DGFT Committee Minutes
DIRECTORATE GENERAL OF FOREIGN TRADE - (DES I SECTION)
MINUTES OF MEETING NO. 03/80 OF THE NORMS COMMITTEE-I DATED 30.07.2020 held on 06.08.2020
Meeting No. 03/80 of the Norms Committee (NC-I) for the licensing year 2020-2021 (originally scheduled for 30.07.2020) held on 06.08.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -
| Sl. No. | Name of the representatives & their Designation | Department |
|---|---|---|
| 1. | Shri B. C. Nayak, D. O. | DHI |
| 2. | Shri K.S. Sodhi, Asst. Director | MSME |
| 2 | Shri Sushil Kumar Jangid, Scientist ‘B’ | MeitY |
| 3. | Shri Shaish Kumar, (Tech-1) | Consultant |
| 4. | Shri V.C. Agarwal, (Tech-3) | Consultant |
| 5. | Shri S. K. Bhatnagar, | Consultant |
| In Attendance | ||
| 1. | Shri K.V. Tirumala, Deputy DGFT | DGFT |
| 2. | Shri Pranav Upadhyay, Assistant Director ISS | DGFT |
Note:
-
In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.
-
Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.
-
All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail addressnc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email / by Post.
-
Minutes of Meeting 01/80 (originally scheduled for 20.05.2020) held on 17.06.2020 was circulated on 23.07.2020, to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and therefore the said minutes were uploaded on dgft.gov.in on 28.07.2020.
1 | P a g e
MEETING NUMBER: 3/80-ALC2/2020 MEETING DATE: 30.07.2020
| Case No.:366/15/80- | Party Name: FOWLER | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | WESTRUP(INDIA)PVT.LTD. | ALC2/2020&30.07.2020 | ||||
| HQ File | RLA File | Lic.No/Date:0710108605 | Pending with Firm | |||
| :01/80/050/00708/AM19/ | :07/24/040/00106/AM16/ | 13.08.2015 |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :
-
Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
-
Weight of each Export Product.
-
1 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
- Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
| Case No.:30/1/80-ALC2/2019 | Party Name: FOWLER | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| WESTRUP(INDIA)PVT LTD. | ALC2/2020&30.07.2020 | Deferred | ||||
| HQ File | RLA File | Lic.No/Date:0710108606 | Pending | |||
| :01/80/050/00778/AM19/ | :07/24/040/00109/AM16/ | 13.08.2015 | with Firm |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :
-
Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
-
Weight of each Export Product.
-
2 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
- Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
| Case No.:363/15/80- | Party Name: PROMAC | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | ENGINEERING INDUSTRIES | ALC2/2020&30.07.2020 | Deferred | ||||
| LIMITED | |||||||
| HQ File | RLA File :07/24/040/00184/AM16/ | Lic.No/Date:0710108812 | Pending with | ||||
| :01/80/050/00705/AM19/ | 05.10.2015 | Firm |
3 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
2 | P a g e
| 4 | Case No.:364/15/80-ALC2/2018 | Party Name: PROMAC<br>ENGINEERING INDUSTRIES<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00706/AM19/ | RLA File<br>:07/24/040/00185/AM16/ | Lic.No/Date:0710108813<br>05.10.2015 | Pending with<br>Firm | |
| Decision:The Committee considered the case as per the agenda and noted that a deficiency<br>certain information as raised byDHIwas sent to the firm on 21.07.2020. However, no reply has<br>yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. | letter seeking<br>been received |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.
| Case No.:215/15/80-ALC2/2018 | Party Name: FOWLER | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| WESTRUP (INDIA) PVT LTD. | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710110568 | Pending | |||
| :01/80/050/00557/AM19/ | :07/24/040/00201/AM17/ | 25.10.2016 | with Firm |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :
- Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
- 5
-
Weight of each Export Product.
-
Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
| Case No.:222/15/80-ALC2/2018 | Party Name: FOWLER | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| WESTRUP (INDIA) PVT LTD. | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710110569 | Pending with | |||
| :01/80/050/00564/AM19/ | :07/24/040/00204/AM17/ | 25.10.2016 | Firm |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :
- Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
- 6
-
Weight of each Export Product.
-
Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
3 | P a g e
| Case No.:380/15/80-ALC2/2018 | Party Name: FOWLER | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| WESTRUP(INDIA)PVT LTD. | ALC2/2020&30.07.2020 | Deferred | ||||
| HQ File | RLA File | Lic.No/Date:0710110914 | Pending with | |||
| :01/80/050/00722/AM19/ | :07/24/040/00302/AM17/ | 05.01.2017 | Firm |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :
-
Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
-
Weight of each Export Product.
7
-
Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
| Case No.:402/15/80-ALC2/2018 | Party Name: SHIV HYDROMET | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020&30.07.2020 | Deferred | |||||
| HQ File | RLA File | Lic.No/Date:2410042158 | Pending | |||
| :01/80/050/00744/AM19/ | :24/24/040/00034/AM17/ | 14.03.2017 | with Firm |
Decision: The Committee considered the case as per agenda and the firm’s representatives (Mr. Manish Viramgama & Mr. Dev) explained the case during personal hearing held via video conferencing. However, on the advice of Consultant (Tech-1) , the Committee directed to the firm’s representative to furnish the following 8 information:
-
Wastage on Antimony metal, indicating net content of Antimony in item of import supported by Certificate of Analysis from supplier (For total import).
-
Antimony metal content on dry basis or wet basis.
-
Certificate of analysis of each of the consignment.
-
Total import & export made in quantity terms.
Case is deferred.
4 | P a g e
| Case No.:1/11/80-ALC2/2018 | Party Name: DIAMOND | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| METAL SCREENS(P)LTD | ALC2/2020&30.07.2020 | Approved | ||||
| HQ File | RLA File | Lic.No/Date:6510000003 | ||||
| :01/80/050/00192/AM19/ | :65/24/040/00003/AM18/ | 17.05.2017 |
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the basis of written comments of MSME as under:
Export items:
9
- Hole diameter -2.5 mm, pitch- 4 mm, open area- 35.53%, quantity- 30 numbers& per unit weight- 10.31 Kgs. 2. Hole diameter- 3 mm, pitch- 5 mm, open area- 33%, quantity -265 numbers& per unit weight 10.72 Kgs. 3. Hole diameter- 4 mm, pitch- 6 mm, open area- 40.43%, quantity-300 numbers & per unit weight- 9.53 Kgs. 4. Hole diameter- 5 mm, pitch- 7 mm, open area 46.41%, quantity-1336 numbers &per unit weight 8.57 Kgs. 5. Hole diameter- 6 mm, pitch- 8 mm, open area 51%, quantity - 2150 numbers &per unit weight- 7.84 Kgs. 6. Hole diameter- 7 mm, pitch- 9 mm, open area- 55%, quantity - 179 numbers & per unit weight- 7.2 Kgs. 7. Hole diameter- 8 mm, pitch- 12 mm, open area- 40.43% & quantity- 243 numbers & per unit weight-9.53 Kgs. 8. Hole diameter- 10 mm, pitch- 14 mm, open area- 46.41%, quantity- 185 numbers &per unit weight- 8.57 Kgs. 9. Hole diameter- 12 mm, pitch- 16 mm, open area- 51%, quantity- 62 numbers & per unit weight- 7.84 Kgs.
Import Items:
-
Quantity of relevant import item at Sl. No. 1 may be allowed with the wastage of 21.36%. 2. Quantity of relevant import item at Sl. No. 2 may be allowed with the wastage of 32.80%. 3. Quantity of relevant import item at Sl. No. 3 may be allowed with the wastage of 45.40%. 4. Quantity of relevant import item at Sl. No. 4 may be allowed with the wastage of 57.70%.
-
Quantity of relevant import item at Sl. No. 5 may be allowed with the wastage of 69.47%. 6. Quantity of relevant import item at Sl. No. 6 may be allowed with the wastage of 81.50%. 7. Quantity of relevant import item at Sl. No. 7 may be allowed with the wastage of 45.27%. 8. Quantity of relevant import item at Sl. No. 8 may be allowed with the wastage of 57.86%. 9. Quantity of relevant import item at Sl. No. 9 may be allowed with the wastage of 69.44%.
Note: The wastage allowed for all the import items after affecting 1/3[rd] recovery from scrap.
RA concerned may take further necessary action as per the decision of NC.
| Case No.:223/15/80- | Party Name: ZEECO | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | INDIA PVT.LTD. | 30.07.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0310814297 | ||||
| :01/80/050/00565/AM19/ | :03/95/040/00271/AM18/ | 28.06.2017 |
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of Consultant (Tech-3) as under:
10
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Norms |
|---|---|---|---|---|---|---|
| 84798999 | Incinerator<br>Superheater<br>With<br>Transitions | 3 Set | 1 | 73044190 | SS Tube - 88.9MM x<br>7.00mm THK x 6050 mm<br>LG SA312 TP321 | As per GN-4 |
| 2 | 73044190 | SS Tube - 60.3MM x<br>11.07mm THK x 6454 mm<br>LG SA312 TP321 | As per GN-4 | |||
| 3 | 73044190 | SS Tube - 33.4MM x<br>4.55mm THK x 3369 mm<br>LG SA312 TP321 | As per GN-4 |
5 | P a g e
| Case No.:20/20/80- | Party Name: BIRLA PRECISION | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2017 | TECHNOLOGIES LTD. | ALC2/2020&30.07.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0310818218 | ||||
| :01/80/050/00384/AM18/ | :03/94/040/00782/AM18/ | 04.01.2018 |
| Case No.:20/20/80-<br>ALC2/2017 | Case No.:20/20/80-<br>ALC2/2017 | Case No.:20/20/80-<br>ALC2/2017 | Party Name: BIRLA PRECISION<br>TECHNOLOGIES LTD. | Meet No/Date:3/80-<br>ALC2/2020&30.07.2020<br>Lic.No/Date:0310818218<br>04.01.2018 | Meet No/Date:3/80-<br>ALC2/2020&30.07.2020<br>Lic.No/Date:0310818218<br>04.01.2018 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00384/AM18/ | RLA File<br>:03/94/040/00782/AM18/ | ||||||
| 11 | Decision:The Committee considered the case as per the agenda and<br>written comments ofMSMEas under: | decided toratifythe ad-hoc norms as per | |||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Norms | ||||
| 1 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6063 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 2 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 3 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 4 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 4589.50 Kgs inclusive of 52% wastage<br>after affecting 20% recovery from Scrap | ||||
| 5 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 4405 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 6 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | Deleted | ||||
| 7 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | Deleted | ||||
| 8 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 7167 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| Case No.:23/20/80- | Party Name: BIRLA PRECISION | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2017 | TECHNOLOGIES LTD. | ALC2/2020&30.07.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0310818219 | ||||
| :01/80/050/00387/AM18/ | :03/94/040/00784/AM18/ | 04.01.2018 |
| Case No.:23/20/80-<br>ALC2/2017 | Case No.:23/20/80-<br>ALC2/2017 | Case No.:23/20/80-<br>ALC2/2017 | Party Name: BIRLA PRECISION<br>TECHNOLOGIES LTD. | Meet No/Date:3/80-<br>ALC2/2020&30.07.2020 | Meet No/Date:3/80-<br>ALC2/2020&30.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00387/AM18/ | RLA File<br>:03/94/040/00784/AM18/ | Lic.No/Date:0310818219<br>04.01.2018 | |||||
| 12 | Decision:The Committee considered the case as per the agenda and<br>written comments ofMSMEas under: | decided toratifythe ad-hoc norms as per | |||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Norms | ||||
| 1 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6063 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 2 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 3 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 4 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 4589.50 Kgs inclusive of 52% wastage<br>after affecting 20% recovery from Scrap | ||||
| 5 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 4405 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 6 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | Deleted | ||||
| 7 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | Deleted | ||||
| 8 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 7167 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
6 | P a g e
| Case No.:21/20/80- | Party Name: BIRLA PRECISION | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2017 | TECHNOLOGIES LTD. | ALC2/2020&30.07.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0310818275 | ||||
| :01/80/050/00385/AM18/ | :03/94/040/00785/AM18/ | 05.01.2018 |
| Case No.:21/20/80-<br>ALC2/2017 | Case No.:21/20/80-<br>ALC2/2017 | Case No.:21/20/80-<br>ALC2/2017 | Party Name: BIRLA PRECISION<br>TECHNOLOGIES LTD. | Meet No/Date:3/80-<br>ALC2/2020&30.07.2020 | Meet No/Date:3/80-<br>ALC2/2020&30.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00385/AM18/ | RLA File<br>:03/94/040/00785/AM18/ | Lic.No/Date:0310818275<br>05.01.2018 | |||||
| 13 | Decision:The Committee considered the case as per the agenda and<br>written comments ofMSMEas under: | decided toratifythe ad-hoc norms as per | |||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Norms | ||||
| 1 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6063 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 2 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 3 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 4 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 4589.50 Kgs inclusive of 52% wastage<br>after affecting 20% recovery from Scrap | ||||
| 5 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 4405 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 6 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | Deleted | ||||
| 7 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | Deleted | ||||
| 8 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 7167 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| Case No.:22/20/80- | Party Name: BIRLA PRECISION | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2017 | TECHNOLOGIES LTD. | ALC2/2020&30.07.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0310818273 | ||||
| :01/80/050/00386/AM18/ | :03/94/040/00783/AM18/ | 05.01.2018 |
| Case No.:22/20/80-<br>ALC2/2017 | Case No.:22/20/80-<br>ALC2/2017 | Case No.:22/20/80-<br>ALC2/2017 | Party Name: BIRLA PRECISION<br>TECHNOLOGIES LTD. | Meet No/Date:3/80-<br>ALC2/2020&30.07.2020<br>Lic.No/Date:0310818273<br>05.01.2018 | Meet No/Date:3/80-<br>ALC2/2020&30.07.2020<br>Lic.No/Date:0310818273<br>05.01.2018 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00386/AM18/ | RLA File<br>:03/94/040/00783/AM18/ | ||||||
| 14 | Decision:The Committee considered the case as per the agenda<br>written comments ofMSMEas under: | and | decided toratifythe ad-hoc norms as per | ||||
| Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Norms | ||||
| 1 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6063 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 2 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 3 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 4 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 4589.50 Kgs inclusive of 52% wastage<br>after affecting 20% recovery from Scrap | ||||
| 5 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 4405 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| 6 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | Deleted | ||||
| 7 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | Deleted | ||||
| 8 | 72281090 | High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils | 7167 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap | ||||
| Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
7 | P a g e
| 15 | Case No.:126/15/80-ALC2/2018 | Party Name: SHAKTI PUMPS<br>(INDIA) LTD. | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00468/AM19/ | RLA File<br>:56/24/040/00036/AM18/ | Lic.No/Date:5610005299<br>08.01.2018 | Pending<br>with Firm | |
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDPIITwas sent to the firm on 06.08.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 06.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
| 16 | Case No.:10/1/80-ALC2/2019 | Party Name: MAGNA<br>AUTOMOTIVE INDIA<br>PRIVATE LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00758/AM19/ | RLA File<br>:04/24/040/00001/AM19/ | Lic.No/Date:0410164172<br>06.04.2018 | Pending<br>with Firm | |
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byMSMEwas sent to the firm on 12.03.2020 followed by a reminder on 22.07.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 12.03.2020 followed by a reminder on 22.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
| 17 | Case No.:397/15/80-ALC2/2018 | Party Name: PROMAC<br>ENGINEERING INDUSTRIES<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00739/AM19/ | RLA File<br>:07/24/040/00357/AM18/ | Lic.No/Date:0710113276<br>14.05.2018 | ||
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 21.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
| Case No.:133/15/80-ALC2/2018 | Party Name: AZAD | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910066357 | Pending | ||||
| :01/80/050/00475/AM19/ | :09/24/040/00058/AM19/ | 20.06.2018 | with Firm |
18 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 12.03.2020 followed by a reminder on 22.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
8 | P a g e
| 19 | Case No.:165/15/80-ALC2/2018 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00507/AM19/ | RLA File<br>:09/24/040/00139/AM19/ | Lic.No/Date:0910066427<br>06.07.2018 | Pending<br>with Firm | |
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 21.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
| Case No.:166/15/80-ALC2/2018 | Party Name: BHARAT HEAVY | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ELECTRICALS LIMITED | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date: 0910066472 | Pending | |||
| :01/80/050/00508/AM19/ | :09/24/040/00171/AM19/ | 18.07.2018 | with Firm |
Decision: The Committee considered the case as per agenda and the firm’s representatives explained the case during personal hearing held via video conferencing. However, on the advice of the representative of DHI , the Committee directed to the firm’s representative to furnish the following information:
-
List of items of import.
-
Weight of each Export Product.
-
20 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
-
Net weight & finish weight of casting of casting & forging
-
Case is deferred.
| Case No.:179/15/80-ALC2/2018 | Party Name: PROMAC | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING INDUSTRIES | ALC2/2020 | Deferred | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710113710 | Pending | |||
| :01/80/050/00521/AM19/ | :07/24/040/00102/AM19/ | 13.08.2018 | with Firm |
- 21 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 11.02.2020 followed by reminders on 20.05.2020 & 21.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
9 | P a g e
| Case No.:23/11/80-ALC2/2018 | Party Name: JAYESH METALS | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| AND FERRO ALLOYS LLP | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310823416 | Pending | |||
| :01/80/050/00214/AM19/ | :03/94/040/00488/AM19/ | 29.08.2018 | with Firm |
Decision: The Committee considered the case as per agenda and the firm’s representatives explained the case 22 during personal hearing held via video conferencing. It was pointed out that the export and import items have overlapping mesh sizes. On the advice of the representative of MSME , the Committee directed to the firm’s representative to furnish the following information:
- To provide details of import & export items for the non-overlapping mesh size.
Case is deferred.
| Case No.:28/11/80-ALC2/2018 | Party Name: L & T-MHPS | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310823400 | Pending | ||||
| :01/80/050/00219/AM19/ | :03/95/040/00466/AM19/ | 29.08.2018 | with DHI |
23 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 19.06.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
| Case No.:9/1/80-ALC2/2019 | Party Name: L & T-MHPS | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310823645 | Pending | ||||
| :01/80/050/00757/AM19/ | :03/95/040/00469/AM19/ | 07.09.2018 | with DHI |
24 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 19.06.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
| 25 | Case No.:201/15/80-<br>ALC2/2018 | Party Name: DYNAMATIC<br>TECHNOLOGIES LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br><br>Lic.No/Date:0710113852<br>17.09.2018<br> <br> | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00543/AM19/ | RLA File :07/24/040/00155/AM19/ | Pending with<br>MSME | ||
| Decision:The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSMEon 07.07.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided toremind MSMEfor expediting the comments.<br>Case is deferred. |
10 | P a g e
| Case No.:57/11/80-ALC2/2018 | Party Name: GL&V INDIA | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Approved | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067179 | ||||
| :01/80/050/00248/AM19/ | :31/83/040/00096/AM19/ | 26.09.2018 |
26
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:
-
Quantity of relevant import items at Sl. No. 1 to 11 may be allowed as per GN-4.
-
Quantity of relevant import item at Sl. No. 12 may be allowed as 5830 Kgs inclusive of 0.8% wastage after affecting 1/3[rd] recovery from scrap.
Note: Weight of export product is 28026 Kgs.
| Case No.:82/11/80- | Party Name: ANSTECH | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | 30.07.2020 | Deferred | ||||
| HQ File | RLA File | Lic.No/Date:3410044543 | Pending with | |||
| :01/80/050/00273/AM19/ | :34/24/040/00218/AM19/ | 04.10.2018 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 27 yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 08.07.2019 followed by reminders on 25.09.2019, 18.10.2019, 08.01.2020, 03.02.2020, 20.05.2020 & 22.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| 28 | Case No.:253/15/80-<br>ALC2/2018 | Party Name: BHARAT HEAVY<br>ELECTRICALS LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br><br>Lic.No/Date:0910066870<br>16.11.2018<br> <br> | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00595/AM19/ | RLA File :09/24/040/00340/AM19/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that a letter was sent toRA,<br>Hyderabad& the firm on 06.08.20220 as per decision taken in Meeting No. 01/80 dated 20.05.2020. However,<br>no information has been received yet. Hence, the Committee decided to wait for the requisite information.<br>Case is deferred. |
| 29 | Case No.:259/15/80-<br>ALC2/2018 | Party Name: DYNAMATIC<br>TECHNOLOGIES LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00601/AM19/ | RLA File :07/24/040/00182/AM19/ | Lic.No/Date:0710114156<br>22.11.2018 | Pending with<br>MSME | |
| Decision:The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSMEon 07.07.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided toremind MSMEfor expediting the comments.<br>Case is deferred. |
11 | P a g e
| Case No.:270/15/80-ALC2/2018 | Party Name: VEM | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| TECHNOLOGIES PVT LTD. | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910066924 | Pending with | |||
| :01/80/050/00612/AM19/ | :09/24/040/00428/AM19/ | 29.11.2018 | Firm |
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of Consultant (SKB):
- What is the length of each blank ( End-Cap-1) having ᶲ76.2 mm, weight 4.2 Kg for obtaining final weight of 0.346 Kgs having ᶲ 73 mm and length 77.2 mm?
30
-
What is the length of each blank ( End-Cap-2) having ᶲ76.2 mm, weight 5.7 Kg for obtaining final weight of 0.578 Kg having ᶲ73 mm and length 110.3 mm?
-
For Collar : Describe about the size of the tube (ᶲ70x ᶲ 50x1000 mm length). How you have calculated the weight of each blank for bringing final weight off 0.31 Kg?
-
For plug mill: The weight of Hax Bar for 119 Nos is indicated 107.1 Kgs. However, import is only 29.75 Kg. Give reasons for less import.
-
For Stop End: The weight of stop end for 119 Nos is indicated 94.01 Kgs. However, import is only 17.85 Kg. Give reasons for less import.
-
For Tab Locking: The weight of stop end for 119 Nos is indicated 97.58 Kgs. However, import is only 24.99 Kg. Give reasons for less import.
Note: The above information may be tabulated with full reason/justification and also match the quantity of import with quantity indicated in the drawings.
Case is deferred.
| Case No.:298/15/80- | Party Name: ULTRA | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | ENGINEERS | ALC2/2020 | Approved | |||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067288 | ||||
| :01/80/050/00640/AM19/ | :31/83/040/00164/AM19/ | 16.01.2019 |
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of DHI as under:
31
| ITCHS<br>Code | Export Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended<br>Norms |
|---|---|---|---|---|---|---|
| 84139190 | Parts Of Oil Field<br>Equipment, *CARR /<br>tube,3.12 ISGS NAL,<br>6/60, 20KSI, 1FT<br>Part No-102014363<br>(Export Product Net<br>Weight =<br>8.718X30500 =<br>265899 Kg) | 30500<br>Number | 1 | 73043119 | Mech Tubing<br>3.125 OD X 0 .313<br>Wall, 135KSI<br>Yield ( Qty<br>61,913.30 FT<br>101395796 | 1.10 Kgs/Kg<br>content in the<br>export product |
| 2 | 39269099 | Protector, Female,<br>3.12 ISGS (Qty<br>6039 KG)<br>101387417 | As per GN-4 with<br>accountability<br>clause |
12 | P a g e
| Case No.:42/1/80-ALC2/2019 | Party Name: LARSEN & | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| TOUBRO LIMITED | ALC2/2020&30.07.2020 | Deferred | ||||
| HQ File | RLA File | Lic.No/Date:0310827622 | Pending | |||
| :01/80/050/00790/AM19/ | :03/95/040/01295/AM19/ | 12.03.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and Consultant (Tech-3) informed that the firm’s reply dated 06.02.2020 is deficient due to following reasons:
- Weight per piece does not match with total weight in Annexure-2 of reply letter.
-
32 2. Import item at Sl. No. 1 is a bar but details given in Annuxure-3 are of a tube.
-
Thickness of tube given in Annexure-3 does not match with OD & ID.
-
For export product at Sl. No.1, Sheet is used to make sleeve, but process is not given.
-
For export product at Sl. No.1, weight of import item at Sl. No. 3 is taken Nil in Annuxure-4.
-
Dimensions of components & calculations of wastage are not given.
-
Therefore, the Committee decided to ask from the firm to provide clarification on the above mentioned deficiencies.
Case is deferred.
| Case No.:5/2/80-ALC2/2019 | Party Name: VIPRA CLOSURES | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020&30.07.2020 | Deferred | ||||
| HQ File | RLA File :03/95/040/01384/AM19/ | Lic.No/Date:0310828134 | Pending with | |||
| :01/80/050/00005/AM20/ | 03.04.2019 | MSME |
33 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 07.07.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
| Case No.:3/3/80-ALC2/2019 | Party Name: MUDHRA FINE | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLANC PRIVATE LTD | ALC2/2020&30.07.2020 | Deferred | ||||
| HQ File | RLA File | Lic.No/Date:0410165451 | Pending | |||
| :01/80/050/00009/AM20/ | :04/24/040/00294/AM19/ | 11.04.2019 | with DHI |
34 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 29.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:4/3/80-ALC2/2019 | Party Name: VEELINE MEDIA | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020&30.07.2020 | Deferred | ||||
| HQ File | RLA File | Lic.No/Date:0210209114 | ||||
| :01/80/050/00010/AM20/ | :02/24/040/00003/AM20/ | 16.04.2019 |
Decision: The Committee considered the case as per the agenda and the representative of MSME informed that 35 the firm’s reply is incomplete as they have not given the net content of the import item in per unit of export product. Therefore, the Committee decided to ask again from the firm to furnish the following information as per advice of the representative of MSME:
1. To provide net content of the import item in per unit of export product.
Case is deferred.
13 | P a g e
| Case No.:8/3/80-ALC2/2019 | Party Name: L & T-MHPS | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310828481 | Pending | |||
| :01/80/050/00014/AM20/ | :03/95/040/01354/AM19/ | 23.04.2019 | with Firm |
36 Decision: The Committee considered the case as per agenda and DHI informed that the firm’s reply dated 11.03.2020 is deficient. Therefore, the Committee decided to ask again from the firm to furnish the following information as per comments of DHI:
- To provide Annuxure-2.
Case is deferred.
| Case No.:1/5/80-ALC2/2019 | Party Name: PAHARPUR | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| COOLING TOWERS LIMITED | ALC2/2020 | Deferred | |||||
| 30.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0210209171 | Pending | ||||
| :01/80/050/00039/AM20/ | :02/24/040/00012/AM20/ | 16.05.2019 | with Firm |
37 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 06.03.2020 followed by a reminder on 22.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
| Case No.:13/5/80-ALC2/2019 | Party Name: HEURTEY | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PETROCHEM INDIA PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045150 | Pending | ||||
| :01/80/050/00051/AM20/ | :34/24/040/00059/AM20/ | 17.05.2019 | with DHI |
38 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 22.07.2020 for examination of the case. However, the representative of DHI informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:1/7/80-ALC2/2019 | Party Name: CROWN | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| CLOSURES PVT. LTD. | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310829905 | Pending | |||
| :01/80/050/00098/AM20/ | :03/94/040/00246/AM20/ | 25.06.2019 | with Firm |
39 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 06.03.2020 followed by a reminder on 23.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
14 | P a g e
| 40 | Case No.:2/7/80-ALC2/2019 | Party Name: OSWAL PUMPS<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00099/AM20/ | RLA File<br>:33/24/040/00012/AM20/ | Lic.No/Date:3310030557<br>25.06.2019 | Pending<br>with Firm | |
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDPIITwas sent to the firm on 06.03.2020 followed by a reminder on 23.07.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 06.03.2020 followed by a reminder on 23.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
| Case No.:3/7/80-ALC2/2019 | Party Name: OAM SAAI | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| INTERNATIONAL INC. | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510411061 | Pending | |||
| :01/80/050/00100/AM20/ | :05/24/040/00181/AM20/ | 26.06.2019 | with Firm |
41 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 07.01.2020 followed by reminders on 06.03.2020 & 23.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
| Case No.:4/7/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910067697 | Pending | ||||
| :01/80/050/00101/AM20/ | :09/24/040/00138/AM20/ | 26.06.2019 | with DHI |
42 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 05.06.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
| Case No.:10/7/80- | Party Name: P. M. ELECTRO | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | AUTO PVT. LTD. | ALC2/2020 | Deferred | |||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067458 | Pending with | |||
| :01/80/050/00107/AM20/ | :31/83/040/00048/AM20/ | 28.06.2019 | RA/Firm |
43 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 08.08.2019 followed by reminders on 11.11.2019, 08.01.2020, 03.02.2020, 26.02.2020 & 23.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
15 | P a g e
| 44 | Case No.:12/7/80-ALC2/2019 | Party Name: AUTOCOMP<br>CORPORATION PANSE<br>PRIVATE LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:3110067460<br>01.07.2019 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00109/AM20/ | RLA File<br>:31/83/040/00050/AM20/ | Pending with<br>Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 20.05.2020 followed by a reminder on 23.07.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 20.05.2020 followed by a reminder on 23.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.
| Case No.:15/7/80-ALC2/2019 | Party Name: DOOWON | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| CLIMATE CONTROL INDIA | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:6610000035 | Pending | |||
| :01/80/050/00112/AM20/ | :66/24/040/00003/AM20/ | 03.07.2019 | with Firm |
45 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of DHI:
- To provide detailed justification along with working calculation supported by dimensional drawing for operations with high wastage such as Trimming, Notching, Blanking, Piercing etc. and complete item descriptions. Case is deferred.
| Case No.:3/9/80-ALC2/2019 | Party Name: DYNA FORCE | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| HYDRAULICS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3110067484 | Pending | |||
| :01/80/050/00128/AM20/ | :31/83/040/00067/AM20/ | 25.07.2019 | with Firm |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the 46 following information as per comments of MSME :
-
To provide per unit weight of export item.
-
To provide blank size (in Kg).
-
Manufacturing process with step-wise wastage and material balancing.
Case is deferred.
| Case No.:4/9/80-ALC2/2019 | Party Name: RATNAMANI | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| METALS AND TUBES LTD | ALC2/2020 | Approved | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0810145826 | ||||
| :01/80/050/00129/AM20/ | :08/24/040/00135/AM20/ | 25.07.2019 |
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per 47 written comments of Consultant (Tech-3) as under:
| ITCHS | Export Item | Quantity | ITCHS | Import Item | Recommended |
|---|---|---|---|---|---|
| Code | Code | Norms | |||
| 81089090 | Welded Titanium Tubes | 179004 | 81089010 | Titanium CR Strip | 187955 Kgs |
| Spec: ASTM B338 TiGR - | Kgs | Tubular Quality Coils | with 5% | ||
| II | GR - II | wastage |
16 | P a g e
| 48 | Case No.:41/11/80-ALC2/2019 | Party Name: PHOENIX FOILS<br>PVT. LTD. | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Approved |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00167/AM20/ | RLA File<br>:03/95/040/00459/AM20/ | Lic.No/Date:0310830770<br>02.08.2019 | ||
| Decision:The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/190/2019-TSW dated 05.08.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| Case No.:45/11/80-ALC2/2004 | Party Name: L&T- MHPS | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310831568 | Pending | ||||
| :01/80/050/00171/AM20/ | :03/95/040/00574/AM20/ | 16.09.2019 | with DHI |
49 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 19.06.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
| Case No.:46/11/80-ALC2/2004 | Party Name: L&T-MHPS | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| BOILERS PVT LTD | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310831569 | Pending | |||
| :01/80/050/00172/AM20/ | :03/95/040/00588/AM20/ | 16.09.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of DHI:
-
Specific of item of export with its specification.
-
Weight of each Export Product.
-
50 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
-
AA of similar export product ratified by NC.
Case is deferred.
-
Case No.:1/13/80-ALC2/2019 Party Name: RONCH Meet No/Date:3/80- Status: POLYMERS PVT LTD ALC2/2020 Deferred 30.07.2020 HQ File RLA File Lic.No/Date:0310832012 Pending with 51 :01/80/050/00186/AM20/ :03/95/040/00654/AM20/ 04.10.2019 Firm Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 05.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.
17 | P a g e
| Case No.:2/13/80- | Party Name: FERRUM | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | EXTREME ENGINEERING | 30.07.2020 | Deferred | |||
| PRIVATE LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0510412040 | Pending with | |||
| :01/80/050/00187/AM20/ | :05/23/040/00265/AM20/ | 07.10.2019 | RA/Firm |
- 52 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 17.12.2019 followed by reminders on 13.02.2020, 21.05.2020 & 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:3/13/80-ALC2/2019 | Party Name: AVLIGHT | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| AUTOMOTIVES PVT. LTD. | ALC2/2020 | Approved | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510412058 | ||||
| :01/80/050/00188/AM20/ | :05/23/040/00266/AM20/ | 09.10.2019 |
| Case No.:3/13/80-ALC2/2019 | Party Name: AVLIGHT<br>AUTOMOTIVES PVT. LTD. | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00188/AM20/ | RLA File<br>:05/23/040/00266/AM20/ | Lic.No/Date:0510412058<br>09.10.2019 | |||
| 53 | Decision:The Committee considered the case as per the agenda and decided toratifythe<br>written comments ofMSMEas under:<br>Sl.<br>No.<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>Sl.<br>No.<br>ITCHS<br>Code<br>Import Item<br>1<br>87089900<br>A1BC Check<br>Arm + Bumper<br>MV Parts –<br>Plastic Moulded<br>Comp<br>38409<br>Number<br>1<br>73261910<br>A1BC Front<br>Inserts Sheet<br>Metal Comp -<br>S2780030<br>2<br>87089900<br>E2SCMoulded<br>Arm Front MV<br>Parts - Plastic<br>Moulded Comp<br>96007<br>Number<br>2<br>73261910<br>E2SC FRONT<br>Inserts Sheet<br>Metal Comp -<br>S2800030<br>3<br>87089900<br>E2SC Moulded<br>Arm Rear MV<br>Parts - Plastic<br>Moulded Comp<br>80000<br>Number<br>3<br>73261910<br>E2SC Rear<br>Inserts Sheet<br>Metal Compo -<br>S2800230<br>RA concerned maytake further necessaryaction asper the decision of NC. | ad-hoc norms as per<br>Recommended<br>Norms<br>As per GN-4<br>As per GN-4<br>As per GN-4 |
| Case No.:4/13/80-ALC2/2019 | Party Name: L&T- MHPS | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310832116 | Pending | ||||
| :01/80/050/00189/AM20/ | :03/95/040/00681/AM20/ | 10.10.2019 | with DHI |
54 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 20.05.2020 for examination of the case. However, the representative of DHI informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
18 | P a g e
| Case No.:5/13/80-ALC2/2019 | Party Name: L&T- MHPS | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310832159 | Pending | |||
| :01/80/050/00190/AM20/ | :03/95/040/00655/AM20/ | 11.10.2019 | with Firm |
-
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain
-
55 information as raised by DHI was sent to the firm on 11.02.2020. The firm vide letter dated 11.03.2020 informed that the Project Engineering & Detail Design is in progress and is expected to complete by 30[th] June 2020. Hence, they requested for extension of time till 30[th] June 2020 to furnish the requisite information. However, no information has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:6/13/80-ALC2/2019 | Party Name: GODREJ & | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| BOYCE MFG. CO. LTD. | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310832178 | Pending | |||
| :01/80/050/00191/AM20/ | :03/94/040/00505/AM20/ | 11.10.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that a similar case was discussed in M. No. 02/80 dated 16.06.2020. Therefore, the Committee decided to ask from the firm to furnish following information on the advice of Consultant (SKB) :
- What is the thickness of the imported plates?
-
56 2. Weight of each Mini/Maxi Proto/production Dyads.
-
What is the chemical composition of carbon steel plates of grade 250/350/PT460 NR/BS80? Please indicate equivalent IS Standard.
-
What are the drawing numbers belong to proto type and production type Mini Dyads?
-
What are the drawing numbers belong to proto type and production type Maxi Dyads?
-
As per drawings, there are 9 types of plate thicknesses are required for fabrication of Mini/Maxi Dyads. However, only 4 grades of plate are indicated. Please clarify whether the remaining grades of plates would be procured indigenously.
-
Which assembly belongs to proto/production type mini/maxi Dyads?
-
Case is deferred.
| 57 | Case No.:7/13/80-ALC2/2019 | Party Name: ISGEC HITACHI<br>ZOSEN LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00192/AM20/ | RLA File<br>:05/23/040/00269/AM20/ | Lic.No/Date:0510412096<br>11.10.2019 | ||
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDPIITwas sent to the firm on 24.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
19 | P a g e
| Case No.:8/13/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068080 | Pending with | |||
| :01/80/050/00193/AM20/ | :09/24/040/00347/AM20/ | 14.10.2019 | Firm |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of Consultant (Tech-3) :
-
Drawing of export items & its blank with all dimensions.
-
Weight of export product.
-
Weight of each of the imported and indigenous input, separately for each product, for the purpose of
58 material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
-
Documents indicating CIF value of import.
-
Documents of disposal of scrap having value in it.
Case is deferred.
Case No.:10/13/80- Party Name: GOLD MOHUR Meet No/Date:3/80-ALC2/2020 Status: ALC2/2019 PROFILES LIMITED 30.07.2020 Approved HQ File RLA File Lic.No/Date:0510412119 :01/80/050/00195/AM20 :05/23/040/00279/AM20/ 15.10.2019
| Case No.:10/13/80-<br>ALC2/2019 | Case No.:10/13/80-<br>ALC2/2019 | Party Name: GOLD MOHUR<br>PROFILES LIMITED | Party Name: GOLD MOHUR<br>PROFILES LIMITED | Party Name: GOLD MOHUR<br>PROFILES LIMITED | Meet No/Date:3/80-ALC2/2020<br>30.07.2020 | Meet No/Date:3/80-ALC2/2020<br>30.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00195/AM20 | RLA File<br>:05/23/040/00279/AM20/ | Lic.No/Date:0510412119<br>15.10.2019 | ||||||
| 59 | Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms as per<br>written comments of**Consultant (Tech-1)**as under: | |||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended Norms | |||
| 84379020 | Rubber Rollers For<br>Automatic Rice<br>Mill Machinery<br>10" | 8000<br>Number | 40025900 | Acrylonitrile<br>Butadiene Rubber<br>(Synthetic Rubber) | 26248 Kgs @ 1.05<br>Kgs/Kg content in the<br>export product | |||
| Note: Net weight of export item per piece should be 8.00 Kg.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| Case No.:1/17/80-ALC2/2019 | Party Name: VICTORA | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| AUTO PVT. LTD. | 30.07.2020 | Deferred | ||||
| HQ File | RLA File | Lic.No/Date:0510412724 | Pending with | |||
| :01/80/050/00233/AM20/ | :05/24/040/00513/AM20/ | 29.11.2019 | MSME |
60 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 28.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
20 | P a g e
| Case No.:2/17/80- | Party Name: SULZER PUMPS | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDIA LIMITED | ALC2/2020 | Deferred | |||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310833126 | Pending with | |||
| :01/80/050/00234/AM20/ | :03/95/040/00827/AM20/ | 02.12.2019 | RA/Firm |
61 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 15.01.2020 followed by reminders on 09.03.2020 & 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:3/17/80-ALC2/2019 | Party Name: SULZER PUMPS | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA LIMITED | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310833143 | Pending with | |||
| :01/80/050/00235/AM20/ | :03/95/040/00828/AM20/ | 02.12.2019 | RA/Firm |
62 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 15.01.2020 followed by reminders on 09.03.2020 & 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:5/17/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File :09/24/040/00439/AM20/ | Lic.No/Date:0910068244 | Pending with | |||
| :01/80/050/00237/AM20/ | 02.12.2019 | RA/Firm |
63 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:9/17/80- | Party Name: HANNING | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P LTD | 30.07.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:3410045677 | Pending with | |||
| :01/80/050/00241/AM20/ | :34/24/040/00270/AM20/ | 03.12.2019 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 64 yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 15.01.2020 followed by reminders on 09.03.2020 &15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
21 | P a g e
| Case No.:10/17/80- | Party Name: HANNING | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P LTD | 30.07.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:3410045679 | Pending with | |||
| :01/80/050/00242/AM20/ | :34/24/040/00271/AM20/ | 03.12.2019 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 65 yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 15.01.2020 followed by reminders on 09.03.2020 & 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:11/17/80- | Party Name: AZAD | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | 30.07.2020 | Deferred | |||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0910068247 | Pending with | |||
| :01/80/050/00243/AM20/ | :09/24/040/00437/AM20/ | 04.12.2019 | RA/Firm |
66 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
- 67
| Case No.:12/17/80-ALC2/2019 | Party Name: DOOWON | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| CLIMATE CONTROL INDIA | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:2610012887 | Pending | ||||
| :01/80/050/00244/AM20/ | :26/24/040/00012/AM20/ | 04.12.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
| Case No.:13/17/80-ALC2/2019 | Party Name: KABY | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRECISION MACHINING | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068268 | Pending with | ||||
| :01/80/050/00245/AM20/ | :09/24/040/00447/AM20/ | 06.12.2019 | Firm |
68 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 27.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
22 | P a g e
69
| Case No.:1/19/80-ALC2/2019 | Party Name: BAUMER | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TECHNOLOGIES INDIA | ALC2/2020 | Deferred | |||||
| PRIVATE LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5210043275 | Pending | ||||
| :01/80/050/00266/AM20/ | :52/24/040/00051/AM20/ | 23.12.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
| Case No.:2/19/80- | Party Name: DILIGENT SCM | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | SOLUTIONS PR IVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068302 | Pending with | |||
| :01/80/050/00267/AM20/ | :09/24/040/00474/AM20/ | 24.12.2019 | RA/Firm |
70 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 14.02.2020 followed by reminders on 26.05.2020 & 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
- 71
| Case No.:4/19/80-ALC2/2019 | Party Name: CRYOGAS | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| EQUIPMENT PVT LTD | ALC2/2020 | Deferred | |||||
| 30.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410045738 | Pending | ||||
| :01/80/050/00269/AM20/ | :34/24/040/00287/AM20/ | 24.12.2019 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
| 72 | Case No.:9/19/80-ALC2/2019 | Party Name: BONATRANS<br>INDIA PRIVATE LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00274/AM20/ | RLA File<br>:03/94/040/00785/AM20/ | Lic.No/Date:0310833747<br>27.12.2019 | Pending<br>with Firm | |
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 24.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
23 | P a g e
| Case No.:8/19/80-ALC2/2019 | Party Name: TEGA | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210209647 | ||||
| :01/80/050/00273/AM20/ | :02/24/040/00148/AM20/ | 30.12.2019 |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to 73 Consultant (Tech-1) on 26.06.2020 for examination of the case. For import item at Sl. No. 1, the Committee decided to ask from the firm to furnish following information on the advice of Consultant (SKB):
- To submit the justification for higher wastage with detailed process on the use of steel plate along with stage wise wastage at each operation involved.
Case is deferred.
| Case No.:10/19/80-ALC2/2019 | Party Name: BANGALORE | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| BIOTECH LABS PVT LTD. | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710115950 | Pending | |||
| :01/80/050/00275/AM20/ | :07/24/040/00223/AM20/ | 30.12.2019 | with Firm |
74 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:11/19/80- | Party Name: AZAD | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | 30.07.2020 | Deferred | |||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0910068312 | Pending with | |||
| :01/80/050/00276/AM20/ | :09/24/040/00489/AM20/ | 31.12.2019 | RA/Firm |
75 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:12/19/80- | Party Name: AZAD | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | 30.07.2020 | Deferred | |||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0910068313 | Pending with | |||
| :01/80/050/00277/AM20/ | :09/24/040/00490/AM20/ | 31.12.2019 | RA/Firm |
76 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
24 | P a g e
| Case No.:13/19/80-ALC2/2019 | Party Name: AUTOCOMP | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| CORPORATION PANSE | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3110067645 | Pending with | |||
| :01/80/050/00278/AM20/ | :31/83/040/00128/AM20/ | 31.12.2019 | Tech-3 |
- 77 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) for examination of the case on 16.03.2020 followed by a reminder on 24.07.2020. The physical file has been also sent on 04.08.2020 to Consultant (Tech-3) to examine the case. However, Consultant (Tech-3) informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:14/19/80-ALC2/2019 | Party Name: ISGEC HEAVY | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING LIMITED | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413163 | Pending | |||
| :01/80/050/00279/AM20/ | :05/23/040/00381/AM20/ | 01.01.2020 | with Firm |
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of Consultant (SKB):
-
78 1. Please provide complete detailed drawings of export item No 1 to 5 and also detail of components and its drawing indicating weight of blank, wastage on each stage and final weight of each export product, which are indicated in numbers.
-
Weight of each export item and complete assembly detail, which could match the weight of export product.
-
Detail of structural steel going to use in each export product.
-
What are the structural steels are being imported?
-
Basis of wastage claimed.
-
Case is deferred.
| Case No.:15/19/80- | Party Name: SOGEFI ENGINE | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | SYSTEMS INDIA PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0710115971 | Pending with | |||
| :01/80/050/00280/AM20/ | :07/24/040/00097/AM20/ | 02.01.2020 | RA/Firm |
- 79 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA, Bangalore on 13.02.2020 followed by reminders on 26.05.2020 & 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
25 | P a g e
| 80 | Case No.:17/19/80-ALC2/2019 | Party Name: ISGEC HEAVY<br>ENGINEERING LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00282/AM20/ | RLA File<br>:05/23/040/00378/AM20/ | Lic.No/Date:0510413181<br>02.01.2020 | Pending<br>with Firm | |
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 20.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 20.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
| Case No.:1/21/80- | Party Name: AZAD | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | 30.07.2020 | Deferred | |||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0910068392 | Pending with | |||
| :01/80/050/00295/AM20/ | :09/24/040/00522/AM20/ | 21.01.2020 | RA/Firm |
81 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:2/21/80- | Party Name: AZAD | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | 30.07.2020 | Deferred | |||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0910068393 | Pending with | |||
| :01/80/050/00296/AM20/ | :09/24/040/00523/AM20/ | 21.01.2020 | RA/Firm |
82 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:3/21/80- | Party Name: AZAD | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | 30.07.2020 | Deferred | |||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0910068394 | Pending with | |||
| :01/80/050/00297/AM20/ | :09/24/040/00524/AM20/ | 21.01.2020 | RA/Firm |
83 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
26 | P a g e
| Case No.:4/21/80- | Party Name: AZAD | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | 30.07.2020 | Deferred | |||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0910068395 | Pending with | |||
| :01/80/050/00298/AM20/ | :09/24/040/00528/AM20/ | 21.01.2020 | RA/Firm |
- 84 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:5/21/80- | Party Name: MAHINDRA | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | DEFENCE SYSTEMS LTD | 30.07.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:0510413404 | Pending with | |||
| :01/80/050/00299/AM20/ | :05/24/040/00602/AM20/ | 21.01.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 85 yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:7/21/80- | Party Name: LM WIND POWER | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | BLADES INDIA PVT. LTD | ALC2/2020 | Deferred | |||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045799 | Pending with | |||
| :01/80/050/00301/AM20/ | :34/24/040/00329/AM20/ | 21.01.2020 | RA/Firm |
86 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:8/21/80- | Party Name: LM WIND | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | 30.07.2020 | Deferred | |||
| PVT. LTD | ||||||
| HQ File | RLA File | Lic.No/Date:3410045800 | Pending with | |||
| :01/80/050/00302/AM20/ | :34/24/040/00330/AM20/ | 21.01.2020 | RA/Firm |
87 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
27 | P a g e
| 88 | Case No.:9/21/80-ALC2/2019 | Party Name: MICRON<br>INSTRUMENTS PVT LTD | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00303/AM20/ | RLA File<br>:05/24/040/00398/AM20/ | Lic.No/Date:0510413428<br>23.01.2020 | Pending<br>with Firm | |
| Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDPIITwas sent to the firm on 24.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
| Case No.:10/21/80-ALC2/2019 | Party Name: THERMAL | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| SYSTEMS (HYDERABAD) P. | ALC2/2020 | Deferred | ||||
| LTD. | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068410 | Pending | |||
| :01/80/050/00304/AM20/ | :09/24/040/00506/AM20/ | 24.01.2020 | with Firm |
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of DHI:
-
89 1. Specification of export item with quantity of export in number.
-
Quantity break-up of item No. 3 & 4 i.e. break-up of gate, globe & check valves and Pneumatic & conventional valves.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
-
Case is deferred.
| Case No.:11/21/80- | Party Name: CHEMICO | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | SYNTHETICS LTD. | 30.07.2020 | Approved | |||
| HQ File | RLA File | Lic.No/Date:0510413441 | ||||
| :01/80/050/00305/AM20/ | :05/23/040/00408/AM20/ | 24.01.2020 |
| Case No.:11/21/80-<br>ALC2/2019 | Case No.:11/21/80-<br>ALC2/2019 | Party Name: CHEMICO<br>SYNTHETICS LTD. | Party Name: CHEMICO<br>SYNTHETICS LTD. | Party Name: CHEMICO<br>SYNTHETICS LTD. | Meet No/Date:3/80-ALC2/2020<br>30.07.2020 | Meet No/Date:3/80-ALC2/2020<br>30.07.2020 | Meet No/Date:3/80-ALC2/2020<br>30.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00305/AM20/ | RLA File<br>:05/23/040/00408/AM20/ | Lic.No/Date:0510413441<br>24.01.2020 | |||||||
| 90 | Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms as per<br>written comments of**Consultant (Tech-1)**as under: | ||||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Norms | ||||
| 81101000 | Antimony Metal<br>(Sb 99.65% Min.) | 134772<br>Kgs | 26171000 | Antimony Concentrate<br>(Antimony Content 60.79%)<br>with 7.83% H2O (Water)<br>Content | 256472 Kgs | ||||
| Note: The Antimony Content in the import item should be 143702 Kgs.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
28 | P a g e
| Case No.:12/21/80- | Party Name: KAY BOUVET | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING LTD | ALC2/2020 | Deferred | |||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067666 | Pending with | |||
| :01/80/050/00306/AM20/ | :31/83/040/00139/AM20/ | 27.01.2020 | RA/Firm |
91 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 09.03.2020 followed by a reminder on 27.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:13/21/80- | Party Name: HANNING | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P LTD | 30.07.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:3410045818 | Pending with | |||
| :01/80/050/00307/AM20/ | :34/24/040/00336/AM20/ | 28.01.2020 | RA/Firm |
92 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:14/21/80- | Party Name: HANNING | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P. LTD. | 30.07.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:3410045819 | Pending with | |||
| :01/80/050/00308/AM20/ | :34/24/040/00337/AM20/ | 28.01.2020 | RA/Firm |
93 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:15/21/80- | Party Name: HANNING | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P LTD | 30.07.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:3410045820 | Pending with | |||
| :01/80/050/00309/AM20/ | :34/24/040/00338/AM20/ | 28.01.2020 | RA/Firm |
94 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
29 | P a g e
| Case No.:17/21/80- | Party Name: AVLIGHT | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | AUTOMOTIVES PVT. LTD. | ALC2/2020 | Deferred | |||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413478 | Pending with | |||
| :01/80/050/00311/AM20/ | :05/23/040/00359/AM20/ | 29.01.2020 | RA/Firm |
95 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 06.03.2020 followed by a reminder on 21.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:18/21/80- | Party Name: LM WIND | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA PVT. | 30.07.2020 | Deferred | |||
| LTD | ||||||
| HQ File | RLA File | Lic.No/Date:3410045830 | Pending with | |||
| :01/80/050/00312/AM20/ | :34/24/040/00341/AM20/ | 30.01.2020 | RA/Firm |
96
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:19/21/80-ALC2/2019 | Party Name: BENGAL | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES PVT. LTD. | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413481 | Pending | |||
| :01/80/050/00313/AM20/ | :05/23/040/00415/AM20/ | 30.01.2020 | with Firm |
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :
- Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
-
97 2. Weight of each Export Product.
-
Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
-
Case is deferred.
30 | P a g e
| Case No.:20/21/80- | Party Name: LM WIND POWER | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | BLADES INDIA PVT. LTD. | ALC2/2020 | Deferred | |||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045838 | Pending with | |||
| :01/80/050/00314/AM20/ | :34/24/040/00344/AM20/ | 30.01.2020 | RA/Firm |
98 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| 99 | Case No.:21/21/80-ALC2/2019 | Party Name: BHARAT HEAVY<br>ELECTRICALS LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00315/AM20/ | RLA File<br>:11/24/040/00011/AM20/ | Lic.No/Date:1110028681<br>31.01.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case<br>examination & comments as per the advice ofDHI.<br>Case is deferred. | toDPIITfor |
| Case No.:22/21/80- | Party Name: JAIN | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | IRRIGATION SYSTEMS | ALC2/2020 | ||||
| LTD. | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310834593 | Pending with | |||
| :01/80/050/00316/AM20/ | :03/94/040/00435/AM20/ | 03.02.2020 | RA/Firm |
100 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 09.03.2020 followed by a reminder on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:23/21/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068441 | Pending with | |||
| :01/80/050/00317/AM20/ | :09/24/040/00557/AM20/ | 03.02.2020 | RA/Firm |
101 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on20.05.2020 &20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
31 | P a g e
| Case No.:24/21/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068442 | Pending with | |||
| :01/80/050/00318/AM20/ | :09/24/040/00559/AM20/ | 03.02.2020 | RA/Firm |
- 102 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:25/21/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068443 | Pending with | |||
| :01/80/050/00319/AM20/ | :09/24/040/00552/AM20/ | 03.02.2020 | RA/Firm |
103 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:26/21/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068444 | Pending with | |||
| :01/80/050/00320/AM20/ | :09/24/040/00554/AM20/ | 03.02.2020 | RA/Firm |
104 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:27/21/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068445 | Pending with | |||
| :01/80/050/00321/AM20/ | :09/24/040/00553/AM20/ | 03.02.2020 | RA/Firm |
105 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
32 | P a g e
| Case No.: | Party Name: COFLE TAYLOR | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| 29/21/80-ALC2/2019 | INDIA CONTROL CABLES & | ALC2/2020 | Approved | |||
| SYSTEMS PRIVAT | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166495 | ||||
| :01/80/050/00323/AM20 | :04/24/040/00167/AM20/ | 05.02.2020 |
| Case No.:<br>29/21/80-ALC2/2019 | Case No.:<br>29/21/80-ALC2/2019 | Case No.:<br>29/21/80-ALC2/2019 | Party Name: COFLE TAYLOR<br>INDIA CONTROL CABLES &<br>SYSTEMS PRIVAT<br>RLA File<br>:04/24/040/00167/AM20/ | Party Name: COFLE TAYLOR<br>INDIA CONTROL CABLES &<br>SYSTEMS PRIVAT<br>RLA File<br>:04/24/040/00167/AM20/ | Party Name: COFLE TAYLOR<br>INDIA CONTROL CABLES &<br>SYSTEMS PRIVAT<br>RLA File<br>:04/24/040/00167/AM20/ | Party Name: COFLE TAYLOR<br>INDIA CONTROL CABLES &<br>SYSTEMS PRIVAT<br>RLA File<br>:04/24/040/00167/AM20/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Approved | |
|---|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00323/AM20 | Lic.No/Date:0410166495<br>05.02.2020 | |||||||||
| 106 | Decision:The Committee considered the c<br>written comments ofMSMEas under: | ase as per the agenda and decided toratifythe ad-hoc norms as per | ||||||||
| ITCHS<br>Code | Export<br>Item | Quantity | Sl.<br>No. | ITCHS<br>Code | Import Item | Recommended Norms | ||||
| 87089900 | Control<br>Cables | 200000<br>Number | 1 | 39269099 | Plastic Part | **As per GN-4 ** | ||||
| 2 | 73121010 | Wire rope | Net to net basis | |||||||
| 3 | 73129000 | Spiral | Net to net basis | |||||||
| 4 | 73261910 | Metalic Part | As per GN-4 | |||||||
| Note: The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
| Case No.: | Party Name: AYYAPPA | Meet No/Date:3/80-ALC2/2020 | ||
|---|---|---|---|---|
| 30/21/80-ALC2/2019 | CNC PVT LTD | 30.07.2020 | ||
| HQ File | RLA File | Lic.No/Date:0710116097 | ||
| :01/80/050/00324/AM20 | :07/24/040/00262/AM20/ | 05.02.2020 |
Status: Approved
| <br> <br> <br> | Case No.:<br>30/21/80-ALC2/2019 | Party Name: AYYAPPA<br>CNC PVT LTD | Meet No/Date:3/80-ALC2/2020<br>30.07.2020 | Status:<br>Approved |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00324/AM20 | RLA File<br>:07/24/040/00262/AM20/ | Lic.No/Date:0710116097<br>05.02.2020 | ||
| 107<br> <br> <br> <br> | Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms as per<br>written comments ofMSMEas under:<br>ITCHS<br>Code<br>Export<br>**Item **<br>Quantity<br>Sl.<br>No.<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>88033000<br>Manifold<br>Hydraulic<br>Assy (Net<br>Content of<br>Import<br>Item Sl.<br>No.1 in<br>Export<br>Product is<br>528 Kgs)<br>1600<br>Number<br>1<br>76061200<br>Aluminium Alloy Plate<br>/ Block (Manifold -<br>Hydraulic)<br>1503.39 Kgs<br>inclusive of<br>184.70% wastage<br>after 15% recovery<br>from scrap<br>2<br>73072900<br>MS21900J6 (Adptor)<br>Stainless Steel<br>As per GN-4<br>3<br>73072900<br>MS21902J6 (Union)<br>Stainless Steel<br>As per GN-4<br>4<br>73072900<br>AS5169J06L (Plug,<br>Blanking) Stainless<br>Steel<br>As per GN-4<br>5<br>40169300<br>NAS1612-6 (Seal, Ring<br>Toridal) Rubber<br>Synthetic<br>As per GN-4<br>Note: The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
33 | P a g e
| Case No.:31/21/80- | Party Name: TEMA INDIA | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | LIMITED | ALC2/2020 | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310834668 | Pending with | |||
| :01/80/050/00325/AM20/ | :03/95/040/01062/AM20/ | 06.02.2020 | RA/Firm |
108 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 09.03.2020 followed by a reminder on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
109
| Case No.:32/21/80-ALC2/2019 | Party Name: IND-SPHINX | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRECISION LIMITED | ALC2/2020 | Withdrawn | |||||
| 30.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3010105038 | |||||
| :01/80/050/00326/AM20/ | :30/24/040/00122/AM20/ | 07.02.2020 |
Decision: The Committee considered the case as per the agenda and noted that the firm informed vide email dated 27.07.2020 that they have surrendered the licence to RA, Ludhiana . Therefore, the Committee decided to withdraw the case from the agenda.
Case is withdrawn.
| Case No.:15/22/80- | Party Name: SULZER INDIA | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRIVATE LIMITED. | ALC2/2020 | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3110067680 | Pending with | |||
| :01/80/050/00341/AM20/ | :31/83/040/00145/AM20/ | 11.02.2020 | RA/Firm |
110 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 09.03.2020 followed by a reminder on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:2/23/80-ALC2/2019 | Party Name: MANN AND | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| HUMMEL FILTER PVT. LTD. | ALC2/2020 | Deferred | |||||
| 30.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0710116157 | Pending | ||||
| :01/80/050/00347/AM20/ | :07/24/040/00271/AM20/ | 20.02.2020 | with DHI |
111 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI for examination of the case on 26.05.2020 followed by a reminder on 20.07.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
34 | P a g e
112
| Case No.:4/23/80-ALC2/2019 | Party Name: RONCH | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| POLYMERS PVT LTD | ALC2/2020 | Deferred | |||||
| 30.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310834951 | Pending | ||||
| :01/80/050/00349/AM20/ | :03/95/040/01089/AM20/ | 20.02.2020 | with Firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
| Case No.:3/23/80- | Party Name: AVLIGHT | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | AUTOMOTIVES LTD. | ALC2/2020 | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413679 | Pending with | |||
| :01/80/050/00348/AM20/ | :05/23/040/00424/AM20/ | 21.02.2020 | RA/Firm |
113 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 26.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:5/23/80- | Party Name: HANNING | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P LTD | ALC2/2020 | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410045900 | Pending with | |||
| :01/80/050/00350/AM20/ | :34/24/040/00368/AM20/ | 21.02.2020 | RA/Firm |
114 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 26.05.2020 followed by a reminder on 21.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:6/23/80- | Party Name: L & T-MHPS | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | TURBINE GENERATORS | ALC2/2020 | ||||
| PRIVATE LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310835043 | Pending with | |||
| :01/80/050/00351/AM20/ | :03/95/040/01074/AM20/ | 25.02.2020 | RA/Firm |
115 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 20.05.2020 followed by a reminder on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
35 | P a g e
| Case No.:7/23/80- | Party Name: LM WIND | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | ||||
| PVT. LTD | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410045913 | Pending with | |||
| :01/80/050/00352/AM20/ | :34/24/040/00375/AM20/ | 28.02.2020 | RA/Firm |
116 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:8/23/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068531 | Pending with | |||
| :01/80/050/00353/AM20/ | :09/24/040/00595/AM20/ | 02.03.2020 | RA/Firm |
117 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:9/23/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068532 | Pending with | |||
| :01/80/050/00354/AM20/ | :09/24/040/00594/AM20/ | 02.03.2020 | RA/Firm |
118 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:10/23/80-ALC2/2019 | Party Name: MAK CONTROLS | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| AND SYSTEMS PVT LTD. | ALC2/2020 | Approved | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3210079436 | ||||
| :01/80/050/00355/AM20/ | :32/21/040/00178/AM20/ | 02.03.2020 |
119 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/99/2020-TSW dated 02.07.2020 as under:
- Quantity of import items may be allowed as per GN-4 for engineering products i.e. on net to net basis with accountability clause.
36 | P a g e
| Case No.:11/23/80-ALC2/2019 | Party Name: MAK CONTROLS | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| AND SYSTEMS PVT LTD. | ALC2/2020 | Approved | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3210079437 | ||||
| :01/80/050/00356/AM20/ | :32/21/040/00236/AM20/ | 02.03.2020 |
120 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/99/2020-TSW dated 02.07.2020 as under:
- Quantity of import items may be allowed as per GN-4 for engineering products i.e. on net to net basis with accountability clause.
| Case No.:12/23/80- | Party Name: ACEINOTEC | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | MANUFACTURING PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710116194 | Pending with | ||||
| :01/80/050/00357/AM20/ | :07/24/040/00294/AM20/ | 02.03.2020 | MSME |
121 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 22.07.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:1/1/80- | Party Name: AAVID | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | THERMALLOY INDIA PVT. | ALC2/2020 | ||||
| LTD. | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410045959 | Pending with | |||
| :01/80/050/00377/AM20/ | :34/24/040/00395/AM20/ | 18.03.2020 | RA/Firm |
122 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 27.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:2/1/80- | Party Name: AVLIGHT | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | AUTOMOTIVES PVT. LTD. | ALC2/2020 | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0510413923 | Pending with | |||
| :01/80/050/00378/AM20/ | :05/23/040/00470/AM20/ | 19.03.2020 | RA/Firm |
123 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 21.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
37 | P a g e
| Case No.:3/1/80-ALC2/2020 | Party Name: TRILLIUM FLOW | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| TECHNOLOGIES INDIA | ALC2/2020 | Approved | ||||
| PRIVATE LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0310835556 | ||||
| :01/80/050/00379/AM20/ | :03/95/040/01192/AM20/ | 20.03.2020 |
124 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:
- Quantity of import items may be allowed as per GN-4 .
Case No.: Party Name: COFLE TAYLOR Meet No/Date:3/80- Status: 4/1/80-ALC2/2020 INDIA CONTROL CABLES & ALC2/2020 Approved SYSTEMS PRIVAT 30.07.2020 HQ File RLA File :04/24/040/00206/AM20/ Lic.No/Date:0410166648 :01/80/050/00380/AM21/ 02.04.2020
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:
125
| ITCHS<br>Code | Export<br>Item | Quantity | Sl.<br>No<br>. | ITCHS<br>Code | Import Item | Recommended Norms |
|---|---|---|---|---|---|---|
| 87089900 | Control<br>Cables | 385000<br>Number | 1 | 39269099 | Plastic Part | As per GN-4 |
| 2 | 73121010 | Wire rope | Net to net basis | |||
| 3 | 73129000 | Spiral | Net to net basis | |||
| 4 | 73261910 | Metalic Part | As per GN-4 | |||
| 5 | 39172110 | Plastic Tube | Net to net basis | |||
| 6 | 39172390 | PVC Tube | Net to net basis |
Note: The firm should import relevant items only.
| Case No.:5/1/80- | Party Name: WHEELS INDIA | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | LIMITED | ALC2/2020 | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166653 | Pending with | |||
| :01/80/050/00381/AM21/ | :04/24/040/00205/AM20/ | 02.04.2020 | RA/Firm |
126 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
38 | P a g e
| Case No.:6/1/80- | Party Name: NEO STRUCTO | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | CONSTRUCTION PVT. LTD. | ALC2/2020 | Deferred | |||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:5210043372 | Pending with | |||
| :01/80/050/00382/AM21 | :52/24/040/00083/AM20/ | 04.04.2020 | RA/Firm |
127 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Surat and in this regard a letter was sent to the firm & RA, Surat on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:7/1/80- | Party Name: UNI VTL | Meet No/Date:3/80-ALC2/2020 | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PRECISION PVT. LTD. | 30.07.2020 | ||||
| HQ File | RLA File | Lic.No/Date:0710116329 | Pending with | |||
| :01/80/050/00383/AM21/ | :07/24/040/00002/AM21/ | 07.04.2020 | RA/Firm |
128 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA, Bangalore on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:11/1/80-ALC2/2020 | Party Name: IND-SPHINX | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRECISION LIMITED | ALC2/2020 | Deferred | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3010105121 | Pending | |||
| :01/80/050/00387/AM21/ | :30/24/040/00140/AM20/ | 07.04.2020 | with Firm |
129 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME:
1. To provide manufacturing process detailing operations performed on import items at Sl. No. 1 & 2 with step-wise wastage.
Case is deferred.
| Case No.:8/1/80- | Party Name: AUTO TECH | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES INDIA PVT | ALC2/2020 | ||||
| LTD | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0410166662 | Pending with | |||
| :01/80/050/00384/AM21/ | :04/24/040/00002/AM21/ | 08.04.2020 | RA/Firm |
130 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
39 | P a g e
| Case No.:9/1/80- | Party Name: NIPHA | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | EXPORTS PRIVATE LIM | ALC2/2020 | ||||
| ITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0210209839 | Pending with | |||
| :01/80/050/00385/AM21/ | :02/24/040/00199/AM20/ | 09.04.2020 | RA/Firm |
131 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA, Kolkata on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:10/1/80- | Party Name: TPI COMPOSITES | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA PRIVATE LIMITED | ALC2/2020 | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166666 | Pending with | |||
| :01/80/050/00386/AM21/ | :04/24/040/00001/AM21/ | 13.04.2020 | RA/Firm |
132 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:13/1/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068616 | Pending with | |||
| :01/80/050/00389/AM21/ | :09/24/040/00647/AM20/ | 17.04.2020 | RA/Firm |
133 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:14/1/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068617 | Pending with | |||
| :01/80/050/00390/AM21/ | :09/24/040/00648/AM20/ | 17.04.2020 | RA/Firm |
134 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
40 | P a g e
| Case No.:15/1/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068618 | Pending with | |||
| :01/80/050/00391/AM21/ | :09/24/040/00649/AM20/ | 17.04.2020 | RA/Firm |
135 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:16/1/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068619 | Pending with | |||
| :01/80/050/00392/AM21/ | :09/24/040/00650/AM20/ | 17.04.2020 | RA/Firm |
136 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:17/1/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068620 | Pending with | |||
| :01/80/050/00393/AM21/ | :09/24/040/00651/AM20/ | 17.04.2020 | RA/Firm |
137 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:18/1/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068621 | Pending with | |||
| :01/80/050/00394/AM21/ | :09/24/040/00652/AM20/ | 17.04.2020 | RA/Firm |
138 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
41 | P a g e
| Case No.:19/1/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068622 | Pending with | |||
| :01/80/050/00395/AM21/ | :09/24/040/00653/AM20/ | 17.04.2020 | RA/Firm |
139 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:20/1/80-ALC2/2020 | Party Name: AZAD | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | 30.07.2020 | Deferred | ||||
| LIMITED | ||||||
| HQ File | RLA File | Lic.No/Date:0910068623 | Pending with | |||
| :01/80/050/00396/AM21/ | :09/24/040/00654/AM20/ | 17.04.2020 | RA/Firm |
140 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:12/1/80- | Party Name: | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | UNDERCARRIAGE AND | ALC2/2020 | Deferred | ||||
| TRACTOR PARTS | 30.07.2020 | ||||||
| PRIVATE LIMITED | |||||||
| HQ File | RLA File | Lic.No/Date:0310835622 | Pending with | ||||
| :01/80/050/00388/AM21 | :03/95/040/01188/AM20/ | 18.04.2020 | RA/Firm |
141 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:21/1/80- | Party Name: TPI COMPOSITES | Meet No/Date:3/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0410166684 | Pending with | |||
| :01/80/050/00397/AM21/ | :04/24/040/00003/AM21/ | 22.04.2020 | RA/Firm |
142 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
42 | P a g e
143
| Case No.:22/1/80- | Party Name: ACEINOTEC | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | MANUFACTURING PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0710116365 | Pending with | ||||
| :01/80/050/00398/AM21/ | :07/24/040/00016/AM21/ | 23.04.2020 | MSME |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 22.07.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:23/1/80-ALC2/2020 | Party Name: KINECO KAMAN | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| COMPOSITES - INDIA PVT | ALC2/2020 | Deferred | |||||
| LTD | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0310835847 | Pending | ||||
| :01/80/050/00399/AM21/ | :03/94/040/01087/AM20/ | 25.04.2020 | with DPIIT |
144 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 28.07.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| 145 | Case No.:24/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00400/AM21/ | RLA File<br>:34/24/040/00022/AM19/ | Lic.No/Date:3410046010<br>27.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| Case No.:25/1/80- | Party Name: NETAFIM | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA | ALC2/2020 | ||||
| PVT.LTD. | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410046013 | Pending with | |||
| :01/80/050/00401/AM21/ | :34/24/040/00028/AM19/ | 27.04.2020 | RA/Firm |
146 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
43 | P a g e
| Case No.:26/1/80- | Party Name: NETAFIM | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA | ALC2/2020 | ||||
| PVT.LTD. | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410046015 | Pending with | |||
| :01/80/050/00402/AM21/ | :34/24/040/00088/AM19/ | 27.04.2020 | RA/Firm |
147 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| 148 | Case No.:27/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00403/AM21/ | RLA File<br>:34/24/040/00245/AM19/ | Lic.No/Date:3410046016<br>27.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| 149 | Case No.:28/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00404/AM21/ | RLA File<br>:34/24/040/00267/AM18/ | Lic.No/Date:3410046009<br>27.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| 150 | Case No.:29/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00405/AM21/ | RLA File<br>:34/24/040/00313/AM16/ | Lic.No/Date:3410046014<br>27.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| 151 | Case No.:30/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD.<br>RLA File<br>:34/24/040/00326/AM18/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br><br>Lic.No/Date:3410046012<br>27.04.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00406/AM21/ | ||||
| **Decision:The Committee considered the case as per the agenda and decided to refer the case t<br>(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. | oConsultant |
44 | P a g e
| 152 | Case No.:31/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00407/AM21/ | RLA File<br>:34/24/040/00368/AM18/ | Lic.No/Date:3410046011<br>27.04.2020 | ||
| **Decision:The Committee considered the case as per the agenda and decided to refer the case t<br>(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. | oConsultant |
| Case No.:32/1/80- | Party Name: NETAFIM | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA | 30.07.2020 | Deferred | |||
| PVT.LTD. | ||||||
| HQ File | RLA File | Lic.No/Date:3410046017 | Pending with | |||
| :01/80/050/00408/AM21/ | :34/24/040/00246/AM18/ | 27.04.2020 | RA/Firm |
153 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| 154 | Case No.:33/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00409/AM21/ | RLA File<br>:34/24/040/00375/AM18/ | Lic.No/Date:3410046018<br>27.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| 155 | Case No.:34/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00410/AM21/ | RLA File<br>:34/24/040/00250/AM18/ | Lic.No/Date:3410046019<br>27.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| 156 | Case No.:35/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00411/AM21/ | RLA File<br>:34/24/040/00289/AM18/ | Lic.No/Date:3410046020<br>27.04.2020 | ||
| **Decision:The Committee considered the case as per the agenda and decided to refer the case t<br>(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. | oConsultant |
45 | P a g e
| 157 | Case No.:36/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD.<br>RLA File<br>:34/24/040/00251/AM18/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br><br>Lic.No/Date:3410046021<br>27.04.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00412/AM21/ | ||||
| **Decision:The Committee considered the case as per the agenda and decided to refer the case t<br>(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. | oConsultant |
| 158 | Case No.:37/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00413/AM21/ | RLA File<br>:34/24/040/00395/AM18/ | Lic.No/Date:3410046022<br>27.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| 159 | Case No.:38/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00414/AM21/ | RLA File<br>:34/24/040/00310/AM18/ | Lic.No/Date:3410046023<br>27.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| 160 | Case No.:39/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00415/AM21/ | RLA File<br>:34/24/040/00258/AM18/ | Lic.No/Date:3410046024<br>27.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| Case No.:40/1/80- | Party Name: NETAFIM | Meet No/Date:3/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA | ALC2/2020 | |||||
| PVT.LTD. | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410046025 | Pending with | ||||
| :01/80/050/00416/AM21/ | :34/24/040/00268/AM18/ | 27.04.2020 | RA/Firm |
161 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.
46 | P a g e
| 16<br>2 | Case No.:41/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00417/AM21/ | RLA File<br>:34/24/040/00187/AM19/ | Lic.No/Date:3410046026<br>27.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| Case No.:42/1/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0910068678 | Pending with | |||
| :01/80/050/00418/AM21/ | :09/24/040/00639/AM20/ | 28.04.2020 | RA/Firm |
163 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| 164 | Case No.:43/1/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00419/AM21/ | RLA File<br>:09/24/040/00640/AM20/ | Lic.No/Date:0910068679<br>28.04.2020 | Pending with<br>RA/Firm | |
| <br>**Decision:**The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm &RA, Hyderabadand in this regard a letter was sent to the firm &RA,<br>Hyderabadon 15.07.2020. However, no information has been received so far. Hence, the Committee decided<br>to wait for the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.
| 165 | Case No.:44/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00420/AM21/ | RLA File<br>:34/24/040/00192/AM18/ | Lic.No/Date:3410046027<br>28.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| 166 | Case No.:45/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| <br>HQ File<br>:01/80/050/00421/AM21/ | RLA File<br>:34/24/040/00342/AM18/ | Lic.No/Date:3410046028<br>28.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
47 | P a g e
167
| Case No.:46/1/80- | Party Name: NETAFIM | Meet No/Date:3/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA | ALC2/2020 | |||||
| PVT.LTD. | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410046029 | Pending with | ||||
| :01/80/050/00422/AM21/ | :34/24/040/00325/AM18/ | 28.04.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.
| 168 | Case No.:47/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00423/AM21/ | RLA File<br>:34/24/040/00030/AM20/ | Lic.No/Date:3410046030<br>28.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| 169 | Case No.:48/1/80-ALC2/2020 | Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. | <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00424/AM21/ | RLA File<br>:34/24/040/00029/AM20/ | Lic.No/Date:3410046031<br>28.04.2020 | ||
| Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. |
| 170 | Case No.:49/1/80-ALC2/2020 | Party Name: HUMANETICS<br>INNOVATIVE SOLUTIONS<br>INDIA PRIVATE LIMI | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00425/AM21/ | RLA File<br>:07/24/040/00001/AM21/ | Lic.No/Date:0710116407<br>30.04.2020 | Pending<br>with DPIIT | |
| Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toDPIITon 22.07.2020 for examination of the case. However, comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred. |
| 171 | Case No.:50/1/80-<br>ALC2/2020 | Party Name: AVLIGHT<br>AUTOMOTIVES PVT. LTD. | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00426/AM21/ | RLA File<br>:05/23/040/00005/AM21/ | Lic.No/Date:0510414101<br>04.05.2020 | Pending with<br>RA/Firm | |
| **Decision:**The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm &RA, New Delhiand in this regard a letter was sent to the firm &RA, New<br>Delhion 21.07.2020. However, no information has been received so far. Hence, the Committee decided to wait<br>for the complete set of application for examination of the case.<br>Case is deferred. |
48 | P a g e
| Case No.:51/1/80- | Party Name: TEGA | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES LIMITED | ALC2/2020 | ||||
| 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0210209859 | Pending with | |||
| :01/80/050/00427/AM21/ | :02/24/040/00005/AM21/ | 06.05.2020 | RA/Firm |
172 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA, Kolkata on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:52/1/80- | Party Name: DEE | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | DEVELOPMENT | ALC2/2020 | ||||
| ENGINEERS LIMITED | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:0510414127 | Pending with | |||
| :01/80/050/00428/AM21/ | :05/23/040/00020/AM21/ | 08.05.2020 | RA/Firm |
173 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:53/1/80-ALC2/2020 | Party Name: MICRON | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2020 | Deferred | |||||
| 30.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510414135 | Pending | ||||
| :01/80/050/00429/AM21/ | :05/24/040/00746/AM20/ | 08.05.2020 | with DPIIT |
174 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 23.07.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:54/1/80- | Party Name: LM WIND | Meet No/Date:3/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | POWER BLADES INDIA | ALC2/2020 | ||||
| PVT. LTD. | 30.07.2020 | |||||
| HQ File | RLA File | Lic.No/Date:3410046049 | Pending with | |||
| :01/80/050/00430/AM21/ | :34/24/040/00021/AM21/ | 11.05.2020 | RA/Firm |
175 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 27.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
49 | P a g e
| 176 | Case No.:1/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068852<br>05.06.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00475/AM21/ | RLA File<br>:09/24/040/00132/AM21/ | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 177 | Case No.:2/3/80-<br>ALC2/2020 | Party Name: PRECISION<br>EQUIPMENTS (CHENNAI)<br>PVT. LTD.<br> <br> <br> | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br>Lic.No/Date:0410166809<br>10.06.2020<br> <br> | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00476/AM21/ | RLA File<br>:04/24/040/00036/AM21/<br> <br> | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Chennai& the firm. Therefore, the Committee decided to request fromRA,<br>Chennaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Chennai & the firm. Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 178 | Case No.:3/3/80-<br>ALC2/2020 | Party Name: JOHNSON<br>MATTHEY INDIA PRIVATE<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414366<br>10.06.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00477/AM21/ | RLA File<br>:05/23/040/00045/AM21/ | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 179 | Case No.:4/3/80-<br>ALC2/2020 | Party Name: AUTOFIT CAR<br>INTERIORS PVT.LTD.<br> <br> <br> <br>RLA File<br>:10/24/040/00018/AM21/<br> <br> | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00478/AM21/ | Lic.No/Date:1010060538<br>11.06.2020 | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Cochin& the firm. Therefore, the Committee decided to request fromRA,<br>Cochinand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Cochin & the firm. Therefore, the Committee decided to request from RA, Cochin and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 180 | Case No.:5/3/80-<br>ALC2/2020 | Party Name: AUTOCOMP<br>CORPORATION PANSE<br>PRIVATE LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00479/AM21/ | RLA File<br>:31/83/040/00012/AM21/ | Lic.No/Date:3110067753<br>11.06.2020 | Pending with<br>RA/Firm | |
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Pune& the firm. Therefore, the Committee decided to request fromRA, Puneand<br>the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
50 | P a g e
| 181 | Case No.:6/3/80-<br>ALC2/2020 | Party Name: ISGEC HEAVY<br>ENGINEERING LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414386<br>12.06.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00480/AM21/ | RLA File<br>:05/23/040/00047/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
Case No.:7/3/80- Party Name: ISGEC HITACHI Meet No/Date:3/80- Status: Deferred ALC2/2020 ZOSEN LIMITED ALC2/2020 30.07.2020 HQ File RLA File Lic.No/Date:0510414387 Pending with 182 :01/80/050/00481/AM21/ :05/23/040/00049/AM21/ 12.06.2020 RA/Firm
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 183 | Case No.:8/3/80-<br>ALC2/2020 | Party Name: CML BIOTECH<br>PRIVATE LIMITED, | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:1010060548<br>15.06.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00482/AM21/ | RLA File<br>:10/24/040/00020/AM21/ | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Cochin& the firm. Therefore, the Committee decided to request fromRA,<br>Cochinand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Cochin & the firm. Therefore, the Committee decided to request from RA, Cochin and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 184 | Case No.:9/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00135/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00483/AM21/ | Lic.No/Date:0910068868<br>15.06.2020 | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| Case No.:10/3/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068869 | Pending with | ||||
| :01/80/050/00484/AM21/ | :09/24/040/00134/AM21/ | 15.06.2020 | RA/Firm |
185 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
51 | P a g e
| 186 | Case No.:11/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00136/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br>Lic.No/Date:0910068870<br>15.06.2020<br> <br> | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00485/AM21/ | Pending with<br>RA/Firm | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 187 | Case No.:12/3/80-ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00133/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00486/AM21/ | Lic.No/Date:0910068872<br>15.06.2020 | Pending with<br>RA/Firm | ||
| The Committee considered the case as per the agenda and noted that the copy of application has not yet been<br>received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA, Hyderabad<br>and the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 188 | Case No.:13/3/80-<br>ALC2/2020 | Party Name: ISGEC HEAVY<br>ENGINEERING LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414402<br>15.06.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00487/AM21/ | RLA File<br>:05/23/040/00055/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 189 | Case No.:14/3/80-ALC2/2020 | Party Name: AAVID<br>THERMALLOY INDIA<br>PVT. LTD.<br>RLA File<br>:34/24/040/00058/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00488/AM21/ | Lic.No/Date:3410046140<br>15.06.2020 | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| Case No.:15/3/80-ALC2/2020 | Party Name: AAVID | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| THERMALLOY INDIA PVT. | ALC2/2020 | Deferred | |||||
| LTD. | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410046141 | Pending with | ||||
| :01/80/050/00489/AM21/ | :34/24/040/00059/AM21/ | 15.06.2020 | RA/Firm |
190 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
52 | P a g e
| 191 | Case No.:16/3/80-<br>ALC2/2020 | Party Name: DEE<br>DEVELOPMENT<br>ENGINEERS LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414434<br>19.06.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00490/AM21/ | RLA File<br>:05/23/040/00051/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 192 | Case No.:17/3/80-<br>ALC2/2020 | Party Name: SULZER INDIA<br>PRIVATE LIMITED. | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00491/AM21/ | RLA File<br>:31/83/040/00019/AM21/ | Lic.No/Date:3110067766<br>22.06.2020 | Pending with<br>RA/Firm | |
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Pune& the firm. Therefore, the Committee decided to request fromRA, Puneand<br>the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Pune & the firm. Therefore, the Committee decided to request from RA, Pune and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 193 | Case No.:18/3/80-<br>ALC2/2020 | Party Name: L&T-MHPS<br>BOILERS PVT LTD | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00492/AM21/ | RLA File<br>:03/95/040/00161/AM21/ | Lic.No/Date:0310836794<br>22.06.2020 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 194 | Case No.:19/3/80-<br>ALC2/2020 | Party Name: MICRON<br>INSTRUMENTS PVT LTD | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00493/AM21/ | RLA File<br>:05/24/040/00129/AM21/ | Lic.No/Date:0510414479<br>24.06.2020 | Pending with<br>RA/Firm | |
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| Case No.:20/3/80-ALC2/2020 | Party Name: HANNING | Meet No/Date:3/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| MOTORS INDIA P LTD | ALC2/2020 | ||||||
| 30.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410046186 | Pending with | ||||
| :01/80/050/00494/AM21/ | :34/24/040/00073/AM21/ | 29.06.2020 | RA/Firm |
195 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
53 | P a g e
196
| Case No.:21/3/80- | Party Name: HANNING | Meet No/Date:3/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | MOTORS INDIA P LTD | ALC2/2020 | |||||
| 30.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:3410046187 | Pending with | ||||
| :01/80/050/00495/AM21/ | :34/24/040/00074/AM21/ | 29.06.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
197
| Case No.:22/3/80- | Party Name: BONATRANS | Meet No/Date:3/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA PRIVATE LIMITED | 30.07.2020 | Deferred | ||||
| HQ File | RLA File | Lic.No/Date:0310836946 | Pending with | ||||
| :01/80/050/00496/AM21/ | :03/94/040/00207/AM21/ | 30.06.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 198 | Case No.:23/3/80-<br>ALC2/2020 | Party Name: MAGNETI<br>MARELLI TALBROS CHASSIS<br>SYSTEMS PRIVATE LI<br>RLA File :05/24/040/00140/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00497/AM21/ | Lic.No/Date:0510414515<br>30.06.2020 | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 199 | Case No.:24/3/80-<br>ALC2/2020 | Party Name: MICRON<br>INSTRUMENTS PVT LTD | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br>Lic.No/Date:0510414517<br>30.06.2020<br> <br> | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00498/AM21/ | RLA File<br>:05/24/040/00134/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| Case No.:25/3/80- | Party Name: MICRON | Meet No/Date:3/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | INSTRUMENTS PVT LTD | ALC2/2020 | |||||
| 30.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0510414518 | Pending with | ||||
| :01/80/050/00499/AM21/ | :05/24/040/00142/AM21/ | 30.06.2020 | RA/Firm |
200 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
54 | P a g e
| 201 | Case No.:26/3/80-<br>ALC2/2020 | Party Name: THE ANUP<br>ENGINEERING LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>S<br>Lic.No/Date:0810148023<br>30.06.2020<br>P<br> | tatus: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00500/AM21/ | RLA File<br>:08/24/040/00076/AM21/ | ending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Ahmedabad& the firm. Therefore, the Committee decided to request fromRA,<br>Ahmedabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Ahmedabad & the firm. Therefore, the Committee decided to request from RA, Ahmedabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 202 | Case No.:27/3/80-<br>ALC2/2020 | Party Name: FRIZAIR<br>PRIVATE LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068919<br>30.06.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00501/AM21/ | RLA File<br>:09/24/040/00158/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 203 | Case No.:28/3/80-<br>ALC2/2020 | Party Name: ONASSIS AUTO<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414546<br>03.07.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00502/AM21/ | RLA File<br>:05/24/040/00152/AM21/ | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 204 | Case No.:29/3/80-<br>ALC2/2020 | Party Name: MASU BRAKE<br>PADS PRIVATE LIMITED<br> <br> <br> | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00503/AM21/ | RLA File<br>:05/24/040/00156/AM21/<br> <br> | Lic.No/Date:0510414554<br>03.07.2020 | Pending with<br>RA/Firm | |
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
205
| Case No.:30/3/80- | Party Name: LM WIND | Meet No/Date:3/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | POWER BLADES INDIA | ALC2/2020 | |||||
| PVT. LTD | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:3410046197 | Pending with | ||||
| :01/80/050/00504/AM21/ | :34/24/040/00077/AM21/ | 07.07.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
55 | P a g e
| 206 | Case No.:36/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00510/AM21/ | RLA File<br>:09/24/040/00190/AM21/ | Lic.No/Date:0910068933<br>07.07.2020 | Pending with<br>RA/Firm | |
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 207 | Case No.:37/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br>Lic.No/Date:0910068934<br>07.07.2020<br> <br> | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00511/AM21/ | RLA File<br>:09/24/040/00194/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 208 | Case No.:38/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00512/AM21/ | RLA File<br>:09/24/040/00193/AM21/ | Lic.No/Date:0910068935<br>07.07.2020 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 209 | Case No.:39/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00513/AM21/ | RLA File<br>:09/24/040/00195/AM21/ | Lic.No/Date:0910068936<br>07.07.2020 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| Case No.:40/3/80-ALC2/2020 | Party Name: AZAD | Meet No/Date:3/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068937 | Pending with | ||||
| :01/80/050/00514/AM21/ | :09/24/040/00187/AM21/ | 07.07.2020 | RA/Firm |
210 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
56 | P a g e
| 211 | Case No.:41/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File :09/24/040/00188/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00515/AM21/ | Lic.No/Date:0910068938<br>07.07.2020 | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 212 | Case No.:42/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File :09/24/040/00192/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068939<br>07.07.2020 | Status:<br>Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00516/AM21/ | ||||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 213 | Case No.:43/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068940<br>07.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00517/AM21/ | RLA File<br>:09/24/040/00189/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 214 | Case No.:44/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br> <br> <br> | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00518/AM21/ | RLA File<br>:09/24/040/00191/AM21/<br> <br> | Lic.No/Date:0910068941<br>07.07.2020 | Pending with<br>RA/Firm | |
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| Case No.:31/3/80- | Party Name: ENDURANCE | Meet No/Date:3/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | TECHNOLOGIES LIMITED | ALC2/2020 | |||||
| 30.07.2020 | |||||||
| HQ File | RLA File | Lic.No/Date:0310837075 | Pending with | ||||
| :01/80/050/00505/AM21/ | :03/94/040/00237/AM21/ | 08.07.2020 | RA/Firm |
215 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
57 | P a g e
| 216 | Case No.:32/3/80-<br>ALC2/2020 | Party Name: SUPER CIRCLE<br>AUTO LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414590<br>08.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00506/AM21/ | RLA File<br>:05/24/040/00148/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 217 | Case No.:33/3/80-<br>ALC2/2020 | Party Name: L & T-MHPS<br>TURBINE GENERATORS<br>PRIVATE LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0310837100<br>09.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00507/AM21/ | RLA File<br>:03/95/040/00220/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 218 | Case No.:34/3/80-<br>ALC2/2020 | Party Name: L & T-MHPS<br>TURBINE GENERATORS<br>PRIVATE LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0310837101<br>09.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00508/AM21/ | RLA File<br>:03/95/040/00219/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 219 | Case No.:35/3/80-<br>ALC2/2020 | Party Name: LM WIND<br>POWER BLADES INDIA<br>PVT. LTD<br> <br> <br> | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00509/AM21/ | RLA File<br>:34/24/040/00076/AM21/<br> <br> | Lic.No/Date:3410046199<br>09.07.2020 | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 220 | Case No.:45/3/80-<br>ALC2/2020 | Party Name: PENGUIN<br>PETROLEUM SERVICES<br>PVT.LTD. | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0310837144<br>13.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00519/AM21/ | RLA File<br>:03/95/040/00147/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.
58 | P a g e
| 221 | Case No.:46/3/80-<br>ALC2/2020 | Party Name: SULZER PUMPS<br>INDIA LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00520/AM21/ | RLA File<br>:03/89/040/00069/AM21/ | Lic.No/Date:0310837170<br>14.07.2020 | Pending with<br>RA/Firm | |
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 222 | Case No.:47/3/80-<br>ALC2/2020 | Party Name: LM WIND<br>POWER BLADES INDIA<br>PVT. LTD | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:3410046223<br>17.07.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00521/AM21/ | RLA File<br>:34/24/040/00092/AM21/ | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 223 | Case No.:49/3/80-<br>ALC2/2020 | Party Name: LM WIND<br>POWER BLADES INDIA PVT.<br>LTD<br>RLA File<br>:34/24/040/00093/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00523/AM21/ | Lic.No/Date:3410046224<br>17.07.2020 | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 224 | Case No.:50/3/80-<br>ALC2/2020 | Party Name: LM WIND<br>POWER BLADES INDIA<br>PVT. LTD<br> <br> <br> | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00524/AM21/ | RLA File<br>:34/24/040/00094/AM21/<br> <br> | Lic.No/Date:3410046225<br>17.07.2020 | Pending with<br>RA/Firm | |
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
| 225 | Case No.:48/3/80-<br>ALC2/2020<br> <br> <br>HQ File<br>:01/80/050/00522/AM21/<br> <br>: | Party Name: THE ANUP<br>ENGINEERING LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| RLA File<br>08/24/040/00094/AM21/ | Lic.No/Date:0810148164<br>20.07.2020 | Pending with RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Ahmedabad& the firm. Therefore, the Committee decided to request fromRA,<br>Ahmedabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Ahmedabad & the firm. Therefore, the Committee decided to request from RA, Ahmedabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
59 | P a g e
| 226 | Case No.:51/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br> <br> <br> | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068972<br>20.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00525/AM21/ | RLA File<br>:09/24/040/00217/AM21/<br> <br> | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 227 | Case No.:52/3/80-<br>ALC2/2020<br>HQ File<br>:01/80/050/00526/AM21/ | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| RLA File<br>:09/24/040/00216/AM21/ | Lic.No/Date:0910068973<br>20.07.2020 | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 228 | Case No.:53/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00215/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068974<br>20.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00527/AM21/ | Pending with<br>RA/Firm | |||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 229 | Case No.:54/3/80-<br>ALC2/2020 | Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00214/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068975<br>20.07.2020 | Status: Deferred<br>Pending with<br>RA/Firm |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00528/AM21/ | ||||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| Case No.:55/3/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068976 | Pending with | ||||
| :01/80/050/00529/AM21/ | :09/24/040/00213/AM21/ | 20.07.2020 | RA/Firm |
230 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
60 | P a g e
231
| Case No.:56/3/80- | Party Name: AZAD | Meet No/Date:3/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 30.07.2020 | ||||||
| HQ File | RLA File | Lic.No/Date:0910068977 | Pending with | ||||
| :01/80/050/00530/AM21/ | :09/24/040/00212/AM21/ | 20.07.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
| Case No.:57/3/80- | Party Name: TEGA | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES LIMITED | 30.07.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:0210209990 | Pending with | |||
| :01/80/050/00531/AM21/ | :02/24/040/00045/AM21/ | 21.07.2020 | RA/Firm |
232 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Kolkata & the firm. Therefore, the Committee decided to request from RA, Kolkata and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
| 233 | Case No.:58/3/80-<br>ALC2/2020 | Party Name: MICRON<br>INSTRUMENTS PVT LTD<br>RLA File<br>:05/24/040/00186/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00532/AM21/ | Lic.No/Date:0510414670<br>21.07.2020 | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| 234 | Case No.:59/3/80-<br>ALC2/2020 | Party Name: MICRON<br>INSTRUMENTS PVT LTD<br>RLA File<br>:05/24/040/00181/AM21/ | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>S<br>Lic.No/Date:0510414671<br>21.07.2020<br>P<br>R | tatus: Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00533/AM21/ | ending with<br>A/Firm | |||
| The Committee considered the case as per the agenda and noted that the copy of application has not yet been<br>received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA, New Delhi<br>and the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.
| Case No.:60/3/80- | Party Name: GOLD MOHUR | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | PROFILES LIMITED | 30.07.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:0510414672 | Pending with | |||
| :01/80/050/00534/AM21/ | :05/23/040/00083/AM21/ | 21.07.2020 | RA/Firm |
235 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
61 | P a g e
| 236 | Case No.:61/3/80-<br>ALC2/2020 | Party Name: HANNING<br>MOTORS INDIA P LTD | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br><br>Lic.No/Date:3410046232<br>21.07.2020<br> <br> | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00535/AM21/ | RLA File<br>:34/24/040/00099/AM21/ | Pending with<br>RA/Firm | ||
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
| 237 | Case No.:62/3/80-ALC2/2020 | Party Name: HANNING<br>MOTORS INDIA P LTD | Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 | Status:<br>Deferred |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00536/AM21/ | RLA File<br>:34/24/040/00100/AM21/ | Lic.No/Date:3410046233<br>21.07.2020 | Pending with<br>RA/Firm | |
| Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred. |
| Case No.:63/3/80- | Party Name: I-TECH PLAST | Meet No/Date:3/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA PVT.LTD.(EOU) | 30.07.2020 | Deferred | |||
| HQ File | RLA File | Lic.No/Date:0310837308 | Pending with | |||
| :01/80/050/00537/AM21/ | :03/94/040/00256/AM21/ | 22.07.2020 | RA/Firm |
238 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
| Case No.:64/3/80- | Party Name: LM WIND | Meet No/Date:3/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | POWER BLADES INDIA | 30.07.2020 | Deferred | ||||
| PVT. LTD | |||||||
| HQ File | RLA File | Lic.No/Date:3410046237 | Pending with | ||||
| :01/80/050/00538/AM21/ | :34/24/040/00095/AM21/ | 22.07.2020 | RA/Firm |
239 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
62 | P a g e
Offline Cases
Sl. No. 21
| Case No.:284/15/80-ALC2/2018<br>MICRON INSTRUMENTS PVT. LTD.<br>Status:<br>M. No.: 03/80-ALC2/2020 dated 30.07.2019 | ||
|---|---|---|
| Lic. No. /date: 0510409150 Date: 02.01.2019<br>Lic. No. /date: 0510409703 Date: 20.02.2019<br>**Subject:**Request for re-fixation of ad-hoc norms | ||
| F. No. 01/80/050/00626/AM19/DES-I<br>RLA F.No. 05/24/040/00548/AM19<br>Approved | ||
| F. No. 01/80/050/00674/AM19/DES-I<br>RLA F.No. 05/24/040/00669/AM19 | ||
| AA No.: 0510409150 dated 02.01.2019:- | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. | ||
| 3/80-ALC2/2019 dated08.05.2019 as per written comments of DPIIT vide their U. O. No.: P-47011/85/2019-TSW | ||
| dated 02.05.2019. | ||
| However, the firm vide letter dated 15.07.2019 had requested for re-fixation of ad-hoc norms. The Committee | ||
| reconsidered the case and noted the comments ofDPIITwherein it is stated that_earlier the firm had not submitted any_ | ||
| documentary evidence regarding the sale price of the scrap generated during the manufacturing process. Now, the firm | ||
| has submitted the representation supported by documentary evidence i.e. invoice of sale of scarp and therefore, norms | ||
| _have been revised._In view ofDPIITcomments, the Committee decided tore-fix the ratified ad-hoc normsas per | ||
| written comments ofDPIITvide U. O. No.: P-47011/85/2019-TSW dated 29.04.2020 as under: | ||
| ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended Norms | ||
| 90229090<br>Anode frame Frange<br>A Kov.<br>Anode Frame Frange<br>A Kov-MA 4132 K<br>09A.<br>920<br>Number<br>72285061<br>Dilaton 29/18 Iron-<br>nickel - Cobalt Sealing<br>Alloy ASTM-F15-04.<br>(Dilaton 29/18 Dia 232<br>mm Tolerance +1/-0<br>mm)<br>6955.20 Kgs @<br>4.20Kgs/Kg content in<br>the export product after<br>taking 6% recovery<br>from scrap | ||
| Note: Net weight of export item may be specified as 1656 Kgs. |
| Sl. No. 21 | Sl. No. 21 | Sl. No. 21 | Sl. No. 21 | ||||
|---|---|---|---|---|---|---|---|
| Case No.:284/15/80-ALC2/2018 | MICRON INSTRUMENTS PVT. LTD. | Status: | |||||
| M. No.: 03/80-ALC2/2020 dated 30.07.2019 | |||||||
| Lic. No. /date: 0510409150 Date: 02.01.2019<br>Lic. No. /date: 0510409703 Date: 20.02.2019 | **Subject:**Request for re-fixation of ad-hoc norms | ||||||
| F. No. 01/80/050/00626/AM19/DES-I<br>F. No. 01/80/050/00674/AM19/DES-I | RLA F.No. 05/24/040/00548/AM19<br>RLA F.No. 05/24/040/00669/AM19 | Approved | |||||
| AA No.: 0510409150 dated 02.01.2019:-<br>Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.<br>3/80-ALC2/2019 dated08.05.2019 as per written comments of DPIIT vide their U. O. No.: P-47011/85/2019-TSW<br>dated 02.05.2019.<br>However, the firm vide letter dated 15.07.2019 had requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and noted the comments ofDPIITwherein it is stated that_earlier the firm had not submitted any_<br>documentary evidence regarding the sale price of the scrap generated during the manufacturing process. Now, the firm<br>has submitted the representation supported by documentary evidence i.e. invoice of sale of scarp and therefore, norms<br>_have been revised._In view ofDPIITcomments, the Committee decided tore-fix the ratified ad-hoc normsas per<br>written comments ofDPIITvide U. O. No.: P-47011/85/2019-TSW dated 29.04.2020 as under: | |||||||
| ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>90229090<br>Anode frame Frange<br>A Kov.<br>Anode Frame Frange<br>A Kov-MA 4132 K<br>09A.<br>920<br>Number<br>72285061<br>Note: Net weight of export item may be specified as 1656 Kgs. | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended Norms | ||
| Anode frame Frange<br>A Kov.<br>Anode Frame Frange<br>A Kov-MA 4132 K<br>09A. | 920<br>Number | 72285061 | Dilaton 29/18 Iron-<br>nickel - Cobalt Sealing<br>Alloy ASTM-F15-04.<br>(Dilaton 29/18 Dia 232<br>mm Tolerance +1/-0<br>mm) | 6955.20 Kgs @<br>4.20Kgs/Kg content in<br>the export product after<br>taking 6% recovery<br>from scrap | |||
| AA No.: 0510409703 dated 20.02.2019:-<br>Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.<br>3/80-ALC2/2019 dated08.05.2019 as per written comments of DPIIT vide F. No.: P-47011/17/2019-TSW dated<br>16.04.2020.<br>The firm vide letter dated 15.07.2019 had requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and noted the comments ofDPIITwherein it is stated that_earlier the firm had not submitted any_<br>documentary evidence regarding the sale price of the scrap generated during the manufacturing process. Now, the firm<br>has submitted the representation supported by documentary evidence i.e. invoice of sale of scarp and therefore, norms<br>_have been revised._In view ofDPIITcomments, the Committee decided tore-fix the ratified ad-hoc normsas per<br>written comments ofDPIITvide U. O. No.: P-47011/85/2019-TSW dated 29.04.2020 as under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended Norms<br>90229090<br>Anode frame<br>Frange A Kov.<br>Anode Frame<br>Frange A Kov-<br>MA 4132 K 09A<br>920<br>Number<br>72285061<br>Dilaton 29/18. Iron-<br>nickel-Cobalt Sealing<br>Alloy ASTM-F15-<br>04.(Dilaton 29/18 Dia 232<br>mm Tolerance +1/-0 mm)<br>6955.20 Kgs @<br>4.20Kgs/Kg content in<br>the export product after<br>taking 6% recovery<br>from scrap<br>Note: Net weight of export item may be specified as 1656 Kgs.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
63 | P a g e
Sl. No. 22
| Sl. No. 22 | ||
|---|---|---|
| Case No. : 61/25/80-ALC2/2016 | M/s. BARODA EQUIPMENT AND<br>VESSELS PVT. LTD. | Status: |
| M. No.: 03/80-ALC2/2020 dated 30.07.2020 | ||
| Lic. No. /date: 3410042545 dated 21.09.2016 | ||
| HQ. No.: 01/80/50/621/AM17/DES-I | **Subject:**Request for reviewing of ad-hoc<br>norms | Approved |
| RLA No.: 34/24/040/00182/AM17 | ||
| Decision:The Committee considered the case as per the agenda noted that the case was rejected in M. No. 14/80-<br>ALC2/2017dated 10.10.2017due to non-submission of reply of deficiency raised by DPIIT.<br>However, the firm furnished the reply vide letter dated 31.07.2019 with a request to fix the ad-hoc<br>norms. The Committee reconsidered the case and decided toratifythe ad-hoc norms as per written comments of<br>DPIITvide U. O. No.: P-47012/61/2019-TSW dated 17.07.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
Sl. No. 23
| Sl. No. 23 | ||
|---|---|---|
| Case No.:1/3/80-ALC2/2019 | ISGEC HITACHI ZOSEN LIMITED | Status: |
| M. No.: 03/80-ALC2/2020 dated 30.07.2020 | ||
| Lic. No. /date: 0510410182 Date: 09.04.2019 | ||
| HQ. No.: 01/80/050/00007/AM20 | **Subject:**Request for re-fixation of ad-hoc<br>norms | Approved |
| RLA No.: 05/23/040/00578/AM19 | ||
| Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting<br>No.11/80-ALC2/2019 dated25.09.2019 as per written comments of DPIIT vide U.O. No.: P-47011/98/2019-TSW<br>dated 29.08.2019.<br>The firm vide letter dated 11.11.2019 had requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and noted the comments ofDPIITwherein it is stated that_there was mistake in the earlier_<br>norms as import items at Sl. No. 22 to 24 are not welding consumables. Moreover, quantity of welding<br>consumables was allowed as 2% of the weight of steel to be welded which is now been modified based on the<br>thickness of plates to be welded as the requirement of welding consumables is more for welding of thicker plates<br>_and hence, the norms have been revised._In view ofDPIITcomments, the Committee decided tore-fix the ratified<br>ad-hoc normsas per written comments ofDPIITvide U. O. No.: P-47011/60/2019-TSW dated 30.06.2020 as<br>under:<br>1. Quantity of import item at Sl. No. 19 may be allowed as 4700 Kgs.<br>2. Quantity of import item at Sl. No. 20 may be allowed as 8900 Kgs.<br>3. Quantity of import item at Sl. No. 21 may be allowed as 8900 Kgs.<br>4. Quantity of import item at Sl. No. 22 may be allowed as 400 Kgs as applied for.<br>5. Quantity of import item at Sl. No. 23 may be allowed as1 Set, on net to netbasis.<br>6. Import item at Sl. No. 23 to be exported along with the export product.<br>7. Quantity of import item at Sl. No. 24 may be allowed as 1.05Kgs/Kg content in the export item.<br>Note: The decision for rest of the import items will remain unchanged as decided inMeeting No.11/80-<br>ALC2/2019 dated25.09.2019.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
64 | P a g e
Sl. No. 24
| Sl. No. 24 | ||
|---|---|---|
| Case No.:27/5/80-ALC2/2018 | ISGEC HEAVY ENGINEERING LIMITED | Status: |
| M. No.: 03/80-ALC2/2020 dated 30.07.2020 | ||
| Lic. No. /date: 0510406287 Date: 01.05.2018 | **Subject:**Request for re-fixation of ad-hoc norms | |
| HQ. No.: 01/80/050/00076/AM19 | RLA No.: 05/23/040/00038/AM19 | Rejected |
| Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 05/80-<br>ALC2/2019 dated06.06.2019 as per written comments ofConsultant (Tech-3).<br>The firm vide letter dated 18.12.2019 had requested for re-fixation of ad-hoc norms. The Committee reconsidered the<br>case and noted that the firm has requested to allow 4% wastage instead of 1% wastage as recommended earlier. However,<br>Consultant (Tech-3)informed that the wastage of 1% was recommended as applied by the firm in its application. Therefore,<br>the Committee decided to maintainstatus quoon the recommendation ofConsultant (Tech-3).<br>Case is rejected. |
Sl. No. 25
| Sl. No. 25 | ||
|---|---|---|
| Case No.:47/3/80-ALC2/2018 | ISGEC HITACHI ZOSEN LIMITED | Status: |
| M. No.: 03/80-ALC2/2020 dated 30.07.2020 | ||
| Lic. No. /date: 0510405848 Date: 13.03.2018 | **Subject:**Request for re-fixation of ad-hoc norms | |
| HQ. No.: 01/80/050/00047/AM19 | RLA No.: 05/23/040/00486/AM18 | Approved |
| Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 06/80-<br>ALC2/2018 dated11.07.2018 on the recommendation of technical member of DHI/DIPP/MSME.<br>The firm vide letter dated 16.12.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the<br>case and decided tore-fixthe ad-hoc norms as per written comments ofDPIITvide U. O. No.: P-47011/354/2018-TSW dated<br>06.07.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC. |
Sl. No. 26
| Case No.:3/20/80-ALC2/2015 | ISGEC HITACHI ZOSEN LIMITED | Status: |
|---|---|---|
| M. No.: 03/80-ALC2/2020 dated 30.07.2020 | ||
| Lic. No. /date: 0510396378 Date: 19.11.2015 | **Subject:**Request for re-fixation of ad-hoc norms | |
| HQ. No.: 01/80/050/00380/AM16 | RLA No.: 05/23/040/00342/AM16 | Approved |
| Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.<br>26/80-ALC2/2015 dated29.03.2016 as per the written comments of DIPP vide ID No. 12/25/2016/TSW/96 dated<br>05.04.2016.<br>The firm vide letter dated 16.12.2019 had requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and noted the comments ofDPIITwherein it is stated that_the firm has requested to modify the_<br>quantities of import items at Sl. No. 11 (Paints) & 12 (Thinner) as earlier quantities of import items at Sl. No. 11 & 12<br>put together was allowed upto 2% FoB value of export items. Moreover, in support of their request the firm has stated<br>that the paints are required for Effluent Chamber which is high temperature equipment used in Fertilizer plant. It is a<br>very special temperature indicating paint used for high temperature applications and it changes colour when the<br>temperature of reactor increases. As a result cost of this paint is very high vis-à-vis normal paint. The firm has also<br>submitted technical data sheet of the paint indicating the requirement of the paint per Sq. meter as well as the<br>_calculations for the paint material supported by technical data sheet of the paint. Hence, the norms have been revised._In<br>view ofDPIITcomments, the Committee decided tore-fix the ad-hoc normsas per written comments ofDPIITvide<br>U. O. No.: P-47011/98/2019-TSW dated 03.07.2020 as under:<br>1.<br>Quantity of import item at Sl. No. 11 may be allowed as 500 Litres.<br>2.<br>Quantity of import item at Sl. No. 12 may be allowed as 100 Litres.<br>Note: The decision for rest of the import items will remain unchanged as decided in Meeting No. 26/80-ALC2/2015<br>dated29.03.2016.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
65 | P a g e
Sl. No. 27
| Sl. No. 27 | ||
|---|---|---|
| Case No.:25/14/80-ALC2/2018 | SPIROTECH HEAT EXCHANGERS<br>PVT. LTD. | Status: |
| M. No.: 03/80-ALC2/2020 dated 30.07.2020 | ||
| Lic. No. /date: 0510386129 Date: 09.05.2014 | ||
| HQ. No.: 01/80/050/00341/AM19 | **Subject:**Request for re-fixation of ad-hoc<br>norms | Deferred |
| RLA No.: 05/24/040/00051/AM15 | ||
| Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting<br>No.14/80-ALC2/2018 dated20.02.2019 as per written comments of DPIIT vide F. No.: P-47011/24/2019-TSW<br>dated 20.02.2019.<br>The firm vide letter dated 22.04.2019 had requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and noted that the comments ofDPIITwherein it is stated that_the import items at Sl. No. 5,_<br>7 & 8 are components and earlier these items were deleted as the requirements of these items as given in Appendix<br>11A indicated as 0.164 Nos., 0.017 Nos. & 0.176 Nos. per unit of export item respectively. As the requirement of<br>any component per unit of export item cannot be in fraction, hence these items were deleted. However, the firm has<br>not given any justification for the fractional requirement of the import items at Sl. No. 5, 7 & 8 per unit of export<br>_item._Therefore, In view of DPIIT comments, the Committee decided to ask form the firm to furnish following<br>information as per comments of DPIIT vide U. O. No.: P-47011/24/2019-TSW dated 23.04.2020:<br>1. To provide clarification for fractional requirements of the import items at Sl. No. 5, 7 & 8 per unit of<br>export item.<br>2. Assembly drawings/diagrams of the resultant product showing placement and exact use of components in<br>the export product (s),for import items at Sl. No. 5, 7 & 8.<br>3. Bifurcated quantities of components to be accounted for in the resultant product and the requirement of<br>components as spares. Raw Material / Consumables,for import items at Sl. No. 5, 7 & 8.<br>Case is deferred. |
Sl. No. 28
| Case No.:53/3/80-ALC2/2017 | GL&V INDIA PRIVATE LIMITED | Status: |
|---|---|---|
| M. No.: 03/80-ALC2/2020 dated 30.07.2020 | ||
| Lic. No. /date: 3110066640 Date: 29.03.2017 | ||
| HQ. No.: 01/80/050/00053/AM18/ | **Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 31/83/040/00185/AM17 | ||
| Decision:The Committee considered the case as per the agenda and noted that the case was rejected in Meeting<br>No.7/80-ALC2/2019 dated17.07.2019 due to non-submission of reply of deficiency letter dated 07.03.2019<br>raised byConsultant (Tech-3).<br>The firm vide letter dated 30.12.2019 had furnished the reply and requested for fixation of ad-hoc norms.<br>The Committee reconsidered the case and noted that the firm’s representation forwarded toConsultant (Tech-3)<br>on 09.03.2020 for examination & comments. However, Consultant (Tech-3) informed that the case is under<br>examination. Hence, the Committee decided to wait for the comments.<br>Case is deferred. |
66 | P a g e
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.