IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2009-08-11

DGFT Committee Minutes

Document text

RATIFIED   Minutes of M.No.19/10 held on 11.08.2009 of Norms Committee (NC­I) (DES.I Section)   The meeting No. 19/10 of the Norms Committee (NC­I) for the licensing year 2009­2010 held on 11.08.2009 under the Chairmanship of Shri A. Komu, Joint Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2004–2009 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 475 23062635 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. B.D. Ghosh. Jt. IA 399 23063355 M/o Steel, U.B. 4. Sh. K.K. Funda, Asstt. Dir. 736A   DC(MSME), N.B. 4. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 5. Sh. Krishan Kumar, DDG & Convener NC­I 302 23061562 Ext.380 DGFT, U.B. 6. Sh. Ramavatar Meena, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­    1

Case No.:4/26/85­ALC3/2007

Party Name:AUROLAB Meet No/Date:19/80­ALC2/2009 11.08.2009 Status:Case approved HQ File :01/85/050/00072/AM08/ RLA File :35/24/040/00027/AM08/ Lic.No/Date:3510021575 31.08.2007   Decision  :  The  DC(MSME)  furnished  written  comments  in  this  case  vide  their  U.O.  No.    30(249)2008­ME  dated  10.08.2009.  The  Committee,  after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization in accordance with their written comments.   Copy of DC(MSME) letter referred to above may be forwarded to RA.   The Regional Authority may take necessary action accordingly.   2

Case No.:3/19/80­ALC2/2009

Party Name:HIND HIGH VACUUM COMPANY PVT LTD. 11.08.2009 Status:Case reverted back to RA HQ File :01/80/050/00259/AM10/ RLA File :07/24/040/00610/AM08/ Lic.No/Date:0710055124 28.12.2007   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.  

Case No.:9/10/80­ALC2/2008

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 11.08.2009 Status:Case deferred

3 HQ File :01/80/050/00309/AM09/ RLA File :09/24/040/00399/AM08/ Lic.No/Date:0910032691 22.01.2008 Defer Date: 29.09.2009 Decision : The representative of DHI, present in the meeting, informed the Committee that they have not received the copy of firm’s application.  The Committee, accordingly, decided to refer the copy of firm’s application to them for examination and submission of comments. The case may be relisted on 29.09.2009.   4

Case No.:27/19/80­ALC2/2009

Party Name:ANAND EXPORTS 11.08.2009 HQ File :01/80/050/01692/AM09/ RLA File :06/24/040/00053/AM09/ Lic.No/Date:0610014979 20.01.2009 Defer Date: 29.09.2009 Decision : The representative of DHI informed the Committee that they have not received the firm’s application. The Committee therefore handed over the case file to the technical authority for examination and submission of comments. The case may be relisted on 29.09.2009.   5

Case No.:28/19/80­ALC2/2009

Party Name:GANESH METAL WORKS, 11.08.2009 HQ File :01/80/050/01693/AM09/ RLA File :07/24/040/00543/AM09/ Lic.No/Date:0710062450 21.01.2009 Defer Date: 29.09.2009 Decision  :  The  Committee  noted  that  copy  of  firm’s  application  has  already  been  forwarded  to  DIPP  for  examination.    However,  as  desired  by  the representation of DC(MSME) present in the meeting one set of application has also been handed over to him for examination. The Committee decided to defer the case and to relist on 29.09.2009.   6

Case No.:29/19/80­ALC2/2009

Party Name:SUR HENNIG PVT. LTD., 11.08.2009 Status:Case approved HQ File :01/80/050/01694/AM09/ RLA File :07/24/040/00580/AM09/ Lic.No/Date:0710062452 21.01.2009   Decision : The representative of the DHI present in the meeting informed the committee that norms of the similar authorization bearing No. No.0710059209 dated 19.08.2008 has been ratified by the NC in its Meeting No. 02/10 held on 16.04.2009 The Committee, accordingly, decided to ratify the norms in respect of the subject advance authorization on repeat basis as per the norms of Advance Authorization No. 0710059209 dated 19.08.2008 ratified in NC Meeting held on 02/10 held on 16.04.2009 as under:­   1.      Quantity of brass items may be allowed with 1% wastage. 2.      Quantity of other raw materials may be allowed with 2% wastage. 3.      Components may be allowed on net­to­net basis without any wastage with accountability clause.   Note: The import of components shall be permitted on net­to­net basis with accountability clause and the type, technical specifications (including part No. if any) etc. of the Components sought for import should conform to those utilized in the manufacture of the resultant product.     7

Case No.:1/19/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED 11.08.2009 Status:Case approved HQ File :01/80/050/00257/AM10/ RLA File :04/24/040/00071/AM10/ Lic.No/Date:0410105872 03.07.2009   Decision : The representative of the DHI present in the meeting recommended the case The Committee after deliberating upon the case decided to ratify

Decision :  The representative of the DHI present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as per General Note No.4 for Engineering Product.   8

Case No.:10/19/80­ALC2/2009

Party Name:INJECTOPLAST PVT.LTD 11.08.2009 HQ File :01/80/050/00266/AM10/ RLA File :06/24/040/00009/AM10/ Lic.No/Date:0610015869 10.07.2009 Defer Date: 29.09.2009 Decision : The Committee noted that DC(MSME) has desired some additional information to examine the case.  However, the representative of DHI present in the meeting informed the Committee that the subject matter pertains to their Department and they have not received firm’s application. The Committee therefore  decided  to  keep  the  DC(MSME)  comments  in  abeyance  and  handed  over  the  firm’s  application  to  DHI  for  examination  and  submission  of comments. The case may be relisted on 29.09.2009.   9

Case No.:11/19/80­ALC2/2009

Party Name:INJECTOPLAST PVT.LTD 11.08.2009 HQ File :01/80/050/00267/AM10/ RLA File :06/24/040/00008/AM10/ Lic.No/Date:0610015868 10.07.2009 Defer Date: 29.09.2009 Decision : The Committee noted that DC(MSME) has desired some additional information to examine the case.  However, the representative of DHI present in the meeting informed the Committee that the subject matter pertains to their Department and they have not received firm’s application. The Committee therefore  decided  to  keep  the  DC(MSME)  comments  in  abeyance  and  handed  over  the  firm’s  application  to  DHI  for  examination  and  submission  of comments. The case may be relisted on 29.09.2009.   10

Case No.:25/19/80­ALC2/2009

Party Name:CANTRONICS OFFICE EQUIPMENTS PVT.LTD., 11.08.2009 Status:Case approved HQ File :01/80/050/00281/AM10/ RLA File :03/94/040/00287/AM10/ Lic.No/Date:0310528918 15.07.2009   Decision : The representative of the DC(MSME) present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1.      Quantity of import item no. 1 may be allowed as 13200 nos. on net to net basis. 2.      Quantity of import item no. 2 may be allowed as 3045 kg. with 5% wastage. 3.      Quantity of import item no. 3 may be allowed as 7740 nos. on net to net basis. 4.      Quantity of import item no. 4 may be allowed as 7740 nos. on net to net basis.   11

Case No.:26/19/80­ALC2/2009

Party Name:BLUE STAR LTD. 11.08.2009 HQ File :01/80/050/00282/AM10/ RLA File :03/94/040/00107/AM10/ Lic.No/Date:0310528936 15.07.2009 Defer Date: 29.09.2009 Decision  :  On  the  recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 29.09.2009:­

Information in respect of Sl.No.3,4,5 & 11 of the Standard Deficiency Format export product wise.   12

Case No.:2/19/80­ALC2/2009

Party Name:TRELLEBORG SEALING SOLUTIONS (INDIA) PVT LTD 11.08.2009 HQ File :01/80/050/00258/AM10/ RLA File :07/24/040/00141/AM10/ Lic.No/Date:0710066093 22.07.2009 Defer Date: 29.09.2009 Decision : The representative of the DHI informed the Committee that the case was under their study and they will finalize their comments shortly. The Committee, therefore, decided to defer the consideration and to re­list the case on 29.09.2009.   13

Case No.:4/19/80­ALC2/2009

Party Name:THE INDURE PVT. LTD 11.08.2009 HQ File :01/80/050/00260/AM10/ RLA File :05/24/040/00803/AM09/ Lic.No/Date:0510246510 23.07.2009 Defer Date: 29.09.2009 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DHI  for examination and submission of comments. The case may be re­listed on 29.09.2009.   14

Case No.:5/19/80­ALC2/2009

Party Name:VOLVO INDIA PVT LIMITED 11.08.2009 Status:Case reverted back to RA HQ File :01/80/050/00261/AM10/ RLA File :07/24/040/00123/AM10/ Lic.No/Date:0710066179 24.07.2009   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   15

Case No.:6/19/80­ALC2/2009

Party Name:TIMKEN INDIA LTD. 11.08.2009 HQ File :01/80/050/00262/AM10/ RLA File :02/24/040/00062/AM10/ Lic.No/Date:0210129502 24.07.2009 Defer Date: 29.09.2009 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DIPP  for   16

Case No.:7/19/80­ALC2/2009

Party Name:DRIPLEX WATER ENGINEERING LTD. 11.08.2009 HQ File :01/80/050/00263/AM10/ RLA File :05/24/040/00199/AM10/ Lic.No/Date:0510246593 24.07.2009 Defer Date: 29.09.2009 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DIPP  for

17

Case No.:8/19/80­ALC2/2009

Party Name:DRIPLEX WATER ENGINEERING LTD. 11.08.2009 HQ File :01/80/050/00264/AM10/ RLA File :05/24/040/00233/AM10/ Lic.No/Date:0510246594 24.07.2009 Defer Date: 29.09.2009 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DIPP  for   18

Case No.:9/19/80­ALC2/2009

Party Name:SHOWA INDIA PRIVATE LIMITED 11.08.2009 HQ File :01/80/050/00265/AM10/ RLA File :05/24/040/00254/AM10/ Lic.No/Date:0510246638 27.07.2009 Defer Date: 29.09.2009 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DHI  for   19

Case No.:12/19/80­ALC2/2009

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 11.08.2009 HQ File :01/80/050/00268/AM10/ RLA File :05/24/040/00246/AM10/ Lic.No/Date:0510246772 28.07.2009 Defer Date: 29.09.2009 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DIPP  for   20

Case No.:13/19/80­ALC2/2009

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., 11.08.2009 HQ File :01/80/050/00269/AM10/ RLA File :03/95/040/00268/AM10/ Lic.No/Date:0310531182 29.07.2009 Defer Date: 29.09.2009 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DHI  for   21

Case No.:14/19/80­ALC2/2009

Party Name:PAM­GLATT PHARMA TECHNOLOGIES PVT.LTD 11.08.2009 Status:Case reverted back to RA HQ File :01/80/050/00270/AM10/ RLA File :03/95/040/00271/AM10/ Lic.No/Date:0310531419 30.07.2009   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.  

Case No.:15/19/80­ALC2/2009

Party Name:MIKROTEK MACHINES LTD., Meet No/Date:19/80­ALC2/2009 Status:Case deferred

22

Case No.:15/19/80 ALC2/2009

Party Name:MIKROTEK MACHINES LTD., Meet No/Date:19/80 ALC2/2009 11.08.2009 HQ File :01/80/050/00271/AM10/ RLA File :07/24/040/00128/AM10/ Lic.No/Date:0710066260 30.07.2009 Defer Date: 29.09.2009 Decision :The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The  Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DHI  for   23

Case No.:16/19/80­ALC2/2009

Party Name:HONEYWELL TURBO (INDIA) PVT.LTD Meet No/Date:19/80­ALC2/2009 11.08.2009 Status:Case reverted back to RA HQ File :01/80/050/00272/AM10/ RLA File :31/21/040/00137/AM10/ Lic.No/Date:3110039446 31.07.2009   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   24

