IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2020-03-25

DGFT Committee Minutes

Document text

DIRECTORATE GENERAL OF FOREIGN TRADE - (DES I SECTION)

MINUTES OF MEETING NO. 24/80 OF THE NORMS COMMITTEE-I DATED 25.03.2020

Meeting No. 24/80 of the Norms Committee (NC-I) for the licensing year 2019-2020 (originally scheduled for 25.03.2020) held on 15.04.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -

==> picture [464 x 235] intentionally omitted <==

----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri K.S. Sodhi, Asst. Director MSME<br>2 Shri Sushil Kumar Jangid, Scientist ‘B’ MeitY<br>3. Shri Shaish Kumar, (Tech-1) Consultant<br>4. Shri V.C. Agarwal, (Tech-3) Consultant<br>5. Shri S. K. Bhatnagar, Consultant<br>In Attendance<br>1. Shri K.V. Tirumala, Deputy DGFT DGFT<br>2. Shri Pranav Upadhyay, Assistant Director ISS DGFT<br>----- End of picture text -----<br>

Note:

  1. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.

  2. Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.

  3. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.

  4. Minutes of Meeting 22/80 dated 28.02.2020 were circulated on 17.03.2020, to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and the said minutes were unanimously approved.

1 | P a g e

MEETING NUMBER: 24/80-ALC2/2019 MEETING DATE: 25.03.2020

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:78/6/83-ALC1/2015 Party Name: ECOCAT INDIA Meet No/Date:24/80- Status:<br>PVT.LTD. ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0510394421 Pending with<br>1 :01/83/050/00408/AM16/ :05/23/040/00078/AM16/ 03.06.2015 Section<br>Decision: The Committee considered the case as per the agenda and noted that the case is being referred to<br>Consultant (Tech-3) for examination as decided in Meeting No. 22/80 dated 28.02.2020.<br>Case is deferred.<br>----- End of picture text -----<br>

2

Case No.:234/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:24/80- Status:
ELECTRICALS LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00576/AM19/ RLA File<br>:07/24/040/00212/AM16/ Lic.No/Date:0710108791<br>24.09.2015 Pending<br>with MeitY

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY on 20.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: AZAD Meet No/Date:24/80- Status:<br>5/15/80-ALC2/2018 ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0910063260 Pending with<br>:01/80/050/00347/AM19/ :09/24/040/00679/AM16/ 12.02.2016 RA/Firm<br>3<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 29.07.2019 followed by reminders on 06.11.2019, 26.12.2019, 03.02.2020 & 19.03.2020.<br>However, no information has been received so far. Hence, the Committee decided to wait for the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

4

Case No.:390/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00732/AM19/ RLA File<br>:07/24/040/00411/AM16/ Lic.No/Date:0710109544<br>18.03.2016 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 20.03.2020 for examination of the case. However, DHI informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

2 | P a g e

5

Case No.:25/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00367/AM19/ RLA File<br>:07/24/040/00080/AM17/ Lic.No/Date:0710109946<br>14.06.2016 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 20.03.2020 for examination of the case. However, DHI informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:186/15/80- Party Name: TEMPCO Meet No/Date:24/80- Status:
ALC2/2018 TEMPERATURE MEASUREMENT ALC2/2019 Deferred
PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00528/AM19/ RLA File :07/24/040/00157/AM17/ Lic.No/Date:0710110332<br>29.08.2016 Pending with<br>Firm

6 Decision: The Committee considered the case as per the agenda and noted that MeitY has sought following information from the firm vide letter dated 03.01.2020 with subsequent reminder on 13.02.2020. However, no information has been received yet. Therefore, the Committee decided to send a reminder to the firm for submitting the requisite information within 15 days as asked by MeitY.

Case is deferred.

7

Case No.:199/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00541/AM19/ RLA File<br>:07/24/040/00173/AM17/ Lic.No/Date:0710110331<br>29.08.2016 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 20.03.2020 for examination of the case. However, DHI informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:404/15/80-ALC2/2018 Party Name: OSWAL PUMPS Meet No/Date:24/80- Status:
LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00746/AM19/ RLA File<br>:33/24/040/00007/AM17/ Lic.No/Date:3310030377<br>03.03.2017 Pending<br>with Firm

8 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

3 | P a g e

Case No.:94/15/80-ALC2/2018 Party Name: MODEL INFRA Meet No/Date:24/80- Status:
CORPORATION PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00436/AM19/ RLA File<br>:07/24/040/00085/AM18/ Lic.No/Date:0710111766<br>16.06.2017 Pending<br>with Firm

9 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019 followed by a reminder on 26.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:405/15/80-ALC2/2018 Party Name: OSWAL PUMPS Meet No/Date:24/80- Status:
LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00747/AM19/ RLA File<br>:33/24/040/00007/AM18/ Lic.No/Date:3310030410<br>01.11.2017 Pending<br>with Firm

10 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:394/15/80-ALC2/2018 Party Name: TRIVENI HI-TECH Meet No/Date:24/80- Status:<br>PVT. LTD. ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0710113046 Pending<br>:01/80/050/00736/AM19/ :07/24/040/00368/AM18/ 04.04.2018 with Firm<br>11<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per the advice of MSME :<br>1. Manufacturing process with step wise wastage.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:121/15/80-ALC2/2018 Party Name: ZTT INDIA Meet No/Date:24/80- Status:<br>PRIVATE LIMITED ALC2/2019 Approved<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0410164238<br>12 :01/80/050/00463/AM19/ :04/24/040/00009/AM19/ 23.04.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: W-21/13/2020-IPHW-MeitY dated 20.03.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

4 | P a g e

==> picture [476 x 232] intentionally omitted <==

----- Start of picture text -----<br> Case No.:122/15/80-ALC2/2018 Party Name: SMC Meet No/Date:24/80- Status:<br>PNEUMATICS (INDIA) ALC2/2019 Approved<br>PRIVATE LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0510406269<br>:01/80/050/00464/AM19/ :05/24/040/00047/AM19/ 27.04.2018<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-3) considering the firm’s reply dated 24.02.2020 as under:<br>13 1. Quantity of import items at Sl. No. 1 to 47 may be allowed on net to net basis as per GN-4 .<br>2. Quantity of import item at Sl. No. 48 may be allowed as 1.71Kgs/Kg weight of body in export product.<br>3. Quantity of import item at Sl. No. 49 may be allowed as 2.07Kgs/Kg weight of body in export product.<br>4. Quantity of import item at Sl. No. 50 may be allowed as 2.03Kgs/Kg weight of body in export product.<br>5. Quantity of import item at Sl. No. 51 may be allowed as 1.89Kgs/Kg weight of body in export product.<br>6. Quantity of import item at Sl. No. 52 may be allowed as 2.18Kgs/Kg weight of body in export product.<br>Note: Grade of brass to match in import & export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 244] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/6/80-ALC2/2019 Party Name: SMC Meet No/Date:24/80- Status:<br>PNEUMATICS (INDIA) ALC2/2019 Approved<br>PRIVATE LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0510407270<br>:01/80/050/00082/AM20/ :05/24/040/00233/AM19/ 23.07.2018<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-3) considering the firm’s reply dated 24.02.2020 as under:<br>1. Quantity of import items at Sl. No. 1 to 47 may be allowed on net to net basis as per GN-4 .<br>14 2. Quantity of import item at Sl. No. 48 may be allowed as 1.71Kgs/Kg weight of body in export product.<br>3. Quantity of import item at Sl. No. 49 may be allowed as 2.07Kgs/Kg weight of body in export product.<br>4. Quantity of import item at Sl. No. 50 may be allowed as 2.03Kgs/Kg weight of body in export product.<br>5. Quantity of import item at Sl. No. 51 may be allowed as 1.89Kgs/Kg weight of body in export product.<br>6. Quantity of import item at Sl. No. 52 may be allowed as 2.18Kgs/Kg weight of body in export product.<br>Note: Grade of brass to match in import & export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.: Party Name: BIRLA PRECISION Meet No/Date:24/80- Status:
3/12/80-ALC2/2018 TECHNOLOGIES LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00276/AM19/ RLA File :03/94/040/00599/AM19/ Lic.No/Date:0310824314<br>09.10.2018 Pending with<br>Firm

15 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020 followed by a reminder on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

5 | P a g e

Case No.: Party Name: BIRLA PRECISION Meet No/Date:24/80- Status:
4/12/80-ALC2/2018 TECHNOLOGIES LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00277/AM19/ RLA File :03/94/040/00600/AM19/ Lic.No/Date:0310824317<br>09.10.2018 Pending with<br>Firm

16 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020 followed by a reminder on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: BIRLA PRECISION Meet No/Date:24/80- Status:<br>5/12/80-ALC2/2018 TECHNOLOGIES LTD. ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File :03/94/040/00598/AM19/ Lic.No/Date:0310824375 Pending with<br>:01/80/050/00278/AM19/ 11.10.2018 Firm<br>----- End of picture text -----<br>

17 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020 followed by a reminder on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.: Party Name: BIRLA PRECISION Meet No/Date:24/80- Status:
12/12/80-ALC2/2018 TECHNOLOGIES LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00285/AM19/ RLA File :03/94/040/00597/AM19/ Lic.No/Date:0310824374<br>11.10.2018 Pending with<br>Firm

18 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020 followed by a reminder on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:22/12/80-ALC2/2018 Party Name: CPS OIL & GAS Meet No/Date:24/80- Status:<br>EQUIPMENTS PVT. LTD. ALC2/2019 Approved<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0310824383<br>:01/80/050/00295/AM19/ :03/94/040/00630/AM19/ 11.10.2018<br>----- End of picture text -----<br>

19 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per comments given by MSME vide email dated 23.03.2020 as under:

  1. Quantity of relevant imports may be allowed as per GN-4 .

RA concerned may take further necessary action as per the decision of NC.

6 | P a g e

==> picture [476 x 152] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/12/80-ALC2/2018 Party Name: JAICO Meet No/Date:24/80- Status:<br>ENTERPRISE LLP ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0310824420 Pending with<br>:01/80/050/00274/AM19/ :03/94/040/00612/AM19/ 12.10.2018 RA/Firm<br>20 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 09.05.2019 followed by reminders on 07.06.2019, 24.07.2019,05.09.2019, 02.01.2020,<br>03.02.2020& 20.02.2020. However, no information has been received so far. Hence, the Committee decided to<br>wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/12/80- Party Name: GENERAL Meet No/Date:24/80- Status:<br>ALC2/2018 INSTRUMENTS CONSORTIUM ALC2/2019 Deferred<br>SOLE PROP.KULKARNI 25.03.2020<br>HQ File RLA File : Lic.No/Date:0310824478 Pending with<br>:01/80/050/00296/AM19/ 03/94/040/00640/AM19/ 16.10.2018 RA/Firm<br>----- End of picture text -----<br>

21 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 09.05.2019 followed by reminders on 07.06.2019, 24.07.2019, 06.11.2019, 16.01.2020 & 20.02.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the complete set of application.

Case is deferred.

22

Case No.:267/15/80-ALC2/2018 Party Name: LARSEN & Meet No/Date:24/80- Status:
TOUBRO LIMITED ALC2/2019&25.03.2020 Deferred
HQ File<br>:01/80/050/00609/AM19/ RLA File<br>:03/95/040/00583/AM19/ Lic.No/Date:0310825583<br>11.12.2018

Decision: The Committee considered the case as per the agenda and as per decision taken in Meeting No. 22 dated 28.02.2020, the case is referred to Policy-IV division.

Case is deferred.

==> picture [476 x 187] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/6/80-ALC2/2019 Party Name: IND-SPHINX Meet No/Date:24/80- Status:<br>PRECISION LTD. ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:2210016034 Pending<br>:01/80/050/00085/AM20/ :22/24/040/00069/AM19/ 18.12.2018 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per advice of the representative of MSME :<br>23<br>1. Weight of import & export items.<br>2. Use of scrap material along with the supporting invoices.<br>The Committee also observed the allowed wastage is on higher side under SION C-945 and therefore, decided to<br>recommend Policy IV division for suspending the SION C-945. For future Advance Authorizations the<br>committee shall ratify the norms on case to case basis.<br>Case is deferred.<br>----- End of picture text -----<br>

7 | P a g e

Case No.:20/14/80-ALC2/2018 Party Name: ULTRA Meet No/Date:24/80- Status:
ENGINEERS ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00336/AM19/ RLA File<br>:31/83/040/00150/AM19/ Lic.No/Date:3110067260<br>19.12.2018 Pending<br>with Firm

24 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020 followed by a reminder on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:300/15/80-ALC2/2018 Party Name: DILIGENT SCM Meet No/Date:24/80- Status:<br>SOLUTIONS PRIVATE ALC2/2019 Deferred<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0910067093 Pending<br>:01/80/050/00642/AM19/ :09/24/040/00487/AM19/ 18.01.2019 with Firm<br>----- End of picture text -----<br>

25 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:313/15/80- Party Name: OMEGA ICEHILL Meet No/Date:24/80- Status:
ALC2/2018 PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00655/AM19/ RLA File :05/24/040/00627/AM19/ Lic.No/Date:0510409545<br>31.01.2019 Pending with<br>Firm

26 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 19.11.2019 followed by a reminder on 24.01.2020. However, no reply has been received yet and final reminder is being sent to the firm as decided in the Meeting No. 22/80 dated 28.02.2020.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:310/15/80-ALC2/2018 Party Name: TERUMO Meet No/Date:24/80- Status:<br>PENPOL PRIVATE LIMITED ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:5310019913 Pending with<br>:01/80/050/00652/AM19/ :53/24/040/00013/AM19/ 05.02.2019 C & PC<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that no reply has been received yet 27 from the firm against deficiency letter dated 21.08.2019 followed by reminders on 04.11.2019 & 16.01.2020 as raised by Consultant (Tech-1) . The Committee also noted that there are other cases of the same firm wherein comments are awaited from the Department of C & PC . Hence, the Committee decided to wait for the reply/comments.

Case is deferred.

8 | P a g e

Case No.:324/15/80-ALC2/2018 Party Name: SWASTIK Meet No/Date:24/80- Status:
TUNGSTEN PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00666/AM19/ RLA File<br>:03/95/040/01213/AM19/ Lic.No/Date:0310827084<br>15.02.2019 Pending with<br>Firm

28 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/1/80-ALC2/2019 Party Name: APAR Meet No/Date:24/80- Status:<br>INDUSTRIES LIMITED ALC2/2019 Approved<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0310827307<br>29 :01/80/050/00754/AM19/ :03/94/040/00999/AM19/ 26.02.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: 17/23/2019-IPHW-MeitY dated 30.03.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.: Party Name: DAGGER MASTER Meet No/Date:24/80- Status:
8/1/80-ALC2/2019 TOOL INDUSTRIES LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00756/AM19/ RLA File :03/94/040/01048/AM19/ Lic.No/Date:0310827404<br>01.03.2019 Pending with<br>Firm

30 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 22.07.2019 followed by reminders with latest on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.: Party Name: AUTOCOMP Meet No/Date:24/80- Status:
3/2/80-ALC2/2019 CORPORATION PANSE PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00003/AM20/ RLA File :31/83/040/00298/AM19/ Lic.No/Date:3110067366<br>02.04.2019 Pending with<br>Firm

31 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020 followed by a reminder on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

9 | P a g e

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/4/80-ALC2/2019 Party Name: STERLITE Meet No/Date:24/80- Status:<br>POWER TRANSMISSION ALC2/2019 Approved<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0310828571<br>32 :01/80/050/00016/AM20/ :03/95/040/00051/AM20/ 24.04.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: W-21/9/2020-IPHW-MeitY dated 30.03.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.: Party Name: SULZER INDIA Meet No/Date:24/80- Status:
2/4/80-ALC2/2019 PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00017/AM20/ RLA File<br>:31/83/040/00009/AM20/ Lic.No/Date:3110067390<br>24.04.2019 Pending<br>with Firm

33 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019 followed by reminders on 04.10.2019, 26.12.2019 & 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:24/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:3110067391 Pending<br>:01/80/050/00018/AM20/ :31/83/040/00010/AM20/ 24.04.2019 with Firm<br>----- End of picture text -----<br>

34 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019 followed by reminders on 04.10.2019, 26.12.2019 & 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:4/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00019/AM20/ RLA File<br>:31/83/040/00011/AM20/ Lic.No/Date:3110067392<br>24.04.2019 Pending<br>with Firm

35 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 23.07.2019 followed by reminders on 04.10.2019, 26.12.2019 & 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

10 | P a g e

Case No.:5/4/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:24/80- Status:
PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00020/AM20/ RLA File<br>:05/24/040/00033/AM20/ Lic.No/Date:0510410376<br>25.04.2019 Pending<br>with Firm

36

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019 followed by a reminder on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 176] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/4/80-ALC2/2019 Party Name: SHIVALIK Meet No/Date:24/80- Status:<br>BIMETAL CONTROLS LTD. ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0510410395 Pending<br>:01/80/050/00022/AM20/ :05/24/040/00016/AM20/ 26.04.2019 with MSME<br>Decision: The Committee considered the case as per the agenda and noted the comments given by MSME. The<br>37 matter was discussed in the meeting and the Committee decided to refer back the matter to MSME for re-<br>examination of the case.<br>The Committee also observed the allowed wastage is on higher side under SION C-397 and therefore, decided to<br>recommend Policy-IV division for suspending the SION C-397. For future Advance Authorizations the<br>committee shall ratify the norms on case to case basis.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:9/4/80-ALC2/2019 Party Name: ERBATECH Meet No/Date:24/80- Status:
MACHINERY P. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00024/AM20/ RLA File<br>:32/24/040/00004/AM20/ Lic.No/Date:3210078932<br>29.04.2019 Pending<br>with Firm

38 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/4/80-ALC2/2019 Party Name: SRI RAM Meet No/Date:24/80- Status:<br>INDUSTRIES ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0410165532 Pending<br>:01/80/050/00028/AM20/ :04/24/040/00157/AM19/ 01.05.2019 with Firm<br>39<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 04.10.2019 followed by reminders on 19.11.2019,<br>16.01.2020 & 19.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for<br>the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

11 | P a g e

Case No.:14/4/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:24/80- Status:
COMPOSITES - INDIA PVT. ALC2/2019 Deferred
LTD. 25.03.2020
HQ File<br>:01/80/050/00029/AM20/ RLA File<br>:03/94/040/01131/AM19/ Lic.No/Date:0310828702<br>01.05.2019 Pending<br>with Firm

40 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 14.01.2020 followed by a reminder on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/4/80-ALC2/2019 Party Name: CHIRAG UDYOG Meet No/Date:24/80- Status:<br>ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0510410451 Pending<br>:01/80/050/00030/AM20/ :05/23/040/00054/AM20/ 02.05.2019 with Firm<br>----- End of picture text -----<br>

41 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:16/4/80-ALC2/2019 Party Name: BLISS ANAND Meet No/Date:24/80- Status:
PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00031/AM20/ RLA File<br>:05/23/040/00051/AM20/ Lic.No/Date:0510410480<br>03.05.2019 Pending<br>with Firm

42 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/4/80-ALC2/2019 Party Name: MASU BRAKE Meet No/Date:24/80- Status:<br>PADS PRIVATE LIMITED ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0510410488 Pending<br>:01/80/050/00036/AM20/ :05/24/040/00057/AM20/ 06.05.2019 with Firm<br>----- End of picture text -----<br>

43 Decision: The Committee considered the case as per the agenda and noted that the deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

12 | P a g e

Case No.:19/4/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:24/80- Status:
PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00034/AM20/ RLA File<br>:05/24/040/00762/AM19/ Lic.No/Date:0510410518<br>08.05.2019 Pending<br>with Firm

44 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019 followed by a reminder on 27.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/4/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:24/80- Status:<br>SOLUTIONS PRIVATE ALC2/2019 Deferred<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0910067492 Pending<br>:01/80/050/00033/AM20/ :09/24/040/00058/AM20/ 10.05.2019 with Firm<br>----- End of picture text -----<br>

45 Decision: The Committee considered the case as per the agenda and noted that the deficiency letter seeking certain information as raised by MSME was sent to the firm on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 324] intentionally omitted <==

----- Start of picture text -----<br> Case No.:28/5/80-ALC2/2019 Party Name: SHIRODKAR Meet No/Date:24/80- Status:<br>PRECI COMP PRIVATE ALC2/2019 Approved<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:3110067433<br>:01/80/050/00066/AM20/ :31/83/040/00028/AM20/ 29.05.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms on as per written<br>comments of Consultant (Tech-3) considering the firm’s reply dated 03.02.2020 as under:<br>Sl. ITCHS<br>Import Items Recommended Norms<br>No. Code<br>Seamless Tubing-O.D.-6.25 Inch X Id 3.25 Inch -Grade-4140 1.48Kgs/Kg content in<br>1 73049000<br>80KSI ES-MA-18-9 the export product<br>46 Seamless Tubing-O.D.-6.25 Inch X Id 3.25 Inch -Grade-4140 1.67Kgs/Kg content in<br>2 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.25 Inch X Id 3.25 Inch -Grade-4140 1.67Kgs/Kg content in<br>3 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.25 Inch X Id 3.50 Inch -Grade-4140 1.49Kgs/Kg content in<br>4 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.25 Inch X Id 3.50 Inch -Grade-4140 1.61Kgs/Kg content in<br>5 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.25 Inch X Id 3.50 Inch -Grade-4140 1.65Kgs/Kg content in<br>6 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.25 Inch X Id 3.50 Inch -Grade-4140 1.66Kgs/Kg content in<br>7 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.25 Inch X Id 3.50 Inch -Grade-4140 1.41Kgs/Kg content in<br>8 73049000<br>80KSI ES-MA-18-9 the export product<br>----- End of picture text -----<br>

13 | P a g e

==> picture [453 x 142] intentionally omitted <==

----- Start of picture text -----<br> Seamless Tubing-O.D.-6.25 Inch X Id 3.50 Inch -Grade-4140 1.68Kgs/Kg content in<br>9 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.25 Inch X Id 3.50 Inch -Grade-4140 1.61Kgs/Kg content in<br>10 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.0 Inch X Id 4.00 Inch -Grade-4140 1.54Kgs/Kg content in<br>11 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.0 Inch X Id 4.00 Inch -Grade-4140 1.60Kgs/Kg content in<br>12 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.0 Inch X Id 4.00 Inch -Grade-4140 1.60Kgs/Kg content in<br>13 73049000<br>80KSI ES-MA-18-9 the export product<br>Seamless Tubing-O.D.-6.0 Inch X Id 4.00 Inch -Grade-4140 1.63Kgs/Kg content in<br>14 73049000<br>80KSI ES-MA-18-9 the export product<br>----- End of picture text -----<br>

Note:

1. Weight of export product given in the firm’s reply dated 03.02.2020 may be incorporated in AA. (Copy enclosed)

2. Grade of imported material should be same as used in export product.

==> picture [476 x 406] intentionally omitted <==

----- Start of picture text -----<br> Case No.:29/5/80- Party Name: SHIRODKAR PRECI Meet No/Date:24/80-ALC2/2019 Status:<br>ALC2/2019 COMP PRIVATE LIMITED 25.03.2020 Approved<br>HQ File RLA File :31/83/040/00027/AM20/ Lic.No/Date:3110067434<br>:01/80/050/00067/AM20/ 29.05.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms on as per written<br>comments of Consultant (Tech-3) considering the firm’s reply dated 03.02.2020 as under:<br>Sl. ITCHS<br>Import Items Recommended Norms<br>No. Code<br>1.56Kgs/Kg content in the<br>1 72222019 Round Bar-O.D.-5 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.68Kgs/Kg content in the<br>2 72222019 Round Bar-O.D.-5 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.66Kgs/Kg content in the<br>3 72222019 Round Bar-O.D.-6 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.53Kgs/Kg content in the<br>47 4 72222019 Round Bar-O.D.-6 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.66Kgs/Kg content in the<br>5 72222019 Round Bar-O.D.-6 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.69Kgs/Kg content in the<br>6 72222019 Round Bar-O.D.-6 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.70Kgs/Kg content in the<br>7 72222019 Round Bar-O.D.-6 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.61Kgs/Kg content in the<br>8 72222019 Round Bar-O.D.-6.25 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.57Kgs/Kg content in the<br>9 72222019 Round Bar-O.D.-6.25 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.64Kgs/Kg content in the<br>10 72222019 Round Bar-O.D.-6.25 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.72Kgs/Kg content in the<br>11 72222019 Round Bar-O.D.-6.25 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>1.66Kgs/Kg content in the<br>12 72222019 Round Bar-O.D.-6.25 Inch -Grade-4140 80KSI ES-MA-18-9<br>export product<br>----- End of picture text -----<br>

14 | P a g e

13 72222019

Round Bar-O.D.-6.25 Inch -Grade-4140 80KSI ES-MA-18-9

1.64Kgs/Kg content in the export product

Note:

1. Weight of export product given in the firm’s reply dated 03.02.2020 may be incorporated in AA. (Copy enclosed)

2. Grade of imported material should be same as used in export product.

Case No.:30/5/80-ALC2/2019 Party Name: TIAGO CHEM Meet No/Date:24/80- Status: ALC2/2019 Deferred 25.03.2020 HQ File RLA File Lic.No/Date:3410045178 Pending :01/80/050/00068/AM20/ :34/24/040/00075/AM20/ 30.05.2019 with RA 48

Decision: The Committee considered the case as per the agenda and noted that the firm has only sent the copy of AA on 20.02.2020. In this regard, in continuation to Meeting No. 22 dated 28.02.2020 the letter is being sent to the firm and RA, Vadodara for submitting the complete set of application.

Case is deferred.

Case No.:32/5/80-ALC2/2019 Party Name: FUTURE TECH Meet No/Date:24/80- Status:
ENGINEERING PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00070/AM20/ RLA File<br>:07/24/040/00050/AM20/ Lic.No/Date:0710115000<br>31.05.2019 Pending<br>with RA

49 Decision: The Committee considered the case as per the agenda and noted that a letter was sent to RA, Bangalore on 27.02.2020 for submitting the hardcopy of firm’s application. However, no information has been received yet. Therefore, the Committee decided to remind RA, Bangalore for submitting the complete set of application.

Case is deferred.

==> picture [476 x 176] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/6/80-ALC2/2019 Party Name: SHIVALIK Meet No/Date:24/80- Status:<br>BIMETAL CONTROLS LTD. ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0510410810 Pending<br>:01/80/050/00072/AM20/ :05/24/040/00129/AM20/ 04.06.2019 with MSME<br>Decision: The Committee considered the case as per the agenda and noted the comments given by MSME. The<br>50 matter was discussed in the meeting and the Committee decided to refer back the matter to MSME for re-<br>examination of the case.<br>The Committee also observed the allowed wastage is on higher side under SION C-397 and therefore, decided to<br>recommend Policy-IV division for suspending the SION C-397. For future Advance Authorizations the<br>committee shall ratify the norms on case to case basis.<br>Case is deferred.<br>----- End of picture text -----<br>

15 | P a g e

Case No.:2/6/80-ALC2/2019 Party Name: LAXMI DENTAL Meet No/Date:24/80- Status:
EXPORT PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00073/AM20/ RLA File<br>:03/95/040/00207/AM20/ Lic.No/Date:0310829403<br>04.06.2019 Pending<br>with Firm

51 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 26.12.2019 followed by a reminder on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 170] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/6/80-ALC2/2019 Party Name: MAGNA Meet No/Date:24/80- Status:<br>AUTOMOTIVE INDIA ALC2/2019 Approved<br>PRIVATE LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0410165680<br>:01/80/050/00075/AM20/ :04/24/040/00049/AM20/ 06.06.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>52<br>comments given by MSME vide email dated 13.04.2020 as under:<br>1. Quantity of relevant import items at Sl. No. 1, 2, 11 to 15 may be allowed on net to net basis .<br>2. Quantity of import item at Sl. No. 4 may be allowed up to 2% of FoB value .<br>3. Quantity of rest of the import items may be allowed as per GN-4 .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:6/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:24/80- Status:
LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00077/AM20/ RLA File<br>:03/95/040/00221/AM20/ Lic.No/Date:0310829486<br>07.06.2019 Pending<br>with Firm

53 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminder on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:24/80- Status:<br>LIMITED ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310829488 Pending<br>:01/80/050/00078/AM20/ :03/95/040/00206/AM20/ 07.06.2019 with Firm<br>54 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminder on 25.02.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

16 | P a g e

==> picture [476 x 129] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:24/80- Status:<br>LIMITED ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310829553 Pending<br>:01/80/050/00081/AM20/ :03/95/040/00229/AM20/ 11.06.2019 with Firm<br>55 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminder on 25.02.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 206] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/6/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:24/80- Status:<br>PVT. LTD. ALC2/2019&25.03.2020 Approved<br>HQ File RLA File Lic.No/Date:0510410880<br>:01/80/050/00083/AM20/ :05/24/040/00144/AM20/ 11.06.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms on as per<br>comments given by MSME vide email dated 13.04.2020as under:<br>56 Sl. ITCHS<br>Import Item Recommended Norms<br>No. Code<br>Cold Rolled Stainless Steel Coils, Grade S 43932, 23485 kg inclusive of 42.80%<br>1 72191190<br>Conforms to IS 6911-2017, ISS 439Ti1 wastage after 1/3rd recovery<br>Stainless Steel Coil, Cold Rolled, Grade 304L, 2B, 73970 kg inclusive of 4.60%<br>2 72191400<br>2 MM X 1524. wastage after 1/3rd recovery<br>Note: Only relevant items should be imported by the firm.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/6/80-ALC2/2019 Party Name: VEELINE MEDIA Meet No/Date:24/80- Status:<br>LIMITED ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0210209240 Pending<br>:01/80/050/00084/AM20/ :02/24/040/00038/AM20/ 11.06.2019 with Firm<br>57 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per the advice of MSME :<br>1. Manufacturing processes and calculations of wastage for Sl. No 9, 10 & 12 of the import items.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:16/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:24/80- Status:
LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00087/AM20/ RLA File<br>:03/95/040/00239/AM20/ Lic.No/Date:0310829596<br>12.06.2019 Pending with<br>Firm

58 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminder on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

17 | P a g e

Case No.:17/6/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:24/80- Status: AUTOMOTIVES LTD. ALC2/2019 Approved 25.03.2020 HQ File RLA File Lic.No/Date:0510410932 :01/80/050/00088/AM20/ :05/23/040/00062/AM20/ 14.06.2019

59 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per comments given by MSME vide email dated 13.04.2020 as under:

  1. Quantity of relevant imports may be allowed as per GN-4 .

Case No.:18/6/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:24/80- Status: AUTOMOTIVES LTD. ALC2/2019 Approved 25.03.2020 HQ File RLA File Lic.No/Date:0510410933 :01/80/050/00089/AM20/ :05/23/040/00063/AM20/ 14.06.2019

60 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per comments given by MSME vide email dated 13.04.2020 as under:

  1. Quantity of relevant imports may be allowed as per GN-4 .
Case No.:21/6/80-ALC2/2019 Party Name: ISGEC HITACHI Meet No/Date:24/80- Status:
ZOSEN LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00092/AM20/ RLA File<br>:05/23/040/00111/AM20/ Lic.No/Date:0510410946<br>14.06.2019 Pending<br>with Firm

61 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019 followed by a reminder on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 177] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/8/80-ALC2/2019 Party Name: MODEL INFRA Meet No/Date:24/80- Status:<br>CORPORATION PRIVATE ALC2/2019 Deferred<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0710115134 Pending<br>:01/80/050/00113/AM20/ :07/24/040/00081/AM20/ 05.07.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>62 following information as per the advice of MSME :<br>2. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>3. Weight of each Export Product.<br>4. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>----- End of picture text -----<br>

18 | P a g e

  • in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
  1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: ULTRA Meet No/Date:24/80-ALC2/2019 Status:<br>3/8/80-ALC2/2019 ENGINEERS 25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:3110067470 Pending<br>:01/80/050/00115/AM20/ :31/83/040/00058/AM20/ 10.07.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>63 Consultant (Tech-3) on 26.12.2019 for examination of the case. It was also noted that the firm informed vide<br>email dated 30.01.2020 that they are revising drawing & designs of the export products as per customer<br>requirement and requested to hold the fixation of norms for 4 weeks as to prepare revise application for<br>amendment. However, no information has been received yet. Therefore, the Committee decided to send a<br>reminder to the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.: Party Name: AUTO TECH Meet No/Date:24/80-ALC2/2019 Status:
8/8/80-ALC2/2019 INDUSTRIES (INDIA) PVT. 25.03.2020 Deferred
LTD.
HQ File<br>:01/80/050/00120/AM20/ RLA File<br>:04/24/040/00068/AM20/ Lic.No/Date:0410165827<br>15.07.2019 Pending<br>with Firm

64 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020 followed by a reminder on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:9/8/80-ALC2/2019 Party Name: ANSTECH Meet No/Date:24/80- Status:
ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00121/AM20/ RLA File<br>:34/24/040/00127/AM20/ Lic.No/Date:3410045281<br>15.07.2019 Pending with<br>RA/Firm

65 Decision: The Committee considered the case as per the agenda and noted that the complete set of application has not yet been received from RA, Vadodara & the firm and in this regard, an email was sent on 03.03.2020 as earlier RA, Vadodara sent only a copy of AA. However, no information has been received yet. Therefore, the Committee decided to remind the firm & RA, Vadodara for submitting the complete set of application.

Case is deferred.

19 | P a g e

==> picture [476 x 152] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/8/80- Party Name: ULTRA Meet No/Date:24/80-ALC2/2019 Status:<br>ALC2/2019 ENGINEERS 25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:3110067477 Pending with<br>:01/80/050/00122/AM20/ :31/83/040/00056/AM20/ 17.07.2019 Firm<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>66 Consultant (Tech-3) on 26.12.2019 for examination of the case. However, it was also noted that the firm<br>informed vide email dated 30.01.2020 that they are revising drawing & designs of the export products as per<br>customer requirement and requested to hold the fixation of norms for 4 weeks as to prepare revise application for<br>amendment. However, no information has been received yet. Therefore, the Committee decided to send a<br>reminder to the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/8/80-ALC2/2019 Party Name: APAR Meet No/Date:24/80- Status:<br>INDUSTRIES LIMITED ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0310830379 Pending<br>67 :01/80/050/00123/AM20/ :03/94/040/00303/AM20/ 17.07.2019 with MeitY<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and MeitY informed that the firm’s reply was received on 14.04.2020 and the case is under process. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 55] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/8/80- Party Name: ZOBELE INDIA Meet No/Date:24/80-ALC2/2019 Status:<br>ALC2/2019 PRIVATE LIMITED 25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310830415 Pending with<br>:01/80/050/00124/AM20/ :03/95/040/00352/AM20/ 18.07.2019 RA/Firm<br>----- End of picture text -----<br>

68 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 23.08.2019 followed by reminders on 06.11.2019, 16.01.2020 & 19.03.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 197] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/8/80- Party Name: HORIZON CHUTES Meet No/Date:24/80- Status:<br>ALC2/2019 PVT. LTD. ALC2/2019&25.03.2020 Approved<br>HQ File RLA File Lic.No/Date:3110067480<br>:01/80/050/00125/AM20/ :31/83/040/00064/AM20/ 18.07.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-3) as under:<br>69 ITCHS Quantity ITCHS Recommended<br>Export Item Import Item<br>Code Code Norms<br>Supply Of Garbage<br>Stainless Steel Coil, 1.035Kgs/Kg<br>Chutes, Linen Chutes, 24938.000<br>84791000 72193390 Cold Rolled 304L 1.50 content in the<br>Debris Chutes Kgs<br>mm x 1250mm export product<br>Note: Grade & type of steel to be imported will be same as used in export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

20 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/9/80-ALC2/2019 Party Name: DYNA FORCE Meet No/Date:24/80- Status:<br>HYDRAULICS PVT. LTD. ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:3110067484 Pending with<br>:01/80/050/00128/AM20/ :31/83/040/00067/AM20/ 25.07.2019 RA/Firm<br>70 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>14.10.2019 followed by reminders on 06.11.2019, 08.01.2020 & 19.03.2020. However, no information has been<br>received so far. Hence, the Committee decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:2/10/80-ALC2/2019 Party Name: DOOWON Meet No/Date:24/80- Status:
AUTOMOTIVE SYSTEMS ALC2/2019 Deferred
INDIA PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00140/AM20/ RLA File<br>:04/24/040/00079/AM20/ Lic.No/Date:0410165942<br>07.08.2019 Pending with<br>RA/Firm

71 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 14.10.2019 followed by reminders on 06.11.2019, 16.01.2020 & 19.03.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/10/80-ALC2/2019 Party Name: JKS Meet No/Date:24/80- Status:<br>ENGINEERING ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:3210079060 Pending with<br>:01/80/050/00143/AM20/ :32/24/040/00033/AM20/ 08.08.2019 RA/Firm<br>72 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Coimbatore and in this regard a letter was sent to the firm & RA,<br>Coimbatore on 16.10.2019 followed by reminders on 06.11.2019, 16.01.2020 & 19.03.2020. However, no<br>information has been received so far. Hence, the Committee decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/10/80-ALC2/2019 Party Name: LM WIND Meet No/Date:24/80- Status:<br>POWER BLADES INDIA ALC2/2019 Deferred<br>PVT. LTD. 25.03.2020<br>HQ File RLA File Lic.No/Date:3410045365 Pending with<br>:01/80/050/00144/AM20/ :34/24/040/00152/AM20/ 09.08.2019 RA/Firm<br>73<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 11.10.2019 followed by reminders on 06.11.2019, 16.01.2020 & 20.03.2020. However, no<br>information has been received so far. Hence, the Committee decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

21 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/10/80-ALC2/2019 Party Name: MAINI Meet No/Date:24/80- Status:<br>PRECISION PRODUCTS ALC2/2019 Deferred<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0710115278 Pending with<br>:01/80/050/00145/AM20/ :07/24/040/00106/AM20/ 13.08.2019 Firm/PH<br>74<br>Decision: The Committee considered the case as per agenda and noted that the firm was called for personal<br>hearing to explain the case before Norms Committee. However, due the nation-wide lockdown, the Committee<br>decided to call the firm for personal hearing, in the forthcoming NC meeting post lockdown.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/10/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:24/80- Status:<br>COMPOSITES - INDIA PVT. ALC2/2019 Deferred<br>LTD. 25.03.2020<br>HQ File RLA File Lic.No/Date:0310831081 Pending<br>:01/80/050/00150/AM20/ :03/94/040/00329/AM20/ 20.08.2019 with Firm<br>75<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 19.03.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/10/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:24/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2019 Transferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:3410045391 Pending<br>76 :01/80/050/00153/AM20/ :34/24/040/00164/AM20/ 23.08.2019 with Section<br>Decision: The Committee considered the case as per the agenda and noted that similar cases of the firm have<br>been considered in DES-II section . Therefore, the Committee decided to transfer the case to DES-II section .<br>Case to be transferred.<br>----- End of picture text -----<br>

==> picture [476 x 215] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/10/80-ALC2/2019 Party Name: DECON INDIA Meet No/Date:24/80- Status:<br>PLASTICS PVT. LTD. ALC2/2019 Approved<br>25.03.2020<br>HQ File RLA File Lic.No/Date:3110067515<br>:01/80/050/00156/AM20/ :31/83/040/00079/AM20/ 26.08.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-1) as under:<br>77<br>Sl. ITCHS Recommended<br>Import Item<br>No. Code Norms<br>Granuals - PA66/PA6/6T(60 +/- 2 ) Percent GF Creamid -A3H7G12.25<br>1 39023000 6937.70 KG<br>92VW E-BLACK (PTS) (NYLON 66)<br>PBT/PET GF30(DINADUR PBT2S25 G30-4202 SCHWARZ) Black -<br>2 39023000 16688.00 KG<br>GRUPO REPOL<br>3 87089997 Tiguan Thumbwheel Air Vent Driver Side Raw Part As per GN-4<br>4 87089997 Tiguan Thumbwheel Air Vent Passenger Side Raw Part As per GN-4<br>5 87089997 Tiguan Thumbwheel 2k CenTER ML/MR As per GN-4<br>6 87089997 THUMBWHEEL MIKO As per GN-4<br>----- End of picture text -----<br>

22 | P a g e

Note: The word “NYLON 66” may be added in the description of the import item at Sl. No. 1.

Case No.:19/10/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:24/80- Status:
SOLUTIONS PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00157/AM20/ RLA File<br>:09/24/040/00272/AM20/ Lic.No/Date:0910067939<br>27.08.2019 Pending<br>with Firm

78

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:20/10/80-ALC2/2019 Party Name: OSWAL PUMPS Meet No/Date:24/80- Status:
LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00158/AM20/ RLA File<br>:33/24/040/00017/AM20/ Lic.No/Date:3310030578<br>27.08.2019 Pending<br>with Firm

79 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/10/80-ALC2/2019 [Party Name: AUTO TECH ] Meet No/Date:24/80- Status:<br>INDUSTRIES (INDIA) PVT. LTD. ALC2/2019 & 25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0410166015 Pending with<br>:01/80/050/00159/AM20/ :04/24/040/00091/AM20/ 28.08.2019 Firm<br>80 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information as<br>decided in the Meeting No. 22/80 dated 28.02.2020.<br>Case is deferred.<br>----- End of picture text -----<br>

81

Case No.:22/10/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:24/80- Status:
ENGINEERING LIMITED ALC2/2019 Approved
25.03.2020
HQ File<br>:01/80/050/00160/AM20/ RLA File<br>:05/23/040/00208/AM20/ Lic.No/Date:0510411660<br>28.08.2019

Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per comments of DHI taking cue from SION C-1647 as under:

  1. Quantity of import items at Sl. No. 1 to 15 may be allowed as 1.02Kgs/Kg content in the export product .

23 | P a g e

  1. Quantity of import items at Sl. No. 29 to 32 may be allowed as 1.04Kgs/Kg content in the export product .

  2. Quantity of rest of the import items may be allowed as per GN-4 with no wastage on number & weight terms . The quantity may be specified in number in addition to weight.

Note: The weight of export to be incorporated in AA as 303,538 Kgs.

Case No.:36/11/80-ALC2/2004 Party Name: PAHARPUR Meet No/Date:24/80- Status:
COOLING TOWERS LIMITED ALC2/2019&25.03.2020 Deferred
HQ File<br>:01/80/050/00162/AM20/ RLA File<br>:02/24/040/00081/AM20/ Lic.No/Date:0210209409<br>02.09.2019 Pending with<br>RA/Firm

82

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Kolkata & the firm . Therefore, the Committee decided to request from RA, Kolkata and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

Case No.:38/11/80-ALC2/2004 Party Name: HANNING Meet No/Date:24/80- Status:
MOTORS INDIA P. LTD. ALC2/2019&25.03.2020 Deferred
HQ File<br>:01/80/050/00164/AM20/ RLA File<br>:34/24/040/00169/AM20/ Lic.No/Date:3410045416<br>04.09.2019 Pending with<br>RA/Firm

83 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/13/85-ALC3/2019 Party Name: AUTOCOMP Meet No/Date:24/80- Status:<br>CORPORATION PANSE ALC2/2019 Deferred<br>PRIVATE LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:3110067530 Pending<br>84 :01/85/050/00082/AM20/ :31/83/040/00085/AM20/ 11.09.2019 with Section<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to DHI for<br>examination & comments.<br>Case is deferred.<br>----- End of picture text -----<br>

85

Case No.:2/12/80-ALC2/2019 Party Name: HEURTEY Meet No/Date:24/80- Status:
PETROCHEM INDIA ALC2/2019 Deferred
PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00174/AM20/ RLA File<br>:34/24/040/00185/AM20/ Lic.No/Date:3410045459<br>19.09.2019 Pending with<br>DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT for examination of the case on 24.02.2020. However, DPIIT vide email dated 13.04.2020 requested to defer the case. Therefore, the Committee decided to defer the case.

Case is deferred.

24 | P a g e

Case No.: Party Name: FREUDENBERG Meet No/Date:24/80- Status:
4/12/80-ALC2/2019 FILTRATION TECHNOLOGIES ALC2/2019 Deferred
INDIA PVT.LTD. 25.03.2020
HQ File<br>:01/80/050/00176/AM20/ RLA File :31/83/040/00008/AM20/ Lic.No/Date:3110067543<br>24.09.2019 Pending with<br>RA/Firm

86 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm and in this regard an email was sent on 29.11.2019 followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/12/80-ALC2/2019 Party Name: GODREJ & Meet No/Date:24/80- Status:<br>BOYCE MFG. CO. LTD. ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0310831805 Pending<br>:01/80/050/00177/AM20/ :03/94/040/00480/AM20/ 25.09.2019 with Firm<br>----- End of picture text -----<br>

87 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:6/12/80-ALC2/2019 Party Name: VICTORA Meet No/Date:24/80- Status:
AUTO PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00178/AM20/ RLA File<br>:05/24/040/00338/AM20/ Lic.No/Date:0510411950<br>25.09.2019 Pending with<br>RA/Firm

88 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 29.11.2019 followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/12/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:24/80- Status:<br>PVT. LTD. ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0510411951 Pending with<br>:01/80/050/00179/AM20/ :05/24/040/00340/AM20/ 25.09.2019 RA/Firm<br>----- End of picture text -----<br>

89 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 29.11.2019 followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

25 | P a g e

Case No.:8/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:24/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00180/AM20/ RLA File<br>:09/24/040/00336/AM20/ Lic.No/Date:0910068046<br>27.09.2019 Pending with<br>RA/Firm

90 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019 followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

Case No.:10/12/80-ALC2/2019 Party Name: AUTO TECH Meet No/Date:24/80- Status:
INDUSTRIES INDIA PVT. ALC2/2019 Deferred
LTD. 25.03.2020
HQ File<br>:01/80/050/00182/AM20/ RLA File<br>:04/24/040/00105/AM20/ Lic.No/Date:0410166124<br>01.10.2019 Pending with<br>Firm

91 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020 followed by a reminder on 20.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:24/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0910068052 Pending with<br>:01/80/050/00183/AM20/ :09/24/040/00345/AM20/ 01.10.2019 RA/Firm<br>92<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019<br>followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the<br>Committee decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:12/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:24/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00184/AM20/ RLA File<br>:09/24/040/00344/AM20/ Lic.No/Date:0910068053<br>01.10.2019 Pending with<br>RA/Firm

93 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019 followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

26 | P a g e

Case No.:13/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:24/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00185/AM20/ RLA File<br>:09/24/040/00346/AM20/ Lic.No/Date:0910068054<br>01.10.2019 Pending with<br>RA/Firm

94 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019 followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

Case No.:6/13/80-ALC2/2019 Party Name: GODREJ & Meet No/Date:24/80- Status: Deferred BOYCE MFG. CO. LTD. ALC2/2019 25.03.2020 HQ File RLA File Lic.No/Date:0310832178 Pending with :01/80/050/00191/AM20/ :03/94/040/00505/AM20/ 11.10.2019 firm/PH

95 Decision: The Committee considered the case as per the agenda and noted that the firm has been called for personal hearing to explain the case along with all the relevant Technical Drawing in the forthcoming NC meeting. However, due the nation-wide lockdown, the Committee decided to call the firm for personal hearing, in the forthcoming NC meeting post lockdown.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/14/80-ALC2/2019 Party Name: LOTUS Meet No/Date:24/80- Status:<br>AVIATION TECHNOLOGY ALC2/2019 Deferred<br>PRIVATE LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0510412171 Pending with<br>:01/80/050/00199/AM20/ :05/23/040/00283/AM20/ 17.10.2019 RA/Firm<br>96<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 29.11.2019<br>followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the<br>Committee decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/14/80-ALC2/2019 Party Name: NIDEC INDIA Meet No/Date:24/80- Status:<br>PRIVATE LIMITED ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510412197 Pending<br>:01/80/050/00200/AM20/ :05/24/040/00403/AM20/ 21.10.2019 with Firm<br>97 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 19.03.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

27 | P a g e

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/14/80-ALC2/2019 Party Name: TEGA Meet No/Date:24/80- Status:<br>INDUSTRIES LIMITED ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0210209491 Pending<br>:01/80/050/00201/AM20/ :02/24/040/00100/AM20/ 22.10.2019 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>98<br>following information as per comments of Consultant (Tech-1) :<br>1. Net weight of rubber compound in export.<br>2. Percentage composition of rubber compound used in export (weight terms).<br>3. Justification for 10% wastage in import item at Sl. No. 1 with detailed manufacturing process.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:6/14/80-ALC2/2019 Party Name: TEGA Meet No/Date:24/80- Status: INDUSTRIES LIMITED ALC2/2019&25.03.2020 Deferred HQ File RLA File Lic.No/Date:0210209503 Pending :01/80/050/00202/AM20/ :02/24/040/00107/AM20/ 23.10.2019 with Firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish 99 following information as per comments of Consultant (Tech-1) :

  1. Net weight of rubber compound in export.

  2. Percentage composition of rubber compound used in export (weight terms).

  3. Justification for 10% wastage in import item at Sl. No. 1 with detailed manufacturing process.

Case is deferred.

Case No.:7/14/80-ALC2/2019 Party Name: SULZER Meet No/Date:24/80- Status: INDIA PRIVATE LIMITED ALC2/2019 & 25.03.2020 Deferred HQ File RLA File Lic.No/Date:3110067581 Pending with :01/80/050/00203/AM20/ :31/83/040/00096/AM20/ 23.10.2019 RA/Firm

100 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm and in this regard an email was sent on 29.11.2019 followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. Case is deferred.

Case No.:8/14/80-ALC2/2019 Party Name: HINDUSTAN Meet No/Date:24/80- Status: RUBBER INDUSTRIES ALC2/2019 & 25.03.2020 Approved HQ File RLA File Lic.No/Date:0510412270 :01/80/050/00204/AM20/ :05/23/040/00294/AM20/ 25.10.2019

Case No.:8/14/80-ALC2/2019Party Name: HINDUSTAN<br>RUBBER INDUSTRIES<br>Meet No/Date:24/80-<br>ALC2/2019 & 25.03.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00204/AM20/<br>RLA File<br>:05/23/040/00294/AM20/<br>Lic.No/Date:0510412270<br>25.10.2019 Case No.:8/14/80-ALC2/2019 Case No.:8/14/80-ALC2/2019 Party Name: HINDUSTAN<br>RUBBER INDUSTRIES Party Name: HINDUSTAN<br>RUBBER INDUSTRIES Party Name: HINDUSTAN<br>RUBBER INDUSTRIES Meet No/Date:24/80-<br>ALC2/2019 & 25.03.2020 Meet No/Date:24/80-<br>ALC2/2019 & 25.03.2020 Meet No/Date:24/80-<br>ALC2/2019 & 25.03.2020 Status:<br>Approved
HQ File<br>:01/80/050/00204/AM20/ RLA File<br>:05/23/040/00294/AM20/ Lic.No/Date:0510412270<br>25.10.2019
101 Decision:The Committee considered the case as per agenda and decided toratifythe ad-hoc norms as per<br>comments of**Consultant (Tech-1)**as under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>84379020<br>Rubber Rollers 10" For Automatic Rice Mill<br>Machinery (Net Weight – 8 Kg. Per Piece,<br>Net Content of Rubber 2.5 Kg/Pc)<br>9000.000<br>Number<br>40025900<br>Acrylonitrile<br>Butadiene Rubber<br>(Synthetic Rubber)<br>As applied<br>Note:<br>1. Net weight of export item should be 8Kg per Piece.<br>2. Net Content of Rubber in export item should be 2.5 Kg/Pc.<br>RA concerned maytake further necessaryaction asper the decision of NC. per agenda and decided toratifythe ad-hoc norms as per
Export Item Quantity ITCHS<br>Code Import Item Recommended<br>Norms
Rubber Rollers 10" For Automatic Rice Mill<br>Machinery (Net Weight – 8 Kg. Per Piece,<br>Net Content of Rubber 2.5 Kg/Pc) 9000.000<br>Number 40025900 Acrylonitrile<br>Butadiene Rubber<br>(Synthetic Rubber) As applied

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per comments of Consultant (Tech-1) as under:

28 | P a g e

Case No.:9/14/80- Party Name: HITAISHI KK Meet No/Date:24/80- Status:
ALC2/2019 MANUFACTURING COMPANY ALC2/2019 Deferred
PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00205/AM20 RLA File :02/24/040/00111/AM20/ Lic.No/Date:0210209515<br>28.10.2019 Pending with<br>RA/Firm

102 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Kolkata & the firm and in this regard an email was sent on 29.11.2019 followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

Case No.:10/14/80-ALC2/2019 Party Name: TENOVA INDIA Meet No/Date:24/80- Status: PRIVATE LIMITED ALC2/2019 Deferred 25.03.2020 HQ File RLA File Lic.No/Date:0710115616 Pending :01/80/050/00206/AM20/ :07/24/040/00154/AM20/ 28.10.2019 with Firm

103 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:11/14/80-ALC2/2019 Party Name: FERRA Meet No/Date:24/80- Status: AEROSPACE PRIVATE ALC2/2019 Deferred LIMITED 25.03.2020 HQ File RLA File Lic.No/Date:0710115617 Pending :01/80/050/00207/AM20/ :07/24/040/00164/AM20/ 29.10.2019 with Firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of MSME:

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.

104

  1. Weight of each Export Product.

  2. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  3. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

29 | P a g e

Case No.:12/14/80- Party Name: MELSTAR Meet No/Date:24/80- Status:
ALC2/2019 MANUFACTURING SYSTEMS ALC2/2019 Deferred
PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00208/AM20/ RLA File :07/24/040/00156/AM20/ Lic.No/Date:0710115619<br>29.10.2019 Pending with<br>RA/Firm

105 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm and in this regard an email was sent on 29.11.2019 followed by reminders on 16.01.2020 & 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

Case No.:1/16/80-ALC2/2019 Party Name: AYYAPPA Meet No/Date:24/80- Status:
CNC PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00211/AM20/ RLA File<br>:07/24/040/00170/AM20/ Lic.No/Date:0710115658<br>08.11.2019 Pending with<br>RA/Firm

106 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 25.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Bangalore & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/16/80-ALC2/2019 Party Name: STERLITE Meet No/Date:24/80- Status:<br>POWER TRANSMISSION ALC2/2019 Approved<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0310832682<br>107 :01/80/050/00212/AM20/ :03/95/040/00761/AM20/ 08.11.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: W-20/8/2020-IPHW-MeitY dated 20.03.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:3/16/80- Party Name: SAMIRI EQUIPMENTS Meet No/Date:24/80- Status:
ALC2/2019 & ENGINEERS PVT.LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00213/AM20/ RLA File :03/95/040/00758/AM20/ Lic.No/Date:0310832707<br>11.11.2019 Pending with<br>RA/Firm

108 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 26.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the complete set of application.

Case is deferred.

30 | P a g e

Case No.:5/16/80-ALC2/2019 Party Name: LM WIND Meet No/Date:24/80- Status:
POWER BLADES INDIA ALC2/2019 Deferred
PVT. LTD. 25.03.2020
HQ File<br>:01/80/050/00215/AM20/ RLA File<br>:34/24/040/00242/AM20/ Lic.No/Date:3410045605<br>13.11.2019 Pending with<br>RA/Firm

109 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 26.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Vadodara & the firm for submitting the complete set of application.

Case is deferred.

Case No.:4/16/80-ALC2/2019 Party Name: BLISS ANAND Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00214/AM20/ RLA File<br>:05/23/040/00311/AM20/ Lic.No/Date:0510412485<br>14.11.2019 Pending with<br>RA/Firm

110 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 25.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/16/80-ALC2/2019 Party Name: NUCON Meet No/Date:24/80- Status:<br>AEROSPACE PVT. LTD. ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0910068185 Pending with<br>:01/80/050/00216/AM20/ :09/24/040/00409/AM20/ 14.11.2019 RA/Firm<br>111<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 01.01.2020<br>followed by a reminder on 26.02.2020. However, no information has been received yet. Therefore, the<br>Committee decided to remind again RA, Hyderabad & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:7/16/80-ALC2/2019 Party Name: MATRIX Meet No/Date:24/80- Status:
CUTTING TOOLS PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00217/AM20/ RLA File<br>:05/24/040/00480/AM20/ Lic.No/Date:0510412508<br>15.11.2019 Pending with<br>RA/Firm

112 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 26.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of application.

Case is deferred.

31 | P a g e

==> picture [476 x 175] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/16/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:24/80- Status:<br>SOLUTIONS PRIVATE ALC2/2019 Deferred<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0910068192 Pending<br>:01/80/050/00218/AM20/ :09/24/040/00408/AM20/ 18.11.2019 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>113 following information as per comments of MSME:<br>1. To clarify why UOM of export product is in numbers while quantity is in fractions.<br>2. Stepwise wastage of manufacturing process with gross weight (before operation) and net weight (after<br>operation)<br>3. Net content of twill filter cloth in Sl. No 1 of export is missing.<br>Case is deferred.<br>----- End of picture text -----<br>

114

Case No.:9/16/80-ALC2/2019 Party Name: KUVAWALA Meet No/Date:24/80- Status:
CORE DRILL EQUIPMENT ALC2/2019 Deferred
PVT. LTD. 25.03.2020
HQ File<br>:01/80/050/00219/AM20/ RLA File<br>:03/94/040/00644/AM20/ Lic.No/Date:0310832842<br>18.11.2019 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 16.03.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

Case No.:10/16/80-ALC2/2019 Party Name: VICTORA Meet No/Date:24/80- Status:
AUTO PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00220/AM20/ RLA File<br>:05/24/040/00462/AM20/ Lic.No/Date:0510412549<br>19.11.2019 Pending with<br>RA/Firm

115 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 25.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/16/80- Party Name: GRADUATE AGRO & Meet No/Date:24/80- Status:<br>ALC2/2019 MECHANICAL ENGINEERS ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File :50/24/040/00013/AM20/ Lic.No/Date:5010002587 Pending with<br>:01/80/050/00221/AM20/ 19.11.2019 RA<br>116 Decision: The Committee considered the case as per the agenda and observed that the firm has asked for<br>certain amendments after issuance of Advance Authorization. The Committee wanted to know as to whether<br>the RA has made any amendments in the authorization or not and in this regard an email was sent to RA,<br>Nagpur on 23.01.2020 followed by a reminder on 20.03.2020. However, no information has been received yet.<br>Hence, the Committee decided to wait for the requisite information from RA, Nagpur .<br>Case is deferred.<br>----- End of picture text -----<br>

32 | P a g e

Case No.:13/16/80-ALC2/2019 Party Name: OAM SAAI Meet No/Date:24/80- Status:
INTERNATIONAL INC. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00223/AM20/ RLA File<br>:05/24/040/00479/AM20/ Lic.No/Date:0510412570<br>21.11.2019 Pending<br>with Firm

117 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of MSME:

  1. Firm to clarify the manufacturing process performed on the import product.

Case is deferred.

118

Case No.:14/16/80-ALC2/2019 Party Name: MICRON Meet No/Date:24/80- Status:
INSTRUMENTS PVT LTD ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00224/AM20/ RLA File<br>:05/24/040/00490/AM20/ Lic.No/Date:0510412571<br>21.11.2019 Pending<br>with DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT for examination of the case on 31.12.2019. However, DPIIT vide email dated 13.04.2020 requested to defer the case. Therefore, the Committee decided to defer the case.

Case is deferred.

119

Case No.:15/16/80-ALC2/2019 Party Name: L&T-MHPS Meet No/Date:24/80- Status:
BOILERS PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00225/AM20/ RLA File<br>:03/95/040/00808/AM20/ Lic.No/Date:0310832929<br>21.11.2019 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI for examination of the case on 11.03.2020. However, DHI informed that the case is under examination. Therefore, the Committee decided to wait for the comments.

Case is deferred.

120

Case No.:16/16/80-ALC2/2019 Party Name: VALEO INDIA Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00226/AM20/ RLA File<br>:04/24/040/00131/AM20/ Lic.No/Date:0410166294<br>21.11.2019 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Chennai & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 20.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Chennai & the firm for submitting the complete set of application.

Case is deferred.

33 | P a g e

Case No.:18/16/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:24/80- Status:
PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00228/AM20/ RLA File<br>:05/24/040/00499/AM20/ Lic.No/Date:0510412651<br>26.11.2019 Pending with<br>RA/Firm

121 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 25.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of application.

Case is deferred.

Case No.:19/16/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00229/AM20/ RLA File<br>:31/83/040/00115/AM20/ Lic.No/Date:3110067611<br>26.11.2019 Pending with<br>RA/Firm

122 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 26.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/16/80-ALC2/2019 Party Name: TRILLIUM Meet No/Date:24/80- Status:<br>FLOW TECHNOLOGIES ALC2/2019 Deferred<br>INDIA PRIVATE LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0310832991 Pending with<br>:01/80/050/00230/AM20/ :03/95/040/00815/AM20/ 26.11.2019 RA/Firm<br>123<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020<br>followed by a reminder on 26.02.2020. However, no information has been received yet. Therefore, the<br>Committee decided to remind again RA, Mumbai & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:21/16/80-ALC2/2019 Party Name: LOYAL Meet No/Date:24/80- Status:
EQUIPMENTS LIMITED ALC2/2019 Approved
25.03.2020
HQ File<br>:01/80/050/00231/AM20/ RLA File<br>:08/24/040/00257/AM20/ Lic.No/Date:0810146666<br>28.11.2019

124 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per comments given by MSME vide email dated 13.04.2020 as under:

  1. Quantity of relevant imports may be allowed on net to net basis .

34 | P a g e

Case No.:22/16/80-ALC2/2019 Party Name: ARIHANT Meet No/Date:24/80- Status:
INDUSTRIES ALC2/2019 Approved
25.03.2020
HQ File<br>:01/80/050/00232/AM20/ RLA File<br>:33/24/040/00026/AM20/ Lic.No/Date:3310030617<br>28.11.2019

125 Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the recommendation of Consultant (Tech-1) as under:

  1. Quantity of relevant imports may be allowed as per GN-4 .
Case No.:2/18/80-ALC2/2019 Party Name: MICRON Meet No/Date:24/80- Status:
INSTRUMENTS PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00247/AM20/ RLA File<br>:05/24/040/00489/AM20/ Lic.No/Date:0510412701<br>29.11.2019 Pending with<br>RA/Firm

126

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 17.01.2020 followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/18/80-ALC2/2019 Party Name: GLOBE HI-FABS Meet No/Date:24/80- Status:<br>LLP ALC2/2019 Approved<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0510412842<br>:01/80/050/00246/AM20/ :05/23/040/00342/AM20/ 10.12.2019<br>127<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>comments given by MSME vide email dated 13.04.2020 as under:<br>1. Quantity of relevant imports may be allowed as per GN-4 .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:5/18/80-ALC2/2019 Party Name: ZTT INDIA Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00250/AM20/ RLA File<br>:04/24/040/00137/AM20/ Lic.No/Date:0410166342<br>10.12.2019 Pending with<br>RA/Firm

128 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Chennai & the firm and in this regard an email was sent on 17.01.2020 followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

35 | P a g e

Case No.:6/18/80-ALC2/2019 Party Name: AUTO TECH Meet No/Date:24/80- Status:
INDUSTRIES (INDIA) PVT. ALC2/2019 Deferred
LTD. 25.03.2020
HQ File<br>:01/80/050/00251/AM20/ RLA File<br>:04/24/040/00134/AM20/ Lic.No/Date:0410166344<br>10.12.2019 Pending with<br>Firm

129 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 19.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:4/18/80-ALC2/2019 Party Name: ZECHA Meet No/Date:24/80- Status:
PRECISION TOOLS ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00249/AM20/ RLA File<br>:03/95/040/00892/AM20/ Lic.No/Date:0310833334<br>11.12.2019 Pending with<br>RA/Firm

130 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 17.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Mumbai & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/18/80-ALC2/2019 Party Name: GAUPAD Meet No/Date:24/80- Status:<br>INDUSTRY ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:0510412855 Pending with<br>:01/80/050/00252/AM20/ :05/23/040/00329/AM20/ 11.12.2019 RA/Firm<br>131<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 17.01.2020<br>followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:8/18/80-ALC2/2019 Party Name: CRYSTAL Meet No/Date:24/80- Status:
INDUSTRIAL SYNDICATE ALC2/2019 Deferred
PVT.LTD. 25.03.2020
HQ File<br>:01/80/050/00253/AM20/ RLA File<br>:03/94/040/00752/AM20/ Lic.No/Date:0310833379<br>12.12.2019 Pending with<br>RA/Firm

132 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 24.01.2020 followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

36 | P a g e

Case No.:9/18/80-ALC2/2019 Party Name: RONCH Meet No/Date:24/80- Status:
POLYMERS PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00254/AM20/ RLA File<br>:03/95/040/00887/AM20/ Lic.No/Date:0310833381<br>12.12.2019 Pending with<br>RA/Firm

133 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 17.01.2020 followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

Case No.:10/18/80-ALC2/2019 Party Name: TPI Meet No/Date:24/80- Status:
COMPOSITES INDIA LLP ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00255/AM20/ RLA File<br>:04/24/040/00138/AM20/ Lic.No/Date:0410166360<br>13.12.2019 Pending with<br>RA/Firm

134 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Chennai & the firm and in this regard an email was sent on 17.01.2020 followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/18/80-ALC2/2019 Party Name: ICEM Meet No/Date:24/80- Status:<br>ENGINEERING COMPANY ALC2/2019 Deferred<br>PRIVATE LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0310833402 Pending with<br>:01/80/050/00256/AM20/ :03/94/040/00760/AM20/ 13.12.2019 RA/Firm<br>135<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 17.01.2020<br>followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:12/18/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:24/80- Status:
PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00257/AM20/ RLA File<br>:05/24/040/00555/AM20/ Lic.No/Date:0510412920<br>16.12.2019 Pending with<br>RA/Firm

136 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 17.01.2020 followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

37 | P a g e

==> picture [476 x 301] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/18/80-ALC2/2019 Party Name: AZAD Meet No/Date:24/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0910068287 Pending<br>:01/80/050/00258/AM20/ :09/24/040/00455/AM20/ 17.12.2019 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of DHI:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>137<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>5. Manufacturing process of export product giving specific use of import item with justification of<br>quantity of import.<br>6. Write up of import item.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:14/18/80-ALC2/2019 Party Name: KELVION Meet No/Date:24/80- Status: INDIA PVT. LTD. ALC2/2019 Deferred 25.03.2020 HQ File RLA File Lic.No/Date:0310833455 Pending with :01/80/050/00259/AM20/ :03/94/040/00474/AM20/ 17.12.2019 DPIIT 138

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT for examination of the case on 22.01.2020 followed by a reminder on 20.03.2020. However, DPIIT vide email dated 13.04.2020 requested to defer the case. Therefore, the Committee decided to defer the case.

Case is deferred.

Case No.:15/18/80-ALC2/2019 Party Name: MASU BRAKE Meet No/Date:24/80- Status:
PADS PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00260/AM20/ RLA File<br>:05/24/040/00559/AM20/ Lic.No/Date:0510412951<br>18.12.2019 Pending<br>with Firm

139 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 25.02.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

38 | P a g e

Case No.:16/18/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:24/80- Status:
PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00261/AM20/ RLA File<br>:05/24/040/00572/AM20/ Lic.No/Date:0510412958<br>18.12.2019 Pending with<br>RA/Firm

140 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 17.01.2020 followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

Case No.:17/18/80-ALC2/2019 Party Name: ZECHA Meet No/Date:24/80- Status:
PRECISION TOOLS ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00262/AM20/ RLA File<br>:03/95/040/00919/AM20/ Lic.No/Date:0310833525<br>18.12.2019 Pending with<br>RA/Firm

141 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 17.01.2020 followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/18/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:24/80- Status:<br>TURBINE GENERATORS ALC2/2019 Deferred<br>PRIVATE LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0310833550 Pending with<br>:01/80/050/00263/AM20/ :03/95/040/00907/AM20/ 19.12.2019 RA/Firm<br>142<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 17.01.2020<br>followed by a reminder on 20.03.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

143

Case No.:19/18/80-ALC2/2019 Party Name: BONATRANS Meet No/Date:24/80- Status:
INDIA PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00264/AM20/ RLA File<br>:03/94/040/00773/AM20/ Lic.No/Date:0310833585<br>20.12.2019 Pending with<br>Firm/PH

Decision: The Committee considered the case as per agenda and noted that the firm was called for personal hearing to explain the case before Norms Committee. However, due the nation-wide lockdown, the Committee decided to call the firm for personal hearing, in the forthcoming NC meeting post lockdown.

Case is deferred.

39 | P a g e

Case No.:20/18/80-ALC2/2019 Party Name: TRILLIUM FLOW Meet No/Date:24/80- Status: TECHNOLOGIES INDIA ALC2/2019 Approved PRIVATE LIMITED 25.03.2020 HQ File RLA File Lic.No/Date:0310833627 :01/80/050/00265/AM20/ :03/95/040/00922/AM20/ 23.12.2019

144 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 17.01.2020. However, the Committee noted that the firm vide email dated 20.03.2020 had informed that the application is made on net to net basis. Therefore, the Committee decided to ratify the norms on Net to Net basis under GN-4.

Case is deferred. (Please ensure approved or not, also hard copy required or not)

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/20/80-ALC2/2019 Party Name: SULZER Meet No/Date:24/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2019 Deferred<br>25.03.2020<br>HQ File RLA File Lic.No/Date:3110067650 Pending with<br>:01/80/050/00283/AM20/ :31/83/040/00132/AM20/ 07.01.2020 RA/Firm<br>145 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>03.02.2020 followed by a reminder on 26.02.2020. However, no information has been received so far.<br>Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 318] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/20/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:24/80- Status:<br>SOLUTIONS PR IVATE ALC2/2019 Approved<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0910068346<br>:01/80/050/00284/AM20/ :09/24/040/00503/AM20/ 08.01.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>comments given by MSME vide email dated 13.04.2020 as under:<br>Sl. Recommended<br>Sl. ITCHS ITCHS Import<br>Export Item Quantity No. Norms<br>No. Code Code Item<br>Horizontal Joint Seal 2716 Kgs<br>Cobalt<br>146 (Net Content Of inclusive of<br>Alloy<br>Cobalt Alloy Sheet 50245.000 16.67% wastage<br>1 84842000 1 81059000 Sheet<br>(Alloy 188) In Export Number after 1/3rd<br>(Alloy<br>Product i.e. (2328 recovery<br>188)<br>KGS))<br>Horizontal Joint Seal 307.13 Kgs<br>(Net Content Of Cobalt inclusive of<br>Cobalt Alloy Sheet 10824.000 Alloy 16.67%<br>2 84842000 2 81059000<br>(Alloy X) In Export Number Sheet wastage after<br>Product i.e. (263.24 (Alloy X) 1/3rd recovery<br>KGS))<br>Horizontal Joint Seal Nickle 47.80 Kgs<br>1760.000<br>3 84842000 (Net Content of 3 75062200 Alloy inclusive of<br>Number<br>Nickle Alloy Sheet Sheet (L 16.67% wastage<br>----- End of picture text -----<br>

40 | P a g e

(L 605) In Export 605) after 1/3rd Product i.e. (40.976 recovery KGS)) Note: The firm should import relevant items only.

Case No.:3/20/80-ALC2/2019 Party Name: HUMANETICS Meet No/Date:24/80- Status: INNOVATIVE SOLUTIONS ALC2/2019 Deferred INDIA PRIVATE LIMI 25.03.2020 HQ File RLA File Lic.No/Date:0710116010 Pending with :01/80/050/00285/AM20/ :07/24/040/00227/AM20/ 09.01.2020 RA/Firm

147 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA, Bangalore on 03.02.2020 followed by a reminder on 26.02.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Bangalore & the firm for submitting the complete set of application.

Case is deferred.

Case No.:4/20/80- Party Name: FITWEL GASKET Meet No/Date:24/80- Status: ALC2/2019 COMPANY (INDIA) PVT LTD ALC2/2019&25.03.2020 Deferred HQ File RLA File :31/83/040/00134/AM20/ Lic.No/Date:3110067657 Pending with :01/80/050/00286/AM20/ 13.01.2020 Firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (Tech-3):

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.

  2. Weight of each Export Product.

  3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of

148 material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

  2. Sheet layout diagram of the material indicating the wastage during blanking.

  3. Use of export product.

  4. Technical name of items of import at Sl. No. 4, 6, 8, 10 & 12 and their specific use in export product.

Case is deferred.

41 | P a g e

Case No.:5/20/80- Party Name: STEEL STRONG Meet No/Date:24/80- Status:
ALC2/2019 VALVES(I)PVT.LTD. ALC2/2019&25.03.2020 Deferred
HQ File<br>:01/80/050/00287/AM20 RLA File :03/95/040/01007/AM20/ Lic.No/Date:0310834108<br>13.01.2020

149 Decision: The Committee considered the case as per agenda and as per written comments of DPIIT vide U. O. No.: P-47011/75/2020-TSW dated 28.04.2020 decided to ask from the firm to furnish the information at Sl. No. 1 to 5, 8and 11 of Standard Deficiency Format export product wise.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/20/80-ALC2/2019 Party Name: ARIHANT Meet No/Date:24/80- Status:<br>INDUSTRIES ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:3310030641 Pending with<br>:01/80/050/00289/AM20/ :33/24/040/00031/AM20/ 13.01.2020 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>150<br>not yet been received from the firm & RA, Panipat and in this regard a letter was sent to the firm & RA,<br>Panipat on 03.02.2020 followed by a reminder on 26.02.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again RA, Panipat & the firm for submitting the complete<br>set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/20/80-ALC2/2019 Party Name: SULZER PUMPS Meet No/Date:24/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310834142 Pending with<br>:01/80/050/00288/AM20/ :03/95/040/01012/AM20/ 14.01.2020 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>151<br>not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 03.02.2020 followed by a reminder on 26.02.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the complete<br>set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/20/80-ALC2/2019 Party Name: VEELINE Meet No/Date:24/80- Status:<br>MEDIA LIMITED ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0210209681 Pending with<br>:01/80/050/00291/AM20/ :02/24/040/00159/AM20/ 14.01.2020 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>152<br>not yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA,<br>Kolkata on 03.02.2020 followed by a reminder on 26.02.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again RA, Kolkata & the firm for submitting the complete<br>set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

42 | P a g e

==> picture [476 x 152] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/20/80-ALC2/2019 Party Name: TRILLIUM Meet No/Date:24/80- Status:<br>FLOW TECHNOLOGIES ALC2/2019 Deferred<br>INDIA PRIVATE LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0310834155 Pending with<br>:01/80/050/00290/AM20/ :03/95/040/00974/AM20/ 15.01.2020 RA/Firm<br>153 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 03.02.2020 followed by a reminder on 26.02.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the complete<br>set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:10/20/80-ALC2/2019 Party Name: GODREJ & Meet No/Date:24/80- Status: BOYCE MFG. CO. LTD. ALC2/2019 Deferred 25.03.2020 HQ File RLA File Lic.No/Date:0310834274 Pending with :01/80/050/00292/AM20/ :03/94/040/00848/AM20/ 17.01.2020 RA/Firm

154 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 03.02.2020 followed by a reminder on 26.02.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the complete set of application.

Case is deferred.

Case No.:11/20/80-ALC2/2019 Party Name: ANSTECH Meet No/Date:24/80- Status: ALC2/2019&25.03.2020 Deferred HQ File RLA File Lic.No/Date:3410045793 Pending with :01/80/050/00293/AM20/ :34/24/040/00313/AM20/ 17.01.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has 155 not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 03.02.2020 followed by a reminder on 26.02.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Vadodara & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 55] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/20/80-ALC2/2019 Party Name: MASU BRAKE Meet No/Date:24/80- Status:<br>PADS PRIVATE LIMITED ALC2/2019&25.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510413364 Pending<br>:01/80/050/00294/AM20/ :05/24/040/00664/AM20/ 17.01.2020 with Firm<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish 156 following information as per comments of Consultant (Tech-1):

  1. Justification for 15% wastage for each import item in manufacturing process.

  2. Detail specification of import item no at Sl. No. 2 and its quantity in numbers.

  3. Details of import item at Sl. No. 3 with specific name of accessories.

Case is deferred.

43 | P a g e

157

Case No.:1/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:24/80- Status:
MATTHEY INDIA ALC2/2019 Deferred
PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00327/AM20/ RLA File<br>:05/23/040/00426/AM20/ Lic.No/Date:0510413542<br>10.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

158

Case No.:2/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:24/80- Status:
MATTHEY INDIA PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00328/AM20/ RLA File<br>:05/23/040/00427/AM20/ Lic.No/Date:0510413543<br>10.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

159

Case No.:3/22/80-ALC2/2019 Party Name: MICRON Meet No/Date:24/80- Status:
INSTRUMENTS PVT LTD ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00329/AM20/ RLA File<br>:05/24/040/00708/AM20/ Lic.No/Date:0510413545<br>10.02.2020 Pending<br>with DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT for examination of the case on 26.02.2020 followed by a reminder on 20.03.2020. However, DPIIT vide email dated 13.04.2020 requested to defer the case. Therefore, the Committee decided to defer the case.

Case is deferred.

160

Case No.:4/22/80-ALC2/2019 Party Name: MICRON Meet No/Date:24/80- Status:
INSTRUMENTS PVT LTD ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00330/AM20/ RLA File<br>:05/24/040/00709/AM20/ Lic.No/Date:0510413546<br>10.02.2020 Pending<br>with DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT for examination of the case on 26.02.2020 followed by a reminder on 20.03.2020. However, DPIIT vide email dated 13.04.2020 requested to defer the case. Therefore, the Committee decided to defer the case.

Case is deferred.

44 | P a g e

161

Case No.:5/22/80-ALC2/2019 Party Name: MICRON Meet No/Date:24/80- Status:
INSTRUMENTS PVT LTD ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00331/AM20/ RLA File<br>:05/24/040/00711/AM20/ Lic.No/Date:0510413547<br>10.02.2020 Pending<br>with DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT for examination of the case on 26.02.2020 followed by a reminder on 20.03.2020. However, DPIIT vide email dated 13.04.2020 requested to defer the case. Therefore, the Committee decided to defer the case.

Case is deferred.

162

Case No.:6/22/80-ALC2/2019 Party Name: MICRON Meet No/Date:24/80- Status:
INSTRUMENTS PVT LTD ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00332/AM20/ RLA File<br>:05/24/040/00712/AM20/ Lic.No/Date:0510413558<br>10.02.2020 Pending<br>with DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT for examination of the case on 26.02.2020 followed by a reminder on 20.03.2020. However, DPIIT vide email dated 13.04.2020 requested to defer the case. Therefore, the Committee decided to defer the case.

Case is deferred.

163

Case No.:7/22/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:24/80- Status:
ENGINEERING LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00333/AM20/ RLA File<br>:05/23/040/00429/AM20/ Lic.No/Date:0510413567<br>10.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

164

Case No.:8/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:24/80- Status:
MATTHEY INDIA PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00334/AM20/ RLA File<br>:05/23/040/00433/AM20/ Lic.No/Date:0510413568<br>10.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

45 | P a g e

165

Case No.:9/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:24/80- Status:
MATTHEY INDIA PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00335/AM20/ RLA File<br>:05/23/040/00434/AM20/ Lic.No/Date:0510413570<br>10.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

166

Case No.:10/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:24/80- Status:
MATTHEY INDIA PRIVATE ALC2/2019 Deferred
LIMITED 25.03.2020
HQ File<br>:01/80/050/00336/AM20/ RLA File<br>:05/23/040/00435/AM20/ Lic.No/Date:0510413571<br>10.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

167

Case No.:11/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:24/80- Status:
MATTHEY INDIA ALC2/2019 Deferred
PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00337/AM20/ RLA File<br>:05/23/040/00436/AM20/ Lic.No/Date:0510413572<br>10.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

168

Case No.:12/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:24/80- Status:
MATTHEY INDIA ALC2/2019 Deferred
PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00338/AM20/ RLA File<br>:05/23/040/00437/AM20/ Lic.No/Date:0510413573<br>10.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

46 | P a g e

169

Case No.:13/22/80-ALC2/2019 Party Name: DEE Meet No/Date:24/80- Status:
DEVELOPMENT ALC2/2019 Deferred
ENGINEERS LIMITED 25.03.2020
HQ File<br>:01/80/050/00339/AM20/ RLA File<br>:05/23/040/00432/AM20/ Lic.No/Date:0510413575<br>10.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

170

Case No.:14/22/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:24/80- Status:
ENGINEERING LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00340/AM20/ RLA File<br>:05/23/040/00428/AM20/ Lic.No/Date:0510413578<br>11.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

171

Case No.:16/22/80-ALC2/2019 Party Name: MICRON Meet No/Date:24/80- Status:
INSTRUMENTS PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00342/AM20/ RLA File<br>:05/24/040/00719/AM20/ Lic.No/Date:0510413598<br>12.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

172

Case No.:17/22/80-ALC2/2019 Party Name: LM WIND Meet No/Date:24/80- Status:
POWER BLADES INDIA ALC2/2019 Deferred
PVT. LTD. 25.03.2020
HQ File<br>:01/80/050/00343/AM20/ RLA File<br>:34/24/040/00355/AM20/ Lic.No/Date:3410045867<br>12.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

47 | P a g e

173

Case No.:18/22/80-ALC2/2019 Party Name: SCHOCH REEDS Meet No/Date:24/80- Status:
INDIA PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00344/AM20/ RLA File<br>:31/83/040/00152/AM20/ Lic.No/Date:3110067684<br>13.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

174

Case No.:19/22/80-ALC2/2019 Party Name: HFCL LIMITED Meet No/Date:24/80- Status:
ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00345/AM20/ RLA File<br>:05/23/040/00443/AM20/ Lic.No/Date:0510413626<br>14.02.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

175

Case No.:1/24/80-ALC2/2019 Party Name: TRILLIUM Meet No/Date:24/80- Status:
FLOW TECHNOLOGIES ALC2/2019 Deferred
INDIA PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00358/AM20/ RLA File<br>:03/95/040/01119/AM20/ Lic.No/Date:0310835187<br>04.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm . Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

176

Case No.:2/24/80-ALC2/2019 Party Name: FRIZAIR Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00359/AM20/ RLA File<br>:09/24/040/00592/AM20/ Lic.No/Date:0910068556<br>06.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

48 | P a g e

177

Case No.:3/24/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00360/AM20/ RLA File<br>:31/83/040/00160/AM20/ Lic.No/Date:3110067707<br>06.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm . Therefore, the Committee decided to request from RA, Pune and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

178

Case No.:4/24/80-ALC2/2019 Party Name: ROTHE ERDE Meet No/Date:24/80- Status:
INDIA PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00361/AM20/ RLA File<br>:31/83/040/00146/AM20/ Lic.No/Date:3110067708<br>06.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm . Therefore, the Committee decided to request from RA, Pune and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

179

Case No.:5/24/80-ALC2/2019 Party Name: ULTRA Meet No/Date:24/80- Status:
ENGINEERS ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00362/AM20/ RLA File<br>:31/83/040/00162/AM20/ Lic.No/Date:3110067709<br>06.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm . Therefore, the Committee decided to request from RA, Pune and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

180

Case No.:6/24/80-ALC2/2019 Party Name: DOOWON Meet No/Date:24/80- Status:
AUTOMOTIVE SYSTEMS ALC2/2019 Deferred
INDIA PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00363/AM20/ RLA File<br>:04/24/040/00195/AM20/ Lic.No/Date:0410166600<br>09.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Chennai & the firm . Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

49 | P a g e

181

Case No.:7/24/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:24/80- Status:
LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00364/AM20/ RLA File<br>:03/95/040/01160/AM20/ Lic.No/Date:0310835306<br>09.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm . Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

182

Case No.:8/24/80-ALC2/2019 Party Name: SHAKTI Meet No/Date:24/80- Status:
PUMPS INDIA LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00365/AM20/ RLA File<br>:56/24/040/00031/AM20/ Lic.No/Date:5610005840<br>09.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Indore & the firm . Therefore, the Committee decided to request from RA, Indore and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

183

Case No.:9/24/80-ALC2/2019 Party Name: SHAKTI Meet No/Date:24/80- Status:
PUMPS INDIA LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00366/AM20/ RLA File<br>:56/24/040/00042/AM20/ Lic.No/Date:5610005841<br>09.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Indore & the firm . Therefore, the Committee decided to request from RA, Indore and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

184

Case No.:10/24/80-ALC2/2019 Party Name: HONDA Meet No/Date:24/80- Status:
TRADING CORPORATION ALC2/2019 Deferred
INDIA PRIVATE LIMITED 25.03.2020
HQ File<br>:01/80/050/00367/AM20/ RLA File<br>:05/23/040/00449/AM20/ Lic.No/Date:0510413853<br>12.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

50 | P a g e

185

Case No.:11/24/80-ALC2/2019 Party Name: HANNING Meet No/Date:24/80- Status:
MOTORS INDIA P. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00368/AM20/ RLA File<br>:34/24/040/00382/AM20/ Lic.No/Date:3410045945<br>12.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

186

Case No.:12/24/80-ALC2/2019 Party Name: HANNING Meet No/Date:24/80- Status:
MOTORS INDIA P. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00369/AM20/ RLA File<br>:34/24/040/00383/AM20/ Lic.No/Date:3410045946<br>12.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

187

Case No.:13/24/80-ALC2/2019 Party Name: HANNING Meet No/Date:24/80- Status:
MOTORS INDIA P. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00370/AM20/ RLA File<br>:34/24/040/00384/AM20/ Lic.No/Date:3410045947<br>12.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

188

Case No.:14/24/80-ALC2/2019 Party Name: S K Meet No/Date:24/80- Status:
INDUSTRIES ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00371/AM20/ RLA File<br>:34/24/040/00387/AM20/ Lic.No/Date:3410045951<br>12.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

51 | P a g e

189

Case No.:15/24/80-ALC2/2019 Party Name: UNI VTL Meet No/Date:24/80- Status:
PRECISION PVT. LTD. ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00372/AM20/ RLA File<br>:07/24/040/00287/AM20/ Lic.No/Date:0710116245<br>12.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm . Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

190

Case No.:16/24/80-ALC2/2019 Party Name: SHREE LAXMI Meet No/Date:24/80- Status:
GLASSTECH ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00373/AM20/ RLA File<br>:13/24/040/00207/AM20/ Lic.No/Date:1310049548<br>13.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Jaipur & the firm . Therefore, the Committee decided to request from RA, Jaipur and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

191

Case No.:17/24/80-ALC2/2019 Party Name: KINECO Meet No/Date:24/80- Status:
KAMAN COMPOSITES - ALC2/2019 Deferred
INDIA PVT. LTD. 25.03.2020
HQ File<br>:01/80/050/00374/AM20/ RLA File<br>:03/94/040/01027/AM20/ Lic.No/Date:0310835424<br>17.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm . Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

192

Case No.:18/24/80-ALC2/2019 Party Name: ANGIPLAST Meet No/Date:24/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
25.03.2020
HQ File<br>:01/80/050/00375/AM20/ RLA File<br>:08/24/040/00406/AM20/ Lic.No/Date:0810147487<br>17.03.2020 Pending with<br>RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Ahmadabad & the firm . Therefore, the Committee decided to request from RA, Ahmadabad and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

52 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/24/80-ALC2/2019 Party Name: AZAD Meet No/Date:24/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 25.03.2020<br>HQ File RLA File Lic.No/Date:0910068587 Pending with<br>:01/80/050/00376/AM20/ :09/24/040/00624/AM20/ 18.03.2020 RA/Firm<br>193<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm . Therefore, the Committee decided to request from<br>RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>


53 | P a g e

==> picture [469 x 643] intentionally omitted <==

54 | P a g e

==> picture [469 x 625] intentionally omitted <==

55 | P a g e

==> picture [469 x 638] intentionally omitted <==

56 | P a g e

==> picture [469 x 640] intentionally omitted <==

57 | P a g e

==> picture [469 x 623] intentionally omitted <==

58 | P a g e

==> picture [469 x 631] intentionally omitted <==

59 | P a g e

60 | P a g e

==> picture [469 x 618] intentionally omitted <==

61 | P a g e

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied