DIRECTORATE GENERAL OF FOREIGN TRADE (DES-II SECTION) MINUTES OF THE NORMS COMMITTEE-II MEETING No. NC/2/MEETlDec/202223ItS (Offline Cases) DATED 19.12.2022 Please Note 1. For information of exporters, Norms Cornmittee-Il handles all cases pertaining to fixation/ratification of norms for Export Products falling under ITC (HS) Chapter 72 to 76, 78 to 80 & 85. Communications in respect of cases/pertaining to NC-Il may be sent to email address: nc2.dgft@nic.in 11. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The concerned applicant/company may go through the same and respond accordingly. 111. The Norms Committee has taken decision only with respect to technical aspect/wastage norms. While redeeming the applications, RAs should check that the applicant has fulfilled all requirements as prescribed in policy/procedure including those in Policy Circulars issued from time to time or any other provisions under FTP/HBP for EODe. IV. Wherever the Committee has fixed Norms, the concerned RA may ensure that AA is issued on the wastages/consumption as ratified by the Committee or as per wastages claimed in the application, whichever is less. Meeting No.
e has fixed Norms, the concerned RA may ensure that AA is issued on the wastages/consumption as ratified by the Committee or as per wastages claimed in the application, whichever is less. Meeting No. NC/2/MEET/Dcc/202223118 (Offline Cases) of Norms Cornmittce-Il for the year 2022-23 held on 19.12.2022 under the Chairmanship of Shri Akash Tanej a, Additional Director General of Foreign Trade to consider the following applications for ratification of norms in respect of Advance Authorizations under Duty Exemption Scheme (Chapter-4) of Foreign Trade Policy 2015-20. The following members were present in the meeting: - Sl. No. Name & Designation Department 1. Shri R. K. Jaiswal, D.O. DHI 2. Shri V.e. Agarwal, Consultant (TEC-3) DGFT 3. Shri S.K. Bhatnagar, Consultant (SKB) DGFT 4. Shri Shaish Kumar, Consultant (TEC-I) DGFT In attendance 1. Shri Santosh Kumar Dubey, Dy. DGFT DGFT Minutes of the cases discussed in the meeting are as under: 1I MEETING NUMBER: NC/2/MEETlDec/202223/1S(Offline Cases) MEETING DATE: 19.12.2022
n attendance 1. Shri Santosh Kumar Dubey, Dy. DGFT DGFT Minutes of the cases discussed in the meeting are as under: 1I MEETING NUMBER: NC/2/MEETlDec/202223/1S(Offline Cases) MEETING DATE: 19.12.2022
2 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
MEETING NUMBER: NC/2/MEET/Dec/202223/18 (Offline Cases) MEETING DATE: 19.12.2022
Sl. No. Applicant's Name / AA No. HQ/RA File No. Case History Decision Status M-1
NASH INDUSTRI ES (I) PRIVATE LIMITED, BENGALU RU 01/80/162/00 302/AM18/ 1/11/2015:E OU:CSEZ/1 476/ DC, CSEZ vide letter dated 03.11.2017, followed by representation dated 29.03.2018 from the applicant, had requested for fixation of scrap/wastage norms for the manufacture and export of Sheet Metal Pressed Components made of iron and steel, copper, brass and such other metals/alloys. The matter was considered in M. No. 01/81 dated 10.04.2019 and on the advice of Consultant (TEC-3), some information was sought from the applicant via email dated 25.05.2019 followed by reminder on 12.07.2019. The email reply dated 13.11.2019 was referred to Consultant (TEC-3) via email dated 14.11.2019. The case was considered in M. No. 20/81 dt. 08.01.2020. The Committee noted that the written comments dated 01.01.2020 of Consultant (TEC- 3) as under: 1. Nash Industries, an EOU, had requested for fixation of wastage norms for export product ‘sheet metal pressed components for UPS & other industrial use’. 2.
.2020 of Consultant (TEC- 3) as under: 1. Nash Industries, an EOU, had requested for fixation of wastage norms for export product ‘sheet metal pressed components for UPS & other industrial use’. 2. Applicant has informed that they are manufacturing 1000 parts & components & have submitted some details for 6 components. 3. Components are manufactured from iron & steel, Cu & Al sheets. 4. Wastages claimed is in the range of 38% to 50% which is average of vide range of 1.5% to 98.4% 5. As range of wastage is very wide and number of components very large, it is not possible to work out wastage of every component. In view of the above, the Committee decided to call the applicant for PH. As per NC decision, an email dated 25.02.2020 was sent to the applicant to attend PH on 04.03.2020. The case was considered in M. No. 22/81 dt. 19.02.2020 as per agenda and noted that the applicant vide email dated 28.02.2020 has sought another date for personal hearing on behalf of the applicant. Therefore, the Committee decided to give one more opportunity to the applicant for personal hearing to explain the case before Norms Committee. During personal hearing held in Meeting No. 05/81 on 28.07.2020, applicant’s representatives asked to furnish following information: 1. To submit details by making subgroup of items manufactured in the limited range of wastages as there is wide variation in the wastage of items manufactured i.e., 1.5% to 98.40%. D/L was sent to the applicant on 22.09.2020. The case was considered in M. No.
the limited range of wastages as there is
wide variation in the wastage of items manufactured i.e.,
1.5% to 98.40%.
D/L was sent to the applicant on 22.09.2020. The case was
considered in M. No. 8/81 dated 29.09.2020 and decided to grant
last opportunity to the applicant to furnish the requisite
information. The applicant's reply dated 03.11.2020 was sent to
Consultant (TEC-3) via email on 10.11.2020. The case was
considered in M. No. 11/81-ALC2/2020 dated 24.11.2020 (Held
on 01.12.2020) and decided to remind Consultant (TEC-3) for
expediting the comments. Reminder issued to Consultant (TEC-3)
on 11.01.2021.
The case was discussed in M. No. 01/81 dated 21.05.2021 and the
Committee noted that Consultant (TEC-3) via email dated
11.02.2021 had requested for the hardcopy of the original
application. Therefore, the Committee decided to ask the
applicant to submit the same. The applicant’s reply was received
on 27.07.2021 and the same was forwarded to Consultant (TEC-3)
on 10.08.2021.
The case was discussed in M. No. NC/2/MEET/Jul/202122/2
(Offline Cases) dated 03.09.2021 and the Committee noted that
Consultant (TEC-3) via email dated 02.09.2021 had requested for
physical file along with hard copy applicant’s reply of the case.
Therefore, the Committee decided to send the same to Consultant
(TEC-3) for examination of the case. A letter was issued to the
The
Committee
considered the case as
per agenda and directed
the Special Committee
to submit its report as
decided in the meeting
dated 21.10.2022.
Deferred
. A letter was issued to the The Committee considered the case as per agenda and directed the Special Committee to submit its report as decided in the meeting dated 21.10.2022.
Deferred
3 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
applicant for all relevant documents on 18.10.2021.
The case was discussed in the M. No. 07/81 (Offline Cases) dated
16.11.2021 and the Committee noted that the information from
the applicant is yet to be received. However, the Committee
decided to refer the matter to DPIIT for examination & comments
as per advice of Consultant (TEC-3).
The case was discussed in the M. No. NC/2/MEET/Jan/202122/8
dated 03.02.2022 and the Committee noted the comments of
DPIIT vide U.O. No. P-47014/37/2021-TSW dated 31.12.2021
wherein DPIIT has requested to send a copy of ad-hoc scarp
norms fixed by DC, CSEZ, Bangalore and copy of DL along with
reply raised by Consultant (TEC-3). As per NC decision, a DL
was issued to the applicant. The applicant’s reply and relevant
documents was sent to DPIIT on 14.03.2022 for examination of
the case.
The
case
was
discussed
in
the
M.
No.
NC/2/MEET/Mar/202122/11 (Offline Cases) dated 30.03.2022
and the Committee decided to wait for the comments from TE.
The case was discussed in the M. No. NC/2/MEET/Jun/202223/8
(Offline Cases) dated 27.07.2022 and the Committee decided to
remind the TE, DPIIT for expediting the comments. As per NC
decision, the reminders were issued to DPIIT on 05.07.2022,
05.09.2022 & 06.10.2022 for expediting the comments.
he Committee decided to remind the TE, DPIIT for expediting the comments. As per NC decision, the reminders were issued to DPIIT on 05.07.2022, 05.09.2022 & 06.10.2022 for expediting the comments. The case was last discussed in the M. No. NC/2/MEET/Oct/202223/14 (Offline Cases) dated 21.10.2022 and the Committee noted the comments given by DPIIT vide U.O. No. P-47014/37/2021-TSW dated 10.10.2022. The matter was deliberated in the meeting and the Committee decided to constitute a Special Committee as per advice of TE, for fixation of wastage norms for disposal of scrap by EOUs as in such cases involving a large number of components/item (s) of manufacturing. The Special Committee shall consist with TE, DPIIT, Consultant (Tech-3), Consultant (SKB) and DDG (SKD). The Special Committee shall visit the site, if required and submit its report within 4 weeks of time. The Special Committee shall also examine and advise in respect of all other similar cases pending for fixation of wastage norms for disposal of scrap arising out from production process by EOUs/SEZ units.
M-2
Lubi Electricals Limited, Ahmedabad
- Referred by DC, KASEZ 01/81/061/00 022/AM18/ KASEZ/100 %EOU/II/96 9/00-01/ KASEZ, vide letter No. KASEZ/100%EOU /II/969/00-01/6116 dated 27.09.2017 forwarded a copy of application for fixation of scrap/wastage norms on regular basis for manufacture and export of Industrial Valves and Industrial Valve Parts.
/II/969/00-01/6116 dated 27.09.2017 forwarded a copy of application for fixation of scrap/wastage norms on regular basis for manufacture and export of Industrial Valves and Industrial Valve Parts. The DC stated that the wastage norms had been fixed on ad-hoc basis up to 31.03.2003 subject to final fixation of norms-by-Norms Committee in DGFT. The case was considered in M. No. 4 /81- Pt.II dated 03.10.2018 and noted that case was referred to DIPP for comments and reminded on 27.09.2019. The case was considered in M. No. 20/81 dt. 08.01.2020, the Committee noted that DPIIT was not reminded for expediting the comments & also the main file was not traced out by the section. Therefore, the Committee decided to remind DPIIT and directed the section to trace out main file immediately. The case was considered in M. No. 23/81 dt. 04.03.2020, the Committee noted that DPIIT has not yet been reminded for expediting the comments & also main file is not yet traced out by the section. Therefore, the Committee decided to remind DPIIT & and directed the section to trace out main file immediately. Since, main file is not traceable in the section, complete set of documents have been sought from KASEZ vide email dated 16.07.2020. The documents received from KASEZ was forwarded to DPIIT vide email dated 20.07.2020 for examination & comments. An email was sent on 22.09.2020 to DPIIT for expediting the comments. The case was The Committee per agenda and directed the Special Committee to submit its report as decided in the meeting dated 21.10.2022.
Deferred
020 to DPIIT for expediting the comments. The case was The Committee per agenda and directed the Special Committee to submit its report as decided in the meeting dated 21.10.2022.
Deferred
4 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
considered in M. No. 8/81 dated 29.09.2020 and decided to seek again from the applicant to furnish following information as per comments given by DPIIT vide U. O. No. P-47011/108/2020- TSW dated 10.08.2020 as the applicant’s reply was deficient:
- A copy of ad-hoc norms fixed by the Development Commissioner, Kandla SEZ for the items under consideration.
- Sl. No. 3, 4, 5 & 11 of the Standard Deficiency Format.
As per NC decision, D/L was sent to the applicant via email on
12.11.2020.
The case was considered in M. No. 11/81-ALC2/2020 dated 24.11.2020 (Held on 01.12.2020) and decided to remind the applicant for furnishing the requisite information. As per NC decision, reminders were sent to the applicant on 11.01.2021 & 08.04.2021.
The case was discussed in M. No. 01/81 dated 21.05.2021 and the Committee noted that the applicant did not furnish the reply of DL. Therefore, the Committee decided to issue a final reminder to the applicant for furnishing their comments within 15 days’ time. The applicant’s reply received vide email dated 19.08.2021 and the same was forwarded to DPIIT on 23.08.2021. The case was discussed in M. No. NC/2/MEET/Jul/202122/2 (Offline Cases) dated 03.09.2021 and the Committee decided to wait for comments.
.2021 and
the same was forwarded to DPIIT on 23.08.2021. The case was
discussed in M. No. NC/2/MEET/Jul/202122/2 (Offline Cases)
dated 03.09.2021 and the Committee decided to wait for
comments.
16.11.2021 and the Committee decided to ask from the applicant
to furnish certain information as per comments of DPIIT vide U.
O. No. P-47011/17/2021-TSW dated 01.10.2021. As per NC
decision, a DL was issued to the applicant on 28.12.2021.
The case was discussed in the M. No. NC/2/MEET/Jan/202122/8
dated 03.02.2022 and the Committee decided to send a reminder
to the applicant for furnishing the requisite information within 15
days. As per NC decision, a reminder was issued to the applicant
on 10.03.2022. The applicant’s reply was sent to DPIIT on
28.03.2022 for examination of the case.
The
case
was
discussed
in
the
M.
No.
and the Committee decided to wait for the comments from TE.
The case was discussed in the M. No. NC/2/MEET/Jun/202223/8
remind the TE, DPIIT for expediting the comments. As per NC
decision, the reminders were issued to DPIIT on 06.07.2022,
05.09.2022 & 06.10.2022.
The case was last discussed in the M. No. and the Committee decided to constitute a Special Committee as per advice of TE, for fixation of wastage norms for disposal of scrap by EOUs/SEZ units.
M-3
INJECTOP LAST PVT. LTD.
061003868
2
Dated
29.08.2017
01/81/050/00
363/AM18/
06/24/040/00 020/AM18/ The case was approved in M. No.
ms for disposal of scrap by EOUs/SEZ units.
M-3
INJECTOP LAST PVT. LTD.
061003868
2
Dated
29.08.2017
01/81/050/00
363/AM18/
06/24/040/00
020/AM18/
The case was approved in M. No. 03/81-ALC2/2018 dated
14.08.2018 with wastage of 5% with the condition that RA should
call for weight of Phenolic Moulding Compound in the export
product and take necessary consequential action accordingly.
The case was again considered in M. No. 06/81 dated 11.08.2020
held on 25.08.2020 and rejected by NC due to non-submission of
composition fee.
However, the applicant vide letter dated 06.11.2020 requested
again for reviewing of ad-hoc norms stating that it is taking AA
for manufacturing resultant product "Brush Box Made Out of
Phenolic Moulding Compound" under 4.7 HBP and being granted
11.88 Grams raw material Phenolic Moulding Compound for
The Committee decided
to remind again the
authority for expediting
the comments.
Deferred
5 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
manufacturing to one piece "Brush Box Made Out of Phenolic Moulding Compound" on each and every AA. Hence, the applicant requested to allow 11.88 Grams per piece. The representation was referred to DPIIT on 18.11.2020. The case was considered in M. No. 11/81-ALC2/2020 dated 24.11.2020 (Held on 01.12.2020) and decided to wait for the comments. A reminder was issued to DPIIT on 12.01.2021. DPIIT via email dt. 05.02.2021 had requested that the application may be referred to D/o C&PC.
ld on 01.12.2020) and decided to wait for the comments. A reminder was issued to DPIIT on 12.01.2021. DPIIT via email dt. 05.02.2021 had requested that the application may be referred to D/o C&PC. Hence, the case was referred to Consultant (TEC-1) on 07.04.2021 for examination & comments. The case was considered in M. No. 01/81 dated 21.05.2021, the Committee decided to send a copy of application to Consultant (TEC-1). As per NC decision, a copy of application sent to Consultant (TEC-1) on 09.07.2021. The case was considered in M. No. NC/2/MEET/Jul/202122/1 (Offline Cases) dated 16.07.2021 and the Committee decided to ask from the applicant to furnish following information as per comments of Consultant (TEC-1):
- Drawing of the mould with complete specification of mould (out of which export is made)
- Past production and consumption data duly certified.
As per NC decision, an email was sent to the applicant on 19.08.2021. The applicant’s reply dated 31.08.2021 was forwarded to Consultant (TEC-1) on 01.09.2021 for examination of the case. The case was discussed in M. No. NC/2/MEET/Jul/202122/2 (Offline Cases) dated 03.09.2021 and it was decided to wait for comments. 16.11.2021 and the Committee noted that Consultant (TEC-1) informed that as per the details furnished by the applicant, the export item is made from 4 cavity moulds where sprue & runner weight is around 53% of components weight. The item is made out of phenolic moulding compound which is thermosetting resin and it cannot be recycled.
made from 4 cavity moulds where sprue & runner
weight is around 53% of components weight. The item is made
out of phenolic moulding compound which is thermosetting resin
and it cannot be recycled. However, the Committee noted that
DPIIT vide their email dated 05.02.2021 had suggested to refer
the case to D/o C&PC. Therefore, Committee decided to take
opinion from D/o C&PC also before taking a final view. As per
NC decision, the case was referred to D/o C&PC on 02.02.2022.
dated 03.02.2022 and the Committee decided to wait for the
comments. A reminder was also issued to D/o C&PC on
15.03.2022 for expediting the comments.
The
case
was
discussed
in
the
M.
No.
and the Committee decided to send a reminder to TE, D/o C &
PC. As per NC decision, a reminder was issued on 21.04.2022.
The
case
was
discussed
in
the
M.
No.
NC/2/MEET/May/202223/4 (Offline Cases) dated 30.05.2022 and
the Committee decided to decide to send again a reminder letter
by post to TE, D/o C & PC. As per NC decision, a letter was sent
to D/o C & PC on 25.07.2022.
The case was discussed in the M. No. NC/2/MEET/Jun/202223/8
wait for comments.
The
case
was
last
discussed
in
the
M.
No.
and the Committee decided to remind the authority for the
comments. As per NC decision, a reminder was issued on
07.12.2022. However, no comments have been received as yet.
ssed in the M. No. and the Committee decided to remind the authority for the comments. As per NC decision, a reminder was issued on 07.12.2022. However, no comments have been received as yet.
6 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
M-4
Bharat Heavy Electricals Limited
111002831 9 dated 12.01.2018 01/81/050/00 096/AM19/
11/24/040/00 006/AM18/
(E-22943)
The case was ratified in M. No. 05/81-ALC2/2018 dated 10.10.2018 as per written comments of DHI vide U. O. No. DES- 2/BHEL/GTr/2018-TW-HEI. The applicant vide their email dated 26.11.2018 requested for revision of ratified norms. The case was considered in M. No. 12/81 dated 18.09.2019, 15/81 dated 30.10.2019 and 18/81 dated 11.12.2019 and decided to send the applicant’s representation/application to DHI immediately. As per the decision of M. No. 24/81dated 18.03.2020, the complete set of application forward to DHI via email dated 07.08.2020. The case was considered in M. No. 06/81 dt. 25.08.2020 and decided to remind DHI for expediting the comments. The representation was again forwarded to DHI on 26.10.2020. The case was considered in M. No. 09/81 dated 20.10.2020 (Held on 27.10.2020) and decided to wait for the comments. A reminder was issued to DHI on 25.11.2020. Also, a scan copy of application was sent to DHI on 22.12.2020 to examine the case. The case was considered in M. No.
decided to wait for the comments. A reminder was issued to DHI
on 25.11.2020. Also, a scan copy of application was sent to DHI
on 22.12.2020 to examine the case.
The case was considered in M. No. 12/81 dated 15.12.2020 and
held on 22.12.2020, the comments given by DHI vide email dated
01.12.2020 wherein it is stated that the applicant had requested
vide letter dated 24.11.2018 to check the item No. 2 of SION C-
158 for typographical error. Further, DHI had requested to send
the file where the SION was fixed to examine the applicant’s
request. However, it was noted that the SIONs were fixed for
items since long year back and at present it is not possible to
search out the file of these SIONs. Therefore, the Committee
decided to request DHI to examine the matter and furnished their
comments.
As per decision, the case was again referred to DHI on
27.01.2021.
The case was considered in M. No. 01/81 dated 21.05.2021, the
Committee decided to remind DHI for expediting the comments.
The case was considered in M. No. NC/2/MEET/Jul/202122/1
(Offline Cases) dated 16.07.2021 and the Committee noted the
comments of DHI vide email dated 21.06.21 wherein it is stated
that the issue of the case is very critical and not possible to
examine the request without knowing the basis of SION and
requested to forward the file where SION was fixed. However, the
Committee again noted at present it is not possible to search out
the file of these SIONs.
st without knowing the basis of SION and
requested to forward the file where SION was fixed. However, the
Committee again noted at present it is not possible to search out
the file of these SIONs. Therefore, the Committee decided to
request Technical Representative of DHI to coordinate with
Consultant (TEC-3), to examine the matter afresh and then
provide their comments. The Committee’s decision was conveyed
to the representative of DHI & Consultant (TEC-3) vide email
dated 19.08.2021.
The case was discussed in M. No. NC/2/MEET/Jul/202122/2
(Offline Cases) dated 03.09.2021 and it was decided to wait for
comments. Reminder was issued on 25.10.2021 to Consultant
(TEC-3) & DHI for expediting the comments.
16.11.2021 and the Committee decided to remind again Consultant (TEC-3) & DHI for expediting the comments. As per NC decision, reminder was issued to Consultant (TEC-3) & DHI for expediting the comments on 28.12.2021. dated 03.02.2022 and the matter was discussed in the meeting. Consultant (TEC-3) advised that the case may be examined and the file, where the SION was fixed, not required as requested by DHI. Further, Consultant (TEC-3) informed that export product does not fall under SION indicated by DHI in their comments. Hence, DHI should examine the case on the basis of details provided by the applicant. Therefore, the Committee decided to request DHI for expediting their comments. The case has already been approved in online meeting No. NC/2/MEET/Nov/202 223/17 dated 06.12.2022.
applicant. Therefore, the Committee decided to
request DHI for expediting their comments.
The case has already
been
approved
in
online meeting No.
NC/2/MEET/Nov/202
223/17
dated
06.12.2022.
Therefore, the case
may
be
withdrawn
from agenda showing
as “approved”.
Approved.
7 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
The case was discussed in the M. No. and the Committee decided to ask the applicant to furnish the following information as per comments of DHI received via email dated 29.03.2022:
- To give the calculation of the requirement of the import item at Sl. No. 2 supported by the dimensional engineering drawing.
As per NC decision, a DL was issued to the applicant on
25.04.2022.
The case was discussed in the M. No. NC/2/MEET/May/202223/4
(Offline Cases) dated 30.05.2022 and the Committee decided to
send a reminder to the applicant for furnishing the requisite
information. The applicant’s reply was received on 13.07.2022
and the same was sent to Consultant (TEC-3) on 26.07.2022 for
examination & comments.
The case was discussed in the M. No. NC/2/MEET/Jun/202223/8
wait for the comments.
The
case
was
last
discussed
in
the
M.
No.
NC/2/MEET/Oct/202223/14 (Offline Cases) dated 21.10.2022and
the Committee decided to remind the TE for expediting the
comments. As per NC decision, a reminder was issued to
Consultant (TEC-3) on 28.11.2022 for expediting the comments.
However, no comments have been received as yet.
M-5
AMC Cookware (India) Pvt. Ltd.
r NC decision, a reminder was issued to Consultant (TEC-3) on 28.11.2022 for expediting the comments. However, no comments have been received as yet.
M-5
AMC Cookware (India) Pvt. Ltd.
071011036 2 Dated 02.09.2016 01/81/050/00 868/AM19/
07/24/040/00 176/AM17/
(E-24809) The case was ratified in M. No. 04/81 dated 17.06.2020 as per written comments given by DPIIT vide U. O. No.: P- 47011/189/2019-TSW dated 30.06.2020. The applicant via email dated 08.09.2020 requested for re-fixation of Norms for such items in which the shape of the output product is oval/oblong made out of sheet. The applicant had provided the dimensions and shape of the input and output products. In these cases the NC had given 10% wastage considering made out of circles. The representation was forwarded to DPIIT vide email dated 08.10.2020 for examination of the case. The case was considered in M. No. 09/81 dated 20.10.2020 (Held on 27.10.2020) and DPIIT informed that the case is under examination. The case was considered in M. No. 12/81 dated 15.12.2020 held on 22.12.2020, the Committee noted the comments given by DPIIT vide U. O. No.: P-47011/189/2019-TSW dated 28.10.2020 wherein it is mentioned that, due to oversight, norms for certain import items were fixed as 1.10Kgs/Kg content in the export item which are applicable for manufacture from Stainless Steel Circle. As in this case, import items are Stainless Steel Sheets, wastage would be higher and, therefore, wastage norms need to be revised.
hich are applicable for manufacture from Stainless Steel Circle. As in this case, import items are Stainless Steel Sheets, wastage would be higher and, therefore, wastage norms need to be revised. The applicant had indicated that the shape of export items in many cases is “Oblong”. In view of above comments, the Committee decided to seek from the applicant to furnish following information as per comments given by DPIIT:
-
Sheet layout diagram indicating wastage during blanking, export product-wise. As per NC decision, D/L was sent to the applicant on 28.01.2021. The applicant’s reply sent to DPIIT on 07.04.2021. The case was considered in M. No. 01/81 dated 21.05.2021, the Committee decided to remind DPIIT for expediting the comments. As per NC decision, a reminder was issued to DPIIT on 09.07.2021.
The case was considered in M. No. NC/2/MEET/Jul/202122/1 (Offline Cases) dated 16.07.2021 and the Committee decided to wait for comments. The case was considered in M. No. NC/2/MEET/Jul/202122/2 (Offline Cases) dated 03.09.2021 and The Committee per agenda and decided to revise the ad-hoc norms as per comments of Consultant (TEC-3) given via email dated 18.12.2022 as under:
The quantity of import items at Sl. No. 1 to 6 may be allowed as 1.20Kgs/Kg content in the export product.
Note:
1.
Export
products
are
oblong/oval
shape
utensils
made
of
Stainless
Steel
Sheets.
2.
Grade
&
thickness of import
item will be same as
used
in
export
product.
3.
oduct.
Note:
1.
Export
products
are
oblong/oval
shape
utensils
made
of
Stainless
Steel
Sheets.
2.
Grade
&
thickness of import
item will be same as
used
in
export
product.
3.
The
Decision for rest of
the
import
items
shall
remain
unchanged
as
decided
in
the
Approved
8 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
decided to remind DPIIT expediting for comments. A reminder
was issued on 26.10.2021 to DPIIT.
16.11.2021 and the Committee decided to wait for the comments.
dated 03.02.2022 and the Committee noted that earlier 10% wastage was recommended by DPIIT. Now, DPIIT vide U.O. No. P-47011/189/2019-TSW dated 18.11.2021 has revised the ratified ad-hoc norms with higher wastage without giving any justification for the same. Therefore, the Committee decided to take second opinion of Consultant (TEC-3) in this matter. As per NC decision, the case was referred to Consultant (TEC-3) on 11.03.2022.
The case was discussed in the M. No. and the Committee decided to remind Consultant (TEC-3) for expediting the comments. As per NC decision, the reminder was issued on 21.04.2022. The case was discussed in the M. No. the Committee decided to send a copy of reply of DL as raised by DPIIT along with a copy of comments of DPIIT as requested by Consultant (TEC-3). As per NC decision, the documents were sent to Consultant (TEC-3) on 06.07.2022 for examination & comments.
The case was discussed in the M. No. NC/2/MEET/Jun/202223/8 wait for the comments.
As per NC decision, the documents were sent to Consultant (TEC-3) on 06.07.2022 for examination & comments.
The case was discussed in the M. No. NC/2/MEET/Jun/202223/8
wait for the comments. Further, the reminders were issued to
Consultant (TEC-3) on 13.09.2022 & 06.10.2022 for expediting
the comments.
The
case
was
last
discussed
in
the
M.
No.
and the Committee decided to remind the TE for expediting the
comments. As per NC decision, a reminder was issued to
Consultant (TEC-3) on 28.11.2022 for expediting the comments.
Meeting No. 04/81dated 17.06.2020.
RA concerned may take suitable consequential action accordingly. M-6
AMC Cookware (India) Pvt. Ltd.
071011083 6 Dated 23.12.2016 01/81/050/01 063/AM19/
07/24/040/00 313/AM17/
(E-24810)
The case was ratified in Meeting No. 4/81-ALC2/2020 dated 17.06.2020 as per written comments given by DPIIT vide U. O. No.: P-47011/189/2019-TSW dated 30.06.2020. The applicant via email dated 08.09.2020 requested for re-fixation of Norms for only such items in which the shape of the output product is oval/oblong made out of sheet. The applicant had provided the dimensions and shape of the input and output products. In these cases the NC had given 10% wastage considering made out of circles. The representation was forwarded to DPIIT vide email dated 08.10.2020 for examination of the case. The case was considered in M. No. 09/81 dated 20.10.2020 (Held on 27.10.2020) and DPIIT informed that the case is under examination. The case was considered in M. No.
for examination of the case. The case was considered in M. No. 09/81 dated 20.10.2020 (Held on 27.10.2020) and DPIIT informed that the case is under examination. The case was considered in M. No. 12/81 dated 15.12.2020 held on 22.12.2020, the Committee noted the comments given by DPIIT vide U. O. No.: P-47011/189/2019-TSW dated 28.10.2020 wherein it is mentioned that, due to oversight, norms for certain import items were fixed as 1.10Kgs/Kg content in the export item which are applicable for manufacture from Stainless Steel Circle. As in this case, import items are Stainless Steel Sheets, wastage would be higher and, therefore, wastage norms need to be revised. The applicant had indicated that the shape of export items in many cases is “Oblong”. In view of above comments, the Committee decided to seek from the applicant to furnish following information as per comments given by DPIIT: The Committee per agenda and decided to revise the ad-hoc norms as per comments of Consultant (TEC-3) given via email dated 18.12.2022 as under:
- The quantity of import items at Sl. No. 1 to 3, 8 & 9 may be allowed as 1.20Kgs/Kg content in the export product.
Note:
- Export products are oblong/oval shape utensils made of Stainless Steel Sheets.
- Grade &thickness of import item Approved
as 1.20Kgs/Kg content in the export product.
Note:
- Export products are oblong/oval shape utensils made of Stainless Steel Sheets.
- Grade &thickness of import item Approved
9 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
- Sheet layout diagram indicating wastage during blanking,
export product-wise.
As per NC decision, D/L was sent to the applicant on 28.01.2021.
Applicant’s Reply sent to DPIIT on 07.04.2021. The case was
considered in M. No. 01/81 dated 21.05.2021, the Committee
decided to remind DPIIT for expediting the comments. As per NC
decision, a reminder was issued to DPIIT on 09.07.2021.
The case was considered in M. No. NC/2/MEET/Jul/202122/1 (Offline Cases) dated 16.07.2021 and the Committee decided to wait for comments.
The case was considered in M. No. NC/2/MEET/Jul/202122/2 (Offline Cases) dated 03.09.2021 and decided to remind DPIIT expediting for comments. A reminder was issued on 26.10.2021 to DPIIT. The case was considered in M. No. NC/2/MEET/Jul/202122/2 (Offline Cases) dated 03.09.2021 and decided to remind DPIIT expediting for comments. A reminder was issued on 26.10.2021 to DPIIT.
16.11.2021 and the Committee decided to wait for the comments. dated 03.02.2022 and the Committee noted that earlier 10% wastage was recommended by DPIIT. Now, DPIIT vide U.O. No. P-47011/189/2019-TSW dated 18.11.2021 has revised the ratified ad-hoc norms with higher wastage without giving any justification for the same.
ge was recommended by DPIIT. Now, DPIIT vide U.O. No.
P-47011/189/2019-TSW dated 18.11.2021 has revised the ratified
ad-hoc norms with higher wastage without giving any justification
for the same. Therefore, the Committee decided to take second
opinion of Consultant (TEC-3) in this matter. As per NC decision,
the case was referred to Consultant (TEC-3) on 11.03.2022.
The
case
was
discussed
in
the
M.
No.
and the Committee decided to remind Consultant (TEC-3) for
expediting the comments. As per NC decision, the reminder was
issued on 21.04.2022.
The
case
was
discussed
in
the
M.
No.
the Committee decided to send a copy of reply of DL as raised by
DPIIT along with a copy of comments of DPIIT as requested by
Consultant (TEC-3). As per NC decision, the documents were
sent to Consultant (TEC-3) on 06.07.2022 for examination &
comments.
The
case
was
discussed
in
the
M.
No.
NC/2/MEET/Jun/202223/8 (Offline Cases) dated 27.07.2022 and
the Committee decided to wait for the comments. Further, the
reminders were issued to Consultant (TEC-3) on 13.09.2022 &
06.10.2022 for expediting the comments.
The
case
was
last
discussed
in
the
M.
No.
and the Committee decided to remind the TE for expediting the
comments. As per NC decision, a reminder was issued to
Consultant (TEC-3) on 28.11.2022 for expediting the comments.
will be same as used in export product. 3. The Decision for rest of the import items shall remain unchanged as decided in the Meeting No. 4/81- ALC2/2020 dated 17.06.2020.
omments.
will be same as used in export product. 3. The Decision for rest of the import items shall remain unchanged as decided in the Meeting No. 4/81- ALC2/2020 dated 17.06.2020.
RA concerned may take suitable consequential action accordingly. M-7
AMC Cookware (India) Pvt. Ltd.
071011126 4 Dated 09.03.2017 01/81/050/01 075/AM19/
07/24/040/00 383/AM17/
(E-24811)
The case was ratified in Meeting No. 4/81-ALC2/2020 dated 17.06.2020 as per written comments given by DPIIT vide U. O. No.: P-47011/189/2019-TSW dated 30.06.2020. The applicant via email dated 08.09.2020 requested for re-fixation of Norms for only such in which the shape of the output product is oval/oblong made out of sheet. The applicant had provided the dimensions and shape of the input and output products. In these cases the NC had given 10% wastage considering made out of circles. The representation was forwarded to DPIIT vide email dated 08.10.2020 for examination of the case. The case was considered in M. No. 09/81 dated 20.10.2020 (Held on 27.10.2020) and DPIIT informed that the case is under examination. The case was The Committee per agenda and decided to revise the ad-hoc norms as per comments of Consultant (TEC-3) given via email dated 18.12.2022 as under:
The quantity of import items at Sl. No. 9 to 14 may be Approved
and decided to revise the ad-hoc norms as per comments of Consultant (TEC-3) given via email dated 18.12.2022 as under:
The quantity of import items at Sl. No. 9 to 14 may be Approved
10 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
considered in M. No. 12/81 dated 15.12.2020 held on 22.12.2020, the Committee noted the comments given by DPIIT vide U. O. No.: P-47011/189/2019-TSW dated 28.10.2020 wherein it is mentioned that, due to oversight, norms for certain import items were fixed as 1.10Kgs/Kg content in the export item which are applicable for manufacture from Stainless Steel Circle. As in this case, import items are Stainless Steel Sheets, wastage would be higher and, therefore, wastage norms need to be revised. The applicant had indicated that the shape of export items in many cases is “Oblong”. In view of above comments, the Committee decided to seek from the applicant to furnish following information as per comments given by DPIIT:
- Sheet layout diagram indicating wastage during blanking,
export product-wise.
As per NC decision, D/L was sent to the applicant on 28.01.2021.
Applicant’s Reply sent to DPIIT on 07.04.2021. The case was
considered in M. No. 01/81 dated 21.05.2021, the Committee
decided to remind DPIIT for expediting the comments. As per NC
decision, a reminder was issued to DPIIT on 09.07.2021.
The case was considered in M. No. NC/2/MEET/Jul/202122/1 (Offline Cases) dated 16.07.2021 and the Committee decided to wait for comments. The case was considered in M. No.
to DPIIT on 09.07.2021.
The case was considered in M. No. NC/2/MEET/Jul/202122/1
(Offline Cases) dated 16.07.2021 and the Committee decided to
wait for comments. The case was considered in M. No.
NC/2/MEET/Jul/202122/2 (Offline Cases) dated 03.09.2021 and
decided to remind DPIIT expediting for comments. A reminder
was issued on 26.10.2021 to DPIIT.
16.11.2021 and the Committee decided to wait for the comments.
dated 03.02.2022 and the Committee noted that earlier 10%
wastage was recommended by DPIIT. Now, DPIIT vide U.O. No.
P-47011/189/2019-TSW dated 18.11.2021 has revised the ratified
ad-hoc norms with higher wastage without giving any justification
for the same. Therefore, the Committee decided to take second
opinion of Consultant (TEC-3) in this matter. As per NC decision,
the case was referred to Consultant (TEC-3) on 11.03.2022.
The
case
was
discussed
in
the
M.
No.
and the Committee decided to remind Consultant (TEC-3) for
expediting the comments. As per NC decision, the reminder was
issued on 21.04.2022.
The
case
was
discussed
in
the
M.
No.
the Committee decided to send a copy of reply of DL as raised by
DPIIT along with a copy of comments of DPIIT as requested by
Consultant (TEC-3). As per NC decision, the documents were
sent to Consultant (TEC-3) on 06.07.2022 for examination &
comments.
The
case
was
discussed
in
the
M.
No.
NC/2/MEET/Jun/202223/8 (Offline Cases) dated 27.07.2022 and
the Committee decided to wait for the comments.
on 06.07.2022 for examination &
comments.
The
case
was
discussed
in
the
M.
No.
NC/2/MEET/Jun/202223/8 (Offline Cases) dated 27.07.2022 and
the Committee decided to wait for the comments. Further, the
reminders were issued to Consultant (TEC-3) on 13.09.2022 &
06.10.2022 for expediting the comments.
The
case
was
last
discussed
in
the
M.
No.
and the Committee decided to remind the TE for expediting the
comments. As per NC decision, a reminder was issued to
Consultant (TEC-3) on 28.11.2022 for expediting the comments.
allowed as 1.20Kgs/Kg content in the export product.
Note:
1.
Export
products
are
oblong/oval
shape
utensils
made
of
Stainless
Steel
Sheets.
2.
Grade
&
thickness of import
item will be same as
used
in
export
product.
3.
The
Decision for rest of
the import items
shall
remain
unchanged
as
decided
in
the
Meeting No. 4/81-
ALC2/2020
dated
17.06.2020.
RA concerned may take suitable consequential action accordingly. M-8
AMC Cookware (India) Pvt. Ltd.
01/81/050/00 766/AM19/
07/24/040/00 016/AM18/ The case was ratified in Meeting No. 4/81-ALC2/2020 dated 17.06.2020 as per written comments given by DPIIT vide U. O. No.: P-47011/189/2019-TSW dated 30.06.2020. The applicant via email dated 08.09.2020 requested for re-fixation of norms for only such items in which the shape of the output product is oval/oblong The Committee per agenda and decided to revise the ad-hoc Approved
ted 08.09.2020 requested for re-fixation of norms for only such items in which the shape of the output product is oval/oblong The Committee per agenda and decided to revise the ad-hoc Approved
11 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
071011150 2 Dated 28.04.2017
(E-24812)
made out of sheet. The applicant had provided the dimensions and shape of the input and output products. In these cases the NC has given 10% wastage considering made out of circles. The representation was forwarded to DPIIT vide email dated 08.10.2020 for examination of the case. The case was considered in M. No. 09/81 dated 20.10.2020 (Held on 27.10.2020) and DPIIT informed that the case is under examination. The case was considered in M. No. 12/81 dated 15.12.2020 held on 22.12.2020, the Committee noted the comments given by DPIIT vide U. O. No.: P-47011/189/2019-TSW dated 28.10.2020 wherein it is mentioned that, due to oversight, norms for certain import items were fixed as 1.10Kgs/Kg content in the export item which are applicable for manufacture from Stainless Steel Circle. As in this case, import items are Stainless Steel Sheets, wastage would be higher and, therefore, wastage norms need to be revised. The applicant had indicated that the shape of export items in many cases is “Oblong”. In view of above comments, the Committee decided to seek from the applicant to furnish following information as per comments given by DPIIT:
- Sheet layout diagram indicating wastage during blanking, export product-wise.
the Committee decided to seek from the applicant to furnish following information as per comments given by DPIIT:
- Sheet layout diagram indicating wastage during blanking,
export product-wise.
As per NC decision, D/L was sent to the applicant on 28.01.2021.
Applicant’s Reply sent to DPIIT on 07.04.2021. The case was
considered in M. No. 01/81 dated 21.05.2021, the Committee
decided to remind DPIIT for expediting the comments. As per NC
decision, a reminder was issued to DPIIT on 09.07.2021.
The case was considered in M. No. NC/2/MEET/Jul/202122/1 (Offline Cases) dated 16.07.2021 and the Committee decided to wait for comments. The case was considered in M. No. NC/2/MEET/Jul/202122/2 (Offline Cases) dated 03.09.2021 and decided to remind DPIIT expediting for comments. A reminder was issued on 26.10.2021 to DPIIT.
16.11.2021 and the Committee decided to wait for the comments. dated 03.02.2022 and the Committee noted that earlier 10% wastage was recommended by DPIIT. Now, DPIIT vide U.O. No. P-47011/189/2019-TSW dated 18.11.2021 has revised the ratified ad-hoc norms with higher wastage without giving any justification for the same. Therefore, the Committee decided to take second opinion of Consultant (TEC-3) in this matter. As per NC decision, the case was referred to Consultant (TEC-3) on 11.03.2022.
The case was discussed in the M. No. and the Committee decided to remind Consultant (TEC-3) for expediting the comments. As per NC decision, the reminder was issued on 21.04.2022. The case was discussed in the M. No.
M. No. and the Committee decided to remind Consultant (TEC-3) for expediting the comments. As per NC decision, the reminder was issued on 21.04.2022. The case was discussed in the M. No. the Committee decided to send a copy of reply of DL as raised by DPIIT along with a copy of comments of DPIIT as requested by Consultant (TEC-3). As per NC decision, the documents were sent to Consultant (TEC-3) on 06.07.2022 for examination & comments.
The case was discussed in the M. No. NC/2/MEET/Jun/202223/8 wait for the comments. Further, the reminders were issued to Consultant (TEC-3) on 13.09.2022 & 06.10.2022 for expediting the comments. The case was last discussed in the M. No. and the Committee decided to remind the TE for expediting the norms as per comments of Consultant (TEC-3) given via email dated 18.12.2022 as under:
- The quantity of import items at Sl. No. 1 to 5 may be allowed as 1.20Kgs/Kg content in the export product. Note:
- Export products are oblong/oval shape utensils made of Stainless Steel Sheets.
- Grade & thickness of import item will be same as used in export product.
- The Decision for rest of the import items shall remain unchanged as decided in the Meeting No. 4/81- ALC2/2020 dated 17.06.2020. RA concerned may take suitable consequential action accordingly.
ision for rest of the import items shall remain unchanged as decided in the Meeting No. 4/81- ALC2/2020 dated 17.06.2020. RA concerned may take suitable consequential action accordingly.
12 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
comments. As per NC decision, a reminder was issued to Consultant (TEC-3) on 28.11.2022 for expediting the comments.
M-9
DIACH CHEMICA LS & PIGMENT S PRIVATE LIMITED
021020826 9 dated 13.03.2018 01/81/050/00 108/AM19/
02/24/040/00
192/AM18/
The case was rejected in M. No. 11/81-ALC2/2018 dated
30.01.2019 due to non-submission of reply of deficiency letter.
The applicant via email dated 13.08.2020 furnished a reply and
requested to ratify the ad-hoc norms. The representation was
referred to DPIIT on 02.12.2020.
The case was considered in M. No. 12/81dated 15.12.2020 held
on 22.12.2020 and decided to wait for the comments. DPIIT via
email dated 05.01.2021 inform that the case may be refer to
MSME. The case was forwarded to MSME on 07.04.2021.
The case was considered in M. No. 01/81 dated 21.05.2021 and
the Committee noted that MSME via email dated 20.05.2021
informed that, as per Certificate of Analysis submitted by the
applicant, the percent of lead in import is 96.43% which works
out to be less than the export quantity. Therefore, the Committee
decided to ask from the applicant to furnish the following
information as per comments of MSME as under:
96.43% which works out to be less than the export quantity. Therefore, the Committee decided to ask from the applicant to furnish the following information as per comments of MSME as under:
- To provide average lead percentage of each batch imported
and provide the overall average lead percentage of import.
As per NC decision, a deficiency letter was sent to the applicant
on 14.07.2021.
The case was considered in M. No. NC/2/MEET/Jul/202122/2 (Offline Cases) dated 03.09.2021 and decided to send a reminder to the applicant for furnishing the requisite information.
16.11.2021 and the Committee noted that the applicant’s reply was sent to MSME on 16.11.2021 for examination of the case. Hence, the Committee decided to wait for the comments.
dated 03.02.2022 and the Committee noted that MSME informed via email dated 03.02.2022 that the comments could be provided after finalizing the report on lead scarp. Therefore, the case was deferred.
The case was discussed in the M. No. and the Committee noted that the report on lead scarp has not been finalized yet. Therefore, the Committee decided to defer the case.
(Offline Cases) dated 27.07.2022 and the Committee noted that the report on lead scarp is under finalization. Therefore, the Committee decided to defer the case. The case was last discussed in the M. No. and the Committee decided to ask from the applicant to furnish the following information: 1.
Therefore, the Committee decided to defer the case. The case was last discussed in the M. No. and the Committee decided to ask from the applicant to furnish the following information:
- Certificate of Analysis (CoA) issued by Custom Authority or Custom Authorized Laboratory on the total net content of lead including lead oxide & lead sulphide in the Lead scraps (Rains/Rails/Rents/ Radio/ Ropes/ Relays/Re-melted Lead Ingots).
- Percentage of recovery of material other than Lead Scrap and value thereof in terms of INR.
- Environment clearance certificate, issued by MoEF&CC/CPCB/SPCB on the import of Lead scraps for processing into Lead Ingots/Lead Alloy Ingot etc. The Committee decided to send a reminder to the applicant for furnishing the requisite information within 15 days.
Deferred
13 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
As per NC decision, DL was issued to the applicant on 07.12.2022. However, no reply has been received as yet.
M-10
DIACH CHEMICA LS & PIGMENT S PRIVATE LIMITED
021020797 0 dated 10.11.2017 01/81/050/00 040/AM19/
02/24/040/00 122/AM18/ The case was rejected in M. No. 11/81-ALC2/2018 dated 30.01.2019 due to non-submission of reply of deficiency letter. The applicant via email dated 13.08.2020 & 17.08.2020 furnished a reply and requested to ratify the ad-hoc norms. The representation was referred to DPIIT on 02.12.2020 & 31.12.2020. The case was considered in M. No.
il dated 13.08.2020 & 17.08.2020 furnished
a reply and requested to ratify the ad-hoc norms. The
representation was referred to DPIIT on 02.12.2020 &
31.12.2020.
The case was considered in M. No. 12/81dated 15.12.2020 held
on 22.12.2020 and decided to wait for the comments. A reminder
was issued to DPIIT on 02.02.2021. Further, the case was referred
to MSME on 20.05.2021 for examination & comments.
The case was considered in M. No. 01/81 dated 21.05.2021 and
the Committee noted that MSME via email dated 20.05.2021
informed that, as per Certificate of Analysis submitted by the
applicant, the percent of lead in import is 97% which works out to
be less than the export quantity. Therefore, the Committee
decided to ask from the applicant to furnish the following
information as per comments of MSME as under:
- To provide average lead percentage of each batch imported and provide the overall average lead percentage of import. As per NC decision, a deficiency letter was sent to the applicant on 14.07.2021. The case was considered in M. No. NC/2/MEET/Jul/202122/2 (Offline Cases) dated 03.09.2021 and decided to send a reminder to the applicant for furnishing the requisite information.
16.11.2021 and the Committee noted that the applicant’s reply was sent to MSME on 16.11.2021 for examination of the case. Hence, the Committee decided to wait for the comments. dated 03.02.2022 and the Committee noted that MSME informed via email dated 03.02.2022 that the comments could be provided after finalizing the report on lead scarp.
ided to wait for the comments. dated 03.02.2022 and the Committee noted that MSME informed via email dated 03.02.2022 that the comments could be provided after finalizing the report on lead scarp. Therefore, the case was deferred. The case was discussed in the M. No. and the Committee noted that the report on lead scarp has not been finalized yet. Therefore, the Committee decided to defer the case. The case was discussed in the M. No. the Committee noted that the report on lead scarp has not been finalized yet. Therefore, the Committee decided to defer the case.
(Offline Cases) dated 27.07.2022 and the Committee noted that the report on lead scarp is under finalization. Therefore, the Committee decided to defer the case. The case was last discussed in the M. No. and the Committee decided to ask from the applicant to furnish the following information: 1. Certificate of Analysis (CoA) issued by Custom Authority or Custom Authorized Laboratory on the total net content of lead including lead oxide & lead sulphide in the Lead scraps (Rains/Rails/Rents/ Radio/ Ropes/ Relays/Re-melted Lead Ingots). 2. Percentage of recovery of material other than Lead Scrap and value thereof in terms of INR. 3. Environment clearance certificate, issued by The Committee decided to send a reminder to the applicant for furnishing the requisite information within 15 days.
Deferred
Deferred
. Environment clearance certificate, issued by The Committee decided to send a reminder to the applicant for furnishing the requisite information within 15 days.
Deferred
Deferred
14 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
MoEF&CC/CPCB/SPCB on the import of Lead scraps for processing into Lead Ingots/Lead Alloy Ingot etc. As per NC decision, DL was issued to the applicant on 07.12.2022. However, no reply has been received as yet.
M-11
PRANITA ENGINEE RING SOLUTIO NS PRIVATE LIMITED
071006449 2 dated 04.05.2009 01/81/050/00 026/AM10/
07/24/040/00 039/AM10/ The case was rejected in M. No. 38/81 dated 22.12.2009 (actually held on 29.12.2009) due to non-submission of reply of the deficiency letter raised by DIPP. Subsequently, the case was placed in M. No. 44/81-ALC2/2009 dated 02.02.2010 and withdrawn. The applicant vide letter dated 11.11.2019 furnished reply with a request to fix the ad-hoc norms and also asked for personal hearing. The applicant’s representation was forwarded to DPIIT on 31.01.2020. In M. No. 22/81 dt. 19.02.2020, the Committee decided to wait for comments. Comments of DPIIT D/L received vide email dated 23.04.2020. DPIIT’s D/L was sent to the applicant on 07.07.2020. The case was considered in M. No. 04/81 dt. 09.07.2020 and decided to wait for reply of the applicant. A reminder was sent to the applicant on 27.08.2020. The case was considered in M. No.
7.2020. The case was considered in M. No.
04/81 dt. 09.07.2020 and decided to wait for reply of the
applicant. A reminder was sent to the applicant on 27.08.2020.
The case was considered in M. No. 07/81dated 08.09.2020 and
decided to remind again the applicant for furnishing the requisite
information. As per NC decision, a reminder was sent to the
applicant on 22.10.2020. The applicant’s reply received via email
dated 17.11.2020 was forwarded to DPIIT on 17.11.2020. The
case was considered in M. No. 10/81 dated 10.11.2020 held on
17.11.2020 and decided to wait for the comments. A reminder
was issued to DPIIT on 23.12.2020. The case was referred
to MSME on 06.01.2021 on the advice of DPIIT. The written
comments was received by MSME via email dated 07.01.2021.
The Committee noted the case was rejected in M. No. 38/81 dated
22.12.2009 (actually held on 29.12.2009) due to non-submission
of reply of the deficiency letter raised by DIPP. Subsequently, the
case was placed in M. No. 44/81-ALC2/2009 dated 02.02.2010
and withdrawn. The applicant had applied for review after a lapse
of approx. 10 years. It is not known whether the case was
considered by the NC in any meeting during this period. Hence,
the Committee decided to seek a report from concerned RA about
present status of norms fixation including any pending ECA
action. A letter was sent to RA, Bangalore on 08.04.2021 in this
regard.
The case was considered in M. No. 01/81 dated 21.05.2021 and
the Committee decided to remind RA, Bangalore for furnishing
the requisite information.
o RA, Bangalore on 08.04.2021 in this
regard.
The case was considered in M. No. 01/81 dated 21.05.2021 and
the Committee decided to remind RA, Bangalore for furnishing
the requisite information. As per NC decision, an email was sent
to RA, Bangalore on 20.07.2021.
The case was considered in M. No. NC/2/MEET/Jul/202122/2
(Offline Cases) dated 03.09.2021 and decided to remind again
RA, Bangalore for expediting the comments. Reminder was
issued to RA, Bangalore on 09.11.2021.
16.11.2021 and the Committee decided to wait for the requisite
information from RA, Bangalore.
dated 03.02.2022 and the Committee decided to remind again RA, Bangalore for expediting the comments. As per NC decision, reminder was issued to RA, Bangalore on 10.03.2022 for expediting the comments.
The case was discussed in the M. No. and the Committee decided to remind again RA, Bangalore for expediting the comments. As per NC decision, a reminder was The Committee decided to remind again RA Bangalore with regard to status of ECA related issue. The committee also decided to refer this case to TE, Consultant (Tech-3) for re-examination.
Deferred
decided to remind again RA Bangalore with regard to status of ECA related issue. The committee also decided to refer this case to TE, Consultant (Tech-3) for re-examination.
Deferred
15 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
issued to RA, Bangalore on 24.05.2022.
The case was discussed in the M. No. the Committee noted that RA, Bangalore’s comments received via email dated 27.04.2022. Therefore, the Committee decided to take further necessary action in the subject matter. (Offline Cases) dated 27.07.2022 and the Committee noted the information received from RA, Bangalore. However, RA, Bangalore did not mention about any pending ECA action against the firm in its email dated 27.05.2022. Further, the matter was deliberated in the meeting and after due deliberation, the Committee decided to seek information regarding any pending ECA action against the firm from RA, Bangalore. As per NC decision, an email was sent to RA, Bangalore on 14.09.2022. The case was last discussed in the M. No. and the Committee noted that this is a very old case and has not been deliberated in any of the meetings. The RA, Banglore’s reply is also not clear. The firm’s representation has also not been received afterwards. Hence, Committee decided to reminder RA Bangalore for ECA related clear information. As per NC decision, a reminder was issued on 07.12.2022. However, no information has been received as yet.
rds. Hence, Committee decided to reminder RA Bangalore for ECA related clear information. As per NC decision, a reminder was issued on 07.12.2022. However, no information has been received as yet.
M-12
CG Power and Industrial Solution Limited (Formerly Crompton Greaves Limited)
031078969 2 dated 26.09.2014 01/81/050/00 505/AM15/
03/94/040/00
268/AM15/
The case was ratified in M. No. 20/81 dated 19.12.2017 as per
comments of DHI vide UO No. TSWB-3/181/2014 dated
12.01.2018.
The applicant vide letter dated 27.11.2020 stated that in the DHI
comments, the Norms were ratified for all items from Sr. no. 1 to
29 and items no. 30 to 39 were deleted. No reason was assigned in
the DHI letter dated 12.01.2018 to delete the items mentioned at
30 to 39. The party has already imported the Transformers and the
same have already been exported, hence the party has requested
for review the application and allow the inputs as per Item No. 30
to 39 on net to net basis as the goods are engineering goods which
are permitted in the policy on Net to Net basis. The representation
was referred to Consultant (TEC-3) on 29.12.2020.
The case was considered in M. No. 01/81 dated 21.05.2021 and
Consultant (TEC-3) informed via email dated 20.05.2021 that the
applicant had represented against deletion of import items at Sl.
No. 30 to 39by DHI. These items are not integral part of export
items i.e. Transformer and therefore, cannot be considered.
t the
applicant had represented against deletion of import items at Sl.
No. 30 to 39by DHI. These items are not integral part of export
items i.e. Transformer and therefore, cannot be considered. As
the earlier comments were given by DHI, therefore, the
Committee decided to forward the representation to DHI as per
advice of Consultant (TEC-3).
As per NC decision, the case was referred to DHI on 20.07.2021
for examination & comments.
The case was considered in M. No. NC/2/MEET/Jul/202122/2
(Offline Cases) dated 03.09.2021 and decided to send a reminder
to the applicant for furnishing the requisite information. Also, an
email was sent on 12.11.2021 to the applicant requesting to attend
personal hearing on 16.11.2021.
16.11.2021 and the Committee directed the applicant’s representatives to submit detailed representation with justification of the revision of the ratified norms during personal hearing.
dated 03.02.2022 and the Committee decided to send the requisite information to the Technical Authority as sought during personal The Committee per agenda and noted the Comments of DHI vide F. No. DES- 2/0310789693/2022- TSW dated 16.11.2022 wherein it is stated that the items mentioned at Sl. No. 30 to 39 of import item list are parts of the control panel which is fitted outside the transformer to monitor and control the various functions of the transformer. Therefore, as per comments of DHI, the Committee decided to revise the ad-hoc norms as under:
- The quantity of import items at Sl. No.
ntrol the various functions of the transformer. Therefore, as per comments of DHI, the Committee decided to revise the ad-hoc norms as under:
- The quantity of import items at Sl. No. 30 to 39 may be allowed on net to net basis as per GN- 4 with accountability clause.
Note: The Decision for rest of the import items shall remain unchanged as Approved
16 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
M- 13
M/s POCL ENTERP RISES LTD.
Lic. No./ Date: 0410163 810 20.12.20 17 HQ File :01/81/050/ 00524/AM 18
RLA File
:04/24/040/
00190/AM
18/
The case was rejected in Meeting No. 12/81-ALC2/2018 dated
13.02.2019 due to non-submission reply of deficiency letter.
Now, the applicant vide email dated 25.03.2021 & 21.04.2021
has furnished reply of deficiency letter with a request to fix the
ad-hoc norms. It is further mentioned by the applicant that the
Lead content in the import item “Re-melted lead ingot” is 96.5%.
The applicant’s representation was forwarded to DPIIT on
23.09.2021 for examination & comments.
The case was considered in M. No. NC/2/MEET/Sep/202122/3
(Offline Cases) dated 29.09.2021 and the Committee decided to
wait for the comments. A reminder was issued to DPIIT on
21.10.2021 for expediting the comments.
The case was discussed in the M. No. 07/81 (Offline Cases)
dated 16.11.2021 and the Committee considered decided to wait
for the comments. DPIIT vide U.O. No.
10.2021 for expediting the comments.
The case was discussed in the M. No. 07/81 (Offline Cases)
dated 16.11.2021 and the Committee considered decided to wait
for the comments. DPIIT vide U.O. No. P-47014/22/2021-TSW
dated 13.12.2021 had informed that the case may be referred to
MSME for comments. Accordingly, the case was referred to
MSME on 15.12.2021 for examination & comments.
The
case
was
discussed
in
the
M.
No.
NC/2/MEET/Jan/202122/8
dated
03.02.2022
and
The
Committee
per agenda and noted
that
applicant
has
submitted
all
the
documents but has
given COA of import
items from supplier
instead of custom lab.
Therefore, committee
decided to call the
applicant for personal
hearing
in
the
forthcoming meeting
to explain the case.
Deferred
hearing in Meeting No. 16.11.2021. As per NC decision, the
applicant’s reply was forwarded to DHI for examination of the
case.
The
case
was
discussed
in
the
M.
No.
and the Committee noted that DHI via email dated 22.03.2022 has
informed that the applicant has enclosed copy of licence of similar
export product to justify import on repeat basis. Further, it was
stated that the decision of NC is not available and requested to
forward the decision of NC to examine the request. DHI also
requested to correlate the items deleted in the present AA with the
one which has been approved. The Committee decided to check
the details as requested by DHI and thereafter, refer back the case
to DHI for examination & comments.
eleted in the present AA with the one which has been approved. The Committee decided to check the details as requested by DHI and thereafter, refer back the case to DHI for examination & comments.
As per NC decision, the case was checked and noted that the NC
decision has already been referred to DHI on 29.03.2022.
The
case
was
discussed
in
the
M.
No.
the Committee decided to remind the TE, DHI for expediting the
comments.
call the applicant for personal hearing to explain the case before
Norms Committee as per advice of the TE, DHI. As per NC
decision, a PH letter was sent to the applicant on 17.10.2022 to
attend personal hearing on 21.10.2022.
The
case
was
last
discussed
in
the
M.
No.
and the Committee heard the firm’s representatives during
personal hearing held during the NC meeting. The firm’s
representatives explained the case before Norms Committee in
detail. Further, the Committee directed the firm’s representatives
to submit detailed information and new points justifying the
essentiality/use of the deleted items in the export products so that
a decision can be taken by NC.
The firm has submitted the justification/representation as
mentioned during PH though email dated 09.11.2022 and the
same was forwarded to DHI for the comments.
decided in the Meeting No. 20/81 dated 19.12.2017.
RA concerned may take suitable consequential action accordingly.
dated 09.11.2022 and the same was forwarded to DHI for the comments.
decided in the Meeting No. 20/81 dated 19.12.2017.
RA concerned may take suitable consequential action accordingly.
17 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
and the Committee deferred the case as the report on lead scarp is not yet finalized.
(Offline Cases) dated 27.07.2022 and the Committee noted that
the report on lead scarp is under finalization. Therefore, the
Committee decided to defer the case. This case was referred to
Consultant (Tech-1).
The
case
was
last
discussed
in
the
M.
No.
and the Committee noted that the following information was
asked to furnish from the applicant:
1.
Certificate of Analysis (CoA) issued by Custom
Authority or Custom Authorized Laboratory on the total net
content of lead including lead oxide & lead sulphide in the Lead
scraps (Rains/Rails/Rents/ Radio/ Ropes/ Relays/Re-melted Lead
Ingots).
2.
Percentage of recovery of material other than Lead
Scrap and value thereof in terms of INR.
3.
Environment
clearance
certificate,
issued
by
MoEF&CC/CPCB/SPCB on the import of Lead scraps for
processing into Lead Ingots/Lead Alloy Ingot etc.
However, the applicant submitted the reply on the above queries on 21.10.2022 and the same were forwarded to Consultant (Tech-1) for comments. A reminder was also sent to Consultant (TEC-1) for expediting the comments. However, no comments have been received.
on 21.10.2022 and the same were forwarded to Consultant (Tech-1) for comments. A reminder was also sent to Consultant (TEC-1) for expediting the comments. However, no comments have been received.
M- 14
M/s
CONSOLI
DATED
COIN
COMPAN
Y
PRIVATE
LIMITED
Lic. No.: 0510405810 dated 07.03.2018
HQ File : HQRNOR MREV IW001465 49AM 22/
05/23/040/
00457/
AM18
The case was ratified in Meeting No. 03/81 dated 14.08.2018 on
repeat as approved for AA No. 0510399348 dated 03.08.2016.
The norms were again revised in Meeting No. 05/81 dated
16.07.2020 held on 28.07.2020 on the basis of study group report
dated 21.02.2020 as adopted by the Committee in the Meeting
No. 24/81 dated 18.3.2020. The Norms were recommended with
11% wastage for Copper Scrap, 8% wastage for Nickel Full
Plates & 8% wastage for SHG Zinc Ingots.
Now, the applicant has again requested to review the ad-hoc
norms.
The applicant’s representation was forwarded to DPIIT on
23.09.2021 for examination & comments.
The case was considered in M. No. NC/2/MEET/Sep/202122/3
(Offline Cases) dated 29.09.2021 and the Committee noted that
the applicant had requested for revision of earlier ratified norms.
The representatives of the applicant also attended personal
hearing and explained their case before Norms Committee.
Thereafter, the case was discussed amongst the technical
members in the meeting and the Committee decided to refer back
the matter to DPIIT & Consultant (TEC-3) for their opinion on
the subject matter.
after, the case was discussed amongst the technical
members in the meeting and the Committee decided to refer back
the matter to DPIIT & Consultant (TEC-3) for their opinion on
the subject matter. As per NC decision, the case was referred to
DPIIT & Consultant (TEC-3) on 11.11.2021 for examination &
comments.
The case was discussed in the M. No. 07/81 (Offline Cases)
dated 16.11.2021 and the Committee decided to wait for the
comments.
The
case
was
discussed
in
the
M.
No.
NC/2/MEET/Jan/202122/8 dated 03.02.2022 and the Committee
noted that the comments was received from DPIIT vide U. O.
No.
P-47011/62/2019-TSW
dated
02.12.2021.
However,
comments of Consultant (TEC-3) were still awaited. Therefore,
the Committee decided to remind Consultant (TEC-3) for
expediting the comments.
The
Committee
per
agenda
and
decided to defer the
case as the report of
study group is still
awaited.
Deferred
18 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
The
case
was
discussed
in
the
M.
No.
and the Committee noted that a Committee was constituted to
review the ad-hoc norms cases of the applicant. However, the
report of Committee is awaited. Therefore, the Committee
decided to defer the case.
The case was last discussed in the M. No. and the Committee decided to defer the case as the report of study group is still awaited.
M- 15
M/s Patel Engineeri ng Ltd
AA. No. 0310531631 dated 31.07.20 19 HQ File No: 01/81/050/ 00139/AM 10
M/s Patel Engineering Ltd.
as the report of study group is still awaited.
M- 15
M/s Patel Engineeri ng Ltd
AA. No. 0310531631 dated 31.07.20 19 HQ File No: 01/81/050/ 00139/AM 10
M/s Patel Engineering Ltd. has submitted review application
vide its letter dated 27.04.2022 in respect of AA No.
0310531631. They have stated that the subject AA was obtained
for import of Hot Rolled Steel Plates in various sizes required for
construction of Steel Liner in Pressure Shaft and Pen Stock as
per Project Authority Certificate issued by NTPC Ltd. They have
applied for the approval of norms through Mumbai DGFT which
was forwarded to DGFT, New Delhi vide their letter dated
31.07.2009. However, their application was withdrawn from the
agenda of Norms Committee meeting No. 26/81-ALC2/2009
dated 29.09.2009 as NC observed that the details given in the
hard copy are different from the particulars forwarded online.
The DGFT, Mumbai vide their letter dated 13.05.2010 addressed
to DGFT, Delhi clarified the cause of difference in data
informing that the technical characteristics of import items were
added at the time of issuance of AA, hence the difference. But
the application was never re-considered thereafter.
The applicant vide letter dated 05.07.2018 and subsequent letter
dated 11.10.2019 & 28.11.2019 approached to DGFT for
reconsideration of their case for fixation of norms but nothing
has been happened.
applicant vide letter dated 05.07.2018 and subsequent letter
dated 11.10.2019 & 28.11.2019 approached to DGFT for
reconsideration of their case for fixation of norms but nothing
has been happened. Upon successful completion of work of
NTPC and on receipt of work completion certificate by NTPC
Ltd, they approached DGFT, Mumbai for redemption of AA and
for issuance of EODC but since the norms were not approved by
NC, they could not redeem the license. The applicant has further
stated that they had got norms fixation in similar type of material
and for the similar work in a project [namely Loharingpala
Hydro Electric Project] awarded by NTPC Ltd vide approval
dated 14.10.2009 and 29.04.2010.
The applicant has further stated that they are being informed by
Mumbai Custom Authorities with encashment of the Bank
Guarantee or to discharge the full amount of Customs Duty
saved on this. The applicant is not able to file the review
application on online mode and requested to consider their case
in offline mode.
The case file has been referred to Consultant (SKB) on 25.07.2022 for examination and comments.
wait for the comments of TE.A reminder was issued to
Consultant (SKB) on 13.09.2022 for expediting the comments.
Further, DL was received via email dated 06.10.2022 form
Consultant (SKB) and the same was sent to the applicant on
07.10.2022.
The
case
was
last
discussed
in
the
M.
No.
and the Committee decided to send a reminder to the applicant
for furnishing the requisite information within 15days.
e applicant on
07.10.2022.
The
case
was
last
discussed
in
the
M.
No.
and the Committee decided to send a reminder to the applicant
for furnishing the requisite information within 15days. As per
The
Committee
per
agenda
and
decided to send final
reminder
to
the
applicant
for
furnishing
the
requisite information
within 15days.
Deferred
19 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
NC decision, reminder was issued on 07.12.2022. However, no reply/information has been received as yet.
M- 16 M/s VEDAN TA LIMITE D (Formerl y M/s. Sterlite Industries (India) Limited
AA No. 3510030 450 dated 03.06.20 10 File No.01/81/0 50/00055/ AM11 The case was rejected in Meeting No. 26/81-ALC2/2010 dated 28.09.2010 as per written comments of Ministry of Mines vide OM No. 4/(16)/2010-Metal-III/L dated 17.09.2010. The Applicant had represented on 14.02.2019 with a request to fix the ad-hoc Norms. The case was considered in the NC-II Meeting No. 13/81 scheduled for 13.12.2020 and held on 08.01.2021. Consultant (TEC-3) informed vide comments dated 29.12.2020 that the applicant has given composition of imported material i.e. Cu Concentrate, which contain gold & silver in ppm. Export product is Copper Anode, which again contain gold & silver in ppm. Gold & Silver are neither being imported indendently nor being exported, as such, after refining. In view of above wastage of these items cannot be ascertained. Earlier also, Department of Mines had rejected the proposal.
being imported indendently nor being exported, as such, after refining. In view of above wastage of these items cannot be ascertained. Earlier also, Department of Mines had rejected the proposal. Therefore, the Committee decided to reject the applicant’s request of fixation of ad-hoc norms.
The Applicant has requested for review of the earlier decision of NC-II and submitted that review application cannot be filed through online mode as the name of the firm has been changed and IEC Code has also been changed.
The Applicant vide their e-mail dated 01.12.2021 has submitted following justification for this review:-
(i) Both the import item and the export item are standard industry items. Copper Concentrate is the industrial raw material for the copper Anode manufacturing process by using the standard manufacturing process by the Copper Industry all across the world.
(ii) The gold & silver are impurities which naturally occur in the copper concentrate. The norms are not required to be fixed for gold & silver. The norms are required to be fixed for copper concentrate (import item) and the export item which is Copper Anode. Gold & Silver are naturally occurring impurities in the copper when copper is extracted in the mines. They are not artificially added. The naturally occurring impurities cannot be extracted and therefore no wastage is required to be fixed for Gold & Silver as they are naturally occurring.
(iii) The manufacturing flow chart & manufacturing process is once again enclosed for your ready reference.
no wastage is required to be fixed for Gold & Silver as they are naturally occurring.
(iii) The manufacturing flow chart & manufacturing process is once again enclosed for your ready reference.
(iv) The Import and Export Items under subject authorization are same as our Advance Authorisation for annual requirement viz. 3510030590 dated 15.06.2010 and norms in respect of this Advance Authorization have been ratified by the norms Committee vide its meeting dated 30.06.2015 under Case No. AR- 3 Meeting No. 06/81 for same import & export product (Refer Line item Sl. No. 8 i.e. Import item: Copper Concentrate Containing Gold & Silver and our Export item: Copper Anode containing Gold & Silver).
Earlier, the Committee had considered the case wherein Consultant (TEC-3) had informed vide comments dated 29.12.2020 that the applicant has given composition of imported material i.e. Cu Concentrate, which contain gold & silver in ppm. Export product is Copper Anode, which again contain gold & silver in ppm. Gold & Silver are neither being imported The Committee per agenda and noted that Consultant (TEC- 3) via email dated 18.12.2022 has requested for physical file of the case along with copy of representation to examine the case. Therefore, the Committee decided to send the same to the TE, Consultant (TEC- 3) for examination of the case. The committee also decide to refer the case to Ministry of Mines for re-examination. Deferred
Committee decided to send the same to the TE, Consultant (TEC- 3) for examination of the case. The committee also decide to refer the case to Ministry of Mines for re-examination. Deferred
20 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
indendently nor being exported, as such, after refining. In view of above wastage of these items cannot be ascertained. Earlier also, Department of Mines had rejected the proposal. Therefore, the Committee decided to reject the applicant’s request of fixation of ad-hoc norms.
The case file has been referred to Consultant (TEC-3) on
25.07.2022 for examination and comments.
wait for the comments of TE. Further, the reminders were issued
to Consultant (TEC-3) on 13.09.2022 & 06.10.2022 for
expediting the comments.
The
case
was
last
discussed
in
the
M.
No.
and the Committee decided to wait for the comments of the TE.
Further, a reminder was issued to Consultant (TEC-3) on
28.11.2022 for expediting the comments.
M- 17 M/s VEDAN TA LIMITE D (Formerl y M/s. Sterlite Industries (India) Limited
AA No. 3510044 672 dated 17.02.20 15 HQ File 01/81/171/ 00019/AM 16/
35/24/039/ 00003/AM 15/ (E-24528) The case was ratified in M. No. 01/81 dated 10.04.2019 as per written comments given by Consultant (TEC-3). The applicant vide letter dated 06.06.2019 requested for revision of ratified norms. The case was considered in M. No. 12/81 dt. 18.09.2019 and decided to refer the case to Consultant (TEC-3) for examination.
vide letter dated 06.06.2019 requested for revision of ratified norms. The case was considered in M. No. 12/81 dt. 18.09.2019 and decided to refer the case to Consultant (TEC-3) for examination. The case was referred to Consultant (TEC-3) on 06.12.2019. The case was considered in M. No. 21/81 dated 22.01.2020, Consultant (TEC-3) informed that the applicant has requested for wastage on gold & silver for which there is no justification. Therefore, the Committee decided to call the applicant for personal hearing to explain the case before Norms Committee in the forthcoming NC meeting. After, Personal hearing which was held on 25.08.2020, on the advice of Consultant (TEC-3), the Committee directed the representatives to furnish following information:
- Specific item of import, its quantity & copy of bill of entry.
- Specific item of export, its quantity & copy of shipping bill.
- Certificate of analysis of total quantity of import & export.
- Is there any by-product in the process? If yes details thereof.
The applicant's reply dated 15.10.2020 was sent to Consultant (TEC-3) on 26.10.2020. The case was concluded during NC-II Meeting No. 12/81 schedule for 15.12.2020 and held on 22.12.2020. The Committee considered the case as per the agenda and Consultant (TEC-3) informed via e-mail dated 14.12.2020 that the applicant in its reply dated 15.10.2020 has proposed to import Cu anode & Cu blister which contain traces of gold & silver. The export product is also anode slime containing minor quantities of gold & silver.
its reply dated 15.10.2020 has proposed to import Cu anode & Cu blister which contain traces of gold & silver. The export product is also anode slime containing minor quantities of gold & silver. Accordingly, gold & silver are neither the direct import items nor export items & therefore wastage norms cannot be fixed for these items. Therefore, the Committee decided to reject the applicant’s request of revision of ratified norms.
Now, the applicant informed that their firm has merged with Vedanta Limited therefore they are not in a position to submit the review application in online mode and requested to review application offline mode.
Further, the applicant has submitted justification for review vide their e-mail dated 01.12.2021:-
(i) Both the import item and the export item are standard industry items. Copper Anode/Unrefined copper Blister are the industrial The Committee per agenda and noted the comments of Consultant (TEC-3) given via email dated 18.12.2022 wherein it is stated that the firm has now want the wastage on Cu Anode & Cu Blister & not for Gold & Silver. Therefore, the Committee decided to ask the applicant to furnish the following information as per comments of Consultant (TEC-3) as under:
- To submit a copy of AA where these are import & export items with details of wastage claimed.
The case stands deferred. The committee also decided to simultaneously refer the case to Ministry of Mines for re- examination.
Deferred
items with details of wastage claimed.
The case stands deferred. The committee also decided to simultaneously refer the case to Ministry of Mines for re- examination.
Deferred
21 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
raw material for the Copper Cathode manufacturing process.
(ii) The raw material are subjected to refining process for cathode production and “Anode Slime” is generated as a by – product during this process.
(iii) The by – product viz.
“Anode Slime” is used in the Precious Metal Industry and it is
used for manufacture of value added product such as Gold and
silver.
(iv) The gold & silver are impurities which naturally occur in the Copper anode and the by – product viz. Anode Slime. During the smelting & refining process there is a process loss and the gold & silver being natural impurities cannot be extracted.
(v) Since both the import item & the export item are standard industry products and the process of extracting Anode Slime from refining process is a standard manufacturing process, we hereby request you to kindly ratify the norms and allow nominal industry standard wastage.
(vi) The manufacturing flow chart & manufacturing process is once again enclosed for your ready reference.
(vii) Please also note that the Import and Export items under subject authorization are same as our Advance authorization for annual requirement viz.
nce again enclosed for your ready reference.
(vii) Please also note that the Import and Export items under subject authorization are same as our Advance authorization for annual requirement viz. 3510030590 dated 15.06.2010 and norms in respect of this Advance Authorization have been ratified by the norms Committee vide its meeting dated 30.06.2015 under Case No. AR-3 Meeting No. 06/81, for same import & export product (Refer Line Item Sl. No. 8 i.e. Import item: Copper Anode Containing gold & silver, Unrefined Copper Blister Copper Containing gold & silver our Export item: Anode Slime containing Gold & Silver) copy of above NC Decision is enclosed herewith for your ready reference.
(viii) Wastage is required to be fixed for copper Anode & Copper Blister & not for Gold & Silver.
(ix) Grant of PH to explain the case personally.
Earlier, the Committee had considered the case as per comments of Consultant (Tech-3) dated 14.12.2020, it was stated that the applicant in its reply dated 15.10.2020 has proposed to import Cu anode & Cu blister which contain traces of gold & silver. The export product is also anode slime containing minor quantities of gold & silver. Accordingly, gold & silver are neither the direct import items nor export items & therefore wastage norms cannot be fixed for these items. Therefore, the Committee had decided to reject the applicant’s request of revision of ratified norms.
The case file has been referred to Consultant (TEC-3) on
25.07.2022 for examination and comments.
wait for the comments of TE.
to reject the applicant’s request of revision of ratified norms.
The case file has been referred to Consultant (TEC-3) on
25.07.2022 for examination and comments.
wait for the comments of TE.
The
case
was
last
discussed
in
the
M.
No.
and the Committee noted that the case was erroneously sent to
DHI on 13.09.2022 for examination & comments. Therefore, the
Committee decided to refer the case to concerned TE, Consultant
(TEC-3) for examination & comments. As per NC decision, the
22 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
case was referred to Consultant (TEC-3) on 28.11.2022 for examination & comments.
M- 18 M/s. Ram Ratana Wires Limited.
F. No. 01/60/16 2/435/A M21/PR C Meeting No. 07/AM23 dated 21.06.2022, case referred by PRC
Subject: Relaxation of Cap of 5% FOB Value on import of
varnish against 15 Advance Authorization No. (i) 0310795248 dated 13.04.2015 (ii) 0310798953 dated 18.09.2015, (iii) 0310798975 dated 21.09.2015, (iv) 0310799291 dated 08.10.2015, (v) 0310799280 dated 08.10.2015, (vi) 0310804606 dated 11.05.2016, (vii) 0310804607 dated 11.05.2016, (viii) 0310804609 dated 11.05.2016, (ix) 0310804763 dated 18.05.2016, (x) 0310804920 dated 23.05.2016, (xi) 0310804936 dated 24.05.2016, (xii) 0310804935 dated 24.05.2016, (xiii) 0310808025 dated 23.09.2016, (xiv) 0310808024 dated 23.09.2016 and (xv) 0310818559 dated 17.01.2018 for redemption / EODC purpose.
This is a referred case of PRC Meeting No. 07/AM23 dated 21.06.2022 as PRC has discussed the matter at length and decided to refer the issue to NC-2 for its examination and resolution. The applicant stated that the subject authorizations have been issued against SION Serial No. C-206. Due to sudden instructions from their buyers they had no other way except to import the said input Varnish in higher quantity resulting in exceeding the cap of 5% of FOB value. Further, it was submitted that the said excess quantity imported by them beyond the cap value is fully utilized in the manufacturing of export product and not even a fraction of said quantity of the input namely Varnish has been diverted in the local market and has been utilized in manufacturing of the export product by way of doing work of coating / polishing of more than one layer.
y of the input namely Varnish has been diverted in the local market and has been utilized in manufacturing of the export product by way of doing work of coating / polishing of more than one layer. All the quantity so imported has been accounted for in the export document specifically in the shipping bills. Hence, requested that the excess quantity of input namely Varnish imported by them beyond cap limit of 5% of FOB value may kindly be relaxed so that the above case may be regularized / EODC / Closure purpose.
Earlier on 05.05.2022, PRC section was provided following
comments in this case on the basis of comments received from
Consultant (TEC-3) (vide his mail dated 20.04.22) is as under:
"The firm has applied for relaxation of policy to PRC for import
of varnish in excess of 5 % of fob value as per SION
C206.Quantity of varnish applied on the bare conductor depends
on the thickness of insulation . While it is possible to calculate
the qty. of varnish required for a given thickness, it is difficult to
convert this qty. to value, as price is a variable factor depending
on its source, volatile matter in it etc."
As referred by PRC, the case was forwarded to Consultant (Tech-3) on 25.07.2022 for further examination and comments.
wait for the comments of the TE. Further, DL raised by TE was sent to the firm on 11.08.2022. The case was last discussed in the M. No. and the Committee decided to send a reminder to the applicant for furnishing the reply of deficiency letter.
was sent to the firm on 11.08.2022. The case was last discussed in the M. No. and the Committee decided to send a reminder to the applicant for furnishing the reply of deficiency letter. The firm’s reply was received on 06.12.2022 and the same was forwarded to Consultant (TEC-3) on 07.12.2022 for examination & comments. However, no comments have been received as yet.
The Committee decided to remind the TE for expediting the comments. Deferred
23 | MEETING NUMBER: NC/2/MEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022
M- 19 M/s Modison Metal Limited, Mumbai
AA No.
0310832
497 dated
30.10.20
19
HQ File
No.:
01/81/05/0
00295/AM
20
The cases were approved by NC in its Meeting No. 9/81-
ALC2/2020 dated 20.10.2020 as per comments of DHI.
Now, the applicant vide letter dated 28.04.2022 has requested for
reviewing the ratified ad-hoc norms. Also, the applicant has
informed that they tried to apply for review through DGFT Portal
but could not fill the review application on DGFT Portal due to
technical glitches.
The case was referred to Consultant (SKB) on 17.10.2022 for
examination & comments.
The case was last discussed in the M. No. and the Committee decided to wait for the comments. A reminder was also issued on 28.11.2022 for expediting the comments. However, no comments have been received as yet.
The
Committee
decided
to
remind
again
the
TE
for
expediting
the
comments.
Deferred
M-
20
M/s Param
Industries
Mumbai
AA Nos. (1)
0310812841
dt. 26.04.17
(2)
0310816013
dt.
The
Committee
decided
to
remind
again
the
TE
for
expediting
the
comments.
Deferred
M-
20
M/s Param
Industries
Mumbai
AA Nos. (1)
0310812841
dt. 26.04.17
(2)
0310816013
dt.
28.09.2017
(3)
0310816014
dt.
28.09.2017
(4)
0310825355
dt.
03.12.2018
(5)
0310825358
dt.
03.12.2018
(6)
0310825553
dt.
10.12.2018
(7)
0310825557
dt.
10.12.2018
F. No.
01/81/050/
00
135/AM18
/DES-II
M/s Param Industries, Mumbai has applied for reviewing the
cases of seven Advance Authorization Numbers. The applicant
informed that they tried to apply for review through DGFT Portal
but could not fill the review applications on DGFT Portal due to
technical glitches and requested for taking up in offline agenda.
The applicant has also furnished the copies of payment receipt of
Rs. 5000/- each paid to RA, Mumbai as composition fee for the
re-opening of mentioned seven cases
The applicant has furnished the documents for reviewing the
mentioned seven Advance Authorizations. These cases were
referred to Consultant (SKB) on 18.10.2022 for examination &
comments.
The case was last discussed in the M. No. and the Committee decided to wait for the comments. A reminder was also issued on 28.11.2022 for expediting the comments. However, no comments have been received as yet. The Committee decided to remind again the TE for expediting the comments. Deferred M- 21 M/s Precision Metals
AA Nos.: 0310830 840 dated 06.08.20 19
HQ F.
en received as yet. The Committee decided to remind again the TE for expediting the comments. Deferred M- 21 M/s Precision Metals
AA Nos.: 0310830 840 dated 06.08.20 19
HQ F. No.:
01/81/050/
00199/AM
20/
M/s Precision Metals has applied for reviewing the already
ratified ad-hoc norms. The applicant informed that they tried to
apply for review through DGFT Portal but could not fill the
review applications on DGFT Portal due to technical glitches and
requested for taking up in offline agenda.
The applicant has now applied for review of the subject licence
due to the reason that the description of export and import
product as per their application and the description given by the
Norms Committee in their Minutes where approval has been
sanctioned is different and the concerned authorities are not
agreeing with the difference in the description.
The applicant had already completed the import and export
against the above mentioned advance licences. Therefore,
applicant has requested to fix the norms as per the description of
the import and export products mentioned in the advance licences
issued.
The Committee decided to remind the TE for expediting the comments.
Deferred
the norms as per the description of the import and export products mentioned in the advance licences issued.
The Committee decided to remind the TE for expediting the comments.
Deferred
M- MIs F.No.: 22 Sterlite 01/81/1711 Technolo 00051AM2 gies 3/DES-II Limited AANo. 0310732 320 dated 23.4.201 3 These cases were referred to Consultant (SKB) on 18.10.2022 for examination & comments. The case was last discussed 111 the M. No. NC/2/MEET/Oct/202223114 (Offline Cases) dated 21.10.2022 and the Committee noted the comments of Consultant (SKB) received via ernail dated 20.10.2022. Further, it was noted that the comments dated 20.10.2022 are not related to subject AA Number. Therefore, the Committee decided to refer back the case to Consultant (SKB) for re-examination of the casc. As per NC decision, the case was referred again to Consultant (SKB) on 28.11.2022 for comments. However, no comments have been received as yet MIs Sterlite Technologies Limited has requested for fixation of norms against Advance Licence No. 0310732320dated23.4.2013. The firm in their letter mentioned that they had obtained the aforesaid license on a self-declaration basis from Mumbai, RA in the year 2013 but till date, the norms were not fixed for the said licence. They had sent letters dated 09.03.2022 & 11.07.2022 to NC-U for considering their application for fixation of norms. In this regard, Norms Committee couldn't find any record regarding this case in the Section.
ent letters dated 09.03.2022 & 11.07.2022 to NC-U for considering their application for fixation of norms. In this regard, Norms Committee couldn't find any record regarding this case in the Section. As Norms Committee is considering only the application receiving through DGFT's Portal and the application for this case is neither on the portal nor on cmail or hard copy, NC requested the firm to apply through DGFT's portal. The firm, vide letter dtd.II.07.2022, informed NC that they had tried to upload the documents in the DGFT's portal, but they found difficulty. They had sent various letters to RA, Mumbai requesting to send the entire records to DGFT Hqrs to get the norms fixed. As they didn't receive any response from RA, Mumbai, they had submitted an RTI application seeking such information. After 30 days of the stipulated period, the firm submitted an appeal in the Appellate Authority. In response to the appeal, RA, Mumbai has forwarded the documents in rlo the Advance Licence No.
tion. After 30 days of the stipulated period, the firm submitted an appeal in the Appellate Authority. In response to the appeal, RA, Mumbai has forwarded the documents in rlo the Advance Licence No. 0310732320 dated 23.04.2013 to Norms Committee II vide letter dated 27.06.2022. As this case is very old and the firm is facing huge pressure from the customs department to submit EODC in relation to said licence, they have requested to file this case as offline cases. The case was referred to Consultant (TEC-3) on 18.10.2022 for examination and comments. The case was last discussed in the M. No. NC/2/MEET/Octl202223114 (Offline Cases) dated 21.10.2022 and the Committee decided to wait for the comments of the TE. Further, a reminder was also issued on 28.11.2022 for expediting the comments. The Committee considered the case as per agenda and decided to ask the applicant to furnish the following information as per advice of Consultant (TEC-3): I. Complete set of application (ANF-4A) and information as per Appendix- 4E. 2. Copy of earlier decision, if any. The case deferred. stands
Deferred 24 I MEETING NUMBER: NCI2IMEET/Dec/202223/18(Offline Cases) MEETING DATE: 19.12.2022 ., ~ ~ ISantosh Kumar Dulley 'J"! -.nn~ ~ ~ . uty Director General of Foreign Trade "'+ ~ ~ ~61~~illi<i1lf •~rate General of Foreign Trade ,}V'l:! fi'I">1TlT IDeptt. of c~mmerce
,\IIinistry of Commerce
& Industry
'>fR<I' ~
ICovt. of India
~
'>1<f"f.
~
~
UdY09 Bhawan,
New
Deihl
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.