IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2010-04-13

DGFT Committee Minutes

Document text

RATIFIED   Minutes of M.No.02/11 held on 13/04/2010 of Norms Committee (NC­I) (DES.I Section)     The  meeting  No.  02/11  of  the  Norms  Committee  (NC­I)  for  the  licensing  year  2010­2011  was  held  on 13.04.2010 under the Chairmanship of Shri A. Komu, Addl. Director General of Foreign Trade to consider the applications  under  Duty  Exemption  /  Remission  Schemes  (Chapter­4)  of  Foreign  Trade  Policy  2004–2009  / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. Rajinder Pal Singh, DDG & Convener NC­I 302 23061562 Ext.345 DGFT, U.B. 5. Sh. Ramavatar Meena, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­    1

Case No.:43/16/80­ALC2/2008

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:2/80­ALC2/2010 13.04.2010 Status:Case deferred HQ File :01/80/050/00566/AM09/ RLA File :04/24/040/00085/AM09/ Lic.No/Date:0410096891 01.07.2008 Defer Date: 08.06.2010 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.   2

Case No.:65/22/80­ALC2/2008

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/00876/AM09/ RLA File :09/24/040/00192/AM09/ Lic.No/Date:0910035094 19.08.2008 Defer Date: 08.06.2010 Decision : The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.     

Case No.:34/28/80­ALC2/2008

Party Name:ALSTOM PROJECTS INDIA LIMITED, 13.04.2010 Status:Case approved HQ File :01/80/050/01115/AM09/ RLA File :03/94/040/00549/AM09/ Lic.No/Date:0310487648 24.09.2008   Decision  :The  DHI  furnished  written  comments  in  this  case  vide  their  U.O.  No.    3(82)/09­TSW(B)/101    dated 09 03 2010 recommending the norms Text of DHI comments are re­produced below:­

3 09.03.2010 recommending the norms. Text of DHI comments are re­produced below:­ Ministry of Heavy Industries & Public Enterprises Department of Heavy Industry TSW(B) Section  

Subject: Application of M/S Alstom Power Systems Hydro for ratification of norms of licence no 0310487648 dt 24­09­

DES­I,  DGFT  may  kindly  refer  to  the  above  mentioned  licence  M/S  Alstom  Power  Systems  Hydro.  The  firm  has submitted reply  vide  their  letter  of  dated  11­08­09.  Based  on  the  information  available,  this  Office  recommends  the following. Export 1. Export weight of item no 1 is 108.5MT, item no2 is 81.9 MT, item no 3 is 22.6 MT, item no 4 is 61.5 MT & that of item no 5 is 1.9MT & the same may be incorporated n the licence.   Import 1. Item no 1­ There is minor machining in the import item. This Office recommends for import of 5 nos with weight 115.8 MT as applied by the firm. 2.  Item no 2­ There is minor machining in the import item. The loss due to machining is only 12% & after 20% recovery, there is no decrease in number of import. Hence This Office recommends for import of 3 nos with weight 91.9 MT as applied by the firm. 3.  Item no 3­ This Office recommends for import of 5 nos with weight 27.75 MT as applied by the firm. 4.  Item no 4­ The firm proposes to import copper flats of weight 52056 kg & the firm has sought wastage of 3%. This Office recommends import of 51009 kg of copper with 1% wastage with 2/3rd recovery. 5. Item no 5 to 15­ These are insulating materials. Weight of item no 5 is 9 .02 kg & that of item no 6 is 3784.27 kg & the same may be incorporated in the licence. The value of import (Item no 5 to 15) may be restricted to 15% of FOB value of export item no 4 & 5.   The above issues with approval of JS(B) B.C.Nayak Development Officer  09­03­10 Shri Ramavtar Meena, FTDO, DES­I Deptt. of HI, UO No 3(82)/09­TSW(B)               dated   The  Committee,  after  deliberating  upon  the  DHI  comments,  decided  to  ratify  the  norms  in  respect  of  the  subject advance authorization in accordance with their written comments except that for import item no. 2 the duty exemption benefit may be restricted to 89.9 MTs.   The Regional Authority may take necessary action accordingly.      4

Case No.:31/30/80­ALC2/2008

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/01161/AM09/ RLA File :09/24/040/00467/AM08/ Lic.No/Date:0910035538 07.10.2008 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to relist the case on 08.06.2010.    5

Case No.:32/30/80­ALC2/2008

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/01162/AM09/ RLA File :09/24/040/00468/AM08/ Lic.No/Date:0910035539 07.10.2008 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to relist the case on 08.06.2010.

6

Case No.:1/33/85­ALC3/2008

Party Name:BOVING FOURESS LIMITED, 13.04.2010 Status:Case rejected HQ File :01/85/050/00218/AM09/ RLA File :07/24/040/00524/AM09/ Lic.No/Date:0710061697 15.12.2008   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      7

Case No.:21/39/80­ALC2/2008

Party Name:SGL CARBON INDIA PVT.LTD 13.04.2010 Status:Case deferred HQ File :01/80/050/01574/AM09/ RLA File :31/24/040/00230/AM09/ Lic.No/Date:3110036420 15.12.2008 Defer Date: 08.06.2010 Decision : The Committee observed that the firm has furnished incomplete reply in response to this office letter calling for  certain  information.  The  Committee,  therefore,  decided  to  direct  the  firm  to  furnish  the  following  information complete in all respects otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 08.06.2010:­ 1. Sl no 11 of SDL.. 2. Use of each export item & import item 3  Clarification on bellows not clear: 4. Manufacturing activity involved in each item of import. 5  gross weight of item of import. congratulation   8

Case No.:6/42/80­ALC2/2008

Party Name:KERN­LIEBERS SPRINGS & STAMPINGS PVT.LTD, 13.04.2010 Status:Case deferred HQ File :01/80/050/01630/AM09/ RLA File :07/24/040/00531/AM09/ Lic.No/Date:0710062052 26.12.2008 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to relist the case on 08.06.2010.    9

Case No.:1/44/80­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/01661/AM09/ RLA File :09/24/040/00377/AM09/ Lic.No/Date:0910036659 09.01.2009 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.    10

Case No.:18/44/80­ALC2/2008

Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. 13.04.2010 Status:Case rejected HQ File :01/80/050/01678/AM09/ RLA File :03/95/040/00742/AM09/ Lic.No/Date:0310502421 13.01.2009   Decision  :  The  Textile  Commissioner  furnished  written  comments  in  this  case  vide  their  letter No.9(144)/2009/TXM/M/32/  dated 18.02.2010 informing that party has not clarified discrepancies pointed out by them. The  Committee  accordingly  decided  to  reject  the  case  on  the  ground  that  the  firm  did  not  furnish  the  complete information desired by Textile Commissioner, in the absence of which, it was not possible to decide the requirement of inputs.

  11

Case No.:15/15/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00199/AM10/ RLA File :04/24/040/00293/AM09/ Lic.No/Date:0410103657 03.04.2009 Defer Date: 11.05.2010 Decision : The representative of the DHI informed the Committee that the case was under their study. The Committee, advised the representative of DHI to give their comments without further delay and decided to defer the consideration for a short period. The case may be relisted on 11.05.2010.    12

Case No.:16/15/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00200/AM10/ RLA File :04/24/040/00303/AM09/ Lic.No/Date:0410103660 03.04.2009 Defer Date: 11.05.2010 Decision : The representative of the DHI informed the Committee that the case was under their study. The Committee, advised the representative of DHI to give their comments without further delay and  decided to defer the consideration for a short period. The case may be relisted on 11.05.2010.      13

Case No.:7/14/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case Approved HQ File :01/80/050/00177/AM10/ RLA File :04/24/040/00299/AM09/ Lic.No/Date:0410103654 03.04.2009   Decision  :  The  DHI  furnished  written  comments  in  this  case  vide  their  U.O.  No.    3(158)/09­TSW(B)/128    dated 15.03.2010 recommending the norms. Text of DHI comments are re­produced below:­ TSW(B) Section

Subject: Application of M/S BHEL, Chennai for ratification of norms of licence no­0410103654 dtd 03­04­09

DES­I, DGFT may kindly refer to the above mentioned licence of M/S BHEL, Chennai. The firm has replied vide their letter of dated 03­02­10.Based on the information submitted by the firm this Office recommends the following. EXPORT 1.        The description of the export product may be modified to “piping system for 2X500MW Steam Generator for Bhusabal TPS”& total export weight is 5046 MT & the same may be incorporated in the licence. IMPORT 1.       Item no 1­ (Carbon Steel)The quantity of seamless tube/ pipe to be allowed is 1174 MT& that of welded tube is 126 MT with 2% wastage as applied by the firm. 2.  Item no 2­ (Alloy Steel)The quantity of seamless tube/ pipe to be allowed is 1100 MT& with 2% wastage as applied by the firm. “welded” may be deleted from the description of import item 3.  Item no 3­ (Alloy Steel)The quantity of seamless tube/ pipe to be allowed is 100 MT& with 2% wastage as applied by the firm. “welded” may be deleted from the description of import item 4. Item no­4­ The total weight is 284 MT & the same may be incorporated in the licence. The item may be allowed under GN­ 4 as applied for. The word “Finished Forging” may be suffixed to the description of import item. 5. Item no­5­ Welding electrodes­ Quantity applied is with in the norms normally allowed. Import may be allowed as applied for. 6.  Item no­6­ The total weight is 8 MT & the same may be incorporated in the licence. The item may be allowed under GN­4 7. Item no­7­ The total weight is 36 MT & the same may be incorporated in the licence. The item may be allowed under GN­4. 8. Item no­ 8­ Description “Hydraulic Shock Absorber Assembly” may be deleted as requested by the firm. The item may be allowed as applied under GN­4. 9. item no 9 to 12 – these items are components & may be allowed under GN­4.   B.C.Nayak Development Officer Deptt. of HI, UO No 3(158)/09­TSW(B)               dated   The  Committee,  after  deliberating  upon  the  DHI  comments,  decided  to  ratify  the  norms  in  respect  of  the  subject advance authorization in accordance with their written comments.      

Case No.:8/14/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case Approved HQ File :01/80/050/00178/AM10/ RLA File :04/24/040/00298/AM09/ Lic.No/Date:0410103650 03.04.2009   Decision  :  The  DHI  furnished  written  comments  in  this  case  vide  their  U.O.  No.    3(158)/09­TSW(B)/129    dated 15.03.2010 recommending the norms. Text of DHI comments are re­produced below:­ TSW(B) Section

Subject: Application of M/S BHEL, Chennai for ratification of norms of licence no­0410103650 dtd 03­04­09

  DES­I, DGFT may kindly refer to the above mentioned licence of M/S BHEL, Chennai. The firm has replied vide their letter of dated 03 02 10 Based on the information submitted by the firm this Office recommends the following

14 letter of dated 03­02­10.Based on the information submitted by the firm this Office recommends the following. EXPORT 1. The description of the export product may be modified to “piping system for 1X500MW Steam Generator for Khaperkheda TPS”& total export weight is 2623 MT & the same may be incorporated in the licence. IMPORT 1.Item no 1­ (Carbon Steel)The quantity of seamless tube/ pipe to be allowed is 587 MT & that of welded tube is 63 MT with 2% wastage as applied by the firm. 2.   Item  no  2­  (Alloy  Steel)The  quantity  of  seamless  tube/  pipe  to  be  allowed  is  550  MT&  with  2%  wastage  as applied by the firm. “Welded” may be deleted from the description of import item 3.  Item no 3­ (Alloy Steel)The quantity of seamless tube/ pipe to be allowed is 50 MT& with 2% wastage as applied by the firm. 4. Item no­4­ The total weight is 142 MT & the same may be incorporated in the licence. The item may be allowed under GN­4 as applied for. 5. Item no­5­ Welding electrodes­ Quantity applied is with in the norms normally allowed. Import may be allowed as applied for. 6.  Item no­6­ The total weight is 4 MT & the same may be incorporated in the licence. The item may be allowed under GN­4 7. Item no­7­ The total weight is 18 MT & the same may be incorporated in the licence. The item may be allowed under GN­4. 8. Item no­ 8­ Description “Hydraulic Shock Absorber Assembly” may be deleted as requested by the firm. The item may be allowed as applied under GN­4. 9. item no 9 to 12 – these items are components & may be allowed under GN­4.   Development Officer Deptt. of HI, UO No 3(158)/09­TSW(B)               dated   The  Committee,  after  deliberating  upon  the  DHI  comments,  decided  to  ratify  the  norms  in  respect  of  the  subject advance authorization in accordance with their written comments.       15

Case No.:3/14/80­ALC2/2009

Party Name:CIM TOOLS PVT.LTD., 13.04.2010 Status:Case rejected HQ File :01/80/050/00173/AM10/ RLA File :07/24/040/00697/AM09/ Lic.No/Date:0710064050 06.04.2009   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     

Case No.:8/3/80­ALC2/2009

Party Name:PRABHA EXPORTS(P) LTD 13.04.2010 Status:Case Approved HQ File :01/80/050/00008/AM10/ RLA File :03/95/040/00855/AM09/ Lic.No/Date:0310515268 13.04.2009   Decision  :    The  DHI  furnished  written  comments  in  this  case  vide  their  U.O.  No.    3(131)/09­TSW(B)/72    dated 15.02.2010 recommending the norms. Text of DHI comments are re­produced below:­ TSW(B) Section

Subject: Application of M/S  Prabha Exports for ratification of norms of licence no 0310515273 dt 13­04­09.

  DES­I, DGFT may kindly refer to the above mentioned licence of M/S  Prabha Exports. Firm’s Application along with reply of 29­ 10 09 h b i d Th l i i l i h i l l i f i l i H b d

16 10­09 has been examined. The reply is incomplete as it has not given calculation of raw material requirement. However based on the information available in the reply the case can be recommended as follows.   1. There are only two raw materials in the list of import and it is HR coil and CR coil. The manufacturing process involves blanking and subsequent minor drilling/ Machining. The net weight of the blanks comes to 21 kg. This Office recommends net wastage of 7% for blanking. The firm’s entitlement comes to 308.6 MT. This Office recommends for import of 308.6 MT of HR coils against import item no 1&2 as the firm has given the requirement of HR coils only. 2.  All other items proposed for import are components & may be allowed under GN­4. The above issues with the approval of Joint Secretary (B). B.C.Nayak Development Officer Deptt. of HI, UO No 3(131)/09­TSW(B)               dated   NC observed  that  DHI  had  given  the  comments  based  on  application  forwarded  by  DGFT. However, on perusal of applications relating to licence Nos.0310515268 and 0310515273 both  dt.13.04.2009 viz­a­viz recommendations,  NC observed that licence nos. were interchanged in the DHI Comments. The Committee, therefore , decided to ratify the norms in respect of the subject advance authorization in accordance with DHI written comments subject to correction in licence no. in their recommendations as 0310515268.       17

Case No.:13/9/80­ALC2/2009

Party Name:PRABHA EXPORTS(P) LTD 13.04.2010 Status:Case Approved HQ File :01/80/050/00104/AM10/ RLA File :03/95/040/00856/AM09/ Lic.No/Date:0310515273 13.04.2009   Decision : The DHI furnished written comments in this case vide their U.O. No.  3(131)/09­TSW(B)/73  dated 15.02.2010 recommending the norms. Text of DHI comments are re­produced below:­ TSW(B) Section  

Subject: Application of M/S  Prabha Exports for ratification of norms of licence no 0310515268 dt 13­04­09.

  DES­I, DGFT may kindly refer to the above mentioned licence of M/S  Prabha Exports. Firm’s Application along with reply  of  21­10­09  have  been  examined.  The  reply  is  incomplete  as  it  has  not  given  calculation  of  raw  material requirement. However based on the information available in the reply the case is recommended as follows.

1. There is only one raw material in the list of import and it is HR coil of weight 382.94 MT. The firm has sought wastage  of  25%  on  input  which  will  come  to  around  33%  with  respect  to  output.  The  manufacturing  process involves blanking and subsequent minor drilling/ Machining. The net weight of the blanks comes to 18.6 kg. This Office recommends net wastage of 7% for blanking etc. The firm’s entitlement comes to 276 MT and the same is recommended.. 2. All other items proposed for import are components & may be allowed under GN­4.   The above issues with the approval of Joint Secretary (B).   B.C.Nayak Development Officer Deptt. of HI, UO No 3(131)/09­TSW(B)               dated   NC  observed  that  DHI  had  given  the  comments  based  on  application  forwarded  by  DGFT.  However,  on perusal  of  applications  relating  to  licence  Nos.0310515268  and  0310515273  both    dt.13.04.2009  viz­a­viz recommendations, NC observed that licence nos. were interchanged in the DHI Comments. The Committee, therefore, decided to ratify the norms in respect of the subject advance authorization in accordance with DHI written comments subject to correction in licence no. in their recommendations as 0310515273.       18

Case No.:5/14/80­ALC2/2009

Party Name:AIA ENGINEERING LTD. 13.04.2010 Status:Case deferred HQ File :01/80/050/00175/AM10/ RLA File :08/24/040/00009/AM10/ Lic.No/Date:0810079414 21.04.2009 Defer Date: 08.06.2010 Decision :The Committee observed that the firm has furnished incomplete reply in response to this office letter calling  for  certain  information  and  further  D.L.  has  already  been  issued  to  the  firm  based  on  the  DHI Comments dt. 19.02.2010 for which reply is still awaited. The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 08.06.2010.   19

Case No.:1/7/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00068/AM10/ RLA File :03/95/040/00983/AM09/ Lic.No/Date:0310517989 01.05.2009 Defer Date: 08.06.2010 Decision :The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information despite reminder. The Committee, therefore, decided to issue final  reminder  to  the  firm  for  expediting  the  said  information  by  14.05.2010  otherwise  their  case  will  be rejected and no further representation will be entertained.   The case may be re­listed on 08.06.2010.    20

Case No.:12/14/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00182/AM10/ RLA File :09/24/040/00048/AM10/ Lic.No/Date:0910038038 28.05.2009 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that the case  was  under  their  study.  The

21

Case No.:13/14/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00183/AM10/ RLA File :09/24/040/00051/AM10/ Lic.No/Date:0910038039 28.05.2009 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that the case  was  under  their  study.  The   22

Case No.:12/15/80­ALC2/2009

13.04.2010 Status:Case deferred HQ File :01/80/050/00196/AM10/ RLA File :04/24/040/00067/AM10/ Lic.No/Date:0410105868 03.07.2009 Defer Date: 08.06.2010 Decision :The Committee observed that DL  could not  issued  due to some confusion. The Committee , therefore, decided to issue the DL  immediately and to relist the case on 08.06.2010.    23

Case No.:14/15/80­ALC2/2009

Party Name:LUBI SUBMERSIBLES LTD 13.04.2010 Status:Case deferred HQ File :01/80/050/00198/AM10/ RLA File :08/24/040/00074/AM10/ Lic.No/Date:0810081260 07.07.2009 Defer Date: 08.06.2010 Decision :The Committee observed that the firm has furnished incomplete reply in response to this office letter calling for certain information. The Committee, therefore, decided to direct the firm to furnish the following information complete in all respects otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 08.06.2010:­   1. Information in respect of Sl.No.4&5 of the Standard    Deficiency Format.    

Case No.:18/21/80­ALC2/2009

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:2/80­ ALC2/2010 13.04.2010 Status:Case Approved HQ File :01/80/050/00300/AM10/ RLA File :09/24/040/00179/AM10/ Lic.No/Date:0910038908 12.08.2009   Decision : The DHI furnished written comments in this case vide their U.O. No.  3(12)/09­TSW(B)/  dated 10.03.2010 recommending the norms. Text of DHI comments are re­produced below:­   TSW(B) Section

Subject: Application of M/S Thermal Systems for ratification of norms of licence no­0910038908 dt 12­08­09

  DES­I, DGFT may kindly refer to the above mentioned licence of M/S Thermal Systems (Hyderabad) on the subject mentioned above. The firm has applied for ratification of norms for manufacture of of “parts of Boiler (Economiser & superheater”. The firm has replied vide their letter of dated 06­02­10. The reply is incomplete. However based on the information available this Office recommends the following. Export 1.The description of export product may be amended to “Parts of Boiler, (four numbers of Economisers & four numbers of Superheaters  ” and total export weight is 1522.3 MT and the same may be incorporated in the licence.

24 Imports 1.Item no 1 ­ The firm has revised the requirement .The firm has sought wastage of 2%. The thickness of plates may be restricted to 45 mm to 105 mm & the same may be incorporated in the licence. This Office recommends import of 250 MT as applied for. 2.Item no 2 ­ The firm has revised the requirement .The firm has sought wastage of 2%. The thickness of plates may be restricted to 45 mm to 55 mm & the same may be incorporated in the licence. This Office recommends import of 50 MT as applied for. 3.Item no 3 ­ The firm has revised the requirement .The firm has sought wastage of 2%. The thickness of plates may be restricted to 45 mm to 55 mm & the same may be incorporated in the licence. This Office recommends import of 100 MT as applied for. 4. Item no 4 ­ The firm has revised the requirement .The firm has sought wastage of 2%. The range of tubes may be restricted to OD 47 mm to 52 mm& thickness 7 mm to 9mm and quantity (100 MT) as applied for. 5. Item no 5 ­ The firm has revised the requirement .The firm has sought wastage of 2%. The range of tubes may be restricted to OD 47 mm to 52 mm& thickness 7 mm to 9mm and quantity (500 MT) as applied for. 6. Item no 6 ­ The firm has revised the requirement .The firm has sought wastage of 2%. The range of tubes may be restricted to OD 47 mm to 52 mm& thickness 7 mm to 9mm and quantity (50 MT) as applied for.         7. Item no 7 ­ The firm has revised the requirement .The firm has sought wastage of 2%. The range of tubes may be restricted to OD 47 mm to 52 mm& thickness 7 mm to 9mm and quantity (200 MT) as applied for. 8. Item no 8 ­ The firm has revised the requirement .The firm has sought wastage of 2%. The range of tubes may be restricted to OD 47 mm to 52 mm& thickness 7 mm to 9mm and quantity (25 MT) as applied for. 9. Item no 9  ­  The  firm  has  revised  the  requirement  .The  firm  has  sought  wastage  of  2%.  We  may  recommend import of 60 MT as applied for. 10.Item no 10 &11­Quantity of import is 4165 pieces each which may be incorporated along with weight as applied by the firm on net to net basis. 11.Item no 12­Quantity of import is 1200 pieces which may be incorporated along with weight as applied by the firm. 12.Item no 13­Quantity of import is 16 pieces which may be incorporated along with weight as applied by the firm and the description may be amended to “Tube Sheets”. 13.Item no 14­ Two tube sheets & eight flanges may be allowed with in the overall weight applied for. 14.Item no 15 to 20­ The item is a component & may be allowed under GN­4.

B.C.Nayak Development Officer 10­03­10 Deptt. of HI, UO No3(12)/09/TSW(B)            dated   The  Committee,  after  deliberating  upon  the  DHI  comments,  decided  to  ratify  the  norms  in  respect  of  the subject advance authorization in accordance with their written comments.         25

Case No.:19/21/80­ALC2/2009

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 13.04.2010 Status:Case Approved HQ File :01/80/050/00301/AM10/ RLA File :09/24/040/00180/AM10/ Lic.No/Date:0910038899 12.08.2009   Decision : The DHI furnished written comments in this case vide their U.O. No.  3(12)/09­TSW(B)/111 dated 11.03.2010 recommending the norms. Text of DHI comments are re­produced below:­ TSW(B) Section  

Subject: Application of M/S Thermal Systems for ratification of norms of licence no­ 0910038899 dt 12­08­09

  DES­I, DGFT may kindly refer to the above mentioned licence of M/S Thermal Systems (Hyderabad) on the subject mentioned above. The firm has applied for ratification of norms for manufacture of  “Heat Recovery system with Accessories”. The firm has replied vide their letter of dated 04­02­10. The reply is incomplete. However based on the information available we may recommend the following.   1.                   The description of export product may be amended to “Heat Recovery system with Accessories consisting of two number of boilers along with economiser & Super heater” and total export weight is 117.8 MT and the same may be incorporated in the licence. Imports 1. Item no 1­ The firm has revised the requirement .The firm has sought wastage of 2%. The range of tubes may be restricted to OD 37 mm to 52 mm& thickness 5 mm to 8mm and quantity (75 MT) as applied for

restricted to OD 37 mm to 52 mm& thickness 5 mm to 8mm and quantity (75 MT) as applied for. 2.  Item no 2­ The firm has revised the requirement .The firm has sought wastage of 2%. This Office recommends for import of 15 MT as applied for. 3. Item no 3 to 11 are components and may be allowed as applied for under GN­4.   The above issues with the approval of JS(B).   B.C.Nayak Development Officer Deptt. of HI, UO No3(12)/09/TSW(B)            dated   The  Committee,  after  deliberating  upon  the  DHI  comments,  decided  to  ratify  the  norms  in  respect  of  the subject advance authorization in accordance with their written comments.       26

Case No.:3/23/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00325/AM10/ RLA File :04/24/040/00292/AM09/ Lic.No/Date:0410107117 21.08.2009 Defer Date: 08.06.2010 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 08.06.2010:­   1. The details of the Accessories to be exported with quantity in number. 2. Use of each component proposed for import in the manufacture of export product. 3. Input Weight of each casting/ forging and corresponding finished weight separately and quantities of import may be given in both weight and numbers. 4. Serial no 5,9 & 11 of SDL. 5. Length and weight of different types of pipes like seamless, welded pipes separately for each type of steel types like carbon steel and alloy steel.   27

Case No.:10/23/80­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 13.04.2010 Status:Case deferred HQ File :01/80/050/00332/AM10/ RLA File :05/24/040/00237/AM10/ Lic.No/Date:0510248312 25.08.2009 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that the case was under their study. The   28

Case No.:13/23/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00335/AM10/ RLA File :04/24/040/00051/AM10/ Lic.No/Date:0410107193 25.08.2009 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that the case was under their study. The  

Case No.:14/23/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00336/AM10/ RLA File :04/24/040/00083/AM10/ Lic No/Date:0410107196 Defer Date:

29 HQ File :01/80/050/00336/AM10/ RLA File :04/24/040/00083/AM10/ Lic.No/Date:0410107196 25.08.2009 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that the case was under their study. The     30

Case No.:15/23/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00337/AM10/ RLA File :04/24/040/00111/AM10/ Lic.No/Date:0410107197 25.08.2009 Defer Date: 08.06.2010 Decision : The representative of the DHI informed the Committee that the case was under their study. The   31

Case No.:11/23/80­ALC2/2009

Party Name:ITS INDIA PVT. LTD. 13.04.2010 Status:Case Approved HQ File :01/80/050/00333/AM10/ RLA File :03/94/040/00438/AM10/ Lic.No/Date:0310535255 26.08.2009   Decision :The DHI  furnished  written  comments  in  this  case  vide  their  U.O.  No.    3(105)/09­TSW(B)/137  dated 22.03.2010 recommending the norms. Text of DHI comments are re­produced below:­ TSW(B) Section

Subject: Application of M/S  ITS INDIA for ratification of norms of licence no 0310535255 dt 26­08­09.

  DES­I, DGFT may kindly refer to the above mentioned licence of M/S  ITS INDIA . The firm has submitted information sought vide their letter of dated 15­12­09. The firm has now revised list of items proposed for import. 1. The firm has given calculation of requirement. There is little oversize in the raw material. Recovery of 20 % has been taken.  Item no 1 may be allowed at 1327 kg (28 numbers) with net wastage of 32% against applied quantity of 1421.7 kg, item 2 at 5746kg with 128% wastage against applied quantity of 6956.93 kg and item no 3 at 3780 kg with 180% wastage against applied quantity of 4270.2 kg. Item no 4 may be allowed at 2070kg with 176% wastage against applied quantity of 2505 kg, item 5 at 3150 kg with 144% wastage against applied quantity of 3902 kg and item no 6 at 3177 kg with 144% wastage against applied quantity of 3963 kg. Item no 7 may be allowed at 870 kg ( 29 number) with 16% wastage against applied quantity of 900 kg (30 numbers). 2. item no 9 is a component and may be allowed under GN­4. 3.  Item no 8 and 10 to 15 may be deleted as the firm has stated to procure the same indigenously. The above issues with the approval of JS(B). B.C.Nayak Development Officer Shri Ramavtar Meena FTDO DES I

Deptt. of HI, UO No 3(105)/09­TSW(B)               dated   The  Committee,  after  deliberating  upon  the  DHI  comments,  decided  to  ratify  the  norms  in  respect  of  the subject advance authorization in accordance with their written comments.     32

Case No.:31/23/80­ALC2/2009

Party Name:HINDUSTAN AERONAUTICS LTD, 13.04.2010 Status:Case deferred HQ File :01/80/050/00353/AM10/ RLA File :07/24/040/00651/AM09/ Lic.No/Date:0710066776 02.09.2009 Defer Date: 08.06.2010 Decision :The Committee observed that the comments called for from DGCA are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 08.06.2010.   33

Case No.:21/47/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00740/AM10/ RLA File :09/24/040/00215/AM10/ Lic.No/Date:0910039330 22.09.2009 Defer Date: 08.06.2010 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by the 08.06.2010:­   1.  Input Weight of each casting/ forging and corresponding finished weight. 2.  Use of each component proposed for import in the manufacture of export product 3.  Serial no 3, 4,5,9 & 11 of SDL . 4.  Some of the items like item no 36,68,75, 82 & 88 are proposed to be imported in odd number while export item is two sets. The firm may clarify how these items are used in fraction quantity. 5.  Quantity of item of import no 3 may also be given in number. 6.  Specification of steel plates rounds etc. 7.  Specification of different steel pipes, their type like Seamless or ERW and corresponding length & weight may be given.   34

Case No.:10/28/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 13.04.2010 Status:Case deferred HQ File :01/80/050/00428/AM10/ RLA File :31/24/040/00121/AM10/ Lic.No/Date:3110040185 07.10.2009 Defer Date: 08.06.2010 Decision :The Committee reviewed the case as firm’s application has been received.  On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 08.06.2010:­   1.      Information in respect of Sl. No. 3, 5 & 11 of Standard Deficiency Format. 2.      Blank size for each export product supported by size of the export product. 3.      Sheet lay out diagram indicating the wastage during blanking, export product­wise     35

Case No.:5/31/80­ALC2/2009

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/00453/AM10/ RLA File :09/24/040/00269/AM10/ Lic.No/Date:0910039591 14.10.2009 Defer Date: 08.06.2010 Decision :The representative of DHI informed the Committee that they have not received reply of the firm. The  Committee  therefore  handed  over  the  firm’s  reply  to  the  technical  authority  for  examination  and submission of comments The case may be relisted on 08 06 2010

submission of comments. The case may be relisted on 08.06.2010.   36

Case No.:6/31/80­ALC2/2009

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/00454/AM10/ RLA File :09/24/040/00270/AM10/ Lic.No/Date:0910039592 14.10.2009 Defer Date: 08.06.2010 Decision :The representative of DHI informed the Committee that they have not received reply of the firm. The  Committee  therefore  handed  over  the  firm’s  reply  to  the  technical  authority  for  examination  and submission of comments. The case may be relisted on 08.06.2010.   37

Case No.:11/31/80­ALC2/2009

Party Name:MINDA SILCA ENGINEERING LTD. 13.04.2010 Status:Case deferred HQ File :01/80/050/00459/AM10/ RLA File :05/24/040/00341/AM10/ Lic.No/Date:0510251004 15.10.2009 Defer Date: 08.06.2010 Decision  :Committee  noted  that  the  letter  for  Personal  Hearing  was  sent  to  the  firm  in  incorrect  address therefore  it  has  been  received  undelivered.  However,  the    letter  was  again  sent  at  correct  address.  The Committee, therefore, decided to remind the firm once again to appear for Personal Hearing on 08.06.2010.   38

Case No.:20/47/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00739/AM10/ RLA File :09/24/040/00267/AM10/ Lic.No/Date:0910039619 15.10.2009 Defer Date: 08.06.2010 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by the 08.06.2010:­   1. Input Weight of each casting/ forging and corresponding finished weight. 2. Use of each component proposed for import in the manufacture of export product 3.  Serial no 3, 4,5,9 & 11 of SDL . 4. Quantity of item of import no 2 may also be given in number.              5. Specification of steel plates rounds etc. 6. Specification of different steel pipes, their type like Seamless or ERW and corresponding length & weight may be given.     39

Case No.:3/31/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00451/AM10/ RLA File :04/24/040/00161/AM10/ Lic.No/Date:0410108588 15.10.2009 Defer Date: 08.06.2010 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by the 08.06.2010:­   1.  Specific items of export with quantity in number and weight. 2. Serial no 5 & 11 of SDL for each export product separately..

. Se ial no 5 & of S fo each expo t p oduct sepa ately.. 3.  Length and weight of different types of pipes like seamless, welded pipes separately for each type of steel types like carbon steel and alloy steel. 4.    Input  weight  &  finished  weight  of  castings  &  forgings  separately.  Quantity  of  import  in  number  of  casting  & forgings should also be given separately. (Item no 7)   40

Case No.:4/31/80­ALC2/2009

13.04.2010 Status:Case deferred HQ File :01/80/050/00452/AM10/ RLA File :04/24/040/00168/AM10/ Lic.No/Date:0410108614 16.10.2009 Defer Date: 08.06.2010 Decision  :The  Committee  noted  that  firm  has  sought  time  for  submission  of  required  information.  The Committee, therefore, decided to remind the firm for expediting the said information by 28.05.2010 otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 08.06.2010.   41

Case No.:8/31/80­ALC2/2009

Party Name:KAMAL RUBPLAST INDUSTRIES (P) LTD. 13.04.2010 Status:Case deferred HQ File :01/80/050/00456/AM10/ RLA File :05/23/040/00063/AM10/ Lic.No/Date:0510251132 20.10.2009 Defer Date: 08.06.2010 Decision :The representative of the DC(MSME) informed the Committee that they received the firm’s reply and  case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.    42

Case No.:14/31/80­ALC2/2009

Party Name:TITAN INDUSTRIES LIMITED, 13.04.2010 Status:Case deferred HQ File :01/80/050/00462/AM10/ RLA File :07/24/040/00194/AM10/ Lic.No/Date:0710067704 21.10.2009 Defer Date: 08.06.2010 Decision :The representative of DHI informed the Committee that they have not received reply of the firm. The  Committee  therefore  handed  over  the  firm’s  reply  to  the  technical  authority  for  examination  and submission of comments. The case may be relisted on 08.06.2010.     43

Case No.:13/31/80­ALC2/2009

13.04.2010 Status:Case deferred HQ File :01/80/050/00461/AM10/ RLA File :04/24/040/00169/AM10/ Lic.No/Date:0410108791 23.10.2009 Defer Date: 08.06.2010 Decision :The representative of DHI informed the Committee that they have not received reply of the firm. The  Committee  therefore  handed  over  the  firm’s  reply  to  the  technical  authority  for  examination  and submission of comments. The case may be relisted on 08.06.2010.   44

Case No.:16/31/80­ALC2/2009

Party Name:SUTURES INDIA PRIVATE LIMITED, 13.04.2010 Status:Case deferred HQ File :01/80/050/00464/AM10/ RLA File :07/24/040/00263/AM10/ Lic.No/Date:0710067849 28.10.2009 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that the case  was  under  their  study.  The  

Case No.:18/31/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00466/AM10/ RLA File :04/24/040/00156/AM10/ Lic No/Date:0410108868 Defer Date:

45 HQ File :01/80/050/00466/AM10/ RLA File :04/24/040/00156/AM10/ Lic.No/Date:0410108868 28.10.2009 Defer Date: 08.06.2010 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by the 08.06.2010:­   1. Serial no 5 & 11 of SDL for each export product separately. 2. Input Weight of each casting/ forging and corresponding finished weight separately. 3. Quantity of seamless and welded pipes separately both in weight and length for each type of steel i.e. CS, AS and SS. 4. Break up of Hydraulic shock absorber assembly and snubeer assembly.(Item no 8 of import.   46

Case No.:26/47/80­ALC2/2009

Party Name:AIR LIQUIDE ENGINEERING INDIA PVT LTD., 13.04.2010 Status:Case Closed HQ File :01/80/050/00745/AM10/ RLA File :09/70/040/00140/AM10/ Lic.No/Date:0910039855 06.11.2009   Decision : Norms Committee examined the firm’s reply dt.20.03.2010 and observed that ratification of norms can not be done before  finalization of export order. Accordingly, Committee decided to close the case and place it again before NC when the firm submitted complete details as per export order.        47

Case No.:6/39/80­ALC2/2009

Party Name:DASHMESH JACQUARD AND POWERLOOM 13.04.2010 Status:Case deferred HQ File :01/80/050/00602/AM10/ RLA File :33/24/040/00009/AM10/ Lic.No/Date:3310014265 12.11.2009 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be rejected and no further representation will be entertained.  It was also decided to forward a copy of firm’s application to DC(MSME). The case may be re­listed on 08.06.2010.    48

Case No.:8/39/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/00604/AM10/ RLA File :03/94/040/00663/AM10/ Lic.No/Date:0310547941 27.11.2009 Defer Date: 08.06.2010 Decision :The representative of the DHI informed the Committee that they received the firm’s reply and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.   49

Case No.:11/39/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case rejected HQ File :01/80/050/00607/AM10/ RLA File :04/24/040/00202/AM10/ Lic.No/Date:0410109872 02.12.2009   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     

Case No :7/39/80 ALC2/2009

Party Name:BHARAT HEAVY Meet No/Date:2/80 ALC2/2010 Status:Case

50

Case No.:7/39/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case rejected HQ File :01/80/050/00603/AM10/ RLA File :04/24/040/00221/AM10/ Lic.No/Date:0410109974 04.12.2009   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.        51

Case No.:33/47/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00752/AM10/ RLA File :09/24/040/00356/AM10/ Lic.No/Date:0910040183 07.12.2009 Defer Date: 08.06.2010 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by the 08.06.2010:­   1. Specific quantity of each export product and their weight separately with details of Auxiliaries. 2. Input Weight of each casting/ forging and corresponding finished weight. 3. Use of each component proposed for import in the manufacture of export product 4. The firm may be asked to give information as per Serial no 5 & 11 of SDL.   52

Case No.:2/39/80­ALC2/2009

Party Name:SGL CARBON INDIA PVT.LTD 13.04.2010 Status:Case deferred HQ File :01/80/050/00598/AM10/ RLA File :31/24/040/00152/AM10/ Lic.No/Date:3110041006 11.12.2009 Defer Date: 08.06.2010 Decision : The Committee observed that no reply of the firm had been received by this office in response to final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   53

Case No.:5/39/80­ALC2/2009

Party Name:KONE ELEVATOR INDIA PVT LTD 13.04.2010 Status:Case deferred HQ File :01/80/050/00601/AM10/ RLA File :04/24/040/00234/AM10/ Lic.No/Date:0410110142 14.12.2009 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   54

Case No.:12/39/80­ALC2/2009

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. 13.04.2010 Status:Case deferred HQ File :01/80/050/00608/AM10/ RLA File :05/24/040/00403/AM10/ Lic.No/Date:0510254647 16.12.2009 Defer Date: 08.06.2010 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by the 08.06.2010:­   1.      Information in respect of Sl.No.3,4,5 & 11 of the Standard Deficiency Format along with copy of shipping bill if already exported. to examine their request .

55

Case No.:14/39/80­ALC2/2009

Party Name:GLOBAL ENGINEERS LTD. 13.04.2010 Status:Case approved HQ File :01/80/050/00610/AM10/ RLA File :05/23/040/00121/AM10/ Lic.No/Date:0510254674 16.12.2009   Decision :The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1.      Net weight of export products at S.No. 1, 2,3 & 4 may be specified as 17936 Kgs., 46000 kgs, 1285 Kgs. & 20064 Kgs. respectively. 2.      Words “length 1.25 meters” may be suffixed with the description of import items at S.No. 1,5 & 7. 3.      Words “length 1.5 meters­68 Nos.,length 1.25 meters­4 Nos.” may be suffixed with the description of import item at S.No. 3. 4.      Import items from S.No. 1 to 8 may be allowed on net to net basis with accountability clause.   56

Case No.:16/39/80­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00612/AM10/ RLA File :03/95/040/00586/AM10/ Lic.No/Date:0310551305 17.12.2009 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   57

Case No.:17/39/80­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00613/AM10/ RLA File :03/95/040/00585/AM10/ Lic.No/Date:0310551317 17.12.2009 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be     58

Case No.:18/39/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/00614/AM10/ RLA File :03/94/040/00786/AM10/ Lic.No/Date:0310551338 17.12.2009 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   59

Case No.:21/39/80­ALC2/2009

Party Name:VEM TECHNOLOGIES P.LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18 12 2009 Defer Date: 08 06 2010

59 18.12.2009 08.06.2010 Decision : The Committee observed that the comments called for from M/o Defence are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments as the product pertains to them. The case may be re­listed on 08.06.2010.   60

Case No.:1/47/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/00720/AM10/ RLA File :03/94/040/00761/AM10/ Lic.No/Date:0310551799 21.12.2009 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   61

Case No.:18/47/80­ALC2/2009

Party Name:BIRLA ERICSSON OPTICAL LTD., 13.04.2010 Status:Case approved HQ File :01/80/050/00737/AM10/ RLA File :11/24/040/00040/AM10/ Lic.No/Date:1110021516 31.12.2009   Decision : The DIT furnished written comments in this case vide their U.O. No. 17(12)/2010­IPHW  dated 31.03.2010 recommending the norms. The Committee, debated the recommendation of DIT and  decided to ratify the norms in respect of the subject advance authorization in accordance with DIT comments as applied for by the firm with 5% wastage and accountability clause.       62

Case No.:19/47/80­ALC2/2009

Party Name:BIRLA ERICSSON OPTICAL LTD., 13.04.2010 Status:Case Approved HQ File :01/80/050/00738/AM10/ RLA File :11/24/040/00041/AM10/ Lic.No/Date:1110021517 31.12.2009   Decision : The DIT furnished written comments in this case vide their U.O. No. 17(13)/2010­IPHW  dated 31.03.2010 recommending the norms. The Committee, debated the recommendation of DIT and  decided to ratify the norms in respect of the subject advance authorization in accordance with DIT comments as under:­   1.      Quantity of Optical Fibre may be allowed as 8593.2 km. 2.      Quantity of Polyethylene may be allowed as 16044.03 kg with 2% wastage.     63

Case No.:38/47/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00757/AM10/ RLA File :04/24/040/00246/AM10/ Lic.No/Date:0410110530 04.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be

64

Case No.:12/47/80­ALC2/2009

Party Name:RAINA ENGINEERS 13.04.2010 Status:Case deferred HQ File :01/80/050/00731/AM10/ RLA File :03/95/040/00641/AM10/ Lic.No/Date:0310553727 05.01.2010 Defer Date: 08.06.2010 Decision :On the recommendation of the representative of DIPP present in the meeting, it was decided by the 08.06.2010:­   1. Information in respect of Sl.No.4,5 & 11 of the Standard Deficiency Format.     65

Case No.:36/47/80­ALC2/2009

Party Name:INJECTOPLAST PVT.LTD 13.04.2010 Status:Case Approved HQ File :01/80/050/00755/AM10/ RLA File :06/24/040/00038/AM10/ Lic.No/Date:0610016960 05.01.2010   Decision  :The  representative  of  the  DC(MSME)  present  in  the  meeting  recommended  the  case.  The Committee, after deliberating upon the case, decided to ratify the norms in respect  of  the  subject  advance authorization with following modifications:­   1.      Weighing  92 gm each may be suffixed in the description of export product No.1 2.      Weighing  89 gm each may be suffixed in the description of export product No.2 & 3 3.      Quantity of import item No. 1 & 2 may be allowed as 1.05 kg /kg content in the export product. 4.      Quantity of remaining import items at Sl. No. 3 to 8 may be allowed on net­to­net basis.   66

Case No.:13/47/80­ALC2/2009

Party Name:ATLAS COPCO (INDIA) LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00732/AM10/ RLA File :03/94/040/00759/AM10/ Lic.No/Date:0310554872 12.01.2010 Defer Date: 08.06.2010 final reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   67

Case No.:16/47/80­ALC2/2009

Party Name:ATLAS COPCO (INDIA) LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00735/AM10/ RLA File :03/94/040/00729/AM10/ Lic.No/Date:0310554882 12.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be    

Case No.:2/47/80­ALC2/2009

Party Name:BHARAT HEAVY Meet No/Date:2/80­ALC2/2010 Status:Case

68

Case No.:2/47/80 ALC2/2009

ELECTRICALS LIMITED Meet No/Date:2/80 ALC2/2010 13.04.2010 Status:Case deferred HQ File :01/80/050/00721/AM10/ RLA File :04/24/040/00254/AM10/ Lic.No/Date:0410110778 12.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   69

Case No.:3/47/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00722/AM10/ RLA File :04/24/040/00255/AM10/ Lic.No/Date:0410110779 12.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   70

Case No.:39/47/80­ALC2/2009

ELECTRICALS LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00758/AM10/ RLA File :04/24/040/00249/AM10/ Lic.No/Date:0410110777 12.01.2010 Defer Date: 08.06.2010 Decision :On the recommendation of the representative of DIPP present in the meeting, it was decided by the 08.06.2010:­   1.      Details of import items at S.No. 1 & 2. 2.      Quantity of pipes (in mtrs.) and fittings (in Numbers) in import item at S.No. 6. 3.      Quantities of import items at S.No. 7 & 8 with use of these items and justification for their quantities.     71

Case No.:8/47/80­ALC2/2009

Party Name:TITANIUM TANTALUM PRODUCTS LIMITED 13.04.2010 Status:Case Approved HQ File :01/80/050/00727/AM10/ RLA File :04/24/040/00261/AM10/ Lic.No/Date:0410110800 12.01.2010     1. Total net weight of export products from S.No. 1 to 87 may be specified as 11597 Kgs. 2. Word “relevant” may be prefixed with the descriptions of import items at Sl. Nos. 1,6,9 & 11 3. Quantities  of  import  items  at  S.No.1,6  &  9  may  be  allowed  as  8751  Kgs.,  144  Kgs  and  389  Kgs. respectively inclusive of 3% wastage. 4. Total quantity of import items at Sl. No. 2 , 8 & 10 put together may be allowed as 232 Kgs. 5. Weights of 18.64 Kgs. and 40 Kgs. may be added with the quantities of import items at S.No. 3 & 11 respectively and the same may be allowed inclusive of 2% wastage. 6. Weights of 0.6 Kgs, 0.54 Kgs., 133 Kgs., 94 Kgs., 637 Kgs., 434 Kgs. & 585 Kgs. may be added with the quantities of import items at S.No. 4, 5, 7, 12,13, 14 & 15 respectively and the same may be allowed on net to net basis with accountability clause.  

Case No.:4/47/80­ALC2/2009

Party Name:DEE DEVELOPMENT Meet No/Date:2/80­ALC2/2010 Status:Case

72 y ENGINEERS PVT. LTD. 13.04.2010 deferred HQ File :01/80/050/00723/AM10/ RLA File :05/23/040/00156/AM10/ Lic.No/Date:0510256325 14.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   73

Case No.:5/47/80­ALC2/2009

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 13.04.2010 Status:Case deferred HQ File :01/80/050/00724/AM10/ RLA File :05/23/040/00157/AM10/ Lic.No/Date:0510256344 15.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   74

Case No.:6/47/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/00725/AM10/ RLA File :03/94/040/00720/AM10/ Lic.No/Date:0310555756 18.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   75

Case No.:7/47/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 13.04.2010 Status:Case Approved HQ File :01/80/050/00726/AM10/ RLA File :03/95/040/00675/AM10/ Lic.No/Date:0310555766 18.01.2010     1.      Net empty export weight of 378 MT may be specified with the quantity of export product. 2.      Word “Relevant” may be prefixed with the descriptions of import items at S.Nos. 1 ,2 & 9. 3.      Quantities of import items at Sl.No. 1 & 2 may be allowed as applied for i.e. 283236 Kgs. & 26348 Kgs. respectively inclusive of   3 % wastage. 4.      Weights of 11 MT, 3.5 MT & 0.75 MT may be specified with the quantities of import items at S.No. 3, 4 & 11 respectively and their quantities may be allowed on net to net basis. 5.      Quantity of import item at S.No. 5 may be allowed as 15160 Kgs 6.      Quantities of import items at S.Nos. 6, 7, 8 & 10 may be allowed as applied for i.e 100 Kgs., 10000 Kgs., 6979 Kgs. & 25160 Kgs. respectively. 7.      Quantity of import item at S.No.9 may be allowed as 49658 Kgs. inclusive of   5% wastage. 8.      Import item at S.No.11 to be supplied alongwith export product. 9.  Import of components may be allowed with accountability clause.

76

Case No.:28/47/80­ALC2/2009

13.04.2010 Status:Case deferred HQ File :01/80/050/00747/AM10/ RLA File :04/24/040/00275/AM10/ Lic.No/Date:0410110976 21.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be rejected and no further representation will be entertained.   It was also decided to forward a copy of firm’s application to DC(MSME). The case may be re­listed on 08.06.2010.   77

Case No.:29/47/80­ALC2/2009

13.04.2010 Status:Case deferred HQ File :01/80/050/00748/AM10/ RLA File :04/24/040/00273/AM10/ Lic.No/Date:0410110970 21.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be rejected and no further representation will be entertained.   It was also decided to forward a copy of firm’s application to DC(MSME). The case may be re­listed on 08.06.2010.   78

Case No.:30/47/80­ALC2/2009

13.04.2010 Status:Case deferred HQ File :01/80/050/00749/AM10/ RLA File :04/24/040/00272/AM10/ Lic.No/Date:0410110978 21.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be rejected and no further representation will be entertained.   It was also decided to forward a copy of firm’s application to DC(MSME). The case may be re­listed on 08.06.2010.   79

Case No.:31/47/80­ALC2/2009

13.04.2010 Status:Case deferred HQ File :01/80/050/00750/AM10/ RLA File :04/24/040/00274/AM10/ Lic.No/Date:0410110973 21.01.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   80

Case No.:32/47/80­ALC2/2009

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/00751/AM10/ RLA File :04/24/040/00259/AM10/ Lic.No/Date:0410111039 25.01.2010 Defer Date: 08.06.2010 Decision :The Committee observed that D.L. has already been issued to the firm based on the DC(MSME) U.O. dated 02.03.2010 for which reply is still awaited. The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 08.06.2010.  

Case No.:10/47/80­ALC2/2009

Party Name:KONE ELEVATOR INDIA PVT LTD 13.04.2010 Status:Case deferred

81 HQ File :01/80/050/00729/AM10/ RLA File :04/24/040/00282/AM10/ Lic.No/Date:0410111263 03.02.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be   82

Case No.:9/47/80­ALC2/2009

Party Name:VISHAY TRANSDUCERS INDIA LTD 13.04.2010 Status:Case deferred HQ File :01/80/050/00728/AM10/ RLA File :04/24/040/00195/AM10/ Lic.No/Date:0410111262 03.02.2010 Defer Date: 08.06.2010 final  reminder  to  the  firm  for  expediting  the  said  information  by  28.05.2010  otherwise  their  case  will  be     83

Case No.23/47/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 13.04.2010 Status:Case Approved HQ File :01/80/050/00742/AM10/ RLA File :03/95/040/00713/AM10/ Lic.No/Date:0310558679 04.02.2010     1.      Net empty export weight of 2396 MT may be specified with the quantity of export product. 2.       Word “relevant” may be prefixed with the descriptions of import items at S. Nos. 1, 2,3 & 4. 3.      Quantities of import items at Sl.No.1,3 & 4 may be allowed as 1804655 Kgs, 83824 Kgs.& 83973 Kgs. respectively inclusive of 3% wastage as applied for. 4.      Quantity of import item at Sl.No.2 may be allowed as 517485 Kgs inclusive of 12% wastage on repeat basis. 5.           Weights of 18.1 MT & 1 MT may be specified with the quantities of import items at S.Nos. 5 & 6 respectively and may be allowed on net to net basis. 6.      Quantities of import items at S.Nos. 7,8,9,10 & 11 may be allowed as  3850 Kgs, 21000 Kgs., 14500 Kgs, 55918 Kgs. & 24850 Kgs. respectively.          7 . Import of components may be allowed with accountability clause   84

Case No.:25/47/80­ALC2/2009

Party Name:MILINDIA LTD. 13.04.2010 Status:Case Approved HQ File :01/80/050/00744/AM10/ RLA File :05/24/040/00264/AM10/ Lic.No/Date:0510257784 04.02.2010     1.      Total net empty export weight of 30.65 MT containing 13475 Kgs. of Stainless Steel may be added with the total quantity of export products from S Nos 1 to 10

the total quantity of export products from S.Nos. 1 to 10. 2.   Word “relevant” may be prefixed with the description of import item and quantity of import item may be allowed as applied for i.e. 14148 Kgs. inclusive of wastage of 5%.     85

Case No.:24/47/80­ALC2/2009

Party Name:HIND HIGH VACUUM COMPANY PVT LTD. 13.04.2010 Status:Case deferred HQ File :01/80/050/00743/AM10/ RLA File :07/24/040/00403/AM10/ Lic.No/Date:0710069858 05.02.2010 Defer Date: 08.06.2010 Decision  :The  Committee  noted  that  firm’s  application  has  now  been  received.  The  Committee  therefore handed  over  the  firm’s  application    to  the  representative  of  DIPP  and  DC(MSME)  for  examination  and submission of comments. The case may be relisted on 08.06.2010.   86

Case No.:27/47/80­ALC2/2009

Party Name:PIONEER FRICTION LTD., 13.04.2010 Status:Case deferred HQ File :01/80/050/00746/AM10/ RLA File :02/24/040/00220/AM10/ Lic.No/Date:0210137588 08.02.2010 Defer Date: 08.06.2010 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by the 08.06.2010:­   1. Information in respect of Sl.No.3,4,5 & 11 of the Standard Deficiency Format.   87

Case No.:35/47/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 13.04.2010 Status:Case Approved HQ File :01/80/050/00754/AM10/ RLA File :03/95/040/00718/AM10/ Lic.No/Date:0310559390 10.02.2010     1.      Net empty export weight of 977.6 MT may be specified with the quantity of export product. 2.      Word “Relevant” may be prefixed with the descriptions of import items at S.Nos. 1  & 2. 3.      Quantity of import item at Sl.No. 1  may be allowed as applied for i.e. 394588 Kgs. inclusive of   3 % wastage. 4.      Quantity of import item at S.No.2 may be allowed as 122925 Kgs. inclusive of   18% wastage 5.      Weight of 22 MT may be specified with the quantity of import item at S.No. 3 and its quantity may be allowed on net to net basis. 6.      Quantities of import items at S.Nos. 4,5 & 6 may be allowed as applied for i.e 14630 Kgs., 5000 Kgs. & 14630  Kgs. respectively.          7.  Import of components may be allowed with accountability clause.  

Case No.:40/47/80­ALC2/2009

Party Name:MINDA SILCA ENGINEERING LTD. 13.04.2010 Status:Case deferred HQ File :01/80/050/00759/AM10/ RLA File :05/24/040/00462/AM10/ Lic.No/Date:0510258405 12.02.2010 Defer Date: 08.06.2010 Decision :On the recommendation of the representative of DHI present in the meeting it was decided by the

88 Decision :On the recommendation of the representative of DHI present in the meeting, it was decided by the 08.06.2010:­ . 1.       4,5,11, 11A of SDL EP wise. 2.       Bifrucation of quantity of export as per Appendix 11A. 3.       Sample of then each export product.   89

Case No.:41/47/80­ALC2/2009

Party Name:M M AQUA TECHNOLOGIES LTD. 13.04.2010 Status:Case Approved HQ File :01/80/050/00760/AM10/ RLA File :05/24/040/00398/AM10/ Lic.No/Date:0510258492 15.02.2010   Decision :The representative of the DIPP present in the meeting recommended the case on repeat basis as per norms of advance authorization No. 0510251802 dated 30.10.2009 ratified by the NC in its meeting no. 48/80 held on 02/03/2010. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization on repeat basis as per norms of advance authorization No. 0510251802 dated 30.10.2009   90

Case No.:42/47/80­ALC2/2009

Party Name:M M AQUA TECHNOLOGIES LTD. 13.04.2010 Status:Case deferred HQ File :01/80/050/00761/AM10/ RLA File :05/24/040/00396/AM10/ Lic.No/Date:0510258494 15.02.2010 Defer Date: 08.06.2010 Decision :The representative of the DC(MSME) informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.    91

Case No.:43/47/80­ALC2/2009

Party Name:TERUMO PENPOL LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00762/AM10/ RLA File :53/24/040/00014/AM10/ Lic.No/Date:5310010148 15.02.2010 Defer Date: 08.06.2010 Decision :The Committee observed that the comments called for from C&PC are yet to be received.    The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 08.06.2010.     92

Case No.:44/47/80­ALC2/2009

Party Name:TERUMO PENPOL LIMITED 13.04.2010 Status:Case deferred HQ File :01/80/050/00763/AM10/ RLA File :53/24/040/00015/AM10/ Lic.No/Date:5310010149 15.02.2010 Defer Date: 08.06.2010 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 08.06.2010.   93

Case No.:46/47/80­ALC2/2009

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 13.04.2010 Status:Case deferred HQ File :01/80/050/00765/AM10/ RLA File :07/24/040/00393/AM10/ Lic.No/Date:0710070031 15.02.2010 Defer Date: 08.06.2010 Decision : The Committee noted that firm’s application was forwarded to DHI. However, the representative of DHI has handed over the firm’s application to DIPP on 12.04.2010 as the product pertains to them. The case

may be re­listed on 08.06.2010.   94

Case No.:47/47/80­ALC2/2009

Party Name:INJECTOPLAST PVT.LTD 13.04.2010 Status:Case deferred HQ File :01/80/050/00766/AM10/ RLA File :06/24/040/00046/AM10/ Lic.No/Date:0610017254 16.02.2010 Defer Date: 08.06.2010 Decision  :  The  representative of DHI,  present in  the  meeting,  informed  the  Committee  that  they  have  not received the copy of  firm’s  application.    The  Committee,  accordingly,  decided  to  refer  the  copy  of  firm’s application to them for examination and submission of comments. The case may be relisted on 08.06.2010.     95

Case No.:48/47/80­ALC2/2009

Party Name:INGERSOLL­RAND (INDIA) LIMITED 13.04.2010 Status:Case Approved HQ File :01/80/050/00767/AM10/ RLA File :03/94/040/00997/AM10/ Lic.No/Date:0310560487 16.02.2010     1.      Description, quantity and net weight of export products may be specified as under:                        Sl.No Description Quantity ( in Nos.) Net  export  weight (MT) 1 Air Compressors Model: 15T 30 7.26 Model: 15T2 120 28.56 Model:  231 25 1.375 Model: 2340 800 39.6 Model: 2475 1300 85.8 Model: 2545 200 20.6 Model: 2545R 350 35.35 Model: 7100 225 39.825 Model: 3000 75 19.2 Model:, 7T2 30 5.16 Model: SS1 60 10.32 Model: SS3 2000 50.0 Model: SS5 800 36.8 Model: SS10 50 3.45 Model: TS5 500 24 2. Vacuum Pumps Model: V244 30 2.94 Total: 6595 410.24   2.      Quantities of import items from Sl. No 1 to 22, 24 to 43, 47 to 56 & 58 to 64  may be allowed on net to net basis with accountability clause. 3.      Quantities of Gasket material/ sheet at Sl No. 23, 45 & 46 of the list of imported items may be allowed as 1.65 sq. mtrs/ sq mtrs content in the Export product. 4.            Quantities  of  Aluminium  Ingot  and  Aluminium  Alloy  Ingot  at  import  items  Sl.  No.  44  &  57  respectively may be allowed as 1.02 Kgs./ Kg. content in the export product    

Case No.:49/47/80­ALC2/2009

Party Name:TRANTER INDIA PRIVATE LIMITED 13.04.2010 Status:Case Approved

96 HQ File :01/80/050/00768/AM10/ RLA File :31/21/040/00337/AM10/ Lic.No/Date:3110041963 16.02.2010     Import items at S.No.1 to 10 may be allowed on net to net basis with accountability clause S.No.01

Case No. A ­ 10

M/s.  CPS  Color India  Pvt.  Ltd., Mumbai  F.No.01/80/50/01279/AM06/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.03/94/040/01080/AM06 0310361349 dt.29.12.2009 Date: 13.04.2010 Ratification of norms The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 08.06.2010:­   1.      Information in respect of Sl.No.8 & 9 of the Standard Deficiency Format. 2.      Use of export product. 3.      use of each item of import.       S.No.01

Case No. A/R­57

M/s.  Bharat  Heavy Electricals  Ltd., Tiruchiraalli  F.No. 01/80/50/ 00285/AM09/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.04/24/040/00228/AM08 0410092521 dt.07.12.2007 Date: 13.04.2010 (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.      S.No.02

Case No. A/R­63

M/s.  Godrej  & Boyce  Mfg.  Co. Ltd., Mumbai  F.No. 01/80/162/ 00961/AM08/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.03/94/040/00587/AM08 0310442080 dt.06.09.2007 Date: 13.04.2010 The case regarding revision of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to advise the firm to appear before the NC to explain their case in person along with full facts. The case may be relisted on 08.06.2010.     S.No.03

Case No.  A/R­94

M/s.  GEA  BGR Energy  System India  Ltd., Chennai HQ F.No.01/80/50/01096/AM08/DES.I Lic. No. & date Meeting No. 02/11  RA.F.No.04/24/040/00322/Am08 0410092978 dt.02.01.2008 Date: 13.04.2010 (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.

S.No.04

Case No.  A/R­98

M/s.  Indiana Conveyors  Ltd., Mumbai HQ F.No.01/80/50/00183/AM00/DES.I Lic. No. & date Meeting No. 02/11  RA.F.No.03/24/00042/00009/AM00 03030323 dt.17.06.1999 Date: 13.04.2010 (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.      S.No.05

Case No.  A/R­78

M/s.  GEA  BGR Energy  System India  Ltd., Chennai HQ F.No.01/80/50/01099/AM08/DES.I Lic. No. & date Meeting No. 02/11  RA.F.No.04/24/040/00323/Am08 0410092975 dt.02.01.2008 Date: 13.04.2010 (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.      S.No.06

Case No. A/R­125

M/s.  Aseem Technologies  Pvt. Ltd., Indore  F.No. 01/80/50/00428/AM09/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.11/24/040/00008/AM09 1110017303 dt.30.05.2008 Date: 13.04.2010 The case regarding mentioning model nos. in the norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to suffixed following model nos. in the description of export product  under the subject advance authorization with   1. Words “ Model Nos. 6441.055500, 8130.202500, 6441.054901, 6441.025004, 6441.202300, 6441.202400, 6441.049000,  6441.027001,  6441.054601,  6441.054700,  6441.024100,  6441.055200,  8130.203200, 6441.055000,  6441.055100,  6441.055300,  6441.001800,  6441.043100,  6441.045100,  8131.100800, 6441.045000,  6441.048300,  8130.203700,  6441.010301,  6441.022400,  6441.025102,  6441.055001, 8130.202600,  8130.202700,  6441.024000,  6441.048600,  6441.043000,  6441.049200,  6441.010000, 6441.055600,  3665.0200, 3665.8300, 3656.2700, 3656.4900, 4015.2400, 4016.1400”  may be suffixed with the description of export product.     S.No.07

Case No. A/R­126

M/s.  Mudhra  Fine Blanc Pvt. LTd.,  F.No. 01/80/50/01125/AM08/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.04/24/040/00321/AM08 0410093738 dt.11.02.2008 Date: 13.04.2010 (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 08.06.2010.      S.No.08

Case No. A/R­128

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar  F.No. 01/80/50/01319/AM09/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.61/24/040/00053/AM09 6110000244 dt.19.11.2008 Date: 13.04.2010 (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. The Committee decided to reject the case on the

ground that the firm did not give any fresh information / justification in their representation. Accordingly, it was not possible to decide the requirement of inputs.        S.No.09

Case  No.    A/R­

115 M/s. BGR Energy System  Ltd., Chennai HQ F.No.01/80/162/01144/AM08/DES.I Lic. No. & date Meeting No. 02/11  RA.F.No.04/24/040/00222/AM08 0410091122 dt.20.09.2007 Date: 13.04.2010 (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1.      Net empty weights of export products at S.No. 1,2,3 & 4 may be specified as  116.772 MT, 328.5 MT, 4.686 MT & 24 MT respectively. 2.      Total net empty weight of export products may be specified as 473.958 MT. . 3.      Word “relevant” may be prefixed with the descriptions of import items at S. Nos. 1 & 4. 4.      UOM of import item at S.No. 1 may be corrected to Kgs. and quantity of this item may be allowed as 1.05 kgs./kg. content in the export product. 5.      Weights of 486 Kgs. and 4.2 MT may be specified with the quantities of import items at S.No. 2 & 3 respectively and the same may be allowed on net to net basis with accountability clause. 6.      Quantity of import item at S.No. 4 may be allowed as 1.05 Kgs/kg. content in the export product.     S.No.10

Case No. A/R­155

M/s.  Delite Engineers Pvt. Ltd., Baroda  F.No.01/80/50/01179/AM07/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.34/24/040/00230/AM07 3410017836 dt.11.01.2007 Date: 13.04.2010 The clarification sought by RA towards establishing the nexus with NC decision to suffix the word “1’ thick” in the description of import item as none of export / import documents submitted by the firm shows the thickness.  The representative of the DIPP present in the meeting recommended for deletion of thickness from the export product as the office of JDGFT, Baroda has informed that date of shipment was 29.5.2007 and ALC decision dated 29.5.2007 was received by them on 25.7.2007. Considering above fact, NC after deliberating upon the case, decided to delete the thickness of import item mentioned by the NC as it will not have any effect on wastage norms.   It was also decided to advise the RA to obtain a declaration for varying the thickness from the exporter.     S.No.11

Case No. A/R­158

M/s.  Thermodyne Technologies P. Ltd.,  F.No.01/80/50/01220/AM08/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.04/24/040/00367/AM08 0410094206 dt.04.03.2008 Date: 13.04.2010 Revision of norms The case regarding revision of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda. The DHI furnished written comments in this case vide their U.O. No.  3(47)/08­TSW(B)/126 dated 13.03.2010 informing that firm has neither given calculation of  requirement  of  HR  Plates  and  Tubes  supported  by  documents  nor  given  any  calculation  for  increase  in  the quantity  of  import    to  consider  their  representation.  The  Committee  therefore  decided  to  reject  the  case  on  the ground that the firm did not furnish complete  information, in the absence of which, it was not possible to decide the requirement of inputs.

q p       S.No.12

Case No. A/R­159

M/s.  Precihole Machine Pvt. Ltd.,  F.No.01/80/50/00942/AM08/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.03/95/040/00586/AM08 0310443655 dt.19.09.2007 Date: 13.04.2010 (NC­I)  in  its  Meeting  No.  02/11  held  on  13.04.2010  as  per  agenda.  The  Committee  observed  that  the  firm  has furnished  incomplete  reply  in  response  to  this  office  letter  calling  for  certain  information  and  further  D.L.  has already  been  issued  to  the  firm  based  on  the  DHI  comments  for  which  reply  is  still  awaited.  The  Committee, therefore,  decided  to  remind  the  firm  for  expediting  the  said  information  otherwise  their  case  will  be  rejected without  any  further  chance  and  no  further  representation  will  be  entertained.      The  case  may  be  re­listed  on 08.06.2010.     S.No.13

Case No. A/R­160

M/s.  The  Saraswati Industrial Syndicate Ltd.,  F.No.01/80/50/01171/AM09/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.05/24/040/00335/AM09 0510229084 dt.10.10.2008 Date: 13.04.2010 Revision of norms The firm’s request for allowing the quantity of import items for 4 export products instead of 1 under the above authorization was considered by the Norms Committee (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda.  The  DHI  furnished  written  comments  in  this  case  vide  their  U.O.  No.    3(10)/09­TSW(B)/151    dated 25.03.2010 recommending the norms. Text of DHI comments are re­produced below:­ TSW(B) Section  

Subject: Application M/S Saraswati Industries for ratification of norms of licence no  ­0510229084 dated 10­10­08

  DES­I, DGFT may kindly refer to the above mentioned licence of M/S Saraswati Industries. The firm has represented & requested  for  enhancement  of  quantity  of  import.  The  firm  had  applied  for  import  of  4  number  steel  drums.  This  Office recommends following amendments. Export The word “Painted” may be deleted from the description of export product. Import 1.Item no 1 ­ may be allowed at 640 MT with 3% wastage. 2. Item no 2­ 8 number of dished end of weight 44 MT may be allowed 3. Item no 3­ 16 MT may be recommended with 3% wastage. 4. Item no 4­ 36 MT may be recommended with 3% wastage. 5. Item no 5 & 6­ Welding material, 20 MT each may be recommended. 6. Item no 7 to 10­ may be deleted as the word “painted” been deleted from export product. 7.  Item no 13 and 14 may be allowed as applied for. However weight of item no 13 is 8.4 MT and that of 14 is 3.2 MT and the same may be incorporated in the licence. 8. Item no 11 & 12 being component may be allowed under GN­4.   The above issues with the approval of Joint Secretary (B). B.C.Nayak Development Officer 25­03­10 Deptt. of HI, UO No 3(10)/09­TSW(B)               date   The Committee, after deliberating upon the DHI comments, decided to ratify the norms in respect of the subject advance authorization in accordance with their written comments.  

S.No.14

Case No. A/R­162

M/s.  Thermodyne Technologies P. Ltd.,  F.No.01/80/50/00521/AM09/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.04/24/040/00079/AM09 0410096647 dt.20.06.2008 Date: 13.04.2010 The case regarding revision of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda.  The DHI furnished written comments in this case vide their U.O. No.  3(47)/08­TSW(B)/125 dated 12.03.2010 informing that firm has neither given calculation of  requirement  of  HR  Plates  and  Tubes  supported  by  documents  nor  given  any  calculation  for  increase  in  the quantity of import  to  consider  their  representation  for  enhancement  of  quantity  of  imports.  The  manufacturing activity mentioned by the firm for allowing components at Sl. No.6 to 13 was also not acceptable.  The Committee therefore decided to reject the case on the ground that the firm did not furnish complete  information, in the absence of which, it was not possible to decide the requirement of inputs.        S.No.15

Case No. A/R­163

M/s.  CIM  Tools Pvt. Ltd., Bangalore  F.No.01/80/50/01747/AM09/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.07/24/040/00599/AM09 0710062744 dt.04.02.2009 Date: 13.04.2010 (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda.  The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information despite reminder. The  Committee,  therefore,  decided  to  issue  final  reminder  to  the  firm  for  expediting  the  said  information  by 28.05.2010 otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 08.06.2010.     S.No.16

Case No. A/R­165

M/s.  Kevin Enterprises Ltd.,  F.No.01/80/50/00884/AM08/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.03/94/040/00398/AM08 0310436880 dt.19.07.2007 Date: 13.04.2010 The clarification sought by RA towards establishing the nexus with NC decision as the description of import item no. 2 & 3 under the subject authorization given by the NC are not matching with the description in shipping bills.  The representative of DIPP informed the Committee that they have not received reply of the firm. The Committee therefore handed over the firm’s reply to the technical authority for examination and submission of comments. The case may be relisted on 08.06.2010.     S.No.17

Case No. A/R­166

M/s.  Apollo Earthmovers  Ltd., Mehsana  F.No.01/80/50/00762/AM07/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.08/24/040/00182/AM07 0810060349 dt.13.10.2006 Date: 13.04.2010 (NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda.   The Committee observed that D.L. was issued to the firm based on the DHI comments and firm’s reply has also been received. However, the representative of DHI informed the Committee that they have not received the reply. The Committee therefore handed over the firm’s reply  to  the  technical  authority  for  examination  and  submission  of  comments.  The  case  may  be  relisted  on 08.06.2010.     S.No.18

Case No. A/R­167

M/s.  The  Saraswati Industrial Syndicate Ltd.,  F.No.01/80/50/01626/AM09/DES.I Lic.No. & Date Meeting No. 02/11 RA F.No.05/24/040/00630/Am09 0510233406 dt.29.12.2008 Date: 13.04.2010 Revision of norms The case regarding revision of norms in respect of above authorization was considered by the Norms Committee (NC I) in its Meeting No 02/11 held on 13 04 2010 as per agenda The representative of DIPP informed the

(NC­I) in its Meeting No. 02/11 held on 13.04.2010 as per agenda.   The representative of DIPP informed the Committee that they have not received reply of the firm. The Committee therefore handed over the firm’s reply to the technical authority for examination and submission of comments. The case may be relisted on 08.06.2010.   (B. C. Nayak D.O., DHI)  Member      (S.K. Jain, D.O., DIPP)      Member                 (K.K.Funda, Asstt. Dir.,DC(MSME) Member        (Rajinder Pal Singh, Dy. DGFT)       Convener             (A. Komu) Chairman

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied