IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2020-03-04

DGFT Committee Minutes

Document text

Recovered from broken page tree (FzErrorArgument: code=4: Attempt to use Leptonica from 2 threads at once!)

DIRECTORATE GENERAL OF FOREIGN TRADE

(DES-Il SECTION)

MINUTES OF THE NORMS COMMITTEE-U MEETING No. 23/81-ALC2/2019 DATED 04.03.2020

Pleasei. For Noteinformation of exporters, Norms Committee-II handles all cases pertaining to fixation/ratification of norms for Export Products falling under ITC (HS) Chapter 72 to 76, 78 to 80, 85. Communications in respect of cases/pertaining to NC-II may be sent to email address: ne2.dgft@nic.in ii. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The concerned applicant/company may go through the same and respond accordingly. iii. Similarly, a scanned copy of the blank Standard Deficiency Format, which may find a reference in NC decisions, has also been attached in the end. This may also be referred to by the concerned applicant/company and may be responded accordingly. iv. The Norms Committee has taken decision only with respect to technical aspect/wastage norms. While redeeming the applications, RAs should check that the applicant has fulfilled all requirements as prescribed in policy/procedure including those in Policy Circulars issued from time to time or any other provisions under FTP/HBP for EODC. v. Wherever the Committee has fixed Norms, the concerned RA may ensure that AA is issued on the wastages/consumption as ratified by the Committee or as per wastages claimed in the application, whichever is less. Meeting No. 23/81 of Norms Committee-II for the year 2019-20 held on 04.03.2020 under the Chairmanship of Shri R. P. Goyal, Additional Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorizations under Duty Exemption Scheme (Chapter-4) of Foreign Trade Policy 2015-20. The following members were present in the meeting:-

==> picture [486 x 297] intentionally omitted <==

----- Start of picture text -----<br> “SINo. [Name & Designation 1°01 _Department ___<br>3. | Shri K. S. Sodhi, AD (ME) | =." _____MSME __<br>4, Shri SushilJangid, Scientist “B’ -. a e<br>6.: a |ShriShri V.C.ShaishAgarwal, Kumar, (7EC-1) (TEC-3)—0ConsultConsultant __<br>7. __| Shri S.K. Bhatnagar, 9 Consultant __<br>$.| Dr. Surendar Singh, Director 9 ____ _EEPC<br>9. _| Shri Opendar Singh, Dy. Director _ Lee 3 EEPC __<br>In attendance _ Sa af, : = ; : St<br>2bs | | Shri Shobhit Gupta,Amit Kumar, Assistant Dy. DGFT Director Raa BokDGFT a<br>+ Minutes of Meeting No. 21/81 held on 22.01 2020 were circulated among all the members of the<br>Committee on 18.02.2020. On receipt of comments, the minutes were finalised and uploaded on<br>DGFT’s website on 21.02.2020. Therefore, the minutes are unanimously approved.<br>Minutes ofthe cases discussed in the meeting are as under: Bee ae<br>te Udyog Bhawan, New Delhi<br>----- End of picture text -----<br>

1 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020

MEETING NUMBER: 23/81-ALC2/2019

MEETING DATE: 04.03.2020

==> picture [439 x 69] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/5/81- Party Name: TATA POWER Meet No/Date:23/81- Status:<br>ALC2/2015 SOLAR SYSTEMS LTD. —=ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:0710108018 Action by :<br>:01/81/050/00107/AM16/ :07/24/040/00470/AM 15/ 15.04.2015 Applicant<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per agenda and decided to seek following information | from the applicant, as asked during personal hearing with respect to similar cases in M. No. 21/81 dated 22.01.2020, on the advice of Consultant (TEC-3):

  1. Quantity of raw materials with dimensions. 2. Calculation of raw material for manufacturing product. 3. Specific use of each import items.

The case stands deferred.

==> picture [462 x 82] intentionally omitted <==

----- Start of picture text -----<br> Case No.:45/14/81- Party Name: Meet No/Date:23/8 1- Status:<br>ALC2/2018 JAYACHANDRAN ALC2/2019 Deferred<br>ALLOYS PRIVATE 04.03.2020<br>LIMITED<br>HQ File RLA File Lic.No/Date:3210077835 Action by :<br>) :01/81/050/00763/AM19/ :32/24/040/00039/AM 1 6/ 16.03.2016 Applicant<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by MSME was sent to the applicant on 06.11.2019 followed by a reminder on 27.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the applicant for furnishing the requisite information.

Case No.:4/10/81Party Name: FCI OEN Meet No/Date:23/81Status: ALC2/2016 CONNECTORS LIMITED —=ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:1010059443 Action by : 3 :01/81/050/00189/AM17/ :10/24/040/00125/AM16/ 30.03.2016 MeitY Decision: The Committee considered the case as per agenda and noted that MeitY was reminded for expediting the comments on 28.02.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case No.:2/6/81-ALC2/2017 Party Name: FCI OEN Meet No/Date:23/81Status: CONNECTORS LIMITED = ALC2/2019 Deferred 04.03.2020 i HQ File RLA File Lic.No/Date: 1010059489 Action by : :01/81/050/00142/AM18/ :10/24/040/00008/AM17/ 24.05.2016 MeitY

Decision: The Committee considered the case as per agenda and noted that MeitY was reminded for

2 | Page 79

==> picture [205 x 16] intentionally omitted <==

----- Start of picture text -----<br> NC -2 Meeting No. 23/81 held on 04.03.2020<br>----- End of picture text -----<br>

==> picture [41 x 16] intentionally omitted <==

----- Start of picture text -----<br> aon<br>----- End of picture text -----<br>

expediting the comments on 28.02.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

The case stands deferred.
Case No.:51/7/81-<br>PartyName: FC]OEN<br>MeetNo/Date:23/81-<br>Status:<br>ALC2/2016<br>CONNECTORS LIMITED = ALC2/2019<br>Deferred<br>04.03.2020
5 HQ File<br>RLA File<br>Lic.No/Date:1010059496 Actionby :<br> :01/81/050/00153/AM17/<br>:10/24/040/00014/AM17/<br>31.05.2016<br>MeitY<br>Decision: The Committee considered the case as peragenda and noted that MeitY was reminded for<br>expediting the comments on 28.02.2020. However, nocomments have been received yet. Hence, the<br>Committeedecidedtowaitforthecomments.

The case stands deferred. Case No.:2/12/81Party Name: FC] OEN Meet No/Date:23/81Status: ALC2/2016 CONNECTORS LIMITED — ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:1010059524 Action by : 6 :01/81/050/00219/AM17/ :10/24/040/00025/AM17/ 01.07.2016 MeitY

Decision: The Committee considered the case as per agenda and noted that MeitY was reminded for expediting the comments on 28.02.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. The case stands deferred.

Case No.:61/12/81Party Name: Meet No/Date:23/81Status: ALC2/2018 JAYACHANDRAN ALLOYS =ALC2/2019 Approved PRIVATE LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:32 10077929 -0.1/81/050/00699/AM19/ _ :32/24/040/00007/AM17/ 13.07.2016 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by MSME as under: ay WORE ee, OE Fe ~ | Recommended Mt cao a 7), 78011000 Lead Ingots 99.97 | 1000.000 As applied seein ibis Cott: % Purity(Min) =| MT Lead Tages inclusive of 2% 5 78019990 Lead Calcium 1000.000 78019920 | (with 98% wastage on net — re | Alloy wat. es a site content of Lead in 3 78019100 Lead Antimoy 500.000= purity import and export Note: 1. Percentage of lead in import is 98%. 2. The applicant should import relevant item only. 3. Wastage for Export Product at Sr. No. 2 & 3 has be allowed as applied 1.02 Kg/Kg taking cue from SION C1960) RA concerned may take suitable consequential action accordingly.

3 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 -

==> picture [448 x 69] intentionally omitted <==

----- Start of picture text -----<br> ALC2/2018Case No.:185/14/81- Party Name: ELECTRO Meet No/Date:23/81- Status:<br>FIBRES ALC2/2019 Rejected<br>04.03.2020<br>HQ File RLA File Lic.No/Date:0710110631 Action by :<br>:01/81/050/00903/AM 19/ :07/24/040/00240/AM17/ 10.11.2016 RA<br>----- End of picture text -----<br>

8 Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 30.09.2019 followed by reminders on 15.10.2019 & 27.12.2019. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.

RA may take consequential action accordingly.

Case No.:351/14/81Party Name: ELECTRO Meet No/Date:23/8 1- Status: ALC2/2018 FIBRES ALC2/2019 Rejected 04.03.2020 HQ File RLA File Lic.No/Date:0710110983 Action by : :01/81/050/01069/AM 19/ :07/24/040/00348/AM17/ 18.01.2017 RA 9 Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 01.10.2019 followed by reminders on 06.11.2019 & 27.12.2019. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Bangalore.

RA may take consequential action accordingly.

Case No.:53/14/81- Party Name: AMC Meet No/Date:23/8 1 - Status:
ALC2/2018 COOKWARE (INDIA) ALC2/2019 Deferred
PVT.LTD: 04.03.2020
10 HQ File<br>:01/81/050/00771/AM19/ RLA File<br>:07/24/040/00062/AM18/ Lic.No/Date:0710111702 <br>31.05.2017 Action by :<br>MSME

Decision: [he Committee considered the case as per agenda and noted that the applicant’s reply was sent to MSME for examination of the case on 22.11.2019 followed by a reminder on 02.03.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. The case stands deferred.

, ALC2/2017Case No.:35/17/81PartyLIMITEDName: R.R.KABEL ALC2/2019Meet No/Date:23/81DeferredStatus: 04.03.2020 HQ File RLA File Lic.No/Date:0310815094 Action by : 11 :01/81/050/00345/AM18/ :03/95/040/008 15/AM16/ 09.08.2017 Applicant Decision: The Committee considered the case as per agenda. The applicant’s representative informed during personal hearing in M. No. 17/81 dated 27.11.2019 that they have requested to RA, Mumbai for amendment in the AA and will apply for ratification after receiving amendment. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for requisite information. The case stands deferred.

go y. Director General of Foreign

4 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020

Case No.:71/14/81Party Name: IHITA Meet No/Date:23/81Status: ALC2/2018 ENGINEERING SERVICES ALC2/2019 Rejected PRIVATE LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:0410163691 Action by : :01/81/050/00789/AM 19/ :04/24/040/00118/AM18/ 13.11.2017 RA 12 Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 01.10.2019 followed by reminders on 06.11.2019 & 03.01.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Chennai.

RA may take consequential action accordingly.

Case No.:72/14/81Party Name: PANASONIC Meet No/Date:23/81Status: ALC2/2018 APPLIANCES INDIA CO. — ALC2/2019 Rejected LTD. 04.03.2020 HQ File RLA File Lic.No/Date:0410163695 Action by : :01/81/050/00790/AM 19/ :04/24/040/00160/AM18/ 14.11.2017 RA 13 Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 01.10.2019 followed by reminders on 06.11.2019 & 27.12.2019. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Chennai.

RA may take consequential action accordingly.

Case No.:358/14/81Party Name: ABB INDIA Meet No/Date:23/81Status: ALC2/2018 LIMITED. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0710112738 Action by : 14 :01/81/050/01076/AM 19/ :07/24/040/00289/AM 1 8/ 24.01.2018 Applicant Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the applicant on 23.12.2019. However, no reply has been received yet. Hence, the Committee decided to remind the applicant.

The case stands deferred. Case No.:75/5/81Party Name: LM WIND Meet No/Date:23/81Status: ALC2/2018 POWER BLADES [INDIA] | ALC2/2019 Deferred PVT. LTD. 04.03.2020 HQ File RLA File Lic.No/Date:0710113376 Action by : 15 :01/81/050/00283/AM 19/ :07/24/040/00342/AM 1 8/ 01.06.2018 Applicant Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 03.02.2020. However, no reply has been received yet. Hence, the Committee decided to remind the applicant.

5 | Page 79

NC -2 Meeting No. 23/81 held on 04.03.2020 ae

==> picture [462 x 70] intentionally omitted <==

----- Start of picture text -----<br> Case No.:74/5/81- Party Name: LM WIND Meet No/Date:23/81- Status:<br>ALC2/2018 POWER BLADES [INDIA] — ALC2/2019 Deferred<br>PVT. LTD 04.03.2020<br>HQ File RLA File Lic.No/Date:0710113408 Action by :<br>16 :01/81/050/00282/AM 19/ :07/24/040/00333/AM18/ 07.06.2018 Applicant<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 03.02.2020. However, no reply has been received yet. Hence, the Committee decided to remind the applicant.

The case stands deferred.

Case No.:99/8/81Party Name: MJM FINE Meet No/Date:23/8 1- Status: ALC2/2018 ENCLOSURES PRIVATE — ALC2/2019 Rejected LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:0710113703 Action by : :01/81/050/00481/AM19/ :07/24/040/00123/AM19/ 08.08.2018 RA !7 Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 16.08.2019 followed by reminders on 01.10.2019 & 02.01.2020. The applicant vide email dated 16.01.2020 requested the time till 25.01.2020 to furnish the reply. However, no reply has been received yet. Hence, the Committee decided to reject the case under intimation to RA, Bangalore. RA may take consequential action accordingly.

Case No.:143/14/81Party Name: EMMVEE Meet No/Date:23/81Status: ALC2/2018 PHOTOVOLTAIC POWER =ALC2/2019 Deferred PVT, LED: 04.03.2020 HQ File RLA File Lic.No/Date:0710113785 Action by : :01/81/050/00861/AM19/ :07/24/040/00130/AM19/ 30.08.2018 Applicant 18 Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 24.12.2019. The applicant vide email dated 24.12.2019 informed that they had sent the reply of deficiency letter on 16.11.2019 by speed post. However, the applicant was again reminded on 28.02.2020 to furnish the reply as no information was received in the section. Hence, the Committee decided to wait for the applicant’s reply.

The case stands deferred.

Case No.:19/10/81Party Name: VEDANTA ‘Meet No/Date:23/8 ALC2/2018 1- Status: LIMITED ALC2/2019 Rejected 04.03.2020 HQ File RLA File Lic.No/Date:03 10823651 Action by : 19 :01/81/050/00500/AM 19/ :03/95/040/00506/AM 19/ 07.09.2018 RA Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 19.02.2019 followed by reminders on 19.11.2019 & 06.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai. RA may take consequential action accordingly. 6 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 ij haga haga Gana

oe ij haga haga Gana ric

==> picture [469 x 117] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case No.:50/12/81-|Party Name: PARKER|Meet No/Date:23/81-|Status:|
|ALC2/2018|HANNIFIN|INDIA PVT.|ALC2/2019|Deferred|
|LID.|04.03.2020|
|HQ File|RLA|File|Lic.No/Date:0410164717|Action|by|:|
|20|-0.1/81/050/00688/AM19/|:04/24/040/00130/AM19/|26.09.2018|MSME|
|Decision:|The|Committee|considered|the|case|as|per|agenda|and|noted|that|the|firm’s|reply|was|
|referred|to|MSME|on|03.01.2020.|However,|no|comments|have|been|received|yet.|Hence,|the|
|Committee|decided|to remind MSME|for|expediting|the|comments.|

----- End of picture text -----<br>

==> picture [449 x 75] intentionally omitted <==

----- Start of picture text -----<br>

||||||||
|---|---|---|---|---|---|---|
|Case No.:56/12/81-|Party Name: DEWAN &|Meet No/Date:23/81-|Status:|
|ALC2/2018|SONS|ALC2/2019|Rejected|
|04.03.2020|
|HQ File|RLA|File|Lic.No/Date:2910025374|Action|by|:|
|:01/81/050/00694/AM19/|:29/24/040/00004/AM 19/|12.11.2018|RA|

----- End of picture text -----<br>

21 Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 16.08.2019 followed by reminders on 01.10.2019 & 02.01.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to concerned RA.

RA may take consequential action accordingly.

Case No.:62/12/81Party Name: JINDAL Meet No/Date:23/81Status: ALC2/2018 FITTINGS LIMITED ALC2/2019 Withdrawn 04.03.2020 HQ File RLA File Lic.No/Date:05 10408454 Action by : 2 :01/81/050/00700/AM 1 9/ :05/23/040/00357/AM19/ 19.11.2018 RA Decision; The Committee considered the case as per agenda and the applicant’s representatives informed during personal hearing that the above AA has been regularized. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, New Delhi.

The case is withdrawn. Case No.:8/13/81Party Name: MAN Meet No/Date:23/81Status: ALC2/2018 INDUSTRIES (INDIA) LTD. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10825719 Action by : :01/81/050/007 16/AM19/ :03/95/040/009 16/AM19/ 18.12.2018 Section 23 Decision: The Committee considered the case as per agenda and noted that the applicant was called for personal hearing to explain the case before Norms Committee. However, nobody was appeared for PH on behalf of the applicant and the applicant vide email dated 27.02.2020 requested for PH in the month of April, 2020. Therefore, the Committee decided to give another date for PH in the month ofThe April case stands2020. deferred. Ss 5c a

Ss 5c a " Udyor : NC -2 Meeting No. 23/81 held on 04.03.2020

7 | Page 79

Case No.:47/14/81Party Name: EFD Meet No/Date:23/8 ALC2/2019 1- Status: INDUCTION PRIVATE ALC2/2019 Approved LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:07101 14437 24 :01/81/050/00145/AM20/ :07/24/040/00246/AM19/ 22.01.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by MeitY vide F. No. W-21/5/2020-IPHW-MeitY dated 27.02.2020. (Copy enclosed).

RA concerned may take suitable consequential action accordingly.

Case No.:41/2/81Party Name: DIAMOND Meet No/Date:23/8 1- Status: ALC2/2019 ENGINEERING ALC2/2019 Withdrawn 04.03.2020 HQ File RLA File Lic.No/Date:0410165165 :01/81/050/01 127/AM19/ :04/24/040/0023 1/AM19/ 04.02.2019

25 Decision: The Committee considered the case as per agenda and noted that the applicant vide email dated 21.01.2020 informed that they have surrendered the AA to RA, Chennai for cancellation due to non-import. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, Chennai.

The case is withdrawn.

Case No.:289/14/81Party Name: RR KABEL Meet No/Date:23/81Status: Deferred ALC2/2018 LIMITED ALC2/2019 04.03.2020 26 HQ File RLA File Lic.No/Date:03 10827010 Action by : :01/81/050/01007/AM19 :03/95/040/01148/AM19/ 13.02.2019 Consultant (TEC-3) Decision: The Committee considered the case as per agenda and noted that the case has been again referred to Consultant (TEC-3) on 04.03.2020 for examination & comments.

Case No.:43/2/81Party Name: SEIKODENKI Meet No/Date:23/81Status: ALC2/2019 INDIA PRIVATE LIMITED ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0410165215 Action by : 27 :01/81/050/01129/AM19/ :04/24/040/00240/AM 19/ 14.02.2019 Applicant Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.

8 | Page 79

NC -2 Meeting No. 23/81 held on 04.03.2020

Directorate Gene: al of Foweign Tr

Case No.:79/2/81Party Name: BELDEN Meet No/Date:23/81Status: ALC2/2019 INDIA PVT.LTD. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:3 110067347 Action by : :01/81/050/01 165/AM19/ :3.1/83/040/00188/AM19/ 11.03.2019 Applicant

28 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.

Case No.:74/2/81Party Name: USHA Meet No/Date:23/8 1- Status: ALC2/2019 INDUSTRIAL ALC2/2019 Deferred CORPORATION. 04.03.2020 HQ File RLA File Lic.No/Date:0810144757 Action by : :01/81/050/01160/AM19/ :08/24/040/00406/AM 19/ 12.03.2019 Applicant 29 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.

Case No.:63/2/81-ALC2/2019 Party Name: ANAND ARC Meet No/Date:23/81Status: LTD: ALC2/2019 Approved 04.03.2020 HQ File RLA File Lic.No/Date:03 10827662 30 :01/81/050/01149/AM19/ :03/94/040/01086/AM19/ 13.03.2019 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by DPIIT vide U. O. No.: P-47014/52/2019-TSW dated 30.01.2020. (Copy enclosed)

Case No.:1/2/81-ALC2/2019 Party Name: GRAVITA Meet No/Date:23/81Status: INDIA LTD. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date: 1310049241 Action by : :01/81/050/00001/AM20/ :13/24/040/00139/AM19/ 27.03.2019 Applicant 31 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of[application.] The case stands deferred. LE

9 | Page 79

Case No.:5/2/81Party Name: ARMOR ALC2/2019 PLAST LIMITED

Meet No/Date:23/81Status: ALC2/2019 Approved 04.03.2020

HQ File RLA File Lic.No/Date:07101 14736 :01/81/050/00005/AM20/ :07/24/040/003 12/AM19/ 01.04.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 25.02.2020 given by Consultant (TEC-3) as under:

==> picture [466 x 84] intentionally omitted <==

----- Start of picture text -----<br> 3 Wes | lee Te nee<br>Code Deets ss =e pa ee ay Code pet iy Quantity<br>Articles Made of Stainless 17-7PH 1.02 Kgs/Kg<br>TEENY Steel Tubes (Net Content | 2580.950 Stainless content in the<br>of Import item in Export KG Teen Steel export product<br>| Produet 258085) | bing ae<br>----- End of picture text -----<br>

Note:

  1. The words “Tubes” may be added in the description of the export item. 2. The grade & diameter of SS to match in import and export product.

Case No.:16/2/81Party Name: STERLITE Meet No/Date:23/8 1- Status: ALC2/2019 POWER TRANSMISSION — ALC2/2019 Deferred LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:03 10828254 Action by : :01/81/050/00016/AM20/ :03/95/040/01250/AM19/ 10.04.2019 Applicant 33 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.

Case No.:24/3/81Party Name: DIAMOND Meet No/Date:23/8 1- Status: ALC2/2019 ENGINEERING (CHENNAI) ALC2/2019 Deferred PVT LTD 04.03.2020 HQ File RLA File Lic.No/Date:0410165528 Action by : 34 :01/81/050/00044/AM20/ :04/24/040/0029 1/AM19/ 30.04.2019 DPIT

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 12.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPT for expediting the comments.

10 | Page 79

==> picture [40 x 15] intentionally omitted <==

----- Start of picture text -----<br> ins 0!<br>----- End of picture text -----<br>

||CaseNo.:4/5/81-ALC2/2019<br>PartyName:TUBACEX<br>MeetNo/Date:23/8|-<br>Status:<br>PRAKASHINDIA<br>ALC2/2019<br>Approved|
|---|---|
||PRIVATE LIMITED<br>04.03.2020|
||HQ File<br>RLAFile<br>Lic.No/Date:0310828823<br>:01/81/050/00053/AM20/<br>-03/95/040/00101/AM20/ =07.05.2019<br>Decision: The Committee considered the case as per agenda and noted that the case was referred to<br>DPIIT on 10.01.2020 for examination. However, nocomments are being furnished by DPIIT. Hence,<br>the matterwas deliberated in the meeting and the Committee decided to fix the ad-hoc norms on the|
||recommendation ofConsultant (TEC-3) as under:|
|35||—<br>ExportItem<br>Quantity ao ne<br>ImportItem<br>ouipatie<br>7<br>"1 Seamless Stainless | Allowed10%<br>Stainless<br>Steal<br>Steel Tubes/Pipes<br>wastage<br>oN<br>1<br>73049000 | (HotFinished)(OD<br>erate<br>370.370<br>notlessthan42mm)<br>73044100<br>een ae<br>;<br>ofRelevantGrade<br>(ColdFinish)<br>|MT<br>fF<br>| ilgerDie =|<br>Asapplied<br>ofRelevant<br>2<br>84559000<br>:<br>(Consumables)<br>withvalue<br>Grade<br>————$ A<br>3<br>84559000<br>Mandrels<br>restricted upto<br>Aaa<br>eae<br>er<br>Lee| (Consumables)<br>—__|SofFOB|

Case No.:46/5/81Party Name: LEITWIND Meet No/Date:23/81Status: ALC2/2019 SHRIRAM MANUFACTURING ALC2/2019 Rejected PRIVATE LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:0410165668 Action by : -01/81/050/00095/AM20/_ :04/24/040/00023/AM20/ 31.05.2019 RA

36 Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by DHI was sent to the applicant on 01.10.2019 followed by reminders on 08.11.2019 & 02.01.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Chennai.

RA concerned may take consequential action accordingly.

Case No.:2/14/81Party Name: BELDEN Meet No/Date:23/81Status: ALC2/2019 INDIA PVT.LTD ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:31 10067437 Action by : 37 :01/81/050/00100/AM20/ :31/83/040/00038/AM20/ 03.06.2019 Applicant ji Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by DHI was sent to the applicant on 22.01.2020 by speed post. However, no reply has been received yet. Hence, the Committee decided to remind the applicant.

==> picture [2 x 2] intentionally omitted <==

----- Start of picture text -----<br> Oi<br>----- End of picture text -----<br>

11 | Page 79

==> picture [10 x 21] intentionally omitted <==

----- Start of picture text -----<br> ee<br>----- End of picture text -----<br>

Case No.:3/14/81Party Name: DEWAN & Meet No/Date:23/81Status: ALC2/2019 SONS ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:2910025405 Action by : :01/81/050/00101/AM20/ :29/2.4/040/00007/AM20/ 04.06.2019 Applicant 38 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.

The case stands deferred.

Case No.:10/14/81-<br>Party Name: APAR<br>Meet No/Date:23/81-<br>Status:
ALC2/2019<br>INDUSTRIES LIMITED<br>ALC2/2019<br>Deferred
04.03.2020
HQ File<br>RLA File<br>Lic.No/Date:3410045194 Action by :
39 :01/81/050/00108/AM20/<br>:34/24/040/00066/AM20/<br>06.06.2019<br>Applicant
Decision: The Committee considered the case as per agenda and noted that the deficiency letter
seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 26.12.2019.
However,noreplyhasbeenreceivedyet.Hence,theCommitteedecidedtoremindtheapplicant.

The case stands deferred.

Case No.:7/14/81Party Name: SEIKODENKI — Meet No/Date:23/81Status: ALC2/2019 INDIA PRIVATE LIMITED (ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0410165686 Action by : :01/81/050/00105/AM20/ :04/24/040/00056/AM20/ 06.06.2019 Applicant 40 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on _ 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:5/14/81Party Name: VESTAS WIND Meet No/Date:23/81Status: ALC2/2019 TECHNOLOGY INDIA ALC2/2019 Deferred PRIVATE LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:0410165683 Action by : :01/81/050/00103/AM20/ :04/24/040/00043/AM20/ 06.06.2019 Applicant 41 Decision: The Committee considered the case as per agenda and noted that the deficiency letter seeking certain information as raised by DHI & Consultant (TEC-1) was sent to the applicant on 08.11.2019 followed by a reminder on 02.01.2020. However, no reply has been received yet. Hence, the Committee decided to remind again the applicant.

12 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020

==> picture [92 x 43] intentionally omitted <==

----- Start of picture text -----<br> a AX.<br>----- End of picture text -----<br>

==> picture [472 x 272] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/14/81- Party Name: APAR Meet No/Date:23/81- Status:<br>ALC2/2019 INDUSTRIES LIMITED ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:3410045197 Action by :<br>42 :01/81/050/00112/AM20/ :34/24/040/00068/AM20/ 07.06.2019 Applicant<br>Decision: The Committee considered the case as per agenda and noted that the deficiency letter<br>seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 26.12.2019.<br>However, no reply has been received yet. Hence, the Committee decided to remind the applicant.<br>The case stands deferred.<br>Case No.:13/14/81- Party Name: DIACH Meet No/Date:23/81- Status:<br>ALC2/2019 CHEMICALS & PIGMENTS ALC2/2019 Deferred<br>PRIVATE LIMITED 04.03.2020<br>HQ File RLA File Lic.No/Date:02 10209231 Action by :<br>43 :01/81/050/00111/AM20/ :02/24/040/00033/AM20/ 07.06.2019 MSME<br>Decision: The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MSME on 03.01.2020 for examination of the case. However, no comments have been received<br>yet. Therefore, the Committee decided to remind MSME for expending the comments.<br>----- End of picture text -----<br>

The case stands deferred.

Case No.:8/14/81Party Name: PREMIER Meet No/Date:23/81Status: ALC2/2019 INDUSTRIAL ALC2/2019 Deferred CORPORATION LIMITED — 04.03.2020 HQ File RLA File Lic.No/Date:03 10829465 Action by : AA :01/81/050/00106/AM20/ :03/95/040/00042/AM20/ 07.06.2019 MSME Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 06.01.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expending the comments.

The case stands deferred.

Case No.:9/14/81Party Name: RAM RATNA Meet No/Date:23/8 1- Status: ALC2/2019 WIRES LIMITED ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10829473 Action by : :01/81/050/00107/AM20/ :03/95/040/00994/AM 19/ 07.06.2019 Applicant 4S Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

The case stands deferred.

