DIRECTORATE GENERAL OF FOREIGN TRADE ([DES-i SECTION] DES-1 MINUTES OF THE MEETING (OFFLINE)

MEETING NO. NC/1/MEET/Apr/ 202425/1 (Offline Cases) Dated 03.04.2024.

SI. No. 01

Case No. 37/19/80-ALC2/2014 M. No.: NC/1/MEET/April/202425/1 (Offline M/s KAMAR Status of case Cases) dated 03.04.2024 INFRASTRUCTURE PVT Licence No.: 0310788243 Date: LTD. 21.08.2014 HQ File No: 01/80/050/00471/AM15/ Subject: Request for review | Approved. RLA File No: 03/94/040/00449/AM15/ and fixation of ad-hoc norms Case History: The Committee considered the case as per agenda and noted that the case was rejected in Meeting No. 06/80 dated 20.06.2017 due to non-submission reply of deficiency letter. However, the applicant had requested for review and fixation of ad-hoc norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by DHI was sent to the applicant on 29.10.2020.

The applicant's reply was sent to DHI on 25.02.2021 for examination of the case. DHI vide letter dated 16.06.2021 informed that the applicant's reply is deficient and it contains only copy of Advance Authorization. Therefore, a deficiency letter was sent to the applicant on 06.08.2021 to furnish the following information as per comments of DHI:

  1. To furnish information as per SI. No. 11 of SDF supported by Engineering Drawing with relevant dimensions highlighted.

==> picture [471 x 70] intentionally omitted <==

er comments of DHI:

  1. To furnish information as per SI. No. 11 of SDF supported by Engineering Drawing with relevant dimensions highlighted.

==> picture [471 x 70] intentionally omitted <==

----- Start of picture text -----<br> SI. No. 11 of SDF: Starting from the specification of the export product, basic calculation<br>as to how of raw materia) proposed for import has been arrived at, including the net<br>weight of components to be manufactured out of these imported materials, wastages<br>claimed at each stage of manufacturing with complete justification and supported by<br>documentary evidence/drawings etc. * *<br>----- End of picture text -----<br>

As per NC decision, a deficiency letter as raised by DHI was sent to the applicant on 06.08.2021 followed by reminders on 27.09.2021 & 11.11.2021. The applicant’s reply was sent to DHI on 07.01.2022 for examination & comments. In NC meeting dated 08.02.2022, the Committee noted that DHI vide email dated 28.01.2022 informed that the applicant had submitted same information as of earlier. Therefore, the Committee decided to ask again from the applicant to furnish following information as per comments of DHI:

  1. To furnish information as per SI. No. 11 of SDF supported by Engineering Drawing with relevant dimensions highlighted.

==> picture [200 x 111] intentionally omitted <==

----- Start of picture text -----<br> 7<br>_. - oar 1santgs, ee.<br>é . Fe Deptt. oFCommerc °"<br>7fae aang [y]<br>. bh ioovt. of India<br>- aw ae BBomn<br>Layos tM<br>----- End of picture text -----<br>

picture text -----<br> 7<br>_. - oar 1santgs, ee.<br>é . Fe Deptt. oFCommerc °"<br>7fae aang [y]<br>. bh ioovt. of India<br>- aw ae BBomn<br>Layos tM<br>----- End of picture text -----**<br>

SI. No. 11 of SDF: Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

A deficiency letter dated 09.03.2022 followed by reminders on 19.05.2022 & 24.06.2022 were issued to the applicant. The applicant vide email dated 01.08.2022 had shared a link against the deficiency letter, but the link was not accessible. Therefore, the applicant, again vide email dated 01.08.2022, has been requested to send the requisite information. As per NC decision, a reminder was issued on 29.09.2022 to the applicant. The applicant's reply received via email dated 01.10.2022 and the same was sent to DH! on 03.10.2022 for examination of the case. However, no comments have been received as yet.

The Committee last considered the case on 28.04.2023 and called for PH with complete set of application, product catalogues and other details. The applicant was again called for PH on 03.04.2024.

The Committee last considered the case on 28.04.2023 and called for PH with complete set of application, product catalogues and other details. The applicant was again called for PH on 03.04.2024.

Decision: The Committee considered the case as per agenda and noted that the firm appeared for PH before NC-1 on 03.04.2024 through their representatives S/Shri Mahesh D Ayare, Account Executive & Sanjeev Sharma and they explained the case in detail. The applicant stated that they do not want to claim any wastage on the items imported against the above mentioned Advance Authorization. The Committee asked the firm to submit the revised list clearly indicating the items imported and not imported along with actual quantity imported and their net content in the export product along with the letter stating that they do not want to claim any wastage on the import items. The case was again considered in the NC meeting dated 18.04.2024 and the Committee decided to review and to fix the ad-hoc norms in respect of above Advance Authorization as per comments of MHI dated 05.04.2024 (as per copy attached).

RA concerned may take suitable consequential action accordingly.

==> picture [291 x 127] intentionally omitted <==

----- Start of picture text -----<br> | Lan<4<br>. Det Snore ufCoe<br>‘ eae ed Sacoee<br>a<br>| eae? age<br>----- End of picture text -----<br>

,

F. No. DES-1/0310788243/2023-TSW Government of India Ministry of Heavy Industries TSW Division Udyog Bhawan, New Delhi Dated: 05 April, 2024

Office Memorandum

Subject:-M/s KAMAR INFRASTRUCTURE PVT LTD - Review of Norms in respect of the Advance Authorizations No. 0310788243 dated 21.08.2014 and 0310799187 dated 05.10.2015 Export products: Kelly elements, Interlocking/Friction Kelly bars, Terminal Joints, Kelly tubes, Holder, Rock teeth, BFZ 80 Teeth Import items: SS tubes/Pipes, Carbide inseris, Stee! plates, Coil Spring, Disc Spring The firm representative appeared for Personal Hearing before Norms Committee-1 in its meeting dated 03.04.2024 at 03.00 PM to explain their cases in detail. 2. During the PH, the firm informed that they have not imported all the items mentioned in the application. They also stated that they do not want to claim any wastage on the items imported against the above mentioned advance authorizations issued to them. The committee asked the firm to submit the revised list clearly indicating the items imported and not imported along with actual quantity imported and their net content in the export product. The committee also asked the firm to give a letter from their authorized signatory stating that the do not want to claim any wastage on the items imported and hence the norms for the above AAs may be approved with NIL wastage. 3. As suggested by Norms Committee-1, the firm has furnished the letter dated 05 April 2024 via mait claiming NIL wastage on imported items and also the revised list. a be aa 4.

ved with NIL wastage. 3. As suggested by Norms Committee-1, the firm has furnished the letter dated 05 April 2024 via mait claiming NIL wastage on imported items and also the revised list. a be aa 4. In view of the above, the firm's proposals in respect of above mentioned two AAS are recommended for items actually imported with NIL wastage on net content basis as per revised list furnished by the firm vide their mail dt. OS April 2024, as requested by the firm.

R-K ees -

(R. K. Jaiswal) Development Officer

To,

DGFT (DES-1), Directorate General of Foreign Trade, Udyog Bhawan, New Delhi — 110011. Email: “DES-1, DGFT" nct.dgft@nic.in;

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6946 --apply.

Citation copied