DGFT Minutes
In force — no superseding record on file.
MINUTES OF MEETING NO. 10/80 OF NORMS COMMITTEE- I (DES-I SECTION) DATED 11.09.2019
Meeting No. 10/20 of the Norms Committee (NC-I) for the licensing year 2019-2020 held on 11.09.2019 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -
| Sl. No. | Name of the representatives & their Designation | Department |
|---|---|---|
| 1. | Shri B. C. Nayak, DO | DHI |
| 2. | Shri Shaish Kumar, ( Tech-1) | Consultant |
| 3. | Shri V.C. Agarwal, (Tech-3) | Consultant |
| 4. | Shri Pranav Upadhyay, Asst. Director (ISS) | DGFT |
Note:
-
In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.
-
Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.
-
All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.
1 | P a g e
MEETING NUMBER: 10/80-ALC2/2019 MEETING DATE: 11.09.2019
| Case No.:78/6/83- | Party Name: ECOCAT | Meet No/Date:10/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC1/2015 | INDIA PVT. LTD. | ALC2/2019 | ||||
| 11.09.2019 | ||||||
| HQ File<br>:01/83/050/00408/AM16/ | RLA File<br>:05/23/040/00078/AM16/ | Lic.No/Date:0510394421<br>03.06.2015 | Deferred |
1 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 15.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [432 x 361] intentionally omitted <==
eminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [432 x 361] intentionally omitted <==
----- Start of picture text -----<br> Case No.:359/15/80- Party Name: MAINI Meet No/Date:10/80- Status:<br>ALC2/2018 PRECISION PRODUCTS P. ALC2/2019<br>LTD. 11.09.2019<br>HQ File RLA File Lic.No/Date:0710108649 Approved<br>:01/80/050/00701/AM19/ :07/24/040/00179/AM16/ 26.08.2015<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms<br>on the basis of inputs given by the Technical Authorities (After excluding wastage claimed for<br>oversize inputs) as under:<br>Sl. Recommended<br>ITCHS Sl. ITCHS Import<br>No. Export Item Norms<br>Code No. Code Item<br>PUMP BODY SS440B<br>2<br>COMPLETE - Round bar<br>1.70Kgs/Kg<br>ASSEMBLY TO P/N DIA 16<br>1 87089900 1 72222019 content in the<br>TM.0114659.B SS440B<br>export product.<br>CONSISTS OF SLEEVE DIA 16<br>AF.0100517 /C-1 mm<br>PUMP BODY SS415M<br>COMPLETE - Round bar<br>1.70Kgs/Kg<br>ASSEMBLY TO P/N DIA 43<br>2 87089900 2 72222019 content in the<br>TM.0114659.B SS415M<br>export product.<br>CONSISTS OF BODY DIA 43<br>PUMP FH.0100048.F mm<br>Note: Per piece weight of export at Sl. No. 1 is 18 gram.<br> Per piece weight of export at Sl. No. 2 is 23 gram.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
2 | P a g e
3
Per piece weight of export at Sl. No. 2 is 23 gram.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
2 | P a g e
3
| Case No.:31/15/80- | Party Name: SIRIA | Meet No/Date:10/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | IMPEX PVT. LTD. | ALC2/2019 & | |||||
| 11.09.2019 | |||||||
| HQ File<br>:01/80/050/00373/AM19/ | RLA File<br>:05/24/040/00177/AM16/ | Lic.No/Date:0510395546<br>08.09.2015 | Withdrawn |
Decision: The Committee considered the case as per the agenda and noted that RA, New Delhi has updated the spreadsheet showing that the above AA has been issued on repeat basis. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, New Delhi.
Case is withdrawn.
| Case No.:1/16/80- | Party Name: GARDNER | Meet No/Date:10/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2015 | AEROSPACE PRANITA | ALC2/2019 | ||||
| PRIVATE LIMITED | 11.09.2019 | |||||
| HQ File<br>:01/80/050/00286/AM16/ | RLA File<br>:07/24/040/00176/AM16/ | Lic.No/Date:0710108718<br>11.09.2015 | Deferred |
4 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 15.01.2019 followed by reminders on 18.04.2019 & 21.08.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
5
the firm on 15.01.2019 followed by reminders on 18.04.2019 & 21.08.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
5
| Case No.:371/15/80- | Party Name: TITAN | Meet No/Date:10/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | COMPANY LIMITED | ALC2/2019 | |||||
| 11.09.2019 | |||||||
| HQ File<br>:01/80/050/00713/AM19/ | RLA File<br>:07/24/040/00171/AM16/ | Lic.No/Date:0710108980<br>02.11.2015 | Withdrawn |
Decision: The Committee considered the case as per the agenda and noted that RA, Bangalore has updated the spreadsheet showing that the above AA has been issued on repeat basis. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, Bangalore.
Case is withdrawn.
| Case No.:2/2/80- | Party Name: OPTIMA | Meet No/Date:10/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2016 | WIRES PVT LTD | ALC2/2019 | ||||
| 11.09.2019 | ||||||
| HQ File<br>:01/80/050/00005/AM17/ | RLA File<br>:34/24/040/00208/AM16/ | Lic.No/Date:3410041684<br>19.11.2015 | Deferred |
6 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 20.05.2019 followed by final reminder on 22.07.2019. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
3 | P a g e
==> picture [432 x 157] intentionally omitted <==
- However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
3 | P a g e
==> picture [432 x 157] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/15/80- Party Name: AZAD Meet No/Date:10/80- Status:<br>ALC2/2018 ENGINEERING PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0910063260 Deferred<br>:01/80/050/00347/AM19/ :09/24/040/00679/AM16/ 12.02.2016<br>7 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Hyderabad . A letter was sent to the<br>firm & RA, Hyderabad on 22/24.04.2019 followed by reminders on 06.06.2019 & 29.07.2019.<br>However, no information has been received so far. Hence, the Committee decided to wait for<br>complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
8
| Case No.:79/15/80- | Party Name: SIRIA IMPEX | Meet No/Date:10/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | PVT.LTD. | ALC2/2019 | |||||
| 11.09.2019 | |||||||
| HQ File<br>:01/80/050/00421/AM19/ | RLA File<br>:05/24/040/00596/AM16/ | Lic.No/Date:0510397825<br>04.03.2016 | Withdrawn |
-|---|---|---| ||ALC2/2018||PVT.LTD.||ALC2/2019||| ||||||11.09.2019||| ||HQ File<br>:01/80/050/00421/AM19/||RLA File<br>:05/24/040/00596/AM16/||Lic.No/Date:0510397825<br>04.03.2016||Withdrawn|
Decision: The Committee considered the case as per the agenda and noted that RA, New Delhi has updated the spreadsheet showing that the above AA has been issued on repeat basis. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, New Delhi.
Case is withdrawn.
==> picture [432 x 121] intentionally omitted <==
----- Start of picture text -----<br> Case No.:399/15/80- Party Name: MAINI Meet No/Date:10/80- Status:<br>ALC2/2018 PRECISION PRODUCTS ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0710109554 Deferred<br>9 :01/80/050/00741/AM19/ :07/24/040/00414/AM16/ 22.03.2016<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>MSME for examination as per the advice of representative of DHI .<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 145] intentionally omitted <==
case to<br>MSME for examination as per the advice of representative of DHI .<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 145] intentionally omitted <==
----- Start of picture text -----<br> Case No.:26/15/80- Party Name: AYYAPPA Meet No/Date:10/80- Status:<br>ALC2/2018 CNC PVT.LTD, ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0710109968 Deferred<br>:01/80/050/00368/AM19/ :07/24/040/00098/AM17/ 17.06.2016<br>10<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME for examination of the case on 17.05.2019 followed by an I.D.<br>reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee<br>decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
4 | P a g e
==> picture [432 x 361] intentionally omitted <==
----- Start of picture text -----<br> Case No.:271/15/80- Party Name: MAINI Meet No/Date:10/80- Status:<br>ALC2/2018 PRECISION PRODUCTS ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0710110120 Approved<br>:01/80/050/00613/AM19/ :07/24/040/00099/AM17/ 19.07.2016<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms<br>on the basis of inputs given by the Technical Authorities (After excluding wastage claimed for<br>oversize inputs) as under:<br>Sl. Recommended<br>ITCHS Sl. ITCHS<br>No. Export Item Import Item Norms<br>Code No.
uts given by the Technical Authorities (After excluding wastage claimed for<br>oversize inputs) as under:<br>Sl. Recommended<br>ITCHS Sl. ITCHS<br>No. Export Item Import Item Norms<br>Code No. Code<br>SLEEVE PUMP BODY<br>COMPLETE - SS440B<br>11<br>ASSEMBLY TO P/N Round bar 1.70Kg/Kg<br>1 87089900 TM. 0114659. B 1 72222019 Dia16 - content in the<br>CONSISTS OF SS440B Dia export product.<br>SLEEVE AF. 0100517 16 mm<br>/C-1<br>BODY PUMP<br>SS415M<br>COMPLETE -<br>Bright bar 1.70Kg/Kg<br>ASSEMBLY TO P/N<br>2 87089900 2 72222019 Dia 43- content in the<br>TM.0114659.B<br>SS415M export product.<br>CONSISTS OF BODY<br>Dia43 mm<br>PUMP FH.0100048.F<br>Note: Per piece weight of export at Sl. No. 1 is 18 gram.<br> Per piece weight of export at Sl. No. 2 is 23 gram.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [432 x 157] intentionally omitted <==
Sl. No. 2 is 23 gram.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [432 x 157] intentionally omitted <==
----- Start of picture text -----<br> Case No.:186/15/80- Party Name: TEMPCO Meet No/Date:10/80- Status:<br>ALC2/2018 TEMPERATURE ALC2/2019<br>MEASUREMENT 11.09.2019<br>PRIVATE LIMITED<br>HQ File RLA File Lic.No/Date:0710110332 Deferred<br>:01/80/050/00528/AM19/ :07/24/040/00157/AM17/ 29.08.2016<br>12<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MeitY on 22.08.2019 for examination of the case. However, MeitY vide<br>email dated 11.09.2019 requested to send again a copy of application. Hence, the Committee<br>decided to send a copy of application to MeitY for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
5 | P a g e
==> picture [432 x 327] intentionally omitted <==
copy of application to MeitY for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
5 | P a g e
==> picture [432 x 327] intentionally omitted <==
----- Start of picture text -----<br> Case No.:53/15/80- Party Name: DOOWON Meet No/Date:10/80- Status:<br>ALC2/2018 AUTOMOTIVE SYSTEMS ALC2/2019<br>INDIA PRIVATE LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0410162395 Approved<br>:01/80/050/00395/AM19/ :04/24/040/00117/AM17/ 19.10.2016<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms<br>on recommendation of technical members present in the meeting, as under:<br>ITCHS Sl. ITCHS Recommended<br>Export Item Import Item<br>Code No. Code Norms<br>TUBE -PART NO.E19811-<br>1 76169900 Net to Net<br>Heater Core 0540a<br>13 [H-3] Part No: SIDE PLATE - PART Net to Net<br>2 84159000<br>H42853-0791 NO.H47243-0820a<br>Import of PIPE CAP-PART NO. Net to Net<br>3 76169900<br>components H40823 -2630<br>87089900 are allowed on HEADER PLATE- PART Net to Net<br>4 84159000<br>net to net basis NO.H42923-0351a<br>with TANK - PART<br>5 84159000 Net to Net<br>accountability NO.H47443-2640z<br>clause in all 1.02 Kgs/Kg<br>FIN - PART NO. E19811-<br>shipping bills 6 76071190 content in the<br>0280a<br>export product<br>Note: Thickness to match in Import and Export.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [432 x 157] intentionally omitted <==
in Import and Export.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [432 x 157] intentionally omitted <==
----- Start of picture text -----<br> Case No.:214/15/80- Party Name: SARA SAE Meet No/Date:10/80- Status:<br>ALC2/2018 PRIVATE LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:6110001384 Approved<br>:01/80/050/00556/AM19/ :61/24/040/00004/AM17/ 14.12.2016<br>14 Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 12.06.2019 for examination of the case. However, no<br>comments are being furnished by MSME . The case was discussed in the meeting and the<br>Committee decided to ratify the norms on Net to Net basis as per GN-4 on the basis of inputs<br>given by Technical Authorities present in the meeting.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [432 x 133] intentionally omitted <==
resent in the meeting.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [432 x 133] intentionally omitted <==
----- Start of picture text -----<br> Case No.:382/15/80- Party Name: UNI VTL Meet No/Date:10/80- Status:<br>ALC2/2018 PRECISION PVT. LTD. ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0710111000 Deferred<br>:01/80/050/00724/AM19/ :07/24/040/00344/AM17/ 19.01.2017<br>15<br>Decision: The Committee considered the case as per the agenda and noted that the copy of<br>application was sent to MSME on 25.07.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
6 | P a g e
==> picture [432 x 145] intentionally omitted <==
----- Start of picture text -----<br> Case No.:404/15/80- Party Name: OSWAL Meet No/Date:10/80- Status:<br>ALC2/2018 PUMPS LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:3310030377 Deferred<br>:01/80/050/00746/AM19/ :33/24/040/00007/AM17/ 03.03.2017<br>16<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME for examination of the case on 21.06.2019 followed by an I.D.<br>reminder on 22.08.2019. However, no comments have been received yet. Hence, the Committee<br>decided to wait for the comments.<br> Case is deferred.<br>----- End of picture text -----<br>
D.<br>reminder on 22.08.2019. However, no comments have been received yet. Hence, the Committee<br>decided to wait for the comments.<br> Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 462] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: BORG WARNER Meet No/Date: Status:<br>84/15/80-ALC2/2018 EMISSIONS SYSTEMS 10/80-ALC2/2019<br>INDIA PVT. LTD. 11.09.2019<br>HQ File RLA File Lic.No/Date:0510402181 Approved<br>:01/80/050/00426/AM19 :05/23/040/00621/AM17/ 06.04.2017<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms<br>as per written comments of Consultant (Tech-3) as under:<br>ITCHS Sl. ITCHS Recommended<br>Export Item Import Item<br>Code No. Code Norms<br>82x49,5x1,5x198,6 4301, CASE-<br>M2700052 STAINLESS STEEL,<br>1 73066100<br>PART NO.M2700052, MADE OF Allowed as per<br>STAINLESS STEEL General Note-<br>TUBE CORRUGATED STAINLESS 4<br>2 73041190 STEEL, PART NO.M2700513,<br>MADE OF STAINLESS STEEL<br>NICROBRAZ ANB EXP1046<br>NICKLE BASED ALLOY<br>17 BRAZING PASTE, PART NO.<br>3 38101010 M7060007 OR ALTERNATIVELY<br>EGR<br>NICKLE PASTE, PART NO<br>COOLER<br>M7060007, FOR BRAZING FILLER<br>ASSEMBLY Allowed upto<br>METALS<br>84195090 FOR USE 2% of FoB<br>JM STOP-FLO NO.1 PAINT STOP<br>IN DEISEL value<br>OFF FOR BRAZING FILLER<br>ENGINES<br>METAL (INHIBITOR), PART NO.<br>4 38109090 M7060011, PARTING<br>COMPOUNDS FORMULATED TO<br>PREVENT THE FLOW MOLTEN<br>BRAZING FILLER METAL<br>BAFFLE STAINLESS STEEL,<br>5 84199090 PA
<br>ENGINES<br>METAL (INHIBITOR), PART NO.<br>4 38109090 M7060011, PARTING<br>COMPOUNDS FORMULATED TO<br>PREVENT THE FLOW MOLTEN<br>BRAZING FILLER METAL<br>BAFFLE STAINLESS STEEL,<br>5 84199090 PART NO. M9210052 MADE OF<br>STAINLESS STEEL Allowed as per<br>FLANGE, MADE OF STAINLESS General Note-<br>6 73072100<br>STEEL 4<br>GAS BOX, MADE OF STAINLESS<br>7 84199090<br>STEEL<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
7 | P a g e
==> picture [432 x 134] intentionally omitted <==
----- Start of picture text -----<br> Case No.:19/1/80- Party Name: BGR ENERGY Meet No/Date:10/80- Status:<br>ALC2/2019 SYSTEMS LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0410163001 Deferred<br>:01/80/050/00767/AM19/ :04/24/040/00209/AM17/ 19.04.2017<br>18<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply<br>was sent to DPIIT on 06.09.2019 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 121] intentionally omitted <==
e been<br>received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 121] intentionally omitted <==
----- Start of picture text -----<br> Case No.:94/15/80- Party Name: MODEL Meet No/Date:10/80- Status:<br>ALC2/2018 INFRA CORPORATION ALC2/2019<br>PRIVATE LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0710111766 Deferred<br>19 :01/80/050/00436/AM19/ :07/24/040/00085/AM18/ 16.06.2017<br>Decision: The Committee considered the case as per the agenda and noted that the copy of<br>application was sent to MSME on 25.07.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 252] intentionally omitted <==
----- Start of picture text -----<br> Case No.:108/15/80- Party Name: DEE Meet No/Date:10/80- Status:<br>ALC2/2018 DEVELOPMENT ALC2/2019<br>ENGINEERS LTD. 11.09.2019<br>HQ File RLA File Lic.No/Date:0510403207 Deferred<br>:01/80/050/00450/AM19/ :05/23/040/00116/AM18/ 22.06.2017<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per advice of representative of DHI as under:<br>1. Specific item of export.<br>2. Break up of import item No. 5 to 8 with quantity in number & weight.<br>20 3.
<br>furnish following information as per advice of representative of DHI as under:<br>1. Specific item of export.<br>2. Break up of import item No. 5 to 8 with quantity in number & weight.<br>20 3. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components<br>to be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary<br>evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>
8 | P a g e
21
| Case No.:96/15/80- | Party Name: TATA HITACHI | Meet No/Date:10/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | CONSTRUCTION | ALC2/2019 | |||||
| MACHINERY COMPANY | 11.09.2019 | ||||||
| PRIVAT | |||||||
| HQ File<br>:01/80/050/00438/AM19/ | RLA File<br>:02/24/040/00265/AM17/ | Lic.No/Date:0210207730<br>29.06.2017 | Withdrawn |
RUCTION||ALC2/2019||| ||||MACHINERY COMPANY||11.09.2019||| ||||PRIVAT||||| ||HQ File<br>:01/80/050/00438/AM19/||RLA File<br>:02/24/040/00265/AM17/||Lic.No/Date:0210207730<br>29.06.2017||Withdrawn|
Decision: The Committee considered the case as per the agenda and noted that RA, Calcutta has updated the spreadsheet showing that the above AA has been issued on net to net basis. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, Calcutta .
Case is withdrawn.
22
| Case No.:405/15/80- | Party Name: OSWAL | Meet No/Date:10/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | PUMPS LIMITED | ALC2/2019 | |||||
| 11.09.2019 | |||||||
| HQ File<br>:01/80/050/00747/AM19/ | RLA File<br>:33/24/040/00007/AM18/ | Lic.No/Date:3310030410<br>01.11.2017 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 21.06.2019 followed by an I.D. reminder on 22.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [432 x 157] intentionally omitted <==
eminder on 22.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [432 x 157] intentionally omitted <==
----- Start of picture text -----<br> Case No.:153/15/80- Party Name: ANSTECH Meet No/Date:10/80- Status:<br>ALC2/2018 ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:3410043589 Approved<br>:01/80/050/00495/AM19/ :34/24/040/00189/AM18/ 06.11.2017<br>23 Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 25.07.2019 for examination of the case. However, no<br>comments are being furnished by MSME . The case was discussed in the meeting and the<br>Committee decided to ratify the norms as per General Note-4 on the basis of inputs given by<br>Technical Authorities present in the meeting.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.: | Party Name: MAG INDIA | Meet No/Date:10/80- | Status: | |||
|---|---|---|---|---|---|---|
| 221/15/80-ALC2/2018 | INDUSTRIAL AUTOMAT | ALC2/2019 | ||||
| IONSYSTEMS PVT. LTD. | 11.09.2019 | |||||
| HQ File<br>:01/80/050/00563/AM19 | RLA File<br>:07/24/040/00190/AM18/ | Lic.No/Date:0710112375<br>08.11.2017 | Approved |
18**||INDUSTRIAL AUTOMAT||ALC2/2019||| |||IONSYSTEMS PVT. LTD.||11.09.2019||| |HQ File<br>:01/80/050/00563/AM19||RLA File<br>:07/24/040/00190/AM18/||Lic.No/Date:0710112375<br>08.11.2017||Approved|
24 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 25.07.2019 for examination of the case. However, no comments are being furnished by MSME . The case was discussed in the meeting and the Committee decided to ratify the norms as per General Note-4 on the basis of inputs given by Technical Authorities present in the meeting.
RA concerned may take further necessary action as per the decision of NC.
9 | P a g e
==> picture [432 x 157] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: MAG INDIA Meet No/Date:10/80- Status:<br>256/15/80-ALC2/2018 INDUSTRIAL AUTOMATION ALC2/2019<br>SYSTEMS PVT. LTD. 11.09.2019<br>HQ File : RLA File : Lic.No/Date:0710112489 Approved<br>01/80/050/00598/AM19/ 07/24/040/00233/AM18/ 05.12.2017<br>25 Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 25.07.2019 for examination of the case. However, no<br>comments are being furnished by MSME .
ttee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 25.07.2019 for examination of the case. However, no<br>comments are being furnished by MSME . The case was discussed in the meeting and the<br>Committee decided to ratify the norms as per General Note-4 on the basis of inputs given by<br>Technical Authorities present in the meeting.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [432 x 134] intentionally omitted <==
----- Start of picture text -----<br> Case No.:261/15/80- Party Name: FUTURE Meet No/Date:10/80- Status:<br>ALC2/2018 TECH ENGINEERING ALC2/2019<br>PVT. LTD. 11.09.2019<br>HQ File RLA File Lic.No/Date:0710112573 Deferred<br>:01/80/050/00603/AM19/ :07/24/040/00258/AM18/ 20.12.2017<br>26<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 25.07.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 133] intentionally omitted <==
have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 133] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: FUTURE Meet No/Date:10/80- Status:<br>391/15/80-ALC2/2018 TECH ENGINEERING ALC2/2019<br>PVT. LTD. 11.09.2019<br>HQ File RLA File Lic.No/Date:0710112747 Deferred<br>:01/80/050/00733/AM19/ :07/24/040/00298/AM18/ 25.01.2018<br>27<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 25.07.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 181] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: TRIVENI HI- Meet No/Date:10/80- Status:<br>394/15/80-ALC2/2018 TECH PVT. LTD. ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0710113046 Deferred<br>:01/80/050/00736/AM19/ :07/24/040/00368/AM18/ 04.04.2018<br>Decision: The Committee considered the case as per the agenda and noted that the copy of<br>28 application was sent to MSME on 13.05.2019 for examination of the case. However, no comments<br>are being furnished by MSME. The case was discussed in the meeting & the Committee on the<br>basis of inputs from the technical members decided to ask from the firm to furnish following<br>information:<br>1.
g furnished by MSME. The case was discussed in the meeting & the Committee on the<br>basis of inputs from the technical members decided to ask from the firm to furnish following<br>information:<br>1. Detail technical note on manufacturing process including the relevant flow sheet.<br>2. Detail technical drawings with dimension of each export product, Catalogue, if any, may<br>also be furnished.<br>----- End of picture text -----<br>
10 | P a g e
-
Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
-
Sheet layout diagram of the material indicating the wastage during blanking.
Case is deferred.
==> picture [432 x 242] intentionally omitted <==
ed by documentary evidence/drawings etc.
- Sheet layout diagram of the material indicating the wastage during blanking.
Case is deferred.
==> picture [432 x 242] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/6/80- Party Name: WHEELS Meet No/Date:10/80- Status:<br>ALC2/2019 INDIA LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0410164155 Approved<br>:01/80/050/00080/AM20/ :04/24/040/00264/AM18/ 04.04.2018<br>Decision: The Committee considered the case as per the agenda and the representative of the firm<br>explained the case before the Norms Committee. The Committee decided to ratify the norms on<br>the recommendation of technical members present in the meeting, as under:<br>29<br>ITCHS ITCHS Recommended<br>Export Item Import Item<br>Code Code Norms<br>FORGED AND MACHINED<br>WHEELS CONDITION - NET<br>CONTENT OF ALUMINIUM ALUMINIUM<br>87087000 76012020<br>BILLETS USED FOR EXPORT BILLET As applied<br>ITEM SHOULD NOT BE LESS<br>THAN 1715.70 KGS.)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [432 x 215] intentionally omitted <==
<br>THAN 1715.70 KGS.)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [432 x 215] intentionally omitted <==
----- Start of picture text -----<br> Case No.:121/15/80- Party Name: ZTT INDIA Meet No/Date:10/80- Status:<br>ALC2/2018 PRIVATE LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0410164238 Deferred<br>:01/80/050/00463/AM19/ :04/24/040/00009/AM19/ 23.04.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per written comments given by MeitY vide F. No.: 17(32)/2019-<br>IPHW dated 03.09.2019 as under:<br>30<br>1. Details of export product i.e. design, drawing etc.<br>2. Quantity of import item required for manufacturing one unit of export product.<br>3. Wastage claimed in manufacturing process.<br>4. Justification of wastage.<br>The Committee also noted that MeitY has already sent the above letter to the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
11 | P a g e
==> picture [432 x 133] intentionally omitted <==
that MeitY has already sent the above letter to the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
11 | P a g e
==> picture [432 x 133] intentionally omitted <==
----- Start of picture text -----<br> Case No.:154/15/80- Party Name: BANCO Meet No/Date:10/80- Status:<br>ALC2/2018 PRODUCTS (INDIA) ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:3410044137 Deferred<br>:01/80/050/00496/AM19/ :34/24/040/00050/AM19/ 14.05.2018<br>31<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 23.07.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 133] intentionally omitted <==
----- Start of picture text -----<br> Case No.:29/8/80- Party Name: SAIRA ASIA Meet No/Date:10/80- Status:<br>ALC2/2018 INTERIORS PVT LTD ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:3410044210 Deferred<br>:01/80/050/00152/AM19/ :34/21/040/00102/AM19/ 07.06.2018<br>32<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 23.07.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 145] intentionally omitted <==
have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 145] intentionally omitted <==
----- Start of picture text -----<br> Case No.:49/8/80- Party Name: UNI VTL Meet No/Date:10/80- Status:<br>ALC2/2018 PRECISION PVT. LTD. ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:6510000016 Deferred<br>:01/80/050/00172/AM19/ :65/24/040/00002/AM19/ 12.06.2018<br>33<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply<br>was sent to MSME for examination of the case on 20.05.2019 followed by an I.D. reminder on<br>22.07.2019. However, no comments have been received yet. Hence, the Committee decided to<br>wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 201] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/8/80- Party Name: CHIRAG Meet No/Date:10/80- Status:<br>ALC2/2018 UDYOG ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0510406909 Approved<br>:01/80/050/00127/AM19/ :05/23/040/00141/AM19/ 19.06.2018<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME for examination of the case on 10.05.2019. However, no<br>34 comments are being furnished by MSME .
e considered the case as per the agenda and noted that a copy of<br>application was sent to MSME for examination of the case on 10.05.2019. However, no<br>34 comments are being furnished by MSME . The case was discussed in the meeting and the<br>Committee decided to ratify the norms on the basis of inputs given by the Technical Authorities<br>present in the meeting as under:<br>ITCHS ITCHS Recommended<br>Export Item Import Item<br>Code Code Norms<br>STAINLESS STEEL CUTLERY MAGNETIC 1.10Kgs/Kg<br>82159900 AND KITCHEN TOOLS MADE 72209090 STAINLESS content in the<br>FROM MAGNTIC STAINLESS STEEL COLD export product<br>----- End of picture text -----<br>
12 | P a g e
STEEL WITH RELEVANT ROLLED COIL THICKNESS GRADE:430, WITH RELEVANT HAVING NET CONTENT OF THICKNESS 14300.00 KG OF STAINLESS GRADE:430 STEEL
RA concerned may take further necessary action as per the decision of NC.
35
| Case No.:134/15/80- | Party Name: FUTURE | Meet No/Date:10/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2018 | TECH ENGINEERING | ALC2/2019 | |||||
| PVT. LTD. | 11.09.2019 | ||||||
| HQ File<br>:01/80/050/00476/AM19/ | RLA File<br>:07/24/040/00058/AM19/ | Lic.No/Date:0710113460<br>20.06.2018 | Deferred |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 23.07.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
f application was sent to MSME on 23.07.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:38/8/80- | Party Name: AYYAPPA | Meet No/Date:10/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | CNC PVT. LTD. | ALC2/2019 | ||||
| 11.09.2019 | ||||||
| HQ File<br>:01/80/050/00161/AM19/ | RLA File<br>:07/24/040/00070/AM19/ | Lic.No/Date:0710113468<br>21.06.2018 | Deferred |
36
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 08.04.2019 followed by I.D. reminders on 07.06.2019 & 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [432 x 192] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: FITCH Meet No/Date:10/80- Status:<br>278/15/80-ALC2/2018 METALS ENGINEERING ALC2/2019<br>INDIA PVT. LTD. 11.09.2019<br>HQ File RLA File Lic.No/Date:0310822068 Deferred<br>:01/80/050/00620/AM19/ :03/94/040/00262/AM19/ 02.07.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per advice of representative of DHI as under:<br>37<br>1. Model number, technical specification and specific quantity-both in terms of number (if<br>any) and/or weight, of each export product (Appendix-33 of current HBP refers).<br>2.
as under:<br>37<br>1. Model number, technical specification and specific quantity-both in terms of number (if<br>any) and/or weight, of each export product (Appendix-33 of current HBP refers).<br>2. Detail technical note on manufacturing process including the relevant flow sheet.<br>3. Assembly drawings/diagrams of the resultant product showing placement and exact use of<br>components in the export product (s).<br>Case is deferred.<br>----- End of picture text -----<br>
13 | P a g e
| Case No.: | Party Name: SEBROS | Meet No/Date: | Status: | |||
|---|---|---|---|---|---|---|
| 15/8/80-ALC2/2018 | INDUSTRIES PVT. LTD. | 10/80-ALC2/2019 | ||||
| 11.09.2019 | ||||||
| HQ File<br>:01/80/050/00138/AM19/ | RLA File<br>:05/24/040/00185/AM19/ | Lic.No/Date:0510407110<br>06.07.2018 | Deferred |
- 38 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 10.06.2019 followed by an I.D. reminder on 25.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [432 x 163] intentionally omitted <==
eminder on 25.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [432 x 163] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: SMC Meet No/Date: Status:<br>11/6/80-ALC2/2019 PNEUMATICS (INDIA) 10/80-ALC2/2019<br>PRIVATE LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0510407270 Deferred<br>:01/80/050/00082/AM20/ :05/24/040/00233/AM19/ 23.07.2018<br>39 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 20.07.2019.<br>Reply received from the firm and sent to tech -3 on 08.08.2019 for examination /comments of the<br>case. However, no comments have been received yet. Hence, the Committee decided to wait for<br>the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 288] intentionally omitted <==
e been received yet. Hence, the Committee decided to wait for<br>the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 288] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: BHARAT Meet No/Date: Status:<br>4/10/80-ALC2/2018 HEAVY ELECTRICALS 10/80-ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0410164525 Deferred<br>:01/80/050/00190/AM19/ :04/24/040/00061/AM19/ 24.07.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per advice of representative of DHI as under:<br>1. Break up of seamless and welded pipes & tubes for item No. 1 to 3.<br>2. Break up of rounds & blooms for item No. 14 & 15.<br>3. Specific type of valves & gauges with complete specification.<br>40<br>4. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each imported<br>and indigenous input in the export product may be indicated. Net weight along with details<br>of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>5.
eight along with details<br>of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>5. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components to<br>be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary<br>evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>
14 | P a g e
==> picture [432 x 350] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: MAINI Meet No/Date: Status:<br>290/15/80-ALC2/2018 PRECISION PRODUCTS 10/80-ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0710113667 Approved<br>:01/80/050/00632/AM19/ :07/24/040/00112/AM19/ 01.08.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms<br>on the basis of inputs given by the Technical Authorities (After excluding wastage claimed for<br>oversize inputs) as under:<br>Sl. ITCHS Sl. ITCHS Import Recommended<br>Export Item<br>No. Code No.
the basis of inputs given by the Technical Authorities (After excluding wastage claimed for<br>oversize inputs) as under:<br>Sl. ITCHS Sl. ITCHS Import Recommended<br>Export Item<br>No. Code No. Code Item Norms<br>PUMP BODY<br>SS440B<br>COMPLETE -<br>Round bar<br>41 ASSEMBLY TO P/N TM.<br>Dia16 Wastage<br>1 87089900 0149863.B CONSISTS 1 72223019<br>SS440B allowed 70%<br>OF SLEEVE AF.0119213<br>Dia 16<br>(Export weight= 17<br>mm<br>gram/piece)<br>PUMP BODY<br>COMPLETE -<br>ASSEMBLY TO P/N TM. Pump<br>0149863.B CONSISTS Body Wastage<br>2 87089900 2 72132090<br>OF PUMP BODY Forging allowed 45%<br>FH.0149261 SS415M<br>(Export weight= 0.48<br>Kg/piece)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [432 x 121] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: MAINI Meet No/Date: Status:<br>291/15/80-ALC2/2018 PRECISION PRODUCTS 10/80-ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0710113804 Deferred<br>42 :01/80/050/00633/AM19/ :07/24/040/00140/AM19/ 03.09.2018<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>MSME for examination as per advice of representative of DHI.<br>Case is deferred.<br>----- End of picture text -----<br>
sidered the case as per the agenda and decided to refer the case to<br>MSME for examination as per advice of representative of DHI.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.: | Party Name: BIRLA | Meet No/Date: | Status: | |||
|---|---|---|---|---|---|---|
| 3/12/80-ALC2/2018 | PRECISION | 10/80-ALC2/2019 | ||||
| TECHNOLOGIES LTD. | 11.09.2019 | |||||
| HQ File<br>:01/80/050/00276/AM19/ | RLA File<br>:03/94/040/00599/AM19/ | Lic.No/Date:0310824314<br>09.10.2018 | Deferred |
43 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 01.07.2019 followed by an I.D. reminder on 23.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
15 | P a g e
==> picture [432 x 145] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/12/80- Party Name: BIRLA Meet No/Date:10/80- Status:<br>ALC2/2018 PRECISION ALC2/2019<br>TECHNOLOGIES LTD. 11.09.2019<br>HQ File RLA File Lic.No/Date:0310824317 Deferred<br>:01/80/050/00277/AM19/ :03/94/040/00600/AM19/ 09.10.2018<br>44<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply<br>was sent to MSME for examination of the case on 01.07.2019 followed by an I.D. reminder on<br>22.08.2019. However, no comments have been received yet. Hence, the Committee decided to<br>wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
.D. reminder on<br>22.08.2019. However, no comments have been received yet. Hence, the Committee decided to<br>wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:5/12/80- | Party Name: BIRLA | Meet No/Date:10/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | PRECISION | ALC2/2019 | ||||
| TECHNOLOGIES LTD. | 11.09.2019 | |||||
| HQ File<br>:01/80/050/00278/AM19/ | RLA File<br>:03/94/040/00598/AM19/ | Lic.No/Date:0310824375<br>11.10.2018 | Deferred |
45 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 10.07.2019 followed by an I.D. reminder on 23.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:12/12/80- | Party Name: BIRLA | Meet No/Date:10/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | PRECISION | ALC2/2019 | ||||
| TECHNOLOGIES LTD. | 11.09.2019 | |||||
| HQ File<br>:01/80/050/00285/AM19/ | RLA File<br>:03/94/040/00597/AM19/ | Lic.No/Date:0310824374<br>11.10.2018 | Deferred |
46 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 01.07.2019 followed by an I.D. reminder on 23.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [432 x 156] intentionally omitted <==
eminder on 23.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [432 x 156] intentionally omitted <==
----- Start of picture text -----<br> Case No.:22/12/80- Party Name: CPS OIL & Meet No/Date:10/80- Status:<br>ALC2/2018 GAS EQUIPMENTS PVT ALC2/2019<br>LTD 11.09.2019<br>HQ File RLA File Lic.No/Date:0310824383 Deferred<br>:01/80/050/00295/AM19/ :03/94/040/00630/AM19/ 11.10.2018<br>47 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Mumbai . A letter was sent to the firm<br>& RA, Mumbai on 09.05.2019 followed by reminders on 09.05.2019, 07.06.2019 & 24.07.2019.<br>However, no information has been received so far. Hence, the Committee decided to wait for the<br>complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
16 | P a g e
==> picture [432 x 157] intentionally omitted <==
br>complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
16 | P a g e
==> picture [432 x 157] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/12/80- Party Name: JAICO Meet No/Date:10/80- Status:<br>ALC2/2018 ENTERPRISE LLP ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0310824420 Deferred<br>:01/80/050/00274/AM19/ :03/94/040/00612/AM19/ 12.10.2018<br>48 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Mumbai . A letter was sent to the firm<br>& RA, Mumbai on 09.05.2019 followed by reminders on 09.05.2019, 07.06.2019 & 24.07.2019.<br>However, no information has been received so far. Hence, the Committee decided to wait for the<br>complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:23/12/80- | Party Name: GENERAL | Meet No/Date:10/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | INSTRUMENTS | ALC2/2019 | ||||
| CONSORTIUM SOLE | 11.09.2019 | |||||
| PROP. KULKARNI | ||||||
| HQ File<br>:01/80/050/00296/AM19/ | RLA File<br>:03/94/040/00640/AM19/ | Lic.No/Date:0310824478<br>16.10.2018 | Deferred |
MENTS||ALC2/2019||| |||CONSORTIUM SOLE||11.09.2019||| |||PROP. KULKARNI||||| |HQ File<br>:01/80/050/00296/AM19/||RLA File<br>:03/94/040/00640/AM19/||Lic.No/Date:0310824478<br>16.10.2018||Deferred|
49 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Mumbai . A letter was sent to the firm & RA, Mumbai on 09.05.2019 followed by reminders on 07.06.2019 & 24.07.2019. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [432 x 121] intentionally omitted <==
----- Start of picture text -----<br> Case No.:241/15/80- Party Name: MAINI Meet No/Date:10/80- Status:<br>ALC2/2018 PRECISION PRODUCTS ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0710114051 Deferred<br>50 :01/80/050/00583/AM19/ :07/24/040/00184/AM19/ 25.10.2018<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>MSME for examination as per advice of representative of DHI.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 167] intentionally omitted <==
the case to<br>MSME for examination as per advice of representative of DHI.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 167] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/12/80-ALC2/2018 Party Name: BONATRANS Meet No/Date:10/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0310824925 Approved<br>:01/80/050/00282/AM19/ :03/94/040/00675/AM19/ 06.11.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms on the<br>51 recommendation of technical members present in the meeting, as under:<br>Sl. ITCHS Sl. ITCHS Recommended<br>Export Item Import Item<br>No. Code No. Code Norms<br>Axles of Railway or Axles of Railway or<br>Tramway Locomotives Tramway Net to Net with<br>1 86071910 1 86071910<br>(61.0-Machined axle for Locomotives (Black 20%<br>wheel set) Acc. To dwg Axle for BTG recoverable<br>----- End of picture text -----<br>
17 | P a g e
th<br>1 86071910 1 86071910<br>(61.0-Machined axle for Locomotives (Black 20%<br>wheel set) Acc. To dwg Axle for BTG recoverable<br>----- End of picture text -----<br>
17 | P a g e
| d11-3-02846 NET WT. | Transfer order) | wastage on | ||||
|---|---|---|---|---|---|---|
| OF EACH BLACK | 67.1001/57 (Net wt. | weight basis | ||||
| AXLE( 405/ KGS / | of each Black Axle | |||||
| NOS)) | 491.000 KGS /PCS) | |||||
| 2 | 86071910 | Axles of Railway or<br>Tramway Locomotives<br>(61.0-Machined axle for<br>wheel set Acc. To dwg<br>d11-3-02948 NET WT.<br>OF EACH BLACK<br>AXLE 190.00 /KGS<br>/NOS) | 2 | 86071910 | Axles of Railway or<br>Tramway<br>Locomotives<br>(BLACK AXLE for<br>BTG Transfer order<br>type 4)<br>1-J86001/1 (Net<br>Weight 290 KGS<br>Per Axle) | Net to Net with<br>20%<br>recoverable<br>wastage on<br>weight basis |
Note: Import item at Sl. No. 1 &2 are allowed on Net to Net with 20% recoverable wastage on weight basis i.e. duty exemption on item No. 1 allowed on 142140 Kg and on item No. 2 on 27000 Kg.
RA concerned may take further necessary action as per the decision of NC.
==> picture [432 x 133] intentionally omitted <==
n item No. 1 allowed on 142140 Kg and on item No. 2 on 27000 Kg.**
RA concerned may take further necessary action as per the decision of NC.
==> picture [432 x 133] intentionally omitted <==
----- Start of picture text -----<br> Case No.:20/12/80- Party Name: MINDA SILCA Meet No/Date:10/80- Status:<br>ALC2/2018 ENGINEERING PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0510408370 Deferred<br>:01/80/050/00293/AM19/ :05/24/040/00433/AM19/ 12.11.2018<br>52<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply<br>was sent to MSME for examination of the case on 22.05.2019 followed by an I.D. reminder on<br>25.07.2019. However, no comments have been received yet. Hence, the Committee decided to<br>wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 133] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/14/80- Party Name: CUPRO Meet No/Date:10/80- Status:<br>ALC2/2018 TUBES ENTERPRISES ALC2/2019<br>PVT. LTD. 11.09.2019<br>HQ File RLA File Lic.No/Date:0310825109 Deferred<br>:01/80/050/00329/AM19/ :03/94/040/00722/AM19/ 19.11.2018<br>53<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 07.06.2019<br>followed by final reminder on 22.07.2019. However, no reply has been received yet.
iency letter<br>seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 07.06.2019<br>followed by final reminder on 22.07.2019. However, no reply has been received yet. Hence, the<br>Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [432 x 143] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: MUDHRA Meet No/Date:10/80- Status:<br>10/12/80-ALC2/2018 FINE BLANC PRIVATE ALC2/2019<br>LTD. 11.09.2019<br>HQ File RLA File Lic.No/Date:0410164931 Approved<br>:01/80/050/00283/AM19/ :04/24/040/00190/AM19/ 29.11.2018<br>54<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms on<br>the recommendation of technical members present in the meeting, as under:<br>ITCHS ITCHS Recommended<br>Export Item Import Item<br>Code Code Norms<br>87089900 40009851 SPROCKET CAM 72269230 BILSTEIN GMBH & Wastage<br>----- End of picture text -----<br>
18 | P a g e
==> picture [348 x 67] intentionally omitted <==
----- Start of picture text -----<br>
||||
|---|---|---|
|VM20662167G/|CO. KG COLD|allowed 35%|
|FCA46328125 ge2 FINE|ROLLED STEEL STRIP|
|BLANC COMPONENT|C45E LC MA-RL SLIT|
|USED FOR I.C ENGINE|EDGE EN 10132-3/ EN|
|TRANSMISSION SYSTEMS|10140 THICKNESS 4.9|
|IN PASSENGER CARS|X WIDTH 140 MM|
----- End of picture text -----<br>
RA concerned may take further necessary action as per the decision of NC.
TRANSMISSION SYSTEMS|10140 THICKNESS 4.9| |IN PASSENGER CARS|X WIDTH 140 MM|
**----- End of picture text -----**<br>
RA concerned may take further necessary action as per the decision of NC.
**==> picture [432 x 145] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:6/14/80- Party Name: WEIR INDIA Meet No/Date:10/80- Status:<br>ALC2/2018 PRIVATE LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0310825488 Withdrawn<br>:01/80/050/00322/AM19/ :03/95/040/00932/AM19/ 06.12.2018<br>55<br>Decision: The Committee considered the case as per the agenda and noted that the firm has<br>informed vide email dated 26.08.2019 that the above AA has been issued on Net to Net basis .<br>Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA,<br>Mumbai .<br>Case is withdrawn.<br>**----- End of picture text -----**<br>
**==> picture [432 x 157] intentionally omitted <==**
ded to withdraw the case from the agenda under intimation to RA,<br>Mumbai .<br>Case is withdrawn.<br>**----- End of picture text -----**<br>
**==> picture [432 x 157] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:267/15/80- Party Name: LARSEN & Meet No/Date:10/80- Status:<br>ALC2/2018 TOUBRO LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0310825583 Deferred<br>:01/80/050/00609/AM19/ :03/95/040/00583/AM19/ 11.12.2018<br>56 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Mumbai and in this regard a letter was<br>sent to the firm & RA, Mumbai on 29.07.2019. However, no information has been received so<br>far. Hence, the Committee decided to wait for the complete set of application for examination of<br>the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 68] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:268/15/80- Party Name: LARSEN & Meet No/Date:10/80- Status:<br>ALC2/2018 TOUBRO LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0310825584 Deferred<br>57 :01/80/050/00610/AM19/ :03/95/040/00579/AM19/ 11.12.2018<br>**----- End of picture text -----**<br>
**Decision:** The Committee considered the case as per the agenda and decided to refer the case to **DPIIT** for examination as per advice of representative of **DHI** .
Case is deferred.
**19 |** P a g e
** The Committee considered the case as per the agenda and decided to refer the case to **DPIIT** for examination as per advice of representative of **DHI** .
Case is deferred.
**19 |** P a g e
**==> picture [432 x 134] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:269/15/80- Party Name: LARSEN & Meet No/Date:10/80- Status:<br>ALC2/2018 TOUBRO LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0310825585 Deferred<br>:01/80/050/00611/AM19/ :03/95/040/00585/AM19/ 11.12.2018<br>58<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to DHI on 04.09.2019 for examination of the case. However, no comments<br>have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
|**Case No.:30/12/80-**||Party Name: CML||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2018**||BIOTECH PRIVATE||ALC2/2019|||
|||LIMITED||11.09.2019|||
|HQ File<br>:01/80/050/00303/AM19/||RLA File<br>:10/24/040/00045/AM19/||Lic.No/Date:1010060084<br>12.12.2018||Deferred|
59 **Decision:** The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by **Consultant (Tech-1)** was sent to the firm on 14.05.2019 followed by final reminder on 22.07.2019. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
was sent to the firm on 14.05.2019 followed by final reminder on 22.07.2019. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
|**Case No.:276/15/80-**||Party Name: BIRLA||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2018**||FURUKAWA FIBRE||ALC2/2019|||
|||OPTICS LIMITED||11.09.2019|||
|HQ File<br>:01/80/050/00618/AM19/||RLA File<br>:03/94/040/00758/AM19/||Lic.No/Date:0310825749<br>18.12.2018||Deferred|
60 **Decision:** The Committee considered the case as per the agenda and noted that a copy of application was sent to **MeitY** on 23.07.2019 for examination of the case. However, MeitY vide email dated 11.09.2019 informed that the case is under examination. Therefore, the Committee decided to wait for the comments.
Case is deferred.
**==> picture [432 x 181] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:14/6/80- Party Name: IND-SPHINX Meet No/Date:10/80- Status:<br>ALC2/2019 PRECISION LTD ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:2210016034 Deferred<br>:01/80/050/00085/AM20/ :22/24/040/00069/AM19/ 18.12.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>61 furnish following information as per the advice of representative of DHI:<br>1. Weight of each Export Product.<br>2. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing.
dvice of representative of DHI:<br>1. Weight of each Export Product.<br>2. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>**----- End of picture text -----**<br>
**20 |** P a g e
3. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
**==> picture [432 x 133] intentionally omitted <==**
ges claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
**==> picture [432 x 133] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:20/14/80- Party Name: ULTRA Meet No/Date:10/80- Status:<br>ALC2/2018 ENGINEERS ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:3110067260 Deferred<br>:01/80/050/00336/AM19/ :31/83/040/00150/AM19/ 19.12.2018<br>62<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply<br>was sent to DHI on 24.07.2019 for examination of the case. However, the representative of DHI<br>informed in meeting that the case is under examination. Therefore, the Committee decided to wait<br>for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 110] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:285/15/80- Party Name: MAINI Meet No/Date:10/80- Status:<br>ALC2/2018 PRECISION PRODUCTS ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0710114362 Deferred<br>63<br>:01/80/050/00627/AM19/ :07/24/040/00237/AM19/ 02.01.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>MSME for examination as per advice of representative of DHI.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 109] intentionally omitted <==**
the case to<br>MSME for examination as per advice of representative of DHI.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 109] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:295/15/80- Party Name: TERUMO Meet No/Date:10/80- Status:<br>ALC2/2018 PENPOL PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:5310019903 Approved<br>64<br>:01/80/050/00637/AM19/ :53/24/040/00010/AM19/ 14.01.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as<br>per written comments given by Consultant (Tech-1). (Copy enclosed)<br>RA concerned may take suitable consequential action accordingly.<br>**----- End of picture text -----**<br>
**==> picture [432 x 145] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:7/14/80- Party Name: ROTZLER Meet No/Date:10/80- Status:<br>ALC2/2018 SERVICES PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0710114403 Deferred<br>:01/80/050/00323/AM19/ :07/24/040/00236/AM19/ 16.01.2019<br>65<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Bangalore . A letter was sent to the<br>firm & RA, Bangalore on 05.04.2019 followed by reminders on 15.05.2019 & 26.07.2019.<br>However, no information has been received so far.
rom the firm & RA, Bangalore . A letter was sent to the<br>firm & RA, Bangalore on 05.04.2019 followed by reminders on 15.05.2019 & 26.07.2019.<br>However, no information has been received so far. Hence, the Committee decided to wait for<br>complete set of application for examination of the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**21 |** P a g e
**==> picture [432 x 122] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:313/15/80- Party Name: OMEGA Meet No/Date:10/80- Status:<br>ALC2/2018 ICEHILL PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0510409545 Deferred<br>66 :01/80/050/00655/AM19/ :05/24/040/00627/AM19/ 31.01.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>DPIIT for examination as per advice of representative of DHI.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 276] intentionally omitted <==**
the case to<br>DPIIT for examination as per advice of representative of DHI.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 276] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:15/6/80- Party Name: BHARAT Meet No/Date:10/80- Status:<br>ALC2/2019 HEAVY ELECTRICALS ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:1110028485 Deferred<br>:01/80/050/00086/AM20/ :11/24/040/00024/AM19/ 04.02.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of representative of DHI:<br>1. Model number, technical specification and specific quantity-both in terms of number (if any)<br>and/or weight, of each export product (Appendix-33 of current HBP refers).<br>67 2. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each imported<br>and indigenous input in the export product may be indicated. Net weight along with details of<br>other imported input to be used in the resultant product and sought to be imported/procured<br>from sources other than the license, if any, may also be indicated.<br>3.
eight along with details of<br>other imported input to be used in the resultant product and sought to be imported/procured<br>from sources other than the license, if any, may also be indicated.<br>3. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components to<br>be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary evidence/drawings<br>etc.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 150] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:310/15/80- Party Name: TERUMO Meet No/Date:10/80- Status:<br>ALC2/2018 PENPOL PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:5310019913 Deferred<br>:01/80/050/00652/AM19/ :53/24/040/00013/AM19/ 05.02.2019<br>68 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 21.08.2019.<br>However, no reply has been received yet. Hence, the Committee decided to wait for reply of the<br>firm.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**22 |** P a g e
8.2019.<br>However, no reply has been received yet. Hence, the Committee decided to wait for reply of the<br>firm.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**22 |** P a g e
|**Case No.:327/15/80-**||Party Name: ASHWIN||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2018**||PLASTIC INDUSTRIES||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00669/AM19/||RLA File<br>:03/94/040/00997/AM19/||Lic.No/Date:0310827105<br>19.02.2019||Deferred|
69 **Decision:** The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 20.06.2019 followed by an I.D. reminder on 22.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
70
||**Case No.:328/15/80-**||Party Name: ACE||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|---|
||**ALC2/2018**||FURNACES PVT. LTD.||ALC2/2019|||
||||||11.09.2019|||
||HQ File<br>:01/80/050/00670/AM19/||RLA File<br>:03/94/040/01005/AM19/||Lic.No/Date:0310827111<br>19.02.2019||Deferred|
**Decision:** The Committee considered the case as per the agenda and noted that the copy of application was sent to **MSME** on 22.07.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
f application was sent to **MSME** on 22.07.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
|**Case No.:334/15/80-**||Party Name: JAMES||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2018**||ROBINSON LABS PVT||ALC2/2019|||
|||LTD||11.09.2019|||
|HQ File<br>:01/80/050/00676/AM19/||RLA File<br>:09/24/040/00531/AM19/||Lic.No/Date:0910067205<br>22.02.2019||Deferred|
71 **Decision:** The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by **Consultant (Tech-1)** was sent to the firm on 10.06.2019 followed by final reminder on 22.07.2019. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.
Case is deferred.
|**Case No.:6/1/80-**||Party Name: APAR||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||INDUSTRIES LIMITED||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00754/AM19/||RLA File<br>:03/94/040/00999/AM19/||Lic.No/Date:0310827307<br>26.02.2019||Deferred|
72
**Decision:** The Committee considered the case as per the agenda and noted that a copy of application was sent to **MeitY** for examination of the case on 13.06.2019 followed by an I.D. reminder on 22.08.2019. However, **MeitY** vide email dated 11.09.2019 informed that the case is under examination. Therefore, the Committee decided to wait for the comments.
Case is deferred.
**23 |** P a g e
8.2019. However, **MeitY** vide email dated 11.09.2019 informed that the case is under examination. Therefore, the Committee decided to wait for the comments.
Case is deferred.
**23 |** P a g e
**==> picture [432 x 264] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:7/1/80- Party Name: Meet No/Date:10/80- Status:<br>ALC2/2019 BONATRANS INDIA ALC2/2019<br>PRIVATE LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0310827336 Approved<br>:01/80/050/00755/AM19/ :03/94/040/01021/AM19/ 27.02.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms on<br>the recommendation of technical members present in meeting, as under:<br>ITCHS ITCHS Recommended<br>Export Item Import Item<br>Code Code Norms<br>73<br>Machined Axle for Wheel 67.1008/58 Rolled<br>set Acc. to Dwg. D11-3- Bar for BTG Net to Net with<br>02846 (Net wt. of each Transfer Order D11- 20%<br>86071910 86071910<br>Machined Axle is 405.000 3-03029 (Net recoverable<br>KGS/PCS) Weight 660 Kgs/ wastage<br>PCS)<br>Note: Import item at Sl. No. 1 are allowed on Net to Net with 20% recoverable wastage on weight<br>basis i.e. duty exemption on item No. 1 allowed on 205233 Kg.<br>RA concerned may take further necessary action as per the decision of NC.<br>**----- End of picture text -----**<br>
**==> picture [432 x 149] intentionally omitted <==**
allowed on 205233 Kg.<br>RA concerned may take further necessary action as per the decision of NC.<br>**----- End of picture text -----**<br>
**==> picture [432 x 149] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:8/1/80- Party Name: DAGGER Meet No/Date:10/80- Status:<br>ALC2/2019 MASTER TOOL ALC2/2019<br>INDUSTRIES LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0310827404 Deferred<br>:01/80/050/00756/AM19/ :03/94/040/01048/AM19/ 01.03.2019<br>74 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 22.07.2019.<br>However, no reply has been received yet. Hence, the Committee decided to send final reminder to<br>the firm to furnish the requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 158] intentionally omitted <==**
requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 158] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:39/1/80- Party Name: CHEMICO Meet No/Date:10/80- Status:<br>ALC2/2019 SYNTHETICS LTD. ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0510409870 Deferred<br>:01/80/050/00787/AM19/ :05/23/040/00540/AM19/ 07.03.2019<br>75 Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 08.04.2019 for examination of the case. However, no<br>comments are being furnished by MSME . The case was discussed in the meeting and the<br>Committee decided to refer the case to Consultant (Tech-1) for examination & comments. Party<br>should submit certificate of analysis of raw material.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**24 |** P a g e
|**Case No.:50/1/80-**||Party Name: SAIRA ASIA||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||INTERIORS PVT LTD||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00798/AM19/||RLA File<br>:34/24/040/00376/AM19/||Lic.No/Date:3410044963<br>08.03.2019||Deferred|
|---|---|
|**ALC2/2019**||INTERIORS PVT LTD||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00798/AM19/||RLA File<br>:34/24/040/00376/AM19/||Lic.No/Date:3410044963<br>08.03.2019||Deferred|
76 **Decision:** The Committee considered the case as per the agenda and noted that the copy of application was sent to **MSME** for examination of the case on 20.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
**==> picture [432 x 209] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:48/1/80- Party Name: LMT TOOLS Meet No/Date:10/80- Status:<br>ALC2/2019 INDIA PRIVATE LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:3110067349 Deferred<br>:01/80/050/00796/AM19/ :31/83/040/00189/AM19/ 12.03.2019<br>Decision: The Committee considered the case as per the agenda and Consultant (Tech-3)<br>informed that the firm’s reply dated 25.07.2019 is deficient due to following reasons:<br>77<br>1. Calculations with supporting drawings for 4-5 sizes of export product, where wastage is<br>high or quantity is high.<br>2. Any documents available regarding disposal of scrap having value in it.<br>The Committee decided to ask from the firm to provide clarification on the above mentioned<br>deficiencies.<br>Case is deferred.<br>**----- End of picture text -----**<br>
78
ving value in it.<br>The Committee decided to ask from the firm to provide clarification on the above mentioned<br>deficiencies.<br>Case is deferred.<br>**----- End of picture text -----**<br>
78
||**Case No.:44/1/80-**||Party Name: COFLE||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|---|
||**ALC2/2019**||TAYLOR INDIA||ALC2/2019|||
||||CONTROL CABLES &||11.09.2019|||
||||SYSTEMS PRIVAT|||||
||HQ File<br>:01/80/050/00792/AM19/||RLA File<br>:04/24/040/00266/AM19/||Lic.No/Date:0410165321<br>14.03.2019||Deferred|
**Decision:** The Committee considered the case as per the agenda and noted that the copy of application was sent to **MSME** for examination of the case on 17.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
**25 |** P a g e
|**Case No.:12/2/80-**||Party Name: VICTORA||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||AUTO PVT. LTD.||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00805/AM19/||RLA File<br>:05/24/040/00738/AM19/||Lic.No/Date:0510410085<br>28.03.2019||Deferred|
79 **Decision:** The Committee considered the case as per the agenda and noted that the copy of application was sent to **MSME** for examination of the case on 14.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
ination of the case on 14.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
|**Case No.:3/2/80-**||Party Name: AUTOCOMP||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||CORPORATION PANSE||ALC2/2019|||
|||PRIVATE LIMITED||11.09.2019|||
|HQ File<br>:01/80/050/00003/AM20/||RLA File<br>:31/83/040/00298/AM19/||Lic.No/Date:3110067366<br>02.04.2019||Deferred|
80 **Decision:** The Committee considered the case as per the agenda and noted that the copy of application was sent to **DHI** for examination of the case on 14.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
81
||**Case No.:1/4/80-**||Party Name: STERLITE||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|---|
||**ALC2/2019**||POWER TRANSMISSION||ALC2/2019|||
||||LIMITED||11.09.2019|||
||HQ File<br>:01/80/050/00016/AM20/||RLA File<br>:03/95/040/00051/AM20/||Lic.No/Date:0310828571<br>24.04.2019||Deferred|
**Decision:** The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by **MeitY** was sent to the firm on 21.08.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
**==> picture [432 x 150] intentionally omitted <==**
he firm on 21.08.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
**==> picture [432 x 150] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:2/4/80- Party Name: SULZER Meet No/Date:10/80- Status:<br>ALC2/2019 INDIA PRIVATE ALC2/2019<br>LIMITED. 11.09.2019<br>HQ File RLA File Lic.No/Date:3110067390 Deferred<br>:01/80/050/00017/AM20/ :31/83/040/00009/AM20/ 24.04.2019<br>82 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019. However, no<br>reply has been received yet. Hence, the Committee decided to send final reminder to the firm to<br>furnish the requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**26 |** P a g e
**==> picture [432 x 150] intentionally omitted <==**
ion within 15 days failing which the case will be rejected.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**26 |** P a g e
**==> picture [432 x 150] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:3/4/80- Party Name: SULZER Meet No/Date:10/80- Status:<br>ALC2/2019 INDIA PRIVATE ALC2/2019<br>LIMITED. 11.09.2019<br>HQ File RLA File Lic.No/Date:3110067391 Deferred<br>:01/80/050/00018/AM20/ :31/83/040/00010/AM20/ 24.04.2019<br>83 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019. However, no<br>reply has been received yet. Hence, the Committee decided to send final reminder to the firm to<br>furnish the requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 150] intentionally omitted <==**
requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 150] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:4/4/80- Party Name: SULZER Meet No/Date:10/80- Status:<br>ALC2/2019 INDIA PRIVATE ALC2/2019<br>LIMITED. 11.09.2019<br>HQ File RLA File Lic.No/Date:3110067392 Deferred<br>:01/80/050/00019/AM20/ :31/83/040/00011/AM20/ 24.04.2019<br>84 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DPIIT was sent to the firm on 23.07.2019. However, no<br>reply has been received yet. Hence, the Committee decided to send final reminder to the firm to<br>furnish the requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 312] intentionally omitted <==**
requisite information within 15 days failing which the case will be rejected.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 312] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:8/4/80- Party Name: KEY-TECH Meet No/Date:10/80- Status:<br>ALC2/2019 ENGINEERING CO. ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0310828538 Deferred<br>:01/80/050/00023/AM20/ :03/94/040/00057/AM20/ 24.04.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of Consultant (Tech-3):<br>1. Detail technical note on manufacturing process including the relevant flow sheet.<br>2. Detail technical drawings with dimension of each export product, Catalogue, if any, may<br>also be furnished.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the<br>85<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>4.
eight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components<br>to be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary<br>evidence/drawings etc.<br>5. Sheet layout diagram of the material indicating the wastage during blanking.<br>6. Use of export product.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**27 |** P a g e
**==> picture [432 x 134] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:5/4/80- Party Name: VICTORA Meet No/Date:10/80- Status:<br>ALC2/2019 AUTO PVT. LTD ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0510410376 Deferred<br>:01/80/050/00020/AM20/ :05/24/040/00033/AM20/ 25.04.2019<br>86<br>Decision: The Committee considered the case as per the agenda and noted that the copy of<br>application was sent to MSME on 05.08.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
9 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
|**Case No.:7/4/80-**||Party Name: SHIVALIK||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||BIMETAL CONTROLS||ALC2/2019|||
|||LTD||11.09.2019|||
|HQ File<br>:01/80/050/00022/AM20/||RLA File<br>:05/24/040/00016/AM20/||Lic.No/Date:0510410395<br>26.04.2019||Deferred|
87 **Decision:** The Committee considered the case as per the agenda and noted that the copy of application was sent to **MSME** for examination of the case on 10.06.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
**==> picture [432 x 156] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:9/4/80- Party Name: ERBATECH Meet No/Date:10/80- Status:<br>ALC2/2019 MACHINERY P LTD ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:3210078932 Deferred<br>:01/80/050/00024/AM20/ :32/24/040/00004/AM20/ 29.04.2019<br>88 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Coimbatore and in this regard a letter<br>was sent to the firm & RA, Coimbatore on 23.07.2019. However, no information has been<br>received so far.
n has not yet been received from the firm & RA, Coimbatore and in this regard a letter<br>was sent to the firm & RA, Coimbatore on 23.07.2019. However, no information has been<br>received so far. Hence, the Committee decided to wait for the complete set of application for<br>examination of the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 150] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:12/4/80- Party Name: FREEDOM Meet No/Date:10/80- Status:<br>ALC2/2019 OPTHALMIC PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0410165526 Deferred<br>:01/80/050/00027/AM20/ :04/24/040/00018/AM20/ 30.04.2019<br>89 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 21.08.2019.<br>However, no reply has been received yet. Hence, the Committee decided to wait for reply of the<br>firm.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**28 |** P a g e
**==> picture [432 x 276] intentionally omitted <==**
ce, the Committee decided to wait for reply of the<br>firm.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**28 |** P a g e
**==> picture [432 x 276] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:13/4/80- Party Name: SRI RAM Meet No/Date:10/80- Status:<br>ALC2/2019 INDUSTRIES ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0410165532 Deferred<br>:01/80/050/00028/AM20/ :04/24/040/00157/AM19/ 01.05.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of representative of DHI:<br>1. Export quantity both in number & weight separately for each export item like Bush, Shaft<br>etc.<br>90 2. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>3.
eight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>3. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components<br>to be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary<br>evidence/drawings etc.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 145] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:14/4/80- Party Name: KINECO Meet No/Date:10/80- Status:<br>ALC2/2019 KAMAN COMPOSITES - ALC2/2019<br>INDIA PVT LTD 11.09.2019<br>HQ File RLA File Lic.No/Date:0310828702 Deferred<br>:01/80/050/00029/AM20/ :03/94/040/01131/AM19/ 01.05.2019<br>91<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MeitY on 24.07.2019 for examination of the case. However, MeitY vide<br>email dated 11.09.2019 informed that the case is under examination. Therefore, the Committee<br>decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
<br>email dated 11.09.2019 informed that the case is under examination. Therefore, the Committee<br>decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
|**Case No.:17/4/80-**||Party Name: SAIRA ASIA||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||INTERIORS PVT. LTD.||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00032/AM20/||RLA File<br>:34/24/040/00035/AM20/||Lic.No/Date:3410045102<br>01.05.2019||Deferred|
92
**Decision:** The Committee considered the case as per the agenda and noted that a copy of application was sent to **MSME** for examination of the case on 11.06.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
**29 |** P a g e
|**Case No.:15/4/80-**||Party Name: CHIRAG||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||UDYOG||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00030/AM20/||RLA File<br>:05/23/040/00054/AM20/||Lic.No/Date:0510410451<br>02.05.2019||Deferred|
93 **Decision:** The Committee considered the case as per the agenda and noted that a copy of application was sent to **MSME** for examination of the case on 20.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
ination of the case on 20.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
|**Case No.:16/4/80-**||Party Name: BLISS||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||ANAND PVT. LTD.||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00031/AM20/||RLA File<br>:05/23/040/00051/AM20/||Lic.No/Date:0510410480<br>03.05.2019||Deferrred|
94
**Decision:** The Committee considered the case as per the agenda and noted that the copy of application was sent to **MSME** for examination of the case on 03.06.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
**==> picture [432 x 163] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:21/4/80- Party Name: MASU BRAKE Meet No/Date:10/80- Status:<br>ALC2/2019 PADS PRIVATE LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0510410488 Deferred<br>:01/80/050/00036/AM20/ :05/24/040/00057/AM20/ 06.05.2019<br>95 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 22.07.2019.<br>However, no reply has been received yet.
as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 22.07.2019.<br>However, no reply has been received yet. Hence, the Committee decided to send final reminder<br>to the firm to furnish the requisite information within 15 days failing which the case will be<br>rejected.<br>Case is deferred.<br>**----- End of picture text -----**<br>
96
||**Case No.:**||Party Name: MAGNETI MARELLI||Meet No/Date:||**Status:**|
|---|---|---|---|---|---|---|---|
||**20/4/80-ALC2/2019**||TALBROS CHASSIS SYSTEMS||10/80-ALC2/2019|||
||||PRIVATE LI||11.09.2019|||
||HQ File<br>:01/80/050/00035/AM20/||RLA File :05/24/040/00053/AM20/||Lic.No/Date:<br>0510410509<br>07.05.2019||Deferred|
**Decision:** The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per the advice of **representative of DHI:**
1. Model number, technical specification and specific quantity-both in terms of number (if any) and/or weight, of each export product (Appendix-33 of current HBP refers).
2. Detail technical note on manufacturing process including the relevant flow sheet.
**30 |** P a g e
number (if any) and/or weight, of each export product (Appendix-33 of current HBP refers).
2. Detail technical note on manufacturing process including the relevant flow sheet.
**30 |** P a g e
3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
4. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
**==> picture [432 x 122] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:19/4/80- Party Name: VICTORA Meet No/Date:10/80- Status:<br>ALC2/2019 AUTO PVT. LTD. ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0510410518 Deferred<br>97 :01/80/050/00034/AM20/ :05/24/040/00762/AM19/ 08.05.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>MSME for examination as per advice of representative of DHI .<br>Case is deferred.<br>**----- End of picture text -----**<br>
idered the case as per the agenda and decided to refer the case to<br>MSME for examination as per advice of representative of DHI .<br>Case is deferred.<br>**----- End of picture text -----**<br>
|**Case No.:18/4/80-**||Party Name: DILIGENT||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||SCM SOLUTIONS||ALC2/2019|||
|||PRIVATE LIMITED||11.09.2019|||
|HQ File<br>:01/80/050/00033/AM20/||RLA File<br>:09/24/040/00058/AM20/||Lic.No/Date:0910067492<br>10.05.2019||Deferred|
98 **Decision:** The Committee considered the case as per the agenda and noted that the copy of application was sent to **MSME** for examination of the case on 22.05.2019 followed by an I.D. reminder on 22.07.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
99
||**Case No.:25/5/80-**||Party Name: WEIR INDIA||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|---|
||**ALC2/2019**||PRIVATE LIMITED||ALC2/2019|||
||||||11.09.2019|||
||HQ File<br>:01/80/050/00063/AM20/||RLA File<br>:03/95/040/00162/AM20/||Lic.No/Date:0310829262<br>27.05.2019||Withdrawn|
**Decision:** The Committee considered the case as per the agenda and noted that the firm informed vide email dated 26.08.2019 that the above AA has been issued on **Net to Net basis** . Therefore, the Committee decided to withdraw the case from the agenda under intimation to **RA, Mumbai** .
Case is withdrawn.
**31 |** P a g e
**==> picture [432 x 157] intentionally omitted <==**
efore, the Committee decided to withdraw the case from the agenda under intimation to **RA, Mumbai** .
Case is withdrawn.
**31 |** P a g e
**==> picture [432 x 157] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:26/5/80- Party Name: ROTHE ERDE Meet No/Date:10/80- Status:<br>ALC2/2019 INDIA PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:3110067430 Deferred<br>:01/80/050/00064/AM20/ :31/83/040/00035/AM20/ 28.05.2019<br>100 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Pune and in this regard a letter was<br>sent to the firm & RA, Pune on 24.07.2019. However, no information has been received so far.<br>Hence, the Committee decided to wait for complete set of application for examination of the<br>case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
|**Case No.:27/5/80-**||Party Name: GRAND PRIX||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||ENGINEERING PVT.LTD.||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00065/AM20/||RLA File<br>:05/23/040/00092/AM20/||Lic.No/Date:0510410754<br>28.05.2019||Withdrawn|
101 **Decision:** The Committee considered the case as per the agenda and noted that the firm informed vide letter dated 08.08.2019 that the above AA was surrendered at **RA, New Delhi** . Therefore, the Committee decided to withdraw the case from the agenda under intimation to **RA, New Delhi** .
Case is withdrawn.
8.08.2019 that the above AA was surrendered at **RA, New Delhi** . Therefore, the Committee decided to withdraw the case from the agenda under intimation to **RA, New Delhi** .
Case is withdrawn.
**==> picture [432 x 287] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:28/5/80- Party Name: SHIRODKAR Meet No/Date:10/80- Status:<br>ALC2/2019 PRECI COMP PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:3110067433 Deferred<br>:01/80/050/00066/AM20/ :31/83/040/00028/AM20/ 29.05.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of Consultant (Tech-3):<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may<br>also be furnished.<br>2. Weight of each Export Product.<br>102<br>3. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>4.
eight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components<br>to be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary<br>evidence/drawings etc.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**32 |** P a g e
**==> picture [432 x 288] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:29/5/80- Party Name: SHIRODKAR Meet No/Date:10/80- Status:<br>ALC2/2019 PRECI COMP PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:3110067434 Deferred<br>:01/80/050/00067/AM20/ :31/83/040/00027/AM20/ 29.05.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of Consultant (Tech-3):<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may<br>also be furnished.<br>2. Weight of each Export Product.<br>103<br>3. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated.
input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components<br>to be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary<br>evidence/drawings etc.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 157] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:30/5/80- Party Name: TIAGO CHEM Meet No/Date:10/80- Status:<br>ALC2/2019 ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:3410045178 Deferred<br>:01/80/050/00068/AM20/ :34/24/040/00075/AM20/ 30.05.2019<br>104 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Vadodara and in this regard a letter<br>was sent to the firm & RA, Vadodara on 26.07.2019. However, no information has been<br>received so far.
ation has not yet been received from the firm & RA, Vadodara and in this regard a letter<br>was sent to the firm & RA, Vadodara on 26.07.2019. However, no information has been<br>received so far. Hence, the Committee decided to wait for complete set of application for<br>examination of the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
105
||**Case No.:32/5/80-**||Party Name: FUTURE||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|---|
||**ALC2/2019**||TECH ENGINEERING||ALC2/2019|||
||||PVT.LTD,||11.09.2019|||
||HQ File<br>:01/80/050/00070/AM20/||RLA File<br>:07/24/040/00050/AM20/||Lic.No/Date:0710115000<br>31.05.2019||Deferred|
**Decision:** The Committee considered the case as per the agenda and noted that the copy of application was sent to **MSME** on 13.08.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
**33 |** P a g e
|**Case No.:**||Party Name: GRAND PRIX||Meet No/Date:||**Status:**|
|---|---|---|---|---|---|---|
|**33/5/80-ALC2/2019**||ENGINEERING PVT. LTD.||10/80-ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00071/AM20/||RLA File<br>:05/23/040/00096/AM20/||Lic.No/Date:0510410791<br>03.06.2019||Deferred|
80-ALC2/2019**||ENGINEERING PVT. LTD.||10/80-ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00071/AM20/||RLA File<br>:05/23/040/00096/AM20/||Lic.No/Date:0510410791<br>03.06.2019||Deferred|
106 **Decision:** The Committee considered the case as per the agenda and noted that a copy of application was sent to **MSME** for examination of the case on 03.07.2019 followed by an I.D. Reminder on 23.08.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
**==> picture [432 x 157] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:1/6/80- Party Name: SHIVALIK Meet No/Date:10/80- Status:<br>ALC2/2019 BIMETAL CONTROLS ALC2/2019<br>LTD 11.09.2019<br>HQ File RLA File Lic.No/Date:0510410810 Deferred<br>:01/80/050/00072/AM20/ :05/24/040/00129/AM20/ 04.06.2019<br>107 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, New Delhi and in this regard a letter<br>was sent to the firm & RA, New Delhi on 24.07.2019. However, no information has been<br>received so far. Hence, the Committee decided to wait for the complete set of application for<br>examination of the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 157] intentionally omitted <==**
ed to wait for the complete set of application for<br>examination of the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 157] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:2/6/80- Party Name: LAXMI Meet No/Date:10/80- Status:<br>ALC2/2019 DENTAL EXPORT PVT. ALC2/2019<br>LTD. 11.09.2019<br>HQ File RLA File Lic.No/Date:0310829403 Deferred<br>:01/80/050/00073/AM20/ :03/95/040/00207/AM20/ 04.06.2019<br>108 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Mumbai and in this regard a letter<br>was sent to the firm & RA, Mumbai on 26.07.2019. However, no information has been received<br>so far. Hence, the Committee decided to wait for the complete set of application for examination<br>of the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 156] intentionally omitted <==**
ed to wait for the complete set of application for examination<br>of the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 156] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:3/6/80- Party Name: Meet No/Date:10/80- Status:<br>ALC2/2019 ENDURANCE ALC2/2019<br>TECHNOLOGIES 11.09.2019<br>LIMITED<br>HQ File RLA File Lic.No/Date:0310829408 Withdrawn<br>:01/80/050/00074/AM20/ :03/94/040/00162/AM20/ 04.06.2019<br>109<br>Decision: The Committee considered the case as per the agenda and noted that RA, Mumbai<br>informed vide letter dated 27.08.2019 that the above license was issued on net to net basis .<br>Hence, the Committee decided to withdraw the case from the agenda under intimation to RA,<br>Mumbai.<br>Case is withdrawn.<br>**----- End of picture text -----**<br>
**34 |** P a g e
**==> picture [432 x 133] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:4/6/80- Party Name: MAGNA Meet No/Date:10/80- Status:<br>ALC2/2019 AUTOMOTIVE INDIA ALC2/2019<br>PRIVATE LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0410165680 Deferred<br>:01/80/050/00075/AM20/ :04/24/040/00049/AM20/ 06.06.2019<br>110<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 30.07.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
9 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 150] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:5/6/80- Party Name: ERBATECH Meet No/Date:10/80- Status:<br>ALC2/2019 MACHINERY PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:3210078986 Deferred<br>:01/80/050/00076/AM20/ :32/24/040/00017/AM20/ 06.06.2019<br>111 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on<br>22.08.2019. However, no reply has been received yet. Hence, the Committee decided to wait for<br>reply of the firm.<br>Case is deferred.<br>**----- End of picture text -----**<br>
|**Case No.:8/6/80-**||Party Name: HANNING||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||MOTORS INDIA P LTD||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00079/AM20/||RLA File<br>:34/24/040/00071/AM20/||Lic.No/Date:3410045192<br>06.06.2019||Deferred|
112 **Decision:** The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & **RA, Vadodara** and in this regard a letter was sent to the firm & **RA, Vadodara** on 29.07.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
, Vadodara** and in this regard a letter was sent to the firm & **RA, Vadodara** on 29.07.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
113
||**Case No.:6/6/80-**||Party Name: TEMA INDIA||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|---|
||**ALC2/2019**||LIMITED||ALC2/2019|||
||||||11.09.2019|||
||HQ File<br>:01/80/050/00077/AM20/||RLA File<br>:03/95/040/00221/AM20/||Lic.No/Date:0310829486<br>07.06.2019||Deferred|
**Decision:** The Committee considered the case as per the agenda and noted that a copy of application was sent to **MSME** on 04.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
**35 |** P a g e
114
||**Case No.:7/6/80-**||Party Name: TEMA INDIA||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|---|
||**ALC2/2019**||LIMITED||ALC2/2019|||
||||||11.09.2019|||
||HQ File<br>:01/80/050/00078/AM20/||RLA File<br>:03/95/040/00206/AM20/||Lic.No/Date:0310829488<br>07.06.2019||Deferred|
**Decision:** The Committee considered the case as per the agenda and noted that a copy of application was sent to **MSME** on 04.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
115
ication was sent to **MSME** on 04.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
115
||**Case No.:10/6/80-**||Party Name: TEMA INDIA||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|---|
||**ALC2/2019**||LIMITED||ALC2/2019|||
||||||11.09.2019|||
||HQ File<br>:01/80/050/00081/AM20/||RLA File<br>:03/95/040/00229/AM20/||Lic.No/Date:0310829553<br>11.06.2019||Deferred|
**Decision:** The Committee considered the case as per the agenda and noted that a copy of application was sent to **MSME** on 04.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
**==> picture [432 x 133] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:12/6/80- Party Name: VICTORA Meet No/Date:10/80- Status:<br>ALC2/2019 AUTO PVT. LTD ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0510410880 Deferred<br>:01/80/050/00083/AM20/ :05/24/040/00144/AM20/ 11.06.2019<br>116<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 31.07.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 134] intentionally omitted <==**
have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 134] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:13/6/80- Party Name: VEELINE Meet No/Date:10/80- Status:<br>ALC2/2019 MEDIA LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0210209240 Deferred<br>:01/80/050/00084/AM20/ :02/24/040/00038/AM20/ 11.06.2019<br>117<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 14.08.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**36 |** P a g e
**==> picture [432 x 134] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:16/6/80- Party Name: TEMA INDIA Meet No/Date:10/80- Status:<br>ALC2/2019 LIMITED ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0310829596 Deferred<br>:01/80/050/00087/AM20/ :03/95/040/00239/AM20/ 12.06.2019<br>118<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 04.09.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 121] intentionally omitted <==**
have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 121] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:17/6/80- Party Name: AVLIGHT Meet No/Date:10/80- Status:<br>ALC2/2019 AUTOMOTIVES LTD. ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0510410932 Deferred<br>119 :01/80/050/00088/AM20/ :05/23/040/00062/AM20/ 14.06.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>DHI for examination as per advice of Consultant (Tech-1).<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 121] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:18/6/80- Party Name: AVLIGHT Meet No/Date:10/80- Status:<br>ALC2/2019 AUTOMOTIVES LTD. ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0510410933 Deferred<br>120 :01/80/050/00089/AM20/ :05/23/040/00063/AM20/ 14.06.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to<br>DHI for examination as per advice of Consultant (Tech-1) .<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 134] intentionally omitted <==**
er the case to<br>DHI for examination as per advice of Consultant (Tech-1) .<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 134] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:21/6/80- Party Name: ISGEC Meet No/Date:10/80- Status:<br>ALC2/2019 HITACHI ZOSEN ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0510410946 Deferred<br>:01/80/050/00092/AM20/ :05/23/040/00111/AM20/ 14.06.2019<br>121<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 31.07.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**37 |** P a g e
**==> picture [432 x 134] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:23/6/80- Party Name: PREMIER Meet No/Date:10/80- Status:<br>ALC2/2019 INDUSTRIAL ALC2/2019<br>CORPORATION LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0310829755 Deferred<br>:01/80/050/00094/AM20/ :03/95/040/00093/AM20/ 18.06.2019<br>122<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 26.07.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 311] intentionally omitted <==**
have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 311] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:24/6/80- Party Name: KEY - TECH Meet No/Date:10/80- Status:<br>ALC2/2019 ENGINEERING CO. ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0310829761 Deferred<br>:01/80/050/00095/AM20/ :03/94/040/00228/AM20/ 18.06.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of Consultant (Tech-3):<br>1. Detail technical note on manufacturing process including the relevant flow sheet.<br>2. Detail technical drawings with dimension of each export product, Catalogue, if any, may<br>also be furnished.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the<br>123<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>4.
eight along<br>with details of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components<br>to be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary<br>evidence/drawings etc.<br>5. Sheet layout diagram of the material indicating the wastage during blanking.<br>6. Use of export product.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 134] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:25/6/80- Party Name: MASCOT Meet No/Date:10/80- Status:<br>ALC2/2019 DYNAMICS PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0310829810 Deferred<br>:01/80/050/00096/AM20/ :03/95/040/00254/AM20/ 20.06.2019<br>124<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to DPIIT on 04.09.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**38 |** P a g e
**==> picture [432 x 134] intentionally omitted <==**
yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**38 |** P a g e
**==> picture [432 x 134] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:26/6/80- Party Name: GLOBE HI- Meet No/Date:10/80- Status:<br>ALC2/2019 FABS LLP ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:0510411004 Deferred<br>:01/80/050/00097/AM20/ :05/23/040/00108/AM20/ 20.06.2019<br>125<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to DHI on 23.07.2019 for examination of the case. However, no comments<br>have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
|**Case No.:1/8/80-**||Party Name: MODEL||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||INFRA CORPORATION||ALC2/2019|||
|||PRIVATE LIMITED||11.09.2019|||
|HQ File<br>:01/80/050/00113/AM20/||RLA File<br>:07/24/040/00081/AM20/||Lic.No/Date:0710115134<br>05.07.2019||Deferred|
126 **Decision:** The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & **RA, Bangalore** and in this regard a letter was sent to the firm & **RA, Bangalore** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
his regard a letter was sent to the firm & **RA, Bangalore** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
|**Case No.:2/8/80-**||Party Name: KABY||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||PRECISION MACHINING||ALC2/2019|||
|||PRIVATE LIMITED||11.09.2019|||
|HQ File<br>:01/80/050/00114/AM20/||RLA File<br>:09/24/040/00176/AM20/||Lic.No/Date:0910067755<br>05.07.2019||Deferred|
127
**Decision:** The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & **RA, Hyderabad** and in this regard a letter was sent to the firm & **RA, Hyderabad** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
|**Case No.:7/8/80-**||Party Name: MICRON||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||SPECMA (INDIA)||ALC2/2019|||
|||PRIVATE LIMITED||11.09.2019|||
|HQ File<br>:01/80/050/00119/AM20/||RLA File<br>:33/24/040/00015/AM20/||Lic.No/Date:3310030562<br>08.07.2019||Deferred|
128 **Decision:** The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & **RA, Panipat** and in this regard a letter was sent to the firm & **RA, Panipat** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
this regard a letter was sent to the firm & **RA, Panipat** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
**39 |** P a g e
|**Case No.:3/8/80-**||Party Name: ULTRA||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||ENGINEERS||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00115/AM20/||RLA File<br>:31/83/040/00058/AM20/||Lic.No/Date:3110067470<br>10.07.2019||Deferred|
129 **Decision:** The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & **RA, Pune** and in this regard a letter was sent to the firm & **RA, Pune** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
**==> picture [432 x 121] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:4/8/80- Party Name: THE INDIAN Meet No/Date:10/80- Status:<br>ALC2/2019 CARD CLOTHING CO ALC2/2019<br>LTD 11.09.2019<br>HQ File RLA File Lic.No/Date:0310830216 Deferred<br>130 :01/80/050/00116/AM20/ :03/95/040/00302/AM20/ 11.07.2019<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to DPIIT on 04.09.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
9 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 133] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:5/8/80- Party Name: VALEO Meet No/Date:10/80- Status:<br>ALC2/2019 INDIA PRIVATE ALC2/2019<br>LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0410165826 Deferred<br>:01/80/050/00117/AM20/ :04/24/040/00067/AM20/ 12.07.2019<br>131<br>Decision: The Committee considered the case as per the agenda and noted that a copy of<br>application was sent to MSME on 05.08.2019 for examination of the case. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 205] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:6/8/80- Party Name: DILIGENT Meet No/Date:10/80- Status:<br>ALC2/2019 SCM SOLUTIONS ALC2/2019<br>PRIVATE LIMITED 11.09.2019<br>HQ File RLA File Lic.No/Date:0910067781 Deferred<br>:01/80/050/00118/AM20/ :09/24/040/00199/AM20/ 12.07.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of Consultant (Tech-3):<br>132<br>1. Weight of each Export Product.<br>2. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing.
of Consultant (Tech-3):<br>132<br>1. Weight of each Export Product.<br>2. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each imported<br>and indigenous input in the export product may be indicated. Net weight along with details<br>of other imported input to be used in the resultant product and sought to be<br>imported/procured from sources other than the license, if any, may also be indicated.<br>3. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components to<br>**----- End of picture text -----**<br>
**40 |** P a g e
be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
4. Sheet layout diagram of the material indicating the wastage during blanking.
5. Use of export product.
Case is deferred.
133
||**Case No.:8/8/80-**||Party Name: AUTO TECH||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|---|
||**ALC2/2019**||INDUSTRIES (INDIA)||ALC2/2019|||
||||PVT. LTD.,||11.09.2019|||
||HQ File<br>:01/80/050/00120/AM20/||RLA File<br>:04/24/040/00068/AM20/||Lic.No/Date:0410165827<br>15.07.2019||Deferred|
ALC2/2019**||INDUSTRIES (INDIA)||ALC2/2019|||
||||PVT. LTD.,||11.09.2019|||
||HQ File<br>:01/80/050/00120/AM20/||RLA File<br>:04/24/040/00068/AM20/||Lic.No/Date:0410165827<br>15.07.2019||Deferred|
**Decision:** The Committee considered the case as per the agenda and noted that a copy of application was sent to **DHI** on 06.09.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
**==> picture [432 x 145] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:9/8/80- Party Name: ANSTECH Meet No/Date:10/80- Status:<br>ALC2/2019 ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:3410045281 Deferred<br>:01/80/050/00121/AM20/ :34/24/040/00127/AM20/ 15.07.2019<br>134<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Vadodara and in this regard a letter<br>was sent to the firm & RA, Vadodara on 23.08.2019. Therefore, the Committee decided to wait<br>for complete set of application for examination of the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 145] intentionally omitted <==**
ecided to wait<br>for complete set of application for examination of the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**==> picture [432 x 145] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:10/8/80- Party Name: ULTRA Meet No/Date:10/80- Status:<br>ALC2/2019 ENGINEERS ALC2/2019<br>11.09.2019<br>HQ File RLA File Lic.No/Date:3110067477 Deferred<br>:01/80/050/00122/AM20/ :31/83/040/00056/AM20/ 17.07.2019<br>135<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Pune and in this regard a letter was<br>sent to the firm & RA, Pune on 23.08.2019. Therefore, the Committee decided to wait for<br>complete set of application for examination of the case.<br>Case is deferred.<br>**----- End of picture text -----**<br>
**41 |** P a g e
|**Case No.:11/8/80-**||Party Name: APAR||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||INDUSTRIES LIMITED||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00123/AM20/||RLA File<br>:03/94/040/00303/AM20/||Lic.No/Date:0310830379<br>17.07.2019||Deferred|
136 **Decision:** The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & **RA, Mumbai** and in this regard a letter was sent to the firm & **RA, Mumbai** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
n this regard a letter was sent to the firm & **RA, Mumbai** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
|**Case No.:12/8/80-**||Party Name: ZOBELE||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||INDIA PRIVATE||ALC2/2019|||
|||LIMITED||11.09.2019|||
|HQ File<br>:01/80/050/00124/AM20/||RLA File<br>:03/95/040/00352/AM20/||Lic.No/Date:0310830415<br>18.07.2019||Deferred|
137 **Decision:** The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & **RA, Mumbai** and in this regard a letter was sent to the firm & **RA, Mumbai** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
|**Case No.:13/8/80-**||Party Name: HORIZON||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||CHUTES PVT LTD||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00125/AM20/||RLA File<br>:31/83/040/00064/AM20/||Lic.No/Date:3110067480<br>18.07.2019||Deferred|
138 **Decision:** The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & **RA, Pune** and in this regard a letter was sent to the firm & **RA, Pune** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
in this regard a letter was sent to the firm & **RA, Pune** on 23.08.2019. Therefore, the Committee decided to wait for complete set of application for examination of the case.
Case is deferred.
|**Case No.:1/10/80-**||Party Name: HANNING||Meet No/Date:10/80-||**Status:**|
|---|---|---|---|---|---|---|
|**ALC2/2019**||MOTORS INDIA P LTD||ALC2/2019|||
|||||11.09.2019|||
|HQ File<br>:01/80/050/00139/AM20/||RLA File<br>:34/24/040/00138/AM20/||Lic.No/Date:3410045343<br>06.08.2019||Deferred|
139 **Decision:** The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from **RA, Vadodara** & the firm. Therefore, the Committee decided to request from **RA, Vadodara** and the firm to **furnish the hard copy** of application for examination of the case.
Case is deferred.
**42 |** P a g e
**==> picture [432 x 157] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No.:2/10/80- Party Name: DOOWON Meet No/Date:10/80- Status:<br>ALC2/2019 AUTOMOTIVE SYSTEMS ALC2/2019<br>INDIA PRIVATE 11.09.2019<br>LIMITED<br>HQ File RLA File Lic.No/Date:0410165942 Deferred<br>:01/80/050/00140/AM20/ :04/24/040/00079/AM20/ 07.08.2019<br>140<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Chennai & the firm.
## **Sl. No. 94**
|**Sl. No. 94**||||
|---|---|---|---|
|Case No. :**66/3/80-ALC2/2015**|||**Status:**|
|M. No.: 10/80-ALC2/2019 dated||||
|11.09.2019|**PYRO ELECTRIC INSTRUMENTS GOA**|||
|Lic. No. /date: 1710006020|**PVT. LTD.**|||
|Dated 08.01.2015||||
|HQ. No.: 01/80/050/00066/AM16<br>RLA No.: 17/24/040/00178/AM15|**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 1710006020||**Deferred**|
||dated 08.01.2015 issued to M/s.**PYRO**|||
||**ELECTRIC INSTRUMENTS GOA PVT. LTD.**,|||
||under Para4.7 of HBP(Vol.-I)– reg.|||
|**Decision:**The Committee considered|the case as per the agenda noted that the case was|approved in||
|Meeting No. 12/80 dated 15.09.2015|as per comments given by DIPP I. D. Note No.: 12/103/2015-|||
|TSW/58 dated 15.09.2015.||||
|However, the firm vide letter dated 08.05.2018 requested for re-fixation of ad-hoc|||norms. The|
|Committee reconsidered the case and decided to forward the firm’s representation to|||**DPIIT**for|
|examination of the case.||||
|Case is deferred.||||
**54 |** P a g e
## **Sl. No. 95**
|Case No. : **35/20/80-ALC2/2017**<br> **Status:**|
|---|
|**TINITA ENGINEERING PVT.LTD.**<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 0310818442<br>Dated11.01.2018|
|HQ. No.: 01/80/050/00399/AM18<br>**Subject:**Request for fixation of ad-hoc norms in<br>respect of Advance Authorization No. 0310818442<br>dated 11.01.2018 issued to M/s.**TINITA**<br>**ENGINEERING PVT.LTD.**, under Para 4.7 of<br>HBP(Vol.-I)– reg.<br>**Deferred**<br>RLA No.: 03/95/040/00851/AM18|
|**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in|
|Meeting No. 05/80 dated 06.06.2019 due to non-submission of reply of deficiency letter dated|
|15.01.2019 followed by final reminder 02.05.2019.|
|However, the firm furnished the reply vide email dated 25.07.2019 with a request to fix the|
|ad-hoc norms. The Committee reconsidered the case and noted that the firm’s reply has been forwarded|
|to**MSME**on 09.09.2019 for examination of the case.|
|Caseis deferred.|
## **Sl. No. 96**
|**Sl. No. 96**|||
|---|---|---|
|Case No. :**34/20/80-ALC2/2017**||**Status:**|
|M. No.: 10/80-ALC2/2019 dated|||
|**L&T-MHPS BOILERS PVT LTD**<br>11.09.2019<br>Lic. No. /date: 0310818379|||
|Dated 10.01.2018|||
|HQ. No.: 01/80/050/00398/AM18<br>**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 0310818379<br>RLA No.: 03/95/040/00677/AM18||**Deferred**|
|dated 10.01.2018 issued to M/s.**L&T-MHPS**|||
|**BOILERS PVT LTD.**, under Para 4.7 of HBP|||
|(Vol.-I)– reg.|||
|**Decision:**The Committee considered the case as per the agenda noted that the case was|approved in||
|Meeting No. 20/80 dated 21.03.2018 on the recommendation of DHI.|||
|However, the firm vide letter dated 18.01.2019 requested for re-fixation of ad-hoc||norms. The|
|Committee reconsidered the case and noted that the firm’s reply has been forwarded|to**DHI**on||
|10.06.2019 with reminder on 19.07.219 for examination of the case. However the comments have not|||
|been received. The Committee decided to**remind DHI**for expediting the comments.|||
|Case is deferred.|||
**55 |** P a g e
## **Sl. No. 97**
|Case No. :**1/16/80-ALC2/2010**<br> **Status:**|
|---|
|**BHARAT HEAVY ELECTRICALS LIMITED**<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 0910042665<br>Dated 08.07.2010|
|HQ. No.: 01/80/050/00242/AM11<br>**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 0910042665<br>dated 08.07.2010 issued to M/s.**BHARAT**<br>**HEAVY ELECTRICALS LIMITED**, under Para<br>4.7 of HBP(Vol.-I)– reg.<br>**Deferred**<br>RLA No.: 09/24/040/00114/AM11|
|**Decision:**The Committee noted that the case was already taken up in Meeting No. 13/13 dated|
|11.09.2012 after firm’s representation and it was ratified as per DHI’s comment.|
|Now the party has requested to enhance the quantity of import item at serial No.44 and 56 on the|
|ground that they have used more quantity of these items. The Committee noted the case has been|
|forwarded to DHI on 10.07.2019. However the comments have not been received. The Committee|
|decided to**remind DHI**for expediting the comments.|
|Caseis deferred.|
## **Sl. No. 98**
|**Sl. No. 98**||||
|---|---|---|---|
|Case No. : **21/20/80-ALC2/2015**|||**Status:**|
|M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 5610004687<br>Date: 18.09.2015||**M/s SHAKTI PUMPS (INDIA) LTD**||
|HQ. No.: 01/80/050/00398/AM16<br>RLA No.: 56/24/040/00027/AM16||**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 5610004687<br>dated 18.09.2015 issued to**M/s SHAKTI PUMPS**<br>**(INDIA) LTD**, under Para 4.7 of HBP (Vol.-I) –<br>reg.|**Deferred**|
|**Decision:**The Committee considered the case as per the agenda noted that the case was ratified the||||
|norms by NC in its**9/80-ALC2/2016**||**dated**02.08.2016 as per the written comments of DIPP vide ID||
|No.12/64/2016/TSW/38 dated 02.08.2016.||||
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee|||reconsidered|
|the case and decided to forward firm’s||representation to**DPIIT**for examination of the case.||
|Case is deferred.||||
**56 |** P a g e
## **Sl. No. 99**
|**Sl. No. 99**||
|---|---|
|Case No. :**6/13/80-ALC2/2017**|**Status:**|
|**M/s BOMBARDIER TRANSPORTATION**<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019||
|**INDIA PRIVATE LTD**<br>Lic. No. /date: 3410042477<br>Date: 30.08.2016||
|HQ. No.: 01/80/050/00242/AM18<br>**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 3410042477<br>dated 30.08.2016 issued to**M/s BOMBARDIER**<br>**TRANSPORTATION INDIA PRIVATE LTD**,<br>under Para4.7 of HBP(Vol.-I)– reg.<br>RLA No.: 34/21/040/00306/AM17|**Deferred**|
|**Decision:**The Committee considered the case as per the agenda noted that the norms was ratified by NC||
|in its meeting No.**16/80-ALC2/2017 dated 14.11.2017**based upon the written comments of DHI I.D||
|No. TSWB 3/80/2017 dated 29.11.2017.||
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee|reconsidered|
|the case and decided to forward firm’s representation to**DHI**for examination of the case.||
|Case is deferred.||
## **Sl. No. 100**
|**Sl. No. 100**||
|---|---|
|Case No. : **31/3/80-ALC2/2017**|**Status:**|
|**M/s THE ANUP ENGINEERING LIMITED**<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 0810138347<br>Date:21.07.2016||
|HQ. No.: 01/80/050/00031/AM18<br>**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 0810138347<br>dated 21.07.2016issued to**M/s THE ANUP**<br>**ENGINEERING LIMITED**, under Para 4.7 of<br>HBP(Vol.-I)– reg.<br>RLA No.: 08/24/040/00139/AM17|**Deferred**|
|**Decision:**The Committee considered the case as per the agenda noted that the norms was ratified by NC||
|in its meeting No.**9/80-ALC2/2018 dated 17.10.2018**as per the recommendation of DHI||
|representative..||
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee|reconsidered|
|the case and decided to forward firm’s representation to**DHI**for examination of the case.||
|Case is deferred.||
**57 |** P a g e
## **Sl. No. 101**
|**Sl. No. 101**||
|---|---|
|Case No. :**20/12/80-ALC2/2017**|**Status:**|
|**M/s L & T-MHPS TURBINE GENERATORS**<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019||
|**PRIVATE LIMITED**<br>Lic. No. /date: 0310814524<br>Date:10.07.2017||
|HQ. No.: 01/80/050/00234/AM18<br>**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization issued to**M/s L**<br>**& T-MHPS TURBINE GENERATORS**<br>**PRIVATE LIMITED**under Para 4.7 of HBP<br>(Vol.-I)– reg.<br>RLA No.: 03/95/040/00122/AM18|**Deferred**|
|**Decision:**The Committee considered the case as per the agenda noted that the norms were ratified the||
|norms by NC in its**9/80-ALC2/2018 dated 17.10.2018**as per the written comments furnished by DHI||
|vide their UO No.03/16/2018-TSWB dated 8.10.2018.||
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee|reconsidered|
|the case and decided to forward firm’s representation to**DHI**for examination of the case.||
|Case is deferred.||
## **Sl. No. 102**
|Case No. : **64/11/80-ALC2/2018**<br> **Status:**|
|---|
|**M/s IND-SPHINX PRECISION LTD**<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 2210015975<br>Date: 13.09.2018|
|HQ. No.: 01/80/050/00255/AM19<br>**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 2210015975<br>dated 13.09.2018 issued to**M/s IND-SPHINX**<br>**PRECISION LTD**under Para 4.7 of HBP (Vol.-I)<br>– reg.<br>**Deferred**<br>RLA No.: 22/24/040/00048/AM19|
|**Decision:**The Committee considered the case as per the agenda noted that the norms were ratified the|
|norms by NC in its**13/80-ALC2/2018 dated 22.01.2019**as per the representative of DHI recommended|
|the case on repeat of Advance authorization No. 2210015101 dated10.10.2014 as ratified in Norms|
|Committee Meeting No. 22/80-ALC2/2015 dated 02.02.2016.|
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered|
|the case and decided to forward firm’s representation to**DHI**for examination of the case.|
|Case is deferred.|
**58 |** P a g e
## **Sl. No. 103**
|**Sl. No. 103**|||
|---|---|---|
|Case No. :**52/25/80-ALC2/2016**||**Status:**|
|M. No.: 10/80-ALC2/2019 dated|||
|11.09.2019|**M/s EXCELLENT HI-CARE PRIVATE**||
|Lic. No. /date: 0410162359|**LIMITED**||
|Date: 07.10.2016|||
|HQ. No.: 01/80/050/00621/AM17<br>RLA No.: 04/24/040/00105/AM17|**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 0410162359|**Deferred**|
||dated 07.10.2016 issued to**M/s EXCELLENT HI-**||
||**CARE PRIVATE LIMITED**under Para 4.7 of||
||HBP(Vol.-I)– reg.||
|**Decision:**The Committee considered the case as per the agenda noted that the norms were rejected the|||
|norms by NC in its**14/80-ALC2/2017 dated 10.10.2017 due to non submission of reply of**deficiency|||
|of DEIT vide letter No. 17 (20)/2017-IPHW dated 15.5.2017, 04.07.2017.|||
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered the|||
|case and decided to forward firm’s representation to**MeitY**for examination /comments of the case.|||
|Case is deferred.|||
## **Sl. No. 104**
|**Sl. No. 104 **|||
|---|---|---|
|Case No. : **16/16/80-ALC2/2016**||**Status:**|
|M. No.: 10/80-ALC2/2019 dated|||
|11.09.2019<br>Lic. No. /date: 0810136711|**M/s VEE KAY VIKRAM & CO LLP**||
|Date: 11.12.2015|||
|HQ. No.: 01/80/050/00391/AM17<br>RLA No.: 08/24/040/00308/AM16|**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 0810136711|**Deferred**|
||dated 11.12.2015 issued to**M/s VEE KAY**||
||**VIKRAM & CO LLP**under Para 4.7 of HBP||
||(Vol.-I)– reg.||
|**Decision:**The Committee considered the case as per the agenda noted that the norms were rejected the|||
|norms by NC in its**17/80-ALC2/2017dated 19.12.2017 and the committed was**noted that export item|||
|is in number and import item is in K.G , hence norms cannot be fixed.|||
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered the|||
|case and decided to forward firm’s representation to**MSME**for examination /comments of the case.|||
|Case is deferred.|||
**59 |** P a g e
## **Sl. No. 105**
**==> picture [448 x 122] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No. : 30/3/80-ALC2/2014 Status:<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>M/s VIJAY TANKS & VESSELS LIMITED<br>Lic. No. /date: 3410039435<br>Date: 06.03.2014<br>HQ. No.: 01/80/050/00041/AM15 Subject: Request for re-fixation of ad-hoc norms in Deferred<br>RLA No.: 34/24/040/00286/AM14 respect of Advance Authorization No. 3410039435<br>dated 06.03.2014 issued to M/s V VIJAY TANKS<br>& VESSELS LIMITED under Para 4.7 of HBP<br>(Vol.-I) – reg.<br>**----- End of picture text -----**<br>
**Decision:** The Committee considered the case as per the agenda noted that the norms were ratified the norms by NC in its **21/80-ALC2/2014 dated 06.01.2015** based upon DIPP Note No. 12/1/2015-TSW/22 dated 06.01.2015.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case and decided to forward firm’s representation to **DPIIT** for examination /comments of the case. Case is deferred.
## **Sl. No. 106**
|**Sl. No. 106**|||
|---|---|---|
|Case No. :**17/19/80-ALC2/2014**||**Status:**|
|M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 2210015101<br>Date: 10.10.2014|**M/s IND-SPHINX PRECISION LTD.,**||
|HQ. No.: 01/80/050/00451/AM15<br>RLA No.: 22/24/040/00056/AM15|**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 2210015101<br>dated 10.10.2014 issued to**M/s IND-SPHINX**<br>**PRECISION LTD.,**under Para 4.7 of HBP (Vol.-<br>I)– reg.|**Deferred**|
|**Decision:**The Committee considered the case as per the agenda noted that the norms were ratified the|||
|norms by NC in its**22/80-ALC2/2015dated 02.02.2016**based upon written recommendation of MSME|||
|vide ID Note No.30 (199)/15-ME dated 30.12.2015.|||
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered|||
|the case and decided to forward firm’s representation to**MSME**for examination /comments of the case.|||
|Case is deferred.|||
**60 |** P a g e
## **Sl. No. 107**
**==> picture [448 x 122] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No. : 21/20/80-ALC2/2015 Status:<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>M/s SHAKTI PUMPS (INDIA) LTD.<br>Lic. No. /date: 2210015101<br>Date: 10.10.2014<br>HQ. No.: 01/80/050/00398/AM16 Subject: Request for re-fixation of ad-hoc norms in Deferred<br>RLA No.: 56/24/040/00027/AM16 respect of Advance Authorization No. 5610004687<br>dated 18.09.2015 issued to M/s SHAKTI PUMPS<br>(INDIA) LTD., under Para 4.7 of HBP (Vol.-I) –<br>reg.<br>**----- End of picture text -----**<br>
**Decision:** The Committee considered the case as per the agenda noted that the norms were ratified the norms by NC in its **9/80-ALC2/2016 dated 02.08.2016** based upon the written comments of DIPP vide ID No.12/64/2016/TSW/38 dated 02.08.2016.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case and decided to forward firm’s representation to **DPIIT** for examination /comments of the case. Case is deferred.
## **Sl. No. 108**
|**Sl. No. 108**|||
|---|---|---|
|Case No. :**8/5/80-ALC2/2017**||**Status:**|
|M. No.: 10/80-ALC2/2019 dated|||
|11.09.2019<br>Lic. No. /date: 0510402055|**M/s OAM SAAI INTERNATIONAL INC.**||
|Date: 24.03.2017|||
|HQ. No.: 01/80/050/00069/AM18<br>RLA No.: 05/24/040/00649/AM17|**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 0510402055|**Deferred**|
||dated 24.03.2017 issued to**M/s OAM SAAI**||
||**INTERNATIONAL INC.**under Para 4.7 of HBP||
||(Vol.-I)– reg.||
|**Decision:**The Committee considered the case as per the agenda noted that the norms were rejected the|||
|norms by NC in its**17/80-ALC2/2017 dated 19.12.2017**as on the ground that the export and import|||
|item are same.|||
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered the|||
|case and decided to forward firm’s representation to**MSME**for examination /comments of the case.|||
|Case is deferred.|||
**61 |** P a g e
## **Sl. No. 109**
**==> picture [448 x 122] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No. : 25/33/80-ALC2/2010 Status:<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>M/s R.D.ENGINEERS (INDIA) PVT.LTD<br>Lic. No. /date: 0310596998<br>Date: 14.10.2010<br>HQ. No.: 01/80/050/00581/AM11 Subject: Request for re-fixation of ad-hoc norms in Deferred<br>RLA No.: 03/95/040/00557/AM11 respect of Advance Authorization No. 0310596998<br>Date: 14.10.2010 issued to R.D.ENGINEERS<br>(INDIA) PVT.LTD., under Para 4.7 of HBP (Vol.-I)<br>– reg.<br>**----- End of picture text -----**<br>
**Decision:** The Committee considered the case as per the agenda noted that the norms were ratified the norms by NC in its **2/80-ALC2/2011 dated** 19.04.2011as per written comments of DIPP received vide their U.O. Note No. dated 19.04.2011.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case and decided to forward firm’s representation to **MSME** for examination /comments of the case.
Case is deferred.
## **Sl. No. 110**
**==> picture [448 x 123] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No. : 7/2/80-ALC2/2014 Status:<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>M/s TRANSASIA BIO MEDICALS LTD.<br>Lic. No. /date: 0310771504<br>Date: 24.02.2014<br>HQ. No.: 01/80/050/00007/AM15 Subject: Request for re-fixation of ad-hoc norms in Deferre<br>RLA No.: 03/95/040/00849/AM14 respect of Advance Authorization No. 0310771504 d<br>dated 24.02.2014 issued to M/s R TRANSASIA BIO<br>MEDICALS LTD., under Para 4.7 of HBP (Vol.-I) –<br>reg.<br>**----- End of picture text -----**<br>
**Decision:** The Committee considered the case as per the agenda noted that the norms were approved by the norms by NC in its **20/80-ALC2/2015 dated** 05.01.2016 based upon the written comments of DIT vide UO No.W-27/17/2014-IPHW dated 08.12.2015.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case and decided to forward firm’s representation to **MeitY** for examination /comments of the case. Case is deferred.
**62 |** P a g e
## **Sl. No. 111**
**==> picture [448 x 122] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No. : 19/23/80-ALC2/2015 Status:<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>M/s STERLITE TECHNOLOGIES LTD.<br>Lic. No. /date: 0310799243<br>Date: 06.10.2015<br>HQ. No.: 01/80/050/00432/AM16 Subject: Request for re-fixation of ad-hoc Deferred<br>RLA No.: 03/95/040/00427/AM16 norms in respect of Advance Authorization<br>No. 0310799243 dated 06.10.2015 issued to<br>M/s STERLITE TECHNOLOGIES LTD.,<br>under Para 4.7 of HBP (Vol.-I) – reg.<br>**----- End of picture text -----**<br>
**Decision:** The Committee considered the case as per the agenda noted that the norms were rejected the norms by NC in its **15/80-ALC2/2016 dated 25.10.2016** due to non submission of replied to the deficiency (raised by DEIT) letter sent to them on 21.06.2016 followed by final reminder sent to firm on 05.10.2016.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case and decided to forward firm’s representation to **MeitY** for examination /comments of the case.
Case is deferred.
## **Sl. No. 112**
**==> picture [448 x 326] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No. 56/19/80-ALC2/2017 Status:<br>Case No. 18/3/80-ALC2/2018<br>Case No. 50/11/80-ALC2/2018<br>M/s AUTO COMP INDIA PVT. LTD.<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 3110066941<br>Date: 20.12.2017<br>Lic. No. /date: 3110067004<br>Date: 15.03.2018<br>Lic. No. /date: 3110067175 dated<br>12.09.2018<br>HQ. No. 01/80/050/00337/AM18 Subject: Request for re-fixation of ad-hoc Deferred<br>HQ. No. 01/80/050/00018/AM19 norms in respect of 3 Advance Authorization<br>HQ. No .01/80/050/00241/AM19 issued to M/s AUTO COMP INDIA PVT.<br>RLA No. 31/83/040/00109/AM18 LTD., under Para 4.7 of HBP (Vol.-I) – reg.<br>RLA No. 31/83/040/00166/AM18<br>RLA No.31/83/040/00090/AM19<br>Decision:<br>i.) In respect of Lic. No. /date: 3110066941 Date: 20.12.2017 Rejected<br>The Committee considered the case as per the agenda noted that the norms were rejected the<br>norms by NC in its 4/80-ALC2/2018 dated 23.05.2018, 3/80-ALC2/2018 dated<br>09.05.2018 and as import item description is not clear Advance authorizations allowed only<br>for specific import item.<br>ii.) In respect of Lic. No. /date: 3110067004 dated 15.03.2018 Approved<br>Committee considered the case as per agenda in its meeting No. 3/80-ALC2/2018 dated<br>09.05.2018 and deliberated on the matter in the presence of technical representatives of DHI,<br>DIPP and MSME. It is decided to ratify the norms<br>**----- End of picture text -----**<br>
**63 |** P a g e
and deliberated on the matter in the presence of technical representatives of DHI,<br>DIPP and MSME. It is decided to ratify the norms<br>**----- End of picture text -----**<br>
**63 |** P a g e
**iii.) In respect of Lic. No. /date: 3110067175 dated 12.09.2018 Approved** Committee considered the case as per agenda in its meeting No. **3/80-ALC2/2018 dated 09.05.2018** and ratified the norms as per the written comments of DHI vide their U. No. No. DES-I/AIPL/HIC-1-2018-HEI dated 20.12.2018
However, the firm has requested for re-fixation of ad-hoc norms in respect of above mentioned 3 advance authorizations. The Committee considered the case and decided to forward firm’s representation to **DHI** for examination /comments of the case.
Case is deferred.
## **Sl. No. 113**
|**Sl. No. 113**||||
|---|---|---|---|
|Case No. :**44/19/80-ALC2/2017**|||**Status:**|
|M. No.: 10/80-ALC2/2019 dated||||
|11.09.2019||||
||**M/s LARSEN & TOUBRO LIMITED.**|||
|Lic. No. /date: 0310816114||||
|Date: 04.10.2017||||
|HQ. No.: 01/80/050/00325/AM18<br>RLA No.: 03/95/040/00365/AM18|**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization No. 0310816114<br>dated 04.10.2017 issued to**M/s LARSEN & TOUBRO**||**Deferred**|
||**LIMITED,**under Para 4.7 of HBP(Vol.-I)– reg.|||
|**Decision:**The committee considered the case as per agenda and deliberated on the matter in||the presence of||
|technical representatives of DHI, DIPP and MSME and It was decided by the NC in its**4/80-ALC2/2018 dated**||||
|**23.05.2018**to ratify the norms.||||
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case||||
|and decided to forward firm’s representation to**DHI**for examination /comments of the case.||||
|Case is deferred.||||
## **Sl. No. 114**
Case No. **13/5/80-ALC2/2017 Status:** Case No. **29/19/80-ALC2/2016** Case No. **8/14/80-ALC2/2018** M. No.: 10/80-ALC2/2019 dated 11.09.2019 **M/s SENIOR INDIA PRIVATE LIMITED** Adv. Lic. No. 0510402202 dated 12.04.2017, Adv. Lic. No. 0510399661 dated 08.09.2016 Adv. Lic. No. 0510409022 dated 20.12.2018 HQ. No. 01/80/050/00325/AM18 **Subject:** Request for re-fixation of ad-hoc **Deferred** HQ. No. 01/80/050/00424/AM17 norms in respect of 3Advance Authorization HQ. No. 01/80/050/00324/AM19 issued to **M/s SENIOR INDIA PRIVATE** RLA No. 03/95/040/00365/AM18 **LIMITED,** under Para 4.7 of HBP (Vol.-I) – RLA No. 05/24/040/00288/AM17 reg. RLA No. 05/24/040/00435/AM19 **Decision:** The Committee considered the case as per the agenda noted that the norms were approved by the norms by NC in its meeting No. 8/80 dated 18.07.2017, in its meeting No. 22/80 dated 31.01.2017, and in its meeting No. 22/80 dated 31.01.2017 based upon the written comments of DIPP letter no. 12/54/2017-TSW/105 dated 18.7.2017, written comments of DIPP vide UO No. 12/6/2017-TSW/56 dated 31.01.2017 and written comments of DPIIT vide U.O. No.: P-47011/416/2018-TSW dated 03.07.2019 respectively.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee re-considered the case and decided to forward firm’s representation **to DPIIT** for examination /comments of the case.
Case is deferred.
**64 |** P a g e
## **Sl. No. 115**
Case No. : **24/17/80-ALC2/2014 Status:** M. No.: 10/80-ALC2/2019 dated 11.09.2019 **M/s GEA BGR ENERGY SYSTEM INDIA** Lic. No. /date: 0410159425 **LIMITED.** Date: 16.09.2014 HQ. No.: 01/80/050/00396/AM15 **Subject:** Request for fixation of ad-hoc norms in respect **Deferred** of Advance Authorization issued to **M/s GEA BGR** RLA No.: 04/24/040/00154/AM15 **ENERGY SYSTEM INDIA LIMITED** under Para 4.7 of HBP (Vol.-I) – reg.
**Decision:** The Committee considered the case as per the agenda noted that the norms were rejected the norms by NC in its **5/80-ALC2/2016 dated 08.06.2015** due to non submission of replied to the deficiency (raised by DHI).
However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and decided to forward firm’s representation to **DHI** for examination /comments of the case.
Case is deferred.
## **Sl. No. 116**
|**Sl. No. 116**||
|---|---|
|Case No. :**12/7/80-ALC2/2016**|**Status:**|
|M. No.: 10/80-ALC2/2019 dated||
|**M/s HONDA TRADING CORPORATION INDIA**<br>11.09.2019||
|**PVT. LTD.**<br>Lic. No. /date: 0510398531||
|Date: 17.05.2016||
|HQ. No.: 01/80/050/00233/AM17<br>**Subject:**Request for fixation of ad-hoc norms in respect of<br>Advance Authorization 0510398531 dated 17.05.2016<br>issued to**M/s HONDA TRADING CORPORATION**<br>RLA No.: 05/23/040/00053/AM17|**Deferred**|
|**INDIA PVT. LTD**Para 4.7 of HBP(Vol.-I)– reg.||
|**Decision:**The Committee considered the case as per the agenda noted that the norms were rejected the norms by||
|NC in its 11/80 meeting dated 29.08.2017 due to non submission of replied to the deficiency (raised by DEIT)||
|letter sent to them on 26.4.2017 followed by final reminder sent to firm on 17.07.2017.||
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered|the case and|
|decided to forward firm’s representation to**MeitY**for examination /comments of the case.||
|Case is deferred.||
## **Sl. No. 117**
Case No. : **4/20/80-ALC2/2017 Status:** M. No.: 10/80-ALC2/2019 dated 11.09.2019 **M/s ISGEC HEAVY ENGINEERING LIMITED.** Lic. No. /date: 0510405282 Date: 10.01.2018 HQ. No.: 01/80/050/00368/AM18 **Subject:** Request for re-fixation of ad-hoc norms in respect **Deferred** of Advance Authorization 0510405282 dated 10.01.2018 RLA No.: 05/23/040/00375/AM18 issued to **M/s ISGEC HEAVY ENGINEERING LIMITED** Para 4.7 of HBP (Vol.-I) – reg.
**Decision:** The Committee considered the case as per the agenda noted that the norms were approved by the norms by NC in its 11/80 meeting dated 06.12.2018 based upon the written comments of DIPP vide DIPP No. P- 47011/354/2018-TSW dated 15.11.2018.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case and decided to forward firm’s representation to **DPIIT** for examination /comments of the case.
Case is deferred.
**65 |** P a g e
## **Sl. No. 118**
Case No. : **37/19/80-ALC2/2017 Status:** M. No.: 10/80-ALC2/2019 dated 11.09.2019 **M/s GODREJ & BOYCE MFG. CO. LTD.** Lic. No. /date: 0310815644 Date: 08.09.2017 HQ. No.: 01/80/050/00318/AM18 **Subject:** Request for fixation of ad-hoc norms in respect of **Deferred** Advance Authorization 0310815644 dated 08.09.2017 RLA No.: 03/94/040/00432/AM18 issued to **M/s GODREJ & BOYCE MFG. CO. LTD.,** Para 4.7 of HBP (Vol.-I) – reg.
**Decision:** The Committee noted that the case was ratified as per recommendation of technical representatives of DHI, DIPP and MSME in its Meeting no. 4/80-ALC2/2018 dated 23.05.2018 **.**
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case and decided to forward firm’s representation to **DHI** for examination /comments of the case
Case is deferred.
## **Sl. No. 119**
|**Sl. No. 119**||||
|---|---|---|---|
|Case No. :**17/31/80-ALC2/2010**|||**Status:**|
|M. No.: 10/80-ALC2/2019 dated||||
|11.09.2019||||
||**M/s BHARAT HEAVY ELECTRICALS LIMITED**|||
|Lic. No. /date: 0910043002||||
|Date: 06.08.2010||||
|HQ. No.: 01/80/050/00495/AM11<br>RLA No.: 09/24/040/00169/AM11|**Subject:**Request for fixation of ad-hoc norms in respect<br>of Advance Authorization 0910043002 dated 06.08.2010<br>issued to**M/s BHARAT HEAVY ELECTRICALS**||**Deferred**|
||**LIMITED**Para 4.7 of HBP(Vol.-I)– reg.|||
|**Decision:** The Committee considered the case as per the agenda noted that the norms were rejected||the norms by||
|NC in its 40/80 meeting dated 22.03.2011 due to non submission of replied to the deficiency raised by||DHI.||
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered|||the case and|
|decided to forward firm’s representation to**DHI**for examination /comments of the case.||||
|Case is deferred.||||
## **SL. No. 120**
|**SL. No. 120**||
|---|---|
|Case No. :**17/33/80-ALC2/2010**|**Status:**|
|**M/s BHARAT HEAVY ELECTRICALS**<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019||
|**LIMITED**<br>Lic. No. /date: 0910043468<br>Date: 09.09.2010||
|HQ. No.: 01/80/050/00573/AM11<br>**Subject:**Request for fixation of ad-hoc norms in<br>respect of Advance Authorization 0910043468<br>date: 09.09.2010 issued to**M/s BHARAT**<br>**HEAVY ELECTRICALS LIMITED**Para 4.7<br>of HBP(Vol.-I)– reg.<br>RLA No.: 09/24/040/00223/AM11|**Deferred**|
|**Decision:**The Committee considered the case as per the agenda noted that the norms were rejected the norms by||
|NC in its 2/80 meeting dated 19.04.2011 due to non submission of replied to the deficiency raised by|DHI.|
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and||
|decided to forward firm’s representation to**DHI**for examination /comments of the case.||
|Case is deferred.||
**66 |** P a g e
## **Sl. No. 121**
|**Sl. No. 121**||||
|---|---|---|---|
|Case No. :**23/9/80-ALC2/2012**|||**Status:**|
|M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 0910053032<br>Date: 13.06.2012||**M/s BHARAT HEAVY ELECTRICALS LIMITED**||
|HQ. No.: 01/80/050/00203/AM13<br>RLA No.:<br>09/24/040/00136/AM13||**Subject:**Request for fixation of ad-hoc norms in respect of<br>Advance Authorization 0910053032 date: 13.06.2012 issued<br>to**M/s BHARAT HEAVY ELECTRICALS LIMITED**<br>Para 4.7 of HBP(Vol.-I)– reg.|**Deferred**|
|**Decision:**The Committee considered the case as per the agenda and the committee decided to withdraw the case||||
|from the meeting owing to non|receipt of comments from EPCG Division by NC in its 23/80 meeting dated|||
|16.02.2016.||||
|However, the firm has|requested for fixation of ad-hoc norms. The Committee considered the case and|||
|decided to forward firm’s representation**to DHI**for examination /comments of the case.||||
|Case is deferred.||||
## **Sl. No. 122**
|Case No. :**30/33/80-ALC2/2009**<br> **Status:**|
|---|
|**M/s BHARAT HEAVY ELECTRICALS LIMITED**<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 0910039076<br>Date: 27.08.2009|
|HQ. No.: 01/80/050/00496/AM10<br>**Subject:**Request for fixation of ad-hoc norms in respect of<br>Advance Authorization 0910039076 date: 27.08.2009 issued<br>to**M/s BHARAT HEAVY ELECTRICALS LIMITED**<br>Para 4.7 of HBP(Vol.-I)– reg.<br>**Deferred**<br>RLA No.:<br>09/24/040/00184/AM10|
|**Decision:** The Committee considered the case as per the agenda noted that the norms were rejected the norms by|
|NC in its 48/80 meeting dated 02.03.2010 due to non submission of reply to the deficiency raised by DHI.|
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and|
|decided to forward firm’s representation to**DHI**for examination /comments of the case.|
|Case is deferred.|
## **Sl. No. 123**
|**Sl. No. 123**|||
|---|---|---|
|Case No. :**23/17/80-ALC2/2014**||**Status:**|
|M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 0410159424<br>Date: 16.09.2014|**M/s GEA BGR ENERGY SYSTEM INDIA LIMITED**||
|HQ. No.: 01/80/050/00395/AM15<br>RLA No.:<br>04/24/040/00155/AM15|**Subject:**Request for fixation of ad-hoc norms in respect of<br>Advance Authorization issued to**M/s GEA BGR ENERGY**<br>**SYSTEM INDIA LIMITED**Para 4.7 of HBP (Vol.-I) – reg.|**Deferred**|
|**Decision:**The Committee considered the case as per the agenda noted that the norms were rejected the norms by|||
|NC in its 48/80 meeting dated 02.03.2010 due to non submission of replied to the deficiency (raised by DHI) dated|||
|14.11.2014, reminder dated 09.01.2015, E-mail dated 13.01.2015 and final reminder dated 09.04.2015.|||
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and|||
|decided to forward firm’s representation to**MeitY**for examination /comments of the case.|||
|Case is deferred.|||
**67 |** P a g e
## **Sl. No. 124**
Case No. **: 1/33/85-ALC3/2008 Status:** M. No.: 10/80-ALC2/2019 dated 11.09.2019 **M/s BOVING FOURESS LIMITED,** Lic. No. /date: 0710061697 Date: 15.12.2008 HQ. No.: 01/85/050/00218/AM09 **Subject:** Request for fixation of ad-hoc norms in **Deferred** respect of Advance Authorization 0710061697 RLA No.: 07/24/040/00524/AM09 date: 15.12.2008 issued to **M/s BOVING FOURESS LIMITED** under Para 4.7 of HBP (Vol.-I) – reg.
**Decision:** The Committee considered the case as per the agenda noted that the norms were rejected the norms by NC in its 2/80 meeting dated 13.04.2010 due to non submission of replied to the deficiency raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and decided to forward firm’s representation to **MeitY** for examination /comments of the case.
Case is deferred.
## **Sl. No. 125**
|Case No.**2/17/80-ALC2/2017**<br> **Status:**|
|---|
|**M/s VEM TECHNOLOGIES PVT LTD.**<br>M. No.: 10/80-ALC2/2019 dated<br>11.09.2019<br>Lic. No. /date: 0910065045<br>Date: 15.05.2017|
|HQ. No.: 01/80/050/00281/AM18<br>**Subject:**Request for fixation of ad-hoc norms in<br>respect of Advance Authorization 0910065045<br>date: 15.05.2017 issued to**VEM**<br>**TECHNOLOGIES PVT LTD. under**Para 4.7<br>of HBP(Vol.-I)– reg.<br>**Deferred**<br>RLA No.: 09/24/040/00055/AM18|
|**Decision:**The Committee considered the case as per the agenda noted that the norms were rejected the norms by|
|NC in its 5/80 meeting dated 06.06.2019 due to non submission of replied to the deficiency raised by DPIIT.|
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and|
|decided to forward firm’s representation to**DPIIT**for examination /comments of the case.|
|Case is deferred.|
## **Sl. No. 126**
|**Sl. No. 126**||||
|---|---|---|---|
|Case No.**8/12/80-ALC2/2014**|||**Status:**|
|M. No.: 10/80-ALC2/2019 dated||||
|11.09.2019||||
|Lic. No. /date: 0810132579|**M/s ANGIPLAST PRIVATE LIMITED.,**|||
|Date: 03.07.2014||||
|HQ. No.: 01/80/050/00257/AM15<br>RLA No.: 08/24/040/00141/AM15|**Subject:**Request for fixation of ad-hoc norms in<br>respect of Advance Authorization 0810132579<br>Date: 03.07.2014 issued to M/s**ANGIPLAST**||**Deferred**|
||**PRIVATE LIMITED.**Para 4.7 of HBP (Vol.-I)|||
||– reg.|||
|**Decision:** The Committee considered the case as per the agenda noted that the norms were rejected|||the norms by|
|NC in its 27/80 meeting dated 31.03.2015due to|non submission of replied to the deficiency raised by||C&PC.|
|However, the firm has requested for|fixation of ad-hoc norms. The Committee considered the case and|||
|decided to forward firm’s representation to**Consultant (Tech 1)**for examination /comments of the case.||||
|Case is deferred.||||
**68 |** P a g e
**==> picture [448 x 157] intentionally omitted <==**
o forward firm’s representation to**Consultant (Tech 1)**for examination /comments of the case.||||
|Case is deferred.||||
**68 |** P a g e
**==> picture [448 x 157] intentionally omitted <==**
**----- Start of picture text -----**<br>
Sl. No. 127<br>Case No. 47/14/80- Status:<br>ALC2/2014<br>M. No.: 10/80-ALC2/2019<br>dated<br>M/s ALSTOM TRANSPORT INDIA LIMITED.,<br>11.09.2019<br>Lic. No. /date: 0710105249<br>Date: 20.06.2014<br>HQ. No.: Subject: Request for fixation of ad-hoc norms in respect Deferred<br>01/80/050/00368/AM15 of Advance Authorization 0710105249<br>RLA No.: Date: 20.06.2014 issued to M/s ALSTOM<br>07/24/040/00092/AM15 TRANSPORT INDIA LIMITED Para 4.7 of HBP<br>(Vol.-I) – reg.<br>**----- End of picture text -----**<br>
**Decision:** The Committee considered the case as per the agenda noted that NC rejected the norms in its meeting no. 11/80 dated 01.09.2015 due to non-submission of reply to the deficiency raised by DHI.
ion:** The Committee considered the case as per the agenda noted that NC rejected the norms in its meeting no. 11/80 dated 01.09.2015 due to non-submission of reply to the deficiency raised by DHI.
**Decision:** The Committee considered the case as per the agenda noted that NC rejected the norms in its meeting no. 11/80 dated 01.09.2015 due to non-submission of reply to the deficiency raised by DHI. Thereafter, the firm represented against the rejection and requested for a review. The case was again considered and deferred in Meeting no. 11/19 dt 06.12.2018 with following decision: _“The Committee noted that a personal hearing was already given to the firm on 06.12.2018. In the personal hearing the firm informed the committee that it has taken various A.A’s for supply of 33 rail/tramway coaches. Further, firm stated that it_ _**has taken an additional license for supplementary material** required for these very 33 rail/tramway coaches. However, it has an additional export obligation of another 33 rail/tramway coaches in this license. The Committee observed that the given submission is not tenable. The committee decided to seek a detailed report from the concerned RA regarding of all such licenses issued to the firm, admissibility and current status.”_ In response to Norm Committee’s e-mail dated 23.04.2019, Addl.
d to seek a detailed report from the concerned RA regarding of all such licenses issued to the firm, admissibility and current status.”_ In response to Norm Committee’s e-mail dated 23.04.2019, Addl. DGFT Bangalore informed that firm has obtained several license (Copy enclosed) which are pending for the wants of norms and also informed about a letter from ECA-II, DGFT, New Delhi seeking information regarding alleged corrupt practices followed by M/s Alstom Transport India. In this matter, the committee noted that the firm had approach the Policy Relaxation Committee (PRC) and the matter was taken up vide Meeting no. 17/AM20 held on 27.08.2019. The PRC noted the submissions by the firm as under: _“They have stated that initially, 7 Advance Authorizations were applied for duty free import of inputs required for the manufacture and supply of 33 Metro Train sets to Chennai Metro Rail Limited being a deemed export project. ATIL sought amendment in all 7 Advance Authorizations to include residual items that were required to manufacture the 33 Train sets but the request was rejected citing technical reasons by RA. Thereupon, ATIL was compelled to apply for additional Advance Authorization No.0710105249 dated 20.06.2014 for importing residual inputs that were missed out and not covered under earlier 7 Advance Authorizations. Acquisition of Alstom India limited who was the manufacturer of key sub-assemblies also lead to inclusion of components required for manufacture of sub-assemblies in the captioned Advance Authorization.
uisition of Alstom India limited who was the manufacturer of key sub-assemblies also lead to inclusion of components required for manufacture of sub-assemblies in the captioned Advance Authorization. However, while applying for the said Advance Authorization (8[th] AA), export obligation of 33 Metro Train sets was declared inadvertently, as the system did not allow the applicant to apply for a new license unless the export obligation was declared. In fact, there is no separate EO under the Advance Authorization No.0710105249 dated 20.06.2014 as all imported inputs were used for manufacture of 33 train sets declared under previous 7 Advance licenses. The Advance Authorization No.0710105249 dated 20.06.2014 under which parts required for manufacture of 33 Metro Trains have been imported has been issued after 22 months from the date of earliest Advance Authorization in the clubbing set. Hence, request is to treat the supplies of 33 Train sets to the Metro Project supplied against Advance Authorizations as one and to discharge the EO. “_ **The policy relaxation committee vide PRC Meeting No. 17/AM20 dated 27.08.2019 gave the following decision in the matter:**
**69 |** P a g e
nce Authorizations as one and to discharge the EO. “_ **The policy relaxation committee vide PRC Meeting No. 17/AM20 dated 27.08.2019 gave the following decision in the matter:**
**69 |** P a g e
_**“Decision:** The Committee heard the submission made by the firm and discussed the matter at length and decided to relax the conditions as laid down in Para 4.38 (vi), (vii) and (xii) of HBP 2015-20 as amended vide Public Notice No.70/2015-20 dated 30.01.2019 for clubbing of eight Advance Authorizations No.(i)0710090351 dated 21.08.2012, (ii)0710090531 dated 31.08.2012, (iii)0710095554 dated 23.05.2013, (iv)0710096369 dated 02.07.2013, (v)0710096370 dated 02.07.2013, (vi)0710099232 dated 28.10.2013 and (vii)0710101246 dated 10.01.2014 and (viii) 0710105249 dated 20.06.2014. It is subject to verification that amendments request of the firm made in the AAs was rejected by the RA, as claimed by the firm and all inputs imported in the 8 AAs are fully accounted for in the supplies. The other terms and conditions for clubbing shall remain same as per policy/HBP provisions. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting.”_
pplies. The other terms and conditions for clubbing shall remain same as per policy/HBP provisions. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting.”_
This committee observed that the PRC has clubbed all the eight authorisations for imports and export purposes. Export obligation of AA no. 0710105249 dt. 20.06.2014 would remain as it is even after clubbing. Therefore the committee decided that the firm should submit a detailed statement to account for the inputs in the export products against this license. Relevant technical drawings and wastage details may be provided in relevant formats for examination by the technical authorities for the purpose of fixation of norms.
Case is deferred.
## **Sl. No. 128**
|**Sl. No. 128**|||
|---|---|---|
|Case No.**57/17/80-ALC2/2015**|||
|M. No.: 10/80-ALC2/2019 dated||**Status:**|
|11.09.2019|**M/s BIRLA FURUKAWA FIBRE OPTICS**||
|Lic. No. /date: 1710006165|**PRIVATE LIMITED**||
|Date: 27.08.2015|||
|HQ. No.: 01/80/050/00361/AM16<br>RLA No.: 17/24/040/00043/AM16|**Subject:**Request for fixation of ad-hoc norms in<br>respect of Advance Authorization 1710006165 Date:|**Deferred**|
||27.08.2015 issued to M/s**BIRLA FURUKAWA**||
||**FIBRE OPTICS PRIVATE LIMITED**Para 4.7 of||
||HBP(Vol.-I)– reg.||
|**Decision:**The Committee considered the case as per the agenda noted that the norms were rejected the|||
|norms by NC in its 23/80 meeting dated 16.02.2016 due to non submission of replied to the deficiency|||
|raised by DEIT.|||
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered the|||
|case and decided to forward firm’s representation to**MeitY**for examination /comments of the case.|||
|Caseis deferred.|||
**70 |** P a g e
## **Sl. No. 129**
**==> picture [436 x 89] intentionally omitted <==**
**----- Start of picture text -----**<br>
M. No.: 10/80-ALC2/2019 Subject: Request for re-fixation of ad-hoc norms in respect of Status<br>dated 11.09.2019 Advance Authorization as details given below issued to M/s<br>KINECO KAMAN COMPOSITES - INDIA PVT LTD under<br>Para 4.7 of HBP (Vol.-I) – reg<br>Case Number : 9/27/80- Party Name : KINECO KAMAN Deferred<br>License No.:<br>ALC2/2014 COMPOSITES - INDIA PVT LTD<br>1710006043<br>HQ File No: RLA File No:<br>Date: 30.01.2015<br>01/80/050/00634/AM15/ 17/24/040/00180/AM15/<br>**----- End of picture text -----**<br>
**Decision:** The Committee considered the case as per the agenda noted that the norms were approved by the norms by NC in its 4 **/80-ALC2/2015 dated** 23.05.2017 based upon the written comments of DIPP vide U.O.No.12 (39)/2017-TSW/4 dated 23.05.2017.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee noted firm’s representation was sent to DPIIT on 29.07.2019. It was decided by the committee to remind DPIIT for their comments.
Case is deferred.
## **Sl. No. 130**
|M. No.: 10/80-<br>ALC2/2019 dated<br>11.09.2019<br>**Subject:**Request for re-fixation of ad-hoc norms in respect of<br>Advance Authorization as details given below issued to**M/s**<br>**KINECO KAMAN COMPOSITES - INDIA PVT LTD**under<br>Para 4.7 of HBP (Vol.-I) – reg<br>**Status**|
|---|
|**Case Number : 2/23/80-**<br>**ALC2/2015**<br>**Party Name : KINECO**<br>**KAMAN COMPOSITES -**<br>**INDIA PVT LTD**<br>License No.:<br>1710006173<br>**Deferred**|
|Date: 08.09.2015<br>HQ File No:<br>01/80/050/00415/AM16/<br>RLA File No:<br>17/24/040/00044/AM16/|
|**Decision:**The Committee considered the case as per the agenda noted that the norms were approved by the|
|norms by NC in its 7**/80-ALC2/2015 dated**04.07.2017 as per the written comments of DIPP vide U.O. No.|
|7/52/2017-TSW/13 dated 04.7.2017.|
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee noted firm’s|
|representation was sent to DPIIT on 29.07.2019. It was decided by the committee to remind DPIIT for their|
|comments.|
|Case is deferred.|
## **Sl. No. 131**
|M. No.: 10/80-<br>ALC2/2019 dated<br>11.09.2019<br>**Subject:**Request for fixation of ad-hoc norms in respect of Advance<br>Authorization as details given below issued to**UNITED DRILLING**<br>**TOOLS LTD**under Para 4.7 of HBP (Vol.-I) – reg:<br>**Status**|
|---|
|**Case Number : 1/25/80-**<br>**ALC2/2015**<br>**Party Name : UNITED**<br>**DRILLING TOOLS LTD.**<br>Licence No.:<br>0510397442<br>Date: 29.01.2016<br>**Deferred**<br>HQ File No:<br>01/80/050/00441/AM16/<br>RLA File No:<br>05/24/040/00493/AM16/|
|**Decision:**The Committee considered the case as per the agenda noted that the norms were rejected the norms|
|by NC in its 5/80 meeting dated 07.06.2016 due to non submission of replied to the deficiency raised by DHI.|
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case|
|and decided to forward firm’s representation to**DHI**for examination /comments of the case.|
|Case is deferred.|
**71 |** P a g e
## **Sl. No. 132**
|**Sl. No. 132**||
|---|---|
|M. No.: 10/80-<br>ALC2/2019 dated<br>11.09.2019<br>**Subject:**Request for re-fixation of ad-hoc norms in respect of<br>Advance Authorization as details given below issued to**M/s AZAD**<br>**ENGINEERING PRIVATE LIMITED**under Para 4.7 of HBP<br>(Vol.-I) – reg|**Status**|
|**Number : 19/23/80-**<br>**ALC2/2016**<br>**Party Name : AZAD ENGINEERING**<br>**PRIVATE LIMITED**<br>License No.:<br>0910064137<br>Date: 14.09.2016<br>HQ File No:<br>01/80/050/00522/AM17/<br>RLA File No: 09/24/040/00295/AM17/|**Deferred**|
|**Decision:** The Committee considered the case as per the agenda and the representative of DHI recommended||
|the case on repeat of norms allowed for Advance authorization 0910064137 dated 14.09.2016 as ratified in||
|Norms Committee Meeting No. 2/80-ALC2/2017 dated 25.04.2017. However, it was noted that the|description|
|of items of exports in both the case does not match.||
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case||
|and decided to forward firm’s representation to DHI for examination /comments of the case.||
|Case is deferred.||
## **Sl. No. 133**
|**Sl. No. 133**|**Sl. No. 133**||
|---|---|---|
|M. No.: 10/80-<br>ALC2/2019 dated<br>11.09.2019<br>**Subject:**Request for re-fixation of ad-hoc norms in respect of Advance<br>Authorization as details given below issued to**M/s**DAGGER<br>MASTER TOOL INDUSTRIES LIMITED under Para 4.7 of HBP<br>(Vol.-I) – reg||**Status**|
|**Number : 1/19/80-**<br>**ALC2/2017**<br>**Party Name : DAGGER MASTER TOOL**<br>**INDUSTRIES LIMITED**<br>HQ File No.:<br>01/80/050/00282/AM18/<br>RLA File No.: 03/94/040/00728/AM18|License No.:<br>0310817719<br>Date: 12.12.2017|Deferred|
|**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in its|||
|Meeting No.**4/80-ALC2/2018**dated 23.05.2018 on the recommendation of representatives of DHI, DIPP &|||
|MSME.|||
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee re-considered the|||
|case and decided to forward firm’s representation to**DPIIT**for examination /comments of the case.|||
|Case is deferred.|||
ed for re-fixation of ad-hoc norms. The Committee re-considered the|||
|case and decided to forward firm’s representation to**DPIIT**for examination /comments of the case.|||
|Case is deferred.|||
|**Sl. No. 134**|
|---|
|M. No.: 10/80-<br>ALC2/2019 dated<br>11.09.2019<br>**Subject:** Request for fixation of ad-hoc norms in respect of Advance<br>Authorization as details given below issued to M/s**JANDIA**<br>**ENGINEERING PRIVATE LIMITED,**under Para 4.7 of HBP (Vol.-<br>I) – reg:<br>**Status**|
|**Number : 29/48/80-**<br>**ALC2/2007**<br>**Party Name : JANDIA ENGINEERING**<br>**PRIVATE LIMITED**<br>Licence No.:<br>3210035131<br>Date: 02.04.2007<br>Deferred<br>HQ File No:<br>01/80/050/00675/AM08/<br>RLA File No: 32/21/040/00328/AM07/|
|**Decision:**The Committee considered the case as per the agenda noted its decision of Meeting 10/80-|
|ALC2/2009 dated 09.06.2009:|
|_“The Committee noted that RA neither reported the status of the case nor forwarded the four sets of application_|
|_in response to this office letter and subsequent reminder. Since, the subject authorization is quite old; the_|
|_Committee presumed that ratification of norms of the subject authorization is not required to RA so that the case_|
|_may be closed on the part of NC.”_|
**72 |** P a g e
However, the firm has requested for fixation of ad-hoc norms. The Committee re-considered the case and decided to ask RA Coimbatore regarding norms on which the authorization has been issued and position of EODC as the case is more than 12 years old.
Case is deferred.
ee re-considered the case and decided to ask RA Coimbatore regarding norms on which the authorization has been issued and position of EODC as the case is more than 12 years old.
Case is deferred.
|**Sl. No. 135**|
|---|
|M. No.: 10/80-<br>ALC2/2019 dated<br>11.09.2019<br>**Subject:**Request for fixation of ad-hoc norms in respect of<br>Advance Authorization as details given below issued to M/s<br>**KAMAR INFRASTRUCTURE PVT LTD.,**under Para 4.7<br>of HBP (Vol.-I) – reg:<br>**Status**|
|**Case Number :**<br>**37/19/80-ALC2/2014**<br>**Party Name : KAMAR**<br>**INFRASTRUCTURE PVT LTD.**<br>Licence No.:<br>0310788243<br>Date: 21.08.2014<br>Deferred<br>HQ File No:<br>01/80/050/00471/AM15/ RLA File No: 03/94/040/00449/AM15/|
|**Decision:**The Committee considered the case as per the agenda noted that the norms were rejected|
|the norms by NC in its 6/80 meeting dated 20.06.2017 due to non submission of replied to the|
|deficiency raised by DHI vide UO No. 3/119/2015-TSW (B) dated 3/2016 and reminder dated|
|16.05.2016.|
|However, the firm has requested for fixation of ad-hoc norms. The Committee considered|
|the case and noted that firm’s representation has been forwarded to**DHI**on 29.07.2019 for|
|examination /comments of the case. It was decided by the committee to remind**DHI**for their|
|comments.|
|Caseis deferred.|
t firm’s representation has been forwarded to**DHI**on 29.07.2019 for|
|examination /comments of the case. It was decided by the committee to remind**DHI**for their|
|comments.|
|Caseis deferred.|
|**Sl. No. 136**|||
|---|---|---|
|M. No.: 10/80-<br>ALC2/2019 dated<br>11.09.2019<br>**Subject:**Request for re-fixation of ad-hoc norms in respect<br>of Advance Authorization as details given below issued to<br>**M/s GODREJ & BOYCE MFG. CO. LTD**under Para 4.7<br>of HBP(Vol.-I)– reg||**Status**|
|**Number : 41/5/80-**<br>**ALC2/2018**<br>**Party Name : GODREJ & BOYCE**<br>**MFG. CO. LTD.**<br>License No.:<br>0310820813<br>Date: 07.05.2018<br>HQ File No:<br>01/80/050/00090/AM19/RLA File No: 03/94/040/00075/AM19/||Deferred|
|**Decision:**The Committee considered the case as per the agenda and the representative||of Tech-3|
|recommended the case for ratification of norms in its meeting No. 1/80- dated 03.04.2019.|||
|However, the firm has requested for re-fixation of ad-hoc norms. The||Committee|
|considered the case and decided to forward firm’s representation to**Consultant (Tech-3)**for|||
|examination /comments of the case.|||
|Caseis deferred.|||
**73 |** P a g e
ms. The||Committee|
|considered the case and decided to forward firm’s representation to**Consultant (Tech-3)**for|||
|examination /comments of the case.|||
|Caseis deferred.|||
**73 |** P a g e
|**Sl. No. 137**|||
|---|---|---|
|Case No.**7/15/80-ALC2/2017**||**Status**|
|M. No.: 10/80-ALC2/2019 dated<br>11.09.2019|**M/s. GODREJ & BOYCE MFG. CO. LTD.**||
|Lic. No. /date: 0310815224<br>dated17.08.2017|||
|HQ. No.: 01/80/050/00261/AM18/<br>RLA No.: 03/94/040/00349/AM18|**Subject:**Request for re-fixation of ad-hoc norms in<br>respect of Advance Authorization as details given<br>below issued to**M/s GODREJ & BOYCE MFG.**<br>**CO. LTD**under Para 4.7 of HBP(Vol.-I)– reg|Approved|
|**Decision:**The Committee considered the case as per the agenda and noted that the norms||were ratified|
|by NC in the presence of technical representatives of DHI, DIPP and MSME in its meeting No. 3/80|||
|dated 09.05.2018 deliberated on the matter.|||
|However, the firm has requested for re-fixation of ad-hoc norms. The Committee||reconsidered|
|the case and decided to**ratify**the norms as per written comments given by DPIIT vide U. O. No.: P-|||
|47011/268/2018-TSW dated 09.09.2019. ( Copy enclosed)|||
|RA concerned maytake further necessaryaction asper the decision of NC.|||
**74 |** P a g e
**==> picture [425 x 601] intentionally omitted <==**
**75 |** P a g e
**==> picture [424 x 594] intentionally omitted <==**
**76 |** P a g e
**==> picture [425 x 615] intentionally omitted <==**
**77 |** P a g e
**==> picture [425 x 621] intentionally omitted <==**
**78 |** P a g e
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6840 --apply.