Case No.:17/19/80­ALC2/2009

Party Name:PAM­GLATT PHARMA TECHNOLOGIES PVT.LTD 11.08.2009 Status:Case reverted back to RA HQ File :01/80/050/00273/AM10/ RLA File :03/95/040/00283/AM10/ Lic.No/Date:0310531632 31.07.2009   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   25

Case No.:18/19/80­ALC2/2009

Party Name:CRAFTSMAN AUTOMATION PVT. LTD., 11.08.2009 HQ File :01/80/050/00274/AM10/ RLA File :32/21/040/00073/AM10/ Lic.No/Date:3210040957 31.07.2009 Defer Date: 29.09.2009 Decision :The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The  Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DHI  for   26

Case No.:19/19/80­ALC2/2009

Party Name:FLOWSERVE INDIA CONTROLS PVT. LTD., 11.08.2009 Status:Case reverted back to RA HQ File :01/80/050/00275/AM10/ RLA File :32/24/040/00015/AM10/ Lic.No/Date:3210040959 31.07.2009   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.

  27

Case No.:20/19/80­ALC2/2009

Party Name:HONEYWELL TURBO (INDIA) PVT.LTD Meet No/Date:19/80­ALC2/2009 11.08.2009 Status:Case reverted back to RA HQ File :01/80/050/00276/AM10/ RLA File :31/21/040/00140/AM10/ Lic.No/Date:3110039451 31.07.2009   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   28

Case No.:21/19/80­ALC2/2009

Party Name:ECOCAT INDIA PVT.LTD. 11.08.2009 HQ File :01/80/050/00277/AM10/ RLA File :05/24/040/00253/AM10/ Lic.No/Date:0510247146 04.08.2009 Defer Date: 29.09.2009 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DHI  for   29

Case No.:22/19/80­ALC2/2009

Party Name:THE INDURE PVT. LTD 11.08.2009 HQ File :01/80/050/00278/AM10/ RLA File :05/24/040/00206/AM10/ Lic.No/Date:0510247147 04.08.2009 Defer Date: 29.09.2009 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DHI  for   30

Case No.:23/19/80­ALC2/2009

Party Name:AKSH OPTI­FIBRE LTD. 11.08.2009 HQ File :01/80/050/00279/AM10/ RLA File :05/24/040/00263/AM10/ Lic.No/Date:0510247149 04.08.2009 Defer Date: 29.09.2009 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DIT  for   31

Case No.:24/19/80­ALC2/2009

Party Name:DRIPLEX WATER ENGINEERING LTD. 11.08.2009 HQ File :01/80/050/00280/AM10/ RLA File :05/24/040/00272/AM10/ Lic.No/Date:0510247150 04.08.2009 Defer Date: 29.09.2009 Decision :The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The  Committee, therefore,  decided  to  remind  RA  to  forward  the  firm’s  application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  i.e  DIPP  for

CATEGORY “A”  

Case No. A­02

M/s.  Glastronix, Bangalor  F.No. 01/80/162/00509/AM09/DES.I Lic.No. & Date Meeting No.19/10 R.A. F.No.07/24/040/00755/AM09 0710060970 dt.07.11.2008 Date: 11.08.2009 Ratification of norms On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 29.09.2009:­   Information in respect of Sl.No.3,4,5,11 & 11A of the Standard Deficiency Format export product wise.    

Case No. A­03

M/s. Johnson  Matthey India Pvt. Ltd.,  F.No. 01/80/162/00501/AM10/DES.I A.A. Lic.No. & Date Meeting No.19/10 R.A. F.No.05/24/039/00001/AM10 0510240582 dt.29.04.2009 Date: 11.08.2009 On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 29.09.2009:­   Information in respect of Sl.No.4,5 & 11 of the Standard Deficiency Format.      

Case No. A/R­32

M/s.  IDMC  Ltd., Anand  F.No. 01/80/162/00937/AM07/DES.I Lic.No. & Date Meeting No.19/10 R.A. F.No.34/24/040/00141/AM07 3410017041 dt.29.09.2006 Date: 11.08.2009   The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to rectify the mistake in the norms of the subject advance authorization recommended by the NC in its meeting No. 37/07 held on 19.12.2006 with following modifications:­   1. Net weight of export product at Sl. No. 1 may be corrected to 3143 Kgs      

Case No. A/R­33

M/s.  IDMC  Ltd., Anand  F.No. 01/80/162/01420/AM07/DES.I Lic.No. & Date Meeting No.19/10 R.A. F.No.34/24/040/00266/AM07 3410018199 dt.28.02.2007 Date: 11.08.2009   The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to rectify the mistake in the norms of the subject advance authorization recommended by the NC in its meeting No. 37/07 held on 19.12.2006 with following modifications:­   1. Net empty weight of export product at Sl. No. 7 may be specified as 2054 Kgs      

Case No. A/R­34

M/s.  Gastek Engineering  (P)  Ltd., New Delhi  F.No. 01/80/50/00086/AM07/DES.I Lic.No. & Date Meeting No.19/10 R.A. F.No.05/24/040/00031/AM07 0510181421 d 26 04 2006

New e dt.26.04.2006 Date: 11.08.2009   The committee perused the copy of shipping bills and noted that exporter had declared the weight of sieves as 1470 kg. in the shipping bill and also that the export was made prior to ratification of norms by the NC.  The Committee therefore decided to allow deletion of word 99.999% Purity for the export product.      

Case No. A/R­35

M/s.  Bharat  Heavy Electricals  Ltd., Hardwar  F.No. 01/80/50/01056/AM08/DES.I Lic.No. & Date Meeting No.19/10 R.A. F.No.61/24/040/00045/AM08 6110000134 dt.11.02.2008 Date: 11.08.2009   The representative of the DHI informed the Committee that the case was under their study and they will finalize their comments shortly. The Committee, therefore, decided to defer the consideration and to re­list the case on 29.09.2009.      

Case No. A/R­36

M/s.  Micron Instrument Pvt. Ltd.,  F.No. 01/80/50/01204/AM08/DES.I Lic.No. & Date Meeting No.19/10 R.A. F.No.05/24/040/00716/AM08 0510213512 dt.13.12.2007 Date: 11.08.2009   The representative of the DIPP present in the meeting recommended the higher wastage case keeping in view, the end cutting wastages due to sophisticated nature of the product and actual realization from scrap as per Central Excise certified data. The Committee, after deliberating upon the case, decided that quantity of import item may be modified to 3330.4 Kgs. inclusive of 338% wastage after taking 6% recovery from scrap as per decision taken by NC in its meeting dated 6.3.2007.      

Case No. A/R­37

M/s.  Shree  Electricals, Pune  F.No. 01/80/50/00975/AM08/DES.I Lic.No. & Date Meeting No.19/10 R.A. F.No.31/24/040/00204/AM08 3110031243 dt.22.10.2007 Date: 11.08.2009   The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1. Net weights of 529 Kgs., 1579 Kgs, 757 Kgs, 984 Kgs, 1693 Kgs, 424 Kgs, 1205 Kgs, 1261 Kgs, & 314 Kgs   may be specified with the quantities of export products from  S.Nos. 1 to 9  respectively 2. Quantity of import item at Sl. No. 1 may be allowed as 778 Nos.  on net to net basis. Duty free weight of this item may be restricted to 924 Kgs inclusive of 74.7 % after taking 20% recovery from scrap. 3. Quantity of import item at Sl. No. 2 may be allowed as 2051 Nos.  on net to net basis. Duty free weight of this item  may be restricted to 3031 Kgs inclusive of 92 % after taking 20% recovery from scrap. 4. Quantity of import item at Sl. No. 3 may be allowed as 512 Nos.  on net to net basis. Duty free weight of this item  may be restricted to 757 Kgs inclusive of 92 % after taking 20% recovery from scrap. 5. Quantity of import item at Sl. No. 4 may be allowed as 701 Nos.  on net to net basis. Duty free weight of this item  may be restricted to 1825 Kgs inclusive of 85 % after taking 20% recovery from scrap. 6. Quantity of import item at Sl. No. 5 may be allowed as 1206 Nos.  on net to net basis. Duty free weight of this item  may be restricted to 3621 Kgs inclusive of 114 % after taking 20% recovery from scrap. 7. Quantity of import item at Sl. No.6 may be allowed as 302 Nos.  on net to net basis. Duty free weight of this item  may be restricted to 907 Kgs inclusive of 114 % ft t ki 20% f

114 % after taking 20% recovery from scrap. 8. Quantity of import item at Sl. No. 7 may be allowed as 500 Nos.  on net to net basis. Duty free weight of this item  may be restricted to 2219 Kgs inclusive of 90 % after taking 20% recovery from scrap. 9. Quantity of import item at Sl. No. 8 may be allowed as 546 Nos.  on net to net basis. Duty free weight of this item  may be restricted to 2719 Kgs inclusive of 116 % after taking 20% recovery from scrap. 10. Quantity of import item at Sl. No. 9 may be allowed as 136 Nos.  on net to net basis. Duty free weight of this item  may be restricted to 677 Kgs inclusive of 116 % after taking 20% recovery from scrap.      

Case No. C­12

M/s.  BOSCH Limited, Bangalore  F.No. 01/80/162/00460/AM10/DES.I   Lic.No. & Date Meeting No.19/10   Date: 11.08.2009   Fixation of SION The representative of the DHI informed the Committee that they have not received the firm’s application. The committee accordingly decided to forward the firm’s application to technical authority for examination and submission of comments.  The case may be re­listed on 29.09.2009.      

Case No. C­13

M/s.  Degania Medical Devices  Pvt.  LTd., Gurgaon  F.No. 01/80/162/00160/AM10/DES.I   Lic.No. & Date Meeting No.19/10   Date: 11.08.2009 Fixation of wastage norms The committee noted that firm has not submitted the application in the prescribed format.  The committee accordingly decided to advise the firm to apply in ANF­ 4(B) along with all enclosures through NSEZ.  The case may be re­listed on 29.09.2009.      

Case No. C­14

M/s.  Larsen & Toubro Ltd.  F.No. 01/80/162/00530 /AM10/DES.I   Lic.No. & Date Meeting No.19/10   Date: 11.08.2009 Fixation of wastage norms The committee noted that EEPC has forwarded some suggestions made by M/s Larsen & Toubro Ltd. regarding change in the Export Import Policy.  The NC has considered the issues pertaining to it and decided to convey the following observations to Policy Division for information and consideration to take a final view:­   Normal wastage of 5% should be allowed for Capital Goods Industry as per SION C­1647.   Generally NC allows a minimum of 5% wastage on import of steel plates / sheets.  However, in case any applicant asks for 3 % wastage only, NC is allowing the same.  In exceptional cases where wastage is low, 3 % wastage only is allowed depending upon the manufacturing process & product.     In some cases where quantity of input which is required foe manufacture of export product are reduced , at lease interest @15% should not be charged.   The norms are fixed based on the data made available by the exporter.  In cases where Norms Committee reduces the quantity applied for, the exporter is at liberty to make a representation within the stipulated time limit.  In such cases NC reviews the cases based on the additional justification given by the exporter in their representation.     Deferred Case S.No.80

Case No. A/R­22

M/s.  Bharat  Heavy Electricals  Ltd., Hardwar  F.No. 01/80/050/00645/AM09/DES.I Lic.No. & Date Meeting No.19/10 R.A. F.No.61/24/040/00041/Am08 6110000129 Dt.25.01.2008 Date: 11.08.2009 The DHI furnished written comments in this case vide their U.O. No.3(12)/08­TSW(B)/298 dated 30.07.2009. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization in accordance with their written comments.   Copy of DHI letter referred to above may be forwarded to RA.           (B. C. Nayak D.O., DHI)  Member      (S.K. Jain, D.O., DIPP)      Member             (B. D. Ghosh, Jt. IA, MOS) Member        (K.K. Funda, Asstt. Director)       Member             (A.K. Mishra, AIA, MOS) Member       (Krishan Kumar, Dy. DGFT)      Convener           (A. Komu) Chairman

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied