DGFT Committee Minutes
RATIFIED Minutes of Meeting No.35/11 scheduled on 11.01.2011 of Norms Committee(NCI) (DES.I Section) The meeting No. 35/11 of the Norms Committee (NCI) for the licensing year 20102011 was held on 11.01.2011 under the Chairmanship of Sh. N.P.S. Monga, Additional Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure VolumeI. The following Members of the Committee were present in the meeting: Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA 13 A 23063332 M/o Steel, U.B. 5. Sh. G. Parthasarathi, Dy.DGFT 312 23061562 Ext.301 DGFT, U.B. 6. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B. I The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon were as under: 1
Case No.:839/26/80ALC2/2007
Party Name:IDMC LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Transferred HQ File :01/80/050/00046/AM07/ RLA File :34/24/040/00004/AM07/ Lic.No/Date:3410015872 17.04.2006 Decision : The Committee decided to transfer the case to NCII as the chapter “73” pertains to them. 2
Case No.:28/42/80ALC2/2008
Party Name:THERMAX LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/01652/AM09/ RLA File :31/21/040/00319/AM09/ Lic.No/Date:3110036852 02.01.2009 Defer Date:22.02.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case for 22.02.2011. 3
Case No.:14/50/80ALC2/2008
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/01812/AM09/ RLA File :09/24/040/00427/AM09/ Lic.No/Date:0910037147 24.02.2009 Defer Date:22.02.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case for 22.02.2011. 4
Case No.:2/1/80ALC2/2009
Party Name:TERUMO PENPOL LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/01825/AM09/ RLA File :53/24/040/00012/AM09/ Lic.No/Date:5310007800 16.03.2009 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re listed on 22.02.1011.
5
Case No.:1/7/80ALC2/2009
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00068/AM10/ RLA File :03/95/040/00983/AM09/ Lic.No/Date:0310517989 01.05.2009 Decision : As per written comments of DHI vide their U.O. Note No.3(31)/09TSW(B)/618 dated 23.12.2010 the Committee decided to ratify the norms in respect of the subject advance authorization as under: Export The word “Accessories” may be deleted from the description of export product & total Export weight is 2654.2 MT may be incorporated in the license. Import 1. Item no 1 The firm has sought wastage of 86%. Wastage sought is reasonable. We may consider 30 % recovery as was done in case of licence no 0310489104 dt 061008 & recommend for 93 MT with net wastage of 60%.The size of plates are 3010 mmX6460mm & 3000 mm X 6285 mm may also be incorporated in the license. 2. Item no 2 The firm has not given the type of plates proposed for import. The description of item may be amended to “non alloy steel plates/Sheets”. The quantity to be allowed may be 1736 MT with net wastage of 8% with 1/3rd recovery. 3. Item no 3 The firm has sought 1% wastage. This Office agrees to it. In addition to the length of tube weight is 130.66 MT may be incorporated in the license. 4. Item no 4 The firm has sought 2% wastage. This Office agrees to it. In addition to the length of tube weight is 97.88 MT may be incorporated in the license. 5. Item no 5 The firm has sought 2% wastage. This Office agrees to it. In addition to the length of tube weight is 316.7 MT may be incorporated in the license. 6. Item no 6 The firm has applied for 416 nos of forgings of gross weight 258.8 MT with 24.9 % wastage. Taking 20% recovery firm’s entitlement comes to 248.8 MT & 400 numbers. This Office recommends for import of 416 numbers of forgings with weight 258.8 MT but duty free import may be restricted to 400 numbers of weight 248.8 MT. 7. Item no 7 16 number each of PTC & Dished ends may be allowed. 8. Item no 8 The item may be allowed under GN4. 9. Item no 9 to 12 These are welding materials. The firm has given calculation for 54914 kg of welding material. Since raw material quantity has been reduced due to recovery on wastage, this Office agrees for totoal 52000 kg of welding material which does not include the flux. This Office recommends for 40 MT of item no 9, 12 MT each of item no 11 & 12. 10. Item no 13These are cutting tools. It may be allowed @ 0.12% of fob value of export. The Regional Authority may take necessary action accordingly. 6
Case No.:14/14/80ALC2/2009
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00184/AM10/ RLA File :61/24/040/00012/AM10/ Lic.No/Date:6110000320 19.06.2009 Decision : As per written comments of DHI vide their U.O. Note No.3(69)/10TSW(B)/611 dated 21.12.2010, the Committee observed that a similar application has been approved for license No. 6110000286 dated 06.02.08 with same export product. Therefore, the Committee decided to ratify the norms of import items on repeat basis in respect of the subject advance authorization as under: Description of export products may be modified as follows and incorporated in the licence. 1. Steam Turbine and their auxiliaries 3 Set (3552 MT) 2. Condenser and their auxiliaries 3Set (2295 MT) 3. Generator and their auxiliaries 3 Set (1632 MT)
Imports: Sl. Nos. 18,85, 91, 191– may be deleted as the items are not part of the export product. Sl no 23 description may be modified to “Moving blade forgings LP 2L, 2R” & quantity restricted to 143 numbers and “Moving blade forgings 3L & 3R” & quantity restricted to 144 numbers Sl. No 74 23000 kg of fluid may be allowed which is required for first fill and top up only Sl. No 86 following description may be suffixed “GR304 SPEC AA10753 Size 31.75X0.7112X13400” 24140 nos and “GR304 SPEC AA10753 Size 31.75X0.89X13400” 390 nos may be allowed with out any wastage. Sl no 88 to 90 – welding material, has not given justification of quantity of import. The quantity of import may be restricted to 2% of fob value of export of condenser. Sl. No. 92 quantity may be amended to 3.15 MT. Sl. No. 93 quantity may be amended to 7 MT. Sl. No. 94 may be deleted as use of the item not given. Sl 96 and 97 deleted as calculation of requirement not given. Sl no 98 to 137 The value of insulating material to be restricted to 5% of fob value of the generator. (as was done in licence no06110000129 dt 250108) Sl no 139 and 140 Quantity may be reduced to 222 nos and weight 428 kg. Sl no 196 may be deleted as use and calculation of the item not given. Sl no 197The quantity may be amended to 605 numbers and weight restricted to 385 kg. Sl no 201 quantity may be reduced to 979 kg with 1% wastage. 208– may be deleted as calculation not given. Sl no 211 quantity may be reduced to 21 number Sl no 213 Quantity of import may be restricted to 47KG. Sl no 214 &215 Quantity may be restricted to 205 MT with 20% wastage. Sl no 216 may be deleted as use and calculation of the item not given. Sl no 223 Quantity may be restricted to 17.85 MT with 5% wastage. Sl no 224 may be deleted as calculation has not been given. Sl no 226 Quantity may be restricted to 42.33 MT with 2% wastage. Sl no 227 Quantity may be restricted to 2.15 MT with 2% wastage. All other items may be allowed as applied for due to recovery does not result in reduction of full number/ low quantity Under GN4. 7
Case No.:16/17/80ALC2/2009
Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00239/AM10/ RLA File :03/94/040/00300/AM10/ Lic.No/Date:0310529264 16.07.2009 Defer Date:22.02.2011 Decision :The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case for 22.02.1011. 8
Case No.:23/21/80ALC2/2009
Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00305/AM10/ RLA File :03/94/040/00396/AM10/ Lic.No/Date:0310533764 13.08.2009 Defer Date:22.02.2011 Decision : The Committee directed to forward a copy of the firm’s reply to DHI for examination and comments. The case may be relisted on 22.02.2011.
9
Case No.:32/37/80ALC2/2009
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00591/AM10/ RLA File :03/95/040/00336/AM10/ Lic.No/Date:0310539120 24.09.2009 Defer Date:22.02.2011 10
Case No.:45/33/80ALC2/2009
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00511/AM10/ RLA File :11/24/040/00015/AM10/ Lic.No/Date:1110021160 13.10.2009 Decision : As per written comments of DHI vide their U.O. Note No.3(80)/10TSW(B)/525 dated 19.10.10, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Export The description of export items be amended & their weight per unit incorporated in the licence. Turbine 120 MT each 3 sets Governor 14.6 MT each 3 sets Hydro generator 248.1 MT each 3 sets Import 1. Item no 1 The Firm has taken oversize plates. The Committee considered gross wastage of 40% & with 1/3rd recovery recommended for 27% wastage. (Quantity160 MT). The word “non alloy” to be prefixed to the description of import. 2. Item no. 2 to 6 are component items Allowed nettonet basis with accountability clause. 3. Item no 8 The net weight of item is 133.6 MT. With 1/3rd recovery of wastage, the Committee allowed for import of 155 MT with 16% wastage. 4. Item no 9 The Committee consider gross wastage of 30% & with 1/3rd recovery allowed for 20% wastage. (Quantity156 MT). 5. Item no 10 The Committee consider gross wastage of 30% & with 1/3rd recovery allowed for 20% wastage. (Quantity67 MT). 6. Item no 7 To be deleted as it is not a component. 7. Item no 11 & 12 These are high value forgings. There is minor machining on this. To be allowed as applied for. 8. Item no 13 to 21 To be allowed under GN4. 9. Item no 22 to25 To be allowed at 0.3% of fob value of export of generator 11
Case No.:2/33/80ALC2/2009
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00468/AM10/ RLA File :07/24/040/00258/AM10/ Lic.No/Date:0710067933 30.10.2009 Defer Date:22.02.2011 12
Case No.:2/1/80ALC2/2010
Party Name:APEX TEST TECHNOLOGIES, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00831/AM10/ RLA File :07/21/040/00797/AM10/ Lic.No/Date:0710069015 21.12.2009 Defer Date:22.02.2011 Decision : The representative of the DC(MSME) informed the Committee that the case is under study. The Committee, therefore, decided to defer the case and to relist the case for 22.02.1011.
13
Case No.:18/41/80ALC2/2009
Party Name:KEBURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00639/AM10/ RLA File :04/24/040/00247/AM10/ Lic.No/Date:0410110339 22.12.2009 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re listed on 22.02.1011. 14
Case No.:16/42/80ALC2/2009
Party Name:KOMET PRECISION TOOLS INDIA PVT LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00662/AM10/ RLA File :07/24/040/00381/AM10/ Lic.No/Date:0710069369 11.01.2010 Defer Date:22.02.2011 Decision: The Committee deliberated the case and on the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case for 22.02.2011 1. Information in respect of Sl.No.5 of the Standard Deficiency Format. 15
Case No.:9/45/80ALC2/2009
Party Name:THERMAX LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00696/AM10/ RLA File :31/24/040/00184/AM10/ Lic.No/Date:3110041632 22.01.2010 Defer Date:22.02.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the case and to relist the case for 22.02.1011. 16
Case No.:4/16/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00245/AM11/ RLA File :03/95/040/00712/AM10/ Lic.No/Date:0310557677 29.01.2010 Decision : As per written comments of DIPP vide their U.O. Note dated 11.01.2011 the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. List of import items to be revised as per the revised list submitted by the firm vide their letter dated 10th November, 2010, within the existing CIF value of Advance Authorisation(copy enclosed). 2. Net weight of export products be specified as 4936.20 MT. 3. Quantities of import items (as per the revised list)may be allowed as under: (i) Word “Relevant” be prefixed with the description of import items at Sl .Nos. 1 to 5, 22, 23, 83 to 88, 96 & 102. (ii) Weights of 42 MT, 4.2 MT, 8 MT, 2.7 MT, 23.4 MT, 5 MT, 2 MT, 5 MT, 8 MT, 3.9 MT, 1.2 MT, 2.4 MT, 4.2 MT, 50 MT, 0.5 MT, 0.08 MT, 0.41 MT, 0.08 MT, 0.35 MT & 2 MT may be specified with the quantities of import items at S.Nos. 5, 9, 10, 11, 12, 22, 23, 24, 88, 90, 91, 92, 93, 97, 98, 99, 100, 101, 102 & 112 respectively. (iii) Quantities of import items at Sl. Nos.1, 2, 83 & 96 be allowed as 1.03 Kgs./Kg. content in the export product. (iv) Quantities of import items at Sl. Nos.3, 4, 5, 84 to 88 & 102 to be allowed as 1.02 Kgs./Kg. content in the export product. (v) Import items at Sl No. 28, 57, 62, 66, 68 & 72 to be allowed as per policy for spares. (vi) Import items at Sl No. 60 & 69 to be deleted as the same are not required.
(vii) Import items at Sl No. 79, 106 &107 to be allowed as applied for being less than 1 % of FOB value of exports. (viii) Import items at Sl No. 80, 81 & 82 to be allowed as applied for i.e. 20 MT, 10 MT & 45 MT respectively. (ix) Rest of the import items which are components to be allowed as per General Note4 for Engineering Products. 17
Case No.:25/45/80ALC2/2009
Party Name:ALTEM POWER LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00712/AM10/ RLA File :31/24/040/00222/AM10/ Lic.No/Date:3110041766 01.02.2010 Defer Date:22.02.2011 comments. The case may be relist on 22.02.2011. 18
Case No.:3/1/80ALC2/2010
Party Name:WEBB INDIA PVT. LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00832/AM10/ RLA File :07/24/040/00411/AM10/ Lic.No/Date:0710069722 01.02.2010 Decision : The Committee deliberated the case and agreed with the views of DHI. As per written comments of DHI vide their U.O. Note No.3(153)/09TSW(B) dated 21.09.10, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. The Total export weight of 92 MT to be incorporated in the license. 2. Weight of item no 20 of export is 437 Kg and the same to be incorporated in the license. 3. Item no 1 to 8 & 10 of import are components and are allowed under GN4. 4. Weight of Item no 5 of import is 70 kg per unit & the same to be incorporated in the license. 5. Item no 9 to be allowed at 1188 meters with 1% wastage. Import weight 12537 kg to be incorporated in the license. 19
Case No.:13/51/80ALC2/2009
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00804/AM10/ RLA File :34/24/040/00189/AM10/ Lic.No/Date:3410026224 02.02.2010 Defer Date:22.02.2011 Decision : The Committee noted that firm’s reply vide their letter dated 18.10.10 is incomplete. The firm has not submitted S.No. 11 of SDL. The firm has sought “Nil” wastage during application which has changed to 10% without any clarification. On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to get clarification/justification the information of S. No. 11 of SDL from firm again and to relist the case for 22.02.2011. 20
Case No.:4/49/80ALC2/2009
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00773/AM10/ RLA File :09/24/040/00458/AM10/ Lic.No/Date:0910040992 18.02.2010 Defer Date:22.02.2011 Decision : The Committee noted that the firm has sought time for submission of detailed calculation supported by drawing. The Committee, therefore, decided to issue final reminder to the firm for expediting requisite information. The case may be relisted on 22.02.2011.
21
Case No.:25/51/80ALC2/2009
Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00816/AM10/ RLA File :05/23/040/00188/AM10/ Lic.No/Date:0510259390 24.02.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The ALC, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.1011. 22
Case No.:23/51/80ALC2/2009
Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00814/AM10/ RLA File :05/23/040/00179/AM10/ Lic.No/Date:0510259450 25.02.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from Ministry of Mines are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.1011. 23
Case No.:16/35/80ALC2/2010
Party Name:EUROFLEX TRANSMISSIONS(INDIA) PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00643/AM11/ RLA File :09/24/040/00491/AM10/ Lic.No/Date:0910041175 04.03.2010 Defer Date:22.02.2011 Decision : The Committee noted that the firm’s application has been sent to DHI for examination and comments and it is under study. Therefore, it has been decided to relist the case on 22.02.2011. 24
Case No.:32/51/80ALC2/2009
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00823/AM10/ RLA File :03/95/040/00808/AM10/ Lic.No/Date:0310564122 11.03.2010 Defer Date:22.02.2011 25
Case No.:14/3/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00014/AM11/ RLA File :03/95/040/00813/AM10/ Lic.No/Date:0310564429 12.03.2010 Defer Date:22.02.2011 26
Case No.:9/1/80ALC2/2010
Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00838/AM10/ RLA File :09/24/040/00501/AM10/ Lic.No/Date:0910041387 19.03.2010 Defer Date:22.02.2011 Decision : The representative of the firm did not turn up for Personal Hearing. The Committee, therefore, decided to give the firm finally opportunity to appear for Personal Hearing to present full facts of the case including description of the given product. The case may be relisted on 22.02.2011.
Case No.:14/11/80ALC2/2010
Party Name:CORE METAL KRAFTS LTD., Meet No/Date:35/80 ALC2/2010 Status: Approved
27 11.01.2011 HQ File :01/80/050/00160/AM11/ RLA File :22/24/040/00056/AM10/ Lic.No/Date:2210009813 25.03.2010 Decision : As per written comments of DHI vide their U.O. Note No.3(75)/10TSW(B)/584 dated 08.12.2010, the Committee decided to ratify the norm of import items in respect of the subject advance authorization as under: Item No. 2 – Deleted All other items – Allowed under GN4 28
Case No.:34/5/80ALC2/2010
Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00067/AM11/ RLA File :05/23/040/00232/AM10/ Lic.No/Date:0510261727 05.04.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from Ministry of Mines are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.1011. 29
Case No.:15/11/80ALC2/2010
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00161/AM11/ RLA File :34/24/040/00229/AM09/ Lic.No/Date:3410026834 16.04.2010 Decision : As per written comments of C&PC vide their O.M. No. 46011/55/2010PC.II dated 24.12.10, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Item to be Exported Quantity Micro Irrigation Equipments (Emmiting Pipe Systems) Streamline 16080 1.49L/H, 0.30 M, 1000 M 1 Meter (Weight 10.24gm+/2%) Rawmaterial allowed for Import Quantity 1. HDPE Granules 2. Master Batch 3. Emitters (Drippers) 9.602 gm 0.400 gm 3.4 No. (0.442 gms) 30
Case No.:16/11/80ALC2/2010
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00162/AM11/ RLA File :34/24/040/00217/AM09/ Lic.No/Date:3410026833 16.04.2010 Decision : As per written comments of C&PC of vide their O.M. No. 46011/55/2010PC.II dated 24.12.10, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Item to be Exported Quantity Micro Irrigation Equipments (Emmiting Pipe Systems) Driplive 16009 1.4L/H, 0.50 M, 400 M 1 Meter (Weight 41.5gm+/2%)
Rawmaterial allowed for Import Quantity 1. HDPE Granules 2. Master Batch (Plasblack) 3. LLDPE Granules 4. LDPE Granules 5. Emitters (Drippers) 8.363 gm 1.883 gm 23.210 gm 8.363 gm 2.04 No. (0.51 gm) 31
Case No.:41/5/80ALC2/2010
Party Name:KINECO PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00074/AM11/ RLA File :17/24/040/00055/AM10/ Lic.No/Date:1710003301 28.04.2010 Defer Date:22.02.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the case and to relist the case on 22.02.1011. 32
Case No.:14/9/80ALC2/2010
Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00127/AM11/ RLA File :11/24/040/00002/AM11/ Lic.No/Date:1110022305 30.04.2010 Defer Date:22.02.2011 Decision : The Committee noted that the reply of firm is incomplete and Annexure “B” has not been received along with firm’s letter dated 09.11.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case for 22.02.2011. 1. Information in respect of Sl.No.11 of the Standard Deficiency Format. For net weight of components, details of components with new weight thereof may be indicated. 2. OD, WT and length of import items at Sl. No. 2 & 3. 3. Detailed calculations for the quantities of import items at Sl. Nos. 2, 3 & 4 supported by the length and number of tubes in the export product. 33
Case No.:21/11/80ALC2/2010
Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00167/AM11/ RLA File :05/23/040/00006/AM11/ Lic.No/Date:0510264179 12.05.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re listed on 22.02.1011. 34
Case No.:22/11/80ALC2/2010
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00168/AM11/ RLA File :07/24/040/00033/AM11/ Lic.No/Date:0710071546 14.05.2010 Defer Date:22.02.2011 Decision: The Committee noted that the firm was asked to submit Sl No 11 of SDL to examine the request. The firm’s reply sent vide their letter of dated 201010 is incomplete. Therefore, on the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to remind the firm to furnish their reply and to relist the case on 22.02.1011:
Case No.:13/15/80ALC2/2010
Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:35/80 ALC2/2010 Status: Deferred
35 11.01.2011 HQ File :01/80/050/00220/AM11/ RLA File :11/24/040/00001/AM11/ Lic.No/Date:1110022429 19.05.2010 Defer Date:22.02.2011 Decision : The representative of the DIPP informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 22.02.1011. 36
Case No.:10/15/80ALC2/2010
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00217/AM11/ RLA File :03/94/040/00114/AM11/ Lic.No/Date:0310575827 25.05.2010 Defer Date:22.02.2011 Decision : The Committee directed to forward a copy of the firm’s reply to DIPP for examination and 37
Case No.:6/11/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00152/AM11/ RLA File :04/24/040/00033/AM11/ Lic.No/Date:0410114086 28.05.2010 Defer Date:22.02.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case for 22.02.1011. 38
Case No.:7/11/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00153/AM11/ RLA File :31/24/040/00031/AM11/ Lic.No/Date:3110043398 28.05.2010 Defer Date:22.02.2011 39
Case No.:19/18/80ALC2/2010
Party Name:STARION INDIA P.LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00272/AM11/ RLA File :31/24/040/00028/AM11/ Lic.No/Date:3110043412 31.05.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.1011. 40
Case No.:38/18/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00291/AM11/ RLA File :04/24/040/00018/AM11/ Lic.No/Date:0410114141 31.05.2010 Decision : As per written comments of DHI of vide their U.O. Note No.3(39)/10TSW(B)/593 dated 13.12.2010 the Committee decided to ratify the norms in respect of the subject advance authorization as under: EXPORT The description of the export product may be modified to “piping system for 2X500 MW for Vallur power project”& total export weight is 2679 MT & the same may be incorporated in the licence. IMPORT 1. Item no 1 (Carbon Steel) The quantity of seamless tube/ pipe to be allowed is 730 MT& that of welded 50 MT with 2% wastage.
2. Item no 2 (Alloy Steel)The quantity of seamless tube/ pipe to be allowed is 50 MT with 2% wastage as applied by the firm. “Welded” may be deleted from the description of import item. 3. Item no 3 (Stainless Steel)The quantity of seamless tube/ pipe to be allowed is 6 MT with 2% wastage as applied by the firm. “Welded” may be deleted from the description of import item. 4. Item no 4 The firm has amended quantity of import to 190 MT. The word “Finished” may be prefixed to the description of import & the same may be incorporated in the licence. The item may be allowed under GN4 as applied for. 5. Item no5 Welding electrodes Quantity applied is only 2 MT which is with in the norms normally allowed. This Office recommends the import as applied for. 6. Item no6 to 8 These are components & may be allowed under GN4. 41
Case No.:11/11/80ALC2/2010
Party Name:UNITED DRILLING TOOLS LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00157/AM11/ RLA File :05/24/040/00073/AM11/ Lic.No/Date:0510265196 01.06.2010 Defer Date:22.02.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 22.02.1011. 42
Case No.:8/11/81ALC2/2010
Party Name:AUTO COMP INDIA PVT. LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/81/050/00053/AM11/ RLA File :31/24/040/00035/AM11/ Lic.No/Date:3110043464 02.06.2010 Defer Date:22.02.2011 Decision : The Committee deliberated on the comments of the DHI vide U.O. Note No. 3(77)/10) TSW(B)/574 dated 2.12.2010 and decided to examine the stage wise wastage process on file. The case may be relisted on 22.02.2011 43
Case No.:27/11/80ALC2/2010
Party Name:FREEDOM OPTHALMIC PRIVATE LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00173/AM11/ RLA File :04/24/040/00036/AM11/ Lic.No/Date:0410114329 07.06.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re listed on 22.02.1011. 44
Case No.:4/13/80ALC2/2010
Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00180/AM11/ RLA File :05/24/040/00100/AM11/ Lic.No/Date:0510266016 14.06.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.1011. 45
Case No.:14/13/80ALC2/2010
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:28/80 ALC2/2010 12.10.2010 Status: Deferred HQ File :01/80/050/00190/AM11/ RLA File :03/94/040/00219/AM11/ Lic.No/Date:0310578752 14.06.2010 Defer Date:22.02.2011
46
Case No.:17/15/80ALC2/2010
Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00224/AM11/ RLA File :04/24/040/00053/AM11/ Lic.No/Date:0410114549 14.06.2010 Defer Date:22.02.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case for 22.02.1011. 47
Case No.:16/13/80ALC2/2010
Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00192/AM11/ RLA File :03/95/040/00212/AM11/ Lic.No/Date:0310578892 15.06.2010 Decision : As per written comments of DHI vide their U.O. Note No.3(33)/08TSW(B)/515 dated 02.12.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Export item – 2 units of COLLAR 9 1/2 inches of weight 2194 kg. Allowed import of two units of weight 3456kg as applied for. 48
Case No.:17/13/80ALC2/2010
Party Name:PERFECT ENGG COMPONENTS P LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00193/AM11/ RLA File :05/24/040/00104/AM11/ Lic.No/Date:0510266164 16.06.2010 Decision : As per written comments of DC(MSME) vide their U.O. Note No.30(127)/2010ME dated 03.01.2011, the Committee decided to ratify the norms of import items in respect of the subject advance authorization as under: 1. Item No. 37 & 38 Deleted 2. All other component items allowed nettonet basis with accountability clause. 49
Case No.:27/13/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00203/AM11/ RLA File :53/24/040/00009/AM11/ Lic.No/Date:5310010616 17.06.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re listed on 22.02.1011.
Case No.:15/18/80ALC2/2010
Party Name:INDUS PRO AUTO ENGINEERS PVT.LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00268/AM11/ RLA File :05/23/040/00054/AM11/ Lic.No/Date:0510266316 17.06.2010 Defer Date:22.02.2011
50 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case for 22.02.1011: 1. The firm has mentioned in the application that there is only one imported item, i.e Vinyl Sheeting Black, Skin, But in the reply there are three import items like Polyols, Iso Cyanates & PVC/ABS alloy skin which needs clarification. 2. The firm has mentioned about the support frame in the manufacturing process but the item does not appear in list of raw material. 3. The firm may be asked to give list of total items both imported & indigenous with total cost & quantity used for the manufacture of t6he export product. 4. The firm has mentioned that Skin requirement is 21 inchesX4.3 yards. Supporting documents in support of the same may be given. 51
Case No.:30/18/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00283/AM11/ RLA File :07/24/040/00080/AM11/ Lic.No/Date:0710072309 17.06.2010 Decision :As per written comments of DIT vide their U.O. Note No.17(45)/2010IPHW dated 30.11.2010 the Committee decided to ratify the norms of import items on nettonet basis with accountability clause in respect of the subject advance authorization. 52
Case No.:28/15/80ALC2/2010
Party Name:SHRIRAM PISTONS & RINGS LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00235/AM11/ RLA File :05/24/040/00067/AM11/ Lic.No/Date:0510267170 30.06.2010 Defer Date:22.02.2011 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case for 22.02.1011: 1. The weight of Coil spring has not been taken in to account in the calculation of weight balance. 2. The firm has stated that total three numbers of springs are required for manufacture one piston ring set. But the firm proposes to import one lakh no of rings in stead of 1.5 lakh rings to export 50,000 piston ring set. 3. The weight of three rings has not been taken in the calculation of weight balance. 4. Sample of the export product may be given 53
Case No.:43/18/80ALC2/2010
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00296/AM11/ RLA File :05/23/040/00091/AM11/ Lic.No/Date:0510267552 05.07.2010 Decision : As per written comments of DHI vide their U.O. Note No.3143)/10TSW(B)/20 dated 05.01.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Export quantity – 30,000 numbers Size 97 mm X170 mm Import Item no 1 30,000 numbers under GN4 as applied for. Item no 2 Palladium Nitrate 9318 gms @ 0.3106 gm/piece as applied for without any wastage
Item no 3 Rhodium Nitrate 3993 gms @ 0.1331 gm/piece as applied for without any wastage. 54
Case No.:42/18/80ALC2/2010
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00295/AM11/ RLA File :05/23/040/00092/AM11/ Lic.No/Date:0510267568 06.07.2010 Decision : As per written comments of DHI vide their U.O. Note No.3(143)/19TSW(B)/19 dated 05.01.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Export quantity – 5,000 numbers Size 118 mm X127 mm Import Item no 1 5,000 numbers under GN4 as applied for. Item no 2 Palladium Nitrate 27897 gms @ 5.5794 gm/piece as applied for without any wastage Item no 3 Rhodium Nitrate 494 gms @ 0.0988 gm/piece as applied for without any wastage. 55
Case No.:45/18/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00298/AM11/ RLA File :06/24/040/00018/AM11/ Lic.No/Date:0610018429 07.07.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from Ministry of Defence (E.P.C. Section) are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.2011. 56
Case No.:47/18/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00300/AM11/ RLA File :06/24/040/00017/AM11/ Lic.No/Date:0610018428 07.07.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from Ministry of Defence (E.P.C. Section) are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.1011. 57
Case No.:2/16/80ALC2/2010
Party Name:M M AQUA TECHNOLOGIES LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00243/AM11/ RLA File :05/24/040/00084/AM11/ Lic.No/Date:0510267884 09.07.2010 Decision : As per written comments of C&PC vide their O.M. No.46011/253/2004PCII dated 24.12.2010 the committee decided to ratify the norms in respect of the subject advance authorization as under: Item to be Exported Quantity PVC Fill Media 1 kg Rawmaterial allowed for Import Quantity PVC Sheet 1.1495 kg
58
Case No.:3/16/80ALC2/2010
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00244/AM11/ RLA File :06/24/040/00020/AM11/ Lic.No/Date:0610018454 09.07.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re listed on 22.02.1011. 59
Case No.:52/18/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00305/AM11/ RLA File :53/24/040/00011/AM11/ Lic.No/Date:5310010998 13.07.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re listed on 22.02.1011. 60
Case No.:21/18/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00274/AM11/ RLA File :61/24/040/00029/AM11/ Lic.No/Date:6110000472 15.07.2010 Defer Date:22.02.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 22.02.1011. 61
Case No.:29/22/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00340/AM11/ RLA File :06/24/040/00022/AM11/ Lic.No/Date:0610018565 21.07.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from Ministry of Defence (E.P.C. Section) are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.1011. 62
Case No.:30/22/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00341/AM11/ RLA File :06/24/040/00023/AM11/ Lic.No/Date:0610018566 21.07.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from Ministry of Defence (E.P.C. Section) are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.1011. 63
Case No.:37/18/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00290/AM11/ RLA File :03/95/040/00200/AM11/ Lic.No/Date:0310584600 22.07.2010 Defer Date:22.02.2011 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case on 22.02.2011:
1. Specific item of export product and their weight separately with details of Accessories & its weight separately. 2. Specific items required for import for manufacture of each Accessories. 3. Break up of item no 1 of import in to AS,SS & CS grade plate. 4. Information in respect of Sl.No.9 & 11 of the Standard Deficiency Format. 64
Case No.:33/35/80ALC2/2010
Party Name:SHETRON METROPAK PVT.LTD, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00660/AM11/ RLA File :07/21/040/00279/AM11/ Lic.No/Date:0710073152 23.07.2010 Defer Date: 22.02.2011 Decision : The Committee noted that the hardcopy of firm’s application is awaited from the Regional Authority. The Committee, therefore, decided to remind RA (with a copy to firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 22.02.2011. 65
Case No.:50/18/80ALC2/2010
Party Name:APEX TEST TECHNOLOGIES, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00303/AM11/ RLA File :07/24/040/00083/AM11/ Lic.No/Date:0710073162 26.07.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.1011. 66
Case No.:23/22/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00334/AM11/ RLA File :07/24/040/00133/AM11/ Lic.No/Date:0710073218 27.07.2010 Decision: As per written comments of DIT vide their U.O. Note No.17(72)/2010IPHW dated 30.12.2010 the committee decided to ratify the norms of import items on nettonet basis with accountability clause in respect of the subject advance authorization. 67
Case No.:27/22/80ALC2/2010
Party Name:THE TATA POWER COMPANY LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00338/AM11/ RLA File :07/24/040/00140/AM11/ Lic.No/Date:0710073216 27.07.2010 Decision : The Committee deliberated the written comments of DIT received vide their U.O. Note No.17(71)/2010IPHW dated 08.12.2010 and decided to ratify the norms of import items on nettonet basis with accountability clause in respect of the subject advance authorization subject to the conditions applicable under export policy. 68
Case No.:2/22/80ALC2/2010
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00313/AM11/ RLA File :05/24/040/00157/AM11/ Lic.No/Date:0510269795 05.08.2010 Defer Date:22.02.2011
Item to be Exported Quantity Micro Irrigation Equipments (Emmiting Pipe Systems) Streamline 16080 1.60 L/H, 0.30 M, 1000 M 1 Meter (Weight 11.4329gm+/2% Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case for 22.02.1011. 69
Case No.:8/21/81ALC2/2010
Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/81/050/00123/AM11/ RLA File :05/24/040/00172/AM11/ Lic.No/Date:0510270168 10.08.2010 Defer Date:22.02.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 22.02.1011. 70
Case No.:4/22/80ALC2/2010
Party Name:SUFFUSUS POLYMER PRIVATE LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00315/AM11/ RLA File :02/24/040/00083/AM11/ Lic.No/Date:0210146259 11.08.2010 Defer Date:22.02.2011 Decision : The Committee deliberated on the comments of C&PC vide their O.M. No.46011/772010 PCII dated 08.12.2010, the Committee decided to examine C&PC comments on file and get clarification regarding Yarn/Resin. The case to be listed on 22.02.2011. 71
Case No.:10/22/80ALC2/2010
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00321/AM11/ RLA File :34/24/040/00037/AM11/ Lic.No/Date:3410027688 12.08.2010 Decision : As per written comments of C&PC of vide their O.M. No. 46011/55/2010PC.II dated 24.12.10, the committee decided to ratify the norms in respect of the subject advance authorization as under: Item to be Exported Quantity Micro Irrigation Equipments (Emmiting Pipe Systems) PE IRR Pipe 12/12.5 M 400M 1 Meter (Weight 35.65gm+/2%) Rawmaterial Recommended for Import Quantity 1. LLDPE Granules 2. LDPE Granules 3. Master Batch (Plasblak) 27.529 gm 7.273 gm 1.561 gm . The Regional Authority may take necessary action accordingly. 72
Case No.:11/22/80ALC2/2010
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00322/AM11/ RLA File :34/24/040/00062/AM11/ Lic.No/Date:3410027689 12.08.2010 Decision : As per written comments of C&PC of vide their O.M.No.46011/55/2010PC.II dated 24.12.10, the Committee decided to ratify the norms in respect of the subject advance authorization as under: The Regional Authority may take
Rawmaterial allowed for Import Quantity 1. HDPE Granules 2. Master Batch (Plasblak) 3. Relevant Emitters (Drippers) 10.7710 gm 0.4488 gm 3.40 No. (0.442 gm) Item to be Exported Quantity Endotracheal Tube (Packed & Sterilized) (Oral/Nasal) (Cuffed or Plain Sizes 2 mm to 10mm) 1 No. Rawmaterial allowed for Import Quantity 1. Relevant Endotracheal Tube (Oral or Nasal) (Cuffed or Plain (2 mm to 10 mm) 2. PP Granules 3. Medical Kraft Paper 4. Polyester Poly Laminate Film Net + 2 % 1.05 kg/kg content in the export product As per Packing Policy As per Packing Policy necessary action accordingly. 73
Case No.:42/22/80ALC2/2010
Party Name:POLY MEDICURE LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Approved HQ File :01/80/050/00353/AM11/ RLA File :05/24/040/00188/AM11/ Lic.No/Date:0510270734 17.08.2010 Decision : As per written comments of C&PC vide their O.M. 46011/91/2006PCII dated 09.12.2010 the Committee decided to ratify the norms in respect of the subject advance authorization as under: The Regional Authority may take necessary action accordingly. 74
Case No.:43/22/80ALC2/2010
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00354/AM11/ RLA File :07/24/040/00166/AM11/ Lic.No/Date:0710073648 17.08.2010 Defer Date:22.02.2011 Decision : The Committee adjourned the meeting at 5.30 p.m. It was decided by the Committee to defer the case and the case may be relisted for 22.02.2011. 75
Case No.:45/22/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00356/AM11/ RLA File :03/95/040/00318/AM11/ Lic.No/Date:0310587934 17.08.2010 Defer Date:22.02.2011 76
Case No.:53/22/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00364/AM11/ RLA File :53/24/040/00013/AM11/ Lic.No/Date:5310011230 17.08.2010 Defer Date:22.02.2011 77
Case No.:46/22/80ALC2/2010
Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00357/AM11/ RLA File :05/24/040/00178/AM11/
Lic.No/Date:0510270834 18.08.2010 Defer Date:22.02.2011 78
Case No.:47/22/80ALC2/2010
Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00358/AM11/ RLA File :05/24/040/00182/AM11/ Lic.No/Date:0510270937 19.08.2010 Defer Date:22.02.2011 79
Case No.:55/22/80ALC2/2010
Party Name:ENDRESS AND HAUSER (INDIA) AUTOMATION INSTRU Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00366/AM11/ RLA File :03/94/040/00462/AM11/ Lic.No/Date:0310588660 19.08.2010 Defer Date:22.02.2011 80
Case No.:51/22/80ALC2/2010
Party Name:PURVA OVERSEAS Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00362/AM11/ RLA File :13/24/040/00018/AM11/ Lic.No/Date:1310033038 20.08.2010 Defer Date:22.02.2011 81
Case No.:50/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00677/AM11/ RLA File :11/24/040/00028/AM11/ Lic.No/Date:1110023053 27.08.2010 Defer Date: 22.02.2011 82
Case No.:9/24/80ALC2/2010
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00381/AM11/ RLA File :06/24/040/00029/AM11/ Lic.No/Date:0610018941 31.08.2010 Defer Date:22.02.2011 Decision : The Committee adjourned the meeting at 5.30 p.m. It was decided by the Committee to 83
Case No.:19/29/80ALC2/2010
Party Name:INTERNATIONAL COIL LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00454/AM11/ RLA File :05/23/040/00141/AM11/ Lic.No/Date:0510271769 31.08.2010 Defer Date:22.02.2011
84
Case No.:13/29/80ALC2/2010
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00448/AM11/ RLA File :05/23/040/00152/AM11/ Lic.No/Date:0510272028 01.09.2010 Defer Date:22.02.2011 85
Case No.:16/29/80ALC2/2010
INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00451/AM11/ RLA File :05/23/040/00153/AM11/ Lic.No/Date:0510272029 01.09.2010 Defer Date:22.02.2011 86
Case No.:17/29/80ALC2/2010
INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00452/AM11/ RLA File :05/23/040/00151/AM11/ Lic.No/Date:0510272027 01.09.2010 Defer Date:22.02.2011 87
Case No.:32/29/80ALC2/2010
Party Name:XYTEL INDIA PVT.LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00467/AM11/ RLA File :31/24/040/00108/AM11/ Lic.No/Date:3110044548 01.09.2010 Defer Date:22.02.2011 88
Case No.:12/29/80ALC2/2010
INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00447/AM11/ RLA File :05/23/040/00156/AM11/ Lic.No/Date:0510272116 06.09.2010 Defer Date:22.02.2011 89
Case No.:14/29/80ALC2/2010
INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00449/AM11/ RLA File :05/23/040/00154/AM11/ Lic.No/Date:0510272109 06.09.2010 Defer Date:22.02.2011
Case No.:15/29/80ALC2/2010
INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 Status: Deferred
90 11.01.2011 HQ File :01/80/050/00450/AM11/ RLA File :05/23/040/00155/AM11/ Lic.No/Date:0510272113 06.09.2010 Defer Date:22.02.2011 91
Case No.:22/29/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00457/AM11/ RLA File :07/24/040/00215/AM11/ Lic.No/Date:0710074064 06.09.2010 Defer Date:22.02.2011 92
Case No.:25/29/80ALC2/2010
Party Name:DYNAMATIC TECHNOLOGIES LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00460/AM11/ RLA File :07/24/040/00189/AM11/ Lic.No/Date:0710074081 06.09.2010 Defer Date:22.02.2011 93
Case No.:26/29/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00461/AM11/ RLA File :07/21/040/00429/AM11/ Lic.No/Date:0710074059 06.09.2010 Defer Date:22.02.2011 94
Case No.:33/29/80ALC2/2010
Party Name:XYTEL INDIA PVT.LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00468/AM11/ RLA File :31/24/040/00114/AM11/ Lic.No/Date:3110044621 07.09.2010 Defer Date:22.02.2011 95
Case No.:2/25/80ALC2/2010
Party Name:NOV SARA INDIA PRIVATE LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00392/AM11/ RLA File :61/24/040/00047/AM11/ Lic.No/Date:6110000492 08.09.2010 Defer Date:22.02.2011 96
Case No.:19/27/80ALC2/2010
Party Name:H.L.EQUIPMENTS Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00416/AM11/ RLA File :52/24/040/00016/AM11/ Lic.No/Date:5210031865 08.09.2010 Defer Date:22.02.2011
97
Case No.:24/29/80ALC2/2010
Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00459/AM11/ RLA File :03/94/040/00501/AM11/ Lic.No/Date:0310591600 08.09.2010 Defer Date:22.02.2011 98
Case No.:11/29/80ALC2/2010
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00446/AM11/ RLA File :05/23/040/00159/AM11/ Lic.No/Date:0510272568 10.09.2010 Defer Date:22.02.2011 99
Case No.:27/29/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00462/AM11/ RLA File :11/24/040/00034/AM11/ Lic.No/Date:1110023193 10.09.2010 Defer Date:22.02.2011 100
Case No.:20/27/80ALC2/2010
Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00417/AM11/ RLA File :04/24/040/00126/AM11/ Lic.No/Date:0410117133 14.09.2010 Defer Date:22.02.2011 101
Case No.:31/29/80ALC2/2010
Party Name:ATHENA INDIA HITECH COMPONENTS PVT.LTD, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00466/AM11/ RLA File :07/24/040/00211/AM11/ Lic.No/Date:0710074162 14.09.2010 Defer Date:22.02.2011 102
Case No.:5/27/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00402/AM11/ RLA File :03/94/040/00547/AM11/ Lic.No/Date:0310592431 15.09.2010 Defer Date:22.02.2011 103
Case No.:6/29/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00441/AM11/ RLA File :03/94/040/00551/AM11/ Lic.No/Date:0310592447 15.09.2010 Defer Date:22.02.2011
104
Case No.:11/27/80ALC2/2010
Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00408/AM11/ RLA File :04/24/040/00158/AM11/ Lic.No/Date:0410117246 16.09.2010 Defer Date:22.02.2011 105
Case No.:28/29/80ALC2/2010
Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00463/AM11/ RLA File :11/24/040/00037/AM11/ Lic.No/Date:1110023212 16.09.2010 Defer Date:22.02.2011 106
Case No.:29/29/80ALC2/2010
Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00464/AM11/ RLA File :11/24/040/00038/AM11/ Lic.No/Date:1110023211 16.09.2010 Defer Date:22.02.2011 107
Case No.:12/27/80ALC2/2010
Party Name:AIR LIQUIDE ENGINEERING INDIA PVT LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00409/AM11/ RLA File :09/24/040/00253/AM11/ Lic.No/Date:0910043538 17.09.2010 Defer Date:22.02.2011 108
Case No.:13/27/80ALC2/2010
Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00410/AM11/ RLA File :05/24/040/00217/AM11/ Lic.No/Date:0510273206 21.09.2010 Defer Date:22.02.2011 109
Case No.:15/27/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00412/AM11/ RLA File :03/94/040/00584/AM11/ Lic.No/Date:0310593584 23.09.2010 Defer Date:22.02.2011
Case No.:29/27/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 Status: Deferred
110 11.01.2011 HQ File :01/80/050/00426/AM11/ RLA File :03/95/040/00354/AM11/ Lic.No/Date:0310593772 24.09.2010 Defer Date:22.02.2011 111
Case No.:30/27/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00427/AM11/ RLA File :03/95/040/00360/AM11/ Lic.No/Date:0310593860 24.09.2010 Defer Date:22.02.2011 112
Case No.:2/29/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00437/AM11/ RLA File :03/94/040/00586/AM11/ Lic.No/Date:0310594220 28.09.2010 Defer Date:22.02.2011 113
Case No.:3/29/80ALC2/2010
Party Name:IN TRANS ENGINEERING LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00438/AM11/ RLA File :02/24/040/00116/AM11/ Lic.No/Date:0210148724 30.09.2010 Defer Date:22.02.2011 114
Case No.:8/29/80ALC2/2010
Party Name:KINECO PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00443/AM11/ RLA File :17/24/040/00017/AM11/ Lic.No/Date:1710003514 30.09.2010 Defer Date:22.02.2011 115
Case No.:9/29/80ALC2/2010
Party Name:VOLVO BUSES INDIA PVT.LTD, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00444/AM11/ RLA File :07/24/040/00219/AM11/ Lic.No/Date:0710074544 01.10.2010 Defer Date:22.02.2011 116
Case No.:38/29/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00473/AM11/ RLA File :53/24/040/00016/AM11/ Lic.No/Date:5310011502 05.10.2010 Defer Date:22.02.2011
117
Case No.:39/29/80ALC2/2010
Party Name:CAMFIL FARR AIR FILTRATION INDIA LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00474/AM11/ RLA File :05/23/040/00186/AM11/ Lic.No/Date:0510274386 07.10.2010 Defer Date:22.02.2011 118
Case No.:14/35/80ALC2/2010
Party Name:MASTER HANDLERS PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00641/AM11/ RLA File :31/21/040/00208/AM11/ Lic.No/Date:3110044937 08.10.2010 Defer Date: 22.02.2011 119
Case No.:5/31/80ALC2/2010
Party Name:GLOBE HIFABS Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00483/AM11/ RLA File :05/23/040/00183/AM11/ Lic.No/Date:0510274904 13.10.2010 Defer Date:22.02.2011 120
Case No.:23/35/80ALC2/2010
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00650/AM11/ RLA File :07/24/040/00279/AM11/ Lic.No/Date:0710074824 14.10.2010 Defer Date: 22.02.2011 121
Case No.:32/35/80ALC2/2010
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00659/AM11/ RLA File :07/24/040/00278/AM11/ Lic.No/Date:0710074825 14.10.2010 Defer Date: 22.02.2011 122
Case No.:21/31/80ALC2/2010
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00499/AM11/ RLA File :34/24/040/00159/AM11/ Lic.No/Date:3410028343 18.10.2010 Defer Date:22.02.2011 123
Case No.:19/31/80ALC2/2010
Party Name:TECHNIP KT INDIA LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00497/AM11/ RLA File :05/24/040/00261/AM11/ Lic.No/Date:0510275153 19.10.2010 Defer Date:22.02.2011
124
Case No.:5/35/80ALC2/2010
Party Name:DEVEN SUPERCRITICALS P.LTD, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00632/AM11/ RLA File :31/24/040/00146/AM11/ Lic.No/Date:3110045122 19.10.2010 Defer Date: 125
Case No.:23/31/80ALC2/2010
Party Name:NOV SARA INDIA PRIVATE LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00501/AM11/ RLA File :61/24/040/00061/AM11/ Lic.No/Date:6110000523 20.10.2010 Defer Date:22.02.2011 126
Case No.:26/31/80ALC2/2010
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00504/AM11/ RLA File :05/24/040/00253/AM11/ Lic.No/Date:0510275353 20.10.2010 Defer Date:22.02.2011 127
Case No.:6/35/80
ALC2/2010 Party Name:GATRAY ENVIROTECH SYSTEMS Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00633/AM11/ RLA File :31/24/040/00144/AM11/ Lic.No/Date:3110045144 20.10.2010 Defer Date: 128
Case No.:28/31/80ALC2/2010
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00506/AM11/ RLA File :05/24/040/00267/AM11/ Lic.No/Date:0510275456 21.10.2010 Defer Date:22.02.2011 129
Case No.:42/35/80ALC2/2010
Party Name:ASHLEY ALTEAMS INDIA LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00669/AM11/ RLA File :04/24/040/00188/AM11/ Lic.No/Date:0410118268 25.10.2010 Defer Date:
Case No.:55/31/80ALC2/2010
Party Name:BOYSEN INDIA LIMITED Meet No/Date:35/80 ALC2/2010 Status: Deferred
130 11.01.2011 HQ File :01/80/050/00533/AM11/ RLA File :05/23/040/00204/AM11/ Lic.No/Date:0510275831 27.10.2010 Defer Date:22.02.2011 131
Case No.:13/35/80
ALC2/2010 Party Name:OGNIBENE INDIA PRIVATE LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00640/AM11/ RLA File :31/24/040/00139/AM11/ Lic.No/Date:3110045249 27.10.2010 Defer Date: 22.02.2011 132
Case No.:27/35/80ALC2/2010
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00654/AM11/ RLA File :05/24/040/00269/AM11/ Lic.No/Date:0510275803 27.10.2010 Defer Date: 22.02.2011 133
Case No.:15/35/80ALC2/2010
Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00642/AM11/ RLA File :03/95/040/00617/AM11/ Lic.No/Date:0310599850 02.11.2010 Defer Date: 22.02.2011 134
Case No.:29/35/80ALC2/2010
Party Name:SECO TOOLS INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00656/AM11/ RLA File :31/24/040/00141/AM11/ Lic.No/Date:3110045365 03.11.2010 Defer Date: 22.02.2011 135
Case No.:34/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00661/AM11/ RLA File :61/24/040/00066/AM11/ Lic.No/Date:6110000531 03.11.2010 Defer Date: 22.02.2011 136
Case No.:4/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00631/AM11/ RLA File :04/24/040/00156/AM11/ Lic.No/Date:0410118619 04.11.2010 Defer Date: 22.02.2011
137
Case No.:7/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00634/AM11/ RLA File :04/24/040/00157/AM11/ Lic.No/Date:0410118621 04.11.2010 Defer Date: 22.02.2011 138
Case No.:11/35/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00638/AM11/ RLA File :03/94/040/00672/AM11/ Lic.No/Date:0310600292 04.11.2010 Defer Date: 22.02.2011 139
Case No.:12/35/80ALC2/2010
Party Name:TRF LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00639/AM11/ RLA File :02/24/040/00122/AM11/ Lic.No/Date:0210150220 04.11.2010 Defer Date: 22.02.2011 140
Case No.:22/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00649/AM11/ RLA File :04/24/040/00194/AM11/ Lic.No/Date:0410118622 04.11.2010 Defer Date: 22.02.2011 141
Case No.:8/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00635/AM11/ RLA File :11/24/040/00050/AM11/ Lic.No/Date:1110023506 08.11.2010 Defer Date: 22.02.2011 142
Case No.:2/32/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00543/AM11/ RLA File :03/95/040/00446/AM11/ Lic.No/Date:0310600429 08.11.2010 Defer Date:22.02.2011 143
Case No.:3/32/80ALC2/2010
Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00544/AM11/ RLA File :03/95/040/00631/AM11/ Lic.No/Date:0310600433 08.11.2010 Defer Date:22.02.2011
144
Case No.:4/32/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00545/AM11/ RLA File :03/94/040/00716/AM11/ Lic.No/Date:0310600460 08.11.2010 Defer Date:22.02.2011 145
Case No.:5/32/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00546/AM11/ RLA File :03/94/040/00717/AM11/ Lic.No/Date:0310600467 08.11.2010 Defer Date:22.02.2011 146
Case No.:14/32/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00555/AM11/ RLA File :53/24/040/00020/AM11/ Lic.No/Date:5310011681 08.11.2010 Defer Date:22.02.2011 147
Case No.:15/32/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00556/AM11/ RLA File :53/24/040/00019/AM11/ Lic.No/Date:5310011682 08.11.2010 Defer Date:22.02.2011 148
Case No.:1/32/80ALC2/2010
Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00542/AM11/ RLA File :04/24/040/00202/AM11/ Lic.No/Date:0410118694 09.11.2010 Defer Date:22.02.2011 149
Case No.:7/32/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00548/AM11/ RLA File :03/94/040/00725/AM11/ Lic.No/Date:0310600644 09.11.2010 Defer Date:22.02.2011
Case No.:8/32/80ALC2/2010
Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:35/80 ALC2/2010 Status: Deferred
150 11.01.2011 HQ File :01/80/050/00549/AM11/ RLA File :04/24/040/00197/AM11/ Lic.No/Date:0410118712 09.11.2010 Defer Date:22.02.2011 151
Case No.:24/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00651/AM11/ RLA File :04/24/040/00205/AM11/ Lic.No/Date:0410118773 10.11.2010 Defer Date: 152
Case No.:6/32/80ALC2/2010
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00547/AM11/ RLA File :06/24/040/00039/AM11/ Lic.No/Date:0610019661 10.11.2010 Defer Date:22.02.2011 153
Case No.:9/32/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00550/AM11/ RLA File :04/24/040/00204/AM11/ Lic.No/Date:0410118772 10.11.2010 Defer Date:22.02.2011 154
Case No.:11/32/80ALC2/2010
Party Name:HIND HIGH VACUUM COMPANY PVT LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00552/AM11/ RLA File :07/24/040/00312/AM11/ Lic.No/Date:0710075337 10.11.2010 Defer Date:22.02.2011 155
Case No.:12/32/80ALC2/2010
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00553/AM11/ RLA File :05/24/040/00279/AM11/ Lic.No/Date:0510276727 10.11.2010 Defer Date:22.02.2011 156
Case No.:10/32/80ALC2/2010
Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00551/AM11/ RLA File :04/24/040/00190/AM11/ Lic.No/Date:0410118791 11.11.2010 Defer Date:22.02.2011
157
Case No.:13/32/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00554/AM11/ RLA File :03/95/040/00510/AM11/ Lic.No/Date:0310601141 12.11.2010 Defer Date:22.02.2011 158
Case No.:25/35/80ALC2/2010
Party Name:L&T MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00652/AM11/ RLA File :03/95/040/00545/AM11/ Lic.No/Date:0310601333 15.11.2010 Defer Date: 22.02.2011 159
Case No.:9/35/80ALC2/2010
Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00636/AM11/ RLA File :11/24/040/00049/AM11/ Lic.No/Date:1110023563 16.11.2010 Defer Date: 22.02.2011 160
Case No.:10/35/80ALC2/2010
Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00637/AM11/ RLA File :11/24/040/00045/AM11/ Lic.No/Date:1110023562 16.11.2010 Defer Date: 22.02.2011 161
Case No.:19/35/80ALC2/2010
Party Name:BANGALORE BIOTECH LABS PVT LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00646/AM11/ RLA File :07/24/040/00317/AM11/ Lic.No/Date:0710075431 16.11.2010 Defer Date: 22.02.2011 162
Case No.:21/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00648/AM11/ RLA File :07/24/040/00314/AM11/ Lic.No/Date:0710075479 18.11.2010 Defer Date: 22.02.2011 163
Case No.:26/35/80ALC2/2010
Party Name:KONECRANES INDIA PRIVATE LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00653/AM11/ RLA File :31/21/040/00237/AM11/ Lic.No/Date:3110045516 18.11.2010 Defer Date: 22.02.2011
164
Case No.:28/35/80ALC2/2010
Party Name:RATHI TRANSPOWER PVT.LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00655/AM11/ RLA File :31/21/040/00245/AM11/ Lic.No/Date:3110045618 25.11.2010 Defer Date: 165
Case No.:55/35/80ALC2/2010
Party Name:G.B. ENGINEERING ENTERPRISES PVT. LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00682/AM11/ RLA File :04/24/040/00196/AM11/ Lic.No/Date:0410119183 25.11.2010 Defer Date: 22.02.2011 166
Case No.:17/35/80ALC2/2010
Party Name:BIO TECH VISION CARE PVT.LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00644/AM11/ RLA File :08/24/040/00252/AM11/ Lic.No/Date:0810094169 26.11.2010 Defer Date: 22.02.2011 167
Case No.:39/35/80ALC2/2010
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00666/AM11/ RLA File :05/23/040/00233/AM11/ Lic.No/Date:0510278032 26.11.2010 Defer Date: 22.02.2011 168
Case No.:60/35/80ALC2/2010
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00687/AM11/ RLA File :05/23/040/00234/AM11/ Lic.No/Date:0510278035 26.11.2010 Defer Date: 22.02.2011 169
Case No.:20/35/80ALC2/2010
Party Name:BIO TECH VISION CARE PVT.LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00647/AM11/ RLA File :08/24/040/00245/AM11/ Lic.No/Date:0810094212 29.11.2010 Defer Date: 22.02.2011
Case No.:54/35/80ALC2/2010
Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:35/80 ALC2/2010 Status: Deferred
170 11.01.2011 HQ File :01/80/050/00681/AM11/ RLA File :05/23/040/00229/AM11/ Lic.No/Date:0510278103 29.11.2010 Defer Date: 22.02.2011 171
Case No.:57/35/80ALC2/2010
Party Name:ION EXCHANGE (INDIA) LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00684/AM11/ RLA File :03/94/040/00758/AM11/ Lic.No/Date:0310603673 30.11.2010 Defer Date: 22.02.2011 172
Case No.:61/35/80ALC2/2010
Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00688/AM11/ RLA File :03/95/040/00602/AM11/ Lic.No/Date:0310603665 30.11.2010 Defer Date: 22.02.2011 173
Case No.:30/35/80ALC2/2010
Party Name:PRIJAI HEAT EXCHANGERS PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00657/AM11/ RLA File :03/95/040/00558/AM11/ Lic.No/Date:0310603942 01.12.2010 Defer Date:22.01.2011 174
Case No.:53/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00680/AM11/ RLA File :61/24/040/00067/AM11/ Lic.No/Date:6110000536 01.12.2010 Defer Date:22.01.2011 175
Case No.:58/35/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00685/AM11/ RLA File :03/94/040/00802/AM11/ Lic.No/Date:0310604238 02.12.2010 Defer Date:22.01.2011 176
Case No.:18/35/80ALC2/2010
Party Name:FLOWSERVE INDIA CONTROLS PVT. LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00645/AM11/ RLA File :32/24/040/00044/AM11/ Lic.No/Date:3210046254 07.12.2010 Defer Date:22.01.2011
177
Case No.:45/35/80ALC2/2010
Party Name:BOSCH LIMITED, Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00672/AM11/ RLA File :07/24/040/00332/AM11/ Lic.No/Date:0710075865 07.12.2010 Defer Date: 22.01.2011 178
Case No.:59/35/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00686/AM11/ RLA File :03/94/040/00820/AM11/ Lic.No/Date:0310604941 07.12.2010 Defer Date: 22.01.2011 179
Case No.:56/35/80ALC2/2010
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00683/AM11/ RLA File :04/24/040/00235/AM11/ Lic.No/Date:0410119594 08.12.2010 Defer Date: 22.01.2011 180
Case No.:63/35/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00690/AM11/ RLA File :03/94/040/00815/AM11/ Lic.No/Date:0310605217 08.12.2010 Defer Date: 22.01.2011 181
Case No.:65/35/80ALC2/2010
Party Name:INGERSOLLRAND (INDIA) LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00692/AM11/ RLA File :03/94/040/00807/AM11/ Lic.No/Date:0310605216 08.12.2010 Defer Date: 22.01.2011 182
Case No.:62/35/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00689/AM11/ RLA File :03/94/040/00823/AM11/ Lic.No/Date:0310605374 09.12.2010 Defer Date: 22.01.2011 183
Case No.:1/35/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00628/AM11/ RLA File :53/24/040/00023/AM11/ Lic.No/Date:5310011884 13.12.2010 Defer Date: 22.01.2011
184
Case No.:64/35/80ALC2/2010
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00691/AM11/ RLA File :03/94/040/00839/AM11/ Lic.No/Date:0310605937 13.12.2010 Defer Date: 22.01.2011 185
Case No.:2/35/80ALC2/2010
Party Name:SCHOTT KAISHA PRIVATE LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00629/AM11/ RLA File :03/95/040/00742/AM11/ Lic.No/Date:0310606206 14.12.2010 Defer Date: 22.01.2011 186
Case No.:3/35/80ALC2/2010
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00630/AM11/ RLA File :03/94/040/00713/AM11/ Lic.No/Date:0310606323 14.12.2010 Defer Date: 22.01.2011 187
Case No.:51/35/80ALC2/2010
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00678/AM11/ RLA File :03/94/040/00791/AM11/ Lic.No/Date:0310606327 14.12.2010 Defer Date: 22.01.2011 188
Case No.:31/35/80ALC2/2010
Party Name:SPIG COOLING TOWERS INDIA PVT LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00658/AM11/ RLA File :03/95/040/00760/AM11/ Lic.No/Date:0310606521 15.12.2010 Defer Date: 22.01.2011 189
Case No.:52/35/80ALC2/2010
PVT., LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00679/AM11/ RLA File :03/94/040/00841/AM11/ Lic.No/Date:0310606401 15.12.2010 Defer Date: 22.01.2011
Case No.:35/35/80ALC2/2010
Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:35/80 ALC2/2010 Status: Deferred
190 11.01.2011 HQ File :01/80/050/00662/AM11/ RLA File :09/24/040/00394/AM11/ Lic.No/Date:0910044744 20.12.2010 Defer Date: 22.01.2011 191
Case No.:36/35/80ALC2/2010
INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00663/AM11/ RLA File :05/23/040/00263/AM11/ Lic.No/Date:0510279826 20.12.2010 Defer Date: 22.01.2011 192
Case No.:37/35/80ALC2/2010
Party Name:DELL ORTO INDIA PVT.LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00664/AM11/ RLA File :05/23/040/00251/AM11/ Lic.No/Date:0510279828 20.12.2010 Defer Date: 22.01.2011 193
Case No.:38/35/80ALC2/2010
LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00665/AM11/ RLA File :53/24/040/00024/AM11/ Lic.No/Date:5310011939 21.12.2010 Defer Date: 22.01.2011 194
Case No.:46/35/80ALC2/2010
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00673/AM11/ RLA File :07/24/040/00368/AM11/ Lic.No/Date:0710076205 22.12.2010 Defer Date: 22.01.2011 195
Case No.:47/35/80ALC2/2010
Party Name:LINCOLN HELIOS ( I ) LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00674/AM11/ RLA File :07/24/040/00348/AM11/ Lic.No/Date:0710076206 22.12.2010 Defer Date: 22.01.2011 196
Case No.:40/35/80ALC2/2010
Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00667/AM11/ RLA File :04/24/040/00251/AM11/ Lic.No/Date:0410120067 23.12.2010 Defer Date: 22.01.2011
197
Case No.:41/35/80ALC2/2010
Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00668/AM11/ RLA File :04/24/040/00256/AM11/ Lic.No/Date:0410120068 23.12.2010 Defer Date: 22.01.2011 198
Case No.:43/35/80ALC2/2010
Party Name:XOMOX SANMAR LIMITED Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00670/AM11/ RLA File :04/24/040/00247/AM11/ Lic.No/Date:0410120070 23.12.2010 Defer Date: 22.01.2011 199
Case No.:44/35/80ALC2/2010
Party Name:EUROFLEX TRANSMISSIONS(INDIA) PVT.LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00671/AM11/ RLA File :09/24/040/00418/AM11/ Lic.No/Date:0910044876 24.12.2010 Defer Date: 22.01.2011 200
Case No.:48/35/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00675/AM11/ RLA File :31/24/040/00191/AM11/ Lic.No/Date:3110046138 27.12.2010 Defer Date: 22.01.2011 201
Case No.:49/35/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00676/AM11/ RLA File :31/24/040/00192/AM11/ Lic.No/Date:3110046140 27.12.2010 Defer Date: 22.01.2011 202
Case No.:66/35/80ALC2/2010
INDIA PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00693/AM11/ RLA File :05/23/040/00271/AM11/ Lic.No/Date:0510280572 28.12.2010 Defer Date: 22.01.2011 203
Case No.:67/35/80ALC2/2010
Party Name:J.D. JONES & CO. PVT. LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00694/AM11/ RLA File :02/24/040/00175/AM11/ Lic.No/Date:0210152785 29.12.2010 Defer Date: 22.01.2011
204
Case No.:68/35/80ALC2/2010
Party Name:SHIV INDUSTRIES Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00695/AM11/ RLA File :30/24/040/00046/AM11/ Lic.No/Date:3010071818 29.12.2010 Defer Date: 22.01.2011 205
Case No.:69/35/80ALC2/2010
Party Name:SAGE METALS LTD. Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00696/AM11/ RLA File :05/24/040/00316/AM11/ Lic.No/Date:0510280781 30.12.2010 Defer Date: 22.01.2011 206
Case No.:70/35/80ALC2/2010
Party Name:H.L.EQUIPMENTS Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00697/AM11/ RLA File :52/24/040/00037/AM11/ Lic.No/Date:5210033179 30.12.2010 Defer Date: 22.01.2011 207
Case No.:71/35/80ALC2/2010
Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00698/AM11/ RLA File :03/94/040/01025/AM09/ Lic.No/Date:0310608723 30.12.2010 Defer Date: 22.01.2011 208
Case No.:72/35/80ALC2/2010
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:35/80 ALC2/2010 11.01.2011 Status: Deferred HQ File :01/80/050/00699/AM11/ RLA File :05/24/040/00327/AM11/ Lic.No/Date:0510280807 31.12.2010 Defer Date: 22.01.2011 S.No.28
Case No. A 01
M/s. Larson & Toubro Ltd., F.No. 01/80/050/ 01184/AM10/DES.I Lic.No. & Date Meeting No. 35/11 RA F.No.03/95/039/00001/AM09 0310475712 dt.20.06.2008 Date: 11.01.2011 Ratification of norms The Committee adjourned the meeting at 5.30 p.m. It was decided by the Committee to defer the case and the case may be relisted for 22.02.2011. S.No.377
Case No. A/R63
M/s. Thyssenkrup Industries India Ltd., F.No. 01/80/50/ 01852/AM09/DES.I Lic.No. & Date Meeting No. 35/11 RA F.No.31/21/040/00399/Am09
3110037568 dt.03.03.2009 Date: 11.01.2011 S.No.378
Case No.A/R25
M/s. Minda Sai Ltd., Mumbai HQ F.No.01/80/50/00755/AM08/DES–I Lic. Nos. & Date Meeting No. 35/11 RLA F.No.05/24/040/00147/AM08 0510204041 dt.24.05.2007 Date: 11.01.2011 S.No.379
Case No.A/R28
M/s. Larson & Toubro LTd., HQ F.No.01/80/162/00301/AM08/DES–I Lic. Nos. & Date Meeting No. 35/11 RLA F.No.04/24/040/00223/AM08 0410091098 dt.18.09.2007 Date: 11.01.2011 S.No.380
Case No.A/R75
M/s. Dee Development Engineers Pvt. LTd., HQ F.No.01/80/50/00160/AM08/DES–I Lic. Nos. & Date Meeting No. 35/11 RLA F.No.05/24/04000175/AM08 0510204393 dt.01.06.2007 Date: 11.01.2011 Deletion of condition in MTR / No. in different advance authorizations S.No.381
Case No. A/R 79
M/s. Precihole Machine Tools Pvt. LTd., F.No. 01/80/50/ 00085/AM10/DES.I Lic.No. & Date Meeting No. 35/11 RA F.No.03/95/040/00989/AM09 0310511441 dt.13.03.2009 Date: 11.01.2011 S.No.382
Case No. A/R 81
M/s. Bharat Heavy Electricals Ltd., Bhopal F.No. 01/80/50/ 00184/AM09/DES.I Lic.No. & Date Meeting No. 35/11 RA F.No.11/24/040/00059/AM08 1110016748 dt.04.02.2008 Date: 11.01.2011 Revision of norms Sl.No.383
Case No. A/R 76
M/s. Delkor Technik India Pvt. Ltd., Bangalore HQ F.No.01/80/50/00945/AM08/DESI Lic. No. & Date Meeting No. 35/11 RLA No.07/24/040/00457/AM08 0710053565 dt.27.09.2007 Date: 11.01.2011 Ratification of norms Sl.No.384
Case No. A/R 78
HQ F.No.01/80/50/00918/AM09/DESI Lic. No. & Date
M/s. Botil Oil Tools India Pvt. Ltd., Meeting No. 35/11 RLA No.05/24/040/00940/AM08 0510217768 dt.12.03.2008 Date: 11.01.2011 Revision of norms Sl.No.385
Case No. A/R 79
M/s. Botil Oil Tools India Pvt. Ltd., HQ F.No.01/80/50/01157/AM09/DESI Lic. No. & Date Meeting No. 35/11 RLA No.05/24/040/00435/AM09 0510228787 dt.03.10.2008 Date: 11.01.2011 Revision of norms Sl.No.386
Case No. A/R 84
M/s. Larson & Toubro Ltd., HQ F.No.01/80/50/01664/AM09/DESI Lic. No. & Date Meeting No. 35/11 RLA No.03/95/040/00828/AM09 0310501993 dt.09.01.2009 Date: 11.01.2011 Revision of norms Sl.No.387
Case No. A/R 88
M/s. Botil Oil Tools India Pvt. Ltd., HQ F.No.01/80/50/00512/AM10/DESI Lic. No. & Date Meeting No. 35/11 RLA No.05/23/040/00093/AM10 0510252255 dt.10.11.2009 Date: 11.01.2011 Revision of norms Sl.No.388
Case No. A/R 89
M/s. Botil Oil Tools India Pvt. Ltd., HQ F.No.01/80/50/00648/AM10/DESI Lic. No. & Date Meeting No. 35/11 RLA No.05/23/040/00145/AM10 0510255715 dt.06.01.2010 Date: 11.01.2011 Revision of norms Sl.No.389
Case No. A/R 90
M/s. Botil Oil Tools India Pvt. Ltd., HQ F.No.01/80/50/00535/AM10/DESI Lic. No. & Date Meeting No. 35/11 RLA No.05/23/040/00099/AM10 0510252923 dt.19.11.2009 Date: 11.01.2011 Revision of norms S.No.390
Case No. A/R118
M/s. Bharat Heavy Electricals Ltd., Haridwar F.No. 01/80/50/ 00670/AM10/DES.I Lic.No. & Date Meeting No. 35/11 RA F.No.61/24/040/00046/AM10 6110000382 dt.08.01.2010 Date: 11.01.2011 S.No.391
Case No. A/R119
M/s. Bharat Heavy Electricals Ltd., Hyderabad F.No. 01/80/50/ 01783/AM09/DES.I Lic.No. & Date Meeting No. 35/11 RA F.No.09/24/040/00401/AM09 0910037049 dt.12.02.2009 Date: 11.01.2011
S.No.392
Case No. A/R78
M/s. GEA BGR Energy System India Ltd., Chennai HQ F.No.01/80/50/01099/AM08/DES.I Lic. No. & date Meeting No. 35/11 RA.F.No.04/24/040/00323/Am08 0410092975 dt.02.01.2008 Date: 11.01.2011 S.No.393
Case No. A/R
133 M/s. Bharat Heavy Electricals LTd., Trichirapalli HQ F.No.01/80/50/01567/AM09/DES.I Lic. No. & date Meeting No. 35/11 RA.F.No.04/24/040/00183/AM09 0410100820 dt.15.12.2008 Date: 11.01.2011 S.No.394
Case No. A/R
134 M/s. Bharat Heavy Electricals LTd., Trichirapalli HQ F.No.01/80/50/00587/AM10/DES.I Lic. No. & date Meeting No. 35/11 RA.F.No.04/24/040/00188/AM09 0410109500 dt.18.11.2009 Date: 11.01.2011 S.No.395
Case No. A/R
135 M/s. GEA BGR Energy System India LTd., Chennai HQ F.No.01/80/50/00442/AM10/DES.I Lic. No. & date Meeting No. 35/11 RA.F.No.04/24/040/00163/AM10 0410108335 dt.09.10.2009 Date: 11.01.2011 S.No.396
Case No. A/R
136 M/s. Bharat Heavy Electricals LTd., Haridwar HQ F.No.01/80/50/00319/AM10/DES.I Lic. No. & date Meeting No. 35/11 RA.F.No.61/24/040/00020/AM10 6110000343 dt.19.08.2009 Date: 11.01.2011 S.No.397
Case No. A/R
137 M/s. Bharat Heavy Electricals LTd., Hyderabad HQ F.No.01/80/50/01675/AM09/DES.I Lic. No. & date Meeting No. 35/11 RA.F.No.09/24/040/00369/AM09 0910036679 dt.12.01.2009 Date: 11.01.2011 S.No.398
Case No. A/R
138 M/s. Bharat Heavy Electricals LTd., Trichirapalli HQ F.No.01/80/50/00326/AM10/DES.I Lic. No. & date RA.F.No.04/24/040/00105/AM10
Meeting No. 35/11 0410107118 dt.21.08.2009 Date: 11.01.2011 S.No.399
Case No. A/R
132 M/s. Enmas GB Power Systems Projects Ltd., Chennai HQ F.No.01/80/050/00102/AM10/DES.I HQ F.No.01/80/050/00365/AM10/DESI Lic. No. & date Meeting No. 35/11 RA.F.No.04/24/040/00323/Am08 0410104770 dt.21.05.2009 & 0410107592 dt.07.09.2009 Date: 11.01.2011 Sl.No.400
Case No. A/R 97
M/s. Larson & Toubro Ltd., HQ F.No.01/80/50/00437/AM10/DESI Lic. No. & Date Meeting No.35/11 RLA No.03/95/040/00424/AM10 0310540959 dt.08.10.2009 Date: 11.01.2011 S.No.373
Case No. A/R113
M/s. Sona Okegawa Precison Forgings LTd., F.No.01/81/50/00884/AM06/DES.I Lic.No. & Date Meeting No.35/11 RA F.No.05/24/040/00842/AM06 0510175316 dt.27.01.2006 Date: 11.01.2011 Revision of norms The representative of the firm Shri Hitender Munjal, D.G.M. Tool Engineering & Engineering & Shri Saiprasad Heranjal, Manager, Sales & Excise appeared before the Committee for personal hearing. They explained the case to the Committee. The Committee decided and directed to the representative of DHI to examine the case and to relist the case for 22.02.2011 S.No.374
Case No. A/R45
M/s. Sona Okegawa Precision Forgings Ltd., Gurgaon HQ F.No.01/81/050/00914/AM07/DES.II/ DESI Lic.No. & Date Meeting No.35/11 RA F.No.05/24/040/00762/AM07 0510199272 dt.09.02.2007 Date: 11.01.2011 The representative of the firm Shri Hitender Munjal, D.G.M. Tool Engineering & Engineering & Shri Saiprasad Heranjal, Manager, Sales & Excise appeared before the Committee for personal hearing. They explained the case to the Committee. The Committee agreed to the firm’s request and decided to ratify the norms in respect of subject advance authorization as per SION at Sl. No. C1723 (Export item Differential Bevel Gears/Pinion made Alloy Steel (B forging Process) subject to deletion the word “Case Assembly” deleted from the Export Product. S.No.375
Case No. A/R69
M/s. Netafin Irrigation India Ltd., F.No. 01/80/50/ 01857/AM09/DES.I Lic.No. & Date Meeting No. 35/11 RA F.No.34/24/040/00192/AM09 3410023781 dt.20.03.2009 Date: 11.01.2011
Case No.A/R143
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/050/00594/AM08/ DESI Lic.No. & Date Meeting No. 35/11 RA F.No.04/24/040/00276/AM08 0410092211 dt.20.11.2007 Date: 11.01.2011 The representative of the firm Shri Anil Bagde, General Manager (Exim) appeared before the Committee for personal hearing. He explained the case and submitted information to the Committee. The Committee observed that for the same export product, multiple licenses have been applied to import different raw materials. It is not clear how applicant firm has taken multiple licences to import different raw materials. Therefore, the Committee decided to as R.A. to examine the licenses as per list and furnish their comments as to how multiple licenses for a single export product had been issued. The case may be relisted on 22.02.2011.
Case No.A/R144
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/050/00338/AM09/ DESI Lic.No. & Date MeetingNo. 35/11 RA F.No.04/24/040/00404/AM08 0410094622 dt.19.03.2008 Date: 11.01.2011 The representative of the firm Shri Anil Bagde, General Manager (Exim) appeared before the Committee for personal hearing. He explained the case and submitted information to the Committee. The Committee observed that for the same export product, multiple licenses have been applied to import different raw materials. It is not clear how applicant firm has taken multiple licences to import different raw materials. Therefore, the Committee decided to as R.A. to examine the licenses as per list and furnish their comments as to how multiple licenses for a single export product had been issued. The case may be relisted on 22.02.2011.
Case No.A/R145
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/162/00884/AM08/ DESI Lic.No. & Date Meeting No.35/11 RA F.No.04/24/040/00163/AM08 0410090764 dt.29.08.2007 Date: 11.01.2011 The representative of the firm Shri Anil Bagde, General Manager (Exim) appeared before the Committee for personal hearing. He explained the case and submitted information to the Committee. The Committee observed that for the same export product, multiple licenses have been applied to import different raw materials. It is not clear how applicant firm has taken multiple licences to import different raw materials. Therefore, the Committee decided to as R.A. to examine the licenses as per list and furnish their comments as to how multiple licenses for a single export product had been issued. The case may be relisted on 22.02.2011.
Case No.A/R146
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/050/00178/AM08/ DESI Lic.No. & Date Meeting No.35/11 RA F.No.04/24/040/00086/AM08 0410089961 dt.14.06.2007 Date: 11.01.2011 The representative of the firm Shri Anil Bagde, General Manager (Exim) appeared before the Committee for personal hearing. He explained the case and submitted information to the Committee. The Committee observed that for the same export product, multiple licenses have been applied to import different raw materials. It is not clear how applicant firm has taken multiple licences to import different raw materials. Therefore, the Committee decided to as R.A. to examine the licenses as per list and furnish their comments as to how multiple licenses for a single export product had been issued. The case may be relisted on 22.02.2011.
Case No.A/R147
M/s. Diamond Engineering (Chennai) Pvt. Ltd., HQ F.No.01/80/050/00617/AM09/ DESI Lic.No. & Date Meeting No.35/11 RA F.No.04/24/040/00032/AM09
Chennai 0410096034 dt.26.05.2008 Date: 11.01.2011 The representative of the firm Shri Anil Bagde, General Manager (Exim) appeared before the Committee for personal hearing. He explained the case and submitted information to the Committee. The Committee observed that for the same export product, multiple licenses have been applied to import different raw materials. It is not clear how applicant firm has taken multiple licences to import different raw materials. Therefore, the Committee decided to as R.A. to examine the licenses as per list and furnish their comments as to how multiple licenses for a single export product had been issued. The case may be relisted on 22.02.2011.
Case No.A/R148
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/050/00832/AM09/ DESI Lic.No. & Date Meeting No.35/11 RA F.No.04/24/040/00115/AM09 0410097812 dt.07.08.2008 Date: 11.01.2011 The representative of the firm Shri Anil Bagde, General Manager (Exim) appeared before the Committee for personal hearing. He explained the case and submitted information to the Committee. The Committee observed that for the same export product, multiple licenses have been applied to import different raw materials. It is not clear how applicant firm has taken multiple licences to import different raw materials. Therefore, the Committee decided to as R.A. to examine the licenses as per list and furnish their comments as to how multiple licenses for a single export product had been issued. The case may be relisted on 22.02.2011.
Case No.A/R153
M/s. Diamond Engineering (Chennai) Pvt. LTd., Chennai HQ F.No.01/80/050/01121/AM08/ DESI Lic.No. & Date Meeting No.35/11 RA F.No.04/24/040/00338/AM08 0410093157 dt.11.01.2008 Date: 11.01.2011 The representative of the DIPP informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case for 22.02.2011.
Case No. A/R
164 M/s. Fedders Lloyd Corporation LTd., HQ F.No.01/80/50/00953/AM08/DES.I Lic. No. & date Meeting No.35/11 RA.F.No.05/24/040/00517/AM08 0510210266 dt.09.10.2007 Date: 11.01.2011 Amendment of export product
Case No. A/R
165 M/s. Zobele India Pvt. LTd., (Formerly M/s. DBK India Pvt. LTd.,) HQ F.No.01/85/80/50/00134/AM06/DES.I Lic. No. & date Meeting No. 35/11 RA.F.No.14/80/040/00003/AM06 1410000227 dt.11.10.2005 Date: 11.01.2011
Case No. A/R
166 M/s. Bharat Heavy Electricals LTd., Bhopal HQ F.No.01/80/050/00339/AM10/DES.I Lic. No. & date Meeting No. 35/11 RA.F.No.11/24/040/00010/AM10 1110020832 dt.04.08.2009 Date: 11.01.2011 S.No.65
Case No. C 14
M/s. MSS India Pvt. F.No. 01/80/162/ 00143/AM11/DES.I Meeting No. 35/11
LTd., Fixation of adhoc wastage norms for “Small fabricated items, Fabricated bus bars, Press work items, Braided connectors, laminated connectors, Cast connectors, Switch fuse unit HSN, Bolled / Moulded Connector, Moulded Components, DC Busbars. Machined & Forged Components. Battery Charger / Transformer”. Date: 11.01.2011 S.No.66
Case No.C04
M/s. Kusalava International LTd., HQ F.No.01/80/162/00021/AM10/DES.I Meeting No. 35/11 Date: 11.01.2011 Fixation of Standard Input Output Norms (SION) for the export of “Cylinder Liners” S.No.67
Case No. C01
M/s. BOSCH Limited, Bangalore F.No. 01/80/162/1193/AM09/DES.I Meeting No. 35/11 Fixation of SION for the export product “Common Rail Injector Parts” Date: 11.01.2011
Case No. C 19
M/s. MSS India Pvt. LTd., F.No. 01/80/162/ 00419/AM11/DES.I Meeting No. 35/11 Fixation of adhoc wastage norms for “Small fabricated items, Fabricated bus bars, Press work items, Braided connectors, Laminated connectors, Cast connectors, Switch fuse unit HSN, Bolled / Moulded Connector, Moulded Components, DC Bus bars. Machined & Forged Components. Battery Charger / Transformer, electrical parts Make of Ferrous & Non Ferrous Material (Viz. Copper, Brass, Aluminium, Steel, Monel, Inconel and Lead etc.), Cast Pillars, Electricals & Auto Assemblies, Plate contacts”. Date: 11.01.2011 *****
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.