IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2020-11-26

DGFT Committee Minutes

Document text

DIRECTORATE GENERAL OF FOREIGN TRADE - (DES I SECTION)

MINUTES OF MEETING NO. 09/80 OF THE NORMS COMMITTEE-I DATED 26.11.2020 HELD ON 08.01.2021

Meeting No. 09/80 of the Norms Committee (NC-I) for the licensing year 2020-2021 (originally scheduled for 26.11.2020) held on 08.01.2021 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -

==> picture [464 x 154] intentionally omitted <==

----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri S. K. Jain, D.O. DPIIT<br>2. Shri B. C. Nayak, D.O. DHI<br>3. Shri K.S. Sodhi, Asst. Director MSME<br>4. Shri Sushil Kumar Jangid, Scientist ‘B’ MeitY<br>5. Shri Shaish Kumar, (Tech-1) Consultant<br>6. Shri V.C. Agarwal, (Tech-3) Consultant<br>7. Shri S. K. Bhatnagar, Consultant<br>In Attendance<br>1. Dr. D. C. Dabhole, Dy. DGFT DGFT<br>2. Shri Pranav Upadhyay, Dy. Director ISS DGFT<br>----- End of picture text -----<br>

Note:

  1. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.

  2. Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.

  3. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail addressnc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.

  4. Minutes of Meeting 07/80 (originally scheduled for 22.10.2020) held on 23.10.2020 were circulated on 08.12.2020, to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and therefore the said minutes were uploaded on dgft.gov.in on 14.12.2020. The said minutes are unanimously approved.

  5. Minutes of Meeting 08/80 (originally scheduled for 05.11.2020) held on 06.11.2020 were circulated on 15.12.2020, to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and therefore the said minutes were uploaded on dgft.gov.in on 23.12.2020. The said minutes are unanimously approved.

1 | P a g e

MEETING NUMBER: 9/80-ALC2/2020 MEETING DATE: 26.11.2020

==> picture [476 x 224] intentionally omitted <==

----- Start of picture text -----<br> Case No.:366/15/80-ALC2/2018 Party Name: FOWLER Meet No/Date:9/80- Status:<br>WESTRUP (INDIA) PVT. LTD. ALC2/2020 Approved<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0710108605<br>:01/80/050/00708/AM19/ :07/24/040/00106/AM16/ 13.08.2015<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME taking cue from SION C-1647 as under:<br>1 1. Quantity of relevant import items at Sl. No. 1 to 9 & 50 may be allowed as 1.02Kgs/Kg net content of<br>export product.<br>2. Quantity of relevant import items at Sl. No. 10 to 21, 23 to 26, 30 to 33, 35 to 42, 46 to 49, 51 to 62, 66<br>to 72 & 76 to 78 may be allowed as per GN-4 .<br>3. Quantity of relevant import items at Sl. No. 27 to 29, 34 & 63 to 65 may be allowed upto 2% of FoB<br>value.<br>4. Quantity of relevant import items at Sl. No. 22, 43 to 45 & 73 to 75 may be allowed on net to net<br>basis .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 201] intentionally omitted <==

----- Start of picture text -----<br> Case No.:30/1/80-ALC2/2019 Party Name: FOWLER Meet No/Date:9/80- Status:<br>WESTRUP (INDIA) PVT LTD. ALC2/2020 Approved<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0710108606<br>:01/80/050/00778/AM19/ :07/24/040/00109/AM16/ 13.08.2015<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME taking cue from SION C-1647 as under:<br>2<br>1. Quantity of relevant import items at Sl. No. 1 to 10 may be allowed as 1.02Kgs/Kg net content of<br>export product.<br>2. Quantity of relevant import items at Sl. No. 11 to 22, 24 to 26, 30 to 33 & 35 to 55 may be allowed as<br>per GN-4 .<br>3. Quantity of relevant import items at Sl. No. 27 to 29 & 34 may be allowed upto 2% of FoB value.<br>4. Quantity of relevant import item at Sl. No. 23 may be allowed on net to net basis .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 199] intentionally omitted <==

----- Start of picture text -----<br> Case No.:363/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:9/80- Status:<br>ENGINEERING INDUSTRIES ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0710108812 Pending<br>:01/80/050/00705/AM19/ :07/24/040/00184/AM16/ 05.10.2015 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DHI ( HE & MT Section ) vide letter dated 29.10.2020 :<br>3<br>1. Name with broad specification and their HSN codes of imported items with value separately.<br>2. Name of the items with value procured from local sources for export separately.<br>3. Name with broad specifications and their HSN codes of items to be exported with value separately.<br>4. Details of manufacturing activity involved on the imported items before exporting the item separately.<br>5. Calculation sheet of value addition as per FTP and wastage generated in punching the holes and drilling<br>separately in Kgs and percentage thereof.<br>Case is deferred.<br>----- End of picture text -----<br>

2 | P a g e

Case No.:364/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:9/80- Status:
ENGINEERING INDUSTRIES ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00706/AM19/ RLA File<br>:07/24/040/00185/AM16/ Lic.No/Date:0710108813<br>05.10.2015 Pending<br>with firm

4 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of DHI vide letter dated 28.10.2020:

  1. To provide details of wastages as per the Annexure attached. (Copy enclosed)

Case is deferred.

==> picture [476 x 143] intentionally omitted <==

----- Start of picture text -----<br> Case No.:27/5/80-ALC2/2020 Party Name: SCIGENICS Meet No/Date:9/80- Status:<br>(INDIA) PRIVATE LIMITED ALC2/2020 Approved<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0410162152<br>:01/80/050/00577/AM21/ :04/21/040/00165/AM17/ 01.08.2016<br>5<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>1. Quantity of import items may be allowed as per GN-4 .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 178] intentionally omitted <==

----- Start of picture text -----<br> Case No.:215/15/80-ALC2/2018 Party Name: FOWLER Meet No/Date:9/80- Status:<br>WESTRUP (INDIA) PVT. LTD. ALC2/2020 Approved<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0710110568<br>:01/80/050/00557/AM19/ :07/24/040/00201/AM17/ 25.10.2016<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>6 written comments of MSME taking cue from SION C-1647 as under:<br>1. Quantity of relevant import items at Sl. No. 1 to 10 may be allowed as 1.02Kgs/Kg net content of<br>export product.<br>2. Quantity of relevant import items at Sl. No. 12 to 28, 31 & 32 may be allowed as per GN-4 .<br>3. Quantity of relevant import items at Sl. No. 11, 29 & 30 may be allowed on net to net basis .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 178] intentionally omitted <==

----- Start of picture text -----<br> Case No.:222/15/80-ALC2/2018 Party Name: FOWLER Meet No/Date:9/80- Status:<br>WESTRUP (INDIA) PVT. LTD. ALC2/2020 Approved<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0710110569<br>:01/80/050/00564/AM19/ :07/24/040/00204/AM17/ 25.10.2016<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>7 written comments of MSME taking cue from SION C-1647 as under:<br>1. Quantity of relevant import items at Sl. No. 1 to 9 may be allowed as 1.02Kgs/Kg net content of export<br>product.<br>2. Quantity of relevant import item at Sl. No. 11 may be allowed as per GN-4 .<br>3. Quantity of relevant import item at Sl. No. 10 may be allowed on net to net basis .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

3 | P a g e

Case No.:380/15/80-ALC2/2018 Party Name: FOWLER Meet No/Date:9/80- Status: WESTRUP (INDIA) PVT. LTD. ALC2/2020 Approved 26.11.2020 HQ File RLA File Lic.No/Date:0710110914 :01/80/050/00722/AM19/ :07/24/040/00302/AM17/ 05.01.2017

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per 8 written comments of MSME taking cue from SION C-1647 as under:

  1. Quantity of relevant import items at Sl. No. 12 to 20 may be allowed as 1.02Kgs/Kg net content of export product.

  2. Quantity of relevant import items at Sl. No. 1 to 5, 8 to 11, 21 & 22 may be allowed as per GN-4 .

  3. Quantity of relevant import items at Sl. No. 6 & 7 may be allowed on net to net basis .

RA concerned may take further necessary action as per the decision of NC.

Case No.:387/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:9/80- Status: ENGINEERING INDUSTRIES ALC2/2020 Deferred LIMITED 26.11.2020 HQ File RLA File Lic.No/Date:0710111210 Pending :01/80/050/00729/AM19/ :07/24/040/00382/AM17/ 01.03.2017 with firm

Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of DHI ( HE & MT Section ) vide letter dated 29.10.2020 :

  • 9
  1. Name with broad specification and their HSN codes of imported items with value separately.

  2. Name of the items with value procured from local sources for export separately.

  3. Name with broad specifications and their HSN codes of items to be exported with value separately.

  4. Details of manufacturing activity involved on the imported items before exporting the item separately.

  5. Calculation sheet of value addition as per FTP and wastage generated in punching the holes and drilling separately in Kgs and percentage thereof.

Case is deferred.

Case No.:126/15/80- Party Name: SHAKTI PUMPS Meet No/Date:9/80- Status: ALC2/2018 (INDIA) LTD. ALC2/2020 Approved 26.11.2020 HQ File RLA File Lic.No/Date:5610005299 :01/80/050/00468/AM19/ :56/24/040/00036/AM18/ 08.01.2018

Case No.:126/15/80-<br>ALC2/2018<br>Party Name: SHAKTI PUMPS<br>(INDIA) LTD.<br>Meet No/Date:9/80-<br>ALC2/2020<br>26.11.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00468/AM19/<br>RLA File<br>:56/24/040/00036/AM18/<br>Lic.No/Date:5610005299<br>08.01.2018 Case No.:126/15/80-<br>ALC2/2018<br> <br> Party Name: SHAKTI PUMPS<br>(INDIA) LTD. Meet No/Date:9/80-<br>ALC2/2020<br>26.11.2020 Status:<br>Approved
HQ File<br>:01/80/050/00468/AM19/<br> <br> RLA File<br>:56/24/040/00036/AM18/ Lic.No/Date:5610005299<br>08.01.2018
10 Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/328/2018-TSW dated 10.12.2020 as under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended Norms<br>84139120<br>Stainless Steel<br>Clamping Strips<br>56000 Kgs<br>72193390<br>Stainless Steel Sheet /<br>Strips / Coils AISI 304<br>/ 304L / DDQ<br>58800 Kgs as<br>1.05Kgs/Kg content in<br>the export item<br>Note:<br>1. Export item shall contain 56000 Kgs of Stainless Steel Strips.<br>2. Import item shall be of relevant grade and thickness as contained/utilized in the export item.<br>RA concerned maytake further necessaryaction asper the decision of NC.

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/328/2018-TSW dated 10.12.2020 as under:

4 | P a g e

Case No.:10/1/80-ALC2/2019 Party Name: MAGNA Meet No/Date:9/80- Status:
AUTOMOTIVE INDIA ALC2/2020 Rejected
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00758/AM19/ RLA File<br>:04/24/040/00001/AM19/ Lic.No/Date:0410164172<br>06.04.2018

11

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 22.07.2020 followed by reminders on 30.09.2020 & 11.11.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Chennai.

==> picture [476 x 199] intentionally omitted <==

----- Start of picture text -----<br> Case No.:397/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:9/80- Status:<br>ENGINEERING INDUSTRIES ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0710113276 Pending<br>:01/80/050/00739/AM19/ :07/24/040/00357/AM18/ 14.05.2018 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DHI ( HE & MT Section ) vide letter dated 29.10.2020 :<br>12<br>1. Name with broad specification and their HSN codes of imported items with value separately.<br>2. Name of the items with value procured from local sources for export separately.<br>3. Name with broad specifications and their HSN codes of items to be exported with value separately.<br>4. Details of manufacturing activity involved on the imported items before exporting the item separately.<br>5. Calculation sheet of value addition as per FTP and wastage generated in punching the holes and drilling<br>separately in Kgs and percentage thereof.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 279] intentionally omitted <==

----- Start of picture text -----<br> Case No.:28/5/80-ALC2/2020 Party Name: PENGUIN Meet No/Date:9/80- Status:<br>PETROLEUM SERVICES PVT. ALC2/2020 Deferred<br>LTD. 26.11.2020<br>HQ File RLA File Lic.No/Date:0310821057 Pending<br>:01/80/050/00578/AM21/ :03/92/040/00044/AM19/ 17.05.2018 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of Consultant (Tech-3) :<br>1. Model number, technical specification and specific quantity-both in terms of number (if any) and/or<br>weight, of each export product (Appendix-33 of current HBP refers).<br>2. Detail technical note on manufacturing process including the relevant flow sheet.<br>13<br>3. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>4. Weight of each Export Product.<br>5. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>6. Use of export product.<br>7. Copy of export order.<br>Case is deferred.<br>----- End of picture text -----<br>

5 | P a g e

==> picture [476 x 257] intentionally omitted <==

----- Start of picture text -----<br> Case No.:31/5/80-ALC2/2020 Party Name: THE TATA Meet No/Date:9/80- Status:<br>POWER COMPANY LTD ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0710113372 Pending<br>:01/80/050/00581/AM21/ :07/24/040/00049/AM19/ 31.05.2018 with firm<br>Decision: The Committee considered the case as per the agenda and noted that MeitY had directly asked from<br>the firm to furnish following information on 11.12.2020 :<br>1. Details of export and import items in terms of technical write-up, design and calculations.<br>2. Quantity of import items required for manufacturing one unit of export product.<br>14<br>3. Calculations on per unit requirement of import items for manufacturing one unit of export product with &<br>without wastage.<br>4. Wastage claimed in the manufacturing process.<br>5. Justification of wastage.<br>Note: The above information should be submitted in excel sheet.<br>The Committee also noted that no reply has been received yet. Therefore, it was decided to send a reminder to<br>the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:133/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:9/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0910066357 Pending<br>:01/80/050/00475/AM19/ :09/24/040/00058/AM19/ 20.06.2018 with firm<br>15<br>Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for”<br>appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case<br>before the Norms Committee in the forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>

16

Case No.:165/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00507/AM19/ RLA File<br>:09/24/040/00139/AM19/ Lic.No/Date:0910066427<br>06.07.2018 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

17

Case No.:166/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:9/80- Status:
ELECTRICALS LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00508/AM19/ RLA File<br>:09/24/040/00171/AM19/ Lic.No/Date:0910066472<br>18.07.2018 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI for examination of the case on 04.01.2021. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

6 | P a g e

==> picture [476 x 199] intentionally omitted <==

----- Start of picture text -----<br> Case No.:179/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:9/80- Status:<br>ENGINEERING INDUSTRIES ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0710113710 Pending<br>:01/80/050/00521/AM19/ :07/24/040/00102/AM19/ 13.08.2018 with firm<br>Decision: : The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DHI ( HE & MT Section ) vide letter dated 29.10.2020 :<br>18<br>1. Name with broad specification and their HSN codes of imported items with value separately.<br>2. Name of the items with value procured from local sources for export separately.<br>3. Name with broad specifications and their HSN codes of items to be exported with value separately.<br>4. Details of manufacturing activity involved on the imported items before exporting the item separately.<br>5. Calculation sheet of value addition as per FTP and wastage generated in punching the holes and drilling<br>separately in Kgs and percentage thereof.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 305] intentionally omitted <==

----- Start of picture text -----<br> Case No.:28/11/80-ALC2/2018 Party Name: L & T-MHPS Meet No/Date:9/80- Status:<br>TURBINE GENERATORS ALC2/2020 Approved<br>PRIVATE LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0310823400<br>:01/80/050/00219/AM19/ :03/95/040/00466/AM19/ 29.08.2018<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DHI as under:<br>1. Weight of export product is 481MT.<br>2. Quantity of import item at Sl. No. 87 may be allowed with 336% wastage after taking 10% recovery<br>from scrap.<br>3. Quantity of import item at Sl. No. 90 may be allowed with 660% wastage after taking 10% recovery<br>19<br>from scrap.<br>4. Quantity of import item at Sl. No. 93 may be allowed with 238% wastage after taking 10% recovery<br>from scrap.<br>5. Quantity of import item at Sl. No. 95 may be allowed with 275% wastage after taking 10% recovery<br>from scrap.<br>6. Import item at Sl. No. 8 to 11 may be deleted as requested by the firm.<br>7. The word “ Finished ” may be prefixed with the description of import items at Sl. No. 107 to 109.<br>8. The word “ Finished ” may be added in the description of import item at Sl. No. 228 and “ rough ” may<br>be deleted .<br>9. Quantity of rest of the import items may be allowed as per GN-4 with accountability clause with nil<br>wastage on weight & number terms.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/1/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:9/80- Status:<br>TURBINE GENERATORS ALC2/2020 Deferred<br>PRIVATE LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0310823645 Pending<br>:01/80/050/00757/AM19/ :03/95/040/00469/AM19/ 07.09.2018 with firm<br>20<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI<br>for examination of the case on 19.06.2020 followed by reminders on 07.09.2020 & 12.11.2020. However, DHI<br>informed that the firm’s reply is incomplete. Therefore, the Committee decided to ask again from the firm to<br>furnish the following information:<br>1. Calculation of all raw materials is to be given linking the same with Dimensional Engineering Drawing.<br>----- End of picture text -----<br>

7 | P a g e

  1. Weight of each Export Product.

  2. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  3. List of components, spares, consumables separately.

  4. Details of sets & accessories in the list of import.

Case is deferred.

Case No.:30/5/80-ALC2/2020 Party Name: PENGUIN Meet No/Date:9/80- Status: PETROLEUM SERVICES PVT. ALC2/2020 Deferred LTD. 26.11.2020 HQ File RLA File Lic.No/Date:0310823657 Pending :01/80/050/00580/AM21/ :03/92/040/00172/AM19/ 10.09.2018 with firm

Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of Consultant (Tech-3) :

  1. Detail technical note on manufacturing process including the relevant flow sheet.
  • 21 2. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.

    1. Weight of each Export Product.

    2. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

    3. Use of export product.

Case is deferred.

Case No.:82/11/80-ALC2/2018 Party Name: ANSTECH Meet No/Date:9/80- Status: ALC2/2020 Approved 26.11.2020 HQ File RLA File Lic.No/Date:3410044543 :01/80/050/00273/AM19/ :34/24/040/00218/AM19/ 04.10.2018 22 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the recommendation of the representative of DPIIT as under:

  1. Quantity of import items may be allowed as per GN-4 .
Case No.:253/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:9/80- Status:
ELECTRICALS LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00595/AM19/ RLA File<br>:09/24/040/00340/AM19/ Lic.No/Date:0910066870<br>16.11.2018 Pending<br>with firm

23 Decision: Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 21.08.2020 for examination of the case. It was also noted that information regarding clubbing of AAs (AA No. 0910066870 and 0910065863) is still awaited from RA, Hyderabad . Hence, the Committee decided to send an ID reminder to RA, Hyderabad .

Case is deferred.

8 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:270/15/80-ALC2/2018 Party Name: VEM Meet No/Date:9/80- Status:<br>TECHNOLOGIES PVT. LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0910066924 Pending<br>:01/80/050/00612/AM19/ :09/24/040/00428/AM19/ 29.11.2018 with firm<br>24 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (SKB) was sent to the firm on 27.08.2020 followed by reminders on<br>30.09.2020 & 11.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send<br>last reminder to the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:267/15/80-ALC2/2018 Party Name: LARSEN & Meet No/Date:9/80- Status:
TOUBRO LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00609/AM19/ RLA File<br>:03/95/040/00583/AM19/ Lic.No/Date:0310825583<br>11.12.2018 Pending<br>withDPIIT

25 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DPIIT on 04.01.2021 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 234] intentionally omitted <==

----- Start of picture text -----<br> Case No.:269/15/80-ALC2/2018 Party Name: LARSEN & Meet No/Date:9/80- Status:<br>TOUBRO LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310825585 Pending<br>:01/80/050/00611/AM19/ :03/95/040/00585/AM19/ 11.12.2018 with firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI via email dated 11.11.2020<br>informed that the firm’s reply is incomplete. Therefore, the Committee decided to ask again from the firm to<br>furnish following information as per comments of DHI :<br>1. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>26<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>2. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:42/1/80-ALC2/2019 Party Name: LARSEN & Meet No/Date:9/80- Status:<br>TOUBRO LIMITED ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0310827622 Pending<br>:01/80/050/00790/AM19/ :03/95/040/01295/AM19/ 12.03.2019 with Tech- 3<br>27<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>Consultant (Tech-3) on 01.12.2020 for examination of the case. In meeting, Consultant (Tech-3) has<br>requested to send physical file of the case. Therefore, the Committee decided to send the same to Consultant<br>(Tech-3) for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

9 | P a g e

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/2/80-ALC2/2019 Party Name: VIPRA CLOSURES Meet No/Date:9/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 26.11.2020 Approved<br>HQ File RLA File Lic.No/Date:0310828134<br>:01/80/050/00005/AM20/ :03/95/040/01384/AM19/ 03.04.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>28<br>written comments of MSME as under:<br>1. Quantity of import items may be allowed as per SION C-754 .<br>Note: Thickness of the coil imported and that used in the export should conform.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:4/3/80-ALC2/2019 Party Name: VEELINE MEDIA Meet No/Date:9/80- Status:
LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00010/AM20/ RLA File<br>:02/24/040/00003/AM20/ Lic.No/Date:0210209114<br>16.04.2019 Pending<br>withMSME

29

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 18.10.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

30

Case No.:8/3/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:9/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00014/AM20/ RLA File<br>:03/95/040/01354/AM19/ Lic.No/Date:0310828481<br>23.04.2019 Pending with<br>DHI

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI for examination of the case on 03.09.2020 followed by reminders on 12.11.2020. However, no comments have been received yet. Therefore, the Committee decided to remind again DHI for expediting the comments.

Case is deferred.

Case No.:26/5/80-ALC2/2020 Party Name: WHEELS INDIA Meet No/Date:9/80- Status:
LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00576/AM21/ RLA File<br>:04/24/040/00278/AM19/ Lic.No/Date:0410165481<br>23.04.2019 Pending<br>withTech-3

31 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-3) on 06.01.2021 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/5/80-ALC2/2019 Party Name: PAHARPUR Meet No/Date:9/80- Status:<br>COOLING TOWERS LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0210209171<br>:01/80/050/00039/AM20/ :02/24/040/00012/AM20/ 16.05.2019<br>32 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 06.03.2020 followed by reminders on 22.07.2020,<br>30.09.2020 & 11.11.2020. However, the reminder via e-mail could not be delivered due to client server issue.<br>Therefore, the Committee decided to send Final reminder by post to the firm .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

10 | P a g e

==> picture [476 x 165] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/5/80-ALC2/2019 Party Name: HEURTEY Meet No/Date:9/80- Status:<br>PETROCHEM INDIA PRIVATE ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:3410045150 Pending<br>:01/80/050/00051/AM20/ :34/24/040/00059/AM20/ 17.05.2019 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>33<br>following information as per comments of DHI vide letter dated 06.11.2020:<br>1. To provide details of actual wastages generated during the operations such as cutting, fin making &<br>testing, welding, weld testing, burning, hole drilling, hydro testing etc. against each raw material as per the<br>Annexure attached. (Copy enclosed)<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/7/80-ALC2/2019 Party Name: CROWN Meet No/Date:9/80- Status:<br>CLOSURES PVT. LTD. ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0310829905<br>:01/80/050/00098/AM20/ :03/94/040/00246/AM20/ 25.06.2019<br>34<br>Decision: The Committee considered the case as per the agenda and noted that firm’s reply was sent to<br>Consultant (Tech 1) on 18.11.2020. However, no comments have been received in the matter. Therefore, the<br>Committee decided to send the reminder to Consultant (Tech1) to expedite the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:2/7/80-ALC2/2019 Party Name: OSWAL PUMPS Meet No/Date:9/80- Status:
LIMITED ALC2/2020 Rejected
26.11.2020
HQ File<br>:01/80/050/00099/AM20/ RLA File<br>:33/24/040/00012/AM20/ Lic.No/Date:3310030557<br>25.06.2019

35 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 06.03.2020 followed by reminders on 23.07.2020, 30.09.2020 & 11.11.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Panipat .

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/7/80-ALC2/2019 Party Name: ENGINEERING Meet No/Date:9/80- Status:<br>PRIVATE LIMITED ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0910067697 Pending<br>:01/80/050/00101/AM20/ :09/24/040/00138/AM20/ 26.06.2019 with firm<br>----- End of picture text -----<br>

36 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 30.09.2020 followed by a reminder on 11.11.2020. However, the Committee observing the deliberation amongst technical authorities noted few points which still require some clarity from the party. Hence, the Committee decided to call the firm for personal hearing in upcoming meeting. “(Clamp Wastage)”

Case is deferred.

11 | P a g e

Case No.:12/7/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:9/80- Status:
CORPORATION PANSE ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00109/AM20/ RLA File<br>:31/83/040/00050/AM20/ Lic.No/Date:3110067460<br>01.07.2019 Pending<br>with firm

37

Decision: The Committee considered the case as per the agenda and noted that the firm has submitted physical copy of the reply of deficiency letter. However, the representative of DHI has requested to send soft copy of the reply. Therefore, the Committee decided to ask from the firm to furnish soft copy of the reply of deficiency letter.

Case is deferred.

Case No.:15/7/80-ALC2/2019 Party Name: DOOWON Meet No/Date:9/80- Status:
CLIMATE CONTROL INDIA ALC2/2020 Rejected
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00112/AM20/ RLA File<br>:66/24/040/00003/AM20/ Lic.No/Date:6610000035<br>03.07.2019

38

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 27.08.2020 followed by reminders on 30.09.2020 & 11.11.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Vijayawada .

39

Case No.:3/9/80-ALC2/2019 Party Name: DYNA FORCE Meet No/Date:9/80- Status:
HYDRAULICS PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00128/AM20/ RLA File<br>:31/83/040/00067/AM20/ Lic.No/Date:3110067484<br>25.07.2019

Decision: The Committee considered the case as per the agenda and noted that firm’s reply was sent to MSME on 16.12.2020. However, no comments have been received in the matter. Therefore, the Committee decided to send the reminder to MSME to expedite the comments.

Case is deferred.

Case No.:45/11/80-ALC2/2004 Party Name: L&T- MHPS Meet No/Date:9/80- Status: TURBINE GENERATORS ALC2/2020 Deferred PRIVATE LIMITED 26.11.2020 HQ File RLA File Lic.No/Date:0310831568 :01/80/050/00171/AM20/ :03/95/040/00574/AM20/ 16.09.2019

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of DHI, as under:

40

ITCHS<br>Code Export<br>Item Quantity ITCHS<br>Code Import Item Recommended<br>Norms
84069000 STEAM<br>TURBINE<br>BLADES 3675<br>Number 76012020 ALLOY STEEL BARS - WIDTH<br>RANGE 34MM TO 93MM - THK<br>RANGE. 44MM TO 240MM - SPEC -<br>MTB10AAM,10705 MBU, 492% wastage after<br>10% recovery

12 | P a g e

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:46/11/80-ALC2/2004 Party Name: L&T-MHPS Meet No/Date:9/80- Status:<br>BOILERS PVT. LTD. ALC2/2020 & 26.11.2020 Rejected<br>HQ File RLA File Lic.No/Date:0310831569<br>:01/80/050/00172/AM20/ :03/95/040/00588/AM20/ 16.09.2019<br>41 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 27.08.2020 followed by reminders on 30.09.2020 &<br>12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under<br>intimation to RA, Mumbai .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:1/13/80-ALC2/2019 Party Name: RONCH Meet No/Date:9/80- Status:
POLYMERS PVT LTD ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00186/AM20/ RLA File<br>:03/95/040/00654/AM20/ Lic.No/Date:0310832012<br>04.10.2019

42 Decision: The Committee considered the case as per the agenda and noted that the firm was informed for furnishing the complete reply of deficiency letter dated 05.08.2020 on 15.10.2020. However, reply of the firm sent to Consultant (Tech-1) on 16.12.2020. Hence, the Committee decided to wait for comments.

Case is deferred.

43

Case No.:2/13/80-ALC2/2019 Party Name: FERRUM Meet No/Date:9/80- Status:
EXTREME ENGINEERING ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00187/AM20/ RLA File<br>:05/23/040/00265/AM20/ Lic.No/Date:0510412040<br>07.10.2019 Pending<br>withTech-3

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-3) on 06.01.2021 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

44

Case No.:4/13/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:9/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00189/AM20/ RLA File<br>:03/95/040/00681/AM20/ Lic.No/Date:0310832116<br>10.10.2019 Pending<br>withDHI

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI for examination of the case on 20.05.2020 followed by a reminder on 15.10.2020. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

45

Case No.:5/13/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:9/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00190/AM20/ RLA File<br>:03/95/040/00655/AM20/ Lic.No/Date:0310832159<br>11.10.2019 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 13.10.2020 for examination of the case. However, DHI informed that some part of the reply is not available. Therefore, the Committee decided to forward the complete reply again to DHI for expediting the comments.

Case is deferred.

13 | P a g e

==> picture [476 x 121] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/13/80-ALC2/2019 Party Name: ISGEC HITACHI Meet No/Date:9/80- Status:<br>ZOSEN LIMITED ALC2/2020 Approved<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0510412096<br>46 :01/80/050/00192/AM20/ :05/23/040/00269/AM20/ 11.10.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No. P-47011/98/2019-TSW dated 06.01.2021. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/13/80-ALC2/2019 Party Name: AZAD Meet No/Date:9/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0910068080<br>:01/80/050/00193/AM20/ :09/24/040/00347/AM20/ 14.10.2019<br>47<br>Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for”<br>appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case<br>before the Norms Committee in the forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 55] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/17/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:9/80- Status:<br>PVT. LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510412724 Pending<br>:01/80/050/00233/AM20/ :05/24/040/00513/AM20/ 29.11.2019 with firm<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the 48 following information as per comments of MSME:

  1. To provide justification for the higher claimed wastage supported by drawings, pictures and step-wise wastage.

Case is deferred.

Case No.:5/17/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2019 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00237/AM20/ RLA File :09/24/040/00439/AM20/ Lic.No/Date:0910068244<br>02.12.2019

49 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/17/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File :09/24/040/00437/AM20/ Lic.No/Date:0910068247<br>:01/80/050/00243/AM20/ 04.12.2019<br>50<br>Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for”<br>appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case<br>before the Norms Committee in the forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>

14 | P a g e

Case No.:12/17/80-ALC2/2019 Party Name: DOOWON Meet No/Date:9/80- Status:
CLIMATE CONTROL INDIA ALC2/2020 Rejected
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00244/AM20/ RLA File<br>:26/24/040/00012/AM20/ Lic.No/Date:2610012887<br>04.12.2019

51

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 24.07.2020 followed by reminders on 30.09.2020 & 11.11.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Visakhapatnam .

Case No.:13/17/80-ALC2/2019 Party Name: KABY PRECISION Meet No/Date:9/80- Status:
MACHINING PRIVATE ALC2/2020 Rejected
LIMITED 26.11.2020
HQ File<br>:01/80/050/00245/AM20/ RLA File<br>:09/24/040/00447/AM20/ Lic.No/Date:0910068268<br>06.12.2019

52

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 27.07.2020 followed by reminders on 30.09.2020 & 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

==> picture [476 x 362] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/18/85-ALC3/2019 Party Name: AUTOCOMP Meet No/Date:9/80- Status:<br>CORPORATION PANSE ALC2/2020 Approved<br>PRIVATE LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:3110067623<br>:01/85/050/00132/AM20/ :31/83/040/00120/AM20/ 10.12.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-3) as under:<br>Export items:<br>1. Weight of export item at Sl. No. 1 is 5.285Kg/Unit and may be added in the description of export item.<br>2. Weight of export item at Sl. No. 2 is 3.688Kg/Unit and may be added in the description of export item.<br>3. Weight of export item at Sl. No. 3 is 2.934Kg/Unit and may be added in the description of export item.<br>4. Weight of export item at Sl. No. 4 is 5.285Kg/Unit and may be added in the description of export item.<br>5. Weight of export item at Sl. No. 5 is 3.690Kg/Unit and may be added in the description of export item.<br>53 6. Weight of export item at Sl. No. 6 is 2.609Kg/Unit and may be added in the description of export item.<br>7. Weight of export item at Sl. No. 7 is 5.285Kg/Unit and may be added in the description of export item.<br>8. Weight of export item at Sl. No. 8 is 3.688Kg/Unit and may be added in the description of export item.<br>9. Weight of export item at Sl. No. 9 is 2.758Kg/Unit and may be added in the description of export item.<br>10. Weight of export item at Sl. No. 10 is 5.289Kg/Unit and may be added in the description of export<br>item.<br>11. Weight of export item at Sl. No. 11 is 3.690Kg/Unit and may be added in the description of export<br>item.<br>12. Weight of export item at Sl. No. 12 is 2.760Kg/Unit and may be added in the description of export<br>item.<br>Import item:<br>1. Quantity of import item at Sl. No. 1 to 4 may be allowed as Net + 2% wastage in weight or as applied,<br>whichever is lower.<br>2. Quantity of import item at Sl. No. 5 may be allowed as 1.44Kgs/Kg content in the export product with<br>1/3 [rd] recovery.<br>3. Quantity of import item at Sl. No. 6 may be allowed as 1.34Kgs/Kg content in the export product with<br>----- End of picture text -----<br>

15 | P a g e

1/3[rd] recovery.

  1. Quantity of import item at Sl. No. 7 may be allowed as 1.28Kgs/Kg content in the export product with 1/3[rd] recovery.

  2. Quantity of import item at Sl. No. 8 may be allowed as 1.39Kgs/Kg content in the export product with 1/3[rd] recovery.

  3. Quantity of import item at Sl. No. 9 may be allowed as 1.36Kgs/Kg content in the export product with 1/3[rd] recovery.

  4. Quantity of import item at Sl. No. 10 may be allowed as 1.40Kgs/Kg content in the export product with 1/3[rd] recovery.

  5. Quantity of import item at Sl. No. 11 may be allowed as per GN-4.

  6. Quantity of import item at Sl. No. 12 may be allowed as 1.59Kgs/Kg content in the export product with 1/3[rd] recovery.

Case No.:4/19/80-ALC2/2019 Party Name: CRYOGAS Meet No/Date:9/80- Status:
EQUIPMENT PVT LTD ALC2/2020 & 26.11.2020 Rejected
HQ File<br>:01/80/050/00269/AM20/ RLA File<br>:34/24/040/00287/AM20/ Lic.No/Date:3410045738<br>24.12.2019

54 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 24.07.2020 followed by reminders on 30.09.2020 & 11.11.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Vadodara .

Case No.:9/19/80-ALC2/2019 Party Name: BONATRANS Meet No/Date:9/80- Status:
INDIA PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00274/AM20/ RLA File<br>:03/94/040/00785/AM20/ Lic.No/Date:0310833747<br>27.12.2019 Pending<br>with firm

55

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 260] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/19/80-ALC2/2019 Party Name: TEGA Meet No/Date:9/80- Status:<br>INDUSTRIES LIMITED ALC2/2020 & 26.11.2020 Approved<br>HQ File RLA File Lic.No/Date:0210209647<br>:01/80/050/00273/AM20/ :02/24/040/00148/AM20/ 30.12.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the<br>recommendation of Consultant (Tech-1) & Consultant (SKB) as under:<br>ITCHS Export Quantity Sl. ITCHS Import Item Recommended<br>Code Item No. Code Norms<br>Hot Rolled Steel Plate<br>56 1.05Kgs/Kg content in<br>1 72254013 - Hardox 500/ JFE EH<br>Parts of the export product<br>500A<br>Mill Liner<br>1.05Kgs/Kg content in<br>for 2 40012200 Natural Rubber<br>84749000 800 MT the export product<br>Grinding<br>1.05Kgs/Kg content in<br>Mill 3 40022000 Synthetic Rubber PBR<br>the export product<br>1.05Kgs/Kg content in<br>4 28030010 Carbon Black<br>the export product<br>Note: The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

16 | P a g e

Case No.:10/19/80-ALC2/2019 Party Name: BANGALORE Meet No/Date:9/80- Status: BIOTECH LABS PVT. LTD. ALC2/2020 Approved 26.11.2020 HQ File RLA File Lic.No/Date:0710115950 :01/80/050/00275/AM20/ :07/24/040/00223/AM20/ 30.12.2019

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No. P-47011/61/2020-TSW dated 02.11.2020 as under: 57

  1. Quantity of import items at Sl. No. 1 to 97, 100 to 121, 135 to 145 and 157 to 227 may be allowed on net to net basis with accountability clause .

  2. Quantity of import item at Sl. No. 98, 99, 122 to 134 & 146 to 156 may be allowed on net to net content basis as claimed by the firm.

58

Case No.:11/19/80-ALC2/2019 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00276/AM20/ RLA File<br>:09/24/040/00489/AM20/ Lic.No/Date:0910068312<br>31.12.2019

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

59

Case No.:12/19/80-ALC2/2019 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00277/AM20/ RLA File<br>:09/24/040/00490/AM20/ Lic.No/Date:0910068313<br>31.12.2019

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

60

Case No.:13/19/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:9/80- Status:
CORPORATION PANSE ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00278/AM20/ RLA File<br>:31/83/040/00128/AM20/ Lic.No/Date:3110067645<br>31.12.2019 Pending<br>withTech-3

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-3) on 18.11.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (Tech-3) for expediting the comments.

Case is deferred.

17 | P a g e

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/19/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:9/80- Status:<br>ENGINEERING LIMITED ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0510413163<br>61 :01/80/050/00279/AM20/ :05/23/040/00381/AM20/ 01.01.2020<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to DHI for<br>examination & comments as per advice of Consultant (SKB).<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:17/19/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:9/80- Status:<br>ENGINEERING LIMITED ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0510413181<br>62 :01/80/050/00282/AM20/ :05/23/040/00378/AM20/ 02.01.2020<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to DHI for<br>examination & comments as per advice of Consultant (SKB).<br>Case is deferred.<br>----- End of picture text -----<br>

63

Case No.:1/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00295/AM20/ RLA File<br>:09/24/040/00522/AM20/ Lic.No/Date:0910068392<br>21.01.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

64

Case No.:2/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00296/AM20/ RLA File<br>:09/24/040/00523/AM20/ Lic.No/Date:0910068393<br>21.01.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:9/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0910068394<br>:01/80/050/00297/AM20/ :09/24/040/00524/AM20/ 21.01.2020<br>65<br>Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for”<br>appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case<br>before the Norms Committee in the forthcoming NC<br>Case is deferred.<br>----- End of picture text -----<br>

18 | P a g e

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:9/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0910068395<br>:01/80/050/00298/AM20/ :09/24/040/00528/AM20/ 21.01.2020<br>66<br>Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for”<br>appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case<br>before the Norms Committee in the forthcoming NC<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/21/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3410045799<br>:01/80/050/00301/AM20/ :34/24/040/00329/AM20/ 21.01.2020<br>67 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 09.03.2020 followed by reminders on 24.07.2020, 01.10.2020 & 12.11.2020.<br>Therefore, the Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/21/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3410045800<br>:01/80/050/00302/AM20/ :34/24/040/00330/AM20/ 21.01.2020<br>68 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 09.03.2020 followed by reminders on 24.07.2020, 01.10.2020 & 12.11.2020.<br>Therefore, the Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

Case No.:9/21/80-ALC2/2019 Party Name: MICRON Meet No/Date:9/80- Status:
INSTRUMENTS PVT. LTD. ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00303/AM20/ RLA File<br>:05/24/040/00398/AM20/ Lic.No/Date:0510413428<br>23.01.2020 Pending<br>with firm

69 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

19 | P a g e

Case No.:10/21/80-ALC2/2019 Party Name: THERMAL Meet No/Date:9/80- Status:
SYSTEMS (HYDERABAD) P. ALC2/2020 Rejected
LTD. 26.11.2020
HQ File<br>:01/80/050/00304/AM20/ RLA File<br>:09/24/040/00506/AM20/ Lic.No/Date:0910068410<br>24.01.2020

70 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 27.08.2020 followed by reminders on 01.10.2020 & 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/21/80-ALC2/2019 Party Name: KAY BOUVET Meet No/Date:9/80- Status:<br>ENGINEERING LTD. ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3110067666<br>:01/80/050/00306/AM20/ :31/83/040/00139/AM20/ 27.01.2020<br>71 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 09.03.2020 followed by reminders on 27.07.2020 & 01.10.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, Pune .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

Case No.:17/21/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:9/80- Status:
AUTOMOTIVES PVT. LTD. ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00311/AM20/ RLA File<br>:05/23/040/00359/AM20/ Lic.No/Date:0510413478<br>29.01.2020 Pending<br>with firm

72 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/21/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3410045830<br>:01/80/050/00312/AM20/ :34/24/040/00341/AM20/ 30.01.2020<br>73 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 09.03.2020 followed by reminders on 24.07.2020, 01.10.2020 & 12.11.2020.<br>Therefore, the Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

20 | P a g e

Case No.:19/21/80-ALC2/2019 Party Name: BENGAL Meet No/Date:9/80- Status:
INDUSTRIES PVT. LTD. ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00313/AM20/ RLA File<br>:05/23/040/00415/AM20/ Lic.No/Date:0510413481<br>30.01.2020 Pending<br>with firm

74 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/21/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3410045838<br>:01/80/050/00314/AM20/ :34/24/040/00344/AM20/ 30.01.2020<br>75 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 09.03.2020 followed by reminders on 24.07.2020, 01.10.2020 & 12.11.2020.<br>Therefore, the Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/21/80-ALC2/2019 Party Name: BHARAT HEAVY Meet No/Date:9/80- Status:<br>ELECTRICALS LIMITED ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:1110028681 Pending<br>:01/80/050/00315/AM20/ :11/24/040/00011/AM20/ 31.01.2020 with firm<br>76 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 11.11.2020. The firm vide email dated 24.11.2020 and<br>29.12.2020 has requested for more time to furnish the requisite information. However, no reply has been<br>received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information<br>within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:22/21/80-ALC2/2019 Party Name: JAIN IRRIGATION Meet No/Date:9/80- Status:<br>SYSTEMS LTD. ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0310834593<br>:01/80/050/00316/AM20/ :03/94/040/00435/AM20/ 03.02.2020<br>----- End of picture text -----<br>

77 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No. 23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting documents to the concerned NC within two months of making the application. However, the same has not been received despite email dated 09.03.2020 followed by reminders on 04.08.2020, 01.10.2020 & 12.11.2020. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai .

RA concerned may take suitable consequential action accordingly.

21 | P a g e

Case No.:23/21/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2019 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00317/AM20/ RLA File :09/24/040/00557/AM20/ Lic.No/Date:0910068441<br>03.02.2020

78 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:24/21/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2019 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00318/AM20/ RLA File :09/24/040/00559/AM20/ Lic.No/Date:0910068442<br>03.02.2020

79 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:25/21/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2019 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00319/AM20/ RLA File :09/24/040/00552/AM20/ Lic.No/Date:0910068443<br>03.02.2020

80 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:26/21/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2019 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00320/AM20/ RLA File :09/24/040/00554/AM20/ Lic.No/Date:0910068444<br>03.02.2020

81 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:27/21/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2019 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00321/AM20/ RLA File :09/24/040/00553/AM20/ Lic.No/Date:0910068445<br>03.02.2020

82 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

22 | P a g e

==> picture [476 x 108] intentionally omitted <==

----- Start of picture text -----<br> Case No.:31/21/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:9/80- Status:<br>LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310834668<br>:01/80/050/00325/AM20/ :03/95/040/01062/AM20/ 06.02.2020<br>83<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to DPIIT for<br>examination & comments as per advice of representative of MSME .<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/22/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:9/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 26.11.2020 Rejected<br>HQ File RLA File Lic.No/Date:3110067680<br>:01/80/050/00341/AM20/ :31/83/040/00145/AM20/ 11.02.2020<br>Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>84<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 09.03.2020 followed by reminders on 20.07.2020, 01.10.2020 & 12.11.2020.<br>Therefore, the Committee decided to reject the case under intimation to RA, Pune .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

Case No.:4/23/80-ALC2/2019 Party Name: RONCH Meet No/Date:9/80- Status:
POLYMERS PVT LTD ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00349/AM20/ RLA File<br>:03/95/040/01089/AM20/ Lic.No/Date:0310834951<br>20.02.2020

85

Decision: The Committee considered the case as per the agenda and noted that the firm was informed for furnishing the complete reply of deficiency letter dated 05.08.2020 on 15.10.2020. However, reply of the firm sent to Consultant (Tech-1) on 16.12.2020. Hence, the Committee decided to wait for comments.

Case is deferred.

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/23/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:9/80- Status:<br>AUTOMOTIVES LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510413679 Pending<br>:01/80/050/00348/AM20/ :05/23/040/00424/AM20/ 21.02.2020 with firm<br>86 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 12.11.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:6/23/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:9/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00351/AM20/ RLA File<br>:03/95/040/01074/AM20/ Lic.No/Date:0310835043<br>25.02.2020 Pending<br>with firm

87 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of DHI:

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.

  2. Weight of each Export Product.

  3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of

23 | P a g e

material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

  2. Sheet layout diagram of the material indicating the wastage during blanking.

  3. List of components, spares, consumables separately.

  4. Raw material weight & finished weight of casting & forgings proposed for import.

  5. List of spares if any.

  6. Information as per Appendix 4K & 4H.

Case is deferred.

Case No.:7/23/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:9/80- Status: BLADES INDIA PVT. LTD. ALC2/2020 Rejected 26.11.2020 HQ File RLA File Lic.No/Date:3410045913 :01/80/050/00352/AM20/ :34/24/040/00375/AM20/ 28.02.2020

  • 88 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No. 23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting documents to the concerned NC within two months of making the application. However, the same has not been received despite email dated 09.03.2020 followed by reminders on 24.07.2020, 30.09.2020 & 12.11.2020. Therefore, the Committee decided to reject the case under intimation to RA, Vadodara .

RA concerned may take suitable consequential action accordingly.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/23/80-ALC2/2019 Party Name: AZAD Meet No/Date:9/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0910068531<br>:01/80/050/00353/AM20/ :09/24/040/00595/AM20/ 02.03.2020<br>89<br>Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for”<br>appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case<br>before the Norms Committee in the forthcoming NC<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/23/80-ALC2/2019 Party Name: AZAD Meet No/Date:9/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0910068532<br>:01/80/050/00354/AM20/ :09/24/040/00594/AM20/ 02.03.2020<br>90<br>Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for”<br>appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case<br>before the Norms Committee in the forthcoming NC<br>Case is deferred.<br>----- End of picture text -----<br>

24 | P a g e

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/23/80-ALC2/2019 Party Name: ACEINOTEC Meet No/Date:9/80- Status:<br>MANUFACTURING PRIVATE ALC2/2020 Rejected<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0710116194<br>:01/80/050/00357/AM20/ :07/24/040/00294/AM20/ 02.03.2020<br>91 Decision: The Committee considered the case as per the agenda and noted that second deficiency letter seeking<br>certain information as raised by MSME was sent to the firm on 01.10.2020 followed by a reminder on<br>12.11.2020. The firm vide email dated 27.11.2020 has requested for 10 more days time to furnish the requisite<br>information. However, no reply has been received yet. Therefore, the Committee decided to reject the case<br>under intimation to RA, Bangalore .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 226] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/1/80- Party Name: AAVID Meet No/Date:9/80- Status: Approved<br>ALC2/2020 THERMALLOY INDIA PVT. LTD. ALC2/2020 & 26.11.2020<br>HQ File RLA File :34/24/040/00395/AM20/ Lic.No/Date:3410045959<br>:01/80/050/00377/AM20/ 18.03.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/148/2020-TSW dated 24.12.2020 as under:<br>ITCHS ITCHS<br>Export Item Quantity Import Item Recommended Norms<br>92 Code Code<br> Alluminium<br>Heatsink (Weight Aluminium Extrusion ( 22000 Number on net<br>2.430 Kg Each) Cut To Lenth (Size to net basis )<br>22000<br>84195090 Aavid Part No. 76169990 91*64 MM) (Weight 53900 Kgs as<br>Number<br>358455 Customer 2.450 Kg Each) Part 1.01Kgs/Kg content in<br>Part Number : 851- No: 363988 the export item<br>9793<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 129] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/1/80-ALC2/2020 Party Name: NEO STRUCTO Meet No/Date:9/80- Status:<br>CONSTRUCTION PVT. LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:5210043372 Pending<br>:01/80/050/00382/AM21/ :52/24/040/00083/AM20/ 04.04.2020 with firm<br>93 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 12.11.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/1/80-ALC2/2020 Party Name: UNI VTL Meet No/Date:9/80- Status:<br>PRECISION PVT. LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710116329<br>:01/80/050/00383/AM21/ :07/24/040/00002/AM21/ 07.04.2020<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>94<br>Consultant (Tech-3) on 10.11.2020 for examination of the case. However, Consultant (Tech-3) asked to send<br>physical file of the earlier approved AA No. 6510000027 dated 05.04.2019 in Meeting No. 23/80 dated<br>13.03.2020. Therefore, the Committee decided to send the same to Consultant (Tech-3) for examination of the<br>case.<br>Case is deferred.<br>----- End of picture text -----<br>

25 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/1/80-ALC2/2020 Party Name: AUTO TECH Meet No/Date:9/80- Status:<br>INDUSTRIES INDIA PVT LTD ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0410166662<br>:01/80/050/00384/AM21/ :04/24/040/00002/AM21/ 08.04.2020<br>95 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 24.07.2020 followed by a reminder on<br>01.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind again<br>the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:9/1/80-ALC2/2020 Party Name: NIPHA EXPORTS Meet No/Date:9/80- Status:
PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00385/AM21/ RLA File<br>:02/24/040/00199/AM20/ Lic.No/Date:0210209839<br>09.04.2020 Pending<br>with firm

96 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of MSME:

  1. To provide blade category-wise blank and final product weights with step-wise wastage.

Case is deferred.

Case No.:10/1/80-ALC2/2020 Party Name: TPI COMPOSITES Meet No/Date:9/80- Status:
INDIA PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00386/AM21/ RLA File<br>:04/24/040/00001/AM21/ Lic.No/Date:0410166666<br>13.04.2020 Pending<br>with firm

97 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/1/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File :09/24/040/00647/AM20/ Lic.No/Date:0910068616<br>:01/80/050/00389/AM21/ 17.04.2020<br>98<br>Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for”<br>appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case<br>before the Norms Committee in the forthcoming NC<br>Case is deferred.<br>----- End of picture text -----<br>

26 | P a g e

Case No.:14/1/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00390/AM21/ RLA File :09/24/040/00648/AM20/ Lic.No/Date:0910068617<br>17.04.2020

99 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:15/1/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00391/AM21/ RLA File :09/24/040/00649/AM20/ Lic.No/Date:0910068618<br>17.04.2020

100 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:16/1/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00392/AM21/ RLA File :09/24/040/00650/AM20/ Lic.No/Date:0910068619<br>17.04.2020

101 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:17/1/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00393/AM21/ RLA File :09/24/040/00651/AM20/ Lic.No/Date:0910068620<br>17.04.2020

102 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:18/1/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00394/AM21/ RLA File :09/24/040/00652/AM20/ Lic.No/Date:0910068621<br>17.04.2020

103 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

27 | P a g e

Case No.:19/1/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00395/AM21/ RLA File :09/24/040/00653/AM20/ Lic.No/Date:0910068622<br>17.04.2020

104 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:20/1/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00396/AM21/ RLA File :09/24/040/00654/AM20/ Lic.No/Date:0910068623<br>17.04.2020

105 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/1/80-ALC2/2020 Party Name: TPI COMPOSITES Meet No/Date:9/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0410166684 Pending<br>:01/80/050/00397/AM21/ :04/24/040/00003/AM21/ 22.04.2020 with firm<br>106 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (Tech-1) was sent to the firm on 12.11.2020. However, no reply<br>has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the<br>requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:22/1/80-ALC2/2020 Party Name: ACEINOTEC Meet No/Date:9/80- Status:
MANUFACTURING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00398/AM21/ RLA File<br>:07/24/040/00016/AM21/ Lic.No/Date:0710116365<br>23.04.2020 Pending<br>with firm

107 Decision: The Committee considered the case as per the agenda and noted that second deficiency letter seeking certain information as raised by MSME was sent to the firm on 01.10.2020 followed by a reminder on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

108

Case No.:23/1/80-ALC2/2020 Party Name: KINECO KAMAN Meet No/Date:9/80- Status:
COMPOSITES - INDIA PVT ALC2/2020 Deferred
LTD 26.11.2020
HQ File<br>:01/80/050/00399/AM21/ RLA File<br>:03/94/040/01087/AM20/ Lic.No/Date:0310835847<br>25.04.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of DPIIT vide U. O. No.: P-47011/193/2019-TSW dated 06.01.2021 :

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.

28 | P a g e

  1. Weight of each Export Product.

  2. Assembly drawings/diagrams of the resultant product showing placement and exact use of components in the export product (s).

  3. Bifurcated quantities of components to be accounted for in the resultant product and the requirement of components as spares. Raw Material / Consumables.

  4. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

  5. Details of import items at Sl. No. 13, 20, 22, 25 & 30 (as description has been indicated in codenumbers) and theirs specific use in the export items.

  6. Quantities of import items (Components, raw-materials, consumable-wise) to be accounted for in the export products.

  7. Basis/Justification for the quantities of import items.

Case is deferred.

Case No.:42/1/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 26.11.2020 HQ File RLA File Lic.No/Date:0910068678 :01/80/050/00418/AM21/ :09/24/040/00639/AM20/ 28.04.2020 109

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

110

Case No.:43/1/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00419/AM21/ RLA File<br>:09/24/040/00640/AM20/ Lic.No/Date:0910068679<br>28.04.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:49/1/80-ALC2/2020 Party Name: HUMANETICS Meet No/Date:9/80- Status:
INNOVATIVE SOLUTIONS ALC2/2020 Deferred
INDIA PRIVATE LIMI 26.11.2020
HQ File<br>:01/80/050/00425/AM21/ RLA File<br>:07/24/040/00001/AM21/ Lic.No/Date:0710116407<br>30.04.2020

111

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 01.10.2020 followed by a reminder on 19.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

29 | P a g e

==> picture [476 x 283] intentionally omitted <==

----- Start of picture text -----<br> Case No.:51/1/80-ALC2/2020 Party Name: TEGA Meet No/Date:9/80- Status:<br>INDUSTRIES LIMITED ALC2/2020 Approved<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0210209859<br>:01/80/050/00427/AM21/ :02/24/040/00005/AM21/ 06.05.2020<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the<br>recommendation of Consultant (Tech-1) & Consultant (SKB) as under:<br>ITCHS Export Quantity Sl. ITCHS Import Item Recommended<br>Code Item No. Code Norms<br>Hot Rolled Steel Plate -<br>112<br>Hardox 500 /Hardox550 1.05Kgs/Kg content<br>1 72254013<br>Parts of / JFE EH 500A in the export product<br>Mill Liner /DILLIDUR500<br>for 1.05Kgs/Kg content<br>84749000 800 MT 2 40012200 Natural Rubber<br>Grinding in the export product<br>Mill 1.05Kgs/Kg content<br>3 40022000 Synthetic Rubber PBR<br>in the export product<br>1.05Kgs/Kg content<br>4 28030010 Carbon Black<br>in the export product<br>Note: The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:52/1/80-ALC2/2020 Party Name: DEE Meet No/Date:9/80- Status:
DEVELOPMENT ENGINEERS ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00428/AM21/ RLA File<br>:05/23/040/00020/AM21/ Lic.No/Date:0510414127<br>08.05.2020 Pending<br>with firm

113

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:54/1/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3410046049<br>:01/80/050/00430/AM21/ :34/24/040/00021/AM21/ 11.05.2020<br>114 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 27.07.2020 followed by reminders on 30.09.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

30 | P a g e

Case No.:1/3/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00475/AM21/ RLA File :09/24/040/00132/AM21/ Lic.No/Date:0910068852<br>05.06.2020

115 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:2/3/80- Party Name: PRECISION Meet No/Date:9/80- Status: ALC2/2020 EQUIPMENTS (CHENNAI) PVT. ALC2/2020 Deferred LTD. 26.11.2020 HQ File RLA File :04/24/040/00036/AM21/ Lic.No/Date:0410166809 :01/80/050/00476/AM21/ 10.06.2020

116 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-3) on 14.12.2020 for examination of the case. However, Consultant (Tech-3) has requested to send hard copy of the firm’s reply to examine the case. Therefore, the Committee decided to send the same to Consultant (Tech-3) for examination of the case.

Case is deferred.

Case No.:3/3/80- Party Name: JOHNSON MATTHEY Meet No/Date:9/80- Status:
ALC2/2020 INDIA PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00477/AM21/ RLA File :05/23/040/00045/AM21/ Lic.No/Date:0510414366<br>10.06.2020 Pending with<br>firm

117 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020 followed by a reminder on 14.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application. Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/3/80-ALC2/2020 Party Name: AUTOFIT CAR Meet No/Date:9/80- Status:<br>INTERIORS PVT. LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:1010060538 Pending<br>:01/80/050/00478/AM21/ :10/24/040/00018/AM21/ 11.06.2020 with firm<br>118 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. To provide CAD drawing with wastage justification.<br>Case is deferred.<br>----- End of picture text -----<br>

119

Case No.:5/3/80-ALC2/2020 Party Name: AUTOCOMP Meet No/Date:9/80- Status:
CORPORATION PANSE ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00479/AM21/ RLA File<br>:31/83/040/00012/AM21/ Lic.No/Date:3110067753<br>11.06.2020 Pending<br>withTech-3

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 08.12.2020. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (Tech-3) for expediting the comments.

Case is deferred.

31 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/3/80-ALC2/2020 Party Name: ISGEC HEAVY Meet No/Date:9/80- Status:<br>ENGINEERING LIMITED ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0510414386<br>:01/80/050/00480/AM21/ :05/23/040/00047/AM21/ 12.06.2020<br>120 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 27.08.2020 followed by reminders on 30.09.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, New Delhi .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/3/80-ALC2/2020 Party Name: ISGEC HITACHI Meet No/Date:9/80- Status:<br>ZOSEN LIMITED ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0510414387<br>:01/80/050/00481/AM21/ :05/23/040/00049/AM21/ 12.06.2020<br>121 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 27.08.2020 followed by reminders on 30.09.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, New Delhi .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

Case No.:8/3/80-ALC2/2020 Party Name: CML BIOTECH Meet No/Date:9/80- Status:
PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00482/AM21/ RLA File<br>:10/24/040/00020/AM21/ Lic.No/Date:1010060548<br>15.06.2020 Pending<br>with firm

122 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

123

Case No.:9/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00483/AM21/ RLA File<br>:09/24/040/00135/AM21/ Lic.No/Date:0910068868<br>15.06.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

32 | P a g e

124

Case No.:10/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00484/AM21/ RLA File<br>:09/24/040/00134/AM21/ Lic.No/Date:0910068869<br>15.06.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

125

Case No.:11/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00485/AM21/ RLA File<br>:09/24/040/00136/AM21/ Lic.No/Date:0910068870<br>15.06.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

126

Case No.:12/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00486/AM21/ RLA File<br>:09/24/040/00133/AM21/ Lic.No/Date:0910068872<br>15.06.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/3/80-ALC2/2020 Party Name: ISGEC HEAVY Meet No/Date:9/80- Status:<br>ENGINEERING LIMITED ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0510414402<br>:01/80/050/00487/AM21/ :05/23/040/00055/AM21/ 15.06.2020<br>127 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 27.08.2020 followed by reminders on 30.09.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, New Delhi .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

33 | P a g e

Case No.:14/3/80-ALC2/2020 Party Name: AAVID Meet No/Date:9/80- Status: THERMALLOY INDIA PVT. ALC2/2020 Approved LTD. 26.11.2020 HQ File RLA File Lic.No/Date:3410046140 :01/80/050/00488/AM21/ :34/24/040/00058/AM21/ 15.06.2020

Case No.:14/3/80-ALC2/2020Party Name: AAVID<br>THERMALLOY INDIA PVT.<br>LTD.<br>Meet No/Date:9/80-<br>ALC2/2020<br>26.11.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00488/AM21/<br>RLA File<br>:34/24/040/00058/AM21/<br>Lic.No/Date:3410046140<br>15.06.2020 Case No.:14/3/80-ALC2/2020 Case No.:14/3/80-ALC2/2020 Party Name: AAVID<br>THERMALLOY INDIA PVT.<br>LTD. Party Name: AAVID<br>THERMALLOY INDIA PVT.<br>LTD. Party Name: AAVID<br>THERMALLOY INDIA PVT.<br>LTD. Party Name: AAVID<br>THERMALLOY INDIA PVT.<br>LTD. Meet No/Date:9/80-<br>ALC2/2020<br>26.11.2020 Status:<br>Approved
HQ File<br>:01/80/050/00488/AM21/ RLA File<br>:34/24/040/00058/AM21/ Lic.No/Date:3410046140<br>15.06.2020
128 Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/148/2020-TSW dated 24.12.2020 as under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended Norms<br>84195090<br>Alluminium Heatsink /<br>Heat Sink 450mm For<br>Gvm/ Gvx Power<br>Module (Weight 2.430<br>Kg Each) Aavid Part<br>No. 370202 Customer<br>Part Number : 851-<br>9793A)<br>36000<br>Number<br>76169990<br>Aluminium Extrusion<br>Cut To Lenth (Size<br>91*64 MM) (Weight<br>2.450 Kg Each) Part<br>No: 363988<br>(36000 Number on net<br>to net basis)<br>88200 Kgs as 1.01Kgs/Kg<br>content in the export item<br>RA concerned maytake further necessaryaction asper the decision of NC.
ITCHS<br>Code Export Item Quantity ITCHS<br>Code Import Item
84195090 Alluminium Heatsink /<br>Heat Sink 450mm For<br>Gvm/ Gvx Power<br>Module (Weight 2.430<br>Kg Each) Aavid Part<br>No. 370202 Customer<br>Part Number : 851-<br>9793A) 36000<br>Number 76169990 Aluminium Extrusion<br>Cut To Lenth (Size<br>91*64 MM) (Weight<br>2.450 Kg Each) Part<br>No: 363988
RA concerned maytake further necessaryaction asper the decision of NC.

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/148/2020-TSW dated 24.12.2020 as under:

==> picture [476 x 237] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/3/80-ALC2/2020 Party Name: AAVID Meet No/Date:9/80- Status:<br>THERMALLOY INDIA PVT. ALC2/2020 Approved<br>LTD. 26.11.2020<br>HQ File RLA File Lic.No/Date:3410046141<br>:01/80/050/00489/AM21/ :34/24/040/00059/AM21/ 15.06.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/148/2020-TSW dated 24.12.2020 as under:<br>ITCHS ITCHS<br>129 Export Item Quantity Import Item Recommended Norms<br>Code Code<br>Alluminium Heatsink /<br>Heat Sink 450mm For<br>Aluminium Extrusion<br>Gvm/ Gvx Power ( 18000 Number on net to<br>Cut To Lenth (Size<br>Module (Weight 2.430 18000 net basis )<br>84195090 76169990 91*64 MM) (Weight<br>Kg Each) AAVID Number 44100 Kgs as 1.01Kgs/Kg<br>2.450 Kg Each) Part<br>PART NO. 370202 content in the export item<br>No: 363988<br>Customer Part Number<br>: 851-9793A)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:16/3/80-ALC2/2020 Party Name: DEE Meet No/Date:9/80- Status:
DEVELOPMENT ENGINEERS ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00490/AM21/ RLA File<br>:05/23/040/00051/AM21/ Lic.No/Date:0510414434<br>19.06.2020 Pending<br>with firm

130 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

34 | P a g e

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:17/3/80-ALC2/2020 Party Name: SULZER INDIA Meet No/Date:9/80- Status:<br>PRIVATE LIMITED ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3110067766<br>:01/80/050/00491/AM21/ :31/83/040/00019/AM21/ 22.06.2020<br>131 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 27.08.2020 followed by reminders on 01.10.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, Pune .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

132

Case No.:18/3/80-ALC2/2020 Party Name: L&T-MHPS Meet No/Date:9/80- Status:
BOILERS PVT. LTD. ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00492/AM21/ RLA File<br>:03/95/040/00161/AM21/ Lic.No/Date:0310836794<br>22.06.2020

Decision: The Committee considered the case as per the agenda and noted that incomplete application has been received from the firm. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 211] intentionally omitted <==

----- Start of picture text -----<br> Case No.:22/3/80-ALC2/2020 Party Name: BONATRANS Meet No/Date:9/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0310836946 Pending<br>:01/80/050/00496/AM21/ :03/94/040/00207/AM21/ 30.06.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of DHI:<br>133<br>1. Manufacturing process/activity.<br>2. Wight of each export product and each imported input.<br>3. Starting from the specification of the export product, basic calculation as to how of raw material proposed<br>for import has been arrived at, including the net weight of components to be manufactured out of these<br>imported materials, wastages claimed at each stage of manufacturing with complete justification and<br>supported by documentary evidence/drawings etc.<br>4. Information as per Appendix 4K & 4H.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:26/3/80-ALC2/2020 Party Name: THE ANUP Meet No/Date:9/80- Status:
ENGINEERING LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00500/AM21/ RLA File<br>:08/24/040/00076/AM21/ Lic.No/Date:0810148023<br>30.06.2020 Pending<br>with firm

134 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

35 | P a g e

Case No.:28/3/80-ALC2/2020 Party Name: ONASSIS AUTO Meet No/Date:9/80- Status:
LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00502/AM21/ RLA File<br>:05/24/040/00152/AM21/ Lic.No/Date:0510414546<br>03.07.2020 Pending<br>with firm

135

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:29/3/80-ALC2/2020 Party Name: MASU BRAKE Meet No/Date:9/80- Status:
PADS PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00503/AM21/ RLA File<br>:05/24/040/00156/AM21/ Lic.No/Date:0510414554<br>03.07.2020 Pending<br>with firm

136 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:30/3/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3410046197<br>:01/80/050/00504/AM21/ :34/24/040/00077/AM21/ 07.07.2020<br>137 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 28.09.2020 followed by reminders on 16.10.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

138

Case No.:36/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00510/AM21/ RLA File<br>:09/24/040/00190/AM21/ Lic.No/Date:0910068933<br>07.07.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

36 | P a g e

Case No.:37/3/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00511/AM21/ RLA File :09/24/040/00194/AM21/ Lic.No/Date:0910068934<br>07.07.2020

139 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:38/3/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00512/AM21/ RLA File :09/24/040/00193/AM21/ Lic.No/Date:0910068935<br>07.07.2020

140 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:39/3/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00513/AM21/ RLA File :09/24/040/00195/AM21/ Lic.No/Date:0910068936<br>07.07.2020

141 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:40/3/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00514/AM21/ RLA File :09/24/040/00187/AM21/ Lic.No/Date:0910068937<br>07.07.2020

142 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:41/3/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00515/AM21/ RLA File :09/24/040/00188/AM21/ Lic.No/Date:0910068938<br>07.07.2020

143 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

37 | P a g e

Case No.:42/3/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00516/AM21/ RLA File :09/24/040/00192/AM21/ Lic.No/Date:0910068939<br>07.07.2020

144 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:43/3/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00517/AM21/ RLA File :09/24/040/00189/AM21/ Lic.No/Date:0910068940<br>07.07.2020

145 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:44/3/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00518/AM21/ RLA File :09/24/040/00191/AM21/ Lic.No/Date:0910068941<br>07.07.2020

146 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

==> picture [476 x 132] intentionally omitted <==

----- Start of picture text -----<br> Case No.:31/3/80- Party Name: ENDURANCE Meet No/Date:9/80- Status:<br>ALC2/2020 TECHNOLOGIES LIMITED ALC2/2020 & 26.11.2020 Approved<br>HQ File RLA File :03/94/040/00237/AM21/ Lic.No/Date:0310837075<br>:01/80/050/00505/AM21/ 08.07.2020<br>147 Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>1. Quantity of import items may be allowed as per GN-4 .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 129] intentionally omitted <==

----- Start of picture text -----<br> Case No.:32/3/80- Party Name: SUPER CIRCLE AUTO Meet No/Date:9/80- Status:<br>ALC2/2020 LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File :05/24/040/00148/AM21/ Lic.No/Date:0510414590 Pending with<br>:01/80/050/00506/AM21/ 08.07.2020 firm<br>148 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (Tech-1) was sent to the firm on 12.11.2020. However, no reply<br>has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the<br>requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

38 | P a g e

Case No.:33/3/80-ALC2/2020 Party Name: L & T-MHPS Meet No/Date:9/80- Status: TURBINE GENERATORS ALC2/2020 Deferred PRIVATE LIMITED 26.11.2020 HQ File RLA File Lic.No/Date:0310837100 :01/80/050/00507/AM21/ :03/95/040/00220/AM21/ 09.07.2020 149

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 14.12.2020 for examination of the case.. Therefore, the Committee decided to wait for DHI’s comments .

Case is deferred.

150

Case No.:34/3/80-ALC2/2020 Party Name: L & T-MHPS Meet No/Date:9/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00508/AM21/ RLA File<br>:03/95/040/00219/AM21/ Lic.No/Date:0310837101<br>09.07.2020

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 14.12.2020 for examination of the case. Therefore, the Committee decided to wait for DHI’s comments.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:35/3/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3410046199<br>:01/80/050/00509/AM21/ :34/24/040/00076/AM21/ 09.07.2020<br>151 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 28.09.2020 followed by reminders on 16.10.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

==> picture [476 x 222] intentionally omitted <==

----- Start of picture text -----<br> Case No.:45/3/80-ALC2/2020 Party Name: PENGUIN Meet No/Date:9/80- Status:<br>PETROLEUM SERVICES PVT. ALC2/2020 Deferred<br>LTD. 26.11.2020<br>HQ File RLA File Lic.No/Date:0310837144 Pending<br>:01/80/050/00519/AM21/ :03/95/040/00147/AM21/ 13.07.2020 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of Consultant (Tech-3) :<br>152 1. Model number, technical specification and specific quantity-both in terms of number (if any) and/or<br>weight, of each export product (Appendix-33 of current HBP refers).<br>2. Detail technical note on manufacturing process including the relevant flow sheet.<br>3. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>4. Weight of each Export Product.<br>5. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>----- End of picture text -----<br>

39 | P a g e

any, may also be indicated.

  1. Use of export product.

  2. Copy of export order.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:46/3/80-ALC2/2020 Party Name: SULZER PUMPS Meet No/Date:9/80- Status:<br>INDIA LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310837170 Pending<br>:01/80/050/00520/AM21/ :03/89/040/00069/AM21/ 14.07.2020 with firm<br>153 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 30.08.2020 followed by a reminder on<br>01.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind<br>again the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:47/3/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 & 26.11.2020 Rejected<br>HQ File RLA File Lic.No/Date:3410046223<br>:01/80/050/00521/AM21/ :34/24/040/00092/AM21/ 17.07.2020<br>Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>154<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 28.09.2020 followed by reminders on 16.10.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:49/3/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 & 26.11.2020 Rejected<br>HQ File RLA File Lic.No/Date:3410046224<br>:01/80/050/00523/AM21/ :34/24/040/00093/AM21/ 17.07.2020<br>Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>155<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 28.09.2020 followed by reminders on 16.10.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:50/3/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3410046225<br>:01/80/050/00524/AM21/ :34/24/040/00094/AM21/ 17.07.2020<br>156 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 28.09.2020 followed by reminders on 16.10.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

40 | P a g e

Case No.:48/3/80-ALC2/2020 Party Name: THE ANUP Meet No/Date:9/80- Status:
ENGINEERING LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00522/AM21/ RLA File<br>:08/24/040/00094/AM21/ Lic.No/Date:0810148164<br>20.07.2020 Pending<br>with firm

157

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days. Case is deferred.

158

Case No.:51/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00525/AM21/ RLA File<br>:09/24/040/00217/AM21/ Lic.No/Date:0910068972<br>20.07.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

159

Case No.:52/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00526/AM21/ RLA File<br>:09/24/040/00216/AM21/ Lic.No/Date:0910068973<br>20.07.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

160

Case No.:53/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00527/AM21/ RLA File<br>:09/24/040/00215/AM21/ Lic.No/Date:0910068974<br>20.07.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

161

Case No.:54/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00528/AM21/ RLA File<br>:09/24/040/00214/AM21/ Lic.No/Date:0910068975<br>20.07.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

41 | P a g e

162

Case No.:55/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00529/AM21/ RLA File<br>:09/24/040/00213/AM21/ Lic.No/Date:0910068976<br>20.07.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

163

Case No.:56/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00530/AM21/ RLA File<br>:09/24/040/00212/AM21/ Lic.No/Date:0910068977<br>20.07.2020

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

==> picture [476 x 317] intentionally omitted <==

----- Start of picture text -----<br> Case No.:57/3/80-ALC2/2020 Party Name: TEGA Meet No/Date:9/80- Status:<br>INDUSTRIES LIMITED ALC2/2020 Approved<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0210209990<br>:01/80/050/00531/AM21/ :02/24/040/00045/AM21/ 21.07.2020<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the<br>recommendation of Consultant (Tech-1) & Consultant (SKB) as under:<br>ITCHS Export Quantity Sl. ITCHS Import Item Recommended<br>Code Item No. Code Norms<br>Hot Rolled Steel Plate -<br>1.05Kgs/Kg<br>Hardox 500 /Hardox550/<br>1 72254013 content in the<br>164 JFE EH 500A<br>export product<br>/DILLIDUR500<br>Parts of<br>1.05Kgs/Kg<br>Mill Liner<br>2 40012200 Natural Rubber content in the<br>for<br>84749000 800 MT export product<br>Grinding<br>1.05Kgs/Kg<br>Mill<br>3 40022000 Synthetic Rubber PBR content in the<br>export product<br>1.05Kgs/Kg<br>4 28030010 Carbon Black content in the<br>export product<br>Note: The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

42 | P a g e

Case No.:58/3/80-ALC2/2020 Party Name: MICRON Meet No/Date:9/80- Status:
INSTRUMENTS PVT LTD ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00532/AM21/ RLA File<br>:05/24/040/00186/AM21/ Lic.No/Date:0510414670<br>21.07.2020 Pending<br>with firm

165 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:59/3/80-ALC2/2020 Party Name: MICRON Meet No/Date:9/80- Status:
INSTRUMENTS PVT LTD ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00533/AM21/ RLA File<br>:05/24/040/00181/AM21/ Lic.No/Date:0510414671<br>21.07.2020 Pending<br>with firm

166 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

167

Case No.:60/3/80-ALC2/2020 Party Name: GOLD MOHUR Meet No/Date:9/80- Status:
PROFILES LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00534/AM21/ RLA File<br>:05/23/040/00083/AM21/ Lic.No/Date:0510414672<br>21.07.2020 Pending<br>withTech-1

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-1) on 04.01.2021 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:63/3/80-ALC2/2020 Party Name: I-TECH PLAST Meet No/Date:9/80- Status:
INDIA PVT. LTD. (EOU) ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00537/AM21/ RLA File<br>:03/94/040/00256/AM21/ Lic.No/Date:0310837308<br>22.07.2020 Pending<br>with firm

168 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

43 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:64/3/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020 Rejected<br>26.11.2020<br>HQ File RLA File Lic.No/Date:3410046237<br>:01/80/050/00538/AM21/ :34/24/040/00095/AM21/ 22.07.2020<br>169 Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No.<br>23/2015-20 dated 15.05.2019 , the applicant was liable to forward the copy of application along with supporting<br>documents to the concerned NC within two months of making the application. However, the same has not been<br>received despite email dated 28.09.2020 followed by reminders on 16.10.2020 & 12.11.2020. Therefore, the<br>Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take suitable consequential action accordingly.<br>----- End of picture text -----<br>

Case No.:3/5/80-ALC2/2020 Party Name: DANIEL Meet No/Date:9/80- Status:
MEASUREMENT SOLUTIONS ALC2/2020 Deferred
P LTD 26.11.2020
HQ File<br>:01/80/050/00553/AM21/ RLA File<br>:34/24/040/00117/AM21/ Lic.No/Date:3410046279<br>11.08.2020 Pending<br>with firm

170 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 14.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:4/5/80-ALC2/2020 Party Name: S K INDUSTRIES Meet No/Date:9/80- Status:
ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00554/AM21/ RLA File<br>:34/24/040/00115/AM21/ Lic.No/Date:3410046283<br>11.08.2020 Pending<br>with firm

171 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 12.11.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

172

Case No.:6/5/80-ALC2/2020 Party Name: AUTOCOMP Meet No/Date:9/80- Status:
CORPORATION PANSE ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00556/AM21/ RLA File<br>:31/83/040/00043/AM21/ Lic.No/Date:3110067819<br>13.08.2020 Pending<br>withTech-3

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 08.12.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (Tech-3) for expending the comments.

Case is deferred.

44 | P a g e

Case No.:1/7/80-ALC2/2020 Party Name: AUTOCOMP Meet No/Date:9/80- Status:
CORPORATION PANSE ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00612/AM21/ RLA File<br>:31/83/040/00042/AM21/ Lic.No/Date:3110067818<br>13.08.2020 Pending<br>with firm

173 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 12.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/5/80- Party Name: TAIKISHA Meet No/Date:9/80- Status:<br>ALC2/2020 ENGINEERING INDIA PVT. LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File :03/95/040/00275/AM21/ Lic.No/Date:0310837658 Pending with<br>:01/80/050/00555/AM21/ 14.08.2020 firm<br>174 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking<br>certain information as raised by MSME was sent to the firm on 12.11.2020. However, no reply has been<br>received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite<br>information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:11/5/80-ALC2/2020 Party Name: VERTICE Meet No/Date:9/80- Status:
GLOBAL PVT LTD. ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00561/AM21/ RLA File<br>:09/24/040/00248/AM21/ Lic.No/Date:0910069043<br>14.08.2020 Pending<br>withDPIIT

175 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 07.01.2021 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:7/5/80-ALC2/2020 Party Name: MICRON Meet No/Date:9/80- Status:
INSTRUMENTS PVT LTD ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00557/AM21/ RLA File<br>:05/24/040/00226/AM21/ Lic.No/Date:0510414900<br>17.08.2020 Pending<br>withDPIIT

176 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 16.10.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expending the comments.

Case is deferred.

177

Case No.:8/5/80-ALC2/2020 Party Name: MICRON Meet No/Date:9/80- Status:
INSTRUMENTS PVT LTD ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00558/AM21/ RLA File<br>:05/24/040/00227/AM21/ Lic.No/Date:0510414902<br>17.08.2020 Pending<br>withDPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 16.10.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expending the comments.

Case is deferred.

45 | P a g e

Case No.:9/5/80-ALC2/2020 Party Name: RADISH Meet No/Date:9/80- Status:
TECHNOLOGIES ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00559/AM21/ RLA File<br>:06/24/040/00031/AM21/ Lic.No/Date:0610039581<br>18.08.2020 Pending<br>with firm

178 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 16.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:10/5/80-ALC2/2020 Party Name: MAGNA Meet No/Date:9/80- Status:
AUTOMOTIVE INDIA ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00560/AM21/ RLA File<br>:04/24/040/00066/AM21/ Lic.No/Date:0410166966<br>19.08.2020 Pending<br>with firm

179 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 30.09.2020 reminder sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:12/5/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:
BLADES INDIA PVT. LTD. ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00562/AM21/ RLA File<br>:34/24/040/00128/AM21/ Lic.No/Date:3410046299<br>19.08.2020 Pending<br>with firm

180 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 16.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:13/5/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:
BLADES INDIA PVT. LTD ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00563/AM21/ RLA File<br>:34/24/040/00129/AM21/ Lic.No/Date:3410046300<br>19.08.2020 Pending<br>with firm

181 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 16.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

46 | P a g e

Case No.:14/5/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:
BLADES INDIA PVT. LTD ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00564/AM21/ RLA File<br>:34/24/040/00131/AM21/ Lic.No/Date:3410046301<br>19.08.2020 Pending<br>with firm

182

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 16.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:15/5/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:
BLADES INDIA PVT. LTD ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00565/AM21/ RLA File<br>:34/24/040/00130/AM21/ Lic.No/Date:3410046302<br>19.08.2020 Pending<br>with firm

183 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 16.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

184

Case No.:16/5/80-ALC2/2020 Party Name: APAR Meet No/Date:9/80- Status:
INDUSTRIES LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00566/AM21/ RLA File<br>:03/94/040/00279/AM21/ Lic.No/Date:0310837819<br>20.08.2020 Pending<br>withMeitY

Decision: The Committee considered the case as per the agenda and noted that the firm has sent reply of deficiency letter to MeitY directly on 12.12.2020 to examine the case. However, no comments have been received yet. Therefore, the Committee decided to remind MeitY for expediting the comments.

Case is deferred.

==> picture [476 x 234] intentionally omitted <==

----- Start of picture text -----<br> Case No.:17/5/80-ALC2/2020 Party Name: FITWEL GASKET Meet No/Date:9/80- Status:<br>COMPANY (INDIA) PRIVATE ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:3110067828 Pending<br>:01/80/050/00567/AM21/ :31/83/040/00050/AM21/ 20.08.2020 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of Consultant (Tech-3) :<br>1. Generic name of item 4 of import & its specific use in export product.<br>185<br>2. Details of wastage claimed.<br>3. Weight of each Export Product.<br>4. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>5. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>----- End of picture text -----<br>

47 | P a g e

justification and supported by documentary evidence/drawings etc.

  1. Sheet layout diagram of the material indicating the wastage during blanking.

  2. Use of export product.

  3. Copy of Advance Authorization.

  4. Copy of export order.

  5. Description of export product at Sl. No. 1 & 2 is same, hence, differentiate with Model No. or specifications.

Case is deferred.

Case No.:18/5/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status: BLADES INDIA PVT. LTD ALC2/2020 & 26.11.2020 Deferred HQ File RLA File Lic.No/Date:3410046308 Pending :01/80/050/00568/AM21/ :34/24/040/00134/AM21/ 20.08.2020 with firm

186 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 16.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:19/5/80-ALC2/2020 Party Name: NUCON AMETRA Meet No/Date:9/80- Status: ELECTRONICS SYSTEMS ALC2/2020 Deferred PRIVATE LIMITED 26.11.2020 HQ File RLA File Lic.No/Date:0910069073 Pending :01/80/050/00569/AM21/ :09/24/040/00251/AM21/ 20.08.2020 with firm

187 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 14.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/5/80- Party Name: DEE DEVELOPMENT Meet No/Date:9/80- Status:<br>ALC2/2020 ENGINEERS LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File :05/23/040/00134/AM21/ Lic.No/Date:0510414969 Pending with<br>:01/80/050/00570/AM21/ 21.08.2020 firm<br>188 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 14.10.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/5/80- Party Name: AAVID Meet No/Date:9/80- Status:<br>ALC2/2020 THERMALLOY INDIA PVT. LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File :34/24/040/00136/AM21/ Lic.No/Date:3410046312 Pending with<br>:01/80/050/00571/AM21/ 24.08.2020 firm<br>189 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 15.10.2020 followed by a reminder on<br>12.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind<br>again the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

48 | P a g e

Case No.:22/5/80-ALC2/2020 Party Name: ADITYA AUTO Meet No/Date:9/80- Status:
COMPONENTS ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00572/AM21/ RLA File<br>:07/24/040/00141/AM21/ Lic.No/Date:0710116924<br>24.08.2020 Pending<br>with firm

190 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 15.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:24/5/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:
BLADES INDIA PVT. LTD ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00574/AM21/ RLA File<br>:34/24/040/00139/AM21/ Lic.No/Date:3410046323<br>25.08.2020 Pending<br>with firm

191 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 16.10.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 303] intentionally omitted <==

----- Start of picture text -----<br> Case No.:25/5/80-ALC2/2020 Party Name: NEO STRUCTO Meet No/Date:9/80- Status:<br>CONSTRUCTION PVT. LTD. ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:5210043502 Pending with<br>:01/80/050/00575/AM21/ :52/24/040/00036/AM21/ 25.08.2020 firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of Consultant (Tech-3) :<br>1. Model number, technical specification and specific quantity-both in terms of number (if any) and/or<br>weight, of each export product (Appendix-33 of current HBP refers).<br>2. Detail technical note on manufacturing process including the relevant flow sheet.<br>3. Weight of each Export Product.<br>192<br>4. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>5. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>6. Use of export product.<br>7. Specific use of each item of import in export product.<br>Case is deferred.<br>----- End of picture text -----<br>

49 | P a g e

Case No.:2/7/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00613/AM21/ RLA File :09/24/040/00299/AM21/ Lic.No/Date:0910069174<br>14.09.2020 Pending with<br>firm

193 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/7/80-ALC2/2020 Party Name: AVLIGHT Meet No/Date:9/80- Status:<br>AUTOMOTIVES PVT. LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510415224 Pending<br>:01/80/050/00614/AM21/ :05/23/040/00177/AM21/ 15.09.2020 with firm<br>194 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 12.11.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:4/7/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00615/AM21/ RLA File :09/24/040/00327/AM21/ Lic.No/Date:0910069183<br>15.09.2020 Pending with<br>firm

195 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

==> picture [476 x 247] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/7/80-ALC2/2020 Party Name: TEGA Meet No/Date:9/80- Status:<br>INDUSTRIES LIMITED ALC2/2020 & 26.11.2020 Approved<br>HQ File RLA File Lic.No/Date:0210210109<br>:01/80/050/00616/AM21/ :02/24/040/00076/AM21/ 16.09.2020<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the<br>recommendation of Consultant (Tech-1) & Consultant (SKB) as under:<br>ITCHS Export Item Quantity Sl. ITCHS Import Item Recommended<br>Code No. Code Norms<br>Hot Rolled Steel Plate -<br>196 1.05Kgs/Kg content<br>1 72254013 Hardox 500 /Hardox550/ JFE<br>in the export product<br>Parts of Mill EH 500A /DILLIDUR500<br>Liner for 1.05Kgs/Kg content<br>2 40012200 Natural Rubber<br>84749000 Grinding 800 MT in the export product<br>Mill 1.05Kgs/Kg content<br>3 40022000 Synthetic Rubber PBR<br>in the export product<br>1.05Kgs/Kg content<br>4 28030010 Carbon Black<br>in the export product<br>Note: The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

50 | P a g e

==> picture [476 x 247] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/7/80-ALC2/2020 Party Name: TEGA Meet No/Date:9/80- Status:<br>INDUSTRIES LIMITED ALC2/2020 & 26.11.2020 Approved<br>HQ File RLA File Lic.No/Date:0210210110<br>:01/80/050/00617/AM21/ :02/24/040/00077/AM21/ 16.09.2020<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the<br>recommendation of Consultant (Tech-1) & Consultant (SKB) as under:<br>ITCHS Export Item Quantity Sl. ITCHS Import Item Recommended<br>Code No. Code Norms<br>Hot Rolled Steel Plate -<br>197 1.05Kgs/Kg content<br>1 72254013 Hardox 500 /Hardox550/ JFE<br>in the export product<br>Parts of Mill EH 500A /DILLIDUR500 -<br>Liner for 1.05Kgs/Kg content<br>2 40012200 Natural Rubber<br>84749000 Grinding 800 MT in the export product<br>Mill 1.05Kgs/Kg content<br>3 40022000 Synthetic Rubber PBR<br>in the export product<br>1.05Kgs/Kg content<br>4 28030010 Carbon Black<br>in the export product<br>Note: The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:7/7/80-ALC2/2020 Party Name: MASU BRAKE Meet No/Date:9/80- Status:
PADS PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00618/AM21/ RLA File<br>:05/24/040/00289/AM21/ Lic.No/Date:0510415237<br>17.09.2020 Pending<br>with firm

198

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 12.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:8/7/80-ALC2/2020 Party Name: VICTORA AUTO Meet No/Date:9/80- Status: PVT. LTD. ALC2/2020 Approved 26.11.2020 HQ File RLA File Lic.No/Date:0510415243 :01/80/050/00619/AM21/ :05/24/040/00290/AM21/ 17.09.2020

Case No.:8/7/80-ALC2/2020<br>Party Name: VICTORA AUTO<br>PVT. LTD.<br>Meet No/Date:9/80-<br>ALC2/2020<br>26.11.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00619/AM21/<br>RLA File<br>:05/24/040/00290/AM21/<br>Lic.No/Date:0510415243<br>17.09.2020 Case No.:8/7/80-ALC2/2020 Case No.:8/7/80-ALC2/2020 Case No.:8/7/80-ALC2/2020 Party Name: VICTORA AUTO<br>PVT. LTD. Party Name: VICTORA AUTO<br>PVT. LTD. Party Name: VICTORA AUTO<br>PVT. LTD. Party Name: VICTORA AUTO<br>PVT. LTD. Meet No/Date:9/80-<br>ALC2/2020<br>26.11.2020 Meet No/Date:9/80-<br>ALC2/2020<br>26.11.2020 Meet No/Date:9/80-<br>ALC2/2020<br>26.11.2020 Status:<br>Approved
HQ File<br>:01/80/050/00619/AM21/ RLA File<br>:05/24/040/00290/AM21/ Lic.No/Date:0510415243<br>17.09.2020
199 Decision:The Committee considered the c<br>written comments ofMSMEas under:<br>Sl.<br>No.<br>ITCHS<br>Code<br>Export Item<br>1<br>87089200<br>Silencers (mufflers) and<br>exhaust pipes; parts<br>thereof-Part Name:<br>Bracket ASSY Part No.:<br>82430270 / 82430265<br>(18621 KGS = 310345<br>Nos.)<br>2<br>87089200<br>Silencers (mufflers) and<br>exhaust pipes; parts<br>thereof-Part Name:<br>Bracket ASSY Part No.:<br>82430697 (12600 KGS<br>= 360000 Nos.) ase as per agenda and decided toratifythe ad-hoc norms as per<br>Quantity<br>Sl.<br>No.<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>310345<br>Number<br>1<br>72193310<br>Cold Rolled<br>Stainless Steel<br>Coils Grade ISS<br>439TI1/ S43932<br>2B 1.2X1250<br>MM<br>40398 Kgs<br>inclusive of<br>wastage<br>@<br>30% for Export<br>item no. 1<br>28.5% for export<br>item no. 2.<br>360000<br>Number
ITCHS<br>Code Export Item Quantity Sl.<br>No. ITCHS<br>Code Import Item Recommended<br>Norms
87089200 Silencers (mufflers) and<br>exhaust pipes; parts<br>thereof-Part Name:<br>Bracket ASSY Part No.:<br>82430270 / 82430265<br>(18621 KGS = 310345<br>Nos.) 310345<br>Number 1 72193310 Cold Rolled<br>Stainless Steel<br>Coils Grade ISS<br>439TI1/ S43932<br>2B 1.2X1250<br>MM 40398 Kgs<br>inclusive of<br>wastage<br>@<br>30% for Export<br>item no. 1<br>28.5% for export<br>item no. 2.
87089200 Silencers (mufflers) and<br>exhaust pipes; parts<br>thereof-Part Name:<br>Bracket ASSY Part No.:<br>82430697 (12600 KGS<br>= 360000 Nos.) 360000<br>Number

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:

51 | P a g e

3<br>87089200<br>Silencers (mufflers) and<br>exhaust pipes; parts<br>thereof-Part Name:<br>Bracket ASSY<br>Part No. 82495326 /<br>82449832 / 82431748 /<br>82478508 (31603 KGS<br>= 343511 Nos.)<br>343511<br>Number<br>2<br>72193310<br>Cold Rolled<br>Stainless Steel<br>Coils Grade ISS<br>439TI1/ S43932<br>2B 2.0X1250<br>MM<br>40538 Kgs<br>inclusive of<br>28.27% wastage<br>after affecting<br>1/3rdrecovery<br>from scarp<br>Note: The firm should import relevant import items only.<br>RA concerned maytake further necessaryaction asper the decision of NC.

Note: The firm should import relevant import items only.

==> picture [476 x 287] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/7/80-ALC2/2020 Party Name: MOC SHIPYARDS Meet No/Date:9/80- Status:<br>PRIVATE LIMITED ALC2/2020 Deferred<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0310838353 Pending with<br>:01/80/050/00620/AM21/ :03/95/040/00367/AM21/ 18.09.2020 firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Weight of each Export Product.<br>200<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete justification<br>and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/7/80-ALC2/2020 Party Name: MOC SHIPYARDS Meet No/Date:9/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310838354 Pending<br>:01/80/050/00621/AM21/ :03/95/040/00370/AM21/ 18.09.2020 with firm<br>201 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 12.11.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

202

Case No.:11/7/80-ALC2/2020 Party Name: PERMANENT Meet No/Date:9/80- Status:
MAGNETS LIMITED ALC2/2020 & 26.11.2020 Approved
HQ File<br>:01/80/050/00622/AM21/ RLA File<br>:03/95/040/00375/AM21/ Lic.No/Date:0310838373<br>18.09.2020

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No. P-47011/140/2020-TSW dated 07.01.2021. (Copy enclosed)

52 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/7/80-ALC2/2020 Party Name: AVLIGHT Meet No/Date:9/80- Status:<br>AUTOMOTIVES PVT. LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510415251 Pending<br>:01/80/050/00623/AM21/ :05/23/040/00166/AM21/ 18.09.2020 with firm<br>203 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 12.11.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/7/80-ALC2/2020 Party Name: SPARECO INDIA Meet No/Date:9/80- Status:<br>ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510415264 Pending<br>:01/80/050/00624/AM21/ :05/24/040/00271/AM21/ 18.09.2020 with firm<br>204 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 12.11.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:14/7/80-ALC2/2020 Party Name: ARIHANT Meet No/Date:9/80- Status:
INDUSTRIES ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00625/AM21/ RLA File<br>:33/24/040/00012/AM21/ Lic.No/Date:3310030743<br>18.09.2020 Pending<br>with firm

205

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 12.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 258] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/7/80-ALC2/2020 Party Name: TEGA Meet No/Date:9/80- Status:<br>INDUSTRIES LIMITED ALC2/2020 & 26.11.2020 Approved<br>HQ File RLA File Lic.No/Date:0210210115<br>:01/80/050/00626/AM21/ :02/24/040/00080/AM21/ 21.09.2020<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the<br>recommendation of Consultant (Tech-1) & Consultant (SKB) as under:<br>ITCHS Export Item Quantity Sl. ITCHS Import Item Recommended Norms<br>Code No. Code<br>Hot Rolled Steel Plate -<br>206 Hardox 500 /Hardox550/ 1.05Kgs/Kg content in<br>1 72254013<br>JFE EH 500A the export product<br>Parts of Mill<br>/DILLIDUR500<br>Liner for<br>1.05Kgs/Kg content in<br>84749000 Grinding 800 MT 2 40012200 Natural Rubber<br>Mill the export product<br>1.05Kgs/Kg content in<br>3 40022000 Synthetic Rubber PBR<br>the export product<br>1.05Kgs/Kg content in<br>4 28030010 Carbon Black<br>the export product<br>Note: The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

53 | P a g e

Case No.:16/7/80-ALC2/2020 Party Name: SULZER PUMPS Meet No/Date:9/80- Status:
INDIA LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00627/AM21/ RLA File<br>:03/95/040/00376/AM21/ Lic.No/Date:0310838403<br>21.09.2020 Pending<br>with firm

207 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 12.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:17/7/80-ALC2/2020 Party Name: BPE BIOTREE Meet No/Date:9/80- Status:
INDIA PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00628/AM21/ RLA File<br>:07/24/040/00164/AM21/ Lic.No/Date:0710117046<br>22.09.2020 Pending<br>with firm

208 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 20.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 197] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/7/80-ALC2/2020 Party Name: MICRON Meet No/Date:9/80- Status:<br>INSTRUMENTS PVT LTD ALC2/2020 Approved<br>26.11.2020<br>HQ File RLA File Lic.No/Date:0510415296<br>:01/80/050/00629/AM21/ :05/24/040/00307/AM21/ 23.09.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms on repeat<br>basis as approved for AA No. 0510414168 dated 13.05.2020 as per written comments of DPIIT vide U. O. No.<br>209<br>P-47011/14/2020-TSW dated 25.11.2020 as under:<br>1. Net weight of export item may be specified as 1320.90Kgs.<br>2. Words “ Dia 130mm ” may be suffixed with the description of import item.<br>3. Quantity of import item may be allowed as 2709.17Kgs as 2.051 Kgs/Kg content in the export item<br>after taking 50% recovery from the scarp.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:19/7/80-ALC2/2020 Party Name: SIRIA IMPEX Meet No/Date:9/80- Status:
PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00630/AM21/ RLA File<br>:05/24/040/00210/AM20/ Lic.No/Date:0510415290<br>23.09.2020 Pending<br>with firm

210

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 12.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

54 | P a g e

211

Case No.:23/7/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00634/AM21/ RLA File<br>:09/24/040/00347/AM21/ Lic.No/Date:0910069252<br>23.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:20/7/80-ALC2/2020 Party Name: GODREJ & Meet No/Date:9/80- Status:
BOYCE MFG. CO. LTD. ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00631/AM21/ RLA File<br>:03/94/040/00427/AM21/ Lic.No/Date:0310838433<br>24.09.2020 Pending<br>with firm

212

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 12.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:21/7/80-ALC2/2020 Party Name: PREMIER Meet No/Date:9/80- Status: INDUSTRIAL ALC2/2020 Approved CORPORATION LIMITED 26.11.2020 HQ File RLA File Lic.No/Date:0310838440 :01/80/050/00632/AM21/ :03/95/040/00144/AM21/ 24.09.2020

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:

213

ITCHS<br>Code Export Item Quantity ITCHS<br>Code Import Item Recommended Norms
81110010 Manganese<br>Metal Powder 27000<br>Kgs 81110010 Electrolytic Manganese<br>Metal Flakes / Chips 1.01Kgs/Kg net content of<br>exportproduct

Note:

1. Size of export should be less than size of import.

2. The firm should import relevant items only.

214

Case No.:24/7/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00635/AM21/ RLA File<br>:09/24/040/00348/AM21/ Lic.No/Date:0910069258<br>24.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

55 | P a g e

==> picture [476 x 151] intentionally omitted <==

----- Start of picture text -----<br> Case No.:22/7/80-ALC2/2020 Party Name: MICRON Meet No/Date:9/80- Status:<br>INSTRUMENTS PVT LTD ALC2/2020 & 26.11.2020 Approved<br>HQ File RLA File Lic.No/Date:0510415334<br>:01/80/050/00633/AM21/ :05/24/040/00313/AM21/ 25.09.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>215 written comments of DPIIT vide U. O. No. P-47011/14/2020-TSW dated 25.11.2020 as under:<br>1. Net weight of export item may be specified as 36.54Kgs.<br>2. Words “ OD 125.5mm, ID 100mm ” may be suffixed with the description of import item.<br>3. Quantity of import item may be allowed as 523.78Kgs as 14.33 Kgs/Kg content in the export item after taking<br>10% recovery from the scarp.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:25/7/80- Party Name: PARAS DEFENCE Meet No/Date:9/80- Status:<br>ALC2/2020 AND SPACE TECHNOLOGIES LTD ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File :03/95/040/00380/AM21/ Lic.No/Date:0310838477 Pending with<br>:01/80/050/00636/AM21/ 25.09.2020 firm<br>216 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

217

Case No.:26/7/80-ALC2/2020 Party Name: ENDRESS AND Meet No/Date:9/80- Status:
HAUSER (INDIA) ALC2/2020 Deferred
AUTOMATION INSTRU- 26.11.2020
HQ File<br>:01/80/050/00637/AM21/ RLA File<br>:03/94/040/00434/AM21/ Lic.No/Date:0310838480<br>25.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 240] intentionally omitted <==

----- Start of picture text -----<br> Case No.:29/7/80- Party Name: DILIGENT SCM Meet No/Date:9/80- Status:<br>ALC2/2020 SOLUTIONS PRIVATE LIMITED ALC2/2020 & 26.11.2020 Approved<br>HQ File RLA File :09/24/040/00268/AM21/ Lic.No/Date:0910069273<br>:01/80/050/00640/AM21/ 29.09.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>ITCHS Sl. ITCHS Recommended<br>Export Item Quantity Import Item<br>Code No. Code Norms<br>218 Laminate Seal (Net Cont. Cobalt Alloy Sheet 3025Kgs inclusive<br>of Cobalt Alloy Sheet 1 81059000 / Coil (Shim HA of 22.23%<br>(HA 188) 2475Kg & 200000 188) wastage<br>84842000<br>Mesh 30x250 Twill Number 7059 Sq. Feet<br>Mesh 30 x 250<br>Filter Cloth 5775SqFt in 2 81059000 inclusive of<br>Twill Filter Cloth<br>Exp Item) 22.23% wastage<br>Note:<br>1. The wastages allowed after affecting 1/3 [rd] recovery from scrap.<br>2. The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

56 | P a g e

Case No.:30/7/80-ALC2/2020 Party Name: DILIGENT SCM Meet No/Date:9/80- Status: SOLUTIONS PRIVATE ALC2/2020 Approved LIMITED 26.11.2020 HQ File RLA File Lic.No/Date:0910069275 :01/80/050/00641/AM21/ :09/24/040/00357/AM21/ 30.09.2020

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms on repeat basis as approved for AA No. 0910067939 dated 27.08.2019 in M. No. 08/80 dated 05.11.2020 as per written comments of MSME as under:

219

ITCHS<br>Code Export Item Quantity Sl.<br>No. ITCHS<br>Code Import Item Recommended<br>Norms
Curved Seal / TP Inner Cloth<br>Seal / TP Outer Cloth Seal 1 81059000 Cobalt Alloy<br>Sheet(L-605) 19.86% wastage<br>allowed
84842000 Net Content of Cobalt Alloy<br>Sheet (L-605) 1025.28 Kgs,<br>Nickle Cobalt Alloy Sheet<br>(X750) 98.568 Kgs & Mesh<br>30 x 250 - Twill Filter Cloth<br>(Haynes 25 - L605) 630 Sq<br>Ft in Export Product 960<br>Number 2<br>3 75062000<br>73141490 Nickle Cobalt<br>Alloy Sheet<br>(X750)<br>Mesh 30 x 250 -<br>Twill Filter Cloth<br>(Haynes 25 -<br>L605) 21.74% wastage<br>allowed<br>28.57% wastage<br>allowed

Note:

1. The wastages allowed after affecting 1/3[rd] recovery from scrap.

2. The firm should import relevant items only.

==> picture [476 x 273] intentionally omitted <==

----- Start of picture text -----<br> Case No.:31/7/80-ALC2/2020 Party Name: DILIGENT SCM Meet No/Date:9/80- Status:<br>SOLUTIONS PRIVATE ALC2/2020 Approved<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0910069276<br>:01/80/050/00642/AM21/ :09/24/040/00284/AM21/ 30.09.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>ITCHS Sl. ITCHS Recommended<br>Export Item Quantity Import Item<br>Code No. Code Norms<br>220 Cloth Seal(Net Cont of Cobalt Alloy 993.50Kgs<br>Cobalt Alloy Sheet (HA 1 81059000 Sheet / Coil (Shim inclusive of<br>188) 812.818Kgs & HA 188) 22.23% wastage<br>Mesh 30 x 250 110138<br>84842000<br>TwillFilter Cloth7, Number 8683 Sq. Feet<br>Mesh 30 x 250<br>103.901Sqft in Exp 2 81059000 inclusive of<br>Twill Filter Cloth<br>Prod) 22.23% wastage<br>Note:<br>3. The wastages allowed after affecting 1/3 [rd] recovery from scrap.<br>4. The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

57 | P a g e

Case No.:32/7/80-ALC2/2020 Party Name: DEE Meet No/Date:9/80- Status:
DEVELOPMENT ENGINEERS ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00643/AM21/ RLA File<br>:05/23/040/00205/AM21/ Lic.No/Date:0510415387<br>01.10.2020 Pending with<br>firm

221 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

222

Case No.:33/7/80-ALC2/2020 Party Name: STERLITE Meet No/Date:9/80- Status:
POWER TRANSMISSION ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00644/AM21/ RLA File<br>:03/95/040/00355/AM21/ Lic.No/Date:0310838632<br>01.10.2020 Pending<br>with MeitY

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY on 11.11.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MeitY for expediting the comments.

Case is deferred.

Case No.:34/7/80-ALC2/2020 Party Name: BPE BIOTREE Meet No/Date:9/80- Status:
INDIA PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00645/AM21/ RLA File<br>:07/24/040/00171/AM21/ Lic.No/Date:0710117086<br>01.10.2020 Pending with<br>firm

223 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 20.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:35/7/80-ALC2/2020 Party Name: PARAS DEFENCE Meet No/Date:9/80- Status:
AND SPACE TECHNOLOGIES ALC2/2020 Deferred
LTD 26.11.2020
HQ File<br>:01/80/050/00646/AM21/ RLA File<br>:03/95/040/00406/AM21/ Lic.No/Date:0310838691<br>05.10.2020 Pending<br>with firm

224 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

58 | P a g e

Case No.:36/7/80-ALC2/2020 Party Name: PARAS DEFENCE Meet No/Date:9/80- Status:
AND SPACE TECHNOLOGIES ALC2/2020 Deferred
LTD 26.11.2020
HQ File<br>:01/80/050/00647/AM21/ RLA File<br>:03/95/040/00407/AM21/ Lic.No/Date:0310838692<br>05.10.2020 Pending<br>with firm

225 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:37/7/80-ALC2/2020 Party Name: PARAS DEFENCE Meet No/Date:9/80- Status:
AND SPACE TECHNOLOGIES ALC2/2020 Deferred
LTD 26.11.2020
HQ File<br>:01/80/050/00648/AM21/ RLA File<br>:03/95/040/00412/AM21/ Lic.No/Date:0310838693<br>05.10.2020 Pending<br>with firm

226 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:38/7/80-ALC2/2020 Party Name: AUSA MEDICAL Meet No/Date:9/80- Status:
DEVICES PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00649/AM21/ RLA File<br>:07/24/040/00183/AM21/ Lic.No/Date:0710117089<br>05.10.2020 Pending<br>with firm

227 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:39/7/80-ALC2/2020 Party Name: AUSA MEDICAL Meet No/Date:9/80- Status:
DEVICES PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00650/AM21/ RLA File<br>:07/24/040/00184/AM21/ Lic.No/Date:0710117090<br>05.10.2020 Pending<br>with firm

228 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

59 | P a g e

Case No.:40/7/80-ALC2/2020 Party Name: AUSA MEDICAL Meet No/Date:9/80- Status:
DEVICES PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00651/AM21/ RLA File<br>:07/24/040/00186/AM21/ Lic.No/Date:0710117091<br>05.10.2020 Pending<br>with firm

229 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:41/7/80-ALC2/2020 Party Name: AUSA MEDICAL Meet No/Date:9/80- Status:
DEVICES PRIVATE LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00652/AM21/ RLA File<br>:07/24/040/00182/AM21/ Lic.No/Date:0710117092<br>05.10.2020 Pending<br>with firm

230 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

Case No.:42/7/80-ALC2/2020 Party Name: DOOWON Meet No/Date:9/80- Status:
CLIMATE CONTROL INDIA ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00653/AM21/ RLA File<br>:26/24/040/00007/AM21/ Lic.No/Date:2610012918<br>05.10.2020 Pending with<br>firm

231 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

232

Case No.:43/7/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00654/AM21/ RLA File<br>:09/24/040/00367/AM21/ Lic.No/Date:0910069298<br>06.10.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

60 | P a g e

233

Case No.:44/7/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00655/AM21/ RLA File<br>:09/24/040/00368/AM21/ Lic.No/Date:0910069299<br>06.10.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

Case No.:45/7/80-ALC2/2020 Party Name: APAR Meet No/Date:9/80- Status:
INDUSTRIES LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00656/AM21/ RLA File<br>:03/94/040/00387/AM21/ Lic.No/Date:0310838718<br>06.10.2020 Pending<br>with MeitY

234 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY on 14.12.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MeitY for expediting the comments.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:46/7/80-ALC2/2020 Party Name: AUSA MEDICAL Meet No/Date:9/80- Status:<br>DEVICES PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710117104 Pending<br>:01/80/050/00657/AM21/ :07/24/040/00185/AM21/ 06.10.2020 with firm<br>235 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:47/7/80-ALC2/2020 Party Name: VICTORA AUTO Meet No/Date:9/80- Status:
PVT. LTD ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00658/AM21/ RLA File<br>:05/24/040/00332/AM21/ Lic.No/Date:0510415444<br>08.10.2020 Pending<br>with MSME

236 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 03.12.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

Case No.:48/7/80-ALC2/2020 Party Name: ISGEC HEAVY Meet No/Date:9/80- Status:
ENGINEERING LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00659/AM21/ RLA File<br>:05/23/040/00214/AM21/ Lic.No/Date:0510415447<br>08.10.2020 Pending<br>with firm

237 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

61 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:49/7/80- Party Name: NUCON AEROSPACE Meet No/Date:9/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File :09/24/040/00374/AM21/ Lic.No/Date:0910069307 Pending with<br>:01/80/050/00660/AM21/ 08.10.2020 firm<br>238 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 11.11.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:50/7/80- Party Name: AZAD ENGINEERING Meet No/Date:9/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00661/AM21/ RLA File :09/24/040/00326/AM21/ Lic.No/Date:0910069313<br>08.10.2020 Pending with<br>firm

239 Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC

Case is deferred.

240

Case No.:8/9/80-ALC2/2020 Party Name: AGRI PROCESS Meet No/Date:9/80- Status:
INNOVATIONS ALC2/2020 Deferred
TECHNOLOGIES LLP 26.11.2020
HQ File<br>:01/80/050/00687/AM21/ RLA File<br>:07/24/040/00166/AM21/ Lic.No/Date:0710117170<br>22.10.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the case pertains to DHI . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:1/9/80-ALC2/2020 Party Name: AVLIGHT Meet No/Date:9/80- Status:
AUTOMOTIVES PVT. LTD. ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00680/AM21/ RLA File<br>:05/23/040/00226/AM21/ Lic.No/Date:0510415636<br>26.10.2020 Pending<br>with firm

241 Decision: The Committee considered the case as per the agenda and noted that the case pertains to Consultant (Tech-1) . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:2/9/80-ALC2/2020 Party Name: ISGEC HITACHI Meet No/Date:9/80- Status:
ZOSEN LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00681/AM21/ RLA File<br>:05/23/040/00243/AM21/ Lic.No/Date:0510415637<br>26.10.2020 Pending<br>with firm

242 Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

62 | P a g e

Case No.:3/9/80-ALC2/2020 Party Name: L&T-MHPS Meet No/Date:9/80- Status:
BOILERS PVT LTD ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00682/AM21/ RLA File<br>:03/95/040/00405/AM21/ Lic.No/Date:0310839123<br>26.10.2020 Pending<br>with firm

243

Decision: The Committee considered the case as per the agenda and noted that the case pertains to DHI . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

244

Case No.:4/9/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00683/AM21/ RLA File<br>:09/24/040/00422/AM21/ Lic.No/Date:0910069389<br>27.10.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

245

Case No.:5/9/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00684/AM21/ RLA File<br>:09/24/040/00421/AM21/ Lic.No/Date:0910069390<br>27.10.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

246

Case No.:6/9/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00685/AM21/ RLA File<br>:09/24/040/00420/AM21/ Lic.No/Date:0910069391<br>27.10.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

247

Case No.:7/9/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00686/AM21/ RLA File<br>:09/24/040/00419/AM21/ Lic.No/Date:0910069392<br>27.10.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

63 | P a g e

Case No.:9/9/80- Party Name: TAIKISHA Meet No/Date:9/80- Status:
ALC2/2020 ENGINEERING INDIA PVT.LTD. ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00688/AM21/ RLA File :03/95/040/00463/AM21/ Lic.No/Date:0310839175<br>28.10.2020 Pending with<br>firm

248 Decision: The Committee considered the case as per the agenda and noted that the case pertains to MSME . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:10/9/80- Party Name: TAIKISHA Meet No/Date:9/80- Status:
ALC2/2020 ENGINEERING INDIA PVT.LTD. ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00689/AM21/ RLA File :03/95/040/00464/AM21/ Lic.No/Date:0310839176<br>28.10.2020 Pending with<br>firm

249 Decision: The Committee considered the case as per the agenda and noted that the case pertains to MSME . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:11/9/80-ALC2/2020 Party Name: VEM Meet No/Date:9/80- Status:
TECHNOLOGIES PVT LTD. ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00690/AM21/ RLA File<br>:09/24/040/00334/AM21/ Lic.No/Date:0910069412<br>29.10.2020 Pending<br>with firm

250 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

251

Case No.:12/9/80-ALC2/2020 Party Name: GECO LEGEND Meet No/Date:9/80- Status:
ENVIRO TECH ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00691/AM21/ RLA File<br>:32/24/040/00070/AM21/ Lic.No/Date:3210079797<br>29.10.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

252

Case No.:13/9/80-ALC2/2020 Party Name: PENTAPHOS Meet No/Date:9/80- Status:
INDUSTRIES PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00692/AM21/ RLA File<br>:03/95/040/00459/AM21/ Lic.No/Date:0310839248<br>02.11.2020 Pending with<br>firm

Decision: The Committee considered the case as per the agenda and noted that the case pertains to MSME . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

64 | P a g e

253

Case No.:14/9/80-ALC2/2020 Party Name: NARENDRA Meet No/Date:9/80- Status:
EXPLOSIVES LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00693/AM21/ RLA File<br>:05/24/040/00349/AM21/ Lic.No/Date:0510415716<br>03.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

254

Case No.:15/9/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00694/AM21/ RLA File<br>:09/24/040/00439/AM21/ Lic.No/Date:0910069430<br>03.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

255

Case No.:16/9/80-ALC2/2020 Party Name: KINECO KAMAN Meet No/Date:9/80- Status:
COMPOSITES - INDIA PVT ALC2/2020 Deferred
LTD 26.11.2020
HQ File<br>:01/80/050/00695/AM21/ RLA File<br>:03/94/040/00555/AM21/ Lic.No/Date:0310839311<br>04.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

256

Case No.:17/9/80-ALC2/2020 Party Name: ISGEC HEAVY Meet No/Date:9/80- Status:
ENGINEERING LIMITED ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00696/AM21/ RLA File<br>:05/23/040/00261/AM21/ Lic.No/Date:0510415736<br>04.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:18/9/80-ALC2/2020 Party Name: ARIHANT Meet No/Date:9/80- Status:
INDUSTRIES ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00697/AM21/ RLA File<br>:33/24/040/00016/AM21/ Lic.No/Date:3310030763<br>04.11.2020 Pending<br>with firm

257 Decision: The Committee considered the case as per the agenda and noted that the case pertains to MSME . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

65 | P a g e

258

Case No.:19/9/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00698/AM21/ RLA File<br>:09/24/040/00451/AM21/ Lic.No/Date:0910069448<br>05.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

259

Case No.:20/9/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00699/AM21/ RLA File<br>:09/24/040/00449/AM21/ Lic.No/Date:0910069449<br>05.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/9/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 26.11.2020<br>HQ File RLA File Lic.No/Date:0910069450 Pending<br>260 :01/80/050/00700/AM21/ :09/24/040/00450/AM21/ 05.11.2020 with firm<br>Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for”<br>appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case<br>before the Norms Committee in the forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>

261

Case No.:22/9/80-ALC2/2020 Party Name: AZAD Meet No/Date:9/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00701/AM21/ RLA File<br>:09/24/040/00454/AM21/ Lic.No/Date:0910069452<br>05.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and observed that the “wastage asked for” appears to be on the higher side. Hence it was decided to call the firm for personal hearing to explain the case before the Norms Committee in the forthcoming NC meeting.

Case is deferred.

Case No.:23/9/80-ALC2/2020 Party Name: WONJIN Meet No/Date:9/80- Status:
AUTOPARTS INDIA PVT LTD ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00702/AM21/ RLA File<br>:04/24/040/00130/AM21/ Lic.No/Date:0410167239<br>05.11.2020 Pending<br>with firm

262 Decision: The Committee considered the case as per the agenda and noted that the case pertains to DHI . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

66 | P a g e

Case No.:24/9/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:9/80- Status:
BLADES INDIA PVT. LTD ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00703/AM21/ RLA File<br>:34/24/040/00217/AM21/ Lic.No/Date:3410046514<br>05.11.2020 Pending<br>with firm

263

Decision: The Committee considered the case as per the agenda and noted that the case pertains to Consultant (Tech-1) . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:25/9/80-ALC2/2020 Party Name: ISGEC HITACHI Meet No/Date:9/80- Status:
ZOSEN LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00704/AM21/ RLA File<br>:05/23/040/00269/AM21/ Lic.No/Date:0510415802<br>09.11.2020 Pending with<br>firm

264 Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:26/9/80-ALC2/2020 Party Name: AIRFINS Meet No/Date:9/80- Status:
PRIVATE LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00705/AM21/ RLA File<br>:31/83/040/00078/AM21/ Lic.No/Date:3110067917<br>10.11.2020 Pending<br>with firm

265 Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

266

Case No.:27/9/80-ALC2/2020 Party Name: AAVID Meet No/Date:9/80- Status:
THERMALLOY INDIA PVT. ALC2/2020 Deferred
LTD. 26.11.2020
HQ File<br>:01/80/050/00706/AM21/ RLA File<br>:34/24/040/00211/AM21/ Lic.No/Date:3410046533<br>10.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 55] intentionally omitted <==

----- Start of picture text -----<br> Case No.:28/9/80-ALC2/2020 Party Name: TEXFAB Meet No/Date:9/80- Status:<br>ENGINEERS (I) PVT. LTD. ALC2/2020 & 26.11.2020 Deferred<br>HQ File RLA File Lic.No/Date:5210043592 Pending<br>:01/80/050/00707/AM21/ :52/24/040/00070/AM21/ 10.11.2020 with firm<br>----- End of picture text -----<br>

267 Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

67 | P a g e

Case No.:35/9/80-ALC2/2020 Party Name: AIROIL- Meet No/Date:9/80- Status:
FLAREGAS PVT. LIMITED ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00714/AM21/ RLA File<br>:08/24/040/00285/AM21/ Lic.No/Date:0810149041<br>11.11.2020 Pending<br>with firm

268 Decision: The Committee considered the case as per the agenda and noted that the case pertains to Consultant (SKB) . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

269

Case No.:29/9/80-ALC2/2020 Party Name: SPECTRA Meet No/Date:9/80- Status:
TECHNOLOGY SOLUTIONS ALC2/2020 Deferred
PVT LTD 26.11.2020
HQ File<br>:01/80/050/00708/AM21/ RLA File<br>:07/24/040/00208/AM21/ Lic.No/Date:0710117266<br>12.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

270

Case No.:30/9/80-ALC2/2020 Party Name: SPECTRA Meet No/Date:9/80- Status:
TECHNOLOGY SOLUTIONS ALC2/2020 Deferred
PVT LTD 26.11.2020
HQ File<br>:01/80/050/00709/AM21/ RLA File<br>:07/24/040/00219/AM21/ Lic.No/Date:0710117267<br>12.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

271

Case No.:31/9/80-ALC2/2020 Party Name: ISGEC TITAN Meet No/Date:9/80- Status:
METAL FABRICATORS ALC2/2020 Deferred
PRIVATE LIMITED 26.11.2020
HQ File<br>:01/80/050/00710/AM21/ RLA File<br>:05/23/040/00280/AM21/ Lic.No/Date:0510415854<br>12.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:32/9/80-ALC2/2020 Party Name: DISTINCT Meet No/Date:9/80- Status:
PRODUCTIVITY SOLUTIONS ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00711/AM21/ RLA File<br>:07/24/040/00190/AM21/ Lic.No/Date:0710117268<br>12.11.2020 Pending<br>with firm

272 Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

68 | P a g e

Case No.:33/9/80-ALC2/2020 Party Name: OAM SAAI Meet No/Date:9/80- Status:
INTERNATIONAL INC. ALC2/2020 & 26.11.2020 Deferred
HQ File<br>:01/80/050/00712/AM21/ RLA File<br>:05/24/040/00421/AM21/ Lic.No/Date:0510415866<br>12.11.2020 Pending<br>with firm

273 Decision: The Committee considered the case as per the agenda and noted that the case pertains to DHI . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

274

Case No.:34/9/80-ALC2/2020 Party Name: MICRON Meet No/Date:9/80- Status:
INSTRUMENTS PVT LTD ALC2/2020 Deferred
26.11.2020
HQ File<br>:01/80/050/00713/AM21/ RLA File<br>:05/24/040/00422/AM21/ Lic.No/Date:0510415867<br>12.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the case pertains to DPIIT . However, the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

275

Case No.:36/9/80-ALC2/2020 Party Name: CAPARO Meet No/Date:9/80- Status:
ENGINEERING INDIA ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00715/AM21/ RLA File<br>:11/24/040/00003/AM21/ Lic.No/Date:1110028749<br>13.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

276

Case No.:37/9/80-ALC2/2020 Party Name: CAPARO Meet No/Date:9/80- Status:
ENGINEERING INDIA ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00716/AM21/ RLA File<br>:11/24/040/00004/AM21/ Lic.No/Date:1110028750<br>13.11.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

277

Case No.:38/9/80-ALC2/2020 Party Name: CAPARO Meet No/Date:9/80- Status:
ENGINEERING INDIA ALC2/2020 Deferred
LIMITED 26.11.2020
HQ File<br>:01/80/050/00717/AM21/ RLA File<br>:11/24/040/00005/AM21/ Lic.No/Date:1110028751<br>13.11.2020 Pending with<br>firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

69 | P a g e

==> picture [469 x 674] intentionally omitted <==

70 | P a g e

==> picture [469 x 616] intentionally omitted <==

71 | P a g e

==> picture [469 x 638] intentionally omitted <==

72 | P a g e

==> picture [469 x 635] intentionally omitted <==

73 | P a g e

==> picture [469 x 620] intentionally omitted <==

74 | P a g e

==> picture [469 x 648] intentionally omitted <==

75 | P a g e

==> picture [469 x 644] intentionally omitted <==

76 | P a g e

==> picture [469 x 661] intentionally omitted <==

77 | P a g e

==> picture [469 x 586] intentionally omitted <==

78 | P a g e

==> picture [469 x 649] intentionally omitted <==

79 | P a g e

==> picture [469 x 638] intentionally omitted <==

80 | P a g e

==> picture [469 x 654] intentionally omitted <==

81 | P a g e

==> picture [469 x 626] intentionally omitted <==

82 | P a g e

==> picture [469 x 611] intentionally omitted <==

83 | P a g e

84 | P a g e

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied