DGFT Committee Minutes
RATIFIED Minutes of M.No.01/10 held on 06.04.2009 of Norms Committee (NCI) (DES.I Section) The meeting No.01/10 of the Norms Committee (NCI) for the licensing year 20092010 was held on 06.04.2009 under the Chairmanship of Shri A. Komu, Joint Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter4) of Foreign Trade Policy 2004–2009 / Handbook of Procedure VolumeI. The following Members of the DIPP were present in the meeting: Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 475 23062635 DHI, U.B. 2. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. B.D. Ghosh. Jt. IA 399 23063355 M/o Steel, U.B. 4. Sh. A.K. Mishra, AIA M/o Steel, U.B. 5. Sh. K.K. Funda, Asstt. Director 736A DC(MSME) N.B. 6. Sh. Krishan Kumar, DDG & Convener NCI 302 23061562 Ext.380 DGFT, U.B. 7. Sh. Ramavatar Meena, FTDO 404 23061562 Ext.265 DGFT, U.B. The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: 1
Case No.:33/4/80ALC2/2008
Party Name:JLC ELECTROMET PVT. LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case approved HQ File :01/80/050/00185/AM09/ RLA File :13/24/040/00031/AM08/ Lic.No/Date:1310026035 09.04.2008 Decision: The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as per SION at S.No. C1581 The Regional Authority may take necessary action accordingly. 2
Case No.:12/17/87ALC1/2008
Party Name:KIDDE INDIA LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/87/050/00329/AM09/ RLA File :03/94/040/00402/AM09/ Lic.No/Date:0310480495 29.07.2008 Decision: The Committee noted that case was transferred from NC –VII as the product pertains to engineering items. The Committee observed that the items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. The Regional Authority may take necessary action accordingly.
Case No.:80/1/80ALC2/2009
Party Name:WINDLASS ENGINEERS & SERVICES PVT.LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01903/AM09/ RLA File :61/24/040/00070/AM09/
3 Lic.No/Date:6110000292 24.02.2009 Defer Date: 26.05.2009 Decision: The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority. The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI & DIPP for examination and submission of comments. The case may be relisted on 26.05.2009. 4
Case No.:24/1/80ALC2/2009
Party Name:TAL MANUFACTURING SOLUTIONS LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01847/AM09/ RLA File :31/21/040/00397/AM09/ Lic.No/Date:3110037523 27.02.2009 Decision: The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 5
Case No.:27/1/80ALC2/2009
Party Name:KIRLOSKAR EBARA PUMPS LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01850/AM09/ RLA File :31/24/040/00318/AM09/ Lic.No/Date:3110037555 02.03.2009 Decision: The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 6
Case No.:12/1/80ALC2/2009
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01835/AM09/ RLA File :05/24/040/00751/AM09/ Lic.No/Date:0510237520 03.03.2009 Defer Date: 26.05.2009 Decision: Committee observed that firm’s application has been received and forwarded to DHI and DC(MSME) for examination and submission of comments. The committee accordingly advised the technical authorities to expedite their comments. The case may be relisted on 26.05.2009.
Case No.:29/1/80ALC2/2009
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01852/AM09/ RLA File :31/21/040/00399/AM09/
7 Lic.No/Date:3110037568 03.03.2009 Defer Date: 26.05.2009 for examination and submission of comments. The case may be relisted on 26.05.2009. 8
Case No.:8/1/80ALC2/2009
Party Name:WINSTAR HYDRAULICS PRIVATE LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01831/AM09/ RLA File :07/24/040/00640/AM09/ Lic.No/Date:0710063399 03.03.2009 Defer Date: 26.05.2009 Decision: The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 9
Case No.:1/1/80ALC2/2009
Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01824/AM09/ RLA File :04/24/040/00271/AM09/ Lic.No/Date:0410102680 04.03.2009 Defer Date: 26.05.2009 Decision: Committee observed that firm’s application has been received. The Committee therefore handedover the firm’s application to the technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 26.05.2009. 10
Case No.:30/1/80ALC2/2009
Party Name:ULTRA ENGINEERS Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01853/AM09/ RLA File :31/24/040/00319/AM09/ Lic.No/Date:3110037589 05.03.2009 Defer Date: 26.05.2009 & DIPP for examination and submission of comments. The case may be relisted on 26.05.2009.
Case No.:3/1/80ALC2/2009
Party Name:TIMKEN INDIA LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case approved HQ File :01/80/050/01826/AM09/ RLA File :02/24/040/00281/AM09/ Lic.No/Date:0210124063 09.03.2009
11 Decision: The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications: 1. Total net export weight of 53.785 MT may be added with the quantity of export product. 2. Quantity of import item may be allowed as 98426 Kgs. inclusive of 83% wastage after 20 % recovery. 12
Case No.:4/1/80ALC2/2009
Party Name:CETHAR VESSELS LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01827/AM09/ RLA File :04/24/040/00261/AM09/ Lic.No/Date:0410102815 09.03.2009 Defer Date: 26.05.2009 handedover the firm’s application to the technical authority i.e. DHI for examination and submission of 13
Case No.:43/1/80ALC2/2009
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01866/AM09/ RLA File :03/94/040/01050/AM09/ Lic.No/Date:0310510853 09.03.2009 Defer Date: 26.05.2009 Decision: The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 14
Case No.:44/1/80ALC2/2009
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01867/AM09/ RLA File :03/94/040/01017/AM09/ Lic.No/Date:0310510880 09.03.2009 Defer Date: 26.05.2009 15
Case No.:51/1/80ALC2/2009
Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01874/AM09/ RLA File :03/94/040/01068/AM09/ Lic.No/Date:0310510897 09.03.2009 Defer Date: 26.05.2009
handedover the firm’s application to the technical authority i.e. DHI for examination and submission of 16
Case No.:52/1/80ALC2/2009
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01875/AM09/ RLA File :03/94/040/01049/AM09/ Lic.No/Date:0310510935 09.03.2009 Defer Date: 26.05.2009 handedover the firm’s application to the technical authority i.e. DIPP for examination and submission of 17
Case No.:10/1/80ALC2/2009
Party Name:RD HYDROTHRUST, Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01833/AM09/ RLA File :07/21/040/01204/AM09/ Lic.No/Date:0710063495 11.03.2009 Defer Date: 26.05.2009 18
Case No.:33/1/80ALC2/2009
Party Name:ALFA LAVAL (INDIA) LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01856/AM09/ RLA File :31/21/040/00404/AM09/ Lic.No/Date:3110037661 12.03.2009 Defer Date: 26.05.2009 19
Case No.:58/1/80ALC2/2009
Party Name:NIRVAN FURNACES PRIVATE LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01881/AM09/ RLA File :03/95/040/00933/AM09/ Lic.No/Date:0310511097 12.03.2009 Defer Date: 26.05.2009
20
Case No.:59/1/80ALC2/2009
Party Name:SCHOTT KAISHA PRIVATE LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case approved HQ File :01/80/050/01882/AM09/ RLA File :03/95/040/00971/AM09/ Lic.No/Date:0310511114 12.03.2009 Decision: The representative of the DC(MSME) present in the meeting recommended the case based on NC decision in the applicant firm’s similar case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as applied for by the firm. 21
Case No.:65/1/80ALC2/2009
Party Name:EMERSON PROCESS MANAGEMENT (INDIA) PVT.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case closed HQ File :01/80/050/01888/AM09/ RLA File :03/94/040/01065/AM09/ Lic.No/Date:0310511172 12.03.2009 Decision: The Committee noted that RA vide their letter dt. 12.03.2009 informed that the subject advance authorization has been issued as per GN – 4 for the engineering products hence hard copy of the firm’s application not forwarded to NC. The Committee accordingly decided to close the case on the part of NC without any examination. 22
Case No.:66/1/80ALC2/2009
Party Name:HAWA VALVES (INDIA) PVT. LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01889/AM09/ RLA File :03/94/040/01070/AM09/ Lic.No/Date:0310511193 12.03.2009 Defer Date: 26.05.2009 handedover the firm’s application to the technical authority i.e. DIPP for examination and submission of 23
Case No.:67/1/80ALC2/2009
Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01890/AM09/ RLA File :03/94/040/00695/AM09/ Lic.No/Date:0310511269 13.03.2009
Case No.:68/1/80ALC2/2009
Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01891/AM09/ RLA File :03/94/040/01066/AM09/ Lic.No/Date:0310511345 13.03.2009
24 Decision: The Committee noted that firm’s application has not been received so far. However, according to 25
Case No.:14/1/80ALC2/2009
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01837/AM09/ RLA File :05/24/040/00725/AM09/ Lic.No/Date:0510238023 16.03.2009 Defer Date: 26.05.2009 Decision: The representative of the DC(MSME) informed the Committee that they had received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 26.05.2009. 26
Case No.:2/1/80ALC2/2009
Party Name:TERUMO PENPOL LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01825/AM09/ RLA File :53/24/040/00012/AM09/ Lic.No/Date:5310007800 16.03.2009 Defer Date: 26.05.2009 Decision: The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 26.05.2009. 27
Case No.:42/1/80ALC2/2009
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01865/AM09/ RLA File :03/94/040/01096/AM09/ Lic.No/Date:0310511647 16.03.2009 Decision: The Committee noted that it is mentioned in the advance authotization itself that the subject authorization has been issued as per GN – 4 for the engineering products. The Committee also noted that from the online data that items of import appear to be covered in GN4 for the Engineering Products and Spears can be allowed as pe policy for spares. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 28
Case No.:45/1/80ALC2/2009
Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01868/AM09/ RLA File :03/94/040/01063/AM09/ Lic.No/Date:0310511682 16.03.2009 Defer Date: 26.05.2009 forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIT
Case No.:15/1/80ALC2/2009
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY Meet No/Date:1/80 ALC2/2009 Status:Case reverted back
29 BAKER OIL 07.04.2009 to RA HQ File :01/80/050/01838/AM09/ RLA File :05/24/040/00764/AM09/ Lic.No/Date:0510238079 17.03.2009 Defer Date: 26.05.2009 handedover the firm’s application to the technical authority i.e. DHI for examination and submission of 30
Case No.:25/1/80ALC2/2009
Party Name:L & T CASE EQUIPMENT PVT. LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01848/AM09/ RLA File :11/21/040/00132/AM09/ Lic.No/Date:1110019856 17.03.2009 31
Case No.:47/1/80ALC2/2009
Party Name:LIVACO INDUSTRIES, Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01870/AM09/ RLA File :03/95/040/00968/AM09/ Lic.No/Date:0310511759 17.03.2009 Defer Date: 26.05.2009 forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP 32
Case No.:48/1/80ALC2/2009
Party Name:TYCO VALVES & CONTROLS INDIA PVT.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case closed HQ File :01/80/050/01871/AM09/ RLA File :03/95/040/00875/AM09/ Lic.No/Date:0310511928 17.03.2009 Decision: The Committee noted that RA vide their letter dt. 17.03.2009 informed that the subject advance authorization has been issued as per GN – 4 for the engineering products hence hard copy of the firm’s application not forwarded to NC. The Committee accordingly decided to close the case on the part of NC without any examination. 33
Case No.:49/1/80ALC2/2009
Party Name:TYCO VALVES & CONTROLS INDIA PVT.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case closed HQ File :01/80/050/01872/AM09/ RLA File :03/95/040/00874/AM09/ Lic.No/Date:0310511930 17.03.2009 Decision: The Committee noted that RA vide their letter dt. 17.03.2009 informed that the subject advance authorization has been issued as per GN – 4 for the engineering products hence hard copy of the firm’s
application not forwarded to NC. The Committee accordingly decided to close the case on the part of NC without any examination. 34
Case No.:26/1/80ALC2/2009
Party Name:ALFA LAVAL (INDIA) LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01849/AM09/ RLA File :31/21/040/00402/AM09/ Lic.No/Date:3110037727 18.03.2009 35
Case No.:28/1/80ALC2/2009
Party Name:BADVE AUTOCOMPS PVT.LTD, Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01851/AM09/ RLA File :31/24/040/00329/AM09/ Lic.No/Date:3110037728 18.03.2009 Defer Date: 26.05.2009 36
Case No.:17/1/80ALC2/2009
Party Name:C & S ELECTRIC LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01840/AM09/ RLA File :05/24/040/00773/AM09/ Lic.No/Date:0510238393 19.03.2009 37
Case No.:18/1/80ALC2/2009
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case approved HQ File :01/80/050/01841/AM09/ RLA File :05/24/040/00779/AM09/ Lic.No/Date:0510238395 19.03.2009 Decision: The representative of the DC(MSME) present in the meeting recommended the case based on NC decision in the applicant firm’s similar case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as applied for by the firm on nettonet basis.
38
Case No.:31/1/80ALC2/2009
Party Name:CRAFTSMAN AUTOMATION PVT. LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01854/AM09/ RLA File :32/21/040/00179/AM09/ Lic.No/Date:3210040016 19.03.2009 Defer Date: 26.05.2009 39
Case No.:32/1/80ALC2/2009
Party Name:CRAFTSMAN AUTOMATION PVT. LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01855/AM09/ RLA File :32/21/040/00180/AM09/ Lic.No/Date:3210040020 19.03.2009 Defer Date: 26.05.2009 40
Case No.:61/1/80ALC2/2009
Party Name:INGERSOLLRAND (INDIA) LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01884/AM09/ RLA File :03/94/040/01104/AM09/ Lic.No/Date:0310512372 19.03.2009 41
Case No.:9/1/80ALC2/2009
Party Name:FRONTLINE PRECISIONS PVT LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case approved HQ File :01/80/050/01832/AM09/ RLA File :07/24/040/00590/AM09/ Lic.No/Date:0710063728 19.03.2009 Decision: The representative of the DIPP present in the meeting recommended the case based on NC decision in the applicant firm’s similar case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications: 1. Net weight of Export product may be specified as 8.37 Kgs. 2. Quantity of import item may be allowed as 13.81 Kgs. inclusive of 65% wastage after taking clue from SION at Sl.No. C388
42
Case No.:11/1/80ALC2/2009
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01834/AM09/ RLA File :07/24/040/00665/AM09/ Lic.No/Date:0710063756 20.03.2009 Defer Date: 26.05.2009 43
Case No.:19/1/80ALC2/2009
Party Name:ECOCAT INDIA PVT.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01842/AM09/ RLA File :05/24/040/00761/AM09/ Lic.No/Date:0510238449 20.03.2009 Defer Date: 26.05.2009 handedover the firm’s application to the technical authority i.e. DHI / DC(MSME) for examination and submission of comments. The case may be relisted on 26.05.2009. 44
Case No.:20/1/80ALC2/2009
Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01843/AM09/ RLA File :05/24/040/00783/AM09/ Lic.No/Date:0510238548 20.03.2009 Defer Date: 26.05.2009 45
Case No.:21/1/80ALC2/2009
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01844/AM09/ RLA File :05/24/040/00781/AM09/ Lic.No/Date:0510238570 20.03.2009 Defer Date: 26.05.2009 46
Case No.:34/1/80ALC2/2009
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01857/AM09/ RLA File :34/24/040/00192/AM09/ Lic.No/Date:3410023781 20.03.2009 Defer Date: 26.05.2009 forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DC(MSME) for examination and submission of comments. The case may be relisted on 26.05.2009.
47
Case No.:35/1/80ALC2/2009
Party Name:IDMC LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01858/AM09/ RLA File :34/24/040/00213/AM09/ Lic.No/Date:3410023782 20.03.2009 Defer Date: 26.05.2009 48
Case No.:36/1/80ALC2/2009
Party Name:IDMC LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01859/AM09/ RLA File :34/24/040/00214/AM09/ Lic.No/Date:3410023783 20.03.2009 Defer Date: 26.05.2009 49
Case No.:37/1/80ALC2/2009
Party Name:IDMC LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01860/AM09/ RLA File :34/24/040/00226/AM09/ Lic.No/Date:3410023784 20.03.2009 50
Case No.:39/1/80ALC2/2009
Party Name:VASANTHA TOOL CRAFTS P.LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01862/AM09/ RLA File :09/24/040/00453/AM09/ Lic.No/Date:0910037474 20.03.2009
Case No.:5/1/80ALC2/2009
Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred
51 HQ File :01/80/050/01828/AM09/ RLA File :04/24/040/00294/AM09/ Lic.No/Date:0410103221 20.03.2009 Defer Date: 26.05.2009 handedover the firm’s application to the technical authority i.e. DIPP for examination and submission of 52
Case No.:69/1/80ALC2/2009
Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01892/AM09/ RLA File :03/94/040/01085/AM09/ Lic.No/Date:0310512634 20.03.2009 Defer Date: 26.05.2009 53
Case No.:22/1/80ALC2/2009
Party Name:ECOCAT INDIA PVT.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01845/AM09/ RLA File :05/24/040/00772/AM09/ Lic.No/Date:0510238640 23.03.2009 Defer Date: 26.05.2009 / DC(MSME) for examination and submission of comments. The case may be relisted on 26.05.2009. 54
Case No.:23/1/80ALC2/2009
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01846/AM09/ RLA File :34/24/040/00227/AM09/ Lic.No/Date:3410023794 23.03.2009 55
Case No.:6/1/80ALC2/2009
Party Name:INSTRUMENTATION LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01829/AM09/ RLA File :10/24/040/00135/AM09/ Lic.No/Date:1010033045 23.03.2009 online data, items of import appear to be covered in GN4 for the Engineering Products and Spears can be allowed as pe policy for spares. The Committee accordingly decided to revert back the case to concerned
Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 56
Case No.:7/1/80ALC2/2009
Party Name:INSTRUMENTATION LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01830/AM09/ RLA File :10/24/040/00136/AM09/ Lic.No/Date:1010033053 23.03.2009 online data, items of import appear to be covered in GN4 for the Engineering Products and Spears can be allowed as pe policy for spares. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 57
Case No.:70/1/80ALC2/2009
Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01893/AM09/ RLA File :03/94/040/00939/AM09/ Lic.No/Date:0310512654 23.03.2009 58
Case No.:13/1/80ALC2/2009
Party Name:REVA ELECTRIC CAR COMPANY PVT.LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01836/AM09/ RLA File :07/24/040/00662/AM09/ Lic.No/Date:0710063820 24.03.2009 59
Case No.:16/1/80ALC2/2009
Party Name:BOYSEN INDIA LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01839/AM09/ RLA File :05/24/040/00755/AM09/ Lic.No/Date:0510238732 24.03.2009 Defer Date: 26.05.2009
60
Case No.:56/1/80ALC2/2009
Party Name:ALLIED INSTRUMENTS PVT LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01879/AM09/ RLA File :03/94/040/01106/AM09/ Lic.No/Date:0310512964 24.03.2009 Defer Date: 26.05.2009 Decision: The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority. The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 26.05.2009. 61
Case No.:57/1/80ALC2/2009
Party Name:SULZER PUMPS INDIA LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01880/AM09/ RLA File :03/95/040/01015/AM09/ Lic.No/Date:0310512973 24.03.2009 62
Case No.:60/1/80ALC2/2009
Party Name:SULZER PUMPS INDIA LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01883/AM09/ RLA File :03/95/040/01003/AM09/ Lic.No/Date:0310512991 24.03.2009 63
Case No.:38/1/80ALC2/2009
Party Name:ENMAS GB POWER SYSTEMS PROJECTS LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01861/AM09/ RLA File :04/24/040/00283/AM09/ Lic.No/Date:0410103309 25.03.2009 Defer Date: 26.05.2009 handedover the firm’s application to the technical authority i.e. DHI for examination and submission of
Case No.:40/1/80ALC2/2009
64 Party Name:MAK CONTROLS AND SYSTEMS PVT LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01863/AM09/ RLA File :32/24/040/00066/AM09/ Lic.No/Date:3210040072 25.03.2009 Defer Date: 26.05.2009 65
Case No.:41/1/80ALC2/2009
Party Name:KIRLOSKAR PNEUMATIC CO LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01864/AM09/ RLA File :31/24/040/00302/AM09/ Lic.No/Date:3110037845 25.03.2009 66
Case No.:46/1/80ALC2/2009
Party Name:ALFA LAVAL (INDIA) LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01869/AM09/ RLA File :31/21/040/00405/AM09/ Lic.No/Date:3110037872 25.03.2009 67
Case No.:50/1/80ALC2/2009
Party Name:ACE MANUFACTURING SYSTEMS LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01873/AM09/ RLA File :07/24/040/00344/AM09/ Lic.No/Date:0710063845 25.03.2009
Case No.:53/1/80ALC2/2009
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case approved
68 HQ File :01/80/050/01876/AM09/ RLA File :05/24/040/00796/AM09/ Lic.No/Date:0510238900 25.03.2009 Decision: The representative of the DC(MSME) present in the meeting recommended the case based on NC decision in the applicant firm’s similar case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as applied for by the firm on nettonet basis. 69
Case No.:54/1/80ALC2/2009
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case approved HQ File :01/80/050/01877/AM09/ RLA File :05/24/040/00787/AM09/ Lic.No/Date:0510238901 25.03.2009 Decision: The representative of the DC(MSME) present in the meeting recommended the case based on NC decision in the applicant firm’s similar case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as applied for by the firm on nettonet basis. 70
Case No.:72/1/80ALC2/2009
Party Name:SCHOTT KAISHA PRIVATE LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case approved HQ File :01/80/050/01895/AM09/ RLA File :03/95/040/01018/AM09/ Lic.No/Date:0310513199 25.03.2009 Decision: The representative of the DC(MSME) present in the meeting recommended the case based on NC decision in the applicant firm’s similar case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modification: 1. Quantity of import item No. 1 may be allowed as 9396 kg. inclusive of 20% wastage. 2. Quantity of balance import items may be allowed on net to net basis. 71
Case No.:73/1/80ALC2/2009
Party Name:TELCO CONSTRUCTION EQUIPMENT CO. LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01896/AM09/ RLA File :03/95/040/00653/AM09/ Lic.No/Date:0310513210 25.03.2009
72
Case No.:74/1/80ALC2/2009
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01897/AM09/ RLA File :03/95/040/00960/AM09/ Lic.No/Date:0310513330 25.03.2009 Defer Date: 26.05.2009 forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI/DIPP for examination and submission of comments. The case may be relisted on 26.05.2009. 73
Case No.:55/1/80ALC2/2009
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01878/AM09/ RLA File :05/24/040/00737/AM09/ Lic.No/Date:0510238929 26.03.2009 74
Case No.:62/1/80ALC2/2009
Party Name:TITAN INDUSTRIES LIMITED, Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01885/AM09/ RLA File :07/24/040/00671/AM09/ Lic.No/Date:0710063869 26.03.2009 Defer Date: 26.05.2009 75
Case No.:63/1/80ALC2/2009
Party Name:KHOSLA ENGINEERING PVT LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01886/AM09/ RLA File :31/24/040/00298/AM09/ Lic.No/Date:3110037900 26.03.2009 Defer Date: 26.05.2009 forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DC(MSME) for examination and submission of comments. The case may be relisted on 26.05.2009.
Case No.:64/1/80ALC2/2009
Party Name:FLOWSERVE INDIA CONTROLS PVT. LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01887/AM09/ RLA File :32/24/040/00064/AM09/ Lic.No/Date:3210040095 26.03.2009
76 Decision: The Committee noted that firm’s application has not been received so far. However, according to 77
Case No.:76/1/80ALC2/2009
Party Name:SWARAJ TECHNOCRAFTS PVT.LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01899/AM09/ RLA File :11/21/040/00150/AM09/ Lic.No/Date:1110019925 26.03.2009 78
Case No.:77/1/80ALC2/2009
Party Name:TELCO CONSTRUCTION EQUIPMENT CO. LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01900/AM09/ RLA File :03/95/040/00818/AM09/ Lic.No/Date:0310513416 26.03.2009 79
Case No.:71/1/80ALC2/2009
Party Name:FLOWSERVE INDIA CONTROLS PVT. LTD., Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01894/AM09/ RLA File :32/24/040/00065/AM09/ Lic.No/Date:3210040102 27.03.2009 80
Case No.:75/1/80ALC2/2009
Party Name:AUTOMOTIVE ANCILLARY SERVICES (PVT) LTD. Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01898/AM09/ RLA File :04/24/040/00284/AM09/ Lic.No/Date:0410103434 30.03.2009 Defer Date: 26.05.2009
81
Case No.:78/1/80ALC2/2009
Party Name:CEEYES METAL ENGINEERING P LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01901/AM09/ RLA File :04/24/040/00289/AM09/ Lic.No/Date:0410103439 30.03.2009 82
Case No.:79/1/80ALC2/2009
Party Name:ZECO AIRCON INDUSTRIES PVT LTD Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01902/AM09/ RLA File :05/24/040/00780/AM09/ Lic.No/Date:0510239200 30.03.2009 83
Case No.:81/1/80ALC2/2009
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01904/AM09/ RLA File :05/24/040/00797/AM09/ Lic.No/Date:0510239217 31.03.2009 84
Case No.:82/1/80ALC2/2009
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01905/AM09/ RLA File :05/24/040/00799/AM09/ Lic.No/Date:0510239218 31.03.2009
85
Case No.:83/1/80ALC2/2009
Party Name:SPARKLINE EQUIPMENTS PVT.LTD, Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case deferred HQ File :01/80/050/01906/AM09/ RLA File :31/24/040/00345/AM09/ Lic.No/Date:3110037942 31.03.2009 Defer Date: 26.05.2009 86
Case No.:84/1/80ALC2/2009
Party Name:KSB PUMPS LIMITED Meet No/Date:1/80 ALC2/2009 07.04.2009 Status:Case reverted back to RA HQ File :01/80/050/01907/AM09/ RLA File :31/24/040/00348/AM09/ Lic.No/Date:3110037952 31.03.2009
Case No. A/R1
M/s. Alstom Power System Hydro India, Mumbai F.No. 01/80/50/636/AM08/DES.I Lic.No. & Date Meeting No.01/10 RA F.No.03/94/040/0328/AM08 0310434375 Dt. 28.06.2007 Date: 06.04.2009 Amendment in norms The representative of DHI informed the Committee that their file dealing with this case is readily not available with them. The Committee therefore handed over the case file to the technical authority for examination and submission of comments. The case may be relisted on 26.05.2009.
Case No. A/R2
M/s. Alstom Power System Hydro India, Mumbai F.No. 01/80/50/1123/AM07/DES.I Lic.No. & Date Meeting No.01/10 RA F.No.03/94/040/1082/AM07 0310413870 Dt.28.12.2006 Date: 06.04.2009 Amendment in norms The representative of DHI informed the Committee that their file dealing with this case is readily not available with them. The Committee therefore handed over the case file to the technical authority for examination and submission of comments. The case may be relisted on 26.05.2009.
Case No. A/R3
M/s. Alstom Power System Hydro India, Mumbai F.No. 01/80/50/843/AM07/DES.I Lic.No. & Date Meeting No.01/10 RA F.No.03/94/040/834/AM07 0310406393 Dt. 02.11.2006 Date: 06.04.2009 Amendment in norms
The representative of DHI informed the Committee that their file dealing with this case is readily not available with them. The Committee therefore handed over the case file to the technical authority for examination and submission of comments. The case may be relisted on 26.05.2009.
Case No.A/R4
M/s. Alstom Projects Ltd., Mumbai. HQ F.No.01/80/50/1442/AM07/DES–I HQ F.No.01/80/50/1440/AM07/DES–I Lic. Nos. & Date Meeting No.01/10 RLA F.No.03/94/40/1364/AM07 RLA F.No.03/94/40/1367/AM07 0310421642 & 0310421640 Both dt. 02.03.2007 Date: 06.04.2009 Consideration of combined norms The representative of DHI informed the Committee that their file dealing with these cases is readily not available with them. The Committee therefore handed over the case files to the technical authority for examination and submission of comments. The case may be relisted on 26.05.2009.
Case No. A/R5
M/s. Rochem Separation Systems ( India) P. Ltd. F.No. 01/81/50/956/AM07/DES.I Lic.No. & Date Meeting No.01/10 RA F.No.03/95/040/1491/AM07 0310421472 28.02.2007 Date: 06.04.2009 Ratification of norms On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case on 26.05.2009: 1. Size i.e. Diameter and Length of import item at Sl. No. 14. 2. Net weight of component to be manufactured from SS Round Bar i.e. import item at Sl. No. 14 supported by the details/drawing of the component.
Case No. A/R6
M/s. Melco India P. Ltd.. Faridabad F.No. 01/80/50/379/AM09/DES.I Lic.No. & Date Meeting No.01/10 RA F.No.05/24/040/935/AM08 0510217796 Dt. 13.03.2008 Date: 06.04.2009 Ratification of norms The representative of DIPP informed the Committee that case pertains to DHI. The representative of DHI informed the Committee that they have not received copy of firm’s application. The Committee therefore decided to forward the copy of firm’s application to the technical authority for examination and submission of comments. The case may be relisted on 26.05.2009.
Case No. A/R7
M/s.Autotech Industries( (India )P. Ltd. Chennai F.No. 01/80/162/753/AM08/DES.I Lic.No. & Date Meeting No.01/10 RA F.No.04/21/040/210/AM08 0410090215 Dated 09.07.2007 Date: 06.04.2009 Ratification of norms The Committee noted that NC ratified norms of the similar authorization of the applicant firm bearing No. 0410098945 dt. 30.09.2008 in its meeting No. 53/09 held on 31.03.2009 based on the recommendation of DHI. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization on similar lines as under: 1. Import item no. 1 being consumable may be allowed as 0.9% of the FOB value. 2. Quantity of import item no. 2 may be allowed on net to net basis without any wastage.
(B. C. Nayak D.O., DHI) Member (S.K. Jain, D.O., DIPP) Member (B.D. Ghosh, Jt. IA, MOS) Member (K.K. Funda, Asstt. Director) Member (A.K. Mishra, AIA, MOS) Member (Krishan Kumar, Dy. DGFT) Convener (A. Komu) Chairman
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.