← Archive
IN FORCE Advance Authorisation

DGFT Minutes

Reliability

In force — no superseding record on file.

Document text

faexr ara AeIreRTTs SSVA-V SUPT

The Meeting No. NC/5/MEET/Oct/2022-23/11(Part-II) Date 14.10.2022 actually held on 14.10.2022 for the licensing year 2022-23 to consider the cases under Para 4.07 FTP 2015-20, Duty Exemption Schemes (Chapter-4) in Room No. 11 of DGFT Udyog Bhawan, under the Chairmanship of Sh. Jai Pal, Joint DGFT. The following officers were present:Name of the representatives and their designation 11. __| Sh. Kuldeep Singh, Asst. Director-I O/o DC(MSME) Dr. Ram Asrey Lal, Consultant DGFT Sh. Nand Lal, Consultant DGFT re _.) Sh. ShaishManoj Kum ar,ar Meena, ConsultantDeputy. Director DGFT Sh. Sanjay Kumar, Sr. Secretariat Assistant (SSA DGFT

Minutes of Meeting no -NC/5/MEET/Oct/2022-23/11(Part-II) Date 14.10.2022

CaeNo-04= Mis. Richa Global Pvt. Ltd. NC Meeting No /Date — “NC/5/MEET/Oct/202223/11(Part-I1)/Date 14/10/2022 RAF. No. 05/24/095/00018/AM19 Date 03.07.2018 HQ F. No. 01/84/162/0065/AM 19/DES-V SPL Adv. Authorization No./Date 0510407082 /Date- 04/07/2018 Case Status: Approved theDecision:The committee considered the case as per agenda along-with other relevant paper and noted that firm has requested vide letter dated 08.11.2021 for amendment in style no from 473782 to 496764 in the approved norms in NC Meeting No- 06/84 AM-19 dated 20.06.2018, actual held on 27.06.2018 as the buyer had change the export item’s style no. The committee went through the details submitted in this case and decided to approve the firm’s request and modified norms for above said special advance authorization is as under:Exportitem = Qty.

. The committee went through the details submitted in this case and decided to approve the firm’s request and modified norms for above said special advance authorization is as under:Exportitem = Qty. | Importitem | Qty. Recommended _| Ladies pullover 11460 97% Rayon, 3% 33463 Sq. Mtr. Style no -496764 Nos. spandex dyed knitted Made of 97% Rayon, 3% spandex fabric GSM 250+/-10% dyed knitted fabric GSM 250+/-10% RA concerned may take necessary action subject to compliance of other usual conditions.

Case No.- 05 M/s. Richa Global Pvt. Ltd. NC Meeting No /Date NC/S/MEET/Oct/202223/11(Part-II)/ Date 14/10/2022 HQ F. No. 01/84/162/00128/AM 19/DES-V SPL Adv. Authorization No/Date ——‘| 0510408154 /Dated: 18/10/2018 [CaseStatus: Approved—“—~™SCSCSCS 1 _ sa FITLAANOJ KUMAR MEENA a / Deputy Director faaer are Helfer D.G.F.T. aifersa {FAT / Deptt. of Commerce WA UIC / Govt. of uidia

==> picture [456 x 427] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Decision:|The|committee|considered|the|case|as|per|agenda|along-with|other|relevant|paper|and|noted|that|
|the|firm|has|requested|vide|letter|dated|12.11.2021|for|amendment|in|style|no|in|export|item|serial|no-|
|3((Ladies|other|garment|(Leotard))|from|4988639|to|498639|in|the|approved|norms|in|NC|Meeting|No-|
|13/84|AM-19|dated|27.09.2018,|actual|held|on|11.10.2018.|The|committee|went|through|the|details|

|
|3((Ladies|other|garment|(Leotard))|from|4988639|to|498639|in|the|approved|norms|in|NC|Meeting|No-|
|13/84|AM-19|dated|27.09.2018,|actual|held|on|11.10.2018.|The|committee|went|through|the|details|
|submitted|in|this|case|and|noted|that|it|was|a|typographical|error|at|DGFT’s|end|and|decided|to|modify|the|
|style|no|in|export|item|serial|no-3((Ladies|other|garment|(Leotard))|from 4988639|to 498639|for above|said|
|special|advance|authorization.|
|RA|concerned|may|take|necessary|action|subject|to|compliance|of other|usual|conditions.|—_|
|Case|No.-|06|M/S|Sundar|Sons|India|Export|
|NC Meeting No|/Date|NC/5/MEET/Oct/202223/11(Part-I1)/|Dt.:|14/10/2022|
|RA|F.|No.|RA|F.|No.|32/AA003980AM21|
|HQ|F.|No.|HQRNORM APPLY00047059AM21|
|Adv.|Authorization|No./Date|3211000127/|Dated:|24/12/2020|
|Decision:|The|committee|considered|the|case|as|per|agenda|along-with|other|relevant|paper|and|noted|that|
|the|firm|has|requested|vide|letter|dated|10.10.2022|for|fixation|of norms|as|their|case|was|rejected|in|NC|
|Meeting|no|NC/S/MEET/Feb/202021/99|Dated|28.05.2022.|The|committee|went|through|the|details|
|submitted|in|this|case|and|based|on|recommendation|of|technical|authority,|decided|to|approve|the|input|
|output|norms|as|under:|
|'S.N.|ExportitemMEN'S|SHIRTS|(FULL SLEEVE)«| Qty.9030|| Importitem100% FLAX YARN __|| Qty.4457.27 RecommendedKg.|
|Net|content|of Flax|Yarn-3875.89|Kg.)|||Nos.|
|2|LADIES TROUSER|1943|100% FLAX YARN ||971.72|Kg.|
|Net|content|of Flax|Yarn-844.98|Kg.|Nos.|
|3.|LADIES|DRESS|2100|100% FLAX YARN|||1429.68|Kg.|
|Net|content|of Flax|Yarn-1243.20|Kg.|Nos.|

|||Nos.|
|2|LADIES TROUSER|1943|100% FLAX YARN ||971.72|Kg.|
|Net|content|of Flax|Yarn-844.98|Kg.|Nos.|
|3.|LADIES|DRESS|2100|100% FLAX YARN|||1429.68|Kg.|
|Net|content|of Flax|Yarn-1243.20|Kg.|Nos.|
|4.|MENS SHIRTS|(FULL SLEEVE)|693|100% FLAX YARN|||444.06|Kg.|
|Net|content|of Flax|Yarn-386.14|Kg.)|Nos.|
|5.|MEN'S TROUSER|756|100% FLAX YARN|||375.44|Kg.|
|(Net|content|of Flax|Yarn-326.47|Kg.)|Nos.|
|RA|concerned|may|take|necessary|action|subject|to|compliance|of other|usual|conditions.|

----- End of picture text -----<br>

Case No.- 07 M/S Jumbo Bag Ltd. NC Meeting No/Date NC/5/MEET/Oct/202223/11(Part-II)/ Dt.: 14/10/2022 coremincewrences si HQ F. No. HQRNORMAPPLY00061032AM21 Ady. Authorization No./Date 0411000180/ Dated: 12/01/2021 Case Status: Approved Decision: The committee considered the case as per agenda along-with other relevant paper and noted that the firm has requested vide letter dated 17.05.2022 for fixation of norms as their case was rejected in NC Meeting no NC/5/MEET/Dec/202122/14Dated 07.01.2022. The committee went through the details submitted in this case and based on recommendation of technical authority, decided to approve the input output norms as under: [Exportitem| Qty. S.N. | Import item 2 wring PAR x2. SY AG /Deputy“ANOJ KUMAR DirectorMEENA fader aauie year WA BBR /Govt. ofwidia

==> picture [416 x 108] intentionally omitted <==

s as under: [Exportitem| Qty. S.N. | Import item 2 wring PAR x2. SY AG /Deputy“ANOJ KUMAR DirectorMEENA fader aauie year WA BBR /Govt. ofwidia

==> picture [416 x 108] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|FLEXIBLE|INTERMEDIATE||250000 }|1.|POLYPROYLENE|201712.5|Kg.|
|BULKBAGS(FIBC)CONTAINER|PP|JUMBO||Kg.|UVGRANULESSTABLIZER|4125|Kg.|
|(Net|content|of|(i)|PP|Granules|-|3.|LDPE GRANULES|49875|Kg.|
|183375|Kg.|
|GO ey Bueeiinet|~ 410) BS.|4.||PP|CONDUCTIVE ||15750K|
|(iii) LDPE Granules- 47500 Kg.|ft|ae|er|
|(iv)|PP|Conductive|Yarn-|15000|Kg.)|s|
|RA|concerned|may|take|necessary|action|subject|to|compliance|of other|usual|conditions.|

----- End of picture text -----<br>

==> picture [455 x 242] intentionally omitted <==

----- Start of picture text -----<br> Case No.- 08 M/s Ashutosh Fibre Pvt. Ltd.<br>NC Meeting No/Date NC/5/MEET/Oct/202223/11(Part-II)/ Dt.: 14/10/2022<br>RA F. No. 08/24/040/00363/AM18<br>HQF.No. — nh 01/84/050/000035/AM19<br>Ady. Authorization No./Date 0810142209 Dated: 21/03/2018<br>Decision: The committee considered the case as per agenda along-with other relevant paper and noted that<br>the firm has requested vide letter dated 25.07.2022 for fixation of norms as their case was rejected in NC<br>Meeting no 5/84-ALC3/2018 Dated 07.06.2018.

g-with other relevant paper and noted that<br>the firm has requested vide letter dated 25.07.2022 for fixation of norms as their case was rejected in NC<br>Meeting no 5/84-ALC3/2018 Dated 07.06.2018. The committee went through the details submitted in this<br>case and based on recommendation of technical authority and taking cue from earlier approved norms for AA<br>No 0810135484 dated 17.06.2015 in NC Meeting no- 15/84-ALC3/2015 Dated 30.07.2015, decided to<br>approve the input output norms as under:<br>Exportitem | Qty. | S.N. | Importitem ‘| Qty. Recommended |<br>Tex Yarn (Containing 50% Para | 48000 Para Aramid Fabric Waste 25804.8 Kg.<br>aeA a“ PaEyNe3 wel 25%# | BBs Actylic Fibre 12499.2 Kg.<br>(2499.2 Ke<br>RA concerned may take necessary action subject to compliance of other usual conditions.<br>----- End of picture text -----<br>

Case No. 09 Amendment in Existing SION J-370 NC Meeting No/Date NC/S/MEET/Oct/202223/11(Part-II)/ Date: 14/10/2022 01/84/171/00003/AM23/DES-V

onditions.<br>----- End of picture text -----<br>

Case No. 09 Amendment in Existing SION J-370 NC Meeting No/Date NC/S/MEET/Oct/202223/11(Part-II)/ Date: 14/10/2022 01/84/171/00003/AM23/DES-V

Decision: - The committee considered the case as per agenda and discussed the existing SION J-370 in detail. The SION J-370 has been published long back vide public notice no-44, dated 26.08.2005 and detail is as under: No. J370 Nonwoven fabrics made of | 1 kg Relevant Man1.17 kg/kg content in the manmade fibre made fibre export product The committee while dealing with input output norms under advance authorization scheme, observed that wastage of 17% allowed under SION- J-370 is very much on higher side and it needs to be rationalized. To initiate the process of rationalization, the Committee decided to first ask from EGTF section, the details of companies have been taken the benefit of SION J-370. Then production and consumption data for 3 years certified by CA may be called from such companies to take a view in this matter. The case stands for deferred and re-listing in next meeting.

==> picture [62 x 11] intentionally omitted <==

----- Start of picture text -----<br> ———<br>----- End of picture text -----<br>

==> picture [5 x 39] intentionally omitted <==

----- Start of picture text -----<br> 3<br>----- End of picture text -----<br>

Tilt DAR ao KUMAR MEENA BT PEL /Deputy Director Fagen arore wenfreerera aferse ___O.G.FT, iPr /Deptt, of Commerce

==> picture [2 x 11] intentionally omitted <==

d of picture text -----**<br>

Tilt DAR ao KUMAR MEENA BT PEL /Deputy Director Fagen arore wenfreerera aferse ___O.G.FT, iPr /Deptt, of Commerce

==> picture [2 x 11] intentionally omitted <==

----- Start of picture text -----<br> |!<br>----- End of picture text -----<br>

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 9222 --apply.

Citation copied