MINUTES OF MEETING NO. 05/80 OF THE NORMS COMMITTEE-I DATED 10.09.2020 HELD ON
17.09.2020
Meeting No. 05/80 of the Norms Committee (NC-I) for the licensing year 2020-2021 (originally scheduled for 10.09.2020) held on 17.09.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -
==> picture [464 x 125] intentionally omitted <==
----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri K.S. Sodhi, Asst. Director MSME<br>2. Shri Sushil Kumar Jangid, Scientist ‘B’ MeitY<br>3. Shri Shaish Kumar, (Tech-1) Consultant<br>4. Shri V.C. Agarwal, (Tech-3) Consultant<br>5. Shri S. K. Bhatnagar, Consultant<br>In Attendance<br>1. Dr. D. C. Dabhole, Dy. DGFT DGFT<br>2. Shri Pranav Upadhyay, Assistant Director ISS DGFT<br>----- End of picture text -----<br>
Note:
-
In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.
-
Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.
-
All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail addressnc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.
-
Minutes of Meeting 03/80 (originally scheduled for 30.07.2020) held on 06.08.2020 were circulated on 28.08.2020,to all the members of the Committee and the comments, there upon (wherever received), were incorporated in the Minutes and therefore the said minutes were uploaded on dgft.gov.in on 17.09.2020.
-
Minutes of Meeting 04/80 dated on 20.08.2020 were circulated on 01.09.2020, to all the members of the Committee and the comments, there upon (wherever received), were incorporated in the Minutes and therefore the said minutes were uploaded on dgft.gov.in on 17.09.2020.
1 | P a g e
MEETING NUMBER: 5/80-ALC2/2020 MEETING DATE: 10.09.2020
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:29/5/80-ALC2/2020 Party Name: MINDA SILCA Meet No/Date:5/80- Status:<br>ENGINEERING LTD. ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0510382039<br>:01/80/050/00579/AM21/ :05/24/040/00476/AM14/ 18.03.2014<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms on repeat 1 basis as approved for AA No. 0510394373 dated 27.05.2015 as per written comments of MSME as under:
| Sl. No. | ITCHS<br>Code | Import Item | Recommended Norms |
|---|---|---|---|
| 1 | 72119090 | Steel Strips (11SMNPB30) | 65.20% wastage allowed after affecting<br>1/3rdrecoveryfrom scrap |
RA concerned may take further necessary action as per the decision of NC.
| Case No.:366/15/80-ALC2/2018 | Party Name: FOWLER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| WESTRUP (INDIA) PVT LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00708/AM19/ | RLA File<br>:07/24/040/00106/AM16/ | Lic.No/Date:0710108605<br>13.08.2015 | Pending<br>with Firm |
2 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:30/1/80-ALC2/2019 | Party Name: FOWLER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| WESTRUP (INDIA) PVT LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00778/AM19/ | RLA File<br>:07/24/040/00109/AM16/ | Lic.No/Date:0710108606<br>13.08.2015 | Pending<br>with Firm |
3 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:363/15/80-ALC2/2018 | Party Name: PROMAC | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING INDUSTRIES | ALC2/2020 | Deferred | ||||
| LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00705/AM19/ | RLA File<br>:07/24/040/00184/AM16/ | Lic.No/Date:0710108812<br>05.10.2015 | Pending<br>with Firm |
4 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
2 | P a g e
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:364/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:5/80- Status:<br>ENGINEERING INDUSTRIES ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0710108813 Pending<br>:01/80/050/00706/AM19/ :07/24/040/00185/AM16/ 05.10.2015 with Firm<br>5<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
6
| Case No.:27/5/80-ALC2/2020 | Party Name: SCIGENICS | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| (INDIA) PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 10.09.2020 | |||||||
| HQ File<br>:01/80/050/00577/AM21/ | RLA File<br>:04/21/040/00165/AM17/ | Lic.No/Date:0410162152<br>01.08.2016 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
| Case No.:215/15/80-ALC2/2018 | Party Name: FOWLER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| WESTRUP (INDIA) PVT LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00557/AM19/ | RLA File<br>:07/24/040/00201/AM17/ | Lic.No/Date:0710110568<br>25.10.2016 | Pending<br>with Firm |
7 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:222/15/80-ALC2/2018 | Party Name: FOWLER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| WESTRUP (INDIA) PVT LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00564/AM19/ | RLA File<br>:07/24/040/00204/AM17/ | Lic.No/Date:0710110569<br>25.10.2016 | Pending<br>with Firm |
8 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
3 | P a g e
| Case No.:380/15/80-ALC2/2018 | Party Name: FOWLER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| WESTRUP (INDIA) PVT LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00722/AM19/ | RLA File<br>:07/24/040/00302/AM17/ | Lic.No/Date:0710110914<br>05.01.2017 | Pending<br>with Firm |
9 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 212] intentionally omitted <==
----- Start of picture text -----<br> Case No.:402/15/80- Party Name: SHIV Meet No/Date:5/80- Status:<br>ALC2/2018 HYDROMET ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:2410042158<br>:01/80/050/00744/AM19/ :24/24/040/00034/AM17/ 14.03.2017<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-1) as under:<br>10<br>ITCHS Export Item Quantity ITCHS Import Item Recommended<br>Code Code Norms<br>81101000 Antimony 45385 26171000 Antimony Concentrate 101138 Kgs<br>Metal Kgs (Antimony Content 47% - 55%) (Weight basis)<br>Note:<br>1. The weight of export item should be 45385 Kgs.<br>2. The import item should contain Antimony as 45999.57Kgs.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:126/15/80-ALC2/2018 Party Name: SHAKTI PUMPS Meet No/Date:5/80- Status:<br>(INDIA) LTD. ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:5610005299 Pending<br>:01/80/050/00468/AM19/ :56/24/040/00036/AM18/ 08.01.2018 with Firm<br>11<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 06.08.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:10/1/80-ALC2/2019 | Party Name: MAGNA | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| AUTOMOTIVE INDIA | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00758/AM19/ | RLA File<br>:04/24/040/00001/AM19/ | Lic.No/Date:0410164172<br>06.04.2018 | Pending<br>with Firm |
12 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 12.03.2020 followed by a reminder on 22.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
4 | P a g e
| Case No.:397/15/80-ALC2/2018 | Party Name: PROMAC | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING INDUSTRIES | ALC2/2020 | Deferred | ||||
| LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00739/AM19/ | RLA File<br>:07/24/040/00357/AM18/ | Lic.No/Date:0710113276<br>14.05.2018 | Pending<br>with Firm |
13 Decision: The Committee considered the case as per the agenda and noted that due to insufficient reply, another deficiency letter seeking certain information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:28/5/80-ALC2/2020 Party Name: PENGUIN Meet No/Date:5/80- Status:<br>PETROLEUM SERVICES ALC2/2020 Deferred<br>PVT.LTD. 10.09.2020<br>HQ File RLA File Lic.No/Date:0310821057 Pending<br>:01/80/050/00578/AM21/ :03/92/040/00044/AM19/ 17.05.2018 with DPIIT<br>14<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>DPIIT on 15.09.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
15
| Case No.:31/5/80-ALC2/2020 | Party Name: THE TATA | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| POWER COMPANY LTD | ALC2/2020 | Deferred | |||||
| 10.09.2020 | |||||||
| HQ File<br>:01/80/050/00581/AM21/ | RLA File<br>:07/24/040/00049/AM19/ | Lic.No/Date:0710113372<br>31.05.2018 | Pending<br>with MeitY |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY on 15.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 165] intentionally omitted <==
----- Start of picture text -----<br> Case No.:133/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910066357 Pending<br>:01/80/050/00475/AM19/ :09/24/040/00058/AM19/ 20.06.2018 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI informed that the firm’s<br>16<br>reply dated 15.06.2020 is deficient as the firm has only given statement of wastage. Therefore, the Committee<br>decided to ask again from the firm to furnish following information as per comments of DHI :<br>1. To provide calculation of requirement supported by Engineering Drawing with relevant dimensions<br>highlighted.<br>Case is deferred.<br>----- End of picture text -----<br>
5 | P a g e
==> picture [476 x 165] intentionally omitted <==
----- Start of picture text -----<br> Case No.:165/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910066427 Pending<br>:01/80/050/00507/AM19/ :09/24/040/00139/AM19/ 06.07.2018 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI informed that the firm’s<br>17<br>reply dated 15.06.2020 is deficient as the firm has only given statement of wastage. Therefore, the Committee<br>decided to ask again from the firm to furnish following information as per comments of DHI :<br>1. To provide calculation of requirement supported by Engineering Drawing with relevant dimensions<br>highlighted.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:166/15/80-ALC2/2018 | Party Name: BHARAT HEAVY | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ELECTRICALS LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00508/AM19/ | RLA File<br>:09/24/040/00171/AM19/ | Lic.No/Date:0910066472<br>18.07.2018 | Pending<br>with Firm |
18 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
19
| Case No.:179/15/80-ALC2/2018 | Party Name: PROMAC | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING INDUSTRIES | ALC2/2020 | Deferred | |||||
| LIMITED | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00521/AM19/ | RLA File<br>:07/24/040/00102/AM19/ | Lic.No/Date:0710113710<br>13.08.2018 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.09.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:23/11/80-ALC2/2018 | Party Name: JAYESH METALS | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| AND FERRO ALLOYS LLP | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00214/AM19/ | RLA File<br>:03/94/040/00488/AM19/ | Lic.No/Date:0310823416<br>29.08.2018 | Pending<br>with Firm |
20 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
6 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:28/11/80- Party Name: L & T-MHPS TURBINE Meet No/Date:5/80- Status:<br>ALC2/2018 GENERATORS PRIVATE LIMITED ALC2/2020 & 10.09.2020 Deferred<br>HQ File RLA File :03/95/040/00466/AM19/ Lic.No/Date:0310823400 Pending with<br>:01/80/050/00219/AM19/ 29.08.2018 Firm<br>21 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish<br>following information as per comments of DHI :<br>1. To submit revised weight balance after deletion of item at Sl. No. 8 to 11.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:9/1/80- | Party Name: L & T-MHPS TURBINE | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | GENERATORS PRIVATE LIMITED | ALC2/2020 & 10.09.2020 | Deferred | |||
| HQ File<br>:01/80/050/00757/AM19/ | RLA File :03/95/040/00469/AM19/ | Lic.No/Date:0310823645<br>07.09.2018 | Pending with<br>DHI |
22 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI for examination of the case on 19.06.2020 followed by a reminder on 07.09.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
23
| Case No.:30/5/80-ALC2/2020 | Party Name: PENGUIN | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PETROLEUM SERVICES | ALC2/2020 | Deferred | |||||
| PVT.LTD. | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00580/AM21/ | RLA File<br>:03/92/040/00172/AM19/ | Lic.No/Date:0310823657<br>10.09.2018 | Pending<br>with DPIIT |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 15.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
24
| Case No.:201/15/80-ALC2/2018 | Party Name: DYNAMATIC | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TECHNOLOGIES LIMITED | ALC2/2020 & 10.09.2020 | Approved | |||||
| HQ File<br>:01/80/050/00543/AM19/ | RLA File<br>:07/24/040/00155/AM19/ | Lic.No/Date:0710113852<br>17.09.2018 |
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MSME . (Copy enclosed)
==> picture [476 x 107] intentionally omitted <==
----- Start of picture text -----<br> Case No.:82/11/80-ALC2/2018 Party Name: ANSTECH Meet No/Date:5/80- Status:<br>ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410044543<br>:01/80/050/00273/AM19/ :34/24/040/00218/AM19/ 04.10.2018<br>25<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application is being<br>sent to the concerned technical authority.<br>Case is deferred<br>----- End of picture text -----<br>
7 | P a g e
| Case No.:253/15/80-ALC2/2018 | Party Name: BHARAT | Meet No/Date:5/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| HEAVY ELECTRICALS | 10.09.2020 | Deferred | ||||
| LIMITED | ||||||
| HQ File<br>:01/80/050/00595/AM19/ | RLA File<br>:09/24/040/00340/AM19/ | Lic.No/Date:0910066870<br>16.11.2018 | Pending with<br>DHI/RA |
26 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 21.08.2020 for examination of the case. It was also noted that information regarding clubbing of AAs (AA No. 0910066870 and 0910065863) is still awaited from RA, Hyderabad. Therefore, the Committee decided to remind RA, Hyderabad & DHI for expediting the comments.
Case is deferred.
==> picture [476 x 120] intentionally omitted <==
----- Start of picture text -----<br> Case No.:259/15/80-ALC2/2018 Party Name: DYNAMATIC Meet No/Date:5/80- Status:<br>TECHNOLOGIES LIMITED ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0710114156<br>27 :01/80/050/00601/AM19/ :07/24/040/00182/AM19/ 22.11.2018<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME . (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:270/15/80-ALC2/2018 | Party Name: VEM | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| TECHNOLOGIES PVT LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00612/AM19/ | RLA File<br>:09/24/040/00428/AM19/ | Lic.No/Date:0910066924<br>29.11.2018 | Pending<br>with Firm |
28 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the firm on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:42/1/80-ALC2/2019 | Party Name: LARSEN & | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| TOUBRO LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00790/AM19/ | RLA File<br>:03/95/040/01295/AM19/ | Lic.No/Date:0310827622<br>12.03.2019 | Pending<br>with Firm |
29 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (TEC-3) was sent to the firm on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
8 | P a g e
==> picture [476 x 155] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/2/80-ALC2/2019 Party Name: VIPRA CLOSURES Meet No/Date:5/80- Status:<br>PRIVATE LIMITED ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0310828134 Pending<br>:01/80/050/00005/AM20/ :03/95/040/01384/AM19/ 03.04.2019 with Firm<br>30 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. To provide details for 14247 Kgs of import and corresponding 9706 Kgs of export while the license is<br>for 200 MT import corresponding to 160 MT export.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 363] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/3/80-ALC2/2019 Party Name: MUDHRA FINE Meet No/Date:5/80- Status:<br>BLANC PRIVATE LTD ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0410165451<br>:01/80/050/00009/AM20/ :04/24/040/00294/AM19/ 11.04.2019<br>Decision: The Committee considered the case as per the agenda and noted that DHI in its comments stated that<br>the firm had not submitted calculation of requirementof raw material supported by dimensional drawing and<br>only submitted statement of wastages. On the basis of written comments of DHI, the Committee decided to<br>ratify the ad-hoc norms as under:<br>Sl.<br>ITCHS ITCHS Recommended<br>No. Export Item Quantity Import Item<br>Code Code Norms<br>CAM-0000-1280 GEAR<br>22858<br>1 87089900 WHEEL LOCK LIFT LH<br>31 Number<br>ITLA BONAITI 1.05 Kgs/Kg<br>CAM-0000-1527 GEAR 72269230 25CRMO4KE content in the<br>22858<br>2 87089900 WHEEL LOCK LIFT RH 147X5 COIL export product<br>Number<br>CAM-0000-1452<br>20742<br>3 87089900 MANUAL LOCK CAM<br>Number<br>CAM-0000-1339 POWER<br>4 87089900 LOCK CAM LH 36299 ITLA BONAITI 1.05 Kgs/Kg<br>Number 72269220 25CRM04KE content in the<br>105X4 COIL export product<br>CAM-0000-1488 POWER<br>36299<br>5 87089900 LOCK CAM RH<br>Number<br>Note: Type & grade of tubing will be same as used in export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/3/80-ALC2/2019 Party Name: VEELINE MEDIA Meet No/Date:5/80- Status:<br>LIMITED ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0210209114 Pending<br>:01/80/050/00010/AM20/ :02/24/040/00003/AM20/ 16.04.2019 with Firm<br>32<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 30.08.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
9 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/3/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:5/80- Status:<br>TURBINE GENERATORS ALC2/2020 Deferred<br>PRIVATE LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0310828481 Pending<br>:01/80/050/00014/AM20/ :03/95/040/01354/AM19/ 23.04.2019 with DHI<br>33<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI<br>on 03.09.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 118] intentionally omitted <==
----- Start of picture text -----<br> Case No.:26/5/80-ALC2/2020 Party Name: WHEELS INDIA Meet No/Date:5/80- Status:<br>LIMITED ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0410165481<br>34 :01/80/050/00576/AM21/ :04/24/040/00278/AM19/ 23.04.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to Consultant<br>(Tech-3) for examination & comments.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:1/5/80-ALC2/2019 | Party Name: PAHARPUR | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| COOLING TOWERS LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00039/AM20/ | RLA File<br>:02/24/040/00012/AM20/ | Lic.No/Date:0210209171<br>16.05.2019 | Pending<br>with Firm |
35 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 06.03.2020 followed by a reminder on 27.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 164] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/5/80-ALC2/2019 Party Name: HEURTEY Meet No/Date:5/80- Status:<br>PETROCHEM INDIA PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:3410045150 Pending<br>:01/80/050/00051/AM20/ :34/24/040/00059/AM20/ 17.05.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI<br>36<br>on 22.07.2020 for examination of the case. However, DHI vide email dated 26.08.2020 informed that the firm<br>has not furnished the calculation sheet of each operation to ascertain the actual wastage. Therefore, the<br>Committee decided to ask again from the firm to furnish the following information as per comments of DHI:<br>1. To provide calculation sheet of each operation.<br>Case is deferred.<br>----- End of picture text -----<br>
10 | P a g e
| Case No.:1/7/80-ALC2/2019 | Party Name: CROWN | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| CLOSURES PVT. LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00098/AM20/ | RLA File<br>:03/94/040/00246/AM20/ | Lic.No/Date:0310829905<br>25.06.2019 | Pending<br>with Firm |
37 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 06.03.2020 followed by a reminder on 23.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/7/80-ALC2/2019 Party Name: OSWAL PUMPS Meet No/Date:5/80- Status:<br>LIMITED ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3310030557 Pending<br>:01/80/050/00099/AM20/ :33/24/040/00012/AM20/ 25.06.2019 with Firm<br>38<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 06.03.2020 followed by a reminder on 23.07.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 144] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/7/80-ALC2/2019 Party Name: OAM SAAI Meet No/Date:5/80- Status:<br>INTERNATIONAL INC. ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0510411061<br>:01/80/050/00100/AM20/ :05/24/040/00181/AM20/ 26.06.2019<br>39<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>1. Quantity of import items may be allowed as per GN-4.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910067697 Pending<br>:01/80/050/00101/AM20/ :09/24/040/00138/AM20/ 26.06.2019 with DHI<br>40<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>DHI for examination of the case on 05.06.2020 followed by a reminder on 07.09.2020. However, no comments<br>have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
11 | P a g e
==> picture [476 x 288] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/7/80-ALC2/2019 Party Name: P. M. ELECTRO Meet No/Date:5/80- Status:<br>AUTO PVT. LTD. ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3110067458 Pending<br>:01/80/050/00107/AM20/ :31/83/040/00048/AM20/ 28.06.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Weight of each Export Product.<br>41<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material proposed<br>for import has been arrived at, including the net weight of components to be manufactured out of these<br>imported materials, wastages claimed at each stage of manufacturing with complete justification and<br>supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:12/7/80-ALC2/2019 | Party Name: AUTOCOMP | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| CORPORATION PANSE | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00109/AM20/ | RLA File<br>:31/83/040/00050/AM20/ | Lic.No/Date:3110067460<br>01.07.2019 | Pending<br>with Firm |
42 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 20.05.2020 followed by a reminder on 23.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:15/7/80-ALC2/2019 | Party Name: DOOWON | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| CLIMATE CONTROL INDIA | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00112/AM20/ | RLA File<br>:66/24/040/00003/AM20/ | Lic.No/Date:6610000035<br>03.07.2019 | Pending<br>with Firm |
43 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
12 | P a g e
| Case No.:3/9/80-ALC2/2019 | Party Name: DYNA FORCE | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| HYDRAULICS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00128/AM20/ | RLA File<br>:31/83/040/00067/AM20/ | Lic.No/Date:3110067484<br>25.07.2019 | Pending<br>with Firm |
44 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
45
| Case No.:45/11/80-ALC2/2004 | Party Name: L&T- MHPS | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00171/AM20/ | RLA File<br>:03/95/040/00574/AM20/ | Lic.No/Date:0310831568<br>16.09.2019 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI for examination of the case on 19.06.2020 followed by a reminder on 07.09.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:46/11/80-ALC2/2004 | Party Name: L&T-MHPS | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BOILERS PVT LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00172/AM20/ | RLA File<br>:03/95/040/00588/AM20/ | Lic.No/Date:0310831569<br>16.09.2019 | Pending<br>with Firm |
46 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:1/13/80-ALC2/2019 | Party Name: RONCH | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| POLYMERS PVT LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00186/AM20/ | RLA File<br>:03/95/040/00654/AM20/ | Lic.No/Date:0310832012<br>04.10.2019 | Pending with<br>Tech-1 |
47 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-1) on 04.09.2020 for examination of the case. However, Consultant (Tech 1) informed that the reply which firm had submitted for their AA0310833381 dated 12.12.2019 is insufficient. Hence, the Committee decided to inform the firm to submit their reply in the matter at the earliest.
Case is deferred.
13 | P a g e
| Case No.:2/13/80- | Party Name: FERRUM EXTREME | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE LIMITED | ALC2/2020&10.09.2020 | Deferred | |||
| HQ File<br>:01/80/050/00187/AM20/ | RLA File :05/23/040/00265/AM20/ | Lic.No/Date:0510412040<br>07.10.2019 |
48 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not been received . However, the Committee was informed that some applications have been received which are yet to be linked. Hence, the Committee asked the section to check up.
Case is deferred.
| Case No.:4/13/80- | Party Name: L&T- MHPS TURBINE | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | GENERATORS PRIVATE LIMITED | ALC2/2020&10.09.2020 | Deferred | |||
| HQ File<br>:01/80/050/00189/AM20/ | RLA File :03/95/040/00681/AM20/ | Lic.No/Date:0310832116<br>10.10.2019 | Pending with<br>DHI |
49 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI for examination of the case on 20.05.2020. However, no comments have been received yet. Hence, the Committee decided to remind DHI , to expedite the case.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/13/80- Party Name: L&T- MHPS TURBINE Meet No/Date:5/80- Status:<br>ALC2/2019 GENERATORS PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :03/95/040/00655/AM20/ Lic.No/Date:0310832159 Pending with<br>:01/80/050/00190/AM20/ 11.10.2019 Firm<br>50 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 11.02.2020 followed by a reminder on 27.08.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/13/80-ALC2/2019 Party Name: GODREJ & Meet No/Date:5/80- Status:<br>BOYCE MFG. CO. LTD. ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310832178 Pending<br>:01/80/050/00191/AM20/ :03/94/040/00505/AM20/ 11.10.2019 with Firm<br>51 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (SKB) was sent to the firm on 27.08.2020. However, no reply has been<br>received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite<br>information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:7/13/80-ALC2/2019 | Party Name: ISGEC HITACHI | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ZOSEN LIMITED | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00192/AM20/ | RLA File<br>:05/23/040/00269/AM20/ | Lic.No/Date:0510412096<br>11.10.2019 | Pending<br>with Firm |
52 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 24.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
14 | P a g e
| Case No.:8/13/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00193/AM20/ | RLA File<br>:09/24/040/00347/AM20/ | Lic.No/Date:0910068080<br>14.10.2019 | Pending<br>with Firm |
53 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 169] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/17/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:5/80- Status:<br>PVT. LTD. ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0510412724 Pending<br>:01/80/050/00233/AM20/ :05/24/040/00513/AM20/ 29.11.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>54 following information as per comments of MSME:<br>1. To provide corresponding blank size for each export item.<br>2. To explain the anomaly why as per AA the net export weight for export item Sl. No. 7 is 21491 Kgs<br>and as per point 16A of ANF 4A at Sl. No. 7 requires 15000 Kgs of import product.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:2/17/80-ALC2/2019 | Party Name: SULZER PUMPS | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA LIMITED | ALC2/2020 | Rejected | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00234/AM20/ | RLA File<br>:03/95/040/00827/AM20/ | Lic.No/Date:0310833126<br>02.12.2019 |
55 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 15.01.2020 followed by reminders on 09.03.2020 & 24.07.2020. However, no information has been received so far. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai.
| Case No.:3/17/80-ALC2/2019 | Party Name: SULZER PUMPS | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA LIMITED | ALC2/2020 | Rejected | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00235/AM20/ | RLA File<br>:03/95/040/00828/AM20/ | Lic.No/Date:0310833143<br>02.12.2019 |
56 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 15.01.2020 followed by reminders on 09.03.2020 & 24.07.2020. However, no information has been received so far. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai.
15 | P a g e
==> picture [476 x 268] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/17/80- Party Name: AZAD ENGINEERING Meet No/Date:5/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :09/24/040/00439/AM20/ Lic.No/Date:0910068244 Pending with<br>:01/80/050/00237/AM20/ 02.12.2019 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>57 3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 186] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/17/80-ALC2/2019 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020&10.09.2020 Approved<br>HQ File RLA File Lic.No/Date:3410045677<br>:01/80/050/00241/AM20/ :34/24/040/00270/AM20/ 03.12.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>58<br>1. Quantity of relevant import items at Sl. No. 1, 2, 5 to 8 & 11 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 4 & 9 may be allowed as 1.05 Kgs/Kg content in the export<br>product.<br>3. Quantity of relevant import item at Sl. No. 10 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 199] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/17/80-ALC2/2019 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020&10.09.2020 Approved<br>HQ File RLA File Lic.No/Date:3410045679<br>:01/80/050/00242/AM20/ :34/24/040/00271/AM20/ 03.12.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>59 1. Quantity of relevant import items at Sl. No. 1 to 13 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 14 may be allowed net to net basis.<br>3. Quantity of relevant import item at Sl. No. 15 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>4. Quantity of relevant import items at Sl. No. 16 to 19 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
16 | P a g e
==> picture [476 x 256] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/17/80- Party Name: AZAD ENGINEERING Meet No/Date:5/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :09/24/040/00437/AM20/ Lic.No/Date:0910068247 Pending with<br>:01/80/050/00243/AM20/ 04.12.2019 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>60<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/17/80- Party Name: DOOWON CLIMATE Meet No/Date:5/80- Status:<br>ALC2/2019 CONTROL INDIA PVT LTD ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :26/24/040/00012/AM20/ Lic.No/Date:2610012887 Pending with<br>:01/80/050/00244/AM20/ 04.12.2019 Firm<br>61 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 24.07.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/17/80- Party Name: KABY PRECISION Meet No/Date:5/80- Status:<br>ALC2/2019 MACHINING PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :09/24/040/00447/AM20/ Lic.No/Date:0910068268 Pending with<br>:01/80/050/00245/AM20/ 06.12.2019 Firm<br>62 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 27.07.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 107] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/18/85- Party Name: AUTOCOMP Meet No/Date:5/80- Status:<br>ALC3/2019 CORPORATION PANSE PVT LTD ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :31/83/040/00120/AM20/ Lic.No/Date:3110067623<br>:01/85/050/00132/AM20/ 10.12.2019<br>63<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to Consultant<br>(Tech-3) for examination & comments.<br>Case is deferred.<br>----- End of picture text -----<br>
17 | P a g e
==> picture [476 x 365] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/19/80- Party Name: BAUMER Meet No/Date:5/80- Status:<br>ALC2/2019 TECHNOLOGIES INDIA ALC2/2020 Approved<br>PRIVATE LIMITED 10.09.2020<br>HQ File RLA File :52/24/040/00051/AM20/ Lic.No/Date:5210043275<br>:01/80/050/00266/AM20/ 23.12.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-3) as under:<br>Sl. ITCHS Quantity Sl. ITCHS Recommended<br>No. Code Export Item No. Code Import Item Norms<br>22MM SOCKET<br>1 90330000 1430 Kgs<br>RAC 1/2 14NPT IX 1.4404<br>18872 Kgs<br>22MM SOCKET<br>2 90330000 RAC G1/2 1.4404 6600 Kgs BRIGHT (including 25%<br>22MM SOCKET 1 72222021 SQUARE BAR wastage) after<br>3 90330000 6000 Kgs 22MM affecting 20%<br>RAC 1/2 14NPT 1.4404<br>64 H11 SS 316L recovery from<br>scrap<br>22MM Socket<br>4 90330000 RAC 1/2 14NPT INOX 1068 Kgs<br>1.4404 316L<br>14MM SOCKET<br>5 90330000 RAC D G1/4 1.4404 470 Kgs 2268 Kgs<br>14MM SOCKET 323.400 BRIGHT (including 40%<br>6 90330000 RAC D 1/4 18NPT 1.4404 Kgs 2 72222021 SQUARE BAR wastage) after<br>14MM SOCKET 14MM affecting 20%<br>7 90330000 RAC F/G SOUDE G1/4 558 Kgs H11 SS 316L recovery from<br>1.4404 scrap<br>14MM SOCKET<br>268.800<br>8 90330000 RAC F/G SOUDE 1/4<br>NPT 1.4404 Kgs<br>Note: Grade of imported steel will be same as used in export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/19/80- Party Name: DILIGENT SCM Meet No/Date:5/80- Status:<br>ALC2/2019 SOLUTIONS PR IVATE LIMITED ALC2/2020&10.09.2020 Rejected<br>HQ File RLA File :09/24/040/00474/AM20/ Lic.No/Date:0910068302<br>:01/80/050/00267/AM20/ 24.12.2019<br>65 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm &RA,<br>Hyderabad on 14.02.2020 followed by reminders on 26.05.2020 & 24.07.2020. However, no information has<br>been received so far. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/19/80-ALC2/2019 Party Name: CRYOGAS Meet No/Date:5/80- Status:<br>EQUIPMENT PVT LTD ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045738 Pending<br>:01/80/050/00269/AM20/ :34/24/040/00287/AM20/ 24.12.2019 with Firm<br>66 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 24.07.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
18 | P a g e
67
| Case No.:9/19/80-ALC2/2019 | Party Name: BONATRANS | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 10.09.2020 | |||||||
| HQ File<br>:01/80/050/00274/AM20/ | RLA File<br>:03/94/040/00785/AM20/ | Lic.No/Date:0310833747<br>27.12.2019 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 24.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/19/80-ALC2/2019 Party Name: TEGA Meet No/Date:5/80- Status:<br>INDUSTRIES LIMITED ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0210209647 Pending<br>:01/80/050/00273/AM20/ :02/24/040/00148/AM20/ 30.12.2019 with Firm<br>68<br>Decision: The Committee considered the case as per the agenda and decided to call the firm for personal hearing<br>on the advice of Consultant (SKB), in the forthcoming NC meeting, since the justification submitted by<br>applicant does not qualify for increasing the wastage..<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:10/19/80-ALC2/2019 | Party Name: BANGALORE | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BIOTECH LABS PVT LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00275/AM20/ | RLA File<br>:07/24/040/00223/AM20/ | Lic.No/Date:0710115950<br>30.12.2019 | Pending<br>with Firm |
69
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.06.2020 followed by a reminder on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 210] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/19/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068312 Pending<br>:01/80/050/00276/AM20/ :09/24/040/00489/AM20/ 31.12.2019 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>70<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>----- End of picture text -----<br>
19 | P a g e
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
-
A video film on complete operations (Cutting, forging and machining) for manufacturing of export item.
Case is deferred.
Case No.:12/19/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068313 Pending :01/80/050/00277/AM20/ :09/24/040/00490/AM20/ 31.12.2019 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
-
What is the exact name of the export product?
-
Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions thereof.
71
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
What is the Rockwell Hardness Number of the final product and forged blank?
-
Detail of any heat treatment, if required.
-
What is the weight of final export item?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
Case No.:13/19/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:5/80- Status: CORPORATION PANSE ALC2/2020 Deferred PRIVATE LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:3110067645 Pending :01/80/050/00278/AM20/ :31/83/040/00128/AM20/ 31.12.2019 with Firm
Decision: The Committee considered the case as per the agenda and Consultant (Tech-3) informed that the firm 72 vide letter dated 26.12.2019 has informed that they have revised items of import. Therefore, the Committee decided to ask from the firm to furnish the following information as per comments of Consultant (Tech-3):
-
To submit a copy of amended AA.
-
Details of wastage claimed.
-
Drawing & calculations may be correlated with export & import list.
Case is deferred.
==> picture [476 x 107] intentionally omitted <==
----- Start of picture text -----<br> Case No.:14/19/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:5/80- Status:<br>ENGINEERING LIMITED ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0510413163 Pending<br>73<br>:01/80/050/00279/AM20/ :05/23/040/00381/AM20/ 01.01.2020 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (SKB) was sent to the firm on 27.08.2020. However, no reply has been<br>received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite<br>----- End of picture text -----<br>
20 | P a g e
information within 15 days.
Case is deferred.
Case No.:15/19/80-ALC2/2019 Party Name: SOGEFI ENGINE Meet No/Date:5/80- Status: SYSTEMS INDIA PRIVATE ALC2/2020 Rejected LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0710115971 :01/80/050/00280/AM20/ :07/24/040/00097/AM20/ 02.01.2020
74 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm &RA, Bangalore on 13.02.2020 followed by reminders on 26.05.2020 & 24.07.2020. However, no information has been received so far. Therefore, the Committee decided to reject the under intimation to RA, Bangalore.
Case No.:17/19/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:5/80- Status: ENGINEERING LIMITED ALC2/2020 Deferred 10.09.2020 HQ File RLA File Lic.No/Date:0510413181 Pending :01/80/050/00282/AM20/ :05/23/040/00378/AM20/ 02.01.2020 with Firm
75 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the firm on 24.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
Case No.:1/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068392 Pending :01/80/050/00295/AM20/ :09/24/040/00522/AM20/ 21.01.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
- Provide complete neat coloured drawing of the product with Top, Side and Front view and dimensions thereof.
76
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
21 | P a g e
==> picture [476 x 280] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068393 Pending<br>:01/80/050/00296/AM20/ :09/24/040/00523/AM20/ 21.01.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>77<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
Case No.:3/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068394 Pending :01/80/050/00297/AM20/ :09/24/040/00524/AM20/ 21.01.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
78
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
22 | P a g e
==> picture [476 x 280] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068395 Pending<br>:01/80/050/00298/AM20/ :09/24/040/00528/AM20/ 21.01.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>79<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 228] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/21/80-ALC2/2019 Party Name: MAHINDRA Meet No/Date:5/80- Status:<br>DEFENCE SYSTEMS LTD ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0510413404<br>:01/80/050/00299/AM20/ :05/24/040/00602/AM20/ 21.01.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>80 ITCHS Sl. ITCHS Recommended<br>Export Item Quantity Import Item<br>Code No. Code Norms<br>APC, LHD, With Base Crane assy (Net<br>1 84269100<br>Ballistic Stanag-2, to Net)<br>Net to net basis<br>Blast Protection of Extension Arm assy<br>2 84269100 with nil wastage<br>87100000 stanag-4, Diesel, 5 Number (Net to Net)<br>and<br>6X6 base vehicle<br>with winch 3 90079140 Camera & Illuminator accountability<br>Kit (Net to Net)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:7/21/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00301/AM20/ | RLA File<br>:34/24/040/00329/AM20/ | Lic.No/Date:3410045799<br>21.01.2020 | Pending<br>with Firm |
81 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.
Case is deferred.
23 | P a g e
| Case No.:8/21/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020 | |||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00302/AM20/ | RLA File<br>:34/24/040/00330/AM20/ | Lic.No/Date:3410045800<br>21.01.2020 | Pending<br>with Firm |
82 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.
Case is deferred.
| Case No.:9/21/80-ALC2/2019 | Party Name: MICRON | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00303/AM20/ | RLA File<br>:05/24/040/00398/AM20/ | Lic.No/Date:0510413428<br>23.01.2020 | Pending<br>with Firm |
83 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 24.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:10/21/80-ALC2/2019 | Party Name: THERMAL | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| SYSTEMS (HYDERABAD) | ALC2/2020 | Deferred | ||||
| P.LTD. | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00304/AM20/ | RLA File<br>:09/24/040/00506/AM20/ | Lic.No/Date:0910068410<br>24.01.2020 | Pending<br>with Firm |
84 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:12/21/80-ALC2/2019 | Party Name: KAY BOUVET | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00306/AM20/ | RLA File<br>:31/83/040/00139/AM20/ | Lic.No/Date:3110067666<br>27.01.2020 | Pending<br>with Firm |
85 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 09.03.2020 followed by a reminder on 27.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.
Case is deferred.
24 | P a g e
==> picture [476 x 210] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/21/80-ALC2/2019 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3410045818<br>:01/80/050/00307/AM20/ :34/24/040/00336/AM20/ 28.01.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>86<br>1. Quantity of relevant import items at Sl. No. 1 to 20 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 21 may be allowed net to net basis.<br>3. Quantity of relevant import item at Sl. No. 27 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>4. Quantity of relevant import items at Sl. No. 22 to 26 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 197] intentionally omitted <==
----- Start of picture text -----<br> Case No.:14/21/80-ALC2/2019 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3410045819<br>:01/80/050/00308/AM20/ :34/24/040/00337/AM20/ 28.01.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>87<br>1. Quantity of relevant import items at Sl. No. 1 to 5 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 6 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>3. Quantity of relevant import items at Sl. No. 7 to 12 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
Case No.:15/21/80-ALC2/2019 Party Name: HANNING Meet No/Date:5/80- Status: MOTORS INDIA P LTD ALC2/2020 Approved 10.09.2020 HQ File RLA File Lic.No/Date:3410045820 :01/80/050/00309/AM20/ :34/24/040/00338/AM20/ 28.01.2020
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:
88
-
Quantity of relevant import items at Sl. No. 1 to 8 may be allowed as per GN-4.
-
Quantity of relevant import item at Sl. No. 9 may be allowed as 1.01 Kgs/Kg content in the export product.
-
Quantity of relevant import items at Sl. No. 10 to 11 may be allowed as 1.05 Kgs/Kg content in the export product.
25 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:17/21/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:5/80- Status:<br>AUTOMOTIVES PVT. LTD. ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0510413478 Pending<br>:01/80/050/00311/AM20/ :05/23/040/00359/AM20/ 29.01.2020 with MSME<br>89<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME on 16.09.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:18/21/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00312/AM20/ | RLA File<br>:34/24/040/00341/AM20/ | Lic.No/Date:3410045830<br>30.01.2020 | Pending<br>with Firm |
90 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.
Case is deferred.
| Case No.:19/21/80-ALC2/2019 | Party Name: BENGAL | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES PVT. LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00313/AM20/ | RLA File<br>:05/23/040/00415/AM20/ | Lic.No/Date:0510413481<br>30.01.2020 | Pending<br>with Firm |
91 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 27.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:20/21/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00314/AM20/ | RLA File<br>:34/24/040/00344/AM20/ | Lic.No/Date:3410045838<br>30.01.2020 | Pending<br>with Firm |
92 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.
Case is deferred.
26 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:21/21/80-ALC2/2019 Party Name: BHARAT HEAVY Meet No/Date:5/80- Status:<br>ELECTRICALS LIMITED ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:1110028681 Pending<br>:01/80/050/00315/AM20/ :11/24/040/00011/AM20/ 31.01.2020 with DPIIT<br>93<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>DPIIT on 03.09.2020 for examination of the case. However, DPIIT informed that the case is under examination.<br>Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:22/21/80-ALC2/2019 | Party Name: JAIN IRRIGATION | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| SYSTEMS LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00316/AM20/ | RLA File<br>:03/94/040/00435/AM20/ | Lic.No/Date:0310834593<br>03.02.2020 | Pending<br>with Firm |
94
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 09.03.2020 followed by a reminder 04.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 279] intentionally omitted <==
----- Start of picture text -----<br> Case No.:23/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068441 Pending<br>:01/80/050/00317/AM20/ :09/24/040/00557/AM20/ 03.02.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>95<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
27 | P a g e
==> picture [476 x 280] intentionally omitted <==
----- Start of picture text -----<br> Case No.:24/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068442 Pending<br>:01/80/050/00318/AM20/ :09/24/040/00559/AM20/ 03.02.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>96<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 279] intentionally omitted <==
----- Start of picture text -----<br> Case No.:25/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068443 Pending<br>:01/80/050/00319/AM20/ :09/24/040/00552/AM20/ 03.02.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>97<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging, and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
28 | P a g e
==> picture [476 x 280] intentionally omitted <==
----- Start of picture text -----<br> Case No.:26/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068444 Pending<br>:01/80/050/00320/AM20/ :09/24/040/00554/AM20/ 03.02.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>98<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging, and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 279] intentionally omitted <==
----- Start of picture text -----<br> Case No.:27/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068445 Pending<br>:01/80/050/00321/AM20/ :09/24/040/00553/AM20/ 03.02.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>99<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging, and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
29 | P a g e
| Case No.:31/21/80-ALC2/2019 | Party Name: TEMA INDIA | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00325/AM20/ | RLA File<br>:03/95/040/01062/AM20/ | Lic.No/Date:0310834668<br>06.02.2020 | Pending<br>with Firm |
100 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 09.03.2020 followed by a reminder on 20.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:15/22/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:5/80- Status:<br>PRIVATE LIMITED ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3110067680 Pending<br>:01/80/050/00341/AM20/ :31/83/040/00145/AM20/ 11.02.2020 with Firm<br>101<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 09.03.2020 followed by a reminder on<br>20.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind<br>again the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 157] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/23/80-ALC2/2019 Party Name: MANN AND Meet No/Date:5/80- Status:<br>HUMMEL FILTER PVT.LTD. ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0710116157<br>:01/80/050/00347/AM20/ :07/24/040/00271/AM20/ 20.02.2020<br>102 Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DHI as under:<br>1. Quantity of relevant import items may be allowed as per GN-4 without any wastage on weight &<br>number terms.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:4/23/80-ALC2/2019 | Party Name: RONCH | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| POLYMERS PVT LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00349/AM20/ | RLA File<br>:03/95/040/01089/AM20/ | Lic.No/Date:0310834951<br>20.02.2020 |
103 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-1) on 04.09.2020 for examination of the case. However, Consultant (Tech 1) informed that the reply which firm had submitted for their AA 0310833381 dated 12.12.2019 is insufficient. Hence, the Committee decided to inform the firm to submit their reply in the matter at the earliest.
Case is deferred.
30 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/23/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:5/80- Status:<br>AUTOMOTIVES LTD. ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0510413679 Pending<br>:01/80/050/00348/AM20/ :05/23/040/00424/AM20/ 21.02.2020 with MSME<br>104<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent<br>to MSME on 16.09.2020 for examination of the case. However, no comments have been received yet. Hence,<br>the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 197] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/23/80-ALC2/2019 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3410045900<br>:01/80/050/00350/AM20/ :34/24/040/00368/AM20/ 21.02.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>105<br>1. Quantity of relevant import items at Sl. No. 1 to 6 & 9 may be allowed as per GN-4.<br>2. Quantity of relevant import items at Sl. No. 7 may be allowed as 1.05 Kgs/Kg content in the export<br>product.<br>3. Quantity of relevant import item at Sl. No. 8 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/23/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:5/80- Status:<br>TURBINE GENERATORS ALC2/2020 Deferred<br>PRIVATE LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0310835043 Pending<br>:01/80/050/00351/AM20/ :03/95/040/01074/AM20/ 25.02.2020 with Firm<br>----- End of picture text -----<br>
106 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 20.05.2020 followed by a reminder on 04.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.
Case is deferred.
| Case No.:7/23/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00352/AM20/ | RLA File<br>:34/24/040/00375/AM20/ | Lic.No/Date:3410045913<br>28.02.2020 | Pending<br>with Firm |
107 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.
Case is deferred.
31 | P a g e
==> picture [476 x 280] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/23/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068531 Pending<br>:01/80/050/00353/AM20/ :09/24/040/00595/AM20/ 02.03.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>108<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
Case No.:9/23/80-ALC2/2019 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068532 Pending :01/80/050/00354/AM20/ :09/24/040/00594/AM20/ 02.03.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
109
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
32 | P a g e
==> picture [476 x 155] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/23/80- Party Name: ACEINOTEC Meet No/Date:5/80- Status:<br>ALC2/2019 MANUFACTURING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File :07/24/040/00294/AM20/ Lic.No/Date:0710116194 Pending with<br>:01/80/050/00357/AM20/ 02.03.2020 Firm<br>110 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. Per unit weight of each export product.<br>2. Manufacturing processes performed on casting blanks with step wise wastage and material balancing.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/1/80- Party Name: AAVID Meet No/Date:5/80- Status:<br>ALC2/2020 THERMALLOY INDIA PVT. LTD. ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :34/24/040/00395/AM20/ Lic.No/Date:3410045959 Pending with<br>:01/80/050/00377/AM20/ 18.03.2020 Firm<br>111 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 27.07.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:2/1/80-ALC2/2020 | Party Name: AVLIGHT | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| AUTOMOTIVES PVT. LTD. | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00378/AM20/ | RLA File<br>:05/23/040/00470/AM20/ | Lic.No/Date:0510413923<br>19.03.2020 | Pending<br>with MSME |
112
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 16.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
113
Case No.:5/1/80-ALC2/2020 Party Name: WHEELS INDIA Meet No/Date:5/80- Status: LIMITED ALC2/2020&10.09.2020 Deferred HQ File RLA File Lic.No/Date:0410166653 :01/80/050/00381/AM21/ :04/24/040/00205/AM20/ 02.04.2020
Decision: The Committee considered the case as per the agenda and decided to refer the case to Consultant (Tech-3) for examination & comments.
Case is deferred.
| Case No.:6/1/80-ALC2/2020 | Party Name: NEO STRUCTO | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| CONSTRUCTION PVT. LTD. | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00382/AM21/ | RLA File<br>:52/24/040/00083/AM20/ | Lic.No/Date:5210043372<br>04.04.2020 | Pending<br>with DPIIT |
114 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 08.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
33 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/1/80-ALC2/2020 Party Name: UNI VTL Meet No/Date:5/80- Status:<br>PRECISION PVT. LTD. ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710116329 Pending<br>:01/80/050/00383/AM21/ :07/24/040/00002/AM21/ 07.04.2020 with Firm<br>115 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 24.07.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 247] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/1/80-ALC2/2020 Party Name: IND-SPHINX Meet No/Date:5/80- Status:<br>PRECISION LIMITED ALC2/2020&10.09.2020 Approved<br>HQ File RLA File Lic.No/Date:3010105121<br>:01/80/050/00387/AM21/ :30/24/040/00140/AM20/ 07.04.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>ITCHS Sl. ITCHS Recommended<br>Export Item Quantity Import Item<br>Code No. Code Norms<br>116 Tungsten carbide shank Net to net basis<br>PCB Drill made<br>1 73269091 dia 3.25+/-0.20mm, with nil wastage<br>from composite length 25+/-2.00mm and accountability<br>blank of Tungsten<br>Tungsten Carbide Pin, Net to net basis<br>Carbide of drill,<br>100000 2 82090090 dia 5.25+/-1.50mm and with nil wastage<br>82075000 dia 3.20 mm to<br>Number length 13+/-2.00mm and accountability<br>6.50mm with<br>shank a) Diamond Grinding<br>dia 3.175 mm and 3 68042190 Wheel, b) Marking Upto 5% of FoB<br>Solution, c) Ultrasonic value<br>length 38.10 mm<br>Solution (5% of FoB)<br>1. Weight of export item will be equal to weight of import item Sl. No. 1 & 2.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/1/80-ALC2/2020 Party Name: AUTO TECH Meet No/Date:5/80- Status:<br>INDUSTRIES INDIA PVT LTD ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0410166662 Pending<br>:01/80/050/00384/AM21/ :04/24/040/00002/AM21/ 08.04.2020 with Firm<br>117 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 24.07.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:9/1/80-ALC2/2020 | Party Name: NIPHA EXPORTS | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIM ITED | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00385/AM21/ | RLA File<br>:02/24/040/00199/AM20/ | Lic.No/Date:0210209839<br>09.04.2020 | Pending<br>with Firm |
118 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 24.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
34 | P a g e
| Case No.:10/1/80-ALC2/2020 | Party Name: TPI COMPOSITES | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00386/AM21/ | RLA File<br>:04/24/040/00001/AM21/ | Lic.No/Date:0410166666<br>13.04.2020 | Pending<br>with Tech-3 |
119
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 14.09.2020 for examination. However, Consultant (Tech 3) suggested referring the case to Consultant (Tech 1). Therefore, the Committee decided to forward the case to Consultant (Tech 1).
Case is deferred.
==> picture [476 x 268] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/1/80- Party Name: AZAD ENGINEERING Meet No/Date:5/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :09/24/040/00647/AM20/ Lic.No/Date:0910068616 Pending with<br>:01/80/050/00389/AM21/ 17.04.2020 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>2. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>120 3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 257] intentionally omitted <==
----- Start of picture text -----<br> Case No.:14/1/80- Party Name: AZAD ENGINEERING Meet No/Date:5/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :09/24/040/00648/AM20/ Lic.No/Date:0910068617 Pending with<br>:01/80/050/00390/AM21/ 17.04.2020 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>121<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
35 | P a g e
==> picture [476 x 279] intentionally omitted <==
----- Start of picture text -----<br> Case No.:15/1/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068618 Pending<br>:01/80/050/00391/AM21/ :09/24/040/00649/AM20/ 17.04.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>122<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 280] intentionally omitted <==
----- Start of picture text -----<br> Case No.:16/1/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068619 Pending<br>:01/80/050/00392/AM21/ :09/24/040/00650/AM20/ 17.04.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>123<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
36 | P a g e
==> picture [476 x 280] intentionally omitted <==
----- Start of picture text -----<br> Case No.:17/1/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068620 Pending<br>:01/80/050/00393/AM21/ :09/24/040/00651/AM20/ 17.04.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>124<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
Case No.:18/1/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068621 Pending :01/80/050/00394/AM21/ :09/24/040/00652/AM20/ 17.04.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
125
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
37 | P a g e
Case No.:19/1/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068622 Pending :01/80/050/00395/AM21/ :09/24/040/00653/AM20/ 17.04.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
126
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
Case No.:20/1/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068623 Pending :01/80/050/00396/AM21/ :09/24/040/00654/AM20/ 17.04.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
127
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
38 | P a g e
==> picture [476 x 171] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/1/80- Party Name: UNDERCARRIAGE Meet No/Date:5/80- Status:<br>ALC2/2020 AND TRACTOR PARTS ALC2/2020 Approved<br>PRIVATE LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0310835622<br>:01/80/050/00388/AM21/ :03/95/040/01188/AM20/ 18.04.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>128<br>written comments of MSME as under:<br>1. Quantity of relevant import items at Sl. No. 15 may be allowed as 513419 Kgs inclusive of 35.10%<br>wastage after affecting 1/3 [rd] recovery from scrap.<br>2. Quantity of rest of the import items may be allowed as per GN-4.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
129
| Case No.:21/1/80-ALC2/2020 | Party Name: TPI COMPOSITES | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 10.09.2020 | |||||||
| HQ File<br>:01/80/050/00397/AM21/ | RLA File<br>:04/24/040/00003/AM21/ | Lic.No/Date:0410166684<br>22.04.2020 | Pending<br>with Tech-3 |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 14.09.2020 for examination. However, Consultant (Tech 3) suggested referring the case to Consultant (Tech 1). Therefore, the Committee decided to forward the case to Consultant (Tech 1).
Case is deferred.
==> picture [476 x 156] intentionally omitted <==
----- Start of picture text -----<br> Case No.:22/1/80-ALC2/2020 Party Name: ACEINOTEC Meet No/Date:5/80- Status:<br>MANUFACTURING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0710116365 Pending<br>:01/80/050/00398/AM21/ :07/24/040/00016/AM21/ 23.04.2020 with Firm<br>130 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. Per unit weight of each export product.<br>2. Manufacturing processes performed on casting blanks with step wise wastage and material balancing.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 188] intentionally omitted <==
----- Start of picture text -----<br> Case No.:23/1/80-ALC2/2020 Party Name: KINECO KAMAN Meet No/Date:5/80- Status:<br>COMPOSITES - INDIA PVT ALC2/2020 Deferred<br>LTD 10.09.2020<br>HQ File RLA File Lic.No/Date:0310835847 Pending<br>:01/80/050/00399/AM21/ :03/94/040/01087/AM20/ 25.04.2020 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DPIIT vide U. O. No.: P-47011/193/2019-TSW dated 13.08.2020 :<br>131<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Weight of each Export Product.<br>3. Assembly drawings/diagrams of the resultant product showing placement and exact use of components<br>in the export product (s).<br>4. Bifurcated quantities of components to be accounted for in the resultant product and the requirement<br>of components as spares. Raw Material / Consumables.<br>----- End of picture text -----<br>
39 | P a g e
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
-
Details of import items at Sl. No. 13, 20, 22, 25 & 30 (As description has been indicated in codeNumber) and their specific use in the export items.
-
Quantities of import items (Components, raw materials, consumable wise) to be accounted for in the export products.
-
Basis/justification for the quantities of import items.
Case is deferred.
| Case No.:24/1/80- | Party Name: NETAFIM | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT.LTD. | ALC2/2020 | Deferred | |||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00400/AM21/ | RLA File :34/24/040/00022/AM19/ | Lic.No/Date:3410046010<br>27.04.2020 | Pending with<br>Firm |
132 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (Tech-1):
- Exact specification of import item i.e. DRIPNET PC and justification for 5% wastage.
Case is deferred.
==> picture [476 x 249] intentionally omitted <==
----- Start of picture text -----<br> Case No.:25/1/80- Party Name: NETAFIM Meet No/Date:5/80- Status:<br>ALC2/2020 IRRIGATION INDIA ALC2/2020 Approved<br>PVT.LTD. 10.09.2020<br>HQ File RLA File Lic.No/Date:3410046013<br>:01/80/050/00401/AM21/ :34/24/040/00028/AM19/ 27.04.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-1) as under:<br>ITCHS Export Item Quantity Sl. ITCHS Import Item Recommended Norms<br>133 Code No. Code<br>1.02 Kgs/Kg content in<br>Micro Irrigation 1 39011010 LLDPE the export product<br>Equipment<br>Masterbatch 1.02 Kgs/Kg content in<br>(Emitting Pipe 2 32064990<br>950000 (Plasblak) the export product<br>84248200 System) Pe Pipe 16/<br>Meter 1.02 Kgs/Kg content in<br>2.5/ 1.2mm 400m 3 39012000 HDPE<br>IND Net Weight the export product<br>51.46 GMS/MTR 4 32064990 Color 1.02 Kgs/Kg content in<br>Masterbatch the export product<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
40 | P a g e
Case No.:26/1/80-ALC2/2020 Party Name: NETAFIM Meet No/Date:5/80- Status: IRRIGATION INDIA ALC2/2020 Approved PVT.LTD. 10.09.2020 HQ File RLA File Lic.No/Date:3410046015 :01/80/050/00402/AM21/ :34/24/040/00088/AM19/ 27.04.2020
| Case No.:26/1/80-ALC2/2020Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD.<br>Meet No/Date:5/80-<br>ALC2/2020<br>10.09.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00402/AM21/<br>RLA File<br>:34/24/040/00088/AM19/<br>Lic.No/Date:3410046015<br>27.04.2020 | Case No.:26/1/80-ALC2/2020 <br> <br> | Case No.:26/1/80-ALC2/2020 <br> <br> | Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. | Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. | Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. | Meet No/Date:5/80-<br>ALC2/2020<br>10.09.2020 | Meet No/Date:5/80-<br>ALC2/2020<br>10.09.2020 | Meet No/Date:5/80-<br>ALC2/2020<br>10.09.2020 | Status:<br>Approved |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00402/AM21/<br> <br>: | RLA File<br>34/24/040/00088/AM19/ | Lic.No/Date:3410046015<br>27.04.2020 | |||||||
| 134 | **Decision:The Committee considered the case as per agenda and d<br>written comments ofConsultant (Tech-1)**as under: | ecided toratifythe ad-hoc | |||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Norms | |||
| 84248200 | Micro Irrigation<br>Equipment<br>(Emitting Pipe<br>System) PE PIPE<br>12/2.5/ 0.9- 1.1MM<br>CL-II 400M IND<br>Net Weight 32.85<br>GMS/MTR | 150000<br>Meter | 1 | 39011010 | LLDPE | ||||
| 2 | 32064990 | Masterbatch<br>(Plasblak) | 1.02 Kgs/Kg content in<br>the exportproduct | ||||||
| 3 | 39012000 | HDPE | 1.02 Kgs/Kg content in<br>the exportproduct | ||||||
| 4 | 32064990 | Color<br>Masterbatch<br>(Plasblak) | 1.02 Kgs/Kg content in<br>the export product | ||||||
| RA concerned maytake further necessaryaction asper the decision o | f NC. |
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of Consultant (Tech-1) as under:
| Case No.:27/1/80-ALC2/2020 | Party Name: NETAFIM | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| IRRIGATION INDIA PVT.LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00403/AM21/ | RLA File<br>:34/24/040/00245/AM19/ | Lic.No/Date:3410046016<br>27.04.2020 |
135
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-1) on 22.07.2020 for examination of the case. However, Consultant (Tech-1) requested to send again the copy of application to examine the case. Therefore, the Committee decided to send again a copy of application to Consultant (Tech-1).
Case is deferred.
| Case No.:28/1/80-ALC2/2020 | Party Name: NETAFIM | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| IRRIGATION INDIA PVT.LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00404/AM21/ | RLA File<br>:34/24/040/00267/AM18/ | Lic.No/Date:3410046009<br>27.04.2020 | Pending<br>with Firm |
136 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (Tech-1):
- Generic name of import item at Sl. No. 5 (HI KAFRIT) .
Case is deferred.
==> picture [476 x 96] intentionally omitted <==
----- Start of picture text -----<br> Case No.:29/1/80-ALC2/2020 Party Name: NETAFIM Meet No/Date:5/80- Status:<br>IRRIGATION INDIA PVT.LTD. ALC2/2020 Deferred<br>10.09.2020<br>137 HQ File RLA File Lic.No/Date:3410046014<br>:01/80/050/00405/AM21/ :34/24/040/00313/AM16/ 27.04.2020<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent<br>to Consultant (Tech-1) on 04.08.2020 for examination of the case. However, Consultant (Tech-1) requested to<br>----- End of picture text -----<br>
41 | P a g e
send again the copy of application to examine the case. Therefore, the Committee decided to send again a copy of application to Consultant (Tech-1).
Case is deferred.
==> picture [476 x 250] intentionally omitted <==
----- Start of picture text -----<br> Case No.:30/1/80-ALC2/2020 Party Name: NETAFIM Meet No/Date:5/80- Status:<br>IRRIGATION INDIA ALC2/2020 Approved<br>PVT.LTD. 10.09.2020<br>HQ File RLA File Lic.No/Date:3410046012<br>:01/80/050/00406/AM21/ :34/24/040/00326/AM18/ 27.04.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-1) as under:<br>ITCHS Export Item Quantity Sl. ITCHS Import Item Recommended Norms<br>138 Code No. Code<br>Micro Irrigation 1 39011090 LDPE 1.02 Kgs/Kg content in<br>Equipments the export product<br>(Emmitting Pipe 1.02 Kgs/Kg content in<br>2 39011010 LLDPE<br>System) PE PIPE 150000 the export product<br>84248200<br>20/4/ 1.5-1.7MM Meter Masterbatch 1.02 Kgs/Kg content in<br>3 32064990<br>400M IND (Plasblak) the export product<br>Net Weight 91.90 Color 1.02 Kgs/Kg content in<br>4 32064990<br>GMS/MTR Masterbatch the export product<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:31/1/80-ALC2/2020 | Party Name: NETAFIM | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| IRRIGATION INDIA PVT.LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00407/AM21/ | RLA File<br>:34/24/040/00368/AM18/ | Lic.No/Date:3410046011<br>27.04.2020 | Pending<br>with Firm |
139 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (Tech-1):
- Exact specification of import item i.e. DRIPNET PC and justification for 5% wastage.
Case is deferred.
| Case No.:32/1/80-ALC2/2020 | Party Name: NETAFIM | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| IRRIGATION INDIA PVT.LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00408/AM21/ | RLA File<br>:34/24/040/00246/AM18/ | Lic.No/Date:3410046017<br>27.04.2020 | Pending<br>with Firm |
140 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (Tech-1):
- Exact specification of import item i.e. STREMLIN DRIP and justification for 5% wastage.
Case is deferred.
42 | P a g e
Case No.:33/1/80- Party Name: NETAFIM Meet No/Date:5/80- Status: ALC2/2020 IRRIGATION INDIA PVT.LTD. ALC2/2020&10.09.2020 Approved HQ File RLA File :34/24/040/00375/AM18/ Lic.No/Date:3410046018 :01/80/050/00409/AM21/ 27.04.2020
| Case No.:33/1/80-<br>ALC2/2020<br>Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD.<br>Meet No/Date:5/80-<br>ALC2/2020&10.09.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00409/AM21/<br>RLA File :34/24/040/00375/AM18/ Lic.No/Date:3410046018<br>27.04.2020 | Case No.:33/1/80-<br>ALC2/2020 | Case No.:33/1/80-<br>ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | Meet No/Date:5/80-<br>ALC2/2020&10.09.2020 | Meet No/Date:5/80-<br>ALC2/2020&10.09.2020 | Meet No/Date:5/80-<br>ALC2/2020&10.09.2020 | Status:<br>Approved |
|---|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00409/AM21/ | RLA File :34/24/040/00375/AM18/ | Lic.No/Date:3410046018<br>27.04.2020 | ||||||||
| 141 | **Decision:The Committee considered the case as per agenda and<br>written comments ofConsultant (Tech-1)**as under: | |||||||||
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Norms | ||||
| 84248200 | Micro Irrigation<br>Equipment<br>(Emmiting Pipe<br>System) PE Pipe<br>16/2.5/1.2MM<br>400M IND Net<br>Weight 51.46<br>GMS/METER | 300000<br>Meter | 1 | 39011010 | LLDPE | |||||
| 2 | 32064990 | Masterbatch<br>(Plasblak) | 1.02 Kgs/Kg content in<br>the exportproduct | |||||||
| 3 | 39012000 | HDPE | 1.02 Kgs/Kg content in<br>the exportproduct | |||||||
| 4 | 32064990 | Color<br>Masterbatch | 1.02 Kgs/Kg content in<br>the exportproduct | |||||||
| RA concerned maytake further necessaryaction asper the decision of NC. |
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of Consultant (Tech-1) as under:
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:34/1/80-ALC2/2020 Party Name: NETAFIM Meet No/Date:5/80- Status:<br>IRRIGATION INDIA PVT.LTD. ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046019 Pending<br>:01/80/050/00410/AM21/ :34/24/040/00250/AM18/ 27.04.2020 with Firm<br>142 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (Tech-1):<br>1. Exact specification of import item i.e. STREMLIN DRIP and justification for 5% wastage.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:35/1/80-ALC2/2020 Party Name: NETAFIM Meet No/Date:5/80- Status:<br>IRRIGATION INDIA PVT.LTD. ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046020 Pending with<br>:01/80/050/00411/AM21/ :34/24/040/00289/AM18/ 27.04.2020 Firm<br>143 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (Tech-1):<br>1. Exact specification of import item i.e. STREMLIN DRIP and justification for 5% wastage.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:36/1/80-ALC2/2020 Party Name: NETAFIM Meet No/Date:5/80- Status:<br>IRRIGATION INDIA PVT.LTD. ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046021 Pending with<br>:01/80/050/00412/AM21/ :34/24/040/00251/AM18/ 27.04.2020 Firm<br>144 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (Tech-1):<br>1. Exact specification of import item i.e. MICRO DRIP DRIPPER and justification for 5% wastage.<br>Case is deferred.<br>----- End of picture text -----<br>
43 | P a g e
| Case No.:37/1/80-ALC2/2020 | Party Name: NETAFIM | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| IRRIGATION INDIA PVT.LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00413/AM21/ | RLA File<br>:34/24/040/00395/AM18/ | Lic.No/Date:3410046022<br>27.04.2020 | Pending<br>with Firm |
145 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (Tech-1):
- Exact specification of import item i.e. EMITTERS DRIPPER and justification for 5% wastage. Case is deferred.
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:38/1/80-ALC2/2020 Party Name: NETAFIM Meet No/Date:5/80- Status:<br>IRRIGATION INDIA PVT.LTD. ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3410046023 Pending<br>:01/80/050/00414/AM21/ :34/24/040/00310/AM18/ 27.04.2020 with Firm<br>146<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (Tech-1):<br>1. Exact specification of import item i.e. STREMLIN DRIP and justification for 5% wastage.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:39/1/80-ALC2/2020 | Party Name: NETAFIM | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| IRRIGATION INDIA PVT.LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00415/AM21/ | RLA File<br>:34/24/040/00258/AM18/ | Lic.No/Date:3410046024<br>27.04.2020 | Pending<br>with Firm |
147 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (Tech-1):
- Exact specification of import item i.e. MICRO DRIP DRIPPER and justification for 5% wastage. Case is deferred.
| Case No.:40/1/80-ALC2/2020 | Party Name: NETAFIM | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| IRRIGATION INDIA PVT.LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00416/AM21/ | RLA File<br>:34/24/040/00268/AM18/ | Lic.No/Date:3410046025<br>27.04.2020 | Pending<br>with Firm |
148 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 04.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
44 | P a g e
Case No.:41/1/80- Party Name: NETAFIM Meet No/Date:5/80- ALC2/2020 IRRIGATION INDIA PVT.LTD. ALC2/2020&10.09.2020 HQ File RLA File :34/24/040/00187/AM19/ Lic.No/Date:3410046026 :01/80/050/00417/AM21/ 27.04.2020
Status: Approved
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of Consultant (Tech-1) as under:
149
==> picture [445 x 119] intentionally omitted <==
----- Start of picture text -----<br> ITCHS Export Item Quantity Sl. ITCHS Import Item Recommended Norms<br>Code No. Code<br>Micro Irrigation 1 39011090 LDPE 1.02 Kgs/Kg content in<br>Equipment the export product<br>(Emmitting Pipe 1.02 Kgs/Kg content in<br>2 39011010 LLDPE<br>System) PE Pipe 150000 the export product<br>84248200<br>20/4/ 1.5-1.7MM Meter Masterbatch 1.02 Kgs/Kg content in<br>3 32064990<br>400M IND Net (Plasblak) the export product<br>Weight 91.90 Color 1.02 Kgs/Kg content in<br>4 32064990<br>GMS/METER Masterbatch the export product<br>----- End of picture text -----<br>
==> picture [476 x 268] intentionally omitted <==
----- Start of picture text -----<br> Case No.:42/1/80- Party Name: AZAD ENGINEERING Meet No/Date:5/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :09/24/040/00639/AM20/ Lic.No/Date:0910068678 Pending with<br>:01/80/050/00418/AM21/ 28.04.2020 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>150 3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product?<br>4. Why not forged SS plate of same the composition for manufacturing of export item, if it is not in<br>round in shape after cutting into required dimensions?<br>5. What is the Rockwell Hardness Number of the final product and forged blank?<br>6. Detail of any heat treatment, if required.<br>7. What is the weight of final export item?<br>8. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>9. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
Case No.:43/1/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068679 Pending :01/80/050/00419/AM21/ :09/24/040/00640/AM20/ 28.04.2020 with Firm
151 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
45 | P a g e
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
Case No.:44/1/80- Party Name: NETAFIM IRRIGATION Meet No/Date:5/80- Status: ALC2/2020 INDIA PVT.LTD. ALC2/2020&10.09.2020 Deferred HQ File RLA File :34/24/040/00192/AM18/ Lic.No/Date:3410046027 Pending with :01/80/050/00420/AM21/ 28.04.2020 Firm
-
152 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (Tech-1):
- Exact specification of import item i.e. STREMLIN DRIP and justification for 5% wastage.
Case is deferred.
Case No.:45/1/80- Party Name: NETAFIM Meet No/Date:5/80- Status: ALC2/2020 IRRIGATION INDIA PVT.LTD. ALC2/2020&10.09.2020 Approved HQ File RLA File :34/24/040/00342/AM18/ Lic.No/Date:3410046028 :01/80/050/00421/AM21/ 28.04.2020
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of Consultant (Tech-1) as under:
153
==> picture [446 x 119] intentionally omitted <==
----- Start of picture text -----<br> ITCHS Export Item Quantity Sl. ITCHS Import Item Recommended Norms<br>Code No. Code<br>Micro Irrigation 1 39011010 LLDPE 1.02 Kgs/Kg content in<br>Equipment the export product<br>(Emmiting Pipe Masterbatch 1.02 Kgs/Kg content in<br>2 32064990<br>System) PE Pipe 350000 (Plasblak) the export product<br>84248200<br>16/2.5/1.2MM Meter Color 1.02 Kgs/Kg content in<br>3 32064990<br>400M IND Net Masterbatch the export product<br>Weight 48.568 1.02 Kgs/Kg content in<br>4 39012000 HDPE<br>GMS/METER the export product<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:46/1/80- Party Name: NETAFIM Meet No/Date:5/80- Status:<br>ALC2/2020 IRRIGATION INDIA PVT.LTD. ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :34/24/040/00325/AM18/ Lic.No/Date:3410046029 Pending with<br>:01/80/050/00422/AM21/ 28.04.2020 Firm<br>154 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 04.08.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
46 | P a g e
155
| Case No.:47/1/80-ALC2/2020 | Party Name: NETAFIM | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| IRRIGATION INDIA PVT.LTD. | ALC2/2020 | Deferred | |||||
| 10.09.2020 | |||||||
| HQ File<br>:01/80/050/00423/AM21/ | RLA File<br>:34/24/040/00030/AM20/ | Lic.No/Date:3410046030<br>28.04.2020 | Pending<br>with Firm |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (Tech-1):
- Exact specification of import item i.e. STREMLIN DRIP and justification for 5% wastage.
Case is deferred.
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.:48/1/80-ALC2/2020 Party Name: NETAFIM Meet No/Date:5/80- Status:<br>IRRIGATION INDIA PVT.LTD. ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3410046031<br>156 :01/80/050/00424/AM21/ :34/24/040/00029/AM20/ 28.04.2020<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application is being<br>sent to Consultant (Tech-1) for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 327] intentionally omitted <==
----- Start of picture text -----<br> Case No.:49/1/80-ALC2/2020 Party Name: HUMANETICS Meet No/Date:5/80- Status:<br>INNOVATIVE SOLUTIONS ALC2/2020 Deferred<br>INDIA PRIVATE LIMI 10.09.2020<br>HQ File RLA File Lic.No/Date:0710116407 Pending<br>:01/80/050/00425/AM21/ :07/24/040/00001/AM21/ 30.04.2020 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DPIIT vide U. O. No.: P-47011/193/2019-TSW dated 13.08.2020 :<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Information about the inputs required per unit of the resultant product as per Sl. No. 1 of<br>Appendix-11A appearing in current HBP (Vol.I) separately for each product.<br>157 3. Assembly drawings/diagrams of the resultant product showing placement and exact use of<br>components in the export product (s).<br>4. Bifurcated quantities of components to be accounted for in the resultant product and the<br>requirement of components as spares. Raw Material / Consumables.<br>5. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components to<br>be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary evidence/drawings<br>etc.<br>6. Total requirement of each import items, export product wise in a tabular form.<br>Case is deferred.<br>----- End of picture text -----<br>
47 | P a g e
158
| Case No.:50/1/80-ALC2/2020 | Party Name: AVLIGHT | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AUTOMOTIVES PVT. LTD. | ALC2/2020&10.09.2020 | Deferred | |||||
| HQ File<br>:01/80/050/00426/AM21/ | RLA File<br>:05/23/040/00005/AM21/ | Lic.No/Date:0510414101<br>04.05.2020 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 21.07.2020 followed by a reminder on 04.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application. Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:51/1/80-ALC2/2020 Party Name: TEGA Meet No/Date:5/80- Status:<br>INDUSTRIES LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0210209859 Pending<br>:01/80/050/00427/AM21/ :02/24/040/00005/AM21/ 06.05.2020 with Firm<br>159 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 24.07.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:52/1/80- | Party Name: DEE DEVELOPMENT | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERS LIMITED | ALC2/2020&10.09.2020 | Deferred | |||
| HQ File<br>:01/80/050/00428/AM21/ | RLA File :05/23/040/00020/AM21/ | Lic.No/Date:0510414127<br>08.05.2020 | Pending with<br>DHI |
160 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 16.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 259] intentionally omitted <==
----- Start of picture text -----<br> Case No.:53/1/80-ALC2/2020 Party Name: MICRON Meet No/Date:5/80- Status:<br>INSTRUMENTS PVT LTD ALC2/2020&10.09.2020 Approved<br>HQ File RLA File Lic.No/Date:0510414135<br>:01/80/050/00429/AM21/ :05/24/040/00746/AM20/ 08.05.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47012/15/2020-TSW dated 25.08.2020 as under:<br>ITCHS Export Quantity ITCHS Import Item Recommended<br>Code Item Code Norms<br>Net to net basis with<br>161 68151010 Fibre Glass Tube Dia 64.5X69.5 LG346. accountability<br>Item No.80828-SP. Component<br>clause<br>FZ149 Sub Round Steel Bars, Material Grade 21831.50Kgs @<br>11740 SITHERM 2743 Corresponding to old 1.58 Kgs/Kg<br>93069000 Assembly<br>Number french material grade 60 NCD VII hot content in the<br>72285020 rolled, soft annealed, cold drawn depth export product after<br>superficial decarburization max. 0.2 mm taking 15%<br>hardness max.270 HB. In random length recovery from scrap<br>of approx .3-5m. Sitherm 2743<br>Note: The export item shall contain 13820 Kgs of stainless-steel component.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
48 | P a g e
| Case No.:54/1/80-ALC2/2020 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00430/AM21/ | RLA File<br>:34/24/040/00021/AM21/ | Lic.No/Date:3410046049<br>11.05.2020 | Pending<br>with Firm |
162
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 279] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068852 Pending<br>:01/80/050/00475/AM21/ :09/24/040/00132/AM21/ 05.06.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>163<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:2/3/80-ALC2/2020 | Party Name: PRECISION | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| EQUIPMENTS (CHENNAI) | ALC2/2020 | Deferred | ||||
| PVT. LTD. | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00476/AM21/ | RLA File<br>:04/24/040/00036/AM21/ | Lic.No/Date:0410166809<br>10.06.2020 | Pending<br>with Firm |
164
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
49 | P a g e
| Case No.:3/3/80-ALC2/2020 | Party Name: JOHNSON | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| MATTHEY INDIA PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00477/AM21/ | RLA File<br>:05/23/040/00045/AM21/ | Lic.No/Date:0510414366<br>10.06.2020 | Pending<br>with Firm |
165 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/3/80-ALC2/2020 Party Name: AUTOFIT CAR Meet No/Date:5/80- Status:<br>INTERIORS PVT.LTD. ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:1010060538 Pending<br>:01/80/050/00478/AM21/ :10/24/040/00018/AM21/ 11.06.2020 with Firm<br>166<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:5/3/80-ALC2/2020 | Party Name: AUTOCOMP | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| CORPORATION PANSE | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00479/AM21/ | RLA File<br>:31/83/040/00012/AM21/ | Lic.No/Date:3110067753<br>11.06.2020 | Pending<br>with Firm |
167 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
| Case No.:6/3/80-ALC2/2020 | Party Name: ISGEC HEAVY | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00480/AM21/ | RLA File<br>:05/23/040/00047/AM21/ | Lic.No/Date:0510414386<br>12.06.2020 | Pending<br>with Firm |
168 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
50 | P a g e
| Case No.:7/3/80-ALC2/2020 | Party Name: ISGEC HITACHI | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ZOSEN LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00481/AM21/ | RLA File<br>:05/23/040/00049/AM21/ | Lic.No/Date:0510414387<br>12.06.2020 | Pending<br>with Firm |
169
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
170
| Case No.:8/3/80-ALC2/2020 | Party Name: CML BIOTECH | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 10.09.2020 | |||||||
| HQ File<br>:01/80/050/00482/AM21/ | RLA File<br>:10/24/040/00020/AM21/ | Lic.No/Date:1010060548<br>15.06.2020 |
Decision: The Committee considered the case as per the agenda and Consultant (Tech-1) informed that he received wrong application against the above AA. Therefore, the Committee decided to send again a complete set of application to Consultant (Tech-1) for examination & comments.
Case is deferred.
| Case No.:9/3/80-ALC2/2020 | Party Name: AZAD | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00483/AM21/ | RLA File<br>:09/24/040/00135/AM21/ | Lic.No/Date:0910068868<br>15.06.2020 | Pending<br>with Firm |
171 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
| Case No.:10/3/80-ALC2/2020 | Party Name: AZAD | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00484/AM21/ | RLA File<br>:09/24/040/00134/AM21/ | Lic.No/Date:0910068869<br>15.06.2020 | Pending<br>with Firm |
172 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
51 | P a g e
| Case No.:11/3/80-ALC2/2020 | Party Name: AZAD | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00485/AM21/ | RLA File<br>:09/24/040/00136/AM21/ | Lic.No/Date:0910068870<br>15.06.2020 | Pending<br>with Firm |
173 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068872 Pending<br>:01/80/050/00486/AM21/ :09/24/040/00133/AM21/ 15.06.2020 with Firm<br>174<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:13/3/80-ALC2/2020 | Party Name: ISGEC HEAVY | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00487/AM21/ | RLA File<br>:05/23/040/00055/AM21/ | Lic.No/Date:0510414402<br>15.06.2020 | Pending<br>with Firm |
175 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
| Case No.:14/3/80-ALC2/2020 | Party Name: AAVID | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| THERMALLOY INDIA PVT. | ALC2/2020 | Deferred | ||||
| LTD. | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00488/AM21/ | RLA File<br>:34/24/040/00058/AM21/ | Lic.No/Date:3410046140<br>15.06.2020 | Pending with<br>Firm |
176 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
52 | P a g e
| Case No.:15/3/80-ALC2/2020 | Party Name: AAVID | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| THERMALLOY INDIA PVT. | ALC2/2020 | Deferred | ||||
| LTD. | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00489/AM21/ | RLA File<br>:34/24/040/00059/AM21/ | Lic.No/Date:3410046141<br>15.06.2020 | Pending<br>with Firm |
177 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
178
| Case No.:16/3/80-ALC2/2020 | Party Name: DEE | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| DEVELOPMENT ENGINEERS | ALC2/2020 | Deferred | |||||
| LIMITED | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00490/AM21/ | RLA File<br>:05/23/040/00051/AM21/ | Lic.No/Date:0510414434<br>19.06.2020 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 16.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:17/3/80-ALC2/2020 | Party Name: SULZER INDIA | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00491/AM21/ | RLA File<br>:31/83/040/00019/AM21/ | Lic.No/Date:3110067766<br>22.06.2020 | Pending<br>with Firm |
179 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
| Case No.:18/3/80-ALC2/2020 | Party Name: L&T-MHPS | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BOILERS PVT LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00492/AM21/ | RLA File<br>:03/95/040/00161/AM21/ | Lic.No/Date:0310836794<br>22.06.2020 | Pending<br>with Firm |
180 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 27.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
53 | P a g e
==> picture [476 x 237] intentionally omitted <==
----- Start of picture text -----<br> Case No.:19/3/80-ALC2/2020 Party Name: MICRON Meet No/Date:5/80- Status:<br>INSTRUMENTS PVT LTD ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0510414479<br>:01/80/050/00493/AM21/ :05/24/040/00129/AM21/ 24.06.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/14/2020-TSW dated 24.08.2020 as under:<br>ITCHS Export Item Quantity ITCHS Import Item Recommended<br>181<br>Code Code Norms<br>1139.60Kgs @<br>Dia4.328 x 3.590 x<br>OFE-OK Copper 2.176 Kgs/Kg<br>.125 Wall, Cu Tube.<br>802 Tube. Dia 112 mm, content in the export<br>90229040 Dia4. 328 x 3.590 x 74071090<br>Number Stress Relief, ASTM product after taking<br>.125 Wall, Cu Tube.<br>C10100 AND F68 40% recovery from<br>Drawing No.15795<br>scrap<br>Note: Net weight of export item may be specified as523.706 Kgs.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 197] intentionally omitted <==
----- Start of picture text -----<br> Case No.:20/3/80-ALC2/2020 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3410046186<br>:01/80/050/00494/AM21/ :34/24/040/00073/AM21/ 29.06.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>182<br>1. Quantity of relevant import items at Sl. No. 1 to 5 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 6 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>3. Quantity of relevant import items at Sl. No. 7 to 12 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 195] intentionally omitted <==
----- Start of picture text -----<br> Case No.:21/3/80-ALC2/2020 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3410046187<br>:01/80/050/00495/AM21/ :34/24/040/00074/AM21/ 29.06.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>183<br>1. Quantity of relevant import items at Sl. No. 1 to 6 & 9 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 7 may be allowed as 1.05 Kgs/Kg content in the export<br>product.<br>3. Quantity of relevant import item at Sl. No. 8 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
54 | P a g e
| Case No.:22/3/80-ALC2/2020 | Party Name: BONATRANS | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00496/AM21/ | RLA File<br>:03/94/040/00207/AM21/ | Lic.No/Date:0310836946<br>30.06.2020 | Pending<br>with Firm |
184 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
185
| Case No.:23/3/80- | Party Name: MAGNETI MARELLI | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | TALBROS CHASSIS SYSTEMS | ALC2/2020 | Deferred | ||||
| PRIVATE LI | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00497/AM21/ | RLA File :05/24/040/00140/AM21/ | Lic.No/Date:0510414515<br>30.06.2020 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 14.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:24/3/80-ALC2/2020 | Party Name: MICRON | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00498/AM21/ | RLA File<br>:05/24/040/00134/AM21/ | Lic.No/Date:0510414517<br>30.06.2020 | Pending<br>with DPIIT |
186 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 14.09.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
187
| Case No.:25/3/80-ALC2/2020 | Party Name: MICRON | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2020&10.09.2020 | Deferred | |||||
| HQ File<br>:01/80/050/00499/AM21/ | RLA File<br>:05/24/040/00142/AM21/ | Lic.No/Date:0510414518<br>30.06.2020 | Pending<br>with DPIIT |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 14.09.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:26/3/80-ALC2/2020 | Party Name: THE ANUP | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING LIMITED | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00500/AM21/ | RLA File<br>:08/24/040/00076/AM21/ | Lic.No/Date:0810148023<br>30.06.2020 | Pending<br>with DPIIT |
188 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 15.09.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
55 | P a g e
| Case No.:27/3/80-ALC2/2020 | Party Name: FRIZAIR | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00501/AM21/ | RLA File<br>:09/24/040/00158/AM21/ | Lic.No/Date:0910068919<br>30.06.2020 | Pending<br>with DPIIT |
189 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 14.09.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:28/3/80-ALC2/2020 | Party Name: ONASSIS AUTO | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00502/AM21/ | RLA File<br>:05/24/040/00152/AM21/ | Lic.No/Date:0510414546<br>03.07.2020 | Pending<br>with MSME |
190 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 14.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:29/3/80-ALC2/2020 Party Name: MASU BRAKE Meet No/Date:5/80- Status:<br>PADS PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510414554<br>:01/80/050/00503/AM21/ :05/24/040/00156/AM21/ 03.07.2020<br>191 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>Consultant (Tech-1) on 14.09.2020 for examination of the case. However, Consultant (Tech 1) informed that<br>the reply which firm had submitted for their AA 0310833381 dated 12.12.2019 is insufficient. Hence, the<br>Committee decided to inform the firm to submit their reply in the matter at the earliest.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:30/3/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:5/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046197 Pending<br>:01/80/050/00504/AM21/ :34/24/040/00077/AM21/ 07.07.2020 with Firm<br>192 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 118] intentionally omitted <==
----- Start of picture text -----<br> Case No.:36/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068933 Pending<br>193 :01/80/050/00510/AM21/ :09/24/040/00190/AM21/ 07.07.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>----- End of picture text -----<br>
56 | P a g e
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
Case No.:37/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068934 Pending :01/80/050/00511/AM21/ :09/24/040/00194/AM21/ 07.07.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
194
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
==> picture [476 x 211] intentionally omitted <==
----- Start of picture text -----<br> Case No.:38/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068935 Pending<br>:01/80/050/00512/AM21/ :09/24/040/00193/AM21/ 07.07.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>195<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>----- End of picture text -----<br>
57 | P a g e
- Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
Case No.:39/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068936 Pending :01/80/050/00513/AM21/ :09/24/040/00195/AM21/ 07.07.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
196
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
Case No.:40/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068937 Pending :01/80/050/00514/AM21/ :09/24/040/00187/AM21/ 07.07.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
- Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions
197 thereof.
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
58 | P a g e
==> picture [476 x 280] intentionally omitted <==
----- Start of picture text -----<br> Case No.:41/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068938 Pending<br>:01/80/050/00515/AM21/ :09/24/040/00188/AM21/ 07.07.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>198<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
Case No.:42/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068939 Pending :01/80/050/00516/AM21/ :09/24/040/00192/AM21/ 07.07.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
199
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
59 | P a g e
==> picture [476 x 268] intentionally omitted <==
----- Start of picture text -----<br> Case No.:43/3/80- Party Name: AZAD ENGINEERING Meet No/Date:5/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :09/24/040/00189/AM21/ Lic.No/Date:0910068940 Pending with<br>:01/80/050/00517/AM21/ 07.07.2020 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>200 3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 268] intentionally omitted <==
----- Start of picture text -----<br> Case No.:44/3/80- Party Name: AZAD ENGINEERING Meet No/Date:5/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :09/24/040/00191/AM21/ Lic.No/Date:0910068941 Pending with<br>:01/80/050/00518/AM21/ 07.07.2020 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and<br>dimensions thereof.<br>201 3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why<br>not forged SS plate of same the composition for manufacturing of export item, if it is not in round<br>in shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give<br>complete reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of<br>export item.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:31/3/80-ALC2/2020 | Party Name: ENDURANCE | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| TECHNOLOGIES LIMITED | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00505/AM21/ | RLA File<br>:03/94/040/00237/AM21/ | Lic.No/Date:0310837075<br>08.07.2020 | Pending<br>with Firm |
202 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
60 | P a g e
| Case No.:32/3/80-ALC2/2020 | Party Name: SUPER CIRCLE | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| AUTO LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00506/AM21/ | RLA File<br>:05/24/040/00148/AM21/ | Lic.No/Date:0510414590<br>08.07.2020 |
203 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-1) on 14.09.2020 for examination of the case. However, Consultant (Tech 1) informed that the reply which firm had submitted for their AA 0310833381 dated 12.12.2019 is insufficient. Hence, the Committee decided to inform the firm to submit their reply in the matter at the earliest.
Case is deferred.
| Case No.:33/3/80-ALC2/2020 | Party Name: L & T-MHPS | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00507/AM21/ | RLA File<br>:03/95/040/00220/AM21/ | Lic.No/Date:0310837100<br>09.07.2020 | Pending<br>with Firm |
204 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
| Case No.:34/3/80-ALC2/2020 | Party Name: L & T-MHPS | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 10.09.2020 | |||||
| HQ File<br>:01/80/050/00508/AM21/ | RLA File<br>:03/95/040/00219/AM21/ | Lic.No/Date:0310837101<br>09.07.2020 | Pending<br>with Firm |
205 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
| Case No.:35/3/80-ALC2/2020 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD. | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00509/AM21/ | RLA File<br>:34/24/040/00076/AM21/ | Lic.No/Date:3410046199<br>09.07.2020 | Pending<br>with Firm |
206 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
61 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:45/3/80-ALC2/2020 Party Name: PENGUIN Meet No/Date:5/80- Status:<br>PETROLEUM SERVICES PVT. ALC2/2020 Deferred<br>LTD. 10.09.2020<br>HQ File RLA File Lic.No/Date:0310837144 Pending<br>:01/80/050/00519/AM21/ :03/95/040/00147/AM21/ 13.07.2020 with DPIIT<br>207<br>Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to<br>DPIIT on 15.09.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:46/3/80-ALC2/2020 Party Name: SULZER PUMPS Meet No/Date:5/80- Status:<br>INDIA LIMITED ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0310837170 Pending<br>:01/80/050/00520/AM21/ :03/89/040/00069/AM21/ 14.07.2020 with Firm<br>208<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:47/3/80-ALC2/2020 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00521/AM21/ | RLA File<br>:34/24/040/00092/AM21/ | Lic.No/Date:3410046223<br>17.07.2020 | Pending<br>with Firm |
209 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
| Case No.:49/3/80-ALC2/2020 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00523/AM21/ | RLA File<br>:34/24/040/00093/AM21/ | Lic.No/Date:3410046224<br>17.07.2020 | Pending<br>with Firm |
210 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
62 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:50/3/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:5/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046225 Pending<br>:01/80/050/00524/AM21/ :34/24/040/00094/AM21/ 17.07.2020 with Firm<br>211 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:48/3/80-ALC2/2020 | Party Name: THE ANUP | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING LIMITED | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00522/AM21/ | RLA File<br>:08/24/040/00094/AM21/ | Lic.No/Date:0810148164<br>20.07.2020 | Pending<br>with DPIIT |
212 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 15.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 268] intentionally omitted <==
----- Start of picture text -----<br> Case No.:51/3/80- Party Name: AZAD ENGINEERING Meet No/Date:5/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :09/24/040/00217/AM21/ Lic.No/Date:0910068972 Pending with<br>:01/80/050/00525/AM21/ 20.07.2020 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>213 3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>
214
| Case No.:52/3/80- | Party Name: AZAD ENGINEERING | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | PRIVATE LIMITED | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00526/AM21/ | RLA File :09/24/040/00216/AM21/ | Lic.No/Date:0910068973<br>20.07.2020 | Pending with<br>Firm |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
63 | P a g e
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
Case No.:53/3/80- Party Name: AZAD ENGINEERING Meet No/Date:5/80- Status: ALC2/2020 PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred HQ File RLA File :09/24/040/00215/AM21/ Lic.No/Date:0910068974 Pending with :01/80/050/00527/AM21/ 20.07.2020 Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
-
215 3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
- Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
==> picture [476 x 222] intentionally omitted <==
----- Start of picture text -----<br> Case No.:54/3/80- Party Name: AZAD ENGINEERING Meet No/Date:5/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File :09/24/040/00214/AM21/ Lic.No/Date:0910068975 Pending with<br>:01/80/050/00528/AM21/ 20.07.2020 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>216 2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>----- End of picture text -----<br>
64 | P a g e
Case is deferred.
==> picture [476 x 279] intentionally omitted <==
----- Start of picture text -----<br> Case No.:55/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0910068976 Pending<br>:01/80/050/00529/AM21/ :09/24/040/00213/AM21/ 20.07.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>217<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape<br>after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred<br>----- End of picture text -----<br>
Case No.:56/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:5/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:0910068977 Pending :01/80/050/00530/AM21/ :09/24/040/00212/AM21/ 20.07.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):
218
-
What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
-
Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
Case is deferred.
65 | P a g e
| Case No.:57/3/80-ALC2/2020 | Party Name: TEGA | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2020 | Deferred | ||||
| 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00531/AM21/ | RLA File<br>:02/24/040/00045/AM21/ | Lic.No/Date:0210209990<br>21.07.2020 | Pending<br>with Firm |
219
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.
Case is deferred.
220
| Case No.:58/3/80-ALC2/2020 | Party Name: MICRON | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2020 | Deferred | |||||
| 10.09.2020 | |||||||
| HQ File<br>:01/80/050/00532/AM21/ | RLA File<br>:05/24/040/00186/AM21/ | Lic.No/Date:0510414670<br>21.07.2020 | Pending<br>with DPIIT |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 14.09.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
221
| Case No.:59/3/80-ALC2/2020 | Party Name: MICRON | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2020 | Deferred | |||||
| 10.09.2020 | |||||||
| HQ File<br>:01/80/050/00533/AM21/ | RLA File<br>:05/24/040/00181/AM21/ | Lic.No/Date:0510414671<br>21.07.2020 | Pending<br>with DPIIT |
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 14.09.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 155] intentionally omitted <==
----- Start of picture text -----<br> Case No.:60/3/80-ALC2/2020 Party Name: GOLD MOHUR Meet No/Date:5/80- Status:<br>PROFILES LIMITED ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:0510414672 Pending<br>:01/80/050/00534/AM21/ :05/23/040/00083/AM21/ 21.07.2020 with Firm<br>222 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of Consultant (Tech-1):<br>1. Details of indigenous input with their quantity.<br>2. Net weight of rubber compound in each of the export product.<br>Case is deferred.<br>----- End of picture text -----<br>
66 | P a g e
==> picture [476 x 185] intentionally omitted <==
----- Start of picture text -----<br> Case No.:61/3/80-ALC2/2020 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020&10.09.2020 Approved<br>HQ File RLA File Lic.No/Date:3410046232<br>:01/80/050/00535/AM21/ :34/24/040/00099/AM21/ 21.07.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>223<br>1. Quantity of relevant import items at Sl. No. 1 to 5 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 6 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>3. Quantity of relevant import items at Sl. No. 7 to 12 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 186] intentionally omitted <==
----- Start of picture text -----<br> Case No.:62/3/80-ALC2/2020 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020&10.09.2020 Approved<br>HQ File RLA File Lic.No/Date:3410046233<br>:01/80/050/00536/AM21/ :34/24/040/00100/AM21/ 21.07.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>224<br>1. Quantity of relevant import items at Sl. No. 1 to 14, 16 & 17 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 15 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>3. Quantity of relevant import item at Sl. No. 18 may be allowed as 1.05 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:63/3/80-ALC2/2020 | Party Name: I-TECH PLAST | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA PVT.LTD.(EOU) | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00537/AM21/ | RLA File<br>:03/94/040/00256/AM21/ | Lic.No/Date:0310837308<br>22.07.2020 | Pending<br>with DPIIT |
225 Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 09.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:64/3/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:5/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020&10.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046237 Pending<br>:01/80/050/00538/AM21/ :34/24/040/00095/AM21/ 22.07.2020 with Firm<br>226 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 30.08.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
67 | P a g e
==> picture [476 x 197] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/5/80-ALC2/2020 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3410046277<br>:01/80/050/00551/AM21/ :34/24/040/00119/AM21/ 11.08.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>227<br>1. Quantity of relevant import items at Sl. No. 1 to 16 may be allowed as per GN-4.<br>2. Quantity of relevant import items at Sl. No. 17 to 20 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>3. Quantity of relevant import item at Sl. No. 21 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 198] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/5/80-ALC2/2020 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020&10.09.2020 Approved<br>HQ File RLA File Lic.No/Date:3410046278<br>:01/80/050/00552/AM21/ :34/24/040/00118/AM21/ 11.08.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>228 1. Quantity of relevant import items at Sl. No. 1 to 13 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 14 may be allowed on net to net basis.<br>3. Quantity of relevant import item at Sl. No. 15 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>4. Quantity of relevant import items at Sl. No. 16 to 20 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
229
| Case No.:3/5/80-ALC2/2020 | Party Name: DANIEL | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| MEASUREMENT SOLUTIONS | ALC2/2020 | Deferred | |||||
| P LTD | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00553/AM21/ | RLA File<br>:34/24/040/00117/AM21/ | Lic.No/Date:3410046279<br>11.08.2020 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
| Case No.:4/5/80-ALC2/2020 | Party Name: S K INDUSTRIES | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020&10.09.2020 | Deferred | |||||
| HQ File<br>:01/80/050/00554/AM21/ | RLA File<br>:34/24/040/00115/AM21/ | Lic.No/Date:3410046283<br>11.08.2020 | Pending<br>with Firm |
230 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
68 | P a g e
231
| Case No.:6/5/80-ALC2/2020 | Party Name: AUTOCOMP | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| CORPORATION PANSE | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00556/AM21/ | RLA File<br>:31/83/040/00043/AM21/ | Lic.No/Date:3110067819<br>13.08.2020 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
232
| Case No.:5/5/80-ALC2/2020 | Party Name: TAIKISHA | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING INDIA | ALC2/2020 | Deferred | |||||
| PVT.LTD. | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00555/AM21/ | RLA File<br>:03/95/040/00275/AM21/ | Lic.No/Date:0310837658<br>14.08.2020 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
| Case No.:11/5/80-ALC2/2020 | Party Name: VERTICE | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| GLOBAL PVT LTD | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00561/AM21/ | RLA File<br>:09/24/040/00248/AM21/ | Lic.No/Date:0910069043<br>14.08.2020 | Pending<br>with Firm |
233
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
| Case No.:7/5/80-ALC2/2020 | Party Name: MICRON | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00557/AM21/ | RLA File<br>:05/24/040/00226/AM21/ | Lic.No/Date:0510414900<br>17.08.2020 | Pending<br>with Firm |
234 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
| Case No.:8/5/80-ALC2/2020 | Party Name: MICRON | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00558/AM21/ | RLA File<br>:05/24/040/00227/AM21/ | Lic.No/Date:0510414902<br>17.08.2020 | Pending<br>with Firm |
235 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
69 | P a g e
| Case No.:9/5/80-ALC2/2020 | Party Name: RADISH | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| TECHNOLOGIES | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00559/AM21/ | RLA File<br>:06/24/040/00031/AM21/ | Lic.No/Date:0610039581<br>18.08.2020 | Pending<br>with Firm |
236
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
237
| Case No.:10/5/80-ALC2/2020 | Party Name: MAGNA | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AUTOMOTIVE INDIA | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00560/AM21/ | RLA File<br>:04/24/040/00066/AM21/ | Lic.No/Date:0410166966<br>19.08.2020 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
Case No.:12/5/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:5/80- Status: BLADES INDIA PVT. LTD ALC2/2020&10.09.2020 Deferred HQ File RLA File Lic.No/Date:3410046299 Pending :01/80/050/00562/AM21/ :34/24/040/00128/AM21/ 19.08.2020 with Firm
238 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
| Case No.:13/5/80-ALC2/2020 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00563/AM21/ | RLA File<br>:34/24/040/00129/AM21/ | Lic.No/Date:3410046300<br>19.08.2020 | Pending<br>with Firm |
239
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
240
| Case No.:14/5/80-ALC2/2020 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020 | Deferred | |||||
| 10.09.2020 | |||||||
| HQ File<br>:01/80/050/00564/AM21/ | RLA File<br>:34/24/040/00131/AM21/ | Lic.No/Date:3410046301<br>19.08.2020 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
70 | P a g e
| Case No.:15/5/80-ALC2/2020 | Party Name: LM WIND POWER | Meet No/Date:5/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2020&10.09.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00565/AM21/ | RLA File<br>:34/24/040/00130/AM21/ | Lic.No/Date:3410046302<br>19.08.2020 | Pending<br>with Firm |
241
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
Case No.:16/5/80-ALC2/2020 Party Name: APAR Meet No/Date:5/80- Status: INDUSTRIES LIMITED ALC2/2020&10.09.2020 Deferred HQ File RLA File Lic.No/Date:0310837819 Pending :01/80/050/00566/AM21/ :03/94/040/00279/AM21/ 20.08.2020 with Firm
242 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
243
Case No.:17/5/80-ALC2/2020 Party Name: FITWEL GASKET Meet No/Date:5/80- Status: COMPANY (INDIA) PRIVATE ALC2/2020 Deferred LIMITED 10.09.2020 HQ File RLA File Lic.No/Date:3110067828 Pending :01/80/050/00567/AM21/ :31/83/040/00050/AM21/ 20.08.2020 with Firm
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
Case No.:18/5/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:5/80- Status: BLADES INDIA PVT. LTD ALC2/2020&10.09.2020 Deferred HQ File RLA File Lic.No/Date:3410046308 Pending :01/80/050/00568/AM21/ :34/24/040/00134/AM21/ 20.08.2020 with Firm
244
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
245
| Case No.:19/5/80-ALC2/2020 | Party Name: NUCON AMETRA | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ELECTRONICS SYSTEMS | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00569/AM21/ | RLA File<br>:09/24/040/00251/AM21/ | Lic.No/Date:0910069073<br>20.08.2020 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
71 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:20/5/80-ALC2/2020 Party Name: DEE Meet No/Date:5/80- Status:<br>DEVELOPMENT ENGINEERS ALC2/2020 Deferred<br>LIMITED 10.09.2020<br>HQ File RLA File Lic.No/Date:0510414969 Pending<br>:01/80/050/00570/AM21/ :05/23/040/00134/AM21/ 21.08.2020 with Firm<br>246<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete<br>set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
247
| Case No.:21/5/80-ALC2/2020 | Party Name: AAVID | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| THERMALLOY INDIA PVT. | ALC2/2020 | Deferred | |||||
| LTD. | 10.09.2020 | ||||||
| HQ File<br>:01/80/050/00571/AM21/ | RLA File<br>:34/24/040/00136/AM21/ | Lic.No/Date:3410046312<br>24.08.2020 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
248
| Case No.:22/5/80-ALC2/2020 | Party Name: ADITYA AUTO | Meet No/Date:5/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| COMPONENTS | ALC2/2020 | Deferred | |||||
| 10.09.2020 | |||||||
| HQ File<br>:01/80/050/00572/AM21/ | RLA File<br>:07/24/040/00141/AM21/ | Lic.No/Date:0710116924<br>24.08.2020 | Pending<br>with Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 210] intentionally omitted <==
----- Start of picture text -----<br> Case No.:23/5/80-ALC2/2020 Party Name: HANNING Meet No/Date:5/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 Approved<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3410046317<br>:01/80/050/00573/AM21/ :34/24/040/00138/AM21/ 24.08.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>249<br>1. Quantity of relevant import items at Sl. No. 1 to 9 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 10 may be allowed on net to net basis.<br>3. Quantity of relevant import items at Sl. No. 11 to 13 & 15 may be allowed as 1.05 Kgs/Kg content in<br>the export product.<br>4. Quantity of relevant import item at Sl. No. 14 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
72 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:24/5/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:5/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:3410046323 Pending<br>:01/80/050/00574/AM21/ :34/24/040/00139/AM21/ 25.08.2020 with Firm<br>250<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete<br>set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:25/5/80-ALC2/2020 Party Name: NEO STRUCTO Meet No/Date:5/80- Status:<br>CONSTRUCTION PVT. LTD. ALC2/2020 Deferred<br>10.09.2020<br>HQ File RLA File Lic.No/Date:5210043502 Pending<br>:01/80/050/00575/AM21/ :52/24/040/00036/AM21/ 25.08.2020 with Firm<br>251<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete<br>set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
73 | P a g e
Minutes of Offline Cases:
Sl. No. 31
==> picture [476 x 73] intentionally omitted <==
----- Start of picture text -----<br> Case No.: 11/14/80-ALC2/2018 Status:<br>M. No.: 05/80-ALC2/2019 dated 10.09.2020 TIL LIMITED<br>Lic. No. /date: 0210208838 Dated:07.12.2018<br>HQ. No.: 01/80/050/00327/AM19/ Subject: Request for re-fixation of ad-hoc Approved<br>RLA No.: 02/24/040/00107/AM19 norms<br>Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 14/80-ALC2/2018 dated 20.02.2019 as per written comments of DHI vide U.O. No.: DES-1/TILL/OTRS-12019-HEI dated 19.02.2019, while Import item at Sl. No. 142was deleted as the same was not certified as part of export product as per Appendix 4E.
No. 14/80-ALC2/2018 dated 20.02.2019 as per written comments of DHI vide U.O. No.: DES-1/TILL/OTRS-12019-HEI dated 19.02.2019, while Import item at Sl. No. 142was deleted as the same was not certified as part of export product as per Appendix 4E. The firm, vide letter dated 13.08.2019 & 22.01.2020, stated that due to typographical error, the itemwas not mentioned in Appendix 4E, however it is very much required. The party further requested for reinstating Import item at Sl. No.142 on Net to Net basis. The Committee reconsidered the case decided to ratify the ad-hoc norms as per comments of DHI as under: 1. The quantity of import item at Sl. No. 142 may be allowed as per GN-4 with accountability clause . Note: The decision for rest of the import items shall remain unchanged as decided in meeting No. 14/80ALC2/2018 dated20.02.2019. RA concerned may take further necessary action as per the decision of NC.
Sl. No. 32
| Case No.:1/14/80-ALC2/2018<br>Status: | |
|---|---|
| AUTO COMP INDIA PVT. LTD<br>M. No.: 05/80-ALC2/2019 dated 10.09.2020<br>Lic. No. /date: 3110067225 Date: 02.11.2018 | |
| HQ. No.: 01/80/050/00317/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>Approved | |
| norms<br>RLA No.: 31/83/040/00121/AM19 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting<br>No.2/80-ALC2/2019 dated24.04.2019 on repeat basis as approved for AA No. 3110067175 dated 12.09.2018 as<br>per the written recommendation of DHI vide their U. O. No.: DES-1/DASI/RDCA-2-2019-HEI dated 28.02.2019.<br>The firm vide letter dated 20.01.2020 has requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and decided to ratify the ad-hoc norms on repeat basis as approved for AA No. 3110043464<br>dated 02.06.2010 as per written comments of DHI as under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>84836090<br>Hub-Impeller / Coupling (<br>Made from Carbon Steel<br>Seamless Tube ) Carbon<br>Content upto 0.60<br>88.030 MT<br>73043939<br>Carbon Steel<br>Seamless Tubes<br>42% wastage<br>allowed<br>Note:<br>1. The description of import item may be amended as “Carbon Steel Seamless Tubes”.<br>2. Grade of steel to match with import & export.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
74 | P a g e
==> picture [476 x 83] intentionally omitted <==
----- Start of picture text -----<br> Sl. No. 33<br>Case No.: 4/8/80-ALC2/2018 Status:<br>M. No.: 05/80-ALC2/2019 dated 10.09.2020 CHIRAG UDYOG<br>Lic. No. /date: 0510406909 Date: 19.06.2018<br>HQ. No.: 01/80/050/00127/AM19 Subject: Request for re-fixation of ad-hoc Deferred<br>RLA No.: 05/23/040/00141/AM19/ norms<br>Decision: The Committee considered the case as per agenda and noted that the case was approved in M. No. 10/80-<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per agenda and noted that the case was approved in M. No. 10/80ALC2/2019 dated 11.09.2019 on the basis of inputs given by the Technical Authorities present in the meeting.
ALC2/2019 dated 11.09.2019 on the basis of inputs given by the Technical Authorities present in the meeting. The firm vide letter dated 21.10.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and decided to ask from the firm to furnish the following information as per comments of Consultant (Tech-3): 1. Specific items of export with quantity in numbers & weight. 2. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished. 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated. 4. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc. 5. Sheet layout diagram of the material indicating the wastage during blanking. Case is deferred.
Sl. No. 34
==> picture [476 x 64] intentionally omitted <==
----- Start of picture text -----<br> Case No.: 53/3/80-ALC2/2017 Status:<br>M. No.: 05/80-ALC2/2019 dated 10.09.2020 GL&V INDIA PRIVATE LIMITED<br>Lic. No. /date: 3110066640 Date: 29.03.2017<br>HQ. No.: 01/80/050/00053/AM18/ Subject: Request for fixation of ad-hoc norms Deferred<br>RLA No.: 31/83/040/00185/AM17<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 7/80-ALC2/2019 dated 17.07.2019 due to non-submission of reply of deficiency letter dated 07.03.2019 raised by Consultant (Tech-3).
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 7/80-ALC2/2019 dated 17.07.2019 due to non-submission of reply of deficiency letter dated 07.03.2019 raised by Consultant (Tech-3). The firm vide letter dated 30.12.2019 has furnished the reply and requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to ask from the firm to furnish the following information as per comments of Consultant (Tech-3): 1. Hard copy of application & AA. 2. Sl. No. of items which are not be imported now. 3. List of loose items to be exported with quantity & corresponding item of import. 4. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated. 5. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc. 6. Sheet layout diagram of the material indicating the wastage during blanking. Case is deferred.
75 | P a g e
Sl. No. 35
| M. No.: 05/80-ALC2/2019 dated 10.09.2020<br>**GEA Process Engineering,**Vadodara<br>Status: |
|---|
| HQ. No.: 01/80/162/AM09/<br>**Subject:**Request for fixation of ad-hoc norms<br>in respect of 26 exportproduct<br>Deferred |
| **Decision:**The firm has stated that they are a 100% Export Oriented Unit having letter of permission (LOP) No. |
| KASEZ/100%EOU/II/08/09-10/11623 dated 23.11.2009 are the Member of EPC for EOUs and KSEZs. The firm |
| has stated that the company is an EOU unit and it is registered with Kandla Special Economic Zone (KASEZ) and |
| there is a requirement by KASEZ that EOU unit needs to fix the norms of its export product. |
| The firm vide their representation dated 11.01.2020 has requested for fixation of input/output Norms for the |
| import/export products. The Committee considered the case and noted that a copy of application was sent to |
| MSME on 08.09.2020 for examination of the case. However, no comments have been received yet. Hence, the |
| Committee decided to wait for the comments. |
| Case is deferred. |
Sl. No. 36
==> picture [476 x 63] intentionally omitted <==
----- Start of picture text -----<br> Case No.: 39/27/80-ALC2/2011 Status:<br>M. No.: 05/80-ALC2/2019 dated 10.09.2020 Bharat Heavy Electricals Limited<br>Lic. No. /date: 6110000728 Dated 27.12.2011<br>HQ. No.: 01/80/050/00572/AM12/ Subject: Request for re-fixation of ad-hoc Deferred<br>RLA No.: 61/24/040/00055/AM12 norms<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 27/80 dated20.03.2012 as per comments of DHI . It was also noted that the case was considered byPRC in its meeting No. 29 dated 19-11-2013 and Norms Committee M. No. 14 dated 01.10.2013 allowed all the items on net to net basis except items mentioned at Sl. No. 217, 218, 219, 228, 229 & 230. These Six items are not allowed in terms of policy Circular No. 50 dated 28.12.2011.
Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 27/80 dated20.03.2012 as per comments of DHI . It was also noted that the case was considered byPRC in its meeting No. 29 dated 19-11-2013 and Norms Committee M. No. 14 dated 01.10.2013 allowed all the items on net to net basis except items mentioned at Sl. No. 217, 218, 219, 228, 229 & 230. These Six items are not allowed in terms of policy Circular No. 50 dated 28.12.2011. The firm has requested for re-fixation of ad-hoc norms for six import items at Sl. No. 217, 218, 219, 228, 229 & 230 and grant of deemed export benefits against the above six items. The Committee reconsidered the case and noted that Policy-VI division vide their letter dated has stated that the cases of the firm were placed by NC-2 before the PIC in its meeting held on 16.07.2019 wherein a decision has been taken. PC-4/NC-1 may take similar action for a decision in this matter. It was decided to present before the committee complete details /history of the case along with the description of item involved. Case is deferred.
Sl. No. 37
| Sl. No. 37 | |
|---|---|
| Case No.: 19/3/80-ALC2/2018 | Status: |
| MVM SOLAR PVT.LTD,<br>M. No.: 05/80-ALC2/2019 dated 10.09.2020 | |
| Lic. No. /date: 0710111072 Dated 03.02.2017 | |
| HQ. No.: 01/80/050/00019/AM19<br>**Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 07/24/040/00349/AM17 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | |
| No. 05/80 dated06.06.2019 due to non-submission of reply of deficiency letter raised byMSME. | |
| The firm vide letter dated 24.01.2020 has furnished the reply and requested for fixation of | ad-hoc norms. |
| The Committee reconsidered the case and decided to refer the case toMSMEfor examination & comments. | |
| Case is deferred. |
76 | P a g e
Sl. No. 38
| Case No.: 34/2/80-ALC2/2016 | Status: | ||
|---|---|---|---|
| M. No.: 05/80-ALC2/2019 dated 10.09.2020 | TPP BOILERS PVT. LTD | ||
| Lic. No. /date: 0310801039 Dated 15.12.2015 | |||
| HQ. No.: 01/80/050/00037/AM17 | **Subject:**Request for fixation of ad-hoc norms | Deferred | |
| RLA No.: 03/95/040/00696/AM16 | |||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting | |||
| No. 02/80 dated26.04.2016as per comments ofDHI. | |||
| The firm vide letter dated 29.07.2019 has requested for re-fixation of ad-hoc norms. | The Committee | ||
| reconsidered the case and decided to refer the case toDHIfor examination & comments. | |||
| Case is deferred. |
Sl. No. 39
| Case No.: 42/5/80-ALC2/2017<br>PLANSEE INDIA HIGH<br>Status: |
|---|
| PERFORMANCE MATERIALS PVT<br>M. No.: 05/80-ALC2/2019 dated 10.09.2020 |
| LTD<br>Lic. No. /date: 0710108948 Dated 26.10.2015 |
| HQ. No.: 01/80/050/00103/AM18<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred |
| RLA No.: 07/24/040/00192/AM16 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting |
| No. 17/80 dated19.12.2017 on the ground that the firm wanted to import Sheets / Plates/ Rods/ Bars etc. and no co- |
| correlation was established with import /export item. Sheets and plates cannot be machined, and no specific input |
| items have been claimed. |
| The firm vide letter dated 24.08.2020has furnished the reply and requested for fixation of ad-hoc norms. |
| The Committee reconsidered the case and decided to refer the case toDPIITfor examination & comments. |
| Case is deferred. |
Sl. No. 40
| Case No.: 19/11/80-ALC2/2018<br>ICEM ENGINEERING COMPANY<br>PRIVATE LIMITED<br>M. No.: 05/80-ALC2/2019 dated 10.09.2020<br>Lic. No. /date: 0310822939 Dated 09.08.2018 | Status: |
|---|---|
| HQ. No.: 01/80/050/00210/AM19<br>**Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 03/94/040/00306/AM19 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | |
| No.23/80 dated13.03.2020 due to non-submission of reply of deficiency letter raised byConsultant (Tech-3). | |
| The firm vide letter dated 19.08.2020furnished the reply and requested for fixation of ad-hoc norms. The | |
| Committee reconsidered the case and decided to refer the case to**Consultant (Tech-3)**for examination & | |
| comments. | |
| Case is deferred. |
Sl. No. 41
| Sl. No. 41 | ||
|---|---|---|
| Case No.: 26/20/80-ALC2/2017 | Status: | |
| M. No.: 05/80-ALC2/2019 dated 10.09.2020 | ICEM ENGINEERING COMPANY | |
| Lic. No. /date: 0310817800 Dated 15.12.2017 | PRIVATE LIMITED | |
| HQ. No.: 01/80/050/00390/AM18 | **Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 03/94/040/00742/AM18 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | ||
| No.23/80 dated13.03.2020 due to non-submission of reply of deficiency letter raised byConsultant (Tech-3). | ||
| The firm vide letter dated 19.08.2020 furnished the reply and requested for fixation of ad-hoc norms. The | ||
| Committee reconsidered the case and decided to refer the case to**Consultant (Tech-3)**for examination & | ||
| comments. | ||
| Case is deferred. |
77 | P a g e
==> picture [469 x 636] intentionally omitted <==
78 | P a g e
==> picture [469 x 678] intentionally omitted <==
79 | P a g e
==> picture [469 x 620] intentionally omitted <==
80 | P a g e
==> picture [469 x 673] intentionally omitted <==
81 | P a g e
==> picture [469 x 648] intentionally omitted <==
82 | P a g e
==> picture [469 x 661] intentionally omitted <==
83 | P a g e
==> picture [469 x 660] intentionally omitted <==
84 | P a g e
==> picture [469 x 641] intentionally omitted <==
85 | P a g e
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.