.2010 Date: 18.02.2014 Ra埚�fica埚�on of norms Decision  :  The  Commi埤�ee  noted  that  the  firm’s  request  has  been  sent  to  DIPP  on  10.02.2014  for  examina埚�on  & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014.   S.No.572

Case  No.    A/R‐

138   M/s.  Thyssenkrupp Industries  India Pvt. Ltd., HQF.No.01/80/050/00491/AM13/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.03/95/040/00710/AM13 3110717487 dt.18.12.2012 Date: 18.02.2014 Revision of norms Decision : The Commi埤�ee noted that the firm’s representa埚�on has been sent to DHI on 30.01.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DHI.Case is deferred to 01.04.2014.     S.No.573

Case No.  A/R‐139

 M/s.  Tema India Ltd., Mumbai HQF.No.01/80/050/00495/AM13/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.03/95/040/00751/AM13 0310718335 dt.27.12.2012 Date: 18.02.2014 Revision of norms Decision : The Commi埤�ee noted that the firm’s representa埚�on has been sent to DIPP on 18.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014.   S.No.574

Case  No.    A/R‐

140  M/s.  ISGEC Heavy Engineering  Ltd., Yamunanagar (Haryana) HQF.No.01/80/050/00065/AM14/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.05/23/040/00534/AM13 0510350891 dt.08.04.2013 Date: 18.02.2014 Request for revision of norms Decision  :  The  Commi埤�ee  noted  that  the  firm’s  request  has  been  sent  to  DIPP  on  11.02.2014  for  examina埚�on  & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014.   S.No.575

Case No.  A/R‐141

  M/s.    Reference received  from Addl.  DGFT, Mumbai  of  M/s. Larsen  &  Toubro Ltd., Mumbai HQF.No.01/80/050/00170/AM14/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.03/95/040/00190/AM14 0310738812 dt.24.06.2013 Date: 18.02.2014 Request for amendment of import at sl. No.10  &  to  amend  the  ITC(HS)  code  of import item Sl. No. 8,9, & 10 of  norms Decision : The Commi埤�ee noted that the reference received from Addl. DGFT, Mumbai in respect of the subject AA has been sent to DIPP on 11.02.2014 for examina埚�on & comments which is under their examina埚�on and decided to await comments of DIPP. Case is deferred to 01.04.2014.   S.No.576

Case  No.    A/R‐

142   M/s.  VEM Technologies  Pvt. Ltd., Hyderabad HQF.No.01/80/050/00047/AM14/DES.I Lic. No. & date   Mee埚�ng No. 24/14 RA.F.No.09/24/040/00491/AM13 0910054874 dt.31.01.2013 Date: 18.02.2014 Request for fixa埚�on  of norms Decision  :  The  Commi埤�ee  decided  to  modify  norms  on  the  basis  of  MSME  U.O.  note  No.  30(58)/13‐ME    dated 20.01.2014 (Copy is to be forwarded to RA and firm).         Sl.No.577

Case No.  C –07

HQ F.No.01/80/162/00016/AM13/DES‐I

M/s.  Alpha Technologies  Pvt. Ltd.., Bangalore   Mee埚�ng No. 24/14 Fixa埚�on of input output norms for the export product “Row &Heat Exchanger and Des Kit, Pre‐processor PCB Assembly, Main Processor PCB Assembly, Power supply Unit PCB Assembly etc.” in respect of 100% EOU – reg. Date: 18.02.2014 Decision : The  Commi埤�ee  decided  to  refer  the  case  to  MSME  according  to  DIT  le埤�er  No.  8(134)/2012‐IPHW  dated 21.1.2012  forwarded  by  DIT  e‐mail  dated  09.01.2014  for  their  examina埚�on  and  comments.  Case  is  deferred  to 01.04.2014.   S.No.578

Case No.  C‐04

Reference  received from  Addl.  DGFT, Kolkata  of  M/s.  Larsen & Toubro Ltd., Kolkata HQF.No.01/80/162/00061/AM14/DES.I   Mee埚�ng No. 24/14 Clarifica埚�on  against  SION  at  Sl.  No.  C‐1647 Engineering Product – reg. Date: 18.02.2014 Decision : The Commi埤�ee noted that firm has not replied to deficiency le埤�er dated 17.12.2013 followed by reminder dated 30.01.2014 and decided to send  final reminder to the firm failing which the Commi埤�ee would be constrained to reject their case with direc埚�on to pay the Custom Duty and applicable interest for regulariza埚�on of the license. Case is deferred to 01.04.2014.    S.No.579

Case No.  C‐05

M/s.  Bri埚�sh  Engines India  Pvt.  Ltd., Bangalore HQF.No.01/80/162/00222/AM14/DES.I   Mee埚�ng No. 24/14 Fixa埚�on  of  input  output  norms  for  the  export product  “Hydraulic  Motor  and  its  parts  and Mul埚�spindle automa埚�c machines spares Valve and its parts” in respect of 100% EOU – reg. Date: 18.02.2014 Decision  :  The  Commi埤�ee  decided  to  ask  the  firm  to  furnish  the    informa埚�on  according  to  DHI  UO  No.  1(05)/13‐ TSW(B)/55 dated 14.02.2014 (copy of the aforesaid communica埚�on to be forward to firm and RA). Case is deferred to 01.04.2014.    SUPLEMENTRY AGENDA   Sl. No. 580

Case No. AR­143

M/s. Siria Impex Pvt. Ltd. HQF. No. 01/80/050/00193/AM14/DES.I Meeting No. 24/14 RLA No. 05/24/040/00007/AM14/DES­I Date: 18.02.2014 Lic. No. 0510351414 dated 11.04.2013 Revision of Norms. Decision :  The Commi埤�ee noted that the descrip埚�on of export and import items furnished by the firm are same. The Commi埤�ee further noted that the firm’s submission that they have no problem in accep埚�ng the decision of NC‐ I mee埚�ng No.  16/80  dated  29.10.2013  i.e.  suffixing  the  word  “Unannealed”  with  the  descrip埚�on  of  import  item  and  the  word “Annealed”  with  the  descrip埚�on  of  export  product  the  firm.  They  have  further  requested  NC‐I  to  direct  CLA  for redemp埚�on of their said AA according to old descrip埚�on of their case as according to them, they have completed the export obliga埚�on against the said AA. The Commi埤�ee aŌer having delibera埚�ons on this issue decided to ask the firm to furnish duly filled in and cer埚�fied A.R.E.1 form by Central Excise Officer which shows that they have already made export aŌer annealing the imported items. Case is deferred to 01.04.2014.   Sl. No. 581

Case No. AR­144

M/s. Undercarriage And Tractor Parts Pvt. Ltd. HQF. No. 01/80/050/00067/AM14/DES.I Meeting No. 24/14 RLA No. 03/95/040/01027/AM13/DES­I Date: 18.02.2014 Lic. No. 0310728824 dated 20.03.2013 Ratification of Norms

Decision  :  The  Commi埤�ee  decided  to  modify  norms  on  the  basis  of  MSME  U.O.  note  No.  30(28)/2013‐ME    dated 05.02.2014 (Copy is to be forwarded to RA and firm).      


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied