DGFT Minutes
In force — no superseding record on file.
MINUTES OF MEETING NO. 20/80 OF NORMS COMMITTEE- I (DES-I SECTION) DATED 30.01.2020
Meeting No. 20/80 of the Norms Committee (NC-I) for the licensing year 2019-2020 held on 30.01.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -
==> picture [428 x 209] intentionally omitted <==
----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri S. K. Jain, D. O. DPIIT<br>2. Shri B. C. Nayak, D. O. DHI<br>3. Shri Shaish Kumar, (Tech-1) Consultant<br>4. Shri V.C. Agarwal, (Tech-3) Consultant<br>5. Shri S. K. Bhatnagar Consultant<br>6. Shri K.V. Tirumala, Deputy DGFT DGFT<br>7. Shri Pranav Upadhyay, Assistant Director ISS DGFT<br>----- End of picture text -----<br>
Note:
-
In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.
-
Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.
-
All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.
-
Minutes of Meeting 18/20 dated 02.01.2020 were circulated on 23.01.2020 respectively, to all the members of the Committee. However no comments were received so the said minutes were unanimously approved.
1 | P a g e
MEETING NUMBER: 20/80-ALC2/2019 MEETING DATE: 30.01.2020
==> picture [476 x 130] intentionally omitted <==
e received so the said minutes were unanimously approved.
1 | P a g e
MEETING NUMBER: 20/80-ALC2/2019 MEETING DATE: 30.01.2020
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: ECOCAT INDIA Meet No/Date:20/80- Status:<br>78/6/83-ALC1/2015 PVT. LTD. ALC2/2019 & 30.01.2020<br>HQ File RLA File :05/23/040/00078/AM16/ Lic.No/Date:0510394421 Deferred<br>:01/83/050/00408/AM16/ 03.06.2015<br>1 Decision: The Committee considered the case as per the agenda and noted that the comments for import items at<br>No. Sl. 1 to 4 was already given by MSME and the case was again referred to MSME on 26.12.2019 for<br>comments on import items at Sl. No. 5 & 6. However, no comments have been received yet. Therefore, the<br>Committee decided to remind MSME for expediting comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 55] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/15/80- Party Name: AZAD ENGINEERING Meet No/Date:20/80- Status:<br>ALC2/2018 PRIVATE LIMITED ALC2/2019 & 30.01.2020<br>HQ File RLA File :09/24/040/00679/AM16/ Lic.No/Date:0910063260 Deferred<br>:01/80/050/00347/AM19/ 12.02.2016<br>----- End of picture text -----<br>
VATE LIMITED ALC2/2019 & 30.01.2020<br>HQ File RLA File :09/24/040/00679/AM16/ Lic.No/Date:0910063260 Deferred<br>:01/80/050/00347/AM19/ 12.02.2016<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has 2 not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 29.07.2019 followed by reminders on 06.11.2019, 26.12.2019 and again on 03.02.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:186/15/80- | Party Name: TEMPCO TEMPERATURE | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | MEASUREMENT PRIVATE LIMITED | ALC2/2019 | ||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00528/AM19/ | RLA File :07/24/040/00157/AM17/ | Lic.No/Date:0710110332<br>29.08.2016 | Deferred |
3 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY for examination of the case on 22.08.2019 followed by reminders on 04.11.2019 & 26.12.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MeitY for expediting the comments.
Case is deferred.
==> picture [476 x 55] intentionally omitted <==
no comments have been received yet. Therefore, the Committee decided to remind again MeitY for expediting the comments.
Case is deferred.
==> picture [476 x 55] intentionally omitted <==
----- Start of picture text -----<br> Case No.:404/15/80- Party Name: OSWAL PUMPS Meet No/Date:20/80- Status:<br>ALC2/2018 LIMITED ALC2/2019& 30.01.2020<br>HQ File RLA File :33/24/040/00007/AM17/ Lic.No/Date:3310030377 Deferred<br>:01/80/050/00746/AM19/ 03.03.2017<br>----- End of picture text -----<br>
4 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 26.12.2019 for examination of the case. However, the representative of DPIIT informed in the meeting that DPIIT did not receive the complete set of application. Therefore, the Committee decided to send again the complete set of application to DPIIT for examination of the case.
Case is deferred.
2 | P a g e
5
| Case No.:94/15/80- | Party Name: MODEL INFRA | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | CORPORATION PRIVATE | ALC2/2019 | |||||
| LIMITED | 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00436/AM19/ | RLA File :07/24/040/00085/AM18/ | Lic.No/Date:0710111766<br>16.06.2017 | Deferred |
||ALC2/2018||CORPORATION PRIVATE||ALC2/2019||| ||||LIMITED||30.01.2020||| ||HQ File<br>:01/80/050/00436/AM19/||RLA File :07/24/040/00085/AM18/||Lic.No/Date:0710111766<br>16.06.2017||Deferred|
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.: | Party Name: DEE | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| 108/15/80-ALC2/2018 | DEVELOPMENT ENGINEERS | ALC2/2019 | ||||
| LTD. | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00450/AM19/ | RLA File<br>:05/23/040/00116/AM18/ | Lic.No/Date:0510403207<br>22.06.2017 | Deferred |
6 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019 followed by reminders on 22.11.2019 & 16.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.: | Party Name: INTERPUMP | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| 3/18/80-ALC2/2019 | HYDRAULICS INDIA PVT. LTD. | ALC2/2019 | ||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00248/AM20/ | RLA File :04/24/040/00094/AM18/ | Lic.No/Date:0410163413<br>10.08.2017 | Deferred |
/18/80-ALC2/2019**||HYDRAULICS INDIA PVT. LTD.||ALC2/2019||| |||||30.01.2020||| |HQ File<br>:01/80/050/00248/AM20/||RLA File :04/24/040/00094/AM18/||Lic.No/Date:0410163413<br>10.08.2017||Deferred|
7 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Chennai & the firm and in this regard an email was sent on 27.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:405/15/80-ALC2/2018 | Party Name: OSWAL PUMPS | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00747/AM19/ | RLA File<br>:33/24/040/00007/AM18/ | Lic.No/Date:3310030410<br>01.11.2017 | Deferred |
8 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 26.12.2019 for examination of the case. However, the representative of DPIIT informed in the meeting that DPIIT did not receive the complete set of application. Therefore, the Committee decided to send again the complete set of application to DPIIT for examination of the case.
Case is deferred.
3 | P a g e
9
e the complete set of application. Therefore, the Committee decided to send again the complete set of application to DPIIT for examination of the case.
Case is deferred.
3 | P a g e
9
| Case No.:394/15/80-ALC2/2018 | Party Name: TRIVENI HI- | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TECH PVT. LTD. | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00736/AM19/ | RLA File<br>:07/24/040/00368/AM18/ | Lic.No/Date:0710113046<br>04.04.2018 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 11.12.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
10
| Case No.:121/15/80-ALC2/2018 | Party Name: ZTT INDIA | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00463/AM19/ | RLA File<br>:04/24/040/00009/AM19/ | Lic.No/Date:0410164238<br>23.04.2018 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MeitY on 21.01.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
11
s reply was sent to MeitY on 21.01.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
11
| Case No.:122/15/80- | Party Name: SMC PNEUMATICS | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | (INDIA) PRIVATE LIMITED | ALC2/2019 | |||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00464/AM19/ | RLA File :05/24/040/00047/AM19/ | Lic.No/Date:0510406269<br>27.04.2018 | Deferred |
Decision: The Committee considered the case as per the agenda and decided to call the firm for personal hearing along with sample of export product and input blank on the advice of Consultant (Tech 3), in the forthcoming NC meeting, as the reply dated 23.02.2019 furnished by the firm is incomplete.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/6/80-ALC2/2019 Party Name: SMC Meet No/Date:20/80- Status:<br>PNEUMATICS (INDIA) ALC2/2019<br>PRIVATE LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:0510407270 Deferred<br>:01/80/050/00082/AM20/ :05/24/040/00233/AM19/ 23.07.2018<br>12<br>Decision: The Committee considered the case as per the agenda and decided to call the firm for personal hearing<br>along with sample of export product and input blank on the advice of Consultant (Tech 3), in the<br>forthcoming NC meeting as the reply furnished by the firm is incomplete.<br>Case is deferred.<br>----- End of picture text -----<br>
4 | P a g e
advice of Consultant (Tech 3), in the<br>forthcoming NC meeting as the reply furnished by the firm is incomplete.<br>Case is deferred.<br>----- End of picture text -----<br>
4 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: BIRLA PRECISION Meet No/Date:20/80- Status:<br>3/12/80-ALC2/2018 TECHNOLOGIES LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File :03/94/040/00599/AM19/ Lic.No/Date:0310824314 Deferred<br>:01/80/050/00276/AM19/ 09.10.2018<br>13<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020. However, no reply has been<br>received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>
14
| Case No.: | Party Name: BIRLA PRECISION | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| 4/12/80-ALC2/2018 | TECHNOLOGIES LTD. | ALC2/2019 | |||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00277/AM19/ | RLA File :03/94/040/00600/AM19/ | Lic.No/Date:0310824317<br>09.10.2018 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
15
as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
15
| Case No.: | Party Name: BIRLA PRECISION | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| 5/12/80-ALC2/2018 | TECHNOLOGIES LTD. | ALC2/2019 | |||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00278/AM19/ | RLA File :03/94/040/00598/AM19/ | Lic.No/Date:0310824375<br>11.10.2018 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: BIRLA PRECISION Meet No/Date:20/80- Status:<br>12/12/80-ALC2/2018 TECHNOLOGIES LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File :03/94/040/00597/AM19/ Lic.No/Date:0310824374 Deferred<br>:01/80/050/00285/AM19/ 11.10.2018<br>16<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020. However, no reply has been<br>received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>
5 | P a g e
14.01.2020. However, no reply has been<br>received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>
5 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:22/12/80-ALC2/2018 Party Name: CPS OIL & GAS Meet No/Date:20/80- Status:<br>EQUIPMENTS PVT. LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0310824383 Deferred<br>:01/80/050/00295/AM19/ :03/94/040/00630/AM19/ 11.10.2018<br>17<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME on 18.12.2019 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 164] intentionally omitted <==
refore,<br>the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 164] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/12/80-ALC2/2018 Party Name: JAICO Meet No/Date:20/80- Status:<br>ENTERPRISE LLP ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0310824420 Deferred<br>:01/80/050/00274/AM19/ :03/94/040/00612/AM19/ 12.10.2018<br>Decision: The Committee considered the case as per the agenda and noted that minutes were erroneously<br>18<br>recorded for Meeting 18/80 dated 02.01.2020. The Committee observed that the hardcopy of the application has<br>not been received from the firm & RA, Mumbai and in this regard a letter was sent to RA, Mumbai on<br>05.02.2019 followed by reminders on 05.04.2019, 09.05.2019, 07.06.2020, 03.02.2020. . However, no<br>information has been received so far. Hence, the Committee decided to wait for the complete set of application<br>for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
ed to wait for the complete set of application<br>for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: GENERAL Meet No/Date:20/80- Status:<br>23/12/80-ALC2/2018 INSTRUMENTS CONSORTIUM SOLE ALC2/2019<br>PROP. KULKARNI 30.01.2020<br>HQ File RLA File :03/94/040/00640/AM19/ Lic.No/Date:0310824478 Deferred<br>:01/80/050/00296/AM19/ 16.10.2018<br>19 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 09.05.2019 followed by reminders on 24.07.2019, 06.11.2019 & 16.01.2020. However, no<br>information has been received so far. Hence, the Committee decided to wait for the complete set of application<br>for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
ed to wait for the complete set of application<br>for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:267/15/80-ALC2/2018 Party Name: LARSEN & Meet No/Date:20/80- Status:<br>TOUBRO LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0310825583 Deferred<br>:01/80/050/00609/AM19/ :03/95/040/00583/AM19/ 11.12.2018<br>20 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 29.07.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been<br>received so far. Hence, the Committee decided to wait for the complete set of application for examination of the<br>case.<br>Case is deferred.<br>----- End of picture text -----<br>
6 | P a g e
==> picture [476 x 131] intentionally omitted <==
complete set of application for examination of the<br>case.<br>Case is deferred.<br>----- End of picture text -----<br>
6 | P a g e
==> picture [476 x 131] intentionally omitted <==
----- Start of picture text -----<br> Case No.:276/15/80- Party Name: BIRLA FURUKAWA Meet No/Date:20/80- Status:<br>ALC2/2018 FIBRE OPTICS LIMITED ALC2/2019 & 30.01.2020<br>HQ File RLA File :03/94/040/00758/AM19/ Lic.No/Date:0310825749 Deferred<br>:01/80/050/00618/AM19/ 18.12.2018<br>21 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MeitY was sent to the firm on 27.09.2019 followed by reminders on 19.11.2019 &<br>27.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the<br>firm.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.: | Party Name: IND-SPHINX | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| 14/6/80-ALC2/2019 | PRECISION LTD | ALC2/2019 & 30.01.2020 | ||||
| HQ File<br>:01/80/050/00085/AM20/ | RLA File :22/24/040/00069/AM19/ | Lic.No/Date:2210016034<br>18.12.2018 | Deferred |
22 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.
Case is deferred.
the firm on 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:20/14/80-ALC2/2018 | Party Name: ULTRA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERS | ALC2/2019 & 30.01.2020 | |||||
| HQ File<br>:01/80/050/00336/AM19/ | RLA File<br>:31/83/040/00150/AM19/ | Lic.No/Date:3110067260<br>19.12.2018 | Deferred |
23 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received from the firm, the Committee decided to wait for reply of the firm.
Case is deferred.
==> picture [476 x 207] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/14/80-ALC2/2018 Party Name: ROTZLER Meet No/Date:20/80- Status:<br>SERVICES PRIVATE ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:0710114403 Approved<br>:01/80/050/00323/AM19/ :07/24/040/00236/AM19/ 16.01.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>comments of MSME as under:<br>24<br>ITCHS Sl. ITCHS Recommended<br>Code Export Item No.
on: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>comments of MSME as under:<br>24<br>ITCHS Sl. ITCHS Recommended<br>Code Export Item No. Code Import Item Norms<br>Free Wheel 1 84835090 Brake Shaft TH2 As per GN-4<br>84311010 Assembly TH2 2 84836090 Brake Clutch Thrust Washer As per GN-4<br>CW / CC 3 73182990 Retainer - Spirolox As per GN-4<br>Note: The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
7 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:300/15/80-ALC2/2018 Party Name: DILIGENT SCM Meet No/Date:20/80- Status:<br>SOLUTIONS PRIVATE ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:0910067093 Deferred<br>:01/80/050/00642/AM19/ :09/24/040/00487/AM19/ 18.01.2019<br>25<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME on 01.01.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
26
. However, no comments have been received yet. Therefore,<br>the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
26
| Case No.:313/15/80-ALC2/2018 | Party Name: OMEGA ICEHILL | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00655/AM19/ | RLA File<br>:05/24/040/00627/AM19/ | Lic.No/Date:0510409545<br>31.01.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 19.11.2019 followed by a reminder on 14.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:15/6/80-ALC2/2019 Party Name: BHARAT HEAVY Meet No/Date:20/80- Status:<br>ELECTRICALS LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:1110028485 Deferred<br>:01/80/050/00086/AM20/ :11/24/040/00024/AM19/ 04.02.2019<br>27<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI<br>on 21.01.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 141] intentionally omitted <==
e been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:310/15/80-ALC2/2018 Party Name: TERUMO PENPOL Meet No/Date:20/80- Status:<br>PRIVATE LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:5310019913 Deferred<br>:01/80/050/00652/AM19/ :53/24/040/00013/AM19/ 05.02.2019<br>28<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (Tech-1) was sent to the firm on 21.08.2019 followed by reminders on<br>04.11.2019 & 16.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for<br>reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
8 | P a g e
==> picture [476 x 141] intentionally omitted <==
nce, the Committee decided to wait for<br>reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
8 | P a g e
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:324/15/80-ALC2/2018 Party Name: SWASTIK Meet No/Date:20/80- Status:<br>TUNGSTEN PVT LTD ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:0310827084 Deferred<br>:01/80/050/00666/AM19/ :03/95/040/01213/AM19/ 15.02.2019<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish<br>29<br>following information as per advice of MSME:<br>1. As per certificate of analysis, 13.7% Mn, 3.1% Ni, 7.6 % Zn, 12.6 % Fe & 2.9% Cu is there in imported<br>powder, the firm to give recovery percentage of each item & the value of the product.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 108] intentionally omitted <==
the firm to give recovery percentage of each item & the value of the product.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 108] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/1/80-ALC2/2019 Party Name: APAR Meet No/Date:20/80- Status:<br>INDUSTRIES LIMITED ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:0310827307 Deferred<br>:01/80/050/00754/AM19/ :03/94/040/00999/AM19/ 26.02.2019<br>30<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MeitY was sent to the firm on 14.01.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/1/80-ALC2/2019 Party Name: DAGGER MASTER Meet No/Date:20/80- Status:<br>TOOL INDUSTRIES LIMITED ALC2/2019 & 30.01.2020<br>HQ File RLA File :03/94/040/01048/AM19/ Lic.No/Date:0310827404 Deferred<br>:01/80/050/00756/AM19/ 01.03.2019<br>31 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (Tech-3) was sent to the firm on 22.07.2019 followed by reminders on<br>04.10.2019 & 26.12.2019. However, no reply has been received yet.
tter seeking certain<br>information as raised by Consultant (Tech-3) was sent to the firm on 22.07.2019 followed by reminders on<br>04.10.2019 & 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to<br>remind again the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 219] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: COFLE TAYLOR Meet No/Date:20/80- Status:<br>44/1/80-ALC2/2019 INDIA CONTROL CABLES & ALC2/2019<br>SYSTEMS PRIVAT 30.01.2020<br>HQ File RLA File :04/24/040/00266/AM19/ Lic.No/Date:0410165321 Approved<br>:01/80/050/00792/AM19/ 14.03.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>comments of MSME as under:<br>32 ITCHS Sl. ITCHS Recommended<br>Code Export Item No. Code Import Item Norms<br>1 39269099 Plastic Part As per GN-4<br>Control Cables 2 40169590 Rubber Part As per GN-4<br>87089900 For Brake 3 73121010 Wire rope Net to net basis<br>4 73129000 Spiral Net to net basis<br>5 73261910 Metallic Part As per GN-4<br>Note: The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
9 | P a g e
==> picture [476 x 131] intentionally omitted <==
nly.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
9 | P a g e
==> picture [476 x 131] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/2/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:20/80- Status:<br>PVT. LTD ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510410085 Deferred<br>:01/80/050/00805/AM19/ :05/24/040/00738/AM19/ 28.03.2019<br>33<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/2/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:20/80- Status:<br>CORPORATION PANSE ALC2/2019<br>PRIVATE LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:3110067366 Deferred<br>:01/80/050/00003/AM20/ :31/83/040/00298/AM19/ 02.04.2019<br>34<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 14.01.2020.
4.2019<br>34<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:1/4/80-ALC2/2019 | Party Name: STERLITE POWER | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| TRANSMISSION LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00016/AM20/ | RLA File<br>:03/95/040/00051/AM20/ | Lic.No/Date:0310828571<br>24.04.2019 | Deferred |
35 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MeitY for examination of the case on 31.10.2019 followed by a reminder on 26.12.2019. However, no comments have been received yet. Therefore, the Committee decided to remind MeitY for expediting the comments.
Case is deferred.
| Case No.:2/4/80-ALC2/2019 | Party Name: SULZER INDIA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00017/AM20/ | RLA File<br>:31/83/040/00009/AM20/ | Lic.No/Date:3110067390<br>24.04.2019 | Deferred |
---|---|---|---|---|---| |||PRIVATE LIMITED||ALC2/2019||| |||||30.01.2020||| |HQ File<br>:01/80/050/00017/AM20/||RLA File<br>:31/83/040/00009/AM20/||Lic.No/Date:3110067390<br>24.04.2019||Deferred|
36 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019 followed by reminders on 04.10.2019 & 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.
Case is deferred
10 | P a g e
| Case No.: | Party Name: SULZER INDIA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| 3/4/80-ALC2/2019 | PRIVATE LIMITED | ALC2/2019 | ||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00018/AM20/ | RLA File :31/83/040/00010/AM20/ | Lic.No/Date:3110067391<br>24.04.2019 | Deferred |
37 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019 followed by reminders on 04.10.2019 & 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.
Case is deferred.
019 & 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:4/4/80-ALC2/2019 | Party Name: SULZER INDIA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00019/AM20/ | RLA File<br>:31/83/040/00011/AM20/ | Lic.No/Date:3110067392<br>24.04.2019 | Deferred |
38 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 23.07.2019 followed by reminders on 04.10.2019 & 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.
Case is deferred.
39
| Case No.:5/4/80-ALC2/2019 | Party Name: VICTORA AUTO | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00020/AM20/ | RLA File<br>:05/24/040/00033/AM20/ | Lic.No/Date:0510410376<br>25.04.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 15.01.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
f application was sent to MSME on 15.01.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:7/4/80-ALC2/2019 | Party Name: SHIVALIK | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| BIMETAL CONTROLS LTD | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00022/AM20/ | RLA File<br>:05/24/040/00016/AM20/ | Lic.No/Date:0510410395<br>26.04.2019 | Deferred |
40 Decision: The Committee considered the case as per the agenda and noted that the copy of application was sent to MSME for examination of the case on 10.06.2019 followed by I.D. reminders on 22.07.2019, 05.11.2019 & 14.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
11 | P a g e
==> picture [476 x 186] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/4/80-ALC2/2019 Party Name: ERBATECH Meet No/Date:20/80- Status:<br>MACHINERY P LTD ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:3210078932 Deferred<br>:01/80/050/00024/AM20/ :32/24/040/00004/AM20/ 29.04.2019<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per advice of the representative of DHI :<br>41<br>1. Detailed product designs showing the use/fitment of the proposed imports.<br>2. Manufacturing process spelling out the stages where the imports are being used.<br>3.
resentative of DHI :<br>41<br>1. Detailed product designs showing the use/fitment of the proposed imports.<br>2. Manufacturing process spelling out the stages where the imports are being used.<br>3. For all the raw materials calculations for use and wastage.<br>4. Weight balance.<br>5. Certificate/statement/details that all the imports will be part of the exports.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 232] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/4/80-ALC2/2019 Party Name: FREEDOM Meet No/Date:20/80- Status:<br>OPTHALMIC PRIVATE ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:0410165526 Approved<br>:01/80/050/00027/AM20/ :04/24/040/00018/AM20/ 30.04.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>comments of Consultant (Tech-1) as under :<br>42 ITCHS Export Sl. ITCHS Recommended Norms<br>Import Item<br>Code Item No. Code<br>Hydrophilic Acrylic Blanks of Net to net<br>Acrylic 1 70151010 relevant specification<br>Foldable<br>Lens Injection Cartridges of Net to net<br>90213900 Intraocular 2 90165090<br>relevant specification<br>Lens<br>3 84589990 Diamond Tool 1% of FoB value<br>4 76072090 Aluminium Foil As per packaging policy<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
Tool 1% of FoB value<br>4 76072090 Aluminium Foil As per packaging policy<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.: | Party Name: SRI RAM INDUSTRIES | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| 13/4/80-ALC2/2019 | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00028/AM20/ | RLA File :<br>04/24/040/00157/AM19/ | Lic.No/Date:0410165532<br>01.05.2019 | Deferred |
43 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019 followed by reminders on 19.11.2019 & 16.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
12 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:14/4/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:20/80- Status:<br>COMPOSITES - INDIA PVT ALC2/2019<br>LTD 30.01.2020<br>HQ File RLA File Lic.No/Date:0310828702 Deferred<br>:01/80/050/00029/AM20/ :03/94/040/01131/AM19/ 01.05.2019<br>44<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 14.01.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
nt to the firm on 14.01.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 199] intentionally omitted <==
----- Start of picture text -----<br> Case No.:15/4/80-ALC2/2019 Party Name: CHIRAG UDYOG Meet No/Date:20/80- Status:<br>ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510410451 Deferred<br>:01/80/050/00030/AM20/ :05/23/040/00054/AM20/ 02.05.2019<br>Decision: The Committee considered the case as per the agenda and noted the following comments submitted by<br>Consultant (Tech 3):<br>45<br>1. Firm has replied that specific item of export will depend on the actual order. And as wastage will vary<br>from product to product it is not possible to calculate input without specific Export Product and it<br>quantity.<br>Hence, the Committee decided to call the firm for personal hearing , to explain the case before the Committee<br>in forthcoming Norms Committee meeting.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: BLISS ANAND PVT. Meet No/Date:20/80- Status:<br>16/4/80-ALC2/2019 LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File :05/23/040/00051/AM20/ Lic.No/Date:0510410480 Deferred<br>:01/80/050/00031/AM20/ 03.05.2019<br>----- End of picture text -----<br>
/2019 LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File :05/23/040/00051/AM20/ Lic.No/Date:0510410480 Deferred<br>:01/80/050/00031/AM20/ 03.05.2019<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish following information as per advice of MSME:
- Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
46
-
Weight of each Export Product.
-
Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
13 | P a g e
==> picture [476 x 130] intentionally omitted <==
stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
13 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:21/4/80-ALC2/2019 Party Name: MASU BRAKE Meet No/Date:20/80- Status:<br>PADS PRIVATE LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510410488 Deferred<br>:01/80/050/00036/AM20/ :05/24/040/00057/AM20/ 06.05.2019<br>47<br>Decision: The Committee considered the case as per the agenda and noted that the recommendation of<br>Consultant (Tech-1) has some shortfall in the import items. Therefore, the Committee advised the Consultant<br>(Tech-1) to update their recommendation. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:19/4/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:20/80- Status:<br>PVT. LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510410518 Deferred<br>:01/80/050/00034/AM20/ :05/24/040/00762/AM19/ 08.05.2019<br>48<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 26.12.2019.
.2019<br>48<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:18/4/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:20/80- Status:<br>SOLUTIONS PRIVATE ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:0910067492 Deferred<br>:01/80/050/00033/AM20/ :09/24/040/00058/AM20/ 10.05.2019<br>49<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 140] intentionally omitted <==
to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:28/5/80-ALC2/2019 Party Name: SHIRODKAR Meet No/Date:20/80- Status:<br>PRECI COMP PRIVATE ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:3110067433 Deferred<br>:01/80/050/00066/AM20/ :31/83/040/00028/AM20/ 29.05.2019<br>50<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019 followed by reminders on<br>19.11.2019 & 16.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for<br>reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
14 | P a g e
| Case No.:29/5/80-ALC2/2019 | Party Name: SHIRODKAR | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRECI COMP PRIVATE | ALC2/2019 | |||||
| LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00067/AM20/ | RLA File<br>:31/83/040/00027/AM20/ | Lic.No/Date:3110067434<br>29.05.2019 | Deferred |
-|---|---|---| |||PRECI COMP PRIVATE||ALC2/2019||| |||LIMITED||30.01.2020||| |HQ File<br>:01/80/050/00067/AM20/||RLA File<br>:31/83/040/00027/AM20/||Lic.No/Date:3110067434<br>29.05.2019||Deferred|
51 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019 followed by reminders on 19.11.2019 & 16.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.:30/5/80-ALC2/2019 Party Name: TIAGO CHEM Meet No/Date:20/80- Status:<br>ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:3410045178 Deferred<br>:01/80/050/00068/AM20/ :34/24/040/00075/AM20/ 30.05.2019<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>52<br>not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 26.07.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has<br>been received so far. Hence, the Committee decided to wait for the complete set of application for examination<br>of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 152] intentionally omitted <==
ed to wait for the complete set of application for examination<br>of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 152] intentionally omitted <==
----- Start of picture text -----<br> Case No.:32/5/80-ALC2/2019 Party Name: FUTURE TECH Meet No/Date:20/80- Status:<br>ENGINEERING PVT. LTD. ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:0710115000 Deferred<br>:01/80/050/00070/AM20/ :07/24/040/00050/AM20/ 31.05.2019<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>53 MSME for examination of the case on 13.08.2019 followed by reminders on 05.11.2019 & 14.01.2020.<br>However, the representative of MSME informed that the hardcopy received from RA, Bangalore has<br>erroneously sent the application of M/s Rotzler Services with the forwarding letter of M/s Future Tech<br>Engineering Pvt. Ltd. Hence, the Committee decided to inform RA, Bangalore for submitting the hardcopy of<br>firm’s application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 159] intentionally omitted <==
to inform RA, Bangalore for submitting the hardcopy of<br>firm’s application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 159] intentionally omitted <==
----- Start of picture text -----<br> Case No.:33/5/80-ALC2/2019 Party Name: GRAND PRIX Meet No/Date:20/80- Status:<br>ENGINEERING PVT. LTD. ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:0510410791 Approved<br>:01/80/050/00071/AM20/ :05/23/040/00096/AM20/ 03.06.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>54 comments of MSME as under:<br>1. Quantity of import items at Sl. No. 1 to 4 & 7 to 10 may be allowed under GN-4.<br>2. Quantity of import items at Sl. No. 5, 6, 11 & 12 may be allowed as 1.03 Kgs/Kg on net content in the<br>export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
15 | P a g e
==> picture [476 x 131] intentionally omitted <==
ct.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
15 | P a g e
==> picture [476 x 131] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/6/80-ALC2/2019 Party Name: SHIVALIK Meet No/Date:20/80- Status:<br>BIMETAL CONTROLS LTD ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510410810 Deferred<br>:01/80/050/00072/AM20/ :05/24/040/00129/AM20/ 04.06.2019<br>55<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME on 24.12.2019 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:2/6/80-ALC2/2019 | Party Name: LAXMI DENTAL | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| EXPORT PVT. LTD. | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00073/AM20/ | RLA File<br>:03/95/040/00207/AM20/ | Lic.No/Date:0310829403<br>04.06.2019 | Deferred |
56 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.
Case is deferred.
57
irm on 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.
Case is deferred.
57
| Case No.:4/6/80-ALC2/2019 | Party Name: MAGNA | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AUTOMOTIVE INDIA | ALC2/2019 | ||||||
| PRIVATE LIMITED | 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00075/AM20/ | RLA File<br>:04/24/040/00049/AM20/ | Lic.No/Date:0410165680<br>06.06.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 30.07.2019 followed by reminders on 05.11.2019 & 15.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for comments.
Case is deferred.
==> picture [476 x 170] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/6/80-ALC2/2019 Party Name: ERBATECH Meet No/Date:20/80- Status:<br>MACHINERY PRIVATE ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:3210078986 Approved<br>:01/80/050/00076/AM20/ :32/24/040/00017/AM20/ 06.06.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>58<br>comments of Consultant (Tech-3) as under:<br>1. The import quantities, which are components , may be allowed on net to net basis as per GN-4 .<br>2. The import quantities, which are raw materials , may be allowed with net plus 2% wastage .<br>3. Import item at Sl. No.
ch are components , may be allowed on net to net basis as per GN-4 .<br>2. The import quantities, which are raw materials , may be allowed with net plus 2% wastage .<br>3. Import item at Sl. No. 145 may be deleted as it is not part of export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
16 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:20/80- Status:<br>LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0310829486 Deferred<br>:01/80/050/00077/AM20/ :03/95/040/00221/AM20/ 07.06.2019<br>59<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:20/80- Status:<br>LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0310829488 Deferred<br>:01/80/050/00078/AM20/ :03/95/040/00206/AM20/ 07.06.2019<br>60<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:20/80- Status:<br>LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0310829553 Deferred<br>:01/80/050/00081/AM20/ :03/95/040/00229/AM20/ 11.06.2019<br>61<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019.
2019<br>61<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/6/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:20/80- Status:<br>PVT. LTD ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510410880 Deferred<br>:01/80/050/00083/AM20/ :05/24/040/00144/AM20/ 11.06.2019<br>62<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME for examination of the case on 31.07.2019 followed by reminders on 05.11.2019 & 14.01.2020.<br>However, no comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
17 | P a g e
| Case No.:13/6/80-ALC2/2019 | Party Name: VEELINE MEDIA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00084/AM20/ | RLA File<br>:02/24/040/00038/AM20/ | Lic.No/Date:0210209240<br>11.06.2019 | Deferred |
*| |---|---|---|---|---|---|---| |||LIMITED||ALC2/2019||| |||||30.01.2020||| |HQ File<br>:01/80/050/00084/AM20/||RLA File<br>:02/24/040/00038/AM20/||Lic.No/Date:0210209240<br>11.06.2019||Deferred|
63 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 14.08.2019 followed by a reminder on 26.12.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:16/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:20/80- Status:<br>LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0310829596 Deferred<br>:01/80/050/00087/AM20/ :03/95/040/00239/AM20/ 12.06.2019<br>64<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:17/6/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:20/80- Status:<br>AUTOMOTIVES LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510410932 Deferred<br>:01/80/050/00088/AM20/ :05/23/040/00062/AM20/ 14.06.2019<br>65<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSME on 03.12.2019 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:18/6/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:20/80- Status:<br>AUTOMOTIVES LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510410933 Deferred<br>:01/80/050/00089/AM20/ :05/23/040/00063/AM20/ 14.06.2019<br>66<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSME on 03.12.2019 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
18 | P a g e
comments have been received yet. Therefore,<br>the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
18 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:21/6/80-ALC2/2019 Party Name: ISGEC HITACHI Meet No/Date:20/80- Status:<br>ZOSEN LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510410946 Deferred<br>:01/80/050/00092/AM20/ :05/23/040/00111/AM20/ 14.06.2019<br>67<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
68
| Case No.:1/8/80-ALC2/2019 | Party Name: MODEL INFRA | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| CORPORATION PRIVATE | ALC2/2019 | ||||||
| LIMITED | 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00113/AM20/ | RLA File<br>:07/24/040/00081/AM20/ | Lic.No/Date:0710115134<br>05.07.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 11.12.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
MSME on 11.12.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/8/80-ALC2/2019 Party Name: KABY PRECISION Meet No/Date:20/80- Status:<br>MACHINING PRIVATE ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:0910067755 Deferred<br>69 :01/80/050/00114/AM20/ :09/24/040/00176/AM20/ 05.07.2019<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and decided to refer the case to Consultant (SKB) for examination & comments.
Case is deferred.
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/8/80-ALC2/2019 Party Name: MICRON SPECMA Meet No/Date:20/80- Status:<br>(INDIA) PRIVATE LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:3310030562 Deferred<br>:01/80/050/00119/AM20/ :33/24/040/00015/AM20/ 08.07.2019<br>70 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Panipat and in this regard a letter was sent to the firm & RA,<br>Panipat on 23.08.2019 followed by reminders on 06.11.2019 & 20.01.2020. However, no information has been<br>received so far.
RA, Panipat and in this regard a letter was sent to the firm & RA,<br>Panipat on 23.08.2019 followed by reminders on 06.11.2019 & 20.01.2020. However, no information has been<br>received so far. Hence, the Committee decided to wait for the complete set of application for examination of the<br>case.<br>Case is deferred.<br>----- End of picture text -----<br>
19 | P a g e
==> picture [476 x 152] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/8/80-ALC2/2019 Party Name: ULTRA Meet No/Date:20/80- Status:<br>ENGINEERS ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:3110067470 Deferred<br>:01/80/050/00115/AM20/ :31/83/040/00058/AM20/ 10.07.2019<br>71 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>Consultant (Tech-3) on 26.12.2019 for examination of the case. However, it was also noted that the firm<br>informed vide email dated 30.01.2020 that they are revising drawing & designs of the export products as per<br>customer requirement and requested to hold the fixation of norms for 4 weeks as to prepare revise application<br>for amendment. Therefore, the Committee decided to wait for the requisite information from the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 66] intentionally omitted <==
ore, the Committee decided to wait for the requisite information from the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/8/80-ALC2/2019 Party Name: VALEO INDIA Meet No/Date:20/80- Status:<br>PRIVATE LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0410165826 Deferred<br>:01/80/050/00117/AM20/ :04/24/040/00067/AM20/ 12.07.2019<br>----- End of picture text -----<br>
72 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 05.08.2019 followed by a reminder on 26.12.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.
Case is deferred.
| Case No.:6/8/80-ALC2/2019 | Party Name: DILIGENT SCM | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| SOLUTIONS PRIVATE | ALC2/2019 | |||||
| LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00118/AM20/ | RLA File<br>:09/24/040/00199/AM20/ | Lic.No/Date:0910067781<br>12.07.2019 | Deferred |
73 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019 followed by reminders on 19.11.2019 & 16.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
to the firm on 04.10.2019 followed by reminders on 19.11.2019 & 16.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/8/80-ALC2/2019 Party Name: AUTO TECH Meet No/Date:20/80- Status:<br>INDUSTRIES (INDIA) PVT. ALC2/2019<br>LTD. 30.01.2020<br>HQ File RLA File Lic.No/Date:0410165827 Deferred<br>:01/80/050/00120/AM20/ :04/24/040/00068/AM20/ 15.07.2019<br>74<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
20 | P a g e
==> picture [476 x 152] intentionally omitted <==
Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
20 | P a g e
==> picture [476 x 152] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: ANSTECH Meet No/Date:20/80- Status:<br>9/8/80-ALC2/2019 ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:3410045281 Deferred<br>:01/80/050/00121/AM20/ :34/24/040/00127/AM20/ 15.07.2019<br>75 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 23.08.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has<br>been received so far. Hence, the Committee decided to wait for the complete set of application for examination<br>of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: ULTRA Meet No/Date:20/80- Status:<br>10/8/80-ALC2/2019 ENGINEERS ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:3110067477 Deferred<br>:01/80/050/00122/AM20/ :31/83/040/00056/AM20/ 17.07.2019<br>----- End of picture text -----<br>
ENGINEERS ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:3110067477 Deferred<br>:01/80/050/00122/AM20/ :31/83/040/00056/AM20/ 17.07.2019<br>----- End of picture text -----<br>
76 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 26.12.2019 for examination of the case. However, it was also noted that the firm informed vide email dated 30.01.2020 that they are revising drawing & designs of the export products as per customer requirement and requested to hold the fixation of norms for 4 weeks as to prepare revise application for amendment. Therefore, the Committee decided to wait for the requisite information from the firm.
Case is deferred.
77
| Case No.:11/8/80-ALC2/2019 | Party Name: APAR | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00123/AM20/ | RLA File<br>:03/94/040/00303/AM20/ | Lic.No/Date:0310830379<br>17.07.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY for examination of the case on 26.11.2019 followed by a reminder on 14.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
reminder on 14.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/8/80-ALC2/2019 Party Name: ZOBELE INDIA Meet No/Date:20/80- Status:<br>PRIVATE LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0310830415 Deferred<br>:01/80/050/00124/AM20/ :03/95/040/00352/AM20/ 18.07.2019<br>----- End of picture text -----<br>
78 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 23.08.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
21 | P a g e
==> picture [476 x 129] intentionally omitted <==
. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
21 | P a g e
==> picture [476 x 129] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/8/80-ALC2/2019 Party Name: HORIZON Meet No/Date:20/80- Status:<br>CHUTES PVT LTD ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:3110067480 Deferred<br>:01/80/050/00125/AM20/ :31/83/040/00064/AM20/ 18.07.2019<br>79 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>23.08.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been received so<br>far. Hence, the Committee decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:3/9/80-ALC2/2019 | Party Name: DYNA FORCE | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| HYDRAULICS PRIVATE | ALC2/2019 | |||||
| LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00128/AM20/ | RLA File<br>:31/83/040/00067/AM20/ | Lic.No/Date:3110067484<br>25.07.2019 | Deferred |
-|---|---|---| |||HYDRAULICS PRIVATE||ALC2/2019||| |||LIMITED||30.01.2020||| |HQ File<br>:01/80/050/00128/AM20/||RLA File<br>:31/83/040/00067/AM20/||Lic.No/Date:3110067484<br>25.07.2019||Deferred|
80 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 14.10.2019 followed by reminders on 06.11.2019 & 08.01.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 177] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/10/80-ALC2/2019 Party Name: HANNING Meet No/Date:20/80- Status:<br>MOTORS INDIA P. LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:3410045343 Approved<br>:01/80/050/00139/AM20/ :34/24/040/00138/AM20/ 06.08.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>81 comments of MSME as under:<br>1. Relevant import of items at Sl. No. 1 to 12 may be allowed as per GN-4.<br>2. Relevant import of item at Sl. No. 13 may be allowed on net to net basis.<br>3. Relevant import of item at Sl. No. 14 may be allowed with 1.01kg/kg in export product.<br>4. Relevant import of items at Sl. No.
import of item at Sl. No. 13 may be allowed on net to net basis.<br>3. Relevant import of item at Sl. No. 14 may be allowed with 1.01kg/kg in export product.<br>4. Relevant import of items at Sl. No. 15 to 18 may be allowed with 1.05kg/kg in export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/10/80-ALC2/2019 Party Name: DOOWON Meet No/Date:20/80- Status:<br>AUTOMOTIVE SYSTEMS ALC2/2019<br>INDIA PRIVATE LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:0410165942 Deferred<br>:01/80/050/00140/AM20/ :04/24/040/00079/AM20/ 07.08.2019<br>82 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA,<br>Chennai on 14.10.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been<br>received so far. Hence, the Committee decided to wait for the complete set of application for examination of the<br>case.<br>Case is deferred.<br>----- End of picture text -----<br>
22 | P a g e
==> picture [476 x 153] intentionally omitted <==
complete set of application for examination of the<br>case.<br>Case is deferred.<br>----- End of picture text -----<br>
22 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/10/80-ALC2/2019 Party Name: HANNING Meet No/Date:20/80- Status:<br>MOTORS INDIA P LTD ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:3410045361 Approved<br>:01/80/050/00142/AM20/ :34/24/040/00145/AM20/ 08.08.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>83 comments of MSME as under:<br>1. Relevant import of items at Sl. No. 1, 4 to 8 and 11 may be allowed as per GN-4.<br>2. Relevant import of items at Sl. No. 2, 3, 9 may be allowed with 1.05kg/kg in export product.<br>3. Relevant import of item at Sl. No. 10 may be allowed with 1.01kg/kg in export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 55] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/10/80-ALC2/2019 Party Name: JKS Meet No/Date:20/80- Status:<br>ENGINEERING ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:3210079060 Deferred<br>:01/80/050/00143/AM20/ :32/24/040/00033/AM20/ 08.08.2019<br>----- End of picture text -----<br>
ENGINEERING ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:3210079060 Deferred<br>:01/80/050/00143/AM20/ :32/24/040/00033/AM20/ 08.08.2019<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has 84 not yet been received from the firm & RA, Coimbatore and in this regard a letter was sent to the firm & RA, Coimbatore on 16.10.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/10/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:20/80- Status:<br>BLADES INDIA PVT. LTD. ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:3410045365 Deferred<br>:01/80/050/00144/AM20/ :34/24/040/00152/AM20/ 09.08.2019<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>85<br>not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 11.10.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has<br>been received so far. Hence, the Committee decided to wait for the complete set of application for examination<br>of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
has<br>been received so far. Hence, the Committee decided to wait for the complete set of application for examination<br>of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.: | Party Name: MAINI | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| 7/10/80-ALC2/2019 | PRECISION PRODUCTS | ALC2/2019 | ||||
| LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00145/AM20/ | RLA File<br>:07/24/040/00106/AM20/ | Lic.No/Date:0710115278<br>13.08.2019 | Deferred |
86 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 26.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.
Case is deferred.
23 | P a g e
==> picture [476 x 237] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/10/80-ALC2/2019 Party Name: SHAKTI PUMPS Meet No/Date:20/80- Status:<br>INDIA LIMITED ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:5610005668 Approved<br>:01/80/050/00146/AM20/ :56/24/040/00012/AM20/ 13.08.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/328/2018-TSW dated 28.01.2020 as under:<br>1. Import items at Sl. No. 1 and 2 shall be of relevant grade and thickness as contained/utilized in the<br>export items.<br>87<br>2.
ide U. O. No.: P-47011/328/2018-TSW dated 28.01.2020 as under:<br>1. Import items at Sl. No. 1 and 2 shall be of relevant grade and thickness as contained/utilized in the<br>export items.<br>87<br>2. Quantities of import items at Sl. No. 1 may be allowed as applied for i.e. 11850.3 Kgs at 1.05 Kgs/Kg<br>content in export items at Sl. No. 1 to 3.<br>3. Quantity of import item at Sl. No. 2 may be allowed as 117900 Kgs as per SION C-1519.<br>4. Quantities of import items at Sl. No. 3 & 4 may be allowed as 3000 Nos, 6000 Nos respectively on net<br>to net basis with accountability clause.<br>5. Quantity of import item at Sl. No. 5 may be allowed as 9300 Meters on net to net basis as claimed by<br>the firm.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 238] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/10/80-ALC2/2019 Party Name: SHAKTI PUMPS Meet No/Date:20/80- Status:<br>INDIA LIMITED ALC2/2019 & 30.01.2020<br>HQ File RLA File Lic.No/Date:5610005671 Approved<br>:01/80/050/00148/AM20/ :56/24/040/00013/AM20/ 19.08.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/328/2018-TSW dated 28.01.2020 as under:<br>1. Import items at Sl. No. 1 to 3 shall be of relevant grade and thickness as contained/utilized in the export<br>items.<br>88<br>2. Quantities of import items at Sl. No. 1 & 2 may be allowed as applied for i.e.
ems at Sl. No. 1 to 3 shall be of relevant grade and thickness as contained/utilized in the export<br>items.<br>88<br>2. Quantities of import items at Sl. No. 1 & 2 may be allowed as applied for i.e. 4870.68 Kgs & 4141.18<br>Kgs respectively aT 1.05 Kgs/Kg content in export items at Sl. No. 1 to 4.<br>3. Quantity of import item at Sl. No. 3 may be allowed as 104800 Kgs as per SION C-1519.<br>4. Quantities of import items at Sl. No. 4 to 6 may be allowed as 2500 Nos, 2500 Nos and 5000 Nos<br>respectively on net to net basis with accountability clause.<br>5. Quantity of import item at Sl. No. 7 may be allowed as 10250 Meters on net to net basis as claimed by<br>the firm.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/10/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:20/80- Status:<br>AUTOMOTIVES PVT. LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510411553 Deferred<br>:01/80/050/00149/AM20/ :05/23/040/00164/AM20/ 20.08.2019<br>89<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME on 21.01.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
24 | P a g e
90
case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
24 | P a g e
90
Case No.:12/10/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:20/80- Status: COMPOSITES - INDIA PVT ALC2/2019 LTD. 30.01.2020 HQ File RLA File Lic.No/Date:0310831081 Deferred :01/80/050/00150/AM20/ :03/94/040/00329/AM20/ 20.08.2019
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT for examination of the case on 09.12.2019. However, no comments have been received yet. Hence, the Committee decided to remind DPIIT for expediting the comments.
Case is deferred.
Case No.:13/10/80-ALC2/2019 Party Name: CAPCO WATER Meet No/Date:20/80- Status: SOLUTIONS PRIVATE ALC2/2019 LIMITED 30.01.2020 HQ File RLA File Lic.No/Date:0310831168 Approved :01/80/050/00151/AM20/ :03/94/040/00273/AM20/ 22.08.2019
Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written 91 comments of MSME as under:
-
Relevant import of item at Sl. No. 1 may be allowed as 1.02 kg/kg in export product.
-
Relevant import of items at Sl. No. 2, 3, 4, 6 & 7 may be as 1.01 kg/kg in export product.
-
Relevant import of item at Sl. No. 5 may be allowed as 1.05kg/kg in export product.
-
Relevant import of item at Sl. No. 8 may be allowed as per GN4.
RA concerned may take further necessary action as per the decision of NC.
No. 5 may be allowed as 1.05kg/kg in export product.
- Relevant import of item at Sl. No. 8 may be allowed as per GN4.
RA concerned may take further necessary action as per the decision of NC.
Case No.:15/10/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:20/80- Status: BLADES INDIA PVT. LTD. ALC2/2019 30.01.2020 HQ File RLA File Lic.No/Date:3410045391 Deferred :01/80/050/00153/AM20/ :34/24/040/00164/AM20/ 23.08.2019
92 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 11.10.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
een received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:18/10/80-ALC2/2019 Party Name: DECON INDIA Meet No/Date:20/80- Status:<br>PLASTICS PVT LTD ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:3110067515 Deferred<br>:01/80/050/00156/AM20/ :31/83/040/00079/AM20/ 26.08.2019<br>93<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>11.10.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been received so<br>far. Hence, the Committee decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
25 | P a g e
==> picture [476 x 153] intentionally omitted <==
he complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
25 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:19/10/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:20/80- Status:<br>SOLUTIONS PRIVATE ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:0910067939 Deferred<br>:01/80/050/00157/AM20/ :09/24/040/00272/AM20/ 27.08.2019<br>94 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish<br>following information as per advice of MSME :<br>1. Firm to submit step wise wastage.<br>2. Firm to provide information on per unit weight of export product with net weight of imported items.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:20/10/80-ALC2/2019 | Party Name: OSWAL PUMPS | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00158/AM20/ | RLA File<br>:33/24/040/00017/AM20/ | Lic.No/Date:3310030578<br>27.08.2019 | Deferred |
95 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 26.12.2019 for examination of the case. However, the representative of DPIIT informed in the meeting that DPIIT did not receive the complete set of application. Therefore, the Committee decided to send again the complete set of application to DPIIT for examination of the case.
the meeting that DPIIT did not receive the complete set of application. Therefore, the Committee decided to send again the complete set of application to DPIIT for examination of the case.
Case is deferred.
96
| Case No.:21/10/80-ALC2/2019 | Party Name: AUTO TECH | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDUSTRIES (INDIA) PVT. | ALC2/2019 | ||||||
| LTD. | 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00159/AM20/ | RLA File<br>:04/24/040/00091/AM20/ | Lic.No/Date:0410166015<br>28.08.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:22/10/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:20/80- Status:<br>ENGINEERING LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510411660 Deferred<br>:01/80/050/00160/AM20/ :05/23/040/00208/AM20/ 28.08.2019<br>97<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 26.12.2019.
8.2019<br>97<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 26.12.2019. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
26 | P a g e
98
| Case No.:1/12/80-ALC2/2019 | Party Name: AYYAPPA CNC | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PVT LTD | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00173/AM20/ | RLA File<br>:07/24/040/00135/AM20/ | Lic.No/Date:0710115448<br>18.09.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 26.11.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
==> picture [476 x 119] intentionally omitted <==
ever, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/12/80-ALC2/2019 Party Name: HEURTEY Meet No/Date:20/80- Status:<br>PETROCHEM INDIA PRIVATE ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:3410045459 Deferred<br>99 :01/80/050/00174/AM20/ :34/24/040/00185/AM20/ 19.09.2019<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application is being<br>forwarded to DPIIT for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:3/12/80-ALC2/2019 | Party Name: FINE PAC | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| STRUCTURES PRIVATE | ALC2/2019 | |||||
| LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00175/AM20/ | RLA File<br>:31/83/040/00088/AM20/ | Lic.No/Date:3110067537<br>20.09.2019 | Deferred |
100 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 21.10.2019 followed by a reminder on 26.12.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: FREUDENBERG Meet No/Date:20/80- Status:<br>4/12/80-ALC2/2019 FILTRATION TECHNOLOGIES ALC2/2019<br>INDIA PVT. LTD. 30.01.2020<br>HQ File RLA File :31/83/040/00008/AM20/ Lic.No/Date:3110067543 Deferred<br>:01/80/050/00176/AM20/ 24.09.2019<br>101<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Pune & the firm and in this regard an email was sent on 29.11.2019 followed<br>by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided<br>to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
27 | P a g e
| Case No.:5/12/80-ALC2/2019 | Party Name: GODREJ & | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| BOYCE MFG. CO. LTD. | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00177/AM20/ | RLA File<br>:03/94/040/00480/AM20/ | Lic.No/Date:0310831805<br>25.09.2019 | Deferred |
---|---|---|---|---| |||BOYCE MFG. CO. LTD.||ALC2/2019||| |||||30.01.2020||| |HQ File<br>:01/80/050/00177/AM20/||RLA File<br>:03/94/040/00480/AM20/||Lic.No/Date:0310831805<br>25.09.2019||Deferred|
102 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:6/12/80-ALC2/2019 | Party Name: VICTORA AUTO | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00178/AM20/ | RLA File<br>:05/24/040/00338/AM20/ | Lic.No/Date:0510411950<br>25.09.2019 | Deferred |
103 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
s been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/12/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:20/80- Status:<br>PVT. LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510411951 Deferred<br>:01/80/050/00179/AM20/ :05/24/040/00340/AM20/ 25.09.2019<br>104<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 29.11.2019<br>followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:8/12/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | |||||
| LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00180/AM20/ | RLA File<br>:09/24/040/00336/AM20/ | Lic.No/Date:0910068046<br>27.09.2019 | Deferred |
|---|---|---| |||ENGINEERING PRIVATE||ALC2/2019||| |||LIMITED||30.01.2020||| |HQ File<br>:01/80/050/00180/AM20/||RLA File<br>:09/24/040/00336/AM20/||Lic.No/Date:0910068046<br>27.09.2019||Deferred|
105 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
28 | P a g e
106
| Case No.:10/12/80-ALC2/2019 | Party Name: AUTO TECH | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDUSTRIES INDIA PVT. | ALC2/2019 | ||||||
| LTD. | 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00182/AM20/ | RLA File<br>:04/24/040/00105/AM20/ | Lic.No/Date:0410166124<br>01.10.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received from the firm, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.:11/12/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | |||||
| LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00183/AM20/ | RLA File<br>:09/24/040/00345/AM20/ | Lic.No/Date:0910068052<br>01.10.2019 | Deferred |
|---|---|---| |||ENGINEERING PRIVATE||ALC2/2019||| |||LIMITED||30.01.2020||| |HQ File<br>:01/80/050/00183/AM20/||RLA File<br>:09/24/040/00345/AM20/||Lic.No/Date:0910068052<br>01.10.2019||Deferred|
107 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:12/12/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | |||||
| LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00184/AM20/ | RLA File<br>:09/24/040/00344/AM20/ | Lic.No/Date:0910068053<br>01.10.2019 | Deferred |
108 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
109
eminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
109
| Case No.:13/12/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | ||||||
| LIMITED | 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00185/AM20/ | RLA File<br>:09/24/040/00346/AM20/ | Lic.No/Date:0910068054<br>01.10.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
29 | P a g e
| Case No.:9/13/80-ALC2/2019 | Party Name: GENESIS | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PACKAGING PVT. LTD. | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00194/AM20/ | RLA File<br>:07/24/040/00152/AM20/ | Lic.No/Date:0710115559<br>14.10.2019 | For next<br>meeting |
|---|---| |||PACKAGING PVT. LTD.||ALC2/2019||| |||||30.01.2020||| |HQ File<br>:01/80/050/00194/AM20/||RLA File<br>:07/24/040/00152/AM20/||Lic.No/Date:0710115559<br>14.10.2019||For next<br>meeting|
110 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 01.11.2019 for examination of the case. However, Committee also noted that the case is already being considered in Odd Sequenced NC-1 Meeting and has been erroneously generated for this meeting. Therefore, the Committee decided to consider the case in other meeting only.
Case to be considered in “Odd Sequenced” meeting.
111
| Case No.:1/14/80-ALC2/2019 | Party Name: MITA INDIA | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00197/AM20/ | RLA File<br>:05/24/040/00388/AM20/ | Lic.No/Date:0510412156<br>17.10.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 19.12.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
112
| Case No.:2/14/80-ALC2/2019 | Party Name: MICRON | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00198/AM20/ | RLA File<br>:05/24/040/00392/AM20/ | Lic.No/Date:0510412157<br>17.10.2019 | Deferred |
|---|---|---|---| ||||INSTRUMENTS PVT LTD||ALC2/2019||| ||||||30.01.2020||| ||HQ File<br>:01/80/050/00198/AM20/||RLA File<br>:05/24/040/00392/AM20/||Lic.No/Date:0510412157<br>17.10.2019||Deferred|
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 31.12.2019 for examination of the case. However, the representative of DPIIT informed in meeting that the case is under examination . Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:3/14/80-ALC2/2019 | Party Name: LOTUS | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| AVIATION TECHNOLOGY | ALC2/2019 | |||||
| PRIVATE LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00199/AM20/ | RLA File<br>:05/23/040/00283/AM20/ | Lic.No/Date:0510412171<br>17.10.2019 | Deferred |
113 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
30 | P a g e
114
- However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
30 | P a g e
114
| Case No.:4/14/80-ALC2/2019 | Party Name: NIDEC INDIA | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00200/AM20/ | RLA File<br>:05/24/040/00403/AM20/ | Lic.No/Date:0510412197<br>21.10.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 19.12.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
| Case No.:5/14/80-ALC2/2019 | Party Name: TEGA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00201/AM20/ | RLA File<br>:02/24/040/00100/AM20/ | Lic.No/Date:0210209491<br>22.10.2019 | Deferred |
115 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Kolkata & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:6/14/80-ALC2/2019 | Party Name: TEGA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00202/AM20/ | RLA File<br>:02/24/040/00107/AM20/ | Lic.No/Date:0210209503<br>23.10.2019 | Deferred |
116 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Kolkata & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:7/14/80-ALC2/2019 | Party Name: SULZER INDIA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00203/AM20/ | RLA File<br>:31/83/040/00096/AM20/ | Lic.No/Date:3110067581<br>23.10.2019 | Deferred |
---|---|---|---|---|---| |||PRIVATE LIMITED||ALC2/2019||| |||||30.01.2020||| |HQ File<br>:01/80/050/00203/AM20/||RLA File<br>:31/83/040/00096/AM20/||Lic.No/Date:3110067581<br>23.10.2019||Deferred|
117 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
31 | P a g e
118
| Case No.:8/14/80-ALC2/2019 | Party Name: HINDUSTAN | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| RUBBER INDUSTRIES | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00204/AM20/ | RLA File<br>:05/23/040/00294/AM20/ | Lic.No/Date:0510412270<br>25.10.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 17.01.2020. However, no reply has been received from the firm, the Committee decided to wait for reply of the firm.
Case is deferred.
as raised by Consultant (Tech-1) was sent to the firm on 17.01.2020. However, no reply has been received from the firm, the Committee decided to wait for reply of the firm.
Case is deferred.
| Case No.: | Party Name: HITAISHI KK | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| 9/14/80-ALC2/2019 | MANUFACTURING COMPANY | ALC2/2019 | ||||
| PRIVATE LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00205/AM20/ | RLA File :02/24/040/00111/AM20/ | Lic.No/Date:0210209515<br>28.10.2019 | Deferred |
119 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Kolkata & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:10/14/80-ALC2/2019 | Party Name: TENOVA INDIA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00206/AM20/ | RLA File<br>:07/24/040/00154/AM20/ | Lic.No/Date:0710115616<br>28.10.2019 | Deferred |
---|---|---|---|---|---| |||PRIVATE LIMITED||ALC2/2019||| |||||30.01.2020||| |HQ File<br>:01/80/050/00206/AM20/||RLA File<br>:07/24/040/00154/AM20/||Lic.No/Date:0710115616<br>28.10.2019||Deferred|
120 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm and in this regard an email was sent on 29.11.2019 followed by reminders on 31.12.2019 & 27.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 118] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/14/80-ALC2/2019 Party Name: FERRA Meet No/Date:20/80- Status:<br>AEROSPACE PRIVATE ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:0710115617 Deferred<br>121 :01/80/050/00207/AM20/ :07/24/040/00164/AM20/ 29.10.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to MSME for<br>examination & comments.<br>Case is deferred.<br>----- End of picture text -----<br>
32 | P a g e
| Case No.:12/14/80- | Party Name: MELSTAR | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MANUFACTURING SYSTEMS | ALC2/2019 | ||||
| PRIVATE LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00208/AM20/ | RLA File :07/24/040/00156/AM20/ | Lic.No/Date:0710115619<br>29.10.2019 | Deferred |
2/2019**||MANUFACTURING SYSTEMS||ALC2/2019||| |||PRIVATE LIMITED||30.01.2020||| |HQ File<br>:01/80/050/00208/AM20/||RLA File :07/24/040/00156/AM20/||Lic.No/Date:0710115619<br>29.10.2019||Deferred|
122 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:1/16/80-ALC2/2019 | Party Name: AYYAPPA CNC | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00211/AM20/ | RLA File<br>:07/24/040/00170/AM20/ | Lic.No/Date:0710115658<br>08.11.2019 | Deferred |
123 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Bangalore & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 152] intentionally omitted <==
t. Therefore, the Committee decided to remind RA, Bangalore & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 152] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/16/80-ALC2/2019 Party Name: STERLITE Meet No/Date:20/80- Status:<br>POWER TRANSMISSION ALC2/2019<br>LIMITED 30.01.2020<br>HQ File RLA File Lic.No/Date:0310832682 Deferred<br>:01/80/050/00212/AM20/ :03/95/040/00761/AM20/ 08.11.2019<br>124 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020.<br>However, the Committee also noted that in Meeting 18/80 dated 02.01.2020, the minutes were erroneously<br>updated as “copy of application was sent to MeitY on 18.12.2019 for examination of the case”. Therefore, the<br>Committee decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/16/80-ALC2/2019 Party Name: SAMIRI Meet No/Date:20/80- Status:<br>EQUIPMENTS & ENGINEERS ALC2/2019<br>PVT.LTD. 30.01.2020<br>HQ File RLA File Lic.No/Date:0310832707 Deferred<br>:01/80/050/00213/AM20/ :03/95/040/00758/AM20/ 11.11.2019<br>----- End of picture text -----<br>
ALC2/2019<br>PVT.LTD. 30.01.2020<br>HQ File RLA File Lic.No/Date:0310832707 Deferred<br>:01/80/050/00213/AM20/ :03/95/040/00758/AM20/ 11.11.2019<br>----- End of picture text -----<br>
125 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Mumbai & the firm for submitting the complete set of application.
Case is deferred.
33 | P a g e
| Case No.:5/16/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD. | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00215/AM20/ | RLA File<br>:34/24/040/00242/AM20/ | Lic.No/Date:3410045605<br>13.11.2019 | Deferred |
126 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:4/16/80-ALC2/2019 | Party Name: BLISS ANAND | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00214/AM20/ | RLA File<br>:05/23/040/00311/AM20/ | Lic.No/Date:0510412485<br>14.11.2019 | Deferred |
127 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
t. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/16/80-ALC2/2019 Party Name: NUCON Meet No/Date:20/80- Status:<br>AEROSPACE PVT. LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0910068185 Deferred<br>:01/80/050/00216/AM20/ :09/24/040/00409/AM20/ 14.11.2019<br>128<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 01.01.2020.<br>However, no information has been received yet. Therefore, the Committee decided to remind RA, Hyderabad<br>& the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:7/16/80-ALC2/2019 | Party Name: MATRIX | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| CUTTING TOOLS PRIVATE | ALC2/2019 | |||||
| LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00217/AM20/ | RLA File<br>:05/24/040/00480/AM20/ | Lic.No/Date:0510412508<br>15.11.2019 | Deferred |
--|---|---| |||CUTTING TOOLS PRIVATE||ALC2/2019||| |||LIMITED||30.01.2020||| |HQ File<br>:01/80/050/00217/AM20/||RLA File<br>:05/24/040/00480/AM20/||Lic.No/Date:0510412508<br>15.11.2019||Deferred|
129 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
34 | P a g e
| Case No.:8/16/80-ALC2/2019 | Party Name: DILIGENT SCM | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| SOLUTIONS PRIVATE | ALC2/2019 | |||||
| LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00218/AM20/ | RLA File<br>:09/24/040/00408/AM20/ | Lic.No/Date:0910068192<br>18.11.2019 | Deferred |
130 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
1.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:9/16/80-ALC2/2019 | Party Name: KUVAWALA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| CORE DRILL EQUIPMENT | ALC2/2019 | |||||
| PVT. LTD. | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00219/AM20/ | RLA File<br>:03/94/040/00644/AM20/ | Lic.No/Date:0310832842<br>18.11.2019 | Deferred |
131 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Mumbai & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
yet. Therefore, the Committee decided to remind RA, Mumbai & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/16/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:20/80- Status:<br>PVT. LTD. ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0510412549 Deferred<br>:01/80/050/00220/AM20/ :05/24/040/00462/AM20/ 19.11.2019<br>132<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020.<br>However, no information has been received yet. Therefore, the Committee decided to remind RA, New Delhi<br>& the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
d RA, New Delhi<br>& the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/16/80-ALC2/2019 Party Name: GRADUATE Meet No/Date:20/80- Status:<br>AGRO & MECHANICAL ALC2/2019<br>ENGINEERS 30.01.2020<br>HQ File RLA File Lic.No/Date:5010002587 Deferred<br>:01/80/050/00221/AM20/ :50/24/040/00013/AM20/ 19.11.2019<br>133 Decision: The Committee considered the case as per the agenda and observed that the firm has asked for<br>certain amendments after issuance of Advance Authorization. The Committee wanted to know as to whether<br>the RA has made any amendments in the authorization or not and in this regard an email was sent to RA,<br>Nagpur on 23.01.2020. However, no information has been received yet. Hence, the Committee decided to wait<br>for the requisite information.<br>Case is deferred.<br>----- End of picture text -----<br>
35 | P a g e
==> picture [476 x 175] intentionally omitted <==
Committee decided to wait<br>for the requisite information.<br>Case is deferred.<br>----- End of picture text -----<br>
35 | P a g e
==> picture [476 x 175] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/16/80-ALC2/2019 Party Name: HANNING Meet No/Date:20/80- Status:<br>MOTORS INDIA P LTD ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:3410045625 Approved<br>:01/80/050/00222/AM20/ :34/24/040/00249/AM20/ 19.11.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>134 comments of MSME as under:<br>1. Relevant import of items at Sl. No. 1 to 9 may be allowed as per GN-4.<br>2. Relevant import of item at Sl. No. 10 may be allowed on net to net basis.<br>3. Relevant import of item at Sl. No. 11 may be allowed with 1.01kg/kg in export product.<br>4. Relevant import of items at Sl. No. 12 to 15 may be allowed with 1.05kg/kg in export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:13/16/80-ALC2/2019 | Party Name: OAM SAAI | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| INTERNATIONAL INC. | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00223/AM20/ | RLA File<br>:05/24/040/00479/AM20/ | Lic.No/Date:0510412570<br>21.11.2019 | Deferred |
|---|---|---|---|---| |||INTERNATIONAL INC.||ALC2/2019||| |||||30.01.2020||| |HQ File<br>:01/80/050/00223/AM20/||RLA File<br>:05/24/040/00479/AM20/||Lic.No/Date:0510412570<br>21.11.2019||Deferred|
135 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
136
| Case No.:14/16/80-ALC2/2019 | Party Name: MICRON | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00224/AM20/ | RLA File<br>:05/24/040/00490/AM20/ | Lic.No/Date:0510412571<br>21.11.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 31.12.2019 for examination of the case. However, the representative of DPIIT informed in meeting that the case is under examination . Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 153] intentionally omitted <==
PIIT** informed in meeting that the case is under examination . Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:15/16/80-ALC2/2019 Party Name: L&T-MHPS Meet No/Date:20/80- Status:<br>BOILERS PVT LTD ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0310832929 Deferred<br>:01/80/050/00225/AM20/ :03/95/040/00808/AM20/ 21.11.2019<br>137 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020.<br>However, the Committee also noted that in Meeting 18/80 dated 02.01.2020, the minutes were erroneously<br>updated as “copy of application was sent to MSME on 09.12.2019 for examination of the case”. Therefore, the<br>Committee decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
36 | P a g e
==> picture [476 x 153] intentionally omitted <==
ttee decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
36 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:16/16/80-ALC2/2019 Party Name: VALEO INDIA Meet No/Date:20/80- Status:<br>PRIVATE LIMITED ALC2/2019<br>30.01.2020<br>HQ File RLA File Lic.No/Date:0410166294 Deferred<br>:01/80/050/00226/AM20/ :04/24/040/00131/AM20/ 21.11.2019<br>138 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Chennai & the firm and in this regard an email was sent on 01.01.2020.<br>However, the Committee also noted that in Meeting 18/80 dated 02.01.2020, the minutes were erroneously<br>updated as “copy of application was sent to MSME on 18.12.2019 for examination of the case”. Therefore, the<br>Committee decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.: | Party Name: LOTUS | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| 17/16/80-ALC2/2019 | AVIATION TECHNOLOGY | ALC2/2019 | ||||
| PRIVATE LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00227/AM20/ | RLA File<br>:05/23/040/00326/AM20/ | Lic.No/Date:0510412636<br>25.11.2019 | Deferred |
/2019**||AVIATION TECHNOLOGY||ALC2/2019||| |||PRIVATE LIMITED||30.01.2020||| |HQ File<br>:01/80/050/00227/AM20/||RLA File<br>:05/23/040/00326/AM20/||Lic.No/Date:0510412636<br>25.11.2019||Deferred|
139 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:18/16/80-ALC2/2019 | Party Name: VICTORA AUTO | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00228/AM20/ | RLA File<br>:05/24/040/00499/AM20/ | Lic.No/Date:0510412651<br>26.11.2019 | Deferred |
140 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
1.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:19/16/80-ALC2/2019 | Party Name: SULZER INDIA | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00229/AM20/ | RLA File<br>:31/83/040/00115/AM20/ | Lic.No/Date:3110067611<br>26.11.2019 | Deferred |
141 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Pune & the firm for submitting the complete set of application.
Case is deferred.
37 | P a g e
| Case No.:20/16/80-ALC2/2019 | Party Name: TRILLIUM FLOW | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| TECHNOLOGIES INDIA | ALC2/2019 | |||||
| PRIVATE LIMITED | 30.01.2020 | |||||
| HQ File<br>:01/80/050/00230/AM20/ | RLA File<br>:03/95/040/00815/AM20/ | Lic.No/Date:0310832991<br>26.11.2019 | Deferred |
-|---| |||TECHNOLOGIES INDIA||ALC2/2019||| |||PRIVATE LIMITED||30.01.2020||| |HQ File<br>:01/80/050/00230/AM20/||RLA File<br>:03/95/040/00815/AM20/||Lic.No/Date:0310832991<br>26.11.2019||Deferred|
142 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Mumbai & the firm for submitting the complete set of application.
Case is deferred.
143
| Case No.:21/16/80-ALC2/2019 | Party Name: LOYAL | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| EQUIPMENTS LIMITED | ALC2/2019 | ||||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00231/AM20/ | RLA File<br>:08/24/040/00257/AM20/ | Lic.No/Date:0810146666<br>28.11.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 21.01.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:22/16/80-ALC2/2019 | Party Name: ARIHANT | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDUSTRIES | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00232/AM20/ | RLA File<br>:33/24/040/00026/AM20/ | Lic.No/Date:3310030617<br>28.11.2019 | Deferred |
|---|---|---|---|---|---|---| |||INDUSTRIES||ALC2/2019||| |||||30.01.2020||| |HQ File<br>:01/80/050/00232/AM20/||RLA File<br>:33/24/040/00026/AM20/||Lic.No/Date:3310030617<br>28.11.2019||Deferred|
144 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Panipat & the firm and in this regard an email was sent on 01.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Panipat & the firm for submitting the complete set of application.
Case is deferred.
145
| Case No.: | Party Name: MICRON | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| 2/18/80-ALC2/2019 | INSTRUMENTS PVT. LTD. | ALC2/2019 | |||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00247/AM20/ | RLA File<br>:05/24/040/00489/AM20/ | Lic.No/Date:0510412701<br>29.11.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 17.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
38 | P a g e
.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
38 | P a g e
| Case No.:1/18/80-ALC2/2019 | Party Name: GLOBE HI-FABS | Meet No/Date:20/80- | Status: | |||
|---|---|---|---|---|---|---|
| LLP | ALC2/2019 | |||||
| 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00246/AM20/ | RLA File<br>:05/23/040/00342/AM20/ | Lic.No/Date:0510412842<br>10.12.2019 | Deferred |
146 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 17.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
Case No.:5/18/80-ALC2/2019 Party Name: ZTT INDIA Meet No/Date:20/80- Status: PRIVATE LIMITED ALC2/2019 30.01.2020 HQ File RLA File Lic.No/Date:0410166342 Deferred :01/80/050/00250/AM20/ :04/24/040/00137/AM20/ 10.12.2019
147 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Chennai & the firm and in this regard an email was sent on 17.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
148
as sent on 17.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
148
| Case No.:6/18/80-ALC2/2019 | Party Name: AUTO TECH | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDUSTRIES (INDIA) PVT. | ALC2/2019 | ||||||
| LTD. | 30.01.2020 | ||||||
| HQ File<br>:01/80/050/00251/AM20/ | RLA File<br>:04/24/040/00134/AM20/ | Lic.No/Date:0410166344<br>10.12.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that an e-copy of application was sent to Consultant (Tech-3) on 15.01.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
149
| Case No.: | Party Name: ZECHA PRECISION | Meet No/Date:20/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| 4/18/80-ALC2/2019 | TOOLS LIMITED | ALC2/2019 | |||||
| 30.01.2020 | |||||||
| HQ File<br>:01/80/050/00249/AM20/ | RLA File :03/95/040/00892/AM20/ | Lic.No/Date:0310833334<br>11.12.2019 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 17.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
39 | P a g e
Sl. No. 616
| Sl. No. 616 | |
|---|---|
| Case No. :30/3/80-ALC2/2014 | Status: |
| M/s VIJAY TANKS & VESSELS<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 | |
| LIMITED<br>Lic. No.: 3410039435 Date: 06.03.2014 | |
| HQ. No.: 01/80/050/00041/AM15<br>**Subject:**Request for re-fixation of ad-hoc | Deferred |
| norms<br>RLA No.: 34/24/040/00286/AM14 | |
| **Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting | |
| No.21/80-ALC2/2014 dated 06.01.2015as per written comments of DIPP vide Note No. 12/1/2015-TSW/22 dated | |
| 06.01.2015 and on firm’s request case was again re-ratified based on written comments of DIPP vide Note No. | |
| 12/94/2015-TSW/13 dated 18.08.2015 in Meeting 10/16 dated 17.08.2015. However, the firm has again requested | |
| for reviewing the earlier decisions stating that few of the items have been mistakenly omitted in the revised norms. | |
| In continuation to Meeting 18/80 dated 02.01.2020, the Committee reconsidered the case | and noted that |
| the file was physically sent toDPIITon 31.12.2019 for examination of the case. However, no comments have been | |
| received. Therefore, the Committee decided to wait for the comments. | |
| Case is deferred. |
Sl. No. 617
| Case No. :17/19/80-ALC2/2014<br>Status: |
|---|
| M/s IND-SPHINX PRECISION LTD.<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020<br>Lic. No.: 2210015101 Date: 10.10.2014 |
| HQ. No.: 01/80/050/00451/AM15<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 22/24/040/00056/AM15 |
| **Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No. |
| 22/80-ALC2/2015 dated 02.02.2016as per written comments ofMSMEvide ID Note No. 30 (199)/15-ME dated |
| 30.12.2015. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case |
| and noted that the firm’s representation was referred toMSMEfor examination of the case on 18.10.2019 followed |
| by an ID reminder on 26.12.2019. However, no comments have been received yet. Therefore, the Committee |
| decided toremind again MSMEfor expediting the comments. |
| Case is deferred. |
Sl. No. 618
| Sl. No. 618 | ||
|---|---|---|
| Case No. :8/5/80-ALC2/2017 | Status: | |
| M. No.: 20/80-ALC2/2019 dated 30.01.2020<br>Lic. No.: 0510402055 Date: 24.03.2017 | M/s OAM SAAI INTERNATIONAL INC. | |
| HQ. No.: 01/80/050/00069/AM18 | **Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 05/24/040/00649/AM17 | ||
| **Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No. | ||
| 17/80-ALC2/2017 dated 19.12.2017on the ground that the export and import item are same. | ||
| However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and | ||
| noted that the firm’s representation was referred to | MSMEfor examination of the case on 09.10.2019 followed by | |
| an ID reminder on 10.01.2020. However, no comments have been received yet. Hence, the Committee decided to | ||
| wait for the comments. | ||
| Case is deferred. |
49 | P a g e
Sl. No. 619
| Sl. No. 619 | ||
|---|---|---|
| Case No. :7/2/80-ALC2/2014 | Status: | |
| M. No.: 20/80-ALC2/2019 dated 30.01.2020<br>Lic. No.: 0310771504 Date: 24.02.2014 | M/s TRANSASIA BIO MEDICALS LTD. | |
| HQ. No.: 01/80/050/00007/AM15 | **Subject:**Request for re-fixation of ad-hoc | Deferred |
| RLA No.: 03/95/040/00849/AM14 | norms | |
| **Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No. | ||
| 20/80-ALC2/2015dated05.01.2016 as per the written comments of DEIT vide U. O. No.: W-27/17/2014-IPHW | ||
| dated 08.12.2015. | ||
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case | ||
| and noted that the firm’s representation was referred toMeitYfor examination of the case on 09.10.2019 followed | ||
| by an ID reminder on 20.01.2020. However, no comments have been received yet. Hence, the Committee decided | ||
| to wait for the comments. | ||
| Case is deferred. |
Sl. No. 620
| Case No. :19/23/80-ALC2/2015<br>Status: |
|---|
| M/s STERLITE TECHNOLOGIES<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 |
| LTD.<br>Lic. No.: 0310799243 Date: 06.10.2015 |
| HQ. No.: 01/80/050/00432/AM16<br>**Subject:**Request for fixation of ad-hoc<br>norms<br>Deferred<br>RLA No.: 03/95/040/00427/AM16 |
| **Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No. |
| 15/80-ALC2/2016dated 25.10.2016due to non submission reply of deficiency letter dated 21.06.2016 (raised by |
| DEIT). |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case |
| and noted that the firm’s representation was referred toMeitYfor examination of the case on 07.10.2019 followed |
| by an ID reminder on 20.01.2020. However, no comments have been received yet. Hence, the Committee decided |
| to wait for the comments. |
| Case is deferred. |
Sl. No. 621
| Case No. 56/19/80-ALC2/2017<br>Case No. 18/3/80-ALC2/2018<br>Case No. 50/11/80-ALC2/2018<br>M/s AUTO COMP INDIA PVT. LTD.<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 |
|---|
| Status:<br>Lic. No. /date: 3110066941 dated 20.12.2017<br>Lic. No. /date: 3110067004 dated 15.03.2018<br>Lic. No. /date: 3110067175 dated 12.09.2018 |
| HQ. No. 01/80/050/00337/AM18<br>HQ. No. 01/80/050/00018/AM19<br>HQ. No .01/80/050/00241/AM19<br>Subject:Request for re-fixation of ad-hoc<br>norms in respect of 3 AA issued toM/s AUTO<br>Deferred |
| **COMP INDIA PVT. LTD.,**under Para 4.7 of<br>HBP (Vol.-I) – reg.<br>RLA No. 31/83/040/00109/AM18<br>RLA No. 31/83/040/00166/AM18<br>RLA No.31/83/040/00090/AM19 |
| Decision: |
| i.)<br>In respect of Lic. No. /date: 3110066941 Date: 20.12.2017 |
| The Committee considered the case as per the agenda and noted that the case was rejected the norms |
| by NC in its4/80-ALC2/2018 dated 23.05.2018, 3/80-ALC2/2018 dated 09.05.2018 andas import |
| item description is not clear Advance Authorizations allowed only for specific import item. |
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case |
| and noted that a deficiencyletter seekingcertain information as raised by DHIwas sent to the firm on |
50 | P a g e
23.01.2020. The firm informed vide email dated 28.01.2020 that they will shortly furnished the reply of deficiency letter. Hence, the Committee decided to wait for the firm’s reply.
ii.) In respect of Lic. No. /date: 3110067004 dated 15.03.2018
The Committee considered the case as per agenda and the case was ratified in meeting No. 3/80ALC2/2018 dated 09.05.2018 on the recommendation of technical representatives of DHI, DIPP and MSME.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 23.01.2020. The firm informed vide email dated 28.01.2020 that they will shortly furnished the reply of deficiency letter. Hence, the Committee decided to wait for the firm’s reply. iii.) In respect of Lic. No. /date: 3110067175 dated 12.09.2018
The Committee considered the case as per agenda and the case was ratified in meeting No. 3/80ALC2/2018 dated 09.05.2018 as per the written comments of DHI vide U. No. No. DESI/AIPL/HIC-1-2018-HEI dated 20.12.2018.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 23.01.2020. The firm informed vide email dated 28.01.2020 that they will shortly furnished the reply of deficiency letter. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
Sl. No. 622
| Sl. No. 622 | ||
|---|---|---|
| Case No. :13/16/80-ALC2/2017 | Status: | |
| M. No.: 20/80-ALC2/2019 dated 30.01.2020<br>Lic. No.: 0310815484 Date: 01.09.2017 | M/s LARSEN & TOUBRO LIMITED. | |
| HQ. No.: 01/80/050/00276/AM18/ | **Subject:**Request for fixation of ad-hoc | Deferred |
| RLA No.: 03/95/040/00052/AM18 | norms | |
| **Decision:**The committee considered the case as per agenda and noted that the case was rejected in Meeting No. | ||
| 6/80-ALC2/2018 dated11.07.2018 as the parts of the import items given (unit of measurement) in sets and each | ||
| set consist of how many numbers and their composition is not known. | ||
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered | the case and | |
| noted that a deficiency letter seeking certain information as raised byDHIwas sent to the firm on | 20.01.2020. | |
| However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. | ||
| Case is deferred. |
Sl. No. 623
| Sl. No. 623 | ||
|---|---|---|
| Case No.13/5/80-ALC2/2017<br>Case No.29/19/80-ALC2/2016<br>Case No.8/14/80-ALC2/2018 | ||
| M. No.: 20/80-ALC2/2019 dated 30.01.2020 | M/s SENIOR INDIA PRIVATE LIMITED | Status: |
| Adv. Lic. No. 0510402202 dated 12.04.2017<br>Adv. Lic. No. 0510399661 dated 08.09.2016<br>Adv. Lic. No. 0510409022 dated 20.12.2018 | ||
| HQ. No. 01/80/050/00074/AM18<br>HQ. No. 01/80/050/00424/AM17<br>HQ. No. 01/80/050/00324/AM19 | Subject:Request for re-fixation of ad-hoc<br>norms in respect of 3 AA issued toM/s<br>SENIOR INDIA PRIVATE LIMITED,<br>under Para 4.7 of HBP (Vol.-I) – reg. | Deferred |
| RLA No. 05/24/040/00012/AM18<br>RLA No. 05/24/040/00288/AM17<br>RLA No. 05/24/040/00435/AM19 |
51 | P a g e
Decision: The Committee considered the case as per the agenda noted that the above three cases were approved by NC in Meeting No. 8/80 dated 18.07.2017, Meeting No. 22/80 dated 31.01.2017 and Meeting No. 06/80 dated 03.07.2019 as per the written comments of DIPP letter no. 12/54/2017TSW/105 dated 18.7.2017, written comments of DIPP vide UO No. 12/6/2017-TSW/56 dated 31.01.2017 and written comments of DPIIT vide U.O. No.: P-47011/416/2018-TSW dated 03.07.2019 respectively.
However, the firm has requested for re-viewing of ad-hoc norms. The Committee reconsidered the case and noted that firm’s reply was sent to DPIIT on 30.01.2020. However, no comments have been received yet. Therefore, the Committee decided to wait for the comments.
Case is deferred.
Sl. No. 624
| Sl. No. 624 | ||
|---|---|---|
| Case No. :24/17/80-ALC2/2014 | Status: | |
| M. No.: 20/80-ALC2/2019 dated 30.01.2020 | M/s GEA BGR ENERGY SYSTEM INDIA | |
| Lic. No.: 0410159425 Date: 16.09.2014 | LIMITED. | |
| HQ. No.: 01/80/050/00396/AM15 | **Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 04/24/040/00154/AM15 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | ||
| No.5/80-ALC2/2016 dated 08.06.2015due to non submission reply of deficiency letter dated 14.11.2014 (raised | ||
| by DHI). | ||
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and | ||
| decided to ask the firm to furnish the complete set of application along with all relevant documents i.e.ANF-4Afor | ||
| examination of the case, as per the advice of representative ofDHI. | ||
| Case is deferred. |
Sl. No. 625
| Sl. No. 625 | |
|---|---|
| Case No. :12/7/80-ALC2/2016 | Status: |
| M/s HONDA TRADING CORPORATION<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 | |
| INDIA PVT. LTD.<br>Lic. No.: 0510398531 Date: 17.05.2016 | |
| HQ. No.: 01/80/050/00233/AM17<br>**Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 05/23/040/00053/AM17 | |
| **Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No. | |
| 11/80 dated 19.08.2017 due to non submission reply of deficiency letter dated 26.04.2017 (raised byDHI). | |
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered | the case and |
| noted that a deficiency letter seeking certain information as raised by**Consultant (Tech-3)**was sent to the firm on | |
| 20.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. | |
| Case is deferred. |
Sl. No. 626
| Sl. No. 626 | |||
|---|---|---|---|
| Case No. :37/19/80 ALC2/2017 | Status: | ||
| M. No.: 20/80-ALC2/2019 dated 30.01.2020<br>Lic. No.: 0310815644 dated 08.09.2017 | M/s GODREJ & BOYCE MFG. CO. LTD. | ||
| HQ. No.: 01/80/050/00318/AM18 | **Subject:**Request for re-fixation of ad-hoc | Approved | |
| RLA No.:03/94/040/00432/AM18 | norms | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting | |||
| No.4/80-ALC2/2018 dated 23.05.2018on the recommendation of technical representatives of | DHI, DIPP and | ||
| MSME. | |||
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case |
52 | P a g e
and decided to revise the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/268/2018TSW dated 28.01.2020. (Copy enclosed)
RA concerned may take further necessary action as per the decision of NC.
Sl. No. 627
==> picture [476 x 72] intentionally omitted <==
----- Start of picture text -----<br> Case No. : 17/31/80-ALC2/2010 Status:<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 M/s BHARAT HEAVY ELECTRICALS<br>Lic. No.: 0910043002 Date: 06.08.2010 LIMITED<br>HQ. No.: 01/80/050/00495/AM11 Subject: Request for fixation of ad-hoc norms Approved<br>RLA No.: 09/24/040/00169/AM11<br>Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 40/80 dated 22.03.2011 due to non submission reply of deficiency letter as raised by DHI.
No. 40/80 dated 22.03.2011 due to non submission reply of deficiency letter as raised by DHI. However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to ratify the ad-hoc norms on the recommendation of the representative of DHI by considering the firm’s letter dated 29.01.2020 as under: 1. Quantity of import items at Sl. No. 1, 47, 48 & 52 may be allowed under GN-4 with nil wastage on weight & number terms. 2. Quantity of import items at Sl. No. 29, 45, 46 & 49 may be deleted as these are software. 3. Quantity of import item at Sl. No. 38 may be deleted as it is a kit. 4. Quantity of rest of the import items may be allowed as applied as per Annexure-4 submitted by the firm vide letter dated 29.01.2020.
of import item at Sl. No. 38 may be deleted as it is a kit. 4. Quantity of rest of the import items may be allowed as applied as per Annexure-4 submitted by the firm vide letter dated 29.01.2020. (Copy Enclosed) RA concerned may take further necessary action as per the decision of NC.
Sl. No. 628
==> picture [476 x 73] intentionally omitted <==
----- Start of picture text -----<br> Case No. : 17/33/80-ALC2/2010 Status:<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 M/s BHARAT HEAVY ELECTRICALS<br>Lic. No.: 0910043468 dated 09.09.2010 LIMITED<br>HQ. No.: 01/80/050/00573/AM11 Subject: Request for fixation of ad-hoc norms Approved<br>RLA No.: 09/24/040/00223/AM11<br>Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 2/80 dated 19.04.2011 due to non submission reply of deficiency letter as raised by DHI.
No. 2/80 dated 19.04.2011 due to non submission reply of deficiency letter as raised by DHI. However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to ratify the ad-hoc norms on the recommendation of the representative of DHI by considering the firm’s letter dated 29.01.2020 as under: 1. The description of export product may be amended as “ Steam Turbine, Generator (43 MW)”. 2. Quantity of import item at Sl. No. 8 may be deleted as it is a kit. 3. Quantity of import items at Sl. No. 29 & 38 may be allowed under GN-4 with nil wastage on weight & number terms. 4. Quantity of import item at Sl. No. 46 may be deleted as these are software. 5.
Quantity of import items at Sl. No. 29 & 38 may be allowed under GN-4 with nil wastage on weight & number terms. 4. Quantity of import item at Sl. No. 46 may be deleted as these are software. 5. Quantity of rest of the import items may be allowed as applied as per Annexure-2 submitted by the firm vide letter dated 29.01.2020. (Copy Enclosed) RA concerned may take further necessary action as per the decision of NC.
53 | P a g e
Sl. No. 629
| Sl. No. 629 | ||
|---|---|---|
| CaseNo. : 23/9/80ALC2/2012 | Status: | |
| M/s BHARAT HEAVY<br>M.No.:20/80-ALC2/2019 dated 30.01.2020 | ||
| ELECTRICALS LIMITED<br>Lic. No.: 0910053032 dated 13.06.2012 | ||
| HQ.No.: 01/80/050/00203/AM13<br>**Subject:**Request for re-fixation of ad-hoc | Deferred | |
| norms<br>RLA No.: 09/24/040/00136/AM13 | ||
| Decision: The Committee considered the case as per the agenda and noted that the case was withdrawn | ||
| from the meeting owing to non receipt of comments from EPCG Division in Meeting No. | 23/80 dated | |
| 16.02.2016. | ||
| However, the firm has requested for fixation of ad-hoc norms. The Committee | reconsidered | |
| the case and noted that firm’s reply was sent to DHI on 29.01.2020. However, no comments have been | ||
| received yet. Hence, the Committee decided to wait for the comments. | ||
| Case is deferred. |
Sl. No. 630
| CaseNo. : 30/33/80-ALC2/2009<br>Status: |
|---|
| M/s BHARAT HEAVY<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 |
| ELECTRICALS LIMITED<br>Lic.No.: 0910039076 dated27.08.2009 |
| HQ. No.: 01/80/050/00496/AM10<br>**Subject:**Request for fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.:09/24/040/00184/AM10 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in |
| Meeting No. 48/80 dated 02.03.2010 due to non submission reply of the deficiency later as raised by |
| DHI. |
| However, the firm has requested for fixation of ad-hoc norms. The Committee considered the |
| case and noted that the firm’s representation was referred toDHIon 07.10.2019 for examination of the |
| case. The complete set of application was again sent toDHIon 22.01.2020 for examination & |
| comments. However, no comments have been received yet. Hence, the Committee decided to wait for |
| the comments. |
| Caseis deferred. |
Sl. No. 631
| Case No.: 1/33/85-ALC3/2008<br>Status: |
|---|
| M/s BOVING FOURESS LIMITED<br>M.No.:20/80-ALC2/2019 dated 30.01.2020<br>Lic. No.: 0710061697 dated 15.12.2008 |
| HQ.No.: 01/85/050/00218/AM09<br>**Subject:**Request for fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 07/24/040/00524/AM09 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in |
| Meeting No. 2/80 dated 13.04.2010 due to non submission reply of deficiency letter as raised by DHI. |
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered |
| the case and noted that a deficiency letter seeking certain information as raised byDHIwas sent to the |
| firm on 20.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for |
| the firm’s reply. |
| Case is deferred. |
54 | P a g e
Sl. No. 632
| CaseNo. 2/17/80-ALC2/2017<br>Status: |
|---|
| M/s VEM TECHNOLOGIES PVT.<br>M.No.:20/80-ALC2/2019 dated 30.01.2020 |
| LTD.<br>Lic. No.: 0910065045 Date: 15.05.2017 |
| HQ.No.: 01/80/050/00281/AM18<br>**Subject:**Request for fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 09/24/040/00055/AM18 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in |
| Meeting No. 05/80 dated 06.06.2019 due to non submission reply of deficiency letter dated 14.01.2019as |
| raised byDPIIT. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee |
| reconsidered the case and noted that a deficiency letter seeking certain information as raised by |
| **Consultant (Tech-3)**was sent to the firm on 20.01.2020. However, no reply has been received yet. |
| Hence, the Committee decided to wait for the firm’s reply. |
| Case is deferred. |
Sl. No. 633
==> picture [476 x 68] intentionally omitted <==
----- Start of picture text -----<br> Case No. 47/14/80-ALC2/2014 Status:<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 M/s ALSTOM TRANSPORT INDIA<br>Lic. No. /date: 0710105249 dated 20.06.2014 LIMITED<br>HQ. No.: 01/80/050/00368/AM15 Subject: Request for fixation of ad-hoc Deferred<br>RLA No.: 07/24/040/00092/AM15 norms.<br>----- End of picture text -----<br>
Decision: In continuation to Meeting No. 12/80 dated 09.10.2019, the Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 11/80 dated 01.09.2015 due to nonsubmission reply of deficiency letter as raised by DHI.
Decision: In continuation to Meeting No. 12/80 dated 09.10.2019, the Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 11/80 dated 01.09.2015 due to nonsubmission reply of deficiency letter as raised by DHI. Thereafter, the firm represented against the rejection and requested for a review. The case was again considered and deferred in Meeting no. 11/19 dated 06.12.2018 with following decision: “The Committee noted that a personal hearing was already given to the firm on 06.12.2018. In the personal hearing the firm informed the committee that it has taken various AA’s for supply of 33 rail/tramway coaches. Further, firm stated that it _has taken an additional license for supplementary material required for these very 33 rail/tramway coaches.
aken various AA’s for supply of 33 rail/tramway coaches. Further, firm stated that it_ has taken an additional license for supplementary material required for these very 33 rail/tramway coaches. However, it has an additional export obligation of another 33 rail/tramway coaches in this license. The Committee observed that the given submission is not tenable. The committee decided to seek a detailed report from the concerned RA regarding of all such licenses issued to the firm, admissibility and current status.” In response to Norm Committee’s e-mail dated 23.04.2019, Addl. DGFT Bangalore informed that firm has obtained several license, which are pending for the wants of norms and also informed about a letter from ECA-II, DGFT, New Delhi seeking information regarding alleged corrupt practices followed by M/s Alstom Transport India. In this matter, the committee noted that the firm had approach the Policy Relaxation Committee (PRC) and the matter was taken up vide Meeting No. 17/AM20 held on 27.08.2019. The PRC noted the submissions by the firm as under: “They have stated that initially, 7 Advance Authorizations were applied for duty free import of inputs required for the manufacture and supply of 33 Metro Train sets to Chennai Metro Rail Limited being a deemed export project. ATIL sought amendment in all 7 Advance Authorizations to include residual
55 | P a g e
ufacture and supply of 33 Metro Train sets to Chennai Metro Rail Limited being a deemed export project. ATIL sought amendment in all 7 Advance Authorizations to include residual_
55 | P a g e
items that were required to manufacture the 33 Train sets but the request was rejected citing technical reasons by RA. Thereupon, ATIL was compelled to apply for additional Advance Authorization No.0710105249 dated 20.06.2014 for importing residual inputs that were missed out and not covered under earlier 7 Advance Authorizations. Acquisition of Alstom India limited who was the manufacturer of key sub-assemblies also lead to inclusion of components required for manufacture of sub-assemblies in the captioned Advance Authorization. However, while applying for the said Advance Authorization (8[th] AA), export obligation of 33 Metro Train sets was declared inadvertently, as the system did not allow the applicant to apply for a new license unless the export obligation was declared. In fact, there is no separate EO under the Advance Authorization No.0710105249 dated 20.06.2014 as all imported inputs were used for manufacture of 33 train sets declared under previous 7 Advance licenses. The Advance Authorization No.0710105249 dated 20.06.2014 under which parts required for manufacture of 33 Metro Trains have been imported has been issued after 22 months from the date of earliest Advance Authorization in the clubbing set. Hence, request is to treat the supplies of 33 Train sets to the Metro Project supplied against Advance Authorizations as one and to discharge the EO. “
The policy relaxation committee vide PRC Meeting No. 17/AM20 dated 27.08.2019 gave the following decision in the matter:
“Decision: The Committee heard the submission made by the firm and discussed the matter at length and decided to relax the conditions as laid down in Para 4.38 (vi), (vii) and (xii) of HBP 2015-20 as amended vide Public Notice No.70/2015-20 dated 30.01.2019 for clubbing of eight Advance Authorizations No.(i)0710090351 dated 21.08.2012, (ii)0710090531 dated 31.08.2012, (iii)0710095554 dated 23.05.2013, (iv)0710096369 dated 02.07.2013, (v)0710096370 dated 02.07.2013, (vi)0710099232 dated 28.10.2013 and (vii)0710101246 dated 10.01.2014 and (viii) 0710105249 dated 20.06.2014. It is subject to verification that amendments request of the firm made in the AAs was rejected by the RA, as claimed by the firm and all inputs imported in the 8 AAs are fully accounted for in the supplies. The other terms and conditions for clubbing shall remain same as per policy/HBP provisions. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting.”
This Committee observed that the PRC has clubbed all the eight authorizations for imports and export purposes. Export obligation of AA No. 0710105249 dt. 20.06.2014 would remain as it is even after clubbing. Hence, the Committee in its Meeting No. 10/80 dated 11.09.2019, asked the firm to furnish following information:
- To provide detailed statement to account for the inputs in the export products against this license.
in its Meeting No. 10/80 dated 11.09.2019, asked the firm to furnish following information:
-
To provide detailed statement to account for the inputs in the export products against this license.
-
Relevant technical drawings and wastage details may be provided in relevant formats for examination by the technical authorities for the purpose of fixation of norms.
And also sought clarification from the PRC cell on 05.11.2019 regarding the export obligation of the eighth authorization if it would run concurrently with the export obligation of the first seven authorizations.
PRC in its meeting no. 23/AM20 dt. 03.12.2019, decided as follows:
“The committee reviewed the case and observed that request of the firm and minutes recorded in the earlier PRC decision were very clear. It reiterated that in view of the submission made by the firm, all the above 8 advance authorizations need to be clubbed for imports and exports purposes wherein export obligation of the 8th advance authorization no. 0710105249 dt. 20.06.2014 be treated as NIL as its EO is subsumed in the export obligation of the other 7 advance authorizations taken together. The firm shall
56 | P a g e
approach RA within 30 days from the date of uploading of the minutes of meeting for clubbing.”
The Committee noted in its Meeting No. 18/80 dated 02.01.2020 that the firm’s reply dated 06.11.2019 forwarded to DHI on 02.12.2019 for examination of the case and again it was asked to the firm to furnish following information:
ing No. 18/80 dated 02.01.2020 that the firm’s reply dated 06.11.2019 forwarded to DHI on 02.12.2019 for examination of the case and again it was asked to the firm to furnish following information:
- Specific use of items imported under the eighth authorization vis-a-vis those imported under other seven authorizations.
The Committee considered the case and noted that the deficiency letter is being sent to the firm.
Sl. No. 634
| Sl. No. 634 | ||
|---|---|---|
| Case No.57/17/80-ALC2/2015 | ||
| M.No.:20/80-ALC2/2019 dated 30.01.2020 | M/s BIRLA FURUKAWA FIBRE | Status: |
| Lic. No.: 1710006165 Date: 27.08.2015 | OPTICS PRIVATE LIMITED | |
| HQ.No.: 01/80/050/00361/AM16 | **Subject:**Request for fixation of ad-hoc | |
| RLA No.:17/24/040/00043/AM16 | norms | Deferred |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in | ||
| Meeting No. 23/80 dated 16.02.2016 due to non submission reply of deficiency letter dated | 02.02.2015 | |
| as raised by DEIT. | ||
| However, the firm has requested for fixation of ad-hoc norms. The Committee considered the | ||
| case and noted that the firm’s representation was referred toMeitYfor examination of the case on | ||
| 09.10.2019 followed by ID reminders on 02.12.2019 & 21.01.2020. However, no comments have | ||
| received yet. Hence, the Committee decided to wait for the comments. | ||
| Caseis deferred. |
Sl. No. 635
==> picture [477 x 69] intentionally omitted <==
----- Start of picture text -----<br> Case No. 1/25/80-ALC2/2015<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 M/s UNITED DRILLING TOOLS LTD Status:<br>Lic. No.: 0510397442 Date: 29.01.2016<br>HQ. No.: 01/80/050/00441/AM16/ Subject: Request for fixation of ad-hoc<br>Deferred<br>RLA No.: 05/24/040/00493/AM16/ norms<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 05/80 dated 07.06.2016 due to non submission reply of deficiency letter dated 29.03.2016 as raised by DHI.
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 05/80 dated 07.06.2016 due to non submission reply of deficiency letter dated 29.03.2016 as raised by DHI. However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to ask from the firm to furnish the following information as per advice of Consultant (Tech-3): 1. Complete set of application & copy of AA. 2. Detail technical note on manufacturing process including the relevant flow sheet. 3. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished. 4. Weight of each Export Product. 5. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and
57 | P a g e
ht of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and
57 | P a g e
indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
-
Use of export product.
Case is deferred.
Sl. No. 636
Case No. 19/23/80-ALC2/2016 M. No.: 20/80-ALC2/2019 dated 30.01.2020 M/s AZAD ENGINEERING PRIVATE Status: Lic. No.: 0910064137 Date: 14.09.2016 LIMITED HQ. No.: 01/80/050/00522/AM17/ Subject: Request for fixation of ad-hoc Deferred RLA No.: 09/24/040/00295/AM17/ norms
Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 02/80-ALC2/2017 dated 25.04.2017 on repeat basis as approved for AA No. 0910064137 dated 14.09.2016 on the recommendation of the representative of DHI.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 20.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
Sl. No. 637
| Case No.1/19/80-ALC2/2017 |
|---|
| M/s DAGGER MASTER TOOL<br>Status:<br>M.No.:20/80-ALC2/2019 dated 30.01.2020 |
| INDUSTRIES LIMITED<br>LicNo.: 0310817719Date:12.12.2017 |
| HQFile No.: 01/80/050/00282/AM18/<br>**Subject:**Request for fixation of ad-hoc<br>norms<br>Rejected<br>RLA File No.: 03/94/040/00728/AM18 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in |
| Meeting No.4/80-ALC2/2018 dated 23.05.2018on the recommendation of representatives of DHI, |
| DIPP & MSME. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case |
| and noted that firm’s representation was forwarded to DHI on 02.12.2019. However, the representative |
| of DHI informed in the meeting that the firm has not given any justification for reconsidering the earlier |
| decision and hence the same may not be agreed. Therefore, Committee decided to reject the case. |
| RA concerned maytake further necessaryaction asper the decision of NC. |
58 | P a g e
Sl. No. 638
==> picture [477 x 75] intentionally omitted <==
----- Start of picture text -----<br> Case No. 29/48/80-ALC2/2007<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 M/s JANDIA ENGINEERING PRIVATE Status:<br>Lic No.: 3210035131 Date: 02.04.2007 LIMITED<br>HQ File No: 01/80/050/00675/AM08/ Subject: Request for fixation of ad-hoc<br>Deferred<br>RLA File No: 32/21/040/00328/AM07/ norms<br>Decision: The Committee considered the case as per the agenda and noted the decision of Meeting 10/80-<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted the decision of Meeting 10/80ALC2/2009 dated 09.06.2009:
ALC2/2009 dated 09.06.2009: “The Committee noted that RA neither reported the status of the case nor forwarded the four sets of application in response to this office letter and subsequent reminder. Since, the subject authorization is quite old; the Committee presumed that ratification of norms of the subject authorization is not required to RA so that the case may be closed on the part of NC.” However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that the query letter as raised in Meeting No. 10/80 dated 11.09.2019 was sent to RA, Coimbatore on 07.10.2019 followed by reminders on 02.12.2019 & 20.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the requisite information. Case is deferred.
Sl. No. 639
| Sl. No. 639 | ||
|---|---|---|
| Case No.37/19/80-ALC2/2014 | ||
| M. No.: 20/80-ALC2/2019 dated 30.01.2020 | M/s KAMAR INFRASTRUCTURE PVT | Status: |
| Licence No.: 0310788243 Date: 21.08.2014 | LTD. | |
| HQFile No: 01/80/050/00471/AM15/<br>RLA File No: 03/94/040/00449/AM15/ | **Subject:**Request for fixation of ad-hoc norms | Deferred |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | ||
| No. 06/80 dated 20.06.2017 due to non submission reply of deficiency letter. | ||
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered | the case and | |
| noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on | 23.12.2019. | |
| However, no reply has been received yet. Therefore, | the Committee decided toremind the firmfor furnishing the | |
| requisite information. | ||
| Case is deferred. |
Sl. No. 640
==> picture [477 x 62] intentionally omitted <==
----- Start of picture text -----<br> Case No. 53/23/80-ALC2/2016 Status:<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 M/s RADIANT HEAT EXCHANGER<br>Lic. No.: 3110066440 Date: 09.12.2016 PVT.LTD<br>HQ. No.: 01/80/050/00556/AM17 Subject: Request for re-fixation of ad-hoc Approved<br>RLA No.: 31/83/040/00112/AM17 norms<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was approved in M. No. 03/80 dated 09.05.2018 on the recommendation of Technical Representatives of DHI, DIPP and MSME.
However, the firm has requested for change in the sizes of CS plates and reduction in the import quantity.. The Committee reconsidered the case and decided to revise the sizes and reductions in import quantity as per written comments of DPIIT vide U. O. No.: P-47011/1/2020-TSW dated 28.01.2020 without any change in the wastage allowed. (Copy enclosed)
RA concerned may take further necessary action as per the decision of NC.
59 | P a g e
Sl. No. 641
| Sl. No. 641 | ||
|---|---|---|
| Case No. 3/10/80-ALC2/2017 | Status: | |
| M. No.: 20/80-ALC2/2019 dated 30.01.2020 | M/s HINDUSTAN RUBBER INDUSTRIES | |
| Lic. No. 0510402563 Date: 16.05.2017 | ||
| HQ. No.: 01/80/050/00213/AM18 | **Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 05/23/040/00043/AM18 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | ||
| No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 08.10.2018. | ||
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and | ||
| noted that the reply of deficiency letter dated 08.10.2018 has not yet been submitted by the firm. It was also noted | ||
| that a letter was sent to the firm on 02.11.2019 followed by a reminder on 20.01.2020, asked to submit the reply of | ||
| deficiency letter dated 08.10.2018. However, no reply has been received yet. Hence, the Committee decided to wait | ||
| for the firm’s reply**.** | ||
| Case is deferred. |
Sl. No. 642
| Case No.8/23/80-ALC2/2015 | Status: |
|---|---|
| M/s HINDUSTAN RUBBER INDUSTRIES<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 | |
| Lic. No. 0510395884 Date: 12.10.2015 | |
| HQ. No.: 01/80/050/00421/AM16<br>**Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 05/23/040/00292/AM16 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | |
| No. 06**/80-**ALC2/2016dated 21.06.2016 due to non submission of reply of deficiency letter dated | 19.04.2016 as |
| raised by DIPP (Chemical) vide ID No.7/77/2016-TSW dated 26.02.2016. | |
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted | |
| that the reply of deficiency letter dated 19.04.2016 has not yet been submitted by the firm. It was also noted that a | |
| letter was sent to the firm on 02.11.2019 followed by a reminder on 20.01.2020, asked to submit the reply of | |
| deficiency letter dated 19.04.2016. However, no reply has been received yet. Hence, the Committee decided to wait | |
| for the firm’s reply**.** | |
| Case is deferred. |
Sl. No. 643
| Case No.14/12/80-ALC2/2017 | Status: |
|---|---|
| M/s GOLD MOHUR PROFILES<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 | |
| LIMITED<br>Lic. No. 0510403501 Date: 25.07.2017 | |
| HQ. No.: 01/80/050/00228/AM18<br>**Subject:**Request for fixation of ad-hoc | Deferred |
| norms<br>RLA No.: 05/23/040/00156/AM18 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | |
| No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 12.10.2018 as | |
| raised by DIPP (Chemical). | |
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and | |
| noted that the reply of deficiency letter dated 12.10.2018 has not yet been submitted by the firm. It was also noted | |
| that a letter was sent to the firm on 02.11.2019 followed by a reminder on 20.01.2020, asked to submit the reply of | |
| deficiency letter dated 12.10.2018. However, no reply has been received yet. Hence, the Committee decided to wait | |
| for the firm’s reply**.** | |
| Case is deferred. |
60 | P a g e
Sl. No. 644
| CaseNo.1/8/80-ALC2/2018<br>Status: |
|---|
| M/s CORNING TECHNOLOGIES<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 |
| INDIA PVT. LTD.<br>Lic.No. 0510406690Date: 30.05.2018 |
| HQ. No.: 01/80/050/00124/AM19<br>**Subject:**Request for fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 05/23/040/00089/AM19 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in |
| Meeting No. 06/80-ALC2/2019 dated 03.07.2019 due to non submission reply of deficiency letter |
| 11.02.2019 as raised by MeitY. |
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the |
| case and noted that the firm’s representation was referred toMeitYfor examination of the case on |
| 05.11.2019 followed by a reminder on 20.01.2020. However, no comments have been received yet. |
| Hence, the Committee decided to wait for the comments. |
| Case is deferred. |
Sl. No. 645
| Sl. No. 645 | |||
|---|---|---|---|
| CaseNo.282/15/80-ALC2/2018 | Status: | ||
| M. No.: 20/80-ALC2/2019 dated 30.01.2020 | M/s CORNING TECHNOLOGIES | ||
| Lic.No 0510409144 Date: 01.01.2019 | INDIA PVT. LTD. | ||
| HQ. No.: 01/80/050/00624/AM19 | **Subject:**Request for fixation of ad-hoc | Deferred | |
| RLA No.: 05/23/040/00395/AM19 | norms | ||
| **Decision:**The Committee considered the case | as per the agenda and noted that the case was rejected in | ||
| Meeting No. 7/80-ALC2/2019 dated 17.07.2019 due to non submission of reply of deficiency letter | |||
| dated 06.05.2019 as raised by MeitY. | |||
| However, the firm has requested for fixation of | ad-hoc norms. The Committee reconsidered the case and | ||
| noted that the firm’s representation was referred toMeitYfor examination of the case on 05.11.2019 | |||
| followed by a reminder on 20.01.2020. However, no comments have been received yet. Hence, the | |||
| Committee decided to wait for the comments. | |||
| Case is deferred. |
Sl. No. 646
| CaseNo.13/12/80-ALC2/2018<br>Status: |
|---|
| M/s NIDEC INDIA PRIVATE<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 |
| LIMITED.<br>Lic.No. /date 0510408160Date:22.10.2018 |
| HQ. No.: 01/80/050/00286/AM19<br>**Subject:**Request for fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 05/24/040/00408/AM19 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in |
| Meeting No. 06/80-ALC2/2019 dated 03.07.2019 due to non submission of reply of deficiency letter as |
| raised by DPIIT. |
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered |
| the case and noted that a deficiency letter seeking certain information as raised byDPIITwas sent to the |
| firm on 20.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for |
| the firm’s reply. |
| Case is deferred. |
61 | P a g e
Sl. No. 647
==> picture [477 x 79] intentionally omitted <==
----- Start of picture text -----<br> Case No. 19/19/80-ALC2/2016 L & T-MHPS TURBINE Status:<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 GENERATORS PRIVATE<br>Lic. No. 0310807493 Date: 31.08.2016 LIMITED<br>HQ. No.: 01/80/050/00414/AM17 Subject: Request for re-fixation of ad- Deferred<br>RLA No.: 03/95/040/00292/AM17 hoc norms<br>Decision: The Committee considered the case as per the agenda and noted that the case was approved in<br>----- End of picture text -----<br>
M. No. 15/80-ALC2/2018 dated 06.03.2019 as per the written comments of DHI vide their U.O. No. 3/96/2016/TSW(B) dated 24.12.2018 However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to ask from the firm to furnish the following information as per advice of the representative of DHI : 1. The final list of import items after all amendments. (there appears to be at least four amendments) 2. To submit calculation correlating the same with Dimensional Engineering Drawing with relevant dimensions highlighted. Case is deferred.
Sl. No. 648
| CaseNo. 33/20/80-ALC2/2017<br>Status: |
|---|
| AUTOCOMP CORPORATION<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 |
| PANSE PRIVATE LIMITED<br>Lic.No. 3110066981 Date:13.02.2018 |
| HQ. No.: 01/80/050/00397/AM18<br>**Subject:**Request for re-fixation of ad-<br>Deferred |
| hoc norms<br>RLA No.: 31/83/040/00154/AM18 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in |
| M. No.3/80-ALC2/2019dated 08.05.2019 as per written comments of DHI vide their U. O. No.: |
| 3/26/2018-TSW(B) through e-mail dated 16.04.19 on repeat basis similar to Export product 22 of AA |
| No. 3110067246 dated 27.11.2018. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case |
| and noted that the firm’s representation was referred to**Consultant (Tech-3)**on 23.12.2019 for |
| examination of the case. However, no comments have been received yet. Therefore, the Committee |
| decided to**remind Consultant (Tech-3)**for expediting the comments. |
| Caseis deferred. |
62 | P a g e
Sl. No. 649
| CaseNo. 31/5/80-ALC2/2018<br>AUTOCOMP CORPORATION<br>Status: |
|---|
| PANSE PRIVATE LIMITED<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 |
| Lic.No. 3110067040Date: 07.05.2018 |
| HQ. No.: 01/80/050/00080/AM19<br>**Subject:**Request for re-fixation of ad-<br>Deferred |
| hoc norms<br>RLA No.: 31/83/040/00011/AM19 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in |
| M. No.3/80-ALC2/2019dated 08.05.19 as per written comments of DHI vide their U. O. No.: |
| 3/26/2018-TSW(B) through e-mail dated 16.04.19 on repeat basis similar to Export product 22 of AA |
| No. 3110067246 dated 27.11.2018. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case |
| and noted that the firm’s representation was referred to**Consultant (Tech-3)**on 23.12.2019 for |
| examination of the case. However, no comments have been received yet. Therefore, the Committee |
| decided to**remind Consultant (Tech-3)**for expediting the comments. |
| Caseis deferred. |
Sl. No. 650
| CaseNo. 30/5/80-ALC2/2018 | Status: |
|---|---|
| AUTOCOMP CORPORATION<br>M.No.:20/80-ALC2/2019 dated 30.01.2020 | |
| PANSE PRIVATE LIMITED<br>Lic. No. 3110067039 Date: 07.05.2018 | |
| HQ.No.: 01/80/050/00079/AM19<br>**Subject:**Request for re-fixation of ad- | Deferred |
| hoc norms<br>RLA No.: 31/83/040/00010/AM19 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in | |
| M. No.3/80-ALC2/2019dated 08.05.2019 as per written comments of DHI vide their U. O. No.: | |
| 3/26/2018-TSW(B) through e-mail dated 16.04.19 on repeat basis to Export product 22 and 24 of AA | |
| No. 3110067246 dated 27.11.2018. | |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case | |
| and noted that the firm’s representation was referred to**Consultant (Tech-3)**on 23.12.2019 for | |
| examination of the case. However, no comments have been received yet. Therefore, the Committee | |
| decided to**remind Consultant (Tech-3)**for expediting the comments. | |
| Case is deferred. |
Sl. No. 651
| CaseNo. 22/8/80-ALC2/2018 | Status: |
|---|---|
| ULTRA ENGINEERS<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 | |
| Lic.No. 3110067126Date:26.07.2018 | |
| HQ. No.: 01/80/050/00145/AM19<br>**Subject:**Request for re-fixation of ad- | Deferred |
| hoc norms<br>RLA No.: 31/83/040/00063/AM19 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in | |
| M. No.14/80-ALC2/2018dated 20.02.2019 on the recommendation of representative of DHI. | |
| However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case | |
| and noted that the firm’s reply was sent toDHIon 23.01.2020 for examination of the case. | However, no |
| comments have been received yet. Hence, the Committee decided to wait for the comments. | |
| Case is deferred. |
63 | P a g e
Sl. No. 652
| Sl. No. 652 | |
|---|---|
| CaseNo. 68/2/80-ALC2/2016 | Status: |
| MINDA SILCA ENGINEERING<br>M.No.:20/80-ALC2/2019 dated 30.01.2020 | |
| PRIVATE LIMITED<br>Lic. No. 0510397530 Date: 08.02.2016 | |
| HQ.No.: 01/80/050/00071/AM17/<br>**Subject:**Request for re-fixation of ad- | Deferred |
| hoc norms<br>RLA No.: 05/24/040/00541/AM16/ | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in | |
| M. No.2/80-ALC2/2019dated 24.04.2019 as per written comments of MSME. | |
| However, the firm vide letter dated 07.11.2019 had requested for re-viewing the ad-hoc norms. The | |
| Committee reconsidered the case and noted that the firm’s representation was sent toMSMEon | |
| 23.01.2020 for examination of the case. However, no comments have been received yet. Hence, the | |
| Committee decided to wait for the comments. | |
| Case is deferred. |
Sl. No. 653
| CaseNo.: 11/33/80-ALC2/2009<br>Status: |
|---|
| IDMC LIMITED<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 |
| Lic.No. 3410025225Date: 30.09.2009 |
| HQ. No.: 01/80/050/00477/AM10/<br>**Subject:**Request for fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 34/24/040/00104/AM10/ |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in |
| M. No.4/80-ALC2/2010dated 27.04.2010 due to non-submission of reply of deficiency letter as raised |
| by DIPP. |
| However, the firm vide letter dated 16.09.2018, 08.11.2019 & 24.12.2019 has requested for |
| fixation of ad-hoc norms. The Committee reconsidered the case and noted that the requisite information |
| i.e.list of items,as asked by the representative ofDPIITin M. No. 18/80 dated 02.01.2020, is being |
| forwarded to DPIIT. |
| Case is deferred. |
Sl. No. 654
| Sl. No. 654 | |||
|---|---|---|---|
| CaseNo.: 67/5/80-ALC2/2018 | Status: | ||
| M. No.: 20/80-ALC2/2019 dated 30.01.2020 | BHARAT HEAVY ELECTRICALS | ||
| Lic.No. 0410164150Date: 02.04.2018 | LIMITED | ||
| HQ. No.: 01/80/050/00116/AM19/ | **Subject:**Request for re-fixation of ad- | Deferred | |
| RLA No.: 04/24/040/00267/AM18/ | hoc norms | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in | |||
| M. No.3/80-ALC2/2019dated 08.05.2019 | as per written comments of DHI vide | email dated | |
| 06.05.2019. | |||
| However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case | |||
| and noted that the firm representation is being forwarded toDHIfor examination of the case. | |||
| Case is deferred. |
64 | P a g e
Sl. No. 655
| Sl. No. 655 | |
|---|---|
| CaseNo.: 21/14/80-ALC2/2016 | Status: |
| VEE KAY VIKRAM & CO LLP<br>M. No.: 20/80-ALC2/2019 dated 30.01.2020 | |
| Lic.No. 0810135377Date:27.05.2015 | |
| HQ. No.: 01/80/050/00371/AM17/<br>**Subject:**Request for fixation of ad-hoc | Deferred |
| norms<br>RLA No.: 08/24/040/00060/AM16/ | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in | |
| M. No.26/80-ALC2/2016dated 28.03.2017 due to non-submission of reply of deficiency letter dated | |
| 27.12.2016 as raised by MSME. | |
| However, the firm vide letter dated 17.09.2019 has requested for fixation of the ad-hoc norms. The | |
| Committee reconsidered the case and noted that the firm’s representation was referred toMSMEon | |
| 22.01.2020 for examination of the case. However, no comments have been received yet. Hence, the | |
| Committee decided to wait for the comments. | |
| Case is deferred. |
Sl. No. 656
| Sl. No. 656 | ||
|---|---|---|
| CaseNo.: 44/19/80-ALC2/2017 | Status: | |
| M. No.: 20/80-ALC2/2019 dated 30.01.2020 | LARSEN & TOUBRO LIMITED | |
| Lic.No. 0310816114 Date: 04.10.2017 | ||
| HQ. No.: 01/80/050/00325/AM18/ | **Subject:**Request for re-fixation of ad- | Deferred |
| RLA No.: 03/95/040/00365/AM18/ | hoc norms | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in | ||
| M. No.4/80-ALC2/2018dated 23.05.2018 on the recommendation of technical representatives of DHI, | ||
| DIPP and MSME. | ||
| However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case | ||
| and noted that the firm’s representation is being forwarded toDPIITfor examination of the | case. | |
| Case is deferred. |
65 | P a g e
==> picture [469 x 657] intentionally omitted <==
66 | P a g e
67 | P a g e
==> picture [469 x 614] intentionally omitted <==
68 | P a g e
==> picture [469 x 618] intentionally omitted <==
69 | P a g e
==> picture [469 x 633] intentionally omitted <==
70 | P a g e
71 | P a g e
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6852 --apply.