DGFT Committee Minutes
DIRECTORATE GENERAL OF FOREIGN TRADE
- (DES I SECTION)
MINUTES OF MEETING NO. 04/80 OF THE NORMS COMMITTEE-I DATED 20.08.2020
Meeting No. 04/80 of the Norms Committee (NC-I) for the licensing year 2020-2021 held on 20.08.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -
| Sl. No. | Name of the representatives & their Designation | Department |
|---|---|---|
| 1. | Shri K.S. Sodhi, Asst. Director | MSME |
| 2. | Shri Sushil Kumar Jangid, Scientist ‘B’ | MeitY |
| 3. | Shri Shaish Kumar, (Tech-1) | Consultant |
| 4. | Shri V.C. Agarwal, (Tech-3) | Consultant |
| 5. | Shri S. K. Bhatnagar, | Consultant |
| In Attendance | ||
| 1. | Shri K.V. Tirumala, Joint DGFT | DGFT |
| 2. | Shri Pranav Upadhyay, Assistant Director ISS | DGFT |
Note:
-
In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.
-
Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.
-
All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail addressnc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.
-
Minutes of Meeting 02/80 (originally scheduled for 16.06.2020) held on 14.07.2020 was circulated on 07.08.2020, to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and therefore the said minutes were uploaded on dgft.gov.in on 20.08.2020.
1 | P a g e
MEETING NUMBER: 4/80-ALC2/2020 MEETING DATE: 20.08.2020
| 1<br> <br> <br> <br> <br> <br> <br> <br> | Case No.:5/15/80-<br>ALC2/2018 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:4/80-ALC2/2020<br>20.08.2020 | Status:<br>Withdrawn |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00347/AM19/ | <br>RLA File :09/24/040/00679/AM16/ | Lic.No/Date:0910063260<br>12.02.2016 | ||
| Decision:The Committee considered the case as per the agenda and noted that the firm via email dated<br>19.08.2020 informed that the above AA has beensurrenderedatRA, Hyderabad. Therefore, the Committee<br>decided towithdrawthe case from the agenda.<br>Case is withdrawn. |
Decision: The Committee considered the case as per the agenda and noted that the firm via email dated 19.08.2020 informed that the above AA has been surrendered at RA, Hyderabad . Therefore, the Committee decided to withdraw the case from the agenda.
| Case No.:390/15/80-ALC2/2018 | Party Name: TENOVA INDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710109544 | Pending | |||
| :01/80/050/00732/AM19/ | :07/24/040/00411/AM16/ | 18.03.2016 | with Firm |
2 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 26.06.2020 followed by a reminder on 31.07.2020. However, the firm via email dated 13.08.2020 informed that they will submit the requisite information upto 31[st] August 2020. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:395/15/80-ALC2/2018 | Party Name: DYNAMATIC | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TECHNOLOGIES LIMITED | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710109626 | Pending | ||||
| :01/80/050/00737/AM19/ | :07/24/040/00423/AM16/ | 04.04.2016 | with MSME |
3 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 11.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:25/15/80-ALC2/2018 | Party Name: TENOVA INDIA | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710109946 | Pending with | ||||
| :01/80/050/00367/AM19/ | :07/24/040/00080/AM17/ | 14.06.2016 | Firm |
4 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 26.06.2020 followed by a reminder on 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
2 | P a g e
| Case No.:199/15/80- | Party Name: TENOVA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710110331 | Pending | |||
| :01/80/050/00541/AM19/ | :07/24/040/00173/AM17/ | 29.08.2016 | with Firm |
5 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 26.06.2020 followed by a reminder on 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:404/15/80- | Party Name: OSWAL PUMPS | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | LIMITED | ALC2/2020 | Deferred | |||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3310030377 | Pending | |||
| :01/80/050/00746/AM19/ | :33/24/040/00007/AM17/ | 03.03.2017 | with Firm |
6 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 19.03.2020 followed by reminders on 01.06.2020 & 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:94/15/80- | Party Name: MODEL INFRA | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | CORPORATION PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710111766 | Pending | ||||
| :01/80/050/00436/AM19/ | :07/24/040/00085/AM18/ | 16.06.2017 | with Firm |
7 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
3 | P a g e
| Case No.:405/15/80- | Party Name: OSWAL | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | PUMPS LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3310030410 | Pending | ||||
| :01/80/050/00747/AM19/ | :33/24/040/00007/AM18/ | 01.11.2017 | withDPIIT |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DPIIT on 31.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| 9 | Case No.:15/1/80-<br>ALC2/2019 | Party Name: WONJIN<br>AUTOPARTS INDIA PVT. LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00763/AM19/ | <br>RLA File<br>:04/24/040/00191/AM18/ | Lic.No/Date:0410163912<br>22.01.2018 | Pending<br>withMSME | |
| Decision:The Committee considered the case as per the agenda and noted that a copy of application<br>was sent toMSMEon 11.08.2020 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to wait for the comments.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 11.08.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to wait for the comments.
| Case No.:394/15/80- | Party Name: TRIVENI HI- | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | TECH PVT. LTD. | ALC2/2020 | Deferred | |||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710113046 | Pending | |||
| :01/80/050/00736/AM19/ | :07/24/040/00368/AM18/ | 04.04.2018 | with Firm |
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to provide clarification on following points as per comments of MSME:
-
To clarify, as per the details given, how the blank size for Sl. No. 1 & 2 is 7.45Kg and 5.00Kg respectively while per unit finished goods weight is 1.50Kg and 1.25Kg respectively.
-
To clarify how Sl. No. of export items works out to be 730 and 1100 for Sl. No. 1 & 2 of items of export, accordingly 7.45730 + 51100= 10938.50. Also as per AA is for 8837 Kgs.
Case is deferred.
4 | P a g e
| Case No.:3/12/80- | Party Name: BIRLA PRECISION | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | TECHNOLOGIES LTD. | ALC2/2020 | Approved | |||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310824314 | ||||
| :01/80/050/00276/AM19/ | :03/94/040/00599/AM19/ | 09.10.2018 |
| Case No.:3/12/80-<br>ALC2/2018 | Case No.:3/12/80-<br>ALC2/2018 | Case No.:3/12/80-<br>ALC2/2018 | Party Name: BIRLA PRECISION<br>TECHNOLOGIES LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00276/AM19/ | RLA File<br>:03/94/040/00599/AM19/ | Lic.No/Date:0310824314<br>09.10.2018 | |||||
| 1 | Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms on<br>repeat basis as approved for AA No. 0310818273 dated 05.01.2018 in Meeting No. 03/80 dated 30.07.2020 as<br>per comments ofMSMEas under: | ||||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Norms | ||||
| 1 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 2 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 3 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 4 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 5 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 6 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | Deleted | ||||
| 7 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | Deleted | ||||
| 8 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The wastage is allowed for items after affecting 20% recovery from Scrap.<br>3. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
5 | P a g e
| Case No.:4/12/80-ALC2/2018 | Party Name: BIRLA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRECISION | ALC2/2020 | Approved | ||||
| TECHNOLOGIES LTD. | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310824317 | ||||
| :01/80/050/00277/AM19/ | :03/94/040/00600/AM19/ | 09.10.2018 |
| Case No.:4/12/80-ALC2/2018 | Case No.:4/12/80-ALC2/2018 | Case No.:4/12/80-ALC2/2018 | Party Name: BIRLA<br>PRECISION<br>TECHNOLOGIES LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00277/AM19/ | RLA File<br>:03/94/040/00600/AM19/ | Lic.No/Date:0310824317<br>09.10.2018 | |||||
| 12 | Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms on<br>repeat basis as approved for AA No. 0310818273 dated 05.01.2018 in Meeting No. 03/80 dated 30.07.2020 as<br>per comments ofMSMEas under: | ||||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Norms | ||||
| 1 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 2 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 3 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 4 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 5 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 6 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | Deleted | ||||
| 7 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | Deleted | ||||
| 8 | 72281090 | High Speed Steel M2 Hot Rolled and annealed Round Bars<br>and High Speed Steel M2 Hot Rolled and annealed wire rods<br>in coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The wastage is allowed for items after affecting 20% recovery from Scrap.<br>3. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
6 | P a g e
| Case No.:5/12/80-ALC2/2018 | Party Name: BIRLA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRECISION | ALC2/2020 | Approved | ||||
| TECHNOLOGIES LTD. | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310824375 | ||||
| :01/80/050/00278/AM19/ | :03/94/040/00598/AM19/ | 11.10.2018 |
| Case No.:5/12/80-ALC2/2018 | Case No.:5/12/80-ALC2/2018 | Case No.:5/12/80-ALC2/2018 | Party Name: BIRLA<br>PRECISION<br>TECHNOLOGIES LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00278/AM19/ | RLA File<br>:03/94/040/00598/AM19/ | Lic.No/Date:0310824375<br>11.10.2018 | |||||
| 13 | Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms on<br>repeat basis as approved for AA No. 0310818273 dated 05.01.2018 in Meeting No. 03/80 dated 30.07.2020 as<br>per comments ofMSMEas under: | ||||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Norms | ||||
| 1 | 72281090 | High Speed Steel M2(Hot Rolled & Annealed ) Round Bars &<br>High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 2 | 72281090 | High Speed Steel M2 (Hot Rolled & Annealed) Round Bars &<br>High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 3 | 72281090 | High Speed Steel M2 (Hot Rolled & Annealed) Round Bars &<br>High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 4 | 72281090 | High Speed Steel M2 (Hot Rolled & Annealed) Round Bars &<br>High Speed Steel M2(Hot Rolled And Annealed) Wire Rods<br>In Coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 5 | 72281090 | High Speed Steel M2 (Hot Rolled & Annealed) Round Bars &<br>High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| 6 | 72281090 | High Speed Steel M2 (Hot Rolled & Annealed) Round Bars &<br>High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils | Deleted | ||||
| 7 | 72281090 | High Speed Steel M2 (Hot Rolled & Annealed) Round Bars &<br>High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils | Deleted | ||||
| 8 | 72281090 | High Speed Steel M2 (Hot Rolled & Annealed) Round Bars &<br>High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils | 1.52 Kgs/Kg content<br>in the export product | ||||
| Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The wastage is allowed for items after affecting 20% recovery from Scrap.<br>3. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
7 | P a g e
| Case No.:12/12/80-ALC2/2018 | Party Name: BIRLA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRECISION | ALC2/2020 | Approved | ||||
| TECHNOLOGIES LTD. | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310824374 | ||||
| :01/80/050/00285/AM19/ | :03/94/040/00597/AM19/ | 11.10.2018 |
| Case No.:12/12/80-ALC2/2018 | Party Name: BIRLA<br>PRECISION<br>TECHNOLOGIES LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00285/AM19/ | RLA File<br>:03/94/040/00597/AM19/ | Lic.No/Date:0310824374<br>11.10.2018 | ||
| 14 | Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms on<br>repeat basis as approved for AA No. 0310818273 dated 05.01.2018 in Meeting No. 03/80 dated 30.07.2020 as<br>per comments ofMSMEas under:<br>Sl.<br>No.<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>1<br>72281090<br>High Speed Steel M2 (Hot Rolled And Annealed ) Round Bars<br>& High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils<br>1.52 Kgs/Kg content<br>in the export product<br>2<br>72281090<br>High Speed Steel M2 (Hot Rolled And Annealed ) Round Bars<br>& High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils<br>1.52 Kgs/Kg content<br>in the export product<br>3<br>72281090<br>High Speed Steel M2 (Hot Rolled And Annealed ) Round Bars<br>& High Speed Steel M2(Hot Rolled And Annealed) Wire Rods<br>In Coils<br>1.52 Kgs/Kg content<br>in the export product<br>4<br>72281090<br>High Speed Steel M2 (Hot Rolled And Annealed ) Round Bars<br>& High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils<br>1.52 Kgs/Kg content<br>in the export product<br>5<br>72281090<br>High Speed Steel M2 (Hot Rolled And Annealed ) Round Bars<br>& High Speed Steel M2(Hot Rolled And Annealed) Wire Rods<br>In Coils<br>1.52 Kgs/Kg content<br>in the export product<br>6<br>72281090<br>High Speed Steel M2 (Hot Rolled And Annealed ) Round Bars<br>& High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils<br>Deleted<br>7<br>72281090<br>High Speed Steel M2 (Hot Rolled And Annealed ) Round Bars<br>& High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils<br>Deleted<br>8<br>72281090<br>High Speed Steel M2 (Hot Rolled And Annealed ) Round Bars<br>& High Speed Steel M2 (Hot Rolled And Annealed) Wire Rods<br>In Coils<br>1.52 Kgs/Kg content<br>in the export product<br>Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The wastage is allowed for items after affecting 20% recovery from Scrap.<br>3. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| Case No.: | Party Name: JAICO ENTERPRISE | Meet No/Date:4/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| 1/12/80-ALC2/2018 | LLP | 20.08.2020 | Withdrawn | |||
| HQ File | RLA File :03/94/040/00612/AM19/ | Lic.No/Date:0310824420 | ||||
| :01/80/050/00274/AM19/ | 12.10.2018 |
15 Decision: The Committee considered the case as per the agenda and noted that RA, Mumbai has updated the spreadsheet showing that the above AA has been surrendered . Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, Mumbai.
Case is withdrawn.
8 | P a g e
| Case No.:23/12/80- | Party Name: GENERAL | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | INSTRUMENTS | ALC2/2020 | ||||
| CONSORTIUM SOLE PROP. | 20.08.2020 | |||||
| KULKARNI | ||||||
| HQ File | RLA File : | Lic.No/Date:0310824478 | Pending with RA/ | |||
| :01/80/050/00296/AM19/ | 03/94/040/00640/AM19/ | 16.10.2018 | Firm |
16 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 16.01.2020 followed by reminders on 20.02.2020, 01.06.2020 & 31.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:267/15/80-ALC2/2018 | Party Name: LARSEN & | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| TOUBRO LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310825583 | Pending | |||
| :01/80/050/00609/AM19/ | :03/95/040/00583/AM19/ | 11.12.2018 | with Firm |
Decision: The Committee considered the case as per the agenda and noted the comments of Policy-IV received vide email dated 20.07.2020. Policy-IV stated in its comments that the firm may be not aware of the RMS 17 guidelines and hence, NC-I may send a detailed letter to the firm, quoting requirement of submission of documents whenever a case is picked up under RMS , and state clearly that the documents are being asked as the case is picked up for detailed scrutiny. Therefore, keeping in view of comments of Policy-IV , the Committee decided to ask from the firm to submit the complete set of application along with all the relevant documents for examination of the case. Further, if the firm doesn't provide all the relevant documents within 15 days, then NC-1 may stop the facility of self-ratification for the firm and will pass a suitable order to the effect.
Case is deferred.
| Case No.:20/14/80-ALC2/2018 | Party Name: ULTRA | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERS | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3110067260 | Pending | ||||
| :01/80/050/00336/AM19/ | :31/83/040/00150/AM19/ | 19.12.2018 | withDHI |
18 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 14.07.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
| Case No.:300/15/80-ALC2/2018 | Party Name: DILIGENT SCM | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| SOLUTIONS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910067093 | Pending | |||
| :01/80/050/00642/AM19/ | :09/24/040/00487/AM19/ | 18.01.2019 | with Firm |
19 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 19.03.2020 followed by reminders on 01.06.2020 & 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
9 | P a g e
| 20 | Case No.:313/15/80-ALC2/2018 | Party Name: OMEGA ICEHILL<br>PRIVATE LIMITED | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00655/AM19/ | RLA File<br>:05/24/040/00627/AM19/ | Lic.No/Date:0510409545<br>31.01.2019 | ||
| Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/29/2020-TSW dated 10.08.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| Case No.:310/15/80- | Party Name: TERUMO PENPOL | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 20.08.2020 | ||||||
| HQ File | RLA File :53/24/040/00013/AM19/ | Lic.No/Date:5310019913 | Pending with | |||
| :01/80/050/00652/AM19/ | 05.02.2019 | Dept. of C & | ||||
| PC |
21 Decision: The Committee considered the case as per the agenda and noted that no reply has been received yet from the firm against deficiency letter dated 21.08.2019 followed by reminders on 04.11.2019 & 16.01.2020 as raised by Consultant (Tech-1) . The Committee also noted that a D.O. letter has been sent to the Department of C & PC on 30.07.2020 (similar cases) as no comments are being furnished by the Department of C & PC. However, no information has been received yet. Hence, the Committee decided to wait for the reply/comments.
Case is deferred.
| Case No.:8/1/80-ALC2/2019 | Party Name: DAGGER | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| MASTER TOOL INDUSTRIES | ALC2/2020 | Deferred | ||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310827404 | Pending | |||
| :01/80/050/00756/AM19/ | :03/94/040/01048/AM19/ | 01.03.2019 | with Firm |
22 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 22.07.2019 followed by reminders on 25.02.2020 & 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:3/2/80-ALC2/2019 | Party Name: AUTOCOMP | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| CORPORATION PANSE | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3110067366 | Pending | |||
| :01/80/050/00003/AM20/ | :31/83/040/00298/AM19/ | 02.04.2019 | with Firm |
23 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020 followed by reminders on 19.03.2020 & 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
10 | P a g e
| Case No.:2/4/80-ALC2/2019 | Party Name: SULZER INDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067390 | Pending | |||
| :01/80/050/00017/AM20/ | :31/83/040/00009/AM20/ | 24.04.2019 | with Firm |
24 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 04.10.2019 followed by reminders on 26.12.2019, 25.02.2020 & 16.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:3/4/80-ALC2/2019 | Party Name: SULZER INDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067391 | Pending | |||
| :01/80/050/00018/AM20/ | :31/83/040/00010/AM20/ | 24.04.2019 | with Firm |
25 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 04.10.2019 followed by reminders on 26.12.2019, 25.02.2020 & 16.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:4/4/80-ALC2/2019 | Party Name: SULZER INDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067392 | Pending | |||
| :01/80/050/00019/AM20/ | :31/83/040/00011/AM20/ | 24.04.2019 | with Firm |
26 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 04.10.2019 followed by reminders on 26.12.2019, 25.02.2020 & 16.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:5/4/80-ALC2/2019 | Party Name: VICTORA AUTO | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510410376 | Pending | |||
| :01/80/050/00020/AM20/ | :05/24/040/00033/AM20/ | 25.04.2019 | with Firm |
27 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019 followed by reminders on 25.02.2020 & 16.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
11 | P a g e
- 28
| Case No.:7/4/80-ALC2/2019 | Party Name: SHIVALIK | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| BIMETAL CONTROLS LTD. | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510410395 | Pending | ||||
| :01/80/050/00022/AM20/ | :05/24/040/00016/AM20/ | 26.04.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:9/4/80-ALC2/2019 | Party Name: ERBATECH | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| MACHINERY P. LTD. | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3210078932 | Pending | |||
| :01/80/050/00024/AM20/ | :32/24/040/00004/AM20/ | 29.04.2019 | with Firm |
29 Decision: The Committee considered the case as per the agenda and DHI informed vide letter dated 20.08.2020 that the firm’s reply is incomplete as they have only submitted general calculation of @ 2% wastage. Therefore, the Committee decided to ask again from the firm to furnish the following information as per comments of DHI :
- Calculation sheet of actual percentage of wastage at each stage of operation.
Case is deferred.
| Case No.:13/4/80-ALC2/2019 | Party Name: SRI RAM | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410165532 | Pending | |||
| :01/80/050/00028/AM20/ | :04/24/040/00157/AM19/ | 01.05.2019 | with Firm |
30 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019 followed by reminders on 16.01.2020, 19.03.2020 & 18.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:14/4/80-ALC2/2019 | Party Name: KINECO | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| KAMAN COMPOSITES - | ALC2/2020 | Deferred | |||||
| INDIA PVT. LTD. | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310828702 | Pending with | ||||
| :01/80/050/00029/AM20/ | :03/94/040/01131/AM19/ | 01.05.2019 | DPIIT |
31 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DPIIT for examination of the case on 31.07.2020 followed by a reminder on 17.08.2020. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
12 | P a g e
| Case No.:15/4/80-ALC2/2019 | Party Name: CHIRAG UDYOG | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | Deferred | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510410451 | Pending | |||
| :01/80/050/00030/AM20/ | :05/23/040/00054/AM20/ | 02.05.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and Consultant (Tech-3) informed that the 32 firm’s reply dated 18.06.2020 is deficient due to following reasons:
-
Sheet layout with wastage details is not given.
-
Details of total export to be made under AA are not given.
Therefore, the Committee decided to ask from the firm to furnish the above mentioned deficiencies.
Case is deferred.
| Case No.:16/4/80-ALC2/2019 | Party Name: BLISS ANAND | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510410480 | Pending | |||
| :01/80/050/00031/AM20/ | :05/23/040/00051/AM20/ | 03.05.2019 | with Firm |
33 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020 followed by reminders on 03.06.2020 & 31.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:21/4/80-ALC2/2019 | Party Name: MASU BRAKE | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PADS PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510410488 | ||||
| :01/80/050/00036/AM20/ | :05/24/040/00057/AM20/ | 06.05.2019 |
34 Decision: The Committee considered the case as per the agenda and noted that Consultant (Tech-1) has given written comments for import items at Sl. No. 2 to 13 and suggested to refer the case to Consultant (SKB) for comments on rest of the import items. Therefore, the Committee decided to refer the case to Consultant (SKB) for comments on rest of the items.
Case is deferred.
| Case No.:19/4/80-ALC2/2019 | Party Name: VICTORA AUTO | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510410518 | Pending | |||
| :01/80/050/00034/AM20/ | :05/24/040/00762/AM19/ | 08.05.2019 | with Firm |
35 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019 followed by reminders on 27.02.2020 & 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
13 | P a g e
| Case No.:18/4/80-ALC2/2019 | Party Name: DILIGENT SCM | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| SOLUTIONS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910067492 | Pending | |||
| :01/80/050/00033/AM20/ | :09/24/040/00058/AM20/ | 10.05.2019 | with Firm |
36 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 19.03.2020 followed by reminders on 01.06.2020, 03.06.2020 & 31.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:30/5/80- | Party Name: TIAGO | Meet No/Date:4/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | CHEM | 20.08.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:3410045178 | Pending with | |||
| :01/80/050/00068/AM20/ | :34/24/040/00075/AM20/ | 30.05.2019 | RA/Firm |
37 Decision: The Committee considered the case as per the agenda and noted that the firm has sent only a copy of AA without any annexure and in this regard a letter was sent to the firm & RA, Vadodara on 03.06.2020 followed by a reminder on 31.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:32/5/80-ALC2/2019 | Party Name: FUTURE TECH | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PVT. LTD. | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710115000 | Pending | |||
| :01/80/050/00070/AM20/ | :07/24/040/00050/AM20/ | 31.05.2019 | with RA |
38 Decision: The Committee considered the case as per the agenda and noted that a letter was sent to RA, Bangalore requesting to submit a copy of the firm’s application for examination of the case on 27.02.2020 followed by reminders on 03.06.2020 & 31.07.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:1/6/80-ALC2/2019 | Party Name: SHIVALIK | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| BIMETAL CONTROLS LTD. | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510410810 | Pending | ||||
| :01/80/050/00072/AM20/ | :05/24/040/00129/AM20/ | 04.06.2019 | with Firm |
39 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
14 | P a g e
| Case No.:2/6/80-ALC2/2019 | Party Name: LAXMI DENTAL | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| EXPORT PVT. LTD. | ALC2/2020 | Approved | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310829403 | ||||
| :01/80/050/00073/AM20/ | :03/95/040/00207/AM20/ | 04.06.2019 |
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of Consultant (Tech-1) as under:
40
| ITCHS | Export Item | Quantity | ITCHS | Import | Recommended Norms |
|---|---|---|---|---|---|
| Code | Code | Item | |||
| 90212900 | Aligner And | 2000000 | 34070090 | Vivak | Nil wastage |
| Retainer Sheets | Number | Sheets |
Note: The import item should be of PETG Sheet of relevant thickness. The firm will account for the imported item in the export product.
RA concerned may take further necessary action as per the decision of NC.
| 41 | Case No.:10/6/80-ALC2/2019 | Party Name: TEMA INDIA<br>LIMITED<br>RLA File<br>:03/95/040/00229/AM20/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00081/AM20/ | Lic.No/Date:0310829553<br>11.06.2019 | |||
| Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/313/2019-TSW dated 04.08.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| Case No.:13/6/80-ALC2/2019 | Party Name: VEELINE MEDIA | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0210209240 | Pending | ||||
| :01/80/050/00084/AM20/ | :02/24/040/00038/AM20/ | 11.06.2019 | with Firm |
42 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 03.06.2020 followed by a reminder on 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:16/6/80-ALC2/2019 | Party Name: TEMA INDIA | Meet No/Date:4/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | 20.08.2020 | Deferred | ||||
| HQ File | RLA File | Lic.No/Date:0310829596 | Pending with | |||
| :01/80/050/00087/AM20/ | :03/95/040/00239/AM20/ | 12.06.2019 | DPIIT |
43 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DPIIT for examination of the case on 18.08.2020. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
15 | P a g e
44
| Case No.:21/6/80-ALC2/2019 | Party Name: ISGEC HITACHI | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ZOSEN LIMITED | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510410946 | Pending | ||||
| :01/80/050/00092/AM20/ | :05/23/040/00111/AM20/ | 14.06.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminders on 25.02.2020 & 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days. Case is deferred.
| 45 | Case No.:1/8/80-ALC2/2019 | Party Name: MODEL INFRA<br>CORPORATION PRIVATE<br>LIMITED | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00113/AM20/ | RLA File<br>:07/24/040/00081/AM20/ | Lic.No/Date:0710115134<br>05.07.2019 | Pending<br>with Firm | |
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byMSMEwas sent to the firm on 03.06.2020 followed by a reminder on 31.07.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 03.06.2020 followed by a reminder on 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm. Case is deferred.
| Case No.:3/8/80-ALC2/2019 | Party Name: ULTRA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERS | ALC2/2020 | Approved | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067470 | ||||
| :01/80/050/00115/AM20/ | :31/83/040/00058/AM20/ | 10.07.2019 |
| Case No.:3/8/80-ALC2/2019 <br>HQ File<br>:01/80/050/00115/AM20/ | Case No.:3/8/80-ALC2/2019 <br>HQ File<br>:01/80/050/00115/AM20/ | Party Name: ULTRA<br>ENGINEERS | Party Name: ULTRA<br>ENGINEERS | Party Name: ULTRA<br>ENGINEERS | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved | ||
|---|---|---|---|---|---|---|---|---|---|---|
| RLA File<br>:31/83/040/00058/AM20/ | Lic.No/Date:3110067470<br>10.07.2019 | |||||||||
| 46 | Decision:The Committee considered the case as per<br>written comments ofConsultant (Tech-3)as under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>84139190<br>Parts Of Oil Field<br>Equipment - Fluid End<br>Assly XQMS 4 in W/<br>Plungers & Packing<br>101093094 (weight<br>kg357569.20)(Weight<br>/Piece - 2560 Kgs)<br>164<br>Number<br>RA concerned maytake further necessaryaction asper | agenda and decided toratifythe ad-hoc norms as per | ||||||||
| Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Norms | ||||||
| Parts Of Oil Field<br>Equipment - Fluid End<br>Assly XQMS 4 in W/<br>Plungers & Packing<br>101093094 (weight<br>kg357569.20)(Weight<br>/Piece - 2560 Kgs) | 164<br>Number | 72222099 | Forging Fluid End-<br>SS Quintuplex<br>Monoblock<br>101052085d (164<br>Nos) (Equivalent<br>Euro 3138800) | 589988 Kgs<br>including 65%<br>wastage | ||||||
| action asper | the decision of NC. |
| Case No.: | Party Name: ANSTECH | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| 9/8/80-ALC2/2019 | ALC2/2020 | ||||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410045281 | Pending with | ||||
| :01/80/050/00121/AM20/ | :34/24/040/00127/AM20/ | 15.07.2019 | RA/Firm |
47 Decision: The Committee considered the case as per the agenda and noted that the firm has sent only a copy of AA without any annexure and in this regard a letter was sent to the firm & RA, Vadodara on 05.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.
16 | P a g e
| Case No.:10/8/80-ALC2/2019 | Party Name: ULTRA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERS | ALC2/2020 | Approved | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067477 | ||||
| :01/80/050/00122/AM20/ | :31/83/040/00056/AM20/ | 17.07.2019 |
| Case No.:10/8/80-ALC2/2019 | Case No.:10/8/80-ALC2/2019 | Party Name: ULTRA<br>ENGINEERS | Party Name: ULTRA<br>ENGINEERS | Party Name: ULTRA<br>ENGINEERS | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00122/AM20/ | RLA File<br>:31/83/040/00056/AM20/ | Lic.No/Date:3110067477<br>17.07.2019 | |||||||
| 48 | Decision:The Committee considered the case as per the agenda and decided toratifythe norms on repeat basis<br>as approved for AA No. 3110067586 dated 05.11.2019 in Meeting No. 01/80 dated 20.05.2020 as per written<br>comments of**Consultant (Tech-3)**as under: | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Norms | ||||
| 84139190 | Parts Of Oil Field<br>Equipment, *CARR/ TUBE,<br>3.12 ISGS NAL,6/60, 20KSI,<br>1FT Part No-102014363<br>(Export Product Net weight<br>Total = 7.80 *58938 =<br>459716.40 Kg) | 58938<br>Number | 73043119 | MECH Tubing<br>3.125 OD X 0<br>.313 Wall,<br>135KSI Yield<br>101395796 ( Qty<br>120316.80FT) | 1.10 Kgs/Kg<br>content in the<br>export product | ||||
| Note: Type & grade of tubing will be same as used in export product.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| Case No.:12/8/80-ALC2/2019 | Party Name: ZOBELE INDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310830415 | Pending | |||
| :01/80/050/00124/AM20/ | :03/95/040/00352/AM20/ | 18.07.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the 49 following information as per comments of Consultant (Tech-3):
-
Generic name & catalogue of import items at Sl. No. 1 to 6.
-
Wastage claimed on raw material is nil and hence, provide explanation for how it is possible to manufacture items without any wastage.
Case is deferred.
| Case No.:3/9/80-ALC2/2019 | Party Name: DYNA FORCE | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| HYDRAULICS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3110067484 | Pending | |||
| :01/80/050/00128/AM20/ | :31/83/040/00067/AM20/ | 25.07.2019 | with Firm |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the 50 following information as per comments of MSME:
-
To provide per unit weight of export item.
-
To provide blank size (in Kg).
-
Manufacturing process with step-wise wastage and material balancing.
Case is deferred.
17 | P a g e
| Case No.:2/10/80-ALC2/2019 | Party Name: DOOWON | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AUTOMOTIVE SYSTEMS | ALC2/2020 | Deferred | |||||
| INDIA PRIVATE LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410165942 | |||||
| :01/80/050/00140/AM20/ | :04/24/040/00079/AM20/ | 07.08.2019 |
51 Decision: The Committee considered the case as per the agenda and noted that DHI in its comments stated that the items do not pertain to it and also raised certain queries. However, the matter was discussed in meeting and the Committee decided to refer the case to Consultant (Tech-3) for examination & comments.
Case is deferred.
| Case No.:5/10/80-ALC2/2019 | Party Name: JKS | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ENGINEERING | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3210079060 | Pending with RA/ | |||
| :01/80/050/00143/AM20/ | :32/24/040/00033/AM20/ | 08.08.2019 | Firm |
52 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Coimbatore and in this regard a letter was sent to the firm & RA, Coimbatore on 16.01.2020 followed by reminders on 19.03.2020, 05.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:6/10/80- | Party Name: LM WIND | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA PVT. | ALC2/2020 | Deferred | |||
| LTD. | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410045365 | Pending with | |||
| :01/80/050/00144/AM20/ | :34/24/040/00152/AM20/ | 09.08.2019 | RA/ Firm |
53 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 16.01.2020 followed by reminders on 20.03.2020, 15.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:7/10/80-ALC2/2019 | Party Name: MAINI | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRECISION PRODUCTS | ALC2/2020 | Deferred | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710115278 | Pending | ||||
| :01/80/050/00145/AM20/ | :07/24/040/00106/AM20/ | 13.08.2019 | with Firm |
54 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
18 | P a g e
| Case No.:19/10/80-ALC2/2019 | Party Name: DILIGENT SCM | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| SOLUTIONS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910067939 | Pending | |||
| :01/80/050/00157/AM20/ | :09/24/040/00272/AM20/ | 27.08.2019 | with Firm |
55 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020 followed by reminders on 01.06.2020 & 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:20/10/80-ALC2/2019 | Party Name: OSWAL PUMPS | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3310030578 | Pending | |||
| :01/80/050/00158/AM20/ | :33/24/040/00017/AM20/ | 27.08.2019 | with Firm |
56 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 19.03.2020 followed by reminders on 01.06.2020 & 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:36/11/80-ALC2/2004 | Party Name: PAHARPUR | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| COOLING TOWERS | ALC2/2020 | |||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0210209409 | Pending with RA/ | |||
| :01/80/050/00162/AM20/ | :02/24/040/00081/AM20/ | 02.09.2019 | Firm |
57 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA, Kolkata on 29.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:38/11/80- | Party Name: HANNING | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2004 | MOTORS INDIA P. LTD. | ALC2/2020 | Deferred | |||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045416 | Pending with | |||
| :01/80/050/00164/AM20/ | :34/24/040/00169/AM20/ | 04.09.2019 | RA/ Firm |
58 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 05.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
19 | P a g e
| Case No.:7/13/85-ALC3/2019 | Party Name: AUTOCOMP | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| CORPORATION PANSE | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067530 | |||||
| :01/85/050/00082/AM20/ | :31/83/040/00085/AM20/ | 11.09.2019 |
59 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 18.08.2020 for examination of the case. However, the matter was discussed in the meeting and the Committee decided to refer the case to Consultant (TEC-3) for examination & comments.
Case is deferred.
| Case No.:2/12/80-ALC2/2019 | Party Name: HEURTEY | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PETROCHEM INDIA PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045459 | Pending | ||||
| :01/80/050/00174/AM20/ | :34/24/040/00185/AM20/ | 19.09.2019 | withDHI |
60 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 17.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:4/12/80- | Party Name: FREUDENBERG | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | FILTRATION TECHNOLOGIES | ALC2/2020 | ||||
| INDIA PVT. LTD. | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3110067543 | Pending with RA/ | |||
| :01/80/050/00176/AM20/ | :31/83/040/00008/AM20/ | 24.09.2019 | Firm |
61 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 16.01.2020 followed by reminders on 20.03.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:5/12/80-ALC2/2019 | Party Name: GODREJ & | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| BOYCE MFG. CO. LTD. | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310831805 | Pending | |||
| :01/80/050/00177/AM20/ | :03/94/040/00480/AM20/ | 25.09.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of Consultant (SKB):
-
62 1. As per gross and net weight calculation sheet, the weight of each export item {BAL2A_Main Construction (Used in Missile Launcher)} is 1710.375 Kgs. However, the applicant has mentioned net weight of assembly is 1600 Kgs vide their email dated 20th June 2020. To clarify which one is correct and reasons of difference.
-
What is the justification of higher CIF value of imported Aluminum and Stainless-Steel items? To provide chemical and mechanical properties of each item of import.
-
To provide detail of each operation to be required on each item of import, which could justify higher wastage for fabrication of assembly parts of the above item of export by cutting, welding and machining operation.
Case is deferred.
-
20 | P a g e
| Case No.:6/12/80-ALC2/2019 | Party Name: VICTORA | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| AUTO PVT. LTD. | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510411950 | Pending with RA/ | |||
| :01/80/050/00178/AM20/ | :05/24/040/00338/AM20/ | 25.09.2019 | Firm |
- 63 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 16.01.2020 followed by reminders on 20.03.2020, 03.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:7/12/80-ALC2/2019 | Party Name: VICTORA | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| AUTO PVT. LTD. | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510411951 | Pending with RA/ | |||
| :01/80/050/00179/AM20/ | :05/24/040/00340/AM20/ | 25.09.2019 | Firm |
64 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 16.01.2020 followed by reminders on 20.03.2020, 03.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
- 65
| Case No.:8/12/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068046 | Pending | ||||
| :01/80/050/00180/AM20/ | :09/24/040/00336/AM20/ | 27.09.2019 | withDHI |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:11/12/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068052 | Pending | ||||
| :01/80/050/00183/AM20/ | :09/24/040/00345/AM20/ | 01.10.2019 | withDHI |
66 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
21 | P a g e
- 67
| Case No.:12/12/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068053 | Pending | ||||
| :01/80/050/00184/AM20/ | :09/24/040/00344/AM20/ | 01.10.2019 | withDHI |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:13/12/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068054 | Pending | ||||
| :01/80/050/00185/AM20/ | :09/24/040/00346/AM20/ | 01.10.2019 | with DHI |
68 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| 69 | Case No.:3/14/80-<br>ALC2/2019 | Party Name: LOTUS AVIATION<br>TECHNOLOGY PRIVATE<br>LIMITED | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00199/AM20/ | RLA File :05/23/040/00283/AM20/ | Lic.No/Date:0510412171<br>17.10.2019 | Pending with<br>MSME | |
| **Decision:**The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSMEon 18.08.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred. |
| Case No.:4/14/80-ALC2/2019 | Party Name: NIDEC INDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510412197 | Pending with | |||
| :01/80/050/00200/AM20/ | :05/24/040/00403/AM20/ | 21.10.2019 | Firm |
70 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 19.03.2020 followed by reminders on 15.06.2020 & 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
22 | P a g e
| Case No.:5/14/80-ALC2/2019 | Party Name: TEGA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210209491 | Pending | |||
| :01/80/050/00201/AM20/ | :02/24/040/00100/AM20/ | 22.10.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that Consultant (Tech-1) has only 71 given written comments for import items at Sl. No. 2 to 4. However, the matter was discussed in the meeting and on the advice of Consultant (SKB), the Committee decided to ask from the firm to furnish following information for the import item at Sl. No. 1 :
- To submit the justification for higher wastage with detailed process on the use of steel plate along with stage wise wastage at each operation involved.
Case is deferred.
| Case No.:6/14/80-ALC2/2019 | Party Name: TEGA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210209503 | Pending | |||
| :01/80/050/00202/AM20/ | :02/24/040/00107/AM20/ | 23.10.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that Consultant (Tech-1) has only 72 given written comments for import items at Sl. No. 2 to 4. However, the matter was discussed in the meeting and on the advice of Consultant (SKB), the Committee decided to ask from the firm to furnish following information for the import item at Sl. No. 1 :
- To submit the justification for higher wastage with detailed process on the use of steel plate along with stage wise wastage at each operation involved.
Case is deferred.
| Case No.:7/14/80-ALC2/2019 | Party Name: SULZER | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| INDIA PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3110067581 | Pending with RA/ | |||
| :01/80/050/00203/AM20/ | :31/83/040/00096/AM20/ | 23.10.2019 | Firm |
73 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 16.01.2020 followed by reminders on 20.03.2020, 16.06.2020 & 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.
23 | P a g e
| 74 | Case No.:9/14/80-<br>ALC2/2019 | Party Name: HITAISHI KK<br>MANUFACTURING<br>COMPANY PRIVATE<br>LIMITED<br>RLA File :<br>02/24/040/00111/AM20/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020<br>Lic.No/Date:0210209515<br>28.10.2019 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00205/AM20/ | Pending with RA/<br>Firm | |||
| **Decision:**The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm &RA, Kolkataand in this regard a letter was sent to the firm &RA, Kolkata<br>on 16.01.2020 followed by reminders on 20.03.2020, 15.06.2020 & 04.08.2020. However, no information has<br>been received so far. Hence, the Committee decided to wait for the complete set of application for examination<br>of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA, Kolkata on 16.01.2020 followed by reminders on 20.03.2020, 15.06.2020 & 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
| Case No.:10/14/80-ALC2/2019 | Party Name: TENOVA INDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710115616 | Pending | |||
| :01/80/050/00206/AM20/ | :07/24/040/00154/AM20/ | 28.10.2019 | with Firm |
75 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 19.03.2020 followed by reminders on 15.06.2020 & 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:11/14/80-ALC2/2019 | Party Name: FERRA | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AEROSPACE PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710115617 | Pending | ||||
| :01/80/050/00207/AM20/ | :07/24/040/00164/AM20/ | 29.10.2019 | with Firm |
76 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 15.06.2020 followed by a reminder on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:12/14/80- | Party Name: MELSTAR | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MANUFACTURING | ALC2/2020 | ||||
| SYSTEMS PRIVATE | 20.08.2020 | |||||
| LIMITED | ||||||
| HQ File : | RLA File : | Lic.No/Date:0710115619 | Pending with RA/ | |||
| 01/80/050/00208/AM20/ | 07/24/040/00156/AM20/ | 29.10.2019 | Firm |
77 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA, Bangalore on 16.01.2020 followed by reminders on 20.03.2020, 15.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
24 | P a g e
| Case No.: | Party Name: AYYAPPA CNC | Meet No/Date:4/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| 1/16/80-ALC2/2019 | PVT. LTD. | 20.08.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:0710115658 | Pending with | |||
| :01/80/050/00211/AM20/ | :07/24/040/00170/AM20/ | 08.11.2019 | Firm |
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of MSME:
- Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
- 78
-
Weight of each Export Product.
-
Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
| Case No.:3/16/80- | Party Name: SAMIRI | Meet No/Date:4/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | EQUIPMENTS & | 20.08.2020 | Deferred | |||
| ENGINEERS PVT. LTD. | ||||||
| HQ File | RLA File | Lic.No/Date:0310832707 | Pending with | |||
| :01/80/050/00213/AM20/ | :03/95/040/00758/AM20/ | 11.11.2019 | RA/ Firm |
- 79 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 01.01.2020 followed by reminders on 26.02.2020 & 15.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:5/16/80- | Party Name: LM WIND | Meet No/Date:4/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA PVT. | 20.08.2020 | Deferred | |||
| LTD. | ||||||
| HQ File | RLA File | Lic.No/Date:3410045605 | Pending with | |||
| :01/80/050/00215/AM20/ | :34/24/040/00242/AM20/ | 13.11.2019 | RA/ Firm |
- 80 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 01.01.2020 followed by reminders on 26.02.2020, 15.06.2020 & 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
25 | P a g e
| 81 | Case No.:4/16/80-ALC2/2019 | Party Name: BLISS ANAND<br>PRIVATE LIMITED<br>RLA File<br>:05/23/040/00311/AM20/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred<br>Pending<br>with DPIIT |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00214/AM20/ | Lic.No/Date:0510412485<br>14.11.2019 | |||
| **Decision:**The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>DPIITon 18.08.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to wait for the comments.<br>Case is deferred. |
| Case No.:6/16/80-ALC2/2019 | Party Name: NUCON | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| AEROSPACE PVT. LTD. | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068185 | Pending with RA/ | |||
| :01/80/050/00216/AM20/ | :09/24/040/00409/AM20/ | 14.11.2019 | Firm |
82 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 01.01.2020 followed by reminders on 26.02.2020 & 16.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:8/16/80-ALC2/2019 | Party Name: DILIGENT SCM | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| SOLUTIONS PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068192 | Pending with | ||||
| :01/80/050/00218/AM20/ | :09/24/040/00408/AM20/ | 18.11.2019 | Firm |
83 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 01.06.2020 followed by a reminder on 31.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| 84 | Case No.:9/16/80-ALC2/2019 | Party Name: KUVAWALA<br>CORE DRILL EQUIPMENT<br>PVT. LTD.<br>RLA File<br>:03/94/040/00644/AM20/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred<br>Pending<br>with Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00219/AM20/ | Lic.No/Date:0310832842<br>18.11.2019 | |||
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 04.08.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
26 | P a g e
| Case No.:10/16/80- | Party Name: VICTORA AUTO | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PVT. LTD. | ALC2/2020 | Deferred | |||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510412549 | Pending with | |||
| :01/80/050/00220/AM20/ | :05/24/040/00462/AM20/ | 19.11.2019 | RA/ Firm |
85 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 01.01.2020 followed by reminders on 25.02.2020, 03.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:13/16/80-ALC2/2019 | Party Name: OAM SAAI | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INTERNATIONAL INC. | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510412570 | Pending | ||||
| :01/80/050/00223/AM20/ | :05/24/040/00479/AM20/ | 21.11.2019 | with Firm |
86 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 16.06.2020 followed by a reminder on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
- 87
| Case No.:15/16/80-ALC2/2019 | Party Name: L & T-MHPS | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| BOILERS PVT. LTD. | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310832929 | Pending | ||||
| :01/80/050/00225/AM20/ | :03/95/040/00808/AM20/ | 21.11.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:16/16/80-ALC2/2019 | Party Name: VALEO INDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166294 | Pending | |||
| :01/80/050/00226/AM20/ | :04/24/040/00131/AM20/ | 21.11.2019 | with Firm |
88 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of MSME:
- Net content of Sl. No. 4 & 5 in per unit item of export.
Case is deferred.
27 | P a g e
| Case No.:19/16/80- | Party Name: SULZER INDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 20.08.2020 | ||||||
| HQ File | RLA File :31/83/040/00115/AM20/ | Lic.No/Date:3110067611 | Pending with | |||
| :01/80/050/00229/AM20/ | 26.11.2019 | RA/ Firm |
89 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 01.01.2020 followed by reminders on 25.02.2020, 03.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:18/16/80- | Party Name: VICTORA | Meet No/Date:4/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | AUTO PVT. LTD. | 20.08.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:0510412651 | Pending with | |||
| :01/80/050/00228/AM20/ | :05/24/040/00499/AM20/ | 26.11.2019 | RA/ Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 89 yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 01.01.2020 followed by reminders on 26.02.2020, 16.06.2020 & 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:2/18/80-ALC2/2019 | Party Name: MICRON | Meet No/Date: | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PV. LTD. | 4/80-ALC2/2020 | ||||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510412701 | Pending with | ||||
| :01/80/050/00247/AM20/ | :05/24/040/00489/AM20/ | 29.11.2019 | DPIIT |
91 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT for examination of the case on 16.06.2020 followed by a reminder on 17.08.2020. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
| 92 | Case No.:5/18/80-ALC2/2019 | Party Name: ZTT INDIA<br>PRIVATE LIMITED<br>RLA File<br>:04/24/040/00137/AM20/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00250/AM20/ | Lic.No/Date:0410166342<br>10.12.2019 | |||
| Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofMeitYvide U. O. No.: W-21/37/2020-IPHW-MeitY dated 23.07.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
28 | P a g e
| Case No.:4/18/80-ALC2/2019 | Party Name: ZECHA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRECISION TOOLS LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310833334 | Pending with | |||
| :01/80/050/00249/AM20/ | :03/95/040/00892/AM20/ | 11.12.2019 | Firm |
93 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of MSME:
- Size and per unit weight of items to be exported and their corresponding blank sizes and numbers. 2. Manufacturing process with step-wise wastage and material balancing.
Case is deferred.
| 94 | Case No.:7/18/80-ALC2/2019 | Party Name: GAUPAD<br>INDUSTRY | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020<br>Lic.No/Date:0510412855<br>11.12.2019 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00252/AM20/ | RLA File<br>:05/23/040/00329/AM20/ | |||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>(SKB)for examination & comments as per advice ofConsultant (Tech-1).<br>Case is deferred. |
| Case No.:8/18/80- | Party Name: CRYSTAL | Meet No/Date:4/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIAL SYNDICATE | 20.08.2020 | Deferred | |||
| PVT. LTD. | ||||||
| HQ File | RLA File | Lic.No/Date:0310833379 | Pending with | |||
| :01/80/050/00253/AM20/ | :03/94/040/00752/AM20/ | 12.12.2019 | RA/ Firm |
95 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 24.01.2020 followed by reminders on 20.03.2020, 16.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:9/18/80-ALC2/2019 | Party Name: RONCH | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| POLYMERS PVT. LTD. | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310833381 | Pending | ||||
| :01/80/050/00254/AM20/ | :03/95/040/00887/AM20/ | 12.12.2019 | with Firm |
96 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
29 | P a g e
| Case No.:10/18/80-ALC2/2019 | Party Name: TPI | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| COMPOSITES INDIA LLP | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166360 | Pending with RA/ | |||
| :01/80/050/00255/AM20/ | :04/24/040/00138/AM20/ | 13.12.2019 | Firm |
- 97 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 17.01.2020 followed by reminders on 20.03.2020 & 16.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Chennai & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:12/18/80-ALC2/2019 | Party Name: VICTORA | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| AUTO PVT. LTD. | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510412920 | Pending with RA/ | |||
| :01/80/050/00257/AM20/ | :05/24/040/00555/AM20/ | 16.12.2019 | Firm |
98 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 17.01.2020 followed by reminders on 20.03.2020, 03.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:13/18/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068287 | Pending | ||||
| :01/80/050/00258/AM20/ | :09/24/040/00455/AM20/ | 17.12.2019 | with DHI |
99 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:14/18/80-ALC2/2019 | Party Name: KELVION INDIA | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310833455 | Pending | ||||
| :01/80/050/00259/AM20/ | :03/94/040/00474/AM20/ | 17.12.2019 | with DPIIT |
100 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 17.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
30 | P a g e
| Case No.:15/18/80-ALC2/2019 | Party Name: MASU BRAKE | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PADS PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510412951 | ||||
| :01/80/050/00260/AM20/ | :05/24/040/00559/AM20/ | 18.12.2019 |
101 Decision: The Committee considered the case as per the agenda and noted that Consultant (Tech-1) has given written comments for import items at Sl. No. 4 to 16 and suggested to refer the case to Consultant (SKB) for comments on rest of the import items. Therefore, the Committee decided to refer the case to Consultant (SKB) for comments on rest of the items.
Case is deferred.
| Case No.:16/18/80-ALC2/2019 | Party Name: VICTORA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| AUTO PVT. LTD | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510412958 | Pending with | |||
| :01/80/050/00261/AM20/ | :05/24/040/00572/AM20/ | 18.12.2019 | RA/ Firm |
102 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 17.01.2020 followed by reminders on 20.03.2020, 03.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:17/18/80-ALC2/2019 | Party Name: ZECHA | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| PRECISION TOOLS | ALC2/2020 | |||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310833525 | Pending with | |||
| :01/80/050/00262/AM20/ | :03/95/040/00919/AM20/ | 18.12.2019 | Firm |
103 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of MSME:
- Size and per unit weight of items to be exported and their corresponding blank sizes and numbers. 2. Manufacturing process with step-wise wastage and material balancing.
Case is deferred.
| Case No.:18/18/80- | Party Name: L&T- MHPS | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | TURBINE GENERATORS | ALC2/2020 | ||||
| PRIVATE LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310833550 | Pending with RA/ | |||
| :01/80/050/00263/AM20/ | :03/95/040/00907/AM20/ | 19.12.2019 | Firm |
104 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 17.01.2020 followed by reminders on 20.03.2020, 16.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
31 | P a g e
105
| Case No.:19/18/80-ALC2/2019 | Party Name: BONATRANS | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310833585 | Pending | ||||
| :01/80/050/00264/AM20/ | :03/94/040/00773/AM20/ | 20.12.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:1/20/80- | Party Name: SULZER INDIA | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | PRIVATE LIMITED | ALC2/2020 | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3110067650 | Pending with RA/ | ||||
| :01/80/050/00283/AM20/ | :31/83/040/00132/AM20/ | 07.01.2020 | Firm |
106 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 03.02.2020 followed by reminders on 25.02.2020, 16.06.2020 & 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.
| 107 | Case No.:3/20/80-ALC2/2019 | Party Name: HUMANETICS<br>INNOVATIVE SOLUTIONS<br>INDIA PRIVATE LIMI | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00285/AM20/ | RLA File<br>:07/24/040/00227/AM20/ | Lic.No/Date:0710116010<br>09.01.2020 | Pending<br>with Firm | |
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking<br>certain information as raised byDPIITwas sent to the firm on 04.08.2020. However, no reply has been<br>received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm. Case is deferred.
| Case No.:4/20/80- | Party Name: FITWEL GASKET | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | COMPANY (INDIA) PRIVATE | ALC2/2020 | Approved | |||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File :31/83/040/00134/AM20/ | Lic.No/Date:3110067657 | ||||
| :01/80/050/00286/AM20/ | 13.01.2020 |
108
Decision: The Committee considered the case as per agenda and Consultant (Tech-3) informed that the firm has imported item at Sl. No. 2 only & exported item at Sl. No. 2. And also, the firm has requested to delete the rest of import & export items. Therefore, as per written comments of Consultant (Tech-3), the Committee decided to ratify the following ad-hoc norms:
Export items:
- For export item at Sl. No. 2- Net content may be replaced by weight- 0.535 Kg/Pc.
Import items:
- The quantity of import item at Sl. No. 2 may be allowed as 34885 Kgs including 15% wastage after 1/3[rd] recovery.
Note: All other items of export & import may be deleted as requested by the firm. RA concerned may take further necessary action as per the decision of NC.
32 | P a g e
| 109 | Case No.:5/20/80-ALC2/2019 | Party Name: STEEL STRONG<br>VALVES (I) PVT.LTD.<br>RLA File<br>:03/95/040/01007/AM20/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00287/AM20/ | Lic.No/Date:0310834108<br>13.01.2020 | Pending<br>with Firm | ||
| <br>Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking<br>certain information as raised byDPIITwas sent to the firm on 04.08.2020. However, no reply has been<br>received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
| Case No.:7/20/80-ALC2/2019 | Party Name: ARIHANT | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| INDUSTRIES | ALC2/2020 | ||||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3310030641 | Pending with RA/ | ||||
| :01/80/050/00289/AM20/ | :33/24/040/00031/AM20/ | 13.01.2020 | Firm | ||||
110 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Panipat and in this regard a letter was sent to the firm & RA, Panipat on 03.02.2020 followed by reminders on 26.02.2020 & 16.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Panipat & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:6/20/80-ALC2/2019 | Party Name: SULZER | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PUMPS INDIA PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310834142 | Pending with | |||
| :01/80/050/00288/AM20/ | :03/95/040/01012/AM20/ | 14.01.2020 | RA/ Firm |
111 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 03.02.2020 followed by reminders on 26.02.2020, 16.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:9/20/80-ALC2/2019 | Party Name: VEELINE MEDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210209681 | ||||
| :01/80/050/00291/AM20/ | :02/24/040/00159/AM20/ | 14.01.2020 |
Decision: The Committee considered the case as per the agenda and the representative of MSME informed that 112 the firm’s reply is incomplete as they have not given the net content of the import item in per unit of export product. The firm has given only details of the quantity required for per unit of export item. Therefore, the Committee decided to ask again from the firm to furnish the following information as per advice of the representative of MSME:
- To provide net content of the import item in per unit of export product. Case is deferred.
33 | P a g e
| 113 | Case No.:10/20/80-<br>ALC2/2019 | Party Name: GODREJ & BOYCE<br>MFG. CO. LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00292/AM20/ | RLA File :03/94/040/00848/AM20/ | Lic.No/Date:0310834274<br>17.01.2020 | ||
| Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/23/2019-TSW dated 20.07.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| Case No.:11/20/80- | Party Name: ANSTECH | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045793 | Pending with RA/ | |||
| :01/80/050/00293/AM20/ | :34/24/040/00313/AM20/ | 17.01.2020 | Firm |
114 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 03.02.2020 followed by reminders on 26.02.2020, 16.06.2020 & 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.
115
| Case No.:12/20/80-ALC2/2019 | Party Name: MASU BRAKE | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PADS PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510413364 | |||||
| :01/80/050/00294/AM20/ | :05/24/040/00664/AM20/ | 17.01.2020 |
Decision: The Committee considered the case as per the agenda and noted that Consultant (Tech-1) has given written comments for import items at Sl. No. 4 to 17 and suggested to refer the case to Consultant (SKB) for comments on rest of the import items. Therefore, the Committee decided to refer the case to Consultant (SKB) for comments on rest of the items.
Case is deferred.
| Case No.:16/21/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068424 | Pending | |||
| :01/80/050/00310/AM20/ | :09/24/040/00525/AM20/ | 29.01.2020 | with Firm |
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of Consultant (SKB):
-
What is the exact name of the export product?
-
Provide complete neat coloured drawing of the product with Top, Side and Front View and dimensions
116 thereof.
-
What is purpose to bring Stainless Steel Rounds of 85 mm size for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item after cutting into required dimensions?
-
What is the Rockwell Hardness Number of the final product and forged blank?
-
Detail of any heat treatment, if required.
-
What is the weight of final export item?
-
Why such high percentage wastage is generated for manufacturing of turbine part. Give complete reasons for such a huge wastage.
-
A Video film on complete operations (cutting, forging and machining) for manufacturing of export item.
Case is deferred.
34 | P a g e
| Case No.:1/22/80- | Party Name: JOHNSON | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510413542 | Pending with | |||
| :01/80/050/00327/AM20/ | :05/23/040/00426/AM20/ | 10.02.2020 | RA/ Firm |
117 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:2/22/80- | Party Name: JOHNSON | Meet No/Date:4/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA PRIVATE | 20.08.2020 | Deferred | |||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0510413543 | Pending with | |||
| :01/80/050/00328/AM20/ | :05/23/040/00427/AM20/ | 10.02.2020 | RA/ Firm |
118 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:7/22/80-ALC2/2019 | Party Name: ISGEC HEAVY | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING LIMITED | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510413567 | Pending | ||||
| :01/80/050/00333/AM20/ | :05/23/040/00429/AM20/ | 10.02.2020 | with DHI |
119 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 11.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:8/22/80- | Party Name: JOHNSON | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510413568 | Pending with | |||
| :01/80/050/00334/AM20/ | :05/23/040/00433/AM20/ | 10.02.2020 | RA/ Firm |
120 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
35 | P a g e
| Case No.:9/22/80-ALC2/2019 | Party Name: JOHNSON | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| MATTHEY INDIA PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510413570 | Pending with | |||
| :01/80/050/00335/AM20/ | :05/23/040/00434/AM20/ | 10.02.2020 | RA/ Firm |
121 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:10/22/80- | Party Name: JOHNSON | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510413571 | Pending with | |||
| :01/80/050/00336/AM20/ | :05/23/040/00435/AM20/ | 10.02.2020 | RA/ Firm |
122 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:11/22/80- | Party Name: JOHNSON | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510413572 | Pending with | |||
| :01/80/050/00337/AM20/ | :05/23/040/00436/AM20/ | 10.02.2020 | RA/ Firm |
123 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:12/22/80- | Party Name: JOHNSON | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA PRIVATE | ALC2/2020 | ||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510413573 | Pending with RA/ | |||
| :01/80/050/00338/AM20/ | :05/23/040/00437/AM20/ | 10.02.2020 | Firm |
124 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
36 | P a g e
| Case No.:13/22/80-ALC2/2019 | Party Name: DEE | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| DEVELOPMENT ENGINEERS | ALC2/2020 | Deferred | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413575 | |||||
| :01/80/050/00339/AM20/ | :05/23/040/00432/AM20/ | 10.02.2020 |
125 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 28.07.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to wait for comments.
Case is deferred.
126
| Case No.:14/22/80-ALC2/2019 | Party Name: ISGEC HEAVY | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING LIMITED | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510413578 | Pending | ||||
| :01/80/050/00340/AM20/ | :05/23/040/00428/AM20/ | 11.02.2020 | with DHI |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 11.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
127
| Case No.:16/22/80-ALC2/2019 | Party Name: MICRON | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510413598 | Pending | ||||
| :01/80/050/00342/AM20/ | :05/24/040/00719/AM20/ | 12.02.2020 | with DPIIT |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 11.08.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:17/22/80-ALC2/2019 | Party Name: LM WIND | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| POWER BLADES INDIA | ALC2/2020 | ||||||
| PVT. LTD | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045867 | Pending with RA/ | ||||
| :01/80/050/00343/AM20/ | :34/24/040/00355/AM20/ | 12.02.2020 | Firm |
128 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 23.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
37 | P a g e
| Case No.:18/22/80-ALC2/2019 | Party Name: SCHOCH | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| REEDS INDIA PRIVATE | ALC2/2020 | ||||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067684 | Pending with RA/ | ||||
| :01/80/050/00344/AM20/ | :31/83/040/00152/AM20/ | 13.02.2020 | Firm |
129 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 23.06.2020 followed by a reminder on 18.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:19/22/80- | Party Name: HFCL LIMITED | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413626 | Pending with RA/ | |||
| :01/80/050/00345/AM20/ | :05/23/040/00443/AM20/ | 14.02.2020 | Firm |
130 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020 followed by a reminder on 18.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:3/24/80- | Party Name: SULZER INDIA | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067707 | Pending with | |||
| :01/80/050/00360/AM20/ | :31/83/040/00160/AM20/ | 06.03.2020 | RA/ Firm |
131 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 26.02.2020 followed by reminders on 16.06.2020 & 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| 132 | Case No.:4/24/80-ALC2/2019 | Party Name: ROTHE ERDE<br>INDIA PRIVATE LIMITED | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00361/AM20/ | RLA File<br>:31/83/040/00146/AM20/ | Lic.No/Date:3110067708<br>06.03.2020 | ||
| Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/25/2019-TSW dated 06.08.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
38 | P a g e
| Case No.:5/24/80-ALC2/2019 | Party Name: ULTRA | Meet No/Date:4/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERS | 20.08.2020 | Deferred | ||||
| HQ File | RLA File | Lic.No/Date:3110067709 | Pending with | |||
| :01/80/050/00362/AM20/ | :31/83/040/00162/AM20/ | 06.03.2020 | Tech-3 |
133 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 02.07.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (Tech-3) for expediting the comments.
Case is deferred.
| Case No.:6/24/80-ALC2/2019 | Party Name: DOOWON | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AUTOMOTIVE SYSTEMS | ALC2/2020 | Deferred | |||||
| INDIA PRIVATE LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166600 | |||||
| :01/80/050/00363/AM20/ | :04/24/040/00195/AM20/ | 09.03.2020 |
134 Decision: The Committee considered the case as per the agenda and noted that DHI in its comments stated that the items do not pertain to it and also raised certain queries. However, the matter was discussed in meeting and the Committee decided to refer the case to Consultant (Tech-3) for examination & comments.
Case is deferred.
| Case No.:7/24/80- | Party Name: TEMA INDIA | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | LIMITED | ALC2/2020 | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310835306 | Pending with RA/ | |||
| :01/80/050/00364/AM20/ | :03/95/040/01160/AM20/ | 09.03.2020 | Firm |
135 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 23.06.2020 followed by a reminder on 18.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:8/24/80- | Party Name: SHAKTI | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PUMPS INDIA LIMITED | ALC2/2020 | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5610005840 | Pending with RA/ | |||
| :01/80/050/00365/AM20/ | :56/24/040/00031/AM20/ | 09.03.2020 | Firm |
136 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Indore and in this regard a letter was sent to the firm & RA, Indore on 23.06.2020 followed by a reminder on 18.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
39 | P a g e
| Case No.:9/24/80-ALC2/2019 | Party Name: SHAKTI | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| PUMPS INDIA LIMITED | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5610005841 | Pending with RA/ | |||
| :01/80/050/00366/AM20/ | :56/24/040/00042/AM20/ | 09.03.2020 | Firm |
137 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Indore and in this regard a letter was sent to the firm & RA, Indore on 23.06.2020 followed by a reminder on 18.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
138
| Case No.:10/24/80-ALC2/2019 | Party Name: HONDA | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TRADING CORPORATION | ALC2/2020 | Deferred | |||||
| INDIA PRIVATE LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413853 | Pending with | ||||
| :01/80/050/00367/AM20/ | :05/23/040/00449/AM20/ | 12.03.2020 | Tech-3 |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 09.07.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to wait for comments.
Case is deferred.
| Case No.:11/24/80-ALC2/2019 | Party Name: HANNING | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| MOTORS INDIA P LTD | ALC2/2020 | ||||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410045945 | Pending with RA/ | ||||
| :01/80/050/00368/AM20/ | :34/24/040/00382/AM20/ | 12.03.2020 | Firm |
139 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 23.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:12/24/80-ALC2/2019 | Party Name: HANNING | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| MOTORS INDIA P LTD | ALC2/2020 | ||||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410045946 | Pending with RA/ | ||||
| :01/80/050/00369/AM20/ | :34/24/040/00383/AM20/ | 12.03.2020 | Firm |
140 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 23.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
40 | P a g e
| Case No.:13/24/80-ALC2/2019 | Party Name: HANNING | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| MOTORS INDIA P LTD | ALC2/2020 | ||||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410045947 | Pending with RA/ | ||||
| :01/80/050/00370/AM20/ | :34/24/040/00384/AM20/ | 12.03.2020 | Firm |
141 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 23.06.2020 followed by a reminder on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:14/24/80-ALC2/2019 | Party Name: S K | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| INDUSTRIES | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045951 | Pending with RA/ | |||
| :01/80/050/00371/AM20/ | :34/24/040/00387/AM20/ | 12.03.2020 | Firm |
142 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 23.06.2020 followed by a reminder on 18.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:15/24/80-ALC2/2019 | Party Name: UNI VTL | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| PRECISION PVT. LTD. | ALC2/2020 | ||||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710116245 | Pending with RA/ | ||||
| :01/80/050/00372/AM20/ | :07/24/040/00287/AM20/ | 12.03.2020 | Firm |
143 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA, Bangalore on 23.06.2020 followed by a reminder on 18.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:16/24/80-ALC2/2019 | Party Name: SHREE | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| LAXMI GLASSTECH | ALC2/2020 | |||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:1310049548 | Pending with RA/ | |||
| :01/80/050/00373/AM20/ | :13/24/040/00207/AM20/ | 13.03.2020 | Firm |
144 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Jaipur and in this regard a letter was sent to the firm & RA, Jaipur on 23.06.2020 followed by a reminder on 18.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
41 | P a g e
| Case No.:17/24/80-ALC2/2019 | Party Name: KINECO KAMAN | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| COMPOSITES - INDIA PVT | ALC2/2020 | Deferred | |||||
| LTD | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310835424 | Pending | ||||
| :01/80/050/00374/AM20/ | :03/94/040/01027/AM20/ | 17.03.2020 | with DPIIT |
145 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was forwarded to DPIIT on 10.08.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:18/24/80-ALC2/2019 | Party Name: ANGIPLAST | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0810147487 | ||||
| :01/80/050/00375/AM20/ | :08/24/040/00406/AM20/ | 17.03.2020 |
146 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-1) on 28.07.2020 for examination of the case. However, in the meeting, Consultant (Tech-1) requested to send physical file of the case for examination. Therefore, the Committee decided to send physical file to Consultant (Tech-1) for examination of the case.
Case is deferred.
| Case No.:19/24/80- | Party Name: AZAD | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068587 | Pending with | ||||
| :01/80/050/00376/AM20/ | :09/24/040/00624/AM20/ | 18.03.2020 | Consultant(SKB) |
147 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 19.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| 148 | Case No.:1/2/80-ALC2/2020 | Party Name: MICRON<br>INSTRUMENTS PVT. LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00431/AM21/ | RLA File<br>:05/24/040/00040/AM21/ | Lic.No/Date:0510414152<br>13.05.2020 | ||
| Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/17/2019-TSW dated 10.08.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
42 | P a g e
| 149 | Case No.:2/2/80-ALC2/2020 | Party Name: MICRON<br>INSTRUMENTS PVT. LTD.<br>RLA File<br>:05/24/040/00041/AM21/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00432/AM21/ | Lic.No/Date:0510414153<br>13.05.2020 | |||
| Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/17/2019-TSW dated 10.08.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| 150 | Case No.:3/2/80-ALC2/2020 | Party Name: MICRON<br>INSTRUMENTS PVT. LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Approved |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00433/AM21/ | RLA File<br>:05/24/040/00042/AM21/ | Lic.No/Date:0510414154<br>13.05.2020 | ||
| Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/17/2019-TSW dated 10.08.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| 151 | Case No.:4/2/80-ALC2/2020 | Party Name: MICRON<br>INSTRUMENTS PVT. LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00434/AM21/ | RLA File<br>:05/24/040/00045/AM21/ | Lic.No/Date:0510414168<br>13.05.2020 | Pending with<br>DPIIT | |
| Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toDPIITon 18.08.2020 for examination of the case. However,DPIITinformed that the case is under<br>examination. Hence, the Committee decided to wait for the comments.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 18.08.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments. Case is deferred.
| Case No.:5/2/80- | Party Name: LM WIND | Meet No/Date:4/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | POWER BLADES INDIA | 20.08.2020 | Deferred | ||||
| PVT. LTD. | |||||||
| HQ File | RLA File | Lic.No/Date:3410046058 | Pending with | ||||
| :01/80/050/00435/AM21/ | :34/24/040/00031/AM21/ | 14.05.2020 | RA/ Firm |
152 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.
| Case No.:6/2/80- | Party Name: LM WIND | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | POWER BLADES INDIA | ALC2/2020 | |||||
| PVT. LTD. | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410046059 | Pending with RA/ | ||||
| :01/80/050/00436/AM21/ | :34/24/040/00032/AM21/ | 14.05.2020 | Firm |
153 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.
43 | P a g e
| Case No.:11/2/80- | Party Name: HANNING | Meet No/Date:4/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | MOTORS INDIA P LTD | ALC2/2020 | Deferred | |||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410046073 | Pending with | |||
| :01/80/050/00441/AM21/ | :34/24/040/00399/AM20/ | 15.05.2020 | RA/ Firm |
154 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
155
| Case No.:13/2/80- | Party Name: AZAD | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068749 | Pending with | ||||
| :01/80/050/00443/AM21/ | :09/24/040/00087/AM21/ | 15.05.2020 | Consultant(SKB) |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 19.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:14/2/80- | Party Name: AZAD | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING | ALC2/2020 | |||||
| PRIVATE LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068750 | Pending with | ||||
| :01/80/050/00444/AM21/ | :09/24/040/00089/AM21/ | 15.05.2020 | Consultant(SKB) |
156 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 19.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| 157 | Case No.:15/2/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | <br>Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00445/AM21/ | RLA File<br>:09/24/040/00086/AM21/ | Lic.No/Date:0910068751<br>15.05.2020 | Pending with<br>Consultant(SKB) | |
| **Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toConsultant (SKB)**on 19.08.2020 for examination of the case. However, comments have been received yet.<br>Hence, the Committee decided to wait for the comments.<br>Case is deferred. |
44 | P a g e
158
| Case No.:16/2/80- | Party Name: AZAD | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068752 | Pending with | ||||
| :01/80/050/00446/AM21/ | :09/24/040/00096/AM21/ | 15.05.2020 | Consultant(SKB) |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 19.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| 159 | Case No.:17/2/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00092/AM21/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00447/AM21/ | Lic.No/Date:0910068753<br>15.05.2020 | Pending with<br>Consultant(SKB) | ||
| **Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toConsultant (SKB)**on 19.08.2020 for examination of the case. However, comments have been received yet.<br>Hence, the Committee decided to wait for the comments.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 19.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
160
| Case No.:18/2/80- | Party Name: AZAD | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING | ALC2/2020 | |||||
| PRIVATE LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068754 | Pending with Consultant | ||||
| :01/80/050/00448/AM21/ | :09/24/040/00090/AM21/ | 15.05.2020 | (SKB) |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 19.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| 161 | Case No.:19/2/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00088/AM21/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00449/AM21/ | Lic.No/Date:0910068755<br>15.05.2020 | Pending with<br>Consultant(SKB) | ||
| **Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toConsultant (SKB)**on 19.08.2020 for examination of the case. However, comments have been received yet.<br>Hence, the Committee decided to wait for the comments.<br>Case is deferred. |
45 | P a g e
| 162 | Case No.:20/2/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status: Deferred<br>Pending with<br>Consultant(SKB) |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00450/AM21/ | RLA File<br>:09/24/040/00085/AM21/ | Lic.No/Date:0910068756<br>15.05.2020 | ||
| **Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toConsultant (SKB)**on 19.08.2020 for examination of the case. However, comments have been received yet.<br>Hence, the Committee decided to wait for the comments.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 19.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments. Case is deferred.
| 163 | Case No.:21/2/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020<br>Lic.No/Date:0910068757<br>15.05.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00451/AM21/ | RLA File<br>:09/24/040/00093/AM21/ | Pending with<br>Consultant(SKB) | ||
| **Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toConsultant (SKB)**on 19.08.2020 for examination of the case. However, comments have been received yet.<br>Hence, the Committee decided to wait for the comments.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 19.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments. Case is deferred.
| 164 | Case No.:22/2/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br> <br> <br> | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020<br>Lic.No/Date:0910068758<br>15.05.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00452/AM21/ | RLA File<br>:09/24/040/00094/AM21/<br> <br> | Pending with<br>Consultant(SKB) | ||
| **Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toConsultant (SKB)**on 19.08.2020 for examination of the case. However, comments have been received yet.<br>Hence, the Committee decided to wait for the comments.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 19.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments. Case is deferred.
| 165 | Case No.:23/2/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br> <br> <br> | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020<br>Lic.No/Date:0910068759<br>15.05.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00453/AM21/ | RLA File<br>:09/24/040/00091/AM21/<br> <br> | Pending with<br>Consultant(SKB) | ||
| **Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toConsultant (SKB)**on 19.08.2020 for examination of the case. However, comments have been received yet.<br>Hence, the Committee decided to wait for the comments.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 19.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments. Case is deferred.
| Case No.:24/2/80- | Party Name: DILIGENT | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | SCM SOLUTIONS PR | ALC2/2020 | |||||
| IVATE LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068760 | Pending with | ||||
| :01/80/050/00454/AM21/ | :09/24/040/00082/AM21/ | 18.05.2020 | RA/Firm |
166 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 31.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.
46 | P a g e
| Case No.:25/2/80- | Party Name: DILIGENT SCM | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | SOLUTIONS PR IVATE | ALC2/2020 | ||||
| LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068770 | Pending with | |||
| :01/80/050/00455/AM21/ | :09/24/040/00083/AM21/ | 18.05.2020 | RA/Firm |
167 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 31.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:28/2/80- | Party Name: VENUS | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | SAFETY & HEALTH | ALC2/2020 | ||||
| PRIVATE LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310836278 | Pending with | |||
| :01/80/050/00458/AM21/ | :03/95/040/00090/AM21/ | 20.05.2020 | RA/Firm |
168 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
169
| Case No.:37/2/80-ALC2/2020 | Party Name: GODREJ & | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| BOYCE MFG. CO. LTD. | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310836284 | Pending | ||||
| :01/80/050/00467/AM21/ | :03/94/040/00083/AM21/ | 20.05.2020 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the firm on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
| Case No.:26/2/80- | Party Name: TPI | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | COMPOSITES INDIA | ALC2/2020 | ||||
| PRIVATE LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166764 | Pending with | |||
| :01/80/050/00456/AM21/ | :04/24/040/00012/AM21/ | 21.05.2020 | RA/Firm |
170 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
47 | P a g e
| Case No.:27/2/80- | Party Name: TPI | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | COMPOSITES INDIA | ALC2/2020 | ||||
| PRIVATE LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166767 | Pending with | |||
| :01/80/050/00457/AM21/ | :04/24/040/00023/AM21/ | 21.05.2020 | RA/Firm |
171 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:38/2/80- | Party Name: STERLITE | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | POWER TRANSMISSION | ALC2/2020 | Deferred | ||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310836300 | Pending with | ||||
| :01/80/050/00468/AM21/ | :03/95/040/01035/AM20/ | 21.05.2020 | MeitY |
172 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY on 17.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:29/2/80- | Party Name: FERRUM | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | EXTREME ENGINEERING | ALC2/2020 | ||||
| PRIVATE LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510414238 | Pending with | |||
| :01/80/050/00459/AM21/ | :05/23/040/00029/AM21/ | 22.05.2020 | RA/Firm |
173 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:30/2/80- | Party Name: HEURTEY | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PETROCHEM INDIA | ALC2/2020 | ||||
| PRIVATE LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410046093 | Pending with | |||
| :01/80/050/00460/AM21/ | :34/24/040/00042/AM21/ | 26.05.2020 | RA/Firm |
174 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
48 | P a g e
| Case No.:35/2/80- | Party Name: L&T- MHPS | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TURBINE GENERATORS | ALC2/2020 | ||||
| PRIVATE LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310836382 | Pending with | |||
| :01/80/050/00465/AM21/ | :03/95/040/00084/AM21/ | 26.05.2020 | RA/Firm |
175 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:36/2/80- | Party Name: L&T- MHPS | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | TURBINE GENERATORS | ALC2/2020 | ||||
| PRIVATE LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310836383 | Pending with | |||
| :01/80/050/00466/AM21/ | :03/95/040/00085/AM21/ | 26.05.2020 | RA/Firm |
176 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:34/2/80- | Party Name: DEE | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | DEVELOPMENT | ALC2/2020 | ||||
| ENGINEERS LIMITED | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510414257 | Pending with | |||
| :01/80/050/00464/AM21/ | :05/23/040/00034/AM21/ | 27.05.2020 | RA/Firm |
177 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:39/2/80-ALC2/2020 | Party Name: JOHNSON LIFTS | Meet No/Date:4/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0410166788 | Pending with | ||||
| :01/80/050/00469/AM21/ | :04/24/040/00202/AM20/ | 29.05.2020 | DHI |
178 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 17.08.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
49 | P a g e
| Case No.:40/2/80- | Party Name: LM WIND | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | POWER BLADES INDIA | ALC2/2020 | ||||
| PVT. LTD. | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410046107 | Pending with | |||
| :01/80/050/00470/AM21/ | :34/24/040/00049/AM21/ | 29.05.2020 | RA/Firm |
179 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 11.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| 180 | Case No.:41/2/80-<br>ALC2/2020 | Party Name: UNDERCARRIAGE<br>AND TRACTOR PARTS PVT.<br>LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00471/AM21/ | RLA File :03/95/040/00097/AM21/ | Lic.No/Date:0310836421<br>29.05.2020 | Pending with<br>MSME | |
| Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toMSMEon 11.08.2020 for examination of the case. However, comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred. |
| Case No.:43/2/80- | Party Name: NTB | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INTERNATIONAL PVT | ALC2/2020 | ||||
| LTD | 20.08.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310836497 | Pending with | |||
| :01/80/050/00473/AM21/ | :03/95/040/01237/AM20/ | 04.06.2020 | RA/Firm |
181 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 17.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:44/2/80- | Party Name: GODREJ & | Meet No/Date:4/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | BOYCE MFG. CO. LTD. | ALC2/2020 | ||||
| 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310836537 | Pending with | |||
| :01/80/050/00474/AM21/ | :03/94/040/00124/AM21/ | 05.06.2020 | RA/Firm |
182 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
50 | P a g e
| 183 | Case No.:<br>1/4/80-ALC2/2020 | Party Name: ISGEC HEAVY<br>ENGINEERING LIMITED<br>RLA File :05/23/040/00096/AM21/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00539/AM21/ | Lic.No/Date:0510414734<br>27.07.2020 | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 184 | Case No.:2/4/80-<br>ALC2/2020 | Party Name: DILIGENT SCM<br>SOLUTIONS PR IVATE<br>LIMITED<br>RLA File :09/24/040/00229/AM21/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00540/AM21/ | Lic.No/Date:0910068997<br>28.07.2020 | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 185 | Case No.:3/4/80-<br>ALC2/2020 | Party Name: AVLIGHT<br>AUTOMOTIVES PVT. LTD.<br> <br> <br> <br>RLA File<br>:05/23/040/00068/AM21/<br> <br> | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00541/AM21/ | Lic.No/Date:0510414753<br>28.07.2020 | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 186 | Case No.:4/4/80-ALC2/2020 | Party Name: TPI<br>COMPOSITES INDIA<br>PRIVATE LIMITED | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020<br>Lic.No/Date:0410166921<br>28.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00542/AM21/ | RLA File<br>:04/24/040/00057/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Chennai& the firm. Therefore, the Committee decided to request fromRA,<br>Chennaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Chennai & the firm. Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 187 | Case No.:5/4/80-<br>ALC2/2020 | Party Name: ISGEC HEAVY<br>ENGINEERING LIMITED | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020<br>Lic.No/Date:0510414771<br>30.07.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00543/AM21/ | RLA File<br>:05/23/040/00107/AM21/ | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case.
51 | P a g e
| Case No.:7/4/80-ALC2/2020 | Party Name: MEDIVAC | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| SURGICAL PRIVATE | ALC2/2020 | ||||||
| LIMITED | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3710002787 | Pending with | ||||
| :01/80/050/00545/AM21/ | :37/24/040/00002/AM21/ | 30.07.2020 | RA/Firm |
188 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from Kandla FT & the firm. Therefore, the Committee decided to request from Kandla FT and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
| Case No.:6/4/80- | Party Name: PERMANENT | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | MAGNETS LIMITED | ALC2/2020 | |||||
| 20.08.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310837528 | Pending with | ||||
| :01/80/050/00544/AM21/ | :03/95/040/00262/AM21/ | 31.07.2020 | RA/Firm |
189 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
| 190 | Case No.:8/4/80-<br>ALC2/2020<br>HQ File<br>:01/80/050/00546/AM21/ | Party Name: BANGALORE<br>BIOTECH LABS PVT. LTD. | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020<br>Lic.No/Date:0710116824<br>31.07.2020 | Status: Deferred |
|---|---|---|---|---|
| RLA File<br>:07/24/040/00114/AM21/ | Pending with<br>RA/Firm | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Bangalore& the firm. Therefore, the Committee decided to request fromRA,<br>Bangaloreand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 191 | Case No.:9/4/80-<br>ALC2/2020 | Party Name: OAM SAAI<br>INTERNATIONAL INC.<br>RLA File<br>:05/24/040/00211/AM21/ | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00547/AM21/ | Lic.No/Date:0510414806<br>31.07.2020 | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 192 | Case No.:10/4/80-<br>ALC2/2020 | Party Name: SULZER PUMPS<br>INDIA LIMITED | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020<br>Lic.No/Date:0310837571<br>07.08.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00548/AM21/ | RLA File<br>:03/95/040/00258/AM21/ | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
52 | P a g e
| 193 | Case No.:11/4/80-<br>ALC2/2020 | Party Name: SULZER PUMPS<br>INDIA LIMITED | Meet No/Date:4/80-<br>ALC2/2020<br>20.08.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00549/AM21/ | RLA File<br>:03/95/040/00257/AM21/ | Lic.No/Date:0310837589<br>10.08.2020 | Pending with<br>RA/Firm | |
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| Case No.:12/4/80- | Party Name: FABTECH | Meet No/Date:4/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | PROJECTS & ENGINEERS | ALC2/2020 | |||||
| LTD | 20.08.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067812 | Pending with | ||||
| :01/80/050/00550/AM21/ | :31/83/040/00038/AM21/ | 11.08.2020 | RA/Firm |
194 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Pune & the firm. Therefore, the Committee decided to request from RA, Pune and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
53 | P a g e
Minutes of Offline Cases
Sl. No. 29
Case No.: 44/19/80-ALC2/2017 M. No.: 04/80-ALC2/2020 dated 20.08.2020 LARSEN & TOUBRO LIMITED Status: Lic. No. 0310816114 Date: 04.10.2017 Approved HQ. No.: 01/80/050/00325/AM18/ Subject: Request for re-fixation of ad-hoc RLA No.: 03/95/040/00365/AM18/ norms
Decision: The Committee considered the case as per the agenda and noted that the case was approved in M. No. 4/80-ALC2/2018 dated 23.05.2018 on the recommendation of technical representatives of DHI, DIPP and MSME. However, the firm requested for re-viewing the ad-hoc norms on the basis of actual wastage as Norms Committee ratified the earlier norms as per SION C-1647 where wastage is allowed as 5% only. For items, Formed Head in 4 Petals, Test Coupons (Import Item at Sl. No 6), the firm applied for 34,943 Kgs claiming 4% wastage. However, Norms Committee ratified norms considering the item as component on net to net basis as per GN-4. Firm requested for allowing import to amend the quantity as 34,626 Kgs with 4% wastage.
The Committee reconsidered the case and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/26/2019-TSW dated 20.05.2020 (copy Enclosed)
RA concerned may take further necessary action as per the decision of NC.
Sl. No. 30
Case No. 13/12/80-ALC2/2018 Status: M. No.: 04/80-ALC2/2020 dated 20.08.2020 M/s NIDEC INDIA PRIVATE LIMITED. Approved Lic. No. /date 0510408160 Date: 22.10.2018 HQ. No.: 01/80/050/00286/AM19 Subject: Request for fixation of ad-hoc RLA No.: 05/24/040/00408/AM19 norms
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 06/80-ALC2/2019 dated 03.07.2019 due to non submission of reply of deficiency letter as raised by DPIIT.
However, the firm had requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/8/2019-TSW dated 08.07.2020. (Copy enclosed)
RA concerned may take further necessary action as per the decision of NC.
54 | P a g e
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.