IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2019-10-09

DGFT Committee Minutes

Document text

MINUTES OF MEETING NO. 12/80 OF NORMS COMMITTEE- I (DES-I SECTION) DATED 09.10.2019

Meeting No. 12/20 of the Norms Committee (NC-I) for the licensing year 2019-2020 held on 09.10.2019 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -

==> picture [428 x 183] intentionally omitted <==

----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri S. K. Jain, D. O. DPIIT<br>2. Shri B. C. Nayak, D. O. DHI<br>3. Shri K.S. Sodhi, Asst. Director MSME<br>4. Shri Shaish Kumar, (Tech-1) Consultant<br>5. Shri V.C. Agarwal, (Tech-3) Consultant<br>6. Shri Pranav Upadhyay, Assistant Director IS DGFT<br>----- End of picture text -----<br>

Note:

  1. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.

  2. Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.

  3. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.

  4. For all the Manual cases, the concerned RA should check the composition fees paid by the firm.

  5. Minutes of Meeting 10/20 dated 11.09.2019 was circulated on 01.10.2019, to all the members of the Committee and the comments, there upon received, were incorporated in the Minutes. Hence, the said minutes were unanimously approved and therefore uploaded on dgft.gov.in on 03.10.2019.

1 | P a g e

MEETING NUMBER: 12/80-ALC2/2019 MEETING DATE: 09.10.2019

Case No.:78/6/83- Party Name: ECOCAT INDIA Meet No/Date:12/80- Status:
ALC1/2015 PVT.LTD. ALC2/2019
09.10.2019
HQ File<br>:01/83/050/00408/AM16/ RLA File<br>:05/23/040/00078/AM16/ Lic.No/Date:0510394421<br>03.06.2015 Deferred

1 Decision: The Committee considered the case as per the agenda and noted that the representative of MSME has given written comments for various import items and suggested referring the case to DHI for Import items at Sl. No. 5 and 6. Hence, the Committee decided to forward the firm representation to DHI.

Case is deferred.

Case No.:1/16/80- Party Name: GARDNER Meet No/Date:12/80- Status:
ALC2/2015 AEROSPACE PRANITA ALC2/2019
PRIVATE LIMITED 09.10.2019
HQ File<br>:01/80/050/00286/AM16/ RLA File<br>:07/24/040/00176/AM16/ Lic.No/Date:0710108718<br>11.09.2015 Deferred

2 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 15.01.2019 followed by reminders on 18.04.2019 & 21.08.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/2/80- Party Name: OPTIMA WIRES Meet No/Date:12/80- Status:<br>ALC2/2016 PVT LTD ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:3410041684 Rejected<br>:01/80/050/00005/AM17/ :34/24/040/00208/AM16/ 19.11.2015<br>3<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 20.05.2019 followed by<br>reminders on 22.07.2019 & 21.08.2019. However, no reply has been received yet. Hence, the<br>Committee decided to reject the case under intimation to RA, Vadodara .<br>RA concerned may take consequential action accordingly.<br>----- End of picture text -----<br>

2 | P a g e

==> picture [476 x 166] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/15/80- Party Name: AZAD Meet No/Date:12/80- Status:<br>ALC2/2018 ENGINEERING PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0910063260 Deferred<br>:01/80/050/00347/AM19/ :09/24/040/00679/AM16/ 12.02.2016<br>4 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Hyderabad . A letter was sent to the firm &<br>RA, Hyderabad on 22/24.04.2019 followed by reminders on 06.06.2019 & 29.07.2019. However, no<br>information has been received so far. Therefore, the Committee decided to remind again RA,<br>Hyderabad & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 306] intentionally omitted <==

----- Start of picture text -----<br> Case No.:399/15/80- Party Name: MAINI PRECISION Meet No/Date:12/80- Status:<br>ALC2/2018 PRODUCTS LIMITED ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0710109554 Approved<br>:01/80/050/00741/AM19/ :07/24/040/00414/AM16/ 22.03.2016<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per<br>written comments of MSME as under:<br>Export Products:<br>1. Per unit weight of export product at Sl. No. 1 should be 8.00 gram.<br>2. Per unit weight of export product at Sl. No. 2 should be 13.00 gram.<br>3. Per unit weight of export product at Sl. No. 3 should be 16.00 gram.<br>5<br>4. Per unit weight of export product at Sl. No. 4 should be 38.00 gram.<br>Import Product:<br>1. Quantity of relevant import item at Sl. No. 1 may be allowed as 635.52 Kg inclusive of 297%<br>wastage after 50% recovery.<br>2. Quantity of relevant import item at Sl. No. 2 may be allowed as 269.055 Kg inclusive of 263%<br>wastage after 50% recovery.<br>3. Quantity of relevant import item at Sl. No. 3 may be allowed as 633.585 Kg inclusive of 204%<br>wastage after 50% recovery.<br>4. Quantity of relevant import item at Sl. No. 4 may be allowed as 1498 Kg inclusive of 131%<br>wastage after 50% recovery.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:26/15/80- Party Name: AYYAPPA CNC Meet No/Date:12/80- Status:<br>ALC2/2018 PVT. LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0710109968 Deferred<br>:01/80/050/00368/AM19/ :07/24/040/00098/AM17/ 17.06.2016<br>6 Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME for examination of the case on 17.05.2019 followed by an I.D. reminder on<br>22.07.2019. The representative of MSME informed the Committee that the case is under examination.<br>Therefore, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

3 | P a g e

7

Case No.:186/15/80- Party Name: TEMPCO Meet No/Date:12/80- Status:
ALC2/2018 TEMPERATURE ALC2/2019
MEASUREMENT PRIVATE 09.10.2019
LIMITED
HQ File<br>:01/80/050/00528/AM19/ RLA File<br>:07/24/040/00157/AM17/ Lic.No/Date:0710110332<br>29.08.2016 Deferred

Decision: The Committee considered the case as per the agenda and noted that the copy of application was sent to MeitY on 22.08.2019 & 16.09.2019 for examination of the case. However, MeitY informed vide email dated 09.10.2019 that the case is under examination. Therefore, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 284] intentionally omitted <==

----- Start of picture text -----<br> Case No.:382/15/80- Party Name: UNI VTL Meet No/Date:12/80- Status:<br>ALC2/2018 PRECISION PVT. LTD. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0710111000 Approved<br>:01/80/050/00724/AM19/ :07/24/040/00344/AM17/ 19.01.2017<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per<br>written comments of MSME as under:<br>ITCHS ITCHS Recommended Norms<br>Export Item Import Item<br>Code Code<br>8<br>HY55 Semi- Import quantity may be<br>Relevant HY 55 Bar<br>Finished Shroud allowed with 6696 Kg<br>84099990 73261990 Ends +11.7mm/-<br>Plates - 9000 Nos. inclusive of 210% wastage<br>11.7 MM - 9000Nos<br>after 10% recovery.<br>HY40 Semi- Import quantity may be<br>Relevant HY 40 Bar<br>Finished Shroud allowed with 2887.50 Kg<br>84099990 73261990 End +10.7mm/- 10.7<br>Plates - 5500 nos. inclusive of 150% wastage<br>MM - 5500<br>after 10% recovery.<br>Note: The word “Relevant” may be added with the description of import items.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:404/15/80- Party Name: OSWAL PUMPS Meet No/Date:12/80- Status:
ALC2/2018 LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00746/AM19/ RLA File<br>:33/24/040/00007/AM17/ Lic.No/Date:3310030377<br>03.03.2017 Deferred

9 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 21.06.2019 followed by an I.D. reminder on 22.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

4 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/1/80-ALC2/2019 Party Name: BGR ENERGY Meet No/Date:12/80- Status:<br>SYSTEMS LIMITED, ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0410163001 Deferred<br>:01/80/050/00767/AM19/ :04/24/040/00209/AM17/ 19.04.2017<br>10 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was<br>sent to DPIIT on 06.09.2019 for examination of the case. However, the representative of DPIIT<br>informed in meeting that the case is under examination. Therefore, the Committee decided to wait for<br>the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:94/15/80- Party Name: MODEL INFRA Meet No/Date:12/80- Status:<br>ALC2/2018 CORPORATION PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0710111766 Deferred<br>:01/80/050/00436/AM19/ :07/24/040/00085/AM18/ 16.06.2017<br>11<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 25.07.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

12

Case No.:108/15/80- Party Name: DEE Meet No/Date:12/80- Status:
ALC2/2018 DEVELOPMENT ENGINEERS ALC2/2019
LTD. 09.10.2019
HQ File<br>:01/80/050/00450/AM19/ RLA File<br>:05/23/040/00116/AM18/ Lic.No/Date:0510403207<br>22.06.2017 Deferred

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:405/15/80- Party Name: OSWAL PUMPS Meet No/Date:12/80- Status:
ALC2/2018 LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00747/AM19/ RLA File<br>:33/24/040/00007/AM18/ Lic.No/Date:3310030410<br>01.11.2017 Deferred

13

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 21.06.2019 followed by an I.D. reminder on 22.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

5 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:261/15/80- Party Name: FUTURE TECH Meet No/Date:12/80- Status:<br>ALC2/2018 ENGINEERING PVT. LTD. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0710112573 Deferred<br>:01/80/050/00603/AM19/ :07/24/040/00258/AM18/ 20.12.2017<br>14<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 25.07.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br> Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:391/15/80- Party Name: FUTURE TECH Meet No/Date:12/80- Status:<br>ALC2/2018 ENGINEERING PVT. LTD. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0710112747 Deferred<br>:01/80/050/00733/AM19/ :07/24/040/00298/AM18/ 25.01.2018<br>15<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 25.07.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

16

Case No.:394/15/80- Party Name: TRIVENI HI- Meet No/Date:12/80- Status:
ALC2/2018 TECH PVT. LTD. ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00736/AM19/ RLA File<br>:07/24/040/00368/AM18/ Lic.No/Date:0710113046<br>04.04.2018 Deferred

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 04.10.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:121/15/80- Party Name: ZTT INDIA Meet No/Date:12/80- Status:<br>ALC2/2018 PRIVATE LIMITED ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0410164238 Deferred<br>:01/80/050/00463/AM19/ :04/24/040/00009/AM19/ 23.04.2018<br>17<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MeitY was sent to the firm on 04.10.2019. However, no reply<br>has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

6 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:122/15/80- Party Name: SMC Meet No/Date:12/80- Status:<br>ALC2/2018 PNEUMATICS (INDIA) ALC2/2019<br>PRIVATE LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0510406269 Deferred<br>:01/80/050/00464/AM19/ :05/24/040/00047/AM19/ 27.04.2018<br>18<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 07.10.2019 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:154/15/80- Party Name: BANCO Meet No/Date:12/80- Status:<br>ALC2/2018 PRODUCTS (INDIA) ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:3410044137 Deferred<br>:01/80/050/00496/AM19/ :34/24/040/00050/AM19/ 14.05.2018<br>19<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 23.07.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:29/8/80-ALC2/2018 Party Name: SAIRA ASIA Meet No/Date:12/80- Status:<br>INTERIORS PVT LTD ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:3410044210 Deferred<br>:01/80/050/00152/AM19/ :34/21/040/00102/AM19/ 07.06.2018<br>20<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 23.07.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:49/8/80-ALC2/2018 Party Name: UNI VTL Meet No/Date:12/80- Status:<br>PRECISION PVT. LTD. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:6510000016 Deferred<br>:01/80/050/00172/AM19/ :65/24/040/00002/AM19/ 12.06.2018<br>21<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was<br>sent to MSME for examination of the case on 20.05.2019 followed by an I.D. reminder on<br>22.07.2019. However, no comments have been received yet. Therefore, the Committee decided to<br>remind again MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

7 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:134/15/80- Party Name: FUTURE TECH Meet No/Date:12/80- Status:<br>ALC2/2018 ENGINEERING PVT.LTD, ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0710113460 Deferred<br>:01/80/050/00476/AM19/ :07/24/040/00058/AM19/ 20.06.2018<br>22<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 23.07.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:38/8/80- Party Name: AYYAPPA Meet No/Date:12/80- Status:
ALC2/2018 CNC PVT.LTD, ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00161/AM19/ RLA File<br>:07/24/040/00070/AM19/ Lic.No/Date:0710113468<br>21.06.2018 Deferred

23 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 08.04.2019 followed by I.D. reminders on 07.06.2019 & 22.07.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

24

Case No.:278/15/80- Party Name: FITCH Meet No/Date:12/80- Status:
ALC2/2018 METALS ENGINEERING ALC2/2019
INDIA PVT. LTD 09.10.2019
HQ File<br>:01/80/050/00620/AM19/ RLA File<br>:03/94/040/00262/AM19/ Lic.No/Date:0310822068<br>02.07.2018 Deferred

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:15/8/80-ALC2/2018 Party Name: SEBROS Meet No/Date:12/80- Status:
INDUSTRIES PVT. LTD. ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00138/AM19/ RLA File<br>:05/24/040/00185/AM19/ Lic.No/Date:0510407110<br>06.07.2018 Deferred

25 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 10.06.2019 followed by an I.D. reminder on 25.07.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

8 | P a g e

==> picture [476 x 158] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/6/80- Party Name: SMC Meet No/Date:12/80- Status:<br>ALC2/2019 PNEUMATICS (INDIA) ALC2/2019<br>PRIVATE LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0510407270 Deferred<br>:01/80/050/00082/AM20/ :05/24/040/00233/AM19/ 23.07.2018<br>26 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 20.07.2019.<br>However, no reply has been received yet. Hence, the Committee decided to send final reminder to<br>the firm to furnish the requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>----- End of picture text -----<br>

27

Case No.:4/10/80-ALC2/2018 Party Name: BHARAT Meet No/Date:12/80- Status:
HEAVY ELECTRICALS ALC2/2019
LIMITED 09.10.2019
HQ File<br>:01/80/050/00190/AM19/ RLA File<br>:04/24/040/00061/AM19/ Lic.No/Date:0410164525<br>24.07.2018 Deferred

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

28

Case No.:291/15/80- Party Name: MAINI Meet No/Date:12/80- Status:
ALC2/2018 PRECISION PRODUCTS ALC2/2019
LIMITED 09.10.2019
HQ File<br>:01/80/050/00633/AM19/ RLA File<br>:07/24/040/00140/AM19/ Lic.No/Date:0710113804<br>03.09.2018 Deferred

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 07.10.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.: Party Name: BIRLA PRECISION Meet No/Date:12/80- Status:
3/12/80-ALC2/2018 TECHNOLOGIES LTD. ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00276/AM19/ RLA File<br>:03/94/040/00599/AM19/ Lic.No/Date:0310824314<br>09.10.2018 Deferred

29 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 01.07.2019 followed by an I.D. reminder on 23.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

9 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: BIRLA PRECISION Meet No/Date:12/80- Status:<br>4/12/80-ALC2/2018 TECHNOLOGIES LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0310824317 Deferred<br>:01/80/050/00277/AM19/ :03/94/040/00600/AM19/ 09.10.2018<br>30 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was<br>sent to MSME for examination of the case on 01.07.2019 followed by an I.D. reminder on<br>22.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait<br>for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/12/80- Party Name: BIRLA PRECISION Meet No/Date:12/80- Status:<br>ALC2/2018 TECHNOLOGIES LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0310824375 Deferred<br>:01/80/050/00278/AM19/ :03/94/040/00598/AM19/ 11.10.2018<br>31 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was<br>sent to MSME for examination of the case on 10.07.2019 followed by an I.D. reminder on<br>23.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait<br>for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/12/80- Party Name: BIRLA PRECISION Meet No/Date:12/80- Status:<br>ALC2/2018 TECHNOLOGIES LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0310824374 Deferred<br>:01/80/050/00285/AM19/ :03/94/040/00597/AM19/ 11.10.2018<br>32 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was<br>sent to MSME for examination of the case on 01.07.2019 followed by an I.D. reminder on<br>23.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait<br>for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:22/12/80- Party Name: CPS OIL & GAS Meet No/Date:12/80- Status:<br>ALC2/2018 EQUIPMENTS PVT LTD ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0310824383 Deferred<br>:01/80/050/00295/AM19/ :03/94/040/00630/AM19/ 11.10.2018<br>33 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Mumbai . A letter was sent to the firm &<br>RA, Mumbai on 09.05.2019 followed by reminders on 09.05.2019, 07.06.2019, 24.07.2019 &<br>05.09.2019. However, no information has been received so far. Hence, the Committee decided to wait<br>for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

10 | P a g e

==> picture [476 x 155] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/12/80- Party Name: JAICO Meet No/Date:12/80- Status:<br>ALC2/2018 ENTERPRISE LLP ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0310824420 Deferred<br>:01/80/050/00274/AM19/ :03/94/040/00612/AM19/ 12.10.2018<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>34<br>application has not yet been received from the firm & RA, Mumbai . A letter was sent to the firm &<br>RA, Mumbai on 09.05.2019 followed by reminders on 09.05.2019, 07.06.2019, 24.07.2019 &<br>05.09.2019. However, no information has been received so far. Hence, the Committee decided to wait<br>for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/12/80- Party Name: GENERAL Meet No/Date:12/80- Status:<br>ALC2/2018 INSTRUMENTS CONSORTIUM ALC2/2019<br>SOLE PROP. KULKARNI 09.10.2019<br>HQ File RLA File :03/94/040/00640/AM19/ Lic.No/Date:0310824478 Deferred<br>:01/80/050/00296/AM19/ 16.10.2018<br>35 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Mumbai . A letter was sent to the firm &<br>RA, Mumbai on 09.05.2019 followed by reminders on 07.06.2019 & 24.07.2019. However, no<br>information has been received so far. Hence, the Committee decided to remind RA, Mumbai & the<br>firm for submitting the complete set of application.<br> Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 59] intentionally omitted <==

----- Start of picture text -----<br> Case No.:241/15/80- Party Name: MAINI PRECISION Meet No/Date:12/80- Status:<br>ALC2/2018 PRODUCTS LIMITED ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0710114051 Deferred<br>:01/80/050/00583/AM19/ :07/24/040/00184/AM19/ 25.10.2018<br>----- End of picture text -----<br>

36 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 07.10.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/12/80- Party Name: MINDA SILCA Meet No/Date:12/80- Status:<br>ALC2/2018 ENGINEERING PVT. LIMITED ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0510408370 Deferred<br>:01/80/050/00293/AM19/ :05/24/040/00433/AM19/ 12.11.2018<br>37 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was<br>sent to MSME for examination of the case on 22.05.2019 followed by an I.D. reminder on<br>25.07.2019. However, no comments have been received yet. Therefore, the Committee decided to<br>remind again MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

11 | P a g e

Case No.:13/14/80- Party Name: CUPRO TUBES Meet No/Date:12/80- Status:
ALC2/2018 ENTERPRISES PVT. LTD. ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00329/AM19/ RLA File<br>:03/94/040/00722/AM19/ Lic.No/Date:0310825109<br>19.11.2018 Rejected

38 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 07.06.2019 and final reminder on 22.07.2019. However, no reply has been received yet. Hence, the Committee decided to reject the case under intimation to RA, Mumbai .

RA concerned may take consequential action accordingly.

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:267/15/80- Party Name: LARSEN & Meet No/Date:12/80- Status:<br>ALC2/2018 TOUBRO LIMITED ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0310825583 Deferred<br>:01/80/050/00609/AM19/ :03/95/040/00583/AM19/ 11.12.2018<br>39 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Mumbai and in this regard a letter was<br>sent to the firm & RA, Mumbai on 29.07.2019. However, no information has been received so far.<br>Therefore, the Committee decided to remind RA, Mumbai & the firm for submitting the complete set<br>of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:268/15/80- Party Name: LARSEN & Meet No/Date:12/80- Status:
ALC2/2018 TOUBRO LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00610/AM19/ RLA File<br>:03/95/040/00579/AM19/ Lic.No/Date:0310825584<br>11.12.2018 Deferred

40 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 07.10.2019 for examination of the case. However, the representative of DPIIT informed in meeting that the case is under examination. Therefore, the Committee decided to wait for the comments.

Case is deferred.

12 | P a g e

==> picture [476 x 393] intentionally omitted <==

----- Start of picture text -----<br> Case No.:269/15/80- Party Name: LARSEN & Meet No/Date:12/80- Status:<br>ALC2/2018 TOUBRO LIMITED ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0310825585 Deferred<br>:01/80/050/00611/AM19/ :03/95/040/00585/AM19/ 11.12.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of representative of DHI:<br>1. Details of loose items in export item & specific items required to manufacture the same.<br>2. Break up of set to number.<br>3. Break up of each import item, i.e. forged components, pipes etc. into number & their raw<br>weight & finished weight separately. (Item no. 8)<br>4. Weight of each Export Product.<br>5. Weight of each of the imported and indigenous input, separately for each product, for the<br>41 purpose of material balancing. Net weight (Gross weight minus wastage) for each imported<br>and indigenous input in the export product may be indicated. Net weight along with details of<br>other imported input to be used in the resultant product and sought to be imported/procured<br>from sources other than the license, if any, may also be indicated.<br>6. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components to be<br>manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary evidence/drawings<br>etc.<br>7. Particulars of the licenses obtained in the past and ratified by ALC (with or without<br>modification) for the same export product covered under this application, in view of Public<br>Notice No. 48 dated 14.11.2002.<br>8. To provide clarification for why it is stated that item no. 1 will be used for manufacture of tube<br>sheet & outer shell while item no. 9 is also tube sheet.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:30/12/80- Party Name: CML BIOTECH Meet No/Date:12/80- Status:
ALC2/2018 PRIVATE LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00303/AM19/ RLA File<br>:10/24/040/00045/AM19/ Lic.No/Date:1010060084<br>12.12.2018 Rejected

42 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 14.05.2019 and final reminder on 22.07.2019. However, no reply has been received yet. Hence, the Committee decided to reject the case under intimation to RA, Cochin .

RA concerned may take consequential action accordingly.

13 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:276/15/80- Party Name: BIRLA Meet No/Date:12/80- Status:<br>ALC2/2018 FURUKAWA FIBRE ALC2/2019<br>OPTICS LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0310825749 Deferred<br>:01/80/050/00618/AM19/ :03/94/040/00758/AM19/ 18.12.2018<br>43<br>Decision: The Committee considered the case as per the agenda and noted that MeitY informed vide<br>email dated 09.10.2019 that a deficiency letter was sent to the firm by them on 27.09.2019. However,<br>no reply has been received yet. Therefore, the Committee decided to wait for reply / comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:14/6/80-ALC2/2019 Party Name: IND-SPHINX Meet No/Date:12/80- Status:
PRECISION LTD ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00085/AM20/ RLA File<br>:22/24/040/00069/AM19/ Lic.No/Date:2210016034<br>18.12.2018 Deferred

44 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019. However, the matter was discussed in the meeting and the Committee decided to refer the case to MSME for further examination & comments.

Case is deferred.

45

Case No.:20/14/80- Party Name: ULTRA Meet No/Date:12/80- Status:
ALC2/2018 ENGINEERS ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00336/AM19/ RLA File<br>:31/83/040/00150/AM19/ Lic.No/Date:3110067260<br>19.12.2018 Deferred

Decision: The Committee considered the case as per the agenda and noted that the firm appeared for Personal Hearing. The Committee noted that the matter has already been referred to DHI on 04.07.2019 & 24.07.2019. Hence, the Committee decided to wait for technical comments of DHI .

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:285/15/80- Party Name: MAINI Meet No/Date:12/80- Status:<br>ALC2/2018 PRECISION PRODUCTS ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0710114362 Deferred<br>:01/80/050/00627/AM19/ :07/24/040/00237/AM19/ 02.01.2019<br>46<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 07.10.2019 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

14 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/14/80-ALC2/2018 Party Name: ROTZLER Meet No/Date:12/80- Status:<br>SERVICES PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0710114403 Deferred<br>:01/80/050/00323/AM19/ :07/24/040/00236/AM19/ 16.01.2019<br>47<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 18.09.2019 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:313/15/80- Party Name: OMEGA Meet No/Date:12/80- Status:<br>ALC2/2018 ICEHILL PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0510409545 Deferred<br>:01/80/050/00655/AM19/ :05/24/040/00627/AM19/ 31.01.2019<br>48<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to DPIIT on 07.10.2019 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/6/80-ALC2/2019 Party Name: BHARAT Meet No/Date:12/80- Status:<br>HEAVY ELECTRICALS ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:1110028485 Deferred<br>:01/80/050/00086/AM20/ :11/24/040/00024/AM19/ 04.02.2019<br>49<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DHI was sent to the firm on 04.10.2019. However, no reply<br>has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 159] intentionally omitted <==

----- Start of picture text -----<br> Case No.:310/15/80- Party Name: TERUMO Meet No/Date:12/80- Status:<br>ALC2/2018 PENPOL PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:5310019913 Deferred<br>:01/80/050/00652/AM19/ :53/24/040/00013/AM19/ 05.02.2019<br>50 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 21.08.2019.<br>However, no reply has been received yet. Hence, the Committee decided to send final reminder to<br>the firm to furnish the requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>----- End of picture text -----<br>

15 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:327/15/80- Party Name: ASHWIN Meet No/Date:12/80- Status:<br>ALC2/2018 PLASTIC INDUSTRIES ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0310827105 Deferred<br>:01/80/050/00669/AM19/ :03/94/040/00997/AM19/ 19.02.2019<br>51<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME for examination of the case on 20.06.2019 followed by an I.D. reminder on<br>22.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait<br>for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

52

Case No.:328/15/80- Party Name: ACE Meet No/Date:12/80- Status:
ALC2/2018 FURNACES PVT. LTD. ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00670/AM19/ RLA File<br>:03/94/040/01005/AM19/ Lic.No/Date:0310827111<br>19.02.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that the copy of application was sent to MSME on 22.07.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:334/15/80- Party Name: JAMES Meet No/Date:12/80- Status:<br>ALC2/2018 ROBINSON LABS PVT LTD ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0910067205 Rejected<br>:01/80/050/00676/AM19/ :09/24/040/00531/AM19/ 22.02.2019<br>53 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 10.06.2019 and<br>final reminder on 22.07.2019. However, no reply has been received yet. Hence, the Committee<br>decided to reject the case under intimation to RA, Hyderabad .<br>RA concerned may take consequential action accordingly.<br>----- End of picture text -----<br>

Case No.:6/1/80-ALC2/2019 Party Name: APAR Meet No/Date:12/80- Status:
INDUSTRIES LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00754/AM19/ RLA File<br>:03/94/040/00999/AM19/ Lic.No/Date:0310827307<br>26.02.2019 Deferred

54

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY for examination of the case on 13.06.2019 followed by an I.D. reminder on 22.08.2019. However, MeitY informed vide email dated 09.10.2019 that the case is under examination. Therefore, the Committee decided to wait for the comments.

Case is deferred.

16 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/1/80-ALC2/2019 Party Name: DAGGER Meet No/Date:12/80- Status:<br>MASTER TOOL ALC2/2019<br>INDUSTRIES LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0310827404 Deferred<br>:01/80/050/00756/AM19/ :03/94/040/01048/AM19/ 01.03.2019<br>55<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 22.07.2019<br>followed by final reminder on 04.10.2019. However, no reply has been received yet. Hence, the<br>Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 270] intentionally omitted <==

----- Start of picture text -----<br> Case No.:39/1/80- Party Name: CHEMICO Meet No/Date:12/80- Status:<br>ALC2/2019 SYNTHETICS LTD. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0510409870 Approved<br>:01/80/050/00787/AM19/ :05/23/040/00540/AM19/ 07.03.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms as<br>per written comments of Consultant (Tech-1) as under:<br>ITCHS ITCHS Recommended<br>Export Item Import Item<br>56 Code Code Norms<br> ANTIMONY ANTIMONY CONCENTRATE<br>METAL ( Antimony Content 54.07%)<br>81101000 (Sb 99.65% Min.) 26171000 with 12.11% H2O ( Water) 5,34,526 Kg<br>( Antimony = Content (Antimony Content =<br>2,38,233 Kg) 2,54,019 Kg)<br>Note:<br>1. The quantity of Antimony should be 2,38,233 Kg in the export item.<br>2. The content of Antimony should be 2,54,019 Kg in the import item.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:50/1/80- Party Name: SAIRA ASIA Meet No/Date:12/80- Status:<br>ALC2/2019 INTERIORS PVT LTD ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:3410044963 Deferred<br>:01/80/050/00798/AM19/ :34/24/040/00376/AM19/ 08.03.2019<br>57<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME for examination of the case on 20.05.2019 followed by an I.D. reminder on<br>22.07.2019. However, no comments have been received yet. Therefore, the Committee decided to<br>remind again MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

17 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:48/1/80-ALC2/2019 Party Name: LMT TOOLS Meet No/Date:12/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:3110067349 Deferred<br>:01/80/050/00796/AM19/ :31/83/040/00189/AM19/ 12.03.2019<br>58<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:44/1/80- Party Name: COFLE TAYLOR Meet No/Date:12/80- Status:
ALC2/2019 INDIA CONTROL CABLES & ALC2/2019
SYSTEMS PRIVAT 09.10.2019
HQ File<br>:01/80/050/00792/AM19/ RLA File<br>:04/24/040/00266/AM19/ Lic.No/Date:0410165321<br>14.03.2019 Deferred

59 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 17.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

Case No.:12/2/80- Party Name: VICTORA Meet No/Date:12/80- Status:
ALC2/2019 AUTO PVT. LTD. ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00805/AM19/ RLA File<br>:05/24/040/00738/AM19/ Lic.No/Date:0510410085<br>28.03.2019 Deferred

60

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 14.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: AUTOCOMP Meet No/Date:12/80- Status:<br>3/2/80-ALC2/2019 CORPORATION PANSE ALC2/2019<br>PRIVATE LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:3110067366 Deferred<br>:01/80/050/00003/AM20/ :31/83/040/00298/AM19/ 02.04.2019<br>61<br>Decision: The Committee considered the case as per the agenda and noted that the firm appeared for<br>Personal Hearing. The Committee noted that the matter has already been referred to DHI on<br>05.07.2019 and 22.07.2019. Hence, the Committee decided to wait for technical comments of DHI .<br>Case is deferred.<br>----- End of picture text -----<br>

18 | P a g e

==> picture [476 x 158] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/4/80-ALC2/2019 Party Name: STERLITE Meet No/Date:12/80- Status:<br>POWER TRANSMISSION ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0310828571 Deferred<br>:01/80/050/00016/AM20/ :03/95/040/00051/AM20/ 24.04.2019<br>62 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MeitY was sent to the firm on 21.08.2019. However, no reply<br>has been received yet. Hence, the Committee decided to send final reminder to the firm to furnish the<br>requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:12/80- Status:<br>PRIVATE LIMITED. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:3110067390 Deferred<br>:01/80/050/00017/AM20/ :31/83/040/00009/AM20/ 24.04.2019<br>63<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019 followed by final<br>reminder on 04.10.2019. However, no reply has been received yet. Hence, the Committee decided to<br>wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:12/80- Status:<br>PRIVATE LIMITED ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:3110067391 Deferred<br>:01/80/050/00018/AM20/ :31/83/040/00010/AM20/ 24.04.2019<br>64 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019 followed by final<br>reminder on 04.10.2019. However, no reply has been received yet. Hence, the Committee decided to<br>wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:12/80- Status:<br>PRIVATE LIMITED. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:3110067392 Deferred<br>:01/80/050/00019/AM20/ :31/83/040/00011/AM20/ 24.04.2019<br>65 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DPIIT was sent to the firm on 23.07.2019 followed by final<br>reminder on 04.10.2019. However, no reply has been received yet. Hence, the Committee decided to<br>wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

19 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/4/80-ALC2/2019 Party Name: KEY-TECH Meet No/Date:12/80- Status:<br>ENGINEERING CO. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0310828538 Deferred<br>:01/80/050/00023/AM20/ :03/94/040/00057/AM20/ 24.04.2019<br>66<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:5/4/80-ALC2/2019 Party Name: VICTORA Meet No/Date:12/80- Status:
AUTO PVT. LTD. ALC2/2019 & 09.10.2019
HQ File<br>:01/80/050/00020/AM20/ RLA File<br>:05/24/040/00033/AM20/ Lic.No/Date:0510410376<br>25.04.2019 Deferred

67 Decision: The Committee considered the case as per the agenda and noted that the copy of application was sent to MSME on 05.08.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

==> picture [476 x 139] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/4/80-ALC2/2019 [Party Name: SHIVALIK ] Meet No/Date:12/80- Status:<br>BIMETAL CONTROLS LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0510410395 Deferred<br>:01/80/050/00022/AM20/ :05/24/040/00016/AM20/ 26.04.2019<br>68 Decision: The Committee considered the case as per the agenda and noted that the copy of application<br>was sent to MSME for examination of the case on 10.06.2019 followed by an I.D. reminder on<br>22.07.2019. However, no comments have been received yet. Therefore, the Committee decided to<br>remind again MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 155] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/4/80-ALC2/2019 Party Name: ERBATECH Meet No/Date:12/80- Status:<br>MACHINERY P LTD ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:3210078932 Deferred<br>:01/80/050/00024/AM20/ :32/24/040/00004/AM20/ 29.04.2019<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>69<br>application has not yet been received from the firm & RA, Coimbatore and in this regard a letter was<br>sent to the firm & RA, Coimbatore on 23.07.2019. However, no information has been received so<br>far. Hence, the Committee decided to remind RA, Coimbatore & the firm for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

20 | P a g e

==> picture [476 x 158] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/4/80-ALC2/2019 Party Name: FREEDOM Meet No/Date:12/80- Status:<br>OPTHALMIC PRIVATE ALC2/2019<br>LIMITED, 09.10.2019<br>HQ File RLA File Lic.No/Date:0410165526 Deferred<br>:01/80/050/00027/AM20/ :04/24/040/00018/AM20/ 30.04.2019<br>70 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 21.08.2019.<br>However, no reply has been received yet. Hence, the Committee decided to send final reminder to<br>the firm to furnish the requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:13/4/80- Party Name: SRI RAM Meet No/Date:12/80- Status:
ALC2/2019 INDUSTRIES ALC2/2019 & 09.10.2019
HQ File<br>:01/80/050/00028/AM20/ RLA File<br>:04/24/040/00157/AM19/ Lic.No/Date:0410165532<br>01.05.2019 Deferred

71 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:14/4/80- Party Name: KINECO Meet No/Date:12/80- Status:
ALC2/2019 KAMAN COMPOSITES - ALC2/2019
INDIA PVT. LTD. 09.10.2019
HQ File<br>:01/80/050/00029/AM20/ RLA File<br>:03/94/040/01131/AM19/ Lic.No/Date:0310828702<br>01.05.2019 Deferred

72

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY on 24.07.2019 for examination of the case. However, MeitY informed vide email dated 09.10.2019 that the case is under examination. Therefore, the Committee decided to wait for the comments.

Case is deferred.

Case No.:17/4/80-ALC2/2019 Party Name: SAIRA ASIA Meet No/Date:12/80- Status:
INTERIORS PVT. LTD. ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00032/AM20/ RLA File<br>:34/24/040/00035/AM20/ Lic.No/Date:3410045102<br>01.05.2019 Deferred

73

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 11.06.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

21 | P a g e

==> picture [476 x 151] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/4/80-ALC2/2019 Party Name: CHIRAG Meet No/Date:12/80- Status:<br>UDYOG ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0510410451 Deferred<br>:01/80/050/00030/AM20/ :05/23/040/00054/AM20/ 02.05.2019<br>74 Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME f or examination of the case on 20.05.2019 followed by an I.D. reminder on<br>22.07.2019. However, no comments have been received yet. Therefore, the Committee decided to<br>remind again MSME for expediting the comments.<br> Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:16/4/80- Party Name: BLISS ANAND Meet No/Date:12/80- Status:<br>ALC2/2019 PVT. LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0510410480 Deferred<br>:01/80/050/00031/AM20/ :05/23/040/00051/AM20/ 03.05.2019<br>75 Decision: The Committee considered the case as per the agenda and noted that the copy of application<br>was sent to MSME for examination of the case on 03.06.2019 followed by an I.D. reminder on<br>22.07.2019. However, no comments have been received yet. Therefore, the Committee decided to<br>remind again MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/4/80-ALC2/2019 Party Name: MASU BRAKE Meet No/Date:12/80- Status:<br>PADS PRIVATE LIMITED ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0510410488 Deferred<br>:01/80/050/00036/AM20/ :05/24/040/00057/AM20/ 06.05.2019<br>76<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 22.07.2019<br>followed by final reminder on 04.10.2019. However, no reply has been received yet. Hence, the<br>Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: MAGNETI Meet No/Date:12/80- Status:<br>20/4/80-ALC2/2019 MARELLI TALBROS CHASSIS ALC2/2019<br>SYSTEM-S PRIVATE LI 09.10.2019<br>HQ File RLA File Lic.No/Date:0510410509 Deferred<br>:01/80/050/00035/AM20/ :05/24/040/00053/AM20/ 07.05.2019<br>77<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DHI was sent to the firm on 04.10.2019. However, no reply<br>has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

22 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/4/80- Party Name: VICTORA Meet No/Date:12/80- Status:<br>ALC2/2019 AUTO PVT. LTD. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0510410518 Deferred<br>:01/80/050/00034/AM20/ :05/24/040/00762/AM19/ 08.05.2019<br>78<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application<br>was sent to MSME on 07.10.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:18/4/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:12/80- Status:
SOLUTIONS PRIVATE ALC2/2019
LIMITED 09.10.2019
HQ File<br>:01/80/050/00033/AM20/ RLA File<br>:09/24/040/00058/AM20/ Lic.No/Date:0910067492<br>10.05.2019 Deferred

79 Decision: The Committee considered the case as per the agenda and noted that the copy of application was sent to MSME for examination of the case on 22.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

Case No.:26/5/80-ALC2/2019 Party Name: ROTHE ERDE Meet No/Date:12/80- Status:
INDIA PRIVATE LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00064/AM20/ RLA File<br>:31/83/040/00035/AM20/ Lic.No/Date:3110067430<br>28.05.2019 Deferred

80 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 30.09.2019 for examination of the case. However, the matter was discussed in the meeting and the Committee decided to refer the case to MSME as per advice of representative of DHI .

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:28/5/80-ALC2/2019 Party Name: SHIRODKAR Meet No/Date:12/80- Status:<br>PRECI COMP PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:3110067433 Deferred<br>:01/80/050/00066/AM20/ :31/83/040/00028/AM20/ 29.05.2019<br>81<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

23 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:29/5/80-ALC2/2019 Party Name: SHIRODKAR Meet No/Date:12/80- Status:<br>PRECI COMP PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:3110067434 Deferred<br>:01/80/050/00067/AM20/ :31/83/040/00027/AM20/ 29.05.2019<br>82<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:30/5/80- Party Name: TIAGO CHEM Meet No/Date:12/80- Status:<br>ALC2/2019 ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:3410045178 Deferred<br>:01/80/050/00068/AM20/ :34/24/040/00075/AM20/ 30.05.2019<br>83 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Vadodara and in this regard a letter was<br>sent to the firm & RA, Vadodara on 26.07.2019. However, no information has been received so far.<br>Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete<br>set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:32/5/80-ALC2/2019 Party Name: FUTURE TECH Meet No/Date:12/80- Status:
ENGINEERING PVT. LTD. ALC2/2019 & 09.10.2019
HQ File<br>:01/80/050/00070/AM20/ RLA File<br>:07/24/040/00050/AM20/ Lic.No/Date:0710115000<br>31.05.2019 Deferred

84 Decision: The Committee considered the case as per the agenda and noted that the copy of application was sent to MSME on 13.08.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:33/5/80-ALC2/2019 Party Name: GRAND PRIX Meet No/Date:12/80- Status:<br>ENGINEERING PVT.LTD. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0510410791 Deferred<br>:01/80/050/00071/AM20/ :05/23/040/00096/AM20/ 03.06.2019<br>85<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME for examination of the case on 03.07.2019 followed by an I.D. Reminder on<br>23.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait<br>for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

24 | P a g e

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/6/80-ALC2/2019 Party Name: SHIVALIK Meet No/Date:12/80- Status:<br>BIMETAL CONTROLS LTD ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0510410810 Deferred<br>:01/80/050/00072/AM20/ :05/24/040/00129/AM20/ 04.06.2019<br>86 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, New Delhi and in this regard a letter was<br>sent to the firm & RA, New Delhi on 24.07.2019. However, no information has been received so far.<br>Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete<br>set of application.<br> Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/6/80-ALC2/2019 Party Name: LAXMI Meet No/Date:12/80- Status:<br>DENTAL EXPORT PVT. ALC2/2019<br>LTD. 09.10.2019<br>HQ File RLA File Lic.No/Date:0310829403 Deferred<br>:01/80/050/00073/AM20/ :03/95/040/00207/AM20/ 04.06.2019<br>87 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Mumbai and in this regard a letter was<br>sent to the firm & RA , Mumbai on 26.07.2019. However, no information has been received so far.<br>Therefore, the Committee decided to remind RA, Mumbai & the firm for submitting the complete set<br>of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/6/80-ALC2/2019 Party Name: MAGNA Meet No/Date:12/80- Status:<br>AUTOMOTIVE INDIA ALC2/2019<br>PRIVATE LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0410165680 Deferred<br>:01/80/050/00075/AM20/ :04/24/040/00049/AM20/ 06.06.2019<br>88<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 30.07.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 107] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/6/80-ALC2/2019 Party Name: ERBATECH Meet No/Date:12/80- Status:<br>MACHINERY PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>89 HQ File RLA File Lic.No/Date:3210078986 Deferred<br>:01/80/050/00076/AM20/ :32/24/040/00017/AM20/ 06.06.2019<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 22.08.2019.<br>----- End of picture text -----<br>

25 | P a g e

However, no reply has been received yet. Hence, the Committee decided to send final reminder to the firm to furnish the requisite information within 15 days failing which the case will be rejected.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/6/80-ALC2/2019 Party Name: HANNING Meet No/Date:12/80- Status:<br>MOTORS INDIA P LTD ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:3410045192 Deferred<br>:01/80/050/00079/AM20/ :34/24/040/00071/AM20/ 06.06.2019<br>90<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Vadodara and in this regard a letter was<br>sent to the firm & RA, Vadodara on 29.07.2019. Therefore, the Committee decided to remind RA,<br>Vadodara & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:6/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:12/80- Status:
LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00077/AM20/ RLA File<br>:03/95/040/00221/AM20/ Lic.No/Date:0310829486<br>07.06.2019 Deferred

91 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 04.09.2019 for examination of the case. However, in meeting representative of MSME informed that the case pertains to DPIIT. Hence, the Committee decided to forward the case to DPIIT.

Case is deferred

Case No.:7/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:12/80- Status:
LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00078/AM20/ RLA File<br>:03/95/040/00206/AM20/ Lic.No/Date:0310829488<br>07.06.2019 Deferred

92 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 04.09.2019 for examination of the case. However, in meeting representative of MSME informed that the case pertains to DPIIT. Hence, the Committee decided to forward the case to DPIIT.

Case is deferred.

26 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/6/80- Party Name: TEMA INDIA Meet No/Date:12/80- Status:<br>ALC2/2019 LIMITED ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0310829553 Deferred<br>:01/80/050/00081/AM20/ :03/95/040/00229/AM20/ 11.06.2019<br>93<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 04.09.2019 for examination of the case. However, in meeting representative of<br>MSME informed that the case pertains to DPIIT. Hence, the Committee decided to forward the case to<br>DPIIT.<br>Case is deferred.<br>----- End of picture text -----<br>

94

Case No.:12/6/80-ALC2/2019 Party Name: VICTORA Meet No/Date:12/80- Status:
AUTO PVT. LTD. ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00083/AM20/ RLA File<br>:05/24/040/00144/AM20/ Lic.No/Date:0510410880<br>11.06.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 31.07.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

95

Case No.:13/6/80-ALC2/2019 Party Name: VEELINE Meet No/Date:12/80- Status:
MEDIA LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00084/AM20/ RLA File<br>:02/24/040/00038/AM20/ Lic.No/Date:0210209240<br>11.06.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 14.08.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:16/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:12/80- Status:
LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00087/AM20/ RLA File<br>:03/95/040/00239/AM20/ Lic.No/Date:0310829596<br>12.06.2019 Deferred

96 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 04.09.2019 for examination of the case. However, in meeting representative of MSME informed that the case pertains to DPIIT. Hence, the Committee decided to forward the case to DPIIT.

Case is deferred.

27 | P a g e

==> picture [476 x 305] intentionally omitted <==

----- Start of picture text -----<br> Case No.:17/6/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:12/80- Status:<br>AUTOMOTIVES LTD. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0510410932 Deferred<br>:01/80/050/00088/AM20/ :05/23/040/00062/AM20/ 14.06.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of representative of MSME:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also<br>be furnished.<br>2. Weight of each Export Product.<br>97<br>3. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each imported<br>and indigenous input in the export product may be indicated. Net weight along with details of<br>other imported input to be used in the resultant product and sought to be imported/procured<br>from sources other than the license, if any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components to be<br>manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary evidence/drawings<br>etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 306] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/6/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:12/80- Status:<br>AUTOMOTIVES LTD. ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0510410933 Deferred<br>:01/80/050/00089/AM20/ :05/23/040/00063/AM20/ 14.06.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of representative of MSME:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also<br>be furnished.<br>2. Weight of each Export Product.<br>98<br>3. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each imported<br>and indigenous input in the export product may be indicated. Net weight along with details of<br>other imported input to be used in the resultant product and sought to be imported/procured<br>from sources other than the license, if any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components to be<br>manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary evidence/drawings<br>etc.<br>Case is deferred.<br>----- End of picture text -----<br>

28 | P a g e

==> picture [476 x 129] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/6/80-ALC2/2019 Party Name: ISGEC Meet No/Date:12/80- Status:<br>HITACHI ZOSEN LIMITED ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0510410946 Deferred<br>99 :01/80/050/00092/AM20/ :05/23/040/00111/AM20/ 14.06.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>DPIIT for examination as per the advice of representative of MSME.<br>Case is deferred.<br>----- End of picture text -----<br>

100

Case No.:23/6/80- Party Name: PREMIER Meet No/Date:12/80- Status:
ALC2/2019 INDUSTRIAL ALC2/2019
CORPORATION LIMITED 09.10.2019
HQ File<br>:01/80/050/00094/AM20/ RLA File<br>:03/95/040/00093/AM20/ Lic.No/Date:0310829755<br>18.06.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 26.07.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

101

Case No.:24/6/80- Party Name: KEY - TECH Meet No/Date:12/80- Status:
ALC2/2019 ENGINEERING CO. ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00095/AM20/ RLA File<br>:03/94/040/00228/AM20/ Lic.No/Date:0310829761<br>18.06.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 72] intentionally omitted <==

----- Start of picture text -----<br> Case No.:25/6/80- Party Name: MASCOT Meet No/Date:12/80- Status:<br>ALC2/2019 DYNAMICS PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0310829810 Approved<br>:01/80/050/00096/AM20/ :03/95/040/00254/AM20/ 20.06.2019<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that DPIIT has advised to 102 refer the case to MSME. However on the basis of inputs given by the Technical Authorities, the Committee decided to ratify the norms as under:

==> picture [443 x 61] intentionally omitted <==

----- Start of picture text -----<br> Sl. ITCHS Recommended<br>Import Item<br>No. Code Norms<br>1 84137099 PUMP MODEL NO. GSA 1.5 x 1 x 8-L3 DA8 Net to net as per<br>2 84139120 CASING GASKET (JOINT-GS1-PTFE 1-209) (C17002361) GN-4<br>3 84139120 SERVICE KIT FOR PUMPS (837331) Deleted<br>----- End of picture text -----<br>

29 | P a g e

4<br>85015210<br>INDUCTION MOTOR B3 (FOOT MOUNTED) TAG NO.704-P-<br>02 A/B(18.5 kW/2pole)<br>Net to net as per<br>GN-4<br>5<br>84137099<br>PUMP MODEL NO.GSA 1.5 x 1 x 8-L3 DA4<br>6<br>84139120<br>CASING GASKET(JOINT-GS1 PTFE 1-209) (C17002361)<br>7<br>84139120<br>SERVICE KIT FOR PUMPS(837331)<br>Deleted<br>8<br>85015210<br>INDUCTION MOTOR B3 (FOOT MOUNTED) TAG NO.704-P<br>11 A/B(3.7 kW/4pole)<br>Net to net as per<br>GN-4<br>RA concerned maytake further necessaryaction asper the decision of NC.

RA concerned may take further necessary action as per the decision of NC.

==> picture [476 x 129] intentionally omitted <==

----- Start of picture text -----<br> Case No.:26/6/80- Party Name: GLOBE HI- Meet No/Date:12/80- Status:<br>ALC2/2019 FABS LLP ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0510411004 Deferred<br>103 :01/80/050/00097/AM20/ :05/23/040/00108/AM20/ 20.06.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>MSME for examination as per the advice of representative of DHI .<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: MODEL INFRA Meet No/Date:12/80- Status:<br>1/8/80-ALC2/2019 CORPORATION PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0710115134 Deferred<br>:01/80/050/00113/AM20/ :07/24/040/00081/AM20/ 05.07.2019<br>104<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Bangalore and in this regard a letter was<br>sent to the firm & RA, Bangalore on 23.08.2019. Therefore, the Committee decided to remind RA,<br>Bangalore & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:2/8/80-ALC2/2019 Party Name: KABY Meet No/Date:12/80- Status:
PRECISION MACHINING ALC2/2019
PRIVATE LIMITED 09.10.2019
HQ File<br>:01/80/050/00114/AM20/ RLA File<br>:09/24/040/00176/AM20/ Lic.No/Date:0910067755<br>05.07.2019 Deferred

105

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 23.08.2019. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.

Case is deferred.

30 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/8/80-ALC2/2019 Party Name: MICRON Meet No/Date:12/80- Status:<br>SPECMA (INDIA) PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:3310030562 Deferred<br>:01/80/050/00119/AM20/ :33/24/040/00015/AM20/ 08.07.2019<br>106<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Panipat and in this regard a letter was<br>sent to the firm & RA, Panipat on 23.08.2019. Therefore, the Committee decided to remind RA,<br>Panipat & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

107

Case No.:3/8/80- Party Name: ULTRA Meet No/Date:12/80- Status:
ALC2/2019 ENGINEERS ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00115/AM20/ RLA File<br>:31/83/040/00058/AM20/ Lic.No/Date:3110067470<br>10.07.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that the firm appeared for Personal Hearing. The Committee noted that the matter has already been referred to DHI on 18.09.2019. Hence, the Committee decided to wait for technical comments of DHI .

Case is deferred.

==> picture [476 x 129] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/8/80-ALC2/2019 Party Name: THE INDIAN Meet No/Date:12/80- Status:<br>CARD CLOTHING CO LTD ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0310830216 Deferred<br>108 :01/80/050/00116/AM20/ :03/95/040/00302/AM20/ 11.07.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>Consultant (Tech-3) for examination as per the advice of representative of DPIIT .<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/8/80-ALC2/2019 Party Name: VALEO INDIA Meet No/Date:12/80- Status:<br>PRIVATE LIMITED ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0410165826 Deferred<br>:01/80/050/00117/AM20/ :04/24/040/00067/AM20/ 12.07.2019<br>109<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 05.08.2019 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

31 | P a g e

110

Case No.:6/8/80-ALC2/2019 Party Name: DILIGENT Meet No/Date:12/80- Status:
SCM SOLUTIONS ALC2/2019
PRIVATE LIMITED 09.10.2019
HQ File<br>:01/80/050/00118/AM20/ RLA File<br>:09/24/040/00199/AM20/ Lic.No/Date:0910067781<br>12.07.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

111

Case No.:8/8/80-ALC2/2019 Party Name: AUTO TECH Meet No/Date:12/80- Status: INDUSTRIES (INDIA) PVT. ALC2/2019 LTD. 09.10.2019 HQ File RLA File Lic.No/Date:0410165827 Deferred :01/80/050/00120/AM20/ :04/24/040/00068/AM20/ 15.07.2019

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 06.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. Case is deferred.

Case No.:9/8/80-ALC2/2019 Party Name: ANSTECH Meet No/Date:12/80- Status: ALC2/2019 09.10.2019 HQ File RLA File Lic.No/Date:3410045281 Deferred :01/80/050/00121/AM20/ :34/24/040/00127/AM20/ 15.07.2019

112 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 23.08.2019. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.

Case is deferred.

113

Case No.:10/8/80- Party Name: ULTRA Meet No/Date:12/80- Status:
ALC2/2019 ENGINEERS ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00122/AM20/ RLA File<br>:31/83/040/00056/AM20/ Lic.No/Date:3110067477<br>17.07.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that the firm appeared for Personal Hearing. The Committee noted that the matter has already been referred to DHI on 17.09.2019. Hence, the Committee decided to wait for technical comments of DHI .

Case is deferred.

32 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/8/80- Party Name: APAR Meet No/Date:12/80- Status:<br>ALC2/2019 INDUSTRIES LIMITED ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:0310830379 Deferred<br>:01/80/050/00123/AM20/ :03/94/040/00303/AM20/ 17.07.2019<br>114<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Mumbai and in this regard a letter was<br>sent to the firm & RA, Mumbai on 23.08.2019. Therefore, the Committee decided to remind RA,<br>Mumbai & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:12/8/80- Party Name: ZOBELE INDIA Meet No/Date:12/80- Status:
ALC2/2019 PRIVATE LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00124/AM20/ RLA File<br>:03/95/040/00352/AM20/ Lic.No/Date:0310830415<br>18.07.2019 Deferred

115 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 23.08.2019. Therefore, the Committee decided to remind RA, Mumbai & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/8/80- Party Name: HORIZON Meet No/Date:12/80- Status:<br>ALC2/2019 CHUTES PVT LTD ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:3110067480 Deferred<br>:01/80/050/00125/AM20/ :31/83/040/00064/AM20/ 18.07.2019<br>116 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Pune and in this regard a letter was sent<br>to the firm & RA, Pune on 23.08.2019. Therefore, the Committee decided to remind RA, Pune &<br>the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/10/80- Party Name: HANNING Meet No/Date:12/80- Status:<br>ALC2/2019 MOTORS INDIA P LTD ALC2/2019<br>09.10.2019<br>HQ File RLA File Lic.No/Date:3410045343 Deferred<br>:01/80/050/00139/AM20/ :34/24/040/00138/AM20/ 06.08.2019<br>117<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee<br>decided to request from RA, Vadodara and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

33 | P a g e

Case No.:2/10/80- Party Name: DOOWON Meet No/Date:12/80- Status:
ALC2/2019 AUTOMOTIVE SYSTEMS ALC2/2019
INDIA PRIVATE LIMITED 09.10.2019
HQ File<br>:01/80/050/00140/AM20/ RLA File<br>:04/24/040/00079/AM20/ Lic.No/Date:0410165942<br>07.08.2019 Deferred

118 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Chennai & the firm. Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

119

Case No.:3/10/80- Party Name: CHASYS Meet No/Date:12/80- Status:
ALC2/2019 AUTOMOTIVE ALC2/2019
COMPONENTS PVT. LTD. 09.10.2019
HQ File<br>:01/80/050/00141/AM20/ RLA File<br>:31/83/040/00063/AM20/ Lic.No/Date:3110067494<br>07.08.2019 Approved

Decision: The Committee considered the case as per the agenda and decided to ratify the norms on repeat basis as approved for AA No. 3110067031 dated 17.04.2018 in M. No. 10/80 dated 16.11.2018 on the recommendation of representative of DHI .

RA concerned may take further necessary action as per the decision of NC.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/10/80- Party Name: HANNING Meet No/Date:12/80- Status:<br>ALC2/2019 MOTORS INDIA P. LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:3410045361 Deferred<br>:01/80/050/00142/AM20/ :34/24/040/00145/AM20/ 08.08.2019<br>120 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee<br>decided to request from RA, Vadodara and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/10/80- Party Name: JKS Meet No/Date:12/80- Status:<br>ALC2/2019 ENGINEERING ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:3210079060 Deferred<br>:01/80/050/00143/AM20/ :32/24/040/00033/AM20/ 08.08.2019<br>121 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Coimbatore & the firm. Therefore, the Committee<br>decided to request from RA, Coimbatore and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

34 | P a g e

Case No.:6/10/80- Party Name: LM WIND Meet No/Date:12/80- Status:
ALC2/2019 POWER BLADES INDIA ALC2/2019
PVT. LTD 09.10.2019
HQ File<br>:01/80/050/00144/AM20/ RLA File<br>:34/24/040/00152/AM20/ Lic.No/Date:3410045365<br>09.08.2019 Deferred

122 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

Case No.:7/10/80- Party Name: MAINI Meet No/Date:12/80- Status:
ALC2/2019 PRECISION PRODUCTS ALC2/2019
LIMITED 09.10.2019
HQ File<br>:01/80/050/00145/AM20/ RLA File<br>:07/24/040/00106/AM20/ Lic.No/Date:0710115278<br>13.08.2019 Deferred

123 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

Case No.:8/10/80- Party Name: SHAKTI Meet No/Date:12/80- Status:
ALC2/2019 PUMPS INDIA LIMITED ALC2/2019 & 09.10.2019
HQ File<br>:01/80/050/00146/AM20/ RLA File<br>:56/24/040/00012/AM20/ Lic.No/Date:5610005668<br>13.08.2019 Deferred

124 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 30.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 133] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/10/80-ALC2/2019 Party Name: PRECISION Meet No/Date:12/80- Status:<br>MACHINE AND AUTO ALC2/2019<br>COMPONENTS(P)LTD 09.10.2019<br>HQ File RLA File Lic.No/Date:0410165954 Approved<br>:01/80/050/00147/AM20/ :04/24/040/00084/AM20/ 14.08.2019<br>125<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per written<br>comments of Consultant (Tech-3) as under:<br>Sl. ITCHS Sl. ITCHS Recommended<br>Export item Import Item<br>No. Code No. Code Norms<br>----- End of picture text -----<br>

35 | P a g e

1 84819090 DYNAMIC<br>SEAT<br>ASSEMBLY,<br>60" GV825, 56<br>BOLT, GEN II<br>WITH<br>BELLOW<br>DESIGN<br>(Weight = 583<br>Kg/each) 1 73269099 SEAT RETAINER,<br>ROUGHFORGING, 60"<br>GV825, 56 BOLT, GEN II<br>WITH BELLOW DESIGN -<br>GRADE - SA 182 Gr F5 -<br>454.30 KGS Duty exemption<br>be allowed on<br>6534.34 kgs.<br>Duty exemption<br>be allowed on<br>5819.2 kgs.<br>Duty exemption<br>be allowed on<br>4413.44 kgs.<br>Duty exemption<br>be allowed on<br>7460.54 kgs
2 73269099 DYNAMIC SEAT,ROUGH<br>FORGING, 60" GV825, 56<br>BOLT, GEN II WITH<br>BELLOW DESIGN -<br>GRADE - SA 182 Gr F5 -<br>400.00 KGS
3 73269099 BELLOW SHIELD,<br>ROUGHFORGING, 60"<br>GV825, 56 BOLT, GEN II<br>WITH BELLOW DESIGN -<br>GRADE - SA 182 Gr F9 -<br>325.72 KGS
2 84819090 STATIC SEAT,<br>MACHINED,<br>60" GV810,<br>815, 820<br>(Weight =<br>391.50Kg/each) 4 73269099 STATIC SEAT, ROUGH<br>MACHINE,ROUGH<br>FORGED, 60" GV810, 815,<br>820 - GRADE - SA 182 Gr<br>F5 - 484.98 KGS
Note:<br>1. The weight of export product at Sl. No. 1 should be 538 Kg/each.<br>2. The weight of export product at Sl. No. 1 should be 391.50Kg/each.<br>3. The words “Rough before forging” may be added in the description of the import items.<br>RA concerned maytake further necessaryaction asper the decision of NC.

Note:

  1. The weight of export product at Sl. No. 1 should be 538 Kg/each.

  2. The weight of export product at Sl. No. 1 should be 391.50Kg/each.

  3. The words “Rough before forging” may be added in the description of the import items.

RA concerned may take further necessary action as per the decision of NC.

==> picture [476 x 129] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/10/80- Party Name: SHAKTI Meet No/Date:12/80- Status:<br>ALC2/2019 PUMPS INDIA LIMITED ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:5610005671 Deferred<br>:01/80/050/00148/AM20/ :56/24/040/00013/AM20/ 19.08.2019<br>126<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 30.09.2019 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:11/10/80- Party Name: AVLIGHT Meet No/Date:12/80- Status:
ALC2/2019 AUTOMOTIVES PVT. LTD. ALC2/2019 & 09.10.2019
HQ File<br>:01/80/050/00149/AM20/ RLA File<br>:05/23/040/00164/AM20/ Lic.No/Date:0510411553<br>20.08.2019 Deferred

127 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

36 | P a g e

Case No.:12/10/80- Party Name: KINECO Meet No/Date:12/80- Status:
ALC2/2019 KAMAN COMPOSITES - ALC2/2019
INDIA PVT LTD 09.10.2019
HQ File<br>:01/80/050/00150/AM20/ RLA File<br>:03/94/040/00329/AM20/ Lic.No/Date:0310831081<br>20.08.2019 Deferred

128 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

129

Case No.:13/10/80- Party Name: CAPCO Meet No/Date:12/80- Status:
ALC2/2019 WATER SOLUTIONS ALC2/2019
PRIVATE LIMITED 09.10.2019
HQ File<br>:01/80/050/00151/AM20/ RLA File<br>:03/94/040/00273/AM20/ Lic.No/Date:0310831168<br>22.08.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 11.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:14/10/80- Party Name: PENGUIN Meet No/Date:12/80- Status:
ALC2/2019 PETROLEUM SERVICES ALC2/2019
PVT. LTD. 09.10.2019
HQ File<br>:01/80/050/00152/AM20/ RLA File<br>:03/95/040/00505/AM20/ Lic.No/Date:0310831190<br>23.08.2019 Deferred

130 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/10/80- Party Name: LM WIND POWER Meet No/Date:12/80- Status:<br>ALC2/2019 BLADES INDIA PVT. LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:3410045391 Deferred<br>:01/80/050/00153/AM20/ :34/24/040/00164/AM20/ 23.08.2019<br>131 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee<br>decided to request from RA, Vadodara and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

37 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:16/10/80- Party Name: LARSEN & Meet No/Date:12/80- Status:<br>ALC2/2019 TOUBRO LIMITED ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0310831221 Deferred<br>:01/80/050/00154/AM20/ :03/95/040/00393/AM20/ 26.08.2019<br>132 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee<br>decided to request from RA, Mumbai and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:17/10/80- Party Name: MAGNETI Meet No/Date:12/80- Status:
ALC2/2019 MARELLI TALBROS CHASSIS ALC2/2019
SYSTEMS PRIVATE LI 09.10.2019
HQ File<br>:01/80/050/00155/AM20/ RLA File<br>:05/24/040/00304/AM20/ Lic.No/Date:0510411630<br>26.08.2019 Deferred

133 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

Case No.:18/10/80- Party Name: DECON INDIA Meet No/Date:12/80- Status:
ALC2/2019 PLASTICS PVT LTD ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00156/AM20/ RLA File<br>:31/83/040/00079/AM20/ Lic.No/Date:3110067515<br>26.08.2019 Deferred

134 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm. Therefore, the Committee decided to request from RA, Pune and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/10/80- Party Name: DILIGENT Meet No/Date:12/80- Status:<br>ALC2/2019 SCM SOLUTIONS ALC2/2019<br>PRIVATE LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0910067939 Deferred<br>:01/80/050/00157/AM20/ :09/24/040/00272/AM20/ 27.08.2019<br>135<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 18.09.2019 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

38 | P a g e

Case No.:20/10/80- Party Name: OSWAL Meet No/Date:12/80- Status:
ALC2/2019 PUMPS LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00158/AM20/ RLA File<br>:33/24/040/00017/AM20/ Lic.No/Date:3310030578<br>27.08.2019 Deferred

136 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Panipat & the firm. Therefore, the Committee decided to request from RA, Panipat and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/10/80- Party Name: AUTO TECH Meet No/Date:12/80- Status:<br>ALC2/2019 INDUSTRIES (INDIA) PVT. LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0410166015 Deferred<br>:01/80/050/00159/AM20/ :04/24/040/00091/AM20/ 28.08.2019<br>137 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Chennai and in this regard a letter was<br>sent to the firm & RA, Chennai on 23.09.2019. However, no information has been received so far.<br>Hence, the Committee decided to wait for complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:22/10/80- Party Name: ISGEC HEAVY Meet No/Date:12/80- Status:
ALC2/2019 ENGINEERING LIMITED ALC2/2019
09.10.2019
HQ File<br>:01/80/050/00160/AM20/ RLA File<br>:05/23/040/00208/AM20/ Lic.No/Date:0510411660<br>28.08.2019 Deferred

138 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/12/80- Party Name: AYYAPPA Meet No/Date:12/80- Status:<br>ALC2/2019 CNC PVT LTD ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0710115448 Deferred<br>:01/80/050/00173/AM20/ :07/24/040/00135/AM20/ 18.09.2019<br>139 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee<br>decided to request from RA, Bangalore and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

39 | P a g e

Case No.:2/12/80- Party Name: HEURTEY Meet No/Date:12/80- Status:
ALC2/2019 PETROCHEM INDIA ALC2/2019
PRIVATE LIMITED 09.10.2019
HQ File<br>:01/80/050/00174/AM20/ RLA File<br>:34/24/040/00185/AM20/ Lic.No/Date:3410045459<br>19.09.2019 Deferred

140 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/12/80- Party Name: FINE PAC Meet No/Date:12/80- Status:<br>ALC2/2019 STRUCTURES PVT. LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:3110067537 Deferred<br>:01/80/050/00175/AM20/ :31/83/040/00088/AM20/ 20.09.2019<br>141 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Pune & the firm. Therefore, the Committee decided<br>to request from RA, Pune and the firm to furnish the hard copy of application for examination of the<br>case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:4/12/80- Party Name: FREUDENBERG Meet No/Date:12/80- Status:
ALC2/2019 FILTRATION TECHNOLOGIES ALC2/2019
INDIA PVT. LTD. 09.10.2019
HQ File<br>:01/80/050/00176/AM20/ RLA File<br>:31/83/040/00008/AM20/ Lic.No/Date:3110067543<br>24.09.2019 Deferred

142 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm. Therefore, the Committee decided to request from RA, Pune and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/12/80- Party Name: GODREJ & Meet No/Date:12/80- Status:<br>ALC2/2019 BOYCE MFG. CO. LTD., ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0310831805 Deferred<br>:01/80/050/00177/AM20/ :03/94/040/00480/AM20/ 25.09.2019<br>143 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee<br>decided to request from RA, Mumbai and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

40 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/12/80- Party Name: VICTORA Meet No/Date:12/80- Status:<br>ALC2/2019 AUTO PVT. LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0510411950 Deferred<br>:01/80/050/00178/AM20/ :05/24/040/00338/AM20/ 25.09.2019<br>144 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee<br>decided to request from RA, New Delhi and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/12/80- Party Name: VICTORA Meet No/Date:12/80- Status:<br>ALC2/2019 AUTO PVT. LTD ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0510411951 Deferred<br>:01/80/050/00179/AM20/ :05/24/040/00340/AM20/ 25.09.2019<br>145 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee<br>decided to request from RA, New Delhi and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/12/80- Party Name: AZAD Meet No/Date:12/80- Status:<br>ALC2/2019 ENGINEERING PVT. LTD. ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0910068046 Deferred<br>:01/80/050/00180/AM20/ :09/24/040/00336/AM20/ 27.09.2019<br>146 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee<br>decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/12/80- Party Name: BANGALORE Meet No/Date:12/80- Status:<br>ALC2/2019 BIOTECH LABS PVT LTD., ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0710115485 Deferred<br>:01/80/050/00181/AM20/ :07/24/040/00144/AM20/ 27.09.2019<br>147 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee<br>decided to request from RA, Bangalore and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

41 | P a g e

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/12/80- Party Name: AUTO TECH Meet No/Date:12/80- Status:<br>ALC2/2019 INDUSTRIES INDIA PVT LTD ALC2/2019 & 09.10.2019<br>HQ File RLA File Lic.No/Date:0410166124 Deferred<br>:01/80/050/00182/AM20/ :04/24/040/00105/AM20/ 01.10.2019<br>148 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Chennai & the firm. Therefore, the Committee<br>decided to request from RA, Chennai and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:11/12/80- Party Name: AZAD Meet No/Date:12/80- Status:
ALC2/2019 ENGINEERING PRIVATE ALC2/2019
LIMITED 09.10.2019
HQ File<br>:01/80/050/00183/AM20/ RLA File<br>:09/24/040/00345/AM20/ Lic.No/Date:0910068052<br>01.10.2019 Deferred

149 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

Case No.:12/12/80- Party Name: AZAD Meet No/Date:12/80- Status:
ALC2/2019 ENGINEERING PRIVATE ALC2/2019
LIMITED 09.10.2019
HQ File<br>:01/80/050/00184/AM20/ RLA File<br>:09/24/040/00344/AM20/ Lic.No/Date:0910068053<br>01.10.2019 Deferred

150 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/12/80- Party Name: AZAD Meet No/Date:12/80- Status:<br>ALC2/2019 ENGINEERING PRIVATE ALC2/2019<br>LIMITED 09.10.2019<br>HQ File RLA File Lic.No/Date:0910068054 Deferred<br>:01/80/050/00185/AM20/ :09/24/040/00346/AM20/ 01.10.2019<br>151<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee<br>decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

42 | P a g e

Manual Cases

Sl. No. 186

Sl. No. 186
Case No.24/6/80-ALC2/2016 Status:
M/s Autocomp Corporation Panse Private<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
Limited<br>Lic. No.: 3110066115 dated 12.04.2016
HQ. No.: 01/80/050/00183/AM17<br>**Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 31/83/040/00002/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
9/80-ALC2/2018dated 17.10.2018 on the recommendation of representative ofDHIwith 5% wastage or as
applied for whichever is less. However, the firm vide letter dated 18.06.2019 requested for re-fixation of ad-hoc
norms.
The Committee reconsidered the case and noted that the firm appeared for Personal Hearing. The Committee
noted that the matter has already been referred toDHIon 07.10.2019. Hence, the Committee decided to wait for
technical comments ofDHI.
Case is deferred.

Sl. No. 187

Case No.6/26/80-ALC2/2016<br>Status:
M/s Autocomp Corporation Panse Private<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
Limited<br>Lic. No.: 3110066585 Date: 10.02.2017
HQ. No.: 01/80/050/00630/AM17<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 31/83/040/00152/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
06/80 dated 11.07.2018 due to non submission of reply of deficiency letter dated 15.09.2017 followed by reminder
dated 24.04.2018. However, the firm furnished the reply dated 11.02.2019 & 18.06.2019 with a request to fix the
ad-hoc norms.
The Committee reconsidered the case and noted that the firm appeared for Personal Hearing. The Committee
noted that the matter has already been referred toDHIon 07.10.2019. Hence, the Committee decided to wait for
technical comments ofDHI.
Case is deferred.

Sl. No. 188

Case No.61/19/80-ALC2/2017 Status:
M/s ULTRA ENGINEERS<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
Lic. No.: 3110066956 Date: 05.01.2018
HQ. No.: 01/80/050/00342/AM18<br>**Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 31/83/040/00135/AM18
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
08/80 dated 14.09.2018 as per written comments ofDHIvide U. O. No.: TSW(B)/4U/3/6956/2018 dated
14.09.2018. However, The firm vide letter dated 17.06.2019 requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm appeared for Personal Hearing. The Committee
noted that the matter has already been referred toDHIon 07.10.2019. Hence, the Committee decided to wait for
technical comments ofDHI.
Case is deferred.

43 | P a g e

Sl. No. 189

Sl. No. 189
Case No.16/16/80-ALC2/2017 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 3110066886 Date: 05.10.2017 M/s Autocomp Corporation Panse Private<br>Limited
HQ. No.: 01/80/050/00279/AM18 **Subject:**Request for re-fixation of ad-hoc Approved
RLA No.: 31/83/040/00083/AM18 norms
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
09/80 dated 17.10.2018 with 5% wastage on the recommendation of representative ofDHI. However, the firm vide
letter dated 18.06.2019 requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm appeared for Personal Hearing. The Committee
noted that the matter has already been referred toDHIon 07.10.2019. Hence, the Committee decided to wait for
technical comments ofDHI.
Case is deferred.

Sl. No. 190

Case No.16/5/80-ALC2/2018<br>Status:
M/s ULTRA ENGINEERS<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
Lic. No. /date: 3110067046 dated 11.05.2018
HQ. No.: 01/80/050/00065/AM19<br>**Subject:**Request for re-fixation of ad-hoc norms<br>Deferred
RLA No.: 31/83/040/00017/AM19
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
08/80 dated 14.09.2018 as per written comments ofDHIvide U. O. No.: 3/40/2018 dated 31.08.2018 on repeat
basis to AA No. 3110066956 dated 05.01.2018. However, the firm vide letter dated 17.06.2019 requested for re-
fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm appeared for Personal Hearing. The
Committee noted that the matter has already been referred toDHIon 07.10.2019. Hence, the Committee decided to
wait for technical comments ofDHI.
Case is deferred.

Sl. No. 191

Sl. No. 191
Case No. :8/9/80-ALC2/2017 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s. AUTOCOMP CORPORATION PANSE
Lic. No.: 3110066789 dt. 21.06.2017
HQ. No.: 01/80/50/186/AM18/DES-I **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 31/83/040/00044/AM18
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
18/80 dated 02.01.2018 due to non submission of reply of deficiency letter dated 07.09.2017 followed by final
reminder dated 15.12.2017.
The Committee reconsidered the case and noted that the firm appeared for Personal Hearing. The
Committee noted that the matter has already been referred toDHIon 07.10.2019. Hence, the Committee decided to
wait for technical comments ofDHI.
Case is deferred.

44 | P a g e

Sl. No. 192

==> picture [476 x 62] intentionally omitted <==

----- Start of picture text -----<br> Case No. : 66/5/80-ALC2/2018 Status:<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s. ULTRA ENGINEERS<br>Lic. No.: 3110067063 dt. 29.05.2018<br>HQ. No.: 01/80/50/115/AM19/DES-I Subject: Request for reviewing of ad-hoc norms Deferred<br>RLA No.: 31/83/040/00028/AM19<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 08/80 dated 14.09.2018 as per written comments of DHI vide U. O. No.: TSW(B)/4U/3/6956/2018 dated 27.07.2018. However, the firm vide letter dated 17.06.2019 requested for re-fixation of ad-hoc norms.

The Committee reconsidered the case and noted that the firm appeared for Personal Hearing. The Committee noted that the matter has already been referred to DHI on 07.10.2019. Hence, the Committee decided to wait for technical comments of DHI .

Case is deferred.

Sl. No. 193

Sl. No. 193
Case No. : 18/8/80-ALC2/2018 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s. ULTRA ENGINEERS
Lic. No.: 3110067111 dt. 12.07.2018
HQ. No.: 01/80/50/141/AM19/DES-I **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 31/83/040/00053/AM19
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
14/80 dated 20.02.2019 on the recommendation of representative ofDHI. However, the firm vide letter dated
17.06.2019 requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm appeared for Personal Hearing. The Committee
noted that the matter has already been referred toDHIon 07.10.2019. Hence, the Committee decided to wait for
technical comments ofDHI.
Case is deferred.

Sl. No. 194

==> picture [476 x 60] intentionally omitted <==

----- Start of picture text -----<br> Case No. : 12/8/80-ALC2/2018 Status:<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s. ULTRA ENGINEERS<br>Lic. No.: 3110067088 dated 25.06.2018<br>HQ. No.: 01/80/50/135/AM19/DES-I Subject: Request for re-fixation of ad-hoc norms Deferred<br>RLA No.: 31/83/040/00043/AM19<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 14/80 dated 20.02.2019 on the recommendation of representative of DHI . However, the firm vide letter dated 17.06.2019 requested for re-fixation of ad-hoc norms.

The Committee reconsidered the case and noted that the firm appeared for Personal Hearing. The Committee noted that the matter has already been referred to DHI on 07.10.2019. Hence, the Committee decided to wait for technical comments of DHI .

Case is deferred.

45 | P a g e

Sl. No. 195

Sl. No. 195
Case No. :9/15/80-ALC2/2017 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019 GODREJ & BOYCE MFG. CO. LTD
Lic. No.: 0310815049 Dated 07.08.2017
HQ. No.: 01/80/050/00263/AM18 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 03/94/040/00379/AM18
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
03/80 dated 09.05.2018 on the recommendation ofDPIIT. However, the firm vide letter dated 05.10.2018
requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by
DPIITwas sent to the firm on 07.10.2019. However, no reply has been received yet. Hence, the Committee
decided to wait for the firm’s reply.
Case is deferred.

Sl. No. 196

Sl. No. 196
Case No. :66/3/80-ALC2/2015 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019 PYRO ELECTRIC INSTRUMENTS GOA PVT.
Lic. No.: 1710006020 Dated 08.01.2015 LTD.
HQ. No.: 01/80/050/00066/AM16 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 17/24/040/00178/AM15
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
12/80 dated 15.09.2015 as per comments given by DIPP I. D. Note No.: 12/103/2015-TSW/58 dated 15.09.2015.
However, the firm vide letter dated 08.05.2018 requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm’s representation was referred toDPIITon
09.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee
decided to wait for the comments.
Case is deferred.

Sl. No. 197

Sl. No. 197
Case No. :35/20/80-ALC2/2017 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 0310818442 Dated 11.01.2018 TINITA ENGINEERING PVT. LTD.
HQ. No.: 01/80/050/00399/AM18 **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 03/95/040/00851/AM18
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
05/80 dated 06.06.2019 due to non-submission of reply of deficiency letter dated 15.01.2019 followed by final
reminder 02.05.2019. However, the firm furnished the reply vide email dated 25.07.2019 with a request to fix the
ad-hoc norms.
The Committee reconsidered the case and noted that the firm’s representation was referred toMSMEon
09.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee
decided to wait for the comments.
Case is deferred.

46 | P a g e

Sl. No. 198

==> picture [476 x 62] intentionally omitted <==

----- Start of picture text -----<br> Case No. : 34/20/80-ALC2/2017 Status:<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>L&T-MHPS BOILERS PVT LTD<br>Lic. No.: 0310818379 Dated 10.01.2018<br>HQ. No.: 01/80/050/00398/AM18 Subject: Request for re-fixation of ad-hoc norms Deferred<br>RLA No.: 03/95/040/00677/AM18<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 20/80 dated 21.03.2018 on the recommendation of DHI. However, the firm vide letter dated 18.01.2019 requested for re-fixation of ad-hoc norms.

The Committee reconsidered the case and noted that the firm had not provided the justification for enhancement of wastage with its representation. Therefore, the Committee decided to call the firm for personal hearing to explain the case before Norms Committee in the forthcoming NC meeting.

Case is deferred.

Sl. No. 199

Case No. :1/16/80-ALC2/2010 Status:
BHARAT HEAVY ELECTRICALS<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
LIMITED<br>Lic. No.: 0910042665 Dated 08.07.2010
HQ. No.: 01/80/050/00242/AM11<br>**Subject:**Request for re-fixation of ad-hoc norms Rejected
RLA No.: 09/24/040/00114/AM11
**Decision:**The Committee noted that the case was already taken up in Meeting No. 13/13 dated 11.09.2012 after
firm’s representation and it was ratified as per DHI’s comment.
The Committee again re-considered the case and as per the advice of technical members present in the
meeting decided to reject the case, after findingno merit.
RA concerned maytake consequential action accordingly.

Sl. No. 200

Sl. No. 200
Case No. :21/20/80-ALC2/2015 Status:
M/s SHAKTI PUMPS (INDIA) LTD<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 5610004687 Date: 18.09.2015
HQ. No.: 01/80/050/00398/AM16<br>**Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 56/24/040/00027/AM16
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in M. No.9/80-
ALC2/2016 dated02.08.2016 as per the written comments of DIPP vide ID No.12/64/2016/TSW/38 dated
02.08.2016. However, the firm has requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm’s representation was referred toDPIITon
07.10.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee
decided to wait for the comments.
Case is deferred.

47 | P a g e

Sl. No. 201

Sl. No. 201
Case No. :6/13/80-ALC2/2017 Status:
M/s BOMBARDIER TRANSPORTATION<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
INDIA PRIVATE LTD.<br>Lic. No.: 3410042477 Date: 30.08.2016
HQ. No.: 01/80/050/00242/AM18<br>**Subject:**Request for re-fixation of ad-hoc norms<br>RLA No.: 34/21/040/00306/AM17 Deferred
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
16/80-ALC2/2017 dated 14.11.2017as per written comments of DHI I.D No. TSWB 3/80/2017 dated 29.11.2017.
However, the firm has requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and decided to ask from the firm to furnish following information as
per advice of representative ofDHI:
1. To provide justification for the amendment requested.
Case is deferred.

Sl. No. 202

Case No. : 31/3/80-ALC2/2017 Status: M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s THE ANUP ENGINEERING LIMITED Lic. No.: 0810138347 Date: 21.07.2016 HQ. No.: 01/80/050/00031/AM18 Subject: Request for re-fixation of ad-hoc norms Approved RLA No.: 08/24/040/00139/AM17

Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 9/80-ALC2/2018 dated 17.10.2018 as per the recommendation of DHI representative.

However, the firm has requested for re-fixation of ad-hoc norms in case of items at Sl. No. 7 & 8. The Committee reconsidered the case and decided to ratify the norms on the recommendation of the representative of DHI as under:

  1. Import items at Sl. No. 7 & 8 may be allowed as applied without value restrictions .

Note: Decision for rest of the import items will remain unchanged as approved in Meeting No. 9/80ALC2/2018 dated 17.10.2018.

RA concerned may take further necessary action as per the decision of NC.

Sl. No. 203

Case No. :20/12/80-ALC2/2017<br> Status:
M/s L & T-MHPS TURBINE GENERATORS<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
PRIVATE LIMITED<br>Lic. No.: 0310814524 Date: 10.07.2017
HQ. No.: 01/80/050/00234/AM18<br>**Subject:**Request for re-fixation of ad-hoc norms<br>Approved
RLA No.: 03/95/040/00122/AM18
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
9/80-ALC2/2018 dated 17.10.2018as per the written comments furnished by DHI vide U. O. No.: 03/16/2018-
TSWB dated 8.10.2018. However, the firm has requested to attach their letter as per the comments of DHI.
The Committee noted that erroneously the firm’s letter was not attached in the Minutes of Meeting6/80-
**ALC2/2018 dated 11.07.2018.**Therefore, the Committee decided to attach the firm’s reply dated 08.05.2018,
keeping the earlier ratified norms as it is. (Copy enclosed).
RA concerned maytake further necessaryaction asper the decision of NC.

48 | P a g e

Sl. No. 204

Sl. No. 204
Case No. :64/11/80-ALC2/2018 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019
M/s IND-SPHINX PRECISION LTD
Lic. No.: 2210015975 Date: 13.09.2018
HQ. No.: 01/80/050/00255/AM19 **Subject:**Request for re-fixation of ad-hoc norms<br>Deferred
RLA No.: 22/24/040/00048/AM19
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
13/80-ALC2/2018 dated 22.01.2019on repeat basis as approved for AA No. 2210015101 dated 10.10.2014 on the
recommendation of the representative of DHI. However, the firm has requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm’s representation was referred toDHIon
07.10.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee
decided to wait for the comments.
Case is deferred.

Sl. No. 205

Sl. No. 205
Case No. :52/25/80-ALC2/2016 Status:
M/s EXCELLENT HI-CARE PRIVATE<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
LIMITED<br>Lic. No.: 0410162359 Date: 07.10.2016
HQ. No.: 01/80/050/00621/AM17<br>**Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 04/24/040/00105/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
14/80-ALC2/2017 dated 10.10.2017 due to non submission of reply ofdeficiency letter as raised by DEIT vide
letter No. 17 (20)/2017-IPHW dated 15.05.2017, 04.07.2017. However, the firm has requested for fixation of ad-
hoc norms.
The Committee reconsidered the case and noted that the firm’s representation has been referred toMeitY
on 09.10.2019 for examination of the case. Therefore, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 206

Sl. No. 206
Case No. :16/16/80-ALC2/2016 Status:
M/s VEE KAY VIKRAM & CO LLP<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 0810136711 Date: 11.12.2015
HQ. No.: 01/80/050/00391/AM17<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 08/24/040/00308/AM16
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
17/80-ALC2/2017dated 19.12.2017 on the ground that the unit of measurement ofexport & import items are
different i.e. export items are in number and import items are in Kg. However, the firm has requested for fixation of
ad-hoc norms.
The Committee considered the case and noted that the firm’s representation has been referred toMSMEon
09.10.2019 for examination of the case. Therefore, the Committee decided to wait for the comments.
Case is deferred.

49 | P a g e

Sl. No. 207

Case No. :30/3/80-ALC2/2014<br> Status:
M/s VIJAY TANKS & VESSELS LIMITED<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 3410039435 Date: 06.03.2014
HQ. No.: 01/80/050/00041/AM15<br>**Subject:**Request for re-fixation of ad-hoc norms<br>Deferred
RLA No.: 34/24/040/00286/AM14
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
21/80-ALC2/2014 dated 06.01.2015as per written comments of DIPP vide Note No. 12/1/2015-TSW/22 dated
06.01.2015. However, the firm has requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm’s representation has been referred to
DPIITon 09.10.2019 for examination of the case. Therefore, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 208

==> picture [476 x 62] intentionally omitted <==

----- Start of picture text -----<br> Case No. : 17/19/80-ALC2/2014 Status:<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>M/s IND-SPHINX PRECISION LTD.,<br>Lic. No.: 2210015101 Date: 10.10.2014<br>HQ. No.: 01/80/050/00451/AM15 Subject: Request for re-fixation of ad-hoc norms Deferred<br>RLA No.: 22/24/040/00056/AM15<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 22/80-ALC2/2015 dated 02.02.2016 as per written comments of MSME vide ID Note No. 30 (199)/15-ME dated 30.12.2015.

However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted that the case is in the process of referring to MSME as per its decision in Meeting No. 10/80 dated 11.09.2019. Therefore, the Committee decided to take up the case in next bi-monthly meeting.

Case is deferred.

Sl. No. 209

Sl. No. 209
Case No. :21/20/80-ALC2/2015 Status:
M/s SHAKTI PUMPS (INDIA) LTD.<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 2210015101 Date: 10.10.2014
HQ. No.: 01/80/050/00398/AM16<br>**Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 56/24/040/00027/AM16
**Decision:**The Committee considered the case as per the agenda noted that the case was ratified in Meeting No.
9/80-ALC2/2016 dated 02.08.2016as per written comments of DIPP vide ID No.12/64/2016/TSW/38 dated
02.08.2016.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case
and noted that the firm’s representation was referred toDPIITon 07.10.2019 for examination of the case.
However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

50 | P a g e

Sl. No. 210

Sl. No. 210
Case No. :8/5/80-ALC2/2017 Status:
M/s OAM SAAI INTERNATIONAL INC.<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 0510402055 Date: 24.03.2017
HQ. No.: 01/80/050/00069/AM18<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 05/24/040/00649/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
17/80-ALC2/2017 dated 19.12.2017on the ground that the export and import item are same.
However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and
noted that the firm’s representation has been referred toMSMEon 09.10.2019 for examination of the case.
Therefore, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 211

Sl. No. 211
Case No. :25/33/80-ALC2/2010 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 0310596998 Date: 14.10.2010 M/s R.D.ENGINEERS (INDIA) PVT. LTD.
HQ. No.: 01/80/050/00581/AM11 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 03/95/040/00557/AM11
**Decision:**The Committee considered the case as per the agenda noted that the norms were ratified the norms by
NC in its2/80-ALC2/2011 dated19.04.2011as per written comments of DIPP received vide their U.O. Note No.
dated 19.04.2011.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case
and noted that the firm’s representation has been referred toMSMEon 09.10.2019 for examination of the case.
Therefore, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 212

Sl. No. 212
Case No. :7/2/80-ALC2/2014 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 0310771504 Date: 24.02.2014 M/s TRANSASIA BIO MEDICALS LTD.
HQ. No.: 01/80/050/00007/AM15 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 03/95/040/00849/AM14
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
20/80-ALC2/2015dated05.01.2016 as per the written comments of DEIT vide U. O. No.: W-27/17/2014-IPHW
dated 08.12.2015.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case
and noted that the firm’s representation has been referred toMeitYon 09.10.2019 for examination of the case.
Therefore, the Committee decided to wait for the comments.
Case is deferred.

51 | P a g e

Sl. No. 213

Case No. :19/23/80-ALC2/2015<br> Status:
M/s STERLITE TECHNOLOGIES LTD.<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 0310799243 Date: 06.10.2015
HQ. No.: 01/80/050/00432/AM16<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 03/95/040/00427/AM16
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
15/80-ALC2/2016dated 25.10.2016due to non submission reply of deficiency letter dated 21.06.2016 (raised by
DEIT).
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case
and noted that the firm’s representation was referred toMeitYon 07.10.2019 for examination of the case.
However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 214

Sl. No. 214 Sl. No. 214
Case No. 56/19/80-ALC2/2017<br>Case No. 18/3/80-ALC2/2018<br>Case No. 50/11/80-ALC2/2018<br>
M/s AUTO COMP INDIA PVT. LTD.<br>Status:<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No. /date: 3110066941 dated 20.12.2017<br>Lic. No. /date: 3110067004 dated 15.03.2018<br>Lic. No. /date: 3110067175 dated 12.09.2018
HQ. No. 01/80/050/00337/AM18<br>HQ. No. 01/80/050/00018/AM19<br>HQ. No .01/80/050/00241/AM19<br>Subject:Request for re-fixation of ad-hoc norms in<br>respect of 3 AA issued toM/s AUTO COMP<br>Deferred
**INDIA PVT. LTD.,**under Para 4.7 of HBP (Vol.-<br>I) – reg.<br>RLA No. 31/83/040/00109/AM18<br>RLA No. 31/83/040/00166/AM18<br>RLA No.31/83/040/00090/AM19
Decision:<br>i.) In respect of Lic. No. /date: 3110066941 Date: 20.12.2017 Rejected<br>The Committee considered the case as per the agenda noted that the norms were rejected the<br>norms by NC in its4/80-ALC2/2018 dated 23.05.2018, 3/80-ALC2/2018 dated<br>09.05.2018 andas import item description is not clear Advance authorizations allowed only<br>forspecificimport item.
ii.) In respect of Lic. No. /date: 3110067004 dated 15.03.2018<br> Approved<br> <br>Committee considered the case as per agenda in its meeting No.3/80-ALC2/2018 dated<br>09.05.2018and deliberated on the matter in the presence of technical representatives of DHI,<br>DIPP andMSME.It is decidedtoratifythenorms
iii.)<br>In respect of Lic. No. /date: 3110067175 dated 12.09.2018 Approved<br>Committee considered the case as per agenda in its meeting No.3/80-ALC2/2018 dated<br>09.05.2018and ratified the norms as per the written comments of DHI vide their U. No. No.<br>DES-I/AIPL/HIC-1-2018-HEI dated 20.12.2018<br>However, the firm has requested for re-fixation of ad-hoc norms in respect of above<br>mentioned 3 advance authorizations. The Committee considered the case and noted that firm’s<br>representation has been forwarded toDHIfor examination /comments of the case on 09.10.2019.<br>Therefore, the Committee decided to wait for the technical comments.<br>Case is deferred.

52 | P a g e

Sl. No. 215

Case No. : 44/19/80-ALC2/2017 Status: M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s LARSEN & TOUBRO LIMITED. Lic. No.: 0310816114 Date: 04.10.2017 HQ. No.: 01/80/050/00325/AM18 Subject: Request for re-fixation of ad-hoc norms Deferred RLA No.: 03/95/040/00365/AM18

Decision: The committee considered the case as per agenda and noted that the case was approved in Meeting No. 4/80-ALC2/2018 dated 23.05.2018 on the recommendation of the technical representatives of DHI, DIPP and MSME.

However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case and noted that the firm’s representation was referred to DHI on 07.10.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Sl. No. 216

Sl. No. 216
Case No.13/5/80-ALC2/2017<br>Case No.29/19/80-ALC2/2016<br>CaseNo. 8/14/80-ALC2/2018
M/s SENIOR INDIA PRIVATE<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019 Status:
LIMITED<br>Adv. Lic. No. 0510402202 dated 12.04.2017<br>Adv. Lic. No. 0510399661 dated 08.09.2016<br>Adv.Lic.No. 0510409022dated20.12.2018
HQ. No. 01/80/050/00325/AM18<br>HQ. No. 01/80/050/00424/AM17<br>HQ. No. 01/80/050/00324/AM19<br>Subject:Request for re-fixation of ad-hoc<br>norms in respect of 3 AA issued toM/s<br>SENIOR INDIA PRIVATE LIMITED, Deferred
under Para 4.7 of HBP (Vol.-I) – reg.<br>RLA No. 03/95/040/00365/AM18<br>RLA No. 05/24/040/00288/AM17<br>RLA No. 05/24/040/00435/AM19
**Decision:**The Committee considered the case as per the agenda noted that the above three cases were
approved by NC in Meeting<br>No. 8/80 dated 18.07.2017, Meeting No. 22/80 dated
31.01.2017 and Meeting No. 06/80 dated 03.07.2019 as per the written comments of DIPP letter no.
12/54/2017-TSW/105 dated 18.7.2017, written comments of DIPP vide UO No. 12/6/2017-TSW/56
dated 31.01.2017 and written comments of DPIIT vide U.O. No.: P-47011/416/2018-TSW dated
03.07.2019 respectively.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered
the case and noted that the firm’s representations have been referred toDPIITon 09.10.2019 for
examination of the cases. Therefore, the Committee decided to wait for the comments.
Caseis deferred.

53 | P a g e

Sl. No. 217

Sl. No. 217
CaseNo. : 24/17/80-ALC2/2014 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s GEA BGR ENERGY SYSTEM
Lic.No.: 0410159425Date:16.09.2014 INDIA LIMITED.
HQ. No.: 01/80/050/00396/AM15 **Subject:**Request for fixation of ad-hoc<br>Deferred
RLA No.: 04/24/040/00154/AM15 norms
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in
Meeting No.5/80-ALC2/2016 dated 08.06.2015 due to non submission reply of deficiency letter dated
14.11.2014 (raised by DHI).
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered
the case and noted that the case is in the process of referring toDHIas per its decision in Meeting No.
10/80 dated 11.09.2019. Therefore, the Committee decided to take up the case in next bi-monthly
meeting.
Case is deferred.

Sl. No. 218

Sl. No. 218
Case No. :12/7/80-ALC2/2016 Status:
M/s HONDA TRADING CORPORATION<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
INDIA PVT. LTD.<br>Lic. No.: 0510398531 Date: 17.05.2016
HQ. No.: 01/80/050/00233/AM17<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 05/23/040/00053/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
11/80 dated 19.08.2017 due to non submission reply of deficiency letter dated 26.04.2017 ( raised byDHI).
However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and
noted that the firm’s representation was wrongly referred toMeitYon 07.10.2019 for examination of the case.
Therefore, the Committee decided to forward the firm’s representation toDHIfor examination of the case.
Case is deferred.

Sl. No. 219

Case No. :4/20/80-ALC2/2017<br> Status:
M/s ISGEC HEAVY ENGINEERING<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
LIMITED<br>Lic. No.: 0510405282 Date: 10.01.2018
HQ. No.: 01/80/050/00368/AM18<br>**Subject:**Request for re-fixation of ad-hoc norms<br>Deferred
RLA No.: 05/23/040/00375/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No. 11/80 dated 06.12.2018 as per written comments of DIPP vide U. O. No. P-47011/354/2018-TSW dated
15.11.2018.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case
and noted that the firm’s representation was referred toDPIITon 07.10.2019 for examination of the case.
However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

54 | P a g e

Sl. No. 220

Sl. No. 220
Case No. :37/19/80 ALC2/2017 Status:
M/s GODREJ & BOYCE MFG. CO. LTD.<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 0310815644 dated 08.09.2017
HQ. No.: 01/80/050/00318/AM18<br>**Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.:03/94/040/00432/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No.4/80-ALC2/2018 dated 23.05.2018on the recommendation of technical representatives of DHI, DIPP and
MSME.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case
and noted that the firm’s representation was referred toDHIon 07.10.2019 for examination of the case. However,
no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 221

Sl. No. 221
Case No. :17/31/80-ALC2/2010 Status:
M/s BHARAT HEAVY ELECTRICALS<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
LIMITED<br>Lic. No.: 0910043002 Date: 06.08.2010
HQ. No.: 01/80/050/00495/AM11<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 09/24/040/00169/AM11
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 40/80 dated 22.03.2011 due to non submission reply of deficiency letter as raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that the case is in the process of referring toDHIas per its decision in Meeting No. 10/80 dated 11.09.2019.
Therefore, the Committee decided to take up the case in next bi-monthly meeting.
Case is deferred.

Sl. No. 222

Sl. No. 222
Case No. :17/33/80-ALC2/2010 Status:
M/s BHARAT HEAVY ELECTRICALS<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
LIMITED<br>Lic. No.: 0910043468 dated 09.09.2010
HQ. No.: 01/80/050/00573/AM11<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 09/24/040/00223/AM11
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 2/80 dated 19.04.2011 due to non submission reply of deficiency letter as raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that the case is in the process of referring toDHIas per its decision in Meeting No. 10/80 dated 11.09.2019.
Therefore, the Committee decided to take up the case in next bi-monthly meeting.
Case is deferred.

55 | P a g e

Sl. No. 223

Sl. No. 223
Case No. :23/9/80ALC2/2012 Status:
M/s BHARAT HEAVY ELECTRICALS<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
LIMITED<br>Lic. No.: 0910053032 dated 13.06.2012
HQ. No.: 01/80/050/00203/AM13<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 09/24/040/00136/AM13
**Decision:**The Committee considered the case as per the agenda and noted that the case was withdrawn from the
meeting owing to non receipt of comments from EPCG Division in Meeting No. 23/80 dated 16.02.2016.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that the case is in the process of referring toDHIas per its decision in Meeting No. 10/80 dated 11.09.2019.
Therefore, the Committee decided to take up the case in next bi-monthly meeting.
Case is deferred.

Sl. No. 224

Sl. No. 224
Case No. :30/33/80-ALC2/2009 Status:
M/s BHARAT HEAVY ELECTRICALS<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
LIMITED<br>Lic. No.: 0910039076 dated 27.08.2009
HQ. No.: 01/80/050/00496/AM10<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.:09/24/040/00184/AM10
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 48/80 dated 02.03.2010 due to non submission reply of the deficiency later as raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and
noted that the firm’s representation was referred toDHIon 07.10.2019 for examination of the case. However, no
comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 225

Sl. No. 225
Case No. :23/17/80-ALC2/2014 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s GEA BGR ENERGY SYSTEM INDIA
Lic. No.: 0410159424 dated 16.09.2014 LIMITED
HQ. No.: 01/80/050/00395/AM15 **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 04/24/040/00155/AM15
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 05/80 dated 08.06.2015 due to non submission reply of deficiency letter dated 14.11.2014 (raised by DHI).
However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and
decided to forward the firm’s representation toDHIfor examination of the case.
Case is deferred.

56 | P a g e

Sl. No. 226

Case No.: 1/33/85-ALC3/2008<br> Status:
M/s BOVING FOURESS LIMITED<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 0710061697 dated 15.12.2008
HQ. No.: 01/85/050/00218/AM09<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 07/24/040/00524/AM09
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 2/80 dated 13.04.2010 due to non submission reply of deficiency letter as raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and
noted that the firm’s representation has been wrongly referred toMeitYon 09.10.2019 for examination of the case.
Therefore, the Committee decided to forward the firm’s representation toDHIfor examination of the case.
Case is deferred.

Sl. No. 227

Sl. No. 227
Case No.2/17/80-ALC2/2017 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>Lic. No.: 0910065045 Date: 15.05.2017 M/s VEM TECHNOLOGIES PVT. LTD.
HQ. No.: 01/80/050/00281/AM18 **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 09/24/040/00055/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 05/80 dated 06.06.2019 due to non submission reply of deficiency letter dated 14.01.2019 as raised by DPIIT.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case
and noted that the firm’s representation has been referred toDPIITon 09.10.2019 for examination of the case.
Therefore, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 228

==> picture [476 x 236] intentionally omitted <==

----- Start of picture text -----<br> Case No. 8/12/80-ALC2/2014 Status:<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019<br>M/s ANGIPLAST PRIVATE LIMITED<br>Lic. No. /date: 0810132579 dated 03.07.2014<br>HQ. No.: 01/80/050/00257/AM15 Subject: Request for fixation of ad-hoc norms Approved<br>RLA No.: 08/24/040/00141/AM15<br>Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting<br>No. 27/80 dated 31.03.2015 due to non submission reply of deficiency letter as raised by C & PC.<br> However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and<br>the matter was deliberated in the meeting. The Committee decided to ratify the norms on repeat basis of AA<br>0810142335 dated 09.04.2018 , approved in meeting no. 05/80 dated 28.06.2018 , as under:<br>ITCHS ITCHS Recommended<br>Export Item Import Item<br>Code Code Norms<br>DELUXE URINE BAGS<br>39204300 PVC FILM SHEET As applied<br>CONTAINING 37225 KGS PVC FILM<br>90189099<br>SHEET AND 10500 KGS<br>39021000 POLYPROPYLENE As applied<br>POLYPROPYLENE<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

57 | P a g e

Sl. No. 229

==> picture [476 x 63] intentionally omitted <==

----- Start of picture text -----<br> Case No. 47/14/80-ALC2/2014 Status:<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s ALSTOM TRANSPORT INDIA<br>Lic. No. /date: 0710105249 dated 20.06.2014 LIMITED<br>HQ. No.: 01/80/050/00368/AM15 Subject: Request for fixation of ad-hoc norms. Deferred<br>RLA No.: 07/24/040/00092/AM15<br>----- End of picture text -----<br>

Decision: In continuation to Meeting No. 10/80 dated 11.09.2019, the Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 11/80 dated 01.09.2015 due to non-submission reply of deficiency letter as raised by DHI.

HQ. No.: 01/80/050/00368/AM15<br>**Subject:**Request for fixation of ad-hoc norms.<br>Deferred<br>RLA No.: 07/24/040/00092/AM15 HQ. No.: 01/80/050/00368/AM15<br>**Subject:**Request for fixation of ad-hoc norms.<br>Deferred<br>RLA No.: 07/24/040/00092/AM15
Decision:In continuation to Meeting No. 10/80 dated 11.09.2019, the Committee considered the case as per the<br>agenda and noted that the case was rejected in Meeting No. 11/80 dated 01.09.2015 due to non-submission reply of<br>deficiency letter as raised by DHI.<br>Thereafter, the firm represented against the rejection and requested for a review. The case was again considered and<br>deferred in Meeting no. 11/19 dated 06.12.2018 with following decision:<br>“The Committee noted that a personal hearing was already given to the firm on 06.12.2018. In the personal<br>hearing the firm informed the committee that it has taken various AA’s for supply of 33 rail/tramway coaches.<br>Further, firm stated that ithas taken an additional license for supplementary materialrequired for these very 33<br>rail/tramway coaches. However, it has an additional export obligation of another 33 rail/tramway coaches in this<br>license. The Committee observed that the given submission is not tenable. The committee decided to seek a detailed<br>report from the concerned RA regarding of all such licenses issued to the firm, admissibility and current status.”<br>In response to Norm Committee’s e-mail dated 23.04.2019, Addl. DGFT Bangalore informed that firm<br>has obtained several license (Copy enclosed) which are pending for the wants of norms and also informed about a<br>letter from ECA-II, DGFT, New Delhi seeking information regarding alleged corrupt practices followed by M/s<br>Alstom Transport India.<br>In this matter, the committee noted that the firm had approach the Policy Relaxation Committee (PRC) and the<br>matter was taken up vide Meeting No. 17/AM20 held on 27.08.2019. The PRC noted the submissions by the firm<br>as under:<br>“They have stated that initially, 7 Advance Authorizations were applied for duty free import of inputs required for<br>the manufacture and supply of 33 Metro Train sets to Chennai Metro Rail Limited being a deemed export project.<br>ATIL sought amendment in all 7 Advance Authorizations to include residual items that were required to<br>manufacture the 33 Train sets but the request was rejected citing technical reasons by RA. Thereupon, ATIL was<br>compelled to apply for additional Advance Authorization No.0710105249 dated 20.06.2014 for importing residual<br>inputs that were missed out and not covered under earlier 7 Advance Authorizations. Acquisition of Alstom India<br>limited who was the manufacturer of key sub-assemblies also lead to inclusion of components required for<br>manufacture of sub-assemblies in the captioned Advance Authorization. However, while applying for the said<br>Advance Authorization (8th AA), export obligation of 33 Metro Train sets was declared inadvertently, as the system<br>did not allow the applicant to apply for a new license unless the export obligation was declared. In fact, there is no<br>separate EO under the Advance Authorization No.0710105249 dated 20.06.2014 as all imported inputs were used<br>for manufacture of 33 train sets declared under previous 7 Advance licenses. The Advance Authorization<br>No.0710105249 dated 20.06.2014 under which parts required for manufacture of 33 Metro Trains have been<br>imported has been issued after 22 months from the date of earliest Advance Authorization in the clubbing set.<br>Hence, request is to treat the supplies of 33 Train sets to the Metro Project supplied against Advance<br>Authorizations as one and to discharge the EO. “<br>The policy relaxation committee vide PRC Meeting No. 17/AM20 dated 27.08.2019 gave the following<br>decision in the matter:<br>“Decision:<br> The Committee heard the submission made by the firm and discussed the matter at length and decided<br>to relax the conditions as laid down in Para 4.38 (vi), (vii) and (xii) of HBP 2015-20 as amended vide Public Notice<br>No.70/2015-20 dated 30.01.2019 for clubbing of eight Advance Authorizations No.(i)0710090351 dated<br>21.08.2012, (ii)0710090531 dated 31.08.2012, (iii)0710095554 dated 23.05.2013, (iv)0710096369 dated<br>02.07.2013, (v)0710096370 dated 02.07.2013, (vi)0710099232 dated 28.10.2013 and (vii)0710101246 dated<br>10.01.2014 and(viii) 0710105249 dated 20.06.2014. It is subject to verification that amendments request of the

58 | P a g e

firm made in the AAs was rejected by the RA, as claimed by the firm and all inputs imported in the 8 AAs are fully accounted for in the supplies. The other terms and conditions for clubbing shall remain same as per policy/HBP provisions. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting.”

This Committee observed that the PRC has clubbed all the eight authorizations for imports and export purposes. Export obligation of AA No. 0710105249 dt. 20.06.2014 would remain as it is even after clubbing. Therefore, the Committee was decided in Meeting No. 10/80 dated 11.09.2019 to ask from the firm to furnish following information

  1. To provide detailed statement to account for the inputs in the export products against this license.

  2. Relevant technical drawings and wastage details may be provided in relevant formats for examination by the technical authorities for the purpose of fixation of norms.

The Committee noted that a deficiency letter was sent to the firm on 07.10.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Sl. No. 230

Sl. No. 230
Case No.57/17/80-ALC2/2015
M/s BIRLA FURUKAWA FIBRE OPTICS<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019 Status:
PRIVATE LIMITED<br>Lic. No.: 1710006165 Date: 27.08.2015
HQ. No.: 01/80/050/00361/AM16<br>**Subject:**Request for fixation of ad-hoc norms
RLA No.: 17/24/040/00043/AM16 Deferred
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 23/80 dated 16.02.2016 due to non submission reply of deficiency letter dated 02.02.2015 as raised by DEIT.
However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and
noted that the firm’s representation has been referred toMeitYon 09.10.2019 for examination of the case.
Therefore, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 231

**Sl. No. 231 **
Case No.9/27/80-ALC2/2014
M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s KINECO KAMAN COMPOSITES - Status:
Lic. No.: 1710006043 Date: 30.01.2015 INDIA PVT. LTD.
HQ. No.: 01/80/050/00634/AM15/<br>RLA No.: 17/24/040/00180/AM15/ **Subject:**Request for fixation of ad-hoc norms Deferred
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No. 4**/80-ALC2/2015 dated**23.05.2017 as per the written comments of DIPP vide U. O. No.12 (39)/2017-TSW/4
dated 23.05.2017.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case
and decided to forward the firm’s representation toMeitYas per comments of DPIIT vide U. O. No. P-
47011/193/2019-TSW dated 02.09.2019.
Case is deferred.

59 | P a g e

Sl. No. 232

Sl. No. 232
Case No.2/23/80-ALC2/2015
M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s KINECO KAMAN COMPOSITES - INDIA Status:
Lic. No.: 1710006173 Date: 08.09.2015 PVT. LTD.
HQ. No.: 01/80/050/00415/AM16/<br>RLA No.: 17/24/040/00044/AM16/ **Subject:**Request for fixation of ad-hoc norms Deferred
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No. 7/80-ALC2/2015dated04.07.2017 as per the written comments of DIPP vide U.O. No. 7/52/2017-TSW/13
dated 04.7.2017.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case
and decided to forward the firm’s representation toMeitYas per comments of DPIIT vide U. O. No. P-
47011/193/2019-TSW dated 02.09.2019.
Case is deferred.

Sl. No. 233

Case No. 1/25/80-ALC2/2015 M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s UNITED DRILLING TOOLS LTD Status: Lic. No.: 0510397442 Date: 29.01.2016 HQ. No.: 01/80/050/00441/AM16/ Subject: Request for fixation of ad-hoc norms RLA No.: 05/24/040/00493/AM16/ Deferred

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 05/80 dated 07.06.2016 due to non submission reply of deficiency letter dated 29.03.2016 as raised by DHI.

However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that the case is in the process of referring to DHI as per its decision in Meeting No. 10/80 dated 11.09.2019. Therefore, the Committee decided to take up the case in next bi-monthly meeting.

Case is deferred.

Sl. No. 234

Case No. 19/23/80-ALC2/2016 M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s AZAD ENGINEERING PRIVATE LIMITED Status: Lic. No.: 0910064137 Date: 14.09.2016 HQ. No.: 01/80/050/00522/AM17/ Subject: Request for fixation of ad-hoc norms RLA No.: 09/24/040/00295/AM17/ Deferred

Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 02/80-ALC2/2017 dated 25.04.2017 on repeat basis as approved for AA No. 0910064137 dated 14.09.2016 on the recommendation of the representative of DHI.

However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case and noted that the firm’s representation has been referred to DHI on 09.10.2019 for examination of the case. Therefore, the Committee decided to wait for the comments.

Case is deferred.

60 | P a g e

Sl. No. 235

Case No.1/19/80-ALC2/2017
M/s DAGGER MASTER TOOL INDUSTRIES<br>Status:<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
LIMITED<br>Lic No.: 0310817719 Date: 12.12.2017
HQ File No.: 01/80/050/00282/AM18/<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred<br>RLA File No.: 03/94/040/00728/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No.4/80-ALC2/2018 dated 23.05.2018 on the recommendation of representatives of DHI, DIPP & MSME.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case
and noted that the case is in the process of referring toDPIITas per its decision in Meeting No. 10/80 dated
11.09.2019. Therefore, the Committee decided to take up the case in next bi-monthly meeting.
Case is deferred.

Sl. No. 236

==> picture [477 x 75] intentionally omitted <==

----- Start of picture text -----<br> Case No. 29/48/80-ALC2/2007<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s JANDIA ENGINEERING PRIVATE Status:<br>Lic No.: 3210035131 Date: 02.04.2007 LIMITED<br>HQ File No: 01/80/050/00675/AM08/<br>Subject: Request for fixation of ad-hoc norms<br>RLA File No: 32/21/040/00328/AM07/ Deferred<br>Decision: The Committee considered the case as per the agenda and noted the decision of Meeting 10/80-<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted the decision of Meeting 10/80ALC2/2009 dated 09.06.2009:

ALC2/2009 dated 09.06.2009: “The Committee noted that RA neither reported the status of the case nor forwarded the four sets of application in response to this office letter and subsequent reminder. Since, the subject authorization is quite old; the Committee presumed that ratification of norms of the subject authorization is not required to RA so that the case may be closed on the part of NC.” However, the firm has requested for fixation of ad-hoc norms. The Committee re-considered the case and noted that the query letter as raised in Meeting No. 10/80 dated 11.09.2019 was sent to RA, Coimbatore on 07.10.2019. However, no information has been received yet. Hence, the Committee decided to wait for the requisite information. Case is deferred.

Sl. No. 237

Case No.37/19/80-ALC2/2014
M/s KAMAR INFRASTRUCTURE PVT LTD.<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019 Status:
Licence No.: 0310788243 Date: 21.08.2014
HQFile No: 01/80/050/00471/AM15/<br>**Subject:**Request for fixation of ad-hoc norms<br>RLA File No: 03/94/040/00449/AM15/ Deferred
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 06/80 dated 20.06.2017 due to non submission reply of deficiency letter.
However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and
noted that firm’s representation was forwarded toDHIfor examination of the case on 29.07.2019 followed by
reminder on 07.10.2019. However, no comments have been received yet. Hence, the Committee decided to wait for
the comments.
Case is deferred.

61 | P a g e

Sl. No. 238

==> picture [477 x 63] intentionally omitted <==

----- Start of picture text -----<br> Case No. 41/5/80-ALC2/2018<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s GODREJ & BOYCE MFG. CO. LTD. Status:<br>License No.: 0310820813 Date: 07.05.2018<br>HQ File No: 01/80/050/00090/AM19<br>Subject: Request for fixation of ad-hoc norms<br>RLA File No: 03/94/040/00075/AM19/ Deferred<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 01/80 dated 03.04.2019 on the recommendation of the Consultant (Tech-3).

Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 01/80 dated 03.04.2019 on the recommendation of the Consultant (Tech-3). However, the firm has requested for correction in the typographical error in the already fixed ad-hoc norms. The Committee considered the case and decided to ratify the norms on the recommendation of the Consultant (Tech-3) as under: Export Item: Heat Exchanger - weight of 104600 KG to be added. Import may be allowed as under: 1. Quantity of import item at Sl. No. 1 may be allowed as applied. 2. Quantity of import item at Sl. No. 2 may be allowed as 10105 Kg. 3. Quantity of import item at Sl. No. 3 may be allowed as applied. 4. Quantity of import item at Sl. No. 4 may be allowed after adding “33 Nos” along with weight. 5. Quantity of import item at Sl. No. 5 may be allowed after adding “4 Nos” along with weight. 6. Quantity of import item at Sl. No. 6 may be allowed as 21030 Kg. 7. Quantity of import item at Sl. No. 7 may be allowed as 26700 Kg. 8. Quantity of import item at Sl. No. 8 to 12 may be allowed upto 6% of FOB value in total. RA concerned may take further necessary action as per the decision of NC.

Sl. No. 239

Sl. No. 239
Case No.53/23/80-ALC2/2016 Status:
M/s RADIANT HEAT EXCHANGER<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
PVT.LTD<br>Lic. No.: 3110066440 Date: 09.12.2016
HQ. No.: 01/80/050/00556/AM17<br>**Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 31/83/040/00112/AM17
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in M. No.
03/80 dated 09.05.2018 on the recommendation of Technical Representatives of DHI, DIPP and MSME.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and
decided to forward the firm’s representation toDHIfor examination of the case.
Case is deferred.

62 | P a g e

Sl. No. 240

==> picture [477 x 62] intentionally omitted <==

----- Start of picture text -----<br> Case No. 26/80-ALC2/2015 Status:<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s GRAPHITE INDIA LIMITED<br>Lic. No. 0310795507 Dated:23.04.2015<br>HQ. No.: 01/80/050/00215/AM16 Subject: Request for fixation of ad-hoc norms Deferred<br>RLA No.: 03/94/040/00006/AM16<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 26/80 dated 29.03.2016 due to non submission of reply of deficiency letter dated 20.01.2016 as raised by DIPP. However, the firm has furnish requisite information and requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to forward firm’s representation to DPIIT for examination of the case.

Case is deferred.

Sl. No. 241

Case No. 3/10/80-ALC2/2017 Status:
M/s HINDUSTAN RUBBER INDUSTRIES<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
Lic. No. 0510402563 Date: 16.05.2017
HQ. No.: 01/80/050/00213/AM18<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 05/23/040/00043/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 08.10.2018.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that the reply of deficiency letter dated 08.10.2018 has not yet been submitted by the firm. Therefore, the
Committee decided to ask from the firm to submit the reply of deficiency letter dated 08.10.2018.
Case is deferred.

Sl. No. 242

Case No. 8/23/80-ALC2/2015 Status: M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s HINDUSTAN RUBBER INDUSTRIES Lic. No. 0510395884 Date: 12.10.2015 HQ. No.: 01/80/050/00421/AM16 Subject: Request for fixation of ad-hoc norms Deferred RLA No.: 05/23/040/00292/AM16 Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 06 /80- ALC2/2016 dated 21.06.2016 due to non submission of reply of deficiency letter dated 19.04.2016 as raised by DIPP (Chemical) vide ID No.7/77/2016-TSW dated 26.02.2016.

However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that the reply of deficiency letter dated 19.04.2016 has not yet been submitted by the firm. Therefore, the Committee decided to ask from the firm to submit the reply of deficiency letter dated 19.04.2016. Case is deferred.

63 | P a g e

Sl. No. 243

Sl. No. 243
Case No.14/12/80-ALC2/2017 Status:
M/s GOLD MOHUR PROFILES LIMITED<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
Lic. No. 0510403501 Date: 25.07.2017
HQ. No.: 01/80/050/00228/AM18<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 05/23/040/00156/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 12.10.2018 as
raised by DIPP (Chemical).
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that the reply of deficiency letter dated 12.10.2018 has not yet been submitted by the firm. Therefore, the
Committee decided to ask from the firm to submit the reply of deficiency letter dated 12.10.2018.
Case is deferred.

Sl. No. 244

Sl. No. 244
Case No. 1/8/80-ALC2/2018 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s CORNING TECHNOLOGIES INDIA PVT.
Lic. No. 0510406690 Date: 30.05.2018 LTD.
HQ. No.: 01/80/050/00124/AM19 **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 05/23/040/00089/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 06/80-ALC2/2019 dated 03.07.2019 due to non submission reply of deficiency letter 11.02.2019 as raised by
MeitY.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
decided to forward firm’s representation toMeitYfor examination of the case.
Case is deferred.

Sl. No. 245

Case No. 282/15/80-ALC2/2018 Status: M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s CORNING TECHNOLOGIES INDIA PVT. Lic. No 0510409144 Date: 01.01.2019 LTD. HQ. No.: 01/80/050/00624/AM19 Subject: Request for fixation of ad-hoc norms Deferred RLA No.: 05/23/040/00395/AM19 Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 7/80-ALC2/2019 dated 17.07.2019 due to non submission of reply of deficiency letter dated 06.05.2019 as raised by MeitY. However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to forward firm’s representation to MeitY for examination of the case. Case is deferred.

64 | P a g e

Sl. No. 246

Sl. No. 246
Case No. 53/11/80-ALC2/2018 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s ISGEC HEAVY ENGINEERING
Lic. No. 0510407844 Date: 19.09.2018 LIMITED
HQ. No.: 01/80/050/00244/AM19 **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 05/23/040/00263/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in M. No.
3/80 dated 08.05.2018 as per written comments of DPIIT vide their U. O. No.: P-47011/60/2019-TSW dated
25.04.2019.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and
decided to forward firm’s representation toDPIITfor examination of the case.
Case is deferred.

Sl. No. 247

Sl. No. 247
Case No. 13/12/80-ALC2/2018 Status:
M/s NIDEC INDIA PRIVATE LIMITED.<br>M. No.: 12/80-ALC2/2019 dated 09.10.2019
Lic. No. /date 0510408160 Date: 22.10.2018
HQ. No.: 01/80/050/00286/AM19<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 05/24/040/00408/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 06/80-ALC2/2019 dated 03.07.2019 due to non submission of reply of deficiency letter as raised by DPIIT.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
decided to forward firm’s representation toDPIITfor examination of the case.
Case is deferred.

Sl. No. 248

Sl. No. 248
Case No. 69/19/80-ALC2/2017 Status:
M. No.: 12/80-ALC2/2019 dated 09.10.2019 M/s PETERS SURGICAL INDIA PVT. LTD.
Lic. No. 0510401487 Date: 03.02.2017
HQ. No.: 01/80/050/00350/AM18 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 05/24/040/00542/AM17
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in M. No.
04/80 dated 23.05.2018 on the recommendation of Technical Representatives of DHI, DIPP and MSME.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
decided to forward firm’s representation to**Consultant (Tech-1)**for examination of the case.
Case is deferred.

65 | P a g e

==> picture [469 x 640] intentionally omitted <==

66 | P a g e

==> picture [469 x 612] intentionally omitted <==

67 | P a g e

==> picture [469 x 557] intentionally omitted <==

68 | P a g e

==> picture [469 x 619] intentionally omitted <==

69 | P a g e

==> picture [469 x 618] intentionally omitted <==

70 | P a g e

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied