DGFT Minutes
In force — no superseding record on file.
″ ヽ ) MINUTES. OF MEETING No.12l19 OF NORMS COMMITTEE-I (DES-I SECTION) HELD ON 10.01 .2019 Meeting No. 12119 of the Norms Committee (NC-l) for the licensing year 2018-2019 was held on 10.0'l .2019 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: - SI.No. Name of the representatives & their Designation Department Shri.K.K.丁ivvari,lndustrial Adviser DHI Udyog Bhawan 2. Shri K.S.Sodhi,Asst.Director MSME, Nirman Bhawan 3. Shri V.C. Agarwal, consultant (Tech-lll) DGFT, Udyog Bhawan 4. Shri Shaish Kumar, consultant ( Tech-l) DGFT, Udyog Bhawan 5 Shri Alok Dwivedi, Deputy DGFT DGFT, Udyog Bhawan 6. Sh.Moin Afaque,Asst.DGF丁 DGFT, Udyog Bhawan Note:
- ln certain cases the decision of the Norms Committee refers to the Recommendations t Observations / Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O NO/O.M No of the scanned copy is reflected in the minutes.
- Wherever the Committee has fixed norms, the RAs shoutd allow inputs as per wastage norms approved or as applied whichever is less.
- All applications/representations lreply to the Deficiency letters etc. may be sent to NC-l at e-mail address- nc1.dgft@nic.in.
inputs as per wastage norms approved or as applied whichever is less. 3. All applications/representations lreply to the Deficiency letters etc. may be sent to NC-l at e-mail address- nc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post. Minutes of meeting No.11119 dt.06.12.2018 & 20.12.2018 were circulated to all the members of the Committee and no comments thereon were received. Hence, the said minutes are considered as unanimously approved. MEETING NUMBER: 12180-ALC11201B MEETTNG DATE: 10.01 .2019 The followinq cases were discussed in the meeting and decisions are stated below each case:
Case No.:28ノ19ノ80‐
ALC2′ 2017 HQ File 1.:911,91950/90399/AM18/ 1 IParty Name:ASHOKA ‐Meet No/Date:12/80- ,MANUFACTURING LttD, IALC2/2018 1 110.01.2019 Withdrawn RLA F‖ e lLic.No/Date:0210206863 1Date:10.01.2019 :02/24/040/00077/AM17/ 128.07.2016 1 Decision:The COmmittee considered the case as per agenda and noted thatthe case was already l approved ln Meeting No.:11/80-ALC2/2018 dated 06.12.2018.丁he Committee decided to l withdraw the case from the agenda. Case is withdrawn. 一 = 一 椰 一 「 , ■ め ヽ 卦 呵 0 峨 . 、 4 1
ヽ Party Name:丁HEINDURE IMeet No/Date11 2/80- PV丁.LttD IALC2/2018 110.01.2019 RLA File .Lic.No/Date:0510402573 1Date:10.01.2019 :01/80/050/001 48/AM 1 8/ :051241040/00005/AM 1 8/ 16.05.2017 2 Decision: The Committee considered the case as per the agenda. The Committee in meeting no. 10/80 dt. 16. 11 .2018 had decided to call the firm for today's meeting for a personal hearing to seek certain clarification. However, The firm's representative appeared for PH and stated that they have :not received deficiency letter as issued by NC-1. Copy of the same was given to the firm. . The case is deferred. Party Name:∪NI VttL IMeet No/Date:12/80- IDeferred PRECIS10N PV丁.LttD.
hey have
:not received deficiency letter as issued by NC-1. Copy of the same was given to the firm. .
The case is deferred.
Party Name:∪NI VttL IMeet No/Date:12/80- IDeferred
PRECIS10N PV丁.LttD. IALC2/2018 1
110.01.2019 1
: IHQ File lRLA File lLic.No/Date:6510000005 1Date:10.01.20191
1 101/80/050/00253/AM18/ 165/24/040/00004/AM18/ 17.07.2017 1
‐
| IDecision:丁he Cornrnittee consldered the case as per the agenda.丁
he Corrlrrllttee in meetlng no.
1 10/80 dt.16.11.2018 had declded to ca‖ the firm for today's rneeting for a personal hearing to seek
l lcenain clariication.丁he irm's representat市e appeared for PH.Based on the comments of thel
l鷲肥需記留凝」
MSMtt he∽
mmittee decid“ bぉk the ttmわ
缶由M雨∝mttm m hel
l ‐ 1・
Stage wise wastage.
| 1 2. Average rate of scrap for each process.
: 1 3. Physical sample ofthe exportitem.
| . 4.CAD design ofthe item.
:1 5,Whytheitem cannot be made from SS tubes?
‐
| 1 6. Copy ofthe shlpping bills/blll of entries.
: I Case is deferred.
iCase No.:4′ 8ノ80‐
ALC2ノ2017
HQ File
ICase No.:6′5′80…
:ALC2′2018
Case No.:48′ 8′80‐
ALC2′ 2018 Party Name:∪NI VttL PRECIS10N PV丁.LTD. Meet No/Date:12/80¨ IDeferred ALC2/2018 1 10.01.2019 , Deferred
Case No.:17ノ13′ 80‐
ALC2′2017 IParty Namei DILIGENT IMeet No/Datei1 2/80- Deferred lSCM SOL∪T10NS ,ALC2/2018 1PRIVAttE LIMI丁ED 10.01.2019 1 | IHQ Flle lRLA File lLic.No/Date:0910065648 1Date:10.01.2019 141:01/80/050/00055/AM19/ 1:09/24/040/00391ノAM18/ 08.11.2017 1 1 1Decision二丁he Cornrnittee considered the case as per agenda and noted that deficiency letter was l :sentto the firm on 28.12.2018.丁he Committee decided to waitforthe reply from firm. | ICase is deferred. IHQ F‖ e lRLA File lLic.No/Date:6510000010 1Date:10.01.2019 1:01/80ノ050/00171/AM19/ :65/24/040/00006/AM18/ 15.11.2017 1 5 1Decision:The Cornrnittee considered the case as perthe agenda.丁 he Cornrnittee in rneeting no. 110/80 dt.16.11.2018 had decided to ca‖ the firm fortoday's rneeting for a personal hearing to seek lcertain clarlficatlon.The firrn's representative appeared for PH.Based on the cornrnents ofthe ,representative of MSME,the Commlttee decided to ask the lrm to furnish information on the fo‖ owing points‐ 1 1.Stage wise wastage.
- nverage rite of scrap for each process.
- Physical sample of the export item.
- CAD design of the item.
- Why the item cannot be made from SS tubes?
- Copy of the shipping bills/ bill of entries. I Case is deferred.
Case No.:2ノ12ノ80‐
IALC2′ 2018 ICase No.:13′ 3ノ80… IALC2′2018 1HQ FIle Party Name:SULZER Meet No/Date:12/80- IDeferred PUMPS INDIA LIMITED IALC2/2018 : HQ File RLA File Lic.No/Date:0310818728 Date:10.0 I .2019' ^ :01/80/050/002751AM191'.0319510401007581AM18/ dt.25.0'1 .2018 o rDecision: The Committee considered the case as per agenda and noted that hard copy was not : :received from RA and firm. The Committee decided to ask RA and firm to furnish the hard copy of the application. , : Case is deferred. Party Name:DIAMOND IMeet No/Date:12/80… MEttAL SCREENS(P)LttD IALC2/2018 110.01.2019 RLA File | 101/80/050/00013/AM19/ :65/24/040/00007/AM18/ 131.01.2018 1 1 1Decision:丁he Cornrnittee considered the case as per agenda.丁he representative of MSME has ‐ lprOVided wtttten comments.Based on the written comments the Committee decided to ratify the l lnorrns as fo‖ ows― | IExportitems should consist of 8 types of Stainless Steel Perforated sheets viz― | l i.1800 kg having:l mm thickness,5 mm hole dia,circle to circle centre distance 8mm,open l l area 35.53%. | l il.1680 kg having:l mm thickness,6 mm hole dia,circle to circle centre distance 9mm,open l l area 40.43%. | l iii・ 1330 kg having:1.2 rnm thickness,3 rTarn hole dia,circle to circle centre distance 5rnrn, ‐ ‐ open area 33%. | : 市.1260 kg having:1.2 mm thickness,5 mm hole dia,circle to circle centre distance 8mm, | 1 0pen area 35.53%. | I V. 1190 kg having:1.2 rnm thickness,6 rnrn hole dia,circle to circle centre distance 9rnrn, 17 1 open area 40.43%. vi.
le dia,circle to circle centre distance 8mm, | 1 0pen area 35.53%. | I V. 1190 kg having:1.2 rnm thickness,6 rnrn hole dia,circle to circle centre distance 9rnrn, 17 1 open area 40.43%. vi. 1150 kg having:1.5 rnm thickness,5 rTarn hole dia,pitch circle to circle centre distance ‐ ‐ 8rnrn,open area 35.53%. | I V‖ ・1050 kg having:1.5 rTnm thlckness,6 rnrn hole dia,circle to circle centre distance 9rnrn, ‐ . open area 40.43%. : : Vlil.850 kg having:1.5 mm thickness,9 mm hole dia,circle to circle centre distance 1 2mm, | 1 0pen area 51.17%. | :Details ofinputs allowed for each type of expon: 1 1 :. | : ll. 1 l lll. 1l Ⅳ ・ | I V. ::Ⅵ . l i V‖ . l i Vili. 2469 kgs allowed fortype(|)Ofl mm thlCkness with 37.61%wastage 2429 kgs allowed fortype(li)Of l mm thickness with 44.58%wastage 1750 kgs allowed fortype(iii)Of l.2 mm thickness with 31.6%wastage 1727 kgs allowed fortype(lv)Of l.2 mm thickness with 37.06%wastage 1703.6 kgs allowed fortype(v)Of l.2 mm thickness with 43.16%wastage 1550.4 kgs allowed fortype(vi)Of l.5 mm thickness with 34.78%wastage 1 517 kgs allowed fortype(vil)Of l.5 mm thickness wlth 44.47%wastage 1450 kgs allowed fortype(vili)Of l.5 mm thickness with 70.6%wastage Ъ Tota‖ mport may be allowed as 14596 kgs,
ヘ ‐ RA concerned may take further necessary action as per the decision of NC. Party Name: DILIGENT Meet No/Date:12180- 'Deferred | ICase No.112′ 5′80‐ 1 lALC2′ 2018 :Case No.:49′ 3ノ80‐ IALC2′2018 1HQ File | ‐case is deferred. ICase No.:19′ 5′80‐ IALC2′ 2018
Case No.:3′ 5′80‐
ALC2′2018 SCM SOL∪丁10NS PRIVAttE LIMI丁ED ALC2′2018 10.01.2019 | :HQ File lRLA F‖ e Lic.No/Date:0910065942 1Date:10.01.2019 181:01/80/050/00061/AM19/ :09/24/040/00555/AM18/ 131.01.2018 1 1 1Decision:The Cornrnittee considered the case as per agenda and noted that deficiency letter was l lsentto the lrm on 28.12.2018.丁he Committee decided to wak forthe reply from irm. | I Case is deferred. Party Name:VVELLCARE IMeet No/Date:12/80- IDeferred OIL ttOOLS PV丁.LttD :ALC2/2018 1 RLA File Lic,No/Date:0510405873‐ Date:10.01.2019 19i:o1/80/050/00049/AM19/ 1:05/24/040/00602/AM18/ 14.03.2018 : : iDecision:The Committee consldered the case as per agenda and noted that deiciency letter was l iSenttO the lrm on 02.01.219.丁 he Committee decided to waitforthe reply from irm. |lcasebdJ¨ d i‐ ・ ldttζ ぎ雨 `::4b′ らr861 11られ,雨どれib66"oN IMeet No/Datel1 2/80- lDeferred l :ALC2′2018 1AUttOMO丁IVE SYSTEMS IALC2/2018 1 1 1 11NDIA PRiVAttE LIMIttED 10.01.2019 1 HQ File RLA File Lic.No/Date:0410164245:Date:10.01.2019 lol:01/80/050/00067/AM19/ 104/24/040/00014/AM19/ 125.04.2018 1 1Decision:丁he Cornrnlttee considered the case as per agenda and noted that deficiency letter was lsentto the firrn on 28.12.2018.丁 he Conlrnittee decided to wait for the reply from firrn. Party Name:D00WON IMeet No/Date:12/80- AU丁OMOTIVE SYSttEMS'ALC2/2018 1NDIA PRIVAttE LIMI丁ED 10.01.2019 | IHQ File lRLA F‖ e lLlc.No/Date:0410164244 1Date:10.01.2019
irrn. Party Name:D00WON IMeet No/Date:12/80- AU丁OMOTIVE SYSttEMS'ALC2/2018 1NDIA PRIVAttE LIMI丁ED 10.01.2019 | IHQ File lRLA F‖ e lLlc.No/Date:0410164244 1Date:10.01.2019 1111:01/80/050/00068/AM19/ 1:04/24/040/00013/AM19/ 25.04.2018 : | IDecision:丁he Commtttee considered the case as per agenda and noted that deficiency letter was l lsentto the irm on 28.12.2018.丁he Commltee decided to waitforthe reply from irm. | :Case is deferred. Deferred IParty Name:lSGEC IMeet No/Date:12/80‥ IVVithdrawn lHEAVY ENGINEERING :ALC2/2018 1 LIMIttED 10.01.2019 12 1HQ FIle :RLA File lLic.No/Date:0510406234 1Date:10.01.2019 :01ノ80ノ050/00052/AM19/ 105/23/040ノ00035/AM19/ 126.04.2018 1 1Decision:The Cornrnittee considered the case as perthe agenda and noted thatthe firrn vide their e― rna‖ 13.12.201 8 has inforrned thatthey have surrendered the above sald licence to the(Э /o :| r J 「
cision:The Cornrnittee considered the case as perthe agenda and noted thatthe firrn vide their e― rna‖ 13.12.201 8 has inforrned thatthey have surrendered the above sald licence to the(Э /o :| r J 「
RLA File 13 :01/80/050/00297/AM19/ :05/23/040/00032/AM19/ 126.04.2018 10.01.2019 Decision: The Committee considered the case as per agenda and noted that the complete set of application sent to DH I on 07.0 1 .2019. The Committee decided to wait for comments from DH l. Case is deferred. Party Name:BIRLA IMeet No/Date:12/80¨ IDeferred F∪R∪KAWA FIBRE IALC2/2018 1 0P丁ICS PRIVAttE 10.01.2019 1 LIMI丁EDl l : RLA File Llc.No/Date:1710006701:Datei1 0.01.2019 141:01/80/050/00097/AM19/ 1:17/24/040/00005/AM19/ 109.05.2018 1 1Decision:The Cornrnittee considered the case as per agenda and noted thatthe firnl's reply dated 01.11.2018 was sentto A/1EITY on 22.11.2018.However,no cornrnents have been received yet.丁he Committee decided to send a reminderto MEI丁Y. ICase is deferred. Case is withdrawn.
Case No.:24ノ12′ 80‐
ALC2′2018 HQ File
Case No.:48′ 5′80‐
ALC2ノ2018 HQ File
Case No.:54′ 5ノ80‐
ALC2ノ2018 HQ File ICase No.:62′ 5′80‐ IALC2′ 2018 17. IHQ File l:01/80ノ050/00111/AM19/ HI丁ACHIZOSEN LIMI丁ED RLA File Party Name: ISGEC Meet No/Date:12/80- IDeferred HITACHI ZOSEN LIMITED IALC2/2018 110.01.2019 Party Name:lSGEC IMeet No/Date:12/80- lDeferred ALC2/2018 1 1 10.01.2019 1 i Lic.No/Date:0510406454 1Date:10.01.20191 151:01/80/050/00103/AM19/ ::05/23/040/00050/AM19/ 14.05.2018 1 1 Decision:The Committee considered the case as per agenda and noted that deiciency letter wasl sentto the irm on 28.12.2018.丁he Committee decided to waitforthe reply from irm. : ICase is deferred
Case No.:64ノ5′80‐
ALC2′ 2018 HQ File RLA Flle Lic.No/Date:0510406462 1Date:10.01.2019 161ツ999「γ9り1,管甲餅fγ2″04餅00080/AM19‐052018 1 1 1Decision:丁he Committee considered the case as per agenda and noted that denciency letter wasl isent to the firm on 12.11.2018.No reply has been received so far.lt vvas decided to send finall lreminderto furnish the requisite information within 1 5 days failing which case will be rtteCted. : ICase is deferred. Party Name:∨ICttORA IMeet No/Date:12/80¨ IDeferred A∪TO PV丁.LTD IALC2/2018 1 10.01.2019 1 IParty Name:PARAS IIMPO―EXPO PVtt LttD, IRLA File ::05/24/040/00068/AM19/ ぢ :Approved Additional DGF丁,CLA,New Delhi.The Committee decided to withdraw the case from the agenda.| 'Meet No/Date:12/80- IALC2/2018 110.01.2019 ILic.No/Date:0510406488 1Date:10.01.2019 116.05.2018 1
Decision: The Committee considered the case as per agenda. Based on the recommendation of the representative from MSME, the Committee decided to ratify the norms as under -
- lmport ltem 1 may be allowed on net to net basis in pieces with 3% wastage in weight. RA concerned may take further necessary action as per the decision of NC.
Case No.:56′ 5ノ80‐
ALC2ノ2018 HQ FIle
Case No.:63′ 5′80‐
ALC2′ 2018 HQ File
Case No.:60′ 5ノ80‐
ALC2ノ2018 HQ File
Case No.158′ 5′80‐
ALC2′ 2018 HQ FIle IParty Name:VlcToRA IMeet No/Date:12/80¨ IAUttO PVT.LttD IALC2/2018 1 :10.01.2019 RLA File Lic.No/Date:0510406536 IDeferred lDate:10.01.2019 18 :01/80/050/00105/AM19/ :05/24/040/00091/AM19/ 121.05.2018 Decision: The Committee considered the case as per agenda and noted that deficiency letter was sent to the firm on 12.11.2018. No information has been received so far. lt was decided to send final reminder to furnish the requisite information within 1 5 days failing which case will be rejected. Case is deferred. IRLA File Lic.No/Date:0510406550 1Date:10.01.20191 191911,9/059199117管V191 199171/919199999■M19/ 122.05.2018 1 1Decision:丁he Cornrnlttee considered the case as per agenda and noted that deficiency letter was lsent to the firm on 12.11.2018.No lnforrnation has been received so far.lt was decided to send lfinal rerrlinder to furnish the requisite lnforrnation within 1 5 days fa‖ ing which case will be rejected. ‐Case ls deferred. IParty Namei VlcttoRA IMeet No/Date:12/80- :Deferred lAUttO PV丁.LttD IALC2/2018 1 1 110.01.2019 1 Party Name:VICTORA IMeet No/Date:12/80- lDeferred A∪丁O PV丁.LttD :ALC2/2018 1 110.01.2019 : Party Name:MASU Meet No/Date:12/80- :Deferred BRAKE PADS PRIVAttE :ALC2/2018 RLA File Llc.No/Date:0510406587:Date:10.01.2019 :01/80/050/001 09/AM1 9/ .05t24t040/001 11 I AM19t 24.05.2018 20 Decision: The Committee considered the case as per agenda and noted that deficiency letter was
Llc.No/Date:0510406587:Date:10.01.2019 :01/80/050/001 09/AM1 9/ .05t24t040/001 11 I AM19t 24.05.2018 20 Decision: The Committee considered the case as per agenda and noted that deficiency letter was sent to the firm on 12.11.2018. No information has been received so far. lt was decided to send final reminder to furnish the requisite information within 15 days failing which case will be rejected. Case is deferred. LIMI丁ED RLA FIle Lic.No/Date:0510406606 1Date:10.01.2019 :01/80/050/001 07 lAM19l :051241040/00095/AM 1 9/ 25.05.2018 21 Decision: The Committee considered the case as per the agenda. Consultant (Tech-1) has called for clarification on certain points. Based on the same the Committee decided to ask the firm to furnish the information on following points- L Size & material of back ptite. 2. Justification for 25oh wastage. 3. Specific type of resin at Sl. No. 4 in the import item list. 6
Case is deferred.
Case No.:59′ 5′80‐
ALC2′ 2018 HQ File
Case No.:65ノ5ノ80‐
ALC2′ 2018 HQ File Party Name:LIFELONG IMeet No/Date:12/80- :Approved MEDI丁ECH PRIVATE IALC2/2018 1 LttD. RLA File Lic.No/Date:0510406631 1Date:10.01.2019 123 122 :01/80/050/001 08/AM 1 9/ :051231040/00098/AM 1 9/ 28.05.2018 Decision: The Committee considered the case as per agenda. Based on the written recommendation received from Consultant ( Tech-1), the Committee decided to ratify the norms as under -
- lmport ltem '1 may be allowed for 1.05 kg/kg content declared in export
- lmport item at Sl. No. 2 may be allowed as per Packing Policy under General Notes.
- lmport item Sl. No. 3 may be allowed for 1.01Nos per No. of needles used in the end product. RA concerned may take further necessary action as per the decision of NC. Party Name:BIRLA Meet No/Date:12/80¨ IApproved CABLE LIMI丁ED IALC2/2018 1 RLA File Lic.No/Dateill 10028338 1Date:10.01.2019 :01/80ノ050/00114/AM19/ :11/24/040/00005/AM19/ 28.05.2018 1 Decision:丁he Cornrnittee considered the case as per agenda and decided to ratify the norrns as perthe wrltten recommendatlon of MEITY vlde their U.0.No.17(21)/2018… IPHW dated 13.11.2018.丁he same is enclosed in the annexure attached. RA concerned rnay take further necessary action as perthe decision of NC.
Case No.110ノ8′80… ,Party Name:」Al 'Meet No/Date:12/80- IDeferred
ALC2ノ2018 11ND∪STRIES INDIA :ALC2/2018 : HQ File RLA File Lic.No/Date:0510406641 1Date:10.01.2019
- :01/80/050/001 33/AM 1 9/ :05123t040/00090/AM 1 9/ 28.05.2018 24 Decision: The Committee considered the case as per agenda and noted that deficiency letter was sent to the firm on 12.11.2018. No information has been received so far. lt was decided to send final reminder to furnish the requisite information within '1 5 days failing which case will be rejected. Case is deferred.
Case No.:23′ 8ノ80‐
ALC2′ 2018 HQ File RLA File Lic.No/Date:0310821275 1Date:10.01.2019 :01/80/050/00146/AM19/ 1:03/94/040/00164/AM19/ 28.05.2018 1 1 Decision:丁he Cornrnittee considered the case as per agenda and noted that deficlency letter was l sentto the firm on 28.12.2018.丁he Committee declded to wait forthe reply from firm. ‐ Case is deferred. 161こ滉だ :イ:側 8併 1耐譜謂序ξ P°WER I躙窮席ほ286 :J¨d Party Name:GE POWER IMeetNo/Date:12/80‐ :Deferred lNDIA LIMI丁ED IALC2/2018 1 125 7
r-
HQ File
.nln rile
lii.ttoloat"'oar oazlzgo oate'ro.oi.2org,
:01/80/050i001 47 tAM19t :03tg4t040l001 59/AM 1 9/ 29.os.2o1B
,- -'-'
'Lv t s I
oeii=ion, tne bormitiee consioereo ine cai"; p;l, i&noa and noted that deficiency tetter *r,
i
sent to the firm on 04.01 .2019. The Committee decided to wait for the reply from firm.
l
Case is deferred.
1:t':|:たた
・ ::鳳ヽ空よёё
RNI`こ MぬNo/bЬも
:12,ёd
.OGIES iNDIA IALC2/2018
PV丁.LttD.
10.01.2019
由0白に
薇LA由さ~ 1由
こ山静b`倦b由646660616まざイ
bbイう
6イ0
:01/80/050/00124/AM19/ 1:05/23/040/00089/AM19/ 130.05.2018 1
6ここたも離十ハさё。品品餞さ
6 66hξ 洒したd“ささらきさら,蕊:,i11lill:癬
話まふさ轟品t repl,も6品
to MEI丁Y on 02.01.2019.丁he Committee decidec
Case is deferred.
Case No.:5ノ10′ 80口 IParty Name:b66vv6雨 IMきさ
|tNo/Date:12/80- iDeferred
ALC2ノ2018 1AU丁OMO丁IVE SYSttEMS IALC2/2018 1
lNDIA PRIVATE LIMITED 10.01.2019 1
| IHQ File RLA lilさ
亡i6:、6′ うち16164461643'616らiさ:46ibl:,610
1281:01/80/050/00191/AM19/ 1lo4/24/040/00044/AM19/ 31.05.2018
: D``lξ i6^:十Aきёも品品
itささ66Aζ iaきたd