DGFT Committee Minutes
DIRECTORATE GENERAL OF FOREIGN TRADE - (DES II SECTION)
MINUTES OF THE NORMS COMMITTEE-II
MEETING No. 06/81-ALC2/2021 DATED 11.08.2020 (Held on 25.08.2020)
Please Note
-
i. For information of exporters, Norms Committee-II handles all cases pertaining to fixation/ratification of norms for Export Products falling under ITC (HS) Chapter 72 to 76, 78 to 80, 85. Communications in respect of cases/pertaining to NC-II may be sent to email address: nc2.dgft@nic.in
-
ii. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The concerned applicant/company may go through the same and respond accordingly.
-
iii. Similarly, a scanned copy of the blank Standard Deficiency Format, which may find a reference in NC decisions, has also been attached in the end. This may also be referred to by the concerned applicant/company and may be responded accordingly.
-
iv. The Norms Committee has taken decision only with respect to technical aspect/wastage norms. While redeeming the applications, RAs should check that the applicant has fulfilled all requirements as prescribed in policy/procedure including those in Policy Circulars issued from time to time or any other provisions under FTP/HBP for EODC.
-
v. Wherever the Committee has fixed Norms, the concerned RA may ensure that AA is issued on the wastages/consumption as ratified by the Committee or as per wastages claimed in the application, whichever is less.
Meeting No. 06/81 of Norms Committee-II for the year 2020-21 (Originally scheduled for 11.08.2020) held on 25.08.2020 through Video Conferencing under the Chairmanship of Shri R. P. Goyal, Additional Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorizations under Duty Exemption Scheme (Chapter-4) of Foreign Trade Policy 2015-20. The following members were present in the meeting:-
| Sl. No. | Name & Designation | Department |
|---|---|---|
| 1. | Shri K. S. Sodhi, AD (ME) | MSME |
| 2. | Shri Devendra Kumar Saini, ADG | DoT |
| 3. | Shri Sushil Kumar Jangid, Scientist „B‟ | MeitY |
| 4. | Shri Shaish Kumar, (TEC-1) | Consultant |
| 5. | Shri V.C. Agarwal, (TEC-3) | Consultant |
| 6. | Shri S. K. Bhatnagar, (SKB) | Consultant |
| In attendance | ||
| 1. | Shri Shobhit Gupta, Dy. DGFT | DGFT |
- i. Draft Minutes of Meeting No. 05/81 scheduled for 16.07.2020 and held on 28.07.2020 were circulated among all the members of the Committee on 10.08.2020. On receipt of comments, the minutes were finalized and uploaded on DGFT‟s website on 17.08.2020. Therefore, the minutes are unanimously approved.
Minutes of the cases discussed in the meeting are as under:
1 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
MEETING NUMBER: 6/81-ALC2/2020 MEETING DATE: 11.08.2020
| Case No.:1/23/81-ALC2/2017 | Party Name: BHARAT | Meet No/Date:6/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| HEAVY ELECTRICALS | ALC2/2020 | Approved | |||||
| LIMITED | 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510250513 | |||||
| :01/81/050/00500/AM18/ | :05/23/040/00041/AM10/ | 08.10.2009 | |||||
| HQ E-office Computer No.: | |||||||
| 23265 |
Decision: The Committee considered the case as per the agenda and noted that Policy Interpretation Committee in its meeting held on 09.06.2020 has decided that such supplies would be admissible as deemed export and also eligible for Advance Authorization. Therefore, the Committee decided to fix the ad-hoc norms as per written comments given by DHI vide U. O. No.DES-2/BHEL/PEM-1-2019HEI-Part(4) email dated 07.09.2019. (Copy enclosed)
RA concerned may take suitable consequential action accordingly.
| Case No.:7/21/81-ALC2/2017 | Party Name: BERGEN PIPE | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| SUPPORTS INDIA | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410163738 | Action By: | |||
| :01/81/050/00448/AM18/ | :04/24/040/00153/AM18/ | 28.11.2017 | Applicant |
2
Decision: The Committee considered the case as per agenda and heard the representatives of the applicant during personal hearing held through video conferencing. The representatives explained the case in details and the Committee directed the representatives to furnish following information as per the advice of Consultant (TEC-3):
-
Item of import and its quantity, if there is any deviation from AA whether AA has been amended if so details thereof.
-
Drawing of export product.
-
Sl. No. 5 of the Standard Deficiency Format.
-
Drawing of components to be fabricated from each of imported raw material with calculation of wastage.
-
Plate/sheet layout with all dimension & calculation of wastage.
The case stands deferred.
| 3 | Case No.:362/14/81-<br>ALC2/2018 | Party Name: TRAFOMEC<br>INDIA PVT LTD | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/01080/AM19/ | RLA File<br>:07/24/040/00296/AM18/ | Lic.No/Date:0710112727<br>23.01.2018 | <br>Action By:<br>DHI | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of applicant‟s reply<br>was forwarded to DHI via email dated 07.08.2020 for examination of the case. However, DHI<br>informed that the case is under examination. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a copy of applicant‟s reply was forwarded to DHI via email dated 07.08.2020 for examination of the case. However, DHI informed that the case is under examination. Hence, the Committee decided to wait for the comments.
2 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:3/2/81-ALC2/2018 | Party Name: ANGELS | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALUMINIUM | ALC2/2020 | Deferred | ||||
| CORPORATION | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310819231 | Action By: | |||
| :01/81/050/00008/AM19/ | :03/94/040/00933/AM18/ | 19.02.2018 | Applicant |
Decision: The Committee considered the case as per agenda and heard the representatives of the applicant during personal hearing held through video conferencing. The representatives explained that 50% of their requirement has only been proposed for import and balance is to be procured 4 indigenously. However, it was not shown requirement of indigenous import in their application. Hence, the Committee directed the representatives to furnish following information as per the advice of Consultant (TEC-3):
-
To submit revise application and give complete details of export & import and indigenous inputs along with economic viability.
-
Process of manufacturing with stage-wise wastage.
| Case No.:82/14/81- | Party Name: TRAFOMEC | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | INDIA PVT LTD | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710113216 | Action By: | |||
| :01/81/050/00800/AM19/ | :07/24/040/00011/AM19/ | 02.05.2018 | Applicant |
5 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the applicant on 02.03.2020 followed by a reminder on 20.05.2020 and 03.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the applicant.
| Case No.:5/10/81-ALC2/2018 | Party Name: MODISON | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| METALS LTD. | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310822894 | Action By: | |||
| :01/81/050/00486/AM19/ | :03/95/040/00439/AM19/ | 07.08.2018 | Applicant |
6 Decision: The Committee considered the case as per agenda and noted that the second deficiency letter seeking certain information as raised by DHI was sent to the applicant via email dated 03.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
3 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:124/10/81- | Party Name: TBEA ENERGY | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | (INDIA) PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410044397 | Action By: | |||
| :01/81/050/00605/AM19/ | :34/24/040/00146/AM19/ | 08.08.2018 | Applicant |
7 Decision: The Committee considered the case as per agenda and noted that the second deficiency letter seeking certain information as raised by DHI was sent to the applicant via email dated 03.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| Case No.:378/14/81- | Party Name: TRUFORM | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | TECHNO PRODUCTS | ALC2/2020 | Deferred | |||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:5010002501 | Action By: | |||
| :01/81/050/01096/AM19/ | :50/24/040/00027/AM19/ | 07.01.2019 | Applicant |
8 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the applicant via email dated 03.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
The case stands deferred
| Case No.:284/14/81- | Party Name: DISHA AUTO | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | COMPONENTS PVT.LTD. | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310826973 | Action By: | |||
| :01/81/050/01002/AM19/ | :03/94/040/00976/AM19/ | 11.02.2019 | Applicant |
9 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of MSME:
- To provide correct details as length and per unit weight details given in reply and in AA are not matching.
Case No.:298/14/81- Party Name: DELTA Meet No/Date:6/81- Status: ALC2/2018 ELECTRONICS INDIA ALC2/2020 Deferred PRIVATE LIMITED 11.08.2020 HQ File RLA File Lic.No/Date:0510409688 Action By: :01/81/050/01016/AM19/ :05/23/040/00504/AM19/ 18.02.2019 Section 10 Decision: The Committee considered the case as per agenda and noted that the applicant was called for personal hearing to explain the case. However, nobody was attended personal hearing on behalf of the applicant. Therefore, the Committee decided to give last opportunities to the applicant for personal hearing in the forthcoming NC meeting. The case stands deferred.
4 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:86/2/81- | Party Name: SATURN | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710114695 | ||||
| :01/81/050/01172/AM19/ | :07/24/040/00288/AM19/ | 22.03.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23302 |
11 Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per comments Consultant (TEC-3) considering reply dated 27.01.2020 as under:
| Sl. No. | ITCHS Code | Import Item | RecommendedQuantity |
|---|---|---|---|
| 1 | 74091900 | Copper Sheet 2.5 MM | 2120 Kgs |
| 2 | 74091900 | CopperSheet3.0MM | 853Kgs |
| 3 | 74091900 | Copper Sheet 2.0 MM | 20535 Kgs |
| Case No.:22/18/81- | Party Name: HIND ALUMINIUM | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES LTD. | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310828114 | Action By: | |||
| :01/81/050/00316/AM20/ | :03/94/040/01125/AM19/ | 02.04.2019 | Applicant |
Decision: The Committee considered the case as per the agenda and noted that the copy of application 12 has not yet been received from the applicant and in this regard, an email was sent on 05.12.2019 followed by a reminder on 13.03.2020. The applicant via email dated 05.06.2020 requested for some more time to submit the requisite information. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:1/3/81- | Party Name: SEIKODENKI | Meet No/Date:6/81- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDIA PRIVATE | ALC2/2020 | ||||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410165474 | Action By: | |||
| :01/81/050/00021/AM20/ | :04/24/040/00003/AM20/ | 15.04.2019 | Applicant/MeitY |
13 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MeitY was sent to the applicant on 25.09.2019 followed by a reminder on 14.01.2020 & 17.05.2020. It was further noted that MeitY also reminded to the applicant on 24.07.2020 for submitting the requisite information. However, no reply has been received yet. Hence, the Committee decided to wait for the reply/comments.
5 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:6/3/81-ALC2/2019 | Party Name: C. | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| L.GUPTA EXPORTS | ALC2/2020 | Approved | ||||
| LTD. | 11.08.2020 | |||||
| HQ | RLA File | Lic.No/Date:2910025392 | ||||
| File/:01/81/050/00026/AM20 | :29/24/040/00001/AM20 | 16.04.2019 | ||||
| HQ E-office Computer No.: | / | |||||
| 23092 |
| Case No.:6/3/81-ALC2/2019 | Case No.:6/3/81-ALC2/2019 | Party Name: C.<br>L.GUPTA EXPORTS<br>LTD. | Party Name: C.<br>L.GUPTA EXPORTS<br>LTD. | Party Name: C.<br>L.GUPTA EXPORTS<br>LTD. | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ<br>File/:01/81/050/00026/AM20<br>HQ E-office Computer No.:<br>23092 | RLA File<br>:29/24/040/00001/AM20<br>/ | Lic.No/Date:2910025392<br>16.04.2019 | |||||||
| 1<br>4 | **Decision:**The Committee considered the case as per the<br>as per written comments given by MSME via email dated | agenda and decided to fix the ad-hoc norms<br>17.08.2020 as under: | |||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 73269099 | Handicraft Artware of<br>S.S. Steel<br>(1 Pcs=1.15 Kg) | 33224<br>Number | 72199090 | Cold Rolled<br>Stainless<br>Steel Coil<br>0.70 Mm<br>430 Grade<br>(Megnatic) | 101.32 MT<br>inclusive of 18%<br>(@15% for item<br>No. 1 + @20.5%<br>for item No. 2)<br>wastage after<br>1/3rdrecovery | ||||
| 73269099 | Handicraft Artware of<br>S.S. Steel<br>(1 Pcs= 0.600 Kg ) | 79278<br>Number | |||||||
| RA concerned maytake suitable consequential action accordingly. |
| Case No.:7/3/81- | Party Name: C. L. GUPTA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | EXPORTS LTD. | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:2910025393 | ||||
| :01/81/050/00027/AM20/ | :29/24/040/00002/AM20/ | 16.04.2019 | ||||
| HQ E-office Computer | ||||||
| No.: 23091 |
| Case No.:7/3/81-<br>ALC2/2019 | Case No.:7/3/81-<br>ALC2/2019 | Party Name: C. L. GUPTA<br>EXPORTS LTD. | Party Name: C. L. GUPTA<br>EXPORTS LTD. | Party Name: C. L. GUPTA<br>EXPORTS LTD. | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00027/AM20/<br>HQ E-office Computer<br>No.: 23091 | RLA File<br>:29/24/040/00002/AM20/ | Lic.No/Date:2910025393<br>16.04.2019 | ||||||
| 15 | **Decision:**The Committee considered the case as per the agenda and decided to fix the ad-hoc norms<br>as per written comments given by MSME via email dated 17.08.2020 as under: | |||||||
| <br>ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |||
| 73269099 | Handicraft Artware<br>of S. S. Steel<br>(1pcs = 2.800 Kg) | 14532<br>Number | 72199090 | Cold Rolled<br>Stainless Steel<br>Coil 0.90 mm<br>430 Grade<br>(Magnetic) | 108.36 MT inclusive<br>of 15.5%(@ 18.3%<br>for item at Sl. No. 1<br>and @ 13.38% for<br>**item No. 2)**wastage<br>after 1/3rdrecovery | |||
| 73269099 | Handicraft Artware<br>of S.S. Steel<br>(1 Pcs = 1.720Kg) | 30876<br>Number | ||||||
| RA concerned maytake suitable consequential action accordingly. |
6 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:17/3/81-ALC2/2019 | Party Name: TBEA ENERGY | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| (INDIA) PRIVATE LIMITED | ALC2/2020 | **Deferred ** | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045082 | Action By: | |||
| :01/81/050/00037/AM20/ | :34/24/040/00034/AM20/ | 26.04.2019 | Applicant |
16 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the applicant on 18.11.2019 followed by reminders on 14.01.2020, 20.05.2020 & 07.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the applicant‟s reply.
| 17 | Case No.:28/5/81-<br>ALC2/2019 | Party Name: DISHA<br>AUTO COMPONENTS<br>PVT. LTD. | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00077/AM20/<br>HQ E-office Computer<br>No.: 23090 | RLA File<br>:03/94/040/00121/AM20/ | Lic.No/Date:0310829099<br>17.05.2019 | Action By:<br>MSME | |
| **Decision:**The Committee considered the case as per the agenda and noted that MSME vide email<br>dated 17.08.2020 has recommended the wastages on length bases. Consultant (TEC-3) informed that<br>major process loss comes on thickness of pipe. Hence, the Committee decided to refer the case back<br>to MSME to recommend the wastages on weight basis also.<br>The case stands deferred. |
Decision: The Committee considered the case as per the agenda and noted that MSME vide email dated 17.08.2020 has recommended the wastages on length bases. Consultant (TEC-3) informed that major process loss comes on thickness of pipe. Hence, the Committee decided to refer the case back to MSME to recommend the wastages on weight basis also.
| Case No.:25/5/81-ALC2/2019 | Party Name: SEIKODENKI | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2020 | Rejected | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410165608 | ||||
| :01/81/050/00074/AM20/ | :04/24/040/00027/AM20/ | 17.05.2019 |
18 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 18.11.2019 followed by reminders on 14.01.2020 & 20.05.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Chennai.
7 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:144/14/81- | Party Name: NU-CORK | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRODUCTS(P) LTD. | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510411850 | Action By: | |||
| :01/81/050/00242/AM20/ | :05/24/040/00339/AM20/ | 16.09.2019 | Applicant |
19 Decision: The Committee considered the case as per agenda and noted that a letter was sent to the applicant on 07.08.2020 for submitting a legible copy of application along with all the relevant documents. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting a legible copy of application for examination of the case.
| Case No.:148/14/81- | Party Name: SCHNEIDER | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ELECTRIC INDIA PVT | ALC2/2020 | Deferred | |||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710115451 | Action By: | |||
| :01/81/050/00246/AM20/ | :07/24/040/00137/AM20/ | 19.09.2019 | Applicant |
20 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 04.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| Case No.:149/14/81- | Party Name: LEITWIND | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | SHRIRAM | ALC2/2020 | Deferred | |||
| MANUFACTURING | 11.08.2020 | |||||
| PRIVATE LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0410166096 | Action By: | |||
| :01/81/050/00247/AM20/ | :04/24/040/00078/AM20/ | 20.09.2019 | Applicant |
21 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 05.12.2019 followed by a reminder on 13.03.2020 & 04.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
8 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:151/14/81- | Party Name: LM WIND | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | Deferred | |||
| PVT. LTD | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410045466 | Action By: | |||
| :01/81/050/00249/AM20/ | :34/24/040/00191/AM20/ | 20.09.2019 | Applicant |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per advice of Consultant (TEC-1):
-
22 1. Net content of FRP in Export Product.
-
Net content of Balsa Wood, PVC form (Weight wise) in Export Product.
-
Net weight of Pultrusions, plate and metal parts.
-
Net weight of Export Product.
-
Value of consumables.
-
SI. No.5 and 11 of the Standard Deficiency Format.
-
| Case No.:152/14/81- | Party Name: LM WIND | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | Deferred | |||
| PVT. LTD. | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410045467 | Action By: | |||
| :01/81/050/00250/AM20/ | :34/24/040/00190/AM20/ | 20.09.2019 | Applicant |
The Committee considered the case as per agenda and decided to seek from the applicant to furnish 23 following information as per advice of Consultant (TEC-1) dated 11.08.2020
-
Net content of FRP in Export Product.
-
Net content of Balsa Wood, PVC form (Weight wise) in Export Product.
-
Net weight of Pultrusions, plate and metal parts.
-
Net weight of Export Product.
-
Value of consumables.
-
SI. No.5 and 11 of the Standard Deficiency Format.
9 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:153/14/81-ALC2/2019 | Party Name: R R | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| KABEL LIMITED | ALC2/2020 | Approved | ||||
| 11.08.2020 | ||||||
| HQ File :01/81/050/00251/AM20/ | RLA File | Lic.No/Date:0310831699 | ||||
| HQ E-office Computer No.: | :03/95/040/00607/A | 23.09.2019 | ||||
| 23304 | M20/ |
| Case No.:153/14/81-ALC2/2019 | Case No.:153/14/81-ALC2/2019 | Case No.:153/14/81-ALC2/2019 | Party Name: R R<br>KABEL LIMITED | Party Name: R R<br>KABEL LIMITED | Party Name: R R<br>KABEL LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|---|
| HQ File :01/81/050/00251/AM20/<br>HQ E-office Computer No.:<br>23304 | RLA File<br>:03/95/040/00607/A<br>M20/ | Lic.No/Date:0310831699<br>23.09.2019 | ||||||||
| 2<br>4 | Decision:The Committee considered the case as per the agenda and decided tofixthe ad-hoc norms<br>as per comments Consultant (TEC-3) considering reply dated 07.08.2020 as under: | |||||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 85444999 | Solar cable - Low<br>Smoke Zero<br>Halogen insulated<br>electric conductors<br>not exceeding 1000<br>volts Net Content:<br>Copper -90154.74<br>Kg,Tin ANODE-<br>2788.29 Kg,<br>Polymers Of<br>Ethylene- 65570.10<br>Kg, Catalyst<br>Masterbatch-<br>3451.06 Kg. | 2000<br>Kilomet<br>er | 1 | 74081190 | Copper Wire<br>Rod | 1.01Kgs/Kg<br>content in the<br>exportproduct | ||||
| 2 | 80030020 | Tin Anode | 1.01Kgs/Kg<br>content in the<br>exportproduct | |||||||
| 3 | 39019090 | Polyethylene | 1.05Kgs/Kg<br>content in the<br>exportproduct | |||||||
| 4 | 38159090 | Catalyst<br>Masterbatch<br>(silane<br>crosslinkable<br>polyethylene<br>copolymer) | 1.05Kgs/Kg<br>content in the<br>export product | |||||||
| Note:<br>1. Size & weight of export product as given in reply dated 07.08.2020 may be added in the<br>description of export product.<br>2. The description of import item at Sl. No. 3 may be amended as “Polyethylene”.<br>3. The words “silane crosslinkable polyethylene copolymer” may be added in the<br>description of import item at Sl. No. 4.<br>4. Type of polyethylene to be imported should be same as used in export item.<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:160/14/81- | Party Name: KRYFS POWER | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | COMPONENTS LIMITED | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310831798 | Action By: | |||
| :01/81/050/00258/AM20/ | :03/94/040/00475/AM20/ | 25.09.2019 | Applicant |
25 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 05.12.2019 followed by reminders on 13.03.2020 & 04.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
10 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:159/14/81- | Party Name: LEITWIND | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | SHRIRAM MANUFACTURING | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166105 | Action By: | |||
| :01/81/050/00257/AM20/ | :04/24/040/00102/AM20/ | 25.09.2019 | Applicant |
26 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 05.12.2019 followed by reminders on 13.03.2020 & 04.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:163/14/81- | Party Name: P.M. ELECTRO | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | AUTO PVT. LTD. | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310831874 | ||||
| :01/81/050/00261/AM20 | :03/95/040/00624/AM20/ | 27.09.2019 | ||||
| HQ E-office Computer | ||||||
| No.: 23762 |
| Case No.:163/14/81-<br>ALC2/2019 | Case No.:163/14/81-<br>ALC2/2019 | Case No.:163/14/81-<br>ALC2/2019 | Party Name: P.M. ELECTRO<br>AUTO PVT. LTD. | Party Name: P.M. ELECTRO<br>AUTO PVT. LTD. | Party Name: P.M. ELECTRO<br>AUTO PVT. LTD. | Party Name: P.M. ELECTRO<br>AUTO PVT. LTD. | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00261/AM20<br>HQ E-office Computer<br>No.: 23762 | RLA File<br>:03/95/040/00624/AM20/ | Lic.No/Date:0310831874<br>27.09.2019 | |||||||||
| 2<br>7 | **Decision:**The Committee considered the case as per the<br>as per written comments given by MSME via email dated | agenda and decided to fix the ad-hoc norms<br>17.08.2020 as under: | |||||||||
| Sl.<br>No. | ITCHS<br>Code | Export<br>Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 1 | 73082900 | Module<br>Mounting<br>Rail<br>Assembly -<br>1.8mm | 272250<br>Kgs | 1 | 72104900 | Hot Dipped<br>Galvanised<br>Steel Coils -<br>1.95 Mm | 334867 Kgs<br>inclusive of 23%<br>wastage after<br>1/3rdrecovery<br>from scrap | ||||
| 2 | 73082900 | Module<br>Mounting<br>Rail<br>Assembly -<br>1.95mm | 56000<br>Kgs | 2 | 72104900 | Hot Dipped<br>Galvanised<br>Steel Coils -<br>1.8 Mm | 67760 Kgs<br>inclusive of 21%<br>wastage after<br>1/3rdrecovery<br>from scrap. | ||||
| Note:<br>1. Per unit weight of item of export at Sl. No. 1 is 0.99 Kg (gross weight of assembly 1.12 kg).<br>2. Per unit weight of item of export at Sl. No. 2 is 1.12 Kg (gross weight of assembly 1.25 kg).<br>RA concerned maytake suitable consequential action accordingly. |
11 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:164/14/81- | Party Name: TPM DEPOT | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067545 | Action By: | |||
| :01/81/050/00262/AM20/ | :31/83/040/00091/AM20/ | 27.09.2019 | Applicant |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to 28 furnish following information as per comments of DHI:
-
Catalogue/ Write-up of export item with specific application.
-
Sl. No. 4, 5 & 11 of the Standard Deficiency Format.
-
Calculation should be supported by Dimensional Engineering Drawing with relevant dimensions highlighted.
-
Detail catalogue/write-up and use of import item at Sl. No. 10, 53, 57 to 60 & 141 with their placement in export product.
| Case No.:165/14/81-ALC2/2019 | Party Name: AUSA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| MEDICAL DEVICES | ALC2/2020 | Approved | ||||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File :01/81/050/00263/AM20/ | RLA File | Lic.No/Date:0710115498 | ||||
| HQ E-office Computer No.: | :07/24/040/00142/AM20/ | 30.09.2019 | ||||
| 23306 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms 2 on the recommendation of Consultant (SKB) as under:
- 9
| ITCHS | Export Item | Quantity | ITCHS | Import Item | Recommended | |
|---|---|---|---|---|---|---|
| Code | Code | Quantity | ||||
| 73042200 | Articles Made Of<br>Stainless Steel Tubes<br>(Net Content of<br>Import item in Export<br>Product 318.63 Kgs) | 318.630<br>Kgs | 73069090 | 17-7PH<br>Stainless Steel<br>Tubing<br>Material | 1.015 Kgs/Kg<br>content in the<br>export product |
| Case No.:167/14/81-ALC2/2019 | Party Name: AXORA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| RESOURCES | ALC2/2020 | Approved | ||||
| LIMITED | 11.08.2020 | |||||
| HQ File :01/81/050/00265/AM20/ | RLA File | Lic.No/Date:0210209466 | ||||
| HQ E-office Computer No.: 23086 | :02/24/040/00098/AM20 | 30.09.2019 |
| Case No.:167/14/81-ALC2/2019 | Case No.:167/14/81-ALC2/2019 | Case No.:167/14/81-ALC2/2019 | Party Name: AXORA<br>RESOURCES<br>LIMITED | Party Name: AXORA<br>RESOURCES<br>LIMITED | Party Name: AXORA<br>RESOURCES<br>LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|
| HQ File :01/81/050/00265/AM20/<br>HQ E-office Computer No.: 23086 | RLA File<br>:02/24/040/00098/AM20 | <br>Lic.No/Date:0210209466<br>30.09.2019 | ||||||
| 3<br>0 | Decision:The Committee considered the case as per the agenda and decided tofixthe ad-hoc norms<br>asper written commentsgiven byMSME via email dated 17.08.2020 as under:<br>ITCHS<br>Code<br>Export Item<br>Quantity ITCHS<br>Code<br>Import Item<br>Recommended<br>Quantity<br>78011000<br>Lead Ingot Purity<br>99.97% & Above<br>500 MT<br>78019920 Remelted Lead<br>Ingot<br>517.60 MT inclusive<br>of 2% wastage<br>Note: a. Maximum lead content in import is 98.5%.<br>b. The applicant should import relevant item only.<br>RA concerned maytake suitable consequential action accordingly. | |||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | ||||
| 78011000 | Lead Ingot Purity<br>99.97% & Above | 500 MT | 78019920 | Remelted Lead<br>Ingot | ||||
| Note: a. Maximum lead content in import is 98.5%.<br>b. The applicant should import relevant item only.<br>RA concerned maytake suitable consequential action accordingly. |
12 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:166/14/81- | Party Name: VEER-O-METALS | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710115502 | Action By: | |||
| :01/81/050/00264/AM20/ | :07/24/040/00147/AM20/ | 01.10.2019 | Applicant |
31 Decision: The Committee considered the case as per agenda and heard the representatives of the applicant during personal hearing held through video conferencing. The representatives explained the case in details and the Committee directed the representatives to submit the reply of deficiencies as raised by Consultant (SKB) in Meeting No. 03/81 dated 27.05.2020.
| Case No.:4/15/81-ALC2/2019 | Party Name: PARAM | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES | ALC2/2020 | Rejected | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310832139 | ||||
| :01/81/050/00273/AM20/ | :03/95/040/00694/AM20/ | 10.10.2019 |
32 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 24.10.2019 followed by reminders on 05.12.2019, 13.03.2020 & 05.08.2020. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai.
| Case No.:5/15/81-ALC2/2019 | Party Name: PARAM | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310832140 | Action By: | |||
| :01/81/050/00274/AM20/ | :03/95/040/00693/AM20/ | 10.10.2019 | Applicant |
33 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of MSME:
- Sl. No. 3, 4, 5 and 11 of the Standard Deficiency Format.
13 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 34 | Case No.:<br>6/15/81-ALC2/2019 | Party Name: PARAM<br>INDUSTRIES | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00275/AM20/ | RLA File<br>:03/95/040/00691/AM20/ | Lic.No/Date:0310832141<br>10.10.2019 | <br>Action By:<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and decided to seek from the applicant to<br>furnish following information as per comments of MSME:<br>1. Sl. No. 3, 4, 5 and 11 of the Standard Deficiency Format.<br>The case stands deferred. |
| Case No.:3/15/81-ALC2/2019 | Party Name: STERLITE | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| POWER TRANSMISSION | ALC2/2020 | Deferred | ||||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310832137 | Action By: | |||
| :01/81/050/00272/AM20/ | :03/95/040/00618/AM20/ | 10.10.2019 | Applicant |
35 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 20.05.2020 followed by reminder on 05.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind again the applicant for furnishing the requisite information.
| Case No.:1/15/81-ALC2/2019 | Party Name: YASH METAL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| IMPEX PVT. LTD. | ALC2/2020 | Rejected | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310832122 | ||||
| :01/81/050/00270/AM20/ | :03/95/040/00669/AM20/ | 10.10.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23768 |
36 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 24.10.2019 followed by reminders on 05.12.2019, 13.03.2020 & 23.05.2020. The applicant vide email dated 26.05.2020 requested for more time to furnish the requisite information. However, no information has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai.
14 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.: | Party Name: | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| 8/15/81-ALC2/2019 | MAHARASHTRA | ALC2/2020 | Approved | |||
| SEAMLESS LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510412078 | ||||
| :01/81/050/00277/AM20/ | :05/24/040/00346/AM20/ | 11.10.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23308 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) on the basis of study group report and the applicant‟s reply dated 05.08.2020 as under:
Export Items:
-
The following words may be added in the description of export item at Sl. No. 1 & 2 “Coating thickness (i) Epoxy Power-150micron (ii) Adhesive - 200 micron (iii) Polyethylene-1.45 mm and total surface area to be coated-58789 Sq. Mtr.”
-
The following words may be added in the description of export item at Sl. No. 3 “Coating
37 thickness (i) Epoxy Power-150micron (ii) Adhesive - 200 micron (iii) Polyethylene-1.65 mm and total surface area to be coated-21327 Sq. Mtr.”
Import Items:
-
Quantity of import item at Sl. No. 1 may be allowed as 1.20 MT/MT content in the export product at Sl. No. 1 to 3 as per SION C-797.
-
Quantity of import item at Sl. No. 2 (Relevant Epoxy Powder) may be allowed as applied. 3. Quantity of import item at Sl. No. 3 (Relevant Adhesive) may be allowed as 18187 Kgs.
-
Quantity of import item at Sl. No. 4 may be allowed as 132151 Kgs.
-
Quantity of import item at Sl. No. 5 may be allowed as applied with value restricted upto 0.75% of FoB value of export product of export items at Sl. No. 1 to 3.
-
Quantity of import item at Sl. No. 6 may be allowed as 1.20 MT/MT content in the export product at Sl. NO. 4 & 5 as per SION C-797.
Note: Grade & thickness of steel to match in import & export
| 38 | Case No.:11/15/81-<br>ALC2/2019 | Party Name: SHIVAM<br>IRON AND STEEL<br>COMPANY LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00280/AM20/<br>HQ E-office Computer No.:<br>23309 | <br>RLA File<br>:02/24/040/00099/AM20/ | Lic.No/Date:0210209475<br>14.10.2019 | Action by :<br>Section | |
| **Decision:**The Committee considered the case as per agenda and decided to refer<br>Consultant (SKB) for examination and comments.<br>The case stands deferred. | the case to |
15 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:15/15/81- | Party Name: METALIC | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | IMPRESSIONS (INDIA) | ALC2/2020 | Approved | |||
| PVT LTD | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510412116 | ||||
| :01/81/050/00284/AM20/ | :05/24/040/00386/AM20/ | 15.10.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23310 |
| Case No.:15/15/81-<br>ALC2/2019 | Case No.:15/15/81-<br>ALC2/2019 | Party Name: METALIC<br>IMPRESSIONS (INDIA)<br>PVT LTD | Party Name: METALIC<br>IMPRESSIONS (INDIA)<br>PVT LTD | Party Name: METALIC<br>IMPRESSIONS (INDIA)<br>PVT LTD | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00284/AM20/<br>HQ E-office Computer No.:<br>23310 | <br>RLA File<br>:05/24/040/00386/AM20/ | Lic.No/Date:0510412116<br>15.10.2019 | |||||||
| 39 | <br>**Decision:**The Committee considered the case as per<br>per comments given by Consultant (TEC-1) as under: | agenda and | decided to fix the ad-hoc norms as | ||||||
| <br>ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import<br>Item | Recommended<br>Quantity | ||||
| 85177090 | Mobile Window (3636600<br>Pcs) Made Out Of Hard<br>Coated Acrylic Sheet Duly<br>Printed & Laminated (0.70<br>To 1.50Mm) | 15000<br>Kgs | 39162019 | Acrylic<br>Sheet<br>(1200 mm<br>by 1650<br>mm) | 1.05 Kgs/Kg<br>content in the<br>export product | ||||
| Note: Size of import item should be 1200 mm by 1650 mm.<br>RA concerned maytake suitable consequential action accordingly. |
| 40 | Case No.:16/15/81-<br>ALC2/2019 | Party Name: BAOSTEEL<br>INDIA COMPANY<br>PRIVATE LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00285/AM20/<br>HQ E-office Computer No.:<br>23311 | RLA File<br>:03/94/040/00555/AM20/ | Lic.No/Date:0310832264<br>16.10.2019 | ||
| **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments dated 24.08.2020 given by Consultant (SKB). (Copy enclosed)<br>RA concerned maytake suitable consequential action accordingly. |
16 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:1/18/81-ALC2/2019 | Party Name: MODISON | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| METALS LTD. | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310832497 | Action By: | |||
| :01/81/050/00295/AM20/ | :03/95/040/00712/AM20/ | 30.10.2019 | Applicant |
Decision: The Committee considered the case as per agenda and DHI informed that the applicant‟s reply is incomplete as the applicant again sent the same reply dated 12.03.2020 via email dated 41 07.08.2020. Therefore, the Committee decided to give last opportunity to the applicant to furnish the following information point-wise as per comments of DHI:
-
To provide export quantity in number in addition to quantity in weight.
-
Sl. No. 5 & 11 of the Standard Deficiency Format.
-
The calculation of the export product should be supported by the dimensional drawing. The case stands deferred.
| Case No.:2/18/81-ALC2/2019 | Party Name: LM WIND | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| POWER BLADES INDIA | ALC2/2020 | Deferred | ||||
| PVT. LTD | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410045571 | Action By: | |||
| :01/81/050/00296/AM20/ | :34/24/040/00224/AM20/ | 31.10.2019 | Applicant |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per Comments of Consultant (TEC-1):
- 42
-
Net content of FRP in Export Product.
-
Net content of Balsa Wood, PVC form (Weight wise) in Export Product.
-
Net weight of Pultrusions, plate and metal parts.
-
Net weight of Export Product.
-
Value of consumables.
-
SI. No. 5 and 11 of the Standard Deficiency Format.
| Case No.:5/18/81-ALC2/2019 | Party Name: STERLITE | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| POWER TRANSMISSION | ALC2/2020 | Deferred | ||||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310832533 | Action By: | |||
| :01/81/050/00299/AM20/ | :03/95/040/00741/AM20/ | 31.10.2019 | Applicant |
- 43 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 20.05.2020 followed by a reminder on 05.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind again the applicant for furnishing the requisite information.
17 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:3/18/81- | Party Name: | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | JAYACHANDRAN ALLOYS | ALC2/2020 | Approved | |||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3210079201 | ||||
| :01/81/050/00297/AM20/ | :32/24/040/00069/AM20/ | 01.11.2019 | ||||
| HQ E-office Computer | ||||||
| **No.:**23084 |
| Case No.:3/18/81-<br>ALC2/2019 | Case No.:3/18/81-<br>ALC2/2019 | Case No.:3/18/81-<br>ALC2/2019 | Party Name:<br>JAYACHANDRAN ALLOYS<br>PRIVATE LIMITED<br>RLA File<br>:32/24/040/00069/AM20/ | Party Name:<br>JAYACHANDRAN ALLOYS<br>PRIVATE LIMITED<br>RLA File<br>:32/24/040/00069/AM20/ | Party Name:<br>JAYACHANDRAN ALLOYS<br>PRIVATE LIMITED<br>RLA File<br>:32/24/040/00069/AM20/ | Party Name:<br>JAYACHANDRAN ALLOYS<br>PRIVATE LIMITED<br>RLA File<br>:32/24/040/00069/AM20/ | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00297/AM20/<br>HQ E-office Computer<br>**No.:**23084 | Lic.No/Date:3210079201<br>01.11.2019 | ||||||||||
| 4<br>4 | Decision:The Committee considered the case as per the agenda and decided tofixthe<br>as per written comments given by MSME via email dated 11.08.2020 as under: | ad-hoc norms | |||||||||
| Sl.<br>No. | ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 1 | 78011000 | Lead Ingots<br>99.97% Purity Min | 283 MT | 1 | 78020010 | Lead Scrap<br>namely ISRI<br>Radio,<br>Racks, Relay,<br>Ropes &<br>Roses | 299.98 MT<br>inclusive of<br>6% wastage<br>(Taking cue<br>from SION<br>C-1195) | ||||
| 2 | 78011000 | Lead Ingots<br>99.97%PurityMin | 1125<br>MT | 2 | 85481020 | Lead Scrap<br>as per ISRI<br>code Rains | 3734 MT<br>inclusive of<br>7%<br>wastage | ||||
| 3 | 78019990 | "Lead Alloy in the<br>form of Ingots<br>(Lead Calcium<br>Alloy)" | 500 MT | ||||||||
| 4 | 78019100 | "Lead Alloy in the<br>form of Ingots<br>(Lead Antimony<br>Alloy)" | 250 MT | ||||||||
| Note:<br>1. Lead content in lead alloy is 99%.<br>2. Average lead content in RAINS is 53.50%.<br>3. The applicant should import relevant items only.<br>RA concerned maytake suitable consequential action accordingly. |
| 45 | <br>Case No.:<br>9/18/81-ALC2/2019<br>HQ File<br>:01/81/050/00303/AM20/ | Party Name: NUCON AMETRA<br>ELECTRONICS SYSTEMS<br>PRIVATE LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| RLA File :09/24/040/00389/AM20/ | Lic.No/Date:0910068160<br>05.11.2019 | <br>Action By:<br>Section | ||
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MeitY on 20.08.2020 for examination of the case. However, MeitY vide email dated<br>25.08.2020 informed that the copy of application was not received by MeitY. Therefore, the<br>Committee decided to send again a copy of application to MeitY for examination of the case.<br>The case stands deferred. |
18 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 46 | Case No.:12/18/81-ALC2/2019 | Party Name:<br>UNIVERSAL CABLES<br>LTD | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved<br> |
|---|---|---|---|---|
| <br>HQ File :01/81/050/00306/AM20/<br>HQ E-office Computer No.:<br>23085 | RLA File<br>:11/24/040/00003/AM20/ | <br>Lic.No/Date:1110028635<br>07.11.2019 | ||
| Decision:The Committee considered the case as per the agenda and decided to fix the norms as per<br>written comments given byDPIITvide U. O. No.: P-47011/352/2019-TSW dated 24.07.2020. (copy<br>enclosed)<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and decided to fix the norms as per written comments given by DPIIT vide U. O. No.: P-47011/352/2019-TSW dated 24.07.2020. (copy enclosed)
| Case No.:13/18/81- | Party Name: JINDAL | Meet No/Date:6/81-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | SAW LIMITED | 11.08.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0510412430 | ||||
| :01/81/050/00307/AM20/ | :05/23/040/00307/AM20/ | 08.11.2019 | ||||
| HQ E-office Computer | ||||||
| **No.:**23083 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) on the basis of study group report and the applicant‟s reply dated 13.08.2020 as under:
Export Items:
The following words may be added in the description of export item added "( a) Adhesive coating thickness on all pipes 270 micron (b) Polyethylene coating thickness & corresponding surface area to be coated (i) 6989.983 sq. mtr. for 2080 micron (ii) 96946.310 sq. mtr. for 2580 micron & 47 (iii) 9410.897 sq.mtr. for 3080 micron”
Import Items:
-
Quantity of import item at Sl. No. 1 may be allowed as applied with value restricted upto 0.5% of FOB value.
-
Quantity of import item at Sl. No. 2 ( Relevant adhesive ) may be allowed as 34.664 MT. 3. Quantity of import item at Sl. No. 3 ( Relevant Polyethylene ) may be allowed as 320.645 MT. 4. Quantity of import item at Sl. No. 4 ( Relevant Sintered powder ) may be allowed as 1.05 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 5 ( Relevant wiremesh ) may be allowed as 1.02 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 6 ( OPC Cement ) may be allowed as 1.05 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 7 may be allowed as per GN-4 .
19 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:14/18/81- | Party Name: JINDAL | Meet No/Date:6/81-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | SAW LIMITED | 11.08.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0510412438 | ||||
| :01/81/050/00308/AM20/ | :05/23/040/00303/AM20/ | 08.11.2019 | ||||
| HQ E-office Computer | ||||||
| **No.:**23082 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) on the basis of study group report and the applicant‟s reply dated 13.08.2020 as under:
Export Items:
48
The following words may be added in the description of export item “ Coating thickness (a) Epoxy 150 micron (b) Adhesive 300 micron (b) Polyethylene & corresponding surface area to be coated (i) 8476.629 sq. mtr. for 2050 micron (ii) 14212.759 sq. mtr. for 2550 micron & (iii) 7214.350 sq.mtr. for 3050 micron ”
Import Items:
-
Quantity of import item at Sl. No. 1 may be allowed as applied with value restricted upto 0.5% of FOB value.
-
Quantity of import item at Sl. No. 2 ( Relevant Epoxy Powder ) may be allowed as 7.67MT.
-
Quantity of import item at Sl. No. 3 ( Relevant adhesive ) may be allowed as 9.10MT.
-
Quantity of import item at Sl. No. 4 ( Relevant Polyethylene ) may be allowed as 81.32MT.
-
Quantity of import item at Sl. No. 5 ( Relevant Sintered powder ) may be allowed as 1.05 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 6 ( Relevant wiremesh ) may be allowed as 1.02 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 7 ( OPC Cement ) may be allowed as 1.05 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 8 may be allowed as per GN-4 .
| 49 | Case No.:19/18/81-<br>ALC2/2019 | Case No.:19/18/81-<br>ALC2/2019 | Party Name: DIACH<br>CHEMICALS & PIGMENTS<br>PRIVATE LIMITED | Party Name: DIACH<br>CHEMICALS & PIGMENTS<br>PRIVATE LIMITED | Party Name: DIACH<br>CHEMICALS & PIGMENTS<br>PRIVATE LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved |
|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00313/AM20/<br>HQ E-office Computer<br>No.: 23081 | <br>RLA File<br>:02/24/040/00117/AM20/ | Lic.No/Date:0210209544<br>13.11.2019 | ||||||
| <br>**Decision:**The Committee considered the case as per the agenda and decided to fix the ad-hoc norms<br>asperwritten commentsgiven byMSMEvia email dated 25.08.2020as under: | ||||||||
| <br>ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |||
| 78019100 | Antimonial Lead<br>Ingot 2.75% (Lead<br>Antimonial Alloy) | 200 MT | 78019920 | Remelted Lead Block<br>/ Ingot | 202.44 MT<br>inclusive of 2%<br>wastage | |||
| Note:<br>1. Maximum percentage of lead in import item is 98%.<br>2. The applicant should import relevant items only.<br>RA concerned maytake suitable consequential action accordingly |
20 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:16/18/81- | Party Name: LM WIND | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | Deferred | |||
| PVT. LTD. | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410045603 | Action By: | |||
| :01/81/050/00310/AM20/ | :34/24/040/00232/AM20/ | 13.11.2019 | Applicant |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of Consultant (TEC-1):
-
Net content of FRP in Export Product.
-
Net content of Balsa Wood, PVC form (Weight wise) in Export Product.
-
Net weight of Pultrusions, plate and metal parts.
-
Net weight of Export Product.
-
Value of consumables.
-
SI. No. 5 and 11 of the Standard Deficiency Format.
| Case No.:20/18/81- | Party Name: LM WIND | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | Deferred | |||
| PVT. LTD | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410045611 | Action By: | |||
| :01/81/050/00314/AM20/ | :34/24/040/00246/AM20/ | 14.11.2019 | Applicant |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of Consultant (TEC-1):
- 51
-
Net content of FRP in Export Product.
-
Net content of Balsa Wood, PVC form (Weight wise) in Export Product.
-
Net weight of Pultrusions, plate and metal parts.
-
Net weight of Export Product.
-
Value of consumables.
-
SI. No. 5 and 11 of the Standard Deficiency Format.
| Case No.:17/18/81- | Party Name: PEARL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INSULATIONS PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710115682 | Action By: | |||
| :01/81/050/00311/AM20/ | :07/24/040/00177/AM20/ | 14.11.2019 | Applicant |
52 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 05.12.2019 followed by a reminder on 13.03.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
21 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:21/18/81-ALC2/2019 | Party Name: JAIN FGL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| METAL INDUSTRIES | ALC2/2020 | Approved | ||||
| 11.08.2020 | ||||||
| HQ File :01/81/050/00315/AM20/ | RLA File | Lic.No/Date:04101662 | ||||
| HQ E-office Computer No.: 23372 | :04/24/040/00128/AM20/ | 75 | ||||
| 15.11.2019 |
| Case No.:21/18/81-ALC2/2019 | Case No.:21/18/81-ALC2/2019 | Case No.:21/18/81-ALC2/2019 | Party Name: JAIN FGL<br>METAL INDUSTRIES | Party Name: JAIN FGL<br>METAL INDUSTRIES | Party Name: JAIN FGL<br>METAL INDUSTRIES | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|
| HQ File :01/81/050/00315/AM20/<br>HQ E-office Computer No.: 23372 | RLA File<br>:04/24/040/00128/AM20/ | <br>Lic.No/Date:04101662<br>75<br>15.11.2019 | ||||||
| 5<br>3 | **Decision:**The Committee considered the<br>as per written comments given by MSME | |||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | ||||
| 74031300 | Refined<br>Copper Billets | 2280684<br>Kgs | 74040012 | Copper Wire Scrap<br>as per ISRI Code<br>Druid | ||||
| Note:<br>1. Average Copper content in import item is 40.39%.<br>2. Average copper content in export item is 99.97%.<br>3. The applicant should import relevant items only.<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:23/18/81- | Party Name: DEWAN & | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | SONS | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510412532 | Action By: | |||
| :01/81/050/00317/AM20/ | :05/23/040/00288/AM20/ | 18.11.2019 | Applicant |
54 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 05.12.2019 followed by a reminder on 13.03.2020 & 09.06.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
The case stands deferred
22 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.: | Party Name: | Meet No/Date:6/81-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| 27/18/81-ALC2/2019 | LEADSTONE ENERGY | 11.08.2020 | Approved | |||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0210209560 | ||||
| :01/81/050/00321/AM20 | :02/24/040/00121/AM20/ | 21.11.2019 | ||||
| HQ E-office Computer | ||||||
| No.: 23313 |
| Case No.:<br>27/18/81-ALC2/2019 | Case No.:<br>27/18/81-ALC2/2019 | Party Name:<br>LEADSTONE ENERGY<br>LIMITED | Party Name:<br>LEADSTONE ENERGY<br>LIMITED | Party Name:<br>LEADSTONE ENERGY<br>LIMITED | Meet No/Date:6/81-ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00321/AM20<br>HQ E-office Computer<br>No.: 23313 | RLA File<br>:02/24/040/00121/AM20/ | Lic.No/Date:0210209560<br>21.11.2019 | |||||||
| 55 | **Decision:**The Committee considered the case as per the agenda and decided to fix the<br>as per written comments given by MSME dated 24.08.2020: | ad-hoc norms | |||||||
| <br>ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 78011000 | Lead Ingot 99.97%<br>Purity | 250 MT | 78019920 | Remelted Lead<br>Ingot | 257.50MT inclusive of<br>1.5% wastage | ||||
| 78019100 | Anitimonial Lead (<br>Lead Antimonial<br>Alloy) | 250 MT | 78019920 | Remelted Lead<br>Ingot | 251.12 MT inclusive<br>of 2% wastage | ||||
| Note:<br>1. Percentage of lead in export item at Sl. No. 2 is 97%.<br>2. Maximum percentage of lead in import is 98.50%.<br>3. The applicant should import relevant items only.<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:31/18/81- | Party Name: RAJHANS | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | METALS PVT. LIMITED | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:2410042932 | Action By: | |||
| :01/81/050/00325/AM20/ | :24/24/040/00036/AM20/ | 22.11.2019 | Applicant |
56 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the applicant on 05.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
The case stands deferred
23 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:32/18/81- | Party Name: JINDAL SAW | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | LIMITED | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510412635 | ||||
| :01/81/050/00326/AM20/ | :05/23/040/00317/AM20/ | 25.11.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23080 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) on the basis of study group report and the applicant‟s reply dated 13.08.2020 as under:
Export items:
The following words may be added in the description of the export item " Coating thickness of Epoxy powder 525 micron for base coat & 115 micron for rough coat & corresponding surface area to 57 be coated 15094.225 Sq. Mtr .”
Import Items:
-
Quantity of import item at Sl. No. 1 may be allowed as applied with value restricted upto 0.2% of Fob value.
-
Quantity of relevant import item at Sl. No. 2 ( epoxy powder for base coat ) may be allowed as 13.67MT.
-
Quantity of relevant import item at Sl. No. 3 ( epoxy powder for rough coat ) may be allowed as 3 MT.
-
Quantity of relevant import item at Sl. No. 4 ( wire mesh ) may be allowed as 1.02 Kgs/Kg content in the export item.
-
Quantity of import item at Sl. No. 5 ( OPC Cement ) may be allowed as 1.05 Kgs/Kg content in the export item.
-
Quantity of import item at Sl. No. 6 may be allowed as per GN-4 .
RA concerned may take suitable consequential action accordingly
24 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:36/18/81- | Party Name: AKSHAY | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ALUMINIUM ALLOYS | ALC2/2020 | Approved | |||
| (P)LTD. | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510412654 | ||||
| :01/81/050/00330/AM20/ | :05/23/040/00331/AM20/ | 26.11.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23763 |
| HQ E-office Computer No.:<br>23763 | HQ E-office Computer No.:<br>23763 | ||
|---|---|---|---|
| **Decision:**The Committee considered the case as per agenda. The Committee observed that there are | |||
| two norms which appear to be applicable to the present case i.e. at C-3 and at C-1679. However, in | |||
| both the entries, the wastages are different. Therefore, the Committee asked the technical authorities to | |||
| provide more clarity on the serial number to be applicable in the current case. The matter was | |||
| discussed in the meeting and the Committee decided to fix the ad-hoc norms on the recommendation | |||
| of Consultant (TEC-3) as under: | |||
| 5 | |||
| 8 | ITCHS<br>Code<br>Export Item<br>QuantitySl.<br>No.<br>ITCHS<br>Code<br>Import Item | Recommended<br>Quantity | |
| Aluminium Alloy<br>Ingots Containing Net<br>Aluminium - 445350<br>1<br>76020010Aluminium<br>Scrap | As per SION<br>C-3 | ||
| 76012010<br>KG. Silicon - 47100<br>KG., Copper - 7550<br>KG (Aluminium -<br>500000<br>Kgs<br>2<br>28046900Silicon<br>Metal | As per SION<br>C-3 | ||
| 89.07%, Silicon -<br>9.42% and Copper -<br>1.51%)<br>3<br>74040012Copper<br>Scrap | As per SION<br>C-3 | ||
| Note: The description of import items is as per SION C-3. | |||
| RA concerned maytake suitable consequential action accordingly. |
25 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:37/18/81- | Party Name: NAMO | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ALLOYS PVT. LTD. | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510412655 | ||||
| :01/81/050/00331/AM20/ | :05/24/040/00505/AM20/ | 26.11.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23764 |
5 9
Decision: The Committee considered the case as per agenda. The Committee observed that there are two norms which appear to be applicable to the present case i.e. at C-3 and at C-1679. However, in both the entries, the wastages are different. Therefore, the Committee asked the technical authorities to provide more clarity on the serial number to be applicable in the current case. The matter was discussed in the meeting and the Committee decided to fix the ad-hoc norms on the recommendation of Consultant (TEC-3) as under:
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |
|---|---|---|---|---|---|---|---|
| Aluminium Alloy<br>Ingots Containing Net | 1 | 76020010 | Aluminium<br>Scrap | As per SION<br>**C-3 ** | |||
| 76012010 | Aluminium - 445350<br>KG, Silicon - 47100<br>KG , Copper - 7550<br>KG (Aluminium-<br>89.07%, Silicon-<br>9.42%, Copper- | 500000<br>Kgs | 2<br>3 | 28046900<br>74040012 | Silicon<br>Metal<br>Copper<br>Scrap | As per SION<br>**C-3 **<br>As per SION<br>C-3 | |
| 1.51%) |
Note: The description of import items is as per SION C-3.
| 60<br> <br> <br> <br> <br> <br><br> <br> <br> | Case No.:33/18/81-<br>ALC2/2019 | Party Name:<br>THYSSENKRUPP<br>ELECTRICAL STEEL<br>INDIA PVT. LTD. | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved |
|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00327/AM20/<br>HQ E-office Computer No.:<br>23314 | RLA File<br>:31/83/040/00112/AM20/ | Lic.No/Date:3110067607<br>26.11.2019 | |||
| **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments dated 21.08.2020 given by Consultant (SKB). (Copy enclosed)<br>RA concerned maytake suitable consequential action accordingly. | |||||
26 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 61 | Case No.:34/18/81-<br>ALC2/2019 | Party Name: THYSSENKRUPP<br>ELECTRICAL STEEL INDIA<br>PVT. LTD. | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00328/AM20/<br>HQ E-office Computer<br>**No.:**23315 | RLA File<br>:31/83/040/00113/AM20/ | Lic.No/Date:3110067608<br>26.11.2019 | ||
| **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments dated 21.08.2020 given by Consultant (SKB). (Copy enclosed)<br>RA concerned maytake suitable consequential action accordingly. |
| 62 | Case No.:35/18/81-<br>ALC2/2019 | Party Name: THYSSENKRUPP<br>ELECTRICAL STEEL INDIA<br>PVT. LTD. | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020<br> <br> <br>Lic.No/Date:3110067609<br>26.11.2019 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00329/AM20/<br>HQ E-office Computer<br>**No.:**23317 | RLA File<br>:31/83/040/00111/AM20/ | |||
| **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments dated 21.08.2020 given by Consultant (SKB). (Copy enclosed)<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:39/18/81- | Party Name: WIELAND | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | METALS INDIA PRIVATE | ALC2/2020 | Deferred | |||
| LTD. | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710115756 | Action By: | |||
| :01/81/050/00333/AM20/ | :07/24/040/00199/AM20/ | 27.11.2019 | Applicant |
Decision: The Committee considered the case as per the agenda. The Committee noted that the 63 applicant was attended personal hearing in Meeting No. 05/81 held on 28.07.2020 for similar cases. Hence, the Committee decided to seek from the applicant to furnish the following information as per advise of the representative of MSME:
-
To submit a copy of Shipping Bill.
-
To submit Material Balancing with details of scrap.
27 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:42/18/81- | Party Name: MAK | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | CONTROLS AND | ALC2/2020 | Approved | |||
| SYSTEMS PVT. LTD. | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3210079262 | ||||
| :01/81/050/00336/AM20/ | :32/21/040/00166/AM20/ | 29.11.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23318 |
64 Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per written comments given by DHI as under:
-
Quantity of import item at Sl. No. 28 to 37, 59 to 61, 148 &149 may be allowed at 1.01 Meters/Meter in export product.
-
Quantity of rest of the import item may be allowed under GN-4 with accountability clause.
| Case No.:43/18/81- | Party Name: JINDAL SAW | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | LIMITED | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510412749 | ||||
| :01/81/050/00337/AM20/ | :05/23/040/00333/AM20/ | 03.12.2019 | ||||
| HQ E-office Computer No.: | ||||||
| 23072 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) on the basis of study group report and the applicant‟s reply dated 14.08.2020 as under:
Export Items:
The following words may be added in the description of the export item at Sl. No. 1: “CS LSAW 3 LPE coated pipes & surface area to be coated 14009.098 Sq. Mtr. Coating thickness (i) Epoxy 100 micron (ii) Adhesive 250 micron (iii)Polyethylene 3150 micron
65
Import Items:
-
Description & quantity of import items at Sl. No. 1 & 8 may be allowed as per Sl. No.1 of SION C-593.
-
The quantity of import item at Sl. No. 2 i.e. welding wire may be allowed as 4 Kgs/MT of export item.
-
Quantity of import item at Sl. No. 3 to 5 may be allowed as applied and value restricted up to 1% of FoB value of export item at Sl. No. 1.
-
Quantity of import item at Sl. No. 6 i.e. relevant adhesive may be allowed as 3.7 MT.
-
Quantity of import item at Sl. No. 7 i.e. Polyethylene may be allowed as 53.26 MT.
-
Quantity of import item at Sl. No. 9 i.e . Welding Wire may be allowed as 4.00 Kgs/MT of export item at Sl. No. 2.
-
Quantity of import item at SL. No. 10 & 11 may be allowed as applied and value restricted up to 1% of FoB value of export item at Sl. No. 2.
Note: Grade & thickness of steel to match in import & export.
28 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:45/18/81- | Party Name: DISHA AUTO | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | COMPONENTS PVT.LTD. | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310833218 | ||||
| :01/81/050/00339/AM20/ | :03/94/040/00675/AM20/ | 04.12.2019 |
Decision: The Committee considered the case as per the agenda and decided to seek from the 66 applicant to furnish the following information as per written comments of Consultant (TEC-3):
-
Sl. No. 3, 4, 5 & 11 of the Standard Deficiency Format.
-
Drawing/diagram of blank with dimensions of each export product.
-
Copy of Advance Authorization.
The case stands deferred
| Case No.:2/21/81-ALC2/2019 | Party Name: SUKRUT | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ELECTRIC COMPANY | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3110067639 | Action By: | |||
| :01/81/050/00377/AM20/ | :31/83/040/00119/AM20/ | 30.12.2019 | Applicant |
Decision: The Committee considered the case as per the agenda and decided to seek from the 67 applicant to furnish the following information as per comments of Consultant (TEC-3):
-
Specific use of each import item in export product.
-
To provide clarification for., why items of import are mentioned as parts of transformer while export product is a terminal box.
-
Sl. No. 8 & 9 of the Standard Deficiency Format.
| Case No.:4/21/81-ALC2/2019 | Party Name: KUNJ | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| FORGINGS PVT.LTD. | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413153 | Action By: | |||
| :01/81/050/00379/AM20/ | :05/23/040/00379/AM20/ | 31.12.2019 | Applicant |
68 Decision: The Committee considered the case as per the agenda and decided to seek from the applicant to furnish the following information as per comments of MSME:
-
To provide per unit weight of export product.
-
Manufacturing process with material balancing and step-wise wastage
29 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:6/21/81-ALC2/2019 | Party Name: NORDEX | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710115967 | Action By: | |||
| :01/81/050/00381/AM20/ | :07/24/040/00234/AM20/ | 01.01.2020 | Applicant |
69 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 06.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
The case stands deferred
| Case No.:11/21/81- | Party Name: LOTUS | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | AVIATION TECHNOLOGY | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510413205 | Action By: | |||
| :01/81/050/00386/AM20/ | :05/23/040/00391/AM20/ | 03.01.2020 | Applicant |
- 70 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 14.01.2020 followed by reminders 22.05.2020 & 06.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:15/21/81- | Party Name: PARAM | Meet No/Date:6/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES | ALC2/2020 | Deferred | ||||
| 11.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310833956 | Action By: | ||||
| :01/81/050/00390/AM20/ | :03/95/040/00943/AM20/ | 07.01.2020 | Applicant |
71 Decision: The Committee considered the case as per the agenda and decided to seek from the applicant to furnish the following information as per comments of MSME:
- Sl. No. 3, 4, 5 & 11 of the Standard Deficiency Format. The case stands deferred.
| Case No.:1/24/81-ALC2/2019 | Party Name: RATNAVEER | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| METALS LIMITED | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045891 | Action By: | |||
| :01/81/050/00438/AM20/ | :34/24/040/00220/AM20/ | 19.02.2020 | Applicant |
72 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 12.03.2020 followed by reminders 24.05.2020 & 06.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
30 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:2/24/81-ALC2/2019 | Party Name: GOLD METAL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| EXTRUSION | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:2410043023 | Action By: | |||
| :01/81/050/00439/AM20/ | :24/24/040/00056/AM20/ | 20.02.2020 | Applicant |
73 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the applicant on 06.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| 74 | Case No.:3/24/81-ALC2/2019 | Party Name: MITTAL<br>APPLIANCES LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00440/AM20/ | RLA File<br>:56/24/040/00037/AM20/ | Lic.No/Date:5610005825<br>20.02.2020 | ||
| <br>**Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (SKB) was sent to the applicant on 06.08.2020. However,<br>no reply has been received yet. Therefore, the Committee decided to remind the applicant for<br>furnishing the requisite information.<br>The case stands deferred. |
| 75 | Case No.:4/24/81-ALC2/2019 | Party Name: TAMRA<br>DHATU UDYOG PRIVATE<br>LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00441/AM20/ | RLA File<br>:02/24/040/00189/AM20/ | Lic.No/Date:0210209779<br>20.02.2020 | <br>Action By:<br>DPIIT | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that the applicant‟s reply was<br>forwarded to DPIIT via email dated 18.08.2020 for examination of the case. However, no comments<br>have been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
31 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:8/24/81- | Party Name: AKSHAY | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ALUMINIUM ALLOYS LLP | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413681 | ||||
| :01/81/050/00445/AM20/ | :05/23/040/00448/AM20/ | 21.02.2020 | ||||
| HQ E-office Computer | ||||||
| **No.:**23319 |
Decision: The Committee considered the case as per agenda. The Committee observed that there are two norms which appear to be applicable to the present case i.e. at C-3 and at C-1679. However, in both the entries, the wastages are different. Therefore, the Committee asked the technical authorities to provide more clarity on the serial number to be applicable in the current case. The matter was discussed in the meeting and the Committee decided to fix the ad-hoc norms on the recommendation of Consultant (TEC-3) as under:
7 6
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |
|---|---|---|---|---|---|---|---|
| Aluminium Alloy<br>Ingots Containing Net | 1 | 76020010 | Aluminium<br>Scrap | As per SION<br>C-3 | |||
| 76012010 | Aluminium-178140.00<br>Kg, Silicon-18840.00<br>Kg, Copper- 3020.00 | 200000<br>Kgs | 2 | 28046900 | Silicon<br>Metal | As per SION<br>C-3 | |
| Kg (Aluminium-<br>89.07%, Silicon-9.42%<br>And Copper-1.51%) | 3 | 74040012 | Copper<br>Scrap | As per SION<br>C-3 |
Note: The description of import items is as per SION C-3.
32 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:7/24/81-ALC2/2019 | Party Name: KEI | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2020 | Approved | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413680 | ||||
| :01/81/050/00444/AM20/ | :05/23/040/00446/AM20/ | 21.02.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23069 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) dated 16.08.2020 as under:
-
77 1. Quantity of import item at Sl. No. 1 & 10 may be allowed as 1.01 Kgs/Kg content in export product.
-
Quantity of import items at Sl. No. 2 to 4, 8 & 9 may be allowed as 1.05 Kgs/Kg content in export product.
-
Quantity of import item at Sl. No. 5 may be allowed as 1.02 Kgs/Kg content in export product.
-
Quantity of import item at Sl. No. 6 may be allowed as 1.01 Kgs/Kg content in the export product. The words " Copper foil " may be deleted from the description of import item.
-
Quantity of import item at Sl. No. 7 may be allowed as 1.02 Sq. Mtr/Sq. Mtr content in the export product.
-
| Case No.:5/24/81-ALC2/2019 | Party Name: TOSHIBA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| TRANSMISSION & | ALC2/2020 | Deferred | ||||
| DISTRIBUTION SYSTEMS | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068506 | Action By: | |||
| :01/81/050/00442/AM20/ | :09/24/040/00571/AM20/ | 21.02.2020 | Applicant |
-
78 Decision: The Committee considered the case as per the agenda and decided to seek from the applicant to furnish the following information as per comments of DHI:
- Specific use of Aluminum sheets (item no 3) in export product with justification of quantity of import & wastage.
| Case No.:6/24/81-ALC2/2019 | Party Name: TOSHIBA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| TRANSMISSION & | ALC2/2020 | Deferred | ||||
| DISTRIBUTION SYSTEMS | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068507 | Action By: | |||
| :01/81/050/00443/AM20/ | :09/24/040/00572/AM20/ | 21.02.2020 | Applicant |
Decision: The Committee considered the case as per the agenda and decided to seek from the 79 applicant to furnish the following information as per comments of DHI:
-
Specific use of Aluminum sheets (item no 3) in export product with justification of quantity of import & wastage.
-
Calculation of painting material for import item at Sl. No. 5 & 6.
33 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:9/24/81- | Party Name: AXORA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | RESOURCES LIMITED | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210209788 | ||||
| :01/81/050/00446/AM20/ | :02/24/040/00193/AM20/ | 24.02.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 23323 |
| Case No.:9/24/81-<br>ALC2/2019 | Case No.:9/24/81-<br>ALC2/2019 | Party Name: AXORA<br>RESOURCES LIMITED | Party Name: AXORA<br>RESOURCES LIMITED | Party Name: AXORA<br>RESOURCES LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00446/AM20/<br>HQ E-office Computer<br>No.: 23323 | <br>RLA File<br>:02/24/040/00193/AM20/ | Lic.No/Date:0210209788<br>24.02.2020 | |||||||
| 8<br>0 | **Decision:**The Committee considered the case as per agenda and decided to fix<br>per written comments given by MSME via email dated 25.08.2020 as under: | the ad-hoc norms as | |||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 78019100 | Antimonial Lead Ingot<br>2.5 % / 3.20% / 2.75 %<br>(Lead AntimonyAlloy) | 400 MT | 78019920 | Remelted Lead<br>Block / Ingot | 511.46 MT<br>inclusive of 2%<br>wastage | ||||
| Note:<br>1. Average lead content in export item (lead alloy) is 97%.<br>2. Maximum lead content in import item is 98.5%.<br>3. The applicant should import relevant item only.<br>RA concerned maytake suitable consequential action accordingly. | |||||||||
| Case No.:13/24/81- | Party Name: MITTAL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | APPLIANCES LIMITED | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5610005827 | Action By: | |||
| :01/81/050/00450/AM20/ | :56/24/040/00038/AM20/ | 25.02.2020 | Applicant |
81 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the applicant on 06.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
34 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:14/24/81- | Party Name: POLYCAB | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDIA LIMITED | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310835066 | ||||
| :01/81/050/00451/AM20/ | :03/95/040/01118/AM20/ | 26.02.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23068 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) dated 16.08.2020 as under:
-
Quantity of import items at Sl. No. 1 & 2 may be allowed as 1.01 Kgs/Kg content in the export product.
-
Quantity of import items at Sl. No. 3 to 8, 11 to 19, 23 & 24 may be allowed as 1.05 Kgs/Kg
82 content in the export product.
-
Quantity of import items at Sl. No. 20, 22 & 25 may be allowed as 1.01 Kgs/Kg content in the export product.
-
Quantity of import items at Sl. No. 9 & 21 may be allowed as 1.02 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 10 may be allowed as 4 % of steel to be galvanized.
-
Quantity of import items at Sl. No. 26 & 27 may be allowed as per packing policy.
Note:
1. Sizes and weight given with application may be incorporated in the description of the export item.
2. Grade of steel to match in import & export
| Case No.:11/24/81- | Party Name: SIECHEM | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | TECHNOLOGIES | ALC2/2020 | Approved | |||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166565 | ||||
| :01/81/050/00448/AM20/ | :04/24/040/00183/AM20/ | 26.02.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 23066 |
83 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) dated 16.08.2020 as under:
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Quantity |
|---|---|---|---|
| 1 | 74081190 | 8mmContinousCastCopper Rod | 1.01 Kgs/Kgcontent in the exportproduct |
35 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:12/24/81- | Party Name: SIECHEM | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | TECHNOLOGIES PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166566 | Action By: | |||
| :01/81/050/00449/AM20/ | :04/24/040/00184/AM20/ | 26.02.2020 | Section |
Decision: The Committee considered the case as per agenda and noted the comments of Consultant 84 (TEC-3) for import item at Sl. No. 1. For rest of the import items, the Committee decided to seek from the applicant to furnish the following information as per comment of Consultant (TEC-1):
-
Sl. No. 12 of the Standard Deficiency Format.
-
Generic name & catalogue of items at Sl. No. 2 to 8.
-
Justification for import of many types of insulating materials.
| Case No.:15/24/81- | Party Name: DIACH | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | CHEMICALS & PIGMENTS | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0210209796 | Action By: | |||
| :01/81/050/00452/AM20/ | :02/24/040/00197/AM20/ | 27.02.2020 | Applicant |
85 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of MSME:
-
Percentage of lead in alloy.
-
Certificate of analysis of import item.
| Case No.:18/24/81- | Party Name: KALPATARU | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER TRANSMISSION | ALC2/2020 | Deferred | |||
| LTD. | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0810147363 | Action By: | |||
| :01/81/050/00455/AM20/ | :08/24/040/00382/AM20/ | 28.02.2020 | Applicant |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to 86 furnish following information as per comments of Consultant (TEC-3):
-
Sl. No. 5 & 11 of Standard Deficiency Format.
-
To provide clarification for, why the import item at Sl. No. 3 & 4 are same.
-
To provide clarification for, total value of inputs (import + indigenous) is much higher than the value of export.
36 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 87 | Case No.:16/24/81-<br>ALC2/2019 | Party Name: WAAREE<br>ENERGIES LTD. | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00453/AM20/ | RLA File<br>:52/24/040/00074/AM20/ | Lic.No/Date:5210043347<br>28.02.2020 | Action By:<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and decided to seek from the applicant to | ||||
| furnish following information as per comments of Consultant (TEC-3): | ||||
| 1. Calculations of requirement of each raw material with justification.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of Consultant (TEC-3):
Case No.:17/24/81- Party Name: APAR Meet No/Date:6/81-ALC2/2020 Status: ALC2/2019 INDUSTRIES LIMITED 11.08.2020 Approved HQ File RLA File Lic.No/Date:0310835137 :01/81/050/00454/AM20/ :03/94/040/01002/AM20/ 02.03.2020 HQ E-office Computer No.: 23065
| Case No.:17/24/81-<br>ALC2/2019 | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:6/81-ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00454/AM20/<br>HQ E-office Computer<br>**No.:**23065 | <br>RLA File<br>:03/94/040/01002/AM20/ | Lic.No/Date:0310835137<br>02.03.2020 | ||
| 88 | <br>**Decision:**The Committee considered the case as per the agenda and decided to fix the ad-hoc norms<br>as per written comments given by Consultant (TEC-3) considering reply dated 14.07.2020 as under:<br>Import Items:<br>Sl.<br>No.<br>ITCHS<br>Code<br>Import Item<br>Recommended Quantity<br>1<br>74081190 COPPER WIRE ROD : 8 MM DIA<br>Net + 1% wastage or as applied,<br>whichever is lower<br>2<br>76011010PRIMARY UNALLOYED<br>ALLUMINIUM INGOTS/SOW/T-BARS<br>Net + 1% wastage or as applied,<br>whichever is lower<br>3<br>39011090 XLPE COMPOUND<br>Net + 2.5% wastage or as applied,<br>whichever is lower<br>4<br>29173200 Plasticiser (DOP)<br>Net + 2.5% wastage or as applied,<br>whichever is lower<br>5<br>39041020 PVC RESIN<br>Net + 2.5% wastage or as applied,<br>whichever is lower<br>6<br>40027000 EPDM<br>Net + 2.5% wastage or as applied,<br>whichever is lower<br>7<br>38029019 CALCINED CLAY<br>Net + 2.5% wastage or as applied,<br>whichever is lower<br>8<br>39013000 EVA CO-POLYMER<br>Net + 2.5% wastage or as applied,<br>whichever is lower<br>9<br>28183000 ALUMINIUM HYDROXIDE<br>Net + 2.5% wastage or as applied,<br>whichever is lower<br>10<br>39019000 POLYMERS OF ETHYLENE<br>Net + 2.5% wastage or as applied,<br>whichever is lower<br>Note:<br>1. Weight of cable may be incorporated in the description of export product as given in the<br>applicant‟s reply letter dated 14.07.2020 (copy enclosed).<br>2. For import item at Sl. No.10, type of polymer to be imported will be same as used in export<br>product.<br>RA concerned maytake suitable consequential action accordingly. |
2. For import item at Sl. No.10, type of polymer to be imported will be same as used in export product. RA concerned may take suitable consequential action accordingly.
37 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:21/24/81- | Party Name: RAJHANS | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | IMPEX PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:2410043047 | Action By: | |||
| :01/81/050/00458/AM20/ | :24/24/040/00060/AM20/ | 03.03.2020 | Applicant |
89 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the applicant on 06.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for submitting the requisite information.
| Case No.:2/3/81-ALC2/2020 | Party Name: SELP INDIA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310835853 | Action By: | |||
| :01/81/050/00501/AM21/ | :03/95/040/00019/AM21/ | 25.04.2020 | MeitY |
90 Decision: The Committee considered the case as per the agenda and noted that the applicant has directly sent the reply of deficiency letter to MeitY on 08.07.2020, 09.07.2020 & 24.07.2020. However, MeitY via email dated 25.08.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.
38 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:4/3/81- | Party Name: APAR | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES LIMITED | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310835975 | ||||
| :01/81/050/00503/AM21/ | :03/94/040/01069/AM20/ | 26.04.2020 | ||||
| HQ E-office Computer | ||||||
| **No.:**23064 |
| Case No.:4/3/81-<br>ALC2/2020 | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00503/AM21/<br>HQ E-office Computer<br>**No.:**23064 | RLA File<br>:03/94/040/01069/AM20/ | Lic.No/Date:0310835975<br>26.04.2020 | ||
| 91 | <br>**Decision:**The Committee considered the case as per the agenda and decided to fix the ad-hoc norms<br>as per written comments given by Consultant (TEC-3) considering reply dated 08.08.2020 as under:<br>Import Items:<br>Sl.<br>No.<br>ITCHS<br>Code<br>Import Item<br>Recommended Quantity<br>1<br>74081190 Copper Wire Rod : 8 Mm Dia<br>Net + 1% wastage or as applied,<br>whichever is lower<br>2<br>76011010Primary Unalloyed Alluminium Ingots/<br>Sow/T-Bars<br>Net + 1% wastage or as applied,<br>whichever is lower<br>3<br>39011090 XLPE Compound<br>Net + 2.5% wastage or as applied,<br>whichever is lower<br>4<br>29173200 Plasticiser(DOP)<br>Net + 2.5% wastage or as applied<br>5<br>39041020PVCResin<br>Net + 2.5% wastage or as applied<br>6<br>39019090 Semi ConductingCompound<br>Net + 2.5% wastage or as applied<br>7<br>39019090Low Smoke Zero Halogen Compound<br>(LSZH)<br>Net + 2.5% wastage or as applied<br>8<br>40027000EPDM<br>Net + 2.5% wastage or as applied<br>9<br>38029019 CalcinedClay<br>Net + 2.5% wastage or as applied<br>10<br>28183000 Aluminium Hydroxide<br>Net + 2.5% wastage or as applied<br>Note: Weight of cable may be incorporated in the description of export product as given in the<br>applicant‟s reply letter dated 08.08.2020 (Copy enclosed).<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:3/3/81-ALC2/2020 | Party Name: SELP INDIA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310835959 | Action By: | |||
| :01/81/050/00502/AM21/ | :03/95/040/00032/AM21/ | 26.04.2020 | MeitY |
92 Decision: The Committee considered the case as per the agenda and noted that the applicant directly has sent reply of deficiency letter to MeitY on 08.07.2020, 09.07.2020 & 24.07.2020. However, MeitY via email dated 25.08.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.
39 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:5/3/81-ALC2/2020 | Party Name: RAJHANS | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| IMPEX PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:2410043085 | Action By: | |||
| :01/81/050/00504/AM21/ | :24/24/040/00002/AM21/ | 28.04.2020 | Applicant |
93 Decision: The Committee considered the case as per agenda and noted that a deficiency letter along with a request to submit complete set of application as raised by Consultant (SKB) was sent to the applicant on 06.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for submitting the requisite information.
| Case No.:6/3/81-ALC2/2020 | Party Name: EFD | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDUCTION PRIVATE | ALC2/2020 | Approved | ||||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710116386 | ||||
| :01/81/050/00505/AM21/ | :07/24/040/00021/AM21/ | 29.04.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23071 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as 94 per written comments given by MeitY vide F. No. W-21/32/2020-IPHW-MeitY dated 12.06.2020 as under:
-
Quantity of import items at Sl. No. 1 & 3 to 7 may be allowed on net to net basis with zero wastage.
-
Quantity of import items at Sl. No. 2 & 8 to 12 may be allowed on net to net basis with accountability clause on nil wastage .
| Case No.:7/3/81-ALC2/2020 | Party Name: EFD | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDUCTION PRIVATE | ALC2/2020 | Approved | ||||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710116387 | ||||
| :01/81/050/00506/AM21/ | :07/24/040/00022/AM21/ | 29.04.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23070 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as 95 per written comments given by MeitY vide F. No. W-21/33/2020-IPHW-MeitY dated 12.06.2020 as under:
1. Quantity of import items at Sl. No. 1 & 3 to 15 may be allowed on net to net basis with accountability clause.
2. Quantity of import items at Sl. No. 2 & 16 to 27 may be allowed as applied with accountability clause on nil wastage .
40 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:10/3/81-ALC2/2020 | Party Name: JAIN FGL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| METAL INDUSTRIES | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166701 | Action By: | |||
| :01/81/050/00509/AM21/ | :04/24/040/00005/AM21/ | 29.04.2020 | Applicant |
96 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the applicant on 06.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for submitting the requisite information.
| Case No.:8/3/81- | Party Name: MITTAL COIN | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PRIVATE LIMITED | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5610005860 | ||||
| :01/81/050/00507/AM21/ | :56/24/040/00001/AM21/ | 29.04.2020 | ||||
| HQ E-office Computer | ||||||
| **No.:**23059 |
- 9 7
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per advice/comments given by Consultant (SKB) as under:
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |
|---|---|---|---|---|---|---|
| 74031300 | Refined Copper<br>Billetshaving<br>minimum<br>purity of<br>99.00% | 287 MT | 74040012 | Copper Scrap Druidas<br>per ISRI (Copper<br>content in the range of<br>37 % to 65%) | 1.03 Kgs/Kg<br>content in the<br>export product |
Note:
1. The export item should have minimum purity of 99.00%. RA concerned may take suitable consequential action accordingly.
| Case No.:9/3/81-ALC2/2020 | Party Name: EFD | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDUCTION PRIVATE | ALC2/2020 | Approved | ||||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710116398 | ||||
| :01/81/050/00508/AM21/ | :07/24/040/00029/AM21/ | 30.04.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23057 |
98 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by MeitY vide F. No. W-21/34/2020-IPHW-MeitY dated 12.06.2020 as under:
-
Quantity of import items at Sl. No. 1 & 3 to 7 may be allowed on net to net basis with accountability clause.
-
Quantity of import items at Sl. No. 2 & 8 to 14 may be allowed as applied with accountability clause on nil wastage .
41 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:13/3/81-ALC2/2020 | Party Name: POLYCAB | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA LIMITED | ALC2/2020 | Approved | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310836051 | ||||
| :01/81/050/00512/AM21/ | :03/95/040/00046/AM21/ | 01.05.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23060 |
Decision: The Committee considered the case as per the agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) as under:
-
99 1. Quantity of import items at Sl. No. 1 & 2 may be allowed as 1.01 Kgs/Kg content in the export product.
-
Quantity of import items at Sl. No. 3 to 5 & 8 to 18 may be allowed as 1.05 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 6 may be allowed as 1.02 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 7 may be allowed with 4% of steel to be galvanized.
-
Quantity of import items at Sl. No. 19 & 20 may be allowed as per packing policy .
-
Note: Grade of steel to match in import & export.
| Case No.:15/3/81- | Party Name: R T JAIN & | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | COMPANY | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310836059 | Action By: | |||
| :01/81/050/00514/AM21/ | :03/95/040/00037/AM21/ | 01.05.2020 | Applicant |
100 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 28.05.2020 followed by a reminder on 07.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:14/3/81- | Party Name: REEP | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES PVT. LTD. | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166711 | Action By: | |||
| :01/81/050/00513/AM21/ | :04/24/040/00008/AM21/ | 01.05.2020 | Applicant |
101 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 07.08.2020. However, no reply has been received yet. Hence, the Committee decided to remind the applicant for submitting the requisite information.
42 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 102 | Case No.:11/3/81-<br>ALC2/2020 | Party Name: STERLITE<br>POWER TRANSMISSION<br>LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00510/AM21/<br>HQ E-office Computer No.:<br>23050 | RLA File<br>:03/95/040/00906/AM20/ | Lic.No/Date:0310836042<br>01.05.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to fix the norms as per<br>written comments given byDPIITvide U. O. No.: P-47011/7/2019-TSW dated 18.08.2020. (copy<br>enclosed)<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:12/3/81- | Party Name: ZOBELE INDIA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PVT. LTD. | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310836043 | Action By: | |||
| :01/81/050/00511/AM21/ | :03/95/040/01153/AM20/ | 01.05.2020 | Applicant |
103 Decision: The Committee considered the case as per the agenda and noted that MeitY has sought certain information from the applicant vide email dated 09.06.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information as asked by MeitY.
| Case No.:18/3/81- | Party Name: APAR | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES LIMITED | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310836093 | Action By: | |||
| :01/81/050/00517/AM21/ | :03/94/040/00001/AM21/ | 04.05.2020 | Applicant |
104 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of Consultant (TEC-3):
-
Sl. No. 12 of the Standard Deficiency Format.
-
Composition of insulating compound.
-
Name of specific polymer in item 4. The case stands deferred.
| 105 | Case No.:19/3/81-<br>ALC2/2020 | Party Name: APAR<br>INDUSTRIES LIMITED | <br>Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status: Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00518/AM21/ | <br>RLA File<br>:03/94/040/00026/AM21/ | <br>Lic.No/Date:0310836094<br>04.05.2020 | Action By:<br>Consultant(TEC-3) | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 29.07.2020 for examination of the case. However, the comments are<br>still awaited. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the<br>comments.<br>The case stands deferred. |
43 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:16/3/81- | Party Name: TRANSCON | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068722 | Action By: | |||
| :01/81/050/00515/AM21/ | :09/24/040/00040/AM21/ | 04.05.2020 | Applicant |
106 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.05.2020 followed by a reminder on 07.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:20/3/81- | Party Name: GOLD METAL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | EXTRUSION | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:2410043093 | Action By: | |||
| :01/81/050/00519/AM21/ | :24/24/040/00004/AM21/ | 06.05.2020 | Applicant |
107 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the applicant on 07.08.2020. However, no reply has been received yet. Hence, the Committee decided to remind the applicant for submitting the requisite information.
| 108 | Case No.:17/3/81-<br>ALC2/2020 | Party Name: JINDAL<br>SAW LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status: Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00516/AM21/ | <br>RLA File<br>:05/23/040/00012/AM21/ | <br>Lic.No/Date:0510414105<br>06.05.2020 | Action By:<br>Consultant(TEC-3) | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 07.08.2020 for examination of the case. However, the comments are<br>still awaited. Hence, the Committee decided to wait for comments.<br>The case stands deferred. |
44 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:22/3/81- | Party Name: MS SUPER | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | IMPEX | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:2410043095 | ||||
| :01/81/050/00521/AM21 | :24/24/040/00003/AM21/ | 08.05.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 23049 |
10 9
| HQ E-office Computer<br>No.: 23049 | |||
|---|---|---|---|
| **Decision:**The Committee considered the case as per agenda | and decided to fix | the ad-hoc norms as | |
| per comments given by Consultant (SKB) as under:<br>ITCHS<br>Code<br>Export Item<br>QuantityITCHS<br>Code | Import Item | Recommended<br>Quantity | |
| 74032100<br>Brass Billets<br>500000<br>Kg<br>74040022 | Brass Scrap<br>(Honey Grade<br>as per ISRI) | 1.06Kgs/Kg<br>content in the<br>exportproduct | |
| Note: (i) The export item i.e. Brass Billets should contain- | Copper 51 -61%, Lead 2 - 3.5%, | ||
| Zinc- 33 -35.5%. | |||
| (ii) Composition of brass in export and import should conform. | |||
| RA concerned maytake suitable consequential action accordingly. |
| Case No.:21/3/81- | Party Name: SHREE | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | BHAVANI EXTRUSION | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:2410043094 | Action By: | |||
| :01/81/050/00520/AM21/ | :24/24/040/00005/AM21/ | 08.05.2020 | Applicant |
110 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the applicant on 07.08.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for submitting the requisite information.
| Case No.:24/3/81- | Party Name: LLOYD | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INSULATIONS (INDIA) | ALC2/2020 | Deferred | |||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166730 | Action By: | |||
| :01/81/050/00523/AM21/ | :04/24/040/00010/AM21/ | 11.05.2020 | Applicant |
111 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.05.2020 followed by a reminder on 07.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
45 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:23/3/81- | Party Name: RHJ TUBES | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310836165 | Action By: | |||
| :01/81/050/00522/AM21/ | :03/95/040/00067/AM21/ | 11.05.2020 | Applicant |
112 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 25.05.2020 followed by a reminder on 07.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:25/3/81- | Party Name: | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | WINOMECHANIC | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166746 | Action By: | |||
| :01/81/050/00524/AM21/ | :04/24/040/00006/AM21/ | 12.05.2020 | Applicant |
113 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.05.2020 followed by a reminder on 07.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:26/3/81- | Party Name: | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | WINOMECHANIC | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166751 | Action By: | |||
| :01/81/050/00525/AM21/ | :04/24/040/00017/AM21/ | 12.05.2020 | Applicant |
114 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.05.2020 followed by a reminder on 07.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
46 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:1/6/81-ALC2/2020 | Party Name: KEI | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414582 | Action By: | |||
| :01/81/050/00628/AM21/ | :05/23/040/00066/AM21/ | 08.07.2020 | Applicant |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant 115 to furnish following information as per written comments of DPIIT vide U. O. No.: P- 47011/95/2019-TSW dated 18.08.2020:
-
Net weight of each cable.
-
Material balancing viz net content of each imported and indigenous input for each cable.
-
Tabular statement giving total requirement of each raw material, export product wise.
| 116 | <br>Case No.:2/6/81-<br>ALC2/2020<br>HQ File<br>:01/81/050/00629/AM21/ | Party Name: NAVGRAH<br>FASTNERS PVT. LTD. | <br>Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status: Deferred |
|---|---|---|---|---|
| RLA File<br>:52/24/040/00022/AM21/ | <br>Lic.No/Date:5210043453<br>08.07.2020 | Action By:<br>Consultant(TEC-3) | ||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 25.08.2020 for examination of the case. However, the comments are<br>still awaited. Hence, the Committee decided to wait for comments.<br>The case stands deferred. |
| Case No.:5/6/81- | Party Name: CHINA STEEL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | CORPORATION INDIA | ALC2/2020 | Approved | |||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410046200 | ||||
| :01/81/050/00632/AM21/ | :34/24/040/00083/AM21/ | 09.07.2020 | ||||
| HQ E-office Computer | ||||||
| **No.:**23048 |
| Case No.:5/6/81-<br>ALC2/2020 | Case No.:5/6/81-<br>ALC2/2020 | Case No.:5/6/81-<br>ALC2/2020 | Party Name: CHINA STEEL<br>CORPORATION INDIA<br>PRIVATE LIMITED<br>RLA File<br>:34/24/040/00083/AM21/ | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00632/AM21/<br>HQ E-office Computer<br>**No.:**23048 | Lic.No/Date:3410046200<br>09.07.2020 | ||||||
| 117 | <br>**Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms on<br>repeat basis as approved for AA No. 3410043636 dated 14.11.2017 in NC-2 M. No. 05/81 dated<br>12.06.2019 on the recommendation of Consultant (SKB) as under: | ||||||
| <br>Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 1 | 72251900 | Silicon Electrical Steel Of Cold Rolled Full Hard<br>(Unannealed) Wide Coil Grade: 50C800, Width of<br>600mm Or More,Thickness 0.300mm-0.750mm | 1.015Kgs/Kg content<br>in the export product | ||||
| 2 | 72251900 | Silicon Electrical Steel Of Cold Rolled Full Hard<br>(Unannealed) Wide Coil Grade: 50C470,Width of<br>600mmOr More,Thickness0.300mm-0.750mm | 1.015Kgs/Kg content<br>in the export product | ||||
| 3 | 72251900 | Silicon Electrical Steel Of Cold Rolled Full Hard<br>(Unannealed) Wide Coil Grade: 50c600,Width of<br>600mm Or More,Thickness 0.300mm-0.750mm | 1.015Kgs/Kg content<br>in the export product | ||||
| RA concerned maytake suitable consequential action accordingly. |
47 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 118 | Case No.:3/6/81-ALC2/2020 | Party Name: POLYCAB<br>INDIA LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00630/AM21/<br>HQ E-office Computer No.:<br>23047 | RLA File<br>:03/95/040/00221/AM21/ | Lic.No/Date:0310837114<br>09.07.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to fix the ad-hoc norms<br>as per written comments given byDPIITvide U. O. No.: P-47011/112/2020-TSW dated 17.08.2020<br>(copy enclosed).<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:4/6/81-ALC2/2020 | Party Name: METAL CARE | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALLOYS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310837128 | Action By: | |||
| :01/81/050/00631/AM21/ | :03/95/040/00218/AM21/ | 10.07.2020 | Applicant |
119 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 10.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.
| Case No.:6/6/81-ALC2/2020 | Party Name: METALIC | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| IMPRESSIONS (INDIA) | ALC2/2020 | Deferred | ||||
| PVT. LTD. | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510414604 | Action By: | |||
| :01/81/050/00633/AM21/ | :05/24/040/00169/AM21/ | 10.07.2020 | Applicant |
120 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 07.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.
48 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 121 | Case No.:7/6/81-<br>ALC2/2020 | Party Name: JAIN<br>RECYCLING<br>PRIVATE LIMITED | Meet No/Date:6/81-ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00634/AM21<br>HQ E-office Computer<br>No.: 23354 | <br>RLA File<br>:32/24/040/00022/AM21 | <br>Lic.No/Date:3210079597<br>13.07.2020 | Action By:<br>Section | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 21.08.2020 for examination of the case. However, the matter was<br>deliberated in the meeting and the Committee decided to refer the case to Consultant(SKB) for<br>examination.<br>The case stands deferred. |
| Case No.:8/6/81-ALC2/2020 | Party Name: PARAM | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES | ALC2/2020 | Deferred | ||||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310837191 | Action By: | |||
| :01/81/050/00635/AM21/ | :03/95/040/00205/AM21/ | 14.07.2020 | Applicant |
122 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 10.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.
| Case No.: | Party Name: UNIVERSAL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| 9/6/81-ALC2/2020 | CABLES LTD. | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:1110028725 | Action By: | |||
| :01/81/050/00636/AM21/ | :11/24/040/00001/AM21/ | 14.07.2020 | Applicant |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per written comments of DPIIT vide U. O. No.: P- 47011/352/2019-TSW dated 18.08.2020:
123
-
Detailed calculations for the requirement of each raw material for the export product. 2. Details of other materials indigenous or imported required in the manufacturing of the cables.
-
Net weight per KM of cable including the weight of Indigenous Inputs.
-
Material balancing viz. net content of each imported and indigenous input, per KM of export product.
49 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:10/6/81- | Party Name: BAOSTEEL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA COMPANY | ALC2/2020 | Approved | |||
| PRIVATE LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310837235 | ||||
| :01/81/050/00637/AM21/ | :03/94/040/00259/AM21/ | 16.07.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 23324 |
| Case No.:10/6/81-<br>ALC2/2020 | Case No.:10/6/81-<br>ALC2/2020 | Party Name: BAOSTEEL<br>INDIA COMPANY<br>PRIVATE LIMITED | Party Name: BAOSTEEL<br>INDIA COMPANY<br>PRIVATE LIMITED | Party Name: BAOSTEEL<br>INDIA COMPANY<br>PRIVATE LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00637/AM21/<br>HQ E-office Computer<br>No.: 23324 | RLA File<br>:03/94/040/00259/AM21/ | Lic.No/Date:0310837235<br>16.07.2020 | |||||||
| 12<br>4 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments given by Consultant (SKB) as under: | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 72111910 | Hot Rolled Steel<br>Sheet In Coils<br>(Pickled And<br>Oiled), Grade<br>Dd11, Thickness<br>3.00 mm, Width<br>257 mm, Length C<br>mm | 600 MT | 72085390 | Hot Rolled Steel<br>Sheet In Coils<br>(Pickled And Oiled),<br>Grade Dd11,<br>Thickness 3.00 mm,<br>Width 1035 mm,<br>Length C mm | 606 MT<br>@1.01Kgs/Kg<br>content in the<br>export product | ||||
| RA concerned maytake suitable consequential action accordingly. |
50 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
12 5
| Case No.:13/6/81- | Party Name: JAIN | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | RECYCLING PRIVATE | ALC2/2020 | Approved | |||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3210079610 | ||||
| :01/81/050/00640/AM21/ | :32/24/040/00026/AM21/ | 16.07.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23355 |
| 12<br>5 | Case No.:13/6/81-<br>ALC2/2020 | Case No.:13/6/81-<br>ALC2/2020 | Case No.:13/6/81-<br>ALC2/2020 | Party Name: JAIN<br>RECYCLING PRIVATE<br>LIMITED | Party Name: JAIN<br>RECYCLING PRIVATE<br>LIMITED | Party Name: JAIN<br>RECYCLING PRIVATE<br>LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved |
|---|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00640/AM21/<br>HQ E-office Computer No.:<br>23355 | RLA File<br>:32/24/040/00026/AM21/ | Lic.No/Date:3210079610<br>16.07.2020 | ||||||||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 21.08.2020 for examination of the case. However, the matter was<br>deliberated in the meeting and the Committee decided ratify the ad-hoc norms taking cue from AA<br>No. 0410166392 dated 24.12.2019 approved in Meeting No. 05/81 held on 28.07.2020 as under: | ||||||||||
| Sl.<br>No. | ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 1 | 74031300 | Refined Copper<br>Billets<br>Min Cu Content<br>- 99% | 13484.000<br>Kg. | 74040012 | Copper scrap as<br>per ISRI Code<br>"DRUID"<br>Cu Content -<br>25% to 30% | 1.03 Kgs/Kg<br>content in the<br>export product<br>after recovery<br>of specified<br>copper content | ||||
| 2 | 74031300 | Refined Copper<br>Billets<br>Min Cu Content<br>- 99% | 31872.000<br>Kg. | 74040012 | Copper scrap as<br>per ISRI Code<br>"DRUID"<br>Cu Content 30%<br>to 35% | 1.03 Kgs/Kg<br>content in the<br>export product<br>after recovery<br>of specified<br>copper content | ||||
| 3 | 74031300 | Refined Copper<br>Billets<br>Min Cu Content<br>- 99% | 183878.000<br>Kg. | 74040012 | Copper scrap as<br>per ISRI Code<br>"DRUID"<br>Cu Content 35%<br>to 40% | 1.03 Kgs/Kg<br>content in the<br>export product<br>after recovery<br>of specified<br>copper content | ||||
| 4 | 74031300 | Refined Copper<br>Billets<br>Min Cu Content<br>- 99% | 625184.000<br>Kg. | 74040012 | Copper scrap as<br>per ISRI Code<br>"DRUID"<br>Cu Content 40%<br>to 45% | 1.03 Kgs/Kg<br>content in the<br>export product<br>after recovery<br>of specified<br>copper content | ||||
| RA concerned maytake suitable consequential action accordingly. |
| 126 | Case No.:14/6/81-<br>ALC2/2020 | Party Name: GAVIRANGA<br>ENTERPRISES<br>RLA File<br>:07/24/040/00109/AM21/ | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00641/AM21/ | Lic.No/Date:0710116762<br>17.07.2020 | <br>Action By:<br>Applicant | ||
| <br>**Decision:**The Committee considered the case as per the agenda and noted that the copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>10.08.2020. However, no information has been received yet. Therefore, the Committee decided to<br>remind the applicant for submitting the complete set of application.<br>The case stands deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 10.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application. The case stands deferred.
51 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:11/6/81- | Party Name: JAIN METAL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ROLLING MILLS, | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166897 | Action By: | |||
| :01/81/050/00638/AM21/ | :04/24/040/00035/AM21/ | 17.07.2020 | Applicant |
127 Decision: The Committee considered the case as per the agenda and decided to seek from the applicant to furnish the following information as per comments given by MSME:
- Certificate of Analysis of import item.
| Case No.:12/6/81- | Party Name: PONDY | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | OXIDES AND CHEMICALS | ALC2/2020 | Deferred | |||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166900 | Action By: | |||
| :01/81/050/00639/AM21/ | :04/24/040/00043/AM21/ | 17.07.2020 | Applicant |
128 Decision: The Committee considered the case as per the agenda and decided to seek from the applicant to furnish the following information as per comments given by MSME:
- Certificate of Analysis of import item.
| Case No.:15/6/81- | Party Name: TOSHIBA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TRANSMISSION & | ALC2/2020 | Deferred | |||
| DISTRIBUTION SYSTEMS | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068967 | Action By: | |||
| :01/81/050/00642/AM21/ | :09/24/040/00206/AM21/ | 20.07.2020 | Applicant |
129 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 10.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.
| 130 | Case No.:16/6/81-<br>ALC2/2020 | Party Name: TOSHIBA<br>TRANSMISSION &<br>DISTRIBUTION SYSTEMS | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00643/AM21/ | RLA File<br>:09/24/040/00207/AM21/ | Lic.No/Date:0910068968<br>20.07.2020 | <br>Action By:<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per the agenda and noted that the copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>10.08.2020. However, no information has been received yet. Therefore, the Committee decided to<br>remind the applicant for submitting the complete set of application.<br>The case stands deferred. |
52 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:17/6/81- | Party Name: AXORA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | RESOURCES LIMITED. | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210209991 | Action By: | |||
| :01/81/050/00644/AM21/ | :02/24/040/00046/AM21/ | 21.07.2020 | Applicant |
131 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 10.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.
| 13<br>2 | Case No.:21/6/81-<br>ALC2/2020 | Party Name:<br>HEALTHICO QUALITY<br>PRODUCTS PRIVATE<br>LIMITED | <br>Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00648/AM21 | RLA File<br>:56/24/040/00012/AM21 | Lic.No/Date:5610005906<br>21.07.2020 | Action By:<br>Consultant (TEC-<br>3) | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 04.08.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 04.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
| Case No.:18/6/81- | Party Name: INDIANA | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | GRATINGS PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310837294 | Action By: | |||
| :01/81/050/00645/AM21/ | :03/94/040/00281/AM21/ | 21.07.2020 | Applicant |
133 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 10.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.
| 134 | Case No.:19/6/81-<br>ALC2/2020 | Party Name: JINDAL<br>SAW LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status: Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00646/AM21/ | <br>RLA File<br>:05/23/040/00084/AM21/ | Lic.No/Date:0510414673<br>21.07.2020 | <br>Action By:<br>Consultant(TEC-3) | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 10.08.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
53 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
135
| Case No.:22/6/81- | Party Name: POLYCAB | Meet No/Date:6/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA LIMITED | ALC2/2020 | Deferred | ||||
| 11.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310837313 | Action By: | ||||
| :01/81/050/00649/AM21/ | :03/95/040/00232/AM21/ | 22.07.2020 | DPIIT |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT via email dated 20.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
| Case No.:20/6/81- | Party Name: SHIVALIK | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | BIMETAL CONTROLS LTD | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414677 | Action By: | |||
| :01/81/050/00647/AM21/ | :05/24/040/00185/AM21/ | 22.07.2020 | Applicant |
136 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 07.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.
| Case No.:23/6/81- | Party Name: DIAMOND | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING (CHENNAI) | ALC2/2020 | Deferred | |||
| PVT LTD | 11.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166916 | Action By: | |||
| :01/81/050/00650/AM21/ | :04/24/040/00050/AM21/ | 23.07.2020 | Applicant |
137 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per written comments of DPIIT vide U. O. No.: P- 47011/199/2019-TSW dated 19.08.2020:
- Sl. No. 1, 3, 4, 5 & 11 of the Standard Deficiency Format.
54 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:24/6/81- | Party Name: MITTAL COIN | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PRIVATE LIMITED | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5610005909 | ||||
| :01/81/050/00651/AM21/ | :56/24/040/00010/AM21/ | 23.07.2020 | ||||
| HQ E-office Computer | ||||||
| No.: 23357 |
Decision: The Committee considered the case as per agenda and noted that applicant‟s reply was sent to Consultant (SKB) on 21.08.2020. However, no comments were received. Therefore, the matter was deliberated in the meeting and the Committee decided to ratify the ad-hoc norms on repeat of 5610005766 dated 24.12.2019 approved in Meeting No. 02/81 scheduled for 29.04.2020 and held on 19.05.2020 as under : 138
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity |
|---|---|---|---|---|---|
| 74031300 | Refined<br>Copper Billets<br>having<br>minimum<br>purity of<br>99.00% | 1800.000<br>MT | 74040012 | Copper Scrap Druid<br>as per ISRI (copper<br>content ranging<br>from 30% to 86) | 1.03 Kgs/Kg<br>content in the<br>export product<br>after recovery<br>of specified<br>copper content |
Note:
1. The export item should have minimum purity of 99.00%.
| Case No.:25/6/81- | Party Name: MITTAL | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | APPLIANCES LIMITED | ALC2/2020 | Approved | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5610005910 | ||||
| :01/81/050/00652/AM21/ | :56/24/040/00009/AM21/ | 24.07.2020 | ||||
| HQ E-office Computer No.: | ||||||
| 23358 |
Decision: The Committee considered the case as per agenda and noted that applicant‟s reply was sent to Consultant (SKB) on 21.08.2020. However, no comments were received. Therefore, the matter was deliberated in the meeting and the Committee decided to ratify the ad-hoc norms on repeat of 5610005766 dated 24.12.2019 approved in Meeting No. 02/81 scheduled for 29.04.2020 139 and held on 19.05.2020 as under:
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity |
|---|---|---|---|---|---|
| 74031300 | Refined<br>Copper Billets<br>having<br>minimum<br>purity of<br>99.00% | 700.000<br>MT | 74040012 | Copper Scrap Druid<br>as per ISRI (copper<br>content ranging<br>from 30% to 86%) | 1.03 Kgs/Kg<br>content in the<br>export product<br>after recovery<br>of specified<br>copper content |
Note:
1. The export item should have minimum purity of 99.00%. RA concerned may take suitable consequential action accordingly.
55 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| Case No.:28/6/81- | Party Name: ACG | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PHARMAPACK PVT LTD | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310837425 | Action By: | |||
| :01/81/050/00655/AM21/ | :03/94/040/00248/AM21/ | 27.07.2020 | Applicant |
140 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 10.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.
| Case No.:29/6/81- | Party Name: ACG | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PHARMAPACK PVT LTD | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310837426 | Action By: | |||
| :01/81/050/00656/AM21/ | :03/94/040/00249/AM21/ | 27.07.2020 | Applicant |
141 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 10.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.
| Case No.:27/6/81- | Party Name: FCI OEN | Meet No/Date:6/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | CONNECTORS LIMITED | ALC2/2020 | Deferred | |||
| 11.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710116799 | Action By: | |||
| :01/81/050/00654/AM21/ | :07/24/040/00089/AM21/ | 27.07.2020 | MeitY |
142 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MeitY on 17.08.2020 for examination of the case. However, MeitY vide email dated 25.06.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.
56 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 14<br>3 | Case No.:26/6/81-<br>ALC2/2020 | Case No.:26/6/81-<br>ALC2/2020 | Party Name: GKEM<br>INTERNATIONAL<br>PRIVATE LIMITED | Party Name: GKEM<br>INTERNATIONAL<br>PRIVATE LIMITED | Party Name: GKEM<br>INTERNATIONAL<br>PRIVATE LIMITED | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Meet No/Date:6/81-<br>ALC2/2020<br>11.08.2020 | Status:<br>Approved |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00653/AM21/<br>HQ E-office Computer<br>No.: 23325 | RLA File<br>:05/23/040/00097/AM21/ | Lic.No/Date:0510414735<br>27.07.2020 | |||||||
| **Decision:**The Committee considered the case as per agenda and decided to fix<br>the recommendation of Consultant (TEC-3) & Consultant (SKB) as under: | the ad-hoc norms on | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 74081190 | Bare Copper Wire<br>Or Conductors<br>1x4mm | 230 MT | 74071010 | Copper Cc Rods<br>EC Grade | 1.01Kgs/Kg<br>content in the<br>exportproduct | ||||
| RA concerned maytake suitable consequential action accordingly. |
57 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
Minutes of Offline cases
| SI.<br>No. | Applicant's<br>Name / AA<br>No. | HQ/RA File<br>No. | Case History | Decision | Status |
|---|---|---|---|---|---|
| HAVELLS<br>INDIA LTD.<br>0510391800<br>dated<br>29.10.2014 | 01/81/050/00<br>469/AM15/<br>05/23/040/00<br>332/AM15/<br>HQ E-office<br>Computer<br>No.: 23374 | The case was rejected in M. No. 9/81 dated<br>11.08.2015 due to non-submission of reply of<br>DIPP deficiency letter dated 11.05.2015. The<br>applicant vide letter dated 03.01.2019 had<br>requested for ratification of the norms. The<br>case was considered in M. No. 12/81 dated<br>18.09.2019. As per NC decision, the case was<br>referred to DPIIT on 23.10.2019. The case was<br>again considered in M. No. 15/81 dated<br>30.10.2019 and the Committee noted that the<br>request has been received beyond 90 days from<br>last decision and decided to ask the applicant to<br>deposit a composition fee of Rs.5000/- for<br>considering the case along with reply of<br>deficiency letter dated 11.05.2019. As per NC<br>decision, a composition fee letter along with a<br>copy of D/L dated 11.05.2015 was sent to<br>applicant via email dated 30.10.2019. The case<br>was last considered in M. No. 21/81 dated<br>22.01.2020 and decided to seek from the<br>applicant to certain information as per<br>comments of DPIIT vide U. O. No.: P-<br>47011/309/2019-TSW dated 21.01.2020. As<br>per NC decision, D/L was sent on 05.03.2020.<br>The applicant's reply dt. 16.03.2020 was sent to<br>DPIIT via email on 16.03.2020 followed by a<br>reminder on 06.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and decided<br>tofixthe ad-hoc norms as per<br>written comments given by<br>DPIIT vide U. O. No.: P-<br>47011/309/2019-TSW<br>dated<br>22.05.2020. (Copy enclosed)<br>RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br>Approved | |
| R1 | |||||
| TRAFOMEC<br>INDIA<br>MAGNETICS<br>PRIVATE<br>LIMITED<br>0710083779<br>dated<br>08.11.2011 | 01/81/050/00<br>325/AM12/<br>07/24/040/00<br>258/AM12/ | The case was rejected in M. No. 9/81-<br>ALC2/2013 dated 16.07.2013 due to non-<br>submission of reply to deficiency letter dated<br>01.02.2013.<br>The<br>applicant's<br>reply<br>dated<br>30.06.2015 along with their earlier reply dated<br>17.09.2012 were forwarded to DHI on<br>19.02.2016. The case was considered in offline<br>Agenda in M. No. 23/81 & 25/81 dated<br>23.02.2016 & 07.03.2017 respectively. The<br>case was again rejected in M. No. 08/81 dated<br>11.07.2017 due to non-submission of reply to<br>deficiency<br>letter<br>dated<br>19.04.2017.<br>The<br>applicants<br>vide<br>letter<br>dated<br>01.05.2019<br>furnished reply and requested to ratify the ad-<br>hoc norms. The case was considered in M. No.<br>12/81 dt. 18.09.2019 and decided to refer the<br>case to DHI. As per decision, the case was<br>referred to DHI on 25.10.2019. As per decision<br>in M.<br>No.<br>18/81dated<br>11.12.2019, the<br>applicant‟s<br>representation/application<br>was | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee noted that DHI<br>vide email dated 24.08.2020<br>informed that the applicant‟s<br>reply dated 17.09.2012 &<br>30.06.2015 is deficient. DHI<br>also informed that the reply of<br>deficiency<br>letter<br>dated<br>13.04.2017<br>contains<br>no<br>additional or new information.<br>Therefore,<br>the<br>Committee<br>decided to seek again from the<br>applicant to furnish the reply<br>of<br>deficiency<br>letter<br>dated<br>13.04.2017 as per advice of<br>DHI as under:<br>i. To provide calculation of<br>core and coil dimensions<br>starting from the export<br>product ratingin English | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred | |
| R2 | |||||
58 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| again referred to DHI on 20.01.2020. The case<br>was last considered in M. No. 24/81dated<br>18.03.2020 and as per the NC decision, the<br>complete application forward to DHI via email<br>dated 06.08.2020. | <br> <br> <br> <br>as documents submitted<br>by the applicant is in<br>French. | <br> | |||
|---|---|---|---|---|---|
| BHARAT<br>HEAVY<br>ELECTRICAL<br>S LIMITED<br>1110028319<br>dated<br>12.01.2018 | 01/81/050/00<br>096/AM19/<br>11/24/040/00<br>006/AM18/ | The case was ratified in M. No. 5/81-<br>ALC2/2018 dated 10.10.2018 as per written<br>comments of DHI vide U. O. No. DES-<br>2/BHEL/GTr/2018-TW-HEI.<br>The<br>applicant<br>vide their email dated 26.11.2018 requested for<br>revision of ratified norms. The case was<br>considered in M. No. 12/81 dated 18.09.2019,<br>15/81 dated 30.10.2019 and 18/81 dated<br>11.12.2019 and decided to send the applicant‟s<br>representation/application to DHI immediately.<br>The case was last considered in M. No. 24/81<br>dated 18.03.2020 and as per the NC decision,<br>the complete set of application was sent to DHI<br>via email dated 07.08.2020. However, no<br>comments have been receivedyet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee decided to<br>remind DHI for expediting the<br>comments. | <br> <br>Deferred | |
| R3 | |||||
| BHARAT<br>HEAVY<br>ELECTRICAL<br>S LIMITED<br>1110018794<br>dated<br>27.10.2008 | 01/81/050/00<br>492/AM09/<br>11/24/040/00<br>024/AM09/ | The case was ratified in M. No. 18/81 dated<br>04.08.2009 as per written comments of DHI<br>vide U. O. No. 3(7)/2009/TSW(B)/334 dated<br>19.08.2009.<br>The applicant vide letter dated 09.07.2018 had<br>requested for revision of norms on actual<br>import/utilization for import items at Sl. No. 3,<br>4, 9, 17, 20, 21, 24, 43 and 55 with<br>justification. The case was last considered in<br>M. No. 12/81 dt. 18.09.2019 and 15/81 dt.<br>30.10.2019 and decided to call the applicant on<br>personal hearing to explain the case. As per<br>NC decision email dated 28.11.2019 sent to the<br>applicant<br>requesting<br>to<br>attend<br>PH<br>on<br>11.12.2019. The Committee considered the<br>case in M. No. 18/81 dated 11.12.2019 and<br>heard the applicant‟s representative during<br>personal hearing. The Committee decided to<br>refer the matter to DHI for further examination<br>of the case. The case was last considered in M.<br>No. 24/81 dated 18.03.2020 and as per the NC<br>decision, the complete set of application was<br>sent to DHI via email dated 07.08.2020.<br>However, no comments have been received<br>yet. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee decided to<br>remind DHI for expediting the<br>comments. | <br> <br>Deferred | |
| R4 | |||||
| TUBEX<br>INDIA<br>0510400849<br>dated<br>19.12.2016 | 01/81/050/00<br>544/AM17/<br>05/24/040/00<br>459/AM17/ | The case was rejected in M. No. 8/81-<br>ALC2/2017 dated 11.07.2017 due to non-<br>submission of reply of deficiency letter dated<br>14.02.2017 as raised by DIPP vide U. O. No.<br>12/5/2017-TSW/103 dated 24 /01/2017. This<br>case was considered in M. No. 12/81 dt.<br>18.09.2019 and the Committee noted that the | <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and<br>noted that a deficiency letter<br>seeking following information<br>as raised by Consultant (TEC-<br>3) was sent to the applicant on | <br> <br> <br> <br> <br>Deferred | |
| R5 | |||||
| <br>18.08.2020: |
59 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| applicant had not furnished the reply of<br>deficiency letter dated 14.02.2017. As per NC<br>decision, an email was sent to the applicant on<br>22.10.2019 along with a copy of D/L dt.<br>14.02.2017 followed by a reminder on<br>03.12.2019. As per NC decision of M. No.<br>21/81dated 22.01.2020, the case was referred<br>to Consultant (TEC-3) on 17.03.2020. The case<br>was last considered in M. No. 24/81 dt.<br>18.03.2020 and decided to wait for comments. | applicant had not furnished the reply of<br>deficiency letter dated 14.02.2017. As per NC<br>decision, an email was sent to the applicant on<br>22.10.2019 along with a copy of D/L dt.<br>14.02.2017 followed by a reminder on<br>03.12.2019. As per NC decision of M. No.<br>21/81dated 22.01.2020, the case was referred<br>to Consultant (TEC-3) on 17.03.2020. The case<br>was last considered in M. No. 24/81 dt.<br>18.03.2020 and decided to wait for comments. | <br> <br> <br> <br> <br> <br> <br> <br> <br>1. Documents for sale of<br>scrap indicating price.<br>2. Documents for CIF value<br>imported inputs /items.<br>However, no reply has been<br>received<br>yet.<br>Hence,<br>the<br>Committee decided to wait for<br>reply of the applicant. | <br> <br> <br> <br> <br> <br> <br> <br> <br>1. Documents for sale of<br>scrap indicating price.<br>2. Documents for CIF value<br>imported inputs /items.<br>However, no reply has been<br>received<br>yet.<br>Hence,<br>the<br>Committee decided to wait for<br>reply of the applicant. | <br> <br> <br> <br> <br> <br> <br> <br> <br>1. Documents for sale of<br>scrap indicating price.<br>2. Documents for CIF value<br>imported inputs /items.<br>However, no reply has been<br>received<br>yet.<br>Hence,<br>the<br>Committee decided to wait for<br>reply of the applicant. | <br> <br> <br> <br> <br> <br> <br> <br> <br>1. Documents for sale of<br>scrap indicating price.<br>2. Documents for CIF value<br>imported inputs /items.<br>However, no reply has been<br>received<br>yet.<br>Hence,<br>the<br>Committee decided to wait for<br>reply of the applicant. | <br> <br> <br> <br> <br> <br> <br> <br> <br>1. Documents for sale of<br>scrap indicating price.<br>2. Documents for CIF value<br>imported inputs /items.<br>However, no reply has been<br>received<br>yet.<br>Hence,<br>the<br>Committee decided to wait for<br>reply of the applicant. | <br> <br> <br> <br> | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| SHINKWANG<br>ELECTRONI<br>CS PRIVATE<br>LIMITED<br>0510339369<br>dated<br>23.11.2012 | <br>01/81/050/00<br>419/AM13/<br>05/24/040/00<br>313/AM13/<br>HQ E-office<br>Computer<br>No.: 23375 | The case was rejected in M. No. 15/81-<br>ALC2/2013 dated 08.10.2013 due to non-<br>submission of reply to MSME deficiency letter<br>vide<br>U.O.<br>No.<br>30(294)2011-ME<br>dated<br>26.2.2013.<br>The applicant vide letter dated 10.09.2019 has<br>requested to ratify the norms. However, the<br>applicant had not furnished reply to deficiency<br>letter. As per NC decision, Composition fee<br>along with copy of D/L dt. 26.02.2013 was<br>sent to the applicant via email dt. 30.10.2019.<br>The receipt of composition fee dt. 14.01.2020<br>received on 20.01.2020. The case was referred<br>to MSME on 21.01.2020. The case was last<br>considered in M. No. 24/81 dt. 18.03.2020 and<br>decided to wait for comments. A reminder was<br>issued to MSME on 06.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and decided<br>tofixthe ad-hoc norms as per<br>written comments given by<br>MSME<br>vide<br>email<br>dated<br>11.08.2020 as under: | <br> <br> <br> <br> <br>Approved | |||||||
| R6 | |||||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import<br>Item | Recommended<br>Quantity | ||||||
| 85044030 | Injection Moulded Plastic Components Mobile<br>Phone Battery Charger (Lower Charger Case<br>With Insert Pin) | 1840000<br>Number | 73269099 | Insert<br>Pin | As per GN-4 | ||||||
| RA concerned maytake suitable consequential action accordingly. | |||||||||||
| TUBE<br>PRODUCTS<br>INCORPORA<br>TE<br>3410014376<br>dated<br>19.09.2005 | 01/81/162/00<br>580/AM11/<br>34/24/040/00<br>133/AM06/<br>HQ E-office<br>Computer<br>No.: 23376 | The case was considered in Offline Agenda in<br>M. No. 32/81dated 25.10.2011 and decided to<br>reject the request of applicant to allow import<br>of Alloy Steel Coil as the above license is<br>issued under SION and inputs are allowed as<br>per SION. The applicant vide letter dated<br>03.05.2012 had requested the PRC for<br>realization of policy to accommodate use of<br>utilization of Alloy Steel in Coil in place of<br>Plate. The case was considered in PRC in<br>Meeting<br>No.14/81dated<br>17.07.2012<br>and<br>decided to reject the request to allow input<br>which is not part of SION. The PRC vide letter<br>dated 07.06.2019 advised the applicant to<br>approach the concerned NC for a decision in<br>the matter. Now, the applicant vide letter dated<br>11.07.2019<br>has<br>enclosed<br>copies<br>of | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and noted<br>the written comments dated<br>17.3.2020 given by Consultant<br>(SKB). After deliberating the<br>matter, the Committee decided<br>to seek from the applicant an<br>statement<br>for<br>import<br>item<br>„Plate/Coil‟ in the following<br>format: | <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred | |||||||
| R7 | |||||||||||
| <br> <br> <br> <br> <br> <br>Bill<br>of<br>entry<br>No.<br>and<br>date | Exac<br>t<br>descr<br>iptio<br>n | Exac<br>t<br>thick<br>ness | Qua<br>ntity | ||||||||
60 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| communications<br>and<br>other<br>supporting<br>documents and requested to ratify the norms.<br>The case was considered in M. No. 18/81 dated<br>11.12.2019 and the applicant‟s representative<br>didn‟t explain the technical details before<br>Norms Committee during personal hearing. On<br>the<br>request<br>of<br>the<br>representative,<br>the<br>Committee decided to grant one more<br>opportunity of personal hearing to the applicant<br>in the forthcoming NC meeting. PH letter sent<br>on 10.0.2020 requesting to appear for PH on<br>22.01.2020. The case was last considered in M.<br>No. 21/81 dated 22.01.2020 and the Committee<br>heard the applicant‟s representative during<br>personal hearing. The Committee directed to<br>the<br>representative<br>to<br>furnish<br>following<br>information as per advice of Consultant (SKB):<br>1. Exact details of export items. 2. Use of exact<br>raw materials. 3. To provide explanation for<br>why value addition is low. 4. Type of grade of<br>material<br>used.<br>As per NC decision, D/L was sent to the<br>applicant on 05.03.2020. The applicant's reply<br>was sent to Consultant (SKB) via email on<br>16.03.2020. The case was last considered in M.<br>No. 24/81 dt. 18.03.2020 and decided to wait<br>for comments. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> | ||||
|---|---|---|---|---|---|
| NSIL<br>EXPORTS<br>LIMITED<br>5610004970<br>dated<br>08.08.2016 | 01/81/050/00<br>300/AM17/<br>56/24/040/00<br>025/AM17/<br>HQ E-office<br>Computer<br>No.: 23377 | The case was rejected in M. No. 7/81-<br>ALC2/2018 dated 29.11.2018 on the ground<br>that no information was received from the<br>applicant regarding license amendment sheet<br>for export product description as per MoS vide<br>U.O. No. 2(11)/2016-TD dated 29.12.2017.<br>The applicant vide letter dated 17.12.2018 had<br>furnished reply and requested to ratify the<br>norms. As per decision of M. No. 12/81 dt.<br>18.09.2019, the case was referred to MoS on<br>24.10.2019 followed by an I.D. reminder on<br>20.01.2020. In M. No. 21/81 dated 22.01.2020<br>the representative of MoS informed in meeting<br>that the case is under examination. Therefore,<br>the Committee decided to wait for the<br>comments. The case was last considered in M. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and decided<br>tofixthe ad-hoc norms as per<br>written comments given by<br>Consultant<br>(SKB).<br>(Copy<br>enclosed)<br>RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br>Approved | |
| R8 | |||||
| No. 24/81 dt. 18.03.2020 and decided to refer<br>the case to Consultant (SKB) for examination<br>as no comments are being furnished by MoS.<br>As per decision, the case was referred to<br>Consultant(SKB)on 07.08.2020. | |||||
| STERLITE<br>POWER<br>TRANSMISSI<br>ON LIMITED | 01/81/050/00<br>030/AM19/ | The case was rejected in M. No. 11/81-<br>ALC2/2018 dated 30.01.2019 due to non-<br>submission of reply to deficiency letter<br>dated18.10.2018. The applicant vide letter | <br> <br>The Committee decided to wait<br>for the comments. | <br>Deferred | |
| R9 | |||||
61 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 0310819587<br>Dated<br>07.03.2018 | 03/95/040/00<br>921/AM18/ | received on 17.01.2019 had furnished the reply<br>& requested for ratification of ad-hoc norms.<br>As per decision of M. No. 12/81 dt.<br>18.09.2019, the case was referred to DPIIT on<br>28.10.2019. The case was considered in M. No.<br>18/81dated 11.12.2019 and decided to send the<br>applicant‟s<br>representation/application<br>to<br>DPIIT. As per NC decision, the case was<br>referred to DPIIT on 20.01.2020. The case was<br>considered in M. No. 21/81dated 22.01.2020<br>and decided to wait for comments. The case | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> | ||
|---|---|---|---|---|---|
| was last considered in M. No. 24/81 dt. | |||||
| 18.03.2020 and decided to remind DPIIT for<br>expediting the comments. Reminder was issued<br>to DPIIT on 05.08.2020. Again, the complete<br>set of application along with applicant‟s reply<br>forwarded<br>to<br>DPIIT<br>via<br>email<br>dated<br>18.08.2020. However, no comments have been<br>receivedyet. | |||||
| <br>BILCARE<br>LIMITED<br>3110066383<br>dated<br>25.10.2016 | 01/81/050/00<br>442/AM17/<br>31/83/040/00<br>099/AM17/ | The case was ratified in M. No. 03/81 dated<br>14.08.2018 as per written comments of DIPP<br>as approved for AA No. 3110066596 dated<br>17.02.2017 ratified in M. No. 19/81 dated<br>05.12.2017. The applicant vide letter dated<br>31.10.2018 has requested for revision of<br>ratified norms. The case was considered in M.<br>No. 12/81 dt. 18.09.2019 and decided to seek<br>from the applicant to furnish following<br>information as per advice of Consultant (TEC-<br>1): (1.) Percentage net content of import item<br>no. 1 to 3 in export product. (2.) Percentage net<br>content of import item no. 4 & 5 on solid<br>content basis. As per NC decision, D/L was<br>issued on 14.10.2019. The applicant's reply<br>was sent to Consultant (TEC-1) on 31.01.2020<br>as decided in M. No. 21/81 dated 22.01.2020.<br>The case was last considered in meeting no.<br>24/81 dt. 18.03.2020 and decided to call the<br>applicant on personal hearing to explain the<br>case. As per NC decision, an email dated<br>24.08.2020 was sent to the applicant requesting<br>to attend PH on 25.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee noted that the<br>firm was called for personal<br>hearing<br>via<br>video<br>conferencing. However, the<br>applicant<br>via<br>email<br>dated<br>24.08.2020 requested to grant<br>personal hearing after one<br>month.<br>Therefore,<br>the<br>Committee decided to call the<br>applicant to attend personal<br>hearing in the forthcoming NC<br>meeting. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred | |
| R10 | |||||
| <br>ARMOR<br>PLAST<br>LIMITED<br>0710113842<br>dated<br>12.09.2018 | 01/81/050/00<br>655/AM19/<br>07/24/040/00<br>156/AM19/ | The case was ratified in M. No. 05/81 dated<br>12.06.2019 on repeat basis as approved for AA<br>No.0710111799 dated 21.06.2017 in M. No.<br>3/81-ALC2/2019<br>dated<br>15.05.2019<br>as<br>recommended<br>by<br>Consultant<br>(TEC-3).<br>The applicant vide letter dated 15.07.2019 has<br>requested for revision of ratified norms. This<br>case was considered in M. No. 12/81 dt.<br>18.09.2019 and decided to ask the applicant to<br>furnish copies of shippingbills. Asper NC | <br> <br> <br>The Committee considered the<br>case as per the agenda and<br>Consultant (TEC-3) informed | <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred | |
| <br>that the applicant in its reply | |||||
| <br>dated 11.08.2020 has given | |||||
| R11 | |||||
| <br>only photograph of the cutter | |||||
| <br>instead of drawing of cutter. | |||||
| <br>Therefore,<br>the<br>Committee | |||||
| <br>decided to seek from the | |||||
| <br>applicant to furnish following |
62 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| decision, D/L was issued on 14.10.2019 along<br>with reminder on 03.12.2019. As per NC<br>decision of M. No. 21/81 dated 22.01.2020, the<br>applicant's reply was referred to Consultant<br>(TEC-3) on 31.01.2020. The case was last | <br>information as per advice of | ||||
|---|---|---|---|---|---|
| <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Consultant (TEC-3):<br>1. Detailed drawing of cutter.<br>The case stands deferred. | |||||
| considered in meeting no. 24/81 dt. 18.03.2020 | |||||
| and Consultant (TEC-3) informed that the<br>applicant had submitted copy of many shipping<br>bills and in some of shipping bills word<br>“Cannula” is mentioned and in few bills word<br>“Cutter”<br>is<br>mentioned.<br>Therefore,<br>the<br>Committee decided to ask the applicant to<br>explain why he is making export of „Cutter‟<br>under the authorization and why such exports<br>should not be disallowed. As per decision of<br>M. No. 24/81 dated 18.03.2020, D/L as raised<br>by Consultant (TEC-3) was sent to the | |||||
| applicant on 18.05.2020 followed by reminder | |||||
| on 10.08.2020. The applicant‟s reply dt. | |||||
| 11.08.2020 was sent to Consultant (TEC-3) on<br>13.08.2020. | |||||
| <br>ARMOR<br>PLAST LTD<br>0710113649<br>Dated<br>27.07.2018 | 01/81/050/00<br>448/AM19/<br>07/24/040/00<br>110/AM19/ | The case was approved in M. No. 5/81-<br>ALC2/2019 dated 12.06.2019 on repeat basis<br>as approved for AA No. 0710111799 dated<br>21.06.2017 in M. No. 3/81-ALC2/2019 dated<br>15.05.2019<br>on<br>the<br>recommendation<br>of<br>Consultant (TEC-3). The applicant vide letter<br>dated 15.07.2019 stated that they had already<br>completed the export obligation against the AA<br>and there is no provision to amend the export<br>shipping bills from the customs. Therefore,<br>they had requested to remove the word "Tubes"<br>from the export item. The case was considered<br>in M. No. 12/81 dt. 18.09.2019 and decided to<br>ask the applicant to furnish copies of shipping<br>bills. As per NC decision, D/L was sent on<br>14.10.2019<br>along<br>with<br>reminder<br>on<br>03.12.2019. As per NC decision of M. No.<br>21/81 dated 22.01.2020, the applicant's reply<br>was referred to Consultant (TEC-3) on<br>31.01.2020. The case was last considered in | <br> <br>The Committee considered the<br>case as per the agenda and<br>Consultant (TEC-3) informed | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred | |
| <br>that the applicant in its reply | |||||
| <br>dated 11.08.2020 has given | |||||
| <br>only photograph of the cutter | |||||
| <br>instead of drawing of cutter. | |||||
| <br>Therefore,<br>the<br>Committee | |||||
| <br>decided to seek from the | |||||
| <br>applicant to furnish following | |||||
| <br>information as per advice of | |||||
| <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Consultant (TEC-3):<br>1. Detailed<br>drawing<br>of<br>cutter.<br>The case stands deferred. | |||||
| R12 | |||||
| meeting<br>no.<br>24/81<br>dt.<br>18.03.2020<br>and | |||||
| Consultant (TEC-3) informed that the applicant<br>had submitted copy of many shipping bills and<br>in some of shipping bills word “Cannula” is<br>mentioned and in few bills word “Cutter” is<br>mentioned. Therefore, the Committee decided<br>to ask the applicant to explain why he is<br>making<br>export<br>of<br>„Cutter‟<br>under<br>the<br>authorization and why such exports should not<br>be disallowed. As per decision of M. No. 24/81<br>dated 18.03.2020,D/L as raised byConsultant |
63 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| (TEC-3) was sent to the applicant on | <br> <br> <br> | ||||
|---|---|---|---|---|---|
| 18.05.2020<br>followed<br>by<br>reminder<br>on | |||||
| 10.08.2020.<br>The<br>applicant‟s<br>reply<br>dt. | |||||
| 11.08.2020 was sent to Consultant (TEC-3) on<br>13.08.2020. | |||||
| <br>ARMOR<br>PLAST LTD<br>0710112339<br>dated<br>01.11.2017 | 01/81/050/00<br>884/AM19/<br>07/24/040/00<br>217/AM18/ | The case was ratified in M. No. 4/81 dated<br>29.05.2019 as recommended by Consultant<br>(TEC-3).<br>The applicant vide letter dated 15.06.2019<br>stated that they had already completed the<br>export obligation against the AA and there is<br>no provision to amend the export shipping bills<br>from the customs. Therefore, they had<br>requested to remove the word "Tubes" from the<br>export item. This case was considered in M.<br>No. 12/81 dt. 18.09.2019 and decided to ask<br>the applicant to furnish copies of shipping bills.<br>As per NC decision, D/L was sent on<br>14.10.2019<br>along<br>with<br>reminder<br>on<br>03.12.2019. The case was considered in M. No.<br>21/81 dated 22.01.2020, the applicant's reply<br>was referred to Consultant (TEC-3) on<br>31.01.2020. The case was last considered in | <br> <br>The Committee considered the<br>case as per the agenda and<br>Consultant (TEC-3) informed | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred | |
| <br>that the applicant in its reply | |||||
| <br>dated 11.08.2020 has given | |||||
| <br>only photograph of the cutter | |||||
| <br>instead of drawing of cutter. | |||||
| <br>Therefore,<br>the<br>Committee | |||||
| <br>decided to seek from the | |||||
| <br>applicant to furnish following | |||||
| <br>information as per advice of | |||||
| <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Consultant (TEC-3):<br>1. Detailed<br>drawing<br>of<br>cutter.<br>The case stands deferred. | |||||
| meeting<br>no.<br>24/81<br>dt.<br>18.03.2020<br>and | |||||
| Consultant (TEC-3) informed that the applicant<br>had submitted copy of many shipping bills and<br>in some of shipping bills word “Cannula” is<br>mentioned and in few bills word “Cutter” is<br>mentioned. Therefore, the Committee decided<br>to ask the applicant to explain why he is<br>making<br>export<br>of<br>„Cutter‟<br>under<br>the<br>authorization and why such exports should not<br>be disallowed. As per decision of M. No. 24/81<br>dated 18.03.2020, D/L as raised by Consultant<br>(TEC-3) was sent to the applicant on | |||||
| R13 | |||||
| 18.05.2020<br>followed<br>by<br>reminder<br>on | |||||
| 10.08.2020.<br>The<br>applicant‟s<br>reply<br>dt. | |||||
| 11.08.2020 was sent to Consultant (TEC-3) on<br>13.08.2020. |
64 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| <br>POLYCAB<br>WIRES PVT.<br>LTD.<br>0310818064<br>dated<br>28.12.2017 | 01/81/050/00<br>018/AM19/<br>03/95/040/00<br>787/AM18/<br>HQ E-office<br>Computer<br>No.: 23378 | The case was ratified in M. No. 2/81-<br>ALC2/2018 dated 29.05.2018 (actually held on<br>18.07.2018)<br>taking<br>cue<br>from<br>AA<br>No.<br>0310815474 dated 01.09.2017 ratified in M.<br>No. 23/81-ALC2/2017 dated 06.03.2018. The<br>applicant<br>vide<br>letter<br>dated<br>12.12.2018<br>requested for revision of ratified norms. In M.<br>No. 21/81dated 22.01.2020, Consultant (TEC-<br>3) informed that the wastage of item at Sl. No.<br>7 & 8 has interchanged and needs correction.<br>Therefore, the Committee decided to ask from<br>the applicant to provide clarification for the<br>same. As per NC decision, D/L was sent to the<br>applicant on 05.03.2020. As per decision of M.<br>No. 24/81 dated 18.03.2020, D/L reminder was | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case<br>as<br>per<br>agenda<br>and<br>Consultant (TEC-3) informed<br>that the applicant in its reply<br>dated<br>08.08.2020<br>has<br>not<br>provided clarification on the<br>wastage of item at Sl. No. 7 &<br>8<br>which<br>seems<br>to<br>be<br>interchanged<br>and<br>hence,<br>correction required. Therefore,<br>the Committee decided to<br>revise the ad-hoc norms as per<br>advice of Consultant (TEC-3)<br>as under:<br>1. Quantity of import item<br>at<br>Sl.<br>No.<br>7<br>i.e.<br>Galvanised Steel Wire<br>may be allowed as 1.02<br>Kgs./Kg. content in the<br>export items at Sl. No. 2,<br>3, 4, 6 & 7.<br>2. Quantity of import item<br>at Sl. No. 8 i.e. Copper<br>Tape may be allowed as<br>1.01 Kgs/Kg content in<br>the export items at Sl.<br>No.2, 3, 4 & 8.<br>Note: The decision for rest of<br>the import items will remain<br>same as decided in M. No.<br>2/81-ALC2/2018<br>dated<br>29.05.2018 (actually held on<br>18.07.2018).<br>RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Approved | |
|---|---|---|---|---|---|
| R14 | |||||
| sent to the applicant on 07.08.2020. The | |||||
| applicant‟s reply dt. 08.08.2020 was sent to | |||||
| Consultant (TEC-3) via email on 10.08.2020. | |||||
| <br>PILOT<br>INDUSTRIES<br>LTD.<br>0510402645<br>dated<br>19.05.2017 | 01/81/050/00<br>199/AM18/<br>05/24/040/00<br>073/AM18/ | The case was ratified in M. No. 3/81-<br>ALC2/2018 dated 14.08.2018 by allowing<br>wastage<br>of<br>5%.<br>The applicant via email dated 21.11.2018<br>requested for revision of ratified norms. The<br>case was considered in M. No. 12/81 dt.<br>18.09.2019 and decided to refer the case to<br>DPIIT for examination. As per decision of<br>meeting no. M. No. 21/81dated 22.01.2020, the<br>representation was forwarded to DPIIT via<br>email dated 16.03.2020. The case was last | <br>The Committee considered the<br>case as per the agenda and | <br> <br> <br> <br> <br> <br>Deferred | |
| <br> <br> <br>decided to seek from the | |||||
| <br>applicant to furnish following | |||||
| <br>information as per comments | |||||
| <br>given by MSME via email | |||||
| <br> <br>dated 25.08.2020: | |||||
| R15 | |||||
| <br> <br>1. Certificate of analysis. | |||||
| <br>2. Manufacturing process | |||||
| <br> <br> <br>with step-wise wastage. | |||||
| considered in meeting no. 24/81 dt. 18.03.2020 | <br> <br> <br>The case stands deferred. | ||||
| and decided to wait for comments. A reminder | |||||
| was issued to DPIIT on 23.04.2020 & |
65 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
||||||||
|---|---|---|---|---|---|---|
|||||05.08.2020. As per DPIIT recommendation<br>dated 11.08.2020, the case was referred to<br>MSME via email dated 13.08.2020.|<br>||
||||||<br>||
||<br>VINDHYA<br>TELELINKS<br>LTD.<br>1110025730<br>dated<br>19.09.2011||01/81/050/00<br>558/AM18/<br>11/24/040/00<br>027/AM12/|The case was ratified in M. No. 3/81-<br>ALC2/2018 dated 14.08.2018 as per DoT<br>comments vide OM No. 15-02/207-IP dated<br>14.05.2018. The applicant vide letters dated<br>22.10.2018 and 09.11.2018 requested for<br>revision of ratified norms. The case was<br>considered in M. No. 12/81 dt. 18.09.2019 and<br>decided to refer the case to DoT for<br>examination. As per the decision of M. No.<br>18/81dated<br>11.12.2019,<br>the<br>applicant‟s<br>representation/application sent to DoT on<br>21.11.2019 along with reminder on 17.03.2020<br>for expediting the comments. The case was last<br>considered in M. No. 24/81 dt. 18.03.2020 and<br>decided to seek from the applicant to furnish<br>the detailed calculations of wastage claimed as<br>per advice of the representative of DoT. As<br>per NC decision, D/L was sent to applicant on<br>18.05.2020<br>followed<br>by<br>reminder<br>on<br>10.08.2020. However, no reply has been<br>receivedyet.|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee decided to<br>remind again the applicant for<br>furnishing<br>the<br>requisite<br>information.|Deferred|
||||||||
|R16|||||||
||||||||
||||||||
||||||<br> <br>||
||<br>ANGLO<br>STEEL PVT.<br>LIMITED<br>0310796525<br>dated<br>09.06.2015||01/81/050/00<br>185/AM16/<br>03/94/040/00<br>165/AM16/|The case was approved in Norms Committee-II<br>special meeting held on 11.12.2017. The<br>applicant via email dated 04.05.2019 requested<br>to correct the AA No. 0310796525 instead of<br>0310798525. The case was considered in M.<br>No. 12/81 dt. 18.09.2019 and decided to refer<br>the case to Consultant (TEC-3). The case was<br>last considered in M. No. 24/81 dated<br>18.03.2020, The Committee noted that the<br>complete set of representation/documents has<br>not yet been referred to Consultant (TEC-3) as<br>decided in M. No. 21/81dated 22.01.2020.<br>Therefore, the Committee directed to forward<br>all the relevant documents to Consultant (TEC-<br>3) immediately. Scanned copies of complete<br>set<br>of<br>applications<br>along<br>with<br>all<br>concerned/related documents (reply to queries<br>raised etc.) in chronological order was sought<br>from<br>the<br>applicant<br>vide<br>email<br>dated|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee noted that the<br>applicant<br>via<br>email<br>dated<br>11.08.2020 requested for some<br>more time to submit the<br>complete<br>application<br>and<br>alongwith relevant documents.<br>Therefore,<br>the<br>Committee<br>decided to wait for reply of the<br>applicant.<br>|Deferred|
||||||||
|R17|||||||
||||||||
||||||||
|||||10.08.2020.|||
||<br>ANGLO<br>STEEL PVT.<br>LIMITED<br>0310796526<br>dated<br>09.06.2015||01/81/050/00<br>184/AM16/<br>03/94/040/00<br>173/AM16/|The case was approved in Norms Committee-II<br>Special Meeting held on 11.12.2017. The<br>applicant via email dated 04.05.2019 requested<br>to correct the AA No. 0310796526 instead of<br>0310798526. The case was considered in M.<br>No. 12/81 dt. 18.09.2019 and decided to refer<br>the case to Consultant (TEC-3). The case was<br>last considered in M. No. 24/81 dated|<br> <br> <br> <br> <br> <br> <br> <br>The Committee noted that the<br>applicant<br>via<br>email<br>dated<br>11.08.2020 requested for some<br>more time to submit the<br>complete<br>application<br>and<br>alongwith relevant documents.<br>Therefore,<br>the<br>Committee<br>decided to wait for replyof the<br>|Deferred|
|R18|||||||
||||||||
||||||||
|||66| **P ag e 7 8** Minutes of NC-II MeetingNo. 06/81 scheduled for 11.08.2020 and held on 25.08.2020|||||
66 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 18.03.2020, The Committee noted that the<br>complete set of representation/documents has<br>not yet been referred to Consultant (TEC-3) as<br>decided in M. No. 21/81dated 22.01.2020.<br>Therefore, the Committee directed to forward<br>all the relevant documents to Consultant (TEC-<br>3) immediately. Scanned copies of complete<br>set<br>of<br>applications<br>along<br>with<br>all<br>concerned/related documents (reply to queries<br>raised etc.) in chronological order was sought<br>from<br>the<br>applicant<br>vide<br>email<br>dated<br>10.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>applicant. | ||||
|---|---|---|---|---|---|
| <br>ANGLO<br>STEEL PVT.<br>LIMITED<br>0310796527<br>dated<br>09.06.2015 | 01/81/050/00<br>186/AM16/<br>03/94/040/00<br>182/AM16/ | The case was approved in Norms Committee-II<br>Special Meeting held on 11.12.2017. The<br>applicant via email dated 04.05.2019 has<br>requested to correct the AA No. 0310796527<br>instead of 0310798527. The case was last<br>considered in M. No. 12/81 dt. 18.09.2019 and<br>decided to refer the case to Consultant (TEC-<br>3). The case was last considered in M. No.<br>24/81 dated 18.03.2020, The Committee noted<br>that<br>the<br>complete<br>set<br>of<br>representation/documents has not yet been<br>referred to Consultant (TEC-3) as decided in<br>M. No. 21/81dated 22.01.2020. Therefore, the<br>Committee directed to forward all the relevant<br>documents<br>to<br>Consultant<br>(TEC-3)<br>immediately. Scanned copies of complete set<br>of applications along with all concerned/related<br>documents (reply to queries raised etc.) in<br>chronological order was sought from the<br>applicant vide email dated 10.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee noted that the<br>applicant<br>via<br>email<br>dated<br>11.08.2020 requested for some<br>more time to submit the<br>complete<br>application<br>and<br>alongwith relevant documents.<br>Therefore,<br>the<br>Committee<br>decided to wait for reply of the<br>applicant. | <br> <br> <br> <br> <br> <br> <br> <br>Deferred | |
| R19 | |||||
| <br>NAGREEKA<br>INDCON<br>PRODUCTS<br>(P) LTD.<br>0310815357<br>dated<br>23.08.2017 | 01/81/050/00<br>336/AM18/<br>03/95/040/00<br>343/AM18/ | The case was ratified in M. No. 2/81-<br>ALC2/2018 dated 29.05.2018 by allowing the<br>quantity of import item 1.05 Kg/Kg content in<br>the export product. The applicant vide letter<br>dated 18.03.2019 requested for revision of<br>ratified norms. As per decision of M. No.<br>12/81 dt. 18.09.2019, the case was referred to<br>DPIIT on 28.10.2019. In M. No. 15/81 dt.<br>30.10.2019, on the request of DPIIT, the<br>Committee decided to send again a copy of<br>application/representation<br>to<br>DPIIT<br>on<br>09.12.2019 for examination. The case was last<br>considered in M. No. 21/81 dated 22.01.2020<br>and decided to seek from the applicant to<br>furnish the following information as per<br>written comments given by DPIIT vide U. O.<br>No.:<br>P-47011/354/2019-TSW<br>dated<br>21.01.2020: Sl. No. 3 & 11 of the SDF. As per<br>NC decision, D/L was sent to the applicant on<br>05.03.2020.<br>The<br>applicant's<br>reply<br>dt. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and noted<br>the comments of DPIIT vide<br>U. O. No.: P-47011/354/2019-<br>TSW<br>dated<br>05.05.2020<br>wherein DPIIT stated that the<br>applicant asked for wastage on<br>different products (Aluminium<br>Foil containers- other than<br>having<br>rectangular/<br>square<br>shape) is 16 to 20%. However,<br>as the aluminium foil scrap has<br>recoverable value. Therefore,<br>the Committee decided to seek<br>from the applicant to furnish<br>following information as per<br>comments given by DPIIT:<br>1. To provide sale price of<br>Aluminium<br>foil<br>scrap | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred | |
| R20 | |||||
67 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 13.03.2020 was sent to DPIIT via email on<br>16.03.2020. Also, the applicant's hardcopy<br>reply dt. 12.03.2020 along with samples sent to<br>DPIIT on 18.03.2020. The case was last | <br> <br> <br> <br> <br>generated<br>during<br>the<br>manufacturing<br>process<br>supported by documentary<br>evidence like copies of sale<br>invoice etc.<br>The case stands deferred. | <br> <br> <br> | |||
|---|---|---|---|---|---|
| considered in M. No. 24/81 dt. 18.03.2020 and | |||||
| decided to wait for the comments. | |||||
| <br>NATIONAL<br>STEEL AND<br>AGRO<br>INDUSTRIES<br>LTD.<br>5610005104<br>dated<br>23.03.2017 | 01/81/050/0<br>0187/AM18/<br>56/24/040/00<br>051/AM17/ | The case was ratified in M. No. 9/81-<br>ALC2/2018 dated 02.01.2019 as per written<br>comments of MoS vide U. O. No.: 2(6)/2017-<br>TD dated 13.12.2018. The applicant vide letter<br>dated 25.04.2019 requested for revision of<br>ratified norms as per the statement of the actual<br>export made under the AA. As per decision of<br>M. No. 12/81 dt. 18.09.2019, the case was<br>referred to MoS on 25.10.2019 followed by an<br>I.D. reminder on 20.01.2020. In M. No. 21/81<br>dated 22.01.2020 the representative of MoS<br>informed that the case is under examination.<br>Therefore, the Committee decided to wait for<br>the comments. The case was last considered in | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee decided to<br>refer the case to Consultant<br>(SKB) for examination as no<br>comments are being furnished<br>by MoS. | <br> <br> <br> <br>Deferred | |
| R21 | |||||
| M. No. 24/81 dt. 18.03.2020 and decided to<br>remind MoS to expedite the comments. A<br>reminder was issued to MoS on 07.08.2020.<br>However, no comments have been received<br>yet. | |||||
| <br>SVAM<br>PACKAGING<br>INDUSTRIES<br>PRIVATE<br>LIMITED<br>0510398071<br>dated<br>30.03.2016 | 01/81/050/00<br>173/AM17/<br>05/24/040/00<br>626/AM16/ | The case was ratified in M. No. 4/81-<br>ALC2/2018 dated 27.08.2018 as per written<br>comments of DIPP vide F. No. 7/176/2018-<br>TSW dated 27.06.2018. The applicant vide<br>letter dated 10.10.2018 requested for revision<br>of ratified norms. As per decision of M. No.<br>12/81 dt. 18.09.2019, the case was referred to<br>DPIIT on 28.10.2019 followed by a reminder<br>on 20.01.2020. As per NC decision of M. No.<br>21/81 dated 22.01.2020 a complete set of<br>application/ representation was referred to<br>DPIIT on 13.02.2020. The case was last | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee decided to<br>remind<br>again<br>DPIIT<br>for<br>expediting the comments. | <br> <br>Deferred | |
| R22 | |||||
| considered in M. No. 24/81 dt. 18.03.2020 and | |||||
| decided to remind DPIIT to expedite the<br>comments. A reminder was issued to DPIIT on<br>07.08.2020. However, no comments have been<br>receivedyet. | |||||
| <br>VEDANTA<br>LIMITED<br>3510044672<br>dated<br>17.02.2015 | 01/81/171/00<br>019/AM16/<br>35/24/039/00<br>003/AM15/ | The case was ratified in M. No. 01/81 dated<br>10.04.2019 as per written comments given by<br>Consultant (TEC-3). The applicant vide letter<br>dated 06.06.2019 requested for revision of<br>ratified norms. The case was considered in M.<br>No. 12/81 dt. 18.09.2019 and decided to refer<br>the<br>case<br>to<br>Consultant<br>(TEC-3)<br>for<br>examination. The case was referred to<br>Consultant(TEC-3)on 06.12.2019. The case | <br> <br> <br> <br> <br> <br> <br> <br> <br>The<br>Committee<br>heard<br>the<br>representatives of the applicant<br>during personal hearing held<br>through video conferencing.<br>On the advice of Consultant<br>(TEC-3),<br>the<br>Committee<br>directed the representatives to<br>furnish following information: | <br> <br> <br> <br> <br> <br> <br>Deferred | |
| R23 | |||||
68 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| was last considered in M. No. 21/81 dated<br>22.01.2020, Consultant (TEC-3) informed that<br>the applicant has requested for wastage on gold<br>& silver for which there is no justification.<br>Therefore, the Committee decided to call the<br>applicant for personal hearing to explain the<br>case<br>before<br>Norms<br>Committee<br>in<br>the<br>forthcoming NC meeting. As per NC decision,<br>an email dated 13.03.2020 sent to the applicant<br>to attend PH on 18.03.2020. The case was last<br>considered in M. No. 24/81 dt. 18.03.2020 and<br>the Committee noted that nobody appeared to<br>attend the personal hearing on behalf of the<br>applicant. Therefore, the Committee decided to<br>give one more opportunity to the applicant for<br>personal hearing. As per NC decision, an email<br>dated 24.08.2020 was sent to the applicant<br>requestingto attend PH on 25.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>1. Specific item of import,<br>its quantity & copy of<br>bill of entry.<br>2. Specific item of export,<br>its quantity & copy of<br>shipping bill.<br>3. Certificate of analysis of<br>total quantity of import &<br>export.<br>4. Is there any by-product in<br>the process? If yes details<br>thereof.<br>The case stands deferred. | <br> <br> <br> <br> <br> <br> <br> | |||
|---|---|---|---|---|---|
| <br>FCI OEN<br>CONNECTOR<br>S LIMITED<br>1010059108<br>dated<br>13.04.2015 | 01/81/050/00<br>154/AM16/<br>10/24/040/00<br>140/AM15/ | The case was approved in M. No. 06/81 dated<br>26.06.2019 as per written comments given by<br>MeitY vide F. No.: 17(41)/2015-IPHW dated<br>25.06.2019. The applicant vide letter dated<br>27.02.2019 had requested for revision of<br>ratified norms. They vide letters dated<br>01.03.2019 and 09.04.2019 had reiterated the<br>same issue. The case was considered in M. No.<br>19/81<br>dt.<br>26.12.2019,<br>the<br>Committee<br>considered the report of study group and<br>decided to refer the matter to MeitY for<br>calculating the entitlement. The case was last<br>considered<br>in<br>meeting<br>no.<br>24/81<br>dt.<br>18.03.2020, the Committee considered the case<br>as per agenda and Consultant (TEC-3)<br>informed that the quantities of import items<br>mentioned by MeitY in its recommendation<br>vide<br>F.<br>No.<br>17(41)/2015-IPHW<br>dated<br>25.06.2019<br>are<br>not<br>matching<br>with<br>the<br>quantities as mentioned in the AA. Therefore,<br>the Committee decided to refer the case back to<br>MeitY for comments. As per decision of M.<br>No. 24/81 dt. 18.03.2020, the case was referred<br>to MeitY on 10.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and<br>noted that MeitY via email<br>dated 25.08.2020 informed that<br>the case is under examination.<br>Therefore,<br>the<br>Committee<br>decided<br>to<br>wait<br>for<br>the<br>comments. | <br> <br> <br> <br> <br> <br> <br>Deferred | |
| R24 | |||||
| <br>FCI OEN<br>CONNECTOR<br>S LIMITED<br>1010058810<br>dated<br>26.09.2014 | 01/81/050/00<br>421/AM15/<br>10/24/040/00<br>058/AM15/ | The case was approved in M. No. 6/81 dated<br>26.06.2019 as per written comments given by<br>MeitY vide F. No.: 17(40)/2015-IPHW dated<br>25.06.2019. The applicant vide letter dated<br>27.02.2019 had requested for revision of<br>ratified norms. They vide letters dated<br>01.03.2019 and 09.04.2019 had reiterated the<br>same issue. In M. No. 19/81 dt. 26.12.2019, the<br>Committee considered the report of study<br>groupand decided to refer the matter to MeitY | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and<br>noted that MeitY via email<br>dated 25.08.2020 informed that<br>the case is under examination.<br>Therefore,<br>the<br>Committee<br>decided<br>to<br>wait<br>for<br>the<br>comments. | <br> <br> <br> <br> <br> <br> <br>Deferred | |
| R25 | |||||
69 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
R26
for calculating the entitlement. The case was last considered in meeting no. 24/81 dt. 18.03.2020, the Consultant (TEC-3) informed that MeitY recommended wastage for Copper Alloy but the import item “Copper Alloy” is not mentioned in the AA. Hence, the Committee decided to refer the case back to MeitY for comments on the issue. As per decision of M. No. 24/81 dt. 18.03.2020, the case was referred to MeitY on 10.08.2020. The case was rejected in M. No. 08/81dated The Committee considered the Approved 24.07.2019 on the ground that Zinc recovered case as per agenda and from the import items is not being exported. Consultant (TEC-3) informed The applicant vide letter dated 14.09.2019 that the applicant in its requested for fixation for ad-hoc norms and representation dated stated that while producing the finished goods 14.09.2019 & 17.02.2020 has the temperature is raised beyond 950ºC. They given chemical analysis report METAL 01/81/050/00 further stated that only zinc has the boiling of import & export item. CARE 417/AM19/ point below melting point of bronze. Hence, Hence, norms may be fixed for ALLOYS the burning loss is confined to very high the import items. Therefore, PRIVATE 03/95/040/00 quantum of zinc and little quantum of balance the Committee decided to fix LIMITED 461/AM19/ metals. Therefore, in the finished product, the the ad-hoc norms as per percentage of zinc content reduces. There is no written comments given by 0310822956 HQ E-office recovery of Zinc during the process. The case Consultant (TEC-3) as under: Dated Computer was considered in M. No. 21/81 dated 09.08.2018 No.: 23379 22.01.2020, the Committee noted that the case was not referred to Consultant (TEC-3) as per decision of M. No. 18/81 dated 11.12.2019. Therefore, the Committee decided to send the applicant‟s representation/ application to Consultant (TEC-3) immediately. As per NC decision, the case was referred to Consultant (TEC-3) on 17.03.2020.
| (TEC-3)on 17.03.2020. | |||||
|---|---|---|---|---|---|
| ITCHS<br>Code<br>Export Item<br>Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | |
| 74032290<br>Bronze Ingots Net Content :<br>1) Brass Scrap: 97,000.000<br>Kilogram 2)Tin Ingots:<br>3,000.000 Kilogram<br>100000<br>Kgs | 1<br>2 | 74040022<br>80011090 | Brass Scrap<br>Tin Ingots | 101850 Kgs inclusive<br>of 2% wastage<br>3040 Kgs inclusive of<br>2% wastage | |
| Note: The composition given in letter dated 17.02.2020 | may be included in the description of export item. | ||||
| RA concerned may take suitable consequential action accordingly. |
70 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| <br>WELSPUN<br>CORP LTD.<br>3410044966<br>Dated<br>11.03.2019 | 01/81/050/01<br>167/AM19/<br>34/24/040/00<br>373/AM19/<br>HQ E-office<br>Computer<br>No.: 23765 | <br>The case was ratified in M. No. 7/81 dated<br>10.07.2019 as per written comments dated<br>09.07.2019 given by Consultant (TEC-3). The<br>applicant vide letters dated 01.08.2019 &<br>27.09.2019 had requested for revision in<br>Norms. The case was referred to Consultant<br>(TEC-3) on 06.12.2019 for examination. The<br>case was last considered in M. No. 24/81dated<br>18.03.2020 and decided to remind Consultant<br>(TEC-3)<br>for<br>expediting<br>the<br>comments.<br>Reminder issued to consultant (TEC-3) on<br>25.05.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee noted that<br>earlier<br>the<br>proposal<br>was<br>approved with 5% wastage for<br>import converting plates into<br>pipes.<br>The<br>applicant<br>has<br>informed that they want to<br>import slabs in place of plates<br>and<br>have<br>requested<br>for<br>additional<br>wastage<br>for<br>converting slabs into plates.<br>The committee noted that as<br>per the<br>Authorisation,<br>the<br>applicant is importing**„Non-<br>alloy steel Slabs‟. Therefore,<br>the Committee decided to<br>revise the ad-hoc normson<br>repeat basisas approved for<br>AA No. 3410044590 dated<br>15.10.2018in M. No. 22/81<br>dated<br>19.02.2020<br>as<br>per<br>comments given by Consultant<br>(TEC-3) as under:<br>1. Quantity ofrelevant**import<br>item may be allowed with 12%<br>wastage.<br>RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Approved | |
|---|---|---|---|---|---|
| R27 | |||||
71 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| <br>GOLDSTONE<br>INFRATECH<br>LIMITED<br>0910066232<br>dated<br>15.05.2018 | <br>GOLDSTONE<br>INFRATECH<br>LIMITED<br>0910066232<br>dated<br>15.05.2018 | <br>01/81/050/00<br>433/AM19/<br>09/24/040/00<br>647/AM18/<br>HQ E-office<br>Computer<br>No.: 23384 | The case was rejected in M. No. 8/81-<br>ALC2/2019 dated 24.07.2019 due to non-<br>submission of reply to Consultant (TEC-1)<br>deficiency<br>letter<br>dated<br>23.04.2019.<br>The<br>applicant<br>vide<br>letter<br>dated<br>19.11.2019<br>furnished reply and requested to fix the ad-hoc<br>norms. The case was last considered in M. No.<br>21/81 dated 22.01.2020, the Committee noted<br>that the case was not referred to Consultant<br>(TEC-1) as decided in M. No. 18/81 dated<br>11.12.2019. Therefore, the Committee decided<br>to<br>send<br>the<br>applicant‟s<br>representation/<br>application<br>to<br>Consultant<br>(TEC-1)<br>immediately. As per NC, the case was referred<br>to Consultant (TEC-1) on 13.02.2020. The case<br>was last considered in M. No. 24/81 dt.<br>18.03.2020 and Consultant (TEC-1) asked<br>physical file for examination of the case.<br>Therefore, the Committee decided to send<br>physical file to Consultant (TEC-1) for<br>examination & comments. Scanned copies of<br>complete set of applications along with all<br>concerned/related documents (reply to queries<br>raised etc.) in chronological order has been<br>sought from the applicant vide email dated<br>10.08.2020.<br>The<br>applicant‟s<br>reply<br>dt.<br>11.08.2020 was sent to Consultant (TEC-1) on<br>11.08.2020 & 25.08.2020. | The case was rejected in M. No. 8/81-<br>ALC2/2019 dated 24.07.2019 due to non-<br>submission of reply to Consultant (TEC-1)<br>deficiency<br>letter<br>dated<br>23.04.2019.<br>The<br>applicant<br>vide<br>letter<br>dated<br>19.11.2019<br>furnished reply and requested to fix the ad-hoc<br>norms. The case was last considered in M. No.<br>21/81 dated 22.01.2020, the Committee noted<br>that the case was not referred to Consultant<br>(TEC-1) as decided in M. No. 18/81 dated<br>11.12.2019. Therefore, the Committee decided<br>to<br>send<br>the<br>applicant‟s<br>representation/<br>application<br>to<br>Consultant<br>(TEC-1)<br>immediately. As per NC, the case was referred<br>to Consultant (TEC-1) on 13.02.2020. The case<br>was last considered in M. No. 24/81 dt.<br>18.03.2020 and Consultant (TEC-1) asked<br>physical file for examination of the case.<br>Therefore, the Committee decided to send<br>physical file to Consultant (TEC-1) for<br>examination & comments. Scanned copies of<br>complete set of applications along with all<br>concerned/related documents (reply to queries<br>raised etc.) in chronological order has been<br>sought from the applicant vide email dated<br>10.08.2020.<br>The<br>applicant‟s<br>reply<br>dt.<br>11.08.2020 was sent to Consultant (TEC-1) on<br>11.08.2020 & 25.08.2020. | The case was rejected in M. No. 8/81-<br>ALC2/2019 dated 24.07.2019 due to non-<br>submission of reply to Consultant (TEC-1)<br>deficiency<br>letter<br>dated<br>23.04.2019.<br>The<br>applicant<br>vide<br>letter<br>dated<br>19.11.2019<br>furnished reply and requested to fix the ad-hoc<br>norms. The case was last considered in M. No.<br>21/81 dated 22.01.2020, the Committee noted<br>that the case was not referred to Consultant<br>(TEC-1) as decided in M. No. 18/81 dated<br>11.12.2019. Therefore, the Committee decided<br>to<br>send<br>the<br>applicant‟s<br>representation/<br>application<br>to<br>Consultant<br>(TEC-1)<br>immediately. As per NC, the case was referred<br>to Consultant (TEC-1) on 13.02.2020. The case<br>was last considered in M. No. 24/81 dt.<br>18.03.2020 and Consultant (TEC-1) asked<br>physical file for examination of the case.<br>Therefore, the Committee decided to send<br>physical file to Consultant (TEC-1) for<br>examination & comments. Scanned copies of<br>complete set of applications along with all<br>concerned/related documents (reply to queries<br>raised etc.) in chronological order has been<br>sought from the applicant vide email dated<br>10.08.2020.<br>The<br>applicant‟s<br>reply<br>dt.<br>11.08.2020 was sent to Consultant (TEC-1) on<br>11.08.2020 & 25.08.2020. | The case was rejected in M. No. 8/81-<br>ALC2/2019 dated 24.07.2019 due to non-<br>submission of reply to Consultant (TEC-1)<br>deficiency<br>letter<br>dated<br>23.04.2019.<br>The<br>applicant<br>vide<br>letter<br>dated<br>19.11.2019<br>furnished reply and requested to fix the ad-hoc<br>norms. The case was last considered in M. No.<br>21/81 dated 22.01.2020, the Committee noted<br>that the case was not referred to Consultant<br>(TEC-1) as decided in M. No. 18/81 dated<br>11.12.2019. Therefore, the Committee decided<br>to<br>send<br>the<br>applicant‟s<br>representation/<br>application<br>to<br>Consultant<br>(TEC-1)<br>immediately. As per NC, the case was referred<br>to Consultant (TEC-1) on 13.02.2020. The case<br>was last considered in M. No. 24/81 dt.<br>18.03.2020 and Consultant (TEC-1) asked<br>physical file for examination of the case.<br>Therefore, the Committee decided to send<br>physical file to Consultant (TEC-1) for<br>examination & comments. Scanned copies of<br>complete set of applications along with all<br>concerned/related documents (reply to queries<br>raised etc.) in chronological order has been<br>sought from the applicant vide email dated<br>10.08.2020.<br>The<br>applicant‟s<br>reply<br>dt.<br>11.08.2020 was sent to Consultant (TEC-1) on<br>11.08.2020 & 25.08.2020. | The case was rejected in M. No. 8/81-<br>ALC2/2019 dated 24.07.2019 due to non-<br>submission of reply to Consultant (TEC-1)<br>deficiency<br>letter<br>dated<br>23.04.2019.<br>The<br>applicant<br>vide<br>letter<br>dated<br>19.11.2019<br>furnished reply and requested to fix the ad-hoc<br>norms. The case was last considered in M. No.<br>21/81 dated 22.01.2020, the Committee noted<br>that the case was not referred to Consultant<br>(TEC-1) as decided in M. No. 18/81 dated<br>11.12.2019. Therefore, the Committee decided<br>to<br>send<br>the<br>applicant‟s<br>representation/<br>application<br>to<br>Consultant<br>(TEC-1)<br>immediately. As per NC, the case was referred<br>to Consultant (TEC-1) on 13.02.2020. The case<br>was last considered in M. No. 24/81 dt.<br>18.03.2020 and Consultant (TEC-1) asked<br>physical file for examination of the case.<br>Therefore, the Committee decided to send<br>physical file to Consultant (TEC-1) for<br>examination & comments. Scanned copies of<br>complete set of applications along with all<br>concerned/related documents (reply to queries<br>raised etc.) in chronological order has been<br>sought from the applicant vide email dated<br>10.08.2020.<br>The<br>applicant‟s<br>reply<br>dt.<br>11.08.2020 was sent to Consultant (TEC-1) on<br>11.08.2020 & 25.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and<br>decided tofix the ad-hoc<br>normsas per comments given<br>by Consultant (TEC-1) as<br>under: | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per the agenda and<br>decided tofix the ad-hoc<br>normsas per comments given<br>by Consultant (TEC-1) as<br>under: | <br> <br> <br> <br> <br>Approved | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| R28 | |||||||||||
| Recommen<br>ded<br>Quantity<br>5 %<br>wastage<br>with<br>accountabil<br>ity in<br>export<br>As per<br>GN-4 | |||||||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommen<br>ded<br>Quantity | |||||
| 85469090 | Silicone<br>Rubber<br>Insulators<br>33kV 10kN<br>Pinpolymer<br>Insulators | 11967<br>Number | 1 | 39100000 | Elastosil R 401/40 S Silicones in<br>PrimaryForms | 5 %<br>wastage<br>with<br>accountabil<br>ity in<br>export | |||||
| 2 | 28183000 | Aluminium Hydroxide | |||||||||
| 3 | 39100000 | Elastosil Aux Mould Release Agent<br>A Silicones in PrimaryForms | |||||||||
| 4 | 32089019 | Elastosil Aux G 3243 Primer<br>Silicones in Primary Forms | |||||||||
| 85469090 | Silicone<br>Rubber<br>Insulators<br>33kV 45kN<br>Suspension<br>Polymer<br>Insulators | 14160<br>Number | 5 | 73261990 | 10kN Ball (Rib) Metal Item | As per<br>GN-4 | |||||
| 6 | 73261990 | 10kN Socket (Rib) Metal Item | |||||||||
| 7 | 73261990 | 45kN Ball (Rib) Metal Item | |||||||||
| 8 | 73261990 | 45kN Socket (Rib) Metal Item | |||||||||
| RA concerned maytake suitable consequential action accordingly. | |||||||||||
| <br>GOLDSTONE<br>INFRATECH<br>LIMITED | <br>01/81/050/00<br>506/AM18/ | The case was rejected in M. No. 11/81-<br>ALC2/2018 dated 30.01.2019 due to non-<br>submission of replyto deficiencyletter dated | <br>The Committee considered the<br>case as per the agenda and<br>Consultant(TEC-1)informed | <br> <br> <br>Deferred | |||||||
| R29 | |||||||||||
72 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 0910065334<br>dated<br>08.08.2017 | 09/24/040/00<br>209/AM18/ | 04.10.2018. The applicant vide letter dated<br>19.11.2019 furnished reply and requested to fix<br>the ad-hoc norms. The case was considered in<br>M. No. 21/81dated 22.01.2020 and decided to<br>seek from the applicant to furnish the<br>following information as per advice of<br>Consultant (TEC-1): 1. Complete technical<br>information as per Appendix 4E.2. Net weight<br>of Silicone Rubber Compound in each of<br>export product. 3. Details of indigenous input<br>along<br>with<br>their<br>quality<br>required<br>to<br>manufacture Silicone Rubber Compound for<br>each export product. 4. Justification for 5%<br>wastage for import item No. 5 to 10. As per<br>NC decision, D/L was sent to the applicant on<br>05.03.2020. The case was last considered in<br>meeting no. 24/81 dt. 18.03.2020 and decided<br>to remind the applicant for furnishing the<br>requisite information. Applicant‟s reply dt.<br>11.08.2020 was sent to Consultant (TEC-1) on<br>11.08.2020. | <br>that the applicant in its reply | <br> <br> <br> <br> <br> <br> <br> <br> | |
|---|---|---|---|---|---|
| <br>dated 11.08.2020 has given | |||||
| <br>only name of indigenous inputs | |||||
| <br>without their corresponding | |||||
| <br>quantity.<br>Therefore,<br>the | |||||
| <br>Committee decided to seek | |||||
| <br>from the applicant to furnish | |||||
| <br>following information as per | |||||
| <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>advice of Consultant (TEC-1):<br>1. Indigenous inputs with<br>their quantity.<br>The case stands deferred. | |||||
| <br>JINDAL SAW<br>LIMITED<br>0510407878<br>dated<br>25.09.2018 | <br>01/81/050/00<br>651/AM19/<br>05/23/040/00<br>271/AM19/ | The case was ratified in M. No. 14/81-<br>ALC2/2019 dated 16.10.2019 as per written<br>comments<br>dated<br>11.10.2019<br>given<br>by<br>Consultant (TEC-3). The applicant vide<br>representation dated 07.01.2020 requested to<br>revise the ratified norms. As per decision of M.<br>No. 21/81 dated 22.01.2020 the representation<br>was forwarded to Consultant (TEC-3) on<br>22.01.2020. However, no comments have been<br>received yet. The case was last considered in<br>meeting<br>no.<br>24/81<br>dt.<br>18.03.2020<br>the<br>Consultant (TEC-3) asked for physical file for<br>examination of the case. Therefore, the<br>Committee decided to send physical file to<br>Consultant<br>(TEC-3)<br>for<br>examination<br>&<br>comments. As per decision, the complete<br>application was sent to Consultant (TEC-3) via<br>email dated 14.08.2020. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda. Consultant<br>(TEC-3) asked for physical file<br>to examine the case. Therefore,<br>the Committee deicide to send<br>physical file to Consultant<br>(TEC-3) for examination of the<br>case. | <br> <br> <br> <br> <br> <br> <br>Deferred | |
| R30 | |||||
| JINDAL SAW<br>LIMITED | <br>01/81/050/00<br>653/AM19/<br>05/23/040/00 | The case was ratified in M. No. 14/81-<br>ALC2/2019 dated 16.10.2019 as per written<br>comments<br>dated<br>15.10.2019<br>given<br>by<br>Consultant (TEC-3). The applicant vide<br>representation dated 07.01.2020 requested to | <br>The Committee considered the<br>case<br>as<br>per<br>the<br>agenda.<br>Consultant (TEC-3) informed | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Rejected | |
| <br>that<br>the<br>applicant<br>has | |||||
| <br>submitted its representation | |||||
| <br>dated<br>07.01.2020<br>against | |||||
| R31 | revise the ratified norms. As per decision of M. | <br>reduction in quantity of import | |||
| 0510408183<br>dated<br>23.10.2018 | 326/AM19/<br>HQ E-office<br>Computer<br>No.: 23769 | No. 21/81 dated 22.01.2020 the representation<br>was forwarded to Consultant (TEC-3) on<br>22.01.2020. The case was last considered in | <br>item No. 4 & reduction of | ||
| <br>wastage of item Nos. 5 & 6. | |||||
| <br> <br>The quantity of import item at | |||||
| meeting no. 24/81 dt. 18.03.2020 and decided | <br>Sl. No. 4 was calculated as per | ||||
| to wait for comments. | thickness<br>given<br>by<br>the | ||||
| applicant in their letter dated |
73 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| 20.06.2019 and report of study | <br> <br> <br> <br> <br> <br> <br> <br> <br> | ||||
|---|---|---|---|---|---|
| group. Now the applicant has | |||||
| revised thickness of coating | |||||
| and also no justification has | |||||
| been provided for increasing | |||||
| allowed wastage for import | |||||
| items Nos. 5 & 6. Therefore, | |||||
| the Committee decided to | |||||
| maintainstatus quo.<br>RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | |||||
| <br>JINDAL SAW<br>LIMITED<br>0510408874<br>Dated<br>11.12.2018 | <br>01/81/050/00<br>701/AM19/<br>05/23/040/00<br>391/AM19/ | The case was ratified in M. No. 5/81-<br>ALC2/2019 dated 12.06.2019 as per written<br>comments given by Consultant (TEC-3). The<br>applicant vide letter dated 14.01.2020 stated<br>that the quantity of welding consumables i.e.<br>Welding Wire, Welding Flux, X-Ray films and<br>CO2 wire are less permitted to them.<br>Therefore, they had requested to revise the ad-<br>hoc norms. As per decision of M. No. 21/81<br>dated 22.01.2020 the representation was<br>forwarded<br>to<br>Consultant<br>(TEC-3)<br>on<br>22.01.2020. The case was last considered in<br>meeting no. 24/81 dt. 18.03.2020 and decided<br>to remind Consultant (TEC-3) for expediting<br>the comments. A reminder issued to consultant | <br>The Committee considered the<br>case as per the agenda and | <br> <br> <br> <br> <br>Deferred | |
| <br> <br> <br>decided to seek from the | |||||
| <br>applicant to furnish following | |||||
| <br>information as per comments | |||||
| <br> <br>given by Consultant (TEC-3): | |||||
| <br>1. Detailed calculations | |||||
| R32 | |||||
| <br>supported with documents | |||||
| <br>for requirement of welding | |||||
| <br>consumables for connector | |||||
| <br>welding. | |||||
| <br> <br> <br>The case stands deferred. | |||||
| (TEC-3)on 25.05.2020 & 07.08.2020. | |||||
| <br>JINDAL SAW<br>LIMITED<br>0510411870<br>Dated<br>18.09.2019 | <br>01/81/050/00<br>245/AM20/<br>05/23/040/00<br>236/AM20/ | The case was considered in M. No. 18/81-<br>ALC2/2019 dated 11.12.2019 and decided to<br>allow description of import items & quantities<br>per SION C-593 as per written comments<br>dated 06.12.2019 given by Consultant (TEC-<br>3). The applicant vide letter dated 14.01.2020<br>stated that the quantity of welding consumables<br>i.e. Welding Wire, Welding Flux, X-Ray films<br>and CO2 wire are less permitted to them.<br>Therefore, they had requested to revise the ad-<br>hoc norms. As per decision of M. No. 21/81<br>dated 22.01.2020 the representation was<br>forwarded<br>to<br>Consultant<br>(TEC-3)<br>on<br>22.01.2020. The case was last considered in<br>meeting no. 24/81 dt. 18.03.2020 and decided<br>to remind Consultant (TEC-3) for expediting<br>the comments. A reminder was issued to | <br>The Committee considered the<br>case as per the agenda and | <br> <br> <br> <br> <br>Deferred | |
| <br> <br>decided to seek from the | |||||
| <br>applicant to furnish following | |||||
| information as per comments | |||||
| <br> <br>given by Consultant (TEC-3): | |||||
| <br> <br>1. Detailed calculations | |||||
| <br>supported with documents | |||||
| for requirement of welding | |||||
| <br>consumables for connector | |||||
| R33 | <br>welding. | ||||
| <br> <br> <br> <br> <br>The case stands deferred. | |||||
| consultant (TEC-3) on 25.05.2020. |
74 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| ANKIT<br>FASTENERS<br>PVT. LTD. | 01/81/050/00<br>922/AM19/<br> | The case was approved in M. No. 4/81-<br>ALC2/2019<br>dated<br>29.05.2019<br>on<br>the<br>recommendation of Consultant (TEC-3). The<br>applicant vide letter dated 09.07.2019 stated<br>that they had requested for RM of Dia. 6.33mm<br>and norms was fixed wrongly RM of Dia.<br>9.50mm and requested to correct the name of<br>RM as “Wire of SS Grade-A286 of dia<br>” | The Committee considered the<br>case<br>as<br>per<br>the<br>agenda.<br>Consultant (TEC-3) informed | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Approved | |
|---|---|---|---|---|---|
| that the applicant has requested | |||||
| for change of diameter of | |||||
| import item from 9.5mm to | |||||
| <br>6.33mm and enhancement of | |||||
| <br> <br>wastage.<br>However,<br>for | |||||
| <br> <br>enhancement of wastage the | |||||
| <br> <br>details<br>submitted<br>by<br>the | |||||
| <br> <br>applicant didn‟t justify the | |||||
| <br> <br>higher wastage. Therefore, on | |||||
| <br> <br>the<br>recommendation<br>of | |||||
| <br> <br>Consultant<br>(TEC-3),<br>the | |||||
| R34 | 07/24/040/00<br> | 6.33mm. The applicant had also requested for<br> | <br> <br>Committee decided that the | ||
| 0710114286<br>dated<br>14.12.2018 | 225/AM19/<br>HQ E-office<br>Computer<br>No.: 23386 | personal hearing to clarify the above point. As<br>per NC decision of M. No. 21/81 dated<br>22.01.2020 the case was referred to Consultant<br>(TEC-3) on 17.03.2020. The case was last<br>considered in meeting no. 24/81 dt. 18.03.2020<br>and decided to wait for comments. Reminder<br>issued to consultant (TEC-3) on 05.08.2020.<br>However, no comments have been received<br>yet. | <br> <br>description of import item may | ||
| <br> <br> <br> <br> <br> <br>be read as under:<br>“Wire of SS Grade-A286 of<br>dia 6.33 mm” | |||||
| <br> <br>Note: The rest of the decision | |||||
| <br>for items remains unchanged | |||||
| as decided in M. No. 4/81- | |||||
| ALC2/2019 dated 29.05.2019. | |||||
| RA<br>concerned<br>may<br>take | |||||
| suitable consequential action | |||||
| accordingly. | |||||
| ANKIT<br>FASTENERS<br>PVT LTD. | 01/81/050/00<br>923/AM19/<br>244 | The case was approved in M. No. 4/81-<br>ALC2/2019<br>dated<br>29.05.2019<br>on<br>the<br>recommendation of Consultant (TEC-3). The<br>applicant vide letter dated 09.07.2019 stated<br>that they had requested for norms as per their<br>technical drawing only but it was fixed very<br>less. The applicant has also requested for<br>l hi lif h b i h | <br> <br>The Committee considered the<br>case<br>as<br>per<br>the<br>agenda.<br>Consultant (TEC-3) informed | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Rejected | |
| <br> <br>that the applicant has requested | |||||
| <br> <br>for enhancement of wastage. | |||||
| <br> <br>However, for enhancement of | |||||
| <br> <br>wastage the details submitted | |||||
| <br> <br>by the applicant didn‟t justify | |||||
| R35 | 07//00/00<br> | persona earng to cary te aove pont. Te<br> | <br> <br>the higher wastage. Therefore, | ||
| 0710114287<br>Dated<br>14.12.2018 | 226/AM19/<br>HQ E-office<br>Computer<br>No.: 23387 | applicant had also requested for personal<br>hearing to clarify the above point. As per NC<br>decision of M. No. 21/81 dated 22.01.2020 the<br>case was referred to Consultant (TEC-3) on<br>17.03.2020. The case was last considered in<br>meeting no. 24/81 dt. 18.03.2020 and decided<br>to wait for comments. A reminder was issued<br>to Consultant (TEC-3) on 05.08.2020. | <br> <br>on the recommendation of | ||
| <br> <br>Consultant<br>(TEC-3),<br>the | |||||
| <br> <br>Committee decided to maintain | |||||
| <br> <br> <br> <br>status quo.<br>RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | |||||
| <br>ANKIT<br>FASTENERS<br>PVT LTD.<br>0710113851 | 01/81/050/00<br>592/AM19/<br>07/24/040/00<br>151/AM19/ | The case was approved in M. No. 4/81-<br>ALC2/2019<br>dated<br>29.05.2019<br>on<br>the<br>recommendation of Consultant (TEC-3). The<br>applicant vide letter dated 09.07.2019 stated<br>that they had requested for norms as per their<br>technical drawingonlybut it was fixed very | <br> <br>The Committee considered the<br>case<br>as<br>per<br>the<br>agenda.<br>Consultant (TEC-3) informed | <br> <br> <br> <br> <br> <br>Rejected | |
| R36 | |||||
| <br>that the applicant has requested | |||||
| <br>for enhancement of wastage. | |||||
| However,for enhancement of |
75 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| dated<br>17.09.2018 | HQ E-office<br>Computer<br>No.: 23391 | less. The applicant had also requested for<br>personal hearing to clarify the above point. The | <br>wastage the details submitted | <br> <br> <br> <br> <br> <br> <br> | |
|---|---|---|---|---|---|
| <br>by the applicant didn‟t justify | |||||
| <br>case was last considered in M. No. 24/81 dt. | <br> <br> <br>the higher wastage. Therefore, | ||||
| 18.03.2020 and decided to refer the case to<br>Consultant<br>(TEC-3)<br>for<br>examination<br>&<br>comments as decided in M. No. 21/81 dated<br>22.01.2020. As per decision of meeting no.<br>24/81 dt. 18.03.2020, the case was referred to<br>Consultant (TEC-3) on 05.11.2020. | <br>on the recommendation of | ||||
| <br>Consultant<br>(TEC-3),<br>the | |||||
| <br>Committee decided to maintain | |||||
| <br> <br>status quo.<br>RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | |||||
| NATIONAL<br>STEEL AND<br>AGRO<br>INDUSTRIES<br> | 01/81/050/00<br>251/AM17/ | Initially, the case was rejected in M. No. 2/81-<br>ALC2/2017 dated 18.04.2017 due to non-<br>submission of reply to MoS deficiency letter<br>dated 20.10.2016. The case was considered in<br>M. No. 9/81 dated 25.07.2017 and decided to<br>ratify the norms for the above AA as per<br>written comments of MoS vide UO No.<br>2(10)/2016-TD<br>dated<br>05.07.2017.<br>The<br>applicant‟s representation dated 26.11.2018<br>against<br>above<br>NC<br>decision<br>was<br>again<br>considered in M. No. 11/81-ALC2/2019 dated<br>04.09.2019. The case was last considered in M. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee decided to<br>remind<br>the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. | <br> <br> <br>Deferred | |
| R37 | <br>LTD. | No. 24/81 dt. 18.03.2020 the Committee noted<br>that the applicant‟s representation has not yet<br>been referred to MoS for examination as<br>decided in M. No. 21/81 dated 22.01.2020.<br>Therefore, the Committee directed to forward<br>the<br>applicant‟s<br>representation<br>to<br>MoS<br>immediately. Scanned copies of complete set<br>of applications along with all concerned/related<br>documents (reply to queries raised etc.) in<br>chronological order has been sought from the<br>applicant<br>vide<br>email<br>dated<br>10.08.2020.<br>However, no reply has been received yet. | |||
| 5610004971<br>Dated<br>08.08.2016 | 56/24/040/00<br>027/AM17/ | ||||
| <br>QUALITY<br>POWER<br>ELECTRICAL<br>EQUIPMENT<br>S PVT. LTD<br>3110065052<br>Dated<br>12.11.2014 | <br>01/81/050/00<br>529/AM15/<br>31/83/040/00<br>165/AM15/<br>HQ E-office<br>Computer<br>No.: 23407 | The case was rejected in M. No. 13/81-<br>ALC2/2015 dated 06.10.2015. NC noted that<br>firm has not replied to DHI D/L dated<br>03.07.2015 and reminder dated 21.08.2015.<br>Since no reply was received form firm despite<br>repeated reminders, the committee decided to<br>reject the case with direction to firm to pay<br>custom duty & applicable interest for EODC.<br>The applicant vide letter received in R&I on<br>03.07.2020 had requested for fixation of the<br>norms and stated that the applicant provide<br>information<br>to<br>joint<br>DGFT<br>Pune<br>on<br>28.10.2014. D/L dated 03.07.2015 had been<br>send but applicant has not replied till date. The<br>applicant has also not deposited the requisite<br>composition fee of Rs. 5000/-. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and noted<br>that no information has been<br>received yet from the applicant<br>regarding the deposition of<br>composition fee. Therefore, the<br>Committee decided toreject<br>the<br>applicant‟s<br>request<br>of<br>fixation of ad-hoc norms.<br>RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br> <br> <br>Rejected | |
| R38 | |||||
76 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| <br>INJECTOPLA<br>ST PVT. LTD<br>0610038682<br>Dated<br>29.08.2017 | 01/81/050/00<br>363/AM18/<br>06/24/040/00<br>020/AM18/<br>HQ E-office<br>Computer<br>No.: 23408 | The case was approved in M. No. 03/81-<br>ALC2/2018 dated 14.08.2018, NC decided to<br>ratify the norms for the above advance<br>authorization allowing the wastage of 5% with<br>the condition that RA should call for weight of<br>Phenolic Moulding Compound in the export<br>product and take necessary consequential<br>action accordingly. However, the applicant<br>vide letter dated 29.06.2020 requested for<br>review of ad-hoc norms stating that it is taking<br>AA for manufacturing resultant product "Brush<br>Box<br>Made<br>Out<br>of<br>Phenolic<br>Moulding<br>Compound" under 4.7 HBP and being granted<br>11.88 Grams raw material Phenolic Moulding<br>Compound for manufacturing to one piece<br>"Brush Box Made Out of Phenolic Moulding<br>Compound" on each and every Advance<br>Authorization. Hence applicant requested to<br>allow 11.88 Grams per piece. The applicant<br>has not deposited the requisite composition fee<br>of Rs. 5000/-. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and noted<br>that no information has been<br>received yet from the applicant<br>regarding the deposition of<br>composition fee. Therefore, the<br>Committee decided toreject<br>the<br>applicant‟s<br>request<br>of<br>revision of ad-hoc norms.<br>RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br> <br> <br>Rejected | |
|---|---|---|---|---|---|
| R39 | |||||
| <br>CHHAPERIA<br>INTERNATIO<br>NAL<br>COMPANY<br>0710115072<br>Dated<br>19.06.2019 | 01/81/050/00<br>137/AM20/<br>07/24/040/00<br>066/AM20/<br>HQ E-office<br>Computer<br>No.: 23411 | The case was approved in M. No. 17/81-<br>ALC2/2019 dated 27.11.2019 as per written<br>comments given by DPIIT vide U. O. No.: P-<br>47011/303/2019-TSW dated 13.11.2019. The<br>party vide letter dated 25.02.2020 has<br>requested for review of ad-hoc norms and<br>inform that the export item width has been<br>restricted to 300 mm but it depends on client<br>order and machine capacity, at the current<br>capacity and order situation. Hence, the<br>applicant has requested to allow width of<br>export item upto 360 mm and thickness of<br>export item to be same or less than the import<br>item thickness. The applicant has not deposited<br>the requisite composition fee of Rs. 5000/-. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and noted<br>that no information has been<br>received yet from the applicant<br>regarding the deposition of<br>composition fee. Therefore, the<br>Committee decided toreject<br>the<br>applicant‟s<br>request<br>of<br>revision of ad-hoc norms.<br>RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | <br> <br> <br> <br> <br> <br> <br> <br> <br>Rejected | |
| R40 | |||||
77 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
| <br>ANAND ARC<br>LTD.<br>0310819142<br>Dated<br>14.02.2018 | <br>01/81/050/00<br>007/AM19/<br>03/94/040/00<br>914/AM18/<br>HQ E-office<br>Computer<br>No.: 23771 | The case was approved in M. No. 21/81-<br>ALC2/2019 dated 22.01.2020 as per written<br>comments<br>of<br>Consultant<br>(TEC-3).<br>The<br>applicant vide letter dated 14.03.2020 had<br>requested<br>for<br>review of<br>ad-hoc<br>norms<br>informing that the product namely plain wire<br>rod 5.5 MM grade ER70S-6 have been fixed<br>@1.01 KGS. content in the export product in<br>the meeting no. 21/81 dated 22.01.2020 and the<br>same product in the same meeting in respect of<br>AA No. 0310822171 dated 06.07.2018 has<br>been fixed @5% wastage. | The case was approved in M. No. 21/81-<br>ALC2/2019 dated 22.01.2020 as per written<br>comments<br>of<br>Consultant<br>(TEC-3).<br>The<br>applicant vide letter dated 14.03.2020 had<br>requested<br>for<br>review of<br>ad-hoc<br>norms<br>informing that the product namely plain wire<br>rod 5.5 MM grade ER70S-6 have been fixed<br>@1.01 KGS. content in the export product in<br>the meeting no. 21/81 dated 22.01.2020 and the<br>same product in the same meeting in respect of<br>AA No. 0310822171 dated 06.07.2018 has<br>been fixed @5% wastage. | The case was approved in M. No. 21/81-<br>ALC2/2019 dated 22.01.2020 as per written<br>comments<br>of<br>Consultant<br>(TEC-3).<br>The<br>applicant vide letter dated 14.03.2020 had<br>requested<br>for<br>review of<br>ad-hoc<br>norms<br>informing that the product namely plain wire<br>rod 5.5 MM grade ER70S-6 have been fixed<br>@1.01 KGS. content in the export product in<br>the meeting no. 21/81 dated 22.01.2020 and the<br>same product in the same meeting in respect of<br>AA No. 0310822171 dated 06.07.2018 has<br>been fixed @5% wastage. | The case was approved in M. No. 21/81-<br>ALC2/2019 dated 22.01.2020 as per written<br>comments<br>of<br>Consultant<br>(TEC-3).<br>The<br>applicant vide letter dated 14.03.2020 had<br>requested<br>for<br>review of<br>ad-hoc<br>norms<br>informing that the product namely plain wire<br>rod 5.5 MM grade ER70S-6 have been fixed<br>@1.01 KGS. content in the export product in<br>the meeting no. 21/81 dated 22.01.2020 and the<br>same product in the same meeting in respect of<br>AA No. 0310822171 dated 06.07.2018 has<br>been fixed @5% wastage. | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and decided<br>torevise the ad-hoc normson<br>repeat basisas approved for<br>**AA No.**0310822171 dated<br>06.07.2018 in M. No. 21/81<br>dated<br>22.01.2020<br>as<br>per<br>comments given by Consultant<br>(TEC-3) as under: | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and decided<br>torevise the ad-hoc normson<br>repeat basisas approved for<br>**AA No.**0310822171 dated<br>06.07.2018 in M. No. 21/81<br>dated<br>22.01.2020<br>as<br>per<br>comments given by Consultant<br>(TEC-3) as under: | <br> <br> <br> <br> <br> <br> <br> <br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| R41 | |||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 72292000 | Wire of other Alloy<br>Silico Manganese Steel | 1500 MT | 72279090 | Plain wire Rod 5.5mm<br>Grade ER70S-6 | 5%<br>wastage<br>with<br>accountabilityclause | ||||
| RA concerned maytake suitable consequential action accordingly. |
The meeting ended with a vote of thanks to the Chair.
Shobhit Gupta Dy. Director General of Foreign Trade E-mail: nc2.dgft@nic.in shobhit.gupta@gov.in
78 | P a g e 7 8 Minutes of NC-II Meeting No. 06/81 scheduled for 11.08.2020 and held on 25.08.2020
SDF
| Export Items: | Export Items: | Export Items: |
|---|---|---|
| 1 | Model number, technical specification and specific quantity-both in terms of number (if<br>any)and/or weight,of each exportproduct(Appendix-33 of current HBP refers). | |
| 2 | Detail technical note on manufacturing process includingthe relevant flowsheet. | |
| 3 | Detail technical drawings with dimension of each export product, Catalogue, if any, may<br>also be furnished. | |
| 4 | Weight of each Export Product. | |
| 5 | Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license,if any,mayalso be indicated. | |
| Import Items: | ||
| 6 | Information about the inputs required per unit of the resultant product as per Sl. No. 1 of<br>Appendix-11A appearingin current HBP(Vol.I)separatelyfor eachproduct. | |
| Components: | ||
| 7 | Technical characteristics /part numbers,if any. | |
| 8 | Assembly drawings/diagrams of the resultant product showing placement and exact use<br>of components in the exportproduct(s). | |
| 9 | Bifurcated quantities of components to be accounted for in the resultant product and the<br>requirement of components as spares. Raw Material / Consumables. | |
| 10 | Size and specification including grade, composition, range, thickness etc. of the items<br>proposed for import. | |
| 11 | Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components<br>to be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing<br>with<br>complete<br>justification<br>and<br>supported<br>by<br>documentary<br>evidence/drawings etc. | |
| 11(a) | Sheet layout diagram of the material indicatingthewastage duringblanking. | |
| 12 | Cross Sectional Diagram of export product with calculation of raw material requirement<br>and the weight of the Cable in Kg. per Km. Copy of relevant National/International<br>Standard/buyer’s data sheet mayalso be furnished. | |
| 13 | Weight of Steel, which requires imported welding material, giving break-up of:<br>i)<br>Steel Plates/Sheets upto 30mm thickness<br>ii)<br>Steel Plates/Sheets more than 30 mm thickness and upto 70 mm thickness<br>iii) Steel Plates/Sheets more than 70 mm thickness.<br>iv) Others e.g.Flanges,Pipes,Tubes,Bars/Rods, Castings/Forgings etc. | |
| 14 | Particulars of the licenses obtained in the past and ratified by ALC (with or without<br>modification) for the same export product covered under this application, in view of<br>PublicNoticeNo.48dated 14.11.2002. | |
| 15 | Use of exportproduct. | |
| 16 | You are advised to applyfor SION. | |
| 17 | Please use expanded/full name of endproduct.Do not use the abbreviations/short form. | |
| 18 | -- | |
| 19 | Any other information: | |
| 20 | The information called for must be submittedin duplicate within 15 daysfrom the date<br>of issue of this letter. The information may be directly sent to Chairman, NC-II, O/o<br>DGFT,UdyogBhawan,New Delhi-110011,Office Telephone No.: 23061562,Extn.267. |
| The following quantity of import may be allowed against export: | The following quantity of import may be allowed against export: | The following quantity of import may be allowed against export: | The following quantity of import may be allowed against export: | The following quantity of import may be allowed against export: | ||
|---|---|---|---|---|---|---|
| SINo<br>Item of Export<br>Quantity<br>Item of Import<br>Quantity | ||||||
| 1<br>HOT<br>ROLLED<br>STEEL<br>21.78 MT<br>HOT ROLLED STEEL<br>21.89 MT<br><br><br> | ||||||
| SHEET<br>(PICKLED | AND<br>SHEET<br>I | N<br>COILS<br>inclusive of 0. | 5% | |||
| OILED) , GRADE | 0011,<br>(PICKLED | AND<br>wastage. | ||||
| THICKNESS<br>5.5 | MM,<br>OILED)<br> | ,<br>GRADE | ||||
| WIDTH<br>1220 | MM,<br>0011,<br>T | HICKNESS | ||||
| LENGTH 2440 MM | 5.5 MM, W | IDTH<br>1220 | ||||
| MM, LENG | TH C MM | |||||
| 2<br>HOT<br>ROLLED<br> | STEEL<br>495 MT<br>HOT ROLL | ED STEEL<br>497.5 MT | ||||
| SHEET<br>(PICKLED<br>AND<br>SHEET<br>IN<br>COILS<br>inclusive of 0.5% | ||||||
| OILED),<br>GRADE<br>0011,<br>(PICKLED<br>AND<br>wastage | ||||||
| THICKNESS<br>2.50<br>MM,<br>OILED),<br>GRADE | ||||||
| WIDTH<br>1220<br>MM,<br>0011,<br>THICKNESS | ||||||
| LENGTH 2440 MM<br>2.50 MM, WIDTH 1220 | ||||||
| MM, LENGTH C MM | ||||||
| 3<br>COLD<br>ROLLED<br>STEEL<br>297 MT<br>COLD<br>ROLLED<br>300 MT inclusive | ||||||
| SHEET<br>IN<br>COILS,<br>STEEL<br>SHEET<br>IN<br>of 1% wastage | ||||||
| GRADE<br>BHG1,<br>COILS, GRADE BHG 1, | ||||||
| THICKNESS<br>0.5<br>MM,<br>THICKNESS<br>0.5<br>MM, | ||||||
| WIDTH<br>24.90 | MM,<br>WIDTH<br> | 1000<br>MM, | ||||
| LENGTH C MM | LENGTH C | MM | ||||
| 4<br>COLD<br>ROLLED<br> | STEEL<br>990 MT<br>COLD | ROLLED<br>1000 MT | ||||
| SHEET<br>IN<br> | COILS,<br>STEEL<br>S | HEET<br>IN<br>inclusive of 1 | % | |||
| GRADE<br>B50 | D390,<br>COILS, | GRADE<br>wastage. | ||||
| THICKNESS<br>0.5 | MM,<br>B50D390, T | HICKNESS | ||||
| WIDTH<br>220.5 | MM<br>0.5 MM W | IDTH<br>1112 | ||||
| ,<br>,<br>LENGTH C MM<br>MM, LENGTH C MM<br>(S.K. Bhatnager)<br>Technical Consultant-4<br>24.08.2020 | ,<br>,<br>LENGTH C MM<br>MM, LENGTH C MM |
| I | SI.No. | Net | Export | Weight | (Kgs.lKm) | SI.No. | Net | Export | Weight | (Kgs.lKm) | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 16811 | 19 | 552.9 | ||||||||
| 2 | 3839.9 | 20 | 759.1 | ||||||||
| 3 | 2502 | 21 | 984.2 | ||||||||
| 4 | 9478 | 22 | 1390.8 | ||||||||
| 5 | 11473 | 23 | 1837.3 | ||||||||
| 6 | 6479 | 24 | 2305.7 | ||||||||
| 7 | 391 | 25 | 12349 | ||||||||
| 8 | 476 | 26 | 670.7 | ||||||||
| 9 | 573.8 | 27 | 871.2 | ||||||||
| 10 | 840.8 | 28 | 1328 | ||||||||
| 11 | 1067.8 | 29 | 2206.9 | ||||||||
| 12 | 1560 | 30 | 1102 | ||||||||
| 13 | 1891.5 | 31 | 663.1 | ||||||||
| 14 | 3415.3 | 32 |
479.8 | ||||||||
| 15 | 5188 | 33 | 247 | ||||||||
| 16 | 6643.4 | 34 | 159.6 | ||||||||
| 17 | 7536.4 | 35 | 43.7 | • | |||||||
| 18 | 446 | 36 | 30.4 |
Government of India Director General of Foreign Trade
Case No 60
HQ File No: 01/81/050/00327/AM20
Advance Authorization No. 3110067607 dated 26.11.2019
M/s Thyssenkrupp Electrical Steel India Pvt Ltd, Nashik
The following quantity of items of imports may be considered by NC-II committee:
| Sl<br>No | Item of export | Quantity | Item of import | Quantity |
|---|---|---|---|---|
| 1 | Cold Rolled Grain<br>Oriented (CRGO)<br>Silicon<br>Electrical<br>Steel Sheets/Coils | 100 MT | Cold Rolled Full Hard<br>Silicon<br>Electrical<br>Steel<br>Coilof relevant grade. | <br>113.90 MT |
| Magnesium Oxide (MgO)<br>Powder. | 0.40 MT | |||
| TitaniumOxide (TiO2) | 0.027 MT | |||
| Organic/Inorganic Coating<br>Chemicals | 0.82 MT | |||
| Liquefied Petroleum Gas<br>asFuel | 20.32 MT | |||
| Liquefied Petroleum Gas<br>asFeed | 5.84 MT | |||
| Vapour<br>Corrosion<br>Inhibitor<br>Paper<br>(VCI<br>Rusto paper Thickness:<br>0.201 mm) | 0.175 MT |
==> picture [86 x 29] intentionally omitted <==
(S.K. Bhatnager) TC(SKB) 21.08.2020
Shri Shobhit Gupta Dy DGFT NC-II
Government of India Director General of Foreign Trade
Case No 61
HQ File No: 01/81/050/00328/AM20
Advance Authorization No. 3110067608 dated 26.11.2019
M/s Thyssenkrupp Electrical Steel India Pvt Ltd, Nashik
The following quantity of items of imports may be considered by NC-II committee:
| Sl<br>No | Item of export | Quantity | Item of import | Quantity |
|---|---|---|---|---|
| 1 | Cold Rolled Grain<br>Oriented (CRGO)<br>Silicon<br>Electrical<br>Steel Sheets/Coils | 100 MT | Cold Rolled Magnesium<br>Oxide<br>(MgO)<br>Coated<br>and<br>Annealed<br>Silicon<br>Electrical Steel Coils of<br>relevant<br>grade<br>and<br>thickness. | 109.55 MT |
| Organic/Inorganic<br>Coating Chemicals. | 0.82 MT | |||
| Liquefied Petroleum Gas<br>(LPG) | 3.37 MT | |||
| Vapour<br>Corrosion<br>Inhibitor<br>Paper<br>(VCI<br>Rusto paper @180GSM) | 0.175 MT |
==> picture [86 x 30] intentionally omitted <==
(S.K. Bhatnager) TC(SKB) 21.08.2020
Shri Shobhit Gupta Dy DGFT NC-II
Government of India Director General of Foreign Trade
Case No 62
HQ File No: 01/81/050/00329/AM20
Advance Authorization No. 3110067609 dated 26.11.2019
M/s Thyssenkrupp Electrical Steel India Pvt Ltd, Nashik
The following quantity of items of imports may be considered by NC-II committee:
| Sl<br>No | Item of export | Quantity | Item of import | Quantity |
|---|---|---|---|---|
| 1 | Cold Rolled Grain<br>Oriented (CRGO)<br>Silicon<br>Electrical<br>Steel Sheets/Coils | 100 MT | Hot Rolled Annealed<br>and<br>Pickled<br>Silicon<br>Electrical Steel Coils of<br>relevant grade. | 120.00 MT |
| Rolling Mill Rolls | 0.12MT | |||
| Rolling Oil | 0.045MT | |||
| Magnesium Oxide (MgO)<br>Powder @ 8gm/m2 both<br>side. | 0.40 MT | |||
| TitaniumOxide (TiO2) | 0.027 MT | |||
| Organic/Inorganic Coating<br>Chemicals | 0.82 MT | |||
| Liquefied Petroleum Gas<br>asFuel | 22.88 MT | |||
| Liquefied Petroleum Gas<br>as Feed | 6.38 MT | |||
| Vapour<br>Corrosion<br>Inhibitor<br>Paper<br>(VCI<br>Rusto paper, Thickness:<br>0.201 mm) | 0.175 MT |
==> picture [86 x 29] intentionally omitted <==
(S.K. Bhatnager) TC(SKB) 21.08.2020
Shri Shobhit Gupta Dy DGFT NC-II
Advance Licence No. 0310835137 DTD. 02.03.2020
LIST OF EXPORT PRODUCTS:-
| SR. NO. | H.S. CODE | DESCRIPTION OF EXPORT PRODUCTS | QTY in Km |
|---|---|---|---|
| 1 | 85446030 | RUBBER INSULATED WIRE / CABLES - 1.5 KVDC/SLR CABLE/1C X 4 SQMM-NL | 500.000 |
| 2 | 74081190 | COPPER CONDUCTOR - APC/35 SQ.MM/CIRCULAR COMPACTED COND. | 80.000 |
| 3 | 74081190 | COPPER CONDUCTOR - APC/95 SQ.MM/CIRCULAR COMPACTED COND. | 15.450 |
| 4 | 85446020 | INSULATED WIRE / CABLES - 1.8/3(3.6)KV/AL/XLPE/PVC/ASA/PVC/1CX400- | 20.000 |
| 5 | 74081190 | COPPER CONDUCTOR - ATC/2/0 AWG-67.42/STRANDED CIRCULAR COND | 2.212 |
| 6 | 74081190 | COPPER CONDUCTOR - ATC/4/0AWG-107.22/STRANDED CIRCULAR COND | 18.300 |
| 7 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/2C X 10 SQ.MM | 600.000 |
| 8 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/4C X 16 SQ.MM | 100.000 |
| 9 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/3CX50+55+25 SQ.MM-IM | 200.000 |
| 10 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/3 X 70+55+ 25 SQ.MM | 200.000 |
| 11 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/3 X 95+55+25 SQ.MM | 100.000 |
| 12 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/4C X 35 + 25 SQ.MM | 8.753 |
| 13 | 74081190 | COPPER CONDUCTOR - APC/25 SQ.MM/CIRCULAR COMPACTED COND. | 0.550 |
| 14 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/4C X 50 + 25 SQ.MM | 25.711 |
| 15 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/PVC/PVC/SWA/PVC/4C X 95+50 | 0.200 |
| 16 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/PVC/PVC/SWA/PVC/4C X 120+70 | 0.200 |
| 17 | 74081190 | COPPER CONDUCTOR - APC/50 SQ.MM/CIRCULAR COMPACTED COND. | |
| TOTAL | 1,913.88 |
Advance Licence No. 0310835975 DTD. 26.04.2020
LIST OF EXPORT PRODUCTS:-
| nce Li<br>OF EX | cence No. 0310835975 DTD. 26.04.2020<br>PORT PRODUCTS:- | cence No. 0310835975 DTD. 26.04.2020<br>PORT PRODUCTS:- | |||||
|---|---|---|---|---|---|---|---|
| SR. | NO. | H.S. CODE | DESCRIPTION OF E | XPORT PRODUCTS | QTY in Km | ||
| 1 | 85446020 | INSULATED WIRE / CABLES - 1.8/3(3.6) | KV/AL/XLPE/PVC/ASA/FR/1CX400 | 16.330 | |||
| 2 | 85446020 | INSULATED WIRE / CABLES - 1.8/3(3.6) | KV/AL/XL/PVC/AWA/FR/1C X 240 | 74.500 | |||
| 3 | 85446020 | INSULATED WIRE / CABLES - 19.9/34.5 KV/AL/XLPE/LSZH/1C X 150/16 | 20.365 | ||||
| 4 | 85446020 | INSULATED WIRE / CABLES - 19.9/34.5 KV/AL/XLPE/LSZH/1C X 185/16 | 29.664 | ||||
| 5 | 85446020 | INSULATED WIRE / CABLES - 19.9/34.5 KV/AL/XLPE/LSZH/1C X 400/16 | 102.372 | ||||
| 6 | 85446020 | INSULATED WIRE / CABLES - 19.9/34.5 KV/AL/XLPE/LSZH/1C X 630/16 | 3.374 | ||||
| 7 | 85446020 | INSULATED WIRE / CABLES - 35 KV/AAC/HMWPE/BHDTRPE/336.4 KCM-MVCC | 14.402 | ||||
| 8 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/PVC/PVC/CTS/PVC/12C X 1.5 | 9.000 | ||||
| 9 | |||||||
| 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/ | U/PVC/PVC/CTS/PVC/20C X 1.5 | 0.550 | ||||
| 1 | 0 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/C | U/PVC/PVC/CTS/PVC/4C X 1.5 | 5.500 | ||
| 1 | 1 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/C | U/PVC/PVC/CTS/PVC/4C X 2.5 | 9.000 | ||
| 1<br> | 2<br> | 85444920<br> | INSULATED WIRE / CABLES - 0.6/1 KV/C<br> | U/PVC/PVC/CTS/PVC/4C X 4<br> | 3.000<br> | ||
| 1 | 3 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/C | U/PVC/PVC/CTS/PVC/4CX6+2.5(E) | 0.500 | ||
| 1 | 4 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/C | U/PVC/PVC/CTS/PVC/4CX16+6(E) | 0.450 | ||
| 1 | 5 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/C | U/PVC/PVC/CTS/PVC/2CX2.5+2.5 | 2.000 | ||
| 1 | 6 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/PVC/PVC/CTS/PVC/2CX6+2.5 | 5.000 | |||
| 1 | 7 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/PVC/PVC/CTS/PVC/3CX6+2.5 | 0.700 | |||
| 1 | 8 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/PVC/PVC/CTS/PVC/3CX16+6 | 0.700 | |||
| 1 | 9 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/XLPE/PVC/CTS/PVC/1C X 630 | 5.000 | |||
| 2 | 0 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/PVC/(AMT+D)/PVC/1PRX1.5 | 0.850 | |||
| 2 | 1 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/PVC/(AMT+D)/PVC/1TRX1 | 1.250 | |||
| 2 | 2 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/PVC/(AMT+D)/PVC/4PRX1.5<br> | 4.300 | |||
| 23 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/PVC/(AMT+D)/PVC/4TRX1 | 3.550 | ||||
| 24 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/XLPE/PVC/CTS/PVC/2CX25+6 | 0.400 | ||||
| 2 | 5 | 85444920 | <br>INSULATED WIRE / CABLES - 0.6/1 KV/C | <br>U/PVC/XLPE/CTS/PVC/2CX50+16 | 0.200 | ||
| 2 | 6 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/C | U/XLPE/PVC/CTS/PVC/3CX25+6 | 0.800 | ||
| 2 | 7 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/C | U/XLPE/PVC/CTS/PVC/3CX35+10 | 0.900 | ||
| 2 | 8 | 85444920 | INSULATED WIRE / CABLES - 06/1 KV/ | U/XLPE/PVC/CTS/PVC/3CX70+25 | 0160 | ||
| . | . | ||||||
| 2 | 9 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/C | U/XLPE/PVC/CTS/PVC/4CX25+6 | 0.120 | ||
| 3 | 0 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/A | B CABLE/3C X 50 + 54.6 SQ.MM | 160.000 | ||
| 3 | 1 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/1C X 50 + 54.6 SQ.MM | 300.000 | |||
| 3 | 2 | 85446020 | INSULATED WIRE / CABLES - 12/20(24)KV/ALU/XLPE/CWS/LSZH/1CX150/16 | 9.000 | |||
| 3 | 3 | 85444920 | INSULATED WIRE / CABLES - 0.6/1.0 KV/AB CABLE/4 C X 25 SQ.MM | 0.380 | |||
| 3 | 4 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/3CX70+1CX54.6+1CX16 | 35.055 | |||
| 3 | 5 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/3CX35+1CX54.6+1CX16 | 9.787 | |||
| 3 | 6 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AB CABLE/3C X 150 + 70 SQ.MM | 0.820 | |||
| 3 | 7 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/XLPE/PVC/1C X 240 SQ.MM-FLEX | 0.200 | |||
| 38 | 8 | 85444920 | INSULATED WIRE / CABLES - 06/1 KV/CU/XLPE/PVC (RV-K)/2C X 15 | 3246 | |||
| . . | . | ||||||
| 39 | 85446030 | RUBBER INDULATED WIRE / CABLES - 1.8KVDC/ATC/HEPR/EVA/1CX4-NL | 1,508.000 | ||||
| 4 | 0 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/C | U/PVC/FRLS/1C X 6 SQ.MM | 0.250 | ||
| 4 | 1 | 85444920 | INSULATED WIRE - CABLES - 0.6/1 KV/C | U/PVC/FRLS/1C X 25 SQ.MM | 2.000 | ||
| 4 | 2 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/A | LU/PVC/FRLS/1C X 185 SQ.MM | 0.800 | ||
| 4 | 3 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/ | NYCY/CU/PVC/PVC/CTS/FR/12CX2.5 | 0.500 | ||
| 4 | 4 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/ | NYCY/CU/PVC/PVC/CTS/FR/19CX2.5 | 5.000 | ||
| 4 | 5 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/A | L/XLPE/PVC/SWA/FR/4C X 10 SQMM | 15.000 | ||
| 4 | 6 | ||||||
| 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AL/XL/PVC/SSA/FR/4C X 120 SQ.MM | 0.500 | |||||
| 4 | 7 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/AL/XL/PVC/SSA/FR/4CX35/25 SQ.MM | 4.500 | |||
| 4 | 8 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/NYCY/CU/PVC/PVC/CTS/FR/2CX2.5 | 0.500 | |||
| 4 | 9 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/NYCY/CU/PVC/PVC/CTS/FR/5CX2.5 | 1.500 | |||
| 5 | 0 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/NYCY/CU/PVC/PVC/CTS/FR/7CX2.5 | 0.500 | |||
| 5 | 1 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/XLPE/PVC/SWA/FR-PVC/3C X 2.5 | 6.500 | |||
| 5 | 2 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/XLPE/PVC/SWA/FR/4C X 4 SQ.MM | 0.800 | |||
| 5 | 3 | 85444920 | INSULATED WIRE / CABLES - 0.6/1 KV/CU/XLPE/PVC/SWA/FR-PVC/3C X 2.5 | 1.500 | |||
| TOTAL | 2,381.27 |
==> picture [267 x 22] intentionally omitted <==
==> picture [176 x 68] intentionally omitted <==
==> picture [6 x 4] intentionally omitted <==
| Sr. | Size & Description | Size & Description | Of Cables | Qty | Total | |||
|---|---|---|---|---|---|---|---|---|
| No. | (MTRS) | Cable wt | ||||||
| (MT) | ||||||||
| 1 | ~pperConductor<br>PVC '"Iu'''''<br>Cu. Wlre Scnened<br>~u. Tapepve Sheathed UnarmouredCabl8Be1ow1000 | with<br>V. | ||||||
| 1.01 | ~ Core X 1.5 Sq MM | 3000 | 0.883 | |||||
| 1.02 | 17 Core X 1.5 Sq MM | 14000 | 5.461 | |||||
| 1.03 | ~2 Core X 1.5 Sq MM | 4000 | 1.885 | |||||
| 1.04 | 2 Core X 2.5 Sq MM | 17380 | 4.661 | |||||
| 1.05 | ~ Core X 4 Sq MM | 1700 | 0.609 | |||||
| 1.06 | ~ Core X 2.5 Sq MM | 9000 | 2.723 | |||||
| 1.07 | ~ Core X 4 Sq MM | 3800 | 1.562 | |||||
| 1.08 | ~ Core X 10 Sq MM | 2650 | 1.885 | |||||
| 1.09 | ~ Core X 2.5 Sq MM | 8000 | 2.860 | |||||
| 1.10 | ~ Core X4 Sq MM | 1440 | O.7G1 | |||||
| 1.11 | 2Core X 35 Sq MM | 1130 | 1.245 | |||||
| - | ||||||||
| 1.12 | 3 Core X 25 Sq MM | 2850 | 3.~~g. | |||||
| 1.13 | ~ Core X 35 Sq MM | 1050 | 1.555 | |||||
| 1.14 | f3 Core X 50 Sq MM | 1710 | 3.416 | |||||
| ~ | d I | |||||||
| 1.15 | ~ Core X 95 Sq MM | 7060 | 26.4,tlt·· |
| 1.16 | ~ Core X 150 Sq MM | 9590 | 55.963 | |||
|---|---|---|---|---|---|---|
| 1.17 | ~ Core X 50 Sq MM | 1560 | 3.977 | |||
| 1.18 | ~ Core X 70 sq MM | 970 | 3.396 | |||
| 1.19 | ~ Core X 95 Sq MM | 1835 | 8.753 | |||
| 1.20 | ~ Core X 185 Sq MM | 3110 | 28.043 | |||
| 1.21 | ~ Core X 1.5 Sq MM | 8000 | 2.227 | |||
| 2 | ~opper Conductor PVC Insulated<br>Unannoured Cable Below 1000 V. | PVC Sheathed | ||||
| 2.01 | 2 Core X 6 Sq MM | . | 800 | 0.287 | ||
| 2.02 | ~ Core X 16 Sq MM | 3060 | 1.918 | |||
| 2.03 | ~ Core X 35 Sq MM | 1010 | 0.934 | |||
| 2.04 | 2 Core X 25 Sq MM | 790 | 0.572 | |||
| 2.05 | 3Core X 2.5 Sq MM | 1806 | 0.300 | |||
| 3 | Copper Conductor Covered withe••••<br>·MlcaTape XLPE<br>nsulatad ZHFR ;SheathedUnarmoul'8d<br>'Gable Below 1000 V. | |||||
| 3.01 | 3 Core X 2.5 Sq. MM | 9960 | 3.517 | |||
| 3.02 | 3 Core X 4 Sq. MM | 680 | 0.293 | |||
| 3.03 | ~ Core X 10 Sq. MM | 12040 | 8.490 | |||
| 3.04 | ~ Core X 4 Sq. MM | 500 | 0.223 | |||
| 3.05 | ~ Core X 2.5 Sq. MM | 500 | 0.188 | |||
| 4 | Copper Conductor Covered with GI_<br>MIca'rape XLPE<br>nsulaled CU. Wire Screened with Cu.".pe ZHFR Sheathed<br>Unarmoured Cable Below 1000 V. | |||||
| 4.01 | 12 Core X 120 Sq. MM | 1010 | 3.508 | |||
| 4.02 | ~ Core X 150 Sq. MM | 2500 | 9.819 | |||
| 4.03 | ~ Core X 185 Sq. MM | 2420 | 12.389 | |||
| 4.04 | ~ Core X 240 Sq. MM | 2940 | 19.246 |
| iCopper Condo Covered | with | Semi | C~Compound | C~Compound | C~Compound | XLPE | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 5 | m.ulated<br>CU. Wire Screened | with | CU. Tape PVC Sheathed | |||||||||
| ~narmOUred<br>Cable<br>6110 KV | {E} | |||||||||||
| 5.01 | ~ Core X 240 MCM | 780 | 6.685 | |||||||||
| 6 | ~Iumlnlum<br>Conuctor<br>XLPE Insulated<br>Sheathed<br>Unarmoured<br>Cable Below | PVC, Nylon,<br>1000 V. | HOPE | |||||||||
| 6.01 | 4 Core X 25 Sq. MM | 500 | 0.294 | |||||||||
| 6.02 | 4 Core X 120 Sq. MM | 500 | 1.094 | |||||||||
| 7 | Copper Conuctor<br>·XLPE Insulated<br>PVC, Nylon,<br>Sheathed<br>Unarmoured<br>Cable Below<br>1000 V. | HDPE | ||||||||||
| 7.01 | 13 Core X 2.5 Sq. MM | 1400 | 0.662 | |||||||||
| 7.02 | ~1 Core X 2.5 Sq. MM | 1400 | 0.577 | |||||||||
| 7.03 | ~ Core X 2.5 Sq. MM | 1400 | 0.474 | |||||||||
| 7.04 | ~ Core X 2.5 Sq. MM | 1700 | 0.466 | |||||||||
| 7.05 | ~ COTeX 2.5 Sq. MM | 3600 | 0.598 | |||||||||
| 7.06 | ~ Core X 4 Sq. MM | 1050 | 0.228 | |||||||||
| 7.07 | 4 Core X 6 Sq. MM | 625 | 0.269 | |||||||||
| 8 | Copper Col1ductor<br>PVC Insulated<br>~OOOY. | Unarmoured | eable | Below | ||||||||
| 8.01 | 1Core X 70 Sq MM | 17000 | 11.508 | |||||||||
| 9 | ~LPE Insulated<br>Aluminium<br>Pha ••<br>r.e ••• nger Condo Aerial<br>Bunched | Cond. <br>Cable | TWisted Without<br> Below<br>1000 V. | |||||||||
| 9.01 | ~ Core X 16 Sq. MM | 140000 | 18.698 | |||||||||
| 9.02 | ~ Core X 16 Sq. MM | 6500 | 1.736 | |||||||||
| XLPE Insulated<br>Aluminium | Condo | TWIsted ·Over A | Central | AI. | ||||||||
| 10 | Alloy Insulated<br>M•••• | nger Condo | Aerial | Bunched | Cable | |||||||
| Below 1000 V. | ||||||||||||
| 10.01 | ~ C X 70 Sq. MM + 1 C | x 55 Sq. MM | 51000 | 46;451 | ||||||||
| 10.02 | B C X 50 Sq. MM + 1 C | x 55 Sq. MM | 73000 | 52.461 | ||||||||
| 10.03 | 3 C X 35 Sq. MM + 1 C | x 55 Sq. MM | 48000 | 28.148 |
| 10.04 | 3 C X 70 Sq. MM + 1 C x 55 Sq. MM | 3 C X 70 Sq. MM + 1 C x 55 Sq. MM | 61500 | 59.632 |
|---|---|---|---|---|
| 11 | Copper Conductor XLPE InaulatH,Z-NFR 'Sheathed<br>Unarmoured<br>Cable Below<br>1000 V. | |||
| 11.01 | as Core X 50 Sq. MM | 500 | 0.911 | |
| 11.02 | ~.5 Core X 95 Sq. MM | 600 | 2.156 | |
| 11.03 | ~.5 Core X 120 Sq. MM | 800 | 3.634 | |
| 11.04 | ~ Core X 70 Sq. MM | 1500 | 1.233 | |
| 11.05 | ~ Core X 4 Sq. MM | 500 | 0.216 | |
| 11.06 | ~ Core X 25 Sq. MM | 1000 | 1.590 | |
| 11.07 | 5 Core X 35 Sq. MM | 1000 | 2.089 | |
| 11.08 | 5 Core X 95 Sq. MM | 500 | 2.620 | |
| 11.09 | 5 Core X 185 Sq. MM | SOO |
4.945 | |
| 11.10 | ~ Core X 4 Sq. MM | 2000 | 0.580 | |
| 11.11 | ~ Core X 10 Sq. MM | SOO |
0.241 | |
| 11.12 | 3 Core X 2.5 Sq. MM | 2500 | 0.667 | |
| 11.13 | 3 Core X 4 Sq. MM | 2800 | 0.939 | |
| 11.14 | 3 Core X 6 Sq. MM | 600 | 0.252 | |
| 11.15 | 3 Core X 10 Sq. MM | 1800 | 1.048 | |
| 11.16 | ~ Core X 16 Sq. MM | 2000 | 1.551 | |
| 11.17 | ~ Core X 2.5 Sq. MM | 2500 | 0.777 | |
| 11.18 | ~ Core X 6 Sq. MM | 1200 | 0.604 | |
| 11.19 | ~ Core X 10 Sq. MM | 800 | 0.568 | |
| 11.20 | ~ Core X 16 Sq. MM | 1500 | 1.439 | |
| 11.21 | ~ Core X 4 Sq. MM | 2200 | 0.638 | |
| 11.22 | ~ Core X 35 Sq. MM | 500 | 0.641 | |
| 11.23 | 3 Core X 50 Sq. MM | 1500 | 2.504 | |
| 11.24 | 3 Core X 120 Sq. MM | 1600 | 6.118· | |
| 11.25 | 3 Core X 185 Sq. MM | 800 | 4.660 | |
| 11.26 | 4 Core X 25 Sq. MM | 1500 | 1.901 |
| 1<br>1<br>1<br>1<br>1<br>1<br>1 | 1<br>1<br>1<br>1<br>1<br>1<br>1 | |||||
|---|---|---|---|---|---|---|
| 12<br>Copper Conductor<br>XLP<br>'<br> | E Insul.tedDFR:<br>Sheathed | |||||
| Annoured<br><lable Below<br>1000 V. | ||||||
| 1 | 2.01 3 Core X 4 Sq. MM<br>500<br>0.276 | |||||
| 1 | 2.02 ~ Core X 2.5 Sq. MM<br>500<br>0.294 | |||||
| 13<br>~opper<br>Conductor<br>PVC IRaulated<br>•••.••<br>1ShIelded<br>PVC<br>~heathed<br>Unannoured<br>Instrumentation<br>cable<br>Below 1000 V. | ||||||
| 1 | 3.01 ~ Pair X 1 Sq MM<br>SOO<br>0.232 | |||||
| 1 | 3.02 ~ Pair X 1 Sq MM<br>500<br>0.278 | |||||
| 14<br>~o..,per Conductor<br>XLPE Insulated'O¥eraliShelided<br>ZHFR<br>ISheathed Unannoured<br>InstI'umentatiOlt<br>cable<br>Below<br>1000 V. | ||||||
| 1 | 4.01 7Core X 1.5Sq.<br>MM<br>3000<br>0.983 |
|||||
| 1 | 4.02 12 Core X 1.5 Sq. MM<br>1000<br>0.473 | |||||
| 1 | 4.03 4TX<br>0.7SSq.MM<br>1500<br>0.472 | |||||
| ~opper<br>Conductor<br>XLPE Inaulateet CU. Wi•• Screened<br>with<br> | ||||||
| 15<br>~u. Ta.,.·ZHFRSheathed<br>Unarmoured<br>lnatrumentalon<br>Cable | ||||||
| I<br>1V | ||||||
| ~Ow<br>000. | ||||||
| 1<br>1<br>1<br>1 | 1 | 5.01 ~ Core X 2.5 Sq. MM | 2000 | 1.071 | ||
| 1 | 5.02 ~ Core X4 Sq. MM | 5000 | 2.562 | |||
| 16<br>!Stranded Round<br>compacted<br>Tinned<br>Copper<br>Conductor | ||||||
| 1 | 6.01 120 SQ. MM<br>2500<br>2.672 | |||||
| 1 | 6.02 958Q.<br>MM<br>2000<br>2.138 |
==> picture [189 x 73] intentionally omitted <==
Government of India Director General of Foreign Trade
CASE No: R8
Subject: Ratification of norms in terms of Para 4.7 of HBP (Vol-I) of Advance Authorization (AA) No 5610004970 dated 18.08.2016 - M/s National Steel & Agro Industries Limited; Indore.
DGFT may refer to the UO Note No 01/81/50/300/AM-17/DES-II/32 dated 24.10.2019 whereby the requisite information received from M/s National Steel & Agro Industries Limited; Indore regarding amendment of export quantity of 331.481 MT of PPGI and 4016 MT of GPGC in place of 5000 MT of PPGI in the above mentioned Advance Authorization due to adverse market condition.
It may be noted that the export product GPGI is covered under SION C 473 of Handbook of Procedures Vol-II and PPGI PNo 33 (RE: 2012)/2009-2014 dated 30.11.2012. The quantity of inputs have been calculated as per Engineering Table given in HBP Vol-II and Tables in PN No 33 (RE: 2012)/2009-2014 dated 30.11.2012. The quantity of items of import to be allowed under the aforesaid AA for aforesaid amended export products has been calculated on per tonne of export product. The Excel sheets enclosed herewith for consideration of the NORMS Committee.
==> picture [78 x 26] intentionally omitted <==
(TC(SKB) 16.08.2020
Encl: as above
1. Shri Shobit Gupta Dy DGFT, NC-II
2. Shri Amit Kumar AD, NC-II
| **Sl.No ** | Advanced<br>Authorisa<br>tion No. &<br>Date | <br> <br>Descripti<br>on of<br>Item of<br>Export | Quantity of<br>Export MT | <br>Thickne<br>ss (MM) | Zinc<br>Coatin<br>g in<br>(gms/<br>m2) | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Zinc (Kg) | Hot<br>Rolled<br>Alloy<br>Steel<br>Sheets/<br>Strips/<br>Wide<br>Coils of<br>relevent<br>grade<br>(Kg) | <br> <br>Rolling<br>Mill<br>Rolls<br>(Kg) | Rolling<br>Oil (Kg) | Picklin<br>g Oil<br>(Kg) | Steel<br>Strappi<br>ng (Kg) | ||||||
| 1 | 56100049<br>70 dated<br>18.08.201<br>6 | Cold<br>rolled<br>Galvanize<br>d<br>(Plan/corr<br>ugated)<br>Alloy<br>Steel<br>Sheetsof<br>relevent<br>grade<br>having<br>thickness<br>0.13 to<br>0.56 mm<br>and zinc<br>coating<br>60 -120<br>gms/m2. | 4016.722 | ||||||||
| 124.640<br> | 0.13 | 80 | 80.2 | 1,028.4 | 1.25 | 0.35 | 0.45 | 2.00 | |||
| 248.706 | 0.14 | 60 | 53.0 | 1,058.7 | 1.25 | 0.35 | 0.45 | 2.00 | |||
| 40.128 | 0.16 | 60 | 46.4 | 1,066.2 | 1.25 | 0.35 | 0.45 | 2.00 | |||
| 2033.391 | 0.18 | 60 | 41.2 | 1,071.9 | 1.25 | 0.35 | 0.45 | 2.00 | |||
| 52.006 | 0.18 | 70 | 57.8 | 1,053.4 | 1.25 | 0.35 | 0.45 | 2.00 | |||
| 1083.220 | 0.18 | 80 | 57.8 | 1,053.4 | 1.25 | 0.35 | 0.45 | 2.00 | |||
| 74.728<br> | 0.26 | 60 | 26.4 | 1,088.4 | 1.25 | 0.35 | 0.45 | 2.00 | |||
| 76.192 | 0.28 | 120 | 58.4 | 1,052.7 | 1.25 | 0.35 | 0.45 | 2.00 | |||
| 138.605 | 0.36 | 60 | 19.5 | 1,096.2 | 1.25 | 0.35 | 0.45 | 2.00 | |||
| 42.806 | 0.40 | 60 | 19.5 | 1,096.2 | 1.25 | 0.35 | 0.45 | 2.00 | |||
| 102.300 | 0.56 | 90 | 23.0 | 1,092.3 | 1.25 | 0.35 | 0.45 | 2.00 |
| **Sl.No ** | Advanced<br>Authorisa<br>tion No. &<br>Date | <br> <br>Descripti<br>on of<br>Item of<br>Export | Quantity of<br>Export MT | <br>Thickne<br>ss (MM) | Zinc<br>Coatin<br>g in<br>(gms/<br>m2) | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product | Quantity of Input per ton of export product |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Hot<br>Rolled<br>Alloy<br>Steel<br>Sheets/<br>Strips/<br>Wide<br>Coils of<br>relevent<br>grade<br>(MT) | Zinc in<br>ingot<br>form<br>(Kg) | Rolling<br>Mill<br>Rolls<br>(Kg) | Rolling<br>Oil (Kg) | Picklin<br>g Oil<br>(Kg) | Steel<br>Strappi<br>ng (Kg) | <br>VCI<br>Rusto -<br>Paper<br>(Sq<br>Metre) | <br>Guard<br>Film<br>(Kg) | Appli<br>cator<br>Rolls<br>(Kg) | <br> <br>Paint<br>Primer<br>(litre) | Paint<br>Backe<br>r<br>(litre) | Paint<br>Top<br>Coat<br>(litre) | ||||||
| 1 | 56100049<br>70 dated<br>18.08.201<br>6 | Cold<br>Rolled<br>Galvanise<br>d Colour<br>Coated<br>Alloy<br>Steel<br>Sheets/<br>Hoops &<br>Strips/<br>Wide<br>Coils<br>(Plain/<br>Corrugate<br>d) having<br>coating<br>thickness<br>of Primer<br>4-10<br>Micron,<br>Backer 4-<br>14 Micron<br> |
331.4810<br> | ||||||||||||||
| 102.2980<br> | 0.250 | 80 | 1019.057 | 55.30 | 1.25 | 0.35 | 0.45 | 2.00 | 5.00 | 23.15 | 0.13 | 13.220 | 15.935 | 28.329 | |||
| 103.7090 | 0.340 | 60 | 1064.783 | 23.82 | 1.25 | 0.35 | 0.45 | 2.00 | 5.00 | 16.63 | 0.13 | 9.494 | 11.444 | 20.345 | |||
| 100.2660 | 0.430 | 100 | 1062.435 | 31.04 | 1.25 | 0.35 | 0.45 | 2.00 | 5.00 | 12.97 | 0.13 | 7.407 | 8.928 | 15.872 | |||
| 25.2080<br><br> <br> | 1.200 | 80 | 1100.783 | 8.78 | 1.25 | 0.35 | 0.45 | 2.00 | 5.00 | 4.58 | 0.13 | 2.615 | 3.152 | 5.604 |