DGFT Committee Minutes
lV. DIRECTORATE GENERAIノ 0「FOREIGN TRADE (DES¨ II SECT10N) PIIINUTES O「TIIE NORPIS COplIⅣIITTEE― II ⅣIEETING No。 15/81… AI」C2/2019 DATED 30.10。2019 Plcasc Note i.For infollllatiOn of exportcrs,Norms Comlnittcc― II handles aH cascs pcrtaining to flxation/ratiflcation Of norms for Export Products falling undcr ITC(HS)ChaptCr 72 1o 76,78 to 80,85.Communications in respcct of cascs/pcrtaining to NC― I11■ay bc scntto cmail addrcss: In certain cases the dccision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies reccived from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has bcen placed at the end of the Minutes, in running serial orders. The concerned applicant/company may go through the samc and respond accordingly. Similarly, a scanned copy of the blank Standard Deficiency ['ormat, which may find a reference in NC decisions, has also been attached in the end. This may also bc referred to by the concerned applicant/company and rnay be responded accordingly. The Norms Committee has taken decision only with respect to technical aspect/wastage norrns. While redecming the applications, RAs should check that the applicant has fulfilled all requirements as prescribed in policy/procedure including those in Policy Circulars issued from time to time or any other provisions under FTP/HBP for EODC. v. Wherever thc Committee has fixed Norms, the concerned RA may ensure that AA is issued on the wastages/consumption as ratified by the Committec or as per wastagcs claimcd in the application, whichcver is less. Meeting No. 15/81 of Norms Committce-ll for the year 2019-20 held on 30.10.2019 under the Chairmanship of Shri R. P. Goyal, Additional Director Gcneral of F'orcign 'l'rade to consider thc following applications for ratification of norms in rcspect of advancc authorizations under Duty Exemption Scheme (Chapter-4) of l"oreign fradc Policy 2015-20.'l'hc following members were present in the mceting:- , _Dcpq(peryt, - DPIIl' DHI MoS Consultant Consultant DGF′ I` DGIrT Minutes of Meeting No. 13/81 datcd 03.10.2019 held on 4.10.2019 were circulated among all the members of the Committec on 17.10.2019. Sincc, no corlrnents were rcccivcd within prcscribed timc,thc minutcs wcrc uploadcd on DG「T's wcbsite on 24 10 2019 Hence,the said minutり arc unanimously approvcd. Minutes of the cases discusscd in thc meeting are as below: ≡ 1 I Page 57 NC-2 Meeting No.15/81 dated 30.10.2019 Nu*"4 O".ienution Shri S.K.」ain.D.0 Shri B C. D.0. K.Mishra,AI sh.i $!q'lh_l!q1aer,{IEq! Shri V.C. Officers in attendance Shri Shobhit Gupta, Dy. DGIr-f Shri Am託 Assistant Director 滉弘」鱚、 絶 lB舗 】 D ・
ⅣIEETING NUⅣIBER:
Case No.:1/23/81¨
ALC2/2017 HQ Filc :01/81/050/00500/AM18/ Casc No.:41/14/81- ALC2/2018 HQ Filc :01/81/050/00759/AⅣl19/
Case No.:32/14/81-
ALC2/2018
HQ Filc
:01/81/050/00750/AM19/
15/81-ALC2/2019
ⅣIEETING DATE:30.10.2019
Party Namc:BHARAT Mcct No/Datc:15/8ト
HEAVY ELECTRICALS ALC2/2019
LIMITED 30.10.2019
RLA Filc Lic.No/Datc:0510250513
:05/23/040/00041/AM10/ .0810.2009
Status:
Deferred
,Decision: The Committee considered the case as per agenda and noted the written comments given by
DHI vide O.M. No. DE,S-2IBI-IEL/PEM- 1 -2019-HEl-Part(4) received through email dated 01 .09.2019.
iThe Committee was informed that similar cases of the same applicant are Leing placed in PIC as the
,items are not imported by any manufacturing unit of the applicant. Hence, the Committee decided to
place the matter before the PIC alongwith such other cases.
' The case stands deferred.
Casc No.:2/8/81¨ AIノC2/2013 Party Namc:EPSILON Mcct No/Datci1 5/81- Status:
‐ IBATTERIIJS PVT.IンTD.
‐ALC2/2019
‐
30.102019
HQ Filc lRLA File Lic.No/Date:0810120617 1Dcfered
:01/81/050/00118/AM14/ 108/24/040/000321民M14/ ‐30.04.2013 1
Decision:Thc Conllnittce considered thc case as per agcnda and notcd that a dcflcicncy lcttcr seeking
ccnain infOrmation as raiscd by Consuhant(TEC-1)waS SCntto thc applicant On 03.06 2019 fo1lowed
by a rclninder on 19.07.2019. Ho、vcvCr, nO rcply has bccn rcccived yet. Thcrefore, thc Colninittcc
dccided tO relnind again thc applicant fOr fllnlishing thc rcquisite information
The casc stands dcfcSrred
Pafty Name: DE,l.I'}HI
Mcct No/Datc:15/81-
Status:
CONNECTION SYSTEMS ,ALC2/2019 1
1NDIA PRIVATE LIMITED 130.10.2019 1
RLA Filc lLic.No/Datc:1010059340 1Defcrred
:10/24/040/00077/AM16/ 110.12.2015 1
Decision: The Committee considered the case as per agenda and noted that the applicant's reply was
sent to MeitY on 17.09.2019 for examination of the case. However, no comments have been received
yet. Therefore, the Committec decided to remind MeitY for expediting the comments.
The case stands deferred.
lParty Name: DELPHI
Mcet No/Date:15/81-
Status:
ICONNECTION SYSTEMS IALC2/2019 1
1NDIA PRIVATE LIMITED 30 10.2019 1
RIフA Filc Lic.No/Datc:1010059610 1Deferrcd
i10/24/040/00060/AM17/ 19.09.2016 1
Decision: The Committee considered the case as per agenda and noted that the applicant's reply was
sent to MeitY on 17 .09.2019 for examination of the case. However, no comments have been received
yet. Therefore, the Committec decided 1o remind MeitY for expediting the comments.
NC-2 Meeting No. 15/81 dated 30.10.201g
2 1 Page 57
,:,*W
ir;,-;n"T:3il-" --
it llrCu:i,l
:01/81/050/006261A.}l191 :0412410401001281AM171 09.11.2016 Decision: The Committee considered the case as per agenda and notcd that a deficiency letter seeking certain information as raised by Consultant (1'EC-3) was sent to thc applicant on 25.03.2019 followed by final reminder on 13.05.2019. However, the applicant sought some more time to furnish the requisite information. Hence, the Committee decided to wait for reply of the applicant. ‐Case No.:10/11/81- ALC2/2018 HQ Filc
Case No.:283/14/81-
ALC2/2018 HQ Filc Casc No.:159/14/81- AI」C2/2018 HQ Filc Case lNo.:7/21/81-AI」C2/2017 HQ Filc :01/81/050/00448/AM18/ Pa口けNamc:MICRO TECH.CNC PRIVATE LIMITED RLA「ilc Party Name: TTP RI″A File Party Namc:BERGEN PIPE SUPPORTSINDIA PRIVATE LIMITED RLA File :04/24/040/00153/AM18/ TECHNOLOGIES PRIVATE.ALC2/2019 LIMITEE) 30.10.2019 Mcct No/Datc:15/81- Status: IALC2/2019 1 ‐30.10.2019 1 Lic.No/Date:0410162481 Dcfcrrcd Status: Mcet No/Datc:15/81¨ Status: Lic.No/Datc:07101 12310 1Dcfcrrcd 26.10.2017 1 Mect No/Datc:15/81- Status: ALC2/2019 1 30.102019 1 Lic No/Date:0410163738 1Dcfcrred 28.11.2017 . Palty Namc:IrCI OEN Mcct No/Datc:15/81 CONNECTORSIフIMI´ I`ED ALC2/2019 30.10.2019 RLA「ile Lic.No/Datc:1010059735 1Dcfcrrcd :011811050101001/AM19/ :1012410401001 lS/AM17/ 15.03.2017 Decision: The Committee considered the case as pcr agenda and noted that a copy olapplication was sent to MeitY on 16.09.2019 for examination of the case. I{owever, no comments have been received yet. Hencc, the Committee decided to wait for the comments. The case stands defcrred. :01/81/050/00877/AM19/ :07/24/040/00191/AM18/ Decision: f'he Committee considered the case as per agenda and noted that a copy of application was ,sent to DHI on 16.09.2019 for examination of the case. However, in the meeting, the representative of DHI requcsted to se nd again a complete set of application. Therefore, thc Committee decided to send a complete set of application to DHI. Decision: The Committee considered the case as per agenda and noted that the second deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 31.08.2019 followed by final reminder on 17.10.2019. Howevcr, no reply has been received yet. Hence, the Committee decided to wait for reply of the applicant. The casc stands dclcrred. 3 | Page 57 NC-2 Meeting No. LSISL dated 30.10.2019
HQ Filc
RLA Filc
:01/81/0s0/00120lAMlgl :13t24t040t00046/AMl8/ 04.01.2018
Decision: The Commiftce considcrcd the case as per agenda and notcd that the applicant was called
for personal hearing to explain thc case before Norms Committee. However, nobody was appeared for
personal hearing on behalf of the applicant. 'fherefore, the Committee decided to give one more
opportunity to the applicant for personal hearing to explain the case before Norms Committee.
Casc is deferred,
Party Namc:1`RAFOMEC
‐Mect No/Datc:15/81- status:
INDIA PVT LTD
‐ALC2/2019
30.102019
11011量:,9夕l?19咎Ylシ l'Fli9夕
9'|二11111澪
ず
郷1:07111::::す
I「11
1 1Decision:The Committcc cOnsidcrcd the case as pcr agcnda and dccidcd tO scck frOm the applicanttO
I lfurnish f0110wing infOrmatiOn as per ad宙cc Of MsME:
| 1 1.SI.No.3,4,5&11 0f Standard Dcflcicncy Format.
| .The case stands dcferrcd.
Case No.:3/2 l8l-1ll,C2l20l8 Parry Name: ANGELS
ALUMINIUM
CORPORATION
RLA File
Casc No。:43/3/81¨ ALC2/2018 Party Nalllc:GRAVITA
INDIA LTD
ICasc No。:362/14/81¨
‐ALC2/2018
Mcct No/Datc:15/81- status:
ALC2/2019 ‐
30.10.2019
Lic.No/Date:13 10048823 1Dcferrcd
Mcct No/Date:15/81- status:
ALC2/2019
‐
3010.2019 1
Lic.No/Date:0310819231 1Deferrcd
Mcct No/Datei1 5/81- status:
ALC2/2019 1
30.102019
Lic.No/Datci3410043899‐ Defcrred
HQ Filc
, , :01/81/050/00008/AM19/ :03t94t040t00933/AMl8/ 19.02.2018
Decision: The Committce considered the case as per agenda and noted that a deficiency letter seeking
ceftain information as raiscd by MSME was sent to the applicant on 03.06.2019 followed by remindel
on 19.07.2019. However, no reply has been received yet. Flence, the Committee decided to remind
again the applicant for submitting the requisite information.
,The case stands deferred.
,Casc No.:34/5/81¨ AIノC2/20181)arty Namc:COSMOS
.I〕NGI′ I`ECH PVT LTD
IHQ Filc
RLA File
'.rrt:0118110501002421AM191 .:3424t040t00315/AMl8/ 19.02.2018
Decision:^The Committec considercd thc case as per agenda and noted that a deficiency lefler seeking
'certain infonnation as raised by Consultant (TEC-l) was sent to the applicant on 03.06.2019 followed
, |V reminders on 19.07.2019 & 12.09.2019.I-lowever, no reply has been received yet. Hence, the
.Committee decided to wait for reply of the applicant.
-*:-h -/
Thecase.tuna.J.r",..a.]I'gdPPttuattt.w
4 | Page 57
NC-2 Meeting No. tslgt dated 30.10.2019
Case No.:2/1/81-AI」C2/2018 Party Namc:KIRTANLAL Mcct No/Datc:15/81-
STEEL PRIVATE LIMITED ALC2/2019 130.10.2019 HQ Filc :01/81/050/00002/AM19/ RLA Filc Lic.No/Datc:0310820384 1Deferrcd :03/94/040/00878/AM18/ 11.04.2018 . - Decision: The Committee considered the case as per agenda. Consultant (TEC-3) informed that l3 tapplicant's reply dated 12.10.2019 is deficient duc to the following reason:
- Size-wise export & corresponding import. .Thercforc,thc Comlnittcc lmcntiOncd dcflcicncy lThc casc stands dcfcrrcd. ,Case No.:82/14/81- IALC2/2018 ‐ HQ File decided to ask from the applicant to provide clarification for the above Status: 一 C 一 h RLA Filc Lic.No/Datc:0710113216 Dcfcrrcd ,o :01/81/050/008001AM191':071241040/000111AM191 02.0s.2018 lDecision: The Committee considered the case as per agenda and noted that a copy of application was sent to MSME on 05.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to remind MSME for expediting thc comments. Paty Name:TRAFOMEC Mcct No/Date:15/81- Status: INDIA PVT LTD IALC2/2019 30.10.2019 ParサNamc:VIKARSH Mcct No/Date:15/81- STAMPINGS「NDIA PVT. :ALC2/2019 LTD. 3010.2019 RLA File Casc No.:114/3/81- IALC2/2018 HQ Filc ICasc No.:87ノ14/81- IAI」C2/2018 1HQ File Pa“y Namc:EFD INDUCT10N PRIVATE LIMITI]D RIンA「ile Mcct No/Datc:15/81- Status: ALC2/2019 1 30.10.2019 ‐ Lic.No/Datc:0710113297 1Deferred 一 u 一 a 一 S Lic.No/Datc:3110067051 Dcfcrrcd .- :01/81/050/00l9llAM19l':311831040100018/AM19/ 1s.05.2018 '' D""i.ion: The Comminee considered the case as per agcnda and noted that MeitY has sought ceflain information from the applicant vide email dated22.01.2019 followed by reminder dated 07.08.2019. However, the requisite information is still awaited. Hence, the Committee decided to remind MeitY for expediting the comments. '16 :01/81/050/00805/AMl9/ :011241040100016/AM19l 17.05.2018 Dccision: 'l'he Committee considered the case as pcr agcnda and notcd that a copy o[ application was ' sent to MeitY on 16.09.20 19 for examination of the case. However, no comments have been received r lyet. Therefore, the Committee decided to remind MeitY for expediting the comments. , 5 | Page 57 NC‐2 Meeting No.15/81 dated 30。10.2019
IRLA File Lic.No/Datc:0310821041‐ Dcferrcd
103/95/040/Ooo94/AM19/ 17.05.2018
1 7 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to
'
furnish following information as per advice or."pr"r"niuiiv" orour,
I ' To clarify, how the quantity of cc rod in Guaranteed l'echnical parameter as 21,000 Kg
against 33,000 Kg at annexurc 1.
Pafty Name: APL METALS Meet No/Date: 15/gl_
LIMITED
ALC2/2OI}
30.10.2019
.革QΠb ttLA貴
た L、 空1よ 6'1626恵3,4 ■lr6↓さ a ‐ |:01/81/050/00816/AM19/ 1:o2/24/040/Ooo51/AM19/ .25.06., 1)ecision: Thc cOmmittee cOnsidgrもと:Aさ isさ
is lさ:五蒼
ha五 五五aとき iaga t6 fltt iA`五
a:A3818∴
“
ζ
tts
l lpCrW五■en cOmments givcn by MsME as under:
8 ‐__
| ‐Casc No.:126/5/81_
IAIノC2/2018
‐
HQ Filc
l 101/81/050/00334/AM19/
Case No.:98/14/81-
IAIノC2/2018
Case No.:111/14/81-
ALC2/2018 1HQ File :01/81/050/00829/AM19/ lё l:c貴。 .:116/5/81- IALC2/2018 1HQ File Party Namei SIEMENS LIMITED IRLA Filc IMect No/Date:15/81- status: IALC2/2019 1 130.10.2019 ‐ Status: Status: ITCHs Code Export Item Quantity ITCHS Code Import Item Recommended Quantity 780110oo Reflned Lcad lngOt Purity 99.97% 519.850 MT 85481010 Lead Scrap Covered By ISRI Code Word Rails As applied, taking cuc frOm SION C_1153 RA concemed may takc suitablc cOnscquential action accOrdingly. 19 Party Namci TATA POwER ,NIlcet No/Datc:15/81- SOLAR SYSTEMS LTD. IALC2/2019 30.10.2019 RLA Fiiど ~ ~ Li3.ヽ 6′ btttざ:6ケi61i35慧215c亮拝 `a :07/24/040/Ooo84/AM19/ 13.07.2018 1 Decision: The committee considered the case asi)er agenda and noted that a deficiency letter seeking certain information as raised by consultant (TEC-3J was sent to the applicant on 14. lo.2o1g. Iii}lffi. no replv has bcen received vet. Hence, tho committee decided iJ *uit for reply of the ,The case stands deferred. PartyName: POLyNOVA MeetNo/Date:15/gl INDUSTRIES LTD. ALC2I20-} 30.10.2019 20 5 | Page 57 NC…2 Meeting No.15/81 dated 30.lo.2019 03百じ671
:01/8i/050/003 I 8/AM l9l
:031g51040100089/AM l9l
11.01.2018
Decision: The Committee considered thc case as pcr agcnda and noted that a deficiency letter seeking
certain information as raised by Consultant (TEC-l) was sent to the applicant on 14.10.2019.
rHowever, no reply has been received yet. Hence, the Committee decided to wait for reply of the
applicant.
The case stands delcrrcd.
1211:01/81/050/00354/AM19/ :32/24/040/00020/AM19/ 18.07.2018 1
1 11)ecision:The ComΠ littee considcrcd thc case as pcr agenda and dccidcd to rcfcrthc case to DPIIT as
l pCr adViCe ofMSME.
| IThe casc stands dcferred.
ICase No。:146/5/81¨
IALC2/2018
HQ Filc
ICase No.:122/14/81-
IAIノC2/2018
HQ Filc
IParty Namc:UNIVERSAL
.HEAT EXCHANGERS
LIMITED
RLA Filc
NIlect No/Date:15/81- Status:
ALC2/2019 1
30.10.2019 1
Lic.No/Datc:3210078574 1Dcfcrrcd
| |:01/81/050/00840/AM19/ :07/24/040/00096/AM19/ 24.072018 ‐
221btitiol:TAc ё6mmittge c6nsiaerea tiも caξc is per agenda and notcd that sccond deflcicncy lctter l Seeking CCnain inf0111lation as raised by Consuhant(TEC-3)was sCnt tO thc applicant on 14.10.2019 1 1郡:Iili no rCply has bccn rcccivcd yct. Hcncc, thc Committcc dccidcd to wait for rcply of thc l lThC Casc stands dcferrcd. Palty Namc:TATA POWER Mcct No/Datc:15/81- Status: SOLAR SYSTEMS LTD. ALC2/2019 30.10.2019 RLA Filc Lic.No/Datc:0710H3626 1Defcrred Party Namc:1`ATA POヽ/ER Mcct No/Datei1 5/81- Status: SOLAR SYSTEMS L1`D.
‐ALC2/2019 1
‐ 130.10.2019 ‐
Lic.No/Datc:0710113625,E)cfcrrcd
24.07.2018 1
つ
4
RLA Filc
:01/81/050/00847/AM19/
107/24/040/00095/AM19/
noted that second deflciency letter
sccking ccrtain information as raiscd by Consultant(TEC-3)was sent tO thc applicant on 14.10.2019.
However, no reply has been receivcd yet. IIencc, thc Comlnittce dccidcd to wait for rcply of the
applicant.
The case stands dcferred.
‐Casc No.:129/14/81¨
AIフC2/2018
1HQ Filc
:U1/01/UDU/Uυ O針//AlVllソ/ .υ ′′Z■′υ
tt υ′υυυフフ′′ヽ■
Vl lノ′ ん可・V′ ・
I)ccision: ′
「hc Comlllittce considcrcd thc casc as per agenda and no
qρFkino ocrtnin information as raised bv Consultant(TEC-3)was senl
7 lPageST
NC… 2 Meeting No.15/81 dated 30.10.2019
Trade
-:71:?;-
Party Namc: Case No。:108/10/81- ALC2/2018 IHQ Filc lRLA Filc 101/81/050/00589/AM19/ ‐:02/24/040/00069/AM19/ may APL METALS NIlcct No/Datc:15/81- Lic.No/Datc:0210208615 ‐Approvcd 01.08.2018 1 consequential action accordingly. ALC2/2019 30.10.2019 Dccision: The Committec considcred thc casc as pcr agcnda and decided to fix thc ad-hoc norms as per written comments given by MSME as under: ITCHS Codc Export Item Quantity ITCHS Code Import Item Recommended Quantity 78011000 Reflned Lead lngot Purity 99。97% 3000 MT 85481020 Lead Scrap Covered By ISRI Code Word Rains As applied with maximum wastage allowed of 5o/o on net content of lead in import. NOte: rerce RA concerne ntage of lead in ir :d may take suitab nport item Ie conseorrc ls 48‐ 55°/。。 IParty Name:MODISON ,METALS LTD. Dccision:The COmlllittec cOnsidcrcd thc casc as pcr agcnda and dccidcd tO scck fl・ 0 furnish fO110wing infollllation as per advicc Ofrcprescntative OfE)HI: L To provide calculation sheet. case stands deferred. fl・Om thc applicant tO
Case No.:124/10/81-
.(INDIA)PRIVATE LIMITED IALC2/201` 130.10.2019 IDeferred 8 1 Page 57 NC…2 Meeting No.15/81 dated 30.10.2019 124 Status: : l. Sl. No. 5 & I 1 of Standard l)eficiency Format. ? List of indigenous items with quantity. 3. To clarify, how there will the export product without winding. SHOBイ New D〔 7c
Party Namei VARDHMAN IMeet No/Date:15/81-
IMPEX ALC2/2019
30.10.2019
| IHQ Filc lRLA Filc lLic.No/Datc:05 10407475 1Defcrred
l :01/81/050/00523/AM19/ 1:o5/24/040/00281/AM19/ 108.08.2018 1
271btiζ 16五:十五 ё
ommittささどもnζ idcrcd iA``五
`さ
五ζ pCr agenda and notcd that a copy ofapplicttion was
l sent to MSME for cxaΠ lination of thc case on 03.06.2019 follo、vcd by rclnindcrs on ll.07.2019 &
1 05.09.2019. Ho、vcvCr,nO commcnts havc bccn rcccivcd yct. Hcncc,the Comlnittcc dccidcd to、
vait
l lfor thc commcnts.
| ICase No。:42/10/81¨
| IALC2/2018
IThc casc stands dcfcrrcd.
ICasc No.:130/14/81-
IAI」C2/2018
Party Namc:TATA POWER Mcct No/Datc:15/8卜
Status:
SOLAR SYSTEMS LTD. ALC2/2019 1
30.10.2019 1
Status:
0
0
う
4
IHQ File
RLA Filc
Lic.No/Datc:0710113742 1Dcfcrrcd
,:01/81/050/00848/AM l9l
:0712410401001 13/AM 19/
23.08.2018
Decision: The Committee considered the case as per agenda and noted that second deficiency letter
seeking certain information as raised by Consultant ('fEC-3) was sent to the applicant on 14.10.2019.
However, no reply has been received yet. Hence, the Committee decided to wait for reply of the
:applicant.
Palty Namc:OETIKER IMcct No/1)atc:15/8ト
INDIA PRIVA′「EI′IMITED ALC2/2019
30.102019
HQ Filc
RLA Filc
Lic No/Datc:0310823417 .Approvcd
29.08.2018 1
:01/81/050/00487/AM19/ 103/95/040/00534/AM19/
Decision: I'he Comrnittce considered thc case as pcr agcnda and dccidcd to fix the ad-hoc norms as
per writlen comments given by MSME as under:
Note: The word "Relevant" may bc added in the description of import items.
ICase No.:6ノ10/81¨
:ALC2/2018
Status:
129
Sl.
No.
ITCHS
Codc
Import Item
Recommended Quantity
1
72202090
Relcvant Stainlcss Steel Coil Typc 304 0.6x
128.7 ⅣIM Cold RoHcd Finish 2B
39105 Kg after l/3'o recovery
inclusive of 4.8%o wastage
つ
ん
72202090
Relevant Stainless StccI Coil´「ype 304 0.8x
132 5 NIM Cold RoHcd Finish 2B
68434 Kg after 1/3'd recovery
inclusive of 4.\Yo wastage
3
72202090
Relevant Stainless Steel Coil 'l'ype 304 1.0 x
132.5 MM Cold Rolled Finish 28
74256 Kg after l/3'o recovery
tnctusive of +.q% w
4
72202090
Rclevant Stainicss Stccl Coi1 1・
ype 304 0.5x
78 MM Cold RoHcd Finish 2B
2"169.40 Kg after l/3'o recovery
inclusive of 20Yo wastage
9 | Page 57
NC-2 Meeting No.15/81 dated 30.10.2019
Case No.:102/10/81-
ALC2/2018 HQ File :01/81/050/00583/AM19/
Case No.:105/10/81-
ALC2/2018 HQ Filc
Case No.:112/10/81¨
AIノC2/2018 HQ Filc :01/81/050/00593/AM19/ Party Namc:LALBABA SEAMLESS TUBES PRIVATE LIMITED Party Namci lッEITWIND ISHRIRAM IⅣIANUFACTURING :LIMITED IRLA Filc IParty Namc:PARAMOUNT COMMUNICATIONS LTD. IRLA Filc 105/24/040/00573/AM17/ Mcct No/1)ate:15/81- Status: ALC2/2019 30102019 ‐Mcct No/Datc:15/81- Status: IALC2/2019 1 130.10.2019 1 1Lic.No/Date:0410164657 Defcrred 107.09.2018 Status: RLA Filc Lic.No/Datc:0210208674 Defcrrcd :02/24/040/00086/Aゝ/119/ 04.092018 30 Decision: The Committee considered the casc as per agenda and noled that a deficiency letter seeking cefiain information as raised by Consultant (TEC-3) was sent to the applicant on 03.06.2019 followed ,by final reminder on 19.07.2019. I'Iowcvcr, no reply has been received yet. Hence, the Committee decided to remind again the applicant for submitting the requisite infonnation. ,, :01/81/050/00586/AMl9/ :04t24t040t00051/AM19/ Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the applicant on 3 I .08.2019 followed by final reminder on 17.10.2019.I-Iowever, no reply has been."""i*d yet. Hence, the Committee rdecided to wait for reply of the applicant. Party Namc:ANKIT Mcct No/Date:15/81- FASTENERS PVT LTD. ALC2/2019 ‐30.102019 RLA File I′ ic.No/Date:0710113849 Dcfcrrcd i07/24/040/00150/AM19/ 1709.2018 32 Decision: The Committec considered thc casc as per agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TI1C-3) was sentto the applicant on 31.0h.2019 by finaI reminder on 21.10.2019. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the applicant. ICase No.:45/10/81¨ IALC2/2018 HQ File 33 :01/81/050/00526/AM19/ Mcct No/Date:15/81- Status: ALC2/2019 1 3010.2019 ‐ 1フic.No/Datc:0510407901 Approved 26.09.2018 Decision: The Commitlee considered the case as per agenda and decided to fix the ad-hoc norms as perwrittencommentsdated28.10.2019givenbyConsuItant(TEC-3).(Copyenclosed)W RA concerned may take suitable consequcntial action accordingly. NC-2 Meeting No. 15/81 dated 30.10.2019 10 1 Page 57
DISTRIBUTION SYSTEMS 30.10.2019 IHQ Filc RLA File Lic.No/Datc:0910066707 1Deferred 34 :011811050/00485/AM19/ :0912410401002951A}i4191 03.10.2018 Decision: The Committee considered the .ui. u, per agenda and noted that the applicant's reply was ,sent to DHI on 02.08.2019 for examination of the case. However, the representative of DHI informed in meeting that the case is under examination. Hence, the Committee dccided to wait for comments. Case No。:4/10/81-ALC2/2018 1Party Namc:TOSHIBA ITRANSMISSION&
Case No.:156/14/81¨
ALC2/2018 Mcct No/Datc:15/81- Status: ALC2/2019 1 Status: Party Namci SCHNEIDER Mcct No/Datc:15/81- ELECTRIC INDIA PVT IALC2/2019 LIMITED 30.10.2019 HQ Filc IRLA Filc Lic.No/Date:07101 13957 1Dcfcrrcd ,, :01/81/0s0l00874lAMlgl :0712410401001621AM191 04.10.2018 Decision: The Committee considered the case as per agenda and noted that second deficiency letter seeking certain information as raised by Consultant (TtlC-3) was sent to the applicant on 14.10.2019. I{owever, no reply has been rcceived yet. I{ence, the Committec decided to wait for reply of the ,applicant. lThe case stands deferred. 36 D""i.ion: The Committee considcred the case as per agenda and notcd that the applicant was called for personal hearing to explain the case before Norms Committee. Llowever, nobody was appeared for personal hcaring on behalf of the applicant. Therefore, the Committee decided to give one more oppofiunity to the applicant for personal hearing to explain the case before Norms Committee. Case is deferred. Casc No.:165/14/81- ALC2/2018 HQ Filc :01/81/050/00883/AM19/
Case No.:168/14/81-
ALC2/2018 HQ Filc Paty Name:GRAVITA INDIA LTD Meet No/Datc:15/81- Status: ALC2/2019 3010.2019 RLA Filc lLic No/Datc:13 10049094 1Dcfcrrcd :13/24/040/00107/AM19/ 105.10.2018 1 Party Name:R.R.PIGMENTS Mcct No/Datc:15/81- Status: PⅢVATE LIMITED ALC2/2019 130.10.2019 1 RI′A「ilc Lic.No/Datc:1310049097 1Dcferred :01/81/050/00886/AM19/ :13/24/040/00102/AM19/ 108.10.2018 1 37 1Decision:Thc Committcc considered thc case as per agcnda and notcd that thc applicant was callcd lfOr pCrsOnal hcaring to explain the case bcforc Norms Committcc.Howcvcr,nObody was appearcd for lpersonal hcaring on bchalf of thc applicant. Thereforc, the ComΠ littcc decided to give onc more ll[[lllllil〕lleappliCantfOrperSOnalhearingtOCXplainthCCaSCbCfOrcNormsCOnllnitti夏 11 1 Page 57 NC…2 Meeting No.15/81 dated 30.10.2019
INDUSTRIES LIMITED IALC2/2019 1 130.10.2019 ‐ 1夕危漏 liO/00073/AM19/ 1:::i]ざg[子le:3410044569 1Approved Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as :per written comments dated 28.10.2019 given by consultant (TEC-3) as under: Case No。:133/10/81- ALC2/2018 HQ File :01/81/050/00614/AⅣl19/ Export Item Party Name: APAR 1.The wOrds“PLATES/SIIEETS/COILS/SLABS"may bc dcleted and may be added in thc dcscription Ofilnportitcnl at sl.No。 1. 2蠍 :TI:λ `胸 罵 け LOY Ю %zRcoMuM"may be addcd h Mcet No/Date:15/81- Status: Recommended 1 5855 MT 25。75 MT 232.30 MT 2040MT the word '6lngot" the description of Status: Approved 13 18 TACSR/AS (Various Sizes) NET CONT : l. Aluminium Ingot :5685.000 MTS (2) Aluminium Master Alloy 107, Zirconium: 25 MTS (3) Aluminium wire/ wire rod :230.000 (4) Steel wirc rod of relevant grade: 2000 MTS, Total Weight: 7940 MTS 3. The words "PLATITS/SIIEETS/COI,S/SLABS" may be deleted and the word .,wire/wire rod" may be added in thc description of import item at sr. No. 3. 4' The description of import item at Sl. No. 4 may be amended as "Steel wire rod of relevant gradett. RA concerned may take suitable consequential action accordingly. Note: ICase No。:173/14/81- :ALC2/2018 1HQ File 101/81/050/00891/AM19/ Pany Namc:DISHA AUTO McctNo/Datei1 5/81- COMPONENTS PVT.LTD.IALC2/2019 13010.2019 RLA Filc lLic.No/Datc:0310824393 :03/94/040/00615/AM19/ 111.lo.2018 1謝胤n鵬慧r鷺∫男 1:ち需」讐ぶlittm:霞ぉ 1!霊龍 r,X tte測・¨ms器 Import Item Carbon StccI Seanlless Pipcs AS EDITION 13-3/8"OD 365.12* K-55/D10 IPER APISCT LATEST 20.62 MM THK GRADE 76141000 5000.000 Kilomctrc 76061190 Aluminium 76012010 Aluminium ⅣIaster Alloy 10°/。 Zirconlum 76061190 Aluminium Wire/ Wire Rod Steel Wirc Rod Of Rclevant Grade Recommended 79 MT with 32% wastage 73043939 12 1 Page 57 NC‐2 Meeting No.15/81 dated 30.10.2019 ITCHS Codc Quantity S ‐ . N 。 ITCHS Codc Import Item つ ん 4 72279090 針 N 。
つ 4 73043939 Carbon Steel Scarnless Pipes AS PER API SCT LATEST EDITION 10-3/4"OD 298.4520 MM THK GRADE K 55 152 MT with 250/O wastagc O J 73043939 Carbon Stccl Scarnless Pipcs AS PER API SCT LATEST EDITION 10-3/4"OD 298.4520 MM THK GRADE L80 26 ⅣIT with 25% wastanC 4 73043939 Carbon StecI Scarnicss Pipes AS PER API SCT LATEST EDITION 9-5/80D269.88*21 MM THK GRADE K― 55/D10 166NllT with 28% wastagc INote:Gradc OfstccltO match in export&import. IRA concerncd may takc suitablc conscqucntial action accOrdingly lCase No.:54/12/81¨ Party Name:ANKIT NIcct No/Datc:15/81- Status: IALC2/2018 1FASTENERS PVT.LTD. ‐ALC2/2019 ‐ HQ Filc RLA Filc RLA File 30.10.2019 Lic.No/Datc:0710114069 Approvcd 130102019 1 1ノic No/Datc:0710H4068 ‐Approvcd | :01/81/050/00692/AM19/ :07/24/040/00189/AM19/ 30.10.2018 ‐ Decision: The ComIIlittcc considcrcd thc casc as per agcnda and dccidcd to flx thc ad― hoc norms as 11∝ WH・Cn commcttsほcd 2&Ю 2m9Jvcn by CO“ J鯰m σ EC→ 器und∝ 0 ITCHS Code Export Item Quantity ITCHS Codc Import Item Recommended Quantitv 73181900 Threaded Bolts Madc outof WIRE OF STAINLESS STEEL Gradc¨A286 410690 Kg 72230091 WIRE OF STAINLESS STEEL Gradc― A286 of9.5 ⅡIIn dianlcter 452 Kg aHowing wastagc@10% RA.concemed may take suitable consequential action accordingly. Casc Nn.: l78ll4l8l- Parly Namc: ANKIT Mccr No/t)arc: I 5/81- Status: AI」(32/2018 HQ Filc FASTENERS PVTIフTD. IALC2/2019 ‐ 101/81/050/00896/AM19/ :07/24/040/00188/AM19/ .30.10.2018 1Dccision:Thc Collllnittcc cOnsidcrcd the casc as pcr agcnda and dccidcd to flx thc ad― hOc norllls as pcr advice givcn by Consultant(TEC-3)as undCr: 4 1 ITCHS Code Export Item Quantity ITCHS Code Import Item Recommended Quantitv 73181900 Thrcadcd BOlts Madc outof WIRE OF STAINLESS STEEL Gradc―A286 967.370 kg 72230091 WIRE OF STAINLESS STEEL Of thickncss Ofabovc l.5 1nin Grade― A286 (Dia-6.33 mm) 1064 Kg a1lowing wastagc@ 10% 〃爺 RA concerned may take suitable consequential action accordingly. り u s ‐ h i d ) e ・ i n D & 刈 13 | Page 57 NC‐2 Meeting No.15ノ81 dated 30.10.2019
Case No.:22/11/81- Pa“ y Name:BELDEN Mcet No/Date:15/81- Status:
| ‐ALC2/2018 11NDIA PVToLTD IALC2/2019 1 30.10.2019 ‐ HQ File RLA Filc Lic.No/Date:3H0067220 1Dcfcrrcd 42191ダl夕,9499,1,イ今ヽ 「19イ 1,141,4919夕?119`AM19/ 130.10.2018 ‐ IDccision:Thc Conlmittcc considcrcd the casc as per agcnda and notcd that a dcflcicncy lcttcr sccking ccrtain information as raiscd by Consuhant(TEC-3)was sCnttO the applicant on 25.06.2019 fo1lowcd by flnal relllindcr on 20.072019.Ho、vcver,nO rcply has bcen rcccivcd yct.Thcrcforc,thc Committcc ldccidcd to rcllllind again thc applicant for subnlitting the requisite infolHlation. .Thc case stands defcrrcd. :謎胤 青 綱γ8卜 1鑑 NttIIRttM° ND I造 ぎ州 留 ・ Ⅳ別~ ヤ Ш (CHENNAI)PVT.LTD. 130.10.2019 1 HQ File RLA Filc Lic.No/Date:0410164830 1Approvcd :01/81/050/00595/AM19/ .:04/24/040/00167/AM19/ 130.10.2018 1 1)ccision: The ComIIlittec considcred thc case as pcr agcnda and dccided tO flx thc ad― hoc norms as per writtcn cOmments dtted 28.10.2019 givcn by COnsultant(TEC… 3)as under: ITCHS Codc Export Item Quantity ITCHS Code Import Itcm Recommended Quantitv 73089050 Fabricated Steel Structures for hot oil heater of petroleum pipelines (67 .501 MT) (Net content of Column UC 50.246 MT) 67.507 MT 72163300 SteelColumn UC Section of relevant grade 51.251 MT wtth 2% 、vastage Note: l. As per rcply datcd 11.07.2019 given by the applicant, the description of export item may be amended as "l'abricated Steel Structures for hot oil heater of petroleum pipelines" with weight 67.507 MT. 2. The net content of Column UC in thc export itcm should bc 50.246 M f . 3. The description of import item may bc amended as "Stccl Column UC Section of relevant grade". RA concerned may take suitable consequential action accordingly.
Case No.:18 0ll4l8l-
Party Name: GAVIRANGA Mect No/Datc: I 5/8 l-
Status:
43
ALC2/2018
HQ File
ENTERPRISES
RIフA File
IALC2/2019
‐
130.10.2019 ‐
ILic.No/Datc:0710114090‐
Defcrred
44101/11/959/00891/AM19/ :07/24/040/00191/AM19/ 101.11.2018
1)ccision: Thc Comrnittcc considcrcd the casc as per agcnda and notcd that thc rcply of deflcicncy
lcttcr was sublnitted dircctly by the applicant to McitY Howcvcr, no commcnts havc bccn rcccived
yet. Therefore, the Committee decided to remind MeitY for expediting the comments.
14 1 Page 57
NC-2 Meeting No. 15/81 dated 30.10.2019
4s :01/81/0501009201AM191 :0812410401002461AM191 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the applicant on 03.06.2019 followed by final reminder on24.01.2019. However, no reply has been received yet.'fherefore, the Committee decided to remind again the applicant for submitting the requisite application.
Case No.:202/14/81-
ALC2/2018 HQ Filc Case No。:91/10/81- ALC2/2018 | ICasc No.:208/14/81- | IALC2/2018 ‐ IHQ File 481:01/81/050/00926/AM19/ Party Namc:CYPRESS INDUS・「RIES INDIA PRIVATE LIMITED RLA Filc Paty Namc:REFORM T00LS PVToLTD. Mcct No/Datci1 5/81¨ Status: ALC2/2019 : 30.10.2019 1 Lic.No/Datci0810143844 1Dcfcrrcd 13.11.2018 ‐ Mcct No/1)atc:15/81- ‐Status: ALC2/2019 30.10.2019 ‐ Lic.No/Datc:0210208801 1DcfcSrrcd 16.11.2018 1 Status: ,^ lecision: The Committee considered the case as per agenda and decided to seek from the applicant to " furnish following information as per written comments of consultant (TEC-3): ; 1. Specific item of export with quantity in numbers & weight. ' 2. Sl. No. 2,3, 5 & 1 1 of Standard Deficiency Format. 3. If sizes are more information, may be given for 4-5 sizes where quantity is high. ,The case stands deferred. HQ File ‐ RLA File :01/81/050/00572/AR/119/ 102/24/040/00119/ANI11 9/
Case No.:207/14/81-
ALC2/2018 Paty Namc:GAVIRANGA 'Mcct No/Datc:15/81- ENTERPRISES IALC2/2019 130.10.2019 HQ Filc RLA Filc Lic No/Datc:0710114294 Dcfcrrcd 47191/8119,0/00?75/AY19/ :07`71/91949922?/AM19/ 18.12.2018 1 1)ecisiOn: 1`hc Comlllittcc cOnsidcrcd thc casc as pcr agenda and notcd that thc rcply of dcflcicncy lICttCr was submittcd dircctly by thc applicant to Mc■ Y.Howevcr,no commcnts havc bccn rcccivcd yct.ThcrcfOrc,thc COmmittcc dccidcd tO rcmind McitY for cxpcditing thc cOmmcnts. IThc casc stands dcfcrrcd. Paty Name:GAVIRANGA IMcet No/Datc:15/81- Status: ENTERPRISES IALC2/2019 130.10.2019 1 RLA Filc Lic.No/Datc:0710114295 Dcfcrrcd :07/24/040/00228/AM19/ 18.12.2018 1 Decision: The Committee considered the case as per agenda and noted that the reply rletter was submitted directly by the applicant to MeitY. However, no comments have yet. Therefore, the Committee decided to remind MeitY for expediting the comments. of deficiency been received 15 1 Page 57 lf F rc〔
Case No.:15/11/81-
IALC2/2018
1HQ File
:01/81/050/00631/AM19/
| ,Casc No.:231/14/81-
I ALC2/2018
HQ Filc
Casc lNo.:378/14/81-
ALC2/2018
HQ Filc
IHQ Filc
52 :01/81/050/00975/AM19/
Party Namc:LASER POWER
&INFRA PRIVATE
LIMITED
RLA Filc
Party Namc:TRUFORM
TECHNO PRODUCTS
LIMITED
RLA File
IVAE VKN INDIA P.
LTD.(FORMERLY
IRLA File
Mcct No/Datc:15/81- Status:
ALC2/2019
130102019 1
Lic.No/Datc:0210208903 Dcfcrcd
Mcct No/Datc:15/81- Status:
ALC2/2019
‐
30.10.2019 1
Lic.No/Datei5010002501 1Defcrred
07.012019 1
ALC2/2019 1
30.10.2019 1
Lic.No/Datc:05 10409464 1Dcfcrrcd
Party Namc:ELECTRO Mcct No/Datc:15/81- Status:
COPPER&ALLOYS MFG IALC2/2019
‐
C0 30.10.2019
RLA Filc lLic.No/Datc:0210208861 1Deferred
i02/24/040/00136/AM19/ 20.12.2018
Decision: The Committcc considered the case as p.r ug"nau. Consultant (TEC-3) informed that the
49 applicant's reply dated 22.10.2019 is deficient as it does not contain reply of any query as asked
against the deficiency letter dated 02.09.2019. Therefore, the Committee decided to ask again from the
applicant to provide clarification for the following deficiencies:
- Export product is not yet finalized and its weight may vary from 70 Kg to 600 Kg.
- Some of export products like cable will have indigenous inputs while firm says there are none. 1501:01/81/050/00949/AM19/ 102/24/040/00142/AM19/ 107.01.2019 'Decision: The Committee considered the case as per agenda and decided to seek from the applicant to ;furnish the information sought by DPIIT vide U. O. No.: P-47011113112019-TSW dated 15.10.2019 (copy enclosed) く υ :01/81/050/01096/AM19/ 150/24/040/00027/AM19/ Decision: The Committee considered the case as per agenda and noted that a copy of appiication was 'sent to MSME for examination on 21.06.2019 followed by reminder on 05.09.2019. However, no comments have been received yet. Hence, the Committee decided to remind MSME for expediting the comments. Casc No。:257/14/81¨ ALC2/2018 Party Name: VOESTALPINE Meet No/Date: I 5/81- Status: 105/24/040/00603/AM19/ .24.01.2019 IDecision:The Committcc considcrcd thc casc as per agenda and notcd that a copy of application wasl sentto DHI on 12.07 2019 for cxamination ofthe casc.HOwcvcr,thc rcprcscntativc of DHI infOrmed llliT::::111lllist::庭]::liundcrCXalnination■― Icnct tllc COlninittcc dccidcd■owailflri°lnnleT;夕 ``|メ lr′ 16 1 Page 57 NC…2 Meeting No.15ノ81 dated 30.10.2019
ICasc No。:261/14/81- IParty Name:CMIENERGY Mcct No/Datc:15/81- Status: IALC2/2018 1NDIA PRIVATE LIMITED ALC2/2019 1 30.10.2019 1HQ File RLA File Iソic.No/Datc:0510409502 Dcfcrrcd 5319イ1イ9'940,?7ッ今Vl?/ 1P,(7,1919夕01,1/AM19/ 29.012019 1)ecision:1`hc(3omlllittcc considcrcd thc casc as per agcnda and notcd that a dcflcicncy lctter sccking lCltain infOrmation as raiscd by Consultant(TEC-3)was sCnt tO thc applicant on 15.07.2019 and lfOHOWCd by flnal rclllindcr on 12.09.2019. Ho、vcvCr, 1lo rcply has bcen receivcd yct. Hcncc, thc lCOmmhCC dCcidcd to watt for rcply ofthc applicant. |´「hc casc stands dcfcrrcd.
Case No.:264114181- Party Name: A-l FENCII Meet No/Date:15/81- Status:
ALC2I2OI} PRODUCTS CO.PV'|.I,'fD. ALC2I2OI} 30.10.2019 ' I'lQ File RLA File Lic.No/Date:0310826718 Defered -. :01/81/0501009821AM191 :031941040100931/AM19l 30.01.2019 )4 ,Decision: The Committee considered the case as per agenda and noted that second deficiency letter ' seeking ceftain information as raised by Consultant (TEC-3) was sent to the applicant on 14.10.2019. ' However, no reply has been received yet. Hence, the Comrnittee decided to wait for reply of the applicant. l'he case stands deferred. Casc No.:26 3ll4l8l- Party Name: AXORA Mect No/Date: I 5/81- Status: .ALCZIZOI} RESOURCES LIMITED. ALC2I2OI9 l0.l 0.2019 I IQ File RLA File Lic.No/Date:0210208946 Deferred :01/81/050/00981lAMlgl :021241040100160/AM19l 30.01.2019 Decision: I'he Committee considercd the casc as per agenda. It was informed by MSME that the '55 applicant's reply dated 08.07.2019 is dcficient due to the following reason: I
- Net lead content in import is less than export. :The Committee noted that the applicant was called for PH in other case, however nobody appeared. rHence, the Comrnittee decided to call the applicant for personal hearing alongwith reply to the I 'deficiencies raised. The case stands deferrcd.
Case No.:28 4ll4l8l-
Party Namc: DISHA AL jTO Mect No/Date: I 5/81- Status:
| IALC2/2018
1 1HQFilc
IRLA File
COMPONENTS PVT.LTD.:ALC2/2019
130.10.2019
Lic No/Date:0310826973 1Defcrcd
561:01/81/050/01002/AM19/ :03/94/040/00976/AM19/ 11.02.2019
‐
I)ccision:Thc ComΠ littec considcrcd thc casc as per agcnda and notcd thatthc applicant's rcply、vas
sent to MSME on 02.08.2019 for examination of the case. I{owever, no comments have been rcceiyed
ffiff:":;rtltt:[]:tj:"
decided to remind MSME' ror expeditingthe comments' ,t#/
17 1 Page 57
NC-2 Meeting No.15/81 dated 30。10.2019
ICasc No.:285/14/81_
IALC2/2018
1HQ File
IParty Namci TATA
IINTERNATIONAL
ILIMITED
IRLA File
Mcet No/Dare:15/81- Status:
ALCZt2019
30.10.2019
Lic.No/Date :02 I 0208972 Deferred
12.02.2019
IDecision:The cOmmittcc cOnsidered the casc as pcr agcnda and noted that the
,MOS on 22.10.2019 fOr cOmmcnts On rcst Ofthe items HOwcvcr,no cOmmcnts
iyCt・HCncc,thc cOmmittce dccided tO wait fOr cOmments.
:ThC Casc stands deferrcd.
‐
ICase No.:290/14/81¨ |五|しヽ五島
1166漁 AM Mcel、。 /5at:13/81- statisI
‐ IALC2/2018 ENTERPRISES ALC2/2019
‐
‐30.102019
1HQ Fi18 ‐ ~
‐
RLA lilc ti漁3/Ditc:63108'76ζ i‐ 5さfc拝8と |:01/81/050/01oo8/AM19/ .:03/95/040/01o88/AM19/ 114.02.2019 ‐ 58 1betisibil↑お ё
611島ittgc coA,還
ti:LttilL卜ご8:ミliil:ifllil:|::計::几tf;ド::|ち:111li:零::
‐ ‐celtain infOrmatiOn as raiscd b
●::お織殿飛鷺罵
fllTttl∬羅
lI'』『淵躙1上淵電驚
ittl謡;t蹴螂拒鮒
r‐
IThC Casc stands deferrcd.
. Case No.:291/14/81_ Party Namci十
良A16MЁё Mさct No/Datc:15/81- lstatus: ‐
| IAIノC2/2018 11NDIA PVT LTD IALC2/2019 1
.10士
n8 ~ :RLA nお
Lι
.No'5五18:0,1611453'bさ庭存
a l l 101/81/050/01oo9/AM19/ 1:o7/24/040/Oo260/AM19/ 114.02.2019 1 1 1591bLtitiふh:十hさ tう。 mnlilきさ も
nζidcrcath``isaζ pCi ttLeAaa aha dc cidcd tO seさk frolll thc appli五iti31
1 1hr面Shおibwing hbma」On as per ad宙ceOf MsME:
| 1 1. SI.NO.3,4,52%1 1 0f standard Dcflcicncy Forlnat.
IThC casc stands dcfcrrcd.
| ICasc No.:295/14/81¨ |'a l/Dtti3:i5/81l Satiζ
: |
| IALC2/2018 1N )19
‐
| | ‐
Sヽ 19
‐ ' ILI
6013脚
:5ν01olll↓L/ 鳥晩″鳳λ
:::11↓lj‐
t鴬究ぢα
0710H4562 Pcお∬さ
`|
i徒1堡IliiΥijiliill1111111111:1,ζ i著鷺
:
571 :01/81/050/01oo3/AM19/
102/24/040/Oo166/AM19/
case was referred to
have been received
18 1 Page 57
NC-2 Meeting No. 15/81 dated 30.10.2019
6t i:01/81/050/01016/AM19/ ,:051231040100504/AM19/ 18.02.2019 Decision: The Committee considered the case as per agenda and noted that MeitY has soughr cerlain information from the applicant vide deficiency lctter dated25.06.2019 followed by reminder dated .9.8.2019. However, the requisite information is still awaitcd. Flence, the Committee decided to wait for the comments.
Case No.:298/14/81-
ALC2/2018 HQ File
Case No.:383/14/81-
ALC2/2018 HQ Filc
Case No.:388/14/81-
ALC2/2018 HQ Filc Party Namc:DEL′「A ELECTRONICSINDIA PRIVATE LIMITED RLA Filc Mcct No/Datc:15/81- Status: AIッC2/2019 30102019 ‐ Lic.No/Datc:05 10409688 1Dcfcrrcd Status:
Case No.:22/2/81¨ALC2/20191Party Name:PRECISION
‐Mcct No/Date:15/81- ,NIIETALS IALC2/2019 30.10.2019 HQ File RLA Filc Iンic.No/Date:03 108273 15 1Dcfcrred :01/81/050/01108/AM19/':03t95fi40fit266tAM19r 26.02.2019 62 Decision: The Committee considered the case as per agenda and noted that the applicant was called for personal hearing to explain the case before Norms Committee. l-lowever, nobody was appeared for personal hearing on behalf of the applicant. Therefore, the Committee decided to give one more opportunity to the applicant for personal hearing to explain the casc before Norms Committee. Case is deferred. RLA File Lic.No/Datc:0510409786 1Deferred ;Ur:011811050/01101/AM19/ ':05124/040t00661/AMt9/ 26.02.2019 : Decision: The Commiflce considered the case as per agenda and noted thal a deficiency letter seeking certain infonnation as raised by Consultant (TEC-3) was sent to the applicant on 19.06.2019 followed by final reminder on27.0J.2019. However, no reply has becn received yet. Therefore, the Committee decided to remind again the applicant for submitting the requisite information. , Party Namci SINGHANIA IMect No/Datc:15/81- status: IALU― FOIL CONTAINERS AIッC2/2019 1 1MANUFACTURING C0 30.102019 Party Namc:AXORA NIIcct No/Date:15/81- Status: RESOURCES LIMITED IALC2/2019 1 130.10.2019 1 RLA Filc Iッic.No/Datc:0210209027 1Defcrrcd :01/81/050/01 106/AM 19/ ':02241040t001 81/AM r 9/ 28.02.2019 64 D".irion: The Committee considered the case as per agenda and noted thal thc applicant was called for personal hearing to explain the case before Nonns Committec. However, nobody was appeared for , personal hearing on behalf of the applicant. Therefore, the Committee decided to give one more roppofiunity to the applicant for personal hearing to explain the case before Norms Co ^itt"".S# Case is deferred. 19 1 Page 57 NC‐ 2 Meeting No.15/81 dated 30。10.2019
ICasc No.:387/14/81- Party Namc:PARAMOUNT Mcct No/Datc:15/81- Status:
IALC2/2018 1COMMUNICATIONS LTD.ALC2/2019 1
30.10.2019 1
1HQ File lRLA Filc Lic.No/Datc:05 10409820 1Dcfcrrcd
65:01481/95,/91105今ヽ 41?/ .:9,(21/919,96?9/AM19/ 28022019 1
1)ccision:Thc Comrnittcc cOnsidcrcd thc casc as per agcnda and noted that a dcflcicncy lettcr secking
ccrtain information as raiscd by Consultant(TEC-3)was sCnt tO thc applicant on 15 07.2019 and
lfoHo、ved by flnal rcnlindcr on 12 09.2019. IIowcvcr, no rcply has been received yet Hencc, the
Committce decided tO rcmind thc applicant.
.The case stands deferrcd
lCasc No.:58/2/81-AIノC2/2019 Party Name:VOESTALPINE.Mcet No/Date:15/81- Status:
VAE VKNINDIA P LTD. ALC2/2019 1
. (FORⅣ
IERLY) 30.10.2019 1
.HQ Filc lRLA Filc Lic.No/Datc:05 10409887 1Dcfcrrcd
66:91481/9,9/91114管Yl?/ :,5424/919/90799/AM19/ 08.03.2019
1)ecision:´「hc Committcc considcred thc case as per agenda and dccidcd to scck froln thc applicant to
furnish foHowing infollllation as pcr advicc of MSME:
1 1.Sl.No.3,4,5&1l of Standard Dcflcicncy Format.
IThe case stands deferred.
Casc No.:91/2/81¨ Party Namc:PLANSEE IMcct No/Datc:15/81- Status:
ALC2/2019
‐INDIA HIGH IALC2/2019 1
‐ PERFORMANCE 130.10.2019 1
1 1MATERIALS PVT LTD I I
IHQ File lRLA Filc lLic.No/Date:0710114697 1Approvcd
101/81/050/01177/AM19/ 107/24/040/00257/AM19/ 122.03.2019 1
Decision: The Comrnittcc considcrcd thc casc as per agenda and dccidcd to flx thc ad― hoc norms as
per written commcnts datcd 28.10.2019 given by Consultant(TEC-3)as undCr:
Sl.
No.
ITCHS
Codc
Export Item
Quantity
SI.
No.
ITCHS
Code
Import Item
Recommended
Ouantitv
1
85168000
Electric IJeating
Resistors -
Tungsten Boats
1000.000
Kg
1
81019990
Tungsten
Sheets/
Plates /
Strips
1030 Kg
う
4
85168000
Electric Heating
Resistors -
Molybdenum
Boats
1000.000
Kg
つ
4
81029590
Molybdenum
Sheets /
Plates /
Strips
1030 Kg
85168000
E,lectric I'leating
Resistors -
Tantalum Boats
500.000
Kg
81032090
Tantalum
Sheets /
Plates /
Strips
515 Kg
Note: The words "Rods/l'oils" -uy be deleted from the description of the import items. -A
RA conclrngd may _takc suitable consequential action accordingly
Dp)
20 I Page 57 NC‐ 2 Meeting No.15/81 dated 30.10.2019
6
7
I Casc No.:86/2/81¨ ALC2/2019 Party Namc:SATURN
INDUSTRIES,
Mcct No/Datc:15/81- ‐
Status:
ALC2/2019
30.10.2019
Status:
1器厨児
5υ∝Ⅳν
AMり 協臆oЮ∞
88/AMり :蹴鼎α
07101Иの
5助た鵬
d
1681bこと
,ζiもふ
:r「hc c6ふΠ
ii18cもAζ iarcd iA五ζ c ttζ おさ ri蒼8hal aha hotcd iAit i acfltiも ncy lさ16:ζ88kiAL I ICCnain informatiOn as raiscd by Consuhant(fEC-3)was sCnt tO thc applicant on 14.10.2019. | IHOWever,no rcply has becn rcccivcd yct.Hcncc,thc Committcc dccided tO wait fOr rcply of the l lappliCant. I Thc case stands dcfcrrcd. Casc No.:2/2/81-ALC2/2019 Party Namc:JINDAIンSAⅥ′ IMcct No/1)atc:15/81- 1ンIMITED IALC2/2019 ‐3010.2019 HQ Filc RLA Filc Iッic No/Datc:0510410092 Deferrcd | :01/81/050/00002/AM20/ 1:05/23/040/00583/AM19/ .2903.2019 691bもtisibil ttllも‐ c6ふふi18888五ζ ia`rさa tA五ζ
五 s icragha五五五
b i6ica titti tt a五 igiし
,icicr sささ
kiAg
lCC■ain information as raiscd by Consuhant(TEC-3)was sCnt tO thc applicant on 02.09.2019 fo1lowcd
by inal remindcr on 22.10.2019.Howcvcr,nO rcply has bccn rcccivcd yct.Hcnce,thc Committcc
ldCCidCd tO watt fOr rcply ofthc appHcallt.
IThc case stands dcferrcd.
:01/81/050/00010/AM20l ::04l24l040t0o2\4tAM19t OZ.O4.2}tg
79 Dccision: Thc Committec considered the case as pcr agenda and dccided to seck from the
furnish following information as per advice of MSME:
- To provide ISRI code of import item at Sl. No.2.
- 'fo provide details of manufacturing processes with justification of wastage. Casc No.:10/2/81¨ ALC2/2019 HQ File ICasc No.:17/2/81- IALC2/2019 1HQ File Party Name:JAIN FGL IMETALINDUS′「RIES IRLA File Meet No/Datc:15/81- ALC2/2019 30.10.2019 Lic.No/Datc:0410165406 Status: Deferred applicant to ,Status: Approved 7 1 Party Namc:UNIVERSAL Mcct No/Datc:15/81- FLEXIBLES PVT.LTD. ALC2/2019 3010.2019 RLA Filc Lic No/1)atci0710114751 :01/81/050/00017/AM20/ 107/24/040/00307/AM19/ 10.04.2019 Decision: 1`hc Comlllittcc cOnsidcrcd thc case as per agcnda and dccidcd tO flx pcr writtcn cOmments datcd 30.102019g市en by COnsultant(TEC¨3)as undCr: ¨ Ψ 21 | Page 57 NC‐ 2 Meeting No.15/81 dated 30.10.2019
S
‐
.
N
。
ITCHS
Code
Export
Item
Quantity
S
‐
.
N
。
ITCHS
Code
Import Item
Recommended
Quantitv
1
73071900
SOCKET
lWA16
(5.520MT
wcight)
Hydraulic
fltting
18488.000
Numbcr
1
73041990
Carbon Scamless
Pipc ASTM A106
GR.B(HOT
Finlshcd Carbon
Steel Scanllcss
Pipe ASTM A106
GR.B)
Sizc:OD 50+0.5x
THK 8+0.5
Lcngth 5mtrs to
10mtrs.
9.2 MT
つ
4
73071900
SOCKET
I WA20(
4.950 MT
wcight)
Hydraulic
fltting
11554.000
Numbcr
つ
4
73041990
Carbon Scamlcss
Pipe ASTM A106
GR.B(HOT
Finlshcd Carbon
StecI Scarnlcss
Pipe ASTM A106
GR.B)
SIZE:OD 60+0.5
xTHK 9+0.5
Length 5mtrs to
10mtrs.
83 MT
73071900
SOCKE′ I`
lWA12
(2.250 MT
WEIGHl`)
Hydraulic
fltting
11764.000
Numbcr
73041990
Carbon Seamless
Pipe ASTM A106
GR.B(HOT
Finlshed Carbon
Stecl Seamless
Pipe ASTⅣI A106
GR.B)
Size:OD 45+0.5x
THK 8+0.5
Length 5mtrs to
10mtrs.
4.O MT
INote:Grade ofsteel to match in import dtt export。
IRA conccmcd may takc suitablc cOnscquential action accordingly l
lCase No.:1/3/81‐ ALC2/2019 ‐ParサName:SEIKODENKI .Mcct No/Date:15/81- Status:
‐
I INDIA PRIVATE LIMITED IALC2/2019 1 1
130.10.2019 1 ‐
HQ File RLA Filc Lic.No/Date:04101 65474 1Deferrcd
i01/81/050/00021/AM20/ :04/24/040/00003/AM20/ 15.04.2019 1
1Dccision:Thc Committcc cOnsidcrcd the casc as per agcnda and nOtcd that McitY has sought thc
lfo1lowing information from the applicant vidc lcttcr.No.:17(26)/2019-IPHW dated 25 09.2019:
| :: R:11:lli柵:I:llrll‖iledforlllanuねcturingoneunitofcxponprOductfOrcachexportittSS'''ゝ″
″
|
|
:
:
i
172
22 1 Page 57
separately. 3. Wastage claimed in manufacturing process. 4. Justification thereof. case stands deferred.
Case No.:6/3 l8l-ALC2l20l9 :Party Name: C.L.GUPTA
EXPORTS LTD. RLA Filc :29/24/040/00001/AM20/ ‐Mcct No/Datci1 5/81- Status: ALC2/2019 30.10.2019 Lic.No/Date:2910025392 Defcrrcd 16.04.2019 Decision: The Committee considered the case as per agenda and decidcd to seek from the applicant to furnish following information as per advice of MSME:
- Need of magnetic grade of SS.
- To provide the details of manufacturing processes alongwith justification of wastage with material balance. ICasc No.:7/3/81¨ AIノC2/2019 : The Committee considered the case as per agenda and decided to seek from the applicant to furnish following information as per advice of MSME: Need of magnetic grade of SS. To provide the details of manufacturing processes alongwith justification of wastage with material balance. case stands deferred. Party Name: TBEA ENERGY Meet No/Date:15/81- Status: Status: (INDIA)PRIVATE LIMITED IALC2/2019 130.10.2019 HQ Filc :01/81/050/00037/AM20/ Decision: The Commiffee considered the case as per agenda and decided to seek from the applicant to furnish following information as per advice of represcntative of DFII: IParty Namci C.L.GUPTA Mcct No/Date:15/81- Status: ‐EXPORTS LTD. ALC2/2019 1 30.10.2019 IRLA Filc Lic No/Datci3410045082‐ Defcrcd 134/24/040/00034/AM20/ 26.04.2019 , 7 ′ l. Sl. No. 5, 8 & I I of Standard Deficiency Format.
- List of indigenous items with quantity.
- Complete specification of import items 3, 5, 6, 10, 1 I & 35. case stands deferred. T r a d e T r a d e :01/81/050/00026/AM20/ IHQ Filc lRLA Filc Lic.No/Date:2910025393 Deferrcd 101/81/050/00027/ANI120/ 129/24/040/00002/AM20/ 16.04.2019
Case No.:17/3/81¨ALC2/2019
り唱%」占洲TI準 "1諦 23 1 Page 57 NC‐ 2 Meeting No.15/81 dated 30.10.2019 畔R埠繋「 8翼職斜 「 IHQ Filc 3H
Casc No.:1/5/81¨
IALC2/2019
1HQ File
Party Namc:APL METALS
ILIMITED
IRLA File
Mcet No/Datc:15/81-
ALC2/2019
30.10.2019
Lic.No/Datc:0210209151
Status:
Approvcd
76
:01/81/050/00050/AM20/ :02/24/040/00008/AM20/ 106.05.2019
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as
per written comments given by MSME as under:
ITCHS
Code
Export ltem
Quantity
ITCHS
Code
Import Item
Recommended
Quantity
78019100
ANTIMONIYAL LEAD ALIンOY
(COntaining Lcad noticss than
98%)
2000000
Ml・
85481010
I´EAI)SCRAP
COVEuD BY
ISRI CODE
WORD RAIIンS
As pcr SION
C-1153
RA concemcd may takc suitablc conscquential action accordingly.
I Case No.:15/5/81-ALC2/2019 Party Namc:DISHA AUTO Mcct No/Datc:15/8卜
Status:
| ‐ COMPONENTS PVT.LTD.IALC2/2019
‐30.10.2019
1 1HQ File RLA Filc Lic No/Datei0310829026 Deferred
101/81/050/00064/A卜/120/ 103/94/040/00096/AM20/ 1405.2019
77 1btciζ i6五:十hc com轟1lc8 861ζ iaぉd thc cムζ8五ζ per agCnda and notcd that a copy ofapplication was l lscnt to MSME for exalnination of thc casc on 06.08.2019 foHo、ved by a rcnlindcr on 21.10.2019. | IHOWever,no commcnts havc been rcccivcd yct.Hcnce,the Committcc dccidcd to wait for thc l lcominents. : IThc casc stands dcfcrred. ICase No.:28/5/81-ALC2/2019 Party Namc:DIS〕tへAUTO COMPONENTSPVT L′「D HQ Filc RIフA Filc 1 101/81/050/00077/AM20/ 1:03/94/040/00121/AM20/ 1781bLtiζ 16五1'十11さё6島llil農cc cottζ idも,もa tAも 五
s8五ζlさ,五LLAa五
| lsent to MSME for cxalnination of thc casc on 07.08.2019
1 :HOWever,no comments have been receivcd yct.Hcncc,
| ICOlninents.
| IThc casc stands deferred.
| ICase No.:25/5/81… ALC2/2019 Party Namei SEIKODENKI
‐ I INDIA PRIVATE LIMITED
179
HQ File
RLA lrilc
:01/81/050/00074/AM20/ :04/24/040/00027/AM20/
Mect No/Date:15/81- Status:
IALC2/2019 1
130.10.2019 ‐
ILic.No/Datc:0310829099‐
Dcfcrrcd
117052019
and notcd that a copy of application was
follo、vcd by a rclnindcr on 21.10.2019.
the Comlllittcc dccidcd to wait for thc
Mcct No/Datc:15/81- Status:
ALC2/2019
30.10.2019
:漱ツ電鍮紹
24 1 Page 57
NC-2 Meeting No.15/81 dated 30.10.2019
: The Committee considered the case as per agenda and decided to seek from the applicant to U. O. No.: P- ICase No.: 37/5/81…ALC2/2019 ,Mcct No/Datc:15/81- IALC2/2019 130102019 IHQ File RLA File Lic.No/Datc:0410165649 1Approved 101/81/050/00086/AM20/ :04/24/040/00039/AM20/ 24.05.2019 1 furnish the following information as per written comments given by DPIIT vide 7011/5/2019-TSW datcd 25.10.2019: Use of export items. Use of import items at Sl. No. 2,3 & 18 and basis/justification for the quantities of these import items and the wastage claimed. Sl. No. 3, 6,8 & 9 of Standard Deficiency F-ormat. Wastage claimed on various wires/tubes. case stands deferred. ParサNamc:LEITWIND SHRIRANI MANUFACTURING IPRIVATE LIMITED 80 Decision: The Commiflee considered the case as pcr agenda and decidcd to fix the ad-hoc norms as per written comments given by DPIIT vide U.O. No.: 7/85/2019-1'SW dated 28.10.2019. (Copy enclosed) 'RA concerned may take suitable consequential action accordingly. Status: HQ Filc i01/81/050/00096/AM20/ :Lic.No/Date:0710114993 131.05.2019 Decision: The Comrnittee considered the case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 12.09.2019 for examination of the casc. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. case stands deferred. Mcct No/Date:15/81- ALC2/2019 30.10.2019 : The Committee considered the case as per the agenda and noted IHQ Filc RLA File 101/81/050/00273/AM20/ :03/95/040/00694/AM20/ Lic.No/Datc:0310832139 1Deferred 10.10.2019 1 that thc hard in this rcgard, copy of an email ion has not yet been received from RA, Mumbai & the applicant and sent on 24.10.2019. However, no information has been receivcd yet. Hence, the to wait for the complete set of application. is deferred. DゝDrⅢ「911撃」叫 Trade Trade
Case No.:4/15/81-
ALC2/2019 25 1 Page 57 NC-2 Meeting No.15/81 dated 30.10.2019 椰鷲麒訂凝為肺 tStatus:
Case No.:47/5/81-AIノC2/2019 Party Namc:GESSMANN
ICONTROLIンERS INDIA PRIVATE LIMITED Mcet No/Date:15/81- IALC2/2019 130.10.2019 181 RLA Filc Party Namc:PARAM INDUSTRIES Status:
83 Decision: The Committee considered the case as per the agenda and noted that the hard copy of
application has not yet been received from RA, Mumbai & the applicant and in this regard, an email
was sent on 24.10.2019. I'lowever, no information has been received yet. Flence, the Committee
decided to wait for the complete set of application.
Case is deferred.
Casc No.:5/15/81¨AIノC2/2019 Palty Namc:PARAM
INDUS・「RIES
HQ Filc
:01/81/050/00274/AM20/
Casc No.:6/15/81¨ALC2/2019 Pany Namc:PARAM
INDUS・「RIES
IMcct No/Date:15/8卜 lstatus:
IALC2/2019 1
130.10.2019 1
RIコA「ilc Lic No/Datc:03 10832140 1Deferrcd
:03/95/040/00693/ANI120/ 101o.2019
Mect No/Datc:15/81-
ALC2/2019
30.10.2019
Status:
HQ File
RLA Filc
Lic.No/Date:03 10832141 1Dcfcrred
841ふζ iふ轟 :Thёも島話薔
8さ86nsぬ
rcd tiあ
ζ
iζ 13F“ 五
ま五ど五and i6t8d thtti tAさ
hard 86″ 61
1application has nOt yct bccn rcccivcd frOm RA,Mumbai`こthe applicant and in this rcgard,an email
was scnt on 24.10.2019. IIowcvcr, no information has becn rcccivcd yct Hcncc, the Comlnittcc
decidcd tO、vait for the cOmplctc sct of application.
Casc is dcfcrred.
85‐ :01/81/050/00271/AM20/ :03/95/040/00652/AM20/
Dccision: Thc Conllnittcc cOnsidcrcd thc casc as pcr
lConsultant(TEC-3)for eXamination and comments.
Thc casc stands defcrred.
Casc No.:
2/15/81-ALC2/2019
HQ Filc
HQ File
:01/81/050/00272/AM20/
Palty Nalllc:POLYCAB
INDIA LIMITED
RI′ A Filc
卜Icct No/Date:15/81- status:
IALC2/2019
130.10.2019 1
:Lic.No/Date:0310832132 1Dcfcrred
110.10.2019 1
agcnda and dccided tO refer the casc tO
Casc No.:3/15/81-ALC2/2019 Party Namc:STERLITE IMcet No/Datc:15/81- status:
POWER TRANSMISSION :ALC2/2019 1
1LIMITED 30.10.2019 1
RLA Filc Lic.No/Datc:03 10832137 1Dcfcrred
:03/95/040/00618/AM20/ 1o.lo.2019 1
86 Decision: The Commiftee considered the case as per the agenda and noted that the hard copy of
application has not yet been reccived from RA, Mumbai & the applicant and in this regard, an email
was sent on 24.10-2019. However, no information has been received yet. Hence, the Committed/
decided to wait for the complete set of application.
ZYy
Casc is deferred.
26 1 Page 57
| ICase No.:1/15/81-ALC2/2019 1Party Namc:YASH METAL Mcct No/Datc:15/81- Status:
. IMPEX PVT LTD. ALC2/2019
‐30.10.2019 1
1 HQ Filc lRLA Filc Lic No/Datc:0310832122 Deferred
i01/81/050/00270/AM20/ :03/95/040/00669/AM20/ 10.10.2019
1871bもtiζibi: ′
ll18 ё。品丼
iittcc cもA:iaclさa tiさ 五s 五ζ
lさli五
` aL8Aと
よ
aha 五
81もa tllttt illさ A五ia t61ジ‐
18F
I ‐
appliCation has not yct becn rcccived fl・
Oln RA,Mumbai2貶
thc applicant and in this rcgard,an email
l lWaS Sent On 24 10.2019.Howcvcr,nO infOrmation has bccn rcccivcd yct.Hcncc,thc Coinmittcc
l dCCidCd tO wait for thc complctc sct ofapplication.
| ‐Casc ls defcrrcd
Case No.:9/15/81-ALC2l20l9 Parly Narnc: lrFD
HQ File INDUCTION PRIVATE ILIMITED IRLA File ,, :01/81/0501002181AM201 :0712410401001531AM201 11.10.2019 Decision: The Committee considered the case as pcr agenda and notcd that the copy of, application ,was sent to MeitY on 23.10.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. lThe case stands deferred. Mcct No/Date:15/81- Status: ALC2/2019 1 30.10.2019 Lic.No/Datc:0710115555‐ Dcfcrrcd
Case No.:8/15/81¨ AI」C2/2019 1Party Namc:
IMAHARASHTRA
SEAMLESS LIMI′ I`ED
Mcct No/Datc:15/8ト
・ALC2/2019
30.10.2019
Status:
Status:
IHQ Filc lRLA Filc Lic.No/Datc:0510412078 1Dcfcrrcd
:01/81/050/00277/AM20/ ::05/24/040/00346/AM20/ H.102019 1
89‐ Decisi3n:ThもёもmふilもcもAζibcrca tllさ caきさ五ζ p8r iAagCnal and A818d titt thc Attid copy 6f
application has nOt yct bccn rcccivcd fl・om RA,Ncw Dclhi&thc applicant and in this rcgard,an cmail
was sent on 24.10.2019. Ho、vcvCr, nO information has bccn rcccivcd yet. Hcncc, the COll11■
ittCC
decidcd to wait fOr thc cOmpletc sct of applicatiOn.
ICasc is dcferrcd.
ICase No.:7/15/81¨ ALC2/2019 1Party Namc:SIEMENS Mect No/Datc:15/81-
IGAMESA RENEWABLE ALC2/2019
. :POWER PRIVATE LIMITED 30 10 2019
HQ Filc
RLA Filc
Lic.No/Datc:0410166153 1Dcfcrrcd
,0,:0]/81/0s\rcaz76lAwl!_ :0424.040100109/AM20/ I 1.10.2019
Decision: The Committee considered the case as pcr the agenda and noted that the hard copy of
application has not yet been received from RA, Chennai & the applicant and in this regard, an cmail
was sent on 24.10.2019. However, no information has been received yet. Hence, the Corumittpe
decidedtowaitforthecompletesetofapplication.M
Case is deferred.
27 1 Page 57
D
‐
D
i
Ⅳ
91 :01/81/0501002791A}/.201 :041241040100108/AM20t 11.10.2019 Dccision: The Commiflce considered the case as per the agenda and notcd that the hard copy of application has not yet been received from RA, Chennai & the applicant and in this regard, an email was sent on 24-10.2019. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. Case is deferred.
Case No.:10/15/81¨
IALC2/2019 1HQ Filc
Case No.:11/15/81¨
AIノC2/2019 HQ Filc :01/81/050/00280/AM20/ Casc No.:14/15/81- ALC2/2019 HQ Filc :01/81/050/00283/AM20/
Case No.:12/15/81¨
AIノC2/2019 ‐ HQ File 94191ダl`9,94997,1/今Y20/ Party Namc:SIEMENS Mcct No/Date:15/81- Status: GAMESA RENEWABLE IALC2/2019 1 POWER PRIVATE LIMITED 30.10.2019 ‐ IRLA File Lic.No/Datc:041 01 66158 1Dcfcrred Paty Namc:SHIVAM IRON McctNo/Datc:15/81- status: AND STEEL COMPANY ALC2/2019 1 LIMITED 30.10.2019 1 RLA Filc Lic.No/Date:0210209475 1Dcfcrred :02/24/040/00099/AM20/ 1410.2019 1 Paty Name:AXORA Mcet No/Date:15/81- status: RESOURCESIフIMITED ALC2/2019 1 130.10.2019 1 RLA Filc Lic.No/Date:0210209479 1Dcfcrred :02/24/040/00101/AM20/ 15.10.2019 1 Party Name:GUJARAT Mect No/Datc:15/81- Status: COPPER ALLOYS LTD. ALC2/2019 1 130.102019 1 RLA File Lic.No/Datc:0310832237 1Deferrcd :03/94/040/00544/AM20/ 115.10.2019 1 92 Decision: The Committce considered thc casc as per the agenda and noted thar the hard copy of application has not yet been received from RA, Calcutta & the applicant and in this rcgard, an Lmail was sent on 24.1 0.20 19. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. Case is deferred. 93 Dccision: The Committec considered lhe case as per the agenda and noted that the hard copy ol ;application has not yet been received from RA, Calcutta & the applicant and in this regard, an Lmail was sent on 24.10.2019. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. Case is deferred. Decision: The committcc considered the casc as per the agcnda and r ,application has not yet been received from RA, Mumbai & the applicant 'was sent on 24.10.2019. However, no information has been received decided to wait for the complete set of application. rCase is deferred. noted and yet. that the hard copy of in this regard, an email Hencc, the CommifiCe w 28 1 Page 57
Case No.:13/15/81-
Party Name: GUJARAT
ALC2/2019
ALLOYS LTD.
RLA Filc
:03/94/040/00545/AM20/
Mect No/Datc:15/81¨
ALC2/2019
30.10.2019
Lic.No/Date:0310832238
15.10.2019
一
一
d
一
∬
一
r
e
一
S
t
a
t
u
一
断
ICase No.:15/15/81¨ IPa■y Name:MEl`ALIC Mcet No/Datc:15/81- Status:
IALC2/2019 11MPRESSIONS(INDIA)PVT‐ ALC2/2019
‐
| ILTD 30.10.2019 1
‐HQ Filc lRLA File Lic.No/Datc:0510412116 Dcfcrrcd
:01/81/050/00284/AM20/ 105/24/040/00386/AM20/ 15.10.2019 ‐
:01/81/050/00282/AM20/
: The Committee considered the case as per the agenda and noted that the hard copy of
has not yet been received from RA, Mumbai & the applicant and in this regard, an email
sent on 24.10.2019. However, no information has been received yet. Hence, the Committee
to wait for the complete set of application.
ase is deferred.
Decision: The Committec considercd the case as per thc agenda and noted that the hard copy of
application has not yet been received from RA, New Delhi & the applicant and in this regard, an email
,was sent on 24.10.2019. However, no information has been received yet. Hence, the Committee
decided to wait for the complete set of application.
Case is deferred.
‐Mcct No/Datc:15/81- Status:
ALC2/2019
30.10.2019
The Committee considered the case as per the agenda and noted that the hard copy of
lication has not yet been received from RA, Mumbai & the applicant and in this regard, an email
sent on 24.10.2019. However, no information has been received yet. Hence, the Committee
led to wait for the complete set of application.
^fr, -/
Lic.No/Datc:03 10832264 1Deferred
‐
16.10.2019 1
SH
Casc No.:16/15/81¨
ALC2/2019
Party Name: BAOSTEEL
INDIA COMPANY
PRIVATE LIMITED
29 | Page 57
NC‐ 2 Meeting No.15/81 dated 30.10.2019
HQ Filc
96
IRLA Filc
l:03/94/040/00555/AM20/
Case is deferred.
OFFLINE CASES SI. No。 Party's Name ⅡQ/RA Filc No。 I CaseHi:::ry Decision Status RI IVOITH HYDRO PRIVATE LIMITED 0510397430 Dated: 28.01.2016 01/81/050/005 17/AM16/ 05/24/040/005 30/AM16/ The representative of lDelerred DHI requested to send I again the complete set of I application to DHI for I examination of the "ur". I Hence, the Committee I directed to refer the case I to DHI again. I R2 HAVELLS INDIA LTD. 0510391800 dated 29.10.2014 01/81/050/004 69/AM15/ 05/23/040/003 32/AM15/ The Committee noted that the request has been received beyond 90 days from last decision. Hence, the Committee decided to ask the applicant to deposit a composition fee of Rs.5 000/- for considering the case along with reply of deficiency letter dated 11.05.2019. Defcrred R3 ANAND ARC LIMITED 0310819142 datcd 14.02.2018 11/81/050/000 7/AM19/ 13/94/040/009 4/AM18/ The case was rejected in M. No. 02lg1 dated 29.05.2018 on the ground that there is no correlation of between import and export items mentioned in the AA. The applicant vide letter dated 02.03.2019 has requested for ratification of ad-hoc norms and stated that the company is manufacturing of welding consumable products as per AWS standard. All products are manufactured in accordance with American welding ;tandard (AWS) and export throughout he world. The case was last consideredl n M. No. l2l8t dt. I8.09.2019 andl lecided to refer the case to Consultantl 'l'EC-3) flor examination and called thel rpplicant for personal hearing. as p"rl lecision of meeting no. l2lgl At.l 8.09.2019, the case has been relerred tol TEC-3) on24.10.20t9. I The Committee considered the case as per agenda and noted that the applicant was called for personal hearing to explain the case before Norms Committee. However, nobody was appeared for personal hearing on behalf of the applicant. Therefore, thc Committee decided to give one more opportunity to the applicant for personal hearing to explain the case before Norms peferred ― ― リ 締 30 1 Page 57 NC-2 Meeting No.15/81 dated 30。10.2019
Committee. R4 TRAFOMEC INDIA MAGNETICS PRIVATE LIMITED 0710083779 dated 08.11.2011 01/81/050/003 25/AM12/ 07/24/040/002 58/AM12/ lThe case was rejected in M. No.9/81- ldtcztzotl dated 16.07.2013 due to lnon-submission of reply 1o deficiency letter dated 01.02.2013.'l'he applicant's reply dated 30.06.2015 along with their earlier reply dated 17.09.2012 were forwarded to DHI on 19.02.2016.The case was considered in offline M. No. 23181 & 25181 dated 23.02.2016 EL 07.03.2017 respectively. The case was again rejected in M. No. 08/81 dated 11.07.2017 due to non-submission of reply to deficiency letter dated 19.04.2011. The applicant vide letter dated 0l .05.2019 has furnished reply and requested to ratify the ad-hoc norms. The case was last considered in M. No. 12181 dt. 18.09.2019 and decided to refer the case to DHI. As per decision of meeting no. 12181 dt. 18.09.2019, the case has been refemed to DHI on 25.10.20t9. The representative of DIll requested to send again the complete set of application to DHI for examination of the case. Hence, the Committee directed to refer the case to DHI again. Deferred R5 MEHTA TUBES LIMITED 0310813091 datcd 05.05.2017 01/81/050/001 38/AM18/ 03/95/040/010 40/AM17/ The case was rejected in M. No.2/81 dated 29.05.2018 due to non-submission of reply of DIPP deficiency letter dated 09.08.2017. The applicant vide letter dated 18.04.2019 furnished the reply and requested to ratify the d-hoc norms. The case was last considered in M. No. 12l81 dt. 18.09.2019. The Committee noted that the request has been received beyond 90 days from last decision. Hence, the Committee decided to ask the applicant to deposit a composition fee of Rs.5000/- for considering the case. As per decision of meeting no. 12181 dt. 18.09.2019, email has been sent to applicant on 29.10.2019. l{owever, no information has been received yet. The Committee decided to wait for the reply of the applicant. Dcfcrrcd R6 Valco lndustrics Ltd. 2210011493 Dated 10.06.2011 01/81/050/000 35/AM18/ 22/21/040/000 34/AM12/ The case was withdrawn in M. No.3/81- ALC2/2017 dated 02.05 .2017 on the ground that the import of aluminium] scrap is not allowed as per SION. Thcl applicant vide letter dated 26.12.20111 has requested for correction of wrongl input description on shipping bill andl Personal Hearing. The case was lastl considered in M. No. 12181 dt. I The Committee per agenda and noted that the applicant was called for personal hearing to explain the case before Norms Committee. However, nobody was appeared for Deferred 轟 / σ 31 1 Page 57
18.09.2019.As per dccision of lnecting no. 12/81 dt. 18.09.2019, thc casc has bcen rcferrcd tO DPIIT on 23.10.2019. PH Ictter scnd on 18.10.2019. personal hearing on behalf of the applicant. Therefore, the give one more opportunity to the applicant for personal hearing to explain the case before Norms Committee. R7 COSMOS ENGITECH PVT LTD. 3410042745 dated 09.12.2016 (Part flle) 01/81/050/006 06/AM17/ 34/24/040/002 44/AM17/ The case was rejected in M. No. 2/81- ALC2|2018 dated 29.05.2018 due to non-submission of reply to DIPP deficiency letter dated 08.08.2017. The applicant vide letter dated 28.12.2018 has furnished reply and requested to ratify the norms. The case was last considered in M. No. 12181 dt. 18.09.2019. As per decision of meeting no. 12181 dt. 18.09.2019, the case has been referred to DPIIT on23.10.2019. The Committee per agenda and the representative of DPIIT informed in the meeting that the case is under examination. Therefore, the Committee decided to wait for the comments. Deferred R8 GRAVITA INDIA LIMITED 1310048372 dated 09.092016 01/81/050/003 64/AM17/ 13/24/040/000 22/ANI11 7/ The case was rejected in M. No.1ll81- ALC2/2018 dated 30.01.2019 due to non-submission of reply of deficiency letter datcd 04.09.2018. The applicant vide letter dated 13.02.2019 has not furnished the reply of deficiency letter & requested to ratify the norms on repeat basis. The case was last considered in meeting no. 12181 dt. 18.09.2019 and decided to call the applicant for PH. As per NC decision, email dated 18. 10.2019 sent to applicant requesting them to attend PH on 30.10.2019. Thc Committee per agenda and noted that the applicant was called for personal hearing to explain the case before Norms Committee. However, nobody was appeared for personal hearing on behalf of the applicant. The refore. thc give one more opportunity to the applicant for personal hearing to explain the case before Norms Committee. Deferrcd R9 BHARAT HEAVY ELECTRICAL S LIMITED 0510238811 dated 24.03.2009 01/81/050/007 88/AM09/ 05/24/040/006 99/AM09/ The case was considered in M. No: 261 81 - ALC2|2009 dated 29.09.2009 and decided to relist the case in meeting dated 24.11.2009. However, the case was not re-indexed in meeting dated 24.11.2009. The case was last 18.09.2019 and the Committee decided to see file for the developments in the case after 2009. The Committee per agenda and noted that the case is l0 year old & the file of the case is also not available in the Section as per retention schedule. Therefore, the Rejected 都 32 1 Page 57 Forur$o p&lnc {ew De
the case. R10 BHARAT HEAVY ELECTRICAL S LIMITED ll10028319 dated 12.01.2018 01/81/050/000 96/ANI11 9/ 11/24/040/000 06/AM18/ The case was ratified in M. No.5/81- ALC212018 dated 10.10.2018 as per written comments of DHI vide their U. O. No.DES-2/BHEL1GTr|2018-TW- HEI. The applicant vide their email dated 26.1 1 .201 8 requested for revision of ratified norms. The case was last 18.09.2019 and decided to refer the case to DHI. The Committee noted that the case has not yet been refered to DHI for examination as decided in M. No. 12181 dated 18.09.2019. Therefore, the Committee directed to refer the case to DHI for comments immediately. Deferred RH TUBEX INDIA 0510400849 datcd 19.12.2016 01/81/050/005 44/AM17/ 05/24/040/004 59/AM17/ The case was rejected in M. No.8/81- ALC2|2017 dated 11.01.2017 due to non-submission of reply of deficiency letter dated 14.02.2017 as raised by DIPP vide UO No. 121512017-TSWI03 dated 24 10112017. 'fhis case was last 18.09.2019. The Committee noted that the applicant has still not furnished reply of deficiency letter dated 14.02.2017. As per NC decision, an email has been sent to applicant on 22.10.2019 along with D/L dt. 14.02.2017. However, no reply has been received yet. 'fhe Committee decided to wait for the reply of the applicant. Deferued R12 01/81/050/002 05/AM18/ 04/24/040/000 53/AM18/ The case was rejected in M. No.l8/81-l ALC2l20l1 dated 21.1 1 .2017 due tol non-submission of reply of deficiencyl letter dated 2l .08.201 7 as raised by] DIPP vide UO No. 1215712017- TSWI 55 dated 25107 12017 . 05.12.2017 & 23.08.2019 has furnished reply and requestcd to ratify the norms. The case was last considered in M. No' l2l8l dt.18.09.2019. As per decision of meeting no. 12l81 dt. 18.09.2019, the case has been referred to DPIIT on 23.10.2019. The Committee per agenda. The representative of DPIIT informed in the meeting that the case is under examination. Therefore, the Committee decided Deferred R13 EVERSENDAI CONSTRUCTI ON PRIVATE LIMITED 0410163236 Datcd 15.06.2017 01/81/050/002 04/Aヽ418/ 04/24/040/000 54/AM18/ The casc was raCCted in M No 18/81- ALC2/2017 dated 21.11.2017 duc to non― subΠlission of reply of dcflciency lctter dated 21.08.2017 as raised by DIPP vide UO No. 12/57/2017- .TSW/155 dated 25/07/2017. 'fhe Committee per agenda and the representative of DPIIT informed in the meeting that the case is under examination. Therefore, the Committee decided Deferred / 33 1 Page 57 NC‐ 2 Meeting No.15/81 dated 30.10.2019
1期聯麟♂薫評需膏 R14 SHINKWANG ELECTRONIC S PRIVATE LIMITED 0510339369 dated 23.112012 01/81/050/004 19/ANI11 3/ 05/24/040/003 13/ANI11 3/ The case was rejected in M. No. 15/81- ALC212O13 dated 08.10.2013 due to non-submission of reply to MSME deficiency letter vide U.O. No. 30(294)201 I -ME dated 26.2.201 3 . 'fhe applicant vide letter dated 10.09.2019 has requested to ratify the norms. However, the applicant has not furnished reply to above mentioned deficiency letter. The case was last I 8.09.2019 and decided to ask to deposit composition fee of Rs.5000/- as the request has been received beyond 901 days from the date of uploading the NCI decision on DGFT website. The partyl has yet not been informed as the mainl file is not readily available. I The Committee directed to trace the main file and take action as decided in M. No. 12181 dt. 1 8.09.20 19 immediately. Defered R15 01/81/162/005 80/AMl1/ 34/24/040/001 33/AM06/ I I he case was considered in Offlin lAgcnda in M. No. 32l}l darer j;25.10.201 l. NC decided to reject th, lrcquest of firm to allow impoa of Allo, lSteel Coil as rhe above Iicence is issuer lunder SION and inpurs are allowed ar lper SION. lfne applicant vide lefter darer IO:.OS.ZO t2 had requesred the pRC for lrealization of policy to accommodatr luse of utilization of Alloy Steel in Coi lin place of Plare. The case wa: lconsidered in PRC in M. No.l4l81 datec 117.07.2012 and decided to rejecr rhe lrequest to allow input which is not par.1 lof SION. The PRC vide leter dated lOl.OA.ZOlg advised rhe applicant ro lapproach the concerned Norms iComminee for a decision in the maner. lNow. the applicanr vide lefler dated ll t .Ol .ZOO has enclosed copies of communications and other supporting documents and requested to ratify the norms. The case was last considered in meeting no. l2/gl dt. 1g.09.2019 and decided to call the applicant for personal hearing to explain the case along with copies of shipping bills. As per NC decision email dated I I I 0 ?0lO senr tn d e ノ ∬ お e D I ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ― ― ― ― ― X 34 1 Page 57
applicant requesting them to attend PH on 30.10.2019. R16 NSIL EXPORTS LIMITED 5610004970 datcd 08.08.2016 01/81/050/003 00/AM17/ 56/24/040/000 25/AM17/ The case was rejected in M. No. 7/81- ALCZl2}l8 dated 29.11.2018 on the ground that no information was received from the applicant regarding license amendment sheet for export product description as per MoS vide U.O. No. 2(11)12016-TD dated 29.12.2017. 11.12.2018 has furnished reply and requested to ratify the norms. The case was last considered in M. No. 12181 dt. to MoS. As per decision of meeting no. 12181 dt. 18.09.2019, the case has been referred to MoS on 24.10.2019. However, no comments have been received yet. Deferred R17 BHARAT HEAVY ELECTRICAL S LIMITED ll10028321 dated 12.01.2018 01/81/050/000 97/AM19/ 11/24/040/000 07/AM18/ The case was ratified in M. No.5/81- ALC2|2018 dated 10.10.2018 as per DHI written comments vide U. O. No.3/58/2014-TSW(B). The applicant via mail dated 06.12.2018 requested for revision of norms for allowing deemed export benefit for rejected import item at Sl. No. 08 and with literature and technical write-up. The case was last considered in meeting no. 12181 dt. to DHI for examination and call the applicant for personal hearing. The Committee noted that the case has not yet been referred to DHI for cxamination as decided in M. No. l2l8l dated 18.09.2019. Therefore, the Committee directed to refer the case to DHI for comments immediately and call the applicant for personal hearing. Deferred R18 STERLITE POWER TRANSMISSI ON LIMITED 0310819587 Datcd 07.03.2018 01/81/050/000 30/AM19/ 03/95/040/009 21/ANl11 8/ The case was rejected in M. No. 11/81- ALC2/2018 dated 30.01.2019 due to non-submission of reply to deficiency letter dated18.10.2018. The applicant vide letter received on 17.01.2019 has furnished the reply & requested for ratification of ad-hoc norms. The case was last considered in M. No. 12181 dt. to DPIIT. As per decision of meeting no. 12181 dt. 18.09.2019, the case has been referred to DPIIT on 28.10.2019. The Committee per agenda and the representative of DPIIT informed in the meeting that the applicant's representation has not yet been received by DPIIT. 'fherefore, the send again the complete representation to DPIIT. Deferred R19 GOEL STEELS 0510405509 datcd 02.02.2018 01/81/050/002 55/AM19/ 05/23/040/004 29/AM18/
ALC2l20l8 dated 01.11.2018 as per recommendation of Consultant (TEC-3). 16.08.2019 has requested to allow l0% wastage. The case was last considered in to wait for the report of study group. SV Deferred / 35 1 Page 57
M. No. 12181 dt. 18.09.2019 and decided to constitute a group to study the manufacturing processes and ascertain wastages by visiting the factory premises of the applicants manufacturing same/similar products. A decision would be taken based on the report ofthe study group. R20 JAYNA STEEL INDIA 0510406390 datcd 09.05.2018 01/81/050/002 60/AM19/ 05/23/040/000 62/AM19/ The case was ratified in M. No. 6/81 dated 01.11.2018 as per recommendation of Consultant (TEC-3). 10.04.2019 has requested for revision of fixed Norms. The case was last 18.09.2019 and decided to constitute a group to study the manufacturing processes and ascertain wastages by visiting the factory premises of the applicants manufacturing same/similar products. A decision would be taken based on the report ofthe study group. study group. Deferrcd R21 SHIVALIK BIIИETAL CONTROLS LTD. 0510399656 datcd 08.09.2016 01/81/050/003 97/AⅣl17/ 05/24/040/002 87/ANI11 7/ 'l'he case was ratified in M. No. 13/81 dated 19.09.2011 as per DIPP comments vide their UO No.12I6812017-TSW45 dated 19.09.2017. The applicant vide letter dated 25.01 .2018 has requested for revision of ratified norms. The case was last considered in meeting no. 12l81 dt. 18.09.2019 and decided to call the applicant for PH. The Committee per agenda and decided to call the applicant for personal hearing to explain the case before Norms Committee in the next NC meeting. Deferred う 乙 う ん R CONSOLIDA TED COIN COMPANY PVT LTD 0510405317 dt ll.01.2018 01/81/050/001 04/AM19/ 05/23/040/003 87/AM18/ The case was ratified in M. No. 3/81 dated 14.08.2018 on repeat with AA No. 0510399348 dated 03.08.2016 ratified in NC M. No.24l81 dated 21 .2.2011. 11.12.2018 & 04.09.2019 has requested for revision of ratified Norms. The case was last considered in M. No. 12181 dt. 18.09.2019. As per decision of meeting no. 12l81 dt. 18.09.2019, the case has been refered to DPIIT on23.10.2019. The Committee per agenda and the representative of DPIIT informed in the meeting that the case is under examination. Therefore, the Committee decided Deferred R23 KEI Industrics Lim■cd 0510407612 datcd 27.08.2018 01/81/050/007 02/ANl19/ 05/23/040/002 26/AM19/ The case was ratified in M. No. l2l81 dated 13.02.2019 as recommended by Consultant (TEC-3). 'fhe applicant vide letter dated 24.05.2019 has requested for revision of ratified norms. The case was last 扁 Deferred ビ 一 36 1 Page 57 NC‐2 Meeung No.15/81 dated 30.10。2019
to Consultant (TEC-3). As per NC decision, the case has been referred to Consultant (TEC-3) on 23.10.2019. However, no comments have been received yet. R24 Bharat Wire Ropes Ltd 0310815138 datcd ll.08.2017 01/81/050/003 12/AM18/ 03/94/040/004 04/AM18/ The case was ratified in M. No. 17181 dated 07.11.2017 on repeat basis as per RA, Mumbai lctter no. 0319410401404/AM18/38 dated 11.08.2017. The applicant vide letter dated 03.01.2019 has requested for fixation of ad-hoc norrns on repeat basis in term of policy circular no. 14 dated 27.12.2018. The case was last to Consultant (TEC-3) for examination As per decision of meeting no. 12l81 dt. 18.09.2019, the case has been referred to Consultant (TEC-3) on 23.10.2019. However. no comments have been received yet. )eferred R25 INDUSTMAL METAL POWDERS INDIA PVT LTD. 3110067107 dated 06.07.2018 01/81/050/005 62/AM19/ 31/83/040/000 52/AM19/ The case was ratified in M. No. 3/81 dated 15.05.2019 on the recommendation of representative of MSME. 10.06.2019 has requested for revision of ratified norrns. The case was last to MSME. As per decision of meeting no. 12l81 dt. 18.09.2019, the case has been referred to MSME on 29.10.2019. However, no comments have been received yet. The Committee per agenda. The representative of MSME, in his written comments, has recommended to revise the wastage from the 9.6Yo to 12o/o on the basis of norrns ratified for AA No. 3110065614 dated 28.08 .2015. Hence, the Committee decided to revise the norms on repeat basis as approved for for AA No. 3 1 10065614 dated 28.08.201s. RA concerned may take suitable consequential action accordingly. {pproved R26 CONSOLIDA TED COIN COMPANY 01/81/050/009 47/AM19/ 05/23/040/004 The case was ratified in M. No. 01/81 dated 10.04.2019 as pcr written comments of Consultant (TEC-3). 'l'he Committee per agenda and directed I Defemed 74{/ 37 1 Page 57 NC‐2 Meeting No.15ノ81 dated 30,10.2019 職蔽溜靡
PRIVATE LIMITED 0510409208 datcd 07.012019 27/AM19/ f 01.07.2019 has requested for revision of I 8.09.2019 and decided to refer the case to DPIIT. However, the case has not yet been refered to DPIIT for examination. to forward the applicant's representation to DPIIT immediately. R27 BHARAT HEAVY ELECTRICAL S LIMITED ll10018794 dated 27.10.2008 01/81/050/004 92/AM09/ 11/24/040/000 24/AM09/ 'l'he case was ratified in M. No. 18/81 dated 04.08.2009 as per written comments of DHI vide U. O. No. 3(7)l2009lTSW(By334 dated 19.08.2009. l'he applicant vide letter dated 09.01.2018 has requested for revision of norms on actual import/utilization for import items at Sl. No. 3, 4,9, 17,20, 27,24, 43 and 55 with justification. The case was last considered in meeting no. 12181 dt. 18.09.2019 and decided to call the applicant for PH. The Committee considerec the case as per agenda anc decided to call the applicanr for personal hearing tc lorthcoming NC meeting. Deferred R28 RR KABEL LIMITED 0310823944 Dated 24.09.2018 01/81/050/005 05/AM19/ 03/95/040/005 93/AM19/ The case was ratified in M. No. 01/81 dated 10.04.2019 as per written comments of Consultant (TEC-3). 'I'he applicant vide letter dated 01.07.2019 has requested for revision of considered in meeting no. 12181 dt. 18.09.2019 and decided to call the applicant for PH. Ihe Committee considerec lhe case as per agenda anc Jecided to call the applicanr lor personal hearing tc :xplain the case before \orms Committee in the lorthcoming NC meeting. Deferred R29 BILCARE LIMITED 3110066383 dated 25.10.2016 01/81/050/004 42/AM17/ 31/83/040/000 99/AM17/ lThe case was ratified in M. No. 03/81 ldated 14.08.201 8 as per wrinen lcomments of DIPP as approved lor AA lNo. 3 I 10066596 dated 17.02.2017 I ratified in M. No. I 9/8 1 dated 105.12.2011 . lf f," applicant vide lefler dated l:t.tO.zOt8 has requested for revision of lratified norms. The case was last I 8.09.2019 and decided to seek from the applicant to furnish following information as per advice of Consultant (TEC-1):(1.)Percentage net content of impoft item no. I to 3 in export product. (2.) Percentage net content of import item no. 4 & 5 on solid content basis. As per NC decision. D/L was issued on 14.10.2019. However. no reply has been] received yet. I to wait for the applicant's reply. Deferred 爛 R30 CONSOLIDA 01/81/050/002 The case was ratified in M. No.7/81 The Committee cttcd 38 1 Page 57
TED COIN COMPANY PVT LTD 0510406615 dated 25.05.2018 40/AM19/ 05/23/040/000 82/AM19/ dated 29 .l1 .2018 as per written comments of Consultant (TEC-3). 11.03.2019 has requested for revision of to DPIIT. However, the case has not yet been refered to DPIIT for examination. per agenda and directed to forward the applicant's representation to DPIIT immediately. R31 APAR INDUSTRIES LIMITED 3410044571 datcd 10.10.2018 01/81/050/006 12/AM19/ 34/24/040/002 21/AM19/ The case was ratified in M. No.4/81 dated 29.05.2019 as per written comments of Consultant (TEC-3) decided to fix the ad-hoc norms. The applicant vide letter dated 03.07.2019 has requested for revision of ratified norms. The case was last considered in meeting no. l2l81 dt. 18.09.2019 and decided to call the applicant for PH. As per NC decision email dated 21.10.2019 sent to applicant requesting them to attend PH on 30.10.2019. The party vide email dated 21.10.2019 has sought another date for PH. l'he Committee personal hearing to next NC meeting. Deferred R32 ARMOR PLAST LIMITED 0710113842 dated 12092018 01/81/050/006 55/AM19/ 07/24/040/001 56/AM19/ The case was ratified in M. No. 05/81 dated 12.06.2019 on repeat basis as approved for AA No.0710111799 dated 21.06.2017 in M. No. 3l8l-ALC212019 dated 15.05.2019 as recommended by Consultant (TEC-3). 15.07.2019 has requested for revision of ratified norrns. This case was last 18.09.2019 and decided to ask thc applicant to furnish copies of shipping bills. As per NC decision, D/L was issued on 14.10.2019. However, no reply has been received yet. Thc Committee decided to wait for the applicant's reply. Deferred R33 P.K.STEEL AND ⅣIETAL WORKS 0510408754 dated 04.12.2018 01/81/050/009 37/AM19/ 05/24/040/004 90/AM19/ The case was ratified in M. No. 5/81 dated 12.06.2019 on the recommendation of Consultant (TEC-3) and representative of MSME. 15.07.2019 has requested for revision of considered in M. No. l2l8l dt. visiting the factory premises of thc 'lhe Committee decided study group. メ Deferred / 39 1 Page 57
b3!9q9t th. report of the study group. R34 IASHISH FOILS PVT. LIMITED 0510405415 datcd 19.012018 01/81/050/008 50/AM19/ 05/23/040/004 14/AM18/ l'fhc case was rarified in M. No. l4lgl dated 13.03.2019 on rhe recommendation of Consultant (TEC-3) and representative of MSME. The applicant's representation received on 07.12.2019 with a request for revision of ratified norns. The case was last considered in M. No. 12l9l dt. applicants manufacturing same/similar] products. A decision would be takenl based on the repor-t of the study group. I study group. Deferred R35 SHRI PARSHAVNA TH IMPEX (INDIA) 0510407088 dated: 0507.2018 01/81/050/003 32/ANI11 9/ 05/24/040/002 02/Aヽ江19/ lThe case was ratified in M. No. g/gl ldated 19.12.2018 on rhe lrecommendarion of Consultant (TEC-3) lby allowing 7Yo wastage. The applicanr vide letter dated 19.04.2019 has requested for revision of ratified Norms. The case was last considered in M. No. 12/81 dt. group to study the manufacturing] processes and ascertain wastages bVj visiting thc factory premises of thel applicants manufacturing same/similarl products. A decision would be takenl Ugg{glh. r"q"t of rhe study group. I study group. IDeferrcd R36 Padmavati Export 0510406991 dated 28.06.2018 01/81/050/002 99/AM19/ 05/24/040/001 80/AM19/ lThe case was ratified in M. No. 8/gl ldated 19.12.2018 on rhe lrecommendation of Consultant (TEC-3) I by allowing 7Yo wastage. lThe applicant's representation received lon 26.04.2019 with a requesr for revision o[ ratified norms. The case was last considcred in M. No. l2l}l dt. processes and ascertain wastages bV] visiting the factory premises of thel applicants manufacturing same/similarl products. A decision would be takenl based on the repofl ofthe srudy group. I study group. Deferred R37 Padmavati Export 01/81/050/002 98/ANI11 9/ Thc casc was ratifled in M.No.6/81 datcd ol.11.2018 0n thc to wait for the report of 鵠 40 1 Page 57
recommendation of Consultant (1'EC-3). applicant's representation received n 26.04.2019 with a request for revision of ratified norms. The case last considercd in M. No. 12/81 dt. 18.09.2019 and decided to constitutc based on the report ofthe stud 0510406414 datcd 10.05.2018 05/24/040/000 20/AM19/ The Committee per agenda and directed to forward the applicant's representation to MeitY immediately. ferred The case was ratified in M. No. 05/81- ALC2|2018 dated 10.10.2018 as per comments of MeitY vide U. O. No. 17(43)12016-IPHW dated 24.09.2018. 08.07.2019 has requestcd for revision ratified norms and stated that the NC allowed wastage at lowest but actual process wastage is higher than thc allowed wastage. The case was last onsidcred in Mo No. 12/81 dt. to MeitY for examination. However, the has not yet been referred to MeitY. VERSATILE CARD TECHNOLOG Y PVT LTD. 0410163278 7.06.2017 01/81/050/002 4/040/000 62/AM18/ R38 ferred 'Ihe Committee decided study group. study group. The case was ratified in M. No. 04181- ALCZ12019 dated 29.05.2019 as recommended by Consultant (TEC-3). 27.08.2019 requested to reconsider their case for allowing 10o% wastage. The case was last considered in M. No. 12l81 dt. 18.09.2019 and decided to constitute a group to study the manufacturin based on the report ofthe study PRIYANKA INDIA PVT. LTD. 0510410078 dated 28.03.2019 01/81/050/011 84/AM19/ 05/24/040/007 24/AM19/ R39 case was ratified in M. No. 14181- ALC2/2018 datcd 13.03.2019 on thc recommendation of Consultant (TEC-3 and representative of MSME. 12.04.2019 has requested to revise the norrns with l0% wastage. The case was last considered in M. No. 12181 dt. to study the manufacturing (Part fllC) 01/81/050/008 02/AM19/ 05/24/040/000 69/AM19/ SANEET STEELS 510406371 09.05.2018 41 | Page 57 NC¨2 Meeting No.15/81 dated 30.10.2019
processes and asceftain wastages by visiting the factory premises of tfrl based On thc reportOfthe studygroupl IARMOR PLAST LTD 0710113649 Datcd 27.07.2018 01/81/050/Oo4 48/AM19/ 07/24/040/Ool 10/ANI11 9/ The case was ratified u. ."*.rd"d by Consultant (TEC_3) with th; COndij9n that grad`&dね島ctcrtts」 match in import & export item. The applicant vide letter dated 15.07.2019 has staled that they have ul."udy .::_rnqI.^"d rhe exporr obligation uguinrt the AA and there is no provision to amend the export shipping bills from the customs. Therefore, they have requested to remove the word "Tubes" from the lexport item. This case was last considered in M. No. 12181 ;;. 18.09.2019 and decided to ask th; applicant to furnish copies of shipping bills. As per NC decision, D/L *ai'r;;; on 14.10.2019. However, no reply has been received yet. to wait for the applicant's reply. HIND ALUⅣIINIUⅣI INDUsTRIES LTD. 0310825143 datcd 20.11.2018 101/81/050/Oo6 80/AM19/ 03/94/040/oo6 86/AM19/ lツli場ギじ .滉j挽1)ヽぶよ 織i脳謂艶蠅曜 I「:Ft u,ed haS bCen changcd by the ALC without any intimation/iir"r.rirn lapproval from them. They have imported and used the Aluminium Coil in manufacture of export product. They 11u",. therefore, requested to reinsta-tl Aluminium plates/Sleets/Coils/Slabs as applied by them in uduun"e authorization. The case was last considered in meeting no. 12/gl dt. I 8.09.201 9 and deciJed to .uf f ,fr" ]nnlj3an1 fo1 PH, As per NC decision, an emarl dated I g. I 0.201 9 sent to the applicanttOattendPHOn301ibi2519. Thc comm高 per agenda and heard the applicant's representative during personal hearing. The representatives stated that during a certain period, the prices ol- value added products i.e. Aluminium PIates/Sheets/Coils erc. were lower in Chinese market (Shanghai Metal Exchange) vis-d_vis London Metal Exchange. Hence, it procured the value added material from China which was melted to manufacture the end product. The representatives also stated that these value added products have been allowed to other company viz. Apar Industries in the past. 42 | Page 57 NC-2 Meeting No.15/81 dated 30.lo.2019
However, the Committee was of the view that value added product is not required to manufacture the end product. Further GN-2 also allow import of "Aluminium" and "Zinc" wherever permitted in the form of ingots/Pigs/Sows/S labs and T-Bars only. The Committee was informed that in all the recent cases of APAR Industries, the NC has allowed import of ingot only by deleting Plate/Sheet/Coil etc. Hence, the Committee decided not to accede to the request of the applicant. R43 ARMOR PLAST LTD 0710112339 dated 01 11.2017 01/81/050/008 84/AM19/ 07/24/040/002 17/AM18/ The case was ratified in M. No. 4/81 dated 29.05.2019 as recommended by Consultant (TEC-3). The applicant vide letter dated 15.06.2019 has stated that they have already completed the export obligation against the AA and there is no provision to amend the export shipping bills from the customs. Therefore, they have requested to remove the word "Tubes" from the export item. This case was last considered in M. No. l2l8l dl. I 8.09.2019 and decided to ask thc applicant to furnish copies of shipping lUittr. ar per NC decision, D/l- was sent lon 14.10.2019. However, no reply has lbeen received yet. to wait for the applicant's reply. )eferred R44 PRIYANKA INDIA PVT LTD. 510410088 dated 28.03.2019 01/81/050/011 86/AM19/ 05/24/040/007 45/AM19/ The case was ratified in M. No. 4/81- ALC212019 dated 29.05.2019 as recommended by Consultant ('fEC-3). 21.08.2019 requested to reconsider their case for allowing 100% wastage. The case was last considered in M. No. 12l81 dt. 18.09.2019 and decided to constitute a group to study the manufacturing study group. ダ Deferred 夕 43 | Page 57 NC‐2 Meeting No.15/81 dated 30。10.2019 I U
applicants manufacturing same/simil based on the report of the study group. R45 MOKSH EXIM 0510409095 datcd 27.12.2018 01/81/050/009 38/AM19/ 05/24/040/005 42/AM19/ The case was ratified in M. No. 01/81 dated 10.04.2019 taking cue from SION -22 as recommcnded bv MSMII. 13.05.2019 has requested for revision o considered in M. No. l2l8l dt. pplicants manufacturing same/similar brygg the report of the study group. study group. fcrrcd R46 INDUSTHAL METAL POWDERS INDIA PVT LTD. 3110067249 dated 10.12.2018 01/81/050/006 82/AM19/ 31/83/040/001 41/AM19/ The case was ratified in M. No. O2lB1- ALC2|2019 dated 01.05.2019 taking cue from approved AA No. 3l10065614 ted 28,08.2015 as recommended bv representative of MSME with the condition that the size of export should be less than size of impoft. The applicant vide letter dated 10.06.2019 & 01.07.2019 has requested to allow 25yo wastage (instead of 9Yo wastage after 20%o recovery from scrap) and import uantity may be suitably modified. The se was last considered in M. no. l2l8l dt 18.09.2019 and decided to rcfer thc case to MSME. As per decision meeting no. 12/81 dt. 18.09.2019, the case was referred to MSME on 25.10.2019. However, no comments have been received yet. per agenda. The representative of MSME, in his written comments, has recommended to revise the wastage from the 9,6Yo to l2Yo on the basis of nonns ratified for AA No. 3110065614 dated 28.08 .2015. Hence, the Committee decided to revise the norms on repeat basis as approved for for AA No. 3110065614 dated 28.08.201s. RA concerned may take suitable consequential action accordingly. pproved BHARAT WIRE ROPES LTD. 0310819950 20.03.2018 01/81/050/002 32/AM19/ 03/94/040/009 83/AM18/ The case was ratified in M, No. 6/81 dated 01.11.2018 on the recommendation of Consultant (TEC-3 ). 13.06.2019 has requested for correction in quantity i.e. correction in calculation error in norm for item at Sr. No. 1 & 2. Enhancement in quantity of Zinc as allowed under SION C 610. This case was last considered in M. No. 12181 dt. 18.09.2019 and decided to ask the applicant to furnish details to wait for the applicant's reply. 44 1 Page 57
calculations as stated by the applicant. As per NC decision, D/L was issued on 14.10.2019. However, no reply has been received yet. R48 BI‐IARAT WItt ROPES LTD. 0310820591 Dated: 23.04.2018 01/81/050/002 34/AM19/ 03/94/040/000 39/AM19/ C a C , d T h c 仙 was ratiflcd in Mo No.6/81 01.11.2018 on the recommendation of Consultant (TEC-3). 14.06.2019 has requested for enhancement in quantity of Zinc as allowed under SION C 610. This case was last considered in M. No. 12181 dt. 18.09.2019 and decided to ask the applicant to furnish details of calculations as stated by the applicant. As per NC decision, D/L was issued on 14.10.2019. However, no reply has been received yet. to wait for the applicant's reply. Deferued R49 BttRAT WIM ROPES LTD. 0310819949 dated 20.03.2018 01/81/050/002 33/AM19/ 03/94/040/009 82/AM18/ The case was ratified in M. No. 6/81 dated 01 .l l 2018 on the recommendation of Consultant (TEC-3). 13.06.2019 has requested for corection in quantity i.e. correction in calculation error in norm for item at Sr. No. I & 2. Enhancement in quantity of Zinc as allowed under SION C 610. This case was last considered in M. No. l2l8l dt. 1 8.09.2019 and decided to ask the applicant to furnish details of calculations as stated by the applicant. As per NC decision, D/L was issued on 14.10.2019. to wait for the applicant's reply. Defered R50 JAYNA STEEL INDIA 0510406419 dated 10.05.2018 01/81/050/002 59/AⅣl19/ 05/23/040/000 72/AM19/ The case was ratified in M. No. 9/81- ALC2l20l8 dated 02.01.2019 allowing the quantity of import item with wastage of l% as per recommendation of representative of MSME, and Consultant (TEC-3) with the condition that the grade/technical specifications of the stainless steel imported and that exported should conform. The applicant vide letter dated 10.04.2019 has requested for revision of ratified Norms. The case was last considered in M. No. l2l8l dt. 18.09.2019 and decided to constitute a group to study the manufacturing processes and asceftain wastages by visiting the factory premises of the applicants study group. ` Deferred / 45 1 Page 57 NC‐2 Meeting No.15/81 dated 30.10.2019 ‐
manufacturing same/similar products. A decision would be taken based on the report of the study POLYCAB WIIES PVT. LTD. 0310816399 dated 17.10.2017 01/81/050/004 72/AM18/ 03/95/040/005 22/ANII1 8/ The case was ratified in M. No. 3/81- ALC212018 dated 14.08.2018 (actually held on 20.08.2018,23.08.2018 and 28.08.2018). 12.12.2018 requested for revision 18.09.2019 and decidcd to refer the to Consultant (TEC-3) for examination. However, the case has not yet been referred to Consultant (TEC-3). The Committee considered directed to forward the applicant's representation to Consultant (TEC-3) immediately. POLYCAB WIRES PVT. LTD. 0310818249 dated 05.01.2018 01/81/050/001 55/AM19/ 3/95/040/008 The case was ratified in M. No.3/81- AI-C212018 dated 14.08.2018 (actually held on 20.08.2018,23.08.2018 and 28.08.2018). 12.12.2018 requested for revision to Consultant (TEC-3) for examination. However, the case has not yet been referred to Consultant (TEC-3). The Committee directed to forward the applicant's representation to Consultant (TEC-3) immediately. ferred POLYCAB WIIES PVT. LTD. 310818064 2812.2017 01/81/050/000 18/AM19/ 03/95/040/007 87/AⅣl18/ case was ratified in M. No.2/81- ALC2/2018 dated 29.05.2018(actually held on 18.07.2018)taking Cuc from AA No. 0310815474 datcd 01.09.2017 ratiflcd in M.No.23/81-ALC2/2017 datcd 06.03.2018. Thc applicant vidc letter dated 12.12.2018 requested for revision i8.09.2019 and decided to refer the case to Consultant (TEC-3) for examination. However, the case has not yet been referred to Consultant (TEC-3). The Committee per agenda and directed to forward the applicant's representation to Consultant (TEC-3) immediately. Dy D" Mi 1パ 45 | Page 57 NC-2 Meeting No.15/81 dated 30,10.2019 R51 Defcrcd R52 R53 )eferred
R54 POWER GEAR LTD. 0710060192 dated 29.09.2018 01/81/050/004 19/AM09/ 07/24/040/003 59/AM09/ The case was ratified in M. No. 28181- ALCZ|2009 dated 13.10.2009 (actually held on 1 1.1 L2009) as per written comments of DHI vide U. O. No. 3(72)/2008lTSw(By373 dated 29.09.2009. 08.01 .2019 stated that they had submitted request for review of the ratified norms vide letter dated 14.05.2013. The case was reconsidered in Meeting No. 08/81 dated 15.07.2014 and was rejected due to non-submission of reply. Now, the applicant vide letter dated 08.01.2019 has again requested for revision of ratified norms as under:- (i) Quantities for the import item no.5 as 48 numbers instead of 24 and (ii) Quantity for import item Sl.No.6 as 2.248 MT instead of 784 Kgs.. The case was last considered in meeting no. 12181 dt. I 8.09.201 9 and decided to call the applicant for PH. As per NC decision, PH letter was sent via email dated 18.10.2019 and representation has been sent to DHI via email dated 29.10.2019. per agenda and heard the applicant's representative. The committee decided to modifu the norms ratified in M. No. 28181- ALC2/2009 datcd 13. 10.2009 (actually held on I l. I 1.2009) as under: (i) The quantity of import item at Sl. No. 5 may be allowed with 24 pairs instead of 24 numbers (on net to net basis). (ii) The decision for rest of the import items will remain the same as decided in the M. No. 28181-ALCZ|2009 dated 13. 1 0.2009. RA concerned may take suitable consequential action accordingly. Committcc Thc Approved R55 POWER GEAR LTD. 0710063772 dated 23.03.2009 01/81/050/007 79/AM09/ 07/24/040/006 75/AM09/ The case was ratified in M. No. 26181- ALC2|2009 dated 29.09.2009 (actually held on 04.1 1 .2009) as per written comments of DHI vide their U.O. No. 3(78)l2009lTSW(B)/415 dated 29.r0.2009. 08.01.2019 has requested for revision of ratified norms i.e. the applicant requested to allow the item at Sl. No. 1l as it was deleted by NC. The case was last considered in meeting no. 12181 dt. 18.09.2019 and decided to call the applicant for PH. As per NC decision, an email dated 18.10.2019 was sent to applicant to attend PH on 30.10.2019. l'he Committee per agenda and heard the applicant's representative. The committee decided to reject the request for revision of ratified norms on the ground the applicant had already imported & exported the items with the same description. Rejected R56 SHIVA UTENSILS INDUSTRIES PVT LTD. 01/81/050/003 29/AM19/ 05/24/040/000 88/AM19/ The case was ratified in M. No. 9/81- ALC2l20l8 dated 02.01.2019 allowing the quantity of import item with wastage of lo as per recommendation of Consultant (TEC-3). study group. “ Defered *V 47 lPageST
0510406463 dated 15.05.2018 12.04.2019 has requested to revise their norms with l0% wastage. The case was last considered in M. No. l2l8l dt. based on the report ofthe study group. R57 SHIVA UTENSILS INDUSTRIES PVT.LTD. 0510406780 datcd 07.06.2018 01/81/050/003 30/AⅣl19/ 05/24/040/001 38/AⅣl19/ The case was ratified in M. No. 8/81- ALC212018 dated 19.12.2018 as per recommendation of Consultant (TEC-3) by allowing 7%o wastage. The applicant vide letter dated 12.04.2019 has requested to revise their norms with 10% wastage. The case was last based on the report ofthe study group. study group. Deferred R58 JAYNA STEEL INDIA 0510406418 dated 10.05.2018 01/81/050/002 61/ANl11 9/ 05/23/040/000 73/AⅣl19/ lThe case was ratified in M. No. 9/81- lALC2l20l8 dated 02.01.2019 allowing Ithe quantity of import item with wastage lof 7% as per recommendation of Consultant (TEC-3). 10.04.2019 has requested to revise their norms with 10% wastage. The case was last considered in M. No. 12/81 dt. visiting the lactory premises of thel applicants manufacturing same/similarl products. A decision would be takenl based on the repofl ofthe study group. I study group. Dcferrcd R59 SIDDHI TRADERS 0510406537 dated 21.052018 01/81/050/003 33/AM19/ 05/24/040/000 93/AM19/ The case was ratified in M. No. 9/81- ALC2l20l8 dated 02.01.2019 allowing quantity of import item with 7Yo wastage as per recommendation of Consultant (rEC-3). 12.04.2019 has requested to revise their norms with 10Yo wastage. The case was study group. 郵 Defercd / ll dヒ 48 1 Page 57
last considered in M. No. 12181 dt. based on the report ofthe study group. R60 JINDAL SAW LIMITED 0510400595 datcd 02.12.2016 01/81/050/004 52/AM17/ 05/23/040/003 93/AM17/ The case was ratified in M. No. 6/81- ALC2l20l7 dated 13.06.2017 as per DIPP UO. No.1214512017-TSW/89 dated 13.06 .2017 . fhe applicant vide letter dated 06.06.2019 has stated that NC had permitted less quantity of Polyethylene (HDPE) against Import Item No.13,26 &. 39 and requested to allow the differential quantity of Polyethylene (HDPE) as calculated and applied in the Advance Authorization. The case was last considered in M. No. 12181 dt. to Consultant (TEC-3). As per decision of meeting no. 12181dt. 18.09.2019, the case was referred to Consultant (TEC-3) on 28.10.20 19. However, no comments have been received yet. Deferred R61 MONTEX GLASS FIBRE IND PVT. LTD 0310813758 datcd 05.06.2017 01/81/050/002 16/AⅣl18/ 03/95/040/001 90/AM18/ The case was ratified in M. No. l2l8l- ALC2|2017 dated 05.09.2017 on repeat basis as approved for AA No. 0310791833 dated 09.12.2014 ratified in NC M. No. 8/81 dated 28.07.2015 as per DIPP comments vide UO No. 1216512017-TSW1 0 I dated 1810912017 . 0l .1 I .201 8 has requested for amendment in norms. The case was last 18.09.2019. As per decision of meeting no. 12181 dt. 18.09.2019, the case was referred to DPIIT on 23.10.2019. However, no comments have bcen received yet. The representative of DPIIT informed in the meeting that the case is under examination. Therefore, the wait for the comments. Deferred R62 AJAY AGARWAL& SONS 0510406236 datcd 26.04.2018 01/81/050/004 02/AM19 05/23/040/000 40/AM19/ The case was ratified in M. No.8/81- ALC2|2018 dated 19.12.2018 on the recommendation of Consultant ('tEC-3) by allowing 7Yo wastage. 12.04.2019 has requested for l0% wastage. The Committee noted in Th" c"rit1 d*id.d to wait for the applicant's reply. Deferred / 49 1 Page 57
Meeting No. l2l81 dt. 18.09.2019 that the request has been received beyond 90 days from last decision. Hence, the Committee decided to ask the applicant to deposit a composition fee of Rs.50001 for considering the case. As per NC decision, an email was sent to applicant on 29.10.2019 requesting for proof of deposition of composition fee. I{owever, no reply has been received yet. R63 APAR INDUSTRIES LIMITED 3410044555 dated 08.10.2018 01/81/050/006 16/AM19/ 34/24/040/002 09/AⅣl19/ 'lhe case was ratified in M. No. 4/81- ALC2l20l9 dated 29.05.2019 as per written comments given by Consultant ('rEC-3). 'fhe applicant vide letter dated 03.07 .2019 has requested for revision of ratified Norms. The case was last considered in meeting no. 12181 dt. I 8.09.2019 and decided to call the applicant for PH. As per NC decision, an email dated 21.10.2019 was sent to applicant to attend PH on 30.10.2019. The party vide email dated 21.10.2019 has sought another date for PH. The Committee personal hearing to next NC meeting. Deferred R64 CONSOLIDA TED COIN COMPANY PRIVATE LIMITED 0510410184 dated 09.04.2019 01/81/050/000 14/AM20/ 05/23/040/000 01/AM20/ The case was ratified in M. No. 4/81- ALC2|2019 dated 29.05.2019 on repeat basis as approved for AA No. 0510409208 dated 07.01.2019 in the M. No.0l/81 dated 10.04.2019. The applicant vide letter dated 08.08.2019 has requested for re-consider the case and allow 'Gross Quantity of Inputs', as asked by them in their application. The case was last considered in M. No. 12l81 dt. 18.09.2019. As per decision of meeting no. 12181 dt. 18.09.2019, the case was referred to DPIIT on 23.10.2019. However, no comments have been received yet. The representative of DPIIT informed in the meeting that the case is under examination. Therefore, the wait for the comments. Deferred R65 PILOT INDUSTRIES LTD. 0510402645 dated 19.05.2017 01/81/050/001 99/AM18/ 05/24/040/000 73/AM18/ 'fhe case was ratified in M. No. 3/81- ALC2l20l8 dated 14.08.2018 by allowing the wastage of 5%. The applicant via email dated 21.1 1 .201 8 has requested for revision of ratified norms. The case was last considered in M. No. 12181 dt. 18.09.2019 and decided to refer the case to DPIIT for examination. However, the case has not yet been referred to DPIIT. The Committee directed to forward the applicant's representation to DPIIT immediately. 雁 Deferred ウ 50 | Page 57 NC-2 Meeting No.15/81 dated 30,10.2019
R66 SANEET STEELS 510407021 29.06.2018 01/81/050/003 28/AM19/ 05/24/040/001 89/AM19/ The case was ratified in M. No. 8/E1- ALC2|2018 dated 19.12.2018 on the recommendation of Consultant (TEC-3) by allowing 7%o wastage. 12.04.2019 has requested to revise thei norrns with 10% wastage. The case was last considered in M. No. 12181 dt. pplicants manufacturing same/similar based on the report ofthe study group. case was ratified in M. No. 3/81- ALC2l20l8 dated 14.08.2018 on repeat basis as approved for AA No. 0510402399 dated 01.05.2017 ratified in M.No.11l8llALc2l20l7 dated 22.08.2011. The applicant's representation received on 22.11.2018 with a request for revision of ratified norms. The case was last considered in M. No. 12181 dt. to MSME. As per decision of meetin no 12/81 dt. 18.09.2019, thc casc has 、vas rcfcrrcd to MSME on 25.10.2019. study group. ferred R67 R68 SIIIVALIK BIMETAL NTROLS 510398533 17.05.2016 VINDHYA TELELINKS LTD. 1110025730 19.09.2011 01/81/050/001 97/AM17/ 05/24/040/000 45/AM17/ 01/81/050/005 58/AM18/ 11/24/040/000 27/AM12/ 01/81/050/001 03/AM19/ 05/23/040/004 57/AM18/ The Committee personal hearing to next NC meeting. CONSOLIDA TED COIN COMPANY PVT LTD 0510405810 datcd 07.03.2018 case was ratified in M. No. 3/81- ALC212018 dated 14.08.2018 as per DoT comments vide O. M. No.15- 07-IP datcd 14.05.2018. applicant vide letter dated 22.10.2018 and 09.1 1.2018 has request for revision of ratificd norms. The casc was last considered in M. No. 12181 dt. to DoT for examination. However. thc ase has not yet been referred to DoT. ""*ffi ALC2/2018 dated 14.08.2018 on rcpcat 、vith AA No. 0510399348 datcd 03.08.2016 ratifled in NC M. datcd 21.2.2017. The applicant vide I ted 17.12.2018 has request revision of ratified norrns of Export Product 'Coin Blanks (Consisting Copper-65%, Nickel- 1 0 And Zinc-25Yo)' under Advance Authorization No. 'l-he Committee directed to forward the applicant's representation to DoT immediately. 'l'he representative of DPIIT informed in the meeting that the case is under examination. Therefore, the wait for the comments. 51 1 Page 57 NC-2 Meeting No.15/81 dated 30.10.2019 )eferred )eferred R69 )eferred レ C
0510405810 dated 07.03.2018. The case was last considered in M. No. 12181 dt. 18.09.2019. As per decision of meeting no. 12181 dt. 18.09.2019, the case was referred to DPIIT on23.10.2019. R70 ANGLO STEEL PVT. LIMITED 0310796525 datcd 09.062015 01/81/050/001 85/AM16/ 03/94/040/001 65/AM16/ iThe case was approved in Norms lCommittee-ll special mceting held on 111.12.2011. The applicant via email dated 04.05.2019 has requested to correct the AA No. 0310196525 instead of 0310798525. The case was last to Consultant (TEC-3). The case has yet not been refered to Consultant (TEC-3) as the main file is not readilv available. The Committee directed to trace the main file and take action as decided in M. No. l2l8l dt. I 8.09.20 1 9 immediately. Deferrcd R71 ANGLO STEEL PVT. LIMITED 0310796526 dated 09.06.2015 01/81/050/001 84/AM16/ 03/94/040/001 73/AM16/ The case was approved in Norms Committee-Il Special Meeting held on 11.12.2011. The applicant via email dated 04.05.2019 has requested to correct the AA No. 0310796526 instead of 0310798526. The case was last considered in M. No. l2l8l dt. to (TEC-3). The case has yet not been refered to Consultant (TEC-3) as the main file is not readily available. The Committee directed to trace the main file and take action as decided in M. No. 12181 dt. I 8.09.20 I 9 immediately. Deferred R72 ANGLO STEEL PVT LIMITED 0310796527 datcd 09.06.2015 01/81/050/001 86/AM16/ 03/94/040/001 82/AM16/ lThe case was approved in Norms lCommittee-ll Special Meeting held on | 1.12.2017. The applicant via email ldated 04.05.2019 has requesred to lcorrect the AA No. 0310196527 insread lof 0310798527. The case was last considered in M. No. l2l8l dt. 18.09.2019 and decided to reler the case to (TEC-3). The case has yet nor been refened to Consultant (TEC-3) as the main file is not readily available. The Committee directed to trace the main file and take action as decided in M. No. 12181 dt. I 8.09.201 9 immediately. Deferred R73 APAR INDUSTRIES LIMITED 3410044570 datcd 10.10.2018 01/81/050/006 13/AM19/ 34/24/040/001 91/AM19/ The case was ratified in M. No. 4/81- ALC2/2019 dated 29.05.2019 as per written comments given by Consultant (rEC-3). ] The applicant vide letter dared I 03.01.2019 has request for revision ofl ratified norrns. The case was lastl considered in meeting no. l2lBl dt. I I 8.09.2019 and decided to call tn.l applicant lor PH. As per NC decisionl email dated 21.10.2019 senr ro applicanrl The Committee personal hearing to next NC meeting. メ Deferred / 52 1 Page 57
requesting them to attend PH on 30.10.2019. The applicant vide email dated 21.10.2019 has sought another date for PH. R74 NAGMEKA INDCON PRODUCTS (P)LTD. 0310815357 dated 23.08.2017 01/81/050/003 36/AM18/ 03/95/040/003 43/AM18/ The case was ratified in M. No. 2/81- ALC2|2018 dated 29.05.2018 allowing the quantity of import item 1.05 Kg/Kg content in the export product. However, the applicant vide letter dated 18.03.2019 has requested for revision of to DPIIT. As per decision of meeting no. l2l8l dt. I 8.09.2019, the case was referred to DPIIT on 28.10.2019. However, no comments have been received yet. On the request of DPIIT, the Committee decided to send a copy of application I representation again to DPIIT for examination. Defered R75 CONSOLIDA TED COIN COMPANY PRIVATE LIMITED 0510409513 datcd 29.01.2019 01/81/050/009 80/AM19/ 05/23/040/004 62/AM19/ The case was ratified in M. No. 3/81- ALC2|2019 dated 15.05.2019 as per written comments were given by DPIIT vide U.O. No.: P-4701116212019-TSW dated 30.04.2019. However, the applicant vide letter dated 03.09.2019 has requested for revision of to DPIIT. As per decision of meeting no. 12181 dt. 1 8.09.2019, the case was referred to DPIIT on24.10.2019. The representative of DPIIT informed in the meeting that the case is under examination. Therefore, the wait for the comments. Deferred R76 CONSOLIDA TED COIN COMPANY PRIVATE LIMITED 0510408678 datcd 29.01.2019 01/81/050/005 51/AM19/ 05/23/040/003 62/ANI11 9/ The case was ratified in M. No. 3/81- ALC2l20l9 dated 15.05.2019 as per written cornments were given by DPIIT vide U.O. No.: P-4701ll1412019-TSW dated 30.04.2019. However, the applicant vide letter dated 03.09.2019 has requested for revision of to DPIIT. As per decision of meeting no. 12181 dt. 18.09.2019, the case was referred to DPIIT on24.10.2019. fhe representative of DPIIT informed in the meeting that the case is under examination. 'l'herefore, the wait for the comments. )eferred R77 NATIONAL STEEL AND AGRO INDUSTRIES LTD. 5610005104 01/81/050/0 0187/AM18/ 56/24/040/000 51/AM17/ The case was ratified in M. No. 9/81- ALC2l20l8 dated 02.01.2019 as per written comments of MoS vide U. O. No.: 2(6)12011-TD dated 13.12.2018. The applicant vide letler dated 25.04.2019 has requested for revision of l'he Committee decided d Defered ジ 53 | Page 57 NC-2 Meeting No.15/81 dated 30。10.2019
23.03.2017 ratified norns as per the statement of the actual export made under the AA. The case was last considered in M. No. l2lg1 dt. 18.09.2019 and decided to refer the case-t-o.floS. As per decision of meeting no. 12/81 dt. 18.09.2019, the casc referrcd tO NIIos On 25.10.2019. Howevcr, no cOmmcnts have becn rcccived yet. R78 JINDAL QUALITY TUBULAR LIMITED 051040196o 15.03.2017 101/81/050/00o 36/AM18/ 05/23/040/Oo5 94/AM17/ The case was ratified i, tvt. No.lZSt_ ALC2/2019 dated 12.06.2019 as per written comments given by Consultant (TEC-3). The applicant vidl lefter dated 12.09.2019 has requested for revision considered in M. No. 12/gl dt. t" (T!9-3) As per decision of meeting no. 12/81 dt. 18.09.2019, the .ur" *ri refened to Consultant (TEC_3) on 28.10.2019.HOwcvcr, ng comふen麗 have been received vet. R79 」INDAL QUALITY TUBULAR IッIMITED 0510403717 dated 18.08.2017 01/81/050/003 56/AM18/ 05/23/040/Ool case was ratified in M. No. 6/g1_ 奪 IEζ 20ふ驚12f」lrO:.OT2品 given by Consultant (TEC-3). 12.09.2019 has requested for revision o ratified norrns. The case was last considcrcd in M. No. 12/81 dt. 18.09.2019 and dccidcd tO rcfer thc case to (TEC-3). As per decision of meeti no.12/81 dt.18.09.2019,thc casc wボ referred to Consultant (TEC_3) on 28.10.2019. However, no comments have been received yet. R80 ЛNDAL SAW LTD. 0510395490 dated 31.08.2015 01/81/050/Oo3 05/23/040/Oo2 21/AⅣl16/ 1/AM16/ The case was ratified ln tut. No ZZlgl_ ALC2/2015 datcd o9.o22016 as w面tcn cOmments Of DIPP宙de Jol 12.09.2019 has requested for revision 》 b5.2017/11/2016-TSw/88 dated ■q apメたant 宙dc た■ cr dated lratified norms. The case was last considered in M. No. l2lgl dt. t" (M-3) As per decision of meeting no. 12/81 dt. 18.09.2019, the .u.. *uf referred to Consultant (TEC_3) on 28.10.2019. However, no comments 54 1 Page 57 NC‐ 2 Meeting No.15/81 dated 30。lo,2019 ristry of Cornn Udyog Bhawi
have been received yet. R81 SVAM PACKAGING INDUSTRIES PRIVATE LIMITED 0510398071 datcd 30.03.2016 01/81/050/001 73/AM17/ 05/24/040/006 26/AM16/ The case was ratified in M. No. 4/81- ALC2l20l8 dated 27.08.2018 as per written comments of DIPP vide F.No.7111612018-TSW dated 27.06.2018. 10.10.2018 has requested for revision of considered in M. No. l2l8l dt. to DPIIT. As per decision of meeting no. l2l8l dt. 18.09.2019, the case was referred to DPIIT on 28.10.2019. However, no comments have been received yet. Deferred R82 ヽredanta Lilllitcd, NItadurai 3510044672 dated 17.02.2015 01/81/171/000 19/AM16/ 35/24/039/000 03/AM15/ The case was ratified in M. No. 01/81 dated 10.04.2019 as per written comments given by Consultant (TEC- 3).However, the applicant vide letter dated 06.06.2019 has requested for revision of ratified norrns. The case was last considered in M. No. 12181 dt. to Consultant (TEC-3) for examination. However, the case has not yet been referred to Consultant (TEC-3). The Committee directed to forward the applicant's representation to Consultant (TEC-3) immediately. Deferred R83 SAHNEY KIRKWOOD PVT. LIMITED 0310825416 datcd 05.12.2018 01/81/050/005 52/AM19/ 03/95/040/009 13/AM19/ The case was ratified in M. No. 12181- ALC2l20l9 dated18.09.2019 as per recommendation of Consultant (TEC- 1 ). 14.10.2019 has requested revision of ratified norms &. personal hearing. However, the applicant vide email dated 24.10.2019 was called to attend PH on 30.10.2019. The party vide email dated 25.10.2019 has sought another date for PH. The Committee personal hearing to forthcoming NC meeting, Deferred R84 SAHNEY KIRKW00D PVT. LIⅣIITED 0310824725 dated 26.10.2018 01/81/050/005 44/AⅣ119/ 03/95/040/007 64/AM19/ The case was ratified in M. No. 12181- ALC2|2019 dated18.09.2019 as per recommendation of Consultant (TEC- I ). 14.10.2019 has requested revision of ratified norms &. personal hearing. However, the applicant vide email dated 24.10.2019 was called to attend PH on 30.10.2019. The party vide email dated 25.10.2019 has sought another date for PH. The Committee personal hearing to forthcoming NC meeting. 刻 Defered / 55 1 Page 57
R85 APAR INDUSTRIES LIMITED 3410044796 datcd 0701.2019 01/81/050/009 51/AM19/ 34/24/040/003 06/AM19/ The case was ratified in M. No. 9/81- ALC2|2019 dated 07.08.2019 as per written comments of Consultant (TEC- 3). 09.10.2019 has requested for revision of ratified norms. The Committee to refer the case to Consultant (TEC-3) for examination and to call the applicant for personal hearing to next NC meeting. Deferred R86 APAR INDUSTRIES LIMITED 3410043984 dated 21.03.2018 01/81/050/009 67/AM19/ 34/24/040/003 36/AM18/ The case was ratified in M. No. 7/81- ALC2|2019 dated 10.07.2019 as per written comments dated 05.01 .2019 given by Consultant (TEC-3). 09.10.2019 has requested for revision of ratified norms. The Committee to refer the case to Consultant (TEC-3) for examination and to call the applicant for personal hearing to next NC meeting. Deferred R87 APAR INDUSTRIES IンIMITED 3410044066 datcd 19.04.2018 01/81/050/008 37/AM19/ 34/24/040/003 82/AM18/ The case was ratified in M. No. 9/81- ALC2/2019 dated 07.08.2019 as per written comments of Consultant (TEC- 3). 09.10.2019 has requested for revision of ratified norms. The Committee to refer the case to Consultant (TEC-3) for examination and to call the applicant for personal hearing to next NC meeting. Deferred R88 POWER GEAR LIMITED 0710059261 dated 21.08.2008 01/81/050/003 41/AM09/ 07/24/040/002 66/AM09/ lThc subject AA of the applicanr was lratified by NC-ll in its Meeting No. I I 8/81-ALC212009 dated 04.08.2009 (actually held on 0l .09.2009) as per written comments ol' DHI vide their U.O. No. 3(t 8)l2009lTSw(B)/340 dated 28.08.2009. 'Ihe applicant vide letter dated 07.01.2019 has stated that they had requested on 30.11.2009 to review the ratified norms. However, no decision is found available in the file based on their representation dated 30.1 I .2009. The applicant via email datedl 14.08.2019 has again requested tol reconsider the case. They have furnishedl a copy of composition fee receipt ofl Rs.5000/- deposired on I 0.01 .2}tg. I The Committee considered the case and thc applicant's representative explained the case before Norms Committee during personal hearing. The Committee noted that the Authrisation was issued in 2008 and norms were ratified in 2009. From the records available in the file, it is observed that after submittins request for review irS lRejected ジ 56 1 Page 57 NC-2 Meeting No.15/81 dated 30,10.2019
2009, the party never sent any communication for review of the norms till 2019. Hence, the Committee after a careful consideration decided not to reopen such old case. R89 POWER GEAR LIMITED 0710027717 datcd 01.032004 01/81/050/010 41/AM04/ 07/24/040/006 76/AM04/ The case was ratified in Meeting No. 26181 dated 25.09.2007. However, the party vide letter dated 08.01.2019 had requested to review of Norms. The case was last considered in M. No. l1/81 dt. 04.09.2019 and decided to refer the case to Consultant (TEC-3) for examination. The Committee considered the case and heard the applicant's representative during personal hearing who informed that it does not have any record in respect of the said case with it. The Committee noted that no record is available in rlo the subject case in DGFT. Hence, the Committee after a careful consideration decided not to reopen such old case. Rejected R90 SHIVALIK BINIIETAL CONTROLS LTD. 0510405797 datcd 07.03.2018 01/81/050/001 74/AM19/ 05/24/040/006 06/AM18/ The case was ratified in Meeting No.3/81-ALC2l20l8 dated 14.08.2018. However, the applicant vide letter dated 18.06.2019 has stated that the norms was ratified as per SION C-397 but the export item is different. They had applied wastage 34Yo on import and 51.51% on export. fhcy had, therefore, requested to review the decision and requested for personal hearing. The casc was last considered in M. No. 11/81 dt. 04.09.2019 and decided to refer the case to DPIIT. However, the case has not yet been referred to DPIII'. personal hearing to next NC meeting. 刻 Deferred / 57 1 Page 57 NC-2 Meeting No.15/81 dated 30.10.2019
Standard Deficiency Format (SDF) Export Items: 1 Model number, technical specification and specific quantity-both in terms of number (if any) and/or weight, of each export product (Appendix-33 of current HBP refers). う 4 Detail technical note on manufacturing process including the relevant flow sheet. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished. 4 Weieht of each Export Product. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated. Import Itelns: 6 Information about the inputs required per unit of the resultant product as per Sl. No. 1 of Appendix-11A appearing in current HBP (Vol.I) separately for each product. ComDonents: 7 Technical characteristics / part numbers. if any. Assembly drawings/diagrams of the resultant product showing placement and exact use of components in the export product (s). 9 Bifurcated quantities of components to be accounted for in the resultant product and the requirement of components as spares. Raw Material / Consumables 10 Size and specification including grade, composition, range, thickness etc. of the items proposed for import Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc 11 (a) Sheet layout diagram of the material indicating the wastage during blanking つ ´ Cross Sectional Diagram of export product with calculation of raw material requirement and the weight of the Cable in Kg. per Km. Copy of relevant National/International Standard/buyer's data sheet may also be fumished. り , Weight of Steel, which requires imported welding material, giving break-up of: 0 Steel Plates/Sheets upto 3Omm thickness ii) Steel Plates/Sheets more than 30 mm thickness and upto 70 mm thickness iii) Steel Plates/Sheets more than 70 mm thickness. i r) Others e.g. Flanges, Pipes, Tubes, Bars/Rods, Castings/Forgings etc. 14 Parliculars of the licenses obtained in the past and ratified by ALC (with or without modification) for the same exporl product covered under this application, in view of Public Notice No. 48 dated 14.11.2002. Use of exoort oroduct 16 You are advised to apply for SION. t7 Please use expanded/full name of end product. Do not use the abbreviations/short form. 18 19 Any other information: 20 The information called for must be submitted of issue of this letter. Ihe infonnation may DGFT, Lldyog Bhawan, New Delhi-11001 23061562, Extn.26l . in duplicate within 15 days from the date be directly sent to Chairman, NC-II, O/o 1, E-mail: nc2.dgft@nic.in, Office Tel.:
93_ fi[-r"'r'te ,r. Reply dt. 21.10.19 lmport t- 1,.lt.kg/kg. Content in Ep AA No - 05,o t{o?9o I ⌒ 計 1濶灘聯i絆詔猟 n3亀島Ⅲ EP 2(iV)LDPE l.o5kg./kg.Contentin EP 3&4-1.05 kg./contentin EP 5-1.o2sq.mtr./sq.mtr.cOntentin EP 6‐ 1.o2kg./kgo Cortentin EP.WOrd“ tapellmav be deleted D黙[
ハ
噸
く|くcゎ|く
赫
赫
R岩ゃIc劇IЧ Iく
可百fゼやQ‖ d劇
憂オτ
T胸瓦→慾諭1looll
2
:戸
雷
軸
~
'w■
繭
Ч
ttd●
(U U5)希`47希
―
翻配哺
命ゴミ断油
弼漏
ぎO′_0舞クグ′″ ′ノ…… 稀
′/:′′:′ ″メ…
.PA、RAノイ″卿
「
.こ′
“
〃″″〃
乃2″Σ.証り、
■…含り
lしd辞赫
イル/クイタ/7可
安
命5哺
Ⅲ
薇赫
甫おw町爺
綸
→ざ
|
計d事→含〕耕
衡晰蒲
再
赫
諭餓序ζ Ч←dd
赫
可
鏑
れ
諭
キiざ1事請請節耐赫F葺
“
瀧て猥油
8劇l al‐
|
(備
ф占|く)
劇51劇ф 獲≧?軍
マ兼耳可o :23061562 マ叶悧 267
1受
諏
中ホF評
マ藁命さゃ市
(3像7師)′職
'「
製
IЧ I口u薇
兼‖d召′
…
晴耳→
際諭
|
2オ漸語
弓c■i:3▼膏載Q市′職
,「覆聴
甲職マdq′ 耳油
鏑
碑衡諭
|
3丼
姉
強
′弱商
職
師
′瞭
軒
R¬ 畿
?‖ dq′
…
鏑
碑
輸
|
4■
…
…
職マ吼褒蘇薫眈
載R距t碑際奇
|
5ハ
マ希科町′w葛
J…
…
蓼町T凋イId劇′ェ市T町硯
→
衡諭
|
6猜赫Tづ記
缶顧諭
赫
′鏑縮澪こ綸
面_餞
呵
動
糊
→鎌哺
|
7琲轟
劇ф′藤デ奇《αlぃ|く′諏)こ零満
衡師鴨_町
研→際裁|
ヽ
8オお硬TTはギ61彎睦
巨
…
齢缶
跡孔¨ 慾諭
|
酬T∬ミ眩
緊織駆慕黒閥
|
11猜■TTは,赫
mloф lく■
1′ 誠マ
「可賢覆命豪‖
dq′ 耳輛蹄爾→慾諭|
・
12オ¨d■N■.・|.中F資電ギ際蘭
鍼赫赫マ百捕前
11改む
載
碑漏
|
13引c球可
鷲
′爺%3晰
満Q吼11こ扇哺
可式碑
際枡
|
…
Ⅲ
斎O1/81棚皮
みmソ4/w町
輸
2り3肺
ら
か/2劇
9
t
File No.P‐ 47011ノ131′ 2019‐ 丁5W 琳 じ ‐ 躙 期く CI・|く 司m‐ 鏃 ま洒河 凋,d引 枷 ― 」k〕終象百酬IЧ Iく帥 Government oflndia Ministry of Comnnerce&lndustry Depattmentfor promotion oflndust「y&lnternal Trade (丁echnical St pport Section) Rせ響よ』 lЪttβ旱 l:雷「 &朋テ〕 :群6'Sttt/闇蟹1'″∫諄∬誓 '::8:∬ 19 N/Vith reference tO the aboVe,the undersigned is directed to say as underi 鷲 attξ l‖犠ざ僣「蓮聾鷲藤 I][uiEl警渉聯慧{岬 Accordin91y flrm may be aSked to Clarify aboVe and also to Subrnitthe fo‖ oいハng inforrnat o11: 1.Deta‖ ed Calculatlo∩S fOr the requirerllent Of eaCh raW material′ e)くpo「t product νヽ パse SUppOrted by the Cross Sectional dlagram of tい e :3able/BUvers data Sheet, 2,Net weight per KM of each Cable 3.Materlal balancing vizi net content of eaCh impOrted and indigenous input′ 4.孔闊 ri晶 :鍵織 yflfttc畔∬鷲緊 li:|°ま ::k product wもe′ maねЭ ubr Fo「m Nornls Colη nlittee may take a view, 7メ iL .__イ 'il1111チ :j'' vV dated 15 10 2019 「 .■,_― llll..: (SK」ain) Development OfflCer 丁e123063166
erk' TrfiR ilm;1+ 3i1-{TffiT i?TEq TmT €Efd 3i1T 3{idRq- eqIEIK fte{rq Government of lndia Ministry of Commerce & lndustry Department for promotion of lndustry & lnternal Trade (Tech nicalSupport Section )
Subject: - M/s Leitwindshriram Manufacturing Pvt.Ltd.(AANo.0410165649 dated 24.05.2019)
Reference: - DGFT I D No. 01 /81 /050/0086/AM20/DES-2/1 29 dated 09.09.201 I With reference to the above, the undersigned is directed to say that the instant AA may be ratified as under:
- Quantity of import item at Sl.No.1 may be allowed as 2400Nos on net to net basis with accountability clause.
- Quantity of import item at Sl.No.2 may be allowed as 2400Nos on net to net basis with accountability clause. ― ■′ ●~ ~■ 万 耳!げ〕レ 1 ′ Norms Committee may take a view. DGFT(Sh百Aml Kumar,A.D,DES― ||) DP‖T∪ON0 7/85′ 2019-TSW dated 28 10.2019 (SK」ain) Development Oficer 丁e123063166
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.