IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2010-12-07

DGFT Committee Minutes

Document text

RATIFIED  MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 35/81 SCHEDULED TO BE HELD ON 30.11.2010 BUT ACTUALLY HELD ON 07.12.2010.   The Meeting No. 35/81 of Norms Committee­II was held on 07.12.2010 for the licensing year 2010­2011 under the Chairmanship of Sh. Hardeep Singh, Joint Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorisations  under  Duty  Exemption  Scheme  (Chapter­4)  of  Foreign  Trade  Policy  2009­2014.  The  following  members  were  present  in  the meeting:­       S.No Name of the representatives &  their Designation   Deptt.   1.         Shri B.D.Ghosh                                                M/o Steel 2.         Shri Gajraj Singh, Sr. D.O.                               DHI 3.         Shri. S.K.Jain, Sr.D.O.                         DIPP 4.         Shri K.K.Funda, AD                                        MSME 5.         Ms. R.L.Devi, Dy. DG                         DGFT 6.         Shri Raman Kumar, F.T.D.O                            DGFT 1

Case No.:1/35/81­ALC2/2010

Party Name:TRINITRON CONTROL SYSTEMS PVT.LTD. Meet No/Date:35/81­ALC2/2010 30.11.2010 Status: Deferred HQ File :01/81/050/00342/AM11/ RLA File :05/24/040/00271/AM11/ Lic.No/Date:0510276977 12.11.2010 Defer Date: 18.01.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 18.01.2011.   2

Case No.:2/35/81­ALC2/2010

Party Name:HBL POWER SYSTEMS LTD., 30.11.2010 Status: Deferred HQ File :01/81/050/00343/AM11/ RLA File :09/24/040/00229/AM11/ Lic.No/Date:0910044261 12.11.2010 Defer Date: 18.01.2011

Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA   3

Case No.:3/35/81­ALC2/2010

Party Name:HBL POWER SYSTEMS LTD., 30.11.2010 Status: Deferred HQ File :01/81/050/00344/AM11/ RLA File :09/24/040/00282/AM11/ Lic.No/Date:0910044263 12.11.2010 Defer Date: 18.01.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA   4

Case No.:5/35/81­ALC2/2010

Party  Name:BHARAT  HEAVY  ELECTRICALS LIMITED 30.11.2010 Status: Deferred HQ File :01/81/050/00346/AM11/ RLA File :05/23/040/00215/AM11/ Lic.No/Date:0510277093 15.11.2010 Defer Date: 18.01.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA   5

Case No.:4/35/81­ALC2/2010

Party Name:UM CABLES LTD., 30.11.2010 Status: Deferred HQ File :01/81/050/00345/AM11/ RLA File :03/95/040/00594/AM11/ Lic.No/Date:0310601620 16.11.2010 Defer Date: 18.01.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA   6

Case No.:6/35/81­ALC2/2010

Party  Name:ABIR  INFRASTRUCTURE  PRIVATE LIMITED 30.11.2010 Status: Deferred HQ File :01/81/050/00347/AM11/ RLA File :05/23/040/00205/AM11/ Lic.No/Date:0510277227 18.11.2010 Defer Date: 18.01.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA   7

Case No.:7/35/81­ALC2/2010

Party Name:MPP TECHNOLOGIES PRIVATE LTD., 30.11.2010 Status: Deferred HQ File :01/81/050/00348/AM11/ RLA File :07/24/040/00309/AM11/ Lic.No/Date:0710075480 18.11.2010 Defer Date: 18.01.2011

Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA   8

Case No.:8/35/81­ALC2/2010

Party Name:MET TRADE (INDIA) LTD. 30.11.2010 Status: Deferred HQ File :01/81/050/00349/AM11/ RLA File :05/24/040/00204/AM11/ Lic.No/Date:0510277416 22.11.2010 Defer Date: 18.01.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA   9

Case No.:9/35/81­ALC2/2010

Party  Name:LAXMI  ELECTRONICS  MOULDS  & PRECISION ENGG P.LTD. 30.11.2010 Status: Deferred HQ File :01/81/050/00350/AM11/ RLA File :07/24/040/00330/AM11/ Lic.No/Date:0710075641 25.11.2010 Defer Date: 18.01.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA   10

Case No.:10/35/81­ALC2/2010

Party Name:ABB LIMITED 30.11.2010 Status:Closed HQ File :01/81/050/00351/AM11/ RLA File :07/24/040/00336/AM11/ Lic.No/Date:0710075642 25.11.2010 Defer Date: Decision : NC presumed that RA has issued the licence on net to net basis as per general note 4 of Engineering products and ratification of NC is not required. The case may be treated as closed.     PART – AR – FRESH

CASE NO. AR ­ 74

M/s. Nazareth Metals, Mumbai Meeting No.  35/81 HQ. F. No. As per table given in the Agenda. (C­4) Dated:                      30.11.2010 Adv. Auth. No & dated As per table given in the Agenda. (C­ 2)   RLA’s F. No. As per table given in the Agenda. (C­3)

Decision : NC decided to send a letter to RA with a copy to firm to submit following documents and forward to DIPP and MSME for comments:­ 1. Copy of application in r/o all eight licences. 2. Copy of all licences . NC also decided to forward the earlier decision of NC in r/o above mentioned licences to DIPP and MSME.   ­­­­­­­­­

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied