DGFT Committee Minutes
DIRECTORATE GENERAL OF FOREIGN TRADE - (DES I SECTION)
MINUTES OF MEETING NO. 02/80 OF THE NORMS COMMITTEE-I DATED 16.06.2020
Meeting No. 02/80 of the Norms Committee (NC-I) for the licensing year 2020-2021 (originally scheduled for 16.06.2020) held on 14.07.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -
==> picture [464 x 191] intentionally omitted <==
----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri K.S. Sodhi, Asst. Director MSME<br>2 Shri Sushil Kumar Jangid, Scientist ‘B’ MeitY<br>3. Shri Shaish Kumar, (Tech-1) Consultant<br>4. Shri V.C. Agarwal, (Tech-3) Consultant<br>5. Shri S. K. Bhatnagar, (SKB) Consultant<br>In Attendance<br>1. Shri Pranav Upadhyay, Assistant Director ISS DGFT<br>----- End of picture text -----<br>
Note:
-
In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.
-
Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.
-
All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail addressnc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.
-
Minutes of Meeting 23/80 dated 13.03.2020 and Meeting 24/80 dated 25.03.2020 were circulated on 20.05.2020, to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and therefore the said minutes were uploaded on dgft.gov.in on 08.06.2020..
1 | P a g e
MEETING NUMBER: 2/80-ALC2/2020 MEETING DATE: 16.06.2020
==> picture [476 x 372] intentionally omitted <==
----- Start of picture text -----<br> Case No.:78/6/83-ALC1/2015 Party Name: ECOCAT INDIA Meet No/Date:2/80- Status:<br>PVT.LTD. ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510394421<br>:01/83/050/00408/AM16/ :05/23/040/00078/AM16/ 03.06.2015<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>comments of MSME & Consultant (Tech-3) as under:<br>Export items:<br>1. Per unit weight of export product at Sl. No. 1 is 27.75Kgs.<br>2. Per unit weight of export product at Sl. No. 2 is 33.52Kgs.<br>3. Per unit length of export product at Sl. No. 3 is 571.53Meter/Piece.<br>4. Per unit weight of export product at Sl. No. 4 is 0.836Kg/Piece i.e. weight of foil.<br>5. Per unit weight of export product at Sl. No. 5 is 0.809Kg/Piece i.e. weight of foil.<br>6. The words “ Drawing No. INT 20777 ” may be added in the description of export item at Sl. No. 5.<br>1<br>Import items:<br>1. Quantity of relevant import item at Sl. No. 1 may be allowed as 6246 Kgs inclusive of 1% wastage.<br>2. Quantity of relevant import item at Sl. No. 2 may be allowed as 203 Kgs inclusive of 1% wastage.<br>3. Quantity of relevant import item at Sl. No. 3 may be allowed as 17317 Meters inclusive of 1%<br>wastage.<br>4. Quantity of relevant import item at Sl. No. 4 may be allowed as 12256.350 Kgs inclusive of 1%<br>wastage.<br>5. Quantity of relevant import item at Sl. No. 5 may be allowed as 5495.500 Gram inclusive of 0.1%<br>wastage.<br>6. Quantity of relevant import item at Sl. No. 6 may be allowed as 549.550 Gram inclusive of 0.1%<br>wastage.<br>7. Total CIF value of both imported items at Sl. No. 5 & 6 should not exceed 25% of FoB value of export<br>item at Sl. No. 5.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 210] intentionally omitted <==
----- Start of picture text -----<br> Case No.:234/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:2/80- Status:<br>ELECTRICALS LIMITED ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0710108791<br>:01/80/050/00576/AM19/ :07/24/040/00212/AM16/ 24.09.2015<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: W-21/30/2020-IPHW-MeitY dated 27.05.2020 as under:<br>2<br>1. Quantity of import items at Sl. No. 1, 3 to 5, 8, 10 to 12, 14, 16, 24, 25, 27, 28 & 32 may be allowed on<br>net to net basis with nil wastage .<br>2. Quantity of import items at Sl. No. 2, 6, 7, 9, 13, 15, 17, 22, 23, 26, 29, 30, 31 & 33 may be allowed on<br>net to net basis with accountability clause .<br>3. Quantity of import items at Sl. No. 18, 19, 20 & 21 may be allowed as per DGFT’s Spares Policy on<br>net to net basis with accountability clause .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
2 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/15/80- Party Name: AZAD Meet No/Date:2/80- Status:<br>ALC2/2018 ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:0910063260 Pending with<br>:01/80/050/00347/AM19/ :09/24/040/00679/AM16/ 12.02.2016 RA/Firm<br>3 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 29.07.2019 followed by reminders on 06.11.2019, 26.12.2019, 03.02.2020, 19.03.2020 &<br>19.06.2020. However, no information has been received so far. Hence, the Committee decided to wait for the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 237] intentionally omitted <==
----- Start of picture text -----<br> Case No.:390/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:2/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710109544 Pending<br>:01/80/050/00732/AM19/ :07/24/040/00411/AM16/ 18.03.2016 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking<br>following information as raised by DHI was sent to the firm on 26.06.2020:<br>1. Technical details/write-ups along with the drawings and end use of the export product required to be<br>submitted for examination.<br>4<br>2. Description of the process of manufacture and machines used for manufacture till the completion of<br>finished product, preferably indicating in the flow chart separately for each product.<br>3. Wastage generated at each stage of operations and the total wastage generated against each product<br>separately.<br>4. Calculation sheet for wastage claimed and value addition achieved separately for each product.<br>However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for<br>furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 233] intentionally omitted <==
----- Start of picture text -----<br> Case No.:25/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:2/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710109946 Pending<br>:01/80/050/00367/AM19/ :07/24/040/00080/AM17/ 14.06.2016 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking<br>following information as raised by DHI was sent to the firm on 26.06.2020:<br>1. Technical details/write-ups along with the drawings and end use of the export product required to be<br>submitted for examination.<br>5<br>2. Description of the process of manufacture and machines used for manufacture till the completion of<br>finished product, preferably indicating in the flow chart separately for each product.<br>3. Wastage generated at each stage of operations and the total wastage generated against each product<br>separately.<br>4. Calculation sheet for wastage claimed and value addition achieved separately for each product.<br>However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for<br>furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
3 | P a g e
6
| Case No.:186/15/80- | Party Name: TEMPCO TEMPERATURE | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | MEASUREMENT PRIVATE LIMITED | ALC2/2020 & 16.06.2020 | Approved | ||||
| HQ File<br>:01/80/050/00528/AM19 | RLA File :07/24/040/00157/AM17/ | Lic.No/Date:0710110332<br>29.08.2016 |
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MeitY vide U. O. No.: W-21/19/2020-IPHW-MeitY dated 15.05.2020. (Copy enclosed)
RA concerned may take further necessary action as per the decision of NC.
==> picture [476 x 165] intentionally omitted <==
----- Start of picture text -----<br> Case No.:199/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:2/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710110331 Pending<br>:01/80/050/00541/AM19/ :07/24/040/00173/AM17/ 29.08.2016 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking<br>following information as raised by DHI was sent to the firm on 26.06.2020:<br>7<br>1. Write up/catalogue of each export product with specific application.<br>However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for<br>furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:404/15/80-ALC2/2018 Party Name: OSWAL PUMPS Meet No/Date:2/80- Status:<br>LIMITED ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:3310030377 Pending<br>:01/80/050/00746/AM19/ :33/24/040/00007/AM17/ 03.03.2017 with Firm<br>8 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 19.03.2020 followed by a reminder on 01.06.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 199] intentionally omitted <==
----- Start of picture text -----<br> Case No.:94/15/80-ALC2/2018 Party Name: MODEL INFRA Meet No/Date:2/80- Status:<br>CORPORATION PVT LTD ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710111766 Pending<br>:01/80/050/00436/AM19/ :07/24/040/00085/AM18/ 16.06.2017 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that MSME informed via email<br>dated 14.07.2020 that the firm’s reply is deficient. Therefore, the Committee decided to ask again from the firm<br>to furnish following information:<br>9<br>1. Stage-wise wastage with material balancing.<br>2. To provide clarification for why, as per information given in reply, per unit requirement for Sl. No. 1<br>item of import is 321 Kgs (19+151+151) and after deducting the wastage claimed the per unit weight<br>for export item No. 1 works out to be 229.8 Kgs. However, the per unit weight worked out from<br>application to be 255.38Kgs (185923/728).<br>3. To provide material balancing sheet.<br>Case is deferred.<br>----- End of picture text -----<br>
4 | P a g e
| Case No.:405/15/80-ALC2/2018 | Party Name: OSWAL PUMPS | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00747/AM19/ | RLA File<br>:33/24/040/00007/AM18/ | Lic.No/Date:3310030410<br>01.11.2017 | Pending<br>with Firm |
10 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 19.03.2020 followed by a reminder on 01.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:394/15/80-ALC2/2018 | Party Name: TRIVENI HI-TECH | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00736/AM19/ | RLA File<br>:07/24/040/00368/AM18/ | Lic.No/Date:0710113046<br>04.04.2018 | Pending<br>with Firm |
11 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 01.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
12
| Case No.:3/12/80- | Party Name: BIRLA | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | PRECISION | 16.06.2020 | Deferred | ||||
| TECHNOLOGIES LTD. | |||||||
| HQ File<br>:01/80/050/00276/AM19/ | RLA File<br>:03/94/040/00599/AM19/ | Lic.No/Date:0310824314<br>09.10.2018 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply has been received and the representative of MSME informed that he will visit to DGFT to examine the case. Hence, the Committee decided to defer the case.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/12/80- Party Name: BIRLA PRECISION Meet No/Date:2/80- Status:<br>ALC2/2018 TECHNOLOGIES LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File :03/94/040/00600/AM19/ Lic.No/Date:0310824317 Pending with<br>:01/80/050/00277/AM19/ 09.10.2018 MSME<br>13<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply has been<br>received and the representative of MSME informed that he will visit to DGFT to examine the case. Hence, the<br>Committee decided to defer the case.<br>Case is deferred.<br>----- End of picture text -----<br>
5 | P a g e
14
| Case No.:5/12/80-ALC2/2018 | Party Name: BIRLA | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRECISION TECHNOLOGIES | ALC2/2020 | Deferred | |||||
| LTD. | 16.06.2020 | ||||||
| HQ File :01/80/050/00278/AM19/ | RLA File<br>:03/94/040/00598/AM19/ | Lic.No/Date:0310824375<br>11.10.2018 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply has been received and the representative of MSME informed that he will visit to DGFT to examine the case. Hence, the Committee decided to defer the case.
Case is deferred.
Case No.:12/12/80- Party Name: BIRLA PRECISION Meet No/Date:2/80- Status: ALC2/2018 TECHNOLOGIES LTD. ALC2/2020 Deferred 16.06.2020 HQ File RLA File :03/94/040/00597/AM19/ Lic.No/Date:0310824374 Pending with :01/80/050/00285/AM19/ 11.10.2018 MSME 15
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply has been received and the representative of MSME informed that he will visit to DGFT to examine the case. Hence, the Committee decided to defer the case.
Case is deferred.
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/12/80- Party Name: JAICO Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2018 ENTERPRISE LLP 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310824420 Pending with<br>:01/80/050/00274/AM19/ :03/94/040/00612/AM19/ 12.10.2018 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>16<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai<br>on 07.06.2019 followed by reminders on 24.07.2019, 05.09.2019, 02.01.2020 & 20.03.2020. However, no<br>information has been received so far. Therefore, the Committee decided to remind again RA, Mumbai & the<br>firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: GENERAL Meet No/Date:2/80- Status:<br>23/12/80-ALC2/2018 INSTRUMENTS CONSORTIUM ALC2/2020 Deferred<br>SOLE PROP. KULKARNI 16.06.2020<br>HQ File RLA File :03/94/040/00640/AM19/ Lic.No/Date:0310824478 Pending with<br>:01/80/050/00296/AM19/ 16.10.2018 RA/Firm<br>17 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai<br>on 16.01.2020 followed by reminders on 20.02.2020 & 01.06.2020. However, no information has been received<br>so far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
6 | P a g e
| Case No.:267/15/80- | Party Name: LARSEN & | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | TOUBRO LIMITED | ALC2/2020 & 16.06.2020 | ||||
| HQ File<br>:01/80/050/00609/AM19/ | RLA File<br>:03/95/040/00583/AM19/ | Lic.No/Date:0310825583<br>11.12.2018 | Pending with Policy-IV<br>Division |
18 Decision: The Committee considered the case as per the agenda and noted that the case was referred to PolicyIV division on 09.07.2020 as per decision taken in Meeting No. 22 dated 28.02.2020. However, comments are awaited from Policy-IV division. Hence, the Committee decided to wait for comments.
Case is deferred.
Case No.:14/6/80- Party Name: IND-SPHINX Meet No/Date:2/80-ALC2/2020 Status: ALC2/2019 PRECISION LTD 16.06.2020 Approved HQ File RLA File Lic.No/Date:2210016034 :01/80/050/00085/AM20/ :22/24/040/00069/AM19/ 18.12.2018
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:
19
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Norms | |
|---|---|---|---|---|---|---|
| 90184900 | Carbide burs made<br>from Solid tungsten<br>carbide blanks dia<br>0.50 mm to 1.50<br>mm | 200000<br>Number | 82090090<br>68042190 | Solid Tungsten Carbide Blanks<br>dia 1.60 +/- 0.50 mm and Overall<br>length 20 +/- 5 mm<br>Diamond Grinding Wheel | Net to net basis<br>Upto 5% FOB<br>value |
Note:
1. For import item at Sl. No. 1, the diameter of corresponding export should be less than the diameter of the blank imported.
2. The firm should import relevant items only.
RA concerned may take further necessary action as per the decision of NC.
20
| Case No.:20/14/80-ALC2/2018 | Party Name: ULTRA | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERS | ALC2/2020 & 16.06.2020 | Deferred | |||||
| HQ File<br>:01/80/050/00336/AM19/ | RLA File<br>:31/83/040/00150/AM19/ | Lic.No/Date:3110067260<br>19.12.2018 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply has been sent to DHI on 14.07.2020 for examination of the case. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:300/15/80-ALC2/2018 Party Name: DILIGENT SCM Meet No/Date:2/80- Status:<br>SOLUTIONS PVT LTD ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0910067093 Pending<br>:01/80/050/00642/AM19/ :09/24/040/00487/AM19/ 18.01.2019 with Firm<br>21 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 19.03.2020 followed by a reminder on 01.06.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
7 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:313/15/80-ALC2/2018 Party Name: OMEGA ICEHILL Meet No/Date:2/80- Status:<br>PRIVATE LIMITED ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510409545 Pending<br>:01/80/050/00655/AM19/ :05/24/040/00627/AM19/ 31.01.2019 with DPIIT<br>22<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>DPIIT on 09.07.2020 & 14.07.2020 for examination of the case. However, no comments have been received<br>yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:310/15/80- Party Name: TERUMO Meet No/Date:2/80- Status: Deferred<br>ALC2/2018 PENPOL PRIVATE ALC2/2020<br>LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:5310019913 Pending with Dept. of C<br>:01/80/050/00652/AM19/ :53/24/040/00013/AM19/ 05.02.2019 & PC/Firm<br>23 Decision: The Committee considered the case as per the agenda and noted that no reply has been received yet<br>from the firm against deficiency letter dated 21.08.2019 followed by reminders on 04.11.2019 & 16.01.2020 as<br>raised by Consultant (Tech-1) . The Committee also noted that there are other cases of the same firm wherein<br>comments are awaited from the Department of C & PC. However, no information has been received so far.<br>Therefore, the Committee decided to send a D.O. letter to the Department of C & PC.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 180] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: SWASTIK Meet No/Date:2/80-ALC2/2020 Status:<br>324/15/80-ALC2/2018 TUNGSTEN PVT LTD 16.06.2020 Approved<br>HQ File RLA File Lic.No/Date:0310827084<br>:01/80/050/00666/AM19 :03/95/040/01213/AM19/ 15.02.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms on repeat<br>basis as approved for AA No. 0310818444 dated 11.01.2018 as per written comments of MSME as under:<br>24<br>ITCHS Export Item Quantity ITCHS Import Item Recommended<br>Code Code Norms<br>81011000 Tungsten Metal 9670.000 81011000 Tungsten Abrasive Powder As applied<br>Powder Kgs<br>Note: Tungsten content should not be more than 50.7% in the import item.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:8/1/80-ALC2/2019 | Party Name: DAGGER | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| MASTER TOOL INDUSTRIES | ALC2/2020 | Deferred | ||||
| LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00756/AM19/ | RLA File<br>:03/94/040/01048/AM19/ | Lic.No/Date:0310827404<br>01.03.2019 | Pending<br>with Firm |
25 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 22.07.2019 followed by reminders on 25.02.2020 & 03.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
8 | P a g e
| Case No.:3/2/80-ALC2/2019 | Party Name: AUTOCOMP | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| CORPORATION PANSE | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00003/AM20/ | RLA File<br>:31/83/040/00298/AM19/ | Lic.No/Date:3110067366<br>02.04.2019 | Pending<br>with Firm |
26 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020 followed by reminders on 19.03.2020 & 03.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:2/4/80-ALC2/2019 | Party Name: SULZER INDIA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00017/AM20/ | RLA File<br>:31/83/040/00009/AM20/ | Lic.No/Date:3110067390<br>24.04.2019 | Pending<br>with Firm |
27 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 04.10.2019 followed by reminders on 26.12.2019, 25.02.2020 & 16.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:3/4/80-ALC2/2019 | Party Name: SULZER INDIA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00018/AM20/ | RLA File<br>:31/83/040/00010/AM20/ | Lic.No/Date:3110067391<br>24.04.2019 | Pending<br>with Firm |
28 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 04.10.2019 followed by reminders on 26.12.2019, 25.02.2020 & 16.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:4/4/80-ALC2/2019 | Party Name: SULZER INDIA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00019/AM20/ | RLA File<br>:31/83/040/00011/AM20/ | Lic.No/Date:3110067392<br>24.04.2019 | Pending<br>with Firm |
29 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 04.10.2019 followed by reminders on 26.12.2019, 25.02.2020 & 16.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
9 | P a g e
| Case No.:5/4/80-ALC2/2019 | Party Name: VICTORA AUTO | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00020/AM20/ | RLA File<br>:05/24/040/00033/AM20/ | Lic.No/Date:0510410376<br>25.04.2019 | Pending<br>with Firm |
30 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019 followed by reminders on 25.02.2020 & 03.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
==> picture [476 x 268] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/4/80-ALC2/2019 Party Name: SHIVALIK Meet No/Date:2/80- Status:<br>BIMETAL CONTROLS LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510410395 Pending<br>:01/80/050/00022/AM20/ :05/24/040/00016/AM20/ 26.04.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME :<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>31 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material proposed<br>for import has been arrived at, including the net weight of components to be manufactured out of these<br>imported materials, wastages claimed at each stage of manufacturing with complete justification and<br>supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/4/80-ALC2/2019 Party Name: ERBATECH Meet No/Date:2/80- Status:<br>MACHINERY P. LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3210078932 Pending<br>:01/80/050/00024/AM20/ :32/24/040/00004/AM20/ 29.04.2019 with DHI<br>32<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI<br>on 23.06.2020 for examination of the case. However, DHI via email dated 14.07.2020 informed that the case is<br>under examination. Therefore, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
10 | P a g e
| Case No.:13/4/80-ALC2/2019 | Party Name: SRI RAM | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00028/AM20/ | RLA File<br>:04/24/040/00157/AM19/ | Lic.No/Date:0410165532<br>01.05.2019 | Pending<br>with Firm |
33 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019 followed by reminders on 19.11.2019, 16.01.2020 & 19.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
34
| Case No.:14/4/80-ALC2/2019 | Party Name: KINECO KAMAN | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| COMPOSITES - INDIA PVT | ALC2/2020 | Deferred | |||||
| LTD | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00029/AM20/ | RLA File<br>:03/94/040/01131/AM19/ | Lic.No/Date:0310828702<br>01.05.2019 | Pending<br>with DPIIT |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DPIIT on 03.06.2020 for examination of the case. However, no reply has been received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.
Case is deferred.
| Case No.:15/4/80-ALC2/2019 | Party Name: CHIRAG UDYOG | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | Deferred | |||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00030/AM20/ | RLA File<br>:05/23/040/00054/AM20/ | Lic.No/Date:0510410451<br>02.05.2019 | Pending<br>with Firm |
35 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 19.03.2020 followed by a reminder on 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:16/4/80-ALC2/2019 | Party Name: BLISS ANAND | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00031/AM20/ | RLA File<br>:05/23/040/00051/AM20/ | Lic.No/Date:0510410480<br>03.05.2019 | Pending<br>with Firm |
36 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020 followed by a reminder on 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
11 | P a g e
| Case No.:21/4/80-ALC2/2019 | Party Name: MASU BRAKE | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PADS PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00036/AM20/ | RLA File<br>:05/24/040/00057/AM20/ | Lic.No/Date:0510410488<br>06.05.2019 | Pending<br>with Firm |
37 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 19.03.2020 followed by a reminder on 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:19/4/80-ALC2/2019 | Party Name: VICTORA AUTO | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00034/AM20/ | RLA File<br>:05/24/040/00762/AM19/ | Lic.No/Date:0510410518<br>08.05.2019 | Pending<br>with Firm |
38 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019 followed by reminders on 27.02.2020 & 03.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:18/4/80-ALC2/2019 | Party Name: DILIGENT SCM | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| SOLUTIONS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00033/AM20/ | RLA File<br>:09/24/040/00058/AM20/ | Lic.No/Date:0910067492<br>10.05.2019 | Pending<br>with Firm |
39 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 19.03.2020 followed by reminders on 01.06.2020 & 03.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:30/5/80- | Party Name: TIAGO CHEM | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00068/AM20/ | RLA File<br>:34/24/040/00075/AM20/ | Lic.No/Date:3410045178<br>30.05.2019 | Pending with<br>RA/Firm |
40 Decision: The Committee considered the case as per the agenda and noted that the firm has sent only a copy of AA on 20.02.2020 without any annexure. In this regard, the firm was reminded on 03.06.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm and RA, Vadodara for submitting the complete set of application.
Case is deferred.
12 | P a g e
| Case No.:32/5/80- | Party Name: FUTURE TECH | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PVT. LTD. | ALC2/2020 | Deferred | |||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00070/AM20/ | RLA File<br>:07/24/040/00050/AM20/ | Lic.No/Date:0710115000<br>31.05.2019 | Pending with<br>RA/Firm |
41 Decision: The Committee considered the case as per the agenda and noted that a letter was sent to RA, Bangalore requesting to submit a copy of the firm’s application for examination of the case on 27.02.2020 followed by a reminder on 03.06.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Bangalore for submitting the complete set of application.
Case is deferred.
==> picture [476 x 268] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/6/80-ALC2/2019 Party Name: SHIVALIK Meet No/Date:2/80- Status:<br>BIMETAL CONTROLS LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510410810 Pending<br>:01/80/050/00072/AM20/ :05/24/040/00129/AM20/ 04.06.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>42 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material proposed<br>for import has been arrived at, including the net weight of components to be manufactured out of these<br>imported materials, wastages claimed at each stage of manufacturing with complete justification and<br>supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:2/6/80-ALC2/2019 | Party Name: LAXMI DENTAL | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| EXPORT PVT. LTD. | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00073/AM20/ | RLA File<br>:03/95/040/00207/AM20/ | Lic.No/Date:0310829403<br>04.06.2019 | Pending<br>with Firm |
43 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 26.12.2019 followed by reminders on 25.02.2020 & 03.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
13 | P a g e
==> picture [476 x 120] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:2/80- Status:<br>LIMITED ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0310829486<br>44 :01/80/050/00077/AM20/ :03/95/040/00221/AM20/ 07.06.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/313/2019-TSW dated 30.06.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 121] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:2/80- Status:<br>LIMITED ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0310829488<br>45 :01/80/050/00078/AM20/ :03/95/040/00206/AM20/ 07.06.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/313/2019-TSW dated 30.06.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:10/6/80-ALC2/2019 | Party Name: TEMA INDIA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00081/AM20/ | RLA File<br>:03/95/040/00229/AM20/ | Lic.No/Date:0310829553<br>11.06.2019 | Pending<br>with Firm |
46 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminders on 25.02.2020 & 03.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:13/6/80-ALC2/2019 | Party Name: VEELINE MEDIA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00084/AM20/ | RLA File<br>:02/24/040/00038/AM20/ | Lic.No/Date:0210209240<br>11.06.2019 | Pending<br>with Firm |
47
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
14 | P a g e
| Case No.:16/6/80-ALC2/2019 | Party Name: TEMA INDIA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00087/AM20/ | RLA File<br>:03/95/040/00239/AM20/ | Lic.No/Date:0310829596<br>12.06.2019 | Pending<br>with Firm |
48 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminders on 25.02.2020 & 03.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:21/6/80-ALC2/2019 | Party Name: ISGEC HITACHI | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| ZOSEN LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00092/AM20/ | RLA File<br>:05/23/040/00111/AM20/ | Lic.No/Date:0510410946<br>14.06.2019 | Pending<br>with Firm |
49 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminders on 25.02.2020 & 03.06.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:1/8/80- | Party Name: MODEL INFRA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | CORPORATION PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00113/AM20/ | RLA File<br>:07/24/040/00081/AM20/ | Lic.No/Date:0710115134<br>05.07.2019 | Pending with<br>Firm |
50 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:3/8/80-ALC2/2019 | Party Name: ULTRA | Meet No/Date:2/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERS | 16.06.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00115/AM20/ | RLA File<br>:31/83/040/00058/AM20/ | Lic.No/Date:3110067470<br>10.07.2019 | Pending with<br>Tech-3 |
51 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-3) on 13.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
15 | P a g e
==> picture [476 x 253] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/8/80-ALC2/2019 Party Name: AUTO TECH Meet No/Date:2/80- Status:<br>INDUSTRIES (INDIA) PVT. ALC2/2020 Approved<br>LTD. 16.06.2020<br>HQ File RLA File Lic.No/Date:0410165827<br>:01/80/050/00120/AM20/ :04/24/040/00068/AM20/ 15.07.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms on repeat<br>basis as approved for AA No. 0410165239 dated 21.02.2019 as per written comments of MSME as under:<br>ITCHS Export Item Quantity ITCHS Import Item Recommended Norms<br>52 Code Code<br>84099199 Exhaust Rocker With 50000 87083000 Arm Rocker 81640 Kg inclusive of<br>Actuator Sub Number -Part 110% wastage after<br>assembly (Part Number 00- taking 20% recovery<br>number 00-045465) 044788<br>Note:<br>1. Per unit weight of export item is 776 Gram.<br>2. Per unit weight of import item is 1847 Gram.<br>3. The firm should import relevant item only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/8/80- Party Name: ANSTECH Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2019 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045281 Pending with<br>:01/80/050/00121/AM20/ :34/24/040/00127/AM20/ 15.07.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>53<br>yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 06.11.2019 followed by reminders on 16.01.2020, 03.03.2020 & 05.06.2020. However, no<br>information has been received so far. Therefore, the Committee decided to remind again RA, Vadodara & the<br>firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:10/8/80-ALC2/2019 | Party Name: ULTRA | Meet No/Date:2/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERS | 16.06.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00122/AM20/ | RLA File<br>:31/83/040/00056/AM20/ | Lic.No/Date:3110067477<br>17.07.2019 | Pending with<br>Tech-3 |
54 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-3) on 09.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
16 | P a g e
==> picture [476 x 120] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/8/80-ALC2/2019 Party Name: APAR Meet No/Date:2/80- Status:<br>INDUSTRIES LIMITED ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0310830379<br>55 :01/80/050/00123/AM20/ :03/94/040/00303/AM20/ 17.07.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: W-21/20/2020-IPHW-MeitY dated 05.05.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/8/80- Party Name: ZOBELE INDIA Meet No/Date:2/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File :03/95/040/00352/AM20/ Lic.No/Date:0310830415 Pending with<br>:01/80/050/00124/AM20/ 18.07.2019 RA/Firm<br>56 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai<br>on 16.01.2020 followed by reminders on 19.03.2020 & 05.06.2020. However, no information has been received<br>so far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
57
| Case No.:3/9/80- | Party Name: DYNA FORCE | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | HYDRAULICS PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | |||||||
| HQ File<br>:01/80/050/00128/AM20/ | RLA File :31/83/040/00067/AM20/ | Lic.No/Date:3110067484<br>25.07.2019 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 09.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:2/10/80-ALC2/2019 | Party Name: DOOWON | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| AUTOMOTIVE SYSTEMS | ALC2/2020 | Deferred | ||||
| INDIA PRIVATE LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00140/AM20/ | RLA File<br>:04/24/040/00079/AM20/ | Lic.No/Date:0410165942<br>07.08.2019 | Pending<br>with DHI |
58 Decision: The Committee considered the case as per the agenda and noted that last minutes were erroneously recorded and a copy of firm’s application was already sent to DHI on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
17 | P a g e
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/10/80- Party Name: JKS Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2019 ENGINEERING 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:3210079060 Pending with<br>:01/80/050/00143/AM20/ :32/24/040/00033/AM20/ 08.08.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>59<br>yet been received from the firm & RA, Coimbatore and in this regard a letter was sent to the firm & RA,<br>Coimbatore on 16.01.2020 followed by reminders on 19.03.2020 & 05.06.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Coimbatore & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/10/80- Party Name: LM WIND POWER Meet No/Date:2/80- Status:<br>ALC2/2019 BLADES INDIA PVT. LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3410045365 Pending with<br>:01/80/050/00144/AM20/ :34/24/040/00152/AM20/ 09.08.2019 RA/Firm<br>60 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 16.01.2020 followed by reminders on 20.03.2020 & 15.06.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Vadodara & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 176] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/10/80-ALC2/2019 Party Name: MAINI Meet No/Date:2/80- Status:<br>PRECISION PRODUCTS ALC2/2020 Deferred<br>LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:0710115278 Pending<br>:01/80/050/00145/AM20/ :07/24/040/00106/AM20/ 13.08.2019 with Firm<br>Decision: The Committee considered the case as per agenda and the firm’s representatives explained the case<br>61 during personal hearing. However, on the advice of Consultant (Tech-3) , the Committee directed to the firm’s<br>representative to furnish the reply of following deficiencies:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.<br>2. To provide clarification for, how the diameter of import item at Sl. No. 3 is 28mm while diameter of<br>export item is shown as 12.80mm.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 121] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: KINECO KAMAN Meet No/Date:2/80- Status:<br>12/10/80-ALC2/2019 COMPOSITES - INDIA PVT. LTD. ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File :03/94/040/00329/AM20/ Lic.No/Date:0310831081<br>62 :01/80/050/00150/AM20/ 20.08.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/193/2019-TSW dated 16.06.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
18 | P a g e
| Case No.:19/10/80-ALC2/2019 | Party Name: DILIGENT SCM | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| SOLUTIONS PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00157/AM20/ | RLA File<br>:09/24/040/00272/AM20/ | Lic.No/Date:0910067939<br>27.08.2019 | Pending<br>with Firm |
63 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020 followed by a reminder on 01.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:20/10/80- Party Name: OSWAL Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2019 PUMPS LIMITED 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:3310030578 Pending with<br>:01/80/050/00158/AM20/ :33/24/040/00017/AM20/ 27.08.2019 Firm<br>64 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 19.03.2020 followed by a reminder on 01.06.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 254] intentionally omitted <==
----- Start of picture text -----<br> Case No.:21/10/80-ALC2/2019 Party Name: AUTO TECH Meet No/Date:2/80- Status:<br>INDUSTRIES (INDIA) PVT. ALC2/2020 Approved<br>LTD. 16.06.2020<br>HQ File RLA File Lic.No/Date:0410166015<br>:01/80/050/00159/AM20/ :04/24/040/00091/AM20/ 28.08.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms on repeat<br>basis as approved for AA No. 0410165239 dated 21.02.2019 as per written comments of MSME as under:<br>ITCHS Export Item Quantity ITCHS Import Item Recommended Norms<br>65 Code Code<br>Exhaust Rocker With 81640 Kg inclusive of<br>Arm Rocker<br>Actuator Sub assembly 50000 110% wastage after<br>84099199 87083000 -part number<br>(Part number 00- Number taking 20% recovery<br>00-044788<br>045465)<br>Note:<br>1. Per unit weight of export item is 776 Gram.<br>2. Per unit weight of import item is 1847 Gram.<br>3. The firm should import relevant item only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
19 | P a g e
| Case No.:36/11/80- | Party Name: PAHARPUR | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2004 | COOLING TOWERS LIMITED | ALC2/2020 | Deferred | |||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00162/AM20/ | RLA File<br>:02/24/040/00081/AM20/ | Lic.No/Date:0210209409<br>02.09.2019 | Pending with<br>RA/Firm |
66 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA, Kolkata on 29.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Kolkata & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:38/11/80- Party Name: HANNING Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2004 MOTORS INDIA P. LTD. 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045416 Pending with<br>:01/80/050/00164/AM20/ :34/24/040/00169/AM20/ 04.09.2019 RA/Firm<br>67 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 05.06.2020. However, no information has been received so far. Therefore, the Committee decided<br>to remind RA, Vadodara & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/13/85-ALC3/2019 Party Name: AUTOCOMP Meet No/Date:2/80- Status:<br>CORPORATION PANSE ALC2/2020 Deferred<br>PRIVATE LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:3110067530<br>68 :01/85/050/00082/AM20/ :31/83/040/00085/AM20/ 11.09.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to DHI for<br>examination & comments.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:2/12/80-ALC2/2019 | Party Name: HEURTEY | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PETROCHEM INDIA PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00174/AM20/ | RLA File<br>:34/24/040/00185/AM20/ | Lic.No/Date:3410045459<br>19.09.2019 |
69 Decision: The Committee considered the case as per the agenda and noted the comments of DPIIT vide U. O. No: P-47011/193/2019-TSW dated 13.07.2020 wherein DPIIT stated that the case does not pertain to it and may be consulted with DHI . Therefore, the Committee decided to refer the case to DHI for examination & comments.
Case is deferred.
20 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/12/80- Party Name: FREUDENBERG Meet No/Date:2/80- Status:<br>ALC2/2019 FILTRATION TECHNOLOGIES ALC2/2020 Deferred<br>INDIA PVT. LTD. 16.06.2020<br>HQ File RLA File :31/83/040/00008/AM20/ Lic.No/Date:3110067543 Pending with<br>:01/80/050/00176/AM20/ 24.09.2019 RA/Firm<br>70 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>16.01.2020 followed by reminders on 20.03.2020 & 20.05.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
71
| Case No.:5/12/80- | Party Name: GODREJ & | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | BOYCE MFG. CO. LTD. | ALC2/2020 | |||||
| 16.06.2020 | |||||||
| HQ File<br>:01/80/050/00177/AM20/ | RLA File<br>:03/94/040/00480/AM20/ | Lic.No/Date:0310831805<br>25.09.2019 | Pending with<br>Consultant(SKB) |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (SKB) on 12.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/12/80- Party Name: VICTORA AUTO Meet No/Date:2/80- Status:<br>ALC2/2019 PVT. LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510411950 Pending with<br>:01/80/050/00178/AM20/ :05/24/040/00338/AM20/ 25.09.2019 RA/Firm<br>72 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 16.01.2020 followed by reminders on 20.03.2020 & 03.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/12/80- Party Name: VICTORA AUTO Meet No/Date:2/80- Status:<br>ALC2/2019 PVT. LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510411951 Pending with<br>:01/80/050/00179/AM20/ :05/24/040/00340/AM20/ 25.09.2019 RA/Firm<br>73 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 16.01.2020 followed by reminders on 20.03.2020 & 03.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
21 | P a g e
==> picture [476 x 247] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:2/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:0910068046 Pending<br>:01/80/050/00180/AM20/ :09/24/040/00336/AM20/ 27.09.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DHI:<br>1. Specific item of export.<br>74 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Calculation of requirement of raw material supported by Dimensional Engineering Drawing with<br>relevant dimensions highlighted. (Export Product wise)<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 254] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/12/80-ALC2/2019 Party Name: AUTO TECH Meet No/Date:2/80- Status:<br>INDUSTRIES INDIA PVT. ALC2/2020 Approved<br>LTD. 16.06.2020<br>HQ File RLA File Lic.No/Date:0410166124<br>:01/80/050/00182/AM20/ :04/24/040/00105/AM20/ 01.10.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms on repeat<br>basis as approved for AA No. 0410165239 dated 21.02.2019 as per written comments of MSME as under:<br>ITCHS Export Item Quantity ITCHS Import Item Recommended Norms<br>75 Code Code<br>Exhaust Rocker With 81640 Kg inclusive of<br>Arm Rocker<br>Actuator Sub assembly 50000 110% wastage after<br>84099199 87083000 -part number<br>(Part number 00- Number taking 20% recovery<br>00-044788<br>045465)<br>Note:<br>1. Per unit weight of export item is 776 Gram.<br>2. Per unit weight of import item is 1847 Gram.<br>3. The firm should import relevant item only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
22 | P a g e
==> picture [476 x 247] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:2/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:0910068052 Pending<br>:01/80/050/00183/AM20/ :09/24/040/00345/AM20/ 01.10.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DHI:<br>1. Specific item of export.<br>76 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Calculation of requirement of raw material supported by Dimensional Engineering Drawing with<br>relevant dimensions highlighted. (Export Product wise)<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 248] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:2/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:0910068053 Pending<br>:01/80/050/00184/AM20/ :09/24/040/00344/AM20/ 01.10.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DHI:<br>1. Specific item of export.<br>77 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Calculation of requirement of raw material supported by Dimensional Engineering Drawing with<br>relevant dimensions highlighted. (Export Product wise)<br>Case is deferred.<br>----- End of picture text -----<br>
23 | P a g e
==> picture [476 x 247] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:2/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:0910068054 Pending<br>:01/80/050/00185/AM20/ :09/24/040/00346/AM20/ 01.10.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DHI:<br>1. Specific item of export.<br>78 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Calculation of requirement of raw material supported by Dimensional Engineering Drawing with<br>relevant dimensions highlighted. (Export Product wise)<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/14/80- Party Name: LOTUS AVIATION Meet No/Date:2/80- Status:<br>ALC2/2019 TECHNOLOGY PRIVATE ALC2/2020 Deferred<br>LIMITED 16.06.2020<br>HQ File RLA File :05/23/040/00283/AM20/ Lic.No/Date:0510412171 Pending with<br>:01/80/050/00199/AM20/ 17.10.2019 RA/Firm<br>79 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 16.01.2020 followed by reminders on 20.03.2020 & 15.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:4/14/80-ALC2/2019 | Party Name: NIDEC INDIA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00200/AM20/ | RLA File<br>:05/24/040/00403/AM20/ | Lic.No/Date:0510412197<br>21.10.2019 | Pending<br>with Firm |
80 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 19.03.2020 followed by a reminder on 15.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
24 | P a g e
| Case No.:5/14/80-ALC2/2019 | Party Name: TEGA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00201/AM20/ | RLA File<br>:02/24/040/00100/AM20/ | Lic.No/Date:0210209491<br>22.10.2019 | Pending<br>with Firm |
81 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 16.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:6/14/80-ALC2/2019 | Party Name: TEGA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00202/AM20/ | RLA File<br>:02/24/040/00107/AM20/ | Lic.No/Date:0210209503<br>23.10.2019 | Pending<br>with Firm |
82 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 16.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/14/80- Party Name: SULZER INDIA Meet No/Date:2/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3110067581 Pending with<br>:01/80/050/00203/AM20/ :31/83/040/00096/AM20/ 23.10.2019 RA/Firm<br>83 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA, Kolkata<br>on 16.01.2020 followed by reminders on 20.03.2020, 15.06.2020 16.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, Kolkata & the firm for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:9/14/80- | Party Name: HITAISHI KK | Meet No/Date:2/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MANUFACTURING | 16.06.2020 | Deferred | |||
| COMPANY PRIVATE | ||||||
| LIMITED | ||||||
| HQ File<br>:01/80/050/00205/AM20/ | RLA File :<br>02/24/040/00111/AM20/ | Lic.No/Date:0210209515<br>28.10.2019 | Pending with<br>RA/Firm |
84 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA, Kolkata on 16.01.2020 followed by reminders on 20.03.2020 & 15.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Kolkata & the firm for submitting the complete set of application.
Case is deferred.
25 | P a g e
| Case No.:10/14/80- | Party Name: TENOVA INDIA | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00206/AM20/ | RLA File<br>:07/24/040/00154/AM20/ | Lic.No/Date:0710115616<br>28.10.2019 | Pending with<br>Firm |
85 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 19.03.2020 followed by a reminder on 15.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:11/14/80- | Party Name: FERRA AEROSPACE | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRIVATE LIMITED | ALC2/2020 | Deferred | |||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00207/AM20/ | RLA File :07/24/040/00164/AM20/ | Lic.No/Date:0710115617<br>29.10.2019 | Pending with<br>Firm |
86 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 15.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:12/14/80- | Party Name: MELSTAR | Meet No/Date:2/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MANUFACTURING | 16.06.2020 | Deferred | |||
| SYSTEMS PRIVATE | ||||||
| LIMITED | ||||||
| HQ File<br>:01/80/050/00208/AM20/ | RLA File<br>:07/24/040/00156/AM20/ | Lic.No/Date:0710115619<br>29.10.2019 | Pending with<br>RA/Firm |
87
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA, Bangalore on 16.01.2020 followed by reminders on 20.03.2020 & 15.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Bangalore & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/16/80- Party Name: AYYAPPA CNC Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2019 PVT. LTD. 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710115658 Pending with<br>:01/80/050/00211/AM20/ :07/24/040/00170/AM20/ 08.11.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>88<br>yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA,<br>Bangalore on 01.01.2020 followed by reminders on 25.02.2020 & 15.06.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Bangalore & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
26 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/16/80- Party Name: SAMIRI Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2019 EQUIPMENTS & 16.06.2020 Deferred<br>ENGINEERS PVT. LTD.<br>HQ File RLA File Lic.No/Date:0310832707 Pending with<br>:01/80/050/00213/AM20/ :03/95/040/00758/AM20/ 11.11.2019 RA/Firm<br>89 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai<br>on 01.01.2020 followed by reminders on 26.02.2020 & 15.06.2020. However, no information has been received<br>so far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/16/80- Party Name: LM WIND Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2019 POWER BLADES INDIA 16.06.2020 Deferred<br>PVT. LTD.<br>HQ File RLA File Lic.No/Date:3410045605 Pending with<br>:01/80/050/00215/AM20/ :34/24/040/00242/AM20/ 13.11.2019 RA/Firm<br>90 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 01.01.2020 followed by reminders on 26.02.2020 & 15.06.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Vadodara & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/16/80- Party Name: BLISS ANAND Meet No/Date:2/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510412485 Pending with<br>:01/80/050/00214/AM20/ :05/23/040/00311/AM20/ 14.11.2019 RA/Firm<br>91 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 01.01.2020 followed by reminders on 25.02.2020 & 16.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/16/80- Party Name: NUCON Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2019 AEROSPACE PVT. LTD. 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0910068185 Pending with<br>:01/80/050/00216/AM20/ :09/24/040/00409/AM20/ 14.11.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>92<br>yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 01.01.2020 followed by reminders on 26.02.2020 & 16.06.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
27 | P a g e
==> picture [476 x 292] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/16/80-ALC2/2019 Party Name: MATRIX Meet No/Date:2/80- Status:<br>CUTTING TOOLS PVT LTD ALC2/2020 & 16.06.2020 Approved<br>HQ File RLA File Lic.No/Date:0510412508<br>:01/80/050/00217/AM20/ :05/24/040/00480/AM20/ 15.11.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>ITCHS Quantity ITCHS Recommended<br>Export Item Import Item<br>Code Code Norms<br>Chipper Knives Made From Alloy Steel<br>2296 Kgs inclusive<br>Material Chipper I.E. Knives & Flat<br>300 of 35.9% wastage<br>93 82082000 Cutting Blades For Wood Cutting Number 72269130 (1.2360) Hot after affecting 20%<br>Machine Hardness Body 35-40 Rolled<br>wastage from scrap<br>HRC Drawing No. 0.271.000.786 17.5163<br>Chipper Knives Made From Alloy Steel<br>6520 Kgs inclusive<br>Material Chipper I.E. Knives & Flat<br>1000 of 55% wastage<br>82082000 Cutting Blades For Wood Cutting 72269130 (1.2360) Hot<br>Number after affecting 20%<br>Machine Hardness: 59-2 HRC Rolled<br>wastage from scrap<br>Drawing No. 0.271.000.181 Rev.03 21.5163<br>Note:<br>1. Per unit weight of export item at Sl. No. 1 is 5.63 Kgs.<br>2. Per unit weight of export item at Sl. No. 2 is 4.20 Kgs.<br>3. The applicant should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/16/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:2/80- Status:<br>SOLUTIONS PVT LTD ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0910068192 Pending<br>:01/80/050/00218/AM20/ :09/24/040/00408/AM20/ 18.11.2019 with Firm<br>94 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 01.06.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 203] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/16/80- Party Name: KUVAWALA CORE Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2019 DRILL EQUIPMENT PVT. LTD. 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310832842 Pending with<br>:01/80/050/00219/AM20/ :03/94/040/00644/AM20/ 18.11.2019 Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DHI:<br>95 1. Technical details/write-ups along with the drawings of the export product required to be submitted for<br>examination as the same are not legible.<br>2. Description of the process of manufacture and machines used for manufacture till the completion of<br>finished product, preferably indicating in the flow chart separately for each product.<br>3. Wastage generated at each stage of operations and the total wastage generated against each product<br>separately.<br>4. Calculation sheet for wastage claimed and value addition achieved separately for each product.<br>Case is deferred.<br>----- End of picture text -----<br>
28 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/16/80- Party Name: VICTORA Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 AUTO PVT. LTD. ALC2/2020<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510412549 Pending with<br>:01/80/050/00220/AM20/ :05/24/040/00462/AM20/ 19.11.2019 RA/Firm<br>96 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 01.01.2020 followed by reminders on 25.02.2020 & 03.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/16/80- Party Name: GRADUATE AGRO & Meet No/Date:2/80- Status:<br>ALC2/2019 MECHANICAL ENGINEERS ALC2/2020 Withdrawn<br>16.06.2020<br>HQ File RLA File :50/24/040/00013/AM20/ Lic.No/Date:5010002587<br>:01/80/050/00221/AM20/ 19.11.2019<br>97 Decision: The Committee considered the case as per the agenda and noted that RA, Nagpur informed via email<br>dated 18.06.2020 that they did not make any amendment in this case and the firm has submitted request for<br>surrender of the authorization and call non-utilization certificate issue from Customs authority on 27.02.2020.<br>However, the same is not submitted by the firm yet. Therefore, the Committee decided to withdraw the case<br>from the agenda.<br>Case is withdrawn.<br>----- End of picture text -----<br>
| Case No.:13/16/80-ALC2/2019 | Party Name: OAM SAAI | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| INTERNATIONAL INC. | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00223/AM20/ | RLA File<br>:05/24/040/00479/AM20/ | Lic.No/Date:0510412570<br>21.11.2019 | Pending<br>with Firm |
98 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 16.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
29 | P a g e
==> picture [476 x 215] intentionally omitted <==
----- Start of picture text -----<br> Case No.:14/16/80- Party Name: MICRON Meet No/Date:2/80- Status:<br>ALC2/2019 INSTRUMENTS PVT LTD ALC2/2020 & 16.06.2020 Approved<br>HQ File RLA File Lic.No/Date:0510412571<br>:01/80/050/00224/AM20/ :05/24/040/00490/AM20/ 21.11.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/15/2020-TSW dated 29.04.2020 as under:<br>ITCHS Quantity ITCHS<br>99 Export Item Import Item Recommended Norms<br>Code Code<br>Support Tube Dilaton 29/18 787.300 Kgs<br>1.594OD Kovar. (Dia-41, 27) Iron- @4.344Kgs/Kg content in<br>1105 7228506<br>90229090 Support Tube Nickel- Cobalt the export product after<br>Number 9<br>1.594OD Kovar Sealing Alloy to taking 6% recovery from<br>Part No. SB26445 ASTM F15-04. scrap<br>Note: Net weight of export product may be specified as 181.22 Kgs.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 268] intentionally omitted <==
----- Start of picture text -----<br> Case No.:15/16/80-ALC2/2019 Party Name: L&T-MHPS Meet No/Date:2/80- Status:<br>BOILERS PVT LTD ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0310832929 Pending<br>:01/80/050/00225/AM20/ :03/95/040/00808/AM20/ 21.11.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DHI:<br>1. Complete specification of export products.<br>2. Weight of each Export Product.<br>100 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>5. AA no of similar export product ratified by NC.<br>Case is deferred.<br>----- End of picture text -----<br>
Case No.:16/16/80- Party Name: VALEO INDIA Meet No/Date:2/80-ALC2/2020 Status: ALC2/2019 PRIVATE LIMITED 16.06.2020 Deferred HQ File RLA File Lic.No/Date:0410166294 Pending with :01/80/050/00226/AM20/ :04/24/040/00131/AM20/ 21.11.2019 MSME 101 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 09.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
30 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:18/16/80- Party Name: VICTORA Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 AUTO PVT. LTD. ALC2/2020<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510412651 Pending with<br>:01/80/050/00228/AM20/ :05/24/040/00499/AM20/ 26.11.2019 RA/Firm<br>102 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 01.01.2020 followed by reminders on 25.02.2020 & 03.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:19/16/80- Party Name: SULZER Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2019 INDIA PRIVATE LIMITED 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:3110067611 Pending with<br>:01/80/050/00229/AM20/ :31/83/040/00115/AM20/ 26.11.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>103<br>yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>01.01.2020 followed by reminders on 26.02.2020 & 16.06.2020. However, no information has been received<br>so far. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete<br>set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
104
| Case No.:20/16/80-ALC2/2019 | Party Name: TRILLIUM FLOW | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TECHNOLOGIES INDIA | ALC2/2020 | Withdrawn | |||||
| PRIVATE LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00230/AM20/ | RLA File<br>:03/95/040/00815/AM20/ | Lic.No/Date:0310832991<br>26.11.2019 |
Decision: The Committee considered the case as per the agenda and noted that the firm via email dated 06.03.2020 informed that they have applied the licence under "net-to-net" basis as per general conditions of Chapter- 4 of FTP 2015-20. Therefore, the Committee decided to withdraw the case from the agenda.
Case is withdrawn.
105
| Case No.:2/18/80-ALC2/2019 | Party Name: MICRON | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT. LTD. | ALC2/2020 | Deferred | |||||
| 16.06.2020 | |||||||
| HQ File<br>:01/80/050/00247/AM20/ | RLA File<br>:05/24/040/00489/AM20/ | Lic.No/Date:0510412701<br>29.11.2019 | Pending<br>with DPIIT |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 16.06.2020 for examination of the case. However, DPIIT informed that they have received incomplete application. Therefore, the Committee decided to send again the complete application to DPIIT .
Case is deferred.
31 | P a g e
| Case No.:5/18/80- | Party Name: ZTT INDIA PRIVATE | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | LIMITED | ALC2/2020 & 16.06.2020 | Deferred | |||
| HQ File<br>:01/80/050/00250/AM20/ | RLA File :04/24/040/00137/AM20/ | Lic.No/Date:0410166342<br>10.12.2019 | Pending with<br>MeitY |
106
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY on 16.06.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MeitY for expediting the comments.
Case is deferred.
==> picture [476 x 225] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/18/80- Party Name: AUTO TECH Meet No/Date:2/80- Status:<br>ALC2/2019 INDUSTRIES (INDIA) PVT. LTD. ALC2/2020 & 16.06.2020 Approved<br>HQ File RLA File :04/24/040/00134/AM20/ Lic.No/Date:0410166344<br>:01/80/050/00251/AM20/ 10.12.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms on repeat<br>basis as approved for AA No. 0410165239 dated 21.02.2019 as per written comments of MSME as under:<br>ITCHS Export Item Quantity ITCHS Import Item Recommended Norms<br>107 Code Code<br>Exhaust Rocker With Arm Rocker - 163280 Kgs inclusive of<br>100000<br>84099199 Actuator Sub assembly 87083000 part number 110% wastage after taking<br>Number<br>(Part number 00-045465) 00-044788 20% recovery<br>Note:<br>1. Per unit weight of export item is 776 Gram.<br>2. Per unit weight of import item is 1847 Gram.<br>3. The firm should import relevant item only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:4/18/80- | Party Name: ZECHA | Meet No/Date:2/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRECISION TOOLS LIMITED | 16.06.2020 | Deferred | |||
| HQ File<br>:01/80/050/00249/AM20/ | RLA File<br>:03/95/040/00892/AM20/ | Lic.No/Date:0310833334<br>11.12.2019 | Pending with<br>MSME |
108 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 09.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/18/80- Party Name: GAUPAD Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 INDUSTRY ALC2/2020 & 16.06.2020<br>HQ File RLA File Lic.No/Date:0510412855 Pending with<br>:01/80/050/00252/AM20/ :05/23/040/00329/AM20/ 11.12.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>109<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 17.01.2020 followed by reminders on 20.03.2020 & 16.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
32 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/18/80- Party Name: CRYSTAL Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 INDUSTRIAL SYNDICATE ALC2/2020<br>PVT. LTD. 16.06.2020<br>HQ File RLA File Lic.No/Date:0310833379 Pending with<br>:01/80/050/00253/AM20/ :03/94/040/00752/AM20/ 12.12.2019 RA/Firm<br>110 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 24.01.2020 followed by reminders on 20.03.2020 & 16.06.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 176] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/18/80-ALC2/2019 Party Name: RONCH Meet No/Date:2/80- Status:<br>POLYMERS PVT. LTD. ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310833381 Pending<br>:01/80/050/00254/AM20/ :03/95/040/00887/AM20/ 12.12.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent<br>to MSME on 16.06.2020 for examination of the case. However, the case was discussed in the meeting and on<br>111 the advice Consultant (Tech-1) , the Committee decided to ask from the firm to furnish the following<br>information:<br>1. Appendix 4E with all technical details indicating percentage wastage applied for.<br>2. Manufacturing process in details with wastage involved at every step.<br>3. Net content of each import item in export.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/18/80- Party Name: TPI Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 COMPOSITES INDIA LLP ALC2/2020<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0410166360 Pending with<br>:01/80/050/00255/AM20/ :04/24/040/00138/AM20/ 13.12.2019 RA/Firm<br>112 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai<br>on 17.01.2020 followed by reminders on 20.03.2020 & 16.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, Chennai & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
113
| Case No.:11/18/80- | Party Name: ICEM | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING COMPANY | ALC2/2020 | Approved | ||||
| PRIVATE LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00256/AM20/ | RLA File<br>:03/94/040/00760/AM20/ | Lic.No/Date:0310833402<br>13.12.2019 |
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/51/2020-TSW dated 21.04.2020. (Copy enclosed)
RA concerned may take further necessary action as per the decision of NC.
33 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/18/80- Party Name: VICTORA Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 AUTO PVT. LTD. ALC2/2020 & 16.06.2020<br>HQ File RLA File Lic.No/Date:0510412920 Pending with<br>:01/80/050/00257/AM20/ :05/24/040/00555/AM20/ 16.12.2019 RA/Firm<br>114 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 17.01.2020 followed by reminders on 20.03.2020 & 03.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 302] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/18/80- Party Name: AZAD ENGINEERING Meet No/Date:2/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File :09/24/040/00455/AM20/ Lic.No/Date:0910068287 Pending with<br>:01/80/050/00258/AM20/ 17.12.2019 Firm<br>Decision: The Committee considered the case as per the agenda and DHI informed via email dated 14.07.2020<br>that the firm’s reply is incomplete as the firm has not given calculations. Therefore, the Committee decided to<br>ask again from the firm to furnish following information point-wise:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>115<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>5. Manufacturing process of export product giving specific use of import item with justification of<br>quantity of import.<br>6. Write up of import item.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 188] intentionally omitted <==
----- Start of picture text -----<br> Case No.:14/18/80-ALC2/2019 Party Name: KELVION INDIA Meet No/Date:2/80- Status:<br>PVT. LTD. ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310833455 DL<br>:01/80/050/00259/AM20/ :03/94/040/00474/AM20/ 17.12.2019<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DPIIT vide U. O. No.: P-47011/271/2018-TSW dated 23.04.2020 :<br>116<br>1. Weight of each Export Product<br>2. Detailed calculation as to how the quantity of raw materials proposed for import have been arrived at,<br>including the net weight of components to be manufactured out of these imported materials, wastage<br>claimed at each state of manufacturing with complete justification and supported by documentary<br>evidence/drawings etc.<br>3. Sheet layout diagram of the material indicating the wastage during blanking<br>Case is deferred.<br>----- End of picture text -----<br>
34 | P a g e
| Case No.:15/18/80-ALC2/2019 | Party Name: MASU BRAKE | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PADS PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00260/AM20/ | RLA File<br>:05/24/040/00559/AM20/ | Lic.No/Date:0510412951<br>18.12.2019 | Pending<br>with Firm |
117 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 25.02.2020 followed by a reminder on 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:16/18/80- Party Name: VICTORA AUTO Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 PVT. LTD. ALC2/2020<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510412958 Pending with<br>:01/80/050/00261/AM20/ :05/24/040/00572/AM20/ 18.12.2019 RA/Firm<br>118 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 17.01.2020 followed by reminders on 20.03.2020 & 03.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
119
| Case No.:17/18/80- | Party Name: ZECHA | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | PRECISION TOOLS | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00262/AM20/ | RLA File<br>:03/95/040/00919/AM20/ | Lic.No/Date:0310833525<br>18.12.2019 | Pending with MSME |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 09.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:18/18/80- Party Name: L&T- MHPS Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 TURBINE GENERATORS ALC2/2020<br>PRIVATE LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:0310833550 Pending with<br>:01/80/050/00263/AM20/ :03/95/040/00907/AM20/ 19.12.2019 RA/Firm<br>120 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 17.01.2020 followed by reminders on 20.03.2020 & 16.06.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
35 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:19/18/80-ALC2/2019 Party Name: BONATRANS Meet No/Date:2/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2020 & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310833585 Pending<br>:01/80/050/00264/AM20/ :03/94/040/00773/AM20/ 20.12.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and the firm’s representatives explained the<br>121 case during personal hearing. The Committee directed to the firm’s representatives to provide clarification on<br>following points:<br>1. To clarify, why the ITCHS code for both import & export items are same and if so, then how import &<br>export items can be differentiated.<br>Case is deferred.<br>----- End of picture text -----<br>
122
| Case No.:20/18/80-ALC2/2019 | Party Name: TRILLIUM FLOW | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TECHNOLOGIES INDIA | ALC2/2020 | Withdrawn | |||||
| PRIVATE LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00265/AM20/ | RLA File<br>:03/95/040/00922/AM20/ | Lic.No/Date:0310833627<br>23.12.2019 |
Decision: The Committee considered the case as per the agenda and noted that the case was already approved in Meeting No. 24/80 dated 25.03.2020. Therefore, the Committee decided to withdraw the case from the agenda .
Case is withdrawn.
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/20/80- Party Name: SULZER INDIA Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 PRIVATE LIMITED ALC2/2020<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3110067650 Pending with<br>:01/80/050/00283/AM20/ :31/83/040/00132/AM20/ 07.01.2020 RA/Firm<br>123 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>03.02.2020 followed by reminders on 26.02.2020 & 16.06.2020. However, no information has been received<br>so far. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete<br>set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 176] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/20/80-ALC2/2019 Party Name: HUMANETICS Meet No/Date:2/80- Status:<br>INNOVATIVE SOLUTIONS ALC2/2020 & 16.06.2020 Deferred<br>INDIA PRIVATE LIMI<br>HQ File RLA File Lic.No/Date:0710116010<br>:01/80/050/00285/AM20/ :07/24/040/00227/AM20/ 09.01.2020<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>124 following information as per comments of DPIIT vide U. O. No: P-47011/101/2020-TSW dated 30.06.2020:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Information about the inputs required per unit of the resultant product as per Sl. No. 1 of Appendix-<br>11A appearing in current HBP (Vol.I) separately for each product.<br>3. Assembly drawings/diagrams of the resultant product showing placement and exact use of components<br>in the export product (s).<br>----- End of picture text -----<br>
36 | P a g e
-
Bifurcated quantities of components to be accounted for in the resultant product and the requirement of components as spares. Raw Material / Consumables.
-
Constituents of “Packs” in import items at Sl. No. 2 to 6.
-
Justification for the wastages claimed on import items.
-
Total requirement of each item, export product wise in a tabular form.
Case is deferred.
Case No.:4/20/80- Party Name: FITWEL GASKET Meet No/Date:2/80- Status: ALC2/2019 COMPANY (INDIA) PRIVATE ALC2/2020 Deferred LIMITED 16.06.2020 HQ File RLA File :31/83/040/00134/AM20/ Lic.No/Date:3110067657 Pending with :01/80/050/00286/AM20/ 13.01.2020 Firm
125
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 16.06.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 176] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/20/80-ALC2/2019 Party Name: STEEL STRONG Meet No/Date:2/80- Status:<br>VALVES (I) PVT. LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0310834108<br>:01/80/050/00287/AM20/ :03/95/040/01007/AM20/ 13.01.2020<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>126 following information as per comments of DPIIT vide U. O. No: P-47011/75/2020-TSW dated 14.07.2020:<br>1. Name of the component proposed to be imported.<br>2. Details of items (Raw materials/Components/Consumables etc.) other then imported components<br>required for the manufacture of “Industrial values” with value thereof.<br>3. Details of manufacturing operations.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/20/80- Party Name: ARIHANT Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 INDUSTRIES ALC2/2020<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3310030641 Pending with<br>:01/80/050/00289/AM20/ :33/24/040/00031/AM20/ 13.01.2020 RA/Firm<br>127 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Panipat and in this regard a letter was sent to the firm & RA, Panipat<br>on 03.02.2020 followed by reminders on 26.02.2020 & 16.06.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, Panipat & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
37 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/20/80- Party Name: SULZER Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 PUMPS INDIA PRIVATE ALC2/2020<br>LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:0310834142 Pending with<br>:01/80/050/00288/AM20/ :03/95/040/01012/AM20/ 14.01.2020 RA/Firm<br>128 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 03.02.2020 followed by reminders on 26.02.2020 & 16.06.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
129
| Case No.:9/20/80-ALC2/2019 | Party Name: VEELINE | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| MEDIA LIMITED | ALC2/2020 | Deferred | |||||
| 16.06.2020 | |||||||
| HQ File<br>:01/80/050/00291/AM20/ | RLA File<br>:02/24/040/00159/AM20/ | Lic.No/Date:0210209681<br>14.01.2020 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 09.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:8/20/80-ALC2/2019 | Party Name: TRILLIUM FLOW | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| TECHNOLOGIES INDIA | ALC2/2020 | Withdrawn | ||||
| PRIVATE LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00290/AM20/ | RLA File<br>:03/95/040/00974/AM20/ | Lic.No/Date:0310834155<br>15.01.2020 |
130 Decision: The Committee considered the case as per the agenda and noted that the firm via email dated 17.06.2020 informed that the application is made under "net-to-net" basis and also they are not requested any kind of wastage. Hence, the case may be dissolved. Therefore, the Committee decided to withdraw the case from the agenda.
Case is withdrawn.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/20/80-ALC2/2019 Party Name: GODREJ & Meet No/Date:2/80- Status:<br>BOYCE MFG. CO. LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0310834274 Pending<br>:01/80/050/00292/AM20/ :03/94/040/00848/AM20/ 17.01.2020 with DPIIT<br>131<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent<br>to DPIIT on 16.06.2020 for examination of the case. However, no comments have been received yet.<br>Therefore, the Committee decided to remind DPIIT for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
38 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/20/80- Party Name: ANSTECH Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 ALC2/2020<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3410045793 Pending with<br>:01/80/050/00293/AM20/ :34/24/040/00313/AM20/ 17.01.2020 RA/Firm<br>132 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 03.02.2020 followed by reminders on 26.02.2020 & 16.06.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Vadodara & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:12/20/80-ALC2/2019 | Party Name: MASU BRAKE | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| PADS PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00294/AM20/ | RLA File<br>:05/24/040/00664/AM20/ | Lic.No/Date:0510413364<br>17.01.2020 | Pending<br>with Firm |
133 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 03.06.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:1/22/80- | Party Name: JOHNSON | Meet No/Date:2/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA | 16.06.2020 | Deferred | |||
| PRIVATE LIMITED | ||||||
| HQ File<br>:01/80/050/00327/AM20/ | RLA File<br>:05/23/040/00426/AM20/ | Lic.No/Date:0510413542<br>10.02.2020 | Pending with<br>RA/Firm |
134 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:2/22/80- | Party Name: JOHNSON | Meet No/Date:2/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA | 16.06.2020 | Deferred | |||
| PRIVATE LIMITED | ||||||
| HQ File<br>:01/80/050/00328/AM20/ | RLA File<br>:05/23/040/00427/AM20/ | Lic.No/Date:0510413543<br>10.02.2020 | Pending with<br>RA/Firm |
135 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
39 | P a g e
==> picture [476 x 365] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/22/80- Party Name: MICRON Meet No/Date:2/80- Status:<br>ALC2/2019 INSTRUMENTS PVT LTD ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510413545<br>:01/80/050/00329/AM20/ :05/24/040/00708/AM20/ 10.02.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/15/2020-TSW dated 29.04.2020 as under:<br>Sl.<br>ITCHS Quantity ITCHS Recommende<br>No. Export Item Import Item<br>Code Code d Norms<br>Cathode Kovar support 1043 Dilaton 29/18.<br>1 90229040<br>Tube-Surya. 2340947 Number Iron- nickel -<br>52373571 Tube 08 1586 Cobalt Sealing<br>2 90229040<br>136 KOV.MA4331K14A Number Alloy ASTM -<br>72223099 2618.500 Kgs<br>5304593 Support -S 398 F15-04. (Dilaton<br>3 90229040<br>KOV. MA8133K13 Number 29/18 Dia 38 mm<br>Support Tube Kovar. 409 Tolerance<br>4 90229040<br>SB25051 Number +0,78/-0 mm)<br>Note:<br>1. Net weight of export product at Sl. No. 1 may be specified as 274.309 Kgs.<br>2. Net weight of export product at Sl. No. 2 may be specified as 380.640 Kgs.<br>3. Net weight of export product at Sl. No. 3 may be specified as 57.710 Kgs.<br>4. Net weight of export product at Sl. No. 4 may be specified as 58.900 Kgs.<br>5. Quantity of import may be allowed as 3.122 Kgs/Kg content in the export item at Sl. No. 1, as<br>3.35 Kgs/Kg content in the export item at Sl. No. 2, as 4.26 Kgs/Kg content in the export item<br>at Sl. No. 3 and as 4.094 Kgs/Kg content in the export item at Sl. No. 4 after taking 6%<br>recovery from scrap.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 225] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/22/80-ALC2/2019 Party Name: MICRON Meet No/Date:2/80- Status:<br>INSTRUMENTS PVT LTD ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510413546<br>:01/80/050/00330/AM20/ :05/24/040/00709/AM20/ 10.02.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/15/2020-TSW dated 29.04.2020 as under:<br>137 ITCHS Export Quantity ITCHS<br>Import Item Recommended Norms<br>Code Item Code<br>Stainless Steel 316L Dia 534.14 Kgs<br>Throat.<br>2.26 Inch. Stainless Steel @18.48Kgs/Kg content<br>Throat. 438<br>90229040 72222099 316L Dia 2.26 Inch RD in the export product<br>Part No - Number<br>per ASTM A276/A276M- after taking 6%<br>5768778<br>17. recovery from scrap<br>Note: Net weight of export product may be specified as 28.908 Kgs.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
40 | P a g e
Case No.:5/22/80-ALC2/2019 Party Name: MICRON Meet No/Date:2/80- Status: INSTRUMENTS PVT LTD ALC2/2020 Approved 16.06.2020 HQ File RLA File Lic.No/Date:0510413547 :01/80/050/00331/AM20/ :05/24/040/00711/AM20/ 10.02.2020
| Case No.:5/22/80-ALC2/2019Party Name: MICRON<br>INSTRUMENTS PVT LTD<br>Meet No/Date:2/80-<br>ALC2/2020<br>16.06.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00331/AM20/<br>RLA File<br>:05/24/040/00711/AM20/<br>Lic.No/Date:0510413547<br>10.02.2020 | Case No.:5/22/80-ALC2/2019 | Case No.:5/22/80-ALC2/2019 | Case No.:5/22/80-ALC2/2019 | Party Name: MICRON<br>INSTRUMENTS PVT LTD | Party Name: MICRON<br>INSTRUMENTS PVT LTD | Party Name: MICRON<br>INSTRUMENTS PVT LTD | Meet No/Date:2/80-<br>ALC2/2020<br>16.06.2020<br> <br> | Meet No/Date:2/80-<br>ALC2/2020<br>16.06.2020<br> <br> | Status:<br>Approved |
|---|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00331/AM20/ | RLA File<br>:05/24/040/00711/AM20/ | Lic.No/Date:0510413547<br>10.02.2020 | |||||||
| 138 | Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>written comments ofDPIITvide U. O. No.: P-47011/15/2020-TSW dated 29.04.2020 as under: | ||||||||
| ITCHS<br>Code | Export<br>**Item ** | Quantity | ITCHS<br>Code | Import Item | Recommended Norms | ||||
| 90229040 | Tubes<br>Many.<br>Tubes<br>Many. Part<br>No-<br>2141254 | 4070<br>Number | 72285090 | Dilaton 29/18. Iron-<br>nickel- Cobalt Sealing<br>Alloy ASTM-F15-04.<br>(Dilaton 29/18 Dia<br>12.7mm Tolerance +0/-<br>0.070 mm) | 401.71 Kgs<br>@2.704Kgs/Kg content<br>in the export product<br>after taking 6%<br>recovery from scrap | ||||
| Note: Net weight of export product may be specified as 148.55 Kgs.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/15/2020-TSW dated 29.04.2020 as under:
==> picture [476 x 248] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/22/80-ALC2/2019 Party Name: MICRON Meet No/Date:2/80- Status:<br>INSTRUMENTS PVT LTD ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510413558<br>:01/80/050/00332/AM20/ :05/24/040/00712/AM20/ 10.02.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/15/2020-TSW dated 29.04.2020 as under:<br>ITCHS Quantity ITCHS Recommended<br>Export Item Import Item<br>139 Code Code Norms<br>31186.60 Kgs<br>Anode SS Frame Pre<br>Stainless Steel Bars- @12.02Kgs/Kg<br>Greening Machining-<br>Sanmac 304L. content in the<br>Vajra. Anode SS Frame 1396<br>90229040 72223099 Stainless Steel Bars - export product<br>Pre Greening Number<br>Sanmac 304L. after taking 20%<br>Machining- Vajra Part<br>ASTM A479, A276 recovery from<br>No-2340587.<br>scrap<br>Note: Net weight of export product may be specified as 2593.77 Kgs.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/22/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:2/80- Status:<br>ENGINEERING LIMITED ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0510413567<br>140 :01/80/050/00333/AM20/ :05/23/040/00429/AM20/ 10.02.2020<br>Decision: The Committee considered the case as per the agenda and noted that DPIIT has suggested referring<br>the matter to DHI. Hence, the Committee decided to refer the case to DHI .<br>Case is deferred.<br>----- End of picture text -----<br>
41 | P a g e
| Case No.:8/22/80- | Party Name: JOHNSON | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA PRIVATE | ALC2/2020 | ||||
| LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00334/AM20/ | RLA File<br>:05/23/040/00433/AM20/ | Lic.No/Date:0510413568<br>10.02.2020 | Pending with<br>RA/Firm |
141 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:9/22/80- | Party Name: JOHNSON | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA PRIVATE | ALC2/2020 | ||||
| LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00335/AM20/ | RLA File<br>:05/23/040/00434/AM20/ | Lic.No/Date:0510413570<br>10.02.2020 | Pending with<br>RA/Firm |
142 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:10/22/80- | Party Name: JOHNSON | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA PRIVATE | ALC2/2020 | ||||
| LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00336/AM20/ | RLA File<br>:05/23/040/00435/AM20/ | Lic.No/Date:0510413571<br>10.02.2020 | Pending with<br>RA/Firm |
143 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:11/22/80- | Party Name: JOHNSON | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00337/AM20/ | RLA File<br>:05/23/040/00436/AM20/ | Lic.No/Date:0510413572<br>10.02.2020 | Pending with<br>RA/Firm |
144 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
42 | P a g e
145
| Case No.:12/22/80- | Party Name: JOHNSON | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | MATTHEY INDIA | 16.06.2020 | Deferred | ||||
| PRIVATE LIMITED | |||||||
| HQ File<br>:01/80/050/00338/AM20/ | RLA File<br>:05/23/040/00437/AM20/ | Lic.No/Date:0510413573<br>10.02.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 23.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application. Case is deferred.
146
Case No.:13/22/80- Party Name: DEE DEVELOPMENT Meet No/Date:2/80- Status: ALC2/2019 ENGINEERS LIMITED ALC2/2020 & 16.06.2020 Deferred HQ File RLA File :05/23/040/00432/AM20/ Lic.No/Date:0510413575 :01/80/050/00339/AM20/ 10.02.2020
Decision: The Committee considered the case as per the agenda and decided to refer the case to DHI for examination and comments.
Case is deferred.
147
| Case No.:14/22/80-ALC2/2019 | Party Name: ISGEC HEAVY | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING LIMITED | ALC2/2020 & 16.06.2020 | Deferred | |||||
| HQ File<br>:01/80/050/00340/AM20/ | RLA File<br>:05/23/040/00428/AM20/ | Lic.No/Date:0510413578<br>11.02.2020 | Pending<br>with DPIIT |
Decision: The Committee considered the case as per the agenda and noted that DPIIT has suggested referring the matter to DHI. Hence, the Committee decided to refer the case to DHI .
Case is deferred.
148
| Case No.:16/22/80-ALC2/2019 | Party Name: MICRON | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2020 & 16.06.2020 | Deferred | |||||
| HQ File<br>:01/80/050/00342/AM20/ | RLA File<br>:05/24/040/00719/AM20/ | Lic.No/Date:0510413598<br>12.02.2020 |
Decision: The Committee considered the case as per the agenda and decided to refer the case to DPIIT for examination and comments.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:17/22/80- Party Name: LM WIND POWER Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2019 BLADES INDIA PVT. LTD. & 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045867 Pending with<br>:01/80/050/00343/AM20/ :34/24/040/00355/AM20/ 12.02.2020 RA/Firm<br>149 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 15.06.2020. However, no information has been received so far. Therefore, the Committee<br>decided to remind RA, Vadodara & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
43 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:18/22/80- Party Name: SCHOCH REEDS Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 INDIA PRIVATE LIMITED ALC2/2020 & 16.06.2020<br>HQ File RLA File Lic.No/Date:3110067684 Pending with<br>:01/80/050/00344/AM20/ :31/83/040/00152/AM20/ 13.02.2020 RA/Firm<br>150 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>23.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind<br>RA, Pune & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:19/22/80- Party Name: HFCL Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 LIMITED ALC2/2020 & 16.06.2020<br>HQ File RLA File Lic.No/Date:0510413626 Pending with<br>:01/80/050/00345/AM20/ :05/23/040/00443/AM20/ 14.02.2020 RA/Firm<br>151 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 23.06.2020. However, no information has been received so far. Therefore, the Committee decided to<br>remind RA, New Delhi & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:1/24/80-ALC2/2019 | Party Name: TRILLIUM FLOW | Meet No/Date:2/80- | Status: | |||
|---|---|---|---|---|---|---|
| TECHNOLOGIES INDIA | ALC2/2020 | Withdrawn | ||||
| PRIVATE LIMITED | 16.06.2020 | |||||
| HQ File<br>:01/80/050/00358/AM20/ | RLA File<br>:03/95/040/01119/AM20/ | Lic.No/Date:0310835187<br>04.03.2020 |
152 Decision: The Committee considered the case as per the agenda and noted that the firm via email dated 17.06.2020 informed that the application is made under "net-to-net" basis and also they are not requested any kind of wastage. Hence, the case may be dissolved. Therefore, the Committee decided to withdraw the case from the agenda.
Case is withdrawn.
==> picture [476 x 207] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/24/80- Party Name: FRIZAIR Meet No/Date:2/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2020 & 16.06.2020 Approved<br>HQ File RLA File Lic.No/Date:0910068556<br>:01/80/050/00359/AM20/ :09/24/040/00592/AM20/ 06.03.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/63/2020-TSW dated 30.06.2020 as under:<br>153 ITCHS Quantit Sl. ITCHS Recommended<br>Export Item y No. Import Item<br>Code Code Norms<br>Condenser/<br>Evaporator Relevant Copper Tubes 1.01Kgs/Kg content<br>Coils used as 1 74111000 Refrigeration Quality - in the export product<br>68429<br>84159000 heat Dia.1/8" to 1/4" as per SION C-1175<br>Kgs<br>Exchangers for<br>Air Relevant Aluminium 1.01Kgs/Kg content<br>Conditioning 2 76082000 Tubes Refrigeration in the export product<br>----- End of picture text -----<br>
44 | P a g e
| and<br>Refrigerator<br>purpose.<br>Model :<br>Condenser -<br>R38 (51840<br>Nos = 68429<br>Kgs) | Quality -Dia. 1/8" to<br>1/4" | as per SION C-1175 | |||||
|---|---|---|---|---|---|---|---|
| 3 | 76072090 | Relevant Aluminium<br>Fin Stock thickness<br>0.10mm to 0.20mm | 1.02Kgs/Kg content<br>in the export product<br>asper SION C-1175 | ||||
| 4 | 83119000 | Brazing Materials | Up to 0.5% of FOB<br>value of export as<br>per SION C-1175 | ||||
| 5 | 74121000 | U Bends | Net to net basis with<br>accountabilityclause | ||||
| RA concerned maytake further necessaryaction asper the decision of NC. |
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/24/80- Party Name: SULZER INDIA Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 PRIVATE LIMITED ALC2/2020<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3110067707 Pending with<br>:01/80/050/00360/AM20/ :31/83/040/00160/AM20/ 06.03.2020 RA/Firm<br>154 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>03.02.2020 followed by reminders on 26.02.2020 & 16.06.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set<br>of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/24/80- Party Name: ROTHE ERDE Meet No/Date:2/80- Status: Deferred<br>ALC2/2019 INDIA PRIVATE LIMITED ALC2/2020 & 16.06.2020<br>HQ File RLA File Lic.No/Date:3110067708 Pending with<br>:01/80/050/00361/AM20/ :31/83/040/00146/AM20/ 06.03.2020 RA/Firm<br>155 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>23.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind<br>RA, Pune & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:5/24/80- | Party Name: ULTRA ENGINEERS Meet No/Date:2/80- | Status: | ||
|---|---|---|---|---|
| ALC2/2019 | ALC2/2020 & 16.06.2020 | Deferred | ||
| HQ File<br>:01/80/050/00362/AM20/ | RLA File :31/83/040/00162/AM20/ Lic.No/Date:3110067709<br>06.03.2020 | Pending with<br>Tech-3 |
156 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 02.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
45 | P a g e
157
| Case No.:6/24/80-ALC2/2019 | Party Name: DOOWON | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AUTOMOTIVE SYSTEMS | ALC2/2020 | Deferred | |||||
| INDIA PRIVATE LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00363/AM20/ | RLA File<br>:04/24/040/00195/AM20/ | Lic.No/Date:0410166600<br>09.03.2020 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 09.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/24/80- Party Name: TEMA INDIA Meet No/Date:2/80-ALC2/2020 Status: Deferred<br>ALC2/2019 LIMITED 16.06.2020<br>HQ File RLA File Lic.No/Date:0310835306 Pending with<br>:01/80/050/00364/AM20/ :03/95/040/01160/AM20/ 09.03.2020 RA/Firm<br>158 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 05.06.2020. However, no information has been received so far. Therefore, the Committee decided<br>to remind RA, Mumbai & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:8/24/80- | Party Name: SHAKTI PUMPS | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDIA LIMITED | ALC2/2020 | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00365/AM20/ | RLA File<br>:56/24/040/00031/AM20/ | Lic.No/Date:5610005840<br>09.03.2020 | Pending with<br>RA/Firm |
159 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Indore and in this regard a letter was sent to the firm & RA, Indore on 05.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Indore & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:9/24/80- | Party Name: SHAKTI PUMPS | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDIA LIMITED | ALC2/2020 | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00366/AM20/ | RLA File<br>:56/24/040/00042/AM20/ | Lic.No/Date:5610005841<br>09.03.2020 | Pending with<br>RA/Firm |
160 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Indore and in this regard a letter was sent to the firm & RA, Indore on 05.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Indore & the firm for submitting the complete set of application.
Case is deferred.
46 | P a g e
161
| Case No.:10/24/80- | Party Name: HONDA | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | TRADING CORPORATION | 16.06.2020 | Deferred | ||||
| INDIA PRIVATE LIMITED | |||||||
| HQ File<br>:01/80/050/00367/AM20/ | RLA File<br>:05/23/040/00449/AM20/ | Lic.No/Date:0510413853<br>12.03.2020 | Pending with<br>Tech-3 |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 09.07.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:11/24/80- | Party Name: HANNING | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P. LTD. | ALC2/2020 | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00368/AM20/ | RLA File<br>:34/24/040/00382/AM20/ | Lic.No/Date:3410045945<br>12.03.2020 | Pending with<br>RA/Firm |
162 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 05.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:12/24/80- | Party Name: HANNING | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P. LTD. | ALC2/2020 | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00369/AM20/ | RLA File<br>:34/24/040/00383/AM20/ | Lic.No/Date:3410045946<br>12.03.2020 | Pending with<br>RA/Firm |
163 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 05.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:13/24/80- | Party Name: HANNING | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P LTD | ALC2/2020 | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00370/AM20/ | RLA File<br>:34/24/040/00384/AM20/ | Lic.No/Date:3410045947<br>12.03.2020 | Pending with<br>RA/Firm |
164 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 05.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
47 | P a g e
| Case No.:14/24/80- | Party Name: S K | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDUSTRIES | ALC2/2020 | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00371/AM20/ | RLA File<br>:34/24/040/00387/AM20/ | Lic.No/Date:3410045951<br>12.03.2020 | Pending with<br>RA/Firm |
165 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 24.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:15/24/80- | Party Name: UNI VTL | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRECISION PVT. LTD. | ALC2/2020 | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00372/AM20/ | RLA File<br>:07/24/040/00287/AM20/ | Lic.No/Date:0710116245<br>12.03.2020 | Pending with<br>RA/Firm |
166 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA, Bangalore on 24.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Bangalore & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:16/24/80- | Party Name: SHREE | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | LAXMI GLASSTECH | ALC2/2020 | ||||
| 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00373/AM20/ | RLA File<br>:13/24/040/00207/AM20/ | Lic.No/Date:1310049548<br>13.03.2020 | Pending with<br>RA/Firm |
167
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Jaipur and in this regard a letter was sent to the firm & RA, Jaipur on 24.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Jaipur & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 188] intentionally omitted <==
----- Start of picture text -----<br> Case No.:17/24/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:2/80- Status:<br>COMPOSITES - INDIA PVT. ALC2/2020 Deferred<br>LTD. 16.06.2020<br>HQ File RLA File Lic.No/Date:0310835424<br>:01/80/050/00374/AM20/ :03/94/040/01027/AM20/ 17.03.2020<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DPIIT vide U. O. No: P-47011/193/2019-TSW dated 13.07.2020:<br>168<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Assembly drawings/diagrams of the resultant product showing placement and exact use of components<br>in the export product (s).<br>3. Bifurcated quantities of components to be accounted for in the resultant product and the requirement<br>of components as spares. Raw Material / Consumables.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>----- End of picture text -----<br>
48 | P a g e
proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
-
Quantities of import items (Raw materials/Components/Consumables wise etc.) to be accounted for in the product.
-
Basis/justification for the quantities of import items.
Case is deferred.
Case No.:18/24/80-ALC2/2019 Party Name: ANGIPLAST Meet No/Date:2/80- Status: PRIVATE LIMITED ALC2/2020 Deferred 16.06.2020 HQ File RLA File Lic.No/Date:0810147487 169 :01/80/050/00375/AM20/ :08/24/040/00406/AM20/ 17.03.2020
Decision: The Committee considered the case as per the agenda and decided to refer the case to Consultant (Tech-1) for examination and comments.
Case is deferred.
Case No.:19/24/80- Party Name: AZAD Meet No/Date:2/80- Status: Deferred ALC2/2019 ENGINEERING PRIVATE ALC2/2020 LIMITED 16.06.2020 HQ File RLA File Lic.No/Date:0910068587 Pending with :01/80/050/00376/AM20/ :09/24/040/00624/AM20/ 18.03.2020 RA/Firm
170
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 15.06.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
171
Case No.:1/2/80- Party Name: MICRON Meet No/Date:2/80- Status: Deferred ALC2/2020 INSTRUMENTS PVT LTD ALC2/2020 & 16.06.2020 HQ File RLA File Lic.No/Date:0510414152 Pending with :01/80/050/00431/AM21/ :05/24/040/00040/AM21/ 13.05.2020 RA/Firm
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the copy of application for examination of the case. Case is deferred.
Case No.:2/2/80- Party Name: MICRON Meet No/Date:2/80- Status: Deferred ALC2/2020 INSTRUMENTS PVT LTD ALC2/2020 & 16.06.2020 HQ File RLA File Lic.No/Date:0510414153 Pending with :01/80/050/00432/AM21/ :05/24/040/00041/AM21/ 13.05.2020 RA/Firm
172 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the copy of application for examination of the case.
Case is deferred.
49 | P a g e
| Case No.:3/2/80- | Party Name: MICRON | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INSTRUMENTS PVT LTD | ALC2/2020 & 16.06.2020 | ||||
| HQ File<br>:01/80/050/00433/AM21/ | RLA File<br>:05/24/040/00042/AM21/ | Lic.No/Date:0510414154<br>13.05.2020 | Pending with<br>RA/Firm |
173 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the copy of application for examination of the case.
Case is deferred.
| Case No.:4/2/80- | Party Name: MICRON | Meet No/Date:2/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2020 | INSTRUMENTS PVT LTD | ALC2/2020 & 16.06.2020 | ||||
| HQ File<br>:01/80/050/00434/AM21/ | RLA File<br>:05/24/040/00045/AM21/ | Lic.No/Date:0510414168<br>13.05.2020 | Pending with<br>RA/Firm |
174 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the copy of application for examination of the case.
Case is deferred.
175
| Case No.:5/2/80- | Party Name: LM WIND | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | POWER BLADES INDIA | ALC2/2020 | |||||
| PVT. LTD | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00435/AM21/ | RLA File<br>:34/24/040/00031/AM21/ | Lic.No/Date:3410046058<br>14.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the copy of application for examination of the case.
Case is deferred.
176
| Case No.:6/2/80- | Party Name: LM WIND | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | POWER BLADES INDIA | ALC2/2020 | |||||
| PVT. LTD | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00436/AM21/ | RLA File<br>:34/24/040/00032/AM21/ | Lic.No/Date:3410046059<br>14.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the copy of application for examination of the case.
Case is deferred.
50 | P a g e
==> picture [476 x 185] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/2/80-ALC2/2020 Party Name: HANNING Meet No/Date:2/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 & 16.06.2020 Approved<br>HQ File RLA File Lic.No/Date:3410046069<br>:01/80/050/00437/AM21/ :34/24/040/00027/AM21/ 15.05.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>177<br>1. Quantity of relevant import items at Sl. No. 1 to 5 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 6 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>3. Quantity of relevant import items at Sl. No. 7 to 12 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 185] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/2/80-ALC2/2020 Party Name: HANNING Meet No/Date:2/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 & 16.06.2020 Approved<br>HQ File RLA File Lic.No/Date:3410046070<br>:01/80/050/00438/AM21/ :34/24/040/00028/AM21/ 15.05.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>178<br>1. Quantity of relevant import items at Sl. No. 1 to 6 & 9 may be allowed as per GN-4.<br>2. Quantity of relevant import items at Sl. No. 7 may be allowed as 1.05 Kgs/Kg content in the export<br>product.<br>3. Quantity of relevant import item at Sl. No. 8 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 195] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/2/80-ALC2/2020 Party Name: HANNING Meet No/Date:2/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3410046071<br>:01/80/050/00439/AM21/ :34/24/040/00029/AM21/ 15.05.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>179<br>1. Quantity of relevant import items at Sl. No. 1 to 6 may be allowed as per GN-4.<br>2. Quantity of relevant import items at Sl. No. 7 & 8 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>3. Quantity of relevant import item at Sl. No. 9 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
51 | P a g e
==> picture [476 x 196] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/2/80-ALC2/2020 Party Name: HANNING Meet No/Date:2/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3410046072<br>:01/80/050/00440/AM21/ :34/24/040/00030/AM21/ 15.05.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>180<br>1. Quantity of relevant import items at Sl. No. 1 to 8 may be allowed as per GN-4.<br>2. Quantity of relevant import items at Sl. No. 9 & 10 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>3. Quantity of relevant import item at Sl. No. 11 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
Case No.:11/2/80- Party Name: HANNING Meet No/Date:2/80-ALC2/2020 Status: Deferred ALC2/2020 MOTORS INDIA P LTD 16.06.2020 HQ File RLA File Lic.No/Date:3410046073 Pending with :01/80/050/00441/AM21/ :34/24/040/00399/AM20/ 15.05.2020 RA/Firm
181
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the copy of application for examination of the case.
Case is deferred.
Case No.:12/2/80-ALC2/2020 Party Name: HANNING Meet No/Date:2/80- Status: MOTORS INDIA P LTD ALC2/2020 Approved 16.06.2020 HQ File RLA File Lic.No/Date:3410046074 :01/80/050/00442/AM21/ :34/24/040/00400/AM20/ 15.05.2020
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:
182
-
Quantity of relevant import items at Sl. No. 1 to 12 may be allowed as per GN-4 .
-
Quantity of relevant import items at Sl. No. 13 to 17 may be allowed as 1.05 Kgs/Kg content in the export product.
-
Quantity of relevant import item at Sl. No. 18 may be allowed as 1.01 Kgs/Kg content in the export product.
RA concerned may take further necessary action as per the decision of NC.
52 | P a g e
183
| Case No.:13/2/80- | Party Name: AZAD | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00443/AM21/ | RLA File<br>:09/24/040/00087/AM21/ | Lic.No/Date:0910068749<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
184
| Case No.:14/2/80- | Party Name: AZAD | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00444/AM21/ | RLA File<br>:09/24/040/00089/AM21/ | Lic.No/Date:0910068750<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
185
| Case No.:15/2/80- | Party Name: AZAD | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00445/AM21/ | RLA File<br>:09/24/040/00086/AM21/ | Lic.No/Date:0910068751<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
186
| Case No.:16/2/80- | Party Name: AZAD | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00446/AM21/ | RLA File<br>:09/24/040/00096/AM21/ | Lic.No/Date:0910068752<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
53 | P a g e
187
| Case No.:17/2/80- | Party Name: AZAD | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00447/AM21/ | RLA File<br>:09/24/040/00092/AM21/ | Lic.No/Date:0910068753<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
188
| Case No.:18/2/80- | Party Name: AZAD | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00448/AM21/ | RLA File<br>:09/24/040/00090/AM21/ | Lic.No/Date:0910068754<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
189
| Case No.:19/2/80- | Party Name: AZAD | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00449/AM21/ | RLA File<br>:09/24/040/00088/AM21/ | Lic.No/Date:0910068755<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
190
| Case No.:20/2/80- | Party Name: AZAD | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00450/AM21/ | RLA File<br>:09/24/040/00085/AM21/ | Lic.No/Date:0910068756<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
54 | P a g e
191
| Case No.:21/2/80- | Party Name: AZAD | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | 16.06.2020 | Deferred | ||||
| LIMITED | |||||||
| HQ File<br>:01/80/050/00451/AM21/ | RLA File<br>:09/24/040/00093/AM21/ | Lic.No/Date:0910068757<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
192
| Case No.:22/2/80- | Party Name: AZAD | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00452/AM21/ | RLA File<br>:09/24/040/00094/AM21/ | Lic.No/Date:0910068758<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
193
| Case No.:23/2/80- | Party Name: AZAD | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00453/AM21/ | RLA File<br>:09/24/040/00091/AM21/ | Lic.No/Date:0910068759<br>15.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
194
| Case No.:24/2/80- | Party Name: DILIGENT | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | SCM SOLUTIONS PR | 16.06.2020 | Deferred | ||||
| IVATE LIMITED | |||||||
| HQ File<br>:01/80/050/00454/AM21/ | RLA File<br>:09/24/040/00082/AM21/ | Lic.No/Date:0910068760<br>18.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
55 | P a g e
195
| Case No.:25/2/80- | Party Name: DILIGENT SCM | Meet No/Date:2/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | SOLUTIONS PR IVATE | ALC2/2020 | |||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00455/AM21/ | RLA File<br>:09/24/040/00083/AM21/ | Lic.No/Date:0910068770<br>18.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the copy of application for examination of the case.
Case is deferred.
196
| Case No.:28/2/80- | Party Name: VENUS | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | SAFETY & HEALTH | 16.06.2020 | Deferred | ||||
| PRIVATE LIMITED | |||||||
| HQ File<br>:01/80/050/00458/AM21/ | RLA File<br>:03/95/040/00090/AM21/ | Lic.No/Date:0310836278<br>20.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm . Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the copy of application for examination of the case.
Case is deferred.
==> picture [476 x 272] intentionally omitted <==
----- Start of picture text -----<br> Case No.:37/2/80- Party Name: GODREJ & Meet No/Date:2/80-ALC2/2020 Status:<br>ALC2/2020 BOYCE MFG. CO. LTD. 16.06.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310836284 Pending with<br>:01/80/050/00467/AM21/ :03/94/040/00083/AM21/ 20.05.2020 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from RA, Mumbai & the firm . However, similar cases of the firm were discussed in<br>meeting during personal hearing. Hence, on the advice of Consultant (SKB), the Committee decided to ask<br>from the firm to furnish complete set of application along with reply of following deficiencies :<br>1. What is the thickness of the imported plates?<br>197 2. Weight of each Mini/Maxi Proto/production Dyads.<br>3. What is the chemical composition of carbon steel plates of grade 250/350/PT460 NR/BS80? Please<br>indicate equivalent IS Standard.<br>4. What are the drawing numbers belong to proto type and production type Mini Dyads?<br>5. What are the drawing numbers belong to proto type and production type Maxi Dyads?<br>6. As per drawings, there are 9 types of plate thicknesses are required for fabrication of Mini/Maxi<br>Dyads. However, only 4 grades of plate are indicated. Please clarify whether the remaining grades of<br>plates would be procured indigenously.<br>7. Which assembly belongs to proto/production type mini/maxi Dyads?<br>Case is deferred.<br>----- End of picture text -----<br>
56 | P a g e
198
| Case No.:26/2/80- | Party Name: TPI | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | COMPOSITES INDIA | 16.06.2020 | Deferred | ||||
| PRIVATE LIMITED | |||||||
| HQ File<br>:01/80/050/00456/AM21/ | RLA File<br>:04/24/040/00012/AM21/ | Lic.No/Date:0410166764<br>21.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Chennai & the firm . Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the copy of application for examination of the case.
Case is deferred.
199
| Case No.:27/2/80- | Party Name: TPI | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | COMPOSITES INDIA | 16.06.2020 | Deferred | ||||
| PRIVATE LIMITED | |||||||
| HQ File<br>:01/80/050/00457/AM21/ | RLA File<br>:04/24/040/00023/AM21/ | Lic.No/Date:0410166767<br>21.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Chennai & the firm . Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the copy of application for examination of the case.
Case is deferred.
200
| Case No.:38/2/80- | Party Name: STERLITE | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | POWER TRANSMISSION | 16.06.2020 | Deferred | ||||
| LIMITED | |||||||
| HQ File<br>:01/80/050/00468/AM21/ | RLA File<br>:03/95/040/01035/AM20/ | Lic.No/Date:0310836300<br>21.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm . Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the copy of application for examination of the case.
Case is deferred.
201
| Case No.:29/2/80- | Party Name: FERRUM | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | EXTREME ENGINEERING | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00459/AM21/ | RLA File<br>:05/23/040/00029/AM21/ | Lic.No/Date:0510414238<br>22.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the copy of application for examination of the case.
Case is deferred.
57 | P a g e
202
| Case No.:30/2/80- | Party Name: HEURTEY | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | PETROCHEM INDIA | 16.06.2020 | Deferred | ||||
| PRIVATE LIMITED | |||||||
| HQ File<br>:01/80/050/00460/AM21/ | RLA File<br>:34/24/040/00042/AM21/ | Lic.No/Date:3410046093<br>26.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the copy of application for examination of the case.
Case is deferred.
==> picture [476 x 210] intentionally omitted <==
----- Start of picture text -----<br> Case No.:31/2/80-ALC2/2020 Party Name: HANNING Meet No/Date:2/80- Status:<br>MOTORS INDIA P. LTD. ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3410046094<br>:01/80/050/00461/AM21/ :34/24/040/00043/AM21/ 26.05.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>203<br>1. Quantity of relevant import items at Sl. No. 1 to 20 may be allowed as per GN-4 .<br>2. Quantity of relevant import item at Sl. No. 21 may be allowed on net to net basis.<br>3. Quantity of relevant import items at Sl. No. 22 & 23 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>4. Quantity of relevant import item at Sl. No. 24 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 197] intentionally omitted <==
----- Start of picture text -----<br> Case No.:32/2/80-ALC2/2020 Party Name: HANNING Meet No/Date:2/80- Status:<br>MOTORS INDIA P. LTD. ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3410046095<br>:01/80/050/00462/AM21/ :34/24/040/00044/AM21/ 26.05.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>204<br>1. Quantity of relevant import items at Sl. No. 1 to 15 may be allowed as per GN-4 .<br>2. Quantity of relevant import items at Sl. No. 16 to 18 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>3. Quantity of relevant import item at Sl. No. 19 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
58 | P a g e
==> picture [476 x 196] intentionally omitted <==
----- Start of picture text -----<br> Case No.:33/2/80-ALC2/2020 Party Name: HANNING Meet No/Date:2/80- Status:<br>MOTORS INDIA P LTD. ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3410046096<br>:01/80/050/00463/AM21/ :34/24/040/00045/AM21/ 26.05.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>205<br>1. Quantity of relevant import items at Sl. No. 1 to 9 may be allowed as per GN-4.<br>2. Quantity of relevant import items at Sl. No. 10 & 11 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>3. Quantity of relevant import item at Sl. No. 12 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
206
| Case No.:35/2/80- | Party Name: L&T- MHPS | Meet No/Date:2/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | TURBINE GENERATORS | 16.06.2020 | Deferred | ||||
| PRIVATE LIMITED | |||||||
| HQ File<br>:01/80/050/00465/AM21/ | RLA File<br>:03/95/040/00084/AM21/ | Lic.No/Date:0310836382<br>26.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm . Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the copy of application for examination of the case.
Case is deferred.
207
| Case No.:36/2/80- | Party Name: L&T- MHPS | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | TURBINE GENERATORS | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00466/AM21/ | RLA File<br>:03/95/040/00085/AM21/ | Lic.No/Date:0310836383<br>26.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm . Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the copy of application for examination of the case.
Case is deferred.
208
| Case No.:34/2/80- | Party Name: DEE | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | DEVELOPMENT ENGINEERS | ALC2/2020 | Deferred | ||||
| LIMITED | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00464/AM21/ | RLA File<br>:05/23/040/00034/AM21/ | Lic.No/Date:0510414257<br>27.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the copy of application for examination of the case.
Case is deferred.
59 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:39/2/80- Party Name: JOHNSON LIFTS Meet No/Date:2/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0410166788 Pending with<br>:01/80/050/00469/AM21/ :04/24/040/00202/AM20/ 29.05.2020 RA/Firm<br>209<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from RA, Chennai & the firm . Therefore, the Committee decided to request from RA,<br>Chennai and the firm to furnish the copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
210
| Case No.:40/2/80- | Party Name: LM WIND | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | POWER BLADES INDIA PVT. | ALC2/2020 | Deferred | ||||
| LTD. | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00470/AM21/ | RLA File<br>:34/24/040/00049/AM21/ | Lic.No/Date:3410046107<br>29.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the copy of application for examination of the case.
Case is deferred.
211
| Case No.: | Party Name: UNDERCARRIAGE | Meet No/Date:2/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| 41/2/80-ALC2/2020 | AND TRACTOR PARTS PVT. | ALC2/2020 | Deferred | ||||
| LTD. | 16.06.2020 | ||||||
| HQ File<br>:01/80/050/00471/AM21/ | RLA File :03/95/040/00097/AM21/ | Lic.No/Date:0310836421<br>29.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm . Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the copy of application for examination of the case.
Case is deferred.
==> picture [476 x 196] intentionally omitted <==
----- Start of picture text -----<br> Case No.:42/2/80-ALC2/2020 Party Name: HANNING Meet No/Date:2/80- Status:<br>MOTORS INDIA P. LTD. ALC2/2020 Approved<br>16.06.2020<br>HQ File RLA File Lic.No/Date:3410046114<br>:01/80/050/00472/AM21/ :34/24/040/00040/AM21/ 02.06.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>212<br>1. Quantity of relevant import items at Sl. No. 1 to 14 may be allowed as per GN-4.<br>2. Quantity of relevant import items at Sl. No. 15 to 18 may be allowed as 1.05 Kgs/Kg content in the<br>export product.<br>3. Quantity of relevant import item at Sl. No. 19 may be allowed as 1.01 Kgs/Kg content in the export<br>product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
60 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:43/2/80- Party Name: NTB Meet No/Date:2/80- Status:<br>ALC2/2020 INTERNATIONAL PVT. LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0310836497 Pending with<br>:01/80/050/00473/AM21/ :03/95/040/01237/AM20/ 04.06.2020 RA/Firm<br>213<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from RA, Mumbai & the firm . Therefore, the Committee decided to request from RA,<br>Mumbai and the firm to furnish the copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 157] intentionally omitted <==
----- Start of picture text -----<br> Case is deferred.<br>Case No.:44/2/80-ALC2/2020 Party Name: GODREJ & Meet No/Date:2/80- Status:<br>BOYCE MFG. CO. LTD. ALC2/2020 Deferred<br>16.06.2020<br>HQ File RLA File Lic.No/Date:0310836537 Pending with<br>:01/80/050/00474/AM21/ :03/94/040/00124/AM21/ 05.06.2020 RA/Firm<br>214<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from RA, Mumbai & the firm . Therefore, the Committee decided to request from RA,<br>Mumbai and the firm to furnish the copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
61 | P a g e
Offline Cases
Sl. No. 13
==> picture [476 x 614] intentionally omitted <==
----- Start of picture text -----<br> Case No. 56/19/80-ALC2/2017<br>Case No. 18/3/80- ALC2 /2018<br>Case No. 50/11/80-ALC2/2018<br>M/s AUTO COMP INDIA PVT. LTD.<br>M. No.: 02/80-ALC2/2019 dated 16.06.2020<br>Lic. No. /date: 3110066941 dated 20.12.2017 Status:<br>Lic. No. /date: 3110067004 dated 15.03.2018 Approved<br>Lic. No. /date: 3110067175 dated 12.09.2018<br>HQ. No. 01/80/050/00337/AM18<br>HQ. No. 01/80/050/00018/AM19 Subject: Request for re-fixation of ad-hoc<br>HQ. No .01/80/050/00241/AM19 norms in respect of 3 AA issued to M/s<br>RLA No. 31/83/040/00109/AM18 AUTO COMP INDIA PVT. LTD., under<br>RLA No. 31/83/040/00166/AM18 Para 4.7 of HBP (Vol.-I) – reg.<br>RLA No.31/83/040/00090/AM19<br>Decision:<br>i.) In respect of Lic. No. /date: 3110066941 dated 20.12.2017:<br>The Committee considered the case as per the agenda and noted that the case was rejected the norms by NC<br>in its 4/80-ALC2/2018 dated 23.05.2018, as import item description is not clear and AA allowed only for<br>specific import item.<br>However, the firm had submitted their justification and requested for fixation of ad-hoc norms. The<br>Committee reconsidered the case and decided to ratify the ad-hoc norms on repeat basis as approved for AA<br>No. 3110043464 dated 02.06.2010 as per written comments of DHI as under:<br>ITCHS Quantity ITCHS Recommended<br>Export Item Import Item<br>Code Code Norms<br>Hub Impeller/ Coupling Carbon Steel 42% wastage<br>84836090 52.820 MT 73043939<br>Carbon Content upto 0.60 Seamless Tubes allowed<br>Note:<br>1. The description of import item may be amended as “Carbon Steel Seamless Tubes”.<br>2. Grade of steel to match with import & export.<br>RA concerned may take further necessary action as per the decision of NC.<br>ii.) In respect of Lic. No. /date: 3110067004 dated 15.03.2018:<br>The Committee considered the case as per agenda and the case was ratified in Meeting No. 3/80-ALC2/2018<br>dated 09.05.2018 on the recommendation of technical representatives of DHI, DIPP and MSME.<br>However, the firm had requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and<br>decided to revise the ad-hoc norms on repeat basis as approved for AA No. 3110043464 dated 02.06.2010 as<br>per written comments of DHI as under:<br>ITCHS Quantity ITCHS Recommended<br>Export Item Import Item<br>Code Code Norms<br>Hub-Impeller / Coupling (<br>Carbon Steel 42% wastage<br>84836090 Carbon Content upto 0.60 88.030 MT 73043939<br>Seamless Tubes allowed<br>Carbon Content upto 0.60<br>Note:<br>1. The description of import item may be amended as “Carbon Steel Seamless Tubes”.<br>2. Grade of steel to match with import & export.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
62 | P a g e
iii.) In respect of Lic. No. /date: 3110067175 dated 12.09.2018: The Committee considered the case as per agenda and the case was ratified in meeting No. 3/80ALC2/2018 dated 09.05.2018 as per the written comments of DHI vide U. No. No. DES-I/AIPL/HIC-12018-HEI dated 20.12.2018.
However, the firm had requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and decided to revise the ad-hoc norms on repeat basis as approved for AA No. 3110043464 dated 02.06.2010 as per written comments of DHI as under:
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import<br>**Item ** | Recommended<br>Norms<br>42% wastage<br>allowed |
|---|---|---|---|---|---|
| 84836090 | Hub-Impeller / Coupling (Made<br>from Carbon Steel Seamless<br>Tube) Carbon Content upto 0.60<br>Grade AISI 1035. | 88.030 MT | 73043939 | Carbon<br>Steel<br>Seamless<br>Tubes |
Note:
1. The description of import item may be amended as “Carbon Steel Seamless Tubes”.
2. Grade of steel to match with import & export.
RA concerned may take further necessary action as per the decision of NC.
Sl. No. 14
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No. 13/5/80-ALC2/2017<br>Case No. 29/19/80-ALC2/2016<br>Case No. 8/14/80-ALC2/2018<br>M. No.: 02/80-ALC2/2019 dated 16.06.2020 Status:<br>M/s SENIOR INDIA PRIVATE LIMITED<br>Adv. Lic. No. 0510402202 dated 12.04.2017 Deferred<br>Adv. Lic. No. 0510399661 dated 08.09.2016<br>Adv. Lic. No. 0510409022 dated 20.12.2018<br>HQ. No. 01/80/050/00074/AM18 Subject: Request for re-fixation of ad-hoc Pending<br>HQ. No. 01/80/050/00424/AM17 norms in respect of 3 AA issued to M/s with DPIIT<br>HQ. No. 01/80/050/00324/AM19 SENIOR INDIA PRIVATE LIMITED,<br>RLA No. 05/24/040/00012/AM18 under Para 4.7 of HBP (Vol.-I) – reg.<br>RLA No. 05/24/040/00288/AM17<br>RLA No. 05/24/040/00435/AM19<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda noted that the above three cases were approved by NC in Meeting No. 8/80 dated 18.07.2017, Meeting No. 22/80 dated 31.01.2017 and Meeting No. 06/80 dated 03.07.2019 as per the written comments of DIPP letter no. 12/54/2017-TSW/105 dated 18.7.2017, written comments of DIPP vide UO No. 12/6/2017-TSW/56 dated 31.01.2017 and written comments of DPIIT vide U.O. No.: P-47011/416/2018-TSW dated 03.07.2019 respectively.
However, the firm has requested for re-viewing of ad-hoc norms. The Committee reconsidered the case and noted that DPIIT in its comments vide U. O. No.: P-47011/416/2018-TSW dated 20.05.2020 had not given any justification for revision of ratified ad-hoc norms. However, the matter was discussed in the meeting and the Committee decided to seek justification for revision of ratified ad-hoc norms from DPIIT .
Case is deferred.
63 | P a g e
Sl. No. 15
| Sl. No. 15 | |
|---|---|
| Case No. 282/15/80-ALC2/2018 | Status: |
| M/s CORNING TECHNOLOGIES INDIA<br>M. No.: 02/80-ALC2/2019 dated 16.06.2020 | Approved |
| PVT. LTD.<br>Lic. No 0510409144 Date: 01.01.2019 | |
| HQ. No.: 01/80/050/00624/AM19<br>**Subject:**Request for fixation of ad-hoc norms | |
| RLA No.: 05/23/040/00395/AM19 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | |
| No. 7/80-ALC2/2019 dated 17.07.2019 due to non submission of reply of deficiency letter dated | 06.05.2019 as |
| raised by MeitY. | |
| However, the firm vide their letter dated 29.07.2019 and 09.08.2019 furnished the reply of deficiency letter and | |
| requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to ratify the ad-hoc | |
| norms as per written comments of MeitY vide U. O. No.: W-41/2/2020-IPHW-MeitY dated 18.03.2020. (Copy | |
| enclosed) | |
| RA concerned maytake further necessaryaction asper the decision of NC. |
Sl. No. 16
| Case No. 1/8/80-ALC2/2018 | Status: |
|---|---|
| M/s CORNING TECHNOLOGIES INDIA<br>M. No.: 02/80-ALC2/2019 dated 16.06.2020 | Approved |
| PVT. LTD.<br>Lic. No. 0510406690 Date: 30.05.2018 | |
| HQ. No.: 01/80/050/00124/AM19<br>**Subject:**Request for fixation of ad-hoc norms | |
| RLA No.: 05/23/040/00089/AM19 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | |
| No. 06/80-ALC2/2019 dated 03.07.2019 due to non submission reply of deficiency letter 11.02.2019 as raised by | |
| MeitY. | |
| However, the firm vide their letter dated 30.07.2019 and 09.08.2019 furnished the reply of deficiency letter | |
| and requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to ratify the ad-hoc | |
| norms as per written comments of MeitY vide U. O. No.: W-41/1/2020-IPHW-MeitY dated 19.03.2020. (Copy | |
| enclosed) | |
| RA concerned maytake further necessaryaction asper the decision of NC. |
Sl. No. 17
| Sl. No. 17 | |
|---|---|
| Case No.:753 | Status: |
| M/s TEGA INDUSTRIES LIMITED<br>M. No.: 02/80-ALC2/2019 dated 16.06.2020 | Deferred |
| Lic. No. 0210208725 Date: 04.10.2018 | |
| HQ. No.: 01/80/050/00325/AM19/DES-1<br>**Subject:**Request for re-fixation of ad-hoc | Pending |
| norms<br>RLA No.: 02/24/040/00099/AM19/ | with firm |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in M. No. | |
| 6/80 dt 03.07.19 on the recommendation of Consultant (Tech-1). | |
| However, the firm has requested for to enhance the wastage for Import item at Sl. No 1, i.e. Hot Rolled Steel Plate | |
| from 5% to 12%. The Committee reconsidered the case and decided to ask from the firm to furnish the following | |
| information as per comments ofConsultant (SKB): | |
| 1. To submit the justification for 12% wastage with detailed process on the use of steel plate along with stage | |
| wise wastage at each operation involved. | |
| Case is deferred. |
64 | P a g e
Sl. No. 18
| Sl. No. 18 | |
|---|---|
| Case No.:754 | Status: |
| M/s TEGA INDUSTRIES LIMITED<br>M. No.: 02/80-ALC2/2019 dated 16.06.2020 | Deferred |
| Lic. No 0210208676 Date: 05.09.2018 | |
| HQ. No.: 01/80/050/00249/AM19/DES-1<br>**Subject:**Request for re-fixation of ad-hoc | Pending |
| norms<br>RLA No.: 02/24/040/00087/AM19/ | with firm |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in M. No. | |
| 7/80 dt 17.07.19 as per written comments of DPIIT vide F. No.: 07/178/2018-TS dated 24.06.2019. | |
| However, the firm has requested for to enhance the wastage for Import item at Sl. No 1, i.e. Hot Rolled Steel Plate | |
| from 5% to 12%. The Committee reconsidered the case and decided to ask from the firm to furnish the following | |
| information as per comments ofConsultant (SKB): | |
| 1. To submit the justification for 12% wastage with detailed process on the use of steel plate along with stage | |
| wise wastage at each operation involved. | |
| Case is deferred. |
Sl. No. 19
==> picture [476 x 62] intentionally omitted <==
----- Start of picture text -----<br> Case No. 57/17/80-ALC2/2015<br>M. No.: 02/80-ALC2/2019 dated 16.06.2020 M/s BIRLA FURUKAWA FIBRE Status:<br>Lic. No.: 1710006165 Date: 27.08.2015 OPTICS PRIVATE LIMITED Approved<br>HQ. No.: 01/80/050/00361/AM16 Subject: Request for fixation of ad-hoc<br>RLA No.: 17/24/040/00043/AM16 norms<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 14/17 dated 11.10.2016 as per comments of DEIT.
However, the firm had requested that typographical error in DEIT comments may be rectified. The Committee reconsidered the case and decided to ratify the ad-hoc norms as per written comments of MeitY vide U. O. No.: W-21/18/2020-IPHW-MeitY dated 03.04.2020. (Copy enclosed)
RA concerned may take further necessary action as per the decision of NC.
Sl. No. 20
| Case No. :8/5/80-ALC2/2017 | Status: | |
|---|---|---|
| M. No.: 02/80-ALC2/2019 dated 16.06.2020<br>Lic. No.: 0510402055 Date: 24.03.2017 | M/s OAM SAAI INTERNATIONAL INC. | Deferred |
| HQ. No.: 01/80/050/00069/AM18 | **Subject:**Request for fixation of ad-hoc norms | |
| RLA No.: 05/24/040/00649/AM17 | ||
| **Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No. | ||
| 17/80-ALC2/2017 dated 19.12.2017on the ground that the export and import item are same. | ||
| However, the firm has given their justification and requested for fixation of ad-hoc norms. The | ||
| Committee reconsidered the case and decided to ask from the firm to furnish the following information as per | ||
| comments ofMSME: | ||
| 1. Per unit weight of blank and finished product. | ||
| Case is deferred. |
65 | P a g e
==> picture [469 x 663] intentionally omitted <==
66 | P a g e
==> picture [469 x 663] intentionally omitted <==
67 | P a g e
==> picture [469 x 663] intentionally omitted <==
68 | P a g e
==> picture [469 x 663] intentionally omitted <==
69 | P a g e
70 | P a g e
==> picture [469 x 632] intentionally omitted <==
71 | P a g e
==> picture [469 x 663] intentionally omitted <==
72 | P a g e
==> picture [469 x 663] intentionally omitted <==
73 | P a g e
74 | P a g e
75 | P a g e
==> picture [469 x 639] intentionally omitted <==
76 | P a g e
77 | P a g e
==> picture [469 x 656] intentionally omitted <==
78 | P a g e
==> picture [469 x 626] intentionally omitted <==
79 | P a g e
==> picture [469 x 652] intentionally omitted <==
80 | P a g e
==> picture [469 x 644] intentionally omitted <==
81 | P a g e
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.