DGFT Committee Minutes
DIRECTORATE GENERAL OF FOREIGN TRADE - (DES II SECTION)
MINUTES OF THE NORMS COMMITTEE-II MEETING No. 07/81-ALC2/2021 DATED 08.09.2020 (Held on 15.09.2020)
Please Note
-
i. For information of exporters, Norms Committee-II handles all cases pertaining to fixation/ratification of norms for Export Products falling under ITC (HS) Chapter 72 to 76, 78 to 80 & 85. Communications in respect of cases/pertaining to NC-II may be sent to email address: nc2.dgft@nic.in
-
ii. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The concerned applicant/company may go through the same and respond accordingly.
-
iii. Similarly, a scanned copy of the blank Standard Deficiency Format, which may find a reference in NC decisions, has also been attached in the end. This may also be referred to by the concerned applicant/company and may be responded accordingly.
-
iv. The Norms Committee has taken decision only with respect to technical aspect/wastage norms. While redeeming the applications, RAs should check that the applicant has fulfilled all requirements as prescribed in policy/procedure including those in Policy Circulars issued from time to time or any other provisions under FTP/HBP for EODC.
-
v. Wherever the Committee has fixed Norms, the concerned RA may ensure that AA is issued on the wastages/consumption as ratified by the Committee or as per wastages claimed in the application, whichever is less.
Meeting No. 07/81 of Norms Committee-II for the year 2020-21 (Originally scheduled for 08.09.2020) held on 15.09.2020 through Video Conferencing under the Chairmanship of Shri R. P. Goyal, Additional Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorizations under Duty Exemption Scheme (Chapter-4) of Foreign Trade Policy 2015-20. The following members were present in the meeting:-
| Sl. No. | Name & Designation | Department |
|---|---|---|
| 1. | Shri K. S. Sodhi, AD (ME) | MSME |
| 2. | Shri Devendra Kumar Saini, ADG | DoT |
| 3. | Shri Sushil Kumar Jangid, Scientist „B‟ | MeitY |
| 4. | Shri Shaish Kumar, (TEC-1) | Consultant |
| 5. | Shri V.C. Agarwal, (TEC-3) | Consultant |
| 6. | Shri S. K. Bhatnagar, (SKB) | Consultant |
| In attendance | ||
| 1. | Shri Shobhit Gupta, Dy. DGFT | DGFT |
Minutes of the cases discussed in the meeting are as under:
1 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
MEETING NUMBER: 7/81-ALC2/2020 MEETING DATE: 08.09.2020
| 1 | Case No.:311/14/81-<br>ALC2/2018<br>HQ E-office Computer<br>No.: 24062 | Party Name: MERSEN<br>INDIA PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Withdrawn |
|---|---|---|---|---|
| HQ File<br>:01/81/050/01029/AM19/ | RLA File<br>:07/24/040/00087/AM16/ | Lic.No/Date:0710108424<br>25.06.2015 | ||
| **Decision:**The Committee considered the case as per agenda and noted that the applicant vide email | ||||
| dated 07.09.2020 informed that the AA has beenredeemed. Therefore, the Committee decided to | ||||
| withdrawthe case from the agenda under intimation to RA, Bangalore. (Copy enclosed) | ||||
| The case is withdrawn. |
| Case No.:25/14/81- | Party Name: SHERA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | ENERGY PVT. LTD. | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:1310047931 | ||||
| :01/81/050/00743/AM19/ | :13/24/040/00002/AM16/ | 17.07.2015 | ||||
| HQ E-office Computer No.: | ||||||
| 24063 |
| Case No.:25/14/81-<br>ALC2/2018 | Case No.:25/14/81-<br>ALC2/2018 | Party Name: SHERA<br>ENERGY PVT. LTD. | Party Name: SHERA<br>ENERGY PVT. LTD. | Party Name: SHERA<br>ENERGY PVT. LTD. | Party Name: SHERA<br>ENERGY PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00743/AM19/<br>HQ E-office Computer No.:<br>24063 | RLA File<br>:13/24/040/00002/AM16/ | Lic.No/Date:1310047931<br>17.07.2015 | |||||||
| 2 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per<br>written comments dated 10.09.2020 given by Consultant (SKB) as under:<br>ITCHS<br>Code<br>Export Item<br>QuantityITCHS<br>Code<br>Import Item<br>Recommended<br>Quantity<br>85441190<br>Paper Covered<br>Copper Winding<br>Strip (Rectangular<br>Wire) (Content Of<br>Copper 46729.00<br>Kg.)<br>47683<br>Kgs<br>74040012<br>Copper Scrap Birch<br>Cliff / Berry / Candy<br>/ Cobra / Clove /<br>Cocoa Barley as per<br>ISRI with minimum<br>97% copper.<br>49065.00 Kg<br>inclusive of 5%<br>wastage on<br>copper content<br>in the export<br>item.<br>RA concerned maytake suitable consequential action accordingly. | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 85441190 | Paper Covered<br>Copper Winding<br>Strip (Rectangular<br>Wire) (Content Of<br>Copper 46729.00<br>Kg.) | 47683<br>Kgs | 74040012 | Copper Scrap Birch<br>Cliff / Berry / Candy<br>/ Cobra / Clove /<br>Cocoa Barley as per<br>ISRI with minimum<br>97% copper. | 49065.00 Kg<br>inclusive of 5%<br>wastage on<br>copper content<br>in the export<br>item. | ||||
| RA concerned maytake suitable consequential action accordingly. |
| 3 | Case No.:317/14/81-<br>ALC2/2018<br>Party Name: VOLEX<br>INTERCONNECT (INDIA)<br>PVT. LTD.<br>Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Status:<br>Deferred<br>HQ File<br>:01/81/050/01035/AM19/<br>HQ E-office Computer No.:<br>23312<br>RLA File<br>:04/24/040/00112/AM16/<br>Lic.No/Date:0410160894<br>10.08.2015<br>Action by :<br>MeitY<br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MeitY on 28.08.2020 for examination of the case. However, no comments have been received<br>yet. Therefore, the Committee decided to remind MeitY for expediting the comments.<br>The case stands deferred. | Party Name: VOLEX<br>INTERCONNECT (INDIA)<br>PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| RLA File<br>:04/24/040/00112/AM16/ | Lic.No/Date:0410160894<br>10.08.2015 | <br>Action by :<br>MeitY |
2 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:318/14/81- | Party Name: GOLDSTONE | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | INFRATECH LIMITED | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910062464 | ||||
| :01/81/050/01036/AM19/ | :09/24/040/00279/AM16/ | 11.08.2015 | ||||
| HQ E-office Computer No.: | ||||||
| 24064 |
| Case No.:318/14/81-<br>ALC2/2018 | Case No.:318/14/81-<br>ALC2/2018 | Case No.:318/14/81-<br>ALC2/2018 | Party Name: GOLDSTONE<br>INFRATECH LIMITED | Party Name: GOLDSTONE<br>INFRATECH LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/01036/AM19/<br>HQ E-office Computer No.:<br>24064 | RLA File<br>:09/24/040/00279/AM16/ | Lic.No/Date:0910062464<br>11.08.2015 | |||||
| 4 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per<br>written comments given by Consultant (TEC-1) as under: | ||||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Quantity | ||||
| 1 | 39100000 | Elastosil R 401/40 S<br>Silicones in PrimaryForms | 5 % Wastage with accountability in export item | ||||
| 2 | 28183000 | Aluminium Hydroxide | 5 % Wastagewith accountabilityin export item | ||||
| 3 | 39100000 | Elastosil Aux Mould Release<br>Agent A Silicones in Primary<br>Forms | 5 % Wastage with accountability in export item | ||||
| 4 | 32089019 | Elastosil Aux G 3243 Primer<br>Primers | 5 % Wastage with accountability in export item | ||||
| 5 | 73261990 | 120kNBall(RIB)Metal Item | AsperGN-4 | ||||
| 6 | 73261990 | 120kN Socket(Rib)Metal Item | AsperGN-4 | ||||
| 7 | 73261990 | 210kN Ball(Rib)Metal Item | Asper GN-4 | ||||
| 8 | 73261990 | 210kN Socket(Rib)Metal Item | AsperGN-4 | ||||
| 9 | 73261990 | 160kN Ball(RiB)Metal Item | Asper GN-4 | ||||
| 10 | 73261990 | 160kN Socket(Rib)Metal Item | AsperGN-4 | ||||
| RA concerned maytake suitable consequential action | accordingly. |
| 5 | Case No.:322/14/81-<br>ALC2/2018<br>Party Name: STERA<br>ENGINEERING INDIA<br>PRIVATE LIMITED<br>Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Status:<br>Rejected<br>HQ File<br>:01/81/050/01040/AM19/<br>HQ E-office Computer No.:<br>RLA File<br>:04/24/040/00113/AM16/<br>Lic.No/Date:0410160911<br>13.08.2015<br>Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 23.12.2019<br>followed by reminders on 30.03.2020, 06.06.2020 & 20.08.2020. However, no information has been<br>received yet. Therefore, the Committee decided torejectthe case under intimation to RA, Chennai.<br>RA concerned maytake suitable consequential action accordingly. | Party Name: STERA<br>ENGINEERING INDIA<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| RLA File<br>:04/24/040/00113/AM16/ | Lic.No/Date:0410160911<br>13.08.2015 |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.12.2019 followed by reminders on 30.03.2020, 06.06.2020 & 20.08.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Chennai.
3 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
6
| 6 | Case No.:323/14/81-<br>ALC2/2018<br>Party Name: TRAFOMEC<br>INDIA PVT LTD<br>Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Status:<br>Deferred<br>HQ File<br>:01/81/050/01041/AM19/<br>HQ E-office Computer No.:<br>23852<br>RLA File<br>:07/24/040/00190/AM16/<br>Lic.No/Date:0710108750<br>21.09.2015<br>Action by :<br>Applicant<br>Decision:The Committee considered the case as per agenda and noted that the applicant‟s reply was<br>sent to DHI on 20.08.2020 for examination of the case. DHI informed that the applicant‟s reply is<br>incomplete as the applicant did not submit reply of following deficiencies point-wise:<br>1. Complete specification with catalogue of each export product with quantity of export in<br>number.<br>2. Sl. No. 2, 4, 5 & 11 of the Standard Deficiency Format.<br>3. Manufacturing process of export item giving specific use of each import item.<br>Therefore, on the recommendation of DHI, the Committee decided to call the applicant forpersonal<br>hearingvia video conferencing to explain the case in the forthcoming NC meeting along with reply of<br>above mentioned deficiencies point-wise.<br>The case stands deferred. | Party Name: TRAFOMEC<br>INDIA PVT LTD | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| RLA File<br>:07/24/040/00190/AM16/ | Lic.No/Date:0710108750<br>21.09.2015 | <br>Action by :<br>Applicant |
| Case No.:34/14/81- | Party Name: ARFIN INDIA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | LIMITED | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0810136182 | ||||
| :01/81/050/00752/AM19/ | :08/24/040/00218/AM16/ | 06.10.2015 | ||||
| HQ E-office Computer No.: | ||||||
| 23250 |
Decision: The Committee considered the case as per the agenda and noted the comments given by DPIIT vide U. O. No.: P-47011/106/2020-TSW dated 14.07.2020. However, the matter was 7 deliberated in the meeting and the Committee decided to fix the ad-hoc norms taking a cue from the norms as approved for AA No. 0810135708 dated 21.07.2020 in meeting No. 04/81 dated 17.06.2020 as under:
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity |
|---|---|---|---|---|---|
| 76011090 | Aluminium Cast,<br>Granulates | 300 MT | 76020010 | Aluminium Scrap<br>As Per ISRI SPEC | 1.05 Kgs/Kg content<br>in the export product |
RA concerned may take suitable consequential action accordingly.
4 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 8 | Case No.:9/14/81-ALC2/2018 | Party Name: JSONS<br>FOUNDRY PVT LTD | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00727/AM19/<br>HQ E-office Computer No.:<br>23330 | RLA File<br>:31/83/040/00141/AM16/ | Lic.No/Date:3110065856<br>08.01.2016 | <br>Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (SKB) was sent to the applicant on 21.08.2020. However,<br>no reply has been received yet. Therefore, the Committee decided to remind the applicant for<br>furnishing the requisite information.<br>The case stands deferred. |
| 9 | Case No.:353/14/81-<br>ALC2/2018 | Party Name: POWER<br>CONTROL EQUIPMENTS | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| HQ File<br>:01/81/050/01071/AM19/<br>HQ E-office Computer No.:<br>24065 | RLA File<br>:07/24/040/00359/AM16/ | Lic.No/Date:0710109325<br>29.01.2016 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019<br>followed by reminders on 31.03.2020, 06.06.2020 & 21.08.2020. However, no information has been<br>received yet. Therefore, the Committee decided torejectthe case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019 followed by reminders on 31.03.2020, 06.06.2020 & 21.08.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.
| 10 | Case No.:354/14/81-<br>ALC2/2018 | Party Name: POWER<br>CONTROL EQUIPMENTS | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/01072/AM19/<br>HQ E-office Computer No.:<br>24068 | RLA File<br>:07/24/040/00364/AM16/ | Lic.No/Date:0710109326<br>29.01.2016 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019<br>followed by reminders on 31.03.2020, 06.06.2020 & 21.08.2020. However, no information has been<br>received yet. Therefore, the Committee decided torejectthe case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019 followed by reminders on 31.03.2020, 06.06.2020 & 21.08.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.
5 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 11 | Case No.:355/14/81-<br>ALC2/2018 | Party Name: KRISAM<br>AUTOMATION PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/01073/AM19/<br>HQ E-office Computer No.:<br>23328 | RLA File<br>:07/24/040/00369/AM16/ | Lic.No/Date:0710109343<br>03.02.2016 | <br>Action by :<br>Section | |
| **Decision:**The Committee considered the case as per agenda and decided to refer the case<br>examination & comments.<br>The case stands deferred. | to MeitY for |
| 12 | Case No.:344/14/81-<br>ALC2/2018 | Party Name: DC AUTO<br>PARTS PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/01062/AM19/<br>HQ E-office Computer No.:<br>24127 | RLA File<br>:07/24/040/00313/AM16/ | Lic.No/Date:0710109432<br>23.02.2016 | <br>Action by :<br>Section | |
| **Decision:**The Committee considered the case as per the agenda and decided to refer<br>application dated 27.08.2020 to Consultant (TEC-3) for examination & comments.<br>The case stands deferred. | the copy of |
| 13 | Case No.:11/14/81-<br>ALC2/2018 | Party Name: GALLANTT<br>METAL LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00729/AM19/ | RLA File<br>:37/24/040/00009/AM16/ | Lic.No/Date:3710002634<br>04.05.2016 | <br>Action by :<br>Applicant | |
| <br>Decision:The Committee considered the case as per the agenda and Consultant (SKB) informed that<br>the applicant‟s reply is incomplete as the applicant did not clarify the following points:<br>1. Do you have Ladle refining furnace for adjustment of chemistry of the end product as per<br>Bureau of Indian Standard/or specification as per buyer requirement. If yes, when it was<br>installed?<br>2. What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT<br>sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55%<br>sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?<br>3. In which Norms Committee meeting, the AAs No. 3710002634/2636/2637/2638/2639/2642<br>was granted?<br>4. What was the reason of indicating the value of Rs 1/- and $1 against the quantity of import of<br>2540 MT of Sponge Iron?<br>5. Which quality of sponge (Coal Based or Gas Based) iron was to be imported and from which<br>country?<br>Therefore, on the recommendation of Consultant (SKB), the Committee decided to call the applicant<br>forpersonal hearingvia video conferencing to explain the case in the forthcoming NC meeting along<br>with reply of above mentioned deficiencies.<br>The case stands deferred. |
- What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT
13 sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55% sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?
6 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 14 | Case No.:12/14/81-<br>ALC2/2018 | Party Name: GALLANTT<br>METAL LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00730/AM19/ | RLA File<br>:37/24/040/00011/AM16/ | Lic.No/Date:3710002636<br>04.05.2016 | <br>Action by :<br>Applicant | |
| <br>Decision:The Committee considered the case as per the agenda and Consultant (SKB) informed that<br>the applicant‟s reply is incomplete as the applicant did not clarify the following points:<br>1. Do you have Ladle refining furnace for adjustment of chemistry of the end product as per<br>Bureau of Indian Standard/or specification as per buyer requirement. If yes, when it was<br>installed?<br>2. What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT<br>sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55%<br>sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?<br>3. In which Norms Committee meeting, the AAs No. 3710002634/2636/2637/2638/2639/2642<br>was granted?<br>4. What was the reason of indicating the value of Rs 1/- and $1 against the quantity of import of<br>2540 MT of Sponge Iron?<br>5. Which quality of sponge (Coal Based or Gas Based) iron was to be imported and from which<br>country?<br>Therefore, on the recommendation of Consultant (SKB), the Committee decided to call the applicant<br>forpersonal hearingvia video conferencing to explain the case in the forthcoming NC meeting along<br>with reply of above mentioned deficiencies.<br>The case stands deferred. |
- What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT
14 sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55% sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?
| 15 | Case No.:13/14/81-<br>ALC2/2018 | Party Name: GALLANTT<br>METAL LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00731/AM19/ | RLA File<br>:37/24/040/00012/AM16/ | Lic.No/Date:3710002637<br>04.05.2016 | <br>Action by :<br>Applicant | |
| <br>Decision:The Committee considered the case as per the agenda and Consultant (SKB) informed that<br>the applicant‟s reply is incomplete as the applicant did not clarify the following points:<br>1. Do you have Ladle refining furnace for adjustment of chemistry of the end product as per<br>Bureau of Indian Standard/or specification as per buyer requirement. If yes, when it was<br>installed?<br>2. What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT<br>sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55%<br>sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?<br>3. In which Norms Committee meeting, the AAs No. 3710002634/2636/2637/2638/2639/2642<br>was granted?<br>4. What was the reason of indicating the value of Rs 1/- and $1 against the quantity of import of<br>2540 MT of Sponge Iron?<br>5. Which quality of sponge (Coal Based or Gas Based) iron was to be imported and from which<br>country?<br>Therefore, on the recommendation of Consultant (SKB), the Committee decided to call the applicant<br>forpersonal hearingvia video conferencing to explain the case in the forthcoming NC meeting along<br>with reply of above mentioned deficiencies.<br>The case stands deferred. |
- What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT
15 sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55% sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?
7 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 16 | Case No.:14/14/81-<br>ALC2/2018 | Party Name: GALLANTT<br>METAL LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00732/AM19/ | RLA File<br>:37/24/040/00013/AM16/ | Lic.No/Date:3710002638<br>04.05.2016 | <br>Action by :<br>Applicant | |
| <br>Decision:The Committee considered the case as per the agenda and Consultant (SKB) informed that<br>the applicant‟s reply is incomplete as the applicant did not clarify the following points:<br>1. Do you have Ladle refining furnace for adjustment of chemistry of the end product as per<br>Bureau of Indian Standard/or specification as per buyer requirement. If yes, when it was<br>installed?<br>2. What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT<br>sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55%<br>sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?<br>3. In which Norms Committee meeting, the AAs No. 3710002634/2636/2637/2638/2639/2642<br>was granted?<br>4. What was the reason of indicating the value of Rs 1/- and $1 against the quantity of import of<br>2540 MT of Sponge Iron?<br>5. Which quality of sponge (Coal Based or Gas Based) iron was to be imported and from which<br>country?<br>Therefore, on the recommendation of Consultant (SKB), the Committee decided to call the applicant<br>forpersonal hearingvia video conferencing to explain the case in the forthcoming NC meeting along<br>with reply of above mentioned deficiencies.<br>The case stands deferred. |
- What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT
16 sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55% sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?
| 17 | Case No.:15/14/81-<br>ALC2/2018 | Party Name: GALLANTT<br>METAL LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00733/AM19/ | RLA File<br>:37/24/040/00014/AM16/ | Lic.No/Date:3710002639<br>04.05.2016 | <br>Action by :<br>Applicant | |
| <br>Decision:The Committee considered the case as per the agenda and Consultant (SKB) informed that<br>the applicant‟s reply is incomplete as the applicant did not clarify the following points:<br>1. Do you have Ladle refining furnace for adjustment of chemistry of the end product as per<br>Bureau of Indian Standard/or specification as per buyer requirement. If yes, when it was<br>installed?<br>2. What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT<br>sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55%<br>sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?<br>3. In which Norms Committee meeting, the AAs No. 3710002634/2636/2637/2638/2639/2642<br>was granted?<br>4. What was the reason of indicating the value of Rs 1/- and $1 against the quantity of import of<br>2540 MT of Sponge Iron?<br>5. Which quality of sponge (Coal Based or Gas Based) iron was to be imported and from which<br>country?<br>Therefore, on the recommendation of Consultant (SKB), the Committee decided to call the applicant<br>forpersonal hearingvia video conferencing to explain the case in the forthcoming NC meeting along<br>with reply of above mentioned deficiencies.<br>The case stands deferred. |
- 17 2. What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55% sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?
8 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 18 | Case No.:17/14/81-<br>ALC2/2018 | Party Name: GALLANTT<br>METAL LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00735/AM19/<br>HQ E-office Computer No.:<br>24131 | RLA File<br>:37/24/040/00008/AM16/ | Lic.No/Date:3710002642<br>23.05.2016 | <br>Action by :<br>Applicant | |
| <br>Decision:The Committee considered the case as per the agenda and Consultant (SKB) informed that<br>the applicant‟s reply is incomplete as the applicant did not clarify the following points:<br>1. Do you have Ladle refining furnace for adjustment of chemistry of the end product as per<br>Bureau of Indian Standard/or specification as per buyer requirement. If yes, when it was<br>installed?<br>2. What was the reason of applying 2230 MT of Non Alloy Steel melting scrap and 2540 MT<br>sponge iron against export 2000 MT Non Alloy Steel Bars/Rods when they were using 55%<br>sponge iron and 45% steel scrap for manufacturing of Non Alloy Steel Bars/Rods?<br>3. In which Norms Committee meeting, the AAs No. 3710002634/2636/2637/2638/2639/2642<br>was granted?<br>4. What was the reason of indicating the value of Rs 1/- and $1 against the quantity of import of<br>2540 MT of Sponge Iron?<br>5. Which quality of sponge (Coal Based or Gas Based) iron was to be imported and from which<br>country?<br>Therefore, on the recommendation of Consultant (SKB), the Committee decided to call the applicant<br>forpersonal hearingvia video conferencing to explain the case in the forthcoming NC meeting along<br>with reply of above mentioned deficiencies.<br>The case stands deferred. |
| 19 | Case No.:172/14/81-<br>ALC2/2018 | Party Name: GAYATRI<br>BATTERIES PRIVATE<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00890/AM19/<br>HQ E-office Computer No.:<br>24074 | RLA File<br>:07/24/040/00221/AM17/ | Lic.No/Date:0710110561<br>24.10.2016 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019<br>followed by reminders on 31.03.2020 & 07.06.2020. However, no information has been received yet.<br>Therefore, the Committee decided torejectthe case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019 followed by reminders on 31.03.2020 & 07.06.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.
9 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 20 | Case No.:33/14/81-<br>ALC2/2018 | Party Name: DIANA<br>METALS | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status: |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00751/AM19/<br>HQ E-office Computer No.:<br>23341 | <br>RLA File<br>:04/24/040/00136/AM17/ | Lic.No/Date:0410162477<br>08.11.2016 | Action by<br>**:**MSME | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MSME on 21.08.2020 for examination of the case. However, no comments have been received<br>yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 21.08.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
| 21 | Case No.:193/14/81-<br>ALC2/2018 | Party Name: SUNSHINE<br>EXTRUSIONS INDIA P.<br>LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00911/AM19/<br>HQ E-office Computer No.:<br>24075 | RLA File<br>:07/24/040/00258/AM17/ | Lic.No/Date:0710110703<br>29.11.2016 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019<br>followed by reminders on 31.03.2020, 07.06.2020 & 24.08.2020. However, no information has been<br>received yet. Therefore, the Committee decided torejectthe case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019 followed by reminders on 31.03.2020, 07.06.2020 & 24.08.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.
| Case No.:347/14/81- | Party Name: TRAFOMEC | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | INDIA PVT LTD | ALC2/2020 | Deferred | ||||
| 08.09.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710110958 | Action by : | ||||
| :01/81/050/01065/AM19/ | :07/24/040/00329/AM17/ | 12.01.2017 | Applicant | ||||
| HQ E-office Computer No.: | |||||||
| 23266 | |||||||
Decision: The Committee considered the case as per agenda and noted that the applicant‟s reply was sent to DHI on 07.08.2020 for examination of the case. DHI informed that the applicant‟s reply is incomplete as the applicant did not submit reply of following deficiencies point-wise: 22
-
Complete specification with catalogue of each export product with quantity of export in number.
-
Sl. No. 2, 4, 5 & 11 of the Standard Deficiency Format.
-
Manufacturing process of export item giving specific use of each import item.
Therefore, on the recommendation of DHI, the Committee decided to call the applicant for personal hearing via video conferencing to explain the case in the forthcoming NC meeting along with reply of above mentioned deficiencies point-wise.
The case stands deferred.
10 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 23 | Case No.:44/14/81-<br>ALC2/2018 | Party Name: VELOX<br>AUTOMATION PRIVATE<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00762/AM19/<br>HQ E-office Computer No.:<br>23347 | RLA File<br>:52/24/040/00085/AM17/ | Lic.No/Date:5210042215<br>15.03.2017 | <br>Action by :<br>TEC-3 | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 09.09.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
| Case No.:55/14/81- | Party Name: ABB INDIA | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | LIMITED | ALC2/2020 | Deferred | ||||
| 08.09.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710111752 | Action by : | ||||
| :01/81/050/00773/AM19/ | :07/24/040/00081/AM18/ | 14.06.2017 | Applicant |
24 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the applicant on 24.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| Case No.:68/14/81- | Party Name: SPIRAL EHL | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | ENGINEERING PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710111807 | Action by : | ||||
| :01/81/050/00786/AM19/ | :07/24/040/00002/AM18/ | 22.06.2017 | Applicant | ||||
| HQ E-office Computer No.: | |||||||
| 23343 | |||||||
Decision: The Committee considered the case as per agenda and heard the representatives of the applicant during personal hearing held through video conferencing. The representatives explained the case in details and the Committee directed the representatives to submit following information as 25 per advice of Consultant (SKB):
-
Details of quantity matching with import & export items.
-
Weight of each export & quantity thereof.
-
Weight of each blank used for manufacturing of export items.
-
Justification for higher wastage, which is in the range of 77-93% on item of import.
-
Reasons for indicating Aluminium Rods and profiles in the items of export while items of import are only plate and tube.
-
Process chart for manufacture of export product and wastage at different stages of operation.
-
What is the composition of Aluminium Alloy, indicating in the item of import?
11 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:62/14/81- | Party Name: D.V. | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | INTERNATIONAL | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510403617 | ||||
| :01/81/050/00780/AM19/ | :05/23/040/00183/AM18/ | 08.08.2017 | ||||
| HQ E-office Computer No.: | ||||||
| 23342 |
| Case No.:62/14/81-<br>ALC2/2018 | Case No.:62/14/81-<br>ALC2/2018 | Party Name: D.V.<br>INTERNATIONAL | Party Name: D.V.<br>INTERNATIONAL | Party Name: D.V.<br>INTERNATIONAL | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00780/AM19/<br>HQ E-office Computer No.:<br>23342 | <br>RLA File<br>:05/23/040/00183/AM18/ | Lic.No/Date:0510403617<br>08.08.2017 | |||||||
| 26 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms on<br>the basis of study group report dated 21.02.2020, as adopted by the Committee in the Meeting No.<br>24/81 dated 18.03.2020, as under: | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| <br>73239390 | Table Kitchen And Other<br>House Hold Made of Stainless<br>Steel With or Without Handel /<br>Lid/ Antiskid Gasket<br>Irrespective of What Material<br>The Handel/ Lid/Antiskid<br>Gasketmay Have Been Made<br>of 200 Series Non Magnetic of<br>Relevant Thickness | 109100<br>Kgs | 72209090 | Stainless<br>Steel Circles<br>200 Series<br>Non<br>Magnetic Of<br>Relevant<br>Thickness | 1.10 Kgs/Kg<br>content in the<br>export product | ||||
| Note:<br>1. Grade of steel to match in import & export.<br>2. Thickness of sheet/circle should be between 0.1 mm to<br>import & export.<br>3. Export product should be of circular/oval shape only.<br>RA concerned maytake suitable consequential action accordingly. | 1 mm and should conform in |
| 27 | Case No.:63/14/81-<br>ALC2/2018 | Party Name: R. K. STEEL<br>MANUFACTURING<br>COMPANY PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0410163442<br>18.08.2017 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00781/AM19/<br>HQ E-office Computer<br>No.: 24076 | <br>RLA File<br>:04/24/040/00101/AM18/ | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 23.12.2019<br>followed by reminders on 30.03.2020, 07.06.2020 & 24.08.2020. However, no information has been<br>received yet. Therefore, the Committee decided torejectthe case under intimation to RA, Chennai.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.12.2019 followed by reminders on 30.03.2020, 07.06.2020 & 24.08.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Chennai.
12 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:244/14/81- | Party Name: BHARAT | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | HEAVY ELECTRICALS | ALC2/2020 | Approved | |||
| LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710112108 | ||||
| :01/81/050/00962/AM19/ | :07/21/040/00316/AM18/ | 07.09.2017 | ||||
| HQ E-office Computer No.: | ||||||
| 23344 |
28 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by DHI as under:
-
The quantity of import items at Sl. No. 1 to 72 may be allowed as per GN-4 with no wastage on number & weight terms with accountability clause .
-
The quantity of import items at Sl. No. 73 may be deleted as it is not the part of export item.
| 29 | Case No.:67/14/81-<br>ALC2/2018 | Party Name: KIRAN UDYOG | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00785/AM19/ | RLA File<br>:09/24/040/00320/AM18/ | Lic.No/Date:0910065532<br>05.10.2017 | <br>Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking | ||||
| <br>certain information as raised by Consultant (TEC-1) was sent to the applicant on 31.08.2020. The | ||||
| <br>applicant vide email dated 10.09.2020 informed that they are in process of applying for amendment to | ||||
| RA, Hyderabad for the Subject Advance Authorization as there are changes in specification for export | ||||
| order from our Customer which requires enhancement in import item inputs. Further, they will submit | ||||
| the details after amendment of AA. Therefore, the Committee decided to remind the applicant for | ||||
| furnishing the requisite information. | ||||
| The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 31.08.2020. The 29 applicant vide email dated 10.09.2020 informed that they are in process of applying for amendment to RA, Hyderabad for the Subject Advance Authorization as there are changes in specification for export order from our Customer which requires enhancement in import item inputs. Further, they will submit the details after amendment of AA. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| 30 | Case No.:148/14/81-<br>ALC2/2018 | Party Name: DC AUTO<br>PARTS PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00866/AM19/ | RLA File<br>:07/24/040/00168/AM18/ | Lic.No/Date:0710112309<br>26.10.2017 | <br>Action by :<br>Section | |
| **Decision:**The Committee considered the case as per the agenda and decided to refer the case to<br>Consultant (TEC-3) for examination & comments.<br>The case stands deferred. |
13 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:183/14/81- | Party Name: ABB INDIA | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | LIMITED | ALC2/2020 | Deferred | ||||
| 08.09.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710112554 | Action by : | ||||
| :01/81/050/00901/AM19/ | :07/24/040/00231/AM18/ | 19.12.2017 | Applicant |
31 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the applicant on 31.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| 32 | Case No.:104/14/81-<br>ALC2/2018 | Party Name: COSMOS<br>ENGITECH PVT LTD | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00822/AM19/<br>HQ E-office Computer No.:<br>23262 | RLA File<br>:34/24/040/00229/AM18/ | Lic.No/Date:3410043767<br>01.01.2018 | <br>Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that the second deficiency<br>letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on<br>31.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the<br>applicant for furnishing the requisite information.<br>The case stands deferred. |
| 33 | Case No.:195/14/81-<br>ALC2/2018 | Party Name: FCI OEN<br>CONNECTORS LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00913/AM19/<br>HQ E-office Computer No.:<br>24077 | RLA File<br>:07/24/040/00257/AM18/ | Lic.No/Date:0710112641<br>04.01.2018 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019<br>followed by reminders on 31.03.2020 & 31.08.2020. However, no information has been received yet.<br>Therefore, the Committee decided torejectthe case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019 followed by reminders on 31.03.2020 & 31.08.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.
14 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:216/14/81- | Party Name: APAR | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | INDUSTRIES LIMITED | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410043787 | ||||
| :01/81/050/00934/AM19/ | :34/24/040/00270/AM18/ | 08.01.2018 | ||||
| HQ E-office Computer No.: | ||||||
| 23421 |
| Case No.:216/14/81-<br>ALC2/2018 | Case No.:216/14/81-<br>ALC2/2018 | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00934/AM19/<br>HQ E-office Computer No.:<br>23421 | RLA File<br>:34/24/040/00270/AM18/ | Lic.No/Date:3410043787<br>08.01.2018 | ||||||||
| 3<br>4 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments given by Consultant (TEC-3) vide email dated 04.09.2020 as under: | |||||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import<br>Item | Recommended<br>Quantity | ||||
| 76149000 | Aluminium Conductor<br>Composite Core (<br>ACCC) Grosbeak Net<br>Content : (1)<br>Aluminium Ingots :<br>630.850 MTS (2)<br>Articles of Graphite<br>(Carbon Fiber<br>Composite core 8.13<br>MM): 53.900 MTS (<br>550 Kms), Total Weight<br>: 684.750MTS | 550<br>Kilometer | 1 | 76011010 | Aluminium<br>Ingots | 637.16 MT<br>with 1%<br>wastage | ||||
| 2 | 85459090 | Articles of<br>Graphite (<br>Carbon<br>Fiber<br>Composite<br>Core 8.13<br>Mm) | 555.5 KM with<br>1% wastage | |||||||
| 76149000 | Aluminium Conductor<br>Composite Core (<br>ACCC) Hawk Net<br>Content : (1)<br>Aluminium Ingots :<br>439.810 MTS (2)<br>Articles of Graphite<br>(Carbon Fiber<br>Composite Core 7.11<br>Mm): 39.140 MTS ( 515<br>Kms), Total Weight :<br>478.950 MTS | 515<br>Kilometer | 3 | 76011010 | Aluminium<br>Ingots | 444.21 MT<br>with 1%<br>wastage | ||||
| 4 | 85459090 | Articles of<br>Graphite (<br>Carbon<br>Fiber<br>Composite<br>Core 7.11<br>Mm) | 520.15 KM<br>with 1%<br>wastage | |||||||
| RA concerned maytake suitable consequential action accordingly. |
| 35 | Case No.:373/14/81-<br>ALC2/2018 | Party Name: ACCIONA<br>WINDPOWER INDIA<br>PRIVATE LIMITED<br>RLA File<br>:07/24/040/00300/AM18/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/01091/AM19/<br>HQ E-office Computer No.:<br>24078 | Lic.No/Date:0710112807<br>09.02.2018 | |||
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (TEC-1) was sent to the applicant on 12.03.2020 followed<br>by reminders on 12.06.2020, 15.06.2020 & 31.08.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 12.03.2020 followed by reminders on 12.06.2020, 15.06.2020 & 31.08.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore. RA concerned may take suitable consequential action accordingly.
15 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 36 | Case No.:364/14/81-<br>ALC2/2018 | Party Name: GAVIRANGA<br>ENTERPRISES | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/01082/AM19/<br>HQ E-office Computer No.:<br>23388 | RLA File<br>:07/24/040/00318/AM18/ | Lic.No/Date:0710112827<br>14.02.2018 | <br>Action by :<br>Section | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MeitY on 09.09.2020 for examination of the case. However, MeitY vide email dated<br>14.09.2020 informed that the copy of Advance Authorization is not received and requested to send<br>again the same. Therefore, the Committee decided to ask from the applicant to submit a copy of<br>Advance Authorization for examination of the case.<br>The case stands deferred. |
| 37 | Case No.:365/14/81-<br>ALC2/2018 | Party Name: GAVIRANGA<br>ENTERPRISES | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/01083/AM19/<br>HQ E-office Computer No.:<br>24231 | RLA File<br>:07/24/040/00319/AM18/ | Lic.No/Date:0710112828<br>14.02.2018 | <br>Action by :<br>Section | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MeitY on 09.09.2020 for examination of the case. However, MeitY vide email dated<br>14.09.2020 informed that the copy of Advance Authorization is not received and requested to send<br>again the same. Therefore, the Committee decided to ask from the applicant to submit a copy of<br>Advance Authorization for examination of the case.<br>The case stands deferred. |
| 38 | Case No.:366/14/81-<br>ALC2/2018 | Party Name: GAYATHRI<br>BATTERIES PVT LTD | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/01084/AM19/<br>HQ E-office Computer No.:<br>24079 | RLA File<br>:07/24/040/00311/AM18/ | Lic.No/Date:0710112878<br>26.02.2018 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019<br>followed by reminders on 31.03.2020 & 31.08.2020. However, no information has been received yet.<br>Therefore, the Committee decided torejectthe case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019 followed by reminders on 31.03.2020 & 31.08.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.
16 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 39 | Case No.:73/5/81-ALC2/2018 | Party Name: LM WIND<br>POWER BLADES [INDIA]<br>PVT. LTD | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00281/AM19/<br>HQ E-office Computer No.:<br>24080 | RLA File<br>:34/24/040/00350/AM18/ | Lic.No/Date:3410043923<br>27.02.2018 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (TEC-1) was sent to the applicant on 12.03.2020 followed<br>by reminders on 07.06.2020 & 31.08.2020. However, no reply has been received yet. The Committee<br>further noted that the applicant vide email dated 6.4.2020 sought some time to submit the requisite<br>documents. Hence, the Committee decided to wait for reply of the applicant.<br>The case stands deferred. |
| 40 | Case No.:367/14/81-<br>ALC2/2018 | Party Name: ACCIONA<br>WINDPOWER INDIA<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/01085/AM19/<br>HQ E-office Computer No.:<br>24081 | RLA File<br>:07/24/040/00337/AM18/ | Lic.No/Date:0710112930<br>06.03.2018 | ||
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (TEC-1) was sent to the applicant on 12.03.2020 followed<br>by reminders on 12.06.2020, 15.06.2020 & 01.09.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 12.03.2020 followed by reminders on 12.06.2020, 15.06.2020 & 01.09.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.
| Case No.:371/14/81- | Party Name: ADHESIVE | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | SPECIALITIES | ALC2/2020 | Deferred | ||||
| 08.09.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710113008 | Action by : | ||||
| :01/81/050/01089/AM19/ | :07/24/040/00351/AM18/ | 22.03.2018 | Applicant | ||||
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by Consultant (TEC-1):
-
41 1. Exact specification, thickness, width and weight of import and export item separately.
-
Details of indigenous inputs with their quantity and area.
-
Detailed manufacturing process indicating wastage at various stage of manufacturing with justification of 10% wastage.
-
Commercial value of wastage generated.
-
Material balance between import and export in terms of weight taking in to account indigenous input and process wastage.
-
17 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:121/14/81- | Party Name: APAR | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | INDUSTRIES LIMITED | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410044075 | ||||
| :01/81/050/00839/AM19/ | :34/24/040/00017/AM19/ | 24.04.2018 | ||||
| HQ E-office Computer | ||||||
| No.:23194 |
| Case No.:121/14/81-<br>ALC2/2018 | Case No.:121/14/81-<br>ALC2/2018 | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00839/AM19/<br>HQ E-office Computer<br>No.:23194 | RLA File<br>:34/24/040/00017/AM19/ | Lic.No/Date:3410044075<br>24.04.2018 | ||||||||
| 4<br>2 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments given by Consultant (TEC-3) vide email dated 04.09.2020 as under: | |||||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import<br>Item | Recommended<br>Quantity | ||||
| 76149000 | Aluminium Conductor<br>Aluminium Alloy<br>Reinforced ( ACAR) Net<br>Contents : (1)<br>Aluminium Plates/<br>Sheets/ Coils/ Slabs/<br>Ingots: 5000 MTS (2)<br>Aluminium Plates/<br>Sheets/ Coils/ Slabs/<br>Ingots: 4950 MTS (3)<br>Magnesium : 25.00 MTS<br>(4) Silicon: 25 MTS,<br>Total Weight:10000<br>MTS | 10000<br>MT | 1 | 76011010 | Aluminium<br>Ingots | 5050 MT with<br>1% wastage | ||||
| 2 | 76011010 | Aluminium<br>Ingots | 5049 MT As<br>applied | |||||||
| 3 | 81041100 | Magnesium | 25.5 MT with<br>2% wastage | |||||||
| 4 | 28046900 | Silicon | 25.5 MT with<br>2% wastage | |||||||
| Note:<br>1. The words “Plates/ Sheets/ Coils/ Slabs” may be deleted from the description of the import<br>items at Sl. No. 1 & 2.<br>2. The import item at Sl. No. 3 & 4 should be in primary form only.<br>RA concerned maytake suitable consequential action accordingly. |
| 43 | Case No.:103/14/81-<br>ALC2/2018 | Party Name: LM WIND POWER<br>BLADES INDIA PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:3410044165<br>23.05.2018 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00821/AM19/<br>HQ E-office Computer<br>No.: 24083 | <br>RLA File<br>:34/24/040/00065/AM19/ | |||
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (TEC-1) was sent to the applicant on 27.01.2020 followed<br>by reminders on 07.06.2020 & 31.08.2020. However, no reply has been received yet. Hence, the<br>Committee decided to wait for reply of the applicant.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 27.01.2020 followed by reminders on 07.06.2020 & 31.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the applicant.
18 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:92/14/81- | Party Name: ABB INDIA | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | LIMITED | ALC2/2020 | Deferred | ||||
| 08.09.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710113375 | Action by : | ||||
| :01/81/050/00810/AM19/ | :07/24/040/00050/AM19/ | 01.06.2018 | Applicant |
44 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the applicant on 01.09.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| 45 | Case No.:108/14/81-<br>ALC2/2018 | Party Name: LM WIND<br>POWER BLADES INDIA<br>PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00826/AM19/<br>HQ E-office Computer No.:<br>24084 | RLA File<br>:34/24/040/00075/AM19/ | Lic.No/Date:3410044263<br>19.06.2018 | ||
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (TEC-1) was sent to the applicant on 27.01.2020 followed<br>by reminders on 07.06.2020 & 31.08.2020. However, no reply has been received yet. Hence, the<br>Committee decided to wait for reply of the applicant.<br>The case stands deferred. |
| Case No.:161/14/81- | Party Name: TUBACEX | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | PRAKASH INDIA | ALC2/2020 | Approved | |||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310821783 | ||||
| :01/81/050/00879/AM19/ | :03/95/040/00260/AM19/ | 20.06.2018 | ||||
| HQ E-office Computer No.: | ||||||
| 23197 |
| Case No.:161/14/81-<br>ALC2/2018 | Case No.:161/14/81-<br>ALC2/2018 | Party Name: TUBACEX<br>PRAKASH INDIA<br>PRIVATE LIMITED | Party Name: TUBACEX<br>PRAKASH INDIA<br>PRIVATE LIMITED | Party Name: TUBACEX<br>PRAKASH INDIA<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00879/AM19/<br>HQ E-office Computer No.:<br>23197 | <br>RLA File<br>:03/95/040/00260/AM19/ | Lic.No/Date:0310821783<br>20.06.2018 | |||||||
| 46 | <br>**Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms on<br>repeat basis as approved for AA No. 0310822231 dated 11.07.2018 in M. No. 08/81 dated<br>24.07.2019 on the recommendation of Consultant (TEC-3) as under: | ||||||||
| <br>ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 73044100 | Stainless Steel seamless<br>Tubes / Pipes (Cold<br>Finish) Various Sizes &<br>Grade 304/ 304L/ 316/<br>316L (11% Nickel)<br>/316TI/ 321/ 321H | 76336<br>Kgs | 72042190 | Stainless Steel<br>Scrap | 1.20 Kgs/Kg<br>content in the<br>export product | ||||
| Note: The applicant should import items with relevant grade & composition only.<br>RA concerned maytake suitable consequential action accordingly. |
19 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 47 | Case No.:71/8/81-ALC2/2018 | Party Name: LM WIND<br>POWER BLADES INDIA<br>PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00453/AM19/<br>HQ E-office Computer No.:<br>24085 | RLA File<br>:34/24/040/00117/AM19/ | Lic.No/Date:3410044297<br>02.07.2018 | ||
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (TEC-1) was sent to the applicant on 27.01.2020 followed<br>by reminders on 07.06.2020 & 31.08.2020. However, no reply has been received yet. Hence, the<br>Committee decided to wait for reply of the applicant.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 27.01.2020 followed by reminders on 07.06.2020 & 31.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the applicant.
| 48 | Case No.:120/14/81-<br>ALC2/2018 | Party Name: ACCIONA<br>WINDPOWER INDIA<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00838/AM19/ | RLA File<br>:07/24/040/00099/AM19/ | Lic.No/Date:0710113621<br>23.07.2018 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and Consultant (TEC-1) informed that<br>the applicant‟s reply is deficient due to following reasons:<br>1. The information provided for solid content in import items at Sl. No. 27 to 30 is not legible and<br>wastage shown as 7.5% is on solid content basis or on total weight.<br>2. The material balance should be on solid content basis.<br>3. Catalogue and material specification of import items at Sl. No. 27 to 30.<br>Therefore, the Committee decided to seek clarification from the applicant on the above mentioned<br>deviancies as per advice of Consultant (TEC-1).<br>The case stands deferred. |
- 48 1. The information provided for solid content in import items at Sl. No. 27 to 30 is not legible and wastage shown as 7.5% is on solid content basis or on total weight.
| 49 | Case No.:128/14/81-<br>ALC2/2018 | Party Name: KIRAN UDYOG | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00846/AM19/<br>HQ E-office Computer No.:<br>24222 | RLA File<br>:09/24/040/00234/AM19/ | Lic.No/Date:0910066574<br>17.08.2018 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking | ||||
| <br>certain information as raised by Consultant (TEC-1) was sent to the applicant on 01.09.2020. The | ||||
| applicant vide email dated 10.09.2020 informed that they are in process of applying for amendment to | ||||
| RA, Hyderabad for the Subject Advance Authorization as there are changes in specification for export | ||||
| order from our Customer which requires enhancement in import item inputs. Further, they will submit | ||||
| the details after amendment of AA. Therefore, the Committee decided to remind the applicant for | ||||
| furnishing the requisite information. | ||||
| The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking 49 certain information as raised by Consultant (TEC-1) was sent to the applicant on 01.09.2020. The applicant vide email dated 10.09.2020 informed that they are in process of applying for amendment to RA, Hyderabad for the Subject Advance Authorization as there are changes in specification for export order from our Customer which requires enhancement in import item inputs. Further, they will submit the details after amendment of AA. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
20 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:177/14/81- | Party Name: GOLDSTONE | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | INFRATECH LIMITED | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910066766 | ||||
| :01/81/050/00895/AM19/ | :09/24/040/00315/AM19/ | 25.10.2018 | ||||
| HQ E-office Computer No.: | ||||||
| 23396 |
| Case No.:177/14/81-<br>ALC2/2018 | Case No.:177/14/81-<br>ALC2/2018 | Case No.:177/14/81-<br>ALC2/2018 | Party Name: GOLDSTONE<br>INFRATECH LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00895/AM19/<br>HQ E-office Computer No.:<br>23396 | <br>RLA File<br>:09/24/040/00315/AM19/ | Lic.No/Date:0910066766<br>25.10.2018 | |||||
| 50 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per comments given by Consultant (TEC-1) as under: | ||||||
| <br>Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Quantity | ||||
| 1 | 39100000 | Elastosil R 401/40S Silicones in Primary<br>Forms | 5 % wastage with<br>accountabilityin export items | ||||
| 2 | 28183000 | Aluminium Hydroxide | 5 % wastage with<br>accountabilityin export items | ||||
| 3 | 39100000 | Elastosil Aux Mould Release Agent A<br>Silicones in PrimaryForms | 5 % wastage with<br>accountabilityin export items | ||||
| 4 | 32089019 | Elastosil Aux G 3243 Primer Silicones in<br>PrimaryForms | 5 % wastage with<br>accountabilityin export items | ||||
| 5 | 73261990 | Power Line Fittings Tongue Metal Item | Asper GN-4 | ||||
| 6 | 73261990 | Power Line Fittings Clevis Metal Item | Asper GN-4 | ||||
| RA concerned may | take suitable consequential action accordingly. |
| 51 | Case No.:179/14/81-ALC2/2018 | Party Name:<br>GAVIRANGA<br>ENTERPRISES | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0710114087<br>01.11.2018 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File :01/81/050/00897/AM19/<br>HQ E-office Computer No.:<br>23390 | RLA File<br>:07/24/040/00190/AM19/ | Action by :<br>Section | ||
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MeitY on 09.09.2020 for examination of the case. However, MeitY vide email dated<br>14.09.2020 informed that the copy of Advance Authorization is not received and requested to send<br>again the same. Therefore, the Committee decided to ask from the applicant to submit a copy of<br>Advance Authorization for examination of the case.<br>The case stands deferred. |
| 52 | Case No.:200/14/81-<br>ALC2/2018 | Party Name: MAHADEVA<br>MULTI TECH | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0710114258<br>12.12.2018 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00918/AM19/<br>HQ E-office Computer No.:<br>24086 | RLA File<br>:07/24/040/00218/AM19/ | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019<br>followed by reminders on 31.03.2020 & 01.09.2020. However, no information has been received yet.<br>Therefore, the Committee decided torejectthe case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019 followed by reminders on 31.03.2020 & 01.09.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore. RA concerned may take suitable consequential action accordingly.
21 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 53 | Case No.:297/14/81-<br>ALC2/2018 | Party Name: BOMAFA<br>SPECIAL VALVE<br>SOLUTIONS PVT LTD | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0810144141<br>20.12.2018 | Status:<br>Deferred<br> <br>Action by :<br>Section |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/01015/AM19/<br>HQ E-office Computer No.:<br>24138 | RLA File<br>:08/24/040/00258/AM19/ | |||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>referred to DHI on 02.07.2020 for examination of the case. However, the matter deliberated in the<br>meeting and the Committee decided to refer the case to Consultant (TEC-3) for examination and<br>comments.<br>The case stands deferred. |
| 54 | Case No.:225/14/81-<br>ALC2/2018 | Party Name: TRASCCON<br>INTERCONNECTION<br>SYSTEMS PRIVATE LIMITED<br>RLA File<br>:07/24/040/00209/AM19/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0710114349<br>01.01.2019 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00943/AM19/<br>HQ E-office Computer<br>**No.:**24087 | ||||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019<br>followed by reminders on 31.03.2020 & 01.09.2020. However, no information has been received yet.<br>Therefore, the Committee decided torejectthe case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019 followed by reminders on 31.03.2020 & 01.09.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.
| 55 | Case No.:258/14/81-<br>ALC2/2018 | Party Name: BHUJ<br>POLYMERS PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:3710002724<br>28.01.2019 | Status:<br>Deferred<br> <br>Action by :<br>Applicant |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00976/AM19/ | RLA File<br>:37/24/040/00004/AM19/ | |||
| <br>**Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by DPIIT was sent to the applicant on 01.09.2020. However, no reply has<br>been received yet. Therefore, the Committee decided to remind the applicant for furnishing the<br>requisite information.<br>The case stands deferred. |
55 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 01.09.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
22 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
Case No.:275/14/81- Party Name: SCHWEITZER Meet No/Date:7/81- Status: ALC2/2018 ENGINEERING ALC2/2020 Approved LABORATORIES PVT. LTD. 08.09.2020 HQ File RLA File Lic.No/Date:0510409583 :01/81/050/00993/AM19/ :05/24/040/00625/AM19/ 05.02.2019 HQ E-office Computer No.: 24088
56 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by MeitY vide F. No. W-21/38/2020-IPHW-MeitY dated 26.08.2020 as under:
- Quantity of import items at Sl. No. 1 to 10 may be allowed on net to net basis with accountability clause and nil wastage .
| 57 | Case No.:49/2/81-ALC2/2019 | Party Name: VESTAS WIND<br>TECHNOLOGY INDIA<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/01135/AM19/ | RLA File<br>:04/24/040/00259/AM19/ | Lic.No/Date:0410165242<br>22.02.2019 | <br>Action by :<br>Applicant | |
| <br>Decision:The Committee considered the case as per agenda and Consultant (TEC-1) informed that<br>the applicant‟s reply is deficient due to following reasons:<br>1. Wastage calculated is on gross weight basis and not on net weight basis.<br>2. Import item name and export item name are not specific and only grades have been shown.<br>Therefore, the Committee decided to ask from the applicantto provide revised material balance on<br>the basis of net weight and also specific name of import and exportas per the advice of Consultant<br>(TEC-1). | ||||
| The case stands deferred. |
- 57
| 58 | Case No.:24/5/81-ALC2/2019 | Party Name: VESTAS WIND<br>TECHNOLOGY INDIA<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00073/AM20/<br>HQ E-office Computer No.:<br>24286 | RLA File<br>:04/24/040/00283/AM19/ | Lic.No/Date:0410165342<br>21.03.2019 | <br>Action by :<br>Applicant | |
| <br>Decision:The Committee considered the case as per agenda and Consultant (TEC-1) informed that<br>the applicant‟s reply is deficient due to following reasons:<br>1. Wastage calculated is on gross weight basis and not on net weight basis.<br>2. Import item name and export item name are not specific and only grades have been shown.<br>Therefore, the Committee decided to ask from the applicantto provide revised material balance on<br>the basis of net weight and also specific name of import and exportas per the advice of Consultant<br>(TEC-1).<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and Consultant (TEC-1) informed that 58 the applicant‟s reply is deficient due to following reasons:
23 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:90/2/81-ALC2/2019 | Party Name: JINDAL | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALUMINIUM LTD. | ALC2/2020 | Approved | ||||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710114696 | ||||
| :01/81/050/01176/AM19/ | :07/24/040/00269/AM19/ | 22.03.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23446 |
Decision: The Committee considered the case as per agenda and noted the applicant sought Aluminium cast strip in coil form to manufacture Aluminium Alloy extruded products. While discussing a similar case of the same applicant (AA No. ), the Policy Interpretation Committee in its meeting held on 9.6.2020 observed that while deciding the norms, the essentiality of the import is one of the main factors. Inputs should be allowed on the basis of essentiality and not on the basis of 59 cheaper availability. Each case should be examined by the Norms Committee taking into consideration of all relevant factors. If an item asked by the applicant is not required, the norms committee should allow the relevant item only. In this case, „Aluminium Cast Strip‟ is not an essential/primary raw material for manufacturing „Rolled Aluminium Sheets‟.
The Committee further noted that the applicant vide letter dated 01.08.2020 has requested to allow „Aluminium Ingots in the form of PIGS/SOWS/SLAB/T-BARS‟ in place of „Aluminium cast strip‟
Therefore, on the basis of comments given by Consultant (TEC-3), the Committee decided to fix the ad-hoc norms as under:
- The description & quantity of import items may be allowed as per SION C-2 .
| 60 | Case No.:12/3/81-ALC2/2019 | Party Name: VIKARSH<br>STAMPINGS INDIA PVT.<br>LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00032/AM20/<br>HQ E-office Computer No.:<br>23442 | RLA File<br>:31/83/040/00007/AM20/ | Lic.No/Date:3110067393<br>24.04.2019 | <br>Action by :<br>MeitY | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>referred to MeitY on 02.09.2020 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind MeitY for expediting the comments.<br>The case stands deferred. |
24 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 61 | Case No.:21/3/81-ALC2/2019 | Party Name: VESTAS WIND<br>TECHNOLOGY INDIA<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00041/AM20/<br>HQ E-office Computer No.:<br>23440 | RLA File<br>:04/24/040/00017/AM20/ | Lic.No/Date:0410165523<br>30.04.2019 | <br>Action by :<br>Applicant | |
| <br>Decision:The Committee considered the case as per agenda and Consultant (TEC-1) informed that<br>the applicant‟s reply is deficient due to following reasons:<br>1. Wastage calculated is on gross weight basis and not on net weight basis.<br>2. Import item name and export item name are not specific and only grades have been shown.<br>Therefore, the Committee decided to ask from the applicantto provide revised material balance on<br>the basis of net weight and also specific name of import and exportas per the advice of Consultant<br>(TEC-1).<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and Consultant (TEC-1) informed that 61 the applicant‟s reply is deficient due to following reasons:
| 62 | Case No.:33/5/81-ALC2/2019 | Party Name: BLUEBIRD<br>SOLAR PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00082/AM20/<br>HQ E-office Computer No.:<br>23444 | RLA File<br>:05/23/040/00078/AM20/ | Lic.No/Date:0510410642<br>21.05.2019 | <br>Action by :<br>TEC-3 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the applicant‟s reply<br>was sent to Consultant (TEC-3) on 10.09.2020 for examination of the case. However, no comments<br>have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for<br>expediting the comments.<br>The case stands deferred. |
| 63 | Case No.:39/5/81-ALC2/2019 | Party Name: SHIVALIK<br>BIMETAL CONTROLS<br>LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00088/AM20/<br>HQ E-office Computer No.:<br>23445 | RLA File<br>:05/24/040/00096/AM20/ | Lic.No/Date:0510410693<br>24.05.2019 | <br>Action by :<br>Section | |
| <br>**Decision:**The Committee considered the case as per the agenda and noted that the applicant‟s reply<br>was sent to Consultant (TEC-3) on 07.09.2020 for examination of the case. However, Consultant<br>(TEC-3) via email dated 11.09.2020 requested to send physical file of the case alongwith reply of the<br>applicant to examine the case. Therefore, the Committee decided to send physical file to Consultant<br>(TEC-3) for examination of the case.<br>The case stands deferred. |
25 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 64 | Case No.:40/5/81-<br>ALC2/2019 | Party Name: SHIVALIK<br>BIMETAL CONTROLS<br>LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00089/AM20/<br>HQ E-office Computer<br>No.: 23455 | RLA File<br>:05/24/040/00095/AM20/ | Lic.No/Date:0510410694<br>24.05.2019 | Action by :<br>TEC-3 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the applicant‟s reply<br>was sent to Consultant (TEC-3) on 08.09.2020 for examination of the case. However, no comments<br>have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for<br>expediting the comments.<br>The case stands deferred. |
| 65 | Case No.:41/5/81-<br>ALC2/2019 | Party Name: SHIVALIK<br>BIMETAL CONTROLS<br>LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00090/AM20/<br>HQ E-office Computer<br>No.: 23456 | RLA File<br>:05/24/040/00094/AM20/ | Lic.No/Date:0510410695<br>24.05.2019 | Action by :<br>TEC-3 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the applicant‟s reply<br>was sent to Consultant (TEC-3) on 07.09.2020 for examination of the case. However, no comments<br>have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for<br>expediting the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per the agenda and noted that the applicant‟s reply was sent to Consultant (TEC-3) on 07.09.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.
26 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:6/16/81- | Party Name: TOSHIBA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | TRANSMISSION & | ALC2/2020 | Approved | |||
| DISTRIBUTION SYSTEMS | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068126 | ||||
| :01/81/050/00291/AM20/ | :09/24/040/00368/AM20/ | 22.10.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23458 |
| Case No.:6/16/81-<br>ALC2/2019 | Case No.:6/16/81-<br>ALC2/2019 | Case No.:6/16/81-<br>ALC2/2019 | Party Name: TOSHIBA<br>TRANSMISSION &<br>DISTRIBUTION SYSTEMS | Party Name: TOSHIBA<br>TRANSMISSION &<br>DISTRIBUTION SYSTEMS | <br>Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00291/AM20/<br>HQ E-office Computer No.:<br>23458 | <br>RLA File<br>:09/24/040/00368/AM20/ | Lic.No/Date:0910068126<br>22.10.2019 | |||||
| 66 | **Decision:**The Committee considered the case as per agenda and decided to fix the following ad-hoc<br>norms on repeat basis as approved for AA No. 0910066988 dated 20.12.2018 for import item at Sl.<br>No. 1, 2, 4 & 5 as per written comments given by DHI: | ||||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Quantity | ||||
| 1 | 72251100 | CRGO Silicon Electrical Steel Coils | 1.035 Kgs/Kg content in the export<br>product or as applied, whichever is lower. | ||||
| <br>2 | 76011040 | Aluminium Wire Rods | 1.01 Kgs/Kg content in the export product<br>or as applied, whichever is lower. | ||||
| 3 | 76061190 | Aluminium Sheet | 1.01 Kgs/Kgcontent in the exportproduct | ||||
| 4 | 27101990 | Transformer Oil | Net to Net | ||||
| 5 | 48103910 | Electrical Insulation Material -<br>Kraft Paper | 1.05 Kgs/Kg content in the export product | ||||
| 6 | 32082090 | Solvent Base Vinyl TopCoat Paint | 2% of FoB value of export product | ||||
| 7 | 32082090 | Thinner | |||||
| 8 | 85049010 | LV BushingAssembly | As perGN-4withaccountability clause<br>withno wastageonweight & number<br>terms | ||||
| 9 | 85049010 | Plugin Bushings | |||||
| 10 | 85049010 | Off Load Tap-Changer | |||||
| 11 | 85049010 | Valve with Oil Drain Cast Iron | |||||
| 12 | 85049010 | RatingPlates | |||||
| 13 | 85049010 | Rollers | |||||
| Note: The grade & thickness should match for import items at Sl. No. 1 with export items.<br>RA concerned maytake suitable consequential action accordingly. |
| 67 | Case No.:7/16/81-ALC2/2019 | Party Name: SHIVALIK<br>BIMETAL CONTROLS<br>LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00292/AM20/<br>HQ E-office Computer No.:<br>23457 | RLA File<br>:05/24/040/00425/AM20/ | Lic.No/Date:0510412272<br>25.10.2019 | <br>Action by :<br>TEC-3 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the applicant‟s reply<br>was sent to Consultant (TEC-3) on 07.09.2020 for examination of the case. However, Consultant<br>(TEC-3) requested to send physical copy of the applicant‟s reply to examine the case. Therefore, the<br>Committee decided to send physical copy of reply of the applicant to Consultant (TEC-3).<br>The case stands deferred. |
27 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 68 | Case No.:3/19/81-ALC2/2019 | Party Name: DIAMOND<br>ENGINEERING (CHENNAI)<br>PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00342/AM20/<br>HQ E-office Computer No.:<br>24228 | RLA File<br>:04/24/040/00135/AM20/ | Lic.No/Date:0410166336<br>06.12.2019 | <br>Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by DPIIT was sent to the applicant on 03.09.2020. However, the<br>applicant vide email dated 10.09.2020 requested for two weeks time to submit the reply. Therefore,<br>the Committee decided to wait for reply of the applicant.<br>The case stands deferred. |
| 69 | Case No.:4/19/81-ALC2/2019 | Party Name: PEARL<br>INSULATIONS PRIVATE<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00343/AM20/<br>HQ E-office Computer No.:<br>24089 | RLA File<br>:07/24/040/00202/AM20/ | Lic.No/Date:0710115821<br>06.12.2019 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019<br>followed by reminders on 31.03.2020 & 03.09.2020. However, no information has been received yet.<br>Therefore, the Committee decided torejectthe case under intimation to RA, Bangalore.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019 followed by reminders on 31.03.2020 & 03.09.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.
| 70 | Case No.:6/19/81-ALC2/2019 | Party Name: ALUFOIL<br>PRODUCTS PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00345/AM20/<br>HQ E-office Computer No.:<br>24090 | RLA File<br>:02/24/040/00131/AM20/ | Lic.No/Date:0210209602<br>09.12.2019 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 23.12.2019<br>followed by reminders on 30.03.2020 & 03.09.2020. However, no information has been received yet.<br>Therefore, the Committee decided torejectthe case under intimation to RA, Kolkata.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.12.2019 followed by reminders on 30.03.2020 & 03.09.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Kolkata.
28 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 71 | Case No.:5/19/81-ALC2/2019 | Party Name: RAJPUTANA<br>INDUSTRIES PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00344/AM20/<br>HQ E-office Computer No.:<br>24134 | RLA File<br>:13/24/040/00177/AM20/ | Lic.No/Date:1310049465<br>09.12.2019 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and MSME vide email dated 14.09.2020<br>informed that the applicant‟s reply is deficient. Therefore, the Committee decided to seek again from<br>the applicant to furnish the following information as per comments of MSME:<br>1. To provide stage-wise wastage with manufacturing process.<br>The case stands deferred. |
| 72 | Case No.:9/19/81-ALC2/2019 | Party Name: NEO POWER<br>ELECTRONICS &<br>PROJECTS PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00348/AM20/<br>HQ E-office Computer No.:<br>24272 | RLA File<br>:03/95/040/00888/AM20/ | Lic.No/Date:0310833357<br>11.12.2019 | <br>Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (TEC-3) was sent to the applicant on 03.09.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to remind the applicant<br>for furnishing the requisite information.<br>The case stands deferred. |
| 73 | Case No.:11/19/81-<br>ALC2/2019 | Party Name: SHERA<br>ENERGY PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00350/AM20/<br>HQ E-office Computer No.:<br>24278 | RLA File<br>:13/24/040/00184/AM20/ | Lic.No/Date:1310049469<br>11.12.2019 | <br>Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by DPIIT was sent to the applicant on 03.09.2020. However, no reply has<br>been received yet. Therefore, the Committee decided to remind the applicant for furnishing the<br>requisite information.<br>The case stands deferred. |
29 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:12/19/81- | Party Name: TOSHIBA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | TRANSMISSION & | ALC2/2020 | Approved | |||
| DISTRIBUTION SYSTEMS | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068279 | ||||
| :01/81/050/00351/AM20/ | :09/24/040/00134/AM20/ | 12.12.2019 | ||||
| HQ E-office Computer No.:<br> |
| Case No.:12/19/81-<br>ALC2/2019 | Case No.:12/19/81-<br>ALC2/2019 | Case No.:12/19/81-<br>ALC2/2019 | Party Name: TOSHIBA<br>TRANSMISSION &<br>DISTRIBUTION SYSTEMS | Party Name: TOSHIBA<br>TRANSMISSION &<br>DISTRIBUTION SYSTEMS | <br>Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00351/AM20/<br>HQ E-office Computer No.:<br> | <br>RLA File<br>:09/24/040/00134/AM20/ | Lic.No/Date:0910068279<br>12.12.2019 | |||||
| 74 | **Decision:**The Committee considered the case as per agenda and decided to fix the following ad-hoc<br>norms on repeat basis as approved for AA No. 0910066988 dated 20.12.2018 for import item at Sl.<br>No. 1, 2, 4 to 6 as per written comments given by DHI: | ||||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Quantity | ||||
| 1 | 72251100 | CRGO Silicon Electrical Steel Coils | 1.035 Kgs/Kg content in the export<br>product or as applied, whichever is lower. | ||||
| <br>2 | 76011040 | Aluminium Wire Rods | 1.01 Kgs/Kg content in the export product<br>or as applied, whichever is lower. | ||||
| 3 | 76061190 | Aluminium Sheet | 1.01 Kgs/Kgcontent in the exportproduct | ||||
| 4 | 27101990 | Transformer Oil | Net to Net | ||||
| 5 | 48103910 | Electrical Insulation Material -<br>Kraft Paper | 1.05 Kgs/Kg content in the export product | ||||
| 6 | 48089000 | Press Boards | 1.05 Kgs/Kgcontent in the exportproduct | ||||
| 7 | 32082090 | Solvent BaseVinyl Top Coat Paint | 2% of FoB value of export product | ||||
| 8 | 32082090 | Thinner | |||||
| 9 | 85049010 | LVBushingAssembly | As perGN-4withaccountability clause<br>withno wastageonweight & number<br>terms | ||||
| 10 | 85049010 | Plugin Bushings | |||||
| 11 | 85049010 | Off Load Tap-Changer | |||||
| 12 | 85049010 | ValvewithOil DrainCast Iron | |||||
| 13 | 85049010 | RatingPlates | |||||
| 14 | 85049010 | Rollers | |||||
| Note: The grade & thickness should match for import item at Sl. No. 1 with export item.<br>RA concerned maytake suitable consequential action accordingly. |
| 75 | Case No.:13/19/81-<br>ALC2/2019 | Party Name: SUBHAM<br>ENGINEERING WORKS | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Rejected |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00352/AM20/<br>HQ E-office Computer No.:<br>24091 | RLA File<br>:03/95/040/00843/AM20/ | Lic.No/Date:0310833407<br>13.12.2019 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 23.12.2019<br>followed by reminders on 30.03.2020 & 04.09.2020. However, no information has been received yet.<br>Therefore, the Committee decided torejectthe case under intimation to RA, Mumbai.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.12.2019 followed by reminders on 30.03.2020 & 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai.
30 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 76 | Case No.:2/22/81-ALC2/2019 | Party Name: ASTA INDIA<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00392/AM20/<br>HQ E-office Computer No.:<br>24224 | RLA File<br>:34/24/040/00262/AM20/ | Lic.No/Date:3410045771<br>08.01.2020 | <br>Action by :<br>DPIIT | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to DPIIT on 08.09.2020 for examination of the case. However, DPIIT vide email dated<br>14.09.2020 informed that the case is under examination. Hence, the Committee decided to wait for the<br>comments.<br>The case stands deferred. |
| 77 | Case No.:3/22/81-ALC2/2019 | Party Name: JAIN FGL<br>METAL INDUSTRIES | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00393/AM20/<br>HQ E-office Computer No.:<br>24275 | RLA File<br>:04/24/040/00151/AM20/ | Lic.No/Date:0410166419<br>09.01.2020 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and MSME vide email dated 14.09.2020<br>informed that the applicant‟s reply is deficient. Therefore, the Committee decided to seek again from<br>the applicant to furnish the following information as per comments of MSME:<br>1. To provide quantity of export item manufactured each from import at Sl. No. 1 & 2.<br>The case stands deferred. |
| Case No.:7/22/81-ALC2/2019 | Party Name: GALA | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRECISION ENGINEERING | ALC2/2020 | Deferred | |||||
| PVT LTD. | 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310834081 | Action by : | ||||
| :01/81/050/00397/AM20/ | :03/94/040/00847/AM20/ | 10.01.2020 | DPIIT |
78 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 07.09.2020 for examination of the case. However, DPIIT vide email dated 14.09.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.
31 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 79 | Case No.:8/22/81-ALC2/2019 | Party Name: H. H. METALS | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00398/AM20/ | RLA File<br>:05/23/040/00377/AM20/ | Lic.No/Date:0510413314<br>13.01.2020 | <br>Action by :<br>Section | |
| **Decision:**The Committee considered the case as per agenda and decided to seek from the applicant to | ||||
| furnish following information as per comments of Consultant (SKB): | ||||
| 1. When the coating weight on handicraft is 30 gram and total numbers of items are 6667 Nos,<br>how the total weight of articles along with coating weight would be only166 Kgs? Then what<br>is the reason for applying 200 Kg Silver?<br>2. What is total area of the articles wherein silver coating is needed?<br>3. What is coating weight and thickness of coating per square meter?<br>The case stands deferred. |
| Case No.:10/22/81- | Party Name: RATNAMANI | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | METALS AND TUBES LTD. | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0810146986 | ||||
| :01/81/050/00400/AM20/ | :08/24/040/00335/AM20/ | 13.01.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23690 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) on the basis of study group report and the applicant‟s reply dated 15.06.2020 as under:
80
Export Items:
The following words may be added in the description of export item “Coating thickness (i) Epoxy 250 micron (ii) Adhesive 250 micron (iii) Polyethylene 2500 micron”
Import Items:
-
Quantity of import item at Sl. No. 1 may be allowed as 1.05 MT/MT content in the export product .
-
Quantity of import item at Sl. No. 2 (Relevant Epoxy Powder) may be allowed as applied.
-
Quantity of import item at Sl. No. 3 (Relevant Adhesive) may be allowed as applied. 4. Quantity of import item at Sl. No. 4 (Polyethylene) may be allowed as 957MT.
-
Quantity of import items at Sl. No. 5 & 6 may be allowed as applied with value restricted up to 1.5% of FoB value.
32 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 81 | Case No.:11/22/81-<br>ALC2/2019 | Party Name: ALUTOP | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00401/AM20/<br>HQ E-office Computer No.:<br>24256 | RLA File<br>:07/24/040/00239/AM20/ | Lic.No/Date:0710116026<br>14.01.2020 | <br>Action by :<br>DPIIT | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to DPIIT on 08.09.2020 for examination of the case. However, no comments have been received<br>yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
| Case No.:14/22/81- | Party Name: DISHA AUTO | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | COMPONENTS PVT. LTD. | ALC2/2020 | Deferred | ||||
| 08.09.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310834191 | Action by : | ||||
| :01/81/050/00404/AM20/ | :03/94/040/00823/AM20/ | 15.01.2020 | Section |
82 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 17.06.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 83 | Case No.:12/22/81-<br>ALC2/2019 | Party Name: SELP INDIA<br>PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00402/AM20/ | RLA File<br>:03/95/040/00997/AM20/ | Lic.No/Date:0310834156<br>15.01.2020 | <br>Action by :<br>MeitY/Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that MeitY directly reminded<br>the applicant for submitting the requisite information on 26.08.2020. However, no information has<br>been received yet. Therefore, the Committee decided to remind the applicant & MeitY for expediting<br>the comments/reply.<br>The case stands deferred. |
83 Decision: The Committee considered the case as per agenda and noted that MeitY directly reminded the applicant for submitting the requisite information on 26.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant & MeitY for expediting the comments/reply.
| 84 | Case No.:17/22/81-<br>ALC2/2019 | Party Name: K G<br>METALLOYS | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00407/AM20/ | RLA File<br>:13/24/040/00191/AM20/ | Lic.No/Date:1310049503<br>17.01.2020 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by MSME was sent to the applicant on 07.06.2020 followed by a<br>reminder on 04.09.2020. However, no reply has been received yet. Therefore, the Committee decided<br>to remind again the applicant for furnishing the requisite information.<br>The case stands deferred. |
33 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:16/22/81- | Party Name: METALIC | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | IMPRESSIONS | ALC2/2020 | Approved | |||
| (INDIA)PVT LTD | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510413371 | ||||
| :01/81/050/00406/AM20/ | :05/24/040/00672/AM20/ | 17.01.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 24092 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms on the recommendation of Consultant (TEC-1) as under:
8 5
| ITCHS | Export Item | Quantity | ITCHS | Import Item | Recommended | |
|---|---|---|---|---|---|---|
| Code | Code | Quantity | ||||
| 85177090 | Mobile Window (3636600 | 15000 | 39162019 | Acrylic Sheet | 1.05 Kgs/Kg | |
| Pcs) Made Out of Hard | Kgs | of relevant | content in the | |||
| Coated Acrylic Sheet Duly | thickness | export product | ||||
| Printed & Laminated |
Note:
1. The size of import item should be 1200x1650mm.
2. The import item should be of relevant thickness.
| 86 | Case No.:18/22/81-<br>ALC2/2019 | Party Name: POLYCAB<br>INDIA LIMITED<br>RLA File<br>:03/95/040/01018/AM20/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00408/AM20/<br>HQ E-office Computer No.:<br>23692 | Lic.No/Date:0310834331<br>20.01.2020 | <br>Action by :<br>DPIIT | ||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to DPIIT on 07.09.2020 for examination of the case. However, DPIIT vide email dated<br>14.09.2020 informed that the case is under examination. Hence, the Committee decided to wait for the<br>comments.<br>The case stands deferred. |
| Case No.:20/22/81- | Party Name: USHA | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIAL | ALC2/2020 | Deferred | ||||
| CORPORATION. | 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0810147053 | Action by : | ||||
| :01/81/050/00410/AM20/ | :08/24/040/00333/AM20/ | 21.01.2020 | Applicant |
87 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 18.02.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
34 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 88 | Case No.:1/1/81-ALC2/2020 | Party Name: GURUSHREE<br>INDUSTRIES PRIVATE<br>LIMITED<br>RLA File<br>:63/24/040/00001/AM20/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00459/AM20/<br>HQ E-office Computer No.:<br>23694 | Lic.No/Date:6310001432<br>18.02.2020 | <br>Action by :<br>Applicant | ||
| <br>**Decision:**The Committee considered the case as per agenda and Consultant (SKB) vide email dated<br>05.09.2020 informed that the applicant‟s reply is deficient. Therefore, the Committee decided to seek<br>again from the applicant to furnish the following information as per comments of Consultant (SKB):<br>1. Source of import of V2O5 compound and its documentary evidence.<br>2. Bill of entry and in which IT(HS) code has been imported.<br>3. What are the other constituents in the imported V2O5 compound and test certificate thereof?<br>4. When you are importing 10% V2O5 compound, please indicate the exact percentage of<br>vanadium in the export of Ferro Vanadium according to the test report.<br>5. Is it slag/residue from crude oil refinery industry or fly ash generated in power plant by<br>burning of petroleum coke?<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and Consultant (SKB) vide email dated 05.09.2020 informed that the applicant‟s reply is deficient. Therefore, the Committee decided to seek 88 again from the applicant to furnish the following information as per comments of Consultant (SKB):
Case No.:2/1/81-ALC2/2020 Party Name: RATNAVEER Meet No/Date:7/81- Status: METALS LIMITED ALC2/2020 Approved 08.09.2020 HQ File RLA File Lic.No/Date:3410045925 :01/81/050/00460/AM20/ :34/24/040/00378/AM20/ 03.03.2020 HQ E-office Computer No.: 23850
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per comments given by Consultant (TEC-3) as under:
8 9
| ITCHS | Export Item | Quantity | ITCHS | Import Item | Recommended | |
|---|---|---|---|---|---|---|
| Code | Code | Quantity | ||||
| Stainless steel | ||||||
| 73182200 | Stainless steel<br>Washer of<br>different Grade<br>Grade -316<br>Thickness :<br>0.1mm to 10 mm | 400000 Kgs | 72199090 | coils/plates/ sheets/<br>sheet cuttings /<br>strips both prime<br>and second of<br>relevant grade<br>Grade 316 .<br>Thickness 0.1 mm | 600 MT | |
| to 10 mm |
Note: (i) Grade & thickness to match in import & export item. (ii) Outer diameter of the export product should be Minimum 4.78 mm and Maximum 160 mm. (iii) Ratio between inner and outer diameter of the export product should be Minimum 0.48 and Maximum 0.56 respectively.
35 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:3/1/81-ALC2/2020 | Party Name: PARAMJYOTI | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| MOVERS PVT. LTD. | ALC2/2020 | Deferred | |||||
| 08.09.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0610039446 | Action by : | ||||
| :01/81/050/00461/AM20/ | :06/24/040/00091/AM20/ | 04.03.2020 | Applicant |
90 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 31.03.2020 followed by a reminder on 09.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
| 91 | Case No.:7/1/81-ALC2/2020 | Party Name: KEI<br>INDUSTRIES LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00465/AM20/<br>HQ E-office Computer No.:<br>23452 | RLA File<br>:05/23/040/00460/AM20/ | Lic.No/Date:0510413815<br>06.03.2020 | <br>Action by :<br>DPIIT | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to DPIIT on 03.09.2020 for examination of the case. However, DPIIT vide email dated<br>14.09.2020 informed that the case is under examination. Hence, the Committee decided to wait for the<br>comments.<br>The case stands deferred. |
| 92 | Case No.:5/1/81-ALC2/2020 | Party Name: MAK<br>CONTROLS AND<br>SYSTEMS PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00463/AM20/<br>HQ E-office Computer No.:<br>23454 | RLA File<br>:32/24/040/00136/AM20/ | Lic.No/Date:3210079446<br>06.03.2020 | <br>Action by :<br>Section | |
| **Decision:**The Committee considered the case as per agenda and decided to refer the case<br>examination & comments as per the advice of DHI.<br>The case stands deferred. | to MeitY for |
| 93 | Case No.:10/1/81-ALC2/2020 | Party Name: LOTUS<br>AVIATION TECHNOLOGY<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00468/AM20/<br>HQ E-office Computer No.:<br>23845 | RLA File<br>:05/23/040/00475/AM20/ | Lic.No/Date:0510413864<br>12.03.2020 | <br>Action by :<br>Section | |
| **Decision:**The Committee considered the case as per the agenda and decided to refer the case to<br>MeitY for examination & comments as per the advice of Consultant (TEC-3).<br>The case stands deferred. |
36 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 94 | Case No.:11/1/81-ALC2/2020 | Party Name: PARAM<br>INDUSTRIES | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by :<br>Applicant |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00469/AM20/<br>HQ E-office Computer No.:<br>23429 | RLA File<br>:03/95/040/01157/AM20/ | Lic.No/Date:0310835385<br>12.03.2020 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the copy of application<br>has not yet been received from the applicant and in this regard, an email was sent on 30.03.2020<br>followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the<br>Committee decided to remind again the applicant for submitting the complete set of application.<br>The case stands deferred. |
| 95 | Case No.:13/1/81-ALC2/2020 | Party Name: AUSA<br>MEDICAL DEVICES<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by :<br>Section |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00471/AM20/<br>HQ E-office Computer No.:<br>23436 | RLA File<br>:07/24/040/00304/AM20/ | Lic.No/Date:0710116253<br>13.03.2020 | ||
| **Decision:**The Committee considered the case as per the agenda and decided to refer the copy of<br>application dated 01.06.2020 received on 11.09.2020 to Consultant (TEC-3) for examination &<br>comments.<br>The case stands deferred. |
| Case No.:17/1/81- | Party Name: DIACH | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | CHEMICALS & PIGMENTS | ALC2/2020 | Approved | |||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0210209825 | ||||
| :01/81/050/00475/AM20/ | :02/24/040/00202/AM20/ | 13.03.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 23098 |
| Case No.:17/1/81-<br>ALC2/2020 | Case No.:17/1/81-<br>ALC2/2020 | Party Name: DIACH<br>CHEMICALS & PIGMENTS<br>PRIVATE LIMITED | Party Name: DIACH<br>CHEMICALS & PIGMENTS<br>PRIVATE LIMITED | Party Name: DIACH<br>CHEMICALS & PIGMENTS<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00475/AM20/<br>HQ E-office Computer<br>No.: 23098 | <br>RLA File<br>:02/24/040/00202/AM20/ | Lic.No/Date:0210209825<br>13.03.2020 | |||||||
| 96 | <br>**Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments given by MSME as under:<br>ITCHS<br>Code<br>Export Item<br>QuantityITCHS<br>Code<br>Import Item<br>Recommended<br>Quantity<br>78019100<br>Antimonial Lead Ingot 2.5 % /<br>3.20% / 2.75 % (Lead<br>AntimonyAlloy)<br>400 MT<br>78019920<br>Remelted<br>Lead Block<br>/ Ingot<br>408 MT<br>inclusive of<br>2% wastage<br>Note:<br>1. Average lead percentage in export item is 97%.<br>2. Maximum lead percentage in import item 97%.<br>3. The applicant should import relevant items only.<br>RA concerned maytake suitable consequential action accordingly. | ||||||||
| Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |||||
| Antimonial Lead Ingot 2.5 % /<br>3.20% / 2.75 % (Lead<br>AntimonyAlloy) | 400 MT | 78019920 | Remelted<br>Lead Block<br>/ Ingot | 408 MT<br>inclusive of<br>2% wastage | |||||
37 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:12/1/81-ALC2/2020 | Party Name: JINDAL SAW | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Approved | ||||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413872 | ||||
| :01/81/050/00470/AM20/ | :05/23/040/00461/AM20/ | 13.03.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23100 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) on the basis of study group report as under:
Export Items:
The following words may be added in the description of export item “Coating thickness (a) Adhesive 300 micron (b) Polypropelene & corresponding surface area to be coated (i) 38073.184sq. mtr. for 2550 micron & (ii) 5106.953 sq.mtr. for 3050 micron”
97
Import Items:
-
Quantity of import item at Sl. No. 1 may be allowed as applied and value restricted up to 0.25% of FoB value .
-
Quantity of import item at Sl. No. 2 ( Relevant Adhesive ) may be allowed as 13.825 MT.
-
Quantity of import item at Sl. No. 3 ( Relevant Polypropylene ) may be allowed as 123.6 MT.
-
Quantity of import item at Sl. No. 4 ( Relevant Sintered powder ) may be allowed as 1.05 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 5 ( Relevant wiremesh ) may be allowed as 1.02 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 6 ( OPC Cement ) may be allowed as 1.05 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 7 may be allowed as per GN-4.
| 98 | Case No.:14/1/81-ALC2/2020 | Party Name: JINDAL SAW<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00472/AM20/<br>HQ E-office Computer No.:<br>23109 | RLA File<br>:05/23/040/00457/AM20/ | Lic.No/Date:0510413873<br>13.03.2020 | ||
| **Decision:**The Committee considered the case as per the agenda and Consultant (TEC-3) informed<br>that the applicant had done amendment in AA as per applicant‟s reply dated 14.08.2020. However, the<br>applicant have not yet been submitted the amendment sheet. Therefore, the Committee decided to ask<br>from the applicant to submit the amendment sheet for examination of the case.<br>The case stands deferred. |
38 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:15/1/81-ALC2/2020 | Party Name: SHIVALIK | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| BIMETAL CONTROLS | ALC2/2020 | Deferred | |||||
| LTD. | 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413875 | Action by : | ||||
| :01/81/050/00473/AM20/ | :05/24/040/00759/AM20/ | 13.03.2020 | Applicant |
99 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 31.03.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 100 | Case No.:18/1/81-<br>ALC2/2020 | Party Name: KEI<br>INDUSTRIES LIMITED<br>RLA File<br>:05/23/040/00477/AM20/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0510413882<br>16.03.2020 | Status:<br>Deferred<br> <br>Action by<br>:DPIIT |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00476/AM20/<br>HQ E-office Computer No.:<br>23841 | ||||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to DPIIT on 07.09.2020 for examination of the case. However, DPIIT vide email dated<br>14.09.2020 informed that the case is under examination. Hence, the Committee decided to wait for<br>the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 07.09.2020 for examination of the case. However, DPIIT vide email dated 14.09.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.
| Case No.:20/1/81- | Party Name: SIECHEM | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TECHNOLOGIES | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166620 | Action by : | |||
| :01/81/050/00478/AM20/ | :04/24/040/00197/AM20/ | 16.03.2020 | Applicant | |||
| HQ E-office Computer No.: | ||||||
| 23192 |
101 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of Consultant (TEC-3):
-
Sl. No. 12 of the Standard Deficiency Format.
-
Generic name & catalogue of items at Sl. No. 2 to 8.
-
Justification for import of many types of insulating materials.
39 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:19/1/81- | Party Name: TUBACEX | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PRAKASH INDIA | ALC2/2020 | Approved | |||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310835401 | ||||
| :01/81/050/00477/AM20/ | :03/95/040/01068/AM20/ | 16.03.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23212 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms on repeat basis as approved for AA No. 0310828823 dated 07.05.2019 in M. No. 23/81 dated 04.03.2020 as per written comments given by Consultant (TEC-3) vide email dated 04.09.2020 as under:
10 2
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |
|---|---|---|---|---|---|---|---|
| 73044100 | Stainless Steel<br>seamless<br>Tubes/Pipes<br>(Cold Finish)<br>of Relevant<br>Grade | 370.370<br>MT | 1<br>2<br>3 | 73049000<br>84559000<br>84559000 | Seamless Stainless<br>Steel Tubes/Pipes<br>(Hot Finished) of<br>Relevant Grade<br>Pilger Die<br>(Consumables)<br>Mandrels<br>(Consumables) | Allowed 10%<br>wastage<br>As applied<br>with value<br>restricted upto<br>5% of FOB |
| Case No.:22/1/81- | Party Name: UPR | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310835465 | Action by : | |||
| :01/81/050/00480/AM20/ | :03/95/040/01185/AM20/ | 17.03.2020 | Applicant |
103 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 30.03.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 104 | Case No.:2/4/81-ALC2/2020 | Party Name: KRISTI<br>OVERSEAS<br>RLA File<br>:24/24/040/00007/AM21/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00527/AM21/<br>HQ E-office Computer No.:<br>23211 | <br>Lic.No/Date:2410043096<br>11.05.2020 | Action by :<br>Applicant | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the applicant‟s reply<br>was sent to MSME on 08.09.2020 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per the agenda and noted that the applicant‟s reply was sent to MSME on 08.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
40 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:1/4/81-ALC2/2020 | Party Name: N F METALS | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| CORPN | ALC2/2020 | Deferred | ||||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414148 | Action by : | |||
| :01/81/050/00526/AM21/ | :05/24/040/00038/AM21/ | 11.05.2020 | Applicant |
105 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 106 | Case No.:3/4/81-ALC2/2020 | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by<br>: TEC-3 |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00528/AM21/<br>HQ E-office Computer No.:<br>24223 | RLA File<br>:03/94/040/00053/AM21/ | Lic.No/Date:0310836192<br>14.05.2020 | ||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 07.09.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
| 107 | Case No.:7/4/81-ALC2/2020 | Party Name: C L GUPTA<br>EXPORTS LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00532/AM21/<br>HQ E-office Computer No.:<br>23839 | RLA File<br>:05/23/040/00016/AM21/ | Lic.No/Date:0510414181<br>15.05.2020 | Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and decided to seek from<br>to furnish following information as per comments given by MSME:<br>1. Blank size of import item and manufacturing process with step-wise wastage.<br>The case stands deferred. | the applicant |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by MSME:
41 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:8/4/81-ALC2/2020 | Party Name: C L GUPTA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| EXPORTS LIMITED | ALC2/2020 | Deferred | ||||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414182 | Action by : | |||
| :01/81/050/00533/AM21/ | :05/23/040/00014/AM21/ | 15.05.2020 | Applicant |
108 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by MSME:
- Blank size of import item and manufacturing process with step-wise wastage.
| 109 | Case No.:13/4/81-<br>ALC2/2020 | Party Name: JAY METAL<br>ALLOYS<br>RLA File<br>:24/24/040/00008/AM21/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:2410043104<br>15.05.2020 | Status:<br>Deferred<br> <br>Action by<br>: MSME |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00538/AM21/<br>HQ E-office Computer No.:<br>23217 | ||||
| **Decision:**The Committee considered the case as per the agenda and noted that the applicant‟s reply<br>was sent to MSME on 07.09.2020 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per the agenda and noted that the applicant‟s reply was sent to MSME on 07.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
| Case No.:6/4/81-ALC2/2020 | Party Name: PARAS | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| LAMINATES PVT. LTD. | ALC2/2020 | Deferred | ||||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414178 | Action by : | |||
| :01/81/050/00531/AM21/ | :05/24/040/00047/AM21/ | 15.05.2020 | Applicant | |||
| HQ E-office Computer No.: | ||||||
| 23846 |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant 110 to furnish following information as per comments given by Consultant (TEC-1):
-
Weight of import item at Sl. No. 1.
-
Net content of import item at Sl. No. 1 (in weight terms) in export.
-
Detailed specification & solid content of import item Sl. No. 2 along with catalogue.
-
Justification of import of acetone and its recovery.
-
Detailed manufacturing process indicating wastage.
-
Material balance between import and export in weight terms.
42 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:10/4/81- | Party Name: POWERCORE | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES INDIA PVT. | ALC2/2020 | Approved | |||
| LTD. | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710116462 | ||||
| :01/81/050/00535/AM21/ | :07/24/040/00315/AM20/ | 15.05.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 23848 |
| Case No.:10/4/81-<br>ALC2/2020<br> <br> <br> <br>HQ File<br>:01/81/050/00535/AM21/<br>HQ E-office Computer<br>No.: 23848<br> <br> | Case No.:10/4/81-<br>ALC2/2020<br> <br> <br> <br>HQ File<br>:01/81/050/00535/AM21/<br>HQ E-office Computer<br>No.: 23848<br> <br> | Party Name: POWERCORE<br>INDUSTRIES INDIA PVT.<br>LTD. | Party Name: POWERCORE<br>INDUSTRIES INDIA PVT.<br>LTD. | Party Name: POWERCORE<br>INDUSTRIES INDIA PVT.<br>LTD. | Party Name: POWERCORE<br>INDUSTRIES INDIA PVT.<br>LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| RLA File<br>:07/24/040/00315/AM20/ | Lic.No/Date:0710116462<br>15.05.2020 | ||||||||
| 11<br>1 | **Decision:**The Committee considered the case as per the agenda and decided to fix the ad-hoc norms<br>as per written comments given by Consultant (SKB) via email dated 04.09.2020 as under: | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 72261100 | C.R.G.O. Silicon<br>Electrical Steel in<br>Slit Coils and<br>Width Less Than<br>600mm | 665 MT | 72251100 | CRGO Silicon<br>Electrical Steel<br>**(Prime)**in Coils and<br>Width more than<br>600mm | 1.015 Kgs/Kg<br>content in the<br>export product | ||||
| Note:<br>1. The import material should be of prime quality only.<br>2. Width of imported coils is more than the respective width of export products.<br>3. The applicant should import relevant grade items only.<br>RA concerned maytake suitable consequential action accordingly. | prime quality only. |
| 112 | Case No.:4/4/81-ALC2/2020 | Party Name: R R KABEL<br>LIMITED<br>RLA File<br>:03/95/040/00061/AM21/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0310836210<br>15.05.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00529/AM21/<br>HQ E-office Computer No.:<br>23190 | Action by :<br>TEC-3 | |||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 21.08.2020 for examination of the case. However, no comments have<br>been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting<br>the comments.<br>The case stands deferred. |
| Case No.:11/4/81- | Party Name: R R KABEL | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | LIMITED | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310836231 | Action by | |||
| :01/81/050/00536/AM21/ | :03/95/040/00059/AM21/ | 15.05.2020 | : TEC-3 |
113 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 21.08.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.
43 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:5/4/81-ALC2/2020 | Party Name: R. M. | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALLOYS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510414175 | Action by : | |||
| :01/81/050/00530/AM21/ | :05/24/040/00048/AM21/ | 15.05.2020 | Applicant |
114 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 115 | Case No.:12/4/81-<br>ALC2/2020 | Party Name: R. R. KABEL<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by<br>: TEC-3 |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00537/AM21/<br>HQ E-office Computer No.:<br>23191 | RLA File<br>:03/95/040/00050/AM21/ | Lic.No/Date:0310836232<br>15.05.2020 | ||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 21.08.2020 for examination of the case. However, no comments have<br>been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting<br>the comments.<br>The case stands deferred. |
| Case No.:9/4/81-ALC2/2020 | Party Name: VEDANTA | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Deferred | |||||
| 08.09.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510414187 | Action by : | ||||
| :01/81/050/00534/AM21/ | :05/24/040/00770/AM20/ | 15.05.2020 | Applicant | ||||
| HQ E-office Computer No.: | |||||||
| 24285 |
116 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
44 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 117 | Case No.:16/4/81-<br>ALC2/2020 | Party Name: MONTEX<br>GLASS FIBRE IND PVT.<br>LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by<br>: DPIIT |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00541/AM21/<br>HQ E-office Computer No.:<br>24240 | RLA File<br>:03/95/040/00083/AM21/ | Lic.No/Date:0310836249<br>18.05.2020 | ||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to DPIIT on 08.09.2020 for examination of the case. However, DPIIT vide email dated<br>14.09.2020 informed that the case is under examination. Hence, the Committee decided to wait for<br>the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 08.09.2020 for examination of the case. However, DPIIT vide email dated 14.09.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.
| Case No.:14/4/81- | Party Name: VIRGO | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | LAMINATES LIMITED | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414200 | Action by : | |||
| :01/81/050/00539/AM21/ | :05/24/040/00050/AM21/ | 18.05.2020 | Applicant | |||
| HQ E-office Computer No.: | ||||||
| 23854 |
118 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by Consultant (TEC-1):
-
Exact name of import items at Sl. No 1 to 4 with catalogue.
-
Relevance of thickness in import of adhesive.
-
Sl. No. 2, 4 & 5 of the Standard Deficiency Format.
| 119 | Case No.:17/4/81-<br>ALC2/2020 | Party Name: DESHMUKH<br>LEAD PRIVATE<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00542/AM21/<br>HQ E-office Computer No.:<br>24226 | RLA File<br>:03/94/040/00073/AM21/ | Lic.No/Date:0310836251<br>19.05.2020 | Action by :<br>TEC-3 | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 10.09.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
45 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 120 | Case No.:18/4/81-<br>ALC2/2020 | Party Name: RAJHANS<br>IMPEX PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00543/AM21/<br>HQ E-office Computer<br>No.: 23178 | RLA File<br>:24/24/040/00010/AM21/ | Lic.No/Date:2410043111<br>19.05.2020 | <br>Action by :<br>MSME | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MSME on 24.08.2020 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 24.08.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
| 121 | Case No.:15/4/81-<br>ALC2/2020 | Party Name: RAJHANS<br>METALS PVT. LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00540/AM21/<br>HQ E-office Computer No.:<br>24277 | RLA File<br>:24/24/040/00006/AM21/ | Lic.No/Date:2410043110<br>19.05.2020 | Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the applicant on 03.09.2020. However,<br>no reply has been received yet. Hence, the Committee decided to remind the applicant for furnishing<br>the requisite information.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the applicant on 03.09.2020. However, no reply has been received yet. Hence, the Committee decided to remind the applicant for furnishing the requisite information.
| Case No.:21/4/81- | Party Name: K G | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | METALLOYS | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414203 | Action by : | |||
| :01/81/050/00546/AM21/ | :05/23/040/00024/AM21/ | 20.05.2020 | Applicant | |||
| HQ E-office Computer No.: | ||||||
| 24232 |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by Consultant (SKB) & on the 122 recommendation of representative of MSME:
-
What is the percentage of lead present in the imported lead scrap in different forms with documentary evidence i.e. Certificate of Analysis?
-
Have they obtained MoEF & CC clearance for importing such scrap?
-
What is the percentage of lead in the re-melted lead ingots to be exported?
-
Complete process chart and stage wise wastage at each operation during process for manufacturing of re-melted lead ingots.
46 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:19/4/81- | Party Name: NAMO | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ALLOYS PVT. LTD. | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414212 | ||||
| :01/81/050/00544/AM21/ | :05/24/040/00058/AM21/ | 20.05.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23220 |
| Case No.:19/4/81-<br>ALC2/2020 | Case No.:19/4/81-<br>ALC2/2020 | Party Name: NAMO<br>ALLOYS PVT. LTD. | Party Name: NAMO<br>ALLOYS PVT. LTD. | Party Name: NAMO<br>ALLOYS PVT. LTD. | Party Name: NAMO<br>ALLOYS PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00544/AM21/<br>HQ E-office Computer No.:<br>23220 | RLA File<br>:05/24/040/00058/AM21/ | Lic.No/Date:0510414212<br>20.05.2020 | |||||||||
| 12<br>3 | **Decision:**The Committee considered the case as per agenda and decided to fix the<br>per written comments of Consultant (SKB) as under: | ad-hoc norms as | |||||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |||||
| 76012010 | Aluminium Alloys<br>Ingots Containing Net<br>Aluminium 846165.00<br>Kg Silicon 89490 Kg,<br>Copper 14345.00 KG.<br>(Aluminium 89.07%,<br>Silicon 9.42%, Copper<br>1.51%) | 950000<br>Kgs | 1 | 76020010 | Aluminium<br>Scrap | As per SION<br>C-3 | |||||
| 2 | 28046900 | Silicon<br>Metal | As per SION<br>C-3 | ||||||||
| 3 | 74040012 | Copper<br>Scrap | As per SION<br>C-3 | ||||||||
| Note: The description of import items is as per SION C-3.<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:20/4/81- | Party Name: MADHUBENI | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | HOME APPLIANCES | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510414220 | Action by : | |||
| :01/81/050/00545/AM21/ | :05/24/040/00053/AM21/ | 21.05.2020 | Applicant |
124 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 125 | Case No.:23/4/81-<br>ALC2/2020 | Party Name: EFD<br>INDUCTION PRIVATE<br>LIMITED<br>RLA File<br>:07/24/040/00050/AM21/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0710116489<br>22.05.2020 | Status:<br>Approved<br> |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00548/AM21/<br>HQ E-office Computer No.:<br>24094 | ||||
| Decision:The Committee considered the case as per the agenda and decided to fix the norms as per<br>written comments given byMeitYvide U. O. No.: W-21/36/2020-IPHW-MeitY dated 23.07.2020.<br>(copy enclosed)<br>RA concerned maytake suitable consequential action accordingly. |
47 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:22/4/81- | Party Name: KEI | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES LIMITED | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414226 | Action by : | |||
| :01/81/050/00547/AM21/ | :05/23/040/00030/AM21/ | 22.05.2020 | Applicant | |||
| HQ E-office Computer No.: | ||||||
| 24234 |
126 Decision: The Committee considered the case as per the agenda and decided to seek from the applicant to furnish the following information as per comments given by DPIIT vide U. O. No.: P- 47011/95/2019-TSW dated 22.07.2020:
-
Net weight of each cable.
-
Material balancing viz. net content of each imported and indigenous input, for each cable. 3. Tabular statement giving total requirement of each raw material, export product wise.
| Case No.:24/4/81- | Party Name: RAJHANS | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | METALS PVT. LIMITED | ALC2/2020 | Deferred | ||||
| 08.09.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:2410043115 | |||||
| :01/81/050/00549/AM21/ | :24/24/040/00011/AM21/ | 22.05.2020 | |||||
| HQ E-office Computer No.: | |||||||
| 23215 |
127 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information on the recommendation of the representative of MSME:
- Percentage composition of import & export supported by relevant documents i.e. Certificate of Analysis.
| Case No.:26/4/81- | Party Name: C L GUPTA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | EXPORTS LIMITED | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414256 | Action by : | |||
| :01/81/050/00551/AM21/ | :05/23/040/00032/AM21/ | 27.05.2020 | Applicant |
128 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by MSME:
-
To provide quantity of each size of export item.
-
Blank size with manufacturing process and step-wise wastage.
48 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 129 | Case No.:29/4/81-<br>ALC2/2020 | Party Name: MASCOT<br>METAL TRADERS | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00554/AM21/<br>HQ E-office Computer No.:<br>23216 | RLA File<br>:24/24/040/00012/AM21/ | Lic.No/Date:2410043118<br>27.05.2020 | Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the applicant on 03.09.2020. However,<br>no reply has been received yet. Therefore, the Committee decided to remind the applicant for<br>furnishing the requisite information.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the applicant on 03.09.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| 130 | Case No.:28/4/81-<br>ALC2/2020 | Party Name: STERLITE<br>POWER TRANSMISSION<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved<br> |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00553/AM21/<br>HQ E-office Computer No.:<br>23214 | RLA File<br>:03/95/040/01199/AM20/ | Lic.No/Date:0310836388<br>27.05.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to fix the norms as per<br>written comments given byDPIITvide U. O. No.: P-47011/7/2019-TSW dated 26.08.2020. (copy<br>enclosed)<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:25/4/81- | Party Name: TRANSCON | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068803 | Action by : | |||
| :01/81/050/00550/AM21/ | :09/24/040/00111/AM21/ | 27.05.2020 | Applicant |
131 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 06.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
49 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:31/4/81- | Party Name: AKSHAY | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ALUMINIUM ALLOYS | ALC2/2020 | Approved | |||
| LLP | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510414277 | ||||
| :01/81/050/00556/AM21/ | :05/23/040/00036/AM21/ | 28.05.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 24095 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 12.09.2020 of Consultant (SKB) as under:
13 2
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import<br>Item | Recommended<br>Quantity | |
|---|---|---|---|---|---|---|---|
| 76012010 | Aluminium Alloy<br>Ingots (Aluminium -<br>89.07%, Silicon-<br>9.42% & Copper-<br>1.51%) | 400000<br>Kgs | 1<br>2<br>3 | 76020010<br>28046900<br>74040012 | Aluminium<br>Scrap<br>Silicon<br>Metal<br>Copper<br>Scrap | As per SION<br>**C-3 **<br>As per SION<br>**C-3 **<br>As per SION<br>**C-3 ** |
Note: The description of import items is as per SION C-3.
| Case No.:30/4/81- | Party Name: GOLDI | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | SOLAR PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:5210043404 | Action by : | |||
| :01/81/050/00555/AM21/ | :52/21/040/00017/AM21/ | 28.05.2020 | TEC-3 |
133 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 03.09.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.
| 134 | Case No.:33/4/81-<br>ALC2/2020 | Party Name: LM WIND<br>POWER BLADES INDIA<br>PVT. LTD<br> <br> <br> <br>RLA File<br>:34/24/040/00048/AM21/<br> <br> | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00558/AM21/<br>HQ E-office Computer No.:<br>24237 | Lic.No/Date:3410046106<br>29.05.2020 | Action by :<br>Applicant | ||
| <br>**Decision:**The Committee considered the case as per the agenda and noted that the copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>06.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet.<br>Therefore, the Committee decided to remind again the applicant for submitting the complete set of<br>application.<br>The case stands deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 06.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
50 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 135 | Case No.:32/4/81-<br>ALC2/2020 | Party Name: SIECHEM<br>TECHNOLOGIES PRIVATE<br>LIMITED | <br>Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0410166790<br>29.05.2020 | Status:<br>Deferred<br> <br>Action by<br>: TEC-3 |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00557/AM21/<br>HQ E-office Computer No.:<br>23210 | RLA File<br>:04/24/040/00029/AM21/ | |||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 29.07.2020 for examination of the case. However, no comments have<br>been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting<br>the comments.<br>The case stands deferred. |
| 136 | Case No.:27/4/81-<br>ALC2/2020 | Party Name: STERLITE<br>POWER TRANSMISSION<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0310836416<br>29.05.2020 | Status:<br>Approved<br> |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00552/AM21/<br>HQ E-office Computer No.:<br>23370 | RLA File<br>:03/95/040/01032/AM20/ | |||
| Decision:The Committee considered the case as per the agenda and decided to fix the norms as per<br>written comments given byDPIITvide U. O. No.: P-47011/7/2019-TSW dated 26.08.2020. (copy<br>enclosed)<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and decided to fix the norms as per written comments given by DPIIT vide U. O. No.: P-47011/7/2019-TSW dated 26.08.2020. (copy enclosed)
| 137 | Case No.:43/4/81-<br>ALC2/2020 | Party Name: DISHA AUTO<br>COMPONENTS PVT. LTD.<br>RLA File<br>:03/94/040/00096/AM21/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0310836464<br>01.06.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00568/AM21/<br>HQ E-office Computer<br>No.: 24230 | Action by :<br>TEC-3 | |||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 20.07.2020 & 25.08.2020 for examination of the case. However, no<br>comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3)<br>for expediting the comments.<br>The case stands deferred. |
51 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 138 | Case No.:34/4/81-<br>ALC2/2020 | Party Name:<br>LEADSTONE ENERGY<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00559/AM21/<br>HQ E-office Computer No.:<br>24239 | RLA File<br>:02/24/040/00014/AM21/ | Lic.No/Date:0210209891<br>01.06.2020 | Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and decided to seek from the applicant<br>to furnish following information as per comments given by MSME vide email dated 15.09.2020:<br>1. Percent of lead in import supported by Certificate of Analysis.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by MSME vide email dated 15.09.2020:
139
| Case No.:35/4/81- | Party Name: UPR | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310836456 | Action by : | ||||
| :01/81/050/00560/AM21/ | :03/95/040/00117/AM21/ | 01.06.2020 | Applicant | ||||
| HQ E-office Computer No.: | |||||||
| 24281 |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 06.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 140 | Case No.:36/4/81-<br>ALC2/2020 | Party Name: URVI<br>BRASS PRODUCTS | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00561/AM21/<br>HQ E-office Computer No.:<br>24283 | RLA File<br>:24/24/040/00014/AM21/ | Lic.No/Date:2410043122<br>01.06.2020 | Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the applicant on 02.09.2020. However,<br>no reply has been received yet. Therefore, the Committee decided to remind the applicant for<br>furnishing the requisite information.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the applicant on 02.09.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
52 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:37/4/81- | Party Name: HITECH | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | EXTRUSION LLP | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:2410043123 | Action by : | |||
| :01/81/050/00562/AM21/ | :24/24/040/00013/AM21/ | 02.06.2020 | Applicant |
141 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the applicant on 02.09.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| Case No.:38/4/81- | Party Name: NAMO | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ALLOYS PVT. LTD. | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414297 | ||||
| :01/81/050/00563/AM21/ | :05/24/040/00080/AM21/ | 02.06.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 24096 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 12.09.2020 of Consultant (SKB) as under:
14 2
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import<br>Item | Recommended<br>Quantity | |
|---|---|---|---|---|---|---|---|
| 76012010 | Aluminium Alloy<br>Ingots (Aluminium<br>89.07%, Silicon<br>9.42%, Copper<br>1.51%) | 500000<br>Kgs | 1<br>2<br>3 | 76020010<br>28046900<br>74040012 | Aluminium<br>Scrap<br>Silicon<br>Metal<br>Copper<br>Scrap | As per SION<br>**C-3 **<br>As per SION<br>**C-3 **<br>As per SION<br>**C-3 ** |
Note: The description of import items is as per SION C-3.
| Case No.:39/4/81- | Party Name: WINOMECHANIC | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166794 | Action by : | |||
| :01/81/050/00564/AM21/ | :04/24/040/00026/AM21/ | 02.06.2020 | Applicant |
143 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 06.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
53 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:41/4/81- | Party Name: ENGINEERS | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414314 | ||||
| :01/81/050/00566/AM21/ | :05/23/040/00037/AM21/ | 03.06.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 24097 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms 14 as per written comments given by Consultant (SKB) via email dated 05.09.2020 as under: 4
| ITCHS | Export Item | Quantity | ITCHS | Import Item | Recommended |
|---|---|---|---|---|---|
| Code | Code | Quantity | |||
| 74081190 | Bare Copper | 225 MT | 74071010 | Copper CC Rods | 1.01 Kgs/Kg |
| Wire | content in the | ||||
| exportproduct |
Note: The import & export items should contain minimum 99% Copper.
| 145 | Case No.:44/4/81-<br>ALC2/2020 | Party Name: RAYZON<br>GREEN ENERGIES<br>RLA File<br>:52/24/040/00011/AM21/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:5210043415<br>03.06.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00569/AM21/<br>HQ E-office Computer No.:<br>23229 | Action by :<br>TEC-3 | |||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 19.08.2020 for examination of the case. However, no comments have<br>been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting<br>the comments.<br>The case stands deferred. |
| 146 | Case No.:45/4/81-<br>ALC2/2020 | Party Name: RAYZON<br>GREEN ENERGIES<br>RLA File<br>:52/24/040/00077/AM20/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by<br>: TEC-3 |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00570/AM21/<br>HQ E-office Computer No.:<br>23231 | Lic.No/Date:5210043417<br>03.06.2020 | |||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 19.08.2020 for examination of the case. However, no comments have<br>been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting<br>the comments.<br>The case stands deferred. |
54 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:40/4/81- | Party Name: VON ROLL | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | (INDIA) PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710116545 | Action by : | |||
| :01/81/050/00565/AM21/ | :07/24/040/00056/AM21/ | 03.06.2020 | TEC-3 |
147 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 19.08.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.
| Case No.:42/4/81- | Party Name: WORTHY | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710116549 | ||||
| :01/81/050/00567/AM21/ | :07/24/040/00058/AM21/ | 03.06.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 23227 |
| Case No.:42/4/81-<br>ALC2/2020<br>HQ File<br>:01/81/050/00567/AM21/<br>HQ E-office Computer<br>No.: 23227 | Case No.:42/4/81-<br>ALC2/2020<br>HQ File<br>:01/81/050/00567/AM21/<br>HQ E-office Computer<br>No.: 23227 | Party Name: WORTHY<br>ENGINEERING<br>RLA File<br>:07/24/040/00058/AM21/ | Party Name: WORTHY<br>ENGINEERING<br>RLA File<br>:07/24/040/00058/AM21/ | Party Name: WORTHY<br>ENGINEERING<br>RLA File<br>:07/24/040/00058/AM21/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|
| Lic.No/Date:0710116549<br>03.06.2020 | ||||||||
| 14<br>8 | **Decision:**The Committee considered the case as per the agenda and decided to fix the ad-hoc norms<br>as per written comments given by MSME taking cue from approved AA No. 0710115198 dated<br>23.07.2019 as under: | |||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |||
| 73089090 | Pre-Fabricated<br>Staircases And Steel<br>Structurals (121.360<br>MTS) Net Content of<br>TMT/HTD Bars<br>Made of Mild Steel<br>Round Is 121360.000<br>Kgs.in Export) | 121.360<br>MT | 72141090 | <br>TMT BARS -<br>16mm X 6m (HTD<br>Bar 16mm x 6m<br>length Steel Bar -<br>MS 146-2014<br>Made of Mild Steel<br>(MS) Round | 1.02 MT/MT<br>content in the<br>export product | |||
| 84806000 | Formwork Precast<br>Mould (72.810 MTS)<br>Net Content of<br>TMT/HTD Bars<br>Made of Mild Steel<br>Round is 72810.000<br>Kgs. in Export) | 72.810<br>MT | 72141090 | <br>TMT BARS -<br>16mm X 6m (HTD<br>Bar 16mm x 6m<br>length Steel Bar -<br>MS 146-2014<br>Made of Mild Steel<br>(MS) Round | 1.02 MT/MT<br>content in the<br>export product | |||
| RA concerned maytake suitable consequential action accordingly. |
55 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 149 | Case No.:47/4/81-<br>ALC2/2020 | Party Name: ICON POWER<br>SOLUTIONS PRIVATE<br>LIMITED | <br>Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0510414336<br>05.06.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00572/AM21/<br>HQ E-office Computer No.:<br>23225 | RLA File<br>:05/23/040/00041/AM21/ | Action by :<br>Section | ||
| **Decision:**The Committee considered the case as per agenda and noted that MeitY vide email dated<br>14.09.2020 informed that they did not receive the copy of application. Therefore, the Committee<br>decided to send again a copy of application to MeitY for examination of the case.<br>The case stands deferred. |
| 150 | Case No.:46/4/81-<br>ALC2/2020 | Party Name: R R KABEL<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by<br>**:**TEC-3 |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00571/AM21/<br>HQ E-office Computer No.:<br>23223 | RLA File<br>:03/95/040/00875/AM20/ | Lic.No/Date:0310836526<br>05.06.2020 | ||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 21.08.2020 for examination of the case. However, no comments have<br>been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting<br>the comments.<br>The case stands deferred. |
| 151 | Case No.:48/4/81-<br>ALC2/2020 | Party Name: SHARBIN<br>INTERNATIONAL | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved<br> |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00573/AM21/<br>HQ E-office Computer No.:<br>23228 | RLA File<br>:08/24/040/00054/AM21/ | Lic.No/Date:0810147902<br>05.06.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to fix the norms as per<br>written comments given byDPIITvide U. O. No.: P-47011/176/2019-TSW dated 06.08.2020. (copy<br>enclosed)<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and decided to fix the norms as per written comments given by DPIIT vide U. O. No.: P-47011/176/2019-TSW dated 06.08.2020. (copy enclosed)
56 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:50/4/81- | Party Name: NAGREEKA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDCON PRODUCTS (P) | ALC2/2020 | Deferred | |||
| LTD. | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310836580 | Action by : | |||
| :01/81/050/00575/AM21/ | :03/95/040/01148/AM20/ | 08.06.2020 | Applicant | |||
| HQ E-office Computer No.: | ||||||
| 23232 |
152 Decision: The Committee considered the case as per the agenda and decided to seek from the applicant to furnish the following information as per comments given by DPIIT vide U. O. No.: P- 47011/354/2019-TSW dated 06.08.2020:
-
Sl. No. 2, 3, 5 & 11 of the Standard Deficiency Format.
-
Sale price of Aluminium foil scrap generated during the manufacturing process supported by documentary evidence like copies of sale invoice etc.
| Case No.:49/4/81- | Party Name: RAJ METAL | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210209908 | Action by : | |||
| :01/81/050/00574/AM21/ | :02/24/040/00018/AM21/ | 08.06.2020 | Applicant |
153 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 06.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 154 | Case No.:52/4/81-<br>ALC2/2020 | Party Name: RATNAVEER<br>METALS LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by<br>: TEC-3 |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00577/AM21/<br>HQ E-office Computer No.:<br>23234 | RLA File<br>:34/24/040/00055/AM21/ | Lic.No/Date:3410046133<br>09.06.2020 | ||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 02.09.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
57 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 155 | Case No.:51/4/81-<br>ALC2/2020 | Party Name: UNIVERSAL<br>METALLICS PRIVATE<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00576/AM21/<br>HQ E-office Computer No.:<br>23267 | RLA File<br>:05/24/040/00090/AM21/ | Lic.No/Date:0510414354<br>09.06.2020 | Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the applicant on 02.09.2020. However,<br>no reply has been received yet. Hence, the Committee decided to remind the applicant for furnishing<br>the requisite information.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the applicant on 02.09.2020. However, no reply has been received yet. Hence, the Committee decided to remind the applicant for furnishing the requisite information.
| Case No.:53/4/81- | Party Name: R R KABEL | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | LIMITED | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310836620 | Action by | |||
| :01/81/050/00578/AM21/ | :03/95/040/00099/AM21/ | 10.06.2020 | : TEC-3 |
156 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 21.08.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.
| Case No.:54/4/81- | Party Name: | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | WINOMECHANIC | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166814 | Action by : | |||
| :01/81/050/00579/AM21/ | :04/24/040/00037/AM21/ | 10.06.2020 | Applicant |
157 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 06.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 158 | Case No.:2/7/81-ALC2/2020 | Party Name:<br>ELECTROLEAD PUNE<br>PRIVATE LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00658/AM21/ | RLA File<br>:31/83/040/00029/AM21/ | Lic.No/Date:3110067796<br>28.07.2020 | Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per the agenda and noted that the copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait<br>for the complete set of application.<br>The case stands deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred.
58 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:3/7/81-ALC2/2020 | Party Name: | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ELECTROLEAD PUNE | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3110067797 | Action by : | |||
| :01/81/050/00659/AM21/ | :31/83/040/00028/AM21/ | 28.07.2020 | Applicant |
159 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:1/7/81-ALC2/2020 | Party Name: KEI | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2020 | Deferred | ||||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414751 | Action by | |||
| :01/81/050/00657/AM21/ | :05/23/040/00088/AM21/ | 28.07.2020 | **:**DPIIT |
160 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 08.09.2020 for examination of the case. However, DPIIT vide email dated 14.09.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.
| Case No.:4/7/81-ALC2/2020 | Party Name: AB | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| CASTINGS | ALC2/2020 | Deferred | ||||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5010002699 | Action by : | |||
| :01/81/050/00660/AM21/ | :50/24/040/00007/AM21/ | 29.07.2020 | Applicant |
161 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| 162 | Case No.:5/7/81-ALC2/2020 | Party Name: GUJARAT<br>COPPER ALLOYS LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by<br>: Section |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00661/AM21/ | RLA File<br>:03/94/040/00282/AM21/ | Lic.No/Date:0310837489<br>29.07.2020 | ||
| **Decision:**The Committee considered the case as per the agenda and decided to refer the case to<br>Consultant (SKB) for examination & comments.<br>The case stands deferred. |
59 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:13/7/81- | Party Name: ASEEM | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TECHNOLOGIES (P) | ALC2/2020 | Deferred | |||
| LTD. | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:5610005913 | Action by : | |||
| :01/81/050/00669/AM21/ | :56/24/040/00013/AM21/ | 30.07.2020 | Applicant |
163 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:7/7/81-ALC2/2020 | Party Name: MUNDRA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| SOLAR PV LIMITED | ALC2/2020 | Deferred | ||||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0810148262 | Action by : | |||
| :01/81/050/00663/AM21/ | :08/24/040/00119/AM21/ | 30.07.2020 | Applicant |
164 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:10/7/81- | Party Name: SIEMENS | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | GAMESA RENEWABLE | ALC2/2020 | Deferred | |||
| POWER PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166930 | Action by : | |||
| :01/81/050/00666/AM21/ | :04/24/040/00058/AM21/ | 30.07.2020 | Applicant | |||
| HQ E-office Computer | ||||||
| No.: 23260 |
165 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by Consultant (TEC-1):
-
Specific Name of import item along with description of import.
-
Revised import item list indicating generic name and quantity as per material balance calculation sheet.
60 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:11/7/81- | Party Name: SIEMENS | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | GAMESA RENEWABLE | ALC2/2020 | Deferred | |||
| POWER PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166931 | Action by : | |||
| :01/81/050/00667/AM21/ | :04/24/040/00059/AM21/ | 30.07.2020 | Applicant | |||
| HQ E-office Computer | ||||||
| No.: 23254 |
166 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by Consultant (TEC-1):
-
Specific Name of import item along with description of import.
-
Revised import item list indicating generic name and quantity as per material balance calculation sheet.
| Case No.:6/7/81-ALC2/2020 | Party Name: | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| VOESTALPINE VAE | ALC2/2020 | Deferred | ||||
| VKN INDIA PRIVATE | 08.09.2020 | |||||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0510414780 | Action by : | |||
| :01/81/050/00662/AM21/ | :05/24/040/00208/AM21/ | 30.07.2020 | Applicant |
167 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by Consultant (SKB):
-
Process of manufacturing (Flow Chart).
-
Wastage on each operation for manufacturing of each set/assembly.
-
Basis of calculation of wastage @5% on each set. .
| Case No.:8/7/81-ALC2/2020 | Party Name: | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| WINOMECHANIC | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166928 | Action by : | |||
| :01/81/050/00664/AM21/ | :04/24/040/00052/AM21/ | 30.07.2020 | Applicant |
168 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
61 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:9/7/81-ALC2/2020 | Party Name: | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| WINOMECHANIC | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166929 | Action by : | |||
| :01/81/050/00665/AM21/ | :04/24/040/00053/AM21/ | 30.07.2020 | Applicant |
169 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:12/7/81- | Party Name: R T JAIN AND | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | COMPANY | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310837519 | Action by : | |||
| :01/81/050/00668/AM21/ | :03/95/040/00261/AM21/ | 31.07.2020 | Applicant |
170 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:17/7/81- | Party Name: TOSHIBA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TRANSMISSION & | ALC2/2020 | Deferred | |||
| DISTRIBUTION SYSTEMS | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910069014 | Action by : | |||
| :01/81/050/00673/AM21/ | :09/24/040/00233/AM21/ | 03.08.2020 | Applicant |
171 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:18/7/81- | Party Name: TOSHIBA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TRANSMISSION & | ALC2/2020 | Deferred | |||
| DISTRIBUTION SYSTEMS | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910069015 | Action by : | |||
| :01/81/050/00674/AM21/ | :09/24/040/00232/AM21/ | 03.08.2020 | Applicant |
172 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
62 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 173 | Case No.:14/7/81-<br>ALC2/2020 | Party Name: SIECHEM<br>TECHNOLOGIES PRIVATE<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00670/AM21/<br>HQ E-office Computer No.:<br>23233 | RLA File<br>:04/24/040/00063/AM21/ | Lic.No/Date:0410166944<br>06.08.2020 | <br>Action by<br>: TEC-3 | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 28.08.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
| 174 | Case No.:15/7/81-<br>ALC2/2020 | Party Name: SHIVALIK<br>BIMETAL CONTROLS LTD | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00671/AM21/ | RLA File<br>:05/24/040/00215/AM21/ | Lic.No/Date:0510414832<br>07.08.2020 | <br>Action by<br>: TEC-3 | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 08.09.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
| Case No.:16/7/81- | Party Name: SONALI | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | METAL INDUSTRIES LLP | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3210079636 | ||||
| :01/81/050/00672/AM21/ | :32/24/040/00034/AM21/ | 07.08.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 23333 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms 17 as per written comments given by Consultant (SKB) via email dated 05.09.2020 as under: 5
| ITCHS | Export Item | Quantity | ITCHS | Import Item | Recommended |
|---|---|---|---|---|---|
| Code | Code | Quantity | |||
| Copper Billets | 1.03 Kgs/Kg of | ||||
| 74031300 | Having Minimum | 100 MT | 74040012 | Copper Scrap | copper content in |
| Purityof99.0% | the exportproduct |
Note: The import item should be as per ISRI with minimum 97% copper content.
63 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:21/7/81- | Party Name: AXORA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | RESOURCES LIMITED | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210210029 | Action by : | |||
| :01/81/050/00677/AM21/ | :02/24/040/00053/AM21/ | 10.08.2020 | Applicant |
176 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by MSME vide email dated 15.09.2020:
- Percentage of lead alloy in import supported by Certificate of Analysis. 2. Percentage of lead in alloy.
| 177 | Case No.:20/7/81-<br>ALC2/2020 | Party Name: BHARAT<br>HEAVY ELECTRICALS<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00676/AM21/<br>HQ E-office Computer No.:<br>23281 | RLA File<br>:11/24/040/00002/AM21/ | Lic.No/Date:1110028728<br>10.08.2020 | Action by :<br>TEC-3 | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 07.09.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
| Case No.:19/7/81- | Party Name: DIAMOND | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING (CHENNAI) | ALC2/2020 | Deferred | |||
| PVT. LTD. | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166948 | Action by | |||
| :01/81/050/00675/AM21/ | :04/24/040/00055/AM21/ | 10.08.2020 | : DPIIT |
178 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 08.09.2020 for examination of the case. However, DPIIT vide email dated 14.09.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.
64 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:24/7/81- | Party Name: MITTAL | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | APPLIANCES LIMITED | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5610005916 | ||||
| :01/81/050/00680/AM21/ | :56/24/040/00003/AM21/ | 10.08.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 24099 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (SKB) via email dated 10.09.2020 as under:
17 9
| ITCHS | Export | Item | Quantity | ITCHS | Import Item | Recommended | |
|---|---|---|---|---|---|---|---|
| Code | Code | Quantity | |||||
| 74031300 | Refined<br>Copper | <br>Billets | 320 MT | 74040012 | Copper Scrap Birch<br>Cliff / Berry / Candy /<br>Cobra / Clove / Cocoa | 1.03 Kg/Kg of<br>copper content in<br>the export product | |
| Barley |
Note:
1. The export item should have minimum purity of 99.00%.
2. The import item should be as per ISRI with minimum 97% copper content.
| Case No.:23/7/81- | Party Name: AMPCO | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | METAL INDIA PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3110067815 | Action by : | |||
| :01/81/050/00679/AM21/ | :31/83/040/00039/AM21/ | 11.08.2020 | Applicant |
180 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:22/7/81- | Party Name: NAVITAS | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | GREEN SOLUTIONS PVT. | ALC2/2020 | Deferred | |||
| LTD. | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:5210043486 | Action by : | |||
| :01/81/050/00678/AM21/ | :52/21/040/00063/AM21/ | 11.08.2020 | Applicant |
181 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
65 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
182
| Case No.:31/7/81- | Party Name: AUSA | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | MEDICAL DEVICES | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710116878 | Action by : | ||||
| :01/81/050/00687/AM21/ | :07/24/040/00136/AM21/ | 13.08.2020 | Section |
Decision: The Committee considered the case as per the agenda and decided to refer the copy of application dated 05.09.2020 received on 09.09.2020 to Consultant (TEC-3) for examination & comments.
| Case No.:32/7/81- | Party Name: LASER POWER | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | & INFRA PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210210037 | Action by : | |||
| :01/81/050/00688/AM21/ | :02/24/040/00057/AM21/ | 13.08.2020 | Applicant |
183 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:26/7/81- | Party Name: POLYCAB | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA LIMITED | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310837632 | Action by : | |||
| :01/81/050/00682/AM21/ | :03/95/040/00270/AM21/ | 13.08.2020 | Applicant |
184 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| 185 | Case No.:25/7/81-<br>ALC2/2020 | Party Name: SKYLEAD | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00681/AM21/ | RLA File<br>:03/95/040/00276/AM21/ | Lic.No/Date:0310837630<br>13.08.2020 | <br>Action by :<br>MSME | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MSME on 11.09.2020 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 11.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
66 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:30/7/81- | Party Name: BAOSTEEL | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA COMPANY | ALC2/2020 | Approved | |||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310837684 | ||||
| :01/81/050/00686/AM21/ | :03/94/040/00345/AM21/ | 14.08.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 24103 |
| Case No.:30/7/81-<br>ALC2/2020 | Case No.:30/7/81-<br>ALC2/2020 | Party Name: BAOSTEEL<br>INDIA COMPANY<br>PRIVATE LIMITED<br>RLA File<br>:03/94/040/00345/AM21/ | Party Name: BAOSTEEL<br>INDIA COMPANY<br>PRIVATE LIMITED<br>RLA File<br>:03/94/040/00345/AM21/ | Party Name: BAOSTEEL<br>INDIA COMPANY<br>PRIVATE LIMITED<br>RLA File<br>:03/94/040/00345/AM21/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00686/AM21/<br>HQ E-office Computer<br>No.: 24103 | Lic.No/Date:0310837684<br>14.08.2020 | ||||||||
| 18<br>6 | **Decision:**The Committee considered the case as per the agenda and decided to fix the ad-hoc norms<br>as per written comments given by Consultant (SKB) via email dated 10.09.2020 as under: | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 72085490 | Hot Rolled<br>Pickled And<br>Oiled Steel<br>Sheet In Coils,<br>Grade Sphc,<br>Thickness 2.3<br>mm, Width 690<br>mm, Length C<br>mm | 297 MT | 72085490 | Hot Rolled<br>Pickled And Oiled<br>Steel Sheet In<br>Coils, Grade Sphc,<br>Thickness 2.3<br>mm, Width 1386<br>mm, Length C<br>mm | 300.00 MT<br>inclusive of 1.0<br>% wastage | ||||
| 72269210 | Prime Cold<br>Rolled Alloyed<br>Steel Sheet In<br>Coils, Grade<br>Spcc, Thickness<br>1.8 mm,Width<br>57.3 mm, Length<br>C mm | 693 MT | 72255010 | Prime Cold Rolled<br>Alloyed Steel<br>Sheet In Coils,<br>Grade Spcc,<br>Thickness 1.8<br>mm, Width 1214<br>mm, Length C<br>mm | 700.00 MT<br>inclusive of<br>1.0% wastage | ||||
| RA concerned maytake suitable consequential action accordingly. |
| Case No.:33/7/81- | Party Name: CYPRESS | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES INDIA | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0810148328 | Action by : | |||
| :01/81/050/00689/AM21/ | :08/24/040/00131/AM21/ | 14.08.2020 | Applicant |
187 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
67 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:28/7/81- | Party Name: JAIN METAL | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ROLLING MILLS | ALC2/2020 | Approved | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166958 | ||||
| :01/81/050/00684/AM21/ | :04/24/040/00064/AM21/ | 14.08.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 24105 |
| Case No.:28/7/81-<br>ALC2/2020 | Case No.:28/7/81-<br>ALC2/2020 | Party Name: JAIN METAL<br>ROLLING MILLS | Party Name: JAIN METAL<br>ROLLING MILLS | Party Name: JAIN METAL<br>ROLLING MILLS | Party Name: JAIN METAL<br>ROLLING MILLS | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br> <br><br>Lic.No/Date:0410166958<br>14.08.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br> <br><br>Lic.No/Date:0410166958<br>14.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00684/AM21/<br>HQ E-office Computer<br>No.: 24105 | RLA File<br>:04/24/040/00064/AM21/ | ||||||||
| 18<br>8 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments given by MSME as under: | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 78011000 | Lead Ingots<br>Lead Content -<br>99.95% | 1569838<br>Kgs | 78020090 | Lead Scrap as per<br>ISRI Code word<br>"Relay" Lead<br>Content -40%,<br>Copper Content -<br>25% | As applied | ||||
| 74081910 | Copper Wire<br>Copper Content<br>-99.97% | 1000000<br>Kgs | 28362010 | Disodium Carbonate<br>Dense | Wastage allowed<br>upto 0.1% of import<br>item at Sl. No. 1 | ||||
| Note: The applicant should import relevant items only.<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:27/7/81- | Party Name: SIEMENS | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | GAMESA RENEWABLE | ALC2/2020 | Deferred | |||
| POWER PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166956 | Action by : | |||
| :01/81/050/00683/AM21/ | :04/24/040/00067/AM21/ | 14.08.2020 | Applicant |
189 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:29/7/81- | Party Name: SIEMENS GAMESA | Meet No/Date:7/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | RENEWABLE POWER | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166959 | Action by : | ||||
| :01/81/050/00685/AM21/ | :04/24/040/00069/AM21/ | 14.08.2020 | Applicant |
190 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
68 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 191 | Case No.:34/7/81-<br>ALC2/2020 | Party Name: APAR INDUSTRIES<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00690/AM21/<br>HQ E-office Computer<br>No.: 23277 | <br>RLA File<br>:03/94/040/00236/AM21/ | Lic.No/Date:0310837707<br>17.08.2020 | <br>Action by :<br>TEC-3 | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 01.09.2020 & 07.09.2020 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
| 192 | Case No.:35/7/81-<br>ALC2/2020 | Party Name: KALPATARU<br>POWER TRANSMISSION<br>LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0810148343<br>17.08.2020 | Status:<br>Deferred<br> <br>Action by<br>: Section |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00691/AM21/<br>HQ E-office Computer No.:<br>24350 | RLA File<br>:08/24/040/00128/AM21/ | |||
| **Decision:**The Committee considered the case as per the agenda and decided to refer<br>Consultant (TEC-3) for examination & comments.<br>The case stands deferred. | the case to |
Decision: The Committee considered the case as per the agenda and decided to refer the case to Consultant (TEC-3) for examination & comments. The case stands deferred.
| 193 | Case No.:36/7/81-<br>ALC2/2020 | Party Name: JAIN<br>RECYCLING PRIVATE<br>LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00692/AM21/<br>HQ E-office Computer No.:<br>24349 | RLA File<br>:32/24/040/00036/AM21/ | Lic.No/Date:3210079645<br>18.08.2020 | Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and decided to seek from the applicant<br>to furnish following information as per comments given by MSME vide email dated 15.09.2020:<br>1. Average percentage of copper in import supported by relevant documentation.<br>2. Percentage of copper in export supported by test certificate.<br>The case stands deferred. |
| 194 | Case No.:37/7/81-<br>ALC2/2020 | Party Name: PRIYANKA<br>INDIA PVT. LTD. | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00693/AM21/ | RLA File<br>:05/24/040/00238/AM21/ | Lic.No/Date:0510414929<br>18.08.2020 | Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per the agenda and noted that the copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait<br>for the complete set of application.<br>The case stands deferred. |
69 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:38/7/81- | Party Name: SIECHEM | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TECHNOLOGIES PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166964 | Action by : | |||
| :01/81/050/00694/AM21/ | :04/24/040/00074/AM21/ | 18.08.2020 | Applicant |
195 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| 19<br>6 | Case No.:40/7/81-<br>ALC2/2020 | Case No.:40/7/81-<br>ALC2/2020 | Party Name: GKEM<br>INTERNATIONAL<br>PRIVATE LIMITED<br>RLA File<br>:05/23/040/00132/AM21/ | Party Name: GKEM<br>INTERNATIONAL<br>PRIVATE LIMITED<br>RLA File<br>:05/23/040/00132/AM21/ | Party Name: GKEM<br>INTERNATIONAL<br>PRIVATE LIMITED<br>RLA File<br>:05/23/040/00132/AM21/ | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0510414937<br>19.08.2020 | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020<br>Lic.No/Date:0510414937<br>19.08.2020 | Status:<br>Approved |
|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00696/AM21/<br>HQ E-office Computer<br>No.: 24109 | ||||||||
| **Decision:**The Committee considered the case as per the agenda and decided to fix the ad-hoc norms<br>as per written comments given by Consultant (SKB) via email dated 10.09.2020 as under: | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |||
| 74081190 | Bare Copper Wire<br>or Conductors<br>1x4mm | 230 MT | 74071010 | Copper CC Rods<br>EC Grade | 1.01Kgs/Kg of<br>copper content in<br>the exportproduct | |||
| Note: The import & export item should contain 99.99% Copper.<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms 19 as per written comments given by Consultant (SKB) via email dated 10.09.2020 as under:
6
Note: The import & export item should contain 99.99% Copper.
| 197 | Case No.:39/7/81-<br>ALC2/2020 | Party Name: POLYCAB<br>INDIA LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00695/AM21/<br>HQ E-office Computer<br>No.: 24351 | RLA File<br>:03/95/040/00289/AM21/ | Lic.No/Date:0310837758<br>19.08.2020 | <br>Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per the agenda and noted that the copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait<br>for the complete set of application.<br>The case stands deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
70 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| 198 | Case No.:41/7/81-<br>ALC2/2020 | Party Name: SKYLEAD | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by<br>: MSME |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00697/AM21/ | RLA File<br>:03/95/040/00297/AM21/ | Lic.No/Date:0310837792<br>19.08.2020 | ||
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MSME on 11.09.2020 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 11.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
| 199 | Case No.:42/7/81-<br>ALC2/2020 | Party Name: SKYLEAD | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by<br>: MSME |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00698/AM21/ | RLA File<br>:03/95/040/00300/AM21/ | Lic.No/Date:0310837793<br>19.08.2020 | ||
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MSME on 11.09.2020 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 11.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
| 200 | Case No.:44/7/81-<br>ALC2/2020 | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:7/81-<br>ALC2/2020<br>08.09.2020 | Status:<br>Deferred<br> <br>Action by<br>: TEC-3 |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00700/AM21/<br>HQ E-office Computer No.:<br>24348 | RLA File<br>:03/94/040/00316/AM21/ | Lic.No/Date:0310837821<br>20.08.2020 | ||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 07.09.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
| Case No.:43/7/81- | Party Name: MUNDRA | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | SOLAR PV LIMITED | ALC2/2020 | Deferred | |||
| 08.09.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0810148374 | Action by : | |||
| :01/81/050/00699/AM21/ | :08/24/040/00139/AM21/ | 20.08.2020 | Applicant |
201 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
71 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Case No.:45/7/81- | Party Name: SIEMENS | Meet No/Date:7/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | GAMESA RENEWABLE | ALC2/2020 | Deferred | |||
| POWER PRIVATE LIMITED | 08.09.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166974 | Action by : | |||
| :01/81/050/00701/AM21/ | :04/24/040/00068/AM21/ | 20.08.2020 | Applicant |
202 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 04.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
72 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
MINUTES OF THE OFFLINE CASES
| SI.<br>No. | Applicant’s<br>Name / AA<br>No. | HQ/RA File<br>No. | Case History | Decision | Status |
|---|---|---|---|---|---|
| ALSTOM<br>PROJECTS<br>INDIA<br> | 01/81/050/00<br>515/AM12 | The Case was rejected in M. No. 18 dt.<br>04.12.2012 due to non-submission of reply.<br>The applicants vide letter dated 09.02.2016<br>furnished reply with a requested to fix the ad-<br>hoc norms. The applicant had also furnished<br>reply dated 21.02.2019 to DHI of deficiency<br>letter dated 23.10.2017 which was forwarded<br>to DHI on 31.05.2019. DHI was reminded on<br>14.08.2019 & 03.10.2019 to expedite the<br>comments. As per NC decision of M. No.<br>13/81 dt. 03.10.2019, a letter was sent to the<br>applicant on 28.10.2019 followed by reminder<br>dated 23.12.2019 requesting to submit the<br>complete set of application. The applicant<br>submitted the copy of application vide email<br>dated 04.06.2020 which was referred to DHI | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| R1 | LIMITED | on the same day. The case was last considered | |||
| 0310683926<br>dated<br>29.02.2012 | 03/94/040/01<br>033/AM12 | <br>in M. No. 04/81 dt. 09.07.2020 as per written<br>comments of DHI, the Committee decided to<br>seek<br>from<br>the<br>applicant<br>the<br>following<br>information:<br>i) Scanned<br>copy<br>of<br>complete<br>set<br>of<br>application along with ANF 4A<br>ii) Complete specification of export products<br>iii)The difference between export item No. 1<br>& 2<br>Sl. No. 4, 5 & 11 of SDL export product wise.<br>The calculation of the requirement of raw<br>material should be supported by dimensional<br>Engineering drawing with relevant dimensions<br>highlighted. As per NC decision, D/L was sent<br>to the applicant on 27.08.2020. However, no<br>replyhas been receivedyet. | |||
| BC<br>INSTRUMEN<br>TS INDIA<br>PRIVATE<br>LIMITED | KASEZ/100<br>%EOU/II/46/<br>2003-<br>04/Vol.I-941 | The applicant requested for fixation of wastage<br>norms in respect of machined components<br>under<br>100%<br>EOU.<br>The<br>applicant‟s<br>representation was referred to DPIIT on<br>23.05.2018. The complete set of application<br>was again sent to DPIIT on 01.11.2019 for<br>examination of the case. The case was last<br>considered in M. No. 19/81 dt. 26.12.2019 and<br>decided to seek from the applicant to furnish<br>some<br>information<br>as<br>per<br>advice<br>of<br>representative of DPIIT. As per NC decision, a<br>deficiency letter was sent to the applicant on<br>28.01.2020. However, no reply has been<br>received yet. Information received from the<br>applicant vide email dated 17.06.2020 has been | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| R2 | |||||
73 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| forwarded<br>to<br>DPIIT<br>for<br>comments<br>on<br>27.06.2020. The case was last considered in M. | <br> <br> <br> <br> <br> | ||||
|---|---|---|---|---|---|
| No. 04/81 dt. 09.07.2020 and decided to<br>remind DPIIT to expedite the comments. As<br>per NC decision, D/L was sent to the applicant<br>on 01.09.2020. However, no reply has been<br>receivedyet. | |||||
| LEITWIND<br>SHRIRAM<br>MANUFACT<br>URING<br>LIMITED<br>0410147961<br>dated<br>15.07.2013 | 01/81/050/00<br>194/AM14<br>04/24/040/00<br>071/AM14<br>HQ E-office<br>Computer<br>No.: | The case was rejected in M. No. 05 dt.<br>03.06.2014 due to non-submission of reply of<br>deficiency letter dated 30.10.2013.<br>The applicant requested for fixation of norms.<br>As per NC decision of M. No. 13/81 dt.<br>03.10.2019, the case was referred to DPIIT on<br>01.11.2019 followed by a reminder on<br>23.12.2019 for expediting the comments. As<br>per decision of M. No. 22/81 dt. 19.02.2020,<br>reminder has been sent to DPIIT on<br>14.04.2020. The case was last considered in M. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and<br>decided to fix the norms as per<br>written comments given by<br>DPIITvide U. O. No.: P-<br>47011/86/2020-TSW<br>dated<br>11.09.2020. (copy enclosed)<br>RA concerned may take suitable<br>consequential<br>action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br>Approved | |
| R3 | |||||
| No. 04/81 dt. 17.06.2020 and decided to send<br>complete set of application along with list of<br>import and export items and reply/information<br>received from the applicant to DPIIT as<br>requested<br>by<br>it<br>vide<br>U.O.<br>No.<br>P-<br>470111/86/2020-TSW dated 22.5.2020. As per | |||||
| decision, the complete set of application was | |||||
| sent to DPIIT on 25.08.2020. | |||||
| Vedanta<br>Limited<br>(Formerly<br>M/S. Sterlite<br>Industries<br>(India) Limited<br>3510030450<br>dated<br>03.06.2010 | <br>01/81/050/00<br>055/AM11/D<br>ES.II<br>35/24/040/00<br>046/AM10/ | The case was rejected in M. No. 26/81-<br>ALC2/2010 dated 28.09.2010 as per written<br>comments of M/o Mines vide OM No.<br>4/(16)/2010-Metal-III/L dated 17.09.2010.<br>The applicant‟s representation received on<br>14.02.2019 with a request to fix the ad-hoc<br>norms. The case was decided to examine on<br>file along with written comments of MSME in<br>M. No. 23/81 dated 28.01.2014. The case was<br>referred<br>to<br>Consultant<br>(TEC-3)<br>for<br>examination. As per NC decision of M. No.<br>16/81 dt. 13.11.2019 and 19/81 dt. 26.12.2019,<br>the applicant was called for personal hearing to<br>explain the case and nobody was appeared for<br>PH.As per NC decision, an email was again<br>sent to the applicant on 30.01.2020 to attend<br>personal<br>hearing<br>on<br>19.02.2020.<br>The<br>Committee considered the case in M. No. 22<br>dated 19.2.2020 and heard the applicant‟s<br>representative during personal hearing. The<br>Committee directed to the representative to<br>furnish following information as per advice of<br>Consultant (TEC-3): Material Balance sheet.<br>1. Manufacturing processes with stage-wise<br>wastage of all three materials.<br>2. Composition of raw materials.<br>Information received from the applicant vide | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and noted<br>that Consultant (TEC-3) via<br>email dated 07.09.2020 asked<br>for hard copy of the applicant‟s<br>reply to examine the case.<br>Therefore,<br>the<br>Committee<br>decided to send hard copy of the<br>applicant‟s reply to Consultant<br>(TEC-3). | <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred | |
| R4 | |||||
74 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
R5
email dated 02.04.2020 has been referred to Consultant TEC-3 on 07.04.2020 and 27.06.2020. The case was last considered in M. No. 04/81 dt. 09.07.2020 deicide to send physical file to Consultant (TEC-3) for examination of the case. As per decision, the main file was referred to Consultant (TEC-3) on 01.09.2020.
The case was rejected in M. No. 24/81 dated The Committee noted that the Deferred 14.09.2010 due to non-submission of reply. applicant‟s reply has been The applicant vide letters dated 27.12.2016, received via email dated 05.06.2017 and 01.07.2017 had requested to 11.09.2020 and decided to ratify the norms. The representation dated forward to Consultant (TEC-3) 01.07.2017 was forwarded to DHI on for examination of the case. 06.07.2017 for examination of the case. In M. No. 04/81-Pt.II dated 03.10.2018, the Committee noted that DHI vide U.O. No. 3/82/2018 dated 13.03.2018 had offered the written comments and recommended the norms on repeat with AA No. 0310343657 dated 19.08.2005. The Case was referred to Consultant (TEC-3) on 25.09.2019 & 01.11.2019. Consultant (TEC-3) on 04.11.2019 stated that input norms export of refurbished items cannot be worked out as details of parts CROMPTON which need repair/replacement is not known GREAVES 01/81/050/00 and scrap value of old parts cannot be LIMITED 624/AM08 ascertained. In M. No. 19/81 dt. 26.12.2019, it was decided to call the applicant on personal 0310444382 03/94/040/00 hearing. As per NC decision, an email was sent dated 634/AM08 to the applicant on 30.01.2020 to attend 26.09.2007 personal hearing on 19.02.2020. Nobody appeared for PH in M.No. 22 dated 19.2.2020. The applicant via email dated 07.07.2020 informed that they will attend PH on 9[th] July 2.30pm. The case was last considered in M. No. 04/81 dt. 09.07.2020, The Committee heard the representatives of the applicant during personal hearing held through video conferencing. On the advice of Consultant (TEC-3), the Committee directed the representatives to furnish information in tabular form. As per NC decision, D/L was sent to the applicant on 27.08.2020.
75 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| TEXMACO<br>RAIL &<br>ENGINEERIN<br>G LIMITED<br>0210196856<br>dated<br>26.11.2013 | 01/81/050/00<br>125/AM15<br>02/24/040/00<br>138/AM14 | The Case was rejected in M. No.15 dt.<br>03.11.2015 due to non submission of reply of<br>DHI deficiency letter dated 14.08.2015. The<br>applicant vide letter dated 27.01.2016 had<br>requested the RA, Kolkata for amendment of<br>AA. The copy of licence amendment sheet<br>dated 25.05.2016 along with representation<br>was forwarded to DHI for examination. DHI<br>on 04.11.2016 advised to consult with DPIIT<br>or ratify under SION C-1647. The case was<br>referred to<br>DPIIT<br>on<br>21.08.2017. The<br>Committee in M. No. 4 /81-Pt.II dated<br>03.10.2018 decided to call the applicant for<br>personal hearing. The PH letter was sent to the<br>applicant on 23.09.2019 to appear before NC<br>in M. No.13/81 dated 03.10.2019 (actually held<br>on 04.10.2019), as per NC decision, another<br>dated of personal hearing was granted. A letter<br>was sent to the applicant on 31.10.2019 to<br>attend personal hearing on 13.11.2019. In M.<br>No. 16/81 dt. 13.11.2019, the Committee heard<br>the applicant‟s representative during personal<br>hearing and noted that authorisation was<br>amended after its issuance. However, the<br>representatives could not explain the present<br>details of export and import items. Therefore,<br>the Committee directed to the representative to<br>submit some information. As per NC decision,<br>D/L was issued to the applicant on 12.12.2019<br>followed by a reminder on 27.01.2020.<br>Information received from the applicant vide<br>email dated 03.04.2020 has been referred to<br>DPIIT on 01.06.2020. The case was last<br>considered in M. No. 04/81 dt. 09.07.2020 and<br>decided to remind DPIIT to expedite the<br>comments. Reminder issued to DPIIT on<br>26.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and decided<br>to seek from the applicant to<br>furnish<br>the<br>following<br>information as per comments of<br>DPIIT vide U. No. No. P-<br>47011/116/2020-TSW<br>dated<br>07.09.2020:<br>1. Copy of AA along with all<br>the amendment sheets.<br>2. Final list of import &<br>export<br>items<br>after<br>incorporating<br>all<br>amendments.<br>3. Information at Sl. No. 3, 4,<br>5 & 11 of Deficiency<br>Format, export product-<br>wise.<br>The case stands deferred. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred | |
|---|---|---|---|---|---|
| R6 | |||||
| NATIONAL<br>STEEL AND<br>AGRO<br>INDUSTRIES<br>LIMITED<br>5610005277<br>dated<br>18.12.2017 | <br>01/81/050/00<br>146/AM19/<br>56/24/040/00<br>031/AM18/ | This case was rejected in M. No. 12/81 dated<br>13.02.2019 due to non-submission of reply to<br>deficiency letter dated 04.10.2018 raised by<br>MoS.<br>The<br>applicant<br>vide<br>letter<br>dated<br>14.05.2019 enclosed a copy of their earlier<br>reply dated 17.07.2018 stating that they had<br>already replied on 17.07.2018 and requested to<br>ratify the norms. As per decision of M. No.<br>13/81dated 04.10.2019, the case was referred<br>to Consultant (TEC-3) on 01.11.2019 as<br>comments from MoS were not coming. In M.<br>No. 16/81 dt. 13.11.2019, the Committee noted<br>the comments furnished by MoS vide U.O. No.<br>2(17)/2019-TD dated 08.11.2019 as well as<br>comments of Consultant (TEC-3) and decided<br>to seek from the applicant the following | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee decided to wait<br>for the reply of the applicant. | <br>Deferred | |
| R7 | |||||
76 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| information: (i) Stage wise wastage of import<br>item No. 1. (ii) Justification for import item 6<br>i.e. GP sheet for packing when one of the<br>export product is also GP sheet. As per NC<br>decision, D/L was sent to the applicant on<br>12.12.2019. The case was considered in M. No.<br>19/81 dt. 26.12.2019 and decided to ask from<br>MoS and the party to clarify both the points. A<br>reminder was also sent to the applicant on<br>27.01.2020. As per NC decision taken in<br>Meeting No. 22 dated 19.2.2020, reminder has<br>was sent to the applicant on 01.04.2020. The<br>case was last considered in M. No. 04/81 dt.<br>09.07.2020<br>and<br>decided<br>to<br>grant<br>last<br>opportunity to the applicant to furnish the<br>requisite information. As per NC decision,<br>final D/L reminder was sent to applicant on<br>26.08.2020. However, no reply has been<br>receivedyet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> | ||||
|---|---|---|---|---|---|
| SHIVALIK<br>BIMETAL<br>CONTROLS<br>LTD.<br>0510399656<br>dated<br>08.09.2016 | 01/81/050/00<br>397/AM17/<br>05/24/040/00<br>287/AM17/ | The case was ratified in M. No. 13/81 dated<br>19.09.2017 as per DIPP comments vide U. O.<br>No.12/68/2017-TSW/45 dated 19.09.2017.<br>The applicant vide letter dated 25.01.2018<br>had requested for revision of ratified norms.<br>As per NC decision, a letter was again sent to<br>the applicant to attend PH on 26.12.2019. The<br>Committee<br>heard<br>the<br>applicant‟s<br>representative during personal hearing in M.<br>No. 19/81 dt. 26.12.2019 and decided to refer<br>the case to DPIIT for further examination. As<br>per NC decision, the case was referred to<br>DPIIT on 31.01.2020. The case was last<br>considered in M. No. 04/81 dt. 09.07.2020,<br>The Committee considered the case as per the<br>agenda and noted the written comments of<br>DPIIT<br>given<br>vide<br>U.O.<br>No.<br>P-<br>470111/80/2019-TSW dated 26.5.2020. The<br>Committee also noted the applicant has<br>applied two import items whereas DPIIT has<br>allowed import item No. 1 only. No<br>comment has been given in r/o import item<br>No. 2. Hence, the Committee decided to<br>refer back the matter again to DPIIT for re-<br>examination. The Committee also noted that<br>the applicant has demanded significantly<br>higher wastage than that recommended by<br>DPIIT. Hence, it was also decided to ask the<br>applicant to justify wastages as demanded. As<br>per NC decision, D/L was sent to applicant<br>on 27.08.2020. The applicant‟s reply email<br>dated 04.09.2020 was forwarded to DPIIT on<br>04.09.2020 for examination of the case.<br>However,no comments have been received | The<br>Committee<br>decided<br>to<br>remind DPIIT for expediting the<br>comments. | <br> <br>Deferred | |
| R8 | |||||
77 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| yet. | |||||
|---|---|---|---|---|---|
| SHIVALIK<br>BIMETAL<br>CONTROLS<br>LTD.<br>0510398533<br>dated<br>17.05.2016 | 01/81/050/00<br>197/AM17/<br>05/24/040/00<br>045/AM17/ | The case was ratified in M. No. 3/81-<br>ALC2/2018 dated 14.08.2018 on repeat basis<br>as approved for AA No. 0510402399 dated<br>01.05.2017 ratified in M.No.11/81/ALC2/2017<br>dated<br>22.08.2017.<br>The<br>applicant‟s<br>representation received on 22.11.2018 with a<br>request for revision of ratified norms. As per<br>NC decision of M. No. 15/81 dt. 30.10.2019, a<br>letter was sent to the applicant to attend PH on<br>13.11.2019. The Committee again called the<br>applicant for personal hearing as nobody was<br>appeared for personal hearing in M. No. 16/81<br>dt. 13.11.2019. As per NC decision, an email<br>was sent to the applicant to attend PH on<br>26.12.2019.<br>The<br>Committee<br>heard<br>the<br>applicant‟s representative during personal<br>hearing in M. No. 19/81 dt. 26.12.2019 and<br>decided to refer the case to DPIIT for further<br>examination. As per NC decision, the case was<br>referred to DPIIT on 12.02.2020. The case was<br>last considered in M. No. 04/81 dt. 09.07.2020,<br>The Committee considered the case as per the<br>agenda and noted the written comments of<br>DPIIT given vide U.O. No. P-470111/80/2019-<br>TSW dated 26.5.2020. The Committee also<br>noted the applicant had applied two import<br>items whereas DPIIT had allowed import item<br>No. 1 only. No comment has been given in r/o<br>import item No. 2. Hence, the Committee<br>decided to refer back the matter again to DPIIT<br>for re-examination. The Committee also noted<br>that the applicant has demanded significantly<br>higher wastage than that recommended by<br>DPIIT. Hence, it was also decided to ask the<br>applicant to justify wastages as demanded. As<br>per NC decision, D/L was sent to the applicant | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind DPIIT for expediting the<br>comments. | <br> <br>Deferred | |
| R9 | |||||
| on 27.08.2020. The applicant‟s reply email | |||||
| dated 04.09.2020 was forwarded to DPIIT on | |||||
| 04.09.2020 for examination of the case. | |||||
| However, no comments have been received | |||||
| yet. | |||||
| SHIVALIK<br>BIMETAL<br>CONTROLS<br>LTD.<br>0510405797<br>dated<br>07.03.2018 | 01/81/050/00<br>174/AM19/<br>05/24/040/00<br>606/AM18/ | The case was ratified in M. No. 3/81-<br>ALC2/2018 dated 14.08.2018. The applicant<br>vide letter dated 18.06.2019 had stated that<br>the norms was ratified as per SION C-397 but<br>the export item is different. They had,<br>therefore, requested to review the decision<br>and requested for personal hearing. As per<br>NC decision of M. No. 15/81 dt. 30.10.2019,<br>an email dated 31.10.2019 sent to the<br>applicant to attend PH on 13.11.2019. In M.<br>No. 16/81 dt. 13.11.2019,the Committee | The Committee decided to wait<br>for the comments. | <br>Deferred | |
| R10 | |||||
78 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
||||noted that nobody was appeared for personal<br>hearing on behalf of the applicant and the<br>Committee granted another date for personal<br>hearing. As per NC decision, a letter was sent<br>to the applicant to attend PH on 26.12.2019.<br>The<br>Committee<br>heard<br>the<br>applicant‟s<br>representative during personal hearing in M.<br>No. 19/81 dt. 26.12.2019 and decided to refer<br>the case to Consultant (TEC-3) for further<br>examination. As per decision, the case was<br>referred<br>to<br>Consultant<br>(TEC-3)<br>on<br>31.01.2020. As per NC decision taken in<br>Meeting No. 22 dated 19.2.2020, D/L was<br>sent on 01.04.2020. Applicant‟s reply dt.<br>01.06.2020 was sent to Consultant (TEC-3)<br>on 01.06.2020. The case was considered in<br>M. No. 04/81 dt. 09.07.2020 and decided to<br>seek from the applicant the following<br>information: 1. Justification for wastage of<br>31.3% on input for slitting supported by<br>evidence. 2. Price of disposal of scrap in last<br>3 years with supporting document. 3.<br>Document for cif price of inputs. As per NC<br>decision, D/L was sent to applicant on<br>27.08.2020. The applicant‟s reply email dated<br>11.09.2020 was forwarded to Consultant<br>(TEC-3) on 11.09.2020 for examination of<br>the case. However, no comments have been<br>receivedyet.|||
|---|---|---|---|---|---|
||<br>U. K. B.<br>ELECTRONI<br>CS PVT. LTD.<br>0510400120<br>dated<br>18.10.2016|<br>01/81/050/00<br>475/AM17/<br>05/24/040/00<br>322/AM17/<br>**HQ E-office**<br>**Computer**<br>**No.: 24067**|The case was rejected in M. No. 9/81 dated<br>25.07.2017 due to non-submission of reply of<br>deficiency<br>letter<br>dated<br>06.04.2017.<br>The<br>applicant requested to fix the norms. The<br>applicant‟s<br>reply<br>dated<br>15.04.2019<br>was<br>forwarded to DPIIT on 03.07.2019 followed by<br>reminder on 27.09.2019. DPIIT vide U. O. No.<br>P-47011/195/2019-TS|W<br>dated<br>30.07.2019<br>advised to seek comments from MeitY as<br>export/import items are pertaining to data<br>communication cables. As per NC decision of<br>M. No. 16/81 dt. 13.11.2019, the case was<br>referred to MeitY on 23.12.2019. The case was<br>considered in M. No. 19/81 dt. 26.12.2019 and<br>decided to wait for comments. As requested by<br>the representative of MeitY in M. No. 22 dated<br>19.02.2020, copy of application was again sent<br>to MeitY vide email dated 03.06.2020. The<br>case was last considered in M. No. 04/81 dt.<br>09.07.2020 and remind MeitY to expedite the<br>comments.Reminder issued to MeitY on|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and<br>decided to fix the norms as per<br>written comments given by<br>**MeitY**vide U. O. No.: W-<br>21/42/2020-IPHW-MeitY dated<br>02.09.2020. (copy enclosed)<br>RA concerned may take suitable<br>consequential<br>action<br>accordingly.|<br> <br> <br> <br> <br> <br> <br>Approved|
|R11||||||
|||||||
|||||||
79 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
26.08.2020.
R12
The case was ratified in M. No. 21 dt. The Committee considered the Approved 09.01.2018 as per written comments dated case as per the agenda and 28.10.2019 given by Consultant (TEC-3). The Consultant (TEC-3) informed applicant vide letter dated 02.12.2019 had that the applicant had made error requested for revision of ratified norms. The in calculation of wastage. case was referred to Consultant (TEC-3) on Therefore, on the basis of 23.12.2019. The case was considered in M. No. comments given by Consultant 12/81 dt. 19.2.2020. Consultant (TEC-3) (TEC-3), the Committee decided informed that the wastage has been allowed in to revise the ad-hoc norms as weight terms but the applicant has requested to under: allow wastage in length which is not possible 01/81/050/00 as major wastage occur on thickness of pipe. DISHA AUTO 891/AM19 Therefore, the Committee decided to call the COMPONEN applicant for personal hearing to explain the TS PVT. LTD. 03/94/040/00 case before Norms Committee in the 615/AM19 forthcoming NC meeting as per advice of 0310824393 Consultant (TEC-3). The case was last dated HQ E-office considered in M. No. 04/81 dt. 09.07.2020 and 11.10.2018 Computer the applicant during personal hearing held No.: 24069 through video conferencing. The representative stated that the Committee has allowed lower wastages to it because it calculated the wastage on „input quantity utilised for export product‟ whereas the Committee has considered it on „output quantity exported‟ basis. Further, the Committee has taken recovery from wastages as 20% whereas it should be between 7-8%. The Committee asked Consultant (TEC-3) to examine the issue and furnish his comments. Reminder issued to consultant (TEC-3) on 26.08.2020.
| Sl.<br>No. | ITC<br>HS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |
|---|---|---|---|---|---|---|---|---|
| Coupling Size 13-3/8" | Carbon Steel Seamless | 87 MT | ||||||
| 1 | 7307<br>9290 | K-55 (Qty 1871 Nos &<br>59.880 M.Ton) Od<br>365.12, Id 323.88 | 519.270<br>Meter | 1 | 73043939 | Pipes As Per Api 5ct Latest<br>Edition 13-3/8" Od 365.12<br>* 20.62 Mm Thk Grade K- | ||
| Length 277.5Mm | 55/D10 (100Mt) | |||||||
| Coupling Size 10-3/4" K | Carbon Steel Seamless | 157 MT | ||||||
| 2 | 7307<br>9290 | 55 (Qty 4192 Nos &<br>121.573 M.Ton) Od<br>298.45, Id 258.45 | 1159.130<br>Meter | 2 | 73043939 | Pipes As Per Api 5ct Latest<br>Edition 10-3/4" Od 298.45<br>* 20 Mm Thk Grade K 55 | ||
| Length 276.5 Mm | (175 Mt) | |||||||
| Coupling Size 10-3/4" L | Carbon Steel Seamless | 27 MT | ||||||
| 3 | 7307<br>9290 | 80 (Qty 719 Nos &<br>20.841 M.Ton) Od<br>298.45, Id 258.45 | 198.710<br>Meter | 3 | 73043939 | Pipes As Per Api 5ct Latest<br>Edition 10-3/4" Od 298.45<br>* 20 Mm Thk Grade L 80 | ||
| Length 276.5 Mm | (30 Mt) | |||||||
| 4 | 7307<br>9290 | Coupling Size 9-5/8" K-<br>55/D10 (Qty 5105 Nos | 1411.540<br>Meter | 4 | 73043939 | Carbon Steel Seamless<br>Pipes As Per Api 5ct Latest | 177 MT |
80 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
& 129.668 M.Ton) Od Edition 9-5/8 Od 269.88 * 269.88, Id 227.88 21 Mm Thk Grade K- Length 276.50 Mm 55/D10 (200 Mt) Note: Grade of steel to match in export & import items.
The case was ratified in M. No. 16/81The Committee considered the Approved ALC2/2019 dated 13.11.2019 as per written case as per the agenda and comments dated 08.11.2019 given by Consultant (TEC-3) informed Consultant (TEC-3). The applicant vide letter that the applicant had made error dated 26.12.2019 requested for revision of in calculation of wastage. ratified norms as under:- (i) to allow import Therefore, on the basis of quantities in Unit of Measurement as Meter comments given by Consultant and (ii) to allow rejection/wastage of 9% on (TEC-3), the Committee decided raw materials or 9.89% on finished product. to revise the ad-hoc norms as The case was considered in M. No. 20/81 dt. under: 08.01.2020 and decided to refer the case to Consultant (TEC-3) for examination & comments. The representation was forwarded to Consultant (TEC-3) on 30.01.2020 for examination of the case. The case was considered in M. No. 23/81 dt. 04.03.2020. The Committee considered the case as per 01/81/050/01 DISHA AUTO agenda and Consultant (Tec-3) informed that 182/AM19 COMPONEN wastage has been allowed as requested with TS PVT. LTD. 20% recovery in weight. The applicant has 03/94/040/01 R13 requested wastage in length which is not 128/AM19 possible as major wastage occur on thickness 0310827926 of pipe. Therefore, the Committee decided to HQ E-office dated call the applicant for personal hearing to Computer 27.03.2019 explain the case before Norms Committee. The No.: 24070 case was last considered in M. No. 04/81 dt. 09.07.2020 and the applicant during personal hearing held through video conferencing. The representative stated that the Committee has allowed lower wastages to it because it calculated the wastage on „input quantity utilised for export product‟ whereas the Committee has considered it on „output quantity exported‟ basis. Further, the Committee has taken recovery from wastages as 20% whereas it should be between 7-8%. The Committee asked Consultant (TEC-3) to examine the issue and furnish his comments. Reminder issued to consultant (TEC-3) on 26.08.2020.
81 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Sl.<br>No. | ITC<br>HS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |
| 1 | 7307<br>9290 | Coupling Size 13-3/8"<br>K-55 (Qty 1871 Nos &<br>59.880 M.Ton) Od<br>365.12, Id 323.88<br>Length 277.5 Mm | 519.270<br>Meter | 1 | 73043939 | Carbon Steel Seamless<br>Pipes As Per Api 5ct<br>Latest Edition 13-3/8" Od<br>365.12 * 20.62 Mm Thk<br>Grade K-55/D10(100 Mt) | 87 MT | |
| 2 | 7307<br>9290 | Coupling Size 10-3/4" K<br>55 (Qty 2396 Nos &<br>69.470 M.Ton) Od<br>298.45, Id 258.45<br>Length 276.5 Mm | 662.360<br>Meter | 2 | 73043939 | Carbon Steel Seamless<br>Pipes As Per Api 5ct<br>Latest Edition 10-3/4" Od<br>298.45 * 20 Mm Thk<br>Grade K-55(100 Mt) | 89 MT | |
| 3 | 7307<br>9290 | Coupling Size 9-5/8" K-<br>55/D10 (Qty 2553 Nos<br>& 64.834 M.Ton) Od<br>269.88, Id 227.88<br>Length 276.50Mm | 705.770<br>Meter | 3 | 73043939 | Carbon Steel Seamless<br>Pipes As Per Api 5ct<br>Latest Edition 9-5/8 Od<br>269.88 * 21 Mm Thk<br>Grade K-55/D10 (100Mt) | 89 MT | |
| Note: Grade of steel to match in export & import items.<br>RA concerned maytake suitable consequential action accordingly. |
82 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
The case was ratified in M. No. 17/81The Committee considered the Approved ALC2/2019 dated 27.11.2019 as per written case as per the agenda and comments dated 21.11.2019 given by Consultant (TEC-3) informed Consultant (TEC-3) considering applicant‟s that the applicant had made error reply dated 30.06.2019 & 24.07.2019. in calculation of wastage. The applicant vide representation dated Therefore, on the basis of 26.12.2019 requested to revise the ratified comments given by Consultant norms. The case was considered in M. No. (TEC-3), the Committee decided 21/81dated 22.01.2020 and decided to refer the to revise the ad-hoc norms as case to Consultant (TEC-3) for examination & under: comments. The representation was forwarded to Consultant (TEC-3) on 27.01.2020. The case was considered in M. No. 24/81 dt. 18.03.2020. The Committee considered the 01/81/050/00 case as per agenda and Consultant (Tec-3) DISHA AUTO 644/AM19/ informed that wastage has been allowed as COMPONEN requested with 20% recovery in weight. The TS PVT. LTD. applicant has requested wastage in length 03/94/040/00 which is not possible as major wastage occur 528/AM19/ on thickness of pipe. Therefore, the Committee 0310823797 decided to call the applicant for personal dated HQ E-office hearing to explain the case before Norms 17.09.2018 Computer Committee. The case was last considered in M. No.: No. 04/81 dt. 09.07.2020 and the applicant R14 during personal hearing held through video conferencing. The representative stated that the Committee has allowed lower wastages to it because it calculated the wastage on „input quantity utilised for export product‟ whereas the Committee has considered it on „output quantity exported‟ basis. Further, the Committee has taken recovery from wastages as 20% whereas it should be between 7-8%. The Committee asked Consultant (TEC-3) to examine the issue and furnish his comments. Reminder issued to consultant (TEC-3) on 26.08.2020. ITCHS ITCHS Recommended Export Item Quantity Import Item Code Code Quantity COUPLING SIZE 9- 27 MT CARBON STEEL SEAMLESS 5/8" L 80 / D10 PIPES AS PER API 5CT 730792 (QTY 766 NOS & 211.730 Meter 73043919 LATEST EDITION 9-5/8 OD 90 19.45 MT) OD 269.88 * 21 MM THK GRADE L 269.88, ID 227.88 80/D10 (30 MT) LENGTH 276.5 MM
Note: Grade of steel to match in export & import items.
RA concerned may take suitable consequential action accordingly
83 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
R15
The case was ratified in M. No. 17/81The Committee considered the Approved ALC2/2019 dated 27.11.2019 as per written case as per the agenda and comments dated 21.11.2019 given by Consultant (TEC-3) informed Consultant (TEC-3) considering applicant‟s that the applicant had made error reply dated 30.06.2019. The applicant vide in calculation of wastage. letter dated 26.12.2019 stated that they had Therefore, on the basis of been granted for lower quantities of imports as comments given by Consultant compared to actual utilized inputs for export (TEC-3), the Committee decided product. They had also requested for personal to revise the ad-hoc norms as hearing before the Norms Committee. The case under: was last considered in M. No. 24/81 dt. 18.03.2020. The Committee considered the case as per agenda and Consultant (Tec-3) 01/81/050/00 informed that wastage has been allowed as DISHA AUTO 643/AM19/ requested with 20% recovery in weight. The COMPONEN applicant has requested wastage in length TS PVT.LTD. which is not possible as major wastage occur 03/94/040/00 on thickness of pipe. Therefore, the Committee 510/AM19/ decided to call the applicant for personal 0310823617 hearing to explain the case before Norms Dated HQ E-office Committee. The case was last considered in M. 07.09.2018 Computer No. 04/81 dt. 09.07.2020 and the applicant No.: 24072 during personal hearing held through video conferencing. The representative stated that the Committee has allowed lower wastages to it because it calculated the wastage on „input quantity utilised for export product‟ whereas the Committee has considered it on „output quantity exported‟ basis. Further, the Committee has taken recovery from wastages as 20% whereas it should be between 7-8%. The Committee asked Consultant (TEC-3) to examine the issue and furnish his comments. Reminder issued to consultant (TEC-3) on 26.08.2020.
| Sl.<br>No. | ITC<br>HS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity |
| Coupling Size 13-3/8" | Carbon Steel Seamless | 52 MT | |||||
| 1 | 7307<br>9290 | K-55 Eue (Qty 1127<br>Nos & 36.06 M.Ton)<br>OD 365.12, Id 323.88 | 311.560<br>Meter | 1 | 73043939 | Pipes As Per Api 5ct<br>Latest Edition 13-3/8" Od<br>365.12 * 20.62 Mm Thk | |
| Length 276.5Mm | Grade K-55/D10 (60Mt) | ||||||
| Coupling Size 10-3/4" K | Carbon Steel Seamless | 54 MT | |||||
| 2 | 7307<br>9290 | 55 Eue (Qty 1437 Nos<br>& 41.682 M.Ton) Od<br>298.45, Id 258.45 | 397.420<br>Meter | 2 | 73043939 | Pipes As Per Api 5ct<br>Latest Edition 10-3/4" Od<br>298.45 * 20 Mm Thk | |
| Length 276.5Mm | Grade K55/D10 (60Mt) | ||||||
| Coupling Size 9-5/8" L | Carbon Steel Seamless | 27 MT | |||||
| 3 | 7307<br>9290 | 80 / D10 (Qty 766 Nos<br>& 19.45 Mt) Od 269.88, | 211.730<br>Meter | 3 | 73043939 | Pipes As Per Api 5ct<br>Latest Edition 9-5/8 Od | |
| Id 227.88 Length 276.5 | 269.88*21 Mm Thk |
84 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| Mm | Mm | Grade L80/D10 (30Mt) | Grade L80/D10 (30Mt) | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 4 | 7307<br>9290 | Coupling Size 9-5/8" K-<br>55/D10 (Qty 2808 Nos<br>& 71.317 M.Ton) Od<br>269.88, Id 227.88<br>Length 276.50 Mm | 776.350<br>Meter | 4 | 73043939 | Carbon Steel Seamless<br>Pipes As Per Api 5ct<br>Latest Edition 9-5/8 Od<br>269.88 * 21 Mm Thk<br>Grade K-55/D10(110 Mt) | 97 MT | ||||
| Note: Grade of steel to match in export & import items.<br>RA concerned maytake suitable consequential action accordingly. | |||||||||||
| RAYCHEM<br>RPG<br>PVT<br>LTD.<br>0310815877<br>dated<br>21.09.2017 | <br>01/81/050/00<br>368/AM18/<br>03/95/040/00<br>479/AM18/<br>HQ E-office<br>Computer<br>No.: 24073 | <br>The case was ratified in M. No. 12/81 dated<br>13.02.2019 on repeat basis as approved for AA<br>No. 03105917496 dated 9.09.2010. The<br>applicant vide letter dated 11.12.2019 had<br>requested for revision of ratified norms. The<br>case was considered in M. No. 19/81 dt.<br>26.12.2019 and decided to refer the case to<br>DPIIT for examination & comments. As per<br>NC decision, the case was referred to DPIIT on<br>26.12.2019. The case was last considered in M.<br>No. 04/81 dt. 09.07.2020 as per written<br>comments give by DPIIT vide U. O. No. P-<br>47011/324/2018-TSW dated 05.05.2020, the<br>Committee decided to seek from the applicant<br>the following information:<br>(i) Sl. No. 3, 4, 5 and 11 of SDF. As per NC<br>decision, D/L was sent to the applicant on<br>07.07.2020 & 15.07.2020. The applicant‟s<br>reply dt. 05.05.2020 was sent to DPIIT on<br>19.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and noted<br>the comments ofDPIITvide U.<br>O. No.: P-47011/324/2018-TSW<br>dated 07.09.2020 wherein DPIIT<br>stated that earlier item was<br>allowed on net to net basis.<br>However, it is a raw material<br>and<br>involves<br>manufacturing<br>operations<br>like<br>casting<br>&<br>machining etc and therefore,<br>norms need to be modified.<br>Therefore, on the basis of<br>comments<br>of<br>DPIIT,<br>the<br>Committee decided to revise the<br>ad-hoc norms as under:<br>1. Taking cue from SION C-<br>27, quantity of import item<br>at Sl. No. 9 (Aluminium<br>Alloy Ingot) may be allowed<br>as 1.06 Kgs/Kg content in<br>the export item at Sl. No. 9.<br>2. Quantity of all other items<br>shall remain unchanged.<br>RA concerned may take suitable<br>consequential<br>action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Approved | |||||||
| R16 | |||||||||||
| <br>JINDAL SAW<br>LIMITED<br>0510410575<br>dated<br>14.05.2019 | <br>01/81/050/00<br>068/AM20/<br>05/23/040/00<br>065/AM20/ | The case was ratified in M. No. 14/81 dated<br>16.10.2019 as per written comments dated<br>21.08.2019 given by Consultant (TEC-3). The<br>applicant vide letter dated 10.10.2019 had<br>requested for revision of ratified norms. The<br>case was referred to Consultant (TEC-3) on<br>03.12.2019. The case was considered in M. No.<br>19/81 dt. 26.12.2019 and decided to wait for<br>comments. Reminder sent to Consultant (TEC-<br>3) vide email dated 14.04.2020 for expediting<br>the comments. The case was last considered in<br>M. No. 04/81 dt. 09.07.2020 and decided to<br>seek from the applicant to furnish following<br>information as per advice of Consultant (TEC-<br>3): Toprovide detailed calculations of stage- | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |||||||
| R17 | |||||||||||
| Mm | Mm | Grade L80/D10 (30Mt) | Grade L80/D10 (30Mt) | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 4 | 7307<br>9290 | Coupling Size 9-5/8" K-<br>55/D10 (Qty 2808 Nos<br>& 71.317 M.Ton) Od<br>269.88, Id 227.88<br>Length 276.50 Mm | 776.350<br>Meter | 4 | 73043939 | Carbon Steel Seamless<br>Pipes As Per Api 5ct<br>Latest Edition 9-5/8 Od<br>269.88 * 21 Mm Thk<br>Grade K-55/D10(110 Mt) | 97 MT | ||||
| Note: Grade of steel to match in export & import items.<br>RA concerned maytake suitable consequential action accordingly. | |||||||||||
| RAYCHEM<br>RPG<br>PVT<br>LTD.<br>0310815877<br>dated<br>21.09.2017 | <br>01/81/050/00<br>368/AM18/<br>03/95/040/00<br>479/AM18/<br>HQ E-office<br>Computer<br>No.: 24073 | <br>The case was ratified in M. No. 12/81 dated<br>13.02.2019 on repeat basis as approved for AA<br>No. 03105917496 dated 9.09.2010. The<br>applicant vide letter dated 11.12.2019 had<br>requested for revision of ratified norms. The<br>case was considered in M. No. 19/81 dt.<br>26.12.2019 and decided to refer the case to<br>DPIIT for examination & comments. As per<br>NC decision, the case was referred to DPIIT on<br>26.12.2019. The case was last considered in M.<br>No. 04/81 dt. 09.07.2020 as per written<br>comments give by DPIIT vide U. O. No. P-<br>47011/324/2018-TSW dated 05.05.2020, the<br>Committee decided to seek from the applicant<br>the following information:<br>(i) Sl. No. 3, 4, 5 and 11 of SDF. As per NC<br>decision, D/L was sent to the applicant on<br>07.07.2020 & 15.07.2020. The applicant‟s<br>reply dt. 05.05.2020 was sent to DPIIT on<br>19.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and noted<br>the comments ofDPIITvide U.<br>O. No.: P-47011/324/2018-TSW<br>dated 07.09.2020 wherein DPIIT<br>stated that earlier item was<br>allowed on net to net basis.<br>However, it is a raw material<br>and<br>involves<br>manufacturing<br>operations<br>like<br>casting<br>&<br>machining etc and therefore,<br>norms need to be modified.<br>Therefore, on the basis of<br>comments<br>of<br>DPIIT,<br>the<br>Committee decided to revise the<br>ad-hoc norms as under:<br>1. Taking cue from SION C-<br>27, quantity of import item<br>at Sl. No. 9 (Aluminium<br>Alloy Ingot) may be allowed<br>as 1.06 Kgs/Kg content in<br>the export item at Sl. No. 9.<br>2. Quantity of all other items<br>shall remain unchanged.<br>RA concerned may take suitable<br>consequential<br>action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Approved | |||||||
| R16 | |||||||||||
| <br>JINDAL SAW<br>LIMITED<br>0510410575<br>dated<br>14.05.2019 | <br>01/81/050/00<br>068/AM20/<br>05/23/040/00<br>065/AM20/ | The case was ratified in M. No. 14/81 dated<br>16.10.2019 as per written comments dated<br>21.08.2019 given by Consultant (TEC-3). The<br>applicant vide letter dated 10.10.2019 had<br>requested for revision of ratified norms. The<br>case was referred to Consultant (TEC-3) on<br>03.12.2019. The case was considered in M. No.<br>19/81 dt. 26.12.2019 and decided to wait for<br>comments. Reminder sent to Consultant (TEC-<br>3) vide email dated 14.04.2020 for expediting<br>the comments. The case was last considered in<br>M. No. 04/81 dt. 09.07.2020 and decided to<br>seek from the applicant to furnish following<br>information as per advice of Consultant (TEC-<br>3): Toprovide detailed calculations of stage- | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |||||||
| R17 | |||||||||||
85 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| wise percentage wastage claimed in the letter<br>with supporting documents. As per NC<br>decision, D/L was sent to the applicant on<br>26.08.2020. However, no reply has been<br>receivedyet. | <br> <br> <br> | ||||
|---|---|---|---|---|---|
| <br>STERLITE<br>POWER<br>TRANSMISSI<br>ON LIMITED<br>0310811681<br>dated<br>07.03.2017 | 01/81/050/00<br>074/AM18/<br>03/95/040/00<br>840/AM17/<br>HQ E-office<br>Computer<br>No.: 24093 | The case was rejected in M. No. 12/81 dated<br>05.09.2017<br>due<br>to<br>non-submission<br>of<br>deficiency letter dated 12.06.2017 raised by<br>DPIIT. The applicant vide letter dated<br>02.01.2019 had requested for fixation of<br>norms. The case was considered in M. No.<br>19/81 dt. 26.12.2019 decided to refer the case<br>to DPIIT for examination & comments. As per<br>NC decision, the case was referred to DPIIT on<br>29.01.2020. Reminder sent to DPIIT vide<br>email dated 23.4.2020 & 15.07.2020 for<br>expediting the comments. The case was last<br>considered in M. No. 04/81 dt. 09.07.2020 and<br>decided to remind DPIIT to expedite the<br>comments. Reminder issued to DPIIT on<br>26.08.2020. Scanned copies of complete set of<br>applications along with all concerned/related<br>documents (reply to queries raised etc.) in<br>chronological order has been sought from the<br>applicant<br>vide<br>email<br>dated<br>27.08.2020.<br>However, no information has been received<br>yet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and<br>decided to fix the norms as per<br>written comments given by<br>DPIITvide U. O. No.: P-<br>47011/192/2019-TSW<br>dated<br>24.07.2019. (copy enclosed)<br>RA concerned may take suitable<br>consequential<br>action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br>Approved | |
| R18 | |||||
| STERLITE<br>POWER<br>TRANSMISSI<br>ON LIMITED<br>0310811638<br>dated<br>06.03.2017 | 01/81/050/00<br>073/AM18/<br>03/95/040/00<br>654/AM17/ | The case was rejected in M. No. 12/81 dated<br>05.09.2017<br>due<br>to<br>non-submission<br>of<br>deficiency letter dated 12.06.2017 raised by<br>DPIIT. The applicant vide letter dated<br>02.01.2019 had requested for fixation of<br>norms. As per decision of M. No. 19/81 dt.<br>26.12.2019, the case was referred to DPIIT on<br>29.01.2020. The case was considered in M. No.<br>22/81 dt. 19.02.2020 and decided to wait for<br>comments. Reminder issued to DPIIT on<br>29.6.2020. The case was last considered in M.<br>No. 04/81 dt. 09.07.2020 and decided to<br>remind DPIIT to expedite the comments.<br>Reminder issued to DPIIT on 26.08.2020.<br>Scanned copies of complete set of applications<br>along with all concerned/related documents<br>(reply to queries raised etc.) in chronological<br>order has been sought from the applicant vide<br>email<br>dated<br>27.08.2020.<br>However,<br>no<br>information has been receivedyet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| R19 | |||||
| STERLITE<br>POWER<br>TRANSMISSI<br>ON LIMITED<br>0310818561 | 01/81/050/00<br>177/AM19/<br>03/95/040/00<br>227/AM18/ | The case was ratified in M. No. 14/81dated<br>16.10.2019<br>on<br>the<br>recommendation<br>of<br>representative of DIPP taking cue from SION<br>C-1394. The applicant vide letter dated<br>02.01.2019 had requested for revision of<br>norms. Asper decision of M. No. 19/81 dt. | <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| R20 | |||||
86 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| dated<br>17.01.2018 | 26.12.2019, the case was referred to DPIIT on<br>13.02.2020. As per decision of M. No. 22/81<br>dt. 19.02.2020 reminder was issued to DPIIT<br>on 29.6.2020. The case was last considered in<br>M. No. 04/81 dt. 09.07.2020 and decided to<br>remind DPIIT to expedite the comments.<br>Reminder issued to DPIIT on 26.08.2020.<br>Scanned copies of complete set of applications<br>along with all concerned/related documents<br>(reply to queries raised etc.) in chronological<br>order has been sought from the applicant vide<br>email<br>dated<br>27.08.2020.<br>However,<br>no<br>information has been receivedyet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> | |||
|---|---|---|---|---|---|
| STERLITE<br>POWER<br>TRANSMISSI<br>ON LIMITED<br>0310814496<br>dated<br>06.07.2017 | 01/81/050/00<br>283/AM18/<br>03/95/040/00<br>026/AM18/ | The case was ratified in M. No. 1/81 dated<br>15.05.2018 as per written comments of DIPP<br>vide<br>F.<br>No.<br>7/257/17-TSW/16<br>dated<br>18.04.2018. The applicant vide letter dated<br>02.01.2019 had requested for revision of<br>ratified norms. As per the decision of M. No.<br>19/81 dt. 26.12.2019, the case was referred to<br>DPIIT on 13.02.2020. The case was considered<br>in M. No. 22/81 dt. 19.02.2020 and decided to<br>wait for comments. Reminder issued to DPIIT<br>on 29.6.2020. The case was last considered in<br>M. No. 04/81 dt. 09.07.2020 and decided to<br>remind DPIIT to expedite the comments.<br>Reminder issued to DPIIT on 26.08.2020.<br>Scanned copies of complete set of applications<br>along with all concerned/related documents<br>(reply to queries raised etc.) in chronological<br>order has been sought from the applicant vide<br>email<br>dated<br>27.08.2020.<br>However,<br>no<br>information has been receivedyet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| R21 | |||||
| STERLITE<br>POWER<br>TRANSMISSI<br>ON LIMITED<br>0310818549<br>dated<br>16.01.2018 | 01/81/050/00<br>178/AM19/<br>03/95/040/00<br>657/AM18/ | The case was ratified in M. No. 06/81 dated<br>01.11.2018<br>on<br>the<br>recommendation<br>of<br>representative of DIPP. The applicant vide<br>letter dated 02.01.2019 had requested for<br>revision of ratified norms. As per the decision<br>of M. No. 19/81 dt. 26.12.2019, the case was<br>referred to DPIIT on 13.02.2020. The case was<br>considered in M. No. 22/81 dt. 19.02.2020 and<br>decided to wait for comments. Reminder<br>issued to DPIIT on 29.6.2020. The case was<br>last considered in M. No. 04/81 dt. 09.07.2020<br>and decided to remind DPIIT to expedite the<br>comments. Reminder issued to DPIIT on<br>26.08.2020. Scanned copies of complete set of<br>applications along with all concerned/related<br>documents (reply to queries raised etc.) in<br>chronological order has been sought from the<br>applicant<br>vide<br>email<br>dated<br>27.08.2020.<br>However, no information has been received<br>yet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| R22 | |||||
87 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| STERLITE<br>POWER<br>TRANSMISSI<br>ON LIMITED<br>0310816650<br>dated<br>31.10.2017 | 01/81/050/00<br>480/AM18/<br>03/95/040/01<br>020/AM17/ | The case was ratified in M. No. 3/81dated<br>14.08.2018 as per comments of DIPP vide F.<br>No: 7/31/2018/TSW dated 18.04.2018. The<br>applicant vide letter dated 02.01.2019 had<br>requested for revision of ratified norms. As per<br>the decision of M. No. 19/81 dt. 26.12.2019,<br>the case was referred to DPIIT on 13.02.2020.<br>The case was considered in M. No. 22/81 dt.<br>19.02.2020 and decided to wait for comments.<br>Reminder issued to DPIIT on 29.6.2020. The<br>case was last considered in M. No. 04/81 dt.<br>09.07.2020 and decided to remind DPIIT to<br>expedite the comments. Reminder issued to<br>DPIIT on 26.08.2020. Scanned copies of<br>complete set of applications along with all<br>concerned/related documents (reply to queries<br>raised etc.) in chronological order has been<br>sought from the applicant vide email dated<br>27.08.2020. However, no information has been<br>receivedyet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
|---|---|---|---|---|---|
| R23 | |||||
| KOTSONS P.<br>LTD<br>0610038228<br>dated<br>22.09.2015 | 01/81/050/00<br>326/AM16/<br>06/24/040/00<br>024/AM16/ | The case was ratified in M. No. 20/81 dated | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| 12.01.2016 as per written comments of DHI | |||||
| vide U. O. No. 3(214)/2015/TSW(B)/398 dated | |||||
| 18.12.2015. The applicant vide letter dated | |||||
| 27.11.2019 had requested for revision of | |||||
| ratified norms. As per the decision of M. No. | |||||
| 19/81 dt. 26.12.2019, the case was referred to | |||||
| DHI on 13.02.2020. In M. No. 22/81 dt. | |||||
| 19.02.2020, the Committee decided to wait for | |||||
| comments. The case was last considered in M.<br>No. 04/81 dt. 09.07.2020 and directed the<br>section to forward complete application with<br>ANF4A<br>to<br>DHI<br>for<br>examination<br>and<br>comments. Scanned copies of complete set of<br>applications along with all concerned/related<br>documents (reply to queries raised etc.) in<br>chronological order has been sought from the<br>applicant<br>vide<br>email<br>dated<br>27.08.2020.<br>However, no information has been received<br>yet. | |||||
| R24 | |||||
| PARAM<br>INDUSTRIES<br>0310812841<br>dated<br>26.04.2017 | 01/81/050/00<br>135/AM18/<br>03/95/040/00<br>044/AM18/ | The case was rejected in M. No. 14/81 dated<br>03.10.2017<br>due<br>to<br>non-submission<br>of<br>deficiency letter dated 30.05.2017 raised by<br>DIPP.<br>The<br>applicant<br>vide<br>letter<br>dated<br>27.11.2019 had requested for fixation of<br>norms. The case was last considered in M. No.<br>19/81 dt. 26.12.2019 decided to refer the case<br>to DPIIT for examination & comments. As per<br>NC decision, the case was referred to DPIIT on<br>29.01.2020. DPIIT vide U.O. dated 22.5.2020<br>intimated that MSME may be consulted in the<br>matter. As per DPIIT complete application has<br>been forwarded to MSME on 06.07.2020. The | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| R25 | |||||
88 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| case was last considered in M. No. 04/81 dt.<br>09.07.2020 and based on the written comments<br>given by MSME vide email dated 08.07.2020,<br>the Committee decided to seek from the<br>applicant the following information:<br>(i) Sl. No. 3, 4, 5 and 11 of SDF. As per NC<br>decision, D/L was sent to the applicant on<br>27.08.2020. However, no reply has been<br>receivedyet. | <br> <br> <br> <br> <br> <br> | ||||
|---|---|---|---|---|---|
| <br>TRAFOMEC<br>INDIA<br>MAGNETICS<br>PVT. LTD.<br>0710090674<br>dated<br>11.09.2012 | 01/81/050/00<br>270/AM13/<br>07/24/040/00<br>216/AM13/ | Initially, the case was rejected in M. No. 21/81<br>dated 31.12.2013 as per written comments of<br>DHI vide U. O. No. 3(41)/2012/TSW(B)/294<br>dated 06.12.2013. The case was again<br>considered in M. No. 11/81 dated 22.08.2017<br>and rejected due to non-submission of reply of<br>deficiency letter dated 13.04.2017 raised by<br>DHI. Now, the applicant vide letter dated<br>01.05.2019 had furnished reply & requested for<br>ratification<br>of<br>ad-hoc<br>norms.<br>The<br>representation was referred to DHI via email<br>dated 24.12.2019. The case was last considered<br>in M. No. 19/81 dt. 26.12.2019 and the<br>Committee decided to defer the case with an<br>advice to the section to trace out the main file<br>as main file was not available. Main file is<br>traced out and referred to DHI on 12.02.2020.<br>In M. No. 22/81 dt. 19.02.2020, the Committee<br>decided to wait for comments. The case was<br>last considered in M. No. 04/81 dt. 09.07.2020,<br>On the request of DHI, the Committee directed<br>the section to forward complete set of<br>application<br>with<br>ANF4A<br>to<br>DHI<br>for<br>examination and comments. Scanned copies of<br>complete set of applications along with all<br>concerned/related documents (reply to queries<br>raised etc.) in chronological order has been<br>sought from the applicant vide email dated<br>01.09.2020. However, no information has been<br>receivedyet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| R26 | |||||
| DYNAMIC<br>FLOW<br>PRODUCTS<br>PVT. LTD.<br>0310814660<br>dated<br>18.07.2017 | 01/81/050/00<br>296/AM18/<br>03/94/040/00<br>321/AM18/<br>HQ E-office<br>Computer<br>No.: 24100 | <br>The case was ratified in Meeting No. 3/81-<br>ALC2/2018 dated 14.08.2018 with 10%<br>wastage. The applicant vide letter dated<br>30.12.2019 requested to revise the ratified<br>norms as 30% wastage instead of 10%<br>wastage. The case was referred to Consultant<br>(TEC-3) on 31.01.2020. As decided by NC-2,<br>the case along with the reply of the applicant<br>was referred to Consultant (TEC-3) dated<br>27.02.2020<br>for<br>comments.<br>Complete<br>application was send again via email dated<br>01.07.2020. The case was last considered in M.<br>No. 04/81 dt. 09.07.2020 and deicide to send<br>physical file to Consultant(TEC-3)for | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case<br>as<br>per<br>the<br>agenda.<br>Consultant (TEC-3) informed<br>that<br>proposal<br>was<br>earlier<br>approved by NC with 10%<br>wastage on total weight of<br>export i.e. 240 MT. However,<br>the export product contains two<br>types of products. The applicant<br>has also utilized indigenous<br>inputs. The applicant has<br>provided<br>detailed<br>working.<br>Hence, the Committee decided<br>to revise the ad-hoc norms asper | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Approved | |
| R27 | |||||
89 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| examination of the case. As per decision, the<br>main file has been referred to Consultant<br>(TEC-3) on 01.09.2020. | <br> <br>written comments given by<br>Consultant (TEC-3) considering<br>reply dated 17.02.2020 as under:<br>Export item:<br>1. Pup joint and C & C<br>Hose- 5014 Nos., 166203<br>Kgs containing 116536<br>Kgs seamless alloy steel<br>pipes of relevant grade.<br>2. NPST<br>Pup<br>joint-2770<br>Nos.,<br>104732<br>Kgs<br>containing 79087 Kgs<br>seamless alloy steel pipes<br>of relevant grade.<br>Import Item:<br>1. Quantity of import item<br>„Precision Cold Rolling<br>and<br>Stress<br>Relieved<br>Seamless<br>Alloy<br>Steel<br>Pipes/Tubes (Grade-AISI<br>4130)may be allowedas<br>234.75 MT(154.15 MT<br>with 32% wastage after<br>20% recovery in r/o Export<br>item No. 1 and 80.6 MT<br>with 2% wastage in r/o<br>Export item No. 2).<br>Note: Grade of steel to match<br>in import & export item.<br>RA concerned may take suitable<br>consequential<br>action<br>accordingly. | <br> <br> <br> <br> | |||
|---|---|---|---|---|---|
| <br>JINDAL SAW<br>LIMITED<br>0510409209<br>dated<br>07.01.2019 | <br>01/81/050/00<br>948/AM19/<br>05/23/040/00<br>440/AM19/<br>HQ E-office<br>Computer<br>No.: 23960 | The case was ratified in M. No. 12/81 dated<br>18.09.2019 as per written comments dated<br>16.09.2019 given by Consultant (TEC-3). The<br>applicant vide letter dated 03.01.2020 stated<br>that NC allowed the quantity of imported item<br>No. 1 and 2 with 10% wastage instead of 20%<br>wastage as per SION C797. Therefore, they<br>requested to allow 20% wastage in respect of<br>import item at Sl. Nos. 1 & 2. The applicant‟s<br>representation was forwarded to Consultant<br>(TEC-3) on 22.01.2020 for examination of the<br>case. In M. No. 22/81 dt. 19.02.2020, the<br>Committee decided to wait for comments. The<br>case was last considered in M. No. 04/81 dt.<br>09.07.2020 and deicide to send physical file to<br>Consultant(TEC-3)for examination of the | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and<br>decided<br>to<br>seek<br>from<br>the<br>applicant<br>the<br>following<br>information on the advice of<br>Consultant (TEC-3):<br>1. Detailed<br>calculation<br>of<br>stage-wise wastages. | <br> <br> <br> <br> <br> <br>Deferred | |
| R28 | |||||
90 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| case. As per decision, the main file was sent to<br>Consultant(TEC-3)on 01.09.2020. | |||||
|---|---|---|---|---|---|
| JINDAL SAW<br>LIMITED<br>0510409268<br>dated<br>09.01.2019 | <br>01/81/050/00<br>955/AM19/<br>05/23/040/00<br>454/AM19/ | The case was ratified in M. No. 12/81-<br>ALC2/2019 dated 18.09.2019 as per written<br>comments<br>dated<br>16.09.2019<br>given<br>by<br>Consultant (TEC-3). The applicant vide letter<br>dated 06.01.2020 requested for revision of<br>ratified norms and stated that the quantity of<br>imported item No.1 Epoxy Powder has allowed<br>236.219<br>MT<br>instead<br>of<br>claimed<br>after<br>enhancement 306.219 MT while import item<br>No.8, Primer SK345 has fully disallowed by<br>the<br>Norms<br>Committee.<br>The<br>applicant‟s<br>representation was forwarded to Consultant<br>(TEC-3) on 31.01.2020 for examination of the<br>case. The case was last considered in M. No.<br>04/81 dt. 09.07.2020, the Committee noted that<br>the applicant‟s representation has not yet been<br>forwarded to Consultant (TEC-3) with main<br>file as decided in Meeting No. 22/81<br>dated19.2.2020. Therefore, the Committee<br>directed the section to send the representation<br>with main file immediately. As per decision,<br>the main file was sent to Consultant (TEC-3)<br>on 01.09.2020. However, no comments have<br>been receivedyet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind Consultant (TEC-3) for<br>expediting the comments. | <br> <br>Deferred | |
| R29 | |||||
| PALOMA<br>TURNING<br>COMPANY<br>PRIVATE<br>LIMITED,<br>BANGALORE<br>, A 100% EOU | <br>01/81/171/00<br>022/AM20/D<br>ES2/<br>CSEZ<br>Bangalore<br>F.No.1/19/20<br>06-<br>EOU:CSEZ | Paloma Turning Company Private Limited,<br>Bangalore, a 100% EOU, vide letter dated<br>02.08.2016 stated that they are manufacturer<br>and 100% exporters of customized machined<br>components made out of bar stocks/Cut<br>blanks/Forgings, Tubes of various metals made<br>on CAM operated automatics, CNC Machines<br>as per customer specification and drawings.<br>The finished export product is manufactured<br>out of this raw material the remnant is the<br>scrap generated since the process involves<br>machining of metals out of bar stocks/Cut<br>blanks/Forgings,<br>Tubes.<br>Therefore,<br>the<br>applicant had requested to fix the scrap norms.<br>O/o MSME Development Institute, Bangalore<br>vide letter dated 02.05.2011 had enclosed a<br>copy of the percentage of scrap generated from<br>Aluminium, Steel, Stainless Steel works out<br>from 16 to 80% as Annexure „A‟. In Meeting<br>No. 22/81 dated 19.2.2020, the Committee<br>directed the section to trace out the main file.<br>The action is yet pending. The case was last<br>considered in M. No. 04/81 dt. 09.07.2020, the<br>Committee directed the section to trace out the<br>main file on priority. In the mean time, the<br>Committee also decided to ask the CSEZ as<br>well as the applicant to submit complete set of | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| R30 | |||||
91 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
|||||documents in the present case. Email to CSEZ<br>sent on 27.08.2020. Email to the applicant sent<br>on 01.09.2020. However, no information has<br>been receivedyet.|<br> <br>||
|---|---|---|---|---|---|---|
||<br>PRANITA<br>ENGINEERIN<br>G<br>SOLUTIONS<br>PRIVATE<br>LIMITED<br>0710064492<br>dated<br>04.05.2009||01/81/050/00<br>026/AM10/<br>07/24/040/00<br>039/AM10/|The case was withdrawn in M. No. 44/81-<br>ALC2/2009 dated 02.02.2010 on the ground<br>that the case was rejected in M. No. 38/81<br>dated 22.12.2009 (actually held on 29.12.2009)<br>due to non submission of reply of the<br>deficiency letter raised by DIPP. The applicant<br>vide letter dated 11.11.2019 furnished reply<br>with a request to fix the ad-hoc norms and also<br>asked for personal hearing. The applicant‟s<br>representation was forwarded to DPIIT on<br>31.01.2020. However, no comments have been<br>received yet. In M. No. 22/81 dt. 19.02.2020,<br>the Committee decided to wait for comments.<br>Comments of DPIIT D/L received vide email<br>dated 23.04.2020. DPIIT D/L was sent to the<br>applicant on 07.07.2020. The case was last<br>considered in M. No. 04/81 dt. 09.07.2020 and<br>decided to wait for reply of the applicant. A<br>reminder was sent to the applicant on<br>27.08.2020. However, no reply has been<br>receivedyet.|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>decided<br>to<br>remind again the applicant for<br>furnishing<br>the<br>requisite<br>information.|<br> <br> <br>Deferred|
|R31|||||||
||||||||
||<br>SYNERGIES<br>CASTINGS<br>LIMITED||VSEZ File<br>No. 8/EOU-<br>326/VSEZ/2<br>020/312|Office of DC, VSEZ, Visakhapatnam vide<br>letter dated 14.01.2020 had referred a copy of<br>application dated 02.05.2017 of Synergies<br>Castings Limited stating that the unit is a 100%<br>EOU manufacturer and exporter of Aluminium<br>Alloy Wheels and requested for fixation of<br>wastage<br>norms.<br>The<br>representation<br>was<br>forwarded to DPIIT on 31.01.2020. However,<br>no comments have been received yet. In M.<br>No. 22/81 dt. 19.02.2020, the Committee<br>decided to wait for comments. DPIIT informed<br>via email dated 03.06.2020 that the matter may<br>be consulted with MSME. The case was last<br>considered in M. No. 04/81 dt. 09.07.2020 and<br>decided to refer the case to MSME for<br>examination and comments as recommended<br>by DPIIT. As per decision, the case was<br>referred to MSME on 01.09.2020.|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and decided<br>to seek from the applicant to<br>furnish following information as<br>per comments of MSME:<br>1. Sl. No. 3, 4, 5 & 11 of the<br>Standard Deficiency Format.<br>The case stands deferred.|<br> <br> <br> <br> <br> <br>Deferred|
|R32|||||||
||||||||
||FCI<br>OEN<br>Connectors<br>Limited<br>AA Nos. 1010059417 dated<br>29.02.2016, 1010059344<br>dated 17.12.2015,<br>1010059345 dated<br>17.12.2015, 1010059352<br>dated 30.12.2015,<br>1010059409 dated|||<br>The norms for referred AAs were decided by<br>Norms Committee -2 in its Meeting No. 24/81<br>dated 18.03.2020 as per the study group<br>report. As decided in the Meeting, a copy of<br>the study group report were provided to RA<br>Cochin as well as the applicant vide email<br>dated 08.06.2020 for taking further necessary<br>action. However, the applicant vide email<br>dated 10.06.2020 filed review application by<br>statingthat he has to incur huge losses on GPC|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Considered the case as per<br>agenda and noted the comments<br>dated 18.06.2020 of Consultant<br>(TEC-3) and comments dated<br>06.09.2020<br>of<br>MeitY.<br>Consultant<br>(TEC-3)<br>and<br>representative<br>of<br>MeitY<br>informed that due to specific<br>requirement of customers and<br>nature ofprocess,it was difficult|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Approved|
|R33|||||||
||||||||
|||92 | Page 94**Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020**|||||
16.02.2016, 1010059410 dated 16.02.2016, 1010059426 dated 04.03.2016, 1010059434 dated 21.03.2016 , 1010059476 dated 11.05.2016, 1010059568 dated 28.07.2016, 1010059351 dated 30.12.2015, 1010059732 dated 23.02.2017 1010059569 dated 28.07.2016, 1010059623 dated 05.10.2016, 1010059624 dated 05.10.2016, 1010059636 dated 25.10.2016, 1010059638 dated 25.10.2016, 1010059661 dated 06.12.2016, 1010059679 dated 05.01.2017, 1010059691 dated 13.01.2017, 1010059721 dated 15.02.2017, 1010059607 dated 09.09.2016, 1010059734 dated 09.03.2017 1010059308 dated 11.11.2015, 1010059346 dated 18.12.2015
and PdTS if its authorizations are finalized as to work out specific requirement per study group report. The applicant has of input materials. Hence, study requested to allow wastages @ 2% on GPC group report was prepared and and PdTS, as approved by the Committee recommendations were made by earlier on the recommendations of MeitY. calculating ratio between CIF Since, the party was contesting the findings of value of gold/ palladium plating the study group report, comment on the salt used in connectors with representation were sought from the Technical FOB value of gold/ palladium Members of the study group viz. MeitY & plated connectors in 6 Export Consultant (VCA) on whether an option can be Obligation completed Advance provided to the applicant to allow wastages Authorizations picked at random either as per report or @ 2% on GPC and basis. However, the applicant is PdTS. representing against the study Comments of Consultant (VCA) have been group report as the received vide email dated 18.06.2020. The case recommendations given on the was last considered in M. No. 04/81 dt. basis of data taken from six 09.07.2020 and decided to wait for comments authorisations may not be of MeitY before deciding the matter. applicable in all cases.
Consultant (TEC-3) further informed that since the applicant is ready to accept earlier approval of NC for wastages given for inputs of GPC & PdTS on the recommendation of MeitY, the same may be accepted.
MeitY vide email dated 06.09.2020 recommended to ratify the norms for Gold Potassium Cyanide (GPC) & Palladium Tretamine Sulphate (PdTS) at 2% for all Advance Licenses except those advance authorizations for which the recommendations have already been given in the study report.
Hence, the Committee decided to revise the ad-hoc norms to allow wastages of @ 2% on GPC and PdTS in respect of all AAs mentioned herein except for AA No. 1010059426 dated 04.03.2016, 1010059434 dated 21.03.2016, 1010059568 dated 28.07.2016 and 1010059569 dated 28.07.2016 as these AAs were considered while finalizing the study group report.
Note: Rest of the decision for all remaining import items shall
93 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
| remain unchanged as decided by | |
|---|---|
| NC in its Meeting No. 24/81 | |
| dated 18.03.2020. | |
| RA concerned may take suitable | |
| consequential<br>action | |
| accordingly. |
The meeting ended with a vote of thanks to the Chair.
Shobhit Gupta Dy. Director General of Foreign Trade E-mail: nc2.dgft@nic.in shobhit.gupta@gov.in
94 | Page 94 Minutes of NC-II Meeting No. 07/81 scheduled for 08.09.2020 and held on 15.09.2020
SDF
| Export Items: | Export Items: | Export Items: |
|---|---|---|
| 1 | Model number, technical specification and specific quantity-both in terms of number (if<br>any)and/or weight,of each exportproduct(Appendix-33 of current HBP refers). | |
| 2 | Detail technical note on manufacturing process includingthe relevant flowsheet. | |
| 3 | Detail technical drawings with dimension of each export product, Catalogue, if any, may<br>also be furnished. | |
| 4 | Weight of each Export Product. | |
| 5 | Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license,if any,mayalso be indicated. | |
| Import Items: | ||
| 6 | Information about the inputs required per unit of the resultant product as per Sl. No. 1 of<br>Appendix-11A appearingin current HBP(Vol.I)separatelyfor eachproduct. | |
| Components: | ||
| 7 | Technical characteristics /part numbers,if any. | |
| 8 | Assembly drawings/diagrams of the resultant product showing placement and exact use<br>of components in the exportproduct(s). | |
| 9 | Bifurcated quantities of components to be accounted for in the resultant product and the<br>requirement of components as spares. Raw Material / Consumables. | |
| 10 | Size and specification including grade, composition, range, thickness etc. of the items<br>proposed for import. | |
| 11 | Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components<br>to be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing<br>with<br>complete<br>justification<br>and<br>supported<br>by<br>documentary<br>evidence/drawings etc. | |
| 11(a) | Sheet layout diagram of the material indicatingthewastage duringblanking. | |
| 12 | Cross Sectional Diagram of export product with calculation of raw material requirement<br>and the weight of the Cable in Kg. per Km. Copy of relevant National/International<br>Standard/buyer’s data sheet mayalso be furnished. | |
| 13 | Weight of Steel, which requires imported welding material, giving break-up of:<br>i)<br>Steel Plates/Sheets upto 30mm thickness<br>ii)<br>Steel Plates/Sheets more than 30 mm thickness and upto 70 mm thickness<br>iii) Steel Plates/Sheets more than 70 mm thickness.<br>iv) Others e.g.Flanges,Pipes,Tubes,Bars/Rods, Castings/Forgings etc. | |
| 14 | Particulars of the licenses obtained in the past and ratified by ALC (with or without<br>modification) for the same export product covered under this application, in view of<br>PublicNoticeNo.48dated 14.11.2002. | |
| 15 | Use of exportproduct. | |
| 16 | You are advised to applyfor SION. | |
| 17 | Please use expanded/full name of endproduct.Do not use the abbreviations/short form. | |
| 18 | -- | |
| 19 | Any other information: | |
| 20 | The information called for must be submittedin duplicate within 15 daysfrom the date<br>of issue of this letter. The information may be directly sent to Chairman, NC-II, O/o<br>DGFT,UdyogBhawan,New Delhi-110011,Office Telephone No.: 23061562,Extn.267. |
==> picture [379 x 554] intentionally omitted <==
W-21/36/2020-IPHW-MeitY Government of India
Ministry of Electronics and Information Technology IPHW Division
Date: 23.07.2020
Subject: Ratification of norms in terms of Para 4.7 of HBP. (Vol.1) in respect of Advance Authorization No. 0710116489 dated 22.05.2020 issued to M/s. EFD Induction Pvt. Ltd.
This refers to DGFT email dated 08.07.2020 seeking comments of this Ministry on the above-mentioned application of M/s. EFD Induction Pvt. Ltd. for export of “Hand Held Transformer”.
- The application has been examined in the Ministry of Electronics and Information Technology from technical angle. The import products are required for manufacturing the export product. The Ministry recommends Ratification of norms of advance authorization as per the following:
i. Sl. No. 1, 3-5: On net to net basis with accountability clause. ii. Sl. No. 2, 6-11: As applied for by the party with Nil wastage.
(Sushil Kumar Jangid) Scientist ‘B’ Tel: 011-24301784 ftp-iphw@meity.gov.in
Shri Amit Kumar , Asst. Director, O/o DGFT, Udyog Bhawan, New Delhi.
==> picture [595 x 386] intentionally omitted <==
24/31
W-21/42/2020-IPHW-MeitY
115788/2020/IPHW
| AA No. 0510400120 | AA No. 0510400120 | AA No. 0510400120 | AA No. 0510400120 | AA No. 0510400120 | AA No. 0510400120 | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| Calculation Sheet | ||||||||||
| Export Items | Quantity of Export Items | Import Item | UOM | Per UnitQuantity | Wastage claimed | Wastage allowed | hoi | Quanity Calculated | Quantity Recommeded | |
| Data Cable;<br>Communication<br>cable-morpho-1 | 960000 | Cable | Mtr. | 0.238 | 0.50% | 0.50% | 229622 | 229622.4 | 229622 | |
| Micro USB | Nos. | 1 | net to net basis | net to net basis | 960000 | 960000 | As applied for by the party with<br>Nil Wastage | |||
| Cnnector | Nos. | Procured other than license | ||||||||
| PVC Compound | Kgs. | |||||||||
| Heat Shrinkable Tube(HST) | Mtr. | |||||||||
| Polypropylene Granules | Kgs. | |||||||||
| Solder Wire | Kgs. | |||||||||
| Data Cable;<br>Communication<br>cable-morpho-2 | 960000 | Cable | Mtr. | 2.09 | 0.50% | 0.50% | 2016432 | 2016432 | 2016432 | |
| USB A type | Nos. | 1 | net to net basis | net to net basis | 960000 | 960000 | As applied for by the party with<br>Nil Wastage | |||
| Connector | Nos. | Procured other than license | ||||||||
| PVC Compound | Kgs. | |||||||||
| Heat Shrinkable Tube(HST) | Mtr. | |||||||||
| Solder Wire | Kgs. |