13 | Page 79

==> picture [205 x 23] intentionally omitted <==

----- Start of picture text -----<br> NC -2 Meeting No. 23/81 held on 04.03.2020<br>----- End of picture text -----<br>

==> picture [103 x 23] intentionally omitted <==

----- Start of picture text -----<br> rector Coreralof Fon Te<br>----- End of picture text -----<br>

==> picture [468 x 113] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/14/81- Party Name: APAR Meet No/Date:23/81- Status:<br>ALC2/2019 INDUSTRIES LIMITED ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:3410045203 Action by :<br>AG :01/81/050/001 19/AM20/ :34/2.4/040/00086/AM20/ 12.06.2019 Applicant<br>Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (TEC-3) was sent to the applicant on 26.12.2019.<br>However, no reply has been received yet. Therefore, the Committee decided to remind the applicant.<br>----- End of picture text -----<br>

The case stands deferred.

Case No.:22/14/81- PartyName: APAR Meet No/Date:23/81- Status:
ALC2/2019 INDUSTRIES LIMITED ALC2/2019 Deferred
04.03.2020
47 HQ File<br>:01/81/050/00120/AM20/ RLA File<br>:34/24/040/00085/AM20/ Lic.No/Date:3410045204 <br>12.06.2019 Action by :<br>Applicant

Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant.

The case stands deferred.

Case No.:19/14/81- Party Name: RAJHANS Meet No/Date:23/8<br>1- Status:
ALC2/2019 METALS PVT. LIMITED ALC2/2019 Deferred
04.03.2020
HQ File RLA File Lic.No/Date:2410042779 Action by :
48 :01/81/050/00117/AM20/ :2.4/24/040/00008/AM20/ 12.06.2019 MSME

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 18.12.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to remind MSME for expediting the comments.

‘Case No.:29/14/81Party Name: LM WIND Meet No/Date:23/81Status: ALC2/2019 POWER BLADES INDIA ALC2/2019 Deferred PVT.LTD 04.03.2020 HQ File RLA File Lic.No/Date:3410045211 Action by : :01/81/050/00127/AM20/ :34/24/040/00092/AM20/ 14.06.2019 Applicant 49 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

==> picture [495 x 18] intentionally omitted <==

----- Start of picture text -----<br> 14 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020. Drecor'e Fovsign Tra<br>----- End of picture text -----<br>

==> picture [469 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:30/14/81- Party Name: LM WIND Meet No/Date:23/81- Status:<br>ALC2/2019 POWER BLADES INDIA ALC2/2019 Deferred<br>PVT. LTD 04.03.2020<br>HQ File RLA File Lic.No/Date:3410045212 Action by :<br>50 :01/81/050/00128/AM20/ :34/24/040/00093/AM20/ 14.06.2019 Applicant<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet.<br>Hence, the Committee decided to wait for the complete set of application.<br>The case stands deferred.<br>----- End of picture text -----<br>

==> picture [472 x 306] intentionally omitted <==

----- Start of picture text -----<br> Case No.:28/14/81- Party Name: METALIC Meet No/Date:23/81- Status:<br>ALC2/2019 IMPRESSIONS (INDIA)PVT ALC2/2019 Deferred<br>LTD 04.03.2020<br>HQ File RLA File Lic.No/Date:0510410945 Action by :<br>51 :01/81/050/00126/AM20/ :05/24/040/00153/AM20/ 14.06.2019 Applicant<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet.<br>Hence, the Committee decided to wait for the complete set of application.<br>The case stands deferred.<br>Case No.:27/14/81- Party Name: TRINITY Meet No/Date:23/81- Status:<br>ALC2/2019 PLAST ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:03 10829646 Action by :<br>:01/81/050/00125/AM20/ 103/95/040/00249/AM20/ 14.06.2019 Study group<br>52 Decision: The Committee considered the case as per agenda and noted that a study group team has<br>visited the factory premises of the applicants manufacturing same/similar products to study the<br>manufacturing processes and ascertain wastages by visiting. The members of study group informed<br>that they have submitted the report. However, the same is yet to be adopted. Hence, the Committee<br>decided to take a decision on adoption of study group report.<br>The case stands deferred.<br>----- End of picture text -----<br>

Case No.:33/14/81Party Name: DIAMOND Meet No/Date:23/8 1 - Status: ALC2/2019 METAL SCREENS (P) LTD ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:65 10000028 Action by : :01/81/050/0013 1/AM20/ :65/24/040/0000 1/AM20/ 18.06.2019 Applicant Decision: The Committee considered the case as per agenda and decided to seek from the applicant to 53 furnish following information as per written comments given by DPIIT vide U. O. No.: P- 47011/19/2020-TSW dated 27.02.2020:

  1. Sl.No. 11 & 12 of the Standard Deficiency Format. 2. Area of perforated Aluminum Sheets to be exported and Aluminum Sheets/Coils proposed for import.

The case stands deferred. 15 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020

==> picture [72 x 50] intentionally omitted <==

----- Start of picture text -----<br> iN<br>piractor General of F<br>----- End of picture text -----<br>

ALC2/2019Case No.:35/14/81Party Name: DIAMOND Meet No/Date:23/81Status: ENGINEERING (CHENNAI) ALC2/2019 Deferred PVT LTD 04.03.2020 HQ File RLA File Lic.No/Date:0410165740 Action by : 54 :01/81/050/00133/AM20/ :04/24/040/00045/AM20/ 19.06.2019 DPIT

Decision: The Committee considered the case as per agenda and noted that the applicant’s reply was referred to DPIIT on 26.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case No.:36/14/81Party Name: JAINMETAL — Meet No/Date:23/81Status: ALC2/2019 ROLLING MILLS ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0410165741 Action by : >> :01/81/050/00134/AM20/ :04/24/040/00013/AM20/ 20.06.2019 Applicant Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per advice ofthe[representative] of MSME:

  1. Certificate of analysis of import item to be submitted. The case stands deferred. Case No.:37/14/81Party Name: JAINMETAL Meet No/Date:23/81Status: ALC2/2019 ROLLING MILLS ALC2/2019 Approved 04.03.2020 HQ File RLA File Lic.No/Date:0410165742 :01/81/050/00135/AM20/ :04/24/040/00015/AM20/ 20.06.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by MSME as under:

one i Pl __ | Recommended ee ee 56 Lead Ingots - Lead Lead Battery 3997950 Kg Content - 99.97% Waste as per inclusive of FEOTOOTD To account for 2000000.000 ISRI Code 5.62% 1999400 Kgs. of lead Kg eae 020 word —Rains wastage within the Export Lead Content - Lead Alloy - Lead 1.02 Kgs/Kg 78011000 Content - 98% (To 200000.000 Disodium content in the | account for 196000 K , 28362010 | carbonate, export product Kgs. of lead within the & dense io. Export Product)_ ca BenOY se& PE ial ean) Tt Note: The applicant should import relevant items only. eee a OF RA concerned may take suitable consequential action accordingly. aN 16 | Page 79 79 NC -2 Meeting No. 23/81 -2 Meeting No. 23/81 Meeting No. 23/81 No. 23/81 23/81 held on on 04.03.2020 Sector's Go gn Trade

16 | Page 79 79 NC -2 Meeting No. 23/81 -2 Meeting No. 23/81 Meeting No. 23/81 No. 23/81 23/81 held on on 04.03.2020

==> picture [469 x 116] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case No.:40/14/81-|Party Name: HONYLITE|Meet No/Date:23/8 1-|Status:|
|ALC2/2019|PRIVATE LIMITED|ALC2/2019|Deferred|
|04.03.2020|
|HQ|File|RLA File|Lic.No/Date:0510411013|Action|by|:|
|57 :01/81/050/00138/AM20/|:05/23/040/001|19/AM20/|21.06.2019|Applicant|
|Decision:|The|Committee considered|the|case|as|per agenda|and|noted|that|a|deficiency|letter seeking|
|certain|information|as|raised|by MSME|was|sent|to|the|applicant|on|26.12.2019.|However,|no|reply|
|has|been|received|yet.|Hence,|the Committee|decided|to|remind|the applicant.|

----- End of picture text -----<br>

The case stands deferred. Case No.:44/14/81Party Name: LM WIND Meet No/Date:23/81Status: ALC2/2019 POWER BLADES INDIA ALC2/2019 Deferred PVT. LTD. 04.03.2020 HQ File RLA File Lic.No/Date:3410045227 Action by : :01/81/050/00142/AM20/ :34/24/040/00104/AM20/ 24.06.2019 Applicant 58 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

==> picture [450 x 98] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||
|---|---|---|---|---|---|---|---|
|The|case|stands|deferred.|
|Case No.:52/14/81-|Party Name:|SHREE|Meet No/Date:23/81-|Status:|
|ALC2/2019|CABLES AND|ALC2/2019|Deferred|
|CONDUCTORS|PVT.LTD.|04.03.2020|
|HQ|File|RLA|File|Lic.No/Date:|1110028604|Action by|:|
|:01/81/050/00150/AM20/|:11/24/040/00004/AM20/|25.06.2019|Applicant|

----- End of picture text -----<br>

59 ‘Necision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

  • The case stands deferred.

Case No.:46/14/81Party Name: A-] FENCE Meet No/Date:23/81Status: ALC2/2019 PRODUCTS CO.PVT.LTD. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10829921 Action by : :01/81/050/00144/AM20/ :03/94/040/00237/AM20/ 26.06.2019 Applicant

60 Hecision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred. -

==> picture [2 x 1] intentionally omitted <==

----- Start of picture text -----<br> |<br>----- End of picture text -----<br>

17 | Page 79

==> picture [468 x 112] intentionally omitted <==

----- Start of picture text -----<br> Case No.:48/14/81- Party Name: JANS COPPER = Meet No/Date:23/81- Status:<br>ALC2/2019 PVT LTD ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:0310829929 Action by :<br>61 :01/81/050/00146/AM20/ :03/94/040/01012/AM19/ 26.06.2019 DPIUT<br>Decision: The Committee considered the case as per agenda and noted that the applicant’s reply was<br>referred to DPIIT on 03.01.2020 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.<br>----- End of picture text -----<br>

The case stands deferred.

==> picture [446 x 68] intentionally omitted <==

----- Start of picture text -----<br> Case No.:49/14/81- Party Name: METALLOYS — Meet No/Date:23/81- Status:<br>ALC2/2019 RECYCLING LIMITED ALC2/2019 Approved<br>04.03.2020<br>HQ File File RLA File Lic.No/Date:03 10829944<br>:01/81/050/00147/AM20/ :03/95/040/01292/AM 19/ 26.06.2019<br>----- End of picture text -----<br>

  • 62 HQ File File :01/81/050/00147/AM20/

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 03.03.2020 given by Consultant (SKB). (Copy enclosed).

Case No.:51/14/81Party Name: STORK FERRO Meet No/Date:23/81Status: ALC2/2019 AND MINERAL ALC2/2019 Deferred INDUSTRIES PRIVATE 04.03.2020 LIMITED HQ File RLA File Lic.No/Date:0510411068 Action by : 63 :01/81/050/00149/AM20/ :05/24/040/00184/AM20/ 27.06.2019 Applicant

Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the applicant on 03.02.2020. However, no reply has been received yet. Hence, the Committee decided to remind the applicant.

Case No.:58/14/81Party Name: RAJ METAL Meet No/Date:23/8 1- Status: ALC2/2019 INDUSTRIES ALC2/2019 Deferred 04.03.2020

HQ File RLA File Lic.No/Date:0210209298 Action by : :01/81/050/00156/AM20/ :02/24/040/00054/AM20/ 03.07.2019 Applicant

64 Decision: The Committee considered the case as per agenda and decided to seck from the applicant to furnish the following information as per advice of representative of MSME:

  • 2.1. PercentageManufacturingof leadprocessin importwith step-wiseitems. wastage.

18 | Page 79

==> picture [205 x 18] intentionally omitted <==

----- Start of picture text -----<br> NC -2 Meeting No. 23/81 held on 04.03.2020<br>----- End of picture text -----<br>

==> picture [57 x 18] intentionally omitted <==

----- Start of picture text -----<br> een . GU<br>----- End of picture text -----<br>

CaseNo.:55/14/81-<br>ALC2/2019 PartyName:RAYCHEM<br>RPGPVTLTD. MeetNo/Date:23/81-<br>Status:<br>ALC2/2019<br>Deferred<br>04.03.2020
65 HQ File<br>:01/81/050/00153/AM20/<br>Decision:TheCommittee RLA File<br>:03/95/040/00313/AM20/<br>consideredthecaseasperagenda Lic.No/Date:0310830050 Actionby :<br>03.07.2019<br>MSME<br>andnotedthattheapplicant’sreplywas

Decision: The Committee considered the case as per agenda and noted that the applicant’s reply was referred to MSME on 25.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

The case stands deferred. Case No.:57/14/81Party Name: PATEL Meet No/Date:23/81Status: ALC2/2019 TECHNOMATION PVT. ALC2/2019 Deferred LTD. 04.03.2020 HQ File RLA File Lic.No/Date:03 10830065 Action by : 66 :01/81/050/00155/AM20/ :03/95/040/0031 1/AM20/ 04.07.2019 Section Decision: The Committee considered the case as per agenda and decided to refer the case to Consultant (SKB) for the examination.

The case stands deferred. Case No.:64/14/81Party Name: DYNAMIC Meet No/Date:23/81Status: ALC2/2019 CABLES PVT. LTD. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date: 1310049348 Action by : 67 :01/81/050/00162/AM20/ :13/24/040/00156/AM20/ 05.07.2019 DPIUT Decision: The Committee considered the case as per agenda and noted that the applicant’s reply was referred to DPIIT on 26.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. The case stands deferred. ‘Case No.:60/14/81Party Name: TATA POWER Meet No/Date:23/81Status: ALC2/2019 SOLAR SYSTEMS LTD. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0710115133 Action by : :01/81/050/00158/AM20/ :07/24/040/00065/AM20/ 05.07.2019 Applicant

Decision: The Committee considered the case as per agenda and Consultant (TEC-3) advised to seek 6 following information from the applicant, as asked during personal hearing with respect to similar cases in M. No. 21/81 dated 22.01.2020:

  1. Quantity of raw materials with dimensions. 2. Calculation of raw material for manufacturing product. 3. Specific use of each import items.

==> picture [36 x 2] intentionally omitted <==

----- Start of picture text -----<br> yor Gee<br>----- End of picture text -----<br>

19 | Page 79

ALC2/2019Case No.:65/14/81Party Name: DC AUTO Meet No/Date:23/81Status: PARTS PVT.LTD. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0710115147 Action by : 69 :01/81/050/00163/AM20/ :07/24/040/00070/AM20/ 09.07.2019 Applicant Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:66/14/81Party Name: STANCORP Meet No/Date:23/81Status: ALC2/2019 ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10830212 Action by : 70 :01/81/050/00164/AM20/ :03/95/040/00128/AM20/ 10.07.2019 Applicant Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

The case stands deferred. ALC2/2019Case No.:73/14/81PartyINFRAPIPESName: GUJARATPVT.LIMITED ALC2/2019Meet No/Date:23/81Status:Deferred 04.03.2020 HQ File RLA File Lic.No/Date:3410045279 Action by : :01/81/050/00171/AM20/ :34/24/040/00094/AM20/ 11.07.2019 Applicant

7] Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:68/14/81Party Name: JINDAL SAW — Meet No/Date:23/81Status: ALC2/2019 LIMITED ALC2/2019 Approved 04.03.2020 HQ File RLA File Lic.No/Date:05 10411234 72 :01/81/050/00166/AM20/ :05/23/040/00147/AM20/ 11.07.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (TEC-3). (Copy enclosed).

20 | Page 79

yevlovo'> Gone -/ of Fovwign Trev

Case No.:72/14/81Party Name: VOESTALPINE Mect No/Date:23/81Status: ALC2/2019 VAE VKN INDIA PRIVATE ALC2/2019 Deferred LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:0510411242 Action by : :01/81/050/00170/AM20/ :05/2.4/040/00219/AM20/ 12.07.2019 Applicant

Decision: The Committee considered the case as per agenda and decided to seek from the applicant to[following][information][as][per][ advice][of][ Consultant][(SKB):] -[furnish]

  1. Weight of each set (SI. No. | to 7) indicated in the item of export? 2. Weight of the quantity of items in number. 3. Manufacturing process of each set. 4. Drawing/photograph of each set. 5. Justification of 5% wastage asked for manufacturing of each set.

Case No.:74/14/81Party Name: DYNAMIC Meet No/Date:23/8 | - Status: Deferred ALC2/2019 FLOW PRODUCTS ALC2/2019 PVT LTD: 04.03.2020 HQ File RLA File Lic.No/Date:03 10830300 Action by : 74 -0.1/81/050/00172/AM20. :03/94/040/00248/AM20/ 15.07.2019 Consultant (TEC-3) Decision: The Committee considered the case as per agenda and noted that the applicant’s reply was referred to Consultant (TEC-3) on 03.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

The case stands deferred. Case No.:76/14/81Party Name: DISHA AUTO Meet No/Date:23/8 1- Status: ALC2/2019 COMPONENTS PVT.LTD. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10830344 10830344 Action by : :01/81/050/00174/AM20/ :03/94/040/00285/AM20/ 16.07.2019 Applicant

HQ File RLA File Lic.No/Date:03 10830344 10830344 Action by : 75 :01/81/050/00174/AM20/ :03/94/040/00285/AM20/ 16.07.2019 Applicant Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 03.02.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant.

Case No.:75/14/81Party Name: KINECO Meet No/Date:23/81Status: ALC2/2019 KAMAN COMPOSITES - ALC2/2019 Deferred INDIA PVT LTD 04.03.2020 HQ File RLA File Lic.No/Date:03 10830319 Action by : 76 :01/81/050/00173/AM20/ :03/94/040/002 19/AM20/ 16.07.2019 Applicant

Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 03.02.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant. The case stands deferred.

21 | Page 79

==> picture [84 x 34] intentionally omitted <==

----- Start of picture text -----<br> SiSIS<br>----- End of picture text -----<br>

==> picture [469 x 124] intentionally omitted <==

----- Start of picture text -----<br> Case No.:77/14/81- Party Name: LM WIND Meet No/Date:23/81- Status:<br>ALC2/2019 POWER BLADES INDIA ALC2/2019 Deferred<br>PVT. LTD 04.03.2020<br>HQ File RLA File Lic.No/Date:34 10045293 Action by : :<br>:01/81/050/00175/AM20/ :34/24/040/00128/AM20/ 17.07.2019 Applicant<br>77 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet.<br>Hence, the Committee decided to wait for the complete set of application.<br>----- End of picture text -----<br>

Case No.:81/14/81Party Name: HORIZON Meet No/Date:23/8 1- Status: ALC2/2019 CHUTES PVT LTD ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:3 110067482 Action by : :01/81/050/00179/AM20/ :31/83/040/00065/AM20/ 23.07.2019 Applicant 78 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

==> picture [488 x 338] intentionally omitted <==

----- Start of picture text -----<br> Case No.:83/14/81- Party Name: RAJHANS Meet No/Date:23/8 1- Status:<br>ALC2/2019 METALS PVT. LIMITED =ALC2/2019 Approved<br>04.03.2020<br>HQ File RLA File Lic.No/Date:24 10042826<br>:01/81/050/00181/AM20/ :24/24/040/00020/AM20/ 23.07.2019<br>Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms on<br>repeat basis as approved for AA No. 2410042282 dated 03.10.2017 in M. No. 18/81 dated 21.11.2017<br>as per written comments given by MSME as under:<br>ITCHS peete! pe ge, | PROSi)ue eS) 5.= RNa<br>19 oe ee oe) | Quantity<br>Copper Scrap 1.06 Kgs/Kg<br>Brass (Clove/Cobra/ content in the<br>Extruded Solid 74040012 | Berry/ Candy) export product<br>Sections Grade As Per ISRI_ | taking clue from<br>74072110 Including Bars | 250000.000 | —=—s| Specification === | [SION] [C-1167_] |<br>And Rods - Keg 1.02 Kes/Kg<br>Extruded content in the<br>Brass Bars 79011200 | Zinc Ingots export product<br>(Solid) taking clue from<br>RA concerned may take suitable consequential action accordingly. oe a<br>22 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 Dy. Director aan<br>----- End of picture text -----<br>

==> picture [470 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:82/14/81- Party Name: VINEY Meet No/Date:23/81- Status:<br>ALC2/2019 CORPORATION LTD. ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:05 10411328 Action by :<br>:01/81/050/00180/AM20/ :05/24/040/00182/AM20/ 23.07.2019 Applicant<br>Decision: The Committee considered the case as per agenda and noted that McitY has sought<br>g0 following information from the applicant on 07.01.2020 followed by a reminder on 27.02.2020:<br>1. Detail of export product i.e. design, drawing, calculation etc.<br>2. Net quantity of import item required for manufacturing of one unit of export product for each<br>product separately (with Calculation).<br>3. Wastage claimed in manufacturing process.<br>----- End of picture text -----<br>

  1. Justification of wastage. The Committee decided to wait for the comments/reply. The case stands deferred. Case No.:80/14/81Party Name: WORTHY Meet No/Date:23/81Status: ALC2/2019 ENGINEERING ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0710115198 Action by : 81 :01/81/050/00178/AM20/ :07/24/040/00092/AM20/ 23.07.2019 MSME Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 03.01.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments. The case stands deferred. Case No.:84/14/81Party Name: WELSPUN Meet No/Date:23/8[1-] Status: ALC2/2019 CORP LTD. ALC2/2019 Approved 04.03.2020 HQ File RLA File Lic.No/Date:34 10045309 :01/81/050/00182/AM20/ :34/24/040/00117/AM20/ 24.07.2019 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (TEC-3) as under: Slee is | Recommended Hee ln: Vince cade, <2|noream |URN gg | PRE mtg 82 Non Alloy Steel HR 1.07 MT/MT Non Alloy Coils/Plates of API Grade content of pies Steel ERW 10000.000 width of 600mm or more & | steel in export Pipe of API MT io cei thickness of 4.75mm or item | Grade more but not exceeding Alloy Steel 10000,000 Alloy Steel HR Coils/Plates es ae 73061929 | ERW Pipe of MT : 72253090 | of API Grade stack inveccionk API Grade (width of 600mmg or more) ‘tina 2 P Note: Grade & thickness of steelto match in import& exportitem. eee RA concerned may take suitable consequential action accordingly. RO 23 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020. pectoral “ .

Case No.:86/14/81Party Name: GALA Meet No/Date:23/8 1- Status: ALC2/2019 PRECISION ENGINEERING ALC2/2019 Approved PVT LTD. 04.03.2020 HQ File RLA File Lic.No/Date:03 10830588 83 :01/81/050/00184/AM20/ :03/94/040/00326/AM20/ 25.07.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by DPIIT vide U. O. No.: P-47011/12/2019-TSW dated 21.02.2020. (Copy enclosed)

Case No.:87/14/81Party Name: JINDAL SAW ssMeet No/Date:23/81Status: ALC2/2019 LIMITED ALC2/2019 Deferred 04.03.2020

HQ File RLA File Lic.No/Date:0510411348 Action by : :01/81/050/00185/AM20/ :05/23/040/00162/AM20/ 25.07.2019 Applicant

84 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per advice of Consultant (TEC-3):

  1. Break up of LSAW, Seamless & riser pipes. 2. Coating thickness of each layer for all types of pipes. 3. Surface area of pipes to be coated for all type of pipes.

Case No.:85/14/81Party Name: POLYCAB Meet No/Date:23/81Status: Deferred ALC2/2019 INDIA LIMITED ALC2/2019

04.03.2020

HQ File RLA File 85 :01/81/050/00183/AM20 :03/95/040/00418/AM20/

Lic.No/Date:03 10830578 Action by : 25.07.2019 Consultant (TEC-3)

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) for examination of the case on 11.10.2019 followed by a reminder on 02.03.2020. However, no comments have been received yet. Therefore, the Committee decided to wait for the comments.

Case No.:88/14/81Party Name: UNIVERSAL Meet No/Date:23/81Status: ALC2/2019 FLEXIBLES PVT. LTD. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0710115218 Action by : 86 :01/81/050/00186/AM20/ :07/24/040/00090/AM20/ 26.07.2019 Applicant

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred.

24 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020

==> picture [100 x 33] intentionally omitted <==

----- Start of picture text -----<br> is _stale<br>----- End of picture text -----<br>

==> picture [468 x 133] intentionally omitted <==

----- Start of picture text -----<br> ~~<br>CaseALC2/2019No.:89/14/81- |partyINDIA Name: PRIVATE GRUNER LIMITED ‘Meet(ALC2/2019 No/Date:23/81- Status:Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:0510411387 Action by :<br>:01/81/050/00187/AM20/ :05/23/040/00161/AM20/ 29.07.2019 Applicant<br>87 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet.<br>Hence, the Committee decided to wait for the complete set of application.<br>----- End of picture text -----<br>

Case No.:90/14/81Party Name: POLYCAB Meet No/Date:23/81Status: ALC2/2019 INDIA LIMITED ALC2/2019 Approved 04.03.2020 HQ File RLA File Lic.No/Date:03 10830685 88 :01/81/050/00188/AM20/ :03/95/040/00440/AM20/ 30.07.2019 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (TEC-3). (Copy enclosed).

Case No.:92/14/81Party Name: KNEST Meet No/Date:23/81Status: ALC2/2019 MANUFACTURERS LLP = ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:3 110067488 Action by : :01/81/050/00190/AM20/ :31/82/040/00035/AM20/ 31.07.2019 Applicant 89 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred. Case No.:91/14/81Party Name: POLYCAB Meet No/Date:23/81Status: ALC2/2019 INDIA LIMITED ALC2/2019 Approved 04.03.2020 HQ File RLA File Lic.No/Date:03 10830723 90 :01/81/050/00189/AM20/ :03/95/040/00452/AM20/ 31.07.2019 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 03.03.2020 given by Consultant (TEC-3). (Copy enclosed).

25 | Page 79

5, oawate Generdl Of

Case No.:93/14/81Party Name: ULTRA Meet No/Date:23/81Status: ALC2/2019 ENGINEERS ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:3 110067489 Action by : 9] :01/81/050/00191/AM20/ :31/83/040/0007 1/AM20/ 31.07.2019 Applicant

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred.

Case No.:95/14/81- Party Name: METALCARE Meet No/Date:23/81- Status:
ALC2/2019 ALLOYS PRIVATE ALC2/2019 Deferred
LIMITED 04.03.2020
HQ File RLA File Lic.No/Date:03 10830743 Action by :
92 :01/81/050/00193/AM20/ :03/95/040/00400/AM20/ 01.08.2019 Section

Decision: The Committee considered the case as per the agenda and noted that hard copy of the application has been received. Hence, the Committee decided to refer the case to Consultant (TEC-3) for examination & comments. The case stands deferred.

Case No.:97/14/81Party Name: BHARAT Meet No/Date:23/8 1 - Status: ALC2/2019 HEAVY ELECTRICALS ALC2/2019 Deferred LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:1110028609 Action by : 93 :01/81/050/00195/AM20/ :11/24/040/00005/AM20/ 02.08.2019 Applicant

Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 03.02.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant. The case stands deferred.

Case No.:96/14/81Party Name: APAR Meet No/Date:23/81Status: ALC2/2019 INDUSTRIES LIMITED ALC2/2019 Approved 04.03.2020 HQ File RLA File Lic.No/Date:03 10830785 :01/81/050/00194/AM20/ :03/94/040/00342/AM20/ 05.08.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 03.03.2020 given by Consultant (TEC-3) as under:

SI. ITCHS Sensrecei Ves Recommended Norms 1 | 74081190 | Copper Wire Rod : 8 mm Dia gees Net + 1% wastage_ 2__| 76011010 | Primary Unalloyed Alluminium Ingots/Sow/T-Bars_| Net + 1% wastage[Compound] | Net +2.5% wastage 3 | 39011090 |[XLPE] A___| 39019090 | Semi Conducting Compound ___| Net + 2.5% wastage RA concerned may take suitable consequential action accordingly. ; EE 26 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 | of F

<!-- page 27 skipped: FzErrorArgument: code=4: Attempt to use Leptonica from 2 threads at once! -->

:01/81/050/00199/AM20/ :03/95/040/00398/AM20/ 06.08.2019 Section Decision: The Committee considered the case as per agenda and decided to refer the case to Consultant (SKB) for examination as per advice of Consultant (TEC-3).

The case stands deferred.

Case No.:102/14/81Party Name: KEI Meet No/Date:23/8 1- Status: ALC2/2019 INDUSTRIES LIMITED ALC2/2019 Approved 04.03.2020 HQ File RLA File Lic.No/Date:05 10411459 99 :01/81/050/00200/AM20/ :05/23/040/00177/AM20/ 07.08.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 03.03.2020 given by Consultant (TEC-3). (Copy enclosed).

==> picture [464 x 70] intentionally omitted <==

----- Start of picture text -----<br> Case No.:104/14/81- Party Name: JAIN FGL Meet No/Date:23/81- Status:<br>ALC2/2019 METAL INDUSTRIES ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:0410165947 Action by :<br>100 :01/81/050/00202/AM20/ :04/2.4/040/00062/AM20/ 08.08.2019 MSME<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 27.11.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

The case stands deferred.

Case No.:107/14/81Party Name: CONSOLIDATED Meet No/Date:23/81Status: ALC2/2019 COIN COMPANY PRIVATE ALC2/2019 Deferred LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:05 10411489 :01/81/050/00205/AM20/_ :05/23/040/00178/AM20/ 09.08.2019

101 Decision: The Committee considered the case as per agenda and noted that a study group team has visited the factory premises of the applicant to study the manufacturing processes and ascertain wastages by visiting. The members of study group informed that they have submitted its report. However, the same is yet to be adopted. Hence, the Committee decided to take a decision on adoption of study group report.

Case No.:105/14/81Party Name: UKB Meet No/Date:23/81Status: ALC2/2019 ELECTRONICS PRIVATE §(ALC2/2019 Deferred LIMITED 04.03.2020 [ue HQ File RLA File Lic.No/Date:0510411476 Action by : :01/81/050/00203/AM20/ :05/24/040/00272/AM20/ 09.08.2019 Applicant

Decision: The Committee considered the case as per the agenda and the representative of MeitY

28 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020

==> picture [111 x 32] intentionally omitted <==

----- Start of picture text -----<br> EE osha isa<br>----- End of picture text -----<br>

informed in meeting that MeitY has sought certain information from the applicant. Therefore, the Committee decided to wait for the reply/comments.

Case No.:106/14/81Party Name: VEDANTA Meet No/Date:23/81-ALC2/2019 Status: ALC2/2019 LIMITED 04.03.2020 Approved HQ File RLA File Lic.No/Date:05 10411482 103 -0.1/81/050/00204/AM20_ :05/24/040/00265/AM20 09.08.2019 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (TEC-3). (Copy enclosed)

Case No.:108/14/81Party Name: ANGELS Meet No/Date:23/81Status: ALC2/2019 ALUMINIUM ALC2/2019 Deferred CORPORATION 04.03.2020 HQ File RLA File Lic.No/Date:03 10830950 Action by : :01/81/050/00206/AM20/ :03/94/040/00392/AM20/ 13.08.2019 Applicant 104 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

==> picture [470 x 282] intentionally omitted <==

----- Start of picture text -----<br> The case stands deferred.<br>Case No.:109/14/81- Party Name: BHARAT Meet No/Date:23/81- Status:<br>ALC2/2019 WIRE ROPES LIMITED ALC2/2019 Approved<br>04.03.2020<br>HQ File RLA File Lic.No/Date:03 10830967<br>:01/81/050/00207/AM20/ :03/94/040/00368/AM20/ 13.08.2019<br>Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms on<br>the recommendation of Consultant (TEC-3) as under:<br>is eee Bk OH 2 |e. ~~| Recommended<br>19 | Code __| Item ___ Quantity | [No.][|][Code][ ciceeei::] [ae]<br>5 Ciniveniaed Wire Rod Grade As per SION<br>hon 1 | 72139190 |SWRH82B Size 6.5 | C667<br>Non Alloy MM<br>/ Alloy S| eT A ee IOONSCS~S<br>TEEN : 95238.100 Wire Rod Grade As per SION<br>| SRE | 2 | 72139190 |SWRH82B Size 9.0 | C667<br>Ropes (All MM<br>type of a RE SaaS EARS TT TS IT ORS Ee ie aE<br>Cores) 3 | 79011100 | Zinc nestor<br>Note: Grade of import should match with export.<br>----- End of picture text -----<br>

==> picture [440 x 60] intentionally omitted <==

----- Start of picture text -----<br> RA concerned may take suitable consequential action accordingly.<br> 79 NC -2 Meeting No. 23/81 held on 04.03.2020 pao a<br>----- End of picture text -----<br>

29 | Page 79

==> picture [442 x 36] intentionally omitted <==

----- Start of picture text -----<br> Case No.:110/14/81- Party Name: ARMOR Meet No/Date:23/8 1- Status:<br>ALC2/2019 PLAST LIMITED ALC2/2019 Approved<br>04.03.2020<br>----- End of picture text -----<br>

HQ File RLA File

:01/81/050/00208/AM20/ —_—:07/24/040/00111/AM20/

Lic.No/Date:07101 15293 16.08.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (TEC-3) as under:

==> picture [468 x 224] intentionally omitted <==

----- Start of picture text -----<br> ITCHS<br>0 nig, ||...RPayPE Fsge | Ne_ | eeeRecommended :<br>Articles Made of 17-7PH Stainless 1.02 Kgs/Kg<br>Stainless Steel ee content in the<br>Tubes peck Tabene export product<br>73042200 | Net Content of _| 201679 | a3q¢0090 | Material Supplied<br>Import [Item] [In] Kg Freea of Cost By<br>Export [Product] Foreign Buyer As<br>PES: oe | eeeee | ET a er epeeFTP 4.19 heats en in<br>Note: The grade & diameter of SS to match in import and export product.<br>RA concerned may take suitable consequential action accordingly.<br>Case No.:113/14/81- Party Name: APAR Meet No/Date:23/81- Status:<br>ALC2/2019 INDUSTRIES LIMITED = ALC2/2019 Approved<br>04.03.2020<br>----- End of picture text -----<br>

HQ File RLA File Lic.No/Date:03 1083 1068 :01/81/050/0021 1/AM20 :03/94/040/00379/AM20 19.08.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (TEC-3) as under:

==> picture [468 x 198] intentionally omitted <==

----- Start of picture text -----<br> BE, | [WICHS] = ]=-- =P ae ne Omi<br>I__| 74081190 | [Copper] Wire Rod:8MmDia | Net + 1% wastage<br>10 | 2 _{ 76011010| Primary Unalloyed Alluminium Ingots/Sow/T-Bars _| Net + [wastage] 1%<br>7 [3 {39011090 | [XLPECompound] CNet+ 2.5% wastage<br>|<br>4 | 39019090| Semi Conducting Compound | Net + 2.5% wastage<br>9 _| 39042110 | PVCResin, Nettwastage<br>6T || 29173200| Plasticiser(DOP) CNet + 1% w astage<br>SOUS1090 | Nylon Fal 0 NO Ie [astage]<br>BOUT TG0G. |Epamy 2. i wens<br>9 | 38029019 | Calcined Clay CNet + 1% wastage<br>10| 39013000 |EVACo-Polymer Wet + 1% wastage<br>1112| _|28183000 | Aluminium Hydroxide Net + 1% wastage<br>Note: 39019090 | Polymers OfEthylene _ a inage<br>The applicant should import same type/grade of polymer as used in the export product.<br>----- End of picture text -----<br>

30 | Page 79

==> picture [205 x 17] intentionally omitted <==

----- Start of picture text -----<br> NC -2 Meeting No. 23/81 held on 04.03.2020<br>----- End of picture text -----<br>

==> picture [56 x 17] intentionally omitted <==

----- Start of picture text -----<br> ral of Foreign Tt<br>----- End of picture text -----<br>

2 ~ Meet No/Date:23/81Status: Case No.:111/14/81Party Name: PARAM ALC2/2019 INDUSTRIES ALC2/2019 Deferred 04.03.2020 HQ File RLA File File Lic.No/Date:03 10831052 10831052 Action by by : :01/81/050/00209/AM20/ :03/95/040/005 12/AM20/ 19.08.2019 Applicant

HQ File RLA File File Lic.No/Date:03 10831052 10831052 Action by by : :01/81/050/00209/AM20/ :03/95/040/005 12/AM20/ 19.08.2019 Applicant 108 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

The case stands deferred.

Case No.:112/14/81Party Name: PARAM Meet No/Date:23/8 1- Status: ALC2/2019 INDUSTRIES ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10831055 Action by : :01/81/050/00210/AM20/ :03/95/040/0051 1/AM20/ 19.08.2019 Applicant 109 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:115/14/81Party Name: AIRMASTER — Meet No/Date:23/81Status: ALC2/2019 TAPE INDUSTRIES ALC2/2019 Deferred PRIVATE LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:0410165978 Action by : :01/81/050/002 13/AM20/ :04/2.4/040/00086/AM20/ 20.08.2019 Applicant 110 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

The case stands deferred. Case No.:116/14/81Party Name: APAR Meet No/Date:23/8[1-] Status: ALC2/2019 INDUSTRIES ALC2/2019 Approved LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:34 10045379 HI -0.1/81/050/00214/AM20_ :34/24/040/00161/AM20 20.08.2019 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (TEC-3) as under:

==> picture [31 x 21] intentionally omitted <==

----- Start of picture text -----<br> ie<br>----- End of picture text -----<br>

==> picture [342 x 21] intentionally omitted <==

----- Start of picture text -----<br> eeLe “Recommended<br>----- End of picture text -----<br>

31 | Page 79

==> picture [206 x 34] intentionally omitted <==

----- Start of picture text -----<br> NC -2 Meeting No. 23/81 held on 04.03.2020<br>----- End of picture text -----<br>

==> picture [62 x 34] intentionally omitted <==

----- Start of picture text -----<br> BEC<br>----- End of picture text -----<br>

==> picture [468 x 455] intentionally omitted <==

----- Start of picture text -----<br> Conductor | 76011010 I tino dones wastage<br>Net Content: (1)<br>: * nee ;<br>21.985Aluminium Ingot High Carbon | 1.02Kgs/Kg=<br>76141000 MT (2) 74.830 Steel Wire content in the<br>| Aluminium Ingot : Rilonutee 2 72279090 | Rod of export product<br>0.933 MT (2) relevant<br>CarbonPatentedSteelHighWire (Rex Ride pea ae fee meat<br>7.879 i faeiind Net + 2%<br>Total weight 3 76011010 I rie as wastage<br>Note: SE ee | ere ee<br>1. The description of import item at SI. No. 2 may be amended as “High Carbon Steel<br>Wire Rod of relevant grade”.<br>2. Export product will contain Aluminium claded steel wire. :<br>RA concerned may take suitable consequential action accordingly.<br>ALC2/2019Case No.:121/14/81- Party Name: APAR Meet No/Date:23/81- Status:<br>INDUSTRIES LIMITED ALC2/2019 Approved<br>04.03.2020<br>HQ File RLA File Lic.No/Date:34 10045382<br>:01/81/050/00219/AM20 __:34/24/040/00162/AM20 21.08.2019<br>Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as<br>per written comments dated 04.03.2020 given by Consultant (TEC-3) as under:<br>PEIIOMR[gen en PR ee Recommended<br>2 [Gide one Te<br>Galvanised Steel<br>Stranded Wire (GSW) Galvarded; As applied<br>Net : High Carbon<br>73121030 content : Galvanised 450.000 tect Wiehe with 1%<br>| Highof Carbon: Steel Wire Kiilometer: 72172010 thicknessae of 18 wastage<br>18SWGa thicknessand belowof SWG and<br>EINE ARR ereensS eeMe fap)bel eee eres<br>----- End of picture text -----<br>

==> picture [506 x 188] intentionally omitted <==

----- Start of picture text -----<br> Case No.:120/14/81- Party Name: K J V ALLOYS Meet No/Date:23/81- Status:<br>ALC2/2019 CONDUCTORS PVT. LTD. ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:5010002551 Action by:<br>113 :01/81/050/002 18/AM20/ :50/24/040/00006/AM20/ 21.08.2019 Applicant<br>Decision: The Committee considered the case as per agenda and noted that a deficiency letter<br>seeking certain information as raised by DPIIT was sent to the applicant on 26.12.2019. However, no<br>reply has been received yet. Therefore, the Committee decided to remind the applicant.<br>32 The case stands deferred. Bi<br>| Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 Ny. Direct a soot cig<br>----- End of picture text -----<br>

Case No.:117/14/81Party Name: MJM FINE Meet No/Date:23/81Status: ALC2/2019 ENCLOSURES PRIVATE — ALC2/2019 Deferred LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:0710115311 Action by : :01/81/050/00215/AM20/ :07/24/040/001 16/AM20/ 21.08.2019 Applicant

114 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:118/14/81Party Name: TECHNO Meet No/Date:23/81Status: ALC2/2019 COAT SYSTEMS (INDIA) —ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0810146018 Action by : :01/81/050/00216/AM20/ :08/24/040/00162/AM20/ 21.08.2019 Applicant

115 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:119/14/81Party Name: TUBACEX Meet No/Date:23/81Status: ALC2/2019 PRAKASH INDIA ALC2/2019 Deferred PRIVATE LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:03 10831123 Action by : :01/81/050/00217/AM20/ :03/95/040/00480/AM20/ 21.08.2019 Applicant

116 Peeision: The Committee considered the case as pper the a g enda and noted that the hard co p y of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:122/14/81Party Name: STERLITE Meet No/Date:23/81Status: ALC2/2019 POWER TRANSMISSION = ALC2/2019 Approved LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:03 10831209 | 117 :01/81/050/00220/AM20/ :03/95/040/00389/AM20/ 23.08.2019 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments given by DPIIT vide U. O. No.: P-47011/3/2019-TSW dated 21.01.2020. (Copy enclosed)

33 | Page 79

NC -2 Meeting No. 23/81 held on 04.03.2020 a

Case No.:123/14/81Party Name: POLYCAB Meet No/Date:23/81Status: ALC2/2019 INDIA LIMITED ALC2/2019 Approved 04.03.2020

HQ File RLA File Lic.No/Date:03 10831229 118 :01/81/050/00221/AM20/ :03/95/040/00520/AM20/ 26.08.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (TEC-3). (Copy enclosed)

Case No.:125/14/81Party Name: WAAREE Meet No/Date:23/81Status: ALC2/2019 ENERGIES LTD. ALC2/2019 Deferred 04.03.2020

HQ File RLA File Lic.No/Date:5210043159 Action by : :01/81/050/00223/AM20/ :52/24/040/00027/AM20/ 26.08.2019 Applicant 119 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per advice of Consultant (TEC-3):

  1. Calculations of requirement of each raw material with justification.

Case No.:124/14/81Party Name: GOEL STEELS Meet No/Date:23/81Status: ALC2/2019 ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:05 10411644 :01/81/050/00222/AM20/ :05/23/040/00207/AM20/ 27.08.2019

120 Decision: The Committee considered the case as per agenda and noted that a study group team has visited the factory premises of the applicants manufacturing same/similar products to study the manufacturing processes and ascertain wastages by visiting. The members of study group informed that they have submitted its report. However, the same is yet to be adopted. Hence, the Committee decided to take a decision on adoption of study group report.

Case No.:128/14/81Party Name: DIAMOND Meet No/Date:23/8 1- Status: ALC2/2019 ENGINEERING ALC2/2019 Deferred (CHENNAI) PVT LTD 04.03.2020 HQ File RLA File Lic.No/Date:0410166025 Action by : 121 :01/81/050/00226/AM20/ :04/24/040/00085/AM20/ 28.08.2019 Applicant

Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the applicant on 06.02.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the applicant.

34 | Page 79

: neval of Fovsign Te

Case No.:126/14/81Party Name: GANGES Meet No/Date:23/81Status: ALC2/2019 INTERNATIONALE (P) ALC2/2019 Deferred LTD., 04.03.2020 HQ File RLA File Lic.No/Date:0410166014 Action by : :01/81/050/00224/AM20/ :04/24/040/00090/AM20/ 28.08.2019 Applicant 122 Decision: ‘The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

The case stands deferred. Case No.:127/14/81Party Name: JINDAL SAW Meet No/Date:23/81Status: ALC2/2019 LIMITED ALC2/2019 Approved 04.03.2020 HQ File RLA File Lic.No/Date:05 10411659 123 :01/81/050/00225/AM20/ :05/23/040/00206/AM20/ 28.08.2019 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (TEC-3). (Copy enclosed).

Case No.:129/14/81Party Name: POLYCAB Meet No/Date:23/81Status: ALC2/2019 INDIA LIMITED ALC2/2019 Approved 04.03.2020 HQ File RLA File Lic.No/Date:03 10831311 124 :01/81/050/00227/AM20/ :03/95/040/00548/AM20/ 29.08.2019

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (TEC-3). (Copy enclosed).

Case No.:131/14/81Party Name: ICON POWER Meet No/Date:23/81Status: ALC2/2019 SOLUTIONS PRIVATE ALC2/2019 Approved LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:05 10411713 :01/81/050/00229/AM20/ :05/23/040/00214/AM20/ 02.09.2019

Decision: The Committee considered the case as per agenda and noted that the case was referred to 12 DPIIT but DPIIT suggested to refer the matter to DHI. The representative of DHI desired to study the 5 case and wanted the file to be referred to him. However, the matter was deliberated in meeting and the Committee observed that the import item can be allowed as per GN-4. Therefore, the Committee decided to fix the ad-hoc norms on the basis of inputs given by Technical Authority as under: [ooo ee ee Eh) ea eee ee Recommended Coie | memeHARNESSee Onaniity nyo.| rede wii — GEN __| | Number_155.000 a ee CGE6E22H9F-BA239 (Connector)14|As per GN-4

35 | Page 79

==> picture [65 x 26] intentionally omitted <==

----- Start of picture text -----<br> 4<br>----- End of picture text -----<br>

==> picture [452 x 44] intentionally omitted <==

----- Start of picture text -----<br> eae i)| aes eee ei Pe CGE6E22H9Z-B14- | AsperGN<br>PDU Part ee ESAs _A239(Connector<br>No: (R10795 MM( WIRE) | AsperGN<<br>----- End of picture text -----<br>

Case No.:132/14/81Party Name: JAIN FGL Meet No/Date:23/8 1- Status: ALC2/2019 METAL INDUSTRIES ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0510411714 Action by : 126 :01/81/050/00230/AM20/ :05/23/040/00546/AM19/ 02.09.2019 MSME

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME for examination of the case on 27.11.2019. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

The case stands deferred.

Case No.:134/14/81Party Name: NUEVOSOL Meet No/Date:23/81Status: ALC2/2019 ENERGY PVT LTD ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0910067962 Action by : :01/81/050/00232/AM20/ :09/24/040/00257/AM20/ 03.09.2019 Applicant 127 Necision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

The case stands deferred.

Case No.:135/14/81Party Name: NUEVOSOL Meet No/Date:23/81Status: ALC2/2019 ENERGY PVT LTD ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0910067963 Action by : :01/81/050/00233/AM20/ :09/24/040/00256/AM20/ 03.09.2019 Applicant 128 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 22.11.2019 followed by a reminder on 28.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

==> picture [482 x 100] intentionally omitted <==

----- Start of picture text -----<br> Case No.:137/14/81- Party Name: JINDAL INDIA Meet No/Date:23/81- Status:<br>ALC2/2019 LIMITED ALC2/2019 Approved<br>129 04.03.2020<br>HQ File RLA File Lic.No/Date:02 10209422<br>:01/81/050/00235/AM20/ :02/24/040/00089/AM20/ 06.09.2019<br>ea)<br>36 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 Directora , i Oreig!<br>----- End of picture text -----<br>

Decision: The Committee consideredthe case as per agenda and decided to fix the ad-hoc norms as per written comments dated 04.03.2020 given by Consultant (SKB). (Copy enclosed).

==> picture [447 x 241] intentionally omitted <==

----- Start of picture text -----<br> Case No.:138/14/81- Party Name: JINDAL SAW Meet No/Date:23/81- Status:<br>ALC2/2019 LIMITED ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:0510411774 Action by :<br>:01/81/050/00236/AM20/ :05/23/040/0022 1/AM20/ 06.09.2019 TEC-3<br>Decision: The Committee considered the case as per agenda agenda and noted that a copy of application application was<br>sent to Consultant (TEC-3) for examination of the the case on 13.12.2019. However, no comments have<br>been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting<br>the comments.<br>The case stands deferred.<br>Case No.:136/14/81- Party Name: POLYCAB Meet No/Date:23/81- Status:<br>ALC2/2019 INDIA LIMITED ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:03 10831395 Action by :<br>:01/81/050/00234/AM20/ :03/95/040/00556/AM20/ 06.09.2019 TEC-3<br>----- End of picture text -----<br>

130 Decision: The Committee considered the case as per agenda agenda and noted that a copy of application application was sent to Consultant (TEC-3) for examination of the the case on 13.12.2019. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.

131 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) for examination of[the][case][on][25.11.2019.][However,][no][comments][have] been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.

==> picture [445 x 68] intentionally omitted <==

----- Start of picture text -----<br> Case No.:140/14/81- Party Name: WELSPUN Meet No/Date:23/81- Status:<br>ALC2/2019 CORP LTD. ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:3410045427 Action by :<br>:01/81/050/00238/AM20/ :34/24/040/00166/AM20/ 09.09.2019 TEC-3<br>----- End of picture text -----<br>

132 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) for examination of the case on 11.10.2019 followed by a reminder on 02.03.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

==> picture [467 x 85] intentionally omitted <==

----- Start of picture text -----<br> Case No.:141/14/81- Party Name: APAR Meet No/Date:23/81- Status:<br>ALC2/2019 INDUSTRIES LIMITED ALC2/2019 Deferred<br>04.03.2020<br>133 TQ File RLA File Lic.No/Date:0310831497 Action by :<br>:01/81/050/00239/AM20/ :03/94/040/00450/AM20/ 12.09.2019 TEC-3<br>Decision: The Committee considered the case as per agenda and noted that a copy of application was<br>----- End of picture text -----<br>

==> picture [346 x 29] intentionally omitted <==

----- Start of picture text -----<br> 37 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020<br>----- End of picture text -----<br>

==> picture [71 x 29] intentionally omitted <==

----- Start of picture text -----<br> P- e<br>----- End of picture text -----<br>

sent to Consultant (TEC-3) for examination of the case on 11.10.2019 followed by a reminder on 02.03.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case No.:142/14/81- Party Name: POLYCAB Meet No/Date:23/81- Status:
ALC2/2019 INDIA LIMITED ALC2/2019 Deferred
04.03.2020
HQ File RLA File Lic.No/Date:0310831527 Action by :
:01/81/050/00240/AM20/ :03/95/040/00584/AM20/ 13.09.2019 TEC-3

134 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 19.11.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.

Case No.:150/14/81- Party Name: WELSPUN Meet No/Date:23/81- Status:
ALC2/2019 CORP LTD. ALC2/2019 Deferred
04.03.2020
HQ File RLA<br>File Lic.No/Date:3410045461 — Action by:
:01/81/050/00248/AM20/ :34/24/040/00165/AM20/ 19.09.2019 TEC-3
135 Decision: The Committee considered the case as peragenda and noted that acopyofapplication application was
sent to Consultant (TEC-3) for examination of the case on 11.10.2019 followed by a reminder on
02.03.2020. However, no comments have been received yet. Hence, the Committee decided to wait
for the comments.
The case stands deferred.
Case No.:156/14/81- Party Name: APAR Meet No/Date:23/81- Status:
ALC2/2019 INDUSTRIES LIMITED ALC2/2019 Deferred
04.03.2020
HQ File RLA File Lic.No/Date:0310831709 Action by :
:01/81/050/00254/AM20/ :03/94/040/0048 1/AM20/ 23.09.2019 TEC-3
136 Necision: TheCommitteeconsidered the case as peragenda and noted that a copyofapplication application was
sent to Consultant (TEC-3) for examination of the case on 11.10.2019 followed by a reminder on
02.03.2020. However, no comments have been received yet. Hence, the Committee decided to wait
forthecomments.

135 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) for examination of the case on 11.10.2019 followed by a reminder on 02.03.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. The case stands deferred.

The case stands deferred. Case No.:158/14/81Party Name: CONSOLIDATED Meet No/Date:23/81Status: ALC2/2019 COIN COMPANY PRIVATE ALC2/2019 Deferred 137 LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:0510411905 | :01/81/050/00256/AM20/ :05/23/040/00244/AM20/ 23.09.2019 38 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 _ Director General of Tore ade

visitedDecision:The Committee considered the case as per agenda and noted that a study group team has the factory premises of the applicant to study the manufacturing processes and ascertain wastages by visiting. The members of study group informed that they have submitted its report. However, the same is yet to be adopted. Hence, the Committee decided to take a decision on adoption of study group report.

Case No.:161/14/81Party Name: POLYCAB Meet No/Date:23/81Status: ALC2/2019 INDIA LIMITED ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10831823 Action by : 138 :01/81/050/00259/AM20/ :03/95/040/00636/AM20/ 26.09.2019 TEC-3 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 19.11.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.

The case stands deferred.

==> picture [467 x 110] intentionally omitted <==

----- Start of picture text -----<br> Case No.:169/14/81- Party Name: DISHA AUTO Meet No/Date:23/81- Status:<br>ALC2/2019 COMPONENTS PVT.LTD. ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:03 10831977 Action by :<br>139 :01/81/050/00267/AM20/ :03/94/040/005 13/AM20/ 03.10.2019 MSME<br>Decision: The Committee considered the case as per agenda and noted that the applicant’s reply was<br>referred to MSME on 08.01.2020 for examination of the case. Hoverer, no comments have been<br>received yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br>----- End of picture text -----<br>

The case stands deferred.

Case No.:170/14/81Party Name: POLYCAB Meet No/Date:23/81Status: ALC2/2019 INDIA LIMITED ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10832082 Action by : :01/81/050/00268/AM20/ :03/95/040/00683/AM20/ 07.10.2019 TEC-3 140 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 19.11.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.

==> picture [464 x 56] intentionally omitted <==

----- Start of picture text -----<br> ALC2/2019Case No.:1/20/81- Party Name: NORDEX Meet No/Date:23/81- Status:<br>14] INDIA PRIVATE LIMITED ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:0710115856 Action by :<br>----- End of picture text -----<br>

==> picture [55 x 31] intentionally omitted <==

----- Start of picture text -----<br> 39 | Page 79<br>----- End of picture text -----<br>

==> picture [204 x 31] intentionally omitted <==

----- Start of picture text -----<br> NC -2 Meeting No. 23/81 held on 04.03.2020<br>----- End of picture text -----<br>

==> picture [78 x 31] intentionally omitted <==

----- Start of picture text -----<br> Ba. ae<br>----- End of picture text -----<br>

:01/81/050/00353/AM20/ :07/24/040/002 16/AM20/

13.12.2019 Applicant

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.

The case stands deferred.

==> picture [467 x 122] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case|No.:3/20/81-|Party|Name:|ENGINEERS|Meet|No/Date:23/81-|Status:|
|ALC2/2019|INDIA|ALC2/2019|Deferred|
|04.03.2020|
|HQ|File|RLA|File|Lic.No/Date:0510412919|Action|by|:|
|:01/81/050/00355/AM20/|:05/23/040/0034|1/AM20/|16.12.2019|Applicant|
|142|Decision:|The|Committee|considered|the|case|as|per|the|agenda|and|noted|that|the|hard|copy|of|
|application|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on|
|03.01.2020.|However,|no|information|has|been|received|yet.|Therefore,|the|Committee|decided|to|
|remind|the|applicant|for|submitting|the|complete|set|of application.|

----- End of picture text -----<br>

==> picture [463 x 68] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||
|---|---|---|---|---|---|---|---|
|Case|No.:2/20/81-|Party Name:|METALLOYS|—|Meet|No/Date:23/81-|Status:|
|ALC2/2019|RECYCLING|LIMITED|ALC2/2019|Approved|
|04.03.2020|
|HQ|File|RLA|File|Lic.No/Date:03|10833431|
|143|:01/81/050/00354/AM20/|:03/95/040/00796/AM20/|16.12.2019|

----- End of picture text -----<br>

Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments dated 03.03.2020 given by Consultant (SKB). (Copy enclosed).

==> picture [466 x 96] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case No.:4/20/81-|Party Name:|METALLOYS|—|Meet|No/Date:23/81-|Status:|
|ALC2/2019|RECYCLING|LIMITED|ALC2/2019|Approved|
|04.03.2020|
|HQ|File|RLA|File|Lic.No/Date:03|10833435|
|144|:01/81/050/00356/AM20/|:03/95/040/00675/AM20/|16.12.2019|
|Decision:|The|Committee|considered|the|case|as|per|agenda|and|decided|to|fix|the|ad-hoc|norms|as|
|per|written|comments|dated|03.03.2020|given|by|Consultant|(SKB).|(Copy|enclosed).|

----- End of picture text -----<br>

==> picture [500 x 122] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case|No.:5/20/81-|Party Name:|POLYCAB|Meet|No/Date:23/81-|Status:|
|ALC2/2019|INDIA|LIMITED|ALC2/2019|Deferred|
|04.03.2020|
|14510|File|RLA|File|Lic.No/Date:03 10833440||Action by|:|
|:01/81/050/00357/AM20/|:03/95/040/00900/AM20/|16.12.2019|TEC-3|
|Decision:|The|Committee|considered|the|case|as|per|agenda|and|noted|that|a|copy|of|es|
|40|||Page|79|NC|-2|Meeting|No.|23/81|held|on|04.03.2020|tor|Gel|Te|

----- End of picture text -----<br>

40 | Page 79

<!-- page 41 skipped: FzErrorArgument: code=4: Attempt to use Leptonica from 2 threads at once! -->

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 06.01.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments.

Case No.:23/20/81Party Name: AGRAWAL Meet No/Date:23/81Status: ALC2/2019 METAL WORKS PVT. LTD ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:33 10030628 :01/81/050/00375/AM20/ :33/24/040/00027/AM20/ 20.12.2019 150 Decision: The Committee considered the case as per agenda and noted that a copy of papplication was sent to Consultant (TEC-3) on 27.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (TEC-3) for expediting the comments. The case stands deferred. Case No.:10/20/81Party Name: RAJ METAL ~— Meet No/Date:23/81Status: ALC2/2019 INDUSTRIES ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0210209634 Action by : :01/81/050/00362/AM20/ :02/24/040/00142/AM20/ 20.12.2019 Applicant

!51 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per advice of MSME:

  1. Percentage of lead content in import & export items. The case stands deferred.

Case No.:11/20/81Party Name: RAJ METAL Meet No/Date:23/81Status: ALC2/2019 INDUSTRIES ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:02 10209635 Action by : :01/81/050/00363/AM20/ :02/24/040/00143/AM20/ 20.12.2019 Applicant 152 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per advice of MSME: 1. Percentage of lead content in import & export items. The case stands deferred. Case No.:12/20/81Party Name: WAAREE Meet No/Date:23/81Status: i353 ALC2/2019 ENERGIES LTD. 04.03.2020ALC2/2019 Deferred 42 HQ File RLA File Lic.No/Date:5210043274 Actionae | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 : ot

:01/81/050/00364/AM20/ :52/24/040/00052/AM20/ 20.12.2019 Applicant

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set ofapplication.

The case stands deferred.

Case No.:13/20/81Party Name: JAY Meet No/Date:23/81Status: ALC2/2019 BHAWANI METAL ALC2/2019 Deferred INDUSTRIES 04.03.2020 HQ File RLA File Lic.No/Date:03 10833602 Action by : 154 :01/81/050/00365/AM20/ :03/94/040/00765/AM20/ 23.12.2019 Applicant Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application. The case stands deferred. Case No.:14/20/81Party Name: STAIN LAY Meet No/Date:23/8 1- Status: ALC2/2019 INDIA PVT. LTD. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0510413038 Action by : 155 :01/81/050/00366/AM20/ :05/24/040/00594/AM20/ 23.12.2019 DPUT

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 12.02.2020 for examination of the case. However, no comments have been received

yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.

The case stands deferred. Case No.:18/20/81Party Name: CHINA STEEL Meet No/Date:23/81Status: ALC2/2019 CORPORATION INDIA ALC2/2019 Approved PRIVATE LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:34 10045742 :01/81/050/00370/AM20/_ :34/24/040/00279/AM20/ 24.12.2019

Decision: The Committee considered the case as per agenda and noted the comments given by 156 Consultant (SKB). The Committee also noted that earlier similar cases were approved @ 1.5% wastage on the recommendation of MoS. Therefore, the Committee decided to fix the ad-hoc norms on repeat basis as approved for AA No. 3410043636 dated 14.11.2017 in NC-2 M. No. 05/81 dated 12.6.2019 @ 1.5% wastage on the recommendation of the representative of MoS with the condition that the thickness and grade of import and export items to match.

==> picture [55 x 29] intentionally omitted <==

----- Start of picture text -----<br> 43 | Page 79<br>----- End of picture text -----<br>

==> picture [339 x 29] intentionally omitted <==

----- Start of picture text -----<br> NC -2 Meeting No. 23/81 held on 04.03.2020 5s) a<br>----- End of picture text -----<br>

==> picture [466 x 116] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/20/81- Party Name: JAIN FGL Meet No/Date:23/8 1 - Status:<br>ALC2/2019 METAL INDUSTRIES ALC2/2019 Deferred<br>04.03.2020<br>157 :01/81/050/00372/AM20/HQ File :04/24/040/00141/AM20/RLA File 24.12.2019Lic.No/Date:0410166392 ActionMSME by:<br>Decision: The Committee considered the case as per agenda and noted that a copy of application was<br>sent to MSME on 24.02.2020 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>----- End of picture text -----<br>

Case No.:17/20/81Party Name: Meet No/Date:23/8 ALC2/2019 1- Status: MAHARASHTRA ALC2/2019 Deferred SEAMLESS LIMITED 04.03.2020 158 HQ File RLA File Lic.No/Date:0510413061 Action by : :01/81/050/00369/AM20/ :05/24/040/0059 1/AM20/ 24.12.2019 Section Decision: The Committee considered the case as per agenda and decided to refer the case to Consultant (TEC-3) for examination & comments. The case stands deferred. Case No.:21/20/81Party Name: MITTAL COIN Meet No/Date:23/81Status: ALC2/2019 PRIVATE LIMITED ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:5610005766 Action by: :01/81/050/00373/AM20/ :56/24/040/00024/AM20/ 24.12.2019 Applicant 159 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per advice of Consultant (SKB):

  1. What is the percentage of copper in copper scrap DRUID? Please submit documentary proof? 2. What is the purity of copper in the export product?

Case No.:16/20/81Party Name: PRECISION Meet No/Date:23/8 ALC2/2019 1- Status: METALS ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10833650 Action by: 160 :01/81/050/00368/AM20/ :03/95/040/009 1 8/AM20/ 24.12.2019 Applicant Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application.

The case stands deferred. 44 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020

==> picture [130 x 68] intentionally omitted <==

----- Start of picture text -----<br> ae<br>Directorate Ge justty<br>----- End of picture text -----<br>

Case No.:19/20/81Party Name: SIEMENS Meet No/Date:23/8 ALC2/2019 1- Status: GAMESA RENEWABLE ALC2/2019 Deferred POWER PRIVATE LIMITED — 04.03.2020 HQ File RLA File Lic.No/Date:0410166390 Action by : :01/81/050/00371/AM20/ :04/24/040/00142/AM20/ 24.12.2019 Applicant 16] Decision: The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per advice of Consultant (TEC-1):

  1. Net weight of export product. 2. Material balance between import & export in weight term. 3. Percentage wastage involved. 4. List of components, raw material, consumables separately.

Case No.:15/20/81Party Name: VAKKAL Meet No/Date:23/8 1- Status: ALC2/2019 IMPEX PVT. LTD. ALC2/2019 Deferred 04.03.2020 162 HQ File RLA File Lic.No/Date:0710115921 Action by : :01/81/050/00367/AM20/ :07/24/040/00219/AM20/ 24.12.2019 Section

Decision: The Committee considered the case as per agenda and decided to refer the case to Consultant (SKB) for examination.

The case stands deferred. ALC2/2019Case No.:22/20/81Party Name: UPR Meet No/Date:23/81Status: ENGINEERING PRIVATE ALC2/2019 Deferred LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:03 10833737 Action by : 163 :01/81/050/00374/AM20/ :03/95/040/00946/AM20/ 27.12.2019 Applicant

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 03.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind the applicant for submitting the complete set of application. The case stands deferred.

ALC2/2019Case No.:3/23/81Party Name: LASER Meet No/Date:23/81Status: POWER & INFRA ALC2/2019 Deferred PRIVATE LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:0210209711 Action by : 164 :01/81/050/004 15/AM20/ :02/24/040/00172/AM20/ 23.01.2020 Applicant

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred.

45 | Page 79

==> picture [73 x 28] intentionally omitted <==

----- Start of picture text -----<br> ee ZS2 ee<br>----- End of picture text -----<br>

==> picture [466 x 281] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/23/81- Party Name: MITTAL Meet No/Date:23/81- Status:<br>ALC2/2019 APPLIANCES LIMITED ALC2/2019 Approved<br>04.03.2020<br>HQ File RLA File Lic.No/Date:5610005798<br>:01/81/050/00414/AM20/ —_—:56/24/040/00034/AM20/ —-.23.01.2020<br>Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms on<br>165 the recommendation of Consultant (TEC-3) as under:<br>TOS a)ee ee TOS |e = | ee<br>2 aa scant cian "eed lemmieamaieen ae<br>ae Refined Copper 200.000 Copper Scrap 1.05 Kgs/Kg<br>aie aT POS Vea]<br>RA concerned may take suitable consequential action accordingly.<br>Case No.:1/23/81- Party Name: TOSHIBA Meet No/Date:23/81- Status:<br>ALC2/2019 TRANSMISSION & ALC2/2019 Deferred<br>DISTRIBUTION SYSTEMS 04.03.2020<br>HQ File RLA File Lic.No/Date:0910068405 Action by :<br>166 :01/81/050/004 13/AM20/ :09/24/040/005 13/AM20/ 23.01.2020 DHI<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DHI on 02.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case No.:7/23/81Party Name: ENGINEERS Meet No/Date:23/81Status: ALC2/2019 INDIA ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0510413444 Action by : 167 :01/81/050/00419/AM20/ :05/23/040/00399/AM20/ 24.01.2020 Applicant

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:5/23/81Party Name: HYDRO Meet No/Date:23/81Status: ALC2/2019 PNEUMATIC ACCESSORIES ALC2/2019 Deferred (1) PVT. LTD. 04.03.2020 HQ File RLA File Lic.No/Date:03 10834450 Action by : 168 :01/81/050/00417/AM20/_ :03/94/040/00868/AM20/ 24.01.2020 Applicant

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred.

==> picture [119 x 53] intentionally omitted <==

----- Start of picture text -----<br> BK<br>Dy. Director General of Foreign Tr<br>----- End of picture text -----<br>

46 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020

Case No.:6/23/81Party Name: SAFEBARRIER Meet No/Date:23/8 1 - ‘Status: ALC2/2019 INTERNATIONAL ALC2/2019 Deferred PRIVATE LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:03 10834468 Action by : 169 :01/81/050/00418/AM20/ :03/95/040/01040/AM20/ 24.01.2020 Applicant Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:4/23/81Party Name: UNIVERSAL — Meet No/Date:23/81Status: ALC2/2019 HEAT EXCHANGERS ALC2/2019 Deferred LIMITED 04.03.2020 170 HQ File RLA File Lic.No/Date:3210079361 Action by : :01/81/050/00416/AM20/ :32/21/040/00209/AM20/ 24.01.2020 Section

Decision: The Committee considered the case as per agenda and decided to refer the case to DPIIT for examination & comments.

Case No.:8/23/81Party Name: APAR Meet No/Date:23/8 1- Status: ALC2/2019 INDUSTRIES LIMITED ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10834499 Action by : 17] :01/81/050/00420/AM20/ :03/94/040/00900/AM20/ 28.01.2020 TEC-3 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 28.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

The case stands deferred.

ALC2/2019Case No.:9/23/81Party Name: AXORA Meet No/Date:23/81Status: RESOURCES LIMITED. ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0210209724 Action by : 172. :01/81/050/0042 1/AM20/ :02/24/040/00173/AM20/ 28.01.2020 Applicant Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

47 | Page 79

==> picture [48 x 18] intentionally omitted <==

----- Start of picture text -----<br> Om AL<br>----- End of picture text -----<br>

Case No.:10/23/81- Party Name: SHIVALIK Meet No/Date:23/81- Status:
ALC2/2019 BIMETAL CONTROLS ALC2/2019 Deferred
LTD 04.03.2020
HQ File RLA File Lic.No/Date:0510413468 Action by :
:01/81/050/00422/AM20/ :05/24/040/00691/AM20/ 29.01.2020 Applicant

173 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:11/23/81- Party Name: SHIVALIK Meet No/Date:23/81- Status:
ALC2/2019 BIMETALCONTROLS ALC2/2019 Deferred
LTD 04.03.2020
HQ File RLA File Lic.No/Date:0510413469 Action by :
:01/81/050/00423/AM20/ :05/24/040/00692/AM20/ 29.01.2020 Applicant

174 Yecision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:12/23/81- Party Name: TOSHIBA Meet No/Date:23/81- Status:
ALC2/2019 TRANSMISSION & ALC2/2019 Deferred
DISTRIBUTION SYSTEMS 04.03.2020
HQ File RLA File Lic.No/Date:0910068428 Action by :
175 :01/81/050/00424/AM20/ :09/24/040/00535/AM20/ 29.01.2020 DHI

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DHI on 02.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case No.:14/23/81Party Name: MICROMAX Meet No/Date:23/81Status: ALC2/2019 INFORMATICS LIMITED = ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:05 10413524 Action by : :01/81/050/00426/AM20/ :05/24/040/00704/AM20/ 04.02.2020 Applicant

176 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

48 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020

==> picture [118 x 64] intentionally omitted <==

----- Start of picture text -----<br> WW ras<br>ro scratiagtr s e cea<br>----- End of picture text -----<br>

==> picture [468 x 125] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/23/81- Party Name: PEARL Meet No/Date:23/81- Status:<br>ALC2/2019 INSULATIONS PRIVATE ALC2/2019 Deferred<br>LIMITED 04.03.2020<br>HQ File RLA File Lic.No/Date:0710116093 Action by :<br>:01/81/050/00425/AM20/ :07/24/040/00258/AM20/ 04.02.2020 Applicant<br>177 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the applicant and in this regard, an email was sent on<br>26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait<br>for the complete set of application.<br>----- End of picture text -----<br>

Case No.:15/23/81Party Name: POLYCAB Meet No/Date:23/81Status: ALC2/2019 INDIA LIMITED ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:03 10834702 Action by : :01/81/050/00427/AM20/ :03/95/040/01061/AM20/ 07.02.2020 Applicant 178 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:16/23/81Party Name: BAOSTEEL Meet No/Date:23/81Status: ALC2/2019 INDIA COMPANY ALC2/2019 Deferred PRIVATE LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:03 10834749 Action by : :01/81/050/00428/AM20/ :03/94/040/00937/AM20/ 10.02.2020 Applicant 179 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

==> picture [473 x 194] intentionally omitted <==

----- Start of picture text -----<br> Case No.:17/23/81- Party Name: HINDALCO Meet No/Date:23/81- Status:<br>ALC2/2019 INDUSTRIES LIMITED ALC2/2019 Approved<br>04.03.2020<br>HQ File RLA File Lic.No/Date:02 10209751<br>:01/81/050/00429/AM20/ :02/24/040/00180/AM20/ 11.02.2020<br>180 The Committee considered the case as per agenda and decided to fix the ad-hoc norms on the<br>recommendation of Consultant (TEC-3) as under:<br>TCHS|[0 T TITCHS‘|Import|Recommended .<br>| Quantty | Code | item _| [Quantity]<br>74031100 |Continuous cast copper rod/ | 3909.804 |74020090| Copper| 1.02 Kgs/Kg<br>49 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 -<br>----- End of picture text -----<br>

==> picture [385 x 43] intentionally omitted <==

----- Start of picture text -----<br> “Copper Wire Rod/Cathode |MT | ~—__| Anodes | content of Cuin<br>containing 99.2% to both the import and<br>99.7% Cu oie SRYah oor Co he Liege export products<br>----- End of picture text -----<br>

Case No.:18/23/81Party Name: APAR Meet No/Date:23/81Status: ALC2/2019 INDUSTRIES LIMITED ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0310834830 Action by : :01/81/050/00430/AM20/ :03/94/040/0093 8/AM20/ 13.02.2020 Applicant 181 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

The case stands deferred.

Case No.:19/23/81Party Name: MITTAL COIN Meet No/Date:23/81Status: ALC2/2019 PRIVATE LIMITED ALC2/2019 Deferred 04.03.2020

HQ File RLA File Lic.No/Date:5610005822 Action by : :01/81/050/0043 1/AM20/ :56/24/040/00036/AM20/ 13.02.2020 Applicant

182 Necision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:20/23/81Party Name: ASTA INDIA — Meet No/Date:23/81Status: ALC2/2019 PRIVATE LIMITED ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:3410045874 Action by : :01/81/050/00432/AM20/ :34/24/040/003 1 8/AM20/ 14.02.2020 Applicant

183 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case No.:21/23/81Party Name: ASTA INDIA — Meet No/Date:23/81Status: ALC2/2019 PRIVATE LIMITED ALC2/2019 Deferred 184 04.03.2020 HQ File RLA File Lic.No/Date:3410045876 Action by : :01/81/050/00433/AM20/ :34/24/040/00346/AM20/ 14.02.2020 Applicant 50 | Page 79 Page 79 79 NC -2 Meeting No. 23/81 -2 Meeting No. 23/81 Meeting No. 23/81 No. 23/81 23/81 held on 04.03.2020 on 04.03.2020 04.03.2020 SHOBMS[SUPT,]

50 | Page 79 Page 79 79 NC -2 Meeting No. 23/81 -2 Meeting No. 23/81 Meeting No. 23/81 No. 23/81 23/81 held on 04.03.2020 on 04.03.2020 04.03.2020

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred. Case No.:22/23/81Party Name: MAHENDRA Meet No/Date:23/81Status: ALC2/2019 INDUSTRIES ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0710116126 Action by : 185 :01/81/050/00434/AM20/ :07/24/040/00273/AM20/ 17.02.2020 Applicant Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred.

Case No.:23/23/81Party Name: MAHENDRA Meet No/Date:23/81Status: ALC2/2019 INDUSTRIES ALC2/2019 Deferred 04.03.2020 HQ File RLA File Lic.No/Date:0710116127 Action by : 186 :01/81/050/00435/AM20/ :07/24/040/00274/AM20/ 17.02.2020 Applicant Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. The case stands deferred. Case No.:25/23/81Party Name: TATA Meet No/Date:23/81_ Status: ALC2/2019 INTERNATIONAL ALC2/2019 Deferred LIMITED 04.03.2020 HQ File RLA File Lic.No/Date:0210209776 Action by: 187 :01/81/050/00437/AM20/ :02/24/040/00187/AM20/ 19.02.2020 Applicant

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

  • The case stands deferred.

==> picture [466 x 111] intentionally omitted <==

----- Start of picture text -----<br> Case No.:24/23/81- Party Name: TECHNO Meet No/Date:23/81- Status:<br>188 ALC2/2019 TRAK ENGINEERS ALC2/2019 Deferred<br>04.03.2020<br>HQ File RLA File Lic.No/Date:3 110067691 Action by:<br>51 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 i>)<br>----- End of picture text -----<br>

:01/81/050/00436/AM20/ :31/83/040/00156/AM20/ 19.02.2020 Applicant Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

|||||Offline Cases||
|---|---|---|---|---|---|
||P<br>Setene Wis||;<br> igRue|CaseHistory<br>Decision|Status|
|||||The case was rejected<br>in M. No.04/81<br>dated|The<br>representative<br>of|/Deferred||
|||||27.08.2018 due to non submission of reply of|DHI informed in meeting<br>DHI’s deficiency letter. However, the applicant|that the applicant did not<br>vide letter dated 03.04.2019 furnished reply with/give<br>the<br>reply<br>to<br>the||
|||||a request to fix the ad-hoc norms. The applicant’s|queries<br>properly.<br>The<br>reply was referred to DHI on 18.07.2019 along|applicant<br>has<br>requested<br>with reminder on<br>11.10.2019.<br>The case<br>was/for<br>ratification<br>under||
|||||considered in M. No. 14/81 dated 16.10.2019, the|SION C334 which is for||
|RI|KOTSONS PVT.<br>LIMITED||01/81/050/003<br>78/AM18/|representative ofDHI informed that the applicant|CRGO Core whereas the<br>:<br>;<br>.<br>:<br>;<br>has still not furnish point wise reply of thejapplicant<br>proposes<br>to<br>deficiencies<br>raised<br>by DHI<br>vide<br>U.O.<br>No.|manufacture<br>and||
||0610038672 dated<br>09.08.2017||06/24/040/000 <br>15/AM18|3(92)/17-TS(B) dated 22.12.2017. Hence, the|morphous core.<br>Committee decided to seek from the applicant to<br>furnish the requisite information as per advice of/Hence,<br>the<br>Committee||
|||||representative of DHI. DHI D/L sent again to/decided<br>to<br>call<br>the||
|||||applicant<br>via email dated 05.11.2019.<br>Reply/applicant<br>for<br>personal<br>received<br>from<br>applicant<br>dt.<br>15.11.2019.|hearing<br>to<br>explain<br>the<br>Applicant's reply dt. 15.11.2019 was sent to DHI|case in the forthcoming<br>on 21.11.2019. The case was last considered in/NC meeting.||
|||||M. No.<br>20/81<br>dt.<br>08.01.2020 and decided<br>to||
|||||remind DHI<br>for expediting the comments. A||
|||||reminder was sent on 28.02.2020.||
|||||DC, CSEZ vide letter dated 03.11.2017, followed|The<br>Committee}|Deferred|
|||||by<br>representation<br>dated<br>29.03.2018<br>from<br>the|considered<br>the<br>case<br>as||
|||||applicant,<br>had<br>requested<br>for<br>fixation<br>of/per agenda and noted that||
|||||scrap/wastage norms for the manufacture and|the applicant vide email||
|R?|NASH<br>INDUSTRIES<br>(1)<br>PRIVATE<br>LIMITED<br>BENGALURU||export ofSheet Metal Pressed Components made|dated<br>28.02.2020<br>has<br>01/80/162/003 jof iron and steel, copper, brass and such other sought another date for<br>:<br>.<br>‘<br>,<br>02/AM18/ |metals/alloys. The matter was considered in M.|personal<br>hearing<br>on<br>1/11/2015:EO No.01/81 dated 10.04.2019 andon the advice of|/behalf of the applicant.<br>U:CSEZ/1476/|Consultant<br>(TEC-3),<br>some<br>information<br>was Therefore,<br>the<br>sought<br>from<br>the<br>applicant<br>via<br>email<br>dated/Committee<br>decided<br>to|||
|||||25.05.2019 followed by reminder on 12.07.2019./give<br>one<br>more||
|Ee|as.|jC||The email reply dated 13.11.2019 was referred to opportunity<br>to<br>the<br>Consultant (TEC-3) via email dated 14.11.2019./applicant<br>for<br>personal<br>hecasewas lastconsidered inM.No.20/81 dt.|hearing to explain thex|x A|
||52<br>|Page|79||NC-2MeetingNo.23/81heldon04.03.2020<br>Dy.<br>Director<br>General<br>of||

<!-- page 53 skipped: FzErrorArgument: code=4: Attempt to use Leptonica from 2 threads at once! -->

advice of Consultant (TEC-3) during personal hearing dated 26.06.2019. The applicant’s reply was forwarded to Consultant (TEC-3) on 06.08.2019 along with reminder on 11.10.2019. In compliance of M. No. 14/81 dated 16.10.2019 decision, a letter was sent to the applicant via email dated 05.11.2019 to seek from the applicant to furnish exact details of sizes on advice of Consultant (TEC-3). The case was last considered in M. No. 20/81 dt. 08.01.2020 and Consultant (TEC-3) informed that the applicant’s reply dated 18.12.2019 is very vague. Therefore, the Committee decided to give last opportunity to the applicant to submit the exact details of sizes of the export product vis-a-vis import along with quantity. As per NC decision, D/L was sent to the applicant on 06.02.2020. However, no reply has been received yet.

The case was approved in M. No.03/81 dated|The Committee decided Deferred 14.08.2018 allowing the wastage of 23%. The|to remind the applicant applicant vide letter dated 18.8.2018 requested to] for furnishing the allow wastage on repeat basis as given to it in requisite information. other cases in Special Norms Committee Meeting dated 12.12.2017. However, it was also noted that the applicant was directed to submit certain information as per advice of Consultant (TEC-3) KIRTANLAL during personal hearing dated 26.06.2019. The STEEL applicant’s reply was forwarded to Consultant PRIVATE 01/81/050/004 |(TEC-3) on 06.08.2019 along with reminder on RS 43/AM18/ /11.10.2019. In compliance of M. No.14/81 dated LIMITED 16.10.2019 decision, a letter was sent to the 03/94/040/001 |applicant via email dated 05.11.2019 to seek 0310815527 05/AM18/ |from the applicant to furnish exact details of sizes dated 05.09.2017 on advice of Consultant (TEC-3). The case was last considered in M. No. 20/81 dt. 08.01.2020 and Consultant (TEC-3) informed that the applicant’s reply dated 18.12.2019 is very vague. Therefore, the Committee decided to give last Opportunity to the applicant to submit the exact details of sizes of the export product vis-a-vis import along with quantity. As per NC decision, D/L was sent to the applicant on 06.02.2020. However, no reply has been received yet. KIRTANLAL The case was rejected in M. No.05/8Idated/The Committee decided Deferred STEEL 10.10.2018 due to non submission of reply of|to remind the applicant PRIVATE 01/81/050/005 |deficiency letter. The applicant vide letter dated| for furnishing the R6 01/AM18/ 20.10.2018 requested to allow wastage on repeat|requisite information. LIMITED basis as given to it in other cases in Special 0310816055 03/94/040/005 |Norms Committee Meeting dated 12.12.2017. dated 29/AM18/_ |However, it was also noted that the applicant was 29.09.2017 directed to submit certain information as per embers Seek ae advice of Consultant (TEC-3) during personal) £ Sree 54 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 y. Director General of Foreign "fe

hearing dated 26.06.2019. The applicant’s reply was forwarded to Consultant (TEC-3) on 06.08.2019 along with reminder on 11.10.2019. In compliance of M. No.14/81 dated 16.10.2019 decision, a letter was sent to the applicant via email dated 05.11.2019 to seek from the applicant to furnish exact details of sizes on advice of Consultant (TEC-3). The case was last considered in M. No. 20/81 dt. 08.01.2020 and Consultant (TEC-3) informed that the applicant’s reply dated 18.12.2019 is very vague. Therefore, the Committee decided to give last opportunity to the applicant to submit the exact details of sizes of the export product vis-a-vis import along with quantity. As per NC decision, D/L was sent to the applicant on 06.02.2020. However, no reply has been received yet.

The case was ratified in M. No. 19/81 dated|The Committee| Deferred FITCAST 05.12.2017 as per SION C-1647. However, the|considered the case as FOUNDERS & applicant vide letter dated 20.06.2018 requested|per agenda. The matter ENGINEERS | 01/81/050/003 |to re-fix the ad-hoc norms. As per decision of M.|was deliberated in the R7 PRIVATE 62/AM17/ |No. 17/81 dt. 27.11.2019, the case was referred meeting and the LIMITED to DPIT on 31.12.2019. The case was last|\Committee decided to 0810138679 08/24/040/001 |considered in M. No. 20/81 dt. 08.01.2020 andlask the applicant to dated TIHAMI7 _ |decided to refer the case to Consultant (TEC-1)|furnish production 16.09.2016 for examination & comments. As per NC/|consumption data duly decision, the case was referred to Consultanticertified from Statuary (TEC-1) on 19.02.2020. Auditor. The case was rejected in M. No.13/81 dated Lene ‘dered pam agit 06.10.2015 due to non submission of reply of _ ot ete Pu deficiency letter dated 03.07.2015 followed by ee iufldacisd my cow reminder dated 21.08.2015. However, the meeting. The Commitice MANLY applicant vide letter dated 09.03.2018 furnished decided a Sx Hie adchoc SILICON the reply with a request to fix the ad-hoc norms. th STEEL A copy of representation was sent to DHI for O'S a ‘ : 01/81/050/006 aCe recommendation of R8 PRIVATE FI/AM15/_ |°X@mination of the case on 20.07.2018 followed Consultant (TEC-3) & LIMITED by reminder on 12.07.2019 &, 11.10.2019. The Precinct (SKB) i” 0710107472 07/24/040/003 |°28¢ as last considered in M. No. 20/81dated oatigs dated 76/AM15/ 08.01.2020 and the Committee noted that the 20.01.2015 complete set of application was not sent to DHI 1. Quantity of import as decided in M. No. 17/81 dated 27.11.2019.| °° » ee Se Therefore, the Committee decided to send a copy oe mt on of application to DHI immediately. The case was ht Se at forwarded to DHI on 26.11.2019 followed by aoe reminder on 25.02.2020. DHI stated that the case| ~. = does not pertain to it. creates eeeeeie action accordingly. TRIVENI 01/81/061/000 DEC, CSEZ vide letter No.|The Committee decided|Deferred R9 AERONAUTICS 02/AM18/ 1/43/2008:EOU:CSEZ/403, dated —15.3.2017/to remind MSME_ for PRIVATE 1/43/2008:EO forwarded an application of the applicant expediting the comments. LIMITED, U:CSEZ/403/ |Peduesting for fixation of scrap/wastage norms on TUMKUR age vias: regular basis under 100% EOU for manufacture 55 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 ca

==> picture [569 x 696] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|and|export|of commercial|aircraft|parts.|A|copy|
|of|representation|was|sent|to|MSME.|for|
|examination|of the|case|on|11.04.2017|followed|
|by|a|reminder|on|12.07.2019 &|26.011.2019.|The|
|case|was|last|considered|in|M.|No.|20/81|dt.|
|08.01.2020|and|decided|to|wait|for|the|
|comments.|However,|no|comments|have|been|
|received|yet.|
|The|case|was|approved|in|M.|No.|1/81-\The|Committee|decided|Deferred|
|ALC2/2012|dated|10.04.2012|as|per|written|to|remind|DPIIT|for|
|BHARAT|comments|of DIPP|vide|U.O. dated|23.04.2012.|| expediting|the comments.|
|HEAVY|However,|the|applicant|vide|letter|dated|
|ELECTRICALS|12.08.2017|requested|to|allow|quantities|on|
|LIMITED|ype|actual|basis.|In|compliance|of|M.|No.|14/81|
|dated|16.10.2019|decision,|the|case|was|referred|
|1110024364|to|DPIIT|via|email|dated|05.11.2019.|As|per|
|dated|Beis|decision|of|M.|No.|17/81|dt.|27.11.2019,|a|
|23.03.2011|reminder|was|issued|to|DPIIT|on|03.01.2020.|
|The|case|was|last|considered|in|M.|No.|20/81|dt.|
|08.01.2020|and|decided|to|wait|for|the|
|comments.|However,|no|comments|have|been|
|received|yet.|
|The|Committee|decided|Approved|
|to|revise|the|ad-hoc|
|norms|on|the|
|recommendation|of|the|
|The|case|was|approved|in|M.|No.|10/81-|representative|of|DHI|as|
|ALC2/2018|dated|16.01.2019|as|per|written]|under:|
|comments|of|DHI|vide|U.O.|No.:|DES-|
|2/BHEL/CTrR-1-2018-HEI|dated|01.01.2019.|1.|Quantity|of|import|
|goin|The|applicant|vide|letter|dated|03.08.2019|has|item|at|SI.|No.|17|
|be|r|=|me oe we|pes|IZ:|is|also _—|may|be|allowed|
|RII|ELECTRICALS|SEALsoes|ratificationunder|-letter.ut|Therefore,it|is|not|theyappearing have requestedin|ec|under a-|we:|
|LIMITED|to|ratify|the|norms|for import|item|no.|17|under}|2¢¢ountability|
|1110028309|11/24/040/000|GN4.|As|per NC|decision|of M.|No.|14/81dated|clause.|
|05/AM18/|16.10.2019,|a|deficiency|letter|was|sent|to|the|
|11.12.2017dated|applicant|on|13.11.2019|requesting|them|to|Note:|The|decisionae|for|
|furnish|the|specific|use|of|import|item|No,|17.\rest|of|the|import|item|
|The|applicant's|reply|dated|22.11.2019|was|will|remain|unchanged|
|referred|to DHI|on|28.11.2019.|The|case was|last|as|decided|in|M.|No.|
|considered|in|M.|No.|20/81|dt.|08.01.2020|and|10/81-ALC2/2018|dated|
|comments.decided|to|remind|DHI|for|expediting|the|16.01.2019.|
|RA|concerned|may|take|
|suitable|consequential|
|action|accordingly.|
|RID|KUN|01/81/171/000|DC,|=|MEPZ-SEZ|vide|—_—letter_~—no,||The|Committee|decided|Deferred|
|AEROSPACE|13/AM20/__|A/2011/012/EOQU-TN|dated|to|remind|MSME_|for|
|56|| Page 79|NC -2 Meeting No. 23/81|held on 04.03.2020|Dy.|Direct|r|General|of|Fore'an|Tre|

----- End of picture text -----<br>

==> picture [567 x 710] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|PRIVATE|A/2011/012/E||09.11.2018forwarded|a letter dated|22.06.2018|of|expediting the comments,|
|LIMITED|OU-TN|the applicant|for|fixation|of wastage|norms|for|its|
|manufactured|items|Aerospace|Components|and|
|Non-Aerospace|Components.|As|per NC|decision|
|in|M.|No.|14/8Idated|16.10.2019,|the|case|was|
|referred|to|MSME|on|05.11.2019|along|with|
|reminder|on|03.01.2020.|The|case|was|last|
|considered|in|M.|No.|20/81|dt.|08.01.2020|and|
|decided|to|wait|for|the|comments.|However,|no|
|=|comments|have|been|received|yet.|
|KASEZ|vide|letter|~No.|KASEZ/100%|The|Committee|decided|Deferred|
|EOU/II/13/2002-03/Vol.|1/-6384|dated|to|remind|again|MSME|
|06.09.2018|forwarded|a copy of|application dated||¢,.|expediting|the|
|14.04.2018|of|the|applicant|for|fixation|o|
|madewastage|norms|for|manufacturing;|of|products|comments.|
|bars,|ofprofile brass rods,and|sectionbrass solidin|additionbars, Brassto|hollowroutine|
|01/81/171/000|product|made|out|of|mix|metal|brass|scrap.|
|R13|et|14/AM20/|||KASEZKASEZ/100%EOU/II/13/2002-03/Vol.vide|letter|1/1048No.|
|LIMITED.|100%|KASEZ/100%||dated|25.04.2018|conveyed|the|approval|of|the|
|EOU|EQU/II/13/200|/DC|for|ad-hoc|norms|as|per|Annexure,|in|terms|
|:|2-03/Vol.|I/||of Para|6.08(e)|of FTP,|2015-20,|for|a|period|of|
|06|(six)|months|subject|to|final|fixation|of Norms|
|by|the|NC|in|DGFT.|As|per|NC|decision|of M.|
|No.|14/81dated|16.10.2019,|the|case was|referred|
|to MSME|on|05.11.2019|followed|by|a|reminder|
|on|03.01.2020.|The|case|was|last|considered|in|
|M.|No.|20/81|dt.|08.01.2020|and|decided|to|wait|
|for|the|comments.|However,|no|comments|have|
|been|received|yet.|
|KASEZ|vide|letter|KASEZ/100%|The|Committee|decided||Deferred|
|EOU/II/77/2004-05/Vol.|1/6026|dated|28.08.2018]to|remind|the|applicant|
|MARGEN|01/81/171/00001/AM19/|offorwardedMergen a copyImpex of letterLimited along withfor|fixationapplicationo|requisitefor|=|furnishinginformation.|the|
|IMPEX|scrap/wastage|norms for|manufacture|and|export|
|;|
|R14|LIMITED|KASEZ/100%|of parts|and|accessories|of test|benches.|The|case|
|GUJARAT.ANAND|EOU/II/77/200 |S|referred|to|Consultant|(TEC-3)|on|
|A|rs|11.10.2019.|As|per NC|decision|of M.|No.|20/81|
|100% EOU|05/VOL.1/602|dt.|08.01.2020,|a deficiency|letter Was|sent|to|the|
|My|applicant|on|24.02.2020|requesting|to|furnish|
|following|information:|(i)|List|of export|products|
|vis-a-vis|import|items|(ii)|Wastage|claimed.|
|However,|no|reply|has|been|received|yet.|
|BEDMUTHA|The|case|was|ratified|in|its|M.|No.6/81-|The|Consultant|(TEC-3)|Rejected|
|INDUSTRIES.||01/81/050/002|ALC2/2018|dated|01.11.2018.|However,|the|informed|that|there|is|no|
|LTD|;|
|RIS|:|08/AM19/|applicant|vide|letter|dated|20.12.2018|and|merit|to|consider|the|
|23.02.2019|stated|that|1.0506|wastage|is|already|applicant’s|representation|
|0310822714|| 03/94/040/002|[Prescribed|by SION where|as ALC|has|fixed|2%|dated|23.02.2019|&|
|dated|19/AM19/_||Wastage which|is much|below actual|wastage|and|20.12.2019|as|it|is|based|
|30.07.2018ye|actual|requirement|and|requested|to|enhance|the|on|SION|&|not|on|actual|
|norms.|The|case|was|considered|by NC|in|its|M.|wastage.|Therefore,|the|
|57|| Page 79|NC -2 Meeting No. 23/81 held on 04.03.2020|SHOBRITaeGUPTA|

----- End of picture text -----<br>

==> picture [573 x 691] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|No.|20/81|dt.|08.01.2020|and|decided|to|wait|for|\Committee|decided|to|
|the|comments.|reject|the|applicant’s|
|request|of|revision|o|
|uated|Mee|FeA|cree|pe|Heh|ratified|ad-hoc|norms.|
|The|case|was|rejected|in|M.|No.|05/81dated|
|LEIGHTON|18.06.2015|due|to|non|submission|of|reply|o|
|WELSPUN|deficiency|letter|dated|11.11.2014.|However,|the|The|cireeurmive|6|
|CONTRACTORS|
|PRIVATE|||01/81/050/00060/AM15/_||the|applicantreply|withvide|aletterrequestdatedto|fix12.06.2018the|ad-hocfurnishednorms.|DHI|ra sc;|Sock|Bee|
|R16|LIMITED|The|applicant’s|reply|was|forwarded|to|DHI|for|es|under|Deferred|
|03/95/040/007||examination|of the|case|on|21.06.2018|followed||xnation|Hence,|the|
|0310764005|||52/AM14/_||by reminder on|12.07.2019 &|11.10.2019. As per|-O™mittee|decided|to|
|dated|NC|decision|of|M.|no.|20/81|dt.|08.01.2020,|a|wait|for comments.|
|01.01.2014|copy|of|application|was|referred|to|DHI|on|
|25.02.2020.|
|The|case|was|rejected|in|M.|No.18/81dated||The|Committee||Deferred|
|29.11.2016|due|to|non|submission|of|reply|of|decided|to|remind|
|deficiency|letter|dated|03.05.2016|followed|by}|again|the|applicant|for|
|reminder|dated|11.07.2016.|However,|the}|submitting|the|requisite|
|applicant|vide|letter|dated|28.12.2016|furnished}|information.|
|the|reply|with|a|request|to|fix|the|ad-hoc|norms.|
|The|case|was|referred|to|Consultant|(TEC-1)|on|
|07.08.2019|for|examination.|As|per NC|decision|
|Entice|of M.|No.11/81|dated|04.09.2019,|a|deficiency|
|PRIVATE.|letter was|sent|to|the|applicant|vide|email|dated|||
|01/81/050/004 —information:|requesting|to|furnish|following|||
|LEAED|OAM IG|1.|Material|balance|between|import|&|export|in|||
|R17|
|0410160874|||04/24/040/001|quantity|terms|taking|in|to|consideration|of|
|dated|14/AM16/|indigenous|procures|items|for|each|export|
|05.08.2015|product|separately.|
|2.|Percentage|wastage|at|each|stage|o|
|manufacturing.|
|3.|Production|&|corresponding|consumption|o|
|various|raw|material|&|consumable|for|last|two|
|year|duly|certified|by|GST|authorities.|
|The|applicant|was|also|reminded|on|13.11.2019|
|&|02.01.2020.|The|case|was|considered|by NC|in|
|its|M.|No.|20/81|dt.|08.01.2020|and|decided|to|
|wait|for|the|applicant’s|reply.|However,|no|reply|
|has|been|received|yet.|Beh|
|The|case|was|ratified|in|M.|No.|12/81|dated/The|Committee|decided|Deferred|
|06.09.2016|as|per|DIPP|U.|O.|No.|12/76/2016-to|remind|the|RA,|New|
|gr neers|ile|TSW/28applicant|videdatedletter06/09/2016.dated|15.02.2019However,reques|t|he/Delhi,edof|Headinvitingof|attentionRA,|_for|
|r|to|re-fix|the|ad-hoc|norms.|A|copy|ofsubmitting|the|requisite|
|R18|representation|was|referred|to|Consultant|(TEC-|information.|
|she|3)|on|07.08.2019|for|examination.|Deficiency|
|eee|oleh ee|letter was|sent|to|the|applicant|on|04.10.2019|as|
|ck)|per|NC|decision|of|Meeting|No.|11/81|dated|
|04.09.2019.|The|applicant's|reply|dated|
|14.11.2019|was|referred|to|Consultant|(TEC-3)|a|2|
|58|| Page 79|NC|-2 Meeting No. 23/81|held|on 04.03.2020|Dy.|Director|General . Arc|ssid|

----- End of picture text -----<br>

Zine theo 7 for examination. NC observed in its -M. No.) ae riz 20/81 dt. 08.01.2020 that the authorization is dated 24.08.2015 and the party would have exported the said items as per norms ratified carlicr. Therefore, the Committee decided to seek a report from RA regarding the thickness/surface area of coating w.r.t Adhesive and Polyethylene in the export product. An email dated 02.03.2020 was sent to RA, New Delhi. However, no ——+| ..mlommationius been reepwelyet | ane The case was ratified in M. No.4/81 dated es Consultant (TEC-3)| Withdraw 29.05.2019 ‘ : informed that the n as per written comments given by . ¥ Consultant as ; : applicant vide letter (TEC-3). The applicant vide letter dated oe dated 07.10.2019 has JINDAL 07.10.2019 had requested for revision o ; : SAW / / h sass stated that it has applied LIMITED 01/81/050/010 |ad-hoc norms. As per decision of M. No.. 14/81 the “AA wailer No-norne R19 ‘ 18/AM19/ |dated 16.10.2019, the case was referred to bi mishike ds the item is 0510409724 05/23/040/005 Consultantneh (TEC-3) on 25.10.2019se for|°Ycovered under SION C- Dated |examination & comments. As per decision of M. 11/AM19/ : ; 820. Therefore, the 21.02.2019 No. 17/81 dt. 27.11.2019, a reminder was issued ; : to we Committee decided to Consultant (TEC-3) on 03.01.2020 for|~* as withdraw the case from expediting the comments. The case was last the Scien indus considered in M. No. 20/81 dt. 08.01.2020 and). #8 decided: to waiti for the comments. intimation; to RA, New The case was ratified in M. No. 9/81 dated|The Committee) Deferred JINDAL 07.08.2019 as per written comments dated|considered the case as SAW 01/81/050/005 30.07.2019 of Consultant (TEC-3). The applicant per agenda and decided LIMITED 06/AM19/ vide letter dated 04.10.2019 had requested forjto send main file to R20 revision of ad-hoc norms. As per decision of M.|Consultant (TEC-3) as 0510407943 No.14/81 dated 16.10.2019, the case was referred requested in the meeting. Dated 05/23/040/002 : 28.09.2018 78/AM19/|*© Consultant (TEC-3) on 25.10.2019 for examination. The case was last considered in M. No. 20/81 dt. 08.01.2020 and decided to wait for fetes hte om ifthe comments. Rains The Ses ele Gi ; “ud case was ratified in M. No. 3/81-ALC2/2018|The Committee noted Deferred dated 14.08.2018 on repeat with AA No.|that a study group team 0510399348 dated 03.08.2016 ratified in NC M.|has visited the factory | dated 21.2.2017. The applicant vide letter dated premises of the applicant CONSOLIDATE 17.12.2018 had request for revision of ratified|to study the D norms of Export Product Coin Blanks manufacturing processes COIN 01/81/050/001 (Consisting of Copper-65%, Nickel-10 And Zinc-|and ascertain wastages R21 COMPANYLID: PVT. 03/AM19/ 25%).18.09.2019,As perthe decisioncase wasofreferredM. No.to 12/81datedDPIIT onlofby visiting.study group The membersinformed 0510405810 05/23/040/004 23.10.2019. The case was considered in M. No.|that they have submitted dated 57/AM18/ 17/81 dt. 27.11.2019 and as per as written|the report. However, the 07.03.2018 comments given by DPIIT vide U.O. No.: P-|same is yet to be adopted. 47011/62/2019-TSW_ dated 13.11.2019. The|Hence, the Committee Committeebeen observed that different norms have/decided to takea decision recommended by technical authorities for/on adoption of study same/similar items in the past. Hence, the group report. Committee decided to get the actual wastage —1+|__|verified by a team consisting DDG(SG),| peas ae

59 | Page 79

==> picture [57 x 29] intentionally omitted <==

----- Start of picture text -----<br> EY<br>----- End of picture text -----<br>

==> picture [568 x 690] intentionally omitted <==

----- Start of picture text -----<br> consultant (VCA) and representative of DPIT.<br>The team would submit its report in 15 days after<br>making physical verification. The case was last<br>considered in M. No. 20/81 dt. 08.01.2020 and<br>directed to study group team to visit the<br>applicant’s factory at an early date. |<br>The case was ratified in M. No. 3/81 dated|The Committee noted|Deferred<br>14.08.2018 on repeat with AA No. 0510399348)that a study group team<br>dated 03.08.2016 ratified in NC M. No.24/81|has visited the factory<br>dated 21.2.2017. The applicant vide letter dated|premises of the applicant |<br>17.12.2018 & 04.09.2019 has requested for|to study the |<br>revision of ratified Norms. As per decision of M.|manufacturing processes |<br>No.12/81 dated 18.09.2019, the case was referred|and ascertain wastages<br>CONSOLIDATE to DPIIT on 23.10.2019. The case was|by visiting. The members<br>D COIN 01/81/050/001 considered in M. No. 17/81 dt. 27.11.2019 as perjof study group informed<br>COMPANY PVT. 04/AM19/_ [2S written comments given by DPIIT vide U.O./that they have submitted<br>LTD. No.: P-47011/62/2019-TSW dated 13.11.2019.|the report. However, the<br>0510405317 05/23/040/003 The Committee observed that different norms |same is yet to be adopted.<br>dated 87/AM18/ havefor same/similarbeen recommendeditems inbythe technicalpast. Hence,authorities}the|decidedHence, tothe takeCommitteea decision<br>11.01.2018 Committee decided to get the actual wastage|on adoption of study<br>verified by a team consisting DDG(SG),/group report.<br>consultant (VCA) and representative of DPIIT.<br>The team would submit its report in 15 days after<br>making physical verification. The case was last<br>considered in M. No. 20/81 dt. 08.01.2020 and<br>directed to study group team to visit the<br>applicant’s factory at an early date.<br>The case was ratified in M. No. 4/81-ALC2/2019|The Committee noted|Deferred<br>dated 29.05.2019 on repeat basis as approved for|that a study group team<br>AA No. 0510409208 dated 07.01.2019 in the M.jhas visited the factory<br>No. 01/81 dated 10.04.2019. The applicant vide|premises of the applicant<br>letter dated 08.08.2019 has requested for re-|to study the<br>consider the case and allow 'Gross Quantity ofjmanufacturing processes<br>Inputs', as asked by them in their application. As|and ascertain wastages<br>CONSOLIDATE per decision of M. No.12/81 dated 18.09.2019,|by visiting. The members<br>D COIN the case was referred to DPIIT on 23.10.2019. Injof study group informed<br>COMPANY _ | 01/81/050/000|M. No. 17/81 dt. 27.11.2019 as per written|that they have submitted<br>PRIVATE 14/AM20/_ |comments given by DPIIT vide U.O. No.: P-|the report. However, the<br>R23 LIMITED 47011/62/2019-TSW_ dated 13.11.2019. The|same is yet to be adopted.<br>05/23/040/000 |Committee observed that different norms have|Hence, the Committee<br>0510410184 01/AM20/_ |been recommended by technical authorities for|decided to take a decision<br>dated same/similar items in the past. Hence, the}on adoption of study<br>09.04.2019 Committee decided to get the actual wastage|group report.<br>verified by a team consisting DDG(SG),<br>consultant (VCA) and representative of DPIIT.<br>The team would submit its report in 15 days after<br>making physical verification. The case was last<br>considered in M. No. 20/81 dt. 08.01.2020 and<br>directed to study group team to visit the<br>applicant’s factory at an early date.<br>R24 | NEO POWER |01/81/050/000 |The case was ratified in M. No.15/81 dated|The ommittec| Deferred<br>60 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 Dy. Director Genera © Foi<<br>----- End of picture text -----<br>

ELECTRONICS | 12/AM19/_ |27.03.2019 as per written comments given by|considered the case as & PROJECTS Consultant (TEC-3). However, the applicant vide|per agenda and decided PVT.LTD. — | 03/95/040/010 letter dated 01.04.2019 requested to amend ITC|to send main file to 69/AM18 __|HS codes in r/o import items No. 3 and 5. Further|Consultant (TEC-3) as 0310819845 the applicant has also requested to amend UOM|requested in the meeting. dated of import item No. 5. The Committee considered 15.03.2018 the case in M. No.09/81 dated 07.08.2019 and noted that the applicant has not given any reason/justification for such changes. A D/L was sent to the applicant vide email dated 02.09.2019 followed by reminder on 07.10.2019. The applicant’s reply dt. 06.10.2017 was referred to Consultant (TEC-3) for examination. The case was last considered in M. No. 20/81 dt. 08.01.2020 and decided to wait for the comments. The case was ratified in M. No.40/81 dated|The Committee} Approve 20.12.2011 as per written comments of DIPP|considered the case as d vide U.O. dated 28.12.2011.The company vide|per agenda and heard the letter dated 20.03.2017 followed by reminder|applicant’s representative dated 01.05.2017 requested to reconsider its|during personal hearing. application for modification of fixed norms. The}The representatives representation was sent to DPIIT on 08.05.2017.\informed that they have DPIIT’s deficiency letter dated 26.07.2017 was|only changed the sent to the applicant on 21.07.2017. Thejelevation description in applicant’s reply dated 06.10.2017 was sent tol|export product due to ABIR DPIT on 23.10.2017. In M. No.11 dated|change in the design fe) INFRASTRUCT |01/81/50/0566/ 04.09.2019, it was decided to send the documents] export product. They URE PRIVATE AM10/ of the case as afresh and reminded DPUT. Injfurther informed _ that R25 LIMITED compliance of above NC decision, a copy of|there would not be any 05/23/50/0519/|TePresentation dated 06.10.2017 sent to DPHT change in the wastage. 0510256336 AM10 again on 08.11.2019. As per NC decision in M./After hearing the party, dated 14.01.2010 No. 17/81 dt. 27.11.2019, an email dated|the Committee, on the Pe 30.12.2019 was sent to the applicant requesting|recommendations of the to attend PH on 08.01.2019. The case was last/Technical Authorities, considered in M. No. 20/81 dt. 08.01.2020 andjallowed — change in the Committee noted that nobody was appeared|elevation as asked for for personal hearing on behalf of the applicant.|with the same wastages. Therefore, the Committee decided to give one more opportunity to the applicant for personal]/RA concerned may take hearing to explain the case before Norms|consequential action Committee. As per NC decision, an email dated|accordingly. 25.02.2020 was sent to the applicant requesting to attend PH on 04.03.2020. ABIR The case was ratified in M. No. 38/81 dated|The Committee] Approve INFRASTRUCT 01/81/050/003 07.12.2011 (actually held on 19.12.2011) as perjconsidered the case as d URE PRIVATE 47/AM11/ written comments of DIPP vide U.O. dated|per agenda and heard the R26 LIMITED 19.12.2011. The company vide letter dated|applicant’s 0510277227 05/23/040/002 23.03.2017 followed by reminder dated|representatives during dated 05/AM11 01.05.2017for modificationrequestedof to reconsiderfixed normsits application|personalas per|representativehearing.informedThe 18.11.2010 description mentioned in licence amendment|that they have only 61 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 BO

sheet dated 17.11.2015. The representation was|changed the elevation sent to DPIIT on 8.5.2017. DPIIT’s deficiency|description in export letter dated 26.7.2017 was sent to the applicant|product due to change in on 21.7.2017. Reply dated 6.10.2017 of the|the design of export applicant was sent to DPIIT on 23.10.2017. In M.|product. They further No. 11 dated 04.09.2019, it was decided to send|informed that there the documents of the case as afresh and remind|would not be any change DPIIT. In compliance of M. No. 14/81 dated|in the wastage. After 16.10.2019, a copy of application sent to DPIIT|hearing the party, the on 08.11.2019. As per NC decision of M. No.|Committee, on the 17/81 dt. 27.11.2019, an email dated 30.12.2019|)recommendations of the sent to applicant requesting to attend PH on/Technical Authorities, 08.01.2019. The case was last considered in M.|allowed change in No. 20/81 dt. 08.01.2020 and the Committee|elevation as asked for noted that nobody was appeared for personal/with the same wastages. hearing on behalf of the applicant. Therefore, the Committee decided to give one more opportunity|RA concerned may take to the applicant for personal hearing to explain|consequential action the case before Norms Committee. As per NC\accordingly. decision, an email dated 25.02.2020 sent to the applicant requesting to attend PH on 04.03.2020. The Committee] Approve The case was ratified in M. No. 6/81 dated — = Pia “ a 10.05.2011 as per written comments of DIPP Re nec ~ soap ar cefaoas vide U.O. dated 10.05.2011. The applicant vide app gout a duri letter dated 23.03.2017 followed by reminder racer Tet ae | dated 01.05.2017 requested to reconsider its oeaaees Se i : application for modification of fixed norms as cr at sa pt persheetdescription mentioned in licence amendment a 2res h ee ke dated 17.11.2015. The representation was Se ae oe ps ABIR sent to DPIIT on 08.05.2017. DPIIT’s deficiency”ea iesicwin: - “ INFRASTRUCT letter dated 26.7.2017 was sent to the applicant He desien of ea st | 01/81/050/002 Jon 21.7.2017. The applicant's reply dated) ct & they et R27 URE PRIVATE | 13/AMI11/_ |06.10.2017 of was sent to DPIIT on 23.10.2017. tafonned ial: Aire LIMITED 05/23/040/002 |As per NC decision of M. No. 17/81 dt. 0510261567 dated| 30/AMI0/ 27.11.2019, an email dated 30.12.2019 sent to tier nn Be bey = 31.03.2010 applicant requesting to attend PH on 08.01.2019. aw ie ca a The case was last considered in M. No. 20/81 dt. oie ek Pat pal 08.01.2020 and the Committee noted that nobody Hare ; recommendations of the was appeared for personal hearing on behalf o ‘Yantiteal - Authovities the applicant. Therefore, the Committee decided awea h me to give one more opportunity to the applicant for 1 rie i es 4 ee personal hearing to explain the case before . Thelen Gace eae Norms Committee. As per NC decision, an email RLS SIS REE: datedattend 25.02.2020PH on 04.03.2020,sent to applicant requestingAmeen to “"/RA concerned may take consequential action accordingly. ABIR 01/81/050/003 |The case was ratified in M. No.6/81 dated|The Committee} Approve R28 INFRASTRUCT | 89/AMI11/ {10.05.2011 as per written comments of DIPP|considered the case as d URE PRIVATE vide U.O. dated 10.05.2011. The applicant vide|/per agenda and heard the LIMITED 05/23/040/001 |letter dated23.03.2017followed by reminderjapplicant’s lg 62 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 = gE tie 2 si FecaionT

ne | 14/AM11/. |dated 01.05.2017 requested to reconsider its representatives during - 0510269360 application for modification of fixed norms. As|personal hearing. The dated per NC decision of M. No. 17/81 dt. 27.11.2019,|representative informed 29.07.2010 an email dated 30.12.2019 sent to applicant|that they have only requesting to attend PH on 08.01.2019. The case|changed the elevation was last considered in M. No. 20/81 dt./description in export 08.01.2020 and the Committee noted that nobody|product due to change in was appeared for personal hearing on behalf of|the design of export the applicant. Therefore, the Committee decided|product. They further to give one more opportunity to the applicant for|informed that there personal hearing to explain the case before|would not be any change Norms Committee. As per NC decision, an email|in the wastage. After dated 25.02.2020 sent to applicant requesting to|hearing the party, the attend PH on 04.03.2020. Committee, on the recommendations of the Technical Authorities, allowed change in elevation as asked for with the same wastages. RA concerned may take consequential action LP e nen Renee oars Shel Mae Shean aPalpscarys accordingly. — The Committee! Approve considered the case as d per agenda and heard the The case was ratified in M. No.19/81 dated rd. 18.12.2012 aut tae vide as per written comments of DIPP The & P és can Ph sea ue letter U.O. dated 11.01.2013. The applicant vide slinniiedd he Hai: tenon dated 16.10.2017 requested for pet ternal y the modification of fixed norms. In M. No.11 dated decals ees ion. a ABIR 04.09.2019, it was decided to send the documents P : ; @ export product due to INFRASTRUCT of the case as afresh and reminded DPIIT. As per ebange in the design of URE 01/81/050/005 |NC decision of M. No. 17/81 dt. 27.11.2019, an PRIVATE : : export product. They aia 62/AMI11/ |email dated 30.12.2019 sent to applicant ce R29 LIMITED H en further informed _ that requesting to attend PH on 08.01.2019. The case th “= 0510284584 | 95/23/040/003 |was last considered in M. No. 20/81 dt.[ 01" WGUNC NOL O°any dated 36/AM11/ |08.01.2020 and : the Committee noted that nobody 6 ‘ ES. 24.02.2011= was appeared for personal hearing, on behal;if Ol seAfterCommiteehearing theonparty,the 4 the applicant. Therefore, the Committee decided Se, to ; ase ; recommendations of the give one more opportunity to the applicant for], ; se personal hearing; to explain: the case before Technical Authorities,. Norms Committee.j As per NC decision,Au an email., |allowed; change in dated : ; elevation as asked for attend 25.02.2020PH on 04.03.2020.sent to applicant requesting to withae th 6 Wit RA concerned may take consequential action aaa Prat ates eee es eee ee See GLOBAL 01/81/050/001 |The case was considered in M. No.17/81 dated|/The Committee decided R30} OVERSEAS 44/AM13/ |20.11.2012. NC decided to reject the case as no|to seek form _ the| Deferred jf manufacturing activity wasappearing. The|applicant to furnish] _ 63 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 BA.) a

0510324256 | 05/23/040/000 |applicant vide letter dated 08.02.2013|following information as Dated 29/AM13/ |represented against above NC decision which|per written comments 09.05.2012 was considered in M. No.05/81 dated|vide DPIIT U. O. No. P- 06.06.2013. The applicant appeared for Personal|/47011/37/2020-TSW Hearing on 03.05.2013 and showed sample of|dated 27.02.2020: unfinished/unpolished items and the finished product. NC noted that the firm is polishing the|1. Details of utensils and doing engraving of same designs on} manufacturing the utensils as per foreign buyer requirement.| activities involved. Since, polishing is a manufacturing activity, NC|2. Information in respect decided to approve the case on net to net basis.| of Sl. No. 3, 4, 5 and Now, the applicant vide letter dated 30.10.2017} 11 of Standard stated that it had imported goods 89.95 M.T. in| Deficiency Format. place of 100 M.T. Thereafter, same goods were exported after polishing and engraving designs on utensils as per buyer’s requirement. Further, it stated that export item name i.e. Household Kitchen appliances (Furnished & designed utensils made up of stainless steel) have been mentioned in Shipping Bill for Export is same as per descriptions mentioned in the Condition Sheet of AA. CLA, New Delhi vide letter dated 30.5.2014 advised the company to submit documentary evidence regarding consumption o SS content in the export/end product and grade/thickness as the same is not mentioned in the Shipping Bills. Therefore, the company requested to look into the matter for suitable reply to enable them to clear Government dues and get EODC on the basis of exported goods as per entries in Shipping Bills. The applicant’s letter dated 30.10.2017 was forwarded to DPIIT on 16.03.2018 for examination. This case was considered by NC in its M. No.4/81-Pt.II dated 03.10.2018. NC decided to call report from the RA on letter of the firm under intimation to firm and defer the case. CLA, New Delhi vide letter dated 01.05.2019 stated that there is no Grade mentioned with the description of import & export item as per authorization but as per B/Es, Grade of Stainless steel mentioned as Grade 410. Accordingly, a deficiency letter was issued on 30.05.2014 followed by reminder dated 07.01.2016 for clarification, but firm has not submitted any reply in this regard. The representation was referred to DPIIT on 11.10.2019 followed by reminders dated 21.11.2019 & 14.01.2020. The case was last considered in M. No. 20/81 dt. 08.01.2020 and decided to wait for the comments. R31 GLOBAL 01/81/050/003 |The case was considered in M. No.18/81-|The Committee decided ised _OVERSEAS| OW/AMI3/ |ALC2/2012 dated04.12.2012.NC decided tojto remind DPNT forget 64 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 Dy. Director General of Foreign Trac

==> picture [567 x 700] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|0510337064|reject|the|case|as|no|manufacturing|activity|is|expediting the comments.|
|dated|— ||05/23/040/002||involved|in|this|case.|The|applicant|vide|dated|
|50/AM13/|{30.10.2017|requested|the|Norms|Committee|to|
|11.10.2012|look|into|the|matter|and|accept|their|application|
|for|EODC|from|RA|on|the|basis|of|exported|
|goods|as|per|entries|in|Shipping|Bills.|The|
|applicant|vide|letter|dated|02.08.2019|has|
|reiterated|the|same|issue.|The|representation|was|
|referred|to|DPHT|on|11.10.2019|followed|with|
|reminders|dated|21.11.2019|&|03.01.2020.|The|
|case|was|last|considered|in|M.|No.|20/81|dt.|
|08.01.2020|and|decided|to|wait|for|the|
|comments.|However,|no|comments|have|been|
|received|yet.|
|The|case|was|ratified|in|M.|No.12/81-|
|ALC2/2019|dated|18.09.2019|as|per|written|
|comments|dated|16.09.2019|given|by|Consultant|
|(TEC-3).|The|applicant|vide|letter|dated|
|03.01.2020|stated|that|the|quantity|of|imported|
|gp|item No.1|and 2 of|Alloy Steel Rounds|is allowed|
|ne|01/81/050/009|jas|1.10|Kgs/Kg.|content|of Export|product No.1|The|Committee|decided|
|:|48/AM19/||&|2|instead|of allowing|1.20|Kgs/Kg.|content|in|:|
|R32|to|remind|Consultant|
|0510409209|the|export|product|as|per|SION|C-797|and|(TEC-3)|for|expediting|Deferred|
|dated|05/23/040/004||requested|to|allow|20%|wastage|in|respect|o|die|dnsaprecanestie|
|07.01.2019|40/AM19/|furnishedimportS|itema|SI.Nos.1copy|of&|2.paymentThe|applicantreceipt:|hasdatedalso|;|
|03.01.2020|of|Rs.5000/-|towards|composition|
|fee.|The|case|was|referred|to|Consultant|(TEC-3)|
|on|21.01.2020|as|per|NC|decision|of|Meeting|
|No.|20/81|dt.|08.01.2020.|However,|no|
|comments|have|been|received|yet.|
|The|case|was|ratified|in|M.|No.|10/81|dated|
|16.01.2019|as|per|written|comments|given|by|
|Consultant|(TEC-1).|The|applicant|vide|letter|
|dated|10.04.2019|had|requested|for|revision|o|
|SVAM|ratified|norms.|As|per|decision|of|meeting|no.|
|PACKAGING|| 01/81/050/005||14/81|dated|16.10.2019,|the|case|was|referred|to|The:|‘Cominities|decided|
|R33|INDUSTRIES|18/AM19/||Consultant|(TEC-1)|on|19.11.2019|—|for|le?|tecind|Consuliant|
|PVT.|LTD.|examination|&|comments.|The|case|was|last (TEC-1)|for|expeditin|Deferred|
|0510407882|05/24/040/003||considered|in|M.|No.|20/81|dt.|08.01.2020,|the],|(0)|°xPeditins|
|dated)|53/AM19/||Committee|noted|the|written|comments|given|by|:|
|25.09.2018|Consultant|(TEC-1).|The|Committee|decided|to|
|request|Consultant|(TEC-1)|to|—|furnish|
|reasons/justification|for|revision|in|norms|
|approved|in|M.|No.|10/81|dated|16.01.2019.|
|However,|no|comments|have|been|received|yet.|
|SHIVA|01/81/050/005||The|case|was|ratified|in|M.|No.10/81|dated/The|members|of|study||Deferred|
|UTENSILS|20/AM19/||16.01.2019|as|recommended|by|Consultant|group|informed|that|they|
|R34|INDUSTRIES|(TEC-3)|and|representative|of|MSME.|Thelhave|submitted|the|
|PVT:|LTD.|applicant|vide|letter|dated|12.04.2019|has|report.|| However,|the|
|0510408100|05/24/040/004||requested|for|revision|of Input-Output|Norms.|In|same|is yet to be adopted.|
|00/AM19__|M.|No.|14/81|dated|16.10.2019,|decided|to|refer|Hence,|the|Committee|
|65|| Page 79|NC -2 Meeting No. 23/81|held on 04.03.2020|L-|

----- End of picture text -----<br>

==> picture [566 x 693] intentionally omitted <==

----- Start of picture text -----<br> Dated 15.10.2018 the case to Consultant (TEC-3). The case was last|decided to take a decision<br>considered in M. No. 20/81 dt. 08.01.2020, the}on adoption of study<br>Committee observed that a team was deputed to| group report.<br>visit the factory premises of some exporters to<br>examine and determine the actual wastages in<br>manufacturing process. The report of study group<br>is awaited. Hence, the Committee decided to wait<br>for report of the study group.<br>The Committee| Approved<br>The case was ratified in M. No. 13/81 dated bonsidered the case’ as<br>KEI 27.02.2019Consultant (TEC-3).as per writtTh e n applicacomme nt svidegivenletter|recommendationby|Pet agenda and on thefe)<br>INDUSTRIES | 01/81/050/002 |dated 24.05.2019 has requested for revision of/Consultant (TEC-3)<br>LIMITED 01/AM19/_ |ratified norms. As per NC decision in M. No.|decided to allow import<br>R35 14/81 dated 16.10.2019 the case was referred to| ,¢ Antimony Trioxide,<br>0510407040 =| 05/23/040/000 |Consultant (TEC-3) on 21.11.2019 for witch wan dar allowed<br>dated 96/AM19__jexamination. The case was last considered in M.<br>03.07.2018 No. 20/81 dt. 08.01.2020 and decided to wait for|°@*ier,; withne 5% wastage.<br>comments. A reminder was issued to Consultant<br>(TEC-3) on 03.01.2020. RA convened may take<br>suitable consequential<br>action accordingly.<br>The case was rejected in M. No.03/81 dated/The Committee decided|Deferred<br>. 14.08.2018 with the observation that no specific|to remind the applicant<br>cement input item. The applicant vide letter dated|for furnishing th<br>INDIA PRIVATE] 01/81/050/001 |22P ; ee ee ge ‘i<br>LIMITED 17/AM19/ 29.11.2018 has requested for ratification of|requisite information.<br>R36 Norms. The case was referred to Consultant<br>3110066955 |31/83/040/001 (TEC-3) on 08.11.2019 for examination. As per<br>deted >1/AM18/ NC decision of meeting no. 20/81 dt. 08.01.2020,<br>05.01.2018 Consultant (TEC-3) s deficiency letter was sent<br>to the applicant on 06.02.2020. However, no<br>reply has been received yet.<br>The Consultant (TEC-3)| Approved<br>informed that the<br>applicant vide<br>representation dated<br>20.08.2019 requested for<br>The case was ratified in M. No. 3/81 datedjdeletion of thickness<br>15.05.2019 as per written comments given by/matching condition and<br>WELSPUN 01/81/050/006 Consultant (TEC-3). However, the applicant vide may be agreed as<br>R37 |. oeJAMI19 ofletterratifi dat ed 20.08.2019norms. Thehadcase requestedwas forreferred revision|differenttojcan also thicknesbe u s edplatein<br>3410044442 =| 34/24/040/001 :<br>Dated 27.08.2018| 80/AM19 Consultant (TEC-3) on 09.09.2019. The case was export product after<br>last considered in M. No. 20/81 dt. 08.01.2020jrolling. Therefore, the<br>and Consultant (TEC-3) was advised to give|Committee decided to<br>comments at earliest. omit the thickness<br>matching condition as<br>decided in M. No. 3/81<br>dated 15.05.2019.<br>Note: The — rest of<br>___|decision will _remain| ~<br>66 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 BE eee onaal of Foviek) Trade<br>----- End of picture text -----<br>

==> picture [567 x 697] intentionally omitted <==

----- Start of picture text -----<br> unchanged as decided<br>in M. No, 3/81 dated<br>15.05.2019.<br>RA concerned may take<br>suitable consequential<br><p action accordingly.<br>The case was ratified in M. No.4/81-ALC2/2018/The Committee decided Deferred<br>dated 27.08.2018. However, the applicant vide|to wait for the applicant’s<br>A-1 FENCE letter dated 30.10.2018 has requested for revision reply.<br>PRODUCTS of ratified norms. The representation was referred<br>COMPANY PVT. 01/81/050/000 |to MSME vide email dated 16.09.2019. The case<br>,<br>R38 LTD 06/AM19/ |was_ referred to MSME on_ 16.09.2019.<br>Deficiency letter was sent to the applicant on<br>0310819800 03/94/040/010 |15.11.2019 as per NC decision of M. No. 14/81<br>dvied 33/AM18/ dated 16.10.2019. A reminder was issued to the<br>14.03.20182 applicant on 02.01.2020. The case was last<br>considered in M. No. 20/81 dt. 08.01.2020 and<br>decided to wait for applicant's reply. However,<br>no reply has been received yet.<br>The case was ratified in M. No.7/81-ALC2/2018<br>dated 29.11.2018 as per recommendation o<br>representative of MSME. However, the applicant<br>vide letter dated 12.02.2019 has enclosed copies<br>of their earlier NC decisions in respect of AA<br>Nos. 0310791169 dated 18.11.2014 and<br>0310560499 dated 16.02.2010 ratified in Meeting<br>Nos. 17/81 dated 24.02.2015 and 12/81 dated<br>22.06.2010 respectively and requested to<br>A-1 FENCE reconsider their AA No.0310820970 dated<br>PRODUCTS 15.05.2018 on repeat with their previous ratified<br>COMPANY PVT 01/81/050/002| files. The applicant vide letters dated 06.05.2019<br>LTD :<br>R39 ‘| 15/AM19,_ |and 26.6.2019 had raised the same issue. In M./The Committee decided<br>No. 14/81 dated 16.10.2019, the Committee|to remind MSME for) Deferred<br>0310820970 03/94/040/001 |noted that norms for the item had been approved|expediting the comments.<br>dated 16/AM19 _ |by NC earlier. The Committee observed that<br>15.05.2018 main file of the applicant was not traceable and it<br>was decided to defer the case for want of main<br>file. ITC HS Code of export product in both the<br>applications also not matches. As per decision o<br>M. No. 17/81 dt. 27.11.2019, the Committee<br>decided to defer the case with an advice to the<br>section to trace out the main file. The case was<br>last considered in M. No. 20/81 dt. 08.01.2020.<br>The complete set of application was referred to<br>MSME on 24.02.2020. However, no comments<br>have been received yet.<br>A-1 FENCE | 01/81/050/002 |The case was ratified in M. No.7/81-ALC2/2018<br>R40 PRODUCTS 12/AM19/ |dated 29.11.2018 as per recommendation of/The Committee decided<br>| CO.PVT.LTD. representative of MSME. However, the applicant/to remind MSME._ for| Deferred<br>0310820125 03/94/040/010 |vide letter dated 07.02.2019 had enclosed copies|expediting the comments.<br>75/AM18/_ jof their earlier NC decisions in respect of AA<br>67 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 p-S a<br>----- End of picture text -----<br>

==> picture [569 x 702] intentionally omitted <==

----- Start of picture text -----<br> dated 27.03.2018 Nos. 0310664581 dated 14.11.2011 &<br>0310800027 dated 04.11.2015 ratified in Meeting<br>Nos. 37/81 dated 29.11.2011 and 24/8] dated<br>08.03.2016 respectively and requested to<br>reconsider their AA No,.0310820125 dated<br>27.03.2018 on repeat with AA No.0310800027<br>dated 04.11.2015. The applicant vide letters<br>dated 06.05.2019 and 26.6.2019 had again raised<br>the same issue. In M. No. 14/8 1dated 16.10.2019,<br>the Committee noted that norms for the item had<br>been approved by NC earlier. The Committee<br>observed that main file of the applicant was not<br>traceable and it was decided to defer the case for<br>want of main file. ITC HS Code of export<br>product in both the application also not matches.<br>The case was last considered in M. No. 20/8] dt.<br>08.01.2020. The complete set of application was)<br>referred to MSME on 24.02.2020. However, no<br>comments have been received yet.<br>The case was rejected in M. No.06/81 dated<br>26.06.2019 due to non submission of reply of<br>KANADE deficiency letter dated 25.03.2019. However, the<br>ANAND applicant vide letter dated 12.07.2019 has The-Committes decided<br>UDYOG 01/81/050/005 |requested for ratification of Norms. The case WIS send ie aeatiewatt<br>R4] PVT. | 46/AM19/ considered in M. No. 17/81 dt. 27.11.2019, the sa ig se se<br>LTD. Committee observed that main file is not mas 3 Fs ii . _| Deferred<br>0310824397 03/94/040/006 |available. Hence, it was decided to defer the case - 3) <s cari,<br>Dated 21/AM19/ with an advice to the section to trace out the main ,<br>11.10.2018 file. The case was referred to Consultant (TEC-3)<br>on 06.01.2020. The case was last considered in<br>M. No. 20/81 dt. 08.01.2020 and decided to wait<br>for comments.<br>The case was ratified in M. No.3/81-ALC2/2018<br>dated 14.08.2018 as per written comments o<br>DIPP. However. The applicant vide letter dated<br>BILCARE 31.10.2018 has stated that the quantity approved<br>LIMITED is insufficient to meet their production<br>SES OSV 000 requirements. Therefore, they have requested to<br>98/AM19/ aa<br>Ra? 3110067062 re-fix the norms as fixed earlier in M. No. The Committee; decided; Victereed<br>dated 31/83/040/000 2/81/ALC2/2015 dated 05.05.2015. The case was to wait for the comments.<br>29.05.2018 26/AM19/ last considered in M. No. 20/81 dt.08.01.2020.<br>The Committee observed that main file is still not<br>available. Hence, it was decided to defer the case<br>with directions to the section to trace the main<br>file. The case has been referred to Consultant<br>(TEC-1) for examination of the case.<br>BILCARE 01/81/050/000 The case was ratified in M. No.2/81 dated<br>LIMITED 35/AM19/ 29.05.2018 as per comments of DIPP. However,/The Committee decided<br>R43 the applicant videRe letter dated 31.10.2018 has|to remind again DPIIT<br>3110066973 ge Deferred<br>dated 31/83/040/001 requested for revision of fixed Norms. As per| fro expediting the<br>08.02.2018 47/AM18/ decision of M. No.11/81 dt. 04.09.2019, the case|comments.<br>has been referred to DPHT on 16.10.2019. The<br>68 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020 Dy. Director General of Foreigtt ©<br>----- End of picture text -----<br>

==> picture [570 x 704] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|case|was|considered|in|M.|No.|14/81|dated|
|16.10.2019,|the|Committee|heard|the|applicant|
|during|personal|hearing|and|decided|to|remind|
|DPIIT|to|expedite|the|comments.|DPIIT|was|
|reminded|on|26.11.2019|&|03.01.2020|for|
|expediting|the|comments.|The|case|was|last|
|considered|in|M.|No.|20/81|dt.|08.01.2020|and|
|decided|to|wait|for|the|comments.|However,|no|
|=|comments|have|been|received|yet.|
|The|case|was|ratified|in|M.|No.|19|dt.|05.12.2017|
|as|per|comments|of|DPIIT.|The|applicant|
|requested|for|revision|of|norms.|The|case|was|
|i|pete|ee|examination.referred to ConsultantAs|per (TEC-1)NC|decision on 25.09.2019of|M.|No./Thefor|Committee|decided|
|R44|13/81dated|04.10.2019,|a|deficiency|letter|was|to|remind|Consultant|Deferred|
|3110066259|dated]|31/83/040/000|(Sent.|t|the|applicant|on|28.10.2019.|The|(TEC-1)|for|expediting=|eferre|
|20.07.2016=|10/AM17|applicant's|reply dated|31.10.2019|was|referred|to|the|comments.|
|Consultant|(TEC-1)|on|02.01.2020.|The|case|was|
|last|considered|in|M.|No.|20/81|dt.|08.01.2020|
|and|decided|to|wait|for|comments.|However,|no|
|comments|have|been|received|yet.|
|The|case|was|ratified|in|M.|No.|19|dt.|05.12.2017|
|as|per|DIPP|comments|F.|No.|7/58/2017-TSW|
|dated|10.11.2017.|The|applicant|requested|for|
|BILCARE|21.08.2019,revision|of|itnorms.was|decidedIn|M.toNo.refer10/80the|casedatedto|
|LIMITED|01/81/050/000||Consultant|(TEC-1)|for|examination.|The|case|‘The|Conauitce|decided|
|R45|i|80/AM18||was|last|considered|in|M.|No.|17/81.|dt. a|aia|Cahn|
|3110066596|27.11.2019,|the|Committee|observed|that|main (TEC-1)|for|expediting|Deferred|
|||dated|31/83/040/001||file|is|not|available.|Hence,|it|was|decided|to|Gis Sbehiments|
|17.02.2017nore|S7/AM17 _||defer|the|case|with|an|advice|to|the|section|to|]|
|trace|out|the|main|file.|The|case|was|referred|to|
|Consultant|(TEC-1)|on|03.01.2020.|The|case|was|
|last|considered|in|M.|No.|20/81|dt.|08.01.2020|
|and|decided|to|wait|for|comments.|However,|no|
|comments|have|been|received|yet.|
|The|case|was|ratified|in|M.|No.|19|dt.|05.12.2017|
|as|per|DIPP|comments|F.|No.|7/58/2017-TSW|
|dated|05.01.2018.|The|applicant|requested|for|
|revision|of|norms.|In|M.|No.|10/80|dated|
|21.08.2019,|it|was|decided|to|refer|the|case|to|
|asian|etn-|wasConsultantlast|considered(TEC-1)|forinexamination.M.|No.|17/81The|casedt./The|Committee|decided|
|R46|27.11.2019,|The|Committee|considered|the|case|to|remind|Consultant|Defevved|
|3110066775|dated]|31/83/040/000||28|Pet|agenda|and|observed|that|main:|file|isg|not|(TEC-1)$|for|expeditingcy|eferre|
|07.06.2017Po|34/AM18|available.|Hence,|it|was|decided|to|defer|the|case|the comments.|
|with|an|advice|to|the|section|to|trace|out|the|main|
|file.|The|case was|referred|to|Consultant|(TEC-1)|
|on|03.01.2020.|The|case|was|last|considered|in|
|M.|No.|20/81|dt.|08.01.2020|and|decided|to|wait|
|for|comments.|However,|no|comments|have|been|
|received|yet.|
|69|| Page 79|NC|-2 Meeting No. 23/81 held on 04.03.2020|B-5)|a|

----- End of picture text -----<br>

==> picture [585 x 690] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|The|case|was|ratified|in|M.|No.4/81|dated|
|29.05.2019|as|per|written|comments|given|by|
|DPIIT|vide|F.|No.:|P-47014/11/2019-TSW|dated|
|22.04.2019.|However,|the|applicant|vide|letter|
|MAN|dated|01 07.2019|and|31.07.2019|has|requested|
|INDUSTRIES.|| 01/81/050/005|for|revision|of|ratified|norms.|The|case|was|
|(INDIA) LTD.|||SO/AMI9/_||[cretTed\|0 DPIIT on 08.11.2019|for examination.|Committee|decided|
|ails|reminder|was|also|issued|to|DPIIT|on|:|
|0310823931|03/95/040/005|03.01.2020.|The|written|comments|given|by|io|pect|DFUT|for)|Deferred|
|Sared|SI/AMI9/|[DPLIT|vide|U.|O.|No.:|P-47014/11/2019-TSw)“*Poamnsthe comments.|
|74.06.2018|dated|06.12.2019|was|considered|by|NC|in|its|;|
|Meeting|No.|20/81|dt.|08.01.2020.|The|
|Committee|decided|to|request|DPIIT|to|furnish|
|reasons/justification|for|revision|in|norms|
|approved|in|M.|No.|4/81|dated|29.05.2019.|
|However,|no|comments|have|been|received|yet.|
|The|case|was|rejected|in|M.|No.22/81|dated|
|PiereSoa|re|deficiency24.01.2017|letterdue|todatednon-submission27.06.2016|followedof|reply|byo|
|PRIVATE|01/81/050/004|reminder|dated|21.09.2016.|However,|the}/The|Committee|decided|
|R48|LIMITED|86/AM16/||applicantrequested|forviderevisionmail|ofdatedfixed|Norms.02.07.2019The|case|representationhas|to|send|a|completeto|DHIset|as|of|Deferred|
|3410041397|34/24/040/001||was|referred|to|DHI|on|26.11.2019.|A|reminder|requested|by|the|
|Dated|23/AM16/__|was|also|issued to|DHI|on|09.01.2020.|The|case|representative of DHI.|
|23.07.2015|was|last|considered|in|M.|_No.|20/81|dt.|
|eae|08.01.2020|and|decided|to|wait|for|comments.|
|However,|no|comments|have|been|received|yet.|
|The|case|was|ratified|in|M.|No.06/81|dated|The|representative|of|Deferred|
|01.11.2018|on|the|recommendation|of/MSME|_|informed|in|
|WIELAND|representative|of|MoS,|allowing|quantity|of meeting|that|the|
|METALS INDIA| 01/81/050/003|import|item|as|1.015|kgs/kg content|in|the|exportlapplicant’s|reply|is|not|
|PRIVATELTD ||59/AM19/|product.|However,|the applicant vide|letters|dated|proper.|Hence,|the|
|RAO|28.05.2019|&|11.07.2019|had|requested|for|Committee|decided|to|
|0710112879||07/24/040/003|\"°view|of|Norms.|A|deficiency|letter was|sent|to|call|the|applicant|for|
|Dated|>A4/AM18/|the|applicant|on|26.12.2019|as|per|NC|decision|personal|hearing|to|
|26.02.2018|of|Meeting|No.|17/81|dt.|27.11.2019.|Thejexplain|the|case|in|the|
|ies|applicant's|reply|dt.|02.01.2020|was|referred|to|forthcoming NC|meeting.|
|MSME|on|24.02.2020|for|examination|of|the|
|case.|
|WIELAND|The|case|was|ratified|in|M.|No.14/81|dated|a|oe|
|METALS|INDIA|13.03.2019 as recommended by representative|o|danesite|that|ie|
|PRIVATE|| 01/81/050/008||MSME.|However,|the|applicant|vide|letter|dated|hicant?|we|;|
|LTD ||78/AM19/||28.05.2019|had|requested|for review|of|Norms.|A|*PPucant's|Feply|1s|no|
|R50|é|'|proper.|Hence,|the|
|0710112301|deficiency|letter|was|sent|to|the|applicant|on Commie|decided:|to|
|Dated|07/24/040/002||26.12.2019|as|per NC|decision|of Meeting|No.|etn|ital|Getieahcal|oie|
|24.10.2017|03/AM18/|02.0|17/8|1|.2020dt.|27.11.2019.was|referredTheto MSMEapplicant'son|24.02.2020|Porsona!—reply|dt.|,|3Rearing|to|
|for examination|of the case|explain|ie|2|ae|
|;|forthcoming NC|meeting.|
|RS]|WIELAND|01/81/050/007||The|case|was|ratified|in|M.|No.14/81|dated|The|representative|of| Deferred|
|METALS|INDIA ||72/AM19/_||13.03.2019|as|recommended|by|representative|of,|MSME|__|informed|
|70|||Page 79|NC|-2|Meeting No.|23/81|held|on|04.03.2020|y.|Director|G|Foreign|

----- End of picture text -----<br>

==> picture [565 x 705] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|PRIVATE LTD|MSME.|However,|the|applicant|vide|letter|dated|meeting|that|the|
|0710111712|07/24/040/000||28.05.2019 has requested|for review|of Norms.|A|applicant’s|reply|is|not|
|Dated|71/AM18/_|deficiency|letter|was|sent|to|the|applicant|on|proper.|Hence,|_|the|
|06.06.2017|26.12.2019|as|per|NC|decision|of Meeting|No.|Committee|decided|to|
|17/81|dt.|27.11.2019.|The|applicant's|reply|dt.jcall|the|applicant|for|
|02.01.2020|was|referred|to MSME|on|24.02.2020|personal|hearing|to|
|for examination ofthe|case.|explain|the|case|in|the|
|forthcoming NC|meeting.|
|WIELAND|The|case|was|ratified|in|M.|No.14/81|datedae|e Deferred|
|METALS|INDIA|13.03.2019|as|recommended|by|representative|o|a|h|
|PRIVATE|| 01/81/050/010||MSME.|However,|the|applicant|vide|letter|dated eo See|ee|
|R52|LTD ||64/AM19/|28.05.2019|has requested|for review of Norms.|A|@PPcant's re|ps|
|0710110935|deficiency|letter|was|sent|to|the|applicant|on rls|aad|;|rs|
|Dated|—|||07/24/040/003||26.12.2019|as|per NC|decision|of Meeting|No.|cull|Ge|sensi|te|
|09.01.2017|23/AM17/||17/81|dt.|27.11.2019.|The|applicant's|reply|dt.|:|Co|
|02.01.2020 was referred|to MSME on 24.02.2020|P“*ea|ss|in|“a|
|for examination|of the case.|Ken Se|ve|
|orthcoming NC|meeting.|
|WIELAND|The|case|was|ratified|in|M.|No.14/81|dated ee|ae|si|ich|
|METALS|13.03.2019|as recommended|by|representative|o|meeting|that|ee|
|INDIA| 01/81/050/010||MSME.|However,|the|applicant|vide|letter|dated|easlicait’s|declv-|is.|not|
|R53|PRIVATE LTD ||74/AM19/||28.05.2019|has requested|for review of Norms.|A|@PP|-|Ply|"|
|0710111245|deficiency|letter|was|sent|to|the|applicant|on Res fia|eosd|“|
|Dated|— ||07/24/040/003||26.12.2019|as|per NC|decision|of Meeting|No. SE|ik|eit|oeinds|* Has|
|07.03.2017|91/AM17/||17/81|dt.|27.11.2019.|The|applicant's|reply|dt.|ed|'|:|
|02.01.2020 was referred|to MSME on 24.02.2020/P°°208|||UCinE|aa|
|for examination of|the case.|raeae RE|neea.|
|WIELAND|The|case|was|ratified|in|M.|No.14/81|dated bead|een|ve|eenhoctas|
|METALSPRIVATELTDINDIA| 01/81/050/008||MSME.13.03.2019However,as recommendedthe|applicantby|representativevide|letter|datedo|seai|8|:|thetlv|i|the|
|R54|||76/AM19/||28.05.2019|has requested|for review of|Norms, A|@PPlicant’sae|
|0710110386|deficiency|letter|was|sent|to|the|applicant|on Sauna|raed|
|Dated|||07/24/040/001||26.12.2019|as|per NC|decision|of Meeting|No.|S240|the|deusliognk|die|
|07.09.2016|9/AM17/|(17/81|dt.|27.11.2019.|The|applicant's|reply|dt.|°@|iy|“PP|CEN|Or|
|02.01.2020|was|referred|to MSME on 24.02.2020/P™008|||nearing|
|for examination|of the|case.|P|;|.|
|forthcoming NC|meeting.|
|WIELAND|The|case|was|ratified|in|M.|No.14/81|dated essaa|nasa|rs een|
|METALS|INDIA|13.03.2019|as recommended|by|representative|o|ening|that|the|
|PRIVATE|| 01/81/050/007||MSME.|However,|the|applicant|vide|letter dated|™|:|e|_|
|R55|LTD ||34/AM19/_||28.05.2019|has requested|for review of|Norms. A|@PP¥cant's Kier,|i|“i|
|0710109853|deficiency|letter|was|sent|to|the|applicant|on i|ee —d|i|
|Dated||07/24/040/000||26.12.2019|as|per NC|decision|of Meeting|No.|6|Shee|Pit|||dock|
|23.05.2016|-48/AM17/||17/81|dt.|27.11.2019.|The|applicant's|reply|dt.|°?|;|ge|eats|
|02.01.2020|was|referred|to MSME on 24.02.2020|Porsonal|hearing|—_ to|
|for examination|of the|case.|=|si|eae hi|
|forthcoming NC|meeting.|
|R56|DYNAMIC|| 01/81/050/001|The|case|was|rejected|in|M.|No.06/81-|The|Committee|é|
|FLOW|06/AMI9/||ALC2/2019|dated|26.06.2019|due|to|non-|considered|the|case|as||“PPFove|
|PRODUCTS|submission|of|reply|of|deficiency|letters|dated|per|agenda|and|decided|
|71|| Page 79|NC -2 Meeting No. 23/81|held on 04.03.2020|ca|

----- End of picture text -----<br>

==> picture [569 x 691] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|PVE:|LED,|03/94/040/008||27.11.2018|&|03.06.2019.|The|applicant|to|fix|the|ad-hoc|norms|
|73/AM18/||furnished|reply|vide|letters|dated|03.12.2018,|as|per|written|comments|
|0310819096|27.02.2019,|13.06.2019|&|22.10.2019|and/dated|25.02.2020|given|
|dated|requested|for|ratification|of|ad-hoc|norms.|The|by|consultant|(TEC-3).|
|12.02.2018|case|was|referred|to|Consultant|(TEC-3)|on|(Copy|enclosed)|
|21.11.2019|for|examination|&|comments.|The|
|case|was|last|considered|in|M.|No.|20/81|dt./RA|concerned|may|take|
|08.01.2020|and|Consultant|(TEC-3)|informed|suitable|consequential|
|that|the|applicant|has|not|yet|finalized|the||action|accordingly.|
|product-mix|&|wastages|vary|with|size.|As|per|
|NC|decision,|a|deficiency|letter|was|sent|to|the|
|applicant|on|06.02.2020.|
|The|case|was|inadvertently|written|ratified|in|M.|
|No.12/81|dated|27.08.2013|whereas|DPIIT|vide|
|U.|O.|No.|12/2/2013-TSW/40|dated|14.06.2013|
|had|sought|following|information|as|mentioned|
|in|NC|M.|No.05/81|dated|06.06.2013|as|under:|1.|
|Voltage|rating|of|cables.|2.|Detailed|calculations|
|for|the|requirement|of|each|raw|material,|export|
|product|wise|supported|by|the|Cross|sectional|
|DELTON|01/81/0S0/004|diagram|of|the|cable/Buyers|data|sheet.|3.|Net|
|CABLES|LTD.|3/AM13/|weight|per|KM|of|each|Cable|4.|Material|The|Committee|decided|
|R57|balancing|viz.|net|content|of each|imported|and|to|remind|the|applicant|
|0510337606|ite|;|:|eee|Deferred|
|Dated|05/23/040/002|indigenous|input, export product wise, per KM|of}|for|furnishing|the|||
|23.10.2012|78/AM13/|exportmaterial,product.export5.productTotal requirementwise,|in|a|tabularof eachformraw|requisite|information.|||
|However,|the|applicant|vide|letter|dated|
|09.08.2016|had|requested|for|ratification|o|
|Norms.|The|case|was|referred|to|DPIIT|on|
|25.10.2019|for|examination|and|comments.|As|
|per|NC|decision|of|Meeting|No.|20/81|dt.|
|08.01.2020,|DPIIT’s|deficiency|letter|was|sent|to|
|the|applicant|on|06.02.2020.|However,|no|reply|
|has|been|received|yet.|
|The|case|was|ratified|in|M.|No.|4/81-ALC2/2019|The|members|of|study|Deferred|
|dated|29.05.2019|as|per|written|comments|dated|group|informed|that|they|
|13.09.2019|given|by|Consultant|(TEC-3).|The/have|submitted|the|
|applicant|vide|letter|dated|18.11.2019|has|report.|However,|—|the|
|requested|for revision|of ratified|Norms.|The|case|same|is|yet|to|be|adopted.|
|KUMAR|01/81/050/008||”|referred|to|Consultant|(TEC-3)|on|Hence,|the|Committee|
|STEELS|INC|58/AM19/|31.01.2020|for|examination|&|comments.|In|M.|decided to take|a decision|
|R58|No.|17/81|dt.|27.11.2019,|the|Committee}on|adoption|of|study|
|0510403616|observed|that|a|team|has|been|deputed|to|visit|the||group|report.|
|dated|05/23/040/001|¢|:|
|08.08.2017|59/AM18/|andfactorydetpr|e|rminemises|ofthesomeactualexporterswastagto|e|s_xaminein|
|manufacturing|process.|The|report|of study|group|
|is|awaited.|Hence,|the|Committee|decided|to|wait|
|for|report|of|the|study|group.|The|case|was|last|
|considered|in|M.|No.|20/81|dt.|08.01.2020|and|
|decided|to|wait|for|the|study|group|report.|ahh|
|RS9|CROMPTON||01/81/050/005||The|case|was|rejected|in|M.|No.|9/81-|The|representative|of Deferred|
|GREAVES|OS/AMI15/||ALC2/2015|dated|11.08.2015|due|to|non-|DHI|informed|in|meeti|ii|
|72|||Page 79|NC|-2 Meeting No. 23/81|held|on|04.03.2020|NP|haset|ee|

----- End of picture text -----<br>

==> picture [564 x 711] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|LIMITED|submission|of reply of deficiencies|raised|by|DHI|that|the|—applicant’s|
|0310789692|03/94/040/002||vide|letter|dated|03.03.2015|despite|reminders.|request|for|revision|of|
|dated|68/AM15/||The|applicant|vide|letter|dated|02.01.2016|had/norms|is|not|clear.|
|26.09.2014|furnished|reply|and|requested|to|fix|the|norms.|Hence,|the|Committee|
|The|subject|AA|was|ratified|in|M.|No.20/81|decided|to|call|the|
|dated|19.12.2017|as|per DHI|comments|vide|UO|applicant|for|personal|
|No.|TSWB-3/181/2014|dated|12.01.2018.|hearing|to|explain|the|
|However,|the|applicant|vide|email|dated|case|in|the|forthcoming|
|09.01.2018|requested|for|amendment|as|all|the|NC|meeting.|
|Net|to|Net|items|are|mandatory|for|requirement|
|of|Export.|The|case|was|referred|to|DHI|on|
|16.09.2019.|DHI|vide|email|dated|21.11.2019|
|has|sought|main|file.|The|case|was|last|
|considered|in|M.|No.|20/81|dt.|08.01.2020|and|it|
|was|decided|to|defer|the|case|with|an|advice|to|
|the|section|to|trace|out|the|main|file.|The|main|
|file|is|traced|out|and|referred|to|DHI|on|
|27.02.2020.|
|The|case|was|ratified|in|M.|No.10/81|dated/The|members|of|study||Deferred|
|16.01.2019|as|per|recommendation|of Consultant|group|informed|that|they|
|(TEC-3)|decided|to|ratify|the|norms|allowing|7%|have|submitted|its|report.|
|wastage|with|the|condition|that|the|However,|the|same|is|yet|
|SHRI|grade/technical|specifications|of|the|stainless|to be adopted. Hence, the|
|PARSHAVNAT|steel imported and|that exported should conform.|Committee|decided|to|
|The|applicant|vide|letter|dated|19.04.2019|has|take|a|decision|on|
|H IMPEX|0.1/81/050/005||requested|for|revision|in Norms.|The|case|was|adoption|of|study|group|
|R60|(INDIA)|17/AM19/__|referred|to|Consultant|(TEC-3)|on|25.10.2019.|report.|
|The|case|was|considered|in|M.|No.|14/81|dated|
|0510407733|05/24/040/003|16.10.2019,|the|Committee|noted|that|a|team|
|dated|30/AM19/__|comprising|officers|of|DGFT|and|DPIIT|has|
|10.09.2018|been|constituted|to|visit|the|factory|premises|0|
|some|applicants:|having‘|same/similarte|products|to|
|study|the|manufacturing|process|and|to|ascertain|
|wastages.|Hence,|the|Committee|decided|to|wait|
|for|report|of|the|study|group.|The|case|was|last|
|considered|in|M.|No.|20/81|dt.08.01.2020|and|
|decided|to wait|for report of the|studygroup.|eae See ne|
|The|case|was|rejected|in|M.|No.|2/81- sc|Paces ahh fia|
|ALC2/2018|dated|29.05.2018|as|Technical|per|agenda|and|after|
|INDIA|officer present opined that Slab cannot be use for considering|written|
|TRADING|making|rounds.|The|applicant|vide|letter|dated comments|of|Consultant|
|HOUSE|01/81/050/003|10.07.2019|had|requested|for|ratification|of ad- (SKB)|decided|to|fix|the|
|R61|98/AM18/|hoc|norms.|The|case|was|referred|to|Consultant ad-hoc|norms|for|import|
|0510404048|(TEC-3)|on|21.11.2019|for|examination.|The|item @ 7%|wastage|on|
|dint|||05/23/040/002||°@S&_|Was|last|considered|in|M.|No.|20/81|dt.|the|basis|of inputs|given|
|20.09.2017|37/AM18|3),08.01.2020.the|CommitteeAs|per|decidedadvice|ofto Consultantrefer|the|case(TEC-to|by Technical Authorities.|
|Consultant (SKB)|for|examination|&|comments.|RA|concerned|may|take|
|As|per|decision|of|M.|No.|20/81|dt.|08.01.2020,)|.|i|
|the|case|was|referred|to|Consultant|(SKB)|on|sunable|consequential|
|_/PA.02.2020.|action accordingly.|
|73|| Page 79|NC -2 Meeting No. 23/81 held on 04.03.2020|BS|

----- End of picture text -----<br>

==> picture [561 x 693] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|KASEZ,|vide|letter|No.|KASEZ/100%EOU/The|Committee|noted||Deferred|
|/11/969/00-01/6116|dated|27.09.2017|forwarded|a|that|DPIT|has|not|yet|
|copy|of application|for|fixation|Of sctap/WAStAgel|oon|reminded’|for|
|norms|on|regular|basis|for|manufacture|and|Hicmilitia|ten|vcatienne|
|export|of|Industrial|Valves|and|Industrial|Valve|P|.|:|;|
|LUBI|Parts. The DC|stated that the wastage norms had &|also|main|file|is|not|
|ELECTRICALS|01/81/0622/AM|1|/0008/|subject[Peet|fixedto|fio|n|alad-hocfixationbasisof|normsup|to|31.03.2003|yetby|Norms/section.tracedTherefore,out|by|the|
|R62|LIMITED,|KASEZ/100%|Committee|in|DGFT.|The|case was|considered|in}Committee|decided|to|
|AHMEDABAD|M.|No.|4|/81-Pt.II|dated|03.10.2018|and|noted|remind|DPIIT|&|and|
|- Referred|by DC|BOUAT/I6RMG|that|case was|referred|to|DIPP|for comments|and||4:|‘|
|KASEZ|?|-01/|:|af|directed|the|section|to|
|reminded|on|27.09.2019.|The|case|was|last Sess|Sak|ein|Ge|
|considered|in|M.|No.|20/81|dt.|08.01.2020,|the].|.|
|Committee|noted|that|DPIIT|was|not|reminded|!™mediately.|
|for|expediting|the|comments|&|also|the|main|file|
|was|not|traced|out|by|the|section.|Therefore,|the|
|Committee|decided|to|remind|DPIIT|and|directed|
|the|section|to|trace|out|main|file|immediately.|
|The|Committee||Approve|
|considered|the|case|as/d|
|per|agenda.|
|Representative|of MSME|
|informed|the|committee|
|that|the|earlier|
|recommendations|given|
|by|Consultant|(TEC-3)|
|were|considering|—|the|
|import|items|as|Lead|
|ingot|whereas|the|actual|
|The|case|was|ratified|in|M.|No.9/81-ALC2/2019|import|items|as|per|
|ESWARI|dated|07.08.2019|on|recommendations|of|Authorisation|is|Lead|
|GLOBAL|Consultant|(TEC-3).|Acid|Battery|scrap|as|per|
|METAL|01/81/050/010|The|applicant|via|email|letter|dated|13.11.2019)ISRI|code,|RAINS.|
|INDUSTRIES|49/AM19/|has|requested|for|review|of ratified|norms as|per|Hence,|the|Committee|
|R63|PRIVATE|AA No.|0710105804|dated|17.07.2014|ratified|in|decided|to fix|the|ad-hoc|
|LIMITED|07/24/040/002|Meeting|No.|21/81|dated|27.01.2016.|As|per NC|norms|taking|cue|from|
|0710109067|56/AM16/|deficiencydecision|of Meetingletter|wasNo.sent20/81to|thedt.|08.01.2020,applicant|on|0710105804ajapproved|AA|datedNo.|
|dated|06.02.2020.|The|applicant's|reply|dt.|07.02.2020]|17.07.2014|as|per|written|
|23.11.2015|was|referred|to|MSME|via|email|datedjcomments’|given|by|
|21.02.2020.|MSME|as|under:|
|1.|Quantity|of|import|
|item|may|be|allowed|
|as|applied|inclusive|
|of 7%|wastage.|
|Note:|Average|
|percentage|of|lead|in|
|import|item|is|53.5%.|
|RA|concerned|may|take|
|74|| Page 79|NC -2|Meeting|No. 23/81|held on 04.03.2020|Dy.|Dir oe|oe|Seer|

----- End of picture text -----<br>

==> picture [578 x 714] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|FI|ee|a|Ete|ae|=|aes|Ae|~—||suitable|consequential|Sot|
|action|accordingly.|
|;|=|1|aa|We|ps|ee po|ne eesee ee|eee|[Based|on|thecomments)|
|The|case|was|ratified|in|M.|No.|03/81- edpiaaiapA -|
|ALC2/2018|dated|14.08.2018|allowing|wastage|ping.|thee|
|of|.|:|:|Committee|decided|to|
|10%|i.|quantity|of|import|allowed|as|devine|a|yes|a|
|VENUS|20.612MT.|The|applicant|vide|letter|dated apate|Tiley|
|INDIA||01/81/050/001|14.11.2019|had|requested|for|revision|of ratified|
|88/AM19/|Norms.;|In|M.|No.|17/81|dated|27.11.2019,|it|was]...|;|
|decided|:|:|(i)|Quantity|of||
|R64|||2910025330|saeto|ask|from|the|applicant|to|depositSet|a||import\”|item,|may|be|Approve|
|Dated|29/24/040/000|compositionsi|fee|of|Rs.5000/-2|:|for|considering,|allowed|as|1.10|d|
|28.03.2018|revision|of the|case.|The|applicant|had|furnished|
|11/AM18/|as|:|Kg/Kg|content|o|
|a|copy|of|composition|fee|of|Rs.5000/-|receipt|Sided|Mal|oul|tus|
|dated|14.12.2019.|The|case|was|referred|to|4|*|
|Consultant|(TEC-3)|on|25.02.2020|as|per|NC|re|
|decision|of|Meeting|No.|20/81|dt.|08.01.2020.|
|However,|no|comments|have|been|received2|yet.|RA|may:|take:|
|consequential|action|
|k|ja|ee|cieilimene|Wes|Lo|tSa|seeenedingly.|
|The|case|was|ratified|in|M.|No.11/81-|
|JINDAL|ALC2/2019|dated|04.09.2019|as|per|written|
|SAW|comments|dated|04.09.2019|given|by|Consultant|
|LIMITED|ghee|tea|(TEC-3).|The|applicant|vide|letter|dated|
|R65|02.01.2020|requested|for|revision|of|ad-hoc/The|Committee|decided ||
|0510407744|05/23/040/002||ROr™S|ratified|in|respect|of import|item|SI.|No.|4|to wait|for the comments.|oe|
|dated|50/AM19/|&|5|as|applied|in|the|AA.|The|case|was|referred|
|11.09.2018|to|Consultant|(TEC-3)|on|25.02.2020|as|per NC|
|decision|of|Meeting|No.|20/81|dt.|08.01.2020.|
|ae|______|However,The|casenowas commentsratifiedhaveinbeenM.|receivedNo.|yet.10/81- ||a|
|PRODUCTS|CO. | 01/81/050/010||"PUS|siven|by|The|Committee|decided|
|ees|applicant|vide|letter|dated|27.01.2020|stated|that|
|PVT|GED,|17/AM19/|2|:|:|to|refer|the|case|to|
|R66|the|wastage|and|quantity|of imported|material|for|
|0310827173|the|“product|"Relevant|Piithe|Hot|_dinned|Consultant|(TEC-3)|for||Deferred|
|Dated||03/94/040/01003/AM19/|galvanisedee|steel|in|eersheets/coils"neem|for:|all|the|PPC’four|comments.examination|&||||
|20.02.2019|export|products|have|not|been|given|correctly.|
|eter|Therefore,|they|have|requested|to|re-fix|the|ad-|
|The|case|was|ratified|in|M.|No.|10/81-|
|VEER-O-a|ALC2/2018|‘|dated|16.01.2019|as|per|written|COmsultant|Sharm|
|METALS|ineh|informed|that|he|has|
|eng|comments|given|by|Consultant|(TEC-3).|The|Kinnloail|die|
|PRIVATE|01/81/050/005||applicant|vide|letter|dated|10.02.2020|stated|that|é|
|R67|LIMITED|79/AM19/|jonly|one|chassis‘|OM-1015C-R6|for|export|samnasiatrepresentation the mainonly feand|
|product|is|mentioned|in|the|ratified|minutes|of/'“4|||Deferred|
|0710112458|07/24/040/002||meeting no.|10/81|dt.|16.01.2019,|Whereas, there The|Cannailien:|directal|
|dated|16/AM18/|are|multiple|chassis|for|the|same|product|'Sheet|‘|
|Metal|:|the|section|to|refer|the|
|24.11.2017|Product’.|Therefore,|they|have|requested|~|~.|
|for|we|;|main|file|to|Consultant|
|revision.|The|representation|was|referred|to (SKB)|immediate!|
||__||_|[Consultant|
|(SKB)|on|25.02.2020.|However,|nol")|mediately.||
|75|| Page 79|NC -2 Meeting No. 23/81 held on 04.03.2020|Be|

----- End of picture text -----<br>

==> picture [566 x 694] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|comments|have|been|received|yet.|
|VEER-O-|The|case was|ratified|in|M.|No.|3/81-ALC2/2018|Consultantinformed|that|he(SKB)has|
|METALS|PVT.||01/81/050/000|dated|14.08.2018.|The|applicant|vide|letter|dated||received|the|
|LTD.:|77,AM18/|10.02.2020|requested|for|consolidated|wastage|representation|only|and|
|R68|
|percentage|in|the|ratification|with|the|export|requested|the main|file.|Deferred|
|0710108701||07/24/040/001|description|of sheet|metal|components|instead|of]|
|dated|91/AM16/|detailing|each|product.|The|representation|was|The|Committee|directed|
|09.09.2015|referred|to|Consultant|(SKB)|on|25.02.2020.|the|section|to|refer|the|
|a|However,|no|comments|have|been|received|yet.||main|file|to|Consultant|
|(SKB)|immediately.|
|DYNAMIC|The|case|was|ratified|in|M.|No.|16/81-|
|FLOW|01/81/050/011|ALC2/2019|dated|13.11.2019|as|per|written|
|PRODUCTS|45/AM19/__||Comments|dated|08.11.2019|given|by|Consultant|
|_—|PVT.LTD.|(TEC-3).|The|applicant|vide|letter|dated|The|Committee|decided|
|0310827574|03/94/040/010|||17.07-9|2|:.2020|||requereque|st|eded|forfor|30%©|wastage.wastage.|The|to|The|to|waiwai|t|forfortheth|comments.|asi ees|
|dated|61/AM19/|3)representationon|25.02.2020.was|However,referred|tonoConsultantcomments(TEC-have|
|08.03.2019|been|received|yet.|
|aaa|The|case|was|ratified|in|M.|No.|13/81-|thatThe theCommitteerequest|hasnotbe|e|d|Deferredn|
|BLADES|01/81/050/004|ALC2/2019|dated|03.10.2019|as|per|written|received|beyond|90|days|
|[INDIA] PVT|66/AM19/__||Comments|dated|27.09.2019|given|by|Consultant|from|_|last|decision.|
|R70|LTDSails|:|(TEC-1).|The|applicant|vide|letter|dated|Hence,|the|Committee|
|07/24/040/001|18.02.2020|requested|to|amend|the|export|decided|to|ask|the|
|0710111965|25/AM18/|product|as|7,20,585.00|Kg.|applicant|to|deposit|
|dated|The|representation|was|referred|to|Consultant|composition|fee|of|
|03.08.2017|(TEC-1)|on|03.03.2020.|Rs.5000/-|for|considering|
|=|the|case.|
|LM|WIND|;|The|Committee|noted|Deferred|
|POWER|The|case|was|ratified|in|M.|No.|12/81-|that the|request|has|been|
|BLADES|01/81/050/004|ALC2/2019|dated|18.09.2019|as|per|written|received|beyond|90|days|
|[INDIA]|PVT.|74/AM19/_||Comments|dated|17.09.2019|given|by|Consultant}|from|last|decision.|
|R71|LTD|(TEC-1).|The|applicant|vide|letter|dated|Hence,|the|Committee|
|07/24/040/002|18.02.2020|requested|to|amend|the|export|decided|to|ask|the|
|0710112408|20/AM18/|product|as 2,98,724.00|Kg.|applicant|to|deposit|
|dated|The|representation|was|referred|to|Consultant|composition|fee|of|
|14.11.2017|(TEC-1)|on|03.03.2020.|Rs.5000/-|for|considering|
|ane|the|case.|
|sy|The|case|was|ratified|in|M.|No.|12/81-|thatThe theCommitteerequest|hasnotbe|e|nd|Deferred|
|BLADES|01/81/050/004|ALC2/2019|dated|18.09.2019|as|per|written|received|beyond|90|days|
|[INDIA]|PVT|73/AM19/|comments|dated|17.09.2019|given|by|Consultant!|from|last|decision.|
|R72|LTD|:|:|(TEC-1).|The|applicant|vide|letter|dated|Hence,|the|Committee|
|07/24/040/002|18.02.2020|requested|amend|the|export|product|decided|to|ask|the|
|0710112465|30/AM18/|[28 367,328.00|Kg.|applicant|to|deposit|
|dated|The|representation|was|referred|to|Consultant/composition|fee|of|
|27.11.2017|(TEC-1) on|03.03.2020.|Rs.5000/-|for|considering|
|aie|the|case.|
|R73|LM WIND|01/81/050/004||The|case|was|ratified|in|M.|No.|11/81-|The|Committee|noted|Deferred|
|POWER|65/AM19/_||ALC2/2019|dated|04.09.2019|as|per|written|that|the|request|has|bee|
|76|||Page 79|NC|-2 Meeting No. 23/81|held on|04.03.2020|mee|

----- End of picture text -----<br>

==> picture [560 x 697] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|BLADES|comments|dated|30.08.2019|given|by|Consultant|received|beyond|90|days|
|[INDIA]|PVT.|| 07/24/040/001||(TEC-1).|The|applicant|vide|letter|dated|from|last|—|decision.|
|LTD.|53/AM18/_||18.02.2020|requested|to|amend|the|export|Hence,|the|Committee|
|product|as|4,65,437.00|Kg.|decided|to|ask|the|
|0710112320|The|representation|was|referred|to|Consultant|applicant|to|deposit|
|dated|(TEC-1)|on|03.03.2020.|composition|fee|o|
|27.10.2017|Rs.5000/-|for|considering|
|the|case.|
|eee|eer|el|ee|lee,|
|ae|The|case|was|ratified|in|M.|No.|13/81-| thatThe theCommitteerequest|hasnoted|Deferredbeen|
|BLADES|01/81/050/004|ALC2/2019|dated|03.10.2019|as|per|written|received|beyond|90|days|
|[INDIA]|PVT.||26/AM19/|comments|dated|27.09.2019|given|by|Consultant)|from|last|decision.|
|R74|LTD.|(TEC-1).|The|applicant|vide|letter|dated|/Hence,|the|Committee|
|07/24/040/003|18.02.2020|requested|amend|the|export|product|decided|to|ask|the|
|0710112926||20/AM18/|as 4,88,144.00|Kg.|applicant|to|deposit|
|dated|The|representation|was|referred|to|Consultant|composition|fee|of|
|05.03.2018|(TEC-1) on|03.03.2020.|Rs.5000/-|for|considering|
|a|the|case.|
|goose|The|case|was|ratified|in|M.|No.|12/81-|thatThe|theCommitteerequest|hasnoted|Deferredbeen|
|BLADES|01/81/050/009||ALC2/2019|dated|18.09.2019|as|per|written|received|beyond|90 days|
|[INDIA] PVT|15/AM19/__||Comments|dated|16.09.2019|given|by|Consultant|from|last|—_decision.|
|RIS|LTD|;|(TEC-1).|The|applicant|vide|letter|dated|Hence,|the|Committee|
|07/24/040/002||!8-02-2020|requested|to|amend|the|export|decided|to|ask|the|
|0710110885|72/,AM17/|product as|14,52,159.00|Kg.|applicant|to|deposit|
|dated|The|representation|was|referred|to|Consultant|Composition|fee|<|
|02.01.2017|(TEC-1)|on|03.03.2020.|Rs.5000/-|for|considering|
|vera|the|case.|
|a|The|Committee|noted|Deferred|
|BLADES|01/81/050/004|ALC2/2019The|case|wasdatedratified18.09.2019in|M.as|No.per|written|received12/81-|that the|requestbeyondhas90|beendays|
|[INDIA]|PVT|42/AM19/|comments|dated|16.09.2019|given|by|Consultant||from|last|decision.|
|R76|LTD|,|(TEC-1).|The|applicant|vide|letter|dated|Hence,|the|Committee|
|07/24/040/000|18.02.2020|requested|to|amend|the|export|decided|to|ask|the|
|0710111859|91/AM18/|product|as|13,38,372.00|Kg.|applicant|to|deposit|
|dated|The|representation|was|referred|to|Consultant}/composition|fee|o|
|05.07.2017|(TEC-1)|on|03.03.2020.|Rs.5000/-|for|considering|
|the|case.|
|LM WIND|=|:|The|Committee|noted|Deferred|
|POWER|[The|case|was|ratified|in|M.|No.|12/81-|that the|request|has|been|
|BLADES|01/81/050/004|ALC2/2019|dated|18.09.2019|as|per|written|received|beyond|90|days|
|[INDIA] PVT|20/AM19/|comments|dated|16.09.2019|given|by|Consultant|from|_last|decision.|
|R77|LTD|‘|(TEC-1).|The|applicant|vide|letter|dated|Hence,|the|Committee|
|07/24/040/003|18.02.2020|requested|to|amend|the|export|decided|to|ask|the|
|0710111037|27/,AM17/|product|as 2,66,695.00|Kg.|applicant|to|deposit|
|dated|The|representation|was|referred|to|Consultant|composition|fee|0|
|31.01.2017|(TEC-1) on|03.03.2020.|Rs.5000/-|for|considering|
|stain|the|case.|
|LM|WIND|01/81/050/004||The|case|was|ratified|in|M.|No.|12/81-/The|Committee|noted|Deferred|
|R78|POWER|75/AM19/||ALC2/2019|dated|18.09.2019|as|per|written|that|the|request|has|been|
|BLADES|comments|dated|16.09.2019|given|by|Consultant|received|beyond|90|days|
|77|| Page 79|NC -2 Meeting No. 23/81 held on 04.03.2020|5-5)|

----- End of picture text -----<br>

R82

||[INDIA]PVT. |07/24/040/002|(TEC-1). The applicant vide<br>letter<br>datedlfrom last<br>decision!<br>LTD<br>05/AM17/<br>|18.02.2020<br>requested<br>to<br>amend<br>the<br>export/Hence,<br>the<br>Committee|[INDIA]PVT. |07/24/040/002|(TEC-1). The applicant vide<br>letter<br>datedlfrom last<br>decision!<br>LTD<br>05/AM17/<br>|18.02.2020<br>requested<br>to<br>amend<br>the<br>export/Hence,<br>the<br>Committee|[INDIA]PVT. |07/24/040/002|(TEC-1). The applicant vide<br>letter<br>datedlfrom last<br>decision!<br>LTD<br>05/AM17/<br>|18.02.2020<br>requested<br>to<br>amend<br>the<br>export/Hence,<br>the<br>Committee|[INDIA]PVT. |07/24/040/002|(TEC-1). The applicant vide<br>letter<br>datedlfrom last<br>decision!<br>LTD<br>05/AM17/<br>|18.02.2020<br>requested<br>to<br>amend<br>the<br>export/Hence,<br>the<br>Committee||||
|---|---|---|---|---|---|---|---|
|||||product as 2,70,035.00 Kg.<br>decided<br>to<br>ask<br>the||||
|||0710110653<br>dated<br>16.11.2016||The representation was referred to Consultant|applicant<br>to<br>deposit<br>(TEC-1) on 03.03.2020.<br>composition<br>fee<br>o<br>Rs.5000/- for considering||||
|R79|LM WIND<br>POWER<br>BLADES<br>:<br>[INDIA] PVT.<br>LTD.<br>0710110119<br>donal<br>19.07.2016<br>a||01/81/050/004<br>51/AM19/<br>07/24/040/001<br>01/AM17/<br>,|The<br>Committee<br>noted|Deferred<br>The<br>case<br>was<br>ratified<br>in<br>M.<br>No.<br>12/81-|that the request has been<br>ALC2/2019<br>dated<br>18.09.2019<br>as per written|/received beyond 90 days<br>F<br>:<br>es<br>comments dated 16.09.2019 given by Consultant|from<br>last<br>decision.<br>‘<br>‘<br>;<br>(TEC-1).<br>The<br>applicant<br>vide<br>letter<br>dated|Hence,<br>the<br>Committee<br>:<br>18.02.2020 requested amend the export product/decided<br>to<br>ask<br>the<br>;<br>as 5,35,588.00 Kg.<br>applicant<br>to<br>deposit<br>5<br>=<br>The representation was referred to Consultant/composition<br>fee<br>of<br>(TEC-1) on 03.03.2020.<br>Rs.5000/- for considering<br>i eek: PARA ee<br>____|thecase._<br>i|||;|
|||||The case was ratified in Meeting No. 11/8ldated/The<br>Committee<br>noted|Deferred||||
|R80||ALUFOIL<br>PRODUCTS_ <br>PVT. LTD<br>;<br>:<br>0210208875<br>dated<br>26.12.2018<br>=||01/81/050/006<br>27/AM19/<br>02/24/040/001 <br>33/AM19/|30.01.2019<br>on<br>the<br>recommendation<br>of the|that the request has been<br>;<br>A<br>representative<br>of MSME by<br>allowing<br>7.5%|received beyond 90 days<br>-<br>At<br>ae<br>oat<br>wastage.<br>The<br>applicant<br>vide<br>letter<br>dated|from<br>last<br>decision.<br>24.02.2020 stated that they had applied for ad-|Hence,<br>the<br>Committee<br> hoc norms@23.5% on netcontent in theirRapor decided<br>to<br>ask<br>the<br>product.<br>Therefore,<br>they have<br>requested<br>forjapplicant<br>to<br>deposit<br>f<br>;<br>;<br>2<br>ae<br>reconsideration oftheircase as applied for.<br>composition<br>fee<br>o<br>The<br>representation<br>has<br>been<br>referred<br>to/Rs.5000/- for considering<br>Consultant(TEC-3)on 04.03.2020.<br>{thecase._<br>;||—"!||
|||||The case was ratified in Meeting No. 2/81 dated|/The<br>Committee<br>noted|(Deferred|||
|||||29.05.2018 (actually held on 18.07.2018) as per|that the request has been||||
|||||MoS comments vide theirUO No. 2(6)/2018-TD/received beyond 90 days||||
|||VEEKAY<br>SMELTERS |01/81/050/005||dated<br>12.06.2018<br>allowing 632kg Aluminium|from<br>last<br>decision.<br> |granules per tonne ofLow Carbon ferro Chrome|Hence,<br>the<br>Committee||||
|||PVT ALED:|24/AM17/||through<br>thermite<br>process. The<br>applicant<br>vide|decided<br>to<br>ask<br>the||||
|R81||2610012779 — |26/24/040/000 <br>dated<br>19/AM17/<br>15.12.2016||letter dated<br>25.02.2020<br>stated<br>that<br>it<br>is<br>not\applicant<br>to<br>deposit<br> |possible<br>to<br>manufacture Low Carbon<br>Ferro|composition<br>fee<br>0<br>_|Chrome ofexport Grade with usingjust 632 Kgs.|Rs.5000/- for considering<br>of Aliminium<br>granules.<br>Therefore, they have|the case.||||
|||||requested for revision with personal hearing.||||
|||||The representation was referred<br>to Consultant||||
|||||The case was ratified in Meeting No. 1/81 dated|The<br>Committee<br>noted|Deferred||||
|||VEEKAY<br>SMELTERS—||| 01/81/050/006|15.05.2018 (actually held on 16.06.2018) as per|that the request has been<br>MoScomments vide theirUONo. 2(6)/2018-TD|received beyond 90 days<br> |dated<br>12.06.2018 allowing 632kg Aluminium|from<br>last<br>decision.||||
|||PVT: LUD:|59/AM17/||Granules per tonne ofLow Carbon Ferro Chrome|Hence,<br>the<br>Committee||||
|R82||2610012763 — |26/24/040/000 <br>dated<br>11/AM17/||through thermite<br>process. The applicant vide|decided<br>to<br>ask<br>the<br> |letter dated 25.02.2020<br>stated<br>that<br>it<br>is<br>notl\applicant<br>to<br>deposit<br>|possible<br>to<br>manufacture Low<br>Carbon<br>Ferro|composition<br>fee<br>of||||
|||14.07.2016||Chrome ofexport Grade with using just 632 Kgs./Rs.5000/- for considering||||
|||||of Aliminium<br>granules.<br>Therefore, they<br>have|the case.||||
||||___|requested for revision with personal hearing.<br>:|||||
|||||||faeck||
|||78<br>| Page 79||NC -2 Meeting No. 23/81 held on 04.03.2020<br><<br>Aboraaaes<br>vest|lp|alle||

The representation was referred to Consultant (SKB) on 03.03.2020. The case was ratified in Meeting No. 1/81 dated|/The Committee noted |Deferred 15.05.2018 (actually held on 14.06.2018) as per|that the request has been MoS comments vide their UO No. 2(6)/2018-TD)received beyond 90 days VEEKAY dated 12.06.2018 allowing 632kg Aluminium|from last decision. SMELTERS _ | 01/81/050/004 |Granules per tonne of Low Carbon Ferro Chrome|Hence, the Committee PVT. LTD. 09/AM17/ through thermite process. The applicant vide|decided to ask the R83 letter dated 25.02.2020 stated that it is notlapplicant to deposit 2610012767 | 26/24/040/000 |possible to manufacture Low Carbon Ferro|composition fee of dated 15/AM17/_ |Chrome of export Grade with using just 632 Kgs. Rs.5000/- for considering 17.08.2016 of Aliminium granules. Therefore, they have|the case. requested for revision with personal hearing. The representation was referred to Consultant (SKB) on 03.03.2020. al,

KRKEKK

79 | Page 79 NC -2 Meeting No. 23/81 held on 04.03.2020

Standard Deficiency Format (SDF)

==> picture [453 x 656] intentionally omitted <==

----- Start of picture text -----<br> Exportitems:] Model number, technical specificationree and specificLey quantity-botheM sat in terms of number (if<br>|||2|3 any) and/orweight,Detail technicalnoteofon each manufacturing export productprocess (Appendix-33including ofthecurrent relevant HBPflow refers).sheet. _ f<br>Detail technical drawings with dimension of each export product, Catalogue, if any, may<br>|4 | alsoWeightbe furnished. ofeach Export Product, at eS da aes ne Eada e vie J<br>5 Weight of cach of the imported and indigenous input, separately for each‘ product, forpn the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details of other imported input to be used in the resultant product and sought to be<br>ernie|| imported/procuredeefrom sourcesie other than the license, if any, may also be indicated. <br>6 a fee ee ee<br>|| | Information about the inputs required per unit of the resultant product as per SI. No. 1 of<br>Appendix-11A appearing in current HBP (Vol.l) separately for each product.<br>|7Components: | eat Ree ae a eeas canes Se Bee ee<br>|Technical characteristics/ part [numbers,][ ifany,]<br>8 Assembly drawings/diagrams of the resultant product showing placement and exact use<br>|| of components in the export [product(s).]<br>9 Bifurcated quantities of components to be accounted for in thestaleresultanttisproduct and the<br>_____| fequirement of components as spares. Raw Material /Consumables Sa<br>| |1011 | Sizeproposedand forspecificationimport includingat grade,5composition,ae peers. Sorrel slecaerange, thicknessey at etc. of the items<br>| Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components<br>to be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary<br>|| evidence/drawingsete,9 rE<br>11 =<br>(a) | Sheet layout diagram ofthe material indicating the wastage during blanking<br>12 | Cross Sectional Diagram of export product with calculation of raw material requirement<br>and the weight of the Cable in Kg. per Km. Copy of relevant National/International<br>|| Standard/buyer’s<br>13. data sheet may also be furnished,<br>| Weight of Steel, which requires imported welding material, giving break-up of:<br>i) Steel Plates/Sheets upto 30mm thickness<br>ii) Steel Plates/Sheets more than 30 mm thickness and upto 70 mm thickness<br>iii) Steel Plates/Sheets more than 70 mm thickness.<br>14 | iv) Others e.g. Flanges, Pipes, Tubes, Bars/Rods, Castings/Forgings etc.<br>| Particulars of the licenses obtained in the past and ratified by ALC (with or without<br>modification) for the same export product covered under this application, in view of<br> | | Public Notice No. 48 dated 14.11.2002, 00 poedceeae<br>nach ch OORR<br>i)|17|AO | Yom enemiesto apply os SION.<br>18 Please use expanded/full name of end product.Do not use the abbreviations/shortform. _<br>vy | --<br>| 19 Any other information:<br>20 | The information called for must be submitted in duplicate within 15 days from the date<br>of issue of this letter. The information may be directly sent to Chairman, NC-II, O/o<br>DGFT, Udyog Bhawan, New Delhi-110011, E-mail: nc2.dgft@nic.in, Office Tel.:<br>----- End of picture text -----<br>

a| ou[e3 [2°20

<i

INO cessscsscscccnszenczacaahssatnsisicas

GovernmentTA UTIof India seaSe Tet Wel t Parca Ministry of Electronics & Information Technology seacitaa Paat, 6, At sit att catareraa, ag fercit-110003 Electronics Niketan, 6,C G O Complex, New Delhi-110003 Website: www. meity.gov.in

em W-21/5/2020-IPHW-MeitY

==> picture [132 x 29] intentionally omitted <==

----- Start of picture text -----<br> feat 27.02.2020<br>DRG Gocco ccccccesascspucnssnccakesstsacese<br>----- End of picture text -----<br>

Subject: Ratification of norms in terms of Para 4.7 of HBP. (Vol.1) in respect of Advance Authorization No. 0710114437 dated 22.01.20i9 issued in favour of M/s. EFD Induction Pvt. Ltd.

This refers to DGFT I.D No. 01/81/50/145/AM-20/DES-2/42 Dated 03.01.2020 seeking comments of this Ministry on the above-mentioned application of M/s. EFD Induction Pvt. Ltd. for export of “HF Power Cable”. 2. The application has been examined in the Ministry of Electronics and Information Technology from technical angle. The import products are required for manufacturing the export product. The Ministry recommends Ratification of norms of advance authorization as per details below: Export Import Qty. Item Qty. Recommended Coexxb constructed of SH2 On net to - wee st rands inner condirctor/ baste with COAX.CB Constructed of| 600.0 a SH2 STrands inner accmurnasnity conductor Meters | clause on nil HF Power 60 LCLUR4087460125 hebg Cable Numbers TSS-14 [rohs yes] On net to net fiberglass sleeve 7/8* or| 690.9 | basis with 22mm (range 7/8 to 1-1/4) accountability thermosleeve 10t01462| Meters | clause on nil [quality assured traceable] wastage

Cf i so[vo] . (Sushil Kumar Jangid) Scientist ‘B’ Tel: 011-24301784 ftp-iphw@meity.gov.in

Eri Amit Kumar, Asst. Director, O/o DGFT, = Udyog Bhawan, New Delhi. | i? Digital India ReneTe Fangio: Uh HEN SSM St BT

==> picture [108 x 78] intentionally omitted <==

----- Start of picture text -----<br> ra<br>*<br>ELECTRONICS INDIA<br>Billion Needs Million Chips<br>----- End of picture text -----<br>

File No.P-47014/52/2019-TSW

30 - o4|03 [222

#e Bhi» USI) 202

ZOO}

HN ALA

Sealer Gather3X Hah cara Fase Government of India Ministry of Commerce & Industry Department for Promotion of Industry & Internal Trade (Technical Support Section)

Subject: - M/s Anand Arc Ltd- A.A. No. 0310827662 dated 13/03/2019 Reference: - DGFT ID No. 01/81/50/1149/AM-19/DES-2/253 dtd. 06.01.2020

With reference to the above, the undersigned is directed to say that Inline with our previous recommendations for similar export and import items, the instant A.A. may be ratified as under on repeat basis as per firm's A.A. 0310825290 dated 29/1 1/2018, ratified in meeting no. 2/81-ALC2/2019 dated 01.05.2019:

  1. Import items at SI.No.1 and 2 shall be of relevant grade as contained in the export items.

  2. Quantities of import items at SI .No. 1 & 2 put-together may be allowed as 1,42,800 Kgs. as 1.05 Kgs/Kg content in the export items.

Norms Committee may take a view.

we ee Aaore ne wo (S. K. Jain) Development Officer Tel.23063166

DGFT(Shri Amit Kumar, A.D, DES-II) DPIIT U.O.NO. P-47014/52/2019-TSW dated 30.01.2020

GA

|

Government of India Director General of Foreign Trade

|

DGFT UO No. 01/81/50/147/AM-20/DES-II/589 dated 20.01.2020 Advance Authorization No. 0310829944 dated 26.06.2019

M/s METALLOYS RECYCLING LTD, MUMBAI

The following Quantity of items of import may be allowed against export:

ITCHS Export Item Quantity | ITCHS Import Item | Quantity to Code Code be allowed 74031200 | Copper wire! 100 MT 74040011 | Copper Import Bars Scrap Quantity may 74031900 be allowed | Copper Ingots | 25 MT Ld aed inclusive of 7% "wastage : on export of copper’ wire Bars and 6% on copper ingots.

,

nln (S.K. Bhatnager)_ TC (SKB) 02.03.2020

Shri Shobhit Gupta, Dy DGFT, NC-II

RR eS SOU) 24

72 ———— OA, 03,2020.

  • Reply dt. 06.02.20 On the basis of study group report, proposal is recommended as follows-
  • EP- CS LSAW 3 LPE & FBE coated pipes - & surface area to be coated 95764.909 sq. Mtr. externally & 3699 sq. mtr. internally Coating thickness externally (i) Epoxy 200 micron (ii) Adhesive 225 micron

    • (iii) HDPE 2275 micron & 725 micron internal top coat

Import 1- Desciption & qty. as per SI. No. 1 of SION C 593

2- Welding Wire - 4 kg./MT

  • 3 to 6 & 10 - Upto 2% of fob value

7- Relevent adhesive - 21.73 MT

9- HDPE - 300.39 MT

7 - Relevent epoxy powder - 4.7 MT

Grade & thickness of steel to match in import & export

bes Lp abs

==> picture [30 x 23] intentionally omitted <==

----- Start of picture text -----<br> ee<br>----- End of picture text -----<br>

==> picture [2 x 14] intentionally omitted <==

----- Start of picture text -----<br> ;<br>----- End of picture text -----<br>

==> picture [2 x 5] intentionally omitted <==

----- Start of picture text -----<br> i<br>----- End of picture text -----<br>

File No.P-47011/12/2019-TSW

|

3 an oul 03 \2

23/2|

oa

FINA GAL

Tea Bate HH Hla cara fears

Government of India Ministry of Commerce & Industry Department for Promotion of Industry & Internal Trade (Technical Support Section)

Subject: - M/s Gala Precision Engineering Pvt. Ltd- A.A. No. 0310830588 dated 25/07/2019 Reference: - DGFT ID No. 01/81/050/184/AM-20/DES-II /52 dated 13/11/2019

A.A. may beWithratifiedreferenceas under:to the above, the undersigned is directed to say that the instant 1. Description of import item may be modified as "S.S. Coils/Plates/Sheets

Thickness:6.5 mm"

  1. Import item shall be of relevant grade as contained in the export item.

  2. Quantity of import item may be allowed as 16180 Kgs. as 1.752 Kgs./Kg content in the export item after taking 22% recovery from the scrap.

Norms Committee may take a view.

--s- — a . rIPMI el (S.K.Jain) Development Officer Tel.23063166

DGFT(Shri Amit Kumar, A.D, DES-II) DPIIT U.O.NO. P-47011/12/2019-TSW dated 21.02.2020

88 () 4,03,..2020

a AA No. 0310830685 Actiol 30,07+2014, Rist Export-Import -1&4- - Sizes and1.01kg./kg. Wt. given withContent applicationin EP may be incorporated . 23,6 &7 - 1.05kg./kg. Content in EP 5&8 - 1.02kg./kg. Content in EP 9 - 4% of wt. Of steel to be galvanised Grade of steel to match in import & export

Fe agees ties oy aloo

  • Dex L oe eet dea

SSa ee ne

eos 04,03,2020 es

as AA od, 0310830723 At. 31.07.2019, ~~ Export- - Sizes and Wt. given with application may be incorporated Import 1 & 2- 1.02 kg./kg. content sh, sea

==> picture [2 x 16] intentionally omitted <==

----- Start of picture text -----<br> bea<br>----- End of picture text -----<br>

3 to 5,7 to 10 & 12 to 18- 1.05 kg./kg. content 6- 1.05 kg./kg. content.Add" containing EVA & carbon black"

11- 1.01 kg./kg.content

19,21 & 22 - 1.02 kg/ ke. content 20 - 4 % of steel to be galvanised 23- As per packing policy Grade of steel to match in import & export

ns Import -1& 8. 1.01 kg./kg.content ~ ~~ 2t047> 10) 17 & 73. 1.05 kg./kg. content. q <3 3 & 6. 1.02 kg./kg. Content 7.1.01deletedkg./kg. content. Words "Copper foil" may be 9. 1.01 Sq. mtr./Sq. mtr. Content FeTOt kg./kg. content 12. 1.01 kg./kg. content. Words " fojj" may be deleted bes if | Ae

04.03, zo sales

ae

lo3 OK 03:2020

AA No - OSLogflIlFs2

~

We

a

import 1 to 4- As per sl.no. 1,2(a),3 & 5 of

SION C 1150 respectively on net content of Al. in EP

  • or as applied whichever is less

  • 5 - 1.02 kg./ kg. content or as applied whichever is less

j

  • 6- Si metal in primary form - 1.02 kg./kg. content or as applied whichever is less

7- As per policy for import of fuel

Deed ws

ony 38 Ay)

File No.P-47011/3/2019-TSW

WE oujos| 29

ol)[Au] B|s]ae20

HN ALA

Seaver Batter 3 Hreahrey carey Pasar Government of India Ministry of Commerce & Industry Department for Promotion of Industry & Internal Trade (Technical Support Section)

Subject: - M/s Sterlite Power Transmission Ltd. -A.A. No. 0310831209 dated 23.08.2019 Reference: - DGFT ID No. 01/81/050/220/AM20/DES-2/232 Dated: 20.12.2019

With reference to the above, the undersigned is directed to say that the instant AA may be ratified as under:

  1. Net weight of export items at SI.No.1 to 9 may be specified as 91 MT, 9.1056 MT, 45.45 MT, 2505.58 MT, 3866.808 MT, 57.811 MT, 10.368 MT, 19.14MT and 3.399 MT respectively.

  2. Quantities of export items at SI. No. 1, 3, 7 & 8 may also be specified as 40 Kms., 50 Kms., 32 Kms. and 33 Kms. respectively in addition to their weights.

  3. Quantity of import item at SI.No.1 may be allowed as 1.02 Kgs/Kg content in the export items at SI.No.1 to 9.

  4. Quantity of import item at SI.No.2 may be allowed as 1.02Kgs/Kg content in the export items at SI.No.2, 6 and 9, taking clue from SION C-7.

  5. Quantity of import item at SI.No.3 may be allowed up to 2% of FOB value of the export items at SI.No.1, 2 and 6 put together.

  6. Quantity of import item at SI.No.4 may be allowed as 4% weight of the steel in the export items at SI.No.2 and 6.

  7. Quantity of import item at SI.No.5 may be allowed as 1.10 Kgs/Kg content in the export items at SI.No.1, 3, 7 and 8, taking clue from SION C-1394.

  8. Quantity of import item at SI.No.6 may be allowed as 1.075 Kgs/Kg content in the export items at SI.No.1, 3, 7 and 8, taking clue from SION C-1394.

  9. Quantity of import item at SI.No.7 may be allowed as 1.01 Kgs/Kg content in the export item at SI.No.4.

  • 10.Quantity of import item at SI.No.8 may be allowed as 1.01Kgs/Kg content in the export item at SI.No.5.

Norms Committee may take a view.

pie pee Alien 21.oa Oe) dery (S. K.Jain) Development Officer Tel.23063166

DGFT(ShriDPIIT U.O.NO.AmitP-47011/3/2019-TSWKumar, A.D, DES-II) dated 21.01.2020

Wy —y.03: 2

aa ,

AA No - 0%)0 931/229

Export- - Sizes and Wt. given with application may be incorporated Import - 1 & 2-1.01 kg./kg. content 3 to 5,7 to 10 & 12 to 18- 1.05 kg./kg. content

6- 1.05 kg./kg. content.Add" containing EVA & carbon black"

11- 1.01 kg./kg.content

19 - 1.02 kg/ kg. content

20-4 % of steel to be galvanised 21- As per packing policy Grade of steel to match in import & export

Des[fi] ite

NY 03

23

aaealine

Import 1. 7.82 MT

  1. 20.415MT

3.0.33 MT

Grade of steel to match in import & export

Cydwy(o Pes fi 3

SS

lay oy | or 2220

o~ Export- - Sizes and Wt. given with application may be incorporated Import - 1 & 2- 1.01kg./kg. Content in EP 3 to 10- 1.05kg./kg. Content in EP 11- As per packing policy a 0 bee oe pee

=aa|25 o4|o3 |2e210

Government of India Director General of Foreign Trade

DGFT UO No. 01/81/50/235/AM-20/DES-II/158 dated 14.10.2019

Advance Authorization No. 0210209422 Dated: 06.09.2019

M/s Jindal India Limited, Howrah.

The case for ratification of Advance License has been examined based on the quantity exported by the applicant against the aforesaid AA. The required quantity of items of import has been calculated as per the revised norm C: 469, published by DGFT vide PN No 33(RE: 2012)/2009-2014 dated 30.11.2012. The required import quantity to be allowed for per tonne of export product has been calculated as per the aforesaid Public Notice and enclosed herewith for consideration of Norms Committee.

sabe (S.K. Bhatnager) TC(SKB) 04.03.2020

Encl: as above

Shri Amit Kumar

Asstt Director, NC-II

==> picture [350 x 688] intentionally omitted <==

----- Start of picture text -----<br> eae<br>S oO > ><br>5 zoe?<br>oa0 off<br>o8n me<br>NOS PAs<br>o°8 o%9<br>pax 9 ©<br>NESS 752N2NDIOCee * Beoo o<br>eSFF2nsggs 2<br>Soaoasgessgeoca 3<br>os 5 ome c<br>oOo 2 0 s2556 po<br>Sa 0NOOD=0 = Tc<br>Qa 2 932 9 oO m<br>oQ9neceO7hOao og<br>oa Vek ORTO 38<br>ear aPkMores Lo<br>of3s B&S ee a<br>»oz8th a2S ae oO=<br>N oO Q So<br>- an re 20<br>oO alo ms<br>a Go] © Sx 2<br>aS ©] 0 dan3<br>oO =}o1o K) Eoot<br>oo<br>oO. oO* 22nx<br>3 > =2<br>BS KR og<br>€ 9 |<ls<br>tak MS 2<br>Ss 5 —<br>~ 3 5 Oo};=<br>=) fS)~ ~ mu2s © ns :<br>Sso252=00<br>be~ S=| |S3eaa°80F5ES2S aq &<br>gso N15(2)<br>R& sN Qaa s\j<sfle<br>°<br>n=<br>oe =ig Bh<br>N otk C4<br>ro)ee) “Nicy =—A aloDie2<br>onal<br>z 5<br>A\ [op) °<br>Q F io ~ o<br>C S A x<br>°<br>hy = 3<br>4\J |<br>g =p) so)<br>Ww bed ~—aiec<br>b ie) Glc<br>e) ra) iz<br>°<br>Es al<br>= =cs<br>coNy a £9ronal<br>ce) fo)Ni »<br>----- End of picture text -----<br>

ry

{4% 04,03.2020

Government of India Director General of Foreign Trade

DGFT UO No. 01/81/50/354/AM-20/DES-II/590 dated 20.01.2020

Advance Authorization No. 0310833431 dated 1 6.12.2019

Mis METALLOYS axis’, msi LTD, MUMBAI

The following Quantity of items of import may be allowed against export:

|ITCHS<br>Export Item<br>Code<br>76012010 | Alluminium<br>Ingots A360, <br>LM24|ITCHS<br>Export Item<br>Code<br>76012010 | Alluminium<br>Ingots A360, <br>LM24|Alloy <br> ADC12,|Quantity<br> |10000MT||ITCHS<br>Code<br>|76020010|Import Item |Quantity — to<br>be allowed<br>Aluminium |By<br>taking<br>Scrap ISRI|<br>clue<br>from<br>Grade<br>SION<br>Cc<br>Code<br>1679, Import<br>Taint/Tabor | Quantity<br>, Tense,<br>may<br>be|Import Item |Quantity — to<br>be allowed<br>Aluminium |By<br>taking<br>Scrap ISRI|<br>clue<br>from<br>Grade<br>SION<br>Cc<br>Code<br>1679, Import<br>Taint/Tabor | Quantity<br>, Tense,<br>may<br>be|Import Item |Quantity — to<br>be allowed<br>Aluminium |By<br>taking<br>Scrap ISRI|<br>clue<br>from<br>Grade<br>SION<br>Cc<br>Code<br>1679, Import<br>Taint/Tabor | Quantity<br>, Tense,<br>may<br>be|
|---|---|---|---|---|---|---|---|
||||||Twitch,<br>Zorba,<br>Tally, Talk ||allowed<br>9671.50 MT<br> inclusive<br>of||
|||||||15%||
|||||||wastage||
|||||74040012|Copper|As applied||
||||||Scrap ISRI|||
||||||Grade|||
||||||Code|||
||||||Birch, Clifff,|||
||||||Berry,|||
||||||Candy,|||
||||||Dream,|||
||||||Clove,|||
|||||Cobra<br>28046900<br>Silicon<br>As applied.<br>ey: a||||
||||||(S.K.|Bhatnager)||
|||||||TC(SKB)||
|ShriShobhitGupta,|Gupta,|||||03.03.2020||

Shri Shobhit Gupta, Dy DGFT, NC-II

pare

Government of India 64. 03,2020 Director General of Foreign Trade :

DGFT UO No. 01/81/50/356/AM-20/DES-II/591 dated 20.01.2020

Advance Authorization No. 0310833435 dated 16.12.2019

:

:

Mis METALLOYS RECYCLING LTD, MUMBAI

The following Quantity of items of import may be allowed against export:

|ITCHS<br>Code<br>74031300|| Copper Billets|Quantity <br> |500MT||ITCHS<br>ImportItem <br>Code<br>74040012 | Copper||ITCHS<br>ImportItem <br>Code<br>74040012 | Copper||Quantity<br>to<br>beallowed<br>Taking<br>clue|
|---|---|---|---|---|---|
|||||Scrap|from SION C|
||||||1890,<br>6%|
||||||wastage<br>may|
||||||be allowed on|
||||||the quantity of|
|74031300|| Brass Billets|export.<br>1500MT | 79020010 | Brass Scrap |Taking<br>clue||||
||||||from SION C|
||||||1627,<br>6%|
||:||||wastage may|
||||||be allowed on|
||||||the quantity of|
||||||export.|

(S.K. Bhatnager) TC(SKB) 03.03.2020

Shri Shobhit Gupta, Dy DGFT, NC-II

3

R-56 M.No. 23% ML.o.0% 20

Reply EP

dt. 17.02.20

    1. Pup joint & C & C Hose - 13490 Nos. , 418124 kg. Containing 283264 kg. seamless alloy steel pipes of relevent grade

2- NPST Pup Joint - 2317 nos. , 88905 kg. Containing 65342 kg. seamless alloy steel pipes of relevent grade Import - 453.2 MT Grade of steel to match in import & export

Dey —

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied