DGFT Minutes
In force — no superseding record on file.
DIRECTORATE GENERAL OF FOREIGN TRADE - (DES II SECTION)
MINUTES OF THE NORMS COMMITTEE-II MEETING No. 05/81-ALC2/2021 DATED 16.07.2020 (Held on 28.07.2020)
Please Note
-
i. For information of exporters, Norms Committee-II handles all cases pertaining to fixation/ratification of norms for Export Products falling under ITC (HS) Chapter 72 to 76, 78 to 80 & 85. Communications in respect of cases/pertaining to NC-II may be sent to email address: nc2.dgft@nic.in
-
ii. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The concerned applicant/company may go through the same and respond accordingly.
-
iii. Similarly, a scanned copy of the blank Standard Deficiency Format, which may find a reference in NC decisions, has also been attached in the end. This may also be referred to by the concerned applicant/company and may be responded accordingly.
-
iv. The Norms Committee has taken decision only with respect to technical aspect/wastage norms. While redeeming the applications, RAs should check that the applicant has fulfilled all requirements as prescribed in policy/procedure including those in Policy Circulars issued from time to time or any other provisions under FTP/HBP for EODC.
-
v. Wherever the Committee has fixed Norms, the concerned RA may ensure that AA is issued on the wastages/consumption as ratified by the Committee or as per wastages claimed in the application, whichever is less.
e Committee has fixed Norms, the concerned RA may ensure that AA is issued on the wastages/consumption as ratified by the Committee or as per wastages claimed in the application, whichever is less.
Meeting No. 05/81 of Norms Committee-II for the year 2020-21 (Originally scheduled for 16.07.2020) held on 28.07.2020 through Video Conferencing under the Chairmanship of Shri R. P. Goyal, Additional Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorizations under Duty Exemption Scheme (Chapter-4) of Foreign Trade Policy 2015-20. The following members were present in the meeting:-
| Sl. No. | Name&Designation | Department |
|---|---|---|
| 1. | Shri K. S. Sodhi,AD(ME) | MSME |
| 2. | Shri Devendra KumarSaini,ADG | DoT |
| 3. | ShriSushil KumarJangid, Scientist „B‟ | MeitY |
| 4. | Shri A. K. Mishra,AIA | MoS |
| 5. | ShriShaish Kumar, (TEC-1) | Consultant |
| 6. | Shri V.C. Agarwal, (TEC-3) | Consultant |
| 7. | ShriS.K.Bhatnagar, (SKB) | Consultant |
| In attendance | ||
| 1. | ShriShobhitGupta,Dy.DGFT | DGFT |
| 2. | Shri Amit Kumar,Assistant Director | DGFT |
Draft Minutes of Meeting No. 04/81 scheduled for 17.06.2020 and held on 09.07.2020 were circulated among all the members of the Committee on 03.07.2020. On receipt of comments, the minutes were finalized and approved for uploading on DGFT‟s website on 28.07.2020. The minutes were unanimously approved in the meeting.
Minutes of the cases discussed in the meeting are as under:
1 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
re unanimously approved in the meeting.
Minutes of the cases discussed in the meeting are as under:
1 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
MEETING NUMBER: 5/81-ALC2/2020 MEETING DATE: 16.07.2020
| Case No.:35/17/81- | Party Name: R.R.KABEL | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2017 | LIMITED | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310815094 | Action by : | ||||
| :01/81/050/00345/AM18/ | :03/95/040/00815/AM16/ | 09.08.2017 | Applicant |
1 Decision: The Committee considered the case as per agenda and noted that the applicant was reminded on 17.04.2020 & 30.06.2020 regarding submission of Amendment Sheet as informed during personal hearing in M. No. 17/81 dated 27.11.2019. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the Amendment Sheet.
The case stands deferred.
17/81 dated 27.11.2019. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the Amendment Sheet.
The case stands deferred.
| 2 | Case No.:358/14/81-<br>ALC2/2018 | Party Name: ABB INDIA<br>LIMITED. | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/01076/AM19/ | RLA File<br>:07/24/040/00289/AM18/ | Lic.No/Date:0710112738<br>24.01.2018 | <br>Action by :<br>Applicant | |
| **Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by DHI was sent to the applicant on 30.06.2020. However, no reply has<br>been received yet. Therefore, the Committee decided to remind the applicant for furnishing the<br>requisite information.<br>The case stands deferred. |
| Case No.:75/5/81-ALC2/2018 | Party Name: LM WIND | Meet No/Date:5/81- | Status: | |||||
|---|---|---|---|---|---|---|---|---|
| POWER BLADES [INDIA] | ALC2/2020 | Deferred | ||||||
| PVT. LTD | 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710113376 | Action by : | |||||
| :01/81/050/00283/AM19/ | :07/24/040/00342/AM18/ | 01.06.2018 | Applicant |
IA]||ALC2/2020||Deferred|| ||||PVT. LTD||16.07.2020|||| ||HQ File||RLA File||Lic.No/Date:0710113376||Action by :|| ||:01/81/050/00283/AM19/||:07/24/040/00342/AM18/||01.06.2018||Applicant||
3 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 03.02.2020 followed by reminders 17.04.2020 & 30.06.2020. However, no reply has been received yet. Hence, the Committee decided to remind the applicant for furnishing the requisite information. The case stands deferred.
| Case No.:74/5/81-ALC2/2018 | Party Name: LM WIND | Meet No/Date:5/81- | Status: | |||||
|---|---|---|---|---|---|---|---|---|
| POWER BLADES [INDIA] | ALC2/2020 | Deferred | ||||||
| PVT. LTD | 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710113408 | Action by : | |||||
| :01/81/050/00282/AM19/ | :07/24/040/00333/AM18/ | 07.06.2018 | Applicant |
4 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 03.02.2020 followed by reminders 17.04.2020 & 30.06.2020. However, no reply has been received yet. Hence, the Committee decided to remind the applicant for furnishing the requisite information. The case stands deferred.
2 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
e decided to remind the applicant for furnishing the requisite information. The case stands deferred.
2 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:143/14/81- | Party Name: EMMVEE | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | PHOTOVOLTAIC POWER | ALC2/2020 | Deferred | ||||
| PVT LTD | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710113785 | Action by : | ||||
| :01/81/050/00861/AM19/ | :07/24/040/00130/AM19/ | 30.08.2018 | Applicant |
5 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 24.12.2019 followed by reminders 28.02.2020 & 13.05.2020. However, no reply has been received yet. Hence, the Committee decided to remind the applicant for furnishing the requisite information.
| 6 | Case No.:8/13/81-ALC2/2018 | Party Name: MAN<br>INDUSTRIES (INDIA) LTD. | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00716/AM19/ | RLA File<br>:03/95/040/00916/AM19/ | Lic.No/Date:0310825719<br>18.12.2018 | <br>Action by :<br>Section | |
| **Decision:**The Committee considered the case as per agenda and heard the representatives of the<br>applicant during personal hearing held through video conferencing. The representative explained the<br>case in detail and the Committee raised certain queries during personal hearing. |
tives of the<br>applicant during personal hearing held through video conferencing. The representative explained the<br>case in detail and the Committee raised certain queries during personal hearing. The representatives<br>informed that they have already submitted the same information vide letter dated 27.12.2020.<br>Therefore, the Committee directed the section to forward a copy of letter dated 27.12.2020 to<br>Consultant (TEC-3) for examination and comments.<br>The case stands deferred.||||
Decision: The Committee considered the case as per agenda and heard the representatives of the 6 applicant during personal hearing held through video conferencing. The representative explained the case in detail and the Committee raised certain queries during personal hearing. The representatives informed that they have already submitted the same information vide letter dated 27.12.2020. Therefore, the Committee directed the section to forward a copy of letter dated 27.12.2020 to Consultant (TEC-3) for examination and comments.
| Case No.:289/14/81- | Party Name: R R KABEL | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | LIMITED | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310827010 | Action by : | ||||
| :01/81/050/01007/AM19/ | :03/95/040/01148/AM19/ | 13.02.2019 | Applicant | ||||
ITED||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0310827010||Action by :|| |:01/81/050/01007/AM19/||:03/95/040/01148/AM19/||13.02.2019||Applicant|| |||||||||
7 Decision: The Committee considered the case as per agenda and noted that the case was referred to Consultant (TEC-3) on 04.03.2020 for examination & comments. Consultant (TEC-3) vide email dated 14.05.2020 asked for complete set of application/original file as he received only part file. It was also noted that the main file of the case is not traceable. Therefore, the Committee decided to ask from the applicant to furnish the complete set of application along with reply of deficiency letter.
3 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:43/2/81-ALC2/2019 | Party Name: SEIKODENKI | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0410165215 | Action by : | ||||
| :01/81/050/01129/AM19/ | :04/24/040/00240/AM19/ | 14.02.2019 | Applicant | ||||
- 8 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020 followed by reminders on 20.04.2020 & 08.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
reminders on 20.04.2020 & 08.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:79/2/81-ALC2/2019 | Party Name: BELDEN INDIA | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PVT. LTD | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3110067347 | Action by : | ||||
| :01/81/050/01165/AM19/ | :31/83/040/00188/AM19/ | 11.03.2019 | Applicant | ||||
- 9 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020 followed by reminders on 20.04.2020 & 02.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:74/2/81-ALC2/2019 | Party Name: USHA | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDUSTRIAL | ALC2/2020 | Deferred | |||||
| CORPORATION. | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0810144757 | Action by : | ||||
| :01/81/050/01160/AM19/ | :08/24/040/00406/AM19/ | 12.03.2019 | Applicant | ||||
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of Consultant (SKB):
- Why the description of item of import at two places with the same specification and size with
10 different quantity?
ant to furnish following information as per comments of Consultant (SKB):
- Why the description of item of import at two places with the same specification and size with
10 different quantity?
-
What will be the size and thickness of the export product?
-
What do you mean of surface treated Aluminium sheet? How the treatment will be carried out?
-
Detail Technical note on manufacturing process including the relevant flow sheet. 5. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of export item to be manufactured out of these imported materials, wastage claimed at each stage of manufacturing with complete justification supported by documentary evidence.
4 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:1/2/81-ALC2/2019 | Party Name: GRAVITA | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA LTD. | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:1310049241 | Action by : | ||||
| :01/81/050/00001/AM20/ | :13/24/040/00139/AM19/ | 27.03.2019 | Applicant | ||||
LTD.||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:1310049241||Action by :|| |:01/81/050/00001/AM20/||:13/24/040/00139/AM19/||27.03.2019||Applicant|| |||||||||
11 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020 followed by reminders on 20.04.2020 & 02.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:16/2/81-ALC2/2019 | Party Name: STERLITE | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| POWER TRANSMISSION | ALC2/2020 | Deferred | |||||
| LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310828254 | Action by : | ||||
| :01/81/050/00016/AM20/ | :03/95/040/01250/AM19/ | 10.04.2019 | Applicant |
12 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020 followed by reminders on 20.04.2020 & 02.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
reminders on 20.04.2020 & 02.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 13 | Case No.:24/3/81-ALC2/2019 | Party Name: DIAMOND<br>ENGINEERING (CHENNAI)<br>PVT LTD | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00044/AM20/ | RLA File<br>:04/24/040/00291/AM19/ | Lic.No/Date:0410165528<br>30.04.2019 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by DPIIT was sent to the applicant on 02.07.2020. However, no reply has<br>been received yet. Therefore, the Committee decided to remind the applicant for furnishing the<br>requisite information.<br>The case stands deferred. |
| 14 | Case No.:2/14/81-ALC2/2019 | Party Name: BELDEN INDIA<br>PVT.LTD | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00100/AM20/ | RLA File<br>:31/83/040/00038/AM20/ | Lic.No/Date:3110067437<br>03.06.2019 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (TEC-3) and agreed to by DHI was sent to the applicant on<br>22.01.2020 followed by reminders vide email dated 17.04.2020 & 17.05.2020. However, no reply has<br>been received yet. |
aised by Consultant (TEC-3) and agreed to by DHI was sent to the applicant on<br>22.01.2020 followed by reminders vide email dated 17.04.2020 & 17.05.2020. However, no reply has<br>been received yet. Hence, the Committee decided to wait for reply of the applicant.<br>The case stands deferred.||||
5 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:3/14/81-ALC2/2019 | Party Name: DEWAN & | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| SONS | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:2910025405 | Action by : | ||||
| :01/81/050/00101/AM20/ | :29/24/040/00007/AM20/ | 04.06.2019 | RA | ||||
15 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received and in this regard, an email was sent to Concerned, RA on 03.01.2020. The Committee also noted that the applicant‟s email address is not available for communication. Therefore, the Committee decided to ask from concerned, RA to provide a copy of complete set of application alongwith email address of the applicant.
| Case No.:5/14/81-ALC2/2019 | Party Name: VESTAS WIND | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TECHNOLOGY INDIA | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410165683 | Action by : | ||||
| :01/81/050/00103/AM20/ | :04/24/040/00043/AM20/ | 06.06.2019 | Section |
A||ALC2/2020||Deferred|| |||PRIVATE LIMITED||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0410165683||Action by :|| |:01/81/050/00103/AM20/||:04/24/040/00043/AM20/||06.06.2019||Section||
16 Decision: The Committee considered the case as per the agenda and noted that the applicant‟s reply was sent to Consultant (TEC-1) on 14.07.2020. However, Consultant (TEC-1) informed that the scanned copy received by him is not visible. Hence, the Committee decided to forward a visible copy of the reply to Consultant (TEC-1) with the request to expedite the comments.
| Case No.:7/14/81-ALC2/2019 | Party Name: SEIKODENKI | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0410165686 | Action by : | ||||
| :01/81/050/00105/AM20/ | :04/24/040/00056/AM20/ | 06.06.2019 | Applicant | ||||
17 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 17.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
6 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
the Committee decided to remind again the applicant for submitting the complete set of application.
6 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:10/14/81- | Party Name: APAR | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES LIMITED | ALC2/2020 | Approved | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045194 | ||||
| :01/81/050/00108/AM20/ | :34/24/040/00066/AM20/ | 06.06.2019 |
| Case No.:10/14/81-<br>ALC2/2019<br>HQ File<br>:01/81/050/00108/AM20/ | Case No.:10/14/81-<br>ALC2/2019<br>HQ File<br>:01/81/050/00108/AM20/ | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|---|
| RLA File<br>:34/24/040/00066/AM20/ | Lic.No/Date:3410045194<br>06.06.2019 | |||||||||
| 1<br>8 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per comments given by Consultant (TEC-3) considering reply dated 28.05.2020 as under: | |||||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity |
r>per comments given by Consultant (TEC-3) considering reply dated 28.05.2020 as under:|||||||||| ||ITCHS<br>Code|Export Item||Quantity|Sl.<br>No.|ITCHS<br>Code||Import Item|Recommended<br>Quantity|| ||76052100|“8176 Alloy of<br>ASTM B800-<br>**05”**Aluminium<br>Alloy Wire Rod<br>Net Content : (1)<br>Aluminium Ingot<br>3958.960 MT<br>(4) Iron 20.240<br>Total weight<br>4000.000MT||4000<br>MT|1|76011010||Aluminium Ingot|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||2|72029931||Aluminium Boron<br>Master Alloy (8%)|Deleted as not<br>a part of<br>export item|| ||||||3|76012010||Aluminium Rare<br>Earth Alloy Re-<br>10%|Deleted as not<br>a part of<br>export item|| ||||||4|72052990||Iron (Fe Al Tablet<br>80%)|1.05Kgs/Kg<br>content in the<br>exportproduct|| ||Note:<br>1. The words “8176 Alloy of ASTM B800-05” may be added in the description of export<br>item.<br>RA concerned maytake suitable consequential action accordingly.||||||||||
| Case No.:9/14/81-ALC2/2019 | Party Name: RAM RATNA | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| WIRES LIMITED | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310829473 | Action by : | ||||
| :01/81/050/00107/AM20/ | :03/95/040/00994/AM19/ | 07.06.2019 | Applicant | ||||
ITED||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0310829473||Action by :|| |:01/81/050/00107/AM20/||:03/95/040/00994/AM19/||07.06.2019||Applicant|| |||||||||
19 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
7 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:13/14/81- | Party Name: DIACH | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | CHEMICALS & PIGMENTS | ALC2/2020 | Approved | |||
| PRIVATE LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0210209231 | ||||
| :01/81/050/00111/AM20/ | :02/24/040/00033/AM20/ | 07.06.2019 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as 20 per comments given by MSME taking cue from SION C-1153 as under:
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity |
|---|---|---|---|---|---|
| 78011000 | Refined Lead Ingot<br>Purity 99.97% | 500 MT | 85481010 | Lead Scrap Covered By<br>ISRICodeWord Rails | As applied |
RA concerned may take suitable consequential action accordingly.
--|---|---| |78011000|Refined Lead Ingot<br>Purity 99.97%|500 MT|85481010|Lead Scrap Covered By<br>ISRICodeWord Rails|As applied|
RA concerned may take suitable consequential action accordingly.
| Case No.:14/14/81- | Party Name: APAR | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES LIMITED | ALC2/2020 | Approved | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045197 | ||||
| :01/81/050/00112/AM20/ | :34/24/040/00068/AM20/ | 07.06.2019 |
| Case No.:14/14/81-<br>ALC2/2019 | Case No.:14/14/81-<br>ALC2/2019 | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00112/AM20/ | RLA File<br>:34/24/040/00068/AM20/ | Lic.No/Date:3410045197<br>07.06.2019 | ||||||||
| 2<br>1 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per comments given by Consultant (TEC-3) considering reply dated 28.05.2020 as under: | |||||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity |
r>per comments given by Consultant (TEC-3) considering reply dated 28.05.2020 as under:|||||||||| ||ITCHS<br>Code|Export Item||Quantity|Sl.<br>No.|ITCHS<br>Code||Import Item|Recommended<br>Quantity|| ||76052990|“EN AW-6101<br>Alloy”<br>Aluminium Alloy<br>Wire (Various<br>Sizes) Net<br>Content<br>:1)Aluminium<br>Ingots 3892MT<br>(2)MG 40MT<br>(3)SN 30MT<br>(4)Al Tit 4MT<br>(5)Al Chro 16MT<br>(6)Iron 2MT (7)Al<br>Cu master alloy<br>16MT Total:<br>4000MT||4000<br>MT|1|76011010||Aluminium Ingots|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||2|81041100||Magnesium|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||3|28046900||Silicon|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||4|76052100||Aluminium<br>Titanium Boron<br>Rod|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||5|76012010||Aluminium<br>Chromium Master<br>Alloy (20%)|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||6|72052990||Iron (Fe Al Tablet<br>80%)|1.05Kgs/Kg<br>content in the<br>exportproduct|| ||||||7|76012090||Aluminium Cu<br>Master Alloy<br>(50%)|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||Note:<br>1. The words “EN AW-6101 Alloy” may be added in the description of export item.||||||||||
8 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
2. All items to be imported in primary form.
| Case No.:19/14/81- | Party Name: RAJHANS | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | METALS PVT. LIMITED | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:2410042779 | Action by : | ||||
| :01/81/050/00117/AM20/ | :24/24/040/00008/AM20/ | 12.06.2019 | Applicant | ||||
22 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of MSME:
-
Quantity of C-314 and C-316 to be exported.
-
Certificate of Analysis of Sl. No. 1 of import item.
| Case No.:21/14/81- | Party Name: APAR | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES LIMITED | ALC2/2020 | Approved | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045203 | ||||
| :01/81/050/00119/AM20/ | :34/24/040/00086/AM20/ | 12.06.2019 |
--|---| |ALC2/2019||INDUSTRIES LIMITED||ALC2/2020||Approved| |||||16.07.2020||| |HQ File||RLA File||Lic.No/Date:3410045203||| |:01/81/050/00119/AM20/||:34/24/040/00086/AM20/||12.06.2019|||
| Case No.:21/14/81-<br>ALC2/2019 | Case No.:21/14/81-<br>ALC2/2019 | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00119/AM20/ | RLA File<br>:34/24/040/00086/AM20/ | Lic.No/Date:3410045203<br>12.06.2019 | ||||||||
| 2<br>3 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per comments given by Consultant (TEC-3) considering reply dated 28.05.2020 as under: | |||||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 76052990 | “EN AW-6101<br>Alloy” Aluminium<br>Alloy Wire (Various<br>Sizes) Net content:<br>(1) Aluminium<br>Ingot 4932.500MT<br>(2) Magnesium<br>32.5MT (3) Silicon<br>27.5MT (5) Iron (Fe<br>Al. |
052990|“EN AW-6101<br>Alloy” Aluminium<br>Alloy Wire (Various<br>Sizes) Net content:<br>(1) Aluminium<br>Ingot 4932.500MT<br>(2) Magnesium<br>32.5MT (3) Silicon<br>27.5MT (5) Iron (Fe<br>Al. Tablet) 2.5MT<br>Total 5000MT||5000 MT|1|76011010||Aluminium<br>Ingot|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||2|81041100||Magnesium|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||3|28046900||Silicon|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||4|76052100||Aluminium<br>Titanium<br>Boron Rod|Deleted as not<br>a part of<br>export item|| ||||||5|72052990||Iron (Fe Al.<br>Tablet 80%)|1.05Kgs/Kg<br>content in the<br>exportproduct|| ||Note:<br>1. The words “EN AW-6101 Alloy” may be added in the description of export item.<br>2. All items to be imported in primary form.<br>RA concerned maytake suitable consequential action accordingly.||||||||||
9 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:22/14/81- | Party Name: APAR | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES LIMITED | ALC2/2020 | Approved | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045204 | ||||
| :01/81/050/00120/AM20/ | :34/24/040/00085/AM20/ | 12.06.2019 |
--|---| |ALC2/2019||INDUSTRIES LIMITED||ALC2/2020||Approved| |||||16.07.2020||| |HQ File||RLA File||Lic.No/Date:3410045204||| |:01/81/050/00120/AM20/||:34/24/040/00085/AM20/||12.06.2019|||
| Case No.:22/14/81-<br>ALC2/2019<br>HQ File<br>:01/81/050/00120/AM20/ | Case No.:22/14/81-<br>ALC2/2019<br>HQ File<br>:01/81/050/00120/AM20/ | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|---|
| RLA File<br>:34/24/040/00085/AM20/ | Lic.No/Date:3410045204<br>12.06.2019 | |||||||||
| 2<br>4 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per comments given by Consultant (TEC-3) considering reply dated 28.05.2020 as under: | |||||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 76149000 | AL 59 -Aluminium<br>Alloy Conductor<br>Net Content: (1)<br>Aluminium<br>3962MT (2)<br>Magnesium 14MT<br>(3) Silicon 14MT<br>(4) Al. Tit 4MT (5)<br>Al. Boron 2MT (6)<br>Fe 2MT (7) Al.<br>Cu. |
|76149000|AL 59 -Aluminium<br>Alloy Conductor<br>Net Content: (1)<br>Aluminium<br>3962MT (2)<br>Magnesium 14MT<br>(3) Silicon 14MT<br>(4) Al. Tit 4MT (5)<br>Al. Boron 2MT (6)<br>Fe 2MT (7) Al.<br>Cu. master 2MT<br>Total 4000MT||4000<br>Kilometer|1|76011010||Aluminium<br>Ingot|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||2|81041100||Magnesium|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||3|28046900||Silicon|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||4|76052100||Aluminium<br>Titanium<br>Boron Rod|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||5|76052100||Aluminium<br>Boron Master<br>Alloy (8%)|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||||||6|72052990||Iron (Fe Al<br>Tablet 80%)|1.05Kgs/Kg<br>content in the<br>exportproduct|| ||||||7|76012090||Aluminium<br>Cu. Master<br>Alloy (50%)|1.02Kgs/Kg<br>content in the<br>exportproduct|| ||Note: All items to be imported in primary form.<br>RA concerned maytake suitable consequential action accordingly.||||||||||
| Case No.:28/14/81- | Party Name: METALIC | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | IMPRESSIONS (INDIA) PVT | ALC2/2020 | Deferred | ||||
| LTD | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510410945 | Action by : | ||||
| :01/81/050/00126/AM20/ | :05/24/040/00153/AM20/ | 14.06.2019 | Applicant |
(INDIA) PVT||ALC2/2020||Deferred|| |||LTD||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0510410945||Action by :|| |:01/81/050/00126/AM20/||:05/24/040/00153/AM20/||14.06.2019||Applicant||
25 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
10 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:29/14/81- | Party Name: LM WIND | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | Deferred | ||||
| PVT. LTD | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045211 | Action by : | ||||
| :01/81/050/00127/AM20/ | :34/24/040/00092/AM20/ | 14.06.2019 | Applicant |
26 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:30/14/81- | Party Name: LM WIND | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | Deferred | ||||
| PVT. LTD. | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045212 | Action by : | ||||
| :01/81/050/00128/AM20/ | :34/24/040/00093/AM20/ | 14.06.2019 | Applicant |
27 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:33/14/81- | Party Name: DIAMOND | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | METAL SCREENS (P) LTD | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:6510000028 | Action by : | ||||
| :01/81/050/00131/AM20/ | :65/24/040/00001/AM20/ | 18.06.2019 | Applicant |
CREENS (P) LTD||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:6510000028||Action by :|| |:01/81/050/00131/AM20/||:65/24/040/00001/AM20/||18.06.2019||Applicant||
28 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 28.04.2020 followed by a reminder on 02.07.2020. However, no reply has been received yet. Therefore, the Committee decided to remind again the applicant for furnishing the requisite information.
| 29 | Case No.:35/14/81-<br>ALC2/2019 | Party Name: DIAMOND<br>ENGINEERING (CHENNAI)<br>PVT LTD | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00133/AM20/ | RLA File<br>:04/24/040/00045/AM20/ | Lic.No/Date:0410165740<br>19.06.2019 | ||
| Decision:The Committee considered the case as per the agenda and decided to approve the case as<br>per written comments given byDPIITvide U. O. No.: P-47011/47/2019-TSW dated 28.05.2020<br>(copy enclosed).<br>RA concerned maytake suitable consequential action accordingly. |
Decision: The Committee considered the case as per the agenda and decided to approve the case as per written comments given by DPIIT vide U. O. No.: P-47011/47/2019-TSW dated 28.05.2020 (copy enclosed).
11 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
en comments given by DPIIT vide U. O. No.: P-47011/47/2019-TSW dated 28.05.2020 (copy enclosed).
11 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| 30 | Case No.:36/14/81-<br>ALC2/2019 | Party Name: JAIN METAL<br>ROLLING MILLS | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00134/AM20/ | RLA File<br>:04/24/040/00013/AM20/ | Lic.No/Date:0410165741<br>20.06.2019 | <br>Action by :<br>MSME | |
| **Decision:**The Committee considered the case as per agenda and noted that information furnish by the<br>applicant was forwarded to MSME vide email dated 28.7.2020 for examination and comments.<br>Hence, the Committee decided to wait for comments.<br>The case stands deferred. |
| Case No.:44/14/81- | Party Name: LM WIND | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | Deferred | ||||
| PVT. LTD | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045227 | Action by : | ||||
| :01/81/050/00142/AM20/ | :34/24/040/00104/AM20/ | 24.06.2019 | Applicant |
31 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.: | Party Name: SHREE | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| 52/14/81-ALC2/2019 | CABLES AND | ALC2/2020 | Deferred | ||||
| CONDUCTORS PVT. LTD. | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:1110028604 | Action by : | ||||
| :01/81/050/00150/AM20/ | :11/24/040/00004/AM20/ | 25.06.2019 | Applicant |
32 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.: | Party Name: A-1 FENCE | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| 46/14/81-ALC2/2019 | PRODUCTS CO. PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310829921 | Action by : | ||||
| :01/81/050/00144/AM20/ | :03/94/040/00237/AM20/ | 26.06.2019 | Applicant |
CO. PVT. LTD.||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0310829921||Action by :|| |:01/81/050/00144/AM20/||:03/94/040/00237/AM20/||26.06.2019||Applicant||
33 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application. The case stands deferred.
12 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:51/14/81- | Party Name: STORK FERRO | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | AND MINERAL INDUSTRIES | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510411068 | Action by : | |||
| :01/81/050/00149/AM20/ | :05/24/040/00184/AM20/ | 27.06.2019 | Applicant |
34 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the applicant on 03.02.2020 followed by reminders on 17.04.2020 & 17.05.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the applicant.
was sent to the applicant on 03.02.2020 followed by reminders on 17.04.2020 & 17.05.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the applicant.
| 35<br> | Case No.:58/14/81-<br>ALC2/2019 | Party Name: RAJ METAL<br>INDUSTRIES | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020<br>Lic.No/Date:0210209298<br>03.07.2019 | Status:<br>Deferred<br> <br>Action by :<br>Applicant |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00156/AM20/ | RLA File<br>:02/24/040/00054/AM20/ | |||
| <br>**Decision:**The Committee considered the case as per agenda and decided to seek from the applicant to<br>furnish following information as per comments of MSME: | ||||
| .<br>1. To submit Certificate of Analysis of import items. | ||||
| The case stands deferred. |
35 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of MSME:
- . 1. To submit Certificate of Analysis of import items.
| Case No.:57/14/81- | Party Name: PATEL | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | TECHNOMATION PVT. | ALC2/2020 | Approved | |||
| LTD. | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310830065 | ||||
| :01/81/050/00155/AM20 | :03/95/040/00311/AM20/ | 04.07.2019 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (SKB) as under:
3 6
040/00311/AM20/||04.07.2019|||
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (SKB) as under:
3 6
| ITCHS<br>Code<br>73089090 | Export Item<br>Reinforcement<br>Post | Quantity<br>99010<br>Kgs | ITCHS<br>Code<br>72104900 | Import Item<br>Galvanized High<br>Tensile SteelSheet/<br>Coils (Grade: | Recommended<br>Quantity<br>99670 Kgs inclusive<br>of 0.66% wastage on<br>net content of export | |
|---|---|---|---|---|---|---|
| S450GD) | weight. | |||||
| 73089090 | Connector<br>Traverse | 380953<br>Kgs | 72104900 | Galvanized High<br>Tensile SteelSheet/<br>Coils (Grade:- | 387277 Kgs inclusive<br>of 1.66% wastage on<br>net content of export | |
| S450GD) | weight. |
Note:
- The word “Sheet” may be added in the description of import items. 2. Grade and thickness of import items should match with export items. RA concerned may take suitable consequential action accordingly.
13 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:60/14/81- | Party Name: TATA POWER | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | SOLAR SYSTEMS LTD. | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710115133 | Action by : | ||||
| :01/81/050/00158/AM20/ | :07/24/040/00065/AM20/ | 05.07.2019 | Applicant/RA |
YSTEMS LTD.||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0710115133||Action by :|| |:01/81/050/00158/AM20/||:07/24/040/00065/AM20/||05.07.2019||Applicant/RA||
- 37 Decision: The Committee considered the case as per agenda and noted that an email was sent to the applicant & RA, Bangalore on 02.07.2020 requesting to submit a copy of amendment sheet for examination of the case. However, no information has been received yet. Therefore, the Committee decided to remind the applicant & RA, Bangalore for submitting the copy of amendment sheet.
| Case No.:65/14/81- | Party Name: DC AUTO | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | PARTS PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710115147 | Action by : | ||||
| :01/81/050/00163/AM20/ | :07/24/040/00070/AM20/ | 09.07.2019 | Applicant | ||||
38 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
reminders on 28.02.2020 & 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:66/14/81- | Party Name: STANCORP | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310830212 | Action by : | ||||
| :01/81/050/00164/AM20/ | :03/95/040/00128/AM20/ | 10.07.2019 | RA | ||||
39 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received and in this regard, an email was sent to RA, Mumbai on 22.11.2019 followed by a reminder on 28.02.2020 & 06.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Mumbai for submitting the complete set of application alongwith email address of the applicant.
14 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:73/14/81- | Party Name: GUJARAT | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | INFRAPIPES PVT. LIMITED | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410045279 | Action by : | ||||
| :01/81/050/00171/AM20/ | :34/24/040/00094/AM20/ | 11.07.2019 | Applicant | ||||
ITED||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:3410045279||Action by :|| |:01/81/050/00171/AM20/||:34/24/040/00094/AM20/||11.07.2019||Applicant|| |||||||||
- 40 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020, 03.05.2020 & 06.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 41 | Case No.:72/14/81-<br>ALC2/2019 | Party Name: VOESTALPINE<br>VAE VKN INDIA PRIVATE<br>LIMITED<br>RLA File<br>:05/24/040/00219/AM20/ | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00170/AM20/ | Lic.No/Date:0510411242<br>12.07.2019 | <br>Action by :<br>Applicant | ||
| <br>**Decision:**The Committee considered the case as per agenda and decided to seek from the applicant to<br>furnish following information as per comments of Consultant (SKB):<br>1. What are the manufacturing activities involved in export item No 1 when imported items at<br>Sl. No 2 is in sets and Sl. No. 12 is in number?<br>2. Why the weight of item No. 6 & 7 of small lengths is more than the weight of item No 5 of<br>bigger length having same description?<br>3. Why the weight of item No. 10 is less of bigger length than the weight of item No 8 & 9<br>having less length?<br>The case stands deferred. |
41
br>bigger length having same description?<br>3. Why the weight of item No. 10 is less of bigger length than the weight of item No 8 & 9<br>having less length?<br>The case stands deferred.||||
41
| Case No.:74/14/81- | Party Name: DYNAMIC | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | FLOW PRODUCTS PVT. | ALC2/2020 | Approved | |||
| LTD. | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310830300 | ||||
| :01/81/050/00172/AM20/ | :03/94/040/00248/AM20/ | 15.07.2019 |
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by Consultant (TEC-3) considering the applicant‟s reply dated 17.02.2020 as under:
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity |
|---|---|---|---|---|---|
| 73261990 | Alloy Steel Pup Joints &<br>C & C Hose containing<br>267019Kgs seamless<br>pipes 9658 Numbers<br>weighing 339909 Kgs | 339.909<br>MT | 73041110 | Seamless<br>Alloy Steel<br>pipes of<br>relevant<br>grade | 337 MT<br>including 26%<br>wastage |
15 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
Note:
1. The description of export item may be amended as “Alloy Steel Pup Joints & C & C Hose containing 267019 Kgs seamless pipes 9658 Numbers weighing 339909 Kgs”.
- The description of import item may be amended as “Seamless Alloy Steel pipes of relevant grade”.
| Case No.:75/14/81- | Party Name: KINECO | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | KAMAN COMPOSITES - | ALC2/2020 | Deferred | ||||
| INDIA PVT LTD | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310830319 | Action by : | ||||
| :01/81/050/00173/AM20/ | :03/94/040/00219/AM20/ | 16.07.2019 | Applicant | ||||
Decision: The Committee considered the case as per agenda and noted that DPIIT informed that the applicant‟s reply dated 24.04.2020 was incomplete. Therefore, the Committee decided to ask again from the applicant to furnish following information as per written comments of DPIIT vide U. O. No.: 43 P-47011/193/2019-TSW dated 21.07.2020:
-
Basic/Justification for the quantities of the consumables, as the value of consumables is about 60% of the total FoB value of the exports.
-
Net content of Raw Materials at Sl. No. 1, 7, to 15 & 19 in the export item and wastage claimed on each Raw Material with justification.
-
Details of import items at Sl. No. 1 to 4, 6 & 19 (as description has been indicated in code numbers) and their specific use in the export items.
imed on each Raw Material with justification.
- Details of import items at Sl. No. 1 to 4, 6 & 19 (as description has been indicated in code numbers) and their specific use in the export items.
| Case No.:76/14/81- | Party Name: DISHA AUTO | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | COMPONENTS PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310830344 | Action by : | ||||
| :01/81/050/00174/AM20/ | :03/94/040/00285/AM20/ | 16.07.2019 | Applicant |
44 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 03.02.2020 followed by reminders on 17.04.2020 & 17.05.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the reply of the applicant.
| Case No.:77/14/81- | Party Name: LM WIND | Meet No/Date:5/81- | Status: | ||||||
|---|---|---|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | Deferred | ||||||
| PVT. LTD | 16.07.2020 | ||||||||
| 45 | HQ File | RLA File | Lic.No/Date:3410045293 | Action by : | |||||
| :01/81/050/00175/AM20/ | :34/24/040/00128/AM20/ | 17.07.2019 | Applicant | ||||||
| **Decision:**The Committee considered the case asper the agenda and noted that the copyof application |
16 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
:**The Committee considered the case asper the agenda and noted that the copyof application||||||||
16 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020, 14.05.2020 & 06.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:81/14/81- | Party Name: HORIZON | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | CHUTES PVT LTD | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3110067482 | Action by : | ||||
| :01/81/050/00179/AM20/ | :31/83/040/00065/AM20/ | 23.07.2019 | Applicant | ||||
46 Decision: The Committee considered the case as per the agenda and noted that the applicant had obtained one more Advance Authorization No. 3110067480 dated 18.07.2019 with same import & export but with different ITCHS Code. Hence, en email has been sent to the applicant on 06.07.2020 to seek clarification in this regard. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for providing clarification on the above said matter.
to seek clarification in this regard. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for providing clarification on the above said matter.
| Case No.:82/14/81- | Party Name: VINEY | Meet No/Date:5/81-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | CORPORATION LTD. | 16.07.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0510411328 | ||||
| :01/81/050/00180/AM20/ | :05/24/040/00182/AM20/ | 23.07.2019 |
| Case No.:82/14/81-<br>ALC2/2019 | Case No.:82/14/81-<br>ALC2/2019 | Case No.:82/14/81-<br>ALC2/2019 | Party Name: VINEY<br>CORPORATION LTD. | Meet No/Date:5/81-ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-ALC2/2020<br>16.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00180/AM20/ | <br>RLA File<br>:05/24/040/00182/AM20/ | Lic.No/Date:0510411328<br>23.07.2019 | |||||
| 47 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments given by Consultant (TEC-1) as under: | ||||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Quantity | ||||
| 1 | 39081010 | Pa-66-Gf 30 Nilamid A 3 H G6<br>Nero(Euronil)Black | 1.05 Kgs/Kg content in the export product | ||||
| 2 | 39039010 | Tpe Tc5csz-50 Shore Black | 1.05Kgs/Kgcontent in the exportproduct | ||||
| <br>3 | 39095000 | Nilenene Pk Girgo H (Ppgf30%<br>Gray) | 1.05 Kgs/Kg content in the export product | ||||
| 4 | 39021000 | Irrograin A 70 E 4675 Natural | 1.05 Kgs/Kgcontent in the exportproduct |
rtproduct|| ||<br>3|39095000|Nilenene Pk Girgo H (Ppgf30%<br>Gray)|||1.05 Kgs/Kg content in the export product|| ||4|39021000|Irrograin A 70 E 4675 Natural|||1.05 Kgs/Kgcontent in the exportproduct|| ||5|39071000|Pom Hostaform C-13031sw Xap2<br>Ls(Ticona)|||1.05 Kgs/Kg content in the export product|| ||6|39071000|Pom Hostaform C-9021 Sw Xap2<br>Ls(Ticona)|||1.05 Kgs/Kg content in the export product|| ||7|39081090|Pa66Latamid66Laser Lati|||1.05Kgs/Kgcontent in the exportproduct|| ||8|39074000|Pc Lexan 144r Black(Sabic)|||1.05 Kgs/Kgcontent in the exportproduct|| ||9|39074000|Pc+Abs Mablex 274 Fs 25052 Uv<br>Ravago|||1.05 Kgs/Kg content in the export product|| ||10|39089090|Pa6-Gf30 Ems Grilon B G-30 S Uv|||1.05 Kgs/Kgcontent in the exportproduct|| ||RA concerned maytake suitable consequential action accordingly.|||||||
17 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:87/14/81- | Party Name: JINDAL SAW | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | LIMITED | ALC2/2020 | Approved | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510411348 | ||||
| :01/81/050/00185/AM20/ | :05/23/040/00162/AM20/ | 25.07.2019 |
Decision: The Committee considered the case as per the agenda and decided to approve the case as per written comments given by Consultant (TEC-3) as under:
Export Items:
-
The following words may be added in the description of the export product: “(I) Adhesive coating thickness on all pipes 300 micron
-
(II) HDPE coating thickness & corresponding surface area to be coated:-
-
(i) Seamless pipe- 16220.299 sq. mtr. for 2550 micron & 154351.556 sq. mtr. for 2950 micron .
-
48
- (ii) LSAW pipe - 48442.212 sq. mtr. for 2950 micron & 5746.061 sq. mtr. for 9450 micron.
Import Items:
-
Quantity of import items at Sl. No. 1, 8, 12 & 13 may be allowed as applied for with value restricted upto 2% of FoB value.
-
Quantity of import item i.e. relevant adhesive at Sl. No. 2 may be allowed as 70 MT.
-
Quantity of import item i.e. HDPE at Sl. No. 3 may be allowed as 785 MT.
-
Quantity of import item i.e. relevant Sintered Powder at Sl. No. 4 may be allowed as 1.05 Kgs/Kg content in the export product.
-
Quantity of import item i.e. relevant wiremesh at Sl. No. 5 may be allowed as 1.02 Kgs/Kg content in the export product.
-
Quantity of import item i.e. OPC Cement at Sl. No. 6 may be allowed as 1.05 Kgs/Kg content in the export product.
-
Quantity of import items at Sl. No. 7 & 9 to 11 may be allowed as per GN-4 .
| Case No.:88/14/81- | Party Name: UNIVERSAL | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | FLEXIBLES PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710115218 | Action by : | ||||
| :01/81/050/00186/AM20/ | :07/24/040/00090/AM20/ | 26.07.2019 | Applicant |
49 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 16.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
reminders on 28.02.2020 & 16.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
18 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:89/14/81- | Party Name: GRUNER | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510411387 | Action by : | ||||
| :01/81/050/00187/AM20/ | :05/23/040/00161/AM20/ | 29.07.2019 | Applicant | ||||
- 50 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 15.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:92/14/81- | Party Name: KNEST | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | MANUFACTURERS LLP | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3110067488 | Action by : | ||||
| :01/81/050/00190/AM20/ | :31/82/040/00035/AM20/ | 31.07.2019 | Applicant | ||||
LLP||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:3110067488||Action by :|| |:01/81/050/00190/AM20/||:31/82/040/00035/AM20/||31.07.2019||Applicant|| |||||||||
- 51 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 15.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:95/14/81- | Party Name: METAL CARE | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | ALLOYS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310830743 | Action by : | ||||
| :01/81/050/00193/AM20/ | :03/95/040/00400/AM20/ | 01.08.2019 | Applicant | ||||
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of Consultant (SKB): 52
-
The average composition of export product (Bronze Ingots) is more than 100%. Please provide a copy of the buyer order indicating exact composition of bronze ingots.
-
To provide test certificate of imported brass scrap, issued by the inspection agency or from Government approved laboratory.
-
What is composition of Tin Ingots?
19 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
e inspection agency or from Government approved laboratory.
- What is composition of Tin Ingots?
19 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| 53 | Case No.:97/14/81-<br>ALC2/2019 | Party Name: BHARAT<br>HEAVY ELECTRICALS<br>LIMITED | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00195/AM20/ | RLA File<br>:11/24/040/00005/AM20/ | Lic.No/Date:1110028609<br>02.08.2019 | ||
| <br>Decision:The Committee considered the case as per the agenda and decided to approve the case as<br>per written comments given byDPIITvide U. O. No.: P-47011/390/2018-TSW dated 17.07.2020<br>(copy enclosed).<br>RA concerned maytake suitable consequential action accordingly. |
| Case No.:99/14/81- | Party Name: STERLITE | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | POWER TRANSMISSION | ALC2/2020 | Deferred | ||||
| LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310830803 | Action by : | ||||
| :01/81/050/00197/AM20/ | :03/95/040/00047/AM20/ | 05.08.2019 | Applicant |
54 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 15.04.2020 followed by a reminder on 17.05.2020. However, no reply has been received yet. Therefore, the Committee decided to remind again the applicant for furnishing the requisite information.
n 15.04.2020 followed by a reminder on 17.05.2020. However, no reply has been received yet. Therefore, the Committee decided to remind again the applicant for furnishing the requisite information.
| Case No.:100/14/81- | Party Name: BHARAT | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | HEAVY ELECTRICALS | ALC2/2020 | Deferred | ||||
| LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:1110028610 | Action by : | ||||
| :01/81/050/00198/AM20/ | :11/24/040/00006/AM20/ | 05.08.2019 | Section | ||||
55 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 06.02.2020 followed by a reminder on 17.04.2020. DPIIT vide U.O. dated 30.6.2020 intimated that DHI may be consulted in the matter as DPIIT is not concerned with this case . Hence, the Committee decided to refer the matter to DHI.
| 56 | Case No.:101/14/81-<br>ALC2/2019 | Party Name: PRECISION<br>METALS | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00199/AM20/ | RLA File<br>:03/95/040/00398/AM20/ | Lic.No/Date:0310830840<br>06.08.2019 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (SKB) was sent to the applicant on 07.07.2020. However,<br>no reply has been received yet. |
case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (SKB) was sent to the applicant on 07.07.2020. However,<br>no reply has been received yet. Therefore, the Committee decided to remind the applicant for<br>furnishing the requisite information.<br>The case stands deferred.||||
20 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| 57 | Case No.:104/14/81-<br>ALC2/2019 | Party Name: JAIN FGL<br>METAL INDUSTRIES<br>RLA File<br>:04/24/040/00062/AM20/ | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020<br>Lic.No/Date:0410165947<br>08.08.2019 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00202/AM20/ | Action by :<br>MSME | |||
| <br>**Decision:**The Committee considered the case as per agenda and noted that information furnish by the<br>applicant was forwarded to MSME vide email dated 28.7.2020 for examination and comments.<br>Hence, the Committee decided to wait for comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that information furnish by the applicant was forwarded to MSME vide email dated 28.7.2020 for examination and comments. Hence, the Committee decided to wait for comments.
e as per agenda and noted that information furnish by the applicant was forwarded to MSME vide email dated 28.7.2020 for examination and comments. Hence, the Committee decided to wait for comments.
| Case No.:105/14/81- | Party Name: UKB | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | ELECTRONICS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510411476 | Action by : | ||||
| :01/81/050/00203/AM20/ | :05/24/040/00272/AM20/ | 09.08.2019 | Applicant |
58 Decision: The Committee considered the case as per the agenda and noted that minutes were erroneously recorded for Meetings 02/81 dated 29.04.2020 & 23/81 dated 04.03.2020. The Committee observed that that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application. The case stands deferred.
| Case No.:108/14/81- | Party Name: ANGELS | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | ALUMINIUM | ALC2/2020 | Deferred | ||||
| CORPORATION | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310830950 | Action by : | ||||
| :01/81/050/00206/AM20/ | :03/94/040/00392/AM20/ | 13.08.2019 | Applicant |
IUM||ALC2/2020||Deferred|| |||CORPORATION||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0310830950||Action by :|| |:01/81/050/00206/AM20/||:03/94/040/00392/AM20/||13.08.2019||Applicant||
59 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 16.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 60 | Case No.:111/14/81-<br>ALC2/2019 | Party Name: PARAM<br>INDUSTRIES | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00209/AM20/ | RLA File<br>:03/95/040/00512/AM20/ | Lic.No/Date:0310831052<br>19.08.2019 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and decided to seek from the applicant to<br>furnish following information as per comments given by MSME:<br>1. Sl. No. 3, 4, 5 & 11 of the Standard Deficiency Format.<br>The case stands deferred. |
21 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
SME:<br>1. Sl. No. 3, 4, 5 & 11 of the Standard Deficiency Format.<br>The case stands deferred.||||
21 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| 61 | Case No.:112/14/81-<br>ALC2/2019 | Party Name: PARAM<br>INDUSTRIES | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00210/AM20/ | RLA File<br>:03/95/040/00511/AM20/ | Lic.No/Date:0310831055<br>19.08.2019 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and decided to seek from the applicant to<br>furnish following information as per comments given by MSME: | ||||
| .<br>1. Sl. No. 3, 4, 5 & 11 of the Standard Deficiency Format. | ||||
| The case stands deferred. |
61 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by MSME:
. 1. Sl. No. 3, 4, 5 & 11 of the Standard Deficiency Format.
| Case No.:115/14/81- | Party Name: AIRMASTER | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | TAPE INDUSTRIES | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410165978 | Action by : | ||||
| :01/81/050/00213/AM20/ | :04/24/040/00086/AM20/ | 20.08.2019 | Applicant |
|ALC2/2020||Deferred|| |||PRIVATE LIMITED||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0410165978||Action by :|| |:01/81/050/00213/AM20/||:04/24/040/00086/AM20/||20.08.2019||Applicant||
62 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:3/20/81-ALC2/2019 | Party Name: ENGINEERS | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510412919 | Action by : | ||||
| :01/81/050/00355/AM20/ | :05/23/040/00341/AM20/ | 16.12.2019 | RA | ||||
63 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received and in this regard, an email was sent to RA, New Delhi on 03.01.2020 followed by a reminder on 08.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, New Delhi for submitting the complete set of application alongwith email address of the applicant.
22 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
New Delhi for submitting the complete set of application alongwith email address of the applicant.
22 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:5/20/81-ALC2/2019 | Party Name: POLYCAB | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA LIMITED | ALC2/2020 | Approved | ||||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310833440 | ||||
| :01/81/050/00357/AM20/ | :03/95/040/00900/AM20/ | 16.12.2019 |
Decision: The Committee considered the case as per the agenda and decided to approve the case as per written comments given by Consultant (TEC-3) as under:
-
Quantity of import items at Sl. No. 1 & 2 may be allowed as 1.01 Kgs/Kg content in the export product.
-
Quantity of import items at Sl. No. 3 to 8, 10 to 18 & 23 may be allowed as 1.05 Kgs/Kg
64 content in the export product.
-
Quantity of import items at Sl. No. 9, 19 & 22 may be allowed as 1.01 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 20 may be allowed as 1.02 Kgs/Kg content in the export product.
-
Quantity of import item at Sl. No. 21 may be allowed with 4% of steel to be galvanized. 6. Quantity of import items at Sl. No. 24 & 25 may be allowed as per packing policy.
Note:
1. Sizes and weight as given in the application may be incorporated in the description of export items.
2. Grade of steel to match in import & export items.
packing policy.
Note:
1. Sizes and weight as given in the application may be incorporated in the description of export items.
2. Grade of steel to match in import & export items.
| Case No.:6/20/81-ALC2/2019 | Party Name: TECHNO TRAK | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERS | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3110067630 | Action by : | ||||
| :01/81/050/00358/AM20/ | :31/83/040/00126/AM20/ | 17.12.2019 | Applicant |
65 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 08.07.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| Case No.:120/14/81- | Party Name: K J V ALLOYS | Meet No/Date:5/81- | Status: | ||||||
|---|---|---|---|---|---|---|---|---|---|
| ALC2/2019 | CONDUCTORS PVT. LTD. | ALC2/2020 | Approved | ||||||
| 16.07.2020 | |||||||||
| HQ File | RLA File | Lic.No/Date:5010002551 | |||||||
| 66 | :01/81/050/00218/AM20/<br>:50/24/040/00006/AM20/<br>21.08.2019<br>**Decision:**The Committee considered the case as per the agenda and decided to approve the case as | ||||||||
| per written comments given byDPIITvide U. O. No.: P-47011/298/2019-TSW dated | 21.07.2020 | ||||||||
| (copy enclosed). | |||||||||
| RA concerned maytake suitable consequential action accordingly. | |||||||||
nts given byDPIITvide U. O. No.: P-47011/298/2019-TSW dated||||||21.07.2020|| |||(copy enclosed).|||||||| |||RA concerned maytake suitable consequential action accordingly.|||||||| |||||||||||
23 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:117/14/81- | Party Name: MJM FINE | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | ENCLOSURES PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710115311 | Action by : | ||||
| :01/81/050/00215/AM20/ | :07/24/040/00116/AM20/ | 21.08.2019 | Applicant | ||||
67 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 16.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:118/14/81- | Party Name: TECHNO COAT | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | SYSTEMS (INDIA) | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0810146018 | Action by : | ||||
| :01/81/050/00216/AM20/ | :08/24/040/00162/AM20/ | 21.08.2019 | RA |
19**||SYSTEMS (INDIA)||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0810146018||Action by :|| |:01/81/050/00216/AM20/||:08/24/040/00162/AM20/||21.08.2019||RA||
68 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received and in this regard, an email was sent to RA, Ahmedabad on 22.11.2019 followed by reminders on 28.02.2020 & 07.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Ahmedabad for submitting the complete set of application alongwith email address of the applicant. The case stands deferred.
| Case No.:119/14/81- | Party Name: TUBACEX | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRAKASH INDIA | ALC2/2020 | Approved | |||
| PRIVATE LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310831123 | ||||
| :01/81/050/00217/AM20/ | :03/95/040/00480/AM20/ | 21.08.2019 |
ALC2/2019*||PRAKASH INDIA||ALC2/2020||Approved| |||PRIVATE LIMITED||16.07.2020||| |HQ File||RLA File||Lic.No/Date:0310831123||| |:01/81/050/00217/AM20/||:03/95/040/00480/AM20/||21.08.2019|||
| :01/81/050/00217/AM20/<br>:03/95/040/00480/AM20/<br>21.08.2019 | ||||
|---|---|---|---|---|
| **Decision:**The Committee considered the case as per agenda and decided to fix the | ad-hoc norms on | |||
| repeat basis as approved for AA No. 0310828823 dated 07.05.2019 in Meeting | No. 23/81 dated | |||
| 04.03.2020 as per comments given by Consultant (TEC-3) as under: | ||||
| 6<br>9 | ITCHS<br>Code<br>Export Item<br>QuantitySl.<br>No.<br>ITCHS<br>Code<br>Import Item | Recommended<br>Quantity | ||
| Seamless Stainless | Allowed 10% | |||
| Stainless Steel<br>Steel Tubes/Pipes | wastage | |||
| seamless<br>1<br>73049000<br>(Hot Finished) (OD | ||||
| 73044100<br>Tubes/Pipes<br>(Cold Finish)<br>of Relevant<br>Grade<br>370.370<br>MT<br>not less than 42 mm)<br>of RelevantGrade<br>2<br>84559000<br>Pilger Die<br>(Consumables) | As applied<br>with value | |||
| 3<br>84559000<br>Mandrels<br>(Consumables) | restricted upto<br>5% of FOB | |||
| RA concerned maytake suitable consequential action accordingly. |
24 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:125/14/81- | Party Name: WAAREE | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENERGIES LTD. | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5210043159 | Action by : | |||
| :01/81/050/00223/AM20/ | :52/24/040/00027/AM20/ | 26.08.2019 | Applicant |
9**||ENERGIES LTD.||ALC2/2020||Deferred| |||||16.07.2020||| |HQ File||RLA File||Lic.No/Date:5210043159||Action by :| |:01/81/050/00223/AM20/||:52/24/040/00027/AM20/||26.08.2019||Applicant|
70 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 15.04.2020 followed by a reminder on 17.05.2020. However, no reply has been received yet. Therefore, the Committee decided to remind again the applicant for furnishing the requisite information.
| Case No.:128/14/81- | Party Name: DIAMOND | Meet No/Date:5/81- | Status: | ||||||
|---|---|---|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING (CHENNAI) | ALC2/2020 | Approved | ||||||
| PVT LTD | 16.07.2020 | ||||||||
| HQ File | RLA File | Lic.No/Date:0410166025 | |||||||
| 71 | :01/81/050/00226/AM20/<br>:04/24/040/00085/AM20/<br>28.08.2019<br>**Decision:**The Committee considered the case as per the agenda and decided to approve the case as | ||||||||
| per written comments given byDPIITvide U. O. No.: P-47011/47/2019-TSW dated | 28.05.2020 | ||||||||
| (copy enclosed). | |||||||||
| RA concerned maytake suitable consequential action accordingly. | |||||||||
ents given byDPIITvide U. O. No.: P-47011/47/2019-TSW dated||||||28.05.2020|| |||(copy enclosed).|||||||| |||RA concerned maytake suitable consequential action accordingly.|||||||| |||||||||||
| Case No.:126/14/81- | Party Name: GANGES | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | INTERNATIONALE (P) | ALC2/2020 | Deferred | ||||
| LTD., | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166014 | Action by : | ||||
| :01/81/050/00224/AM20/ | :04/24/040/00090/AM20/ | 28.08.2019 | Applicant | ||||
72 Decision: The Committee considered the case as per the agenda and decided to seek from the applicant to furnish the following information as per written comments given by DPIIT vide U. O. No.: P-47011/90/2020-TSW dated 08.06.2020:
- Sl. No. 3, 5 & 11 of the Standard Deficiency Format.
| 73 | Case No.:132/14/81-<br>ALC2/2019 | Party Name: JAIN FGL<br>METAL INDUSTRIES | Meet No/Date:5/81-<br>ALC2/2020<br>16072020 | Status:<br>Deferred |
|---|---|---|---|---|
| .. | ||||
| <br>HQ File<br>:01/81/050/00230/AM20/ | RLA File<br>:05/23/040/00546/AM19/ | Lic.No/Date:0510411714<br>02092019 | <br>Action by :<br>MSME | |
| <br> | .. | |||
| **Decision:**The Committee considered the case as per the agenda and noted that the applicant‟s reply<br>was sent to MSME on 26.07.2020 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. | ||||
25 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred.|||| ||||||
25 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:134/14/81- | Party Name: NUEVOSOL | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | ENERGY PVT LTD | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0910067962 | Action by : | ||||
| :01/81/050/00232/AM20/ | :09/24/040/00257/AM20/ | 03.09.2019 | Applicant |
74 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 16.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:135/14/81- | Party Name: NUEVOSOL | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | ENERGY PVT LTD | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0910067963 | Action by : | ||||
| :01/81/050/00233/AM20/ | :09/24/040/00256/AM20/ | 03.09.2019 | Applicant |
ENERGY PVT LTD||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0910067963||Action by :|| |:01/81/050/00233/AM20/||:09/24/040/00256/AM20/||03.09.2019||Applicant||
75 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by reminders on 28.02.2020 & 16.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:138/14/81- | Party Name: JINDAL SAW | Meet No/Date:5/81- | Status: | ||||||
|---|---|---|---|---|---|---|---|---|---|
| ALC2/2019 | LIMITED | ALC2/2020 | Deferred | ||||||
| 16.07.2020 | |||||||||
| HQ File | RLA File | Lic.No/Date:0510411774 | Action by : | ||||||
| 76 | :01/81/050/00236/AM20/ | :05/23/040/00221/AM20/ | 06.09.2019 | Applicant | |||||
| **Decision:**The Committee considered the case as per the agenda and Consultant (TEC-3) informed | |||||||||
| that the case is under examination. Hence, the Committee decided to wait for comments. | |||||||||
| The case stands deferred. | |||||||||
| Case No.:140/14/81- | Party Name: WELSPUN | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | CORP LTD. | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410045427 | Action by : | ||||
| :01/81/050/00238/AM20/ | :34/24/040/00166/AM20/ | 09.09.2019 | Section |
019**||CORP LTD.||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:3410045427||Action by :|| |:01/81/050/00238/AM20/||:34/24/040/00166/AM20/||09.09.2019||Section||
77 Decision: The Committee considered the case as per the agenda and noted that the applicant‟s reply was sent to Consultant (TEC-3) on 03.07.2020 for examination of the case. However, Consultant (TEC-3) via email dated 26.07.2020 requested to send physical file along with the applicant‟s reply. Therefore, the Committee decided to send physical file to Consultant (TEC-3) for examination of the case.
26 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:150/14/81- | Party Name: WELSPUN | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | CORP LTD. | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410045461 | Action by : | ||||
| :01/81/050/00248/AM20/ | :34/24/040/00165/AM20/ | 19.09.2019 | Section | ||||
78 Decision: The Committee considered the case as per the agenda and noted that the applicant‟s reply was sent to Consultant (TEC-3) on 15.07.2020 & 21.07.2020 for examination of the case. However, Consultant (TEC-3) via email dated 26.07.2020 requested to send physical file along with the applicant‟s reply. Therefore, the Committee decided to send physical file to Consultant (TEC-3) for examination of the case.
a email dated 26.07.2020 requested to send physical file along with the applicant‟s reply. Therefore, the Committee decided to send physical file to Consultant (TEC-3) for examination of the case.
| Case No.:169/14/81- | Party Name: DISHA AUTO | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | COMPONENTS PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310831977 | Action by : | ||||
| :01/81/050/00267/AM20/ | :03/94/040/00513/AM20/ | 03.10.2019 | Applicant |
79 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the applicant on 08.07.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| Case No.:1/20/81-ALC2/2019 | Party Name: NORDEX | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710115856 | Action by : | ||||
| :01/81/050/00353/AM20/ | :07/24/040/00216/AM20/ | 13.12.2019 | Applicant | ||||
Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by Consultant (TEC-1):
- 80 1. Material specification of each of import and indigenous inputs and their function.
to seek from the applicant to furnish following information as per comments given by Consultant (TEC-1):
-
80 1. Material specification of each of import and indigenous inputs and their function.
-
Percentage of non volatile matter in all chemical items i.e. adhesive, resins, curing agent in import as well as indigenous input.
-
Material balance (in weight terms) between import and export taking in to consideration indigenous input and wastage claimed.
-
List of components in the import items.
-
List of consumables with their value in the import.
-
27 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| 81 | Case No.:7/20/81-ALC2/2019 | Party Name: PHOENIX<br>INDUSTRIES PVT. LTD | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00359/AM20/ | RLA File<br>:03/95/040/00081/AM20/ | Lic.No/Date:0310833457<br>17.12.2019 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and decided to seek from the applicant to<br>furnish following information as per comments given by Consultant (SKB):<br>1. Composition Zinc Alloy Ingots of export item at Sl. No. 1.<br>2. Chemical composition of items of import from Sl. No. 1 to 9.<br>3. In the flow sheet (FC/1), Aluminium, Copper and magnesium are given as an alloying element.<br>However, in the export product, Aluminium and Copper are indicated. Hence, to clarify<br>whether magnesium is an alloying element in the export product or not. |
um are given as an alloying element.<br>However, in the export product, Aluminium and Copper are indicated. Hence, to clarify<br>whether magnesium is an alloying element in the export product or not. If yes, what is source<br>of magnesium? If not, re-submit the flow sheet after necessary amendment.<br>The case stands deferred.||||
| Case No.:8/20/81-ALC2/2019 | Party Name: RATNAVEER | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| METALS LIMITED | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410045719 | Action by : | ||||
| :01/81/050/00360/AM20/ | :34/24/040/00281/AM20/ | 18.12.2019 | Applicant | ||||
82 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020 followed by a reminder on 20.04.2020. It was also noted that the applicant‟s email dated 20.04.2020 received without attachment of copy of application. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application for examination of the case.
.2020 received without attachment of copy of application. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application for examination of the case.
| 83 | Case No.:10/20/81-<br>ALC2/2019 | Party Name: RAJ METAL<br>INDUSTRIES | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/81/050/00362/AM20/ | RLA File<br>:02/24/040/00142/AM20/ | Lic.No/Date:0210209634<br>20.12.2019 | <br>Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per agenda and decided to seek from the applicant to<br>furnish following information as per comments of MSME:<br>1. Tosubmit Certificate ofAnalysis from supplier.<br>The case stands deferred. |
83 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of MSME:
28 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:11/20/81- | Party Name: RAJ | Meet No/Date:5/81-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | METAL INDUSTRIES | 16.07.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:0210209635 | Action by : | |||
| :01/81/050/00363/AM20/ | :02/24/040/00143/AM20/ | 20.12.2019 | Applicant |
84 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of MSME:
- To submit Certificate of Analysis from supplier.
he Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of MSME:
-
To submit Certificate of Analysis from supplier.
-
To clarify why lead alloy is exporting with lead percentage 99.97% purity. The case stands deferred.
| Case No.:12/20/81- | Party Name: WAAREE | Meet No/Date:5/81-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENERGIES LTD. | 16.07.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:5210043274 | ||||
| :01/81/050/00364/AM20 | :52/24/040/00052/AM20 | 20.12.2019 |
| Case No.:12/20/81-<br>ALC2/2019 | Case No.:12/20/81-<br>ALC2/2019 | Case No.:12/20/81-<br>ALC2/2019 | Case No.:12/20/81-<br>ALC2/2019 | Party Name: WAAREE<br>ENERGIES LTD. | Meet No/Date:5/81-ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-ALC2/2020<br>16.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00364/AM20 | RLA File<br>:52/24/040/00052/AM20 | Lic.No/Date:5210043274<br>20.12.2019 | |||||||
| 85 | **Decision:**The Committee considered the case as per the agenda and decided to fix the ad-hoc norms<br>on repeat basis as approved for AA No. 5210042877 dated 20.12.2018 in Meeting No. 04/81 dated<br>17.06.2020 as per written comments given by Consultant (TEC-3) as under:<br>Export Items:<br>Sl. No.<br>ITCHS Code<br>Export Item<br>Quantity<br>1.<br>85414011<br>SOLAR PV MODULES 300WP-400WP ((Weight<br>22.5 Kg/Module)<br>35526 Numbers<br>Import Items: | ||||||||
| Sl. |
Items:**<br>Sl. No.<br>ITCHS Code<br>Export Item<br>Quantity<br>1.<br>85414011<br>SOLAR PV MODULES 300WP-400WP ((Weight<br>22.5 Kg/Module)<br>35526 Numbers<br>Import Items:||||||||| ||Sl. No.||ITCHS Code||Export Item|||Quantity|| ||1.||85414011||SOLAR PV MODULES 300WP-400WP ((Weight<br>22.5 Kg/Module)|||35526 Numbers|| ||Import Items:||||||||| ||Sl.<br>No.|ITCHS<br>Code||Import Item|||Recommended Quantity||| ||1|85414011||Solar Cell For Solar PV Module, Efficiency :<br>21.00%and Above5.13WP and Above|||Net + 1% wastage||| ||<br>2|70071900||Solar Glass For Solar PV Module Arc 2002x<br>998x3.2mm|||As per GN-4||| ||3|76041031||Aluminium Frame For Solar PV Module<br>2007x1003.5mm|||As per GN-4||| ||4|39013000||EVA Sheet For Solar PV Module 0.45x1000mm|||Net + 0.5% wastage||| ||5|39206290||Backsheet For Solar PV Module 1005mm|||Net + 0.5% wastage||| ||6|74081990||Solar Ribbon For Solar PV Module 0.9mm x<br>0.25mm|||As applied(Combined Value<br>of item No. 6, 7 and 9<br>restricted upto 2% of FoB<br>value)||| ||7|74081990||Solar Bus Bar For Solar PV Module 5mm x<br>0.40mm|||As applied(Combined Value<br>of item No. 6, 7 and 9<br>restricted upto 2% of FoB<br>value)||| ||8|85369030||PV Junction Box For Solar PV Module|||Asper GN-4||| ||9|35061000||RTV For Solar PV Module (Silicone Sealant)|||As applied(Combined Value<br>of item No. 6, 7 and 9<br>restricted upto 2% of FoB<br>value)|||
29 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
Note:
1. The following words “Weight 22.5 Kg/Module” may be added in the description of the export product.
2. Export item will contain 72 imported cells per module.
3. Specification and wattage of imported cells will be same as used in export items. The RA will obtain specification/wattage of the cells to be imported and would endorse the same on the authorization both for export and import products.
| Case No.:13/20/81- | Party Name: JAY BHAWANI | Meet No/Date:5/81- | Status: | |||||||
|---|---|---|---|---|---|---|---|---|---|---|
| ALC2/2019 | METAL INDUSTRIES | ALC2/2020 | Deferred | |||||||
| 16.07.2020 | ||||||||||
| HQ File | RLA File | Lic.No/Date:0310833602 | Action by: | |||||||
| :01/81/050/00365/AM20/ | :03/94/040/00765/AM20/ | 23.12.2019 | Applicant | |||||||
| 86 | **Decision:**The Committee | considered the case as per the agenda and noted that the copy of application | ||||||||
| has not yet been received from the applicant and in this regard, an email was sent on | 03.01.2020 | |||||||||
| followed by reminders on | 20.04.2020 & 16.05.2020. However, no information has been received yet. | |||||||||
| Therefore, the Committee decided to remind again the | applicant for submitting the complete set of | |||||||||
| application. | ||||||||||
| The case stands deferred. | ||||||||||
yet.||||||| |||Therefore, the Committee decided to remind again the|||applicant for submitting the complete set of|||||| |||application.||||||||| |||The case stands deferred.||||||||| ||||||||||||
| Case No.:14/20/81- | Party Name: STAIN LAY | Meet No/Date:5/81-ALC2/2020 | Status: | |||||
|---|---|---|---|---|---|---|---|---|
| ALC2/2019 | INDIA PVT. LTD. | 16.07.2020 | Approved | |||||
| HQ File | RLA File | Lic.No/Date:0510413038 | ||||||
| 87 | :01/81/050/00366/AM20/<br>**Decision:**The Committee | :05/24/040/00594/AM20/<br>considered the case as per | 23.12.2019<br>agenda and decided to fix the ad-hoc norms as | |||||
| per written comments given by DPIIT vide U. O. | No.: P-47011/67/2020-TSW dated 09.07.2020. | |||||||
| (Copy enclosed) | ||||||||
| RA concerned maytake suitable consequential action | accordingly. |
| Case No.:15/20/81- | Party Name: VAKKAL | Meet No/Date:5/81-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | IMPEX PVT. LTD. | 16.07.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0710115921 | ||||
| :01/81/050/00367/AM20/ | :07/24/040/00219/AM20/ | 24.12.2019 |
---|---|---|---|---|---|---| |ALC2/2019||IMPEX PVT. LTD.||16.07.2020||Approved| |HQ File||RLA File||Lic.No/Date:0710115921||| |:01/81/050/00367/AM20/||:07/24/040/00219/AM20/||24.12.2019|||
| Case No.:15/20/81- | Case No.:15/20/81- | Party Name: VAKKAL | Party Name: VAKKAL | Party Name: VAKKAL | Party Name: VAKKAL | Meet No/Date:5/81-ALC2/2020 | Meet No/Date:5/81-ALC2/2020 | Meet No/Date:5/81-ALC2/2020 | Status: | |
|---|---|---|---|---|---|---|---|---|---|---|
| ALC2/2019 | <br>IM | <br>PEX PVT. LTD. | 16.07. | 2020 | Approved | |||||
| HQ File<br>:01/81/050/00367/AM20/ | <br>RL<br>:07 | A File<br>/24/040/00219/AM20/ | <br>Lic.No<br>24.12. | /Date:0710115921<br>2019 | ||||||
| 88 | **Decision:**The Committee co<br>per written comments given b | nsidered the case as per agend<br>y Consultant (SKB) as under: | a and decided to fix the ad-h | oc norms as | ||||||
| <br> <br>ITCHS<br>Code<br>Export<br>Item<br>QuantityITCHS<br>Code<br>Import Item<br>76012010<br>Aluminium<br>Alloy<br>Ingots<br>ADC12<br>100000<br>Kgs<br>76020010Aluminium<br>Scrap /<br>Note: Description of Import item would be as per SION C-3.<br>RA concerned maytake suitable consequential action accordingly. | Recommended Quantity<br>85490 Kgs inclusive of 3%<br>wastage**(As per SION C-3)**<br>on net content of Aluminium<br>in the exportproduct. | |||||||||
| Export<br>Item | Quantity | ITCHS<br>Code | Import Item | Recommended Quantity |
3%<br>wastage**(As per SION C-3)<br>on net content of Aluminium<br>in the exportproduct.|| |||Export<br>Item|Quantity||ITCHS<br>Code|Import Item|||Recommended Quantity|| |||Aluminium<br>Alloy<br>Ingots<br>ADC12|100000<br>Kgs||76020010|Aluminium<br>Scrap /|||85490 Kgs inclusive of 3%<br>wastage(As per SION C-3)**<br>on net content of Aluminium<br>in the exportproduct.||
30 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:16/20/81- | Party Name: PRECISION | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | METALS | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310833650 | Action by : | ||||
| :01/81/050/00368/AM20/ | :03/95/040/00918/AM20/ | 24.12.2019 | Applicant |
89 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the applicant on 08.07.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| Case No.:17/20/81- | Party Name: | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | MAHARASHTRA | ALC2/2020 | Deferred | ||||
| SEAMLESS LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413061 | Action by : | ||||
| :01/81/050/00369/AM20/ | :05/24/040/00591/AM20/ | 24.12.2019 | Applicant |
ALC2/2020||Deferred|| |||SEAMLESS LIMITED||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0510413061||Action by :|| |:01/81/050/00369/AM20/||:05/24/040/00591/AM20/||24.12.2019||Applicant||
90 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 08.07.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| 91 | Case No.:19/20/81-<br>ALC2/2019 | Party Name: SIEMENS<br>GAMESA RENEWABLE<br>POWER PRIVATE LIMITED | <br>Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00371/AM20/ | RLA File<br>:04/24/040/00142/AM20/ | Lic.No/Date:0410166390<br>24.12.2019 | ||
| **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments given by Consultant (TEC-1). (Copy enclosed)<br>RA concerned maytake suitable consequential action accordingly. |
| 92 | Case No.:20/20/81-<br>ALC2/2019 | Party Name: JAIN FGL<br>METAL INDUSTRIES | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020<br>Lic.No/Date:0410166392<br>24.12.2019 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00372/AM20/ | RLA File<br>:04/24/040/00141/AM20/ | |||
| **Decision:**The Committee considered the case as per agenda<br>per comments given by MSME as under: | and decided to fix the ad-hoc norms as |
0/00372/AM20/|RLA File<br>:04/24/040/00141/AM20/||| ||**Decision:**The Committee considered the case as per agenda<br>per comments given by MSME as under:||and decided to fix the ad-hoc norms as||
31 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| ITCHS | Export Item | Quantity | ITCHS | Import Item | Recommended |
|---|---|---|---|---|---|
| Code | Code | Quantity | |||
| 74031300 | Refined Copper | 2286400 | 74040012 | Copper wire scrap | 5885713 Kgs |
| Billets (Copper | Kgs | as per ISRI code | inclusive of 3% | ||
| Content<br>99.97%) | Druid (Copper<br>Content 40%) | wastage after<br>40% recovery<br>from scrap |
Note:
1. Average copper content in export item is 99.97%.
2. Average copper content in import item is 40%. 3. The applicant should import relevant item only.
Case No.:22/20/81- Party Name: UPR Meet No/Date:5/81- Status: ALC2/2019 ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 16.07.2020 HQ File RLA File Lic.No/Date:0310833737 Action by : :01/81/050/00374/AM20/ :03/95/040/00946/AM20/ 27.12.2019 Applicant 93 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of MSME:
- Number of units of each part number to be exported.
ommittee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments of MSME:
- Number of units of each part number to be exported.
Case No.:1/23/81-ALC2/2019 Party Name: TOSHIBA Meet No/Date:5/81- Status: TRANSMISSION & ALC2/2020 Deferred DISTRIBUTION SYSTEMS 16.07.2020 HQ File RLA File Lic.No/Date:0910068405 Action by : :01/81/050/00413/AM20/ :09/24/040/00513/AM20/ 23.01.2020 Applicant 94 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the applicant on 08.07.2020. However, the applicant via email dated 24.07.2020 has requested for some more time to furnish the reply. Therefore, the Committee decided to wait for reply of the applicant. The case stands deferred.
| Case No.:3/23/81-ALC2/2019Party Name: LASER POWER | Meet No/Date:5/81- | Status: | |||||
|---|---|---|---|---|---|---|---|
| & INFRA PRIVATE | ALC2/2020 | Approved | |||||
| LIMITED | 16.07.2020 | ||||||
| HQ File<br>RLA File | Lic.No/Date:0210209711 | ||||||
| 95 | :01/81/050/00415/AM20/<br>:02/24/040/00172/AM20/ | 23.01.2020 | |||||
| **Decision:**The Committee considered the case as per agenda | and decided to fix the ad-hoc norms as | ||||||
| per written comments given by DPIIT vide U. O. No.: P-47011/131/2019-TSW dated | 22.07.2020. | ||||||
| (Copy enclosed) | |||||||
| RA concerned maytake suitable consequential action accordingly. |
32 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| |||(Copy enclosed)|||||| |||RA concerned maytake suitable consequential action accordingly.||||||
32 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:4/23/81-ALC2/2019 | Party Name: UNIVERSAL | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| HEAT EXCHANGERS | ALC2/2020 | Deferred | |||||
| LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3210079361 | Action by : | ||||
| :01/81/050/00416/AM20/ | :32/21/040/00209/AM20/ | 24.01.2020 | Applicant |
96 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 16.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.
Case No.:5/23/81- Party Name: HYDRO Meet No/Date:5/81- Status: ALC2/2019 PNEUMATIC ACCESSORIES (I) ALC2/2020 Approved PVT. LTD. 16.07.2020 HQ File RLA File :03/94/040/00868/AM20/ Lic.No/Date:0310834450 :01/81/050/00417/AM20/ 24.01.2020 97
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by DPIIT vide U. O. No.: P-47011/107/2020-TSW dated 27.07.2020. (Copy enclosed)
** The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by DPIIT vide U. O. No.: P-47011/107/2020-TSW dated 27.07.2020. (Copy enclosed)
| Case No.:6/23/81-ALC2/2019Party Name: SAFEBARRIER | Meet No/Date:5/81- | Status: | ||||||
|---|---|---|---|---|---|---|---|---|
| INTERNATIONAL | ALC2/2020 | Deferred | ||||||
| PRIVATE LIMITED | 16.07.2020 | |||||||
| HQ File<br>RLA File | Lic.No/Date:0310834468 | Action by : | ||||||
| 98 | :01/81/050/00418/AM20/<br>:03/95/040/01040/AM20/<br>**Decision:**The Committee considered the case as per agenda | 24.01.2020<br>DPIIT<br>and noted that the applicant‟s reply was | ||||||
| sent to DPIIT on 21.07.2020 for examination of the case. However, no comments have been received | ||||||||
| yet. Hence, the Committee decided to wait for the comments. | ||||||||
| The case stands deferred. |
| Case No.:7/23/81-ALC2/2019 | Party Name: ENGINEERS | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510413444 | Action by : | ||||
| :01/81/050/00419/AM20/ | :05/23/040/00399/AM20/ | 24.01.2020 | RA |
---|---|---| |||INDIA||ALC2/2020||Deferred|| |||||16.07.2020|||| |HQ File||RLA File||Lic.No/Date:0510413444||Action by :|| |:01/81/050/00419/AM20/||:05/23/040/00399/AM20/||24.01.2020||RA||
99 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received and in this regard, an email was sent to RA, New Delhi on 26.02.2020 followed by a reminder on 08.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, New Delhi for submitting the complete set of application alongwith email address of the applicant. The case stands deferred.
33 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:8/23/81- | Party Name: APAR | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES LIMITED | ALC2/2020 | Approved | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310834499 | ||||
| :01/81/050/00420/AM20/ | :03/94/040/00900/AM20/ | 28.01.2020 |
--|---| |ALC2/2019||INDUSTRIES LIMITED||ALC2/2020||Approved| |||||16.07.2020||| |HQ File||RLA File||Lic.No/Date:0310834499||| |:01/81/050/00420/AM20/||:03/94/040/00900/AM20/||28.01.2020|||
| Case No.:8/23/81-<br>ALC2/2019 | Case No.:8/23/81-<br>ALC2/2019 | Case No.:8/23/81-<br>ALC2/2019 | Party Name: APAR<br>INDUSTRIES LIMITED | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00420/AM20/ | RLA File<br>:03/94/040/00900/AM20/ | Lic.No/Date:0310834499<br>28.01.2020 | |||||
| 100 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per comments given by Consultant (TEC-3) as under: | ||||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Quantity | ||||
| 1 | 74081190 | Copper Wire Rod : 8<br>MM DIA | Net + 1% wastage or as applied whichever is lower | ||||
| <br>2 | 76011010 | Primary Unalloyed<br>Alluminium Ingots/<br>Sow/T-Bars | Net + 1% wastage or as applied whichever is lower | ||||
| 3 | 39011090 | XLPECompound | Net + 2.5% wastage or as appliedwhichever is lower | ||||
| 4 | 29173200 | Plasticiser(DOP) | Net + 2.5% wastage or as appliedwhichever is lower | ||||
| 5 | 39041020 | PVC RESIN | Net + 2.5% wastage or as applied whichever is lower | ||||
| 6 | 40027000 | EPDM | Net + 2.5% wastage or as appliedwhichever is lower | ||||
| 7 | 38029019 | Calcined Clay | Net + 2.5% wastage or as applied whichever is lower | ||||
| 8 | 39013000 | EVACo-Polymer | Net + 2.5% wastage or as appliedwhichever is lower |
or as appliedwhichever is lower||| ||7|38029019|Calcined Clay||Net + 2.5% wastage or as applied whichever is lower||| ||8|39013000|EVACo-Polymer||Net + 2.5% wastage or as appliedwhichever is lower||| ||9|28183000|Aluminium Hydroxide||Net + 2.5% wastage or as applied whichever is lower||| ||10|39019000|Polymers Of Ethylene||Net + 2.5% wastage or as applied whichever is lower||| ||Note: For import item at Sl. No. 10, the type of polymer to be imported will be same as used in<br>export product.<br>RA concerned maytake suitable consequential action accordingly.|||||||
| Case No.:9/23/81- | Party Name: AXORA | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | RESOURCES LIMITED | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210209724 | Action by : | |||
| :01/81/050/00421/AM20/ | :02/24/040/00173/AM20/ | 28.01.2020 | Applicant |
101 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by MSME:
- To submit Certificate of analysis from supplier for import item.
the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by MSME:
- To submit Certificate of analysis from supplier for import item.
| 102 | <br>Case No.:10/23/81-<br>ALC2/2019 | Party Name: SHIVALIK<br>BIMETAL CONTROLS<br>LTD.<br> <br> <br> | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00422/AM20/ | RLA File<br>:05/24/040/00691/AM20/<br> <br> | Lic.No/Date:0510413468<br>29.01.2020 | Action by :<br>Applicant | |
| **Decision:**The Committee considered the case asper agenda and decided to seek from | the applicant |
34 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
to furnish following information as per comments given by Consultant (TEC-3):
-
Justification for wastage of 31.3% on input for slitting supported by evidence.
-
Price of disposal of scrap with supporting document.
-
Document for CIF price of inputs.
| Case No.:11/23/81- | Party Name: SHIVALIK | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | BIMETAL CONTROLS | ALC2/2020 | Deferred | |||
| LTD | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510413469 | Action by : | |||
| :01/81/050/00423/AM20/ | :05/24/040/00692/AM20/ | 29.01.2020 | Applicant |
Decision: The Committee considered the case as per agenda and decided to seek from the applicant 103 to furnish following information as per comments given by Consultant (TEC-3):
.
.
- .
- Specific item of export.
nsidered the case as per agenda and decided to seek from the applicant 103 to furnish following information as per comments given by Consultant (TEC-3):
.
.
- .
-
Specific item of export.
-
Sl. No. 3, 5, 11 & 11(a) of the Standard Deficiency Format. 3. Price of disposal of scrap with supporting document.
-
Document for CIF price of inputs.
| Case No.:13/23/81- | Party Name: PEARL | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INSULATIONS PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710116093 | Action by : | |||
| :01/81/050/00425/AM20/ | :07/24/040/00258/AM20/ | 04.02.2020 | Applicant |
104 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020 followed by a reminder on 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:14/23/81- | Party Name: MICROMAX | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INFORMATICS LIMITED | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413524 | Action by : | |||
| :01/81/050/00426/AM20/ | :05/24/040/00704/AM20/ | 04.02.2020 | Applicant |
NFORMATICS LIMITED||ALC2/2020||Deferred| |||||16.07.2020||| |HQ File||RLA File||Lic.No/Date:0510413524||Action by :| |:01/81/050/00426/AM20/||:05/24/040/00704/AM20/||04.02.2020||Applicant|
105 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020 followed by a reminder on 17.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application. The case stands deferred.
35 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:15/23/81- | Party Name: POLYCAB | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDIA LIMITED | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310834702 | Action by : | |||
| :01/81/050/00427/AM20/ | :03/95/040/01061/AM20/ | 07.02.2020 | TEC-3 |
106 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 19.05.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.
onsultant (TEC-3) on 19.05.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.
| Case No.:16/23/81- | Party Name: BAOSTEEL | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDIA COMPANY | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310834749 | Action by : | |||
| :01/81/050/00428/AM20/ | :03/94/040/00937/AM20/ | 10.02.2020 | Applicant |
107 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020 followed by a reminder on 17.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| 108 | Case No.:18/23/81-<br>ALC2/2019 | Party Name: APAR<br>INDUSTRIES LIMITED | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00430/AM20/ | RLA File<br>:03/94/040/00938/AM20/ | Lic.No/Date:0310834830<br>13.02.2020 | Action by :<br>TEC-3 | |
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>sent to Consultant (TEC-3) on 20.07.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred. |
onsultant (TEC-3) on 20.07.2020 for examination of the case. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>The case stands deferred.||||
| Case No.:19/23/81- | Party Name: MITTAL | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | COIN PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:5610005822 | Action by : | ||||
| :01/81/050/00431/AM20/ | :56/24/040/00036/AM20/ | 13.02.2020 | Applicant |
109 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the applicant on 08.07.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information. The case stands deferred.
36 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
decided to remind the applicant for furnishing the requisite information. The case stands deferred.
36 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:20/23/81- | Party Name: ASTA INDIA | Meet No/Date:5/81- | Status: | |||||
|---|---|---|---|---|---|---|---|---|
| ALC2/2019 | PRIVATE LIMITED | ALC2/2020 | Approved | |||||
| 16.07.2020 | ||||||||
| HQ File | RLA File | Lic.No/Date:3410045874 | ||||||
| 110 | :01/81/050/00432/AM20/<br>:34/24/040/00318/AM20/<br>14.02.2020<br>**Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as | |||||||
| per written comments given by DPIIT vide U. O. No.: P-47011/187/2019-TSW dated | 27.05.2020. | |||||||
| (Copy enclosed) | ||||||||
| RA concerned maytake suitable consequential action accordingly. |
| Case No.:21/23/81- | Party Name: ASTA INDIA | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | PRIVATE LIMITED | ALC2/2020 | Approved | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410045876 | |||||
| :01/81/050/00433/AM20/ | :34/24/040/00346/AM20/ | 14.02.2020 |
111 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by DPIIT vide U. O. No.: P-47011/187/2019-TSW dated 27.05.2020. (Copy enclosed)
** The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by DPIIT vide U. O. No.: P-47011/187/2019-TSW dated 27.05.2020. (Copy enclosed)
| Case No.:22/23/81- | Party Name: MAHENDRA | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES | ALC2/2020 | Approved | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710116126 | |||||
| :01/81/050/00434/AM20/ | :07/24/040/00273/AM20/ | 17.02.2020 |
112 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by DPIIT vide U. O. No.: P-47011/88/2020-TSW dated 03.06.2020. (Copy enclosed)
| Case No.:23/23/81- | Party Name: MAHENDRA | Meet No/Date:5/81-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES | 16.07.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0710116127 | ||||
| :01/81/050/00435/AM20/ | :07/24/040/00274/AM20/ | 17.02.2020 |
113 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by DPIIT vide U. O. No.: P-47011/88/2020-TSW dated 03.06.2020. (Copy enclosed)
37 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
itten comments given by DPIIT vide U. O. No.: P-47011/88/2020-TSW dated 03.06.2020. (Copy enclosed)
37 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:24/23/81- | Party Name: TECHNO | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | TRAK ENGINEERS | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067691 | Action by : | |||
| :01/81/050/00436/AM20/ | :31/83/040/00156/AM20/ | 19.02.2020 | Applicant |
114 Decision: The Committee considered the case as per the agenda and decided to seek from the applicant to furnish the following information as per written comments given by DPIIT vide U. O. No.: P-47011/68/2020-TSW dated 08.06.2020:
- Sl. No. 3, 5 & 11 of the Standard Deficiency Format.
| Case No.:25/23/81- | Party Name: TATA | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INTERNATIONAL | ALC2/2020 | Deferred | |||
| LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0210209776 | Action by : | |||
| :01/81/050/00437/AM20/ | :02/24/040/00187/AM20/ | 19.02.2020 | Applicant |
115 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020 followed by a reminder on 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application. The case stands deferred.
n 14.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application. The case stands deferred.
| Case No.:1/2/81-ALC2/2020 | Party Name: POLYCAB | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA LIMITED | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310835466 | Action by : | ||||
| :01/81/050/00481/AM20/ | :03/95/040/01187/AM20/ | 17.03.2020 | TEC-3 |
116 Decision: The Committee considered the case as per agenda and noted that a copy of application was referred to Consultant (TEC-3) for examination of the case on 22.04.2020 followed by a reminder on 09.07.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. The case stands deferred.
| 117 | Case No.:2/2/81-ALC2/2020 | Party Name: POLYCAB<br>INDIA LIMITED<br>RLA File<br>:03/95/040/01202/AM20/ | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred<br> <br>Action by<br>: TEC-3 |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00482/AM20/ | Lic.No/Date:0310835490<br>18.03.2020 | |||
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application was<br>referred to Consultant (TEC-3) for examination of the case on 22.04.2020 followed by a reminder on<br>09.07.2020. However, no comments have been received yet. Hence, the Committee decided to wait<br>for the comments.<br>The case stands deferred. |
case on 22.04.2020 followed by a reminder on<br>09.07.2020. However, no comments have been received yet. Hence, the Committee decided to wait<br>for the comments.<br>The case stands deferred.||||
38 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:3/2/81-ALC2/2020 | Party Name: ARMOR | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| PLAST LIMITED | ALC2/2020 | Deferred | ||||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710116277 | Action by : | |||
| :01/81/050/00483/AM20/ | :07/24/040/00309/AM20/ | 18.03.2020 | Applicant |
118 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 30.04.2020 followed by a reminder on 17.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:9/2/81-ALC2/2020 | Party Name: DYNAMIC | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| CABLES LTD. | ALC2/2020 | Approved | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:1310049550 | |||||
| :01/81/050/00489/AM21/ | :13/24/040/00208/AM20/ | 19.03.2020 |
119 Decision: The Committee considered the case as per the agenda and decided to approve the case as per written comments given by DPIIT vide U. O. No.: P-47011/93/2019-TSW dated 27.05.2020 (copy enclosed).
The Committee considered the case as per the agenda and decided to approve the case as per written comments given by DPIIT vide U. O. No.: P-47011/93/2019-TSW dated 27.05.2020 (copy enclosed).
| Case No.:4/2/81-<br>Party Name: TOSHIBA | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|
| ALC2/2020<br>TRANSMISSION & | ALC2/2020 | Deferred | |||
| DISTRIBUTION SYSTEMS | 16.07.2020 | ||||
| HQ File<br>RLA File | Lic.No/Date:0910068597 | Action by : | |||
| 120 | :01/81/050/00484/AM20/<br>:09/24/040/00627/AM20/<br>20.03.2020<br>Applicant<br>**Decision:**The Committee considered the case as per agenda and noted that a deficiency letter | ||||
| seeking certain information as raised by DHI was sent to the applicant on 08.07.2020. However, the | |||||
| applicant via email dated 24.07.2020 has requested for some more time to furnish the reply. | |||||
| Therefore, the Committee decided to wait for reply of the applicant. | |||||
| The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the applicant on 08.07.2020. However, the applicant via email dated 24.07.2020 has requested for some more time to furnish the reply. Therefore, the Committee decided to wait for reply of the applicant. The case stands deferred.
wever, the applicant via email dated 24.07.2020 has requested for some more time to furnish the reply. Therefore, the Committee decided to wait for reply of the applicant. The case stands deferred.
| Case No.:6/2/81-ALC2/2020 | Party Name: HINDALCO | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0210209838 | Action by | ||||
| :01/81/050/00486/AM20/ | :02/24/040/00205/AM20/ | 23.03.2020 | : TEC-3 |
121 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 03.05.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments. The case stands deferred.
39 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
122
| Case No.:8/2/81-ALC2/2020 | Party Name: WORTHY | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING | ALC2/2020 | Deferred | |||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710116312 | Action by | ||||
| :01/81/050/00488/AM21/ | :07/24/040/00318/AM20/ | 31.03.2020 | : MSME |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 14.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
123
ted that a copy of application was sent to MSME on 14.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
123
| Case No.:10/2/81- | Party Name: UNIVERSAL | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | METALLICS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413980 | Action by | ||||
| :01/81/050/00490/AM21/ | :05/24/040/00008/AM21/ | 13.04.2020 | : MSME |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 15.06.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
| Case No.:11/2/81- | Party Name: AXORA | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | RESOURCES LIMITED | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210209843 | Action by : | |||
| :01/81/050/00491/AM21/ | :02/24/040/00002/AM21/ | 13.04.2020 | Applicant |
124 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the applicant on 09.07.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
raised by MSME was sent to the applicant on 09.07.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant for furnishing the requisite information.
| Case No.:12/2/81- | Party Name: ASIAN | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PLASTOWARES PVT. LTD. | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310835651 | Action by : | |||
| :01/81/050/00492/AM21/ | :03/94/040/01094/AM20/ | 18.04.2020 | Applicant |
125 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 30.04.2020 followed by a reminder on 17.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application. The case stands deferred.
40 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
126
| Case No.:13/2/81- | Party Name: DISHA AUTO | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | COMPONENTS PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310835652 | Action by : | ||||
| :01/81/050/00493/AM21/ | :03/94/040/01006/AM20/ | 18.04.2020 | TEC-3 |
OMPONENTS PVT. LTD.||ALC2/2020||Deferred| ||||||16.07.2020||| ||HQ File||RLA File||Lic.No/Date:0310835652||Action by :| ||:01/81/050/00493/AM21/||:03/94/040/01006/AM20/||18.04.2020||TEC-3|
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 15.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
127
| Case No.:14/2/81- | Party Name: POLYCAB | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA LIMITED | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310835720 | Action by | ||||
| :01/81/050/00494/AM21/ | :03/95/040/00015/AM21/ | 20.04.2020 | : TEC-3 |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 21.05.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.
| Case No.:15/2/81- | Party Name: JINDAL SAW | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | LIMITED | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414028 | Action by : | |||
| :01/81/050/00495/AM21/ | :05/23/040/00490/AM20/ | 20.04.2020 | Applicant |
C2/2020**||LIMITED||ALC2/2020||Deferred| |||||16.07.2020||| |HQ File||RLA File||Lic.No/Date:0510414028||Action by :| |:01/81/050/00495/AM21/||:05/23/040/00490/AM20/||20.04.2020||Applicant|
128 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by Consultant (TEC-3):
-
Coating thickness of each layer as per purchase order.
-
Surface area of pipes to be coated. The case stands deferred.
| Case No.:16/2/81- | Party Name: CHAMPION | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ELECTRICAL | ALC2/2020 | Deferred | |||
| INDUSTRIES | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510414029 | Action by : | |||
| :01/81/050/00496/AM21/ | :05/23/040/00001/AM21/ | 20.04.2020 | Applicant |
129 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 30.04.2020 followed by a reminder on 17.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application. The case stands deferred.
41 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
remind again the applicant for submitting the complete set of application. The case stands deferred.
41 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:17/2/81- | Party Name: MEHTA | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TUBES LIMITED | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310835766 | Action by : | |||
| :01/81/050/00497/AM21/ | :03/95/040/01132/AM20/ | 21.04.2020 | Applicant |
130 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 30.04.2020 followed by a reminder on 17.05.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the applicant for submitting the complete set of application.
| Case No.:18/2/81- | Party Name: WIELAND | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | METALS INDIA | ALC2/2020 | Deferred | ||||
| PRIVATE LTD. | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710116357 | Action by : | ||||
| :01/81/050/00498/AM21/ | :07/24/040/00307/AM20/ | 22.04.2020 | MSME |
LS INDIA||ALC2/2020||Deferred| ||||PRIVATE LTD.||16.07.2020||| ||HQ File||RLA File||Lic.No/Date:0710116357||Action by :| ||:01/81/050/00498/AM21/||:07/24/040/00307/AM20/||22.04.2020||MSME|
131 Decision: The Committee considered the case as per the agenda and noted the comments of MSME received via email dated 28.07.2020. Since, the applicant attended personal hearing in similar cases with the request to allow higher wastages, the matter was deliberated in the meeting. The Committee decided to refer the matter back to examine the case with other review cases. The case stands deferred.
| Case No.:4/5/81-ALC2/2020 | Party Name: BRIGHT | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| METALS INDIA PVT. | ALC2/2020 | Deferred | |||||
| LTD. | 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:1310049585 | Action by : | ||||
| :01/81/050/00583/AM21/ | :13/24/040/00011/AM21/ | 05.06.2020 | Applicant |
132 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 24.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred.
d in this regard, an email was sent on 23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred.
| Case No.:30/5/81- | Party Name: ICE STEEL1 | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166845 | Action by : | |||
| :01/81/050/00609/AM21/ | :04/24/040/00020/AM21/ | 25.06.2020 | Applicant |
160 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by MSME:
-
Per unit weight of export item.
-
Manufacturing process with step-wise wastage and material balancing. The case stands deferred.
| Case No.:31/5/81- | Party Name: ICE STEEL1 | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166846 | Action by : | |||
| :01/81/050/00610/AM21/ | :04/24/040/00021/AM21/ | 25.06.2020 | Applicant |
161 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per comments given by MSME:
-
Per unit weight of export item.
-
Manufacturing process with step-wise wastage and material balancing. The case stands deferred.
50 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
- Manufacturing process with step-wise wastage and material balancing. The case stands deferred.
50 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:29/5/81- | Party Name: SIECHEM | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TECHNOLOGIES | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166843 | Action by : | |||
| :01/81/050/00608/AM21/ | :04/24/040/00039/AM21/ | 25.06.2020 | Applicant |
162 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:33/5/81- | Party Name: FCI OEN | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | CONNECTORS LIMITED | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710116666 | Action by : | |||
| :01/81/050/00612/AM21/ | :07/24/040/00091/AM21/ | 26.06.2020 | Applicant |
163 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
ved from the applicant and in this regard, an email was sent on 23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:32/5/81- | Party Name: POLYCAB | Meet No/Date:5/81- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA LIMITED | ALC2/2020 | Deferred | ||||
| 16.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310836912 | Action by : | ||||
| :01/81/050/00611/AM21/ | :03/95/040/00171/AM21/ | 26.06.2020 | TEC-3 |
164 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 15.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
| 165 | Case No.:34/5/81-<br>ALC2/2020 | Party Name: R. M.<br>ALLOYS PRIVATE<br>LIMITED | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00613/AM21/ | RLA File<br>:05/24/040/00132/AM21/ | Lic.No/Date:0510414494<br>26.06.2020 | Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per the agenda and noted that the copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>24.07.2020. However, no information has been received yet. Hence, the Committee decided to wait<br>for the complete set of application.<br>The case stands deferred. |
rd, an email was sent on<br>24.07.2020. However, no information has been received yet. Hence, the Committee decided to wait<br>for the complete set of application.<br>The case stands deferred.||||
51 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:35/5/81- | Party Name: JAIN | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | RECYCLING PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0210209945 | Action by : | |||
| :01/81/050/00614/AM21/ | :02/24/040/00032/AM21/ | 29.06.2020 | Applicant |
166 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per the advice of the representative of MSME:
- To provide certificate of analysis with average percentage of copper in each item of import.
16
Case No.:38/5/81- Party Name: FCI OEN Meet No/Date:5/81- Status: ALC2/2020 CONNECTORS ALC2/2020 Deferred LIMITED 16.07.2020 HQ File RLA File Lic.No/Date:0710116681 Action by : :01/81/050/00617/AM21/ :07/24/040/00129/AM20/ 30.06.2020 Applicant
7 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
ved from the applicant and in this regard, an email was sent on 23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:36/5/81- | Party Name: GKEM | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INTERNATIONAL | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510414504 | Action by : | |||
| :01/81/050/00615/AM21/ | :05/23/040/00067/AM21/ | 30.06.2020 | Applicant |
168 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 24.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:37/5/81- | Party Name: MW WIRETEC | Meet No/Date:5/81- | Status: | |||||
|---|---|---|---|---|---|---|---|---|
| ALC2/2020 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 16.07.2020 | ||||||||
| HQ File | RLA File | Lic.No/Date:0510414512 | Action by | |||||
| 169 | :01/81/050/00616/AM21/ | :05/24/040/00139/AM21/ | 30.06.2020 | : TEC-3 | ||||
| **Decision:**The Committee considered the case as per agenda and noted that a copy of application was | ||||||||
| sent to Consultant (TEC-3) on | 24.07.2020 for examination of | the case. However, no comments have | ||||||
| been received yet. Hence, the Committee decided to wait for the comments. | ||||||||
| The case stands deferred. |
- on|24.07.2020 for examination of||the case. However, no comments have|||| |||been received yet. Hence, the Committee decided to wait for the comments.||||||| |||The case stands deferred.|||||||
52 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| 170 | Case No.:39/5/81-<br>ALC2/2020 | Party Name: FCI OEN<br>CONNECTORS LIMITED | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00618/AM21/ | <br>RLA File<br>:07/24/040/00127/AM20/ | Lic.No/Date:0710116686<br>01.07.2020 | Action by :<br>Applicant | |
| <br>**Decision:**The Committee considered the case as per the agenda and noted that the copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait<br>for the complete set of application.<br>The case stands deferred. |
| Case No.:40/5/81- | Party Name: SAMYAK | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | METALS PRIVATE | ALC2/2020 | Approved | |||
| LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510414534 | ||||
| :01/81/050/00619/AM21/ | :05/24/040/00150/AM21/ | 01.07.2020 |
---| |ALC2/2020||METALS PRIVATE||ALC2/2020||Approved| |||LIMITED||16.07.2020||| |HQ File||RLA File||Lic.No/Date:0510414534||| |:01/81/050/00619/AM21/||:05/24/040/00150/AM21/||01.07.2020|||
| Case No.:40/5/81-<br>ALC2/2020 | Case No.:40/5/81-<br>ALC2/2020 | Party Name: SAMYAK<br>METALS PRIVATE<br>LIMITED | Party Name: SAMYAK<br>METALS PRIVATE<br>LIMITED | Party Name: SAMYAK<br>METALS PRIVATE<br>LIMITED | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/81/050/00619/AM21/ | RLA File<br>:05/24/040/00150/AM21/ | Lic.No/Date:0510414534<br>01.07.2020 | |||||||
| 17<br>1 | **Decision:**The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per comments given by Consultant (SKB) as under: | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Quantity | ||||
| 76012010 | Aluminium Alloy Ingots<br>Containing Net Aluminium;<br>452900kgs And Net Silicon<br>47100kgs (Aluminium<br>90.58%,Silicon 9.42%) | 500 MT | 76020010 | Aluminium<br>Scrap | As per SION<br>C-3 | ||||
| 28046900 | Silicon<br>Metal | As per SION<br>C-3 | |||||||
| Note: Description of import items should be as per SION C-3.<br>RA concerned maytake suitable consequential action accordingly. |
||||||28046900||Silicon<br>Metal|As per SION<br>C-3|| ||Note: Description of import items should be as per SION C-3.<br>RA concerned maytake suitable consequential action accordingly.|||||||||
| 172 | Case No.:42/5/81-<br>ALC2/2020 | Party Name: SUCHI<br>FASTENERS PVT LTD | Meet No/Date:5/81-<br>ALC2/2020<br>16.07.2020<br>Lic.No/Date:3410046193<br>02.07.2020 | Status:<br>Deferred<br> <br>Action by<br>: TEC-3 |
|---|---|---|---|---|
| <br>HQ File<br>:01/81/050/00621/AM21/ | RLA File<br>:34/24/040/00061/AM21/ | |||
| <br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application has<br>been referred to Consultant (TEC-3) on 28.07.2020 for examination of the case. Therefore, the<br>Committee decided to wait for the comments.<br>The case stands deferred. |
Decision: The Committee considered the case as per agenda and noted that a copy of application has been referred to Consultant (TEC-3) on 28.07.2020 for examination of the case. Therefore, the Committee decided to wait for the comments.
53 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:43/5/81- | Party Name: TOSHIBA | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TRANSMISSION & | ALC2/2020 | Deferred | |||
| DISTRIBUTION SYSTEMS | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068926 | Action by : | |||
| :01/81/050/00622/AM21/ | :09/24/040/00161/AM21/ | 02.07.2020 | Applicant |
ALC2/2020||Deferred| |||DISTRIBUTION SYSTEMS||16.07.2020||| |HQ File||RLA File||Lic.No/Date:0910068926||Action by :| |:01/81/050/00622/AM21/||:09/24/040/00161/AM21/||02.07.2020||Applicant|
173 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:44/5/81- | Party Name: TOSHIBA | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TRANSMISSION & | ALC2/2020 | Deferred | |||
| DISTRIBUTION SYSTEMS | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068927 | Action by : | |||
| :01/81/050/00623/AM21/ | :09/24/040/00152/AM21/ | 02.07.2020 | Applicant |
174 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:41/5/81- | Party Name: HVR SOLAR | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 16.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510414551 | Action by : | |||
| :01/81/050/00620/AM21/ | :05/23/040/00065/AM21/ | 03.07.2020 | Applicant |
*||PRIVATE LIMITED||ALC2/2020||Deferred| |||||16.07.2020||| |HQ File||RLA File||Lic.No/Date:0510414551||Action by :| |:01/81/050/00620/AM21/||:05/23/040/00065/AM21/||03.07.2020||Applicant|
175 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 24.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:45/5/81- | Party Name: POLYCAB | Meet No/Date:5/81- | Status: | ||||||
|---|---|---|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA LIMITED | ALC2/2020 | Deferred | ||||||
| 16.07.2020 | |||||||||
| HQ File | RLA File | Lic.No/Date:0310837033 | Action by : | ||||||
| 176 | :01/81/050/00624/AM21/<br>:03/95/040/00204/AM21/<br>06.07.2020<br>TEC-3<br>**Decision:**The Committee considered the case as per agenda and noted that a copy of application has | ||||||||
| been referred to Consultant (TEC-3) on 28.07.2020 for | examination of the case. Therefore, the | ||||||||
| Committee decided to wait for | the comments. | ||||||||
| The case stands deferred. | |||||||||
54 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
Committee decided to wait for|the comments.||||||| |||The case stands deferred.|||||||| |||||||||||
54 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| Case No.:46/5/81- | Party Name: SIECHEM | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TECHNOLOGIES | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166865 | Action by : | |||
| :01/81/050/00625/AM21/ | :04/24/040/00048/AM21/ | 06.07.2020 | Applicant |
177 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:47/5/81- | Party Name: A-1 FENCE | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PRODUCTS COMPANY | ALC2/2020 | Deferred | |||
| PRIVATE LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310837058 | Action by : | |||
| :01/81/050/00626/AM21/ | :03/94/040/00197/AM21/ | 07.07.2020 | Applicant |
178 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 24.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
ved from the applicant and in this regard, an email was sent on 24.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
| Case No.:48/5/81- | Party Name: SIECHEM | Meet No/Date:5/81- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TECHNOLOGIES PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 16.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166869 | Action by : | |||
| :01/81/050/00627/AM21/ | :04/24/040/00051/AM21/ | 07.07.2020 | Applicant |
179 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the applicant and in this regard, an email was sent on 23.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.
55 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
Minutes of Offline cases
| Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | Minutes of Offline cases | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| SI.<br>No. | Applicant's<br>Name / AA<br>No. | pli<br>me | cant's<br>/ AA | HQ/RA File<br> | Case History | Decision | Status | |||||||||
| No. | ||||||||||||||||
| KOTSONS<br>PVT.<br>LIMITED<br>0610038672<br>dated<br>09.08.2017 | The cas<br>27.08.20<br>DHI‟s d<br> | e was rejected in M. No.04/8<br>18 due to non submission of r<br>eficiency letter. However, the ap<br> | 1 dated<br>eply of<br>plicant<br> | <br> <br> <br> <br>The Committee<br>nobody was attend<br>hearing on beh<br> <br> | noted that<br>ed personal<br>alf of the<br> <br> | <br> <br> <br> <br> <br> <br>Deferred | ||||||||||
| vide let<br>with a r<br>alican | er dated 03.04.2019 furnishe<br>equest to fix the ad-hoc norm<br>t‟s rel was referred to D | reply<br>s. The<br>HI on | <br> <br> <br>applicant.<br>There<br>Committee decided<br>oortunit to the | fore,<br>the<br>to give last<br>alicant to | ||||||||||||
| pp py<br>18.07.2019<br>along<br>with<br>reminder<br>on<br>11.10.2019. The case was considered in M. |
There<br>Committee decided<br>oortunit to the||fore,<br>the<br>to give last<br>alicant to|| |||||||pp py<br>18.07.2019<br>along<br>with<br>reminder<br>on<br>11.10.2019. The case was considered in M. No.<br>14/81 dated 16.10.2019, the representative of<br>DHI informed that the applicant has still not<br>furnish point wise reply of the deficiencies<br>raised by DHI vide U.O. No. 3(92)/17-TS(B)<br>dated 22.12.2017. Hence, the Committee<br>decided to seek from the applicant to furnish|||||||<br> <br> <br> <br> <br> <br> <br> <br> <br>ppy pp<br>attend personal hearing.|||| |||||||the requisite information as per advice of<br>|||||||<br>|||| |||PV<br>IMI<br>100<br>dat<br>.08|T.<br>TED<br>38672|01/81/050/003<br>78/AM18/<br>06/24/040/000||represe<br>applica<br>receive<br>Alic|ntative of DHI. DHI D/L sen<br>nt via email dated 05.11.20<br>d<br>from<br>applicant<br>dt.<br>15<br>nt's rel dt 15112019 w||||t again to<br>19. Reply<br>.11.2019.<br>s sent to||<br> <br> <br>|||| |R1||||||||||||||||| |||||||||||||||||| ||||<br>ed<br>.2017|15/AM18||pp<br>DHI on<br>20/81 d|py . ..<br>21.11.2019. As per decision<br>t. 08.01.2020 reminder was se||||<br>of M. No.<br>nt to DHI||<br> <br>|||| |||||||on 28.02.2020. The case was last considered in<br>M. No. 23/81 dt 04.03.2020, the representative<br>of DHI informed in meeting that the applicant<br>did not give the reply to the queries properly.<br>The applicant has requested for ratification<br>under SION C334 which is for CRGO Core|||||||<br> <br> <br> <br> <br>|||| |||||||whereas the ap<br>and morphous<br>|||plicant prop<br>core.
roperly.<br>The applicant has requested for ratification<br>under SION C334 which is for CRGO Core|||||||<br> <br> <br> <br> <br>|||| |||||||whereas the ap<br>and morphous<br>|||plicant prop<br>core. Hen<br>|oses to manu<br>ce, the Co<br>||facture<br>mmittee<br>|<br> <br>|||| |||||||decided to c<br>hearing to exp<br>NC meeting.<br>27.7.2020 sent<br>attend PH on 2|||all the appl<br>lain the case<br>As per NC d<br>to applicant<br>8.7.2020 at 2|icant for p<br>in the forth<br>ecision emai<br>requesting t<br>:45 p.m.||ersonal<br>coming<br>l dated<br>hem to|<br> <br> <br>|||| |||||||||||||||||| ||<br>IN<br>P<br>LI<br>BE|NA<br>DU<br>S<br>RIV<br>MI<br>NG<br>U|SH<br>STRIE<br>(I)<br>ATE<br>TED,<br>ALUR<br>|01/80<br>02/<br>1/11/<br>U:CS|/162/003<br>AM18/<br>2015:EO<br>EZ/1476/|<br>DC, CSEZ<br>followed by r<br>from the appli<br>of scrap/wasta<br>and export of S<br>made of iron a<br>other metals/al<br>in M. No. 01/<br> <br>|||vide letter<br>epresentatio<br>cant, had re<br>ge norms f<br>heet Metal P<br>nd steel, cop<br>loys.
of scrap/wasta<br>and export of S<br>made of iron a<br>other metals/al<br>in M. No. 01/<br> <br>|||vide letter<br>epresentatio<br>cant, had re<br>ge norms f<br>heet Metal P<br>nd steel, cop<br>loys. The ma<br>81 dated 10.<br>|dated 03.1<br>n dated 29.0<br>quested for f<br>or the manu<br>ressed Com<br>per, brass an<br>tter was con<br>04.2019 and<br>||1.2017,<br>3.2018<br>ixation<br>facture<br>ponents<br>d such<br>sidered<br>on the|<br> <br> <br> <br> <br> <br> <br> <br>The<br>Comm<br>representativ<br>during pers<br>through vi<br>On the adv<br>(TEC-3),<br>directed the<br>furnish follo|ittee<br>heard<br>the<br>es of the applicant<br>onal hearing held<br>deo conferencing.<br>ice of Consultant<br>the<br>Committee<br>representatives to<br>wing information:||<br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred| |R2||||||||||||||||| |||||||||||||||||| |||||||advice<br>of<br>Consultant<br>(TEC-3),<br>some<br>information was sought from the applicant via<br>email dated 25.05.2019 followed byreminder|||||||<br> <br> <br>1. To su<br>making|bmit details by<br>subgroup<br>of||| ||||||||||||||||||
56 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
<br>1. To su<br>making|bmit details by<br>subgroup<br>of||| ||||||||||||||||||
56 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
on 12.07.2019. The email reply dated items manufactured in 13.11.2019 was referred to Consultant (TEC-3) the limited range of via email dated 14.11.2019. The case was wastages as there is wide considered in M. No. 20/81 dt. 08.01.2020. variation in the wastage of The Committee noted that the written items manufactured i.e. comments dated 01.01.2020 of Consultant 1.5% to 98.40%. (TEC-3) as under: 1. Nash Industries, an EOU, had requested for fixation of wastage norms for The case stands deferred. export product „sheet metal pressed components for UPS & other industrial use‟. 2. Applicant has informed that they are manufacturing 1000 parts & components & have submitted some details for 6 components. 3. Components are manufactured from iron & steel, Cu & Al sheets. 4. Wastages claimed is in the range of 38% to 50% which is average of vide range of 1.5% to 98.4% 5. As range of wastage is very wide and number of components very large, it is not possible to work out wastage of every component. In view of the above, the Committee decided to call the applicant for PH. As per NC decision, an email dated 25.02.2020 was sent to the applicant to attend PH on 04.03.2020. The case was last considered in M. No. 22/81 dt. 19.02.2020 as per agenda and noted that the applicant vide email dated 28.02.2020 has sought another date for personal hearing on behalf of the applicant.
case was last considered in M. No. 22/81 dt. 19.02.2020 as per agenda and noted that the applicant vide email dated 28.02.2020 has sought another date for personal hearing on behalf of the applicant. Therefore, the Committee decided to give one more opportunity to the applicant for personal hearing to explain the case before Norms Committee. As per NC decision email dated 27.7.2020 sent to applicant requesting them to attend PH on 28.7.2020 at 2:45 p.m. The case was approved in M. No. 03/81 dated The Committee noted that the Rejected. 14.08.2018 allowing the wastage of 23%. The applicant is not providing the applicant vide letter dated 18.8.2018 requested exact details of sizes of the KIRTANLA to allow wastage on repeat basis as given to it export product vis-a-vis import L STEEL in other cases in Special Norms Committee along with quantity despite PRIVATE 01/81/050/004 Meeting dated 12.12.2017. However, the several reminders. Hence, the LIMITED 42/AM18/ applicant was directed to submit certain Committee decided reject the R3 information as per advice of Consultant (TECrequest of the applicant to 03/94/040/001 3) during personal hearing dated 26.06.2019. review the case. 0310815526 02/AM18/ The applicant‟s reply was forwarded to dated Consultant (TEC-3) on 06.08.2019 along with 05.09.2017 reminder on 11.10.2019. In compliance of M. No. 14/81 dated 16.10.2019 decision, a letter was sent to the applicant via email dated 05.11.2019 to seek from the applicant to
57 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
ecision, a letter was sent to the applicant via email dated 05.11.2019 to seek from the applicant to
57 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| fih dil f i di f | fih dil f i di f | fih dil f i di f | fih dil f i di f | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| urns exact etas o szes on avce o<br>Consultant (TEC-3). The case was considered<br>in M. No. 20/81 dt. 08.01.2020 and Consultant<br>(TEC-3) informed that the applicant‟s reply<br>dated 18.12.2019 is very vague. Therefore, the<br>Committee decided to give last opportunity to | <br> <br> <br> <br> <br> | ||||||||||
| <br>the applicant to submit the exact details of | <br> | ||||||||||
| sizes of<br>along wit<br>was sent<br> | the export product vis-a-vis<br>h quantity. As per NC decisio<br>to the applicant on 06.02<br> | import<br>n, D/L<br>.2020.<br> | <br> <br> <br> | ||||||||
| However,<br>8.2.2020<br>quantity | the applicant vide email<br>informed that exact import /<br>is not needed for fixation of n | dated<br>export<br>orms | <br> | ||||||||
| .<br>The case was last considered in M. No. 23/81<br>dt. 04.03.2020 and decided to remind the<br>applicant<br>for<br>furnishing<br>the<br>requisite<br>information. As per NC decision, a reminder<br>was sent to applicant on 10.7.2020. However,<br>no replyhas been receivedyet. | <br> <br> <br> <br> | ||||||||||
| KIRTANLA<br>L STEEL<br>PRIVATE<br>LIMITED<br>0310815527<br>dated<br>05.09.2017 | The case was approved in M. No.03/81 dated<br>14.08.2018 allowing the wastage of 23%. |
et.||||<br> <br> <br> <br>||| ||KIRTANLA<br>L STEEL<br>PRIVATE<br>LIMITED<br>0310815527<br>dated<br>05.09.2017||||The case was approved in M. No.03/81 dated<br>14.08.2018 allowing the wastage of 23%. The<br>applicant vide letter dated 18.8.2018 requested||||<br> <br> <br>The Committee noted that the<br>applicant is not providing the<br>exact details of sizes of the||<br> <br> <br> <br> <br> <br> <br> <br>Rejected.| ||||||to allow wastage on repeat basis as given to it||||<br>export product vis-a-vis import||| ||||||in other<br>Meeting<br>also not<br>|cases in Special Norms C<br>dated 12.12.2017. Howeve<br>ed that the applicant was di<br>|||<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>along with quantity despite<br>several reminders. Hence, the<br>Committee decided reject the<br>request of the applicant to<br>review the case.||| |||||<br>01/81/050/004<br>43/AM18/<br>03/94/040/001<br>05/AM18/|||||||| |R4|||||||||||| |||||||||||||
58 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
|||<br>01/81/050/004<br>43/AM18/<br>03/94/040/001<br>05/AM18/|||||||| |R4|||||||||||| |||||||||||||
58 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| fihi th iit ifti Rl | fihi th iit ifti Rl | fihi th iit ifti Rl | fihi th iit ifti Rl | fihi th iit ifti Rl | fihi th iit ifti Rl | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| urnsn<br>received<br>15/22.4.2<br>(TEC-3) | g e requse normao<br>from the applicant vide em<br>020 has been referred to C<br>for examination and comment | . epy<br>ail dated<br>onsultant<br>s. | <br> <br> | ||||||||||
| KIRTANLA<br>L STEEL<br>PRIVATE<br>LIMITED<br>0310816055<br>dated<br>29.09.2017 | The case<br>10.10.20 | was rejected in M. No.05<br>18 due to non submission of | /81dated<br>reply of | <br> <br>The Committee n<br>applicant is not p | oted that the<br>roviding the | <br> <br> <br> <br> <br> <br> <br> <br>Rejected. | |||||||
| deficiency letter. The applicant vide letter<br>dated 20.10.2018 requested to allow wastage<br>on repeat basis as given to it in other cases in<br>Special Norms Committee Meeting dated<br>12.12.2017. However, it was also noted that<br>the applicant was directed to submit certain<br>information as per advice of Consultant (TEC-<br> | <br> <br> <br> <br> <br> <br> <br>exact details of sizes of the<br>export product vis-a-vis import<br>along with quantity despite<br>several reminders. |
tion as per advice of Consultant (TEC-<br>||||||<br> <br> <br> <br> <br> <br> <br>exact details of sizes of the<br>export product vis-a-vis import<br>along with quantity despite<br>several reminders. Hence, the<br>Committee decided reject the<br>request of the applicant to<br>review the case.||| ||||||3) during personal hearing dated 26.06.2019.<br>The applicant‟s reply was forwarded to<br>Consultant (TEC-3) on 06082019 alon with||||||<br> <br>||| |||RTA<br>STE<br>RIVA<br>IMIT<br>1081<br>date<br>.09.2|NLA<br>EL||<br>reminder<br>No.14/81<br>was sen||..<br>on 11.10.2019. In compli<br>dated 16.10.2019 decisio<br>t to the applicant via e|g<br>ance of M.<br>n, a letter<br>mail dated|||<br> <br> <br> <br> <br> <br>||| ||||<br>TE<br>ED|01/81/050/005<br>01/AM18/|05.11.20<br>furnish<br>||19 to seek from the ap<br>exact details of sizes on<br>|plicant to<br>advice of<br>|||||| |R5|||6055<br>d<br>017|<br>03/94/040/005<br>29/AM18/|Consultant (TEC-3). The case was considered<br>in M. No. 20/81 dt. 08.01.2020 and Consultant<br>(TEC-3) informed that the applicant‟s reply<br>dated 18.12.2019 is very vague. Therefore, the<br>Committee decided to give last opportunity to<br>the applicant to submit the exact details of<br>sizes of the export product vis-a-vis import<br>along with quantity.
is very vague. Therefore, the<br>Committee decided to give last opportunity to<br>the applicant to submit the exact details of<br>sizes of the export product vis-a-vis import<br>along with quantity. As per NC decision D/L||||||<br> <br> <br> <br> <br> <br> <br>||| ||||||||||||||| ||||||,<br>was sent to the applicant on 06.02.2020.||||||<br>||| ||||||How<br>8.2.2<br>quan<br>|ever,the applicant vide email<br>020 informed that exact import /<br>tity is not needed for fixation of<br>||||dated<br>export<br>norms.<br>|<br> <br>||| ||||||The c<br>dt. 0<br>ali|ase was last considered in M. No<br>4.03.2020 and decided to remi<br>ant<br>for<br>furnishin<br>the<br>r||||. 23/81<br>nd the<br>uisite|<br> <br>||| ||||||pp<br> <br>g<br> <br>q<br>information. Reply received from the applicant<br>vide email dated 15/22.4.2020 has been<br>referred to Consultant (TEC-3) for examination<br>and comments.||||||<br> <br> <br>||| ||FITCAST<br>FOUNDERS<br>&<br>ENGINEER<br>S PRIVATE<br>LIMITED<br>0810138679<br>dated|ITCA<br>UND<br>&<br>GIN|ST<br>ERS<br> <br>EER|<br>01/81/050/003<br>|The case was ratified in M. No. 19/81 dated<br>05.12.2017 as per SION C-1647. However, the<br>applicant<br>vide<br>letter<br>dated<br>20.06.2018<br>requested to re-fix the ad-hoc norms. As per||||||<br> <br> <br> <br>The Committee considered the<br>case<br>as<br>per<br>agenda<br>and<br>Consultant (TEC-1) informed<br>that the applicant‟s reply dated||<br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred| |||||62/AM17/|<br>decision of M. No. 17/81 dt.
<br>as<br>per<br>agenda<br>and<br>Consultant (TEC-1) informed<br>that the applicant‟s reply dated||<br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred| |||||62/AM17/|<br>decision of M. No. 17/81 dt. 27.11.2019, the||||||<br> <br> <br>16.07.2020<br>is<br>deficient.||| |R6|||||||||||||| |||IMIT<br>1013<br>date|ED<br>|<br>08/24/040/001<br>77/AM17|case was<br>case wa<br>08.01.20<br>||referred to DPIIT on 31.12.2<br>s considered in M. No. 2<br>20 and decided to refer the<br> <br> <br> <br>||019. The<br>0/81 dt.<br>case to<br> <br>||<br> <br> <br> <br>Therefore,<br>the<br>decided to seek ag<br>applicant<br>to<br>f<br>|Committee<br>ain form the<br>urnish<br>the<br>|| ||||||||||||||| ||||8679<br>d||Consulta<br>comment||nt<br>(TEC-1)<br>for<br>examina<br>s. Asper NC decision,the||tion<br>&<br>case was||<br> <br>following inform<br>advice of Consulta|ation as per<br>nt(TEC-1):|| ||||||||||||||| |||||||||||||||
59 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
following inform<br>advice of Consulta|ation as per<br>nt(TEC-1):|| ||||||||||||||| |||||||||||||||
59 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| 16.09.2016 | 16.09.2016 | 16.09.2016 | fd l 1 1222 | fd l 1 1222 | fd l 1 1222 | fd l 1 1222 | fd l 1 1222 | <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| .09. | 0 | reerre to Consutant (TEC-) on 9.0.00.<br>The case was last considered in M. No. 23/81<br>dt. 04.03.2020 and decided to ask the applicant<br>to furnish production consumption data duly<br>certified from Statuary Auditor. As per NC<br>decision, D/L has been sent on 17.04.2020.<br>Reply received vide email dated 16.7.2020 and | <br> <br> <br> <br> <br> <br> <br>1. To provide again production<br>consumption<br>data<br>as<br>submitted earlier is not for<br>total quantity of export in<br>the licence. Also, quantity<br>of export indicated in 1st | ||||||||||
| <br>forwarded<br>to<br>Consultant<br>(TEC-1)<br>for | <br> <br> <br>column does not match with<br> | ||||||||||||
| examinat | ion and comments. | 3rdcolumn.<br>2. |
y<br>of export indicated in 1st||| |||||||<br>forwarded<br>to<br>Consultant<br>(TEC-1)<br>for|||||<br> <br> <br>column does not match with<br>||| |||||||examinat|ion and comments.||||3rdcolumn.<br>2. To provide clar<br>why in the cove<br>|ification for<br>ring letter, it<br>|| ||||||||||||is stated thatF<br>of binderis 6<br>casting which|nal content<br>.81% in the<br>is not true|| ||||||||||||,<br>since<br>casting<br>does<br>not<br>contain anyorganic binder.||| ||TRIVENI<br>AERONAUT<br>ICS<br>PRIVATE<br>LIMITED,<br>TUMKUR|||||DC,<br>CSEZ<br>vide<br>letter<br>No.<br>1/43/2008:EOU:CSEZ/403, dated 15.3.2017<br>forwarded an application of the applicant<br>requesting for fixation of scrap/wastage norms<br>on regular basis under 100% EOU for|||||<br> <br> <br> <br> <br>The Committee decided to wait<br>for reply of the applicant.||<br>Deferred| |||||||manufacture and export of commercial aircraft<br>|||||<br>||| |||RIV<br>RON<br>ICS<br>RIVA<br>|ENI<br>AUT|01/81/061/000||parts. A<br>MSME<br>11.04.20<br>12.07.20<br>consider<br>decided t|copy of representation was<br>for examination of the<br>17 followed by a remi<br>19 & 260112019 Th|||sent to<br>case on<br>nder on<br>|<br> <br> <br>||| ||||<br>TE<br>|02/AM18/<br>1/43/2008:EO<br>|||... e<br>ed in M. No. 20/81 dt. 08.01.<br>o wait for the comments. Ho|||ase was<br>2020 and<br>wever, no|<br> <br>||| |R7|||||||||||||| ||||||||||||||| |||MIT<br>UMK|ED,<br>UR|U:CSEZ/403/||<br>comments have been received yet. The case<br>was last considered in M. No.
o|||ase was<br>2020 and<br>wever, no|<br> <br>||| |R7|||||||||||||| ||||||||||||||| |||MIT<br>UMK|ED,<br>UR|U:CSEZ/403/||<br>comments have been received yet. The case<br>was last considered in M. No. 23/81 dt.<br>04.03.2020 and decided to remind MSME for|||||<br> <br> <br> <br> <br> <br> <br> <br>||| |||||||expeditin<br>reminder<br>|g the comment<br>issued to M|s. As per N<br>SME on 2|C decision,<br>0.04.2020.||<br> <br>||| ||||||||||||||| |||||||MSME|D/L received|vide em|ail dated||<br> <br>||| |||||||26.04.20<br>|20. MSME D/<br>he applicant on<br>has been receiv|L dt. 26.04<br>27.07.2017.<br>edyet.|.2020 was<br>However,||||| |||||||sent to t<br>|||||||| |||||||no reply|||||||| ||BHARAT<br>HEAVY<br>ELECTRICA<br>LS LIMITED<br>1110024364<br>dated<br>23.03.2011|HAR<br>EA<br>ECT<br>LIM<br>1002<br>date<br>.03.2||||The cas|e was approv<br>012 dated 10.0|ed in M.<br>4.2012 as p|No. 1/81-<br>er written||<br>The Commit<br>case as per a||<br> <br> <br> <br> <br> <br> <br> <br> <br>Approved| |||||||ALC2/2|||||||| ||||AT<br>VY<br>RICA<br>ITED<br>4364<br>d<br>011|<br> <br>01/81/050/000<br>57/AM12/<br>11/24/040/000<br>65/AM11/||comments<br>of<br>DIPP<br>vide<br>U.O.<br>dated<br>23.04.2012. However, the applicant vide letter<br>dated 12.08.2017 requested to allow quantities<br>on actual basis. In compliance of M. No. 14/81<br>dated 16.10.2019 decision, the case was<br>referred to DPIIT via email dated 05.11.2019.<br>As per decision of M. No. 17/81 dt.<br>27.11.2019, a reminder was issued to DPIIT on<br>03.01.2020. The case was considered in M.
ion, the case was<br>referred to DPIIT via email dated 05.11.2019.<br>As per decision of M. No. 17/81 dt.<br>27.11.2019, a reminder was issued to DPIIT on<br>03.01.2020. The case was considered in M. No.|||||||| |R8|||||||||||||| ||||||||||||||| |||||||20/81 dt. 08.01.2020 and decided to wait for<br>the comments. The case was last considered in|||||<br> <br>dated 10.04.2012 will remain<br>unchanged.|||
60 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| M. No. 23/81 dt. 04.03.2020. | RA<br>concerned<br>may<br>take<br>suitable consequential action<br>accordingly. | <br> | |||
|---|---|---|---|---|---|
| KUN<br>AEROSPAC<br>E PRIVATE<br>LIMITED | 01/81/171/000<br>13/AM20/<br>A/2011/012/E<br>OU-TN | DC,<br>MEPZ-SEZ<br>vide<br>letter<br>no.<br>A/2011/012/EOU-TN<br>dated<br>09.11.2018forwarded a letter dated 22.06.2018<br>of the applicant for fixation of wastage norms<br>for<br>its<br>manufactured<br>items<br>Aerospace<br>Components and Non-Aerospace Components.<br>As per NC decision in M. No. 14/81dated<br>16.10.2019, the case was referred to MSME on<br>05.11.2019<br>along<br>with<br>reminder<br>on<br>03.01.2020. The case was considered in M. No.<br>20/81 dt. 08.01.2020 and decided to wait for<br>the comments. However, no comments have<br>been received yet. The case was last considered<br>in M. No. 23/81 dt. 04.03.2020 and decided to<br>remind MSME for expediting the comments.<br>As per NC decision, reminder issued to MSME<br>on 20.04.2020. MSME D/L received vide<br>email dated 26.04.2020. |
No. 23/81 dt. 04.03.2020 and decided to<br>remind MSME for expediting the comments.<br>As per NC decision, reminder issued to MSME<br>on 20.04.2020. MSME D/L received vide<br>email dated 26.04.2020. MSME D/L dt.<br>26.04.2020 was sent to the applicant on<br>27.07.2017. However, no reply has been<br>receivedyet.|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee decided to wait<br>for reply of the applicant.|<br>Deferred| |R9|||||| ||||||| ||POOJAWES<br>TERN<br>METALIKS<br>LIMITED,<br>100% EOU|01/81/171/000<br>14/AM20/<br>KASEZ/100%<br>EOU/II/13/200<br>2-03/Vol. I/|KASEZ<br>vide<br>letter<br>No.<br>KASEZ/100%<br>EOU/II/13/2002-03/Vol.<br>I/-6384<br>dated<br>06.09.2018 forwarded a copy of application<br>dated 14.04.2018 of the applicant for fixation<br>of wastage norms for manufacturing of<br>products made of brass rods, brass solid bars,<br>Brass hollow bars, profile and section in<br>addition to routine product made out of mix<br>metal brass scrap. KASEZ vide letter No.<br>KASEZ/100%EOU/II/13/2002-03/Vol. I/1048<br>dated 25.04.2018 conveyed the approval of the<br>DC for ad-hoc norms as per Annexure, in<br>terms of Para 6.08(e) of FTP, 2015-20, for a<br>period of 06 (six) months subject to final<br>fixation of Norms by the NC in DGFT. As per<br>NC decision of M. No. 14/81dated 16.10.2019,<br>the case was referred to MSME on 05.11.2019<br>followed by a reminder on 03.01.2020. The<br>case was considered in M. No. 20/81 dt.<br>08.01.2020 and decided to wait for the<br>comments.
.10.2019,<br>the case was referred to MSME on 05.11.2019<br>followed by a reminder on 03.01.2020. The<br>case was considered in M. No. 20/81 dt.<br>08.01.2020 and decided to wait for the<br>comments. However, no comments have been<br>received yet. The case was last considered in<br>M. No. 23/81 dt. 04.03.2020 and decided to<br>remind MSME for expediting the comments.<br>Asper NC decision,reminder issued to MSME|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee decided to wait<br>for reply of the applicant.|<br>Deferred| |R10|||||| |||||||
61 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| 20042020MEME D/L id | 20042020MEME D/L id | 20042020MEME D/L id | 20042020MEME D/L id | 20042020MEME D/L id | 20042020MEME D/L id | 20042020MEME D/L id | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| on .<br>26.04.20<br>sent to t<br>no reply | .. rec<br>20. MSME D/L dt. |
D/L id|20042020MEME D/L id|20042020MEME D/L id||||| |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| |||||||on .<br>26.04.20<br>sent to t<br>no reply||.. rec<br>20. MSME D/L dt. 26.04.2<br>he applicant on 27.07.2017.<br>has been receivedyet.|||ve on<br>020 was<br>However,||<br> <br>|||| ||M<br>I<br>LI<br>A<br>G<br>|||||KASEZ<br>EOU/II/||<br>vide<br>letter<br>KAS<br>77/2004-05/Vol.<br>I/6026|||EZ/100%<br>dated||<br> <br>The Committee<br>remind again the||decided to<br>applicant for|Deferred| |||ARG<br>MPE<br>MIT<br>NA<br>UJAR<br>A 10<br>EO||||28.08.2018 forwarded a copy of letter along<br>with application of Mergen Impex Limited for<br>fixation<br>of<br>scrap/wastage<br>norms<br>for<br> <br> <br> <br> <br> <br>|||||||<br> <br> <br> <br>furnishing<br>the<br>requisite<br>information.|||| ||||EN|01/81/|171/000|manufacture<br>accessories<br>|||<br>and<br>exp<br>of test ben<br>|ort<br>of<br>pa<br>ches. The<br>|rts<br>and<br>case was<br>||<br> <br>|||| ||||X<br>ED,<br>ND,<br>AT,<br>0%<br>U|01/A<br>KASE<br>EOU/I<br><br>05/VO|M19/<br>Z/100%<br>I/77/200<br>4-<br>L.I/602<br>6|referred to C<br>As per NC<br>08.01.2020,<br>applicant on<br>following i<br>products vis<br>|||onsultant (T<br>decision o<br>a deficiency<br>24.02.2020<br>nformation:<br>-à-vis impo<br>|EC-3) on 11<br>f M. No.<br>letter was s<br>requesting t<br>(i) List o<br>rt items (ii)<br>|.10.2019.<br>20/81 dt.<br>ent to the<br>o furnish<br>f export<br>Wastage<br>||<br> <br> <br> <br> <br> <br>|||| |R11||||||||||||||||| |||||||||||||||||| |||||||claimed. The case was last considered in M.<br>No.
r>20/81 dt.<br>ent to the<br>o furnish<br>f export<br>Wastage<br>||<br> <br> <br> <br> <br> <br>|||| |R11||||||||||||||||| |||||||||||||||||| |||||||claimed. The case was last considered in M.<br>No. 23/81 dt. 04.03.2020 and decided to<br>remind the applicant for furnishing the<br>requisite information. As per NC decision,<br>reminder was sent to the applicant on<br>18.04.2020. However, no reply has been<br>receivedyet.|||||||<br> <br> <br> <br> <br>|||| ||LEIGHTON<br>WELSPUN<br>CONTRACT<br>ORSPRIVA<br>TE<br>LIMITED<br>0310764005<br>dated<br>01.01.2014|||||The case was rejected in M. No. 05/81dated<br>18.06.2015 due to non submission of reply of|||||||<br> <br>The Committee considered the<br>case as per agenda and noted|||<br> <br> <br>Deferred| |||||||deficiency letter dated 11.11.2014. However,|||||||<br>that DHI via email dated|||| |||IGH<br>ELS<br>NTR<br>SPR<br>TE<br>IMIT<br>1076<br>date<br>.01.2|TON<br>PUN<br>ACT<br>IVA|01/81/050/000||the ap<br>furnish<br>hoc<br>n<br>f|plicant vide letter dated 12.0<br>ed the reply with a request to fix<br>orms.<br>The<br>applicant‟s<br>repl<br>d DHI f ii f|||||6.2018<br>the ad-<br>y<br>was<br>|<br> <br> <br>16.07.2020 asked<br>set of application<br>the Committee dec<br>h l||for complete<br>. Therefore,<br>ided to send<br>lii|| ||||<br>ED|60/AM15/<br>||orwar<br>on 21<br>12.07.2|e to or examnaton o t<br>.06.2018 followed by remind<br>019 & 11.10.2019.
mmittee dec<br>h l||for complete<br>. Therefore,<br>ided to send<br>lii|| ||||<br>ED|60/AM15/<br>||orwar<br>on 21<br>12.07.2|e to or examnaton o t<br>.06.2018 followed by remind<br>019 & 11.10.2019. As per NC d|||||e case<br>er on<br>ecision|<br> <br> <br>te compete set o<br>along with the app<br>dated<br>12.06.2018||appcaton<br>licant's reply<br><br>with<br>all|| |R12||||||||||||||||| |||||||||||||||||| ||||4005<br>d<br>014|<br>03/95/040/007<br>52/AM14/||<br>of M. no. 20/81 dt. 08.01.2020, a copy of<br>application was referred to DHI on 25.02.2020.<br>The case was last considered in M. No. 23/81<br>dt. 04.03.2020, the representative of DHI<br>informed that the case is under examination.<br>Hence, the Committee decided to wait for|||||||<br> <br> <br> <br> <br> <br> <br>annexure<br>to<br>DHI<br>for<br>examination of the case.|||| |||||||comments.||||||||||| ||IN<br>CO<br>P<br>L<br>04<br>05|DO C<br>MP<br>ES<br>RIVA<br>IMIT<br>1016<br>date<br>.08.2|OOL<br>OSIT<br> <br>TE|<br>01/81/050/004||The ca<br>29.11.2<br>deficie<br>remind|se was rejected in M.
||||| ||IN<br>CO<br>P<br>L<br>04<br>05|DO C<br>MP<br>ES<br>RIVA<br>IMIT<br>1016<br>date<br>.08.2|OOL<br>OSIT<br> <br>TE|<br>01/81/050/004||The ca<br>29.11.2<br>deficie<br>remind|se was rejected in M. No.18/8<br>016 due to non submission of r<br>ncy letter dated 03.05.2016 follo<br>er dated 11072016 Howev|||||1dated<br>eply of<br>wed by<br>r the|<br> <br> <br> <br>The Committee<br>remind Consultant<br>expediting the com||decided to<br>(TEC-1) for<br>ments.|<br>Deferred| ||||<br>ED|64/AM16/<br>||<br>applica<br>furnish|...<br>nt<br>vide<br>letter<br>dated<br>28.1<br>ed the reply with a request to fix|||||,<br>2.2016<br>the ad-|<br>|||| |R13||||||||||||||||| |||||||||||||||||| ||||0874<br>d<br>015|<br>04/24/040/001<br>14/AM16/||<br>hoc norms. The case was referred to Consultant<br>(TEC-1) on 07.08.2019 for examination. As<br>per NC decision of M. No.11/81 dated<br>04.09.2019,a deficiencyletter was sent to the|||||||<br> <br> <br>|||| ||||||||||||||||||
62 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
==> picture [32 x 319] intentionally omitted <==
applicant vide email dated 04.10.2019 requesting to furnish following information: 1. Material balance between import & export in quantity terms taking in to consideration of indigenous procures items for each export product separately. 2. Percentage wastage at each stage of manufacturing.
l balance between import & export in quantity terms taking in to consideration of indigenous procures items for each export product separately. 2. Percentage wastage at each stage of manufacturing.
- Production & corresponding consumption of various raw material & consumable for last two year duly certified by GST authorities. The applicant was also reminded on 13.11.2019 & 02.01.2020. The case was considered by NC in its M. No. 20/81 dt. 08.01.2020 and decided to wait for the applicant‟s reply. However, no reply has been received yet. The case was last considered in M. No. 23/81 dt. 04.03.2020 and decided to remind again the applicant for submitting the requisite information. As per NC decision, final reminder has been sent to applicant on 18.04.2020. Reply dated 24.4.2020 was referred to Consultant (TEC-1) on 29.4.2020. However, no comments have been received yet.
The case was ratified in M. No. 12/81 dated The Committee decided to Deferred 06.09.2016 as per DIPP U. O. No. 12/76/2016remind again CLA, New Delhi TSW/28 dated 06/09/2016. However, the for expediting the matter. applicant vide letter dated 15.02.2019 requested to re-fix the ad-hoc norms. A copy of representation was referred to Consultant (TEC-3) on 07.08.2019 for examination. Deficiency letter was sent to the applicant on 04.10.2019 as per NC decision of Meeting No. JINDAL 11/81 dated 04.09.2019. The applicant's reply SAW 01/81/050/004 dated 14.11.2019 was referred to Consultant LIMITED 63/AM16/ (TEC-3) for examination. NC observed in its R14 M. No. 20/81 dt.
o. JINDAL 11/81 dated 04.09.2019. The applicant's reply SAW 01/81/050/004 dated 14.11.2019 was referred to Consultant LIMITED 63/AM16/ (TEC-3) for examination. NC observed in its R14 M. No. 20/81 dt. 08.01.2020 that the authorization is dated 24.08.2015 and the party 0510395407 05/23/040/002 would have exported the said items as per dated 07/AM16/ norms ratified earlier. Therefore, the 24.08.2015 Committee decided to seek a report from RA regarding the thickness/surface area of coating w.r.t Adhesive and Polyethylene in the export product. An email dated 02.03.2020 was sent to RA, New Delhi. However, no information has been received yet. The case was last considered in M. No. 23/81 dt. 04.03.2020 and decided to remind the RA, New Delhi, inviting attention of Head of RA, for submitting the
63 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
| requisite information. As per NC decision,<br>reminder was sent to RA, New Delhi, on<br>10.07.2020 and 16.07.2020. However, no<br>information has been receivedyet. | <br> <br> | ||||
|---|---|---|---|---|---|
| JINDAL<br>SAW<br>LIMITED<br>0510407943<br>Dated<br>28.09.2018 | <br>01/81/050/005<br>06/AM19/<br>05/23/040/002<br>78/AM19/ | The case was ratified in M. No. 9/81 dated<br>07.08.2019 as per written comments dated<br>30.07.2019<br>of<br>Consultant (TEC-3).<br>The<br>applicant vide letter dated 04.10.2019 had<br>requested for revision of ad-hoc norms. As per<br>decision of M. No.14/81 dated 16.10.2019, the<br>case was referred to Consultant (TEC-3) on<br>25.10.2019 for examination. |
er dated 04.10.2019 had<br>requested for revision of ad-hoc norms. As per<br>decision of M. No.14/81 dated 16.10.2019, the<br>case was referred to Consultant (TEC-3) on<br>25.10.2019 for examination. The case was<br>considered in M. No. 20/81 dt. 08.01.2020 and<br>decided to wait for the comments. The case<br>was last considered in M. No. 23/81 dt.<br>04.03.2020 and decided to send main file to<br>Consultant (TEC-3) as requested in the<br>meeting.|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case<br>as<br>per<br>agenda<br>and<br>Consultant (TEC-3) informed<br>that<br>the<br>applicant<br>in<br>its<br>representation<br>dated<br>04.10.2019<br>has<br>requested<br>against reduction in quantity of<br>import items at Sl. No. 15 &<br>16 and deletion of item nos. 17<br>& 18. Also, the quantity of<br>import items at Sl. No. 15 &<br>16 were calculated as per<br>thickness<br>given<br>by<br>the<br>applicant in their letter dated<br>25.04.2019 and report of study<br>group. Now, the applicant has<br>revised thickness of coating.<br>On the advice of Consultant<br>(TEC-3),<br>the<br>Committee<br>decided to seek from the<br>applicant to furnish following<br>information:<br>1. To explain how repair of<br>inner layer of coating will<br>be carried out, regarding<br>import items at Sl. No. 17<br>& 18.<br>2.
seek from the<br>applicant to furnish following<br>information:<br>1. To explain how repair of<br>inner layer of coating will<br>be carried out, regarding<br>import items at Sl. No. 17<br>& 18.<br>2. Justification for 2 types of<br>kits and their quantity.<br>The case stands deferred.|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred| |R15|||||| ||||||| ||CONSOLID<br>ATED COIN<br>COMPANY<br>PVT. LTD.<br>0510405810<br>dated<br>07.03.2018|<br> <br>01/81/050/001<br>03/AM19/<br>05/23/040/004<br>57/AM18/|The case was ratified in M. No. 3/81-<br>ALC2/2018 dated 14.08.2018 on repeat with<br>AA No. 0510399348 dated 03.08.2016 ratified<br>in NC M. dated 21.2.2017. The applicant vide<br>letter dated 17.12.2018 had request for revision<br>of ratified norms of Export Product Coin<br>Blanks (Consisting of Copper-65%, Nickel-10<br>And Zinc-25%). As per decision of M. No.<br>12/81dated 18.09.2019, the case was referred<br>to DPIIT on 23.10.2019. The case was<br>considered in M. No. 17/81 dt. 27.11.2019 and<br>as per as written comments given by DPIIT<br>vide U.O. No.: P-47011/62/2019-TSW dated<br>13.11.2019.
ferred<br>to DPIIT on 23.10.2019. The case was<br>considered in M. No. 17/81 dt. 27.11.2019 and<br>as per as written comments given by DPIIT<br>vide U.O. No.: P-47011/62/2019-TSW dated<br>13.11.2019. The Committee observed that<br>different norms have been recommended by|<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee considered the<br>case as per agenda and decided<br>to re-fix the ad-hoc norms on<br>the basis of study group report<br>dated 21.02.2020 as adopted<br>by the Committee in the<br>Meeting<br>No.<br>24/81<br>dated<br>18.3.2020 as under:|<br> <br> <br> <br> <br> <br> <br>Approved| |R16|||||| |||||||
64 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
==> picture [32 x 268] intentionally omitted <==
technical authorities for same/similar items in the past. Hence, the Committee decided to get the actual wastage verified by a team consisting DDG (SG), consultant (VCA) and representative of DPIIT. The team would submit its report in 15 days after making physical verification. The case was considered in M. No. 20/81 dt. 08.01.2020 and directed to study group team to visit the applicant‟s factory at an early date. The case was last considered in M. No. 23/81 dt. 04.03.2020, the Committee noted that a study group team has visited the factory premises of the applicant to study the manufacturing processes and ascertain wastages by visiting. The members of study group informed that they have submitted the report. However, the same is yet to be adopted.
the applicant to study the manufacturing processes and ascertain wastages by visiting. The members of study group informed that they have submitted the report. However, the same is yet to be adopted. Hence, the Committee decided to take a decision on adoption of study group report. The study group report has been adopted in Meeting No. 24/81 dated 18.3.2020.
| the report. However, the same is yet to be<br>adopted. Hence, the Committee decided to take<br>a decision on adoption of study group report.<br>The study group report has been adopted in<br>MeetingNo. 24/81 dated 18.3.2020. | <br> <br> <br> | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| ITCHS<br>Code | Export Item | Quantity<br>Sl.<br>No.<br>ITCHS<br>Code<br>Import Item | Recommended<br>Quantity | |||||||
| 74199990 | Coin Blanks<br>(Consisting Of<br>Copper-65%,<br>Nickel-10% And<br>Zinc-25%)<br>375000<br>Kgs<br>1<br>74040012<br>Copper Scrap Millberry (Cu<br>99.90%)<br>2<br>75021000<br>Nickel Full Plates (Ni<br>99.90%)<br>3<br>79011100<br>SHG Zinc Ingots (Zn<br>99.90%) | 1.11 Kgs/Kg<br>in the export<br>1.08 Kgs/Kg<br>in the export<br>1.08 Kgs/Kg<br>in the export | content<br> product<br>content<br> product<br>content<br> product | |||||||
| RA concerned maytake suitable consequential action accordingly. | ||||||||||
| The case was ratified in M. No. 3/81 dated | <br>The Committee considered the | <br>Approved | ||||||||
| 14.08.2018<br>on<br>repeat<br>with<br>AA<br>No. | <br>case as per agenda and decided | |||||||||
| 0510399348 dated 03.08.2016 ratified in NC | <br>to re-fix the ad-hoc norms on | |||||||||
| M. |
roved|| |||||||14.08.2018<br>on<br>repeat<br>with<br>AA<br>No.|<br>case as per agenda and decided|||| |||||||0510399348 dated 03.08.2016 ratified in NC|<br>to re-fix the ad-hoc norms on|||| |||||||M. No.24/81 dated 21.2.2017. The applicant|<br>the basis of study group report|||| ||R17||CONSOLID<br>ATED COIN<br>COMPANY<br>PVT. LTD.||<br>01/81/050/001<br>04/AM19/|vide letter dated 17.12.2018 & 04.09.2019 has<br>requested for revision of ratified Norms. As per<br>decision of M. No.12/81 dated 18.09.2019, the<br>case was referred to DPIIT on 23.10.2019. The<br>case was considered in M. No. 17/81 dt.<br>27.11.2019 as per as written comments given|<br> <br> <br> <br> <br> <br>dated 21.02.2020 as adopted<br>by the Committee in the<br>Meeting<br>No.<br>24/81<br>dated<br>18.3.2020 as under:||<br> <br>|| ||||0510405317<br>dated<br>11.01.2018||<br>05/23/040/003<br>87/AM18/|by DPIIT vide U.O. No.: P-47011/62/2019-<br>TSW dated 13.11.2019. The Committee<br>observed that different norms have been<br>recommended by technical authorities for|<br> <br>|||| |||||||same/similar items in the past. Hence, the||||| |||||||Committee decided to get the actual wastage||||| |||||||verified by a team consisting DDG (SG),||||| |||||||consultant(VCA)and representative of DPIIT.|||||
65 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
==> picture [32 x 355] intentionally omitted <==
sultant(VCA)and representative of DPIIT.|||||
65 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
==> picture [32 x 355] intentionally omitted <==
The team would submit its report in 15 days after making physical verification. The case was considered in M. No. 20/81 dt. 08.01.2020 and directed to study group team to visit the applicant‟s factory at an early date. The case was last considered in M. No. 23/81 dt. 04.03.2020, the Committee noted that a study group team has visited the factory premises of the applicant to study the manufacturing processes and ascertain wastages by visiting. The members of study group informed that they have submitted the report. However, the same is yet to be adopted. Hence, the Committee decided to take a decision on adoption of study group report.
| ITCHS<br>Code | Export Item | Quantity | Sl. No. | ITCHS Code | Import Item | Recommended<br>Quantity |
|---|---|---|---|---|---|---|
| 74199990 | Coin Blanks<br>(Consisting Of<br>Copper-65%,<br>Nickel-10%<br>And Zinc-<br>25%) | 375000<br>Kgs | 1 | 74040012 | Copper Scrap Millberry<br>(Cu99.90%) | 1.11 Kgs/Kg content<br>in the exportproduct |
| 2 | 75021000 | Nickel Full Plates (Ni<br>99.90%) | 1.08 Kgs/Kg content<br>in the exportproduct | |||
| 3 | 79011100 | SHG Zinc Ingots (Zn<br>99.90%) | 1.08 Kgs/Kg content<br>in the export product |
tproduct| ||||2|75021000|Nickel Full Plates (Ni<br>99.90%)|1.08 Kgs/Kg content<br>in the exportproduct| ||||3|79011100|SHG Zinc Ingots (Zn<br>99.90%)|1.08 Kgs/Kg content<br>in the export product|
| The case was ratified in M. No. 4/81- | The Committee considered the | <br>Approved | ||||
|---|---|---|---|---|---|---|
| ALC2/2019 dated 29.05.2019 on repeat basis | <br>case as per agenda and decided | |||||
| as approved for AA No. 0510409208 dated | <br>to re-fix the ad-hoc norms on | |||||
| 07.01.2019 in the M. No. 01/81 dated | <br>the basis of study group report | |||||
| 10.04.2019. The applicant vide letter dated | <br>dated 21.02.2020 as adopted | |||||
| 08.08.2019 has requested for re-consider the | <br>by the Committee in the | |||||
| R18 | CONSOLID<br>ATED COIN<br>COMPANY<br>PRIVATE<br>LIMITED | <br>01/81/050/000<br>14/AM20/ | case and allow 'Gross Quantity of Inputs', as<br>asked by them in their application. As per<br>decision of M. No.12/81 dated 18.09.2019, the<br>case was referred to DPIIT on 23.10.2019. In<br>M. No. 17/81 dt. 27.11.2019 as per written<br>comments given by DPIIT vide U.O. No.: P- | <br> <br> <br> <br> <br>Meeting<br>No.<br>24/81<br>dated<br>18.3.2020 as under: | ||
| 0510410184<br>dated<br>09.04.2019 | 05/23/040/000<br>01/AM20/ | 47011/62/2019-TSW dated 13.11.2019. The<br>Committee observed that different norms have<br>been recommended by technical authorities for<br>same/similar items in the past. |
9|05/23/040/000<br>01/AM20/|47011/62/2019-TSW dated 13.11.2019. The<br>Committee observed that different norms have<br>been recommended by technical authorities for<br>same/similar items in the past. Hence, the<br>Committee decided to get the actual wastage|<br> <br> <br> <br>|| |||||verified by a team consisting DDG (SG),||| |||||consultant (VCA) and representative of DPIIT.||| |||||The team would submit its report in 15 days||| |||||after making physical verification. The case||| |||||was considered in M. No. 20/81 dt. 08.01.2020||| |||||and directed to study groupteam to visit the|||
66 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
==> picture [32 x 143] intentionally omitted <==
applicant‟s factory at an early date. The case was last considered in M. No. 23/81 dt. 04.03.2020, the Committee noted that a study group team has visited the factory premises of the applicant to study the manufacturing processes and ascertain wastages by visiting. The members of study group informed that they have submitted the report. However, the same is yet to be adopted. Hence, the Committee decided to take a decision on adoption of study group report.
. The members of study group informed that they have submitted the report. However, the same is yet to be adopted. Hence, the Committee decided to take a decision on adoption of study group report.
|||||applicant‟s factory at an early date. The case<br>was last considered in M. No. 23/81 dt.<br>04.03.2020, the Committee noted that a study<br>group team has visited the factory premises of<br>the applicant to study the manufacturing<br>processes and ascertain wastages by visiting.<br>The members of study group informed that<br>they have submitted the report. However, the<br>same is yet to be adopted. Hence, the<br>Committee decided to take a decision on<br>adoption of study group report.|applicant‟s factory at an early date. The case<br>was last considered in M. No. 23/81 dt.<br>04.03.2020, the Committee noted that a study<br>group team has visited the factory premises of<br>the applicant to study the manufacturing<br>processes and ascertain wastages by visiting.<br>The members of study group informed that<br>they have submitted the report. However, the<br>same is yet to be adopted. Hence, the<br>Committee decided to take a decision on<br>adoption of study group report.|applicant‟s factory at an early date. The case<br>was last considered in M. No. 23/81 dt.<br>04.03.2020, the Committee noted that a study<br>group team has visited the factory premises of<br>the applicant to study the manufacturing<br>processes and ascertain wastages by visiting.<br>The members of study group informed that<br>they have submitted the report. However, the<br>same is yet to be adopted.
t to study the manufacturing<br>processes and ascertain wastages by visiting.<br>The members of study group informed that<br>they have submitted the report. However, the<br>same is yet to be adopted. Hence, the<br>Committee decided to take a decision on<br>adoption of study group report.|applicant‟s factory at an early date. The case<br>was last considered in M. No. 23/81 dt.<br>04.03.2020, the Committee noted that a study<br>group team has visited the factory premises of<br>the applicant to study the manufacturing<br>processes and ascertain wastages by visiting.<br>The members of study group informed that<br>they have submitted the report. However, the<br>same is yet to be adopted. Hence, the<br>Committee decided to take a decision on<br>adoption of study group report.|<br> <br> <br> <br> <br> <br> <br> <br> <br>|<br> <br> <br> <br> <br> <br> <br> <br> <br>|| |---|---|---|---|---|---|---|---|---|---|---| ||||||||||Recommended<br>Quantity<br>1.11 Kgs/Kg content<br>in the exportproduct<br>1.08 Kgs/Kg content<br>in the exportproduct<br>1.08 Kgs/Kg content<br>in the exportproduct|| ||ITCHS<br>Code|Export Item||Quantity|Sl.<br>No.|ITCHS<br>Code|Import Item||Recommended<br>Quantity|| ||74199990|Coin Blanks<br>(Consisting Of<br>Copper-65%,<br>Nickel-10%<br>And Zinc-<br>25%)||225000<br>Kgs|1|74040012|Copper Scrap Millberry (Cu<br>99.90%)||1.11 Kgs/Kg content<br>in the exportproduct|| ||||||2|75021000|Nickel Full Plates (Ni 99.90%)||1.08 Kgs/Kg content<br>in the exportproduct|| ||||||3|79011100|SHG Zinc Ingots (Zn 99.90%)||1.08 Kgs/Kg content<br>in the exportproduct||
ortproduct|| ||||||2|75021000|Nickel Full Plates (Ni 99.90%)||1.08 Kgs/Kg content<br>in the exportproduct|| ||||||3|79011100|SHG Zinc Ingots (Zn 99.90%)||1.08 Kgs/Kg content<br>in the exportproduct|| ||RA concerned maytake suitable consequential|||||action accordingly.||||| ||NEO<br>POWER<br>ELECTRON<br>ICS &<br>PROJECTS<br>PVT. LTD.<br>0310819845<br>dated<br>15.03.2018||<br>01/81/050/000<br>12/AM19/<br>03/95/040/010<br>69/AM18|The case was ratified in M. No.15/81 dated<br>27.03.2019 as per written comments given by<br>Consultant (TEC-3). However, the applicant<br>vide letter dated 01.04.2019 requested to<br>amend ITC HS codes in r/o import items No. 3<br>and 5. Further the applicant has also requested<br>to amend UOM of import item No. 5. The<br>Committee considered the case in M. No.09/81<br>dated 07.08.2019 and noted that the applicant<br>has not given any reason/justification for such<br>changes. A D/L was sent to the applicant vide<br>email dated 02.09.2019 followed by reminder<br>on 07.10.2019. The applicant‟s reply dt.<br>06.10.2017 was referred to Consultant (TEC-3)<br>for examination. The case was last considered<br>in M. No. 20/81 dt. 08.01.2020 and decided to<br>wait for the comments. The case was last<br>considered in M. No. 23/81 dt.
d to Consultant (TEC-3)<br>for examination. The case was last considered<br>in M. No. 20/81 dt. 08.01.2020 and decided to<br>wait for the comments. The case was last<br>considered in M. No. 23/81 dt. 04.03.2020 and<br>decided to send main file to Consultant (TEC-<br>3)as requested in the meeting.||||<br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br> <br>The Committee noted that the<br>applicant‟s representation has<br>not yet been forwarded to<br>Consultant (TEC-3) with main<br>file as decided in Meeting No.<br>23/81dated<br>04.03.2020.<br>Therefore,<br>the<br>Committee<br>directed the section to send the<br>representation with main file to<br>Consultant<br>(TEC-3)<br>immediately.||<br> <br> <br> <br> <br> <br> <br> <br> <br> <br>Deferred| |R19||||||||||| |||||||||||| ||GLOBAL<br>OVERSEAS<br>0510324256<br>Dated<br>09.05.2012||<br> <br>01/81/050/001<br>44/AM13/<br>05/23/040/000<br>29/AM13/|The case was considered in M. No.17/81 dated<br>20.11.2012. NC decided to reject the case as no<br>manufacturing activity was appearing. The<br>applicant<br>vide<br>letter<br>dated<br>08.02.2013<br>represented against above NC decision which<br>was<br>considered<br>in<br>M.<br>No.05/81<br>dated<br>06.06.2013.<br>The<br>applicant<br>appeared<br>for||||<br> <br> <br> <br> <br> <br> <br>The Committee decided to wait<br>for reply of the applicant.||<br>Deferred| |R20||||||||||| ||||||||||||
67 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
==> picture [32 x 648] intentionally omitted <==
.||<br>Deferred| |R20||||||||||| ||||||||||||
67 | Page 94 NC-II Meeting No. 05/81 (scheduled for 16.07.2020) held on 28.07.2020
==> picture [32 x 648] intentionally omitted <==
Personal Hearing on 03.05.2013 and showed sample of unfinished/unpolished items and the finished product. NC noted that the applicant is polishing the utensils and doing engraving of same designs on the utensils as per foreign buyer requirement. Since, polishing is a manufacturing activity, NC decided to approve the case on net to net basis. Now, the applicant vide letter dated 30.10.2017 stated that it had imported goods 89.95 M.T. in place of 100 M.T. Thereafter, same goods were exported after polishing and engraving designs on utensils as per buyer‟s requirement. Further, it stated that export item name i.e. Household Kitchen appliances (Furnished & designed utensils made up of stainless steel) have been mentioned in Shipping Bill for Export is same as per descriptions mentioned in the Condition Sheet of AA. CLA, New Delhi vide letter dated 30.5.2014 advised the company to submit documentary evidence regarding consumption of SS content in the export/end product and grade/thickness as the same is not mentioned in the Shipping Bills. Therefore, the company requested to look into the matter for suitable reply to enable them to clear Government dues and get EODC on the basis of exported goods as per entries in Shipping Bills. The applicant‟s letter dated 30.10.2017 was forwarded to DPIIT on 16.03.2018 for examination. This case was considered by NC in its M.
on the basis of exported goods as per entries in Shipping Bills. The applicant‟s letter dated 30.10.2017 was forwarded to DPIIT on 16.03.2018 for examination. This case was considered by NC in its M. No.4/81Pt.II dated 03.10.2018. NC decided to call report from the RA on letter of the applicant under intimation to applicant and defer the case. CLA, New Delhi vide letter dated 01.05.2019 stated that there is no Grade mentioned with the description of import & export item as per authorization but as per B/Es, Grade of Stainle
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 7404 --apply.