DIRECTORATE GENERAL OF FOREIGN TRADE - (DES I SECTION)

MINUTES OF MEETING NO. 03/80 OF THE NORMS COMMITTEE-I DATED 30.07.2020 held on 06.08.2020

Meeting No. 03/80 of the Norms Committee (NC-I) for the licensing year 2020-2021 (originally scheduled for 30.07.2020) held on 06.08.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -

Sl. No. Name of the representatives & their Designation Department
1. Shri B. C. Nayak, D. O. DHI
2. Shri K.S. Sodhi, Asst. Director MSME
2 Shri Sushil Kumar Jangid, Scientist ‘B’ MeitY
3. Shri Shaish Kumar, (Tech-1) Consultant
4. Shri V.C. Agarwal, (Tech-3) Consultant
5. Shri S. K. Bhatnagar, Consultant
In Attendance
1. Shri K.V. Tirumala, Deputy DGFT DGFT
2. Shri Pranav Upadhyay, Assistant Director ISS DGFT

Note:

  1. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.

  2. Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.

  3. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail addressnc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email / by Post.

  4. Minutes of Meeting 01/80 (originally scheduled for 20.05.2020) held on 17.06.2020 was circulated on 23.07.2020, to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and therefore the said minutes were uploaded on dgft.gov.in on 28.07.2020.

1 | P a g e

MEETING NUMBER: 3/80-ALC2/2020 MEETING DATE: 30.07.2020

Case No.:366/15/80- Party Name: FOWLER Meet No/Date:3/80- Status: Deferred
ALC2/2018 WESTRUP(INDIA)PVT.LTD. ALC2/2020&30.07.2020
HQ File RLA File Lic.No/Date:0710108605 Pending with Firm
:01/80/050/00708/AM19/ :07/24/040/00106/AM16/ 13.08.2015

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.

  2. Weight of each Export Product.

  • 1 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

    1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

Case No.:30/1/80-ALC2/2019 Party Name: FOWLER Meet No/Date:3/80- Status:
WESTRUP(INDIA)PVT LTD. ALC2/2020&30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0710108606 Pending
:01/80/050/00778/AM19/ :07/24/040/00109/AM16/ 13.08.2015 with Firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.

  2. Weight of each Export Product.

  • 2 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

    1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

    Case is deferred.

Case No.:363/15/80- Party Name: PROMAC Meet No/Date:3/80- Status:
ALC2/2018 ENGINEERING INDUSTRIES ALC2/2020&30.07.2020 Deferred
LIMITED
HQ File RLA File :07/24/040/00184/AM16/ Lic.No/Date:0710108812 Pending with
:01/80/050/00705/AM19/ 05.10.2015 Firm

3 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

2 | P a g e

4 Case No.:364/15/80-ALC2/2018 Party Name: PROMAC<br>ENGINEERING INDUSTRIES<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00706/AM19/ RLA File<br>:07/24/040/00185/AM16/ Lic.No/Date:0710108813<br>05.10.2015 Pending with<br>Firm
Decision:The Committee considered the case as per the agenda and noted that a deficiency<br>certain information as raised byDHIwas sent to the firm on 21.07.2020. However, no reply has<br>yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. letter seeking<br>been received

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.

Case No.:215/15/80-ALC2/2018 Party Name: FOWLER Meet No/Date:3/80- Status:
WESTRUP (INDIA) PVT LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0710110568 Pending
:01/80/050/00557/AM19/ :07/24/040/00201/AM17/ 25.10.2016 with Firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
  • 5
  1. Weight of each Export Product.

  2. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  3. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

Case No.:222/15/80-ALC2/2018 Party Name: FOWLER Meet No/Date:3/80- Status:
WESTRUP (INDIA) PVT LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0710110569 Pending with
:01/80/050/00564/AM19/ :07/24/040/00204/AM17/ 25.10.2016 Firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
  • 6
  1. Weight of each Export Product.

  2. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  3. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

3 | P a g e

Case No.:380/15/80-ALC2/2018 Party Name: FOWLER Meet No/Date:3/80- Status:
WESTRUP(INDIA)PVT LTD. ALC2/2020&30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0710110914 Pending with
:01/80/050/00722/AM19/ :07/24/040/00302/AM17/ 05.01.2017 Firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.

  2. Weight of each Export Product.

7

  1. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  2. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

Case No.:402/15/80-ALC2/2018 Party Name: SHIV HYDROMET Meet No/Date:3/80- Status:
ALC2/2020&30.07.2020 Deferred
HQ File RLA File Lic.No/Date:2410042158 Pending
:01/80/050/00744/AM19/ :24/24/040/00034/AM17/ 14.03.2017 with Firm

Decision: The Committee considered the case as per agenda and the firm’s representatives (Mr. Manish Viramgama & Mr. Dev) explained the case during personal hearing held via video conferencing. However, on the advice of Consultant (Tech-1) , the Committee directed to the firm’s representative to furnish the following 8 information:

  1. Wastage on Antimony metal, indicating net content of Antimony in item of import supported by Certificate of Analysis from supplier (For total import).

  2. Antimony metal content on dry basis or wet basis.

  3. Certificate of analysis of each of the consignment.

  4. Total import & export made in quantity terms.

Case is deferred.

4 | P a g e

Case No.:1/11/80-ALC2/2018 Party Name: DIAMOND Meet No/Date:3/80- Status:
METAL SCREENS(P)LTD ALC2/2020&30.07.2020 Approved
HQ File RLA File Lic.No/Date:6510000003
:01/80/050/00192/AM19/ :65/24/040/00003/AM18/ 17.05.2017

Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the basis of written comments of MSME as under:

Export items:

9

  1. Hole diameter -2.5 mm, pitch- 4 mm, open area- 35.53%, quantity- 30 numbers& per unit weight- 10.31 Kgs. 2. Hole diameter- 3 mm, pitch- 5 mm, open area- 33%, quantity -265 numbers& per unit weight 10.72 Kgs. 3. Hole diameter- 4 mm, pitch- 6 mm, open area- 40.43%, quantity-300 numbers & per unit weight- 9.53 Kgs. 4. Hole diameter- 5 mm, pitch- 7 mm, open area 46.41%, quantity-1336 numbers &per unit weight 8.57 Kgs. 5. Hole diameter- 6 mm, pitch- 8 mm, open area 51%, quantity - 2150 numbers &per unit weight- 7.84 Kgs. 6. Hole diameter- 7 mm, pitch- 9 mm, open area- 55%, quantity - 179 numbers & per unit weight- 7.2 Kgs. 7. Hole diameter- 8 mm, pitch- 12 mm, open area- 40.43% & quantity- 243 numbers & per unit weight-9.53 Kgs. 8. Hole diameter- 10 mm, pitch- 14 mm, open area- 46.41%, quantity- 185 numbers &per unit weight- 8.57 Kgs. 9. Hole diameter- 12 mm, pitch- 16 mm, open area- 51%, quantity- 62 numbers & per unit weight- 7.84 Kgs.

Import Items:

  1. Quantity of relevant import item at Sl. No. 1 may be allowed with the wastage of 21.36%. 2. Quantity of relevant import item at Sl. No. 2 may be allowed with the wastage of 32.80%. 3. Quantity of relevant import item at Sl. No. 3 may be allowed with the wastage of 45.40%. 4. Quantity of relevant import item at Sl. No. 4 may be allowed with the wastage of 57.70%.

  2. Quantity of relevant import item at Sl. No. 5 may be allowed with the wastage of 69.47%. 6. Quantity of relevant import item at Sl. No. 6 may be allowed with the wastage of 81.50%. 7. Quantity of relevant import item at Sl. No. 7 may be allowed with the wastage of 45.27%. 8. Quantity of relevant import item at Sl. No. 8 may be allowed with the wastage of 57.86%. 9. Quantity of relevant import item at Sl. No. 9 may be allowed with the wastage of 69.44%.

Note: The wastage allowed for all the import items after affecting 1/3[rd] recovery from scrap.

RA concerned may take further necessary action as per the decision of NC.

Case No.:223/15/80- Party Name: ZEECO Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2018 INDIA PVT.LTD. 30.07.2020 Approved
HQ File RLA File Lic.No/Date:0310814297
:01/80/050/00565/AM19/ :03/95/040/00271/AM18/ 28.06.2017

Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of Consultant (Tech-3) as under:

10

ITCHS<br>Code Export Item Quantity Sl.<br>No. ITCHS<br>Code Import Item Recommended<br>Norms
84798999 Incinerator<br>Superheater<br>With<br>Transitions 3 Set 1 73044190 SS Tube - 88.9MM x<br>7.00mm THK x 6050 mm<br>LG SA312 TP321 As per GN-4
2 73044190 SS Tube - 60.3MM x<br>11.07mm THK x 6454 mm<br>LG SA312 TP321 As per GN-4
3 73044190 SS Tube - 33.4MM x<br>4.55mm THK x 3369 mm<br>LG SA312 TP321 As per GN-4

5 | P a g e

Case No.:20/20/80- Party Name: BIRLA PRECISION Meet No/Date:3/80- Status:
ALC2/2017 TECHNOLOGIES LTD. ALC2/2020&30.07.2020 Approved
HQ File RLA File Lic.No/Date:0310818218
:01/80/050/00384/AM18/ :03/94/040/00782/AM18/ 04.01.2018
Case No.:20/20/80-<br>ALC2/2017 Case No.:20/20/80-<br>ALC2/2017 Case No.:20/20/80-<br>ALC2/2017 Party Name: BIRLA PRECISION<br>TECHNOLOGIES LTD. Meet No/Date:3/80-<br>ALC2/2020&30.07.2020<br>Lic.No/Date:0310818218<br>04.01.2018 Meet No/Date:3/80-<br>ALC2/2020&30.07.2020<br>Lic.No/Date:0310818218<br>04.01.2018 Status:<br>Approved
HQ File<br>:01/80/050/00384/AM18/ RLA File<br>:03/94/040/00782/AM18/
11 Decision:The Committee considered the case as per the agenda and<br>written comments ofMSMEas under: decided toratifythe ad-hoc norms as per
Sl.<br>No. ITCHS<br>Code Import Item Recommended Norms
1 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6063 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
2 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
3 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
4 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 4589.50 Kgs inclusive of 52% wastage<br>after affecting 20% recovery from Scrap
5 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 4405 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
6 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils Deleted
7 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils Deleted
8 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 7167 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC.
Case No.:23/20/80- Party Name: BIRLA PRECISION Meet No/Date:3/80- Status:
ALC2/2017 TECHNOLOGIES LTD. ALC2/2020&30.07.2020 Approved
HQ File RLA File Lic.No/Date:0310818219
:01/80/050/00387/AM18/ :03/94/040/00784/AM18/ 04.01.2018
Case No.:23/20/80-<br>ALC2/2017 Case No.:23/20/80-<br>ALC2/2017 Case No.:23/20/80-<br>ALC2/2017 Party Name: BIRLA PRECISION<br>TECHNOLOGIES LTD. Meet No/Date:3/80-<br>ALC2/2020&30.07.2020 Meet No/Date:3/80-<br>ALC2/2020&30.07.2020 Status:<br>Approved
HQ File<br>:01/80/050/00387/AM18/ RLA File<br>:03/94/040/00784/AM18/ Lic.No/Date:0310818219<br>04.01.2018
12 Decision:The Committee considered the case as per the agenda and<br>written comments ofMSMEas under: decided toratifythe ad-hoc norms as per
Sl.<br>No. ITCHS<br>Code Import Item Recommended Norms
1 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6063 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
2 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
3 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
4 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 4589.50 Kgs inclusive of 52% wastage<br>after affecting 20% recovery from Scrap
5 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 4405 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
6 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils Deleted
7 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils Deleted
8 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 7167 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC.

6 | P a g e

Case No.:21/20/80- Party Name: BIRLA PRECISION Meet No/Date:3/80- Status:
ALC2/2017 TECHNOLOGIES LTD. ALC2/2020&30.07.2020 Approved
HQ File RLA File Lic.No/Date:0310818275
:01/80/050/00385/AM18/ :03/94/040/00785/AM18/ 05.01.2018
Case No.:21/20/80-<br>ALC2/2017 Case No.:21/20/80-<br>ALC2/2017 Case No.:21/20/80-<br>ALC2/2017 Party Name: BIRLA PRECISION<br>TECHNOLOGIES LTD. Meet No/Date:3/80-<br>ALC2/2020&30.07.2020 Meet No/Date:3/80-<br>ALC2/2020&30.07.2020 Status:<br>Approved
HQ File<br>:01/80/050/00385/AM18/ RLA File<br>:03/94/040/00785/AM18/ Lic.No/Date:0310818275<br>05.01.2018
13 Decision:The Committee considered the case as per the agenda and<br>written comments ofMSMEas under: decided toratifythe ad-hoc norms as per
Sl.<br>No. ITCHS<br>Code Import Item Recommended Norms
1 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6063 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
2 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
3 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
4 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 4589.50 Kgs inclusive of 52% wastage<br>after affecting 20% recovery from Scrap
5 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 4405 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
6 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils Deleted
7 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils Deleted
8 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 7167 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC.
Case No.:22/20/80- Party Name: BIRLA PRECISION Meet No/Date:3/80- Status:
ALC2/2017 TECHNOLOGIES LTD. ALC2/2020&30.07.2020 Approved
HQ File RLA File Lic.No/Date:0310818273
:01/80/050/00386/AM18/ :03/94/040/00783/AM18/ 05.01.2018
Case No.:22/20/80-<br>ALC2/2017 Case No.:22/20/80-<br>ALC2/2017 Case No.:22/20/80-<br>ALC2/2017 Party Name: BIRLA PRECISION<br>TECHNOLOGIES LTD. Meet No/Date:3/80-<br>ALC2/2020&30.07.2020<br>Lic.No/Date:0310818273<br>05.01.2018 Meet No/Date:3/80-<br>ALC2/2020&30.07.2020<br>Lic.No/Date:0310818273<br>05.01.2018 Status:<br>Approved
HQ File<br>:01/80/050/00386/AM18/ RLA File<br>:03/94/040/00783/AM18/
14 Decision:The Committee considered the case as per the agenda<br>written comments ofMSMEas under: and decided toratifythe ad-hoc norms as per
Sl.<br>No. ITCHS<br>Code Import Item Recommended Norms
1 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6063 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
2 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
3 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 6431 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
4 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 4589.50 Kgs inclusive of 52% wastage<br>after affecting 20% recovery from Scrap
5 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 4405 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
6 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils Deleted
7 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils Deleted
8 72281090 High Speed Steel M2 (Hot Rolled And Annealed)<br>Round Bars Or Wire Rods In Coils 7167 Kgs inclusive of 52% wastage after<br>affecting 20% recovery from Scrap
Note:<br>1. The import & export items at Sl. No. 6 & 7 may be deleted as per request of the firm.<br>2. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC.

7 | P a g e

15 Case No.:126/15/80-ALC2/2018 Party Name: SHAKTI PUMPS<br>(INDIA) LTD. Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00468/AM19/ RLA File<br>:56/24/040/00036/AM18/ Lic.No/Date:5610005299<br>08.01.2018 Pending<br>with Firm
Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDPIITwas sent to the firm on 06.08.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 06.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

16 Case No.:10/1/80-ALC2/2019 Party Name: MAGNA<br>AUTOMOTIVE INDIA<br>PRIVATE LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00758/AM19/ RLA File<br>:04/24/040/00001/AM19/ Lic.No/Date:0410164172<br>06.04.2018 Pending<br>with Firm
Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byMSMEwas sent to the firm on 12.03.2020 followed by a reminder on 22.07.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 12.03.2020 followed by a reminder on 22.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

17 Case No.:397/15/80-ALC2/2018 Party Name: PROMAC<br>ENGINEERING INDUSTRIES<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00739/AM19/ RLA File<br>:07/24/040/00357/AM18/ Lic.No/Date:0710113276<br>14.05.2018
Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 21.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case No.:133/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:3/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910066357 Pending
:01/80/050/00475/AM19/ :09/24/040/00058/AM19/ 20.06.2018 with Firm

18 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 12.03.2020 followed by a reminder on 22.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

8 | P a g e

19 Case No.:165/15/80-ALC2/2018 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00507/AM19/ RLA File<br>:09/24/040/00139/AM19/ Lic.No/Date:0910066427<br>06.07.2018 Pending<br>with Firm
Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 21.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 21.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case No.:166/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:3/80- Status:
ELECTRICALS LIMITED ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date: 0910066472 Pending
:01/80/050/00508/AM19/ :09/24/040/00171/AM19/ 18.07.2018 with Firm

Decision: The Committee considered the case as per agenda and the firm’s representatives explained the case during personal hearing held via video conferencing. However, on the advice of the representative of DHI , the Committee directed to the firm’s representative to furnish the following information:

  1. List of items of import.

  2. Weight of each Export Product.

  • 20 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

    1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

    2. Net weight & finish weight of casting of casting & forging

Case is deferred.

Case No.:179/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:3/80- Status:
ENGINEERING INDUSTRIES ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0710113710 Pending
:01/80/050/00521/AM19/ :07/24/040/00102/AM19/ 13.08.2018 with Firm
  • 21 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 11.02.2020 followed by reminders on 20.05.2020 & 21.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.

Case is deferred.

9 | P a g e

Case No.:23/11/80-ALC2/2018 Party Name: JAYESH METALS Meet No/Date:3/80- Status:
AND FERRO ALLOYS LLP ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0310823416 Pending
:01/80/050/00214/AM19/ :03/94/040/00488/AM19/ 29.08.2018 with Firm

Decision: The Committee considered the case as per agenda and the firm’s representatives explained the case 22 during personal hearing held via video conferencing. It was pointed out that the export and import items have overlapping mesh sizes. On the advice of the representative of MSME , the Committee directed to the firm’s representative to furnish the following information:

  1. To provide details of import & export items for the non-overlapping mesh size.

Case is deferred.

Case No.:28/11/80-ALC2/2018 Party Name: L & T-MHPS Meet No/Date:3/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0310823400 Pending
:01/80/050/00219/AM19/ :03/95/040/00466/AM19/ 29.08.2018 with DHI

23 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 19.06.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

Case No.:9/1/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:3/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0310823645 Pending
:01/80/050/00757/AM19/ :03/95/040/00469/AM19/ 07.09.2018 with DHI

24 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 19.06.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

25 Case No.:201/15/80-<br>ALC2/2018 Party Name: DYNAMATIC<br>TECHNOLOGIES LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br><br>Lic.No/Date:0710113852<br>17.09.2018<br> <br> Status:<br>Deferred
HQ File<br>:01/80/050/00543/AM19/ RLA File :07/24/040/00155/AM19/ Pending with<br>MSME
Decision:The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSMEon 07.07.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided toremind MSMEfor expediting the comments.<br>Case is deferred.

10 | P a g e

Case No.:57/11/80-ALC2/2018 Party Name: GL&V INDIA Meet No/Date:3/80- Status:
PRIVATE LIMITED ALC2/2020 Approved
30.07.2020
HQ File RLA File Lic.No/Date:3110067179
:01/80/050/00248/AM19/ :31/83/040/00096/AM19/ 26.09.2018

26

Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:

  1. Quantity of relevant import items at Sl. No. 1 to 11 may be allowed as per GN-4.

  2. Quantity of relevant import item at Sl. No. 12 may be allowed as 5830 Kgs inclusive of 0.8% wastage after affecting 1/3[rd] recovery from scrap.

Note: Weight of export product is 28026 Kgs.

Case No.:82/11/80- Party Name: ANSTECH Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2018 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:3410044543 Pending with
:01/80/050/00273/AM19/ :34/24/040/00218/AM19/ 04.10.2018 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 27 yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 08.07.2019 followed by reminders on 25.09.2019, 18.10.2019, 08.01.2020, 03.02.2020, 20.05.2020 & 22.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

28 Case No.:253/15/80-<br>ALC2/2018 Party Name: BHARAT HEAVY<br>ELECTRICALS LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br><br>Lic.No/Date:0910066870<br>16.11.2018<br> <br> Status:<br>Deferred
HQ File<br>:01/80/050/00595/AM19/ RLA File :09/24/040/00340/AM19/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that a letter was sent toRA,<br>Hyderabad& the firm on 06.08.20220 as per decision taken in Meeting No. 01/80 dated 20.05.2020. However,<br>no information has been received yet. Hence, the Committee decided to wait for the requisite information.<br>Case is deferred.
29 Case No.:259/15/80-<br>ALC2/2018 Party Name: DYNAMATIC<br>TECHNOLOGIES LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00601/AM19/ RLA File :07/24/040/00182/AM19/ Lic.No/Date:0710114156<br>22.11.2018 Pending with<br>MSME
Decision:The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSMEon 07.07.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided toremind MSMEfor expediting the comments.<br>Case is deferred.

11 | P a g e

Case No.:270/15/80-ALC2/2018 Party Name: VEM Meet No/Date:3/80- Status:
TECHNOLOGIES PVT LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0910066924 Pending with
:01/80/050/00612/AM19/ :09/24/040/00428/AM19/ 29.11.2018 Firm

Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of Consultant (SKB):

  1. What is the length of each blank ( End-Cap-1) having ᶲ76.2 mm, weight 4.2 Kg for obtaining final weight of 0.346 Kgs having ᶲ 73 mm and length 77.2 mm?

30

  1. What is the length of each blank ( End-Cap-2) having ᶲ76.2 mm, weight 5.7 Kg for obtaining final weight of 0.578 Kg having ᶲ73 mm and length 110.3 mm?

  2. For Collar : Describe about the size of the tube (ᶲ70x ᶲ 50x1000 mm length). How you have calculated the weight of each blank for bringing final weight off 0.31 Kg?

  3. For plug mill: The weight of Hax Bar for 119 Nos is indicated 107.1 Kgs. However, import is only 29.75 Kg. Give reasons for less import.

  4. For Stop End: The weight of stop end for 119 Nos is indicated 94.01 Kgs. However, import is only 17.85 Kg. Give reasons for less import.

  5. For Tab Locking: The weight of stop end for 119 Nos is indicated 97.58 Kgs. However, import is only 24.99 Kg. Give reasons for less import.

Note: The above information may be tabulated with full reason/justification and also match the quantity of import with quantity indicated in the drawings.

Case is deferred.

Case No.:298/15/80- Party Name: ULTRA Meet No/Date:3/80- Status:
ALC2/2018 ENGINEERS ALC2/2020 Approved
30.07.2020
HQ File RLA File Lic.No/Date:3110067288
:01/80/050/00640/AM19/ :31/83/040/00164/AM19/ 16.01.2019

Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of DHI as under:

31

ITCHS<br>Code Export Item Quantity Sl.<br>No. ITCHS<br>Code Import Item Recommended<br>Norms
84139190 Parts Of Oil Field<br>Equipment, *CARR /<br>tube,3.12 ISGS NAL,<br>6/60, 20KSI, 1FT<br>Part No-102014363<br>(Export Product Net<br>Weight =<br>8.718X30500 =<br>265899 Kg) 30500<br>Number 1 73043119 Mech Tubing<br>3.125 OD X 0 .313<br>Wall, 135KSI<br>Yield ( Qty<br>61,913.30 FT<br>101395796 1.10 Kgs/Kg<br>content in the<br>export product
2 39269099 Protector, Female,<br>3.12 ISGS (Qty<br>6039 KG)<br>101387417 As per GN-4 with<br>accountability<br>clause

12 | P a g e

Case No.:42/1/80-ALC2/2019 Party Name: LARSEN & Meet No/Date:3/80- Status:
TOUBRO LIMITED ALC2/2020&30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0310827622 Pending
:01/80/050/00790/AM19/ :03/95/040/01295/AM19/ 12.03.2019 with Firm

Decision: The Committee considered the case as per the agenda and Consultant (Tech-3) informed that the firm’s reply dated 06.02.2020 is deficient due to following reasons:

  1. Weight per piece does not match with total weight in Annexure-2 of reply letter.
  • 32 2. Import item at Sl. No. 1 is a bar but details given in Annuxure-3 are of a tube.

    1. Thickness of tube given in Annexure-3 does not match with OD & ID.

    2. For export product at Sl. No.1, Sheet is used to make sleeve, but process is not given.

    3. For export product at Sl. No.1, weight of import item at Sl. No. 3 is taken Nil in Annuxure-4.

    4. Dimensions of components & calculations of wastage are not given.

Therefore, the Committee decided to ask from the firm to provide clarification on the above mentioned deficiencies.

Case is deferred.

Case No.:5/2/80-ALC2/2019 Party Name: VIPRA CLOSURES Meet No/Date:3/80- Status:
PRIVATE LIMITED ALC2/2020&30.07.2020 Deferred
HQ File RLA File :03/95/040/01384/AM19/ Lic.No/Date:0310828134 Pending with
:01/80/050/00005/AM20/ 03.04.2019 MSME

33 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 07.07.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

Case No.:3/3/80-ALC2/2019 Party Name: MUDHRA FINE Meet No/Date:3/80- Status:
BLANC PRIVATE LTD ALC2/2020&30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0410165451 Pending
:01/80/050/00009/AM20/ :04/24/040/00294/AM19/ 11.04.2019 with DHI

34 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 29.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:4/3/80-ALC2/2019 Party Name: VEELINE MEDIA Meet No/Date:3/80- Status:
LIMITED ALC2/2020&30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0210209114
:01/80/050/00010/AM20/ :02/24/040/00003/AM20/ 16.04.2019

Decision: The Committee considered the case as per the agenda and the representative of MSME informed that 35 the firm’s reply is incomplete as they have not given the net content of the import item in per unit of export product. Therefore, the Committee decided to ask again from the firm to furnish the following information as per advice of the representative of MSME:

1. To provide net content of the import item in per unit of export product.

Case is deferred.

13 | P a g e

Case No.:8/3/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:3/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0310828481 Pending
:01/80/050/00014/AM20/ :03/95/040/01354/AM19/ 23.04.2019 with Firm

36 Decision: The Committee considered the case as per agenda and DHI informed that the firm’s reply dated 11.03.2020 is deficient. Therefore, the Committee decided to ask again from the firm to furnish the following information as per comments of DHI:

  1. To provide Annuxure-2.

Case is deferred.

Case No.:1/5/80-ALC2/2019 Party Name: PAHARPUR Meet No/Date:3/80- Status:
COOLING TOWERS LIMITED ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0210209171 Pending
:01/80/050/00039/AM20/ :02/24/040/00012/AM20/ 16.05.2019 with Firm

37 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 06.03.2020 followed by a reminder on 22.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:13/5/80-ALC2/2019 Party Name: HEURTEY Meet No/Date:3/80- Status:
PETROCHEM INDIA PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:3410045150 Pending
:01/80/050/00051/AM20/ :34/24/040/00059/AM20/ 17.05.2019 with DHI

38 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 22.07.2020 for examination of the case. However, the representative of DHI informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:1/7/80-ALC2/2019 Party Name: CROWN Meet No/Date:3/80- Status:
CLOSURES PVT. LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0310829905 Pending
:01/80/050/00098/AM20/ :03/94/040/00246/AM20/ 25.06.2019 with Firm

39 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 06.03.2020 followed by a reminder on 23.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

14 | P a g e

40 Case No.:2/7/80-ALC2/2019 Party Name: OSWAL PUMPS<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00099/AM20/ RLA File<br>:33/24/040/00012/AM20/ Lic.No/Date:3310030557<br>25.06.2019 Pending<br>with Firm
Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDPIITwas sent to the firm on 06.03.2020 followed by a reminder on 23.07.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 06.03.2020 followed by a reminder on 23.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case No.:3/7/80-ALC2/2019 Party Name: OAM SAAI Meet No/Date:3/80- Status:
INTERNATIONAL INC. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0510411061 Pending
:01/80/050/00100/AM20/ :05/24/040/00181/AM20/ 26.06.2019 with Firm

41 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 07.01.2020 followed by reminders on 06.03.2020 & 23.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:4/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:3/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910067697 Pending
:01/80/050/00101/AM20/ :09/24/040/00138/AM20/ 26.06.2019 with DHI

42 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 05.06.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

Case No.:10/7/80- Party Name: P. M. ELECTRO Meet No/Date:3/80- Status:
ALC2/2019 AUTO PVT. LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:3110067458 Pending with
:01/80/050/00107/AM20/ :31/83/040/00048/AM20/ 28.06.2019 RA/Firm

43 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 08.08.2019 followed by reminders on 11.11.2019, 08.01.2020, 03.02.2020, 26.02.2020 & 23.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

15 | P a g e

44 Case No.:12/7/80-ALC2/2019 Party Name: AUTOCOMP<br>CORPORATION PANSE<br>PRIVATE LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:3110067460<br>01.07.2019 Status:<br>Deferred
HQ File<br>:01/80/050/00109/AM20/ RLA File<br>:31/83/040/00050/AM20/ Pending with<br>Firm
Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 20.05.2020 followed by a reminder on 23.07.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 20.05.2020 followed by a reminder on 23.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.

Case No.:15/7/80-ALC2/2019 Party Name: DOOWON Meet No/Date:3/80- Status:
CLIMATE CONTROL INDIA ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:6610000035 Pending
:01/80/050/00112/AM20/ :66/24/040/00003/AM20/ 03.07.2019 with Firm

45 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of DHI:

  1. To provide detailed justification along with working calculation supported by dimensional drawing for operations with high wastage such as Trimming, Notching, Blanking, Piercing etc. and complete item descriptions. Case is deferred.
Case No.:3/9/80-ALC2/2019 Party Name: DYNA FORCE Meet No/Date:3/80- Status:
HYDRAULICS PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:3110067484 Pending
:01/80/050/00128/AM20/ :31/83/040/00067/AM20/ 25.07.2019 with Firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the 46 following information as per comments of MSME :

  1. To provide per unit weight of export item.

  2. To provide blank size (in Kg).

  3. Manufacturing process with step-wise wastage and material balancing.

Case is deferred.

Case No.:4/9/80-ALC2/2019 Party Name: RATNAMANI Meet No/Date:3/80- Status:
METALS AND TUBES LTD ALC2/2020 Approved
30.07.2020
HQ File RLA File Lic.No/Date:0810145826
:01/80/050/00129/AM20/ :08/24/040/00135/AM20/ 25.07.2019

Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per 47 written comments of Consultant (Tech-3) as under:

ITCHS Export Item Quantity ITCHS Import Item Recommended
Code Code Norms
81089090 Welded Titanium Tubes 179004 81089010 Titanium CR Strip 187955 Kgs
Spec: ASTM B338 TiGR - Kgs Tubular Quality Coils with 5%
II GR - II wastage

16 | P a g e

48 Case No.:41/11/80-ALC2/2019 Party Name: PHOENIX FOILS<br>PVT. LTD. Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Approved
HQ File<br>:01/80/050/00167/AM20/ RLA File<br>:03/95/040/00459/AM20/ Lic.No/Date:0310830770<br>02.08.2019
Decision:The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/190/2019-TSW dated 05.08.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC.
Case No.:45/11/80-ALC2/2004 Party Name: L&T- MHPS Meet No/Date:3/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0310831568 Pending
:01/80/050/00171/AM20/ :03/95/040/00574/AM20/ 16.09.2019 with DHI

49 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 19.06.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

Case No.:46/11/80-ALC2/2004 Party Name: L&T-MHPS Meet No/Date:3/80- Status:
BOILERS PVT LTD ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0310831569 Pending
:01/80/050/00172/AM20/ :03/95/040/00588/AM20/ 16.09.2019 with Firm

Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of DHI:

  1. Specific of item of export with its specification.

  2. Weight of each Export Product.

  • 50 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

    1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

    2. AA of similar export product ratified by NC.

    Case is deferred.

Case No.:1/13/80-ALC2/2019 Party Name: RONCH Meet No/Date:3/80- Status: POLYMERS PVT LTD ALC2/2020 Deferred 30.07.2020 HQ File RLA File Lic.No/Date:0310832012 Pending with 51 :01/80/050/00186/AM20/ :03/95/040/00654/AM20/ 04.10.2019 Firm Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 05.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.

17 | P a g e

Case No.:2/13/80- Party Name: FERRUM Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 EXTREME ENGINEERING 30.07.2020 Deferred
PRIVATE LIMITED
HQ File RLA File Lic.No/Date:0510412040 Pending with
:01/80/050/00187/AM20/ :05/23/040/00265/AM20/ 07.10.2019 RA/Firm
  • 52 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 17.12.2019 followed by reminders on 13.02.2020, 21.05.2020 & 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:3/13/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:3/80- Status:
AUTOMOTIVES PVT. LTD. ALC2/2020 Approved
30.07.2020
HQ File RLA File Lic.No/Date:0510412058
:01/80/050/00188/AM20/ :05/23/040/00266/AM20/ 09.10.2019
Case No.:3/13/80-ALC2/2019 Party Name: AVLIGHT<br>AUTOMOTIVES PVT. LTD. Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Approved
HQ File<br>:01/80/050/00188/AM20/ RLA File<br>:05/23/040/00266/AM20/ Lic.No/Date:0510412058<br>09.10.2019
53 Decision:The Committee considered the case as per the agenda and decided toratifythe<br>written comments ofMSMEas under:<br>Sl.<br>No.<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>Sl.<br>No.<br>ITCHS<br>Code<br>Import Item<br>1<br>87089900<br>A1BC Check<br>Arm + Bumper<br>MV Parts –<br>Plastic Moulded<br>Comp<br>38409<br>Number<br>1<br>73261910<br>A1BC Front<br>Inserts Sheet<br>Metal Comp -<br>S2780030<br>2<br>87089900<br>E2SCMoulded<br>Arm Front MV<br>Parts - Plastic<br>Moulded Comp<br>96007<br>Number<br>2<br>73261910<br>E2SC FRONT<br>Inserts Sheet<br>Metal Comp -<br>S2800030<br>3<br>87089900<br>E2SC Moulded<br>Arm Rear MV<br>Parts - Plastic<br>Moulded Comp<br>80000<br>Number<br>3<br>73261910<br>E2SC Rear<br>Inserts Sheet<br>Metal Compo -<br>S2800230<br>RA concerned maytake further necessaryaction asper the decision of NC. ad-hoc norms as per<br>Recommended<br>Norms<br>As per GN-4<br>As per GN-4<br>As per GN-4
Case No.:4/13/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:3/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0310832116 Pending
:01/80/050/00189/AM20/ :03/95/040/00681/AM20/ 10.10.2019 with DHI

54 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 20.05.2020 for examination of the case. However, the representative of DHI informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

18 | P a g e

Case No.:5/13/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:3/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0310832159 Pending
:01/80/050/00190/AM20/ :03/95/040/00655/AM20/ 11.10.2019 with Firm
  • Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain

  • 55 information as raised by DHI was sent to the firm on 11.02.2020. The firm vide letter dated 11.03.2020 informed that the Project Engineering & Detail Design is in progress and is expected to complete by 30[th] June 2020. Hence, they requested for extension of time till 30[th] June 2020 to furnish the requisite information. However, no information has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:6/13/80-ALC2/2019 Party Name: GODREJ & Meet No/Date:3/80- Status:
BOYCE MFG. CO. LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0310832178 Pending
:01/80/050/00191/AM20/ :03/94/040/00505/AM20/ 11.10.2019 with Firm

Decision: The Committee considered the case as per the agenda and noted that a similar case was discussed in M. No. 02/80 dated 16.06.2020. Therefore, the Committee decided to ask from the firm to furnish following information on the advice of Consultant (SKB) :

  1. What is the thickness of the imported plates?
  • 56 2. Weight of each Mini/Maxi Proto/production Dyads.

    1. What is the chemical composition of carbon steel plates of grade 250/350/PT460 NR/BS80? Please indicate equivalent IS Standard.

    2. What are the drawing numbers belong to proto type and production type Mini Dyads?

    3. What are the drawing numbers belong to proto type and production type Maxi Dyads?

    4. As per drawings, there are 9 types of plate thicknesses are required for fabrication of Mini/Maxi Dyads. However, only 4 grades of plate are indicated. Please clarify whether the remaining grades of plates would be procured indigenously.

    5. Which assembly belongs to proto/production type mini/maxi Dyads?

Case is deferred.

57 Case No.:7/13/80-ALC2/2019 Party Name: ISGEC HITACHI<br>ZOSEN LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00192/AM20/ RLA File<br>:05/23/040/00269/AM20/ Lic.No/Date:0510412096<br>11.10.2019
Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDPIITwas sent to the firm on 24.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

19 | P a g e

Case No.:8/13/80-ALC2/2019 Party Name: AZAD Meet No/Date:3/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068080 Pending with
:01/80/050/00193/AM20/ :09/24/040/00347/AM20/ 14.10.2019 Firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of Consultant (Tech-3) :

  1. Drawing of export items & its blank with all dimensions.

  2. Weight of export product.

  3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of

58 material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

  2. Documents indicating CIF value of import.

  3. Documents of disposal of scrap having value in it.

Case is deferred.

Case No.:10/13/80- Party Name: GOLD MOHUR Meet No/Date:3/80-ALC2/2020 Status: ALC2/2019 PROFILES LIMITED 30.07.2020 Approved HQ File RLA File Lic.No/Date:0510412119 :01/80/050/00195/AM20 :05/23/040/00279/AM20/ 15.10.2019

Case No.:10/13/80-<br>ALC2/2019 Case No.:10/13/80-<br>ALC2/2019 Party Name: GOLD MOHUR<br>PROFILES LIMITED Party Name: GOLD MOHUR<br>PROFILES LIMITED Party Name: GOLD MOHUR<br>PROFILES LIMITED Meet No/Date:3/80-ALC2/2020<br>30.07.2020 Meet No/Date:3/80-ALC2/2020<br>30.07.2020 Status:<br>Approved
HQ File<br>:01/80/050/00195/AM20 RLA File<br>:05/23/040/00279/AM20/ Lic.No/Date:0510412119<br>15.10.2019
59 Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms as per<br>written comments of**Consultant (Tech-1)**as under:
ITCHS<br>Code Export Item Quantity ITCHS<br>Code Import Item Recommended Norms
84379020 Rubber Rollers For<br>Automatic Rice<br>Mill Machinery<br>10" 8000<br>Number 40025900 Acrylonitrile<br>Butadiene Rubber<br>(Synthetic Rubber) 26248 Kgs @ 1.05<br>Kgs/Kg content in the<br>export product
Note: Net weight of export item per piece should be 8.00 Kg.<br>RA concerned maytake further necessaryaction asper the decision of NC.
Case No.:1/17/80-ALC2/2019 Party Name: VICTORA Meet No/Date:3/80-ALC2/2020 Status:
AUTO PVT. LTD. 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0510412724 Pending with
:01/80/050/00233/AM20/ :05/24/040/00513/AM20/ 29.11.2019 MSME

60 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 28.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

20 | P a g e

Case No.:2/17/80- Party Name: SULZER PUMPS Meet No/Date:3/80- Status:
ALC2/2019 INDIA LIMITED ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0310833126 Pending with
:01/80/050/00234/AM20/ :03/95/040/00827/AM20/ 02.12.2019 RA/Firm

61 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 15.01.2020 followed by reminders on 09.03.2020 & 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:3/17/80-ALC2/2019 Party Name: SULZER PUMPS Meet No/Date:3/80- Status:
INDIA LIMITED ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0310833143 Pending with
:01/80/050/00235/AM20/ :03/95/040/00828/AM20/ 02.12.2019 RA/Firm

62 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 15.01.2020 followed by reminders on 09.03.2020 & 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:5/17/80- Party Name: AZAD Meet No/Date:3/80- Status:
ALC2/2019 ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File :09/24/040/00439/AM20/ Lic.No/Date:0910068244 Pending with
:01/80/050/00237/AM20/ 02.12.2019 RA/Firm

63 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:9/17/80- Party Name: HANNING Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 MOTORS INDIA P LTD 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:3410045677 Pending with
:01/80/050/00241/AM20/ :34/24/040/00270/AM20/ 03.12.2019 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 64 yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 15.01.2020 followed by reminders on 09.03.2020 &15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

21 | P a g e

Case No.:10/17/80- Party Name: HANNING Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 MOTORS INDIA P LTD 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:3410045679 Pending with
:01/80/050/00242/AM20/ :34/24/040/00271/AM20/ 03.12.2019 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 65 yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 15.01.2020 followed by reminders on 09.03.2020 & 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:11/17/80- Party Name: AZAD Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 ENGINEERING PRIVATE 30.07.2020 Deferred
LIMITED
HQ File RLA File Lic.No/Date:0910068247 Pending with
:01/80/050/00243/AM20/ :09/24/040/00437/AM20/ 04.12.2019 RA/Firm

66 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

  • 67
Case No.:12/17/80-ALC2/2019 Party Name: DOOWON Meet No/Date:3/80- Status:
CLIMATE CONTROL INDIA ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:2610012887 Pending
:01/80/050/00244/AM20/ :26/24/040/00012/AM20/ 04.12.2019 with Firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:13/17/80-ALC2/2019 Party Name: KABY Meet No/Date:3/80- Status:
PRECISION MACHINING ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068268 Pending with
:01/80/050/00245/AM20/ :09/24/040/00447/AM20/ 06.12.2019 Firm

68 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 27.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

22 | P a g e

69

Case No.:1/19/80-ALC2/2019 Party Name: BAUMER Meet No/Date:3/80- Status:
TECHNOLOGIES INDIA ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:5210043275 Pending
:01/80/050/00266/AM20/ :52/24/040/00051/AM20/ 23.12.2019 with Firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:2/19/80- Party Name: DILIGENT SCM Meet No/Date:3/80- Status: Deferred
ALC2/2019 SOLUTIONS PR IVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068302 Pending with
:01/80/050/00267/AM20/ :09/24/040/00474/AM20/ 24.12.2019 RA/Firm

70 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 14.02.2020 followed by reminders on 26.05.2020 & 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

  • 71
Case No.:4/19/80-ALC2/2019 Party Name: CRYOGAS Meet No/Date:3/80- Status:
EQUIPMENT PVT LTD ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:3410045738 Pending
:01/80/050/00269/AM20/ :34/24/040/00287/AM20/ 24.12.2019 with Firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

72 Case No.:9/19/80-ALC2/2019 Party Name: BONATRANS<br>INDIA PRIVATE LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00274/AM20/ RLA File<br>:03/94/040/00785/AM20/ Lic.No/Date:0310833747<br>27.12.2019 Pending<br>with Firm
Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 24.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

23 | P a g e

Case No.:8/19/80-ALC2/2019 Party Name: TEGA Meet No/Date:3/80- Status:
INDUSTRIES LIMITED ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0210209647
:01/80/050/00273/AM20/ :02/24/040/00148/AM20/ 30.12.2019

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to 73 Consultant (Tech-1) on 26.06.2020 for examination of the case. For import item at Sl. No. 1, the Committee decided to ask from the firm to furnish following information on the advice of Consultant (SKB):

  1. To submit the justification for higher wastage with detailed process on the use of steel plate along with stage wise wastage at each operation involved.

Case is deferred.

Case No.:10/19/80-ALC2/2019 Party Name: BANGALORE Meet No/Date:3/80- Status:
BIOTECH LABS PVT LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0710115950 Pending
:01/80/050/00275/AM20/ :07/24/040/00223/AM20/ 30.12.2019 with Firm

74 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:11/19/80- Party Name: AZAD Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 ENGINEERING PRIVATE 30.07.2020 Deferred
LIMITED
HQ File RLA File Lic.No/Date:0910068312 Pending with
:01/80/050/00276/AM20/ :09/24/040/00489/AM20/ 31.12.2019 RA/Firm

75 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:12/19/80- Party Name: AZAD Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 ENGINEERING PRIVATE 30.07.2020 Deferred
LIMITED
HQ File RLA File Lic.No/Date:0910068313 Pending with
:01/80/050/00277/AM20/ :09/24/040/00490/AM20/ 31.12.2019 RA/Firm

76 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

24 | P a g e

Case No.:13/19/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:3/80- Status:
CORPORATION PANSE ALC2/2020 Deferred
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:3110067645 Pending with
:01/80/050/00278/AM20/ :31/83/040/00128/AM20/ 31.12.2019 Tech-3
  • 77 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) for examination of the case on 16.03.2020 followed by a reminder on 24.07.2020. The physical file has been also sent on 04.08.2020 to Consultant (Tech-3) to examine the case. However, Consultant (Tech-3) informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:14/19/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:3/80- Status:
ENGINEERING LIMITED ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0510413163 Pending
:01/80/050/00279/AM20/ :05/23/040/00381/AM20/ 01.01.2020 with Firm

Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of Consultant (SKB):

  • 78 1. Please provide complete detailed drawings of export item No 1 to 5 and also detail of components and its drawing indicating weight of blank, wastage on each stage and final weight of each export product, which are indicated in numbers.

    1. Weight of each export item and complete assembly detail, which could match the weight of export product.

    2. Detail of structural steel going to use in each export product.

    3. What are the structural steels are being imported?

    4. Basis of wastage claimed.

Case is deferred.

Case No.:15/19/80- Party Name: SOGEFI ENGINE Meet No/Date:3/80- Status:
ALC2/2019 SYSTEMS INDIA PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0710115971 Pending with
:01/80/050/00280/AM20/ :07/24/040/00097/AM20/ 02.01.2020 RA/Firm
  • 79 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA, Bangalore on 13.02.2020 followed by reminders on 26.05.2020 & 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

25 | P a g e

80 Case No.:17/19/80-ALC2/2019 Party Name: ISGEC HEAVY<br>ENGINEERING LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00282/AM20/ RLA File<br>:05/23/040/00378/AM20/ Lic.No/Date:0510413181<br>02.01.2020 Pending<br>with Firm
Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDHIwas sent to the firm on 20.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 20.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case No.:1/21/80- Party Name: AZAD Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 ENGINEERING PRIVATE 30.07.2020 Deferred
LIMITED
HQ File RLA File Lic.No/Date:0910068392 Pending with
:01/80/050/00295/AM20/ :09/24/040/00522/AM20/ 21.01.2020 RA/Firm

81 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:2/21/80- Party Name: AZAD Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 ENGINEERING PRIVATE 30.07.2020 Deferred
LIMITED
HQ File RLA File Lic.No/Date:0910068393 Pending with
:01/80/050/00296/AM20/ :09/24/040/00523/AM20/ 21.01.2020 RA/Firm

82 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:3/21/80- Party Name: AZAD Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 ENGINEERING PRIVATE 30.07.2020 Deferred
LIMITED
HQ File RLA File Lic.No/Date:0910068394 Pending with
:01/80/050/00297/AM20/ :09/24/040/00524/AM20/ 21.01.2020 RA/Firm

83 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

26 | P a g e

Case No.:4/21/80- Party Name: AZAD Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 ENGINEERING PRIVATE 30.07.2020 Deferred
LIMITED
HQ File RLA File Lic.No/Date:0910068395 Pending with
:01/80/050/00298/AM20/ :09/24/040/00528/AM20/ 21.01.2020 RA/Firm
  • 84 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:5/21/80- Party Name: MAHINDRA Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 DEFENCE SYSTEMS LTD 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0510413404 Pending with
:01/80/050/00299/AM20/ :05/24/040/00602/AM20/ 21.01.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 85 yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:7/21/80- Party Name: LM WIND POWER Meet No/Date:3/80- Status:
ALC2/2019 BLADES INDIA PVT. LTD ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:3410045799 Pending with
:01/80/050/00301/AM20/ :34/24/040/00329/AM20/ 21.01.2020 RA/Firm

86 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:8/21/80- Party Name: LM WIND Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 POWER BLADES INDIA 30.07.2020 Deferred
PVT. LTD
HQ File RLA File Lic.No/Date:3410045800 Pending with
:01/80/050/00302/AM20/ :34/24/040/00330/AM20/ 21.01.2020 RA/Firm

87 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

27 | P a g e

88 Case No.:9/21/80-ALC2/2019 Party Name: MICRON<br>INSTRUMENTS PVT LTD Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00303/AM20/ RLA File<br>:05/24/040/00398/AM20/ Lic.No/Date:0510413428<br>23.01.2020 Pending<br>with Firm
Decision:The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised byDPIITwas sent to the firm on 24.07.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 24.07.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case No.:10/21/80-ALC2/2019 Party Name: THERMAL Meet No/Date:3/80- Status:
SYSTEMS (HYDERABAD) P. ALC2/2020 Deferred
LTD. 30.07.2020
HQ File RLA File Lic.No/Date:0910068410 Pending
:01/80/050/00304/AM20/ :09/24/040/00506/AM20/ 24.01.2020 with Firm

Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per comments of DHI:

  • 89 1. Specification of export item with quantity of export in number.

    1. Quantity break-up of item No. 3 & 4 i.e. break-up of gate, globe & check valves and Pneumatic & conventional valves.

    2. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

Case No.:11/21/80- Party Name: CHEMICO Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 SYNTHETICS LTD. 30.07.2020 Approved
HQ File RLA File Lic.No/Date:0510413441
:01/80/050/00305/AM20/ :05/23/040/00408/AM20/ 24.01.2020
Case No.:11/21/80-<br>ALC2/2019 Case No.:11/21/80-<br>ALC2/2019 Party Name: CHEMICO<br>SYNTHETICS LTD. Party Name: CHEMICO<br>SYNTHETICS LTD. Party Name: CHEMICO<br>SYNTHETICS LTD. Meet No/Date:3/80-ALC2/2020<br>30.07.2020 Meet No/Date:3/80-ALC2/2020<br>30.07.2020 Meet No/Date:3/80-ALC2/2020<br>30.07.2020 Status:<br>Approved
HQ File<br>:01/80/050/00305/AM20/ RLA File<br>:05/23/040/00408/AM20/ Lic.No/Date:0510413441<br>24.01.2020
90 Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms as per<br>written comments of**Consultant (Tech-1)**as under:
ITCHS<br>Code Export Item Quantity ITCHS<br>Code Import Item Recommended<br>Norms
81101000 Antimony Metal<br>(Sb 99.65% Min.) 134772<br>Kgs 26171000 Antimony Concentrate<br>(Antimony Content 60.79%)<br>with 7.83% H2O (Water)<br>Content 256472 Kgs
Note: The Antimony Content in the import item should be 143702 Kgs.<br>RA concerned maytake further necessaryaction asper the decision of NC.

28 | P a g e

Case No.:12/21/80- Party Name: KAY BOUVET Meet No/Date:3/80- Status:
ALC2/2019 ENGINEERING LTD ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:3110067666 Pending with
:01/80/050/00306/AM20/ :31/83/040/00139/AM20/ 27.01.2020 RA/Firm

91 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 09.03.2020 followed by a reminder on 27.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:13/21/80- Party Name: HANNING Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 MOTORS INDIA P LTD 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:3410045818 Pending with
:01/80/050/00307/AM20/ :34/24/040/00336/AM20/ 28.01.2020 RA/Firm

92 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:14/21/80- Party Name: HANNING Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 MOTORS INDIA P. LTD. 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:3410045819 Pending with
:01/80/050/00308/AM20/ :34/24/040/00337/AM20/ 28.01.2020 RA/Firm

93 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:15/21/80- Party Name: HANNING Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 MOTORS INDIA P LTD 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:3410045820 Pending with
:01/80/050/00309/AM20/ :34/24/040/00338/AM20/ 28.01.2020 RA/Firm

94 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

29 | P a g e

Case No.:17/21/80- Party Name: AVLIGHT Meet No/Date:3/80- Status:
ALC2/2019 AUTOMOTIVES PVT. LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0510413478 Pending with
:01/80/050/00311/AM20/ :05/23/040/00359/AM20/ 29.01.2020 RA/Firm

95 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 06.03.2020 followed by a reminder on 21.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:18/21/80- Party Name: LM WIND Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2019 POWER BLADES INDIA PVT. 30.07.2020 Deferred
LTD
HQ File RLA File Lic.No/Date:3410045830 Pending with
:01/80/050/00312/AM20/ :34/24/040/00341/AM20/ 30.01.2020 RA/Firm

96

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:19/21/80-ALC2/2019 Party Name: BENGAL Meet No/Date:3/80- Status:
INDUSTRIES PVT. LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0510413481 Pending
:01/80/050/00313/AM20/ :05/23/040/00415/AM20/ 30.01.2020 with Firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME :

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
  • 97 2. Weight of each Export Product.

    1. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

    2. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

30 | P a g e

Case No.:20/21/80- Party Name: LM WIND POWER Meet No/Date:3/80- Status:
ALC2/2019 BLADES INDIA PVT. LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:3410045838 Pending with
:01/80/050/00314/AM20/ :34/24/040/00344/AM20/ 30.01.2020 RA/Firm

98 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

99 Case No.:21/21/80-ALC2/2019 Party Name: BHARAT HEAVY<br>ELECTRICALS LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00315/AM20/ RLA File<br>:11/24/040/00011/AM20/ Lic.No/Date:1110028681<br>31.01.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case<br>examination & comments as per the advice ofDHI.<br>Case is deferred. toDPIITfor
Case No.:22/21/80- Party Name: JAIN Meet No/Date:3/80- Status: Deferred
ALC2/2019 IRRIGATION SYSTEMS ALC2/2020
LTD. 30.07.2020
HQ File RLA File Lic.No/Date:0310834593 Pending with
:01/80/050/00316/AM20/ :03/94/040/00435/AM20/ 03.02.2020 RA/Firm

100 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 09.03.2020 followed by a reminder on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:23/21/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2019 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068441 Pending with
:01/80/050/00317/AM20/ :09/24/040/00557/AM20/ 03.02.2020 RA/Firm

101 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on20.05.2020 &20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

31 | P a g e

Case No.:24/21/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2019 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068442 Pending with
:01/80/050/00318/AM20/ :09/24/040/00559/AM20/ 03.02.2020 RA/Firm
  • 102 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:25/21/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2019 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068443 Pending with
:01/80/050/00319/AM20/ :09/24/040/00552/AM20/ 03.02.2020 RA/Firm

103 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:26/21/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2019 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068444 Pending with
:01/80/050/00320/AM20/ :09/24/040/00554/AM20/ 03.02.2020 RA/Firm

104 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:27/21/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2019 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068445 Pending with
:01/80/050/00321/AM20/ :09/24/040/00553/AM20/ 03.02.2020 RA/Firm

105 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

32 | P a g e

Case No.: Party Name: COFLE TAYLOR Meet No/Date:3/80- Status:
29/21/80-ALC2/2019 INDIA CONTROL CABLES & ALC2/2020 Approved
SYSTEMS PRIVAT 30.07.2020
HQ File RLA File Lic.No/Date:0410166495
:01/80/050/00323/AM20 :04/24/040/00167/AM20/ 05.02.2020
Case No.:<br>29/21/80-ALC2/2019 Case No.:<br>29/21/80-ALC2/2019 Case No.:<br>29/21/80-ALC2/2019 Party Name: COFLE TAYLOR<br>INDIA CONTROL CABLES &<br>SYSTEMS PRIVAT<br>RLA File<br>:04/24/040/00167/AM20/ Party Name: COFLE TAYLOR<br>INDIA CONTROL CABLES &<br>SYSTEMS PRIVAT<br>RLA File<br>:04/24/040/00167/AM20/ Party Name: COFLE TAYLOR<br>INDIA CONTROL CABLES &<br>SYSTEMS PRIVAT<br>RLA File<br>:04/24/040/00167/AM20/ Party Name: COFLE TAYLOR<br>INDIA CONTROL CABLES &<br>SYSTEMS PRIVAT<br>RLA File<br>:04/24/040/00167/AM20/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Approved
HQ File<br>:01/80/050/00323/AM20 Lic.No/Date:0410166495<br>05.02.2020
106 Decision:The Committee considered the c<br>written comments ofMSMEas under: ase as per the agenda and decided toratifythe ad-hoc norms as per
ITCHS<br>Code Export<br>Item Quantity Sl.<br>No. ITCHS<br>Code Import Item Recommended Norms
87089900 Control<br>Cables 200000<br>Number 1 39269099 Plastic Part **As per GN-4 **
2 73121010 Wire rope Net to net basis
3 73129000 Spiral Net to net basis
4 73261910 Metalic Part As per GN-4
Note: The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC.
Case No.: Party Name: AYYAPPA Meet No/Date:3/80-ALC2/2020
30/21/80-ALC2/2019 CNC PVT LTD 30.07.2020
HQ File RLA File Lic.No/Date:0710116097
:01/80/050/00324/AM20 :07/24/040/00262/AM20/ 05.02.2020

Status: Approved

<br> <br> <br> Case No.:<br>30/21/80-ALC2/2019 Party Name: AYYAPPA<br>CNC PVT LTD Meet No/Date:3/80-ALC2/2020<br>30.07.2020 Status:<br>Approved
HQ File<br>:01/80/050/00324/AM20 RLA File<br>:07/24/040/00262/AM20/ Lic.No/Date:0710116097<br>05.02.2020
107<br> <br> <br> <br> Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms as per<br>written comments ofMSMEas under:<br>ITCHS<br>Code<br>Export<br>**Item **<br>Quantity<br>Sl.<br>No.<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>88033000<br>Manifold<br>Hydraulic<br>Assy (Net<br>Content of<br>Import<br>Item Sl.<br>No.1 in<br>Export<br>Product is<br>528 Kgs)<br>1600<br>Number<br>1<br>76061200<br>Aluminium Alloy Plate<br>/ Block (Manifold -<br>Hydraulic)<br>1503.39 Kgs<br>inclusive of<br>184.70% wastage<br>after 15% recovery<br>from scrap<br>2<br>73072900<br>MS21900J6 (Adptor)<br>Stainless Steel<br>As per GN-4<br>3<br>73072900<br>MS21902J6 (Union)<br>Stainless Steel<br>As per GN-4<br>4<br>73072900<br>AS5169J06L (Plug,<br>Blanking) Stainless<br>Steel<br>As per GN-4<br>5<br>40169300<br>NAS1612-6 (Seal, Ring<br>Toridal) Rubber<br>Synthetic<br>As per GN-4<br>Note: The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC.

33 | P a g e

Case No.:31/21/80- Party Name: TEMA INDIA Meet No/Date:3/80- Status: Deferred
ALC2/2019 LIMITED ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:0310834668 Pending with
:01/80/050/00325/AM20/ :03/95/040/01062/AM20/ 06.02.2020 RA/Firm

108 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 09.03.2020 followed by a reminder on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

109

Case No.:32/21/80-ALC2/2019 Party Name: IND-SPHINX Meet No/Date:3/80- Status:
PRECISION LIMITED ALC2/2020 Withdrawn
30.07.2020
HQ File RLA File Lic.No/Date:3010105038
:01/80/050/00326/AM20/ :30/24/040/00122/AM20/ 07.02.2020

Decision: The Committee considered the case as per the agenda and noted that the firm informed vide email dated 27.07.2020 that they have surrendered the licence to RA, Ludhiana . Therefore, the Committee decided to withdraw the case from the agenda.

Case is withdrawn.

Case No.:15/22/80- Party Name: SULZER INDIA Meet No/Date:3/80- Status: Deferred
ALC2/2019 PRIVATE LIMITED. ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:3110067680 Pending with
:01/80/050/00341/AM20/ :31/83/040/00145/AM20/ 11.02.2020 RA/Firm

110 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 09.03.2020 followed by a reminder on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:2/23/80-ALC2/2019 Party Name: MANN AND Meet No/Date:3/80- Status:
HUMMEL FILTER PVT. LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0710116157 Pending
:01/80/050/00347/AM20/ :07/24/040/00271/AM20/ 20.02.2020 with DHI

111 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI for examination of the case on 26.05.2020 followed by a reminder on 20.07.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

34 | P a g e

112

Case No.:4/23/80-ALC2/2019 Party Name: RONCH Meet No/Date:3/80- Status:
POLYMERS PVT LTD ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0310834951 Pending
:01/80/050/00349/AM20/ :03/95/040/01089/AM20/ 20.02.2020 with Firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 04.08.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:3/23/80- Party Name: AVLIGHT Meet No/Date:3/80- Status: Deferred
ALC2/2019 AUTOMOTIVES LTD. ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:0510413679 Pending with
:01/80/050/00348/AM20/ :05/23/040/00424/AM20/ 21.02.2020 RA/Firm

113 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 26.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.

Case is deferred.

Case No.:5/23/80- Party Name: HANNING Meet No/Date:3/80- Status: Deferred
ALC2/2019 MOTORS INDIA P LTD ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:3410045900 Pending with
:01/80/050/00350/AM20/ :34/24/040/00368/AM20/ 21.02.2020 RA/Firm

114 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 26.05.2020 followed by a reminder on 21.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:6/23/80- Party Name: L & T-MHPS Meet No/Date:3/80- Status: Deferred
ALC2/2019 TURBINE GENERATORS ALC2/2020
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0310835043 Pending with
:01/80/050/00351/AM20/ :03/95/040/01074/AM20/ 25.02.2020 RA/Firm

115 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 20.05.2020 followed by a reminder on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

35 | P a g e

Case No.:7/23/80- Party Name: LM WIND Meet No/Date:3/80- Status: Deferred
ALC2/2019 POWER BLADES INDIA ALC2/2020
PVT. LTD 30.07.2020
HQ File RLA File Lic.No/Date:3410045913 Pending with
:01/80/050/00352/AM20/ :34/24/040/00375/AM20/ 28.02.2020 RA/Firm

116 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020 followed by a reminder on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:8/23/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2019 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068531 Pending with
:01/80/050/00353/AM20/ :09/24/040/00595/AM20/ 02.03.2020 RA/Firm

117 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:9/23/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2019 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068532 Pending with
:01/80/050/00354/AM20/ :09/24/040/00594/AM20/ 02.03.2020 RA/Firm

118 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by reminders on 20.05.2020 & 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:10/23/80-ALC2/2019 Party Name: MAK CONTROLS Meet No/Date:3/80- Status:
AND SYSTEMS PVT LTD. ALC2/2020 Approved
30.07.2020
HQ File RLA File Lic.No/Date:3210079436
:01/80/050/00355/AM20/ :32/21/040/00178/AM20/ 02.03.2020

119 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/99/2020-TSW dated 02.07.2020 as under:

  1. Quantity of import items may be allowed as per GN-4 for engineering products i.e. on net to net basis with accountability clause.

36 | P a g e

Case No.:11/23/80-ALC2/2019 Party Name: MAK CONTROLS Meet No/Date:3/80- Status:
AND SYSTEMS PVT LTD. ALC2/2020 Approved
30.07.2020
HQ File RLA File Lic.No/Date:3210079437
:01/80/050/00356/AM20/ :32/21/040/00236/AM20/ 02.03.2020

120 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/99/2020-TSW dated 02.07.2020 as under:

  1. Quantity of import items may be allowed as per GN-4 for engineering products i.e. on net to net basis with accountability clause.
Case No.:12/23/80- Party Name: ACEINOTEC Meet No/Date:3/80- Status:
ALC2/2019 MANUFACTURING PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0710116194 Pending with
:01/80/050/00357/AM20/ :07/24/040/00294/AM20/ 02.03.2020 MSME

121 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 22.07.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:1/1/80- Party Name: AAVID Meet No/Date:3/80- Status: Deferred
ALC2/2020 THERMALLOY INDIA PVT. ALC2/2020
LTD. 30.07.2020
HQ File RLA File Lic.No/Date:3410045959 Pending with
:01/80/050/00377/AM20/ :34/24/040/00395/AM20/ 18.03.2020 RA/Firm

122 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 27.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:2/1/80- Party Name: AVLIGHT Meet No/Date:3/80- Status: Deferred
ALC2/2020 AUTOMOTIVES PVT. LTD. ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:0510413923 Pending with
:01/80/050/00378/AM20/ :05/23/040/00470/AM20/ 19.03.2020 RA/Firm

123 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 21.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

37 | P a g e

Case No.:3/1/80-ALC2/2020 Party Name: TRILLIUM FLOW Meet No/Date:3/80- Status:
TECHNOLOGIES INDIA ALC2/2020 Approved
PRIVATE LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0310835556
:01/80/050/00379/AM20/ :03/95/040/01192/AM20/ 20.03.2020

124 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:

  1. Quantity of import items may be allowed as per GN-4 .

Case No.: Party Name: COFLE TAYLOR Meet No/Date:3/80- Status: 4/1/80-ALC2/2020 INDIA CONTROL CABLES & ALC2/2020 Approved SYSTEMS PRIVAT 30.07.2020 HQ File RLA File :04/24/040/00206/AM20/ Lic.No/Date:0410166648 :01/80/050/00380/AM21/ 02.04.2020

Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:

125

ITCHS<br>Code Export<br>Item Quantity Sl.<br>No<br>. ITCHS<br>Code Import Item Recommended Norms
87089900 Control<br>Cables 385000<br>Number 1 39269099 Plastic Part As per GN-4
2 73121010 Wire rope Net to net basis
3 73129000 Spiral Net to net basis
4 73261910 Metalic Part As per GN-4
5 39172110 Plastic Tube Net to net basis
6 39172390 PVC Tube Net to net basis

Note: The firm should import relevant items only.

Case No.:5/1/80- Party Name: WHEELS INDIA Meet No/Date:3/80- Status: Deferred
ALC2/2020 LIMITED ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:0410166653 Pending with
:01/80/050/00381/AM21/ :04/24/040/00205/AM20/ 02.04.2020 RA/Firm

126 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

38 | P a g e

Case No.:6/1/80- Party Name: NEO STRUCTO Meet No/Date:3/80- Status:
ALC2/2020 CONSTRUCTION PVT. LTD. ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:5210043372 Pending with
:01/80/050/00382/AM21 :52/24/040/00083/AM20/ 04.04.2020 RA/Firm

127 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Surat and in this regard a letter was sent to the firm & RA, Surat on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:7/1/80- Party Name: UNI VTL Meet No/Date:3/80-ALC2/2020 Status: Deferred
ALC2/2020 PRECISION PVT. LTD. 30.07.2020
HQ File RLA File Lic.No/Date:0710116329 Pending with
:01/80/050/00383/AM21/ :07/24/040/00002/AM21/ 07.04.2020 RA/Firm

128 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA, Bangalore on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:11/1/80-ALC2/2020 Party Name: IND-SPHINX Meet No/Date:3/80- Status:
PRECISION LIMITED ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:3010105121 Pending
:01/80/050/00387/AM21/ :30/24/040/00140/AM20/ 07.04.2020 with Firm

129 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of MSME:

1. To provide manufacturing process detailing operations performed on import items at Sl. No. 1 & 2 with step-wise wastage.

Case is deferred.

Case No.:8/1/80- Party Name: AUTO TECH Meet No/Date:3/80- Status: Deferred
ALC2/2020 INDUSTRIES INDIA PVT ALC2/2020
LTD 30.07.2020
HQ File RLA File Lic.No/Date:0410166662 Pending with
:01/80/050/00384/AM21/ :04/24/040/00002/AM21/ 08.04.2020 RA/Firm

130 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

39 | P a g e

Case No.:9/1/80- Party Name: NIPHA Meet No/Date:3/80- Status: Deferred
ALC2/2020 EXPORTS PRIVATE LIM ALC2/2020
ITED 30.07.2020
HQ File RLA File Lic.No/Date:0210209839 Pending with
:01/80/050/00385/AM21/ :02/24/040/00199/AM20/ 09.04.2020 RA/Firm

131 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA, Kolkata on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:10/1/80- Party Name: TPI COMPOSITES Meet No/Date:3/80- Status: Deferred
ALC2/2020 INDIA PRIVATE LIMITED ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:0410166666 Pending with
:01/80/050/00386/AM21/ :04/24/040/00001/AM21/ 13.04.2020 RA/Firm

132 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:13/1/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2020 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068616 Pending with
:01/80/050/00389/AM21/ :09/24/040/00647/AM20/ 17.04.2020 RA/Firm

133 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:14/1/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2020 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068617 Pending with
:01/80/050/00390/AM21/ :09/24/040/00648/AM20/ 17.04.2020 RA/Firm

134 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

40 | P a g e

Case No.:15/1/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2020 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068618 Pending with
:01/80/050/00391/AM21/ :09/24/040/00649/AM20/ 17.04.2020 RA/Firm

135 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:16/1/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2020 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068619 Pending with
:01/80/050/00392/AM21/ :09/24/040/00650/AM20/ 17.04.2020 RA/Firm

136 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:17/1/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2020 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068620 Pending with
:01/80/050/00393/AM21/ :09/24/040/00651/AM20/ 17.04.2020 RA/Firm

137 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:18/1/80- Party Name: AZAD Meet No/Date:3/80- Status:
ALC2/2020 ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068621 Pending with
:01/80/050/00394/AM21/ :09/24/040/00652/AM20/ 17.04.2020 RA/Firm

138 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

41 | P a g e

Case No.:19/1/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2020 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068622 Pending with
:01/80/050/00395/AM21/ :09/24/040/00653/AM20/ 17.04.2020 RA/Firm

139 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:20/1/80-ALC2/2020 Party Name: AZAD Meet No/Date:3/80-ALC2/2020 Status:
ENGINEERING PRIVATE 30.07.2020 Deferred
LIMITED
HQ File RLA File Lic.No/Date:0910068623 Pending with
:01/80/050/00396/AM21/ :09/24/040/00654/AM20/ 17.04.2020 RA/Firm

140 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:12/1/80- Party Name: Meet No/Date:3/80- Status:
ALC2/2020 UNDERCARRIAGE AND ALC2/2020 Deferred
TRACTOR PARTS 30.07.2020
PRIVATE LIMITED
HQ File RLA File Lic.No/Date:0310835622 Pending with
:01/80/050/00388/AM21 :03/95/040/01188/AM20/ 18.04.2020 RA/Firm

141 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:21/1/80- Party Name: TPI COMPOSITES Meet No/Date:3/80- Status:
ALC2/2020 INDIA PRIVATE LIMITED ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0410166684 Pending with
:01/80/050/00397/AM21/ :04/24/040/00003/AM21/ 22.04.2020 RA/Firm

142 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 20.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

42 | P a g e

143

Case No.:22/1/80- Party Name: ACEINOTEC Meet No/Date:3/80- Status:
ALC2/2020 MANUFACTURING PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0710116365 Pending with
:01/80/050/00398/AM21/ :07/24/040/00016/AM21/ 23.04.2020 MSME

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 22.07.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:23/1/80-ALC2/2020 Party Name: KINECO KAMAN Meet No/Date:3/80- Status:
COMPOSITES - INDIA PVT ALC2/2020 Deferred
LTD 30.07.2020
HQ File RLA File Lic.No/Date:0310835847 Pending
:01/80/050/00399/AM21/ :03/94/040/01087/AM20/ 25.04.2020 with DPIIT

144 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 28.07.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

145 Case No.:24/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00400/AM21/ RLA File<br>:34/24/040/00022/AM19/ Lic.No/Date:3410046010<br>27.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
Case No.:25/1/80- Party Name: NETAFIM Meet No/Date:3/80- Status: Deferred
ALC2/2020 IRRIGATION INDIA ALC2/2020
PVT.LTD. 30.07.2020
HQ File RLA File Lic.No/Date:3410046013 Pending with
:01/80/050/00401/AM21/ :34/24/040/00028/AM19/ 27.04.2020 RA/Firm

146 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

43 | P a g e

Case No.:26/1/80- Party Name: NETAFIM Meet No/Date:3/80- Status: Deferred
ALC2/2020 IRRIGATION INDIA ALC2/2020
PVT.LTD. 30.07.2020
HQ File RLA File Lic.No/Date:3410046015 Pending with
:01/80/050/00402/AM21/ :34/24/040/00088/AM19/ 27.04.2020 RA/Firm

147 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

148 Case No.:27/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
<br>HQ File<br>:01/80/050/00403/AM21/ RLA File<br>:34/24/040/00245/AM19/ Lic.No/Date:3410046016<br>27.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
149 Case No.:28/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
<br>HQ File<br>:01/80/050/00404/AM21/ RLA File<br>:34/24/040/00267/AM18/ Lic.No/Date:3410046009<br>27.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
150 Case No.:29/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
<br>HQ File<br>:01/80/050/00405/AM21/ RLA File<br>:34/24/040/00313/AM16/ Lic.No/Date:3410046014<br>27.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
151 Case No.:30/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD.<br>RLA File<br>:34/24/040/00326/AM18/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br><br>Lic.No/Date:3410046012<br>27.04.2020 Status:<br>Deferred
<br>HQ File<br>:01/80/050/00406/AM21/
**Decision:The Committee considered the case as per the agenda and decided to refer the case t<br>(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. oConsultant

44 | P a g e

152 Case No.:31/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
<br>HQ File<br>:01/80/050/00407/AM21/ RLA File<br>:34/24/040/00368/AM18/ Lic.No/Date:3410046011<br>27.04.2020
**Decision:The Committee considered the case as per the agenda and decided to refer the case t<br>(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. oConsultant
Case No.:32/1/80- Party Name: NETAFIM Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2020 IRRIGATION INDIA 30.07.2020 Deferred
PVT.LTD.
HQ File RLA File Lic.No/Date:3410046017 Pending with
:01/80/050/00408/AM21/ :34/24/040/00246/AM18/ 27.04.2020 RA/Firm

153 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

154 Case No.:33/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
<br>HQ File<br>:01/80/050/00409/AM21/ RLA File<br>:34/24/040/00375/AM18/ Lic.No/Date:3410046018<br>27.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
155 Case No.:34/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
<br>HQ File<br>:01/80/050/00410/AM21/ RLA File<br>:34/24/040/00250/AM18/ Lic.No/Date:3410046019<br>27.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
156 Case No.:35/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
<br>HQ File<br>:01/80/050/00411/AM21/ RLA File<br>:34/24/040/00289/AM18/ Lic.No/Date:3410046020<br>27.04.2020
**Decision:The Committee considered the case as per the agenda and decided to refer the case t<br>(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. oConsultant

45 | P a g e

157 Case No.:36/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD.<br>RLA File<br>:34/24/040/00251/AM18/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br><br>Lic.No/Date:3410046021<br>27.04.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00412/AM21/
**Decision:The Committee considered the case as per the agenda and decided to refer the case t<br>(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred. oConsultant
158 Case No.:37/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00413/AM21/ RLA File<br>:34/24/040/00395/AM18/ Lic.No/Date:3410046022<br>27.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
159 Case No.:38/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00414/AM21/ RLA File<br>:34/24/040/00310/AM18/ Lic.No/Date:3410046023<br>27.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
160 Case No.:39/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00415/AM21/ RLA File<br>:34/24/040/00258/AM18/ Lic.No/Date:3410046024<br>27.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
Case No.:40/1/80- Party Name: NETAFIM Meet No/Date:3/80- Status: Deferred
ALC2/2020 IRRIGATION INDIA ALC2/2020
PVT.LTD. 30.07.2020
HQ File RLA File Lic.No/Date:3410046025 Pending with
:01/80/050/00416/AM21/ :34/24/040/00268/AM18/ 27.04.2020 RA/Firm

161 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.

46 | P a g e

16<br>2 Case No.:41/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00417/AM21/ RLA File<br>:34/24/040/00187/AM19/ Lic.No/Date:3410046026<br>27.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
Case No.:42/1/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2020 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068678 Pending with
:01/80/050/00418/AM21/ :09/24/040/00639/AM20/ 28.04.2020 RA/Firm

163 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

164 Case No.:43/1/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
<br>HQ File<br>:01/80/050/00419/AM21/ RLA File<br>:09/24/040/00640/AM20/ Lic.No/Date:0910068679<br>28.04.2020 Pending with<br>RA/Firm
<br>**Decision:**The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm &RA, Hyderabadand in this regard a letter was sent to the firm &RA,<br>Hyderabadon 15.07.2020. However, no information has been received so far. Hence, the Committee decided<br>to wait for the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 15.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.

165 Case No.:44/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
<br>HQ File<br>:01/80/050/00420/AM21/ RLA File<br>:34/24/040/00192/AM18/ Lic.No/Date:3410046027<br>28.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
166 Case No.:45/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA<br>PVT.LTD. Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
<br>HQ File<br>:01/80/050/00421/AM21/ RLA File<br>:34/24/040/00342/AM18/ Lic.No/Date:3410046028<br>28.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.

47 | P a g e

167

Case No.:46/1/80- Party Name: NETAFIM Meet No/Date:3/80- Status: Deferred
ALC2/2020 IRRIGATION INDIA ALC2/2020
PVT.LTD. 30.07.2020
HQ File RLA File Lic.No/Date:3410046029 Pending with
:01/80/050/00422/AM21/ :34/24/040/00325/AM18/ 28.04.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 04.08.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case. Case is deferred.

168 Case No.:47/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00423/AM21/ RLA File<br>:34/24/040/00030/AM20/ Lic.No/Date:3410046030<br>28.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
169 Case No.:48/1/80-ALC2/2020 Party Name: NETAFIM<br>IRRIGATION INDIA PVT.LTD. <br>Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00424/AM21/ RLA File<br>:34/24/040/00029/AM20/ Lic.No/Date:3410046031<br>28.04.2020
Decision:The Committee considered the case as per the agenda and decided to refer the case toConsultant<br>**(Tech-1)**for examination & comments, on the advice of the representative of MSME.<br>Case is deferred.
170 Case No.:49/1/80-ALC2/2020 Party Name: HUMANETICS<br>INNOVATIVE SOLUTIONS<br>INDIA PRIVATE LIMI Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00425/AM21/ RLA File<br>:07/24/040/00001/AM21/ Lic.No/Date:0710116407<br>30.04.2020 Pending<br>with DPIIT
Decision:The Committee considered the case as per the agenda and noted that a copy of application was sent<br>toDPIITon 22.07.2020 for examination of the case. However, comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.
171 Case No.:50/1/80-<br>ALC2/2020 Party Name: AVLIGHT<br>AUTOMOTIVES PVT. LTD. Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00426/AM21/ RLA File<br>:05/23/040/00005/AM21/ Lic.No/Date:0510414101<br>04.05.2020 Pending with<br>RA/Firm
**Decision:**The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm &RA, New Delhiand in this regard a letter was sent to the firm &RA, New<br>Delhion 21.07.2020. However, no information has been received so far. Hence, the Committee decided to wait<br>for the complete set of application for examination of the case.<br>Case is deferred.

48 | P a g e

Case No.:51/1/80- Party Name: TEGA Meet No/Date:3/80- Status: Deferred
ALC2/2020 INDUSTRIES LIMITED ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:0210209859 Pending with
:01/80/050/00427/AM21/ :02/24/040/00005/AM21/ 06.05.2020 RA/Firm

172 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA, Kolkata on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:52/1/80- Party Name: DEE Meet No/Date:3/80- Status: Deferred
ALC2/2020 DEVELOPMENT ALC2/2020
ENGINEERS LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0510414127 Pending with
:01/80/050/00428/AM21/ :05/23/040/00020/AM21/ 08.05.2020 RA/Firm

173 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 24.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:53/1/80-ALC2/2020 Party Name: MICRON Meet No/Date:3/80- Status:
INSTRUMENTS PVT LTD ALC2/2020 Deferred
30.07.2020
HQ File RLA File Lic.No/Date:0510414135 Pending
:01/80/050/00429/AM21/ :05/24/040/00746/AM20/ 08.05.2020 with DPIIT

174 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 23.07.2020 for examination of the case. However, comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:54/1/80- Party Name: LM WIND Meet No/Date:3/80- Status: Deferred
ALC2/2020 POWER BLADES INDIA ALC2/2020
PVT. LTD. 30.07.2020
HQ File RLA File Lic.No/Date:3410046049 Pending with
:01/80/050/00430/AM21/ :34/24/040/00021/AM21/ 11.05.2020 RA/Firm

175 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 27.07.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

49 | P a g e

176 Case No.:1/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068852<br>05.06.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00475/AM21/ RLA File<br>:09/24/040/00132/AM21/
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

177 Case No.:2/3/80-<br>ALC2/2020 Party Name: PRECISION<br>EQUIPMENTS (CHENNAI)<br>PVT. LTD.<br> <br> <br> Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br>Lic.No/Date:0410166809<br>10.06.2020<br> <br> Status: Deferred
HQ File<br>:01/80/050/00476/AM21/ RLA File<br>:04/24/040/00036/AM21/<br> <br> Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Chennai& the firm. Therefore, the Committee decided to request fromRA,<br>Chennaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Chennai & the firm. Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the complete set of application for examination of the case. Case is deferred.

178 Case No.:3/3/80-<br>ALC2/2020 Party Name: JOHNSON<br>MATTHEY INDIA PRIVATE<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414366<br>10.06.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00477/AM21/ RLA File<br>:05/23/040/00045/AM21/
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

179 Case No.:4/3/80-<br>ALC2/2020 Party Name: AUTOFIT CAR<br>INTERIORS PVT.LTD.<br> <br> <br> <br>RLA File<br>:10/24/040/00018/AM21/<br> <br> Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00478/AM21/ Lic.No/Date:1010060538<br>11.06.2020
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Cochin& the firm. Therefore, the Committee decided to request fromRA,<br>Cochinand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Cochin & the firm. Therefore, the Committee decided to request from RA, Cochin and the firm to furnish the complete set of application for examination of the case. Case is deferred.

180 Case No.:5/3/80-<br>ALC2/2020 Party Name: AUTOCOMP<br>CORPORATION PANSE<br>PRIVATE LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00479/AM21/ RLA File<br>:31/83/040/00012/AM21/ Lic.No/Date:3110067753<br>11.06.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Pune& the firm. Therefore, the Committee decided to request fromRA, Puneand<br>the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

50 | P a g e

181 Case No.:6/3/80-<br>ALC2/2020 Party Name: ISGEC HEAVY<br>ENGINEERING LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414386<br>12.06.2020 Status: Deferred
HQ File<br>:01/80/050/00480/AM21/ RLA File<br>:05/23/040/00047/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

Case No.:7/3/80- Party Name: ISGEC HITACHI Meet No/Date:3/80- Status: Deferred ALC2/2020 ZOSEN LIMITED ALC2/2020 30.07.2020 HQ File RLA File Lic.No/Date:0510414387 Pending with 182 :01/80/050/00481/AM21/ :05/23/040/00049/AM21/ 12.06.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

183 Case No.:8/3/80-<br>ALC2/2020 Party Name: CML BIOTECH<br>PRIVATE LIMITED, Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:1010060548<br>15.06.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00482/AM21/ RLA File<br>:10/24/040/00020/AM21/
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Cochin& the firm. Therefore, the Committee decided to request fromRA,<br>Cochinand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Cochin & the firm. Therefore, the Committee decided to request from RA, Cochin and the firm to furnish the complete set of application for examination of the case. Case is deferred.

184 Case No.:9/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00135/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00483/AM21/ Lic.No/Date:0910068868<br>15.06.2020
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

Case No.:10/3/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2020 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068869 Pending with
:01/80/050/00484/AM21/ :09/24/040/00134/AM21/ 15.06.2020 RA/Firm

185 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

51 | P a g e

186 Case No.:11/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00136/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br>Lic.No/Date:0910068870<br>15.06.2020<br> <br> Status: Deferred
HQ File<br>:01/80/050/00485/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

187 Case No.:12/3/80-ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00133/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00486/AM21/ Lic.No/Date:0910068872<br>15.06.2020 Pending with<br>RA/Firm
The Committee considered the case as per the agenda and noted that the copy of application has not yet been<br>received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA, Hyderabad<br>and the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

188 Case No.:13/3/80-<br>ALC2/2020 Party Name: ISGEC HEAVY<br>ENGINEERING LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414402<br>15.06.2020 Status: Deferred
HQ File<br>:01/80/050/00487/AM21/ RLA File<br>:05/23/040/00055/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

189 Case No.:14/3/80-ALC2/2020 Party Name: AAVID<br>THERMALLOY INDIA<br>PVT. LTD.<br>RLA File<br>:34/24/040/00058/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00488/AM21/ Lic.No/Date:3410046140<br>15.06.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case. Case is deferred.

Case No.:15/3/80-ALC2/2020 Party Name: AAVID Meet No/Date:3/80- Status:
THERMALLOY INDIA PVT. ALC2/2020 Deferred
LTD. 30.07.2020
HQ File RLA File Lic.No/Date:3410046141 Pending with
:01/80/050/00489/AM21/ :34/24/040/00059/AM21/ 15.06.2020 RA/Firm

190 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

52 | P a g e

191 Case No.:16/3/80-<br>ALC2/2020 Party Name: DEE<br>DEVELOPMENT<br>ENGINEERS LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414434<br>19.06.2020 Status: Deferred
HQ File<br>:01/80/050/00490/AM21/ RLA File<br>:05/23/040/00051/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

192 Case No.:17/3/80-<br>ALC2/2020 Party Name: SULZER INDIA<br>PRIVATE LIMITED. Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00491/AM21/ RLA File<br>:31/83/040/00019/AM21/ Lic.No/Date:3110067766<br>22.06.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Pune& the firm. Therefore, the Committee decided to request fromRA, Puneand<br>the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Pune & the firm. Therefore, the Committee decided to request from RA, Pune and the firm to furnish the complete set of application for examination of the case. Case is deferred.

193 Case No.:18/3/80-<br>ALC2/2020 Party Name: L&T-MHPS<br>BOILERS PVT LTD Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00492/AM21/ RLA File<br>:03/95/040/00161/AM21/ Lic.No/Date:0310836794<br>22.06.2020
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.

194 Case No.:19/3/80-<br>ALC2/2020 Party Name: MICRON<br>INSTRUMENTS PVT LTD Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00493/AM21/ RLA File<br>:05/24/040/00129/AM21/ Lic.No/Date:0510414479<br>24.06.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

Case No.:20/3/80-ALC2/2020 Party Name: HANNING Meet No/Date:3/80- Status: Deferred
MOTORS INDIA P LTD ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:3410046186 Pending with
:01/80/050/00494/AM21/ :34/24/040/00073/AM21/ 29.06.2020 RA/Firm

195 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

53 | P a g e

196

Case No.:21/3/80- Party Name: HANNING Meet No/Date:3/80- Status: Deferred
ALC2/2020 MOTORS INDIA P LTD ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:3410046187 Pending with
:01/80/050/00495/AM21/ :34/24/040/00074/AM21/ 29.06.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

197

Case No.:22/3/80- Party Name: BONATRANS Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2020 INDIA PRIVATE LIMITED 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0310836946 Pending with
:01/80/050/00496/AM21/ :03/94/040/00207/AM21/ 30.06.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.

198 Case No.:23/3/80-<br>ALC2/2020 Party Name: MAGNETI<br>MARELLI TALBROS CHASSIS<br>SYSTEMS PRIVATE LI<br>RLA File :05/24/040/00140/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00497/AM21/ Lic.No/Date:0510414515<br>30.06.2020
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

199 Case No.:24/3/80-<br>ALC2/2020 Party Name: MICRON<br>INSTRUMENTS PVT LTD Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br>Lic.No/Date:0510414517<br>30.06.2020<br> <br> Status: Deferred
HQ File<br>:01/80/050/00498/AM21/ RLA File<br>:05/24/040/00134/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

Case No.:25/3/80- Party Name: MICRON Meet No/Date:3/80- Status: Deferred
ALC2/2020 INSTRUMENTS PVT LTD ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:0510414518 Pending with
:01/80/050/00499/AM21/ :05/24/040/00142/AM21/ 30.06.2020 RA/Firm

200 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

54 | P a g e

201 Case No.:26/3/80-<br>ALC2/2020 Party Name: THE ANUP<br>ENGINEERING LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>S<br>Lic.No/Date:0810148023<br>30.06.2020<br>P<br> tatus: Deferred
HQ File<br>:01/80/050/00500/AM21/ RLA File<br>:08/24/040/00076/AM21/ ending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Ahmedabad& the firm. Therefore, the Committee decided to request fromRA,<br>Ahmedabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Ahmedabad & the firm. Therefore, the Committee decided to request from RA, Ahmedabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

202 Case No.:27/3/80-<br>ALC2/2020 Party Name: FRIZAIR<br>PRIVATE LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068919<br>30.06.2020 Status: Deferred
HQ File<br>:01/80/050/00501/AM21/ RLA File<br>:09/24/040/00158/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

203 Case No.:28/3/80-<br>ALC2/2020 Party Name: ONASSIS AUTO<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414546<br>03.07.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00502/AM21/ RLA File<br>:05/24/040/00152/AM21/
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

204 Case No.:29/3/80-<br>ALC2/2020 Party Name: MASU BRAKE<br>PADS PRIVATE LIMITED<br> <br> <br> Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00503/AM21/ RLA File<br>:05/24/040/00156/AM21/<br> <br> Lic.No/Date:0510414554<br>03.07.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

205

Case No.:30/3/80- Party Name: LM WIND Meet No/Date:3/80- Status: Deferred
ALC2/2020 POWER BLADES INDIA ALC2/2020
PVT. LTD 30.07.2020
HQ File RLA File Lic.No/Date:3410046197 Pending with
:01/80/050/00504/AM21/ :34/24/040/00077/AM21/ 07.07.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

55 | P a g e

206 Case No.:36/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00510/AM21/ RLA File<br>:09/24/040/00190/AM21/ Lic.No/Date:0910068933<br>07.07.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

207 Case No.:37/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br>Lic.No/Date:0910068934<br>07.07.2020<br> <br> Status: Deferred
HQ File<br>:01/80/050/00511/AM21/ RLA File<br>:09/24/040/00194/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

208 Case No.:38/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00512/AM21/ RLA File<br>:09/24/040/00193/AM21/ Lic.No/Date:0910068935<br>07.07.2020
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

209 Case No.:39/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00513/AM21/ RLA File<br>:09/24/040/00195/AM21/ Lic.No/Date:0910068936<br>07.07.2020
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

Case No.:40/3/80-ALC2/2020 Party Name: AZAD Meet No/Date:3/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068937 Pending with
:01/80/050/00514/AM21/ :09/24/040/00187/AM21/ 07.07.2020 RA/Firm

210 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

56 | P a g e

211 Case No.:41/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File :09/24/040/00188/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00515/AM21/ Lic.No/Date:0910068938<br>07.07.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

212 Case No.:42/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File :09/24/040/00192/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068939<br>07.07.2020 Status:<br>Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00516/AM21/
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

213 Case No.:43/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068940<br>07.07.2020 Status: Deferred
HQ File<br>:01/80/050/00517/AM21/ RLA File<br>:09/24/040/00189/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

214 Case No.:44/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br> <br> <br> Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00518/AM21/ RLA File<br>:09/24/040/00191/AM21/<br> <br> Lic.No/Date:0910068941<br>07.07.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

Case No.:31/3/80- Party Name: ENDURANCE Meet No/Date:3/80- Status: Deferred
ALC2/2020 TECHNOLOGIES LIMITED ALC2/2020
30.07.2020
HQ File RLA File Lic.No/Date:0310837075 Pending with
:01/80/050/00505/AM21/ :03/94/040/00237/AM21/ 08.07.2020 RA/Firm

215 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

57 | P a g e

216 Case No.:32/3/80-<br>ALC2/2020 Party Name: SUPER CIRCLE<br>AUTO LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0510414590<br>08.07.2020 Status: Deferred
HQ File<br>:01/80/050/00506/AM21/ RLA File<br>:05/24/040/00148/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

217 Case No.:33/3/80-<br>ALC2/2020 Party Name: L & T-MHPS<br>TURBINE GENERATORS<br>PRIVATE LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0310837100<br>09.07.2020 Status: Deferred
HQ File<br>:01/80/050/00507/AM21/ RLA File<br>:03/95/040/00220/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.

218 Case No.:34/3/80-<br>ALC2/2020 Party Name: L & T-MHPS<br>TURBINE GENERATORS<br>PRIVATE LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0310837101<br>09.07.2020 Status: Deferred
HQ File<br>:01/80/050/00508/AM21/ RLA File<br>:03/95/040/00219/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.

219 Case No.:35/3/80-<br>ALC2/2020 Party Name: LM WIND<br>POWER BLADES INDIA<br>PVT. LTD<br> <br> <br> Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00509/AM21/ RLA File<br>:34/24/040/00076/AM21/<br> <br> Lic.No/Date:3410046199<br>09.07.2020
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case. Case is deferred.

220 Case No.:45/3/80-<br>ALC2/2020 Party Name: PENGUIN<br>PETROLEUM SERVICES<br>PVT.LTD. Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0310837144<br>13.07.2020 Status: Deferred
HQ File<br>:01/80/050/00519/AM21/ RLA File<br>:03/95/040/00147/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.

58 | P a g e

221 Case No.:46/3/80-<br>ALC2/2020 Party Name: SULZER PUMPS<br>INDIA LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00520/AM21/ RLA File<br>:03/89/040/00069/AM21/ Lic.No/Date:0310837170<br>14.07.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Mumbai& the firm. Therefore, the Committee decided to request fromRA,<br>Mumbaiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case. Case is deferred.

222 Case No.:47/3/80-<br>ALC2/2020 Party Name: LM WIND<br>POWER BLADES INDIA<br>PVT. LTD Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:3410046223<br>17.07.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00521/AM21/ RLA File<br>:34/24/040/00092/AM21/
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case. Case is deferred.

223 Case No.:49/3/80-<br>ALC2/2020 Party Name: LM WIND<br>POWER BLADES INDIA PVT.<br>LTD<br>RLA File<br>:34/24/040/00093/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00523/AM21/ Lic.No/Date:3410046224<br>17.07.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case. Case is deferred.

224 Case No.:50/3/80-<br>ALC2/2020 Party Name: LM WIND<br>POWER BLADES INDIA<br>PVT. LTD<br> <br> <br> Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00524/AM21/ RLA File<br>:34/24/040/00094/AM21/<br> <br> Lic.No/Date:3410046225<br>17.07.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.
225 Case No.:48/3/80-<br>ALC2/2020<br> <br> <br>HQ File<br>:01/80/050/00522/AM21/<br> <br>: Party Name: THE ANUP<br>ENGINEERING LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
RLA File<br>08/24/040/00094/AM21/ Lic.No/Date:0810148164<br>20.07.2020 Pending with RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Ahmedabad& the firm. Therefore, the Committee decided to request fromRA,<br>Ahmedabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Ahmedabad & the firm. Therefore, the Committee decided to request from RA, Ahmedabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

59 | P a g e

226 Case No.:51/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br> <br> <br> Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068972<br>20.07.2020 Status: Deferred
HQ File<br>:01/80/050/00525/AM21/ RLA File<br>:09/24/040/00217/AM21/<br> <br> Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

227 Case No.:52/3/80-<br>ALC2/2020<br>HQ File<br>:01/80/050/00526/AM21/ Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
RLA File<br>:09/24/040/00216/AM21/ Lic.No/Date:0910068973<br>20.07.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

228 Case No.:53/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00215/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068974<br>20.07.2020 Status: Deferred
HQ File<br>:01/80/050/00527/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

229 Case No.:54/3/80-<br>ALC2/2020 Party Name: AZAD<br>ENGINEERING PRIVATE<br>LIMITED<br>RLA File<br>:09/24/040/00214/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>Lic.No/Date:0910068975<br>20.07.2020 Status: Deferred<br>Pending with<br>RA/Firm
HQ File<br>:01/80/050/00528/AM21/
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Hyderabad& the firm. Therefore, the Committee decided to request fromRA,<br>Hyderabadand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case. Case is deferred.

Case No.:55/3/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2020 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068976 Pending with
:01/80/050/00529/AM21/ :09/24/040/00213/AM21/ 20.07.2020 RA/Firm

230 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

60 | P a g e

231

Case No.:56/3/80- Party Name: AZAD Meet No/Date:3/80- Status: Deferred
ALC2/2020 ENGINEERING PRIVATE ALC2/2020
LIMITED 30.07.2020
HQ File RLA File Lic.No/Date:0910068977 Pending with
:01/80/050/00530/AM21/ :09/24/040/00212/AM21/ 20.07.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

Case No.:57/3/80- Party Name: TEGA Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2020 INDUSTRIES LIMITED 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0210209990 Pending with
:01/80/050/00531/AM21/ :02/24/040/00045/AM21/ 21.07.2020 RA/Firm

232 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Kolkata & the firm. Therefore, the Committee decided to request from RA, Kolkata and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

233 Case No.:58/3/80-<br>ALC2/2020 Party Name: MICRON<br>INSTRUMENTS PVT LTD<br>RLA File<br>:05/24/040/00186/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status: Deferred
HQ File<br>:01/80/050/00532/AM21/ Lic.No/Date:0510414670<br>21.07.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA,<br>New Delhiand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

234 Case No.:59/3/80-<br>ALC2/2020 Party Name: MICRON<br>INSTRUMENTS PVT LTD<br>RLA File<br>:05/24/040/00181/AM21/ Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br>S<br>Lic.No/Date:0510414671<br>21.07.2020<br>P<br>R tatus: Deferred
HQ File<br>:01/80/050/00533/AM21/ ending with<br>A/Firm
The Committee considered the case as per the agenda and noted that the copy of application has not yet been<br>received fromRA, New Delhi& the firm. Therefore, the Committee decided to request fromRA, New Delhi<br>and the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case. Case is deferred.

Case No.:60/3/80- Party Name: GOLD MOHUR Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2020 PROFILES LIMITED 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0510414672 Pending with
:01/80/050/00534/AM21/ :05/23/040/00083/AM21/ 21.07.2020 RA/Firm

235 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

61 | P a g e

236 Case No.:61/3/80-<br>ALC2/2020 Party Name: HANNING<br>MOTORS INDIA P LTD Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020<br> <br><br>Lic.No/Date:3410046232<br>21.07.2020<br> <br> Status:<br>Deferred
HQ File<br>:01/80/050/00535/AM21/ RLA File<br>:34/24/040/00099/AM21/ Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.

237 Case No.:62/3/80-ALC2/2020 Party Name: HANNING<br>MOTORS INDIA P LTD Meet No/Date:3/80-<br>ALC2/2020<br>30.07.2020 Status:<br>Deferred
HQ File<br>:01/80/050/00536/AM21/ RLA File<br>:34/24/040/00100/AM21/ Lic.No/Date:3410046233<br>21.07.2020 Pending with<br>RA/Firm
Decision:The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received fromRA, Vadodara& the firm. Therefore, the Committee decided to request fromRA,<br>Vadodaraand the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.
Case No.:63/3/80- Party Name: I-TECH PLAST Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2020 INDIA PVT.LTD.(EOU) 30.07.2020 Deferred
HQ File RLA File Lic.No/Date:0310837308 Pending with
:01/80/050/00537/AM21/ :03/94/040/00256/AM21/ 22.07.2020 RA/Firm

238 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

Case No.:64/3/80- Party Name: LM WIND Meet No/Date:3/80-ALC2/2020 Status:
ALC2/2020 POWER BLADES INDIA 30.07.2020 Deferred
PVT. LTD
HQ File RLA File Lic.No/Date:3410046237 Pending with
:01/80/050/00538/AM21/ :34/24/040/00095/AM21/ 22.07.2020 RA/Firm

239 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.

Case is deferred.

62 | P a g e

Offline Cases

Sl. No. 21

Case No.:284/15/80-ALC2/2018<br>MICRON INSTRUMENTS PVT. LTD.<br>Status:<br>M. No.: 03/80-ALC2/2020 dated 30.07.2019
Lic. No. /date: 0510409150 Date: 02.01.2019<br>Lic. No. /date: 0510409703 Date: 20.02.2019<br>**Subject:**Request for re-fixation of ad-hoc norms
F. No. 01/80/050/00626/AM19/DES-I<br>RLA F.No. 05/24/040/00548/AM19<br>Approved
F. No. 01/80/050/00674/AM19/DES-I<br>RLA F.No. 05/24/040/00669/AM19
AA No.: 0510409150 dated 02.01.2019:-
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.
3/80-ALC2/2019 dated08.05.2019 as per written comments of DPIIT vide their U. O. No.: P-47011/85/2019-TSW
dated 02.05.2019.
However, the firm vide letter dated 15.07.2019 had requested for re-fixation of ad-hoc norms. The Committee
reconsidered the case and noted the comments ofDPIITwherein it is stated that_earlier the firm had not submitted any_
documentary evidence regarding the sale price of the scrap generated during the manufacturing process. Now, the firm
has submitted the representation supported by documentary evidence i.e. invoice of sale of scarp and therefore, norms
_have been revised._In view ofDPIITcomments, the Committee decided tore-fix the ratified ad-hoc normsas per
written comments ofDPIITvide U. O. No.: P-47011/85/2019-TSW dated 29.04.2020 as under:
ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended Norms
90229090<br>Anode frame Frange<br>A Kov.<br>Anode Frame Frange<br>A Kov-MA 4132 K<br>09A.<br>920<br>Number<br>72285061<br>Dilaton 29/18 Iron-<br>nickel - Cobalt Sealing<br>Alloy ASTM-F15-04.<br>(Dilaton 29/18 Dia 232<br>mm Tolerance +1/-0<br>mm)<br>6955.20 Kgs @<br>4.20Kgs/Kg content in<br>the export product after<br>taking 6% recovery<br>from scrap
Note: Net weight of export item may be specified as 1656 Kgs.
Sl. No. 21 Sl. No. 21 Sl. No. 21 Sl. No. 21
Case No.:284/15/80-ALC2/2018 MICRON INSTRUMENTS PVT. LTD. Status:
M. No.: 03/80-ALC2/2020 dated 30.07.2019
Lic. No. /date: 0510409150 Date: 02.01.2019<br>Lic. No. /date: 0510409703 Date: 20.02.2019 **Subject:**Request for re-fixation of ad-hoc norms
F. No. 01/80/050/00626/AM19/DES-I<br>F. No. 01/80/050/00674/AM19/DES-I RLA F.No. 05/24/040/00548/AM19<br>RLA F.No. 05/24/040/00669/AM19 Approved
AA No.: 0510409150 dated 02.01.2019:-<br>Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.<br>3/80-ALC2/2019 dated08.05.2019 as per written comments of DPIIT vide their U. O. No.: P-47011/85/2019-TSW<br>dated 02.05.2019.<br>However, the firm vide letter dated 15.07.2019 had requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and noted the comments ofDPIITwherein it is stated that_earlier the firm had not submitted any_<br>documentary evidence regarding the sale price of the scrap generated during the manufacturing process. Now, the firm<br>has submitted the representation supported by documentary evidence i.e. invoice of sale of scarp and therefore, norms<br>_have been revised._In view ofDPIITcomments, the Committee decided tore-fix the ratified ad-hoc normsas per<br>written comments ofDPIITvide U. O. No.: P-47011/85/2019-TSW dated 29.04.2020 as under:
ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>90229090<br>Anode frame Frange<br>A Kov.<br>Anode Frame Frange<br>A Kov-MA 4132 K<br>09A.<br>920<br>Number<br>72285061<br>Note: Net weight of export item may be specified as 1656 Kgs. Export Item Quantity ITCHS<br>Code Import Item Recommended Norms
Anode frame Frange<br>A Kov.<br>Anode Frame Frange<br>A Kov-MA 4132 K<br>09A. 920<br>Number 72285061 Dilaton 29/18 Iron-<br>nickel - Cobalt Sealing<br>Alloy ASTM-F15-04.<br>(Dilaton 29/18 Dia 232<br>mm Tolerance +1/-0<br>mm) 6955.20 Kgs @<br>4.20Kgs/Kg content in<br>the export product after<br>taking 6% recovery<br>from scrap
AA No.: 0510409703 dated 20.02.2019:-<br>Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.<br>3/80-ALC2/2019 dated08.05.2019 as per written comments of DPIIT vide F. No.: P-47011/17/2019-TSW dated<br>16.04.2020.<br>The firm vide letter dated 15.07.2019 had requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and noted the comments ofDPIITwherein it is stated that_earlier the firm had not submitted any_<br>documentary evidence regarding the sale price of the scrap generated during the manufacturing process. Now, the firm<br>has submitted the representation supported by documentary evidence i.e. invoice of sale of scarp and therefore, norms<br>_have been revised._In view ofDPIITcomments, the Committee decided tore-fix the ratified ad-hoc normsas per<br>written comments ofDPIITvide U. O. No.: P-47011/85/2019-TSW dated 29.04.2020 as under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended Norms<br>90229090<br>Anode frame<br>Frange A Kov.<br>Anode Frame<br>Frange A Kov-<br>MA 4132 K 09A<br>920<br>Number<br>72285061<br>Dilaton 29/18. Iron-<br>nickel-Cobalt Sealing<br>Alloy ASTM-F15-<br>04.(Dilaton 29/18 Dia 232<br>mm Tolerance +1/-0 mm)<br>6955.20 Kgs @<br>4.20Kgs/Kg content in<br>the export product after<br>taking 6% recovery<br>from scrap<br>Note: Net weight of export item may be specified as 1656 Kgs.<br>RA concerned maytake further necessaryaction asper the decision of NC.

63 | P a g e

Sl. No. 22

Sl. No. 22
Case No. : 61/25/80-ALC2/2016 M/s. BARODA EQUIPMENT AND<br>VESSELS PVT. LTD. Status:
M. No.: 03/80-ALC2/2020 dated 30.07.2020
Lic. No. /date: 3410042545 dated 21.09.2016
HQ. No.: 01/80/50/621/AM17/DES-I **Subject:**Request for reviewing of ad-hoc<br>norms Approved
RLA No.: 34/24/040/00182/AM17
Decision:The Committee considered the case as per the agenda noted that the case was rejected in M. No. 14/80-<br>ALC2/2017dated 10.10.2017due to non-submission of reply of deficiency raised by DPIIT.<br>However, the firm furnished the reply vide letter dated 31.07.2019 with a request to fix the ad-hoc<br>norms. The Committee reconsidered the case and decided toratifythe ad-hoc norms as per written comments of<br>DPIITvide U. O. No.: P-47012/61/2019-TSW dated 17.07.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC.

Sl. No. 23

Sl. No. 23
Case No.:1/3/80-ALC2/2019 ISGEC HITACHI ZOSEN LIMITED Status:
M. No.: 03/80-ALC2/2020 dated 30.07.2020
Lic. No. /date: 0510410182 Date: 09.04.2019
HQ. No.: 01/80/050/00007/AM20 **Subject:**Request for re-fixation of ad-hoc<br>norms Approved
RLA No.: 05/23/040/00578/AM19
Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting<br>No.11/80-ALC2/2019 dated25.09.2019 as per written comments of DPIIT vide U.O. No.: P-47011/98/2019-TSW<br>dated 29.08.2019.<br>The firm vide letter dated 11.11.2019 had requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and noted the comments ofDPIITwherein it is stated that_there was mistake in the earlier_<br>norms as import items at Sl. No. 22 to 24 are not welding consumables. Moreover, quantity of welding<br>consumables was allowed as 2% of the weight of steel to be welded which is now been modified based on the<br>thickness of plates to be welded as the requirement of welding consumables is more for welding of thicker plates<br>_and hence, the norms have been revised._In view ofDPIITcomments, the Committee decided tore-fix the ratified<br>ad-hoc normsas per written comments ofDPIITvide U. O. No.: P-47011/60/2019-TSW dated 30.06.2020 as<br>under:<br>1. Quantity of import item at Sl. No. 19 may be allowed as 4700 Kgs.<br>2. Quantity of import item at Sl. No. 20 may be allowed as 8900 Kgs.<br>3. Quantity of import item at Sl. No. 21 may be allowed as 8900 Kgs.<br>4. Quantity of import item at Sl. No. 22 may be allowed as 400 Kgs as applied for.<br>5. Quantity of import item at Sl. No. 23 may be allowed as1 Set, on net to netbasis.<br>6. Import item at Sl. No. 23 to be exported along with the export product.<br>7. Quantity of import item at Sl. No. 24 may be allowed as 1.05Kgs/Kg content in the export item.<br>Note: The decision for rest of the import items will remain unchanged as decided inMeeting No.11/80-<br>ALC2/2019 dated25.09.2019.<br>RA concerned maytake further necessaryaction asper the decision of NC.

64 | P a g e

Sl. No. 24

Sl. No. 24
Case No.:27/5/80-ALC2/2018 ISGEC HEAVY ENGINEERING LIMITED Status:
M. No.: 03/80-ALC2/2020 dated 30.07.2020
Lic. No. /date: 0510406287 Date: 01.05.2018 **Subject:**Request for re-fixation of ad-hoc norms
HQ. No.: 01/80/050/00076/AM19 RLA No.: 05/23/040/00038/AM19 Rejected
Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 05/80-<br>ALC2/2019 dated06.06.2019 as per written comments ofConsultant (Tech-3).<br>The firm vide letter dated 18.12.2019 had requested for re-fixation of ad-hoc norms. The Committee reconsidered the<br>case and noted that the firm has requested to allow 4% wastage instead of 1% wastage as recommended earlier. However,<br>Consultant (Tech-3)informed that the wastage of 1% was recommended as applied by the firm in its application. Therefore,<br>the Committee decided to maintainstatus quoon the recommendation ofConsultant (Tech-3).<br>Case is rejected.

Sl. No. 25

Sl. No. 25
Case No.:47/3/80-ALC2/2018 ISGEC HITACHI ZOSEN LIMITED Status:
M. No.: 03/80-ALC2/2020 dated 30.07.2020
Lic. No. /date: 0510405848 Date: 13.03.2018 **Subject:**Request for re-fixation of ad-hoc norms
HQ. No.: 01/80/050/00047/AM19 RLA No.: 05/23/040/00486/AM18 Approved
Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 06/80-<br>ALC2/2018 dated11.07.2018 on the recommendation of technical member of DHI/DIPP/MSME.<br>The firm vide letter dated 16.12.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the<br>case and decided tore-fixthe ad-hoc norms as per written comments ofDPIITvide U. O. No.: P-47011/354/2018-TSW dated<br>06.07.2020. (Copy enclosed)<br>RA concerned maytake further necessaryaction asper the decision of NC.

Sl. No. 26

Case No.:3/20/80-ALC2/2015 ISGEC HITACHI ZOSEN LIMITED Status:
M. No.: 03/80-ALC2/2020 dated 30.07.2020
Lic. No. /date: 0510396378 Date: 19.11.2015 **Subject:**Request for re-fixation of ad-hoc norms
HQ. No.: 01/80/050/00380/AM16 RLA No.: 05/23/040/00342/AM16 Approved
Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.<br>26/80-ALC2/2015 dated29.03.2016 as per the written comments of DIPP vide ID No. 12/25/2016/TSW/96 dated<br>05.04.2016.<br>The firm vide letter dated 16.12.2019 had requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and noted the comments ofDPIITwherein it is stated that_the firm has requested to modify the_<br>quantities of import items at Sl. No. 11 (Paints) & 12 (Thinner) as earlier quantities of import items at Sl. No. 11 & 12<br>put together was allowed upto 2% FoB value of export items. Moreover, in support of their request the firm has stated<br>that the paints are required for Effluent Chamber which is high temperature equipment used in Fertilizer plant. It is a<br>very special temperature indicating paint used for high temperature applications and it changes colour when the<br>temperature of reactor increases. As a result cost of this paint is very high vis-à-vis normal paint. The firm has also<br>submitted technical data sheet of the paint indicating the requirement of the paint per Sq. meter as well as the<br>_calculations for the paint material supported by technical data sheet of the paint. Hence, the norms have been revised._In<br>view ofDPIITcomments, the Committee decided tore-fix the ad-hoc normsas per written comments ofDPIITvide<br>U. O. No.: P-47011/98/2019-TSW dated 03.07.2020 as under:<br>1.<br>Quantity of import item at Sl. No. 11 may be allowed as 500 Litres.<br>2.<br>Quantity of import item at Sl. No. 12 may be allowed as 100 Litres.<br>Note: The decision for rest of the import items will remain unchanged as decided in Meeting No. 26/80-ALC2/2015<br>dated29.03.2016.<br>RA concerned maytake further necessaryaction asper the decision of NC.

65 | P a g e

Sl. No. 27

Sl. No. 27
Case No.:25/14/80-ALC2/2018 SPIROTECH HEAT EXCHANGERS<br>PVT. LTD. Status:
M. No.: 03/80-ALC2/2020 dated 30.07.2020
Lic. No. /date: 0510386129 Date: 09.05.2014
HQ. No.: 01/80/050/00341/AM19 **Subject:**Request for re-fixation of ad-hoc<br>norms Deferred
RLA No.: 05/24/040/00051/AM15
Decision:The Committee considered the case as per the agenda and noted that the case was approved in Meeting<br>No.14/80-ALC2/2018 dated20.02.2019 as per written comments of DPIIT vide F. No.: P-47011/24/2019-TSW<br>dated 20.02.2019.<br>The firm vide letter dated 22.04.2019 had requested for re-fixation of ad-hoc norms. The Committee<br>reconsidered the case and noted that the comments ofDPIITwherein it is stated that_the import items at Sl. No. 5,_<br>7 & 8 are components and earlier these items were deleted as the requirements of these items as given in Appendix<br>11A indicated as 0.164 Nos., 0.017 Nos. & 0.176 Nos. per unit of export item respectively. As the requirement of<br>any component per unit of export item cannot be in fraction, hence these items were deleted. However, the firm has<br>not given any justification for the fractional requirement of the import items at Sl. No. 5, 7 & 8 per unit of export<br>_item._Therefore, In view of DPIIT comments, the Committee decided to ask form the firm to furnish following<br>information as per comments of DPIIT vide U. O. No.: P-47011/24/2019-TSW dated 23.04.2020:<br>1. To provide clarification for fractional requirements of the import items at Sl. No. 5, 7 & 8 per unit of<br>export item.<br>2. Assembly drawings/diagrams of the resultant product showing placement and exact use of components in<br>the export product (s),for import items at Sl. No. 5, 7 & 8.<br>3. Bifurcated quantities of components to be accounted for in the resultant product and the requirement of<br>components as spares. Raw Material / Consumables,for import items at Sl. No. 5, 7 & 8.<br>Case is deferred.

Sl. No. 28

Case No.:53/3/80-ALC2/2017 GL&V INDIA PRIVATE LIMITED Status:
M. No.: 03/80-ALC2/2020 dated 30.07.2020
Lic. No. /date: 3110066640 Date: 29.03.2017
HQ. No.: 01/80/050/00053/AM18/ **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 31/83/040/00185/AM17
Decision:The Committee considered the case as per the agenda and noted that the case was rejected in Meeting<br>No.7/80-ALC2/2019 dated17.07.2019 due to non-submission of reply of deficiency letter dated 07.03.2019<br>raised byConsultant (Tech-3).<br>The firm vide letter dated 30.12.2019 had furnished the reply and requested for fixation of ad-hoc norms.<br>The Committee reconsidered the case and noted that the firm’s representation forwarded toConsultant (Tech-3)<br>on 09.03.2020 for examination & comments. However, Consultant (Tech-3) informed that the case is under<br>examination. Hence, the Committee decided to wait for the comments.<br>Case is deferred.