IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2010-08-10

DGFT Committee Minutes

Document text

RATIFIED   (DES.I Section)   Minutes of Meeting No.18/11 dated 03.08.2010 of Norms Committee (NC­I)   The meeting No. 18/11 dt.03.08.2010 of the Norms Committee (NC­I) for the licensing year 2010­2011 was actually held on 10.08.2010 under the Chairpersonship of Ms. Shubhra, Jt. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009– 2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh. B. D. Ghosh, Jt. IA 399 23063355 M/o Steel, U.B 2. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 6.      Sh. Krishan Kumar, Dy. D.G.F.T 302 23061562  Ext. 380 DGFT, UB 7. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases. The decision taken thereon are as under: ­ 1

Case No.:65/22/80­ALC2/2008

Party Name:THERMAL SYSTMES (HYDERABAD) P. LTD. Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Approved HQ File :01/80/050/00876/AM09/ RLA File :09/24/040/00192/AM09/ Lic.No/Date:0910035094 19.08.2008   Decision : The Meeting No.18/11 was actually held on 10.08.2010. Based on written comments of DHI vide their U.O. No.3(6)/10/TSW(B) signed on 02.08.2010, NC approved following norms:­ Export The export weight is 239.7 MT & the same may be incorporated in the licence. Import 1. Item  no  1­Total  quantity  of  import  is  16  numbers  &  weight  is  as  applied  for.  Quantity  may  be bifurcated to 8 numbers of tube sheet & 8 numbers of flanges. It is recommended under GN­4. 2. Item no 2­Total quantity of import is 1090 numbers & weight is as applied for. It is recommended under GN­4. 3. Item no 3 & 4­ these are seamless pipes. May be allowed as applied for with 2% wastage. 4. Item no 5 to 9­ These are components. May be allowed under GN­4.   RA may take action accordingly.   2

Case No.:14/50/80­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status:   Deferred HQ File :01/80/050/01812/AM09/ RLA File :09/24/040/00427/AM09/ Lic.No/Date:0910037147 24.02.2009 Defer Date: 31.08.2010 Decision :  The Meeting No.18/11 was actually held on 10.08.2010. It was decided to remind the firm to  furnish the requisite information before the next meeting.  

Case No.:37/21/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:18/80­ ALC2/2010 Status: Withdrawn

3 03.08.2010 HQ File :01/80/050/00319/AM10/ RLA File :61/24/040/00020/AM10/ Lic.No/Date:6110000343 19.08.2009   Decision : The Meeting No.18/11 was actually held on 10.08.2010. It was noted that the case has already  been approved in meeting No.16/80 dt.20.07.2010. Accordingly case is withdrawn.   4

Case No.:25/51/80­ALC2/2009

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:18/80­ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00816/AM10 RLA File :05/23/040/00188/AM10 Lic.No/Date:0510259390 24.02.2010 Defer Date:31.08.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. It was decided to remind DIT to expedite their comments. The letter to be issued at the level of chairman of NC­I..   5

Case No.:9/13/80­ALC2/2010

Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. 03.08.2010 Status: Approved HQ File :01/80/050/00185/AM11/ RLA File :03/95/040/00002/AM11/ Lic.No/Date:0310568211 06.04.2010   Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC approved import of all item except at Sl. No. 427 on net­to­net basis with accountability clause. Item at Sl. No. 427 is not recommended for import.   RA may make necessary action accordingly.   6

Case No.:15/13/80­ALC2/2010

Party Name:KOHLI AUTOMOBILES PVT.LTD. 03.08.2010 Status: Withdrawn HQ File :01/80/050/00191/AM11/ RLA File :05/23/040/00024/AM11/ Lic.No/Date:0510263255 28.04.2010   Decision : The Meeting No.18/11 was actually held on 10.08.2010. It was noted that the case has already been approved in meeting No.16/11 dt.20.07.2010. Accordingly case is withdrawn.   7

Case No.:7/13/80­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, 03.08.2010 Status: Deferred HQ File :01/80/050/00183/AM11/ RLA File :03/94/040/00125/AM11/ Lic.No/Date:0310573839 12.05.2010 Defer Date:31.08.2010 Decision : On the recommendation  of  the  representative  of  DHI  present  in  the  meeting,  it  was  decided  by  the Committee to clarify for the following information/clarification from the firm and to re­list the case on  28.09.2010: ­        “The firm has submitted two applications for manufacture and export of 4 numbers of Turbine shaft forgings of weight 270.8  MT  for  which  it  proposes  to  import  4  numbers  of  proof  machined  Turbine  shaft  forging  weight 301.028 MT in the first license.  But in the above license (2nd license),the firm proposes to import 12 numbers of shaft forgings of weight 301.028 MT.  The export value of both licenses are same.  The firm is to clarify the above. It may also give the manufacturing process of the item.  It may also be asked to inform how the three shafts in case of 2nd application are coupled.”   8

Case No.:13/13/80­ALC2/2010

Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00189/AM11/ RLA File :03/94/040/00149/AM11/ Lic.No/Date:0310575748 24.05.2010 Decision : The Meeting No 18/11 was actually held on 10 08 2010 NC noted that DL has been issued to the firm

Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that DL has been issued to the firm on 3.08.2010 and deferred the case for 31.08.2010.   9

Case No.:1/13/80­ALC2/2010

Party Name:KIRLOSKAR TOYODATEXTILE MACHINERY PVT LTD., Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00177/AM11/ RLA File :07/21/040/00161/AM11/ Lic.No/Date:0710072178 10.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that letter dt.20.07.2010 has been issued to RA for sending copies of application and decided to remind RA to immediately forward the same.   10

Case No.:6/13/80­ALC2/2010

Party Name:TYCO VALVES & CONTROLS INDIA PVT.LTD. 03.08.2010 Status: Deferred HQ File :01/80/050/00182/AM11/ RLA File :34/21/040/00057/AM11/ Lic.No/Date:3410027201 10.06.2010 Defer Date:31.08.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that letter dt.20.07.2010 has been issued to RA for sending copies of application and decided to remind RA to immediately forward the same.   11

Case No.:2/13/80­ALC2/2010

Party Name:KIRLOSKAR BROTHERS LTD Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00178/AM11/ RLA File :31/24/040/00044/AM11/ Lic.No/Date:3110043541 11.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that the application has been sent to DIPP on 11.06.2010 for examination. It was decided  to remind DIPP to expedite their comments.   12

Case No.:3/13/80­

ALC2/2010 Party Name:KONECRANES INDIA PRIVATE LIMITED Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00179/AM11/ RLA File :31/21/040/00079/AM11/ Lic.No/Date:3110043545 11.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that the application has been sent to DIPP  on  19.07.2010  for  examination.  As  representative  of  DIPP  was  not  present,  the  case  was  deferred  for 31.08.2010.   13 Case Number : 4/13/80­ ALC2/2010 Party Name : MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., 03.08.2010 Status: Deferred HQ File : 01/80/050/00180/AM11 RLA File No: 05/24/040/00100/AM11/  Date: 10.06.2010 Lic.No/Date: 0510266016  Date: 14.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. Representative of DHI mentioned that the export product falls under the purview of DIPP. Accordingly, it was decided to forward  a copy of application to DIPP.   14

Case No.:5/13/80­ALC2/2010

Party Name:LIEBHERR MACHINE TOOLS (I) PVT LTD 03.08.2010 Status: Deferred HQ File :01/80/050/00181/AM11/ RLA File :07/24/040/00056/AM11/ Lic.No/Date:0710072220 14.06.2010 Defer Date:31.08.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that letter dt.20.07.2010 has been issued to RA for sending copies of application and decided to remind RA to immediately forward the same.

g p pp y   15

Case No.:14/13/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., 03.08.2010 Status: Deferred HQ File :01/80/050/00190/AM11/ RLA File :03/94/040/00219/AM11/ Lic.No/Date:0310578752 14.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. On the recommendations of representative of DHI, NC decided to call for following information / clarification from the firm:­ 1. Specific model no. of export. 2. Item DR motors appear at. Sl. No. 2 &18.  Specific use of these items. 3. Gross weigh and net  weight along with Sl. No. 11 of SDL for item no. 7 of import.   16

Case No.:16/13/80­ALC2/2010

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00192/AM11/ RLA File :03/95/040/00212/AM11/ Lic.No/Date:0310578892 15.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. DHI representative informed that firm may requested to reply to SDL 11. Accordingly NC decided to call for the information from the firm so as to reach before 31.08.2010.   17

Case No.:17/13/80­ALC2/2010

Party Name:PERFECT ENGG COMPONENTS P LTD Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00193/AM11/ RLA File :05/24/040/00104/AM11/ Lic.No/Date:0510266164 16.06.2010 Decision  :  The  Meeting  No.18/11  was  actually  held  on  10.08.2010.  As  per  DC(MSME)’s  UO  Note No.30(127)/2010­ME dated 09.07.2010, the DL has already been issued on 16.07.2010. It was decided to remind the firm to send the requisite information before 31.08.2010.   18

Case No.:18/13/80­ALC2/2010

Party Name:PAHARPUR COOLING TOWERS LIMITED, Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00194/AM11/ RLA File :02/24/040/00039/AM11/ Lic.No/Date:0210143626 17.06.2010 Defer Date:03.08.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. As representative of DIPP was not present, the case was deferred for 31.08.2010.   19

Case No.:19/13/80­ALC2/2010 Party Name:ZENITH PRECISION

PVT LTD ., Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00195/AM11/ RLA File :07/24/040/00053/AM11/ Lic.No/Date:0710072312 17.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that copy of application has been sent to DHI / DIPP on 17.06.2010. However, it was decided to send the application to the o/o DC(MSME) for examination.   20

Case No.:20/13/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00196/AM11/ RLA File :07/24/040/00065/AM11/ Lic.No/Date:0710072313 17.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that copy of application has been

sent to DHI / DIPP on 17.06.2010. However, it was decided to send the application to the o/o DC(MSME) for examination.   21

Case No.:27/13/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00203/AM11/ RLA File :53/24/040/00009/AM11/ Lic.No/Date:5310010616 17.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. It was decided to remind  C&PC to expedite their comments.   22

Case No.:21/13/80­ALC2/2010

Party Name:WHIRLPOOL OF INDIA LTD., Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00197/AM11/ RLA File :05/24/040/00069/AM11/ Lic.No/Date:0510266400 18.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. As representative of DIPP was not present, the case was deferred for 31.08.2010.   23

Case No.:22/13/80­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00198/AM11/ RLA File :03/95/040/00112/AM11/ Lic.No/Date:0310579480 18.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010.  As representative of DIPP was not present, the case was deferred for 31.08.2010.   24

Case No.:23/13/80­ALC2/2010

Party Name:LIEBHERR MACHINE TOOLS (I) PVT LTD Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00199/AM11/ RLA File :07/24/040/00078/AM11/ Lic.No/Date:0710072325 18.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that letter dt.20.07.2010 has been issued to RA for sending copies of application and decided to remind RA to immediately forward the same.   25

Case No.:24/13/80­ALC2/2010

Party Name:JCBL LTD., 03.08.2010 Status: Approved HQ File :01/80/050/00200/AM11/ RLA File :22/24/040/00012/AM11/ Lic.No/Date:2210010087 18.06.2010   Decision : The Meeting No.18/11 was actually held on 10.08.2010. As per written comments furnished by DHI vide their U.O. No.3(68)/10­TSW(B).393 dated 03.08.2010, the committee decided to ratify the norms under GN­ 4.   RA may take necessary  action accordingly.   26

Case No.:25/13/80­ALC2/2010

Party Name:VEE KAY VIKRAM & CO 03.08.2010 Status: Approved HQ File :01/80/050/00201/AM11/ RLA File :08/24/040/00362/AM10/ Lic.No/Date:0810089868 21.06.2010   Decision  :  The  Meeting  No.18/11  was  actually  held  on  10.08.2010.  As  per  written  comments  furnished  by C&PC vide their OM No.46011/74/2007­PC­II dated 03.08.2010, the committe decided to ratify the norms as under:   b d i

6 Item to be Exported Quantity Pipeline Pigs & Spares Thereof 241 Nos. (Weight 5608 kg+/­2%) Raw­material  Recommended  for import Quantity 1.      Polyurethane Prepolymer 2.      Curative (Additive) 5187.365 kg 575.938 kg            RA may take necessary  action accordingly.   27

Case No.:26/13/80­ALC2/2010

Party Name:AVASARALA TECHNOLOGIES LIMITED, 03.08.2010 Status: Deferred HQ File :01/80/050/00202/AM11/ RLA File :07/21/040/00191/AM11/ Lic.No/Date:0710072364 21.06.2010 Defer Date:31.08.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that letter dt.20.07.2010 has been issued to RA for sending copies of application and decided to remind RA to immediately forward the same.   28

Case No.:29/13/80­ALC2/2010

Party Name:ABB LIMITED Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00205/AM11/ RLA File :07/24/040/00090/AM11/ Lic.No/Date:0710072375 22.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. NC noted that letter dt.20.07.2010 has been issued to RA for sending copies of application and decided to remind RA to immediately forward the same.   29

Case No.:30/13/80­ALC2/2010

Party Name:APEX TEST TECHNOLOGIES, Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00206/AM11/ RLA File :07/21/040/00192/AM11/ Lic.No/Date:0710072390 23.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010.  NC noted that letter dt.20.07.2010 has been issued to RA for sending copies of application and decided to remind RA to immediately forward the same.   30

Case No.:31/13/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:18/80­ ALC2/2010 03.08.2010 Status: Deferred HQ File :01/80/050/00207/AM11/ RLA File :04/24/040/00060/AM11/ Lic.No/Date:0410114911 24.06.2010 Decision : The Meeting No.18/11 was actually held on 10.08.2010. Based on recommendation of representative of DHI was decided to call for following information / clarification from the firm:­ 1. Specific items of export with details of Auxiliaries with quantity in number and weight separately for each export product. 2 serial no 5,9 & 11 of SDL for each export product separately. 3. Length and weight of different types of pipes like seamless, welded pipes separately for each type of steel types like carbon steel and alloy steel. 4. Use of components proposed for import 5. Net weight & gross weight of the castings/forgings proposed for import.

The firm may be asked to furnish information before 31.03.2010.       Sl.No.147

Case No. A/R­ 67

M/s.    IDMC Limited  Vithal Udyognagar HQ F.No.01/80/50/00477/AM10/DES­I Lic. No. & Date Meeting No.18/11 RLA No.34/24/040/00104/AM10 3410025225 dt.30.09.2009 Date: 03.08.2010 Revision of norms The Meeting No.18/11 was actually held on 10.08.2010. The committee noted that DL was issued on 27.07.2010 and  reply  to  that  DL  has  been  received  only  on  03.08.2010  for  examination  by  DIPP. The  case  is  deferred  for 07.09.2010.   Sl.No.148

Case No. A/R­ 68

M/s.    Sona Okegawa Precision  Forging Ltd., New Delhi HQ F.No.01/81/50/00074/AM04/DES­I Lic. No. & Date Meeting No.18/11 RLA No.03/88/040/00675/AM03 0510080047 dt.05.02.2003 Date: 03.08.2010 Ratification  of norms The Meeting No.18/11 was actually held on 10.08.2010. It was decided to examine the case on file and the case was deferred for 07.09.2010.   Sl.No.149

Case No. A/R­ 70

M/s.    Sarastwati Industrial Syndicate Ltd., HQ F.No.01/80/50/01187/AM08/DES­I Lic. No. & Date Meeting No.18/11 RLA No.05/24/040/00757/AM08 0510214345 dt.03.01.2008 Date: 03.08.2010 Ratification  of norms The Meeting No.18/11 was actually held on 10.08.2010. As representative of DIPP was not present, the case was deferred for 07.09.2010.   Sl.No.150

Case No. A/R­ 72

M/s.    The Saraswati Industrial Syndicate Ltd., HQ F.No.01/80/50/00075/AM10/DES­I Lic. No. & Date Meeting No.18/11 RLA No.05/24/040/00057/AM10 0510240867 dt.05.05.2009 Date: 03.08.2010 Ratification  of norms The Meeting No.18/11 was actually held on 10.08.2010. As representative of DIPP was not present, the case was deferred for 07.09.2010.   Sl.No.151

Case No. A/R­ 73

M/s.    The Saraswati Industrial Syndicate Ltd., HQ F.No.01/80/50/01188/AM08/DES­I Lic. No. & Date Meeting No.18/11 RLA No.05/24/040/00757/AM08 0510214271 dt.01.02.2008 Date: 03.08.2010 Ratification  of norms The Meeting No.18/11 was actually held on 10.08.2010. As representative of DIPP was not present, the case was deferred for 07.09.2010.    

Case No. A/R­ 76

M/s.    Delkor Technik  India  Pvt. LTd., Bangalore HQ F.No.01/80/50/00945/AM08/DES­I Lic. No. & Date Meeting No.18/11 RLA No.07/24/040/00457/AM08 0710053565 dt.27.09.2007 Date: 03.08.2010 Ratification  of norms The  Meeting  No.18/11  was  actually  held  on  10.08.2010.  Committee  noted  that  the  representation  has  been forwarded to DIPP for examination and deferred the case for 07.09.2010.  

Case No. A/R­ 77

M/s.  Kamal Rubber  Plast Industries  Pvt. LTd., HQ F.No.01/80/50/01240/AM09/DES­I Lic. No. & Date Meeting No.18/11 RLA No.05/24/040/00477/AM09 0510230022 dt.27.10.2008 Date: 03.08.2010 Ratification  of norms The  Meeting  No.18/11  was  actually  held  on  10.08.2010.  The  committee  noted  that  the  case  is  under  study  of DC(MSME). The case was deferred for 07.09.2010.   Sl.No.25

Case No. C ­ 08

M/s.    Vidyut  Metallics Pvt. Ltd., HQ F.No.01/94/180/00039/AM11/PC­4(B)/DES­I/ Meeting No 18/11 Modification of DEPB items to include “Single /

Pvt. Ltd., Meeting No.18/11   Modification  of  DEPB  items  to  include  Single  / Triple / Four Blade Shaving Systems, Blade Cartridge Magazine, Components of Shaving Systems” – reg. Date: 03.08.2010 The Meeting No.18/11 was actually held on 10.08.2010. The firm had been called for P.H. on 03.08.2010 but the meeting  was  not  held  on  03.08.2010.  The  firm’s  representatives  had  come  for  P.H.  on  03.08.2010.  The  firm’s representatives explained the case to Mr. S.K. Jain, DIPP representative and Mr. Krishan Kumar, Dy.DGFT. During the discussion, it was noted that the product which the firm wants to include under Sl. No. 216 of DEPB Schedule does not figure in the corresponding SION C­873. The firm was thus advised to apply for revision of  SION for the item. Mr. Krishan Kumar apprised NC of outcome of P.H. Accordingly NC decided to close the case.    

Case No. C ­ 10

M/s.    Amar  Equipment Pvt. LTd., Mumbai HQ F.No.01/80/162/00050/AM11/DES­I/ Meeting No.18/11  Fixation of SION for “Laboratory Autoclave, Spare Assembly of Autoclave” Date: 03.08.2010 The Meeting No.18/11 was actually held on 10.08.2010. It was decided to send the representation of the firm to DC(MSME) for examination. The case was deferred for 07.09.2010.

Case No. C ­ 11

M/s.  D & H Engineering (Bharat)  Pvt.  LTd., Navasari HQ F.No.01/80/162/00205/AM11/DES­I/ Meeting No.18/11  Fixation of SION in respect of 100% EOU for the export  product  “Eye  Ends,  Piston  Heads,  Valve Bodies, Gear Levers, Takos, Dump Ends, End Caps” Date: 03.08.2010 The Meeting No.18/11 was actually held on 10.08.2010. The committee noted that the case has been sent to DHI for examination on 03.07.2010. The case was deferred for 07.09.2010.


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied