NC-1 Offline Minutes Meeting No.NC/1/MEET/Feb./202324/23 Dated 18.03.2024

==> picture [488 x 80] intentionally omitted <==

----- Start of picture text -----<br> Sl. No.1<br>M. No.: NC/1/MEET/Feb./202324/23 (Offline Status of case<br>Cases) dated 18.03.2024 M/s. Xomox Sanmar Ltd., Chennai<br>Lic. No : 0410120070 dated 23.12.2010<br>HQ. F. No.: 01/80/50/00670/AM11/NC-I (part Subject: Order dated 06.06.23 of Madras High Deferred.<br>file Court in W.P.No.26422 of 2015 in M/s. Xomox<br>RLA No.: Sanmar Ltd. Vs. The DGFT & Anr. - reg.<br>----- End of picture text -----<br>

Case History: This is regarding Order dated 06.06.23 of Madras High Court in W.P.No.26422 of 2015 in M/s. Xomox Sanmar Ltd. Vs. The DGFT & Anr., received vide mail dated 23.06.23.

  1. In the said petition, the petitioner has challenged DES-I’s letter No.01/80/050/00670/AM11/DES.1/1162 dated 12.08.14 whereby the request of the petitioner for ratification of norms in respect of Advance License No.0410120070 dated 23.12.2010 was rejected by NC-I in its meeting No.07/15 dated 24.06.14 on the grounds that the items of export as well as items of imports are valves and there is no manufacturing activity involved because upon manufacturing a new product with distinctive named should come into existence.

he items of export as well as items of imports are valves and there is no manufacturing activity involved because upon manufacturing a new product with distinctive named should come into existence.

a; Vide Order dated 06.06.23 (copy enclosed), the court has set aside the impugned order and remanded the matter to the file of Respondent 1, to be decided afresh and in line with the discussion in the said order after ascertaining if the petitioner has in fact, made any additions to the imported valves by procurement of indigenous products.

  1. Consequent upon this order, RA, Chennai asked the petitioner to file a representation afresh. In compliance, the petitioner has forwarded their letter dated 20.12.23 vide mail dated 20.12.23, wherein the details of their earlier representation dated 07.04.11 and supporting documents are mentioned. The petitioner has requested that it may be given an opportunity of being heard before any orders are passed in this matter.

  2. The matter has been referred to DPIIT for examination and comments.

The petitioner has requested that it may be given an opportunity of being heard before any orders are passed in this matter.

  1. The matter has been referred to DPIIT for examination and comments.

  2. Subsequently, the case was considered by NC-1 in its meeting dated 03.01.24 and the Committee decided to call the applicant in PH in the forthcoming meeting to explain the case in detail. Accordingly, the firm was called for PH before NC-1 on 19.02.24. 7. The representative of the firm, Shri V. Guruprasath, AVP, M/s XomoXSanmar Ltd appeared for the PH on 19.02.2024 and briefed the case before the committee. He informed that they had supplied items after fitment of various indigenous items like gear boxes, actuators, limit swishes etc. and testing. After deliberations, the Committee decided to call the applicant in the next meeting along with the following information/documents: (i) Copy of application made at the time of getting Advance Authorization (ii) Copy of Advance Authorization (iii) Details of import and export items (iv) Details of indigenous inputs used (v) Copies of Bill of export showing items supplied to SEZ against the AA. (vi) Details of deemed export (vii) Any other documents relevant to the case.

  3. Accordingly, the firm has been called in PH before NC-1 on 18.03.24.

showing items supplied to SEZ against the AA. (vi) Details of deemed export (vii) Any other documents relevant to the case.

  1. Accordingly, the firm has been called in PH before NC-1 on 18.03.24.

Decision: The Committee heard the representatives of the firm in PH again on 18.03.2024. It was requested by them that some more time (40 days) may be given to collect the requisite documents as sought in earlier meeting. The Committee, therefore, decided to call the firm on PH after 45 days along-with the requisite information/documents. Case stands deferred. g it puoes puoes

==> picture [133 x 93] intentionally omitted <==

----- Start of picture text -----<br> g it puoes puoes<br>ro xor wd c< flal 2 ee 3<br>Neaof Oe oot eee at<br>----- End of picture text -----<br>

S.No.2

==> picture [66 x 15] intentionally omitted <==

----- Start of picture text -----<br> Status of case<br>----- End of picture text -----<br>

Cases) dated 18.03.2024

==> picture [155 x 15] intentionally omitted <==

----- Start of picture text -----<br> GENERATORS PRIVATE LIMITED<br>----- End of picture text -----<br>

br>

Cases) dated 18.03.2024

==> picture [155 x 15] intentionally omitted <==

----- Start of picture text -----<br> GENERATORS PRIVATE LIMITED<br>----- End of picture text -----<br>

hoc norms Case history: The Committee considered the case as per agenda and noted that the case was approved in M. No. 15/80-ALC2/2018 dated 06.03.2019 as per the written comments of DHI vide their U.O. No. 3/96/2016/TSW(B) dated 24.12.2018. However, the applicant had requested for review of already fixed ad-hoc norms. The Committee reconsidered the case and noted that a deficiency letter seeking following information as raised by DHI was sent to the applicant on 24.02.2020 followed by reminders on 06.11.2020 & 06.08.2021:

  1. The final list of import items after all amendments. (there appears to be at least four amendments) 2. To submit calculation correlating the same with Dimensional Engineering Drawing with relevant dimensions highlighted. i

The applicant's reply was sent to DHI on 43.08.2021 & 11.11.2021 followed by a reminder on 09.03.2022 for expediting the comments. DHI vide email dated 30.03.2022 informed that the applicant has not given calculation correlating it with the dimensional Engineering drawing. As per comments of DHI, a DL was issued to the applicant on 25.05.2022 followed by a reminder on 24.06.2022. However, no reply has been received as yet.

it with the dimensional Engineering drawing. As per comments of DHI, a DL was issued to the applicant on 25.05.2022 followed by a reminder on 24.06.2022. However, no reply has been received as yet.

The case was last considered by NC-1 in its meeting dt.28.04.23 and the Committee decided to refer this case to MHI. Accordingly, the case was referred to MHI vide mail dt.14.06.23. Subsequently, the comments of MHI received vide OM dt.30.10.23.

Decision: The Committee considered the case as per agenda and noted the comments given by MHI. After due deliberation, the Committee decided to review the case and to modify the ad-hoc norms as per comments of MHI dated 30.10.2023 (copy enclosed).

RA concerned to take suitable consequential action accordingly.

==> picture [192 x 23] intentionally omitted <==

----- Start of picture text -----<br> SI. No.3<br>M. No.: NC/1/MEET/Feb./202324/23 (Offline<br>----- End of picture text -----<br>

==> picture [234 x 46] intentionally omitted <==

----- Start of picture text -----<br> Status of case<br>Subject: Request for fixation of ad-<br>----- End of picture text -----<br>

==> picture [234 x 46] intentionally omitted <==

----- Start of picture text -----<br> Status of case<br>Subject: Request for fixation of ad-<br>----- End of picture text -----<br>

Case History: The case was rejected by NC in its M. No. 15/80dated 25.10.2016 due to non-submission of reply of deficiency (raised by DHI). The firm vide email dated 19.02.2021, 06.03.2021 & 10.08.2021 has furnished the technical documents containing Manufacturing Process and Nesting Diagram indicating scrap/wastage for Raw Materials and requested to fix the ad-hoc norms. The firm's representation was forwarded to DHI on 23.08.2021 for examination of the case. The Committee decided to ask from the applicant to furnish following information as per comments of DHI:

;

  1. Acopy of complete application as per ANF-4B. 2. Complete information as per Appendix-4E, Appendix-4K & Appendix-4H. 3. Background note of the case along with NC decision/deficiency letter along with the corresponding reply in a chronological order.

  2. Complete application, NC deficiency letter along with its reply and decision of NC for the approved AA No. 0710104231.

As per NC decision, a DL was issued to the applicant for furnishing the above information.The applicant's reply was sent to DHI on 19.01.2022 for examination & comments. DHI vide letter dated 08.02.2022 had requested to send point-wise reply of the deficiency letter separately to each AA Number. Therefore, the Committee decided to ask from the applicant to furnish the point-wise reply of following deficiencies as per comments of DHI:

y of the deficiency letter separately to each AA Number. Therefore, the Committee decided to ask from the applicant to furnish the point-wise reply of following deficiencies as per comments of DHI:

  1. Acopy of complete application as per ANF-4B. 2. Complete information as per Appendix-4E, Appendix-4K & Appendix-4H. 3. Background note of the case along with NC decision/deficiency letter along with the corresponding reply in a chronological order.

  2. Complete application, NC deficiency letter along with its reply and decision of NC for the approved AA No. 0710104231.

As per NC decision, a deficiency letter was issued to the applicant on 10.03.2022. The applicant's reply was sent to DHI 30.05.2022 for examination & comments. Further, DHI vide email dated 26.07.2022 has raised some queries and the same was asked from the applicant to furnish. The applicant's reply received vide email dated 30.07.2022 was forwarded to DHI on 01.08.2022. As per NC decision, a reminder was also issued to DHI on 27.09.2022 for expediting the comments. However, no comments have been received as yet.

The firm has submitted the requisite information/documents as per email dt.23.08.2023 and the same has been forwarded to MHI for examination and comments. The comments of MHI are awaited.

The case was considered by NC-I in its meeting held on 22.11.23 and the minutes of the said case is as under:-

been forwarded to MHI for examination and comments. The comments of MHI are awaited.

The case was considered by NC-I in its meeting held on 22.11.23 and the minutes of the said case is as under:-

“The Committee considered the case as per agenda and observed the above AA has list of only indigenous items in ANF 4B of the application and do not have any imported items required for manufacturing of 12 DT cars. Therefore, the Committee decided to call the applicant on PH in the forthcoming meeting to explain the case in detail. Case stands deferred.”

Subsequently, the firm appeared before NC-1 for PH on 03.01.24. The Committee heard the representatives of the firm in PH. S/Shri Praveen Kumar Mathpal, CGM (O), Prabhakar S, Dy. GM, Manish Kumar, AGM(F & A) & Nagendra Mishra, Manager attended the PH and briefed the committee in detail. MHI has pointed out that data provided by BEML is inconsistent and not complete. It has been assured by the representatives of firm that rectified & authenticated data in respect of referred items would be provided within a week. After due deliberation, the committee decided to wait for the rectified data and the complete information from the firm and on receipt of the same, MHI would examine the case expeditiously.

Thereafter, vide mail dt.11.01.24, the detailed information/data received from the firm was forwarded to MHI for examination and comments. Comments of MHI has been received vide OM dt.05.03.24.

.

Thereafter, vide mail dt.11.01.24, the detailed information/data received from the firm was forwarded to MHI for examination and comments. Comments of MHI has been received vide OM dt.05.03.24.

Decision: The Committee considered the case as per agenda and noted the comments furnished by MHI dated 05.03.2024. After due deliberation, the Committee decided to review the case and to fix the ad-hoc norms as per comments of MHI OM No. DES1/0710105280, 0710105283, 0710105285/2022-TSW dated 05.03.2024, as under:

Note: The written recommendation as given by MHI will be communicated to the applicant as well as concerned RA through email.

RA concerned may take suitable consequential action accordingly.

Before redemption, RA should ensure that neither any court case nor any ECA case is pending against the subject Advance Authorization.

==> picture [109 x 41] intentionally omitted <==

----- Start of picture text -----<br> SI. No.4<br>Cases) dated 18.03.2024<br>----- End of picture text -----<br>

==> picture [183 x 44] intentionally omitted <==

----- Start of picture text -----<br> M/S BEML LIMITED Approved.<br>hoc norms<br>----- End of picture text -----<br>

Case History: The case was rejected by NC in its M. No. 15/80dated 25.10.2016 due to non-submission of reply of deficiency(raised by DHI). The firm vide email dated 19.02.2021, 06.03.2021 & 10.08.2021has furnished the technical documents containing Manufacturing Process and Nesting Diagram indicating scrap/wastage for Raw Materials and requested to fix the ad-hoc norms.

, 06.03.2021 & 10.08.2021has furnished the technical documents containing Manufacturing Process and Nesting Diagram indicating scrap/wastage for Raw Materials and requested to fix the ad-hoc norms.

The firm’s representation was forwarded to DHI on 23.08.2021 for examination of the case. Therefore, the Committee decided to ask from the applicant to furnish following information as per comments of DHI:

  1. Acopy of complete application as per ANF-4B. 2. Complete information as per Appendix-4E, Appendix-4K & Appendix-4H. 3. Background note of the case along with NC decision/deficiency letter along with the corresponding reply in a chronological order.

  2. Complete application, NC deficiency letter along with its reply and decision of NC for the approved AA No. 0710104231.

As per NC decision, a DL was issued to the applicant for furnishing the above information. The applicant’s reply was sent to DHI on 19.01.2022 for examination & comments. DHI vide letter dated 08.02.2022 had requested to send point-wise reply of the deficiency letter separately to each AA Number. Therefore, the Committee decided to ask from the applicant to furnish the point-wise reply of following deficiencies as per comments of DHI:

:

  1. Acopy of complete application as per ANF-4B. 2. Complete information as per Appendix-4E, Appendix-4K & Appendix-4H. 3. Background note of the case along with NC decision/deficiency letter along with the corresponding reply in a chronological order.

plete information as per Appendix-4E, Appendix-4K & Appendix-4H. 3. Background note of the case along with NC decision/deficiency letter along with the corresponding reply in a chronological order.

  1. Complete application, NC deficiency letter along with its reply and decision of NC for the approved AA No. 0710104231.

As per NC decision, a deficiency letter was issued to the applicant. The applicant's reply was sent to DHI 30.05.2022 for examination & comments. Further, DHI vide email dated 20.07.2022 has raised some queries and the same was asked from the applicant to furnish. The applicant's reply received vide email dated 30.07.2022 was forwarded to DHI on 01.08.2022. As per NC decision, a reminder was also issued to DHI on 27.09.2022 for expediting the comments. However, no comments have been received as yet.

The firm has submitted the requisite information/documents as per email dt.23.08.2023 and the same has been forwarded to MHI for examination and comments. The comments of MHI is awaited.

The case was considered by NC-I in its meeting held on 22.11.23 and the minutes of the said case is as under:-

“The Committee considered the case as per agenda and noted that the firm has submitted the reply. However, the TE, MHI has stated that data furnished by the firm are highly inconsistent and hence, they are not able to offer the comments. Therefore, the Committee decided to call the applicant on PH in the forthcoming meeting to explain the case in detail. Case stands deferred.”

ent and hence, they are not able to offer the comments. Therefore, the Committee decided to call the applicant on PH in the forthcoming meeting to explain the case in detail. Case stands deferred.”

Subsequently, the firm appeared before NC-1 for PH on 03.01.24. The Committee heard the representatives of the firm in PH. S/Shri Praveen Kumar Mathpal, CGM (O), Prabhakar S, Dy. GM, Manish Kumar, AGM(F & A) & Nagendra Mishra, Manager attended the PH and briefed the committee in detail. MHI has pointed out that data provided by BEML is inconsistent and not complete. It has been assured by the representatives of firm that rectified & authenticated data in respect of referred items would be provided within a week. After due deliberation, the committee decided to wait for the rectified data and the complete information from the firm and on receipt of the same, MHI would examine the case expeditiously.

Thereafter, vide mail dt.11.01.24, the detailed information/data received from the firm was forwarded to MHI for examination and comments. Comments of MHI has been received vide OM dt.05.03.24.

Decision: The Committee considered the case as per agenda and noted the comments furnished by MHI dated 05.03.2024. After due deliberation, the Committee decided to review the case and to fix the ad-hoc norms as per comments of MHI OM No. DES1/0710105280, 0710105283, 0710105285/2022-TSW dated 05.03.2024, as under: Note: The written recommendation as given by MHI will be communicated to the applicant as well as concerned RA through email.

0710105280, 0710105283, 0710105285/2022-TSW dated 05.03.2024, as under: Note: The written recommendation as given by MHI will be communicated to the applicant as well as concerned RA through email.

RA concerned may take suitable consequential action accordingly.

Before redemption, RA should ensure that neither any court case nor any ECA case is pending against the subject Advance Authorization.

Sl. No.5 M. No.: NC/1/MEET/Feb./202324/23 (Offline Status of case Cases) dated 18.03.2024 M/S BEML LIMITED Lic. No : 0710105283 dated 20.06.2014 HQ. No.: 01/80/050/00366/AM15 Subject: Request for fixation of adApproved. RLA No.: 07/24/040/00103/AM15 hoc norms

Status of case

Case History: The case was rejected by NC in its M. No. 15/80dated 25.10.2016 due to non-submission of reply of deficiency (raised by DHI). The firm vide email dated 19.02.2021, 06.03.2021 & 10.08.2021 has furnished the technical documents containing Manufacturing Process and Nesting Diagram indicating scrap/wastage for Raw Materials and requested to fix the ad-hoc norms. The firm's representation was forwarded to DHI on 23.08.2021 for examination of the case. Therefore, the Committee decided to ask from the applicant to furnish following information as per comments of DHI:

's representation was forwarded to DHI on 23.08.2021 for examination of the case. Therefore, the Committee decided to ask from the applicant to furnish following information as per comments of DHI:

  1. Acopy of complete application as per ANF-4B. 2. Complete information as per Appendix-4E, Appendix-4K & Appendix-4H. 3. Background note of the case along with NC decision/deficiency letter along with the corresponding reply in a chronological order. 4. Complete application, NC deficiency letter along with its reply and decision of NC for the approved AA No. 0710104231.

.

As per NC decision, a DL was issued to the applicant for furnishing the above information. The applicant's reply was sent to DHI on 19.01.2022 for examination & comments. DHI vide letter dated 08.02.2022 had requested to send point-wise reply of the deficiency letter separately to each AA Number. Therefore, the Committee decided to ask from the applicant to furnish the point-wise reply of following deficiencies as per comments of DHI:

  1. Acopy of complete application as per ANF-4B. 2. Complete information as per Appendix-4E, Appendix-4K & Appendix-4H. 3. Background note of the case along with NC decision/deficiency letter along with the corresponding reply in a chronological order.

  2. Complete application, NC deficiency letter along with its reply and decision of NC for the approved AA No. 0710104231.

iency letter along with the corresponding reply in a chronological order.

  1. Complete application, NC deficiency letter along with its reply and decision of NC for the approved AA No. 0710104231.

As per NC decision, a deficiency letter was issued to the applicant. The applicant's reply was sent to DHI 30.05.2022 for examination & comments. Further, DHI vide email dated 18.07.2022 has raised some queries and the same was asked from the applicant to furnish. The applicant's reply received vide email dated 30.07.2022 was forwarded to DHI on 01.08.2022. As per NC decision, a reminder was also issued to DHI on 27.09.2022 for expediting the comments. However, no comments have been received as yet. The firm has submitted the requisite information/documents as per email dt.23.08.2023 and the same has been forwarded to MHI for examination and comments. The comments of MHI is awaited. The case was considered by NC-I in its meeting held on 22.11.23 and the minutes of the said case is as under:-

“The Committee considered the case as per agenda and noted that the firm has submitted the reply. However, the TE, MHI has stated that data furnished by the firm are highly inconsistent and hence, they are not able to offer the comments. Therefore, the Committee decided to call the applicant on PH in the forthcoming meeting to explain the case in detail. Case stands deferred.”

ent and hence, they are not able to offer the comments. Therefore, the Committee decided to call the applicant on PH in the forthcoming meeting to explain the case in detail. Case stands deferred.”

Subsequently, the firm appeared before NC-1 for PH on 03.01.24. The Committee heard the representatives of the firm in PH. S/Shri Praveen Kumar Mathpal, CGM (0), Prabhakar S, Dy. GM, Manish Kumar, AGM(F & A) & Nagendra Mishra, Manager attended the PH and briefed the committee in detail. MHI has pointed out that data provided by BEML is inconsistent and not complete. It has been assured by the representatives of firm that rectified & authenticated data in respect of referred items would be provided within a week. After due deliberation, the committee decided to wait for the rectified data and the complete information from the firm and on receipt of the same, MHI would examine the case expeditiously. Thereafter, vide mail dt.11.01.24, the detailed information/data received from the firm was forwarded to MHI for examination and comments. Comments of MHI has been received vide OM dt.05.03.24.

Decision: The Committee considered the case as per agenda and noted the comments furnished by MHI dated 05.03.2024. After due deliberation, the Committee decided to review the case and to fix the ad-hoc norms as per comments of MHI OM No. DES1/0710105280, 0710105283, 0710105285/2022-TSW dated 05.03.2024, as under: Note: The written recommendation as given by MHI will be communicated to the applicant as well as concerned RA through email.

0710105280, 0710105283, 0710105285/2022-TSW dated 05.03.2024, as under: Note: The written recommendation as given by MHI will be communicated to the applicant as well as concerned RA through email.

RA concerned may take suitable consequential action accordingly.

against Beforethe subjectredemptio Adva n ,ceRAAuthorization. should ensure that neither any court case nor any ECA case is pending

:

==> picture [245 x 39] intentionally omitted <==

----- Start of picture text -----<br> 98 ok ok ok kk pe j<br>umet =<br>: a F otkaa ae<br>----- End of picture text -----<br>

F. No. DES-1/0310807493/2023-TSW

|

!

|

Government of India Ministry of Heavy Industries TSW Division

Udyog[Bhawan,][New][Delhi] Dated: 30 Oct, 2023

Office Memorandum Subject: - M/s. L&T —- MHI POWER TURBINE GENERATORS PRIVATE LIMITED - AA No. 0310807493 Date: 31.08.2016 Please refer to your email dated 13 & 14 Jan 2023 regarding the request of L&T - MHI POWERTURBINE GENERATORS PRIVATE LIMITED on the subject mentioned above. The request has been examined. 2. It is observed that the firm has sought to import 305 items as mentioned in the import list of the application for manufacture and supply of 2 units of 660 MW Steam Turbine and Cjenerator with auxiliaries. 3. The above mentioned Advance Authorization had been ratified earlier for items placed at S. No. | to 276 in import list of application in NC Meeting No. 15/80-ALC/2018 dated 6.3.2019. 4. The firm’s present request is for review the earlier approved norms for items at S. No. | to 276 and also norms fixation for additional items at S. No. 277 to 305. 5. MHI inputs: |S. No. (Item Detail) Ratified Norms | Firm’s Review |MHI input oe ap ae | Request Ss eeatNaee. 59 (Alloy Steel Bar) 8936 Kgs Re-instatement — 497.44% to be allowed as against 603% claimed 62 (Alloy Steel Rod) | SION C-738 as Raw Material "No change (as per SION C.738) peas, 302 S (Aluminium Alloy | Not mentioned in | With Quantity & [730; t6 be allowed as against 18% claimed Plate) earlier Wastage On net ratification weight basis.

al "No change (as per SION C.738) peas, 302 S (Aluminium Alloy | Not mentioned in | With Quantity & [730; t6 be allowed as against 18% claimed Plate) earlier Wastage On net ratification weight basis. 277 to 305 Additional items |Components on | 277 to 280, 282 to 286, 289, 291 to 296, 298 to 304 requested for | net to net basis | to be allowed as components under GN-4 on net to ratification GN4 _net basis with accountability clause | 281, 287, 288, 290, 297 to be allowedEel as ait . | consumables within 2% of FOB value of Generator | 305 to be allowed as mandaton spare as per policy _ for spares, 27, 37 to 43, 80, 109 & | No mention in | For 27, 37 t© 43 to be allowed as components under 110 ratification consideration GN-4 on net to net basis with accountability clause and ratification | 80, 109 & 110 to be allowed as consumabdles within 67 as components | 2% of FOBvalueof Generator er hoe to 71, 74 to 78, 86 to | Insulation / | Insulation / | No change, i.e. Insulation /consumable (upto 2"s ot 101, 108, 123, 130, 132 | consumable (2% | Consumable FOB value of Generator) to 137, 150 to 154, 165 | of FOB value of | (2% of value of to 187, 192 to 194, 217 | Generator) Set Exported) to 221, 223 to 242, 246 1072,259, 263 & 265 SESE So See OR RT aL ED ee to 73, 81, 82, 112, 115 | Insulation ‘| For ratification | To be allowed as components under GN-4 on net to 117, 161, 195 | consumable (2% | as component | net basis with accountability clause | of FOB value of | GN4 net to net Rx. paar (R. K.

ratification | To be allowed as components under GN-4 on net to 117, 161, 195 | consumable (2% | as component | net basis with accountability clause | of FOB value of | GN4 net to net Rx. paar (R. K. Jaiswal) To, Development Officer DGFT (DES-1), Directorate General of Foreign Trade, Udyog Bhawan, New Dethi — 110011. Email: "DES-1, DGFT" nel.dgft@nic.in;

F. No. DES-10710105280, 0710105283, 0710105285/2022-TSW Government of India Ministry of Heavy Industries TSW Division Udyog Bhawan, New Delhi Dated: 05 March, 2024

Office Memorandum Subject:- BEML Limited - AA No. 0710105280 dtd. 20.06.2014, 0710105283 dtd. 20.06.2014 and 0710105285 dtd. 20.06.2014

Pursuant to the discussion held during personal hearing before NC-1 on 03.01 24 BEML Limited Bangalore has furnished final revised list of imported items vide their mail dated 15 Feb 2024.

The above mentioned three licenses relate to execution of a deemed export order for supply of 12 DT Cars supplied to OMRC and the import items mentioned in the list are required for manufacturing of these DT cars .

Export Product: 12 DT Cars

Driving Trailer (EARTH MOVING EQPTS, RAIL COACHES AND ROLLING STOCK)

MHI Input:

AA — 0710105280 (S. No. as per Annexure-A (MHI Input 0710105280))

Import Items at S. No. 1 to 126, may be allowed as component under GN-4 on netto-net basis with accountability clause.

import Items at S. No. 127 to 129, may be allowed as consumables.

AA - 0710105283 (S. No. as per Annexure-B (MHI Input 0710105283))

Import Items at S. No. 1 to 134, may be allowed as component under GN-4 on netto-net basis with accountability clause. Import Items at S. No. 135 to 142, may be allowed as spares as per spares policy. Import Items at S. No. 143 to 146, may be allowed with % wastage on net content basis as mentioned in the Annexure-B.

AA — 0710105285 (S. No. as per Annexure-C (MHI Input 0710105285) Import Items at S. No. 1 to 388, may be allowed as component under GN-4 on netto-net basis with accountability clause. Import Items at S. No. 389 to 419, may be allowed as consumable. . Import Items (as raw material) at S. No. 420 to 491, may be allowed with % wastage on net content basis as mentioned in the Annexure-C.

  • Total CIF value of consumables of all the three AAs taken together may be allowed upto 2% of FOB value of export or as applied for, whichever 's lower

(R. K. Jaiswal) Development Officer

To, DGFT (DES-1), Directorate General of Foreign Trade, Udyog Bhawan, New Delhi - 110011. Email: "DES-1, DGFT" nc1.dgft@nic.in;

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6944 --apply.

Citation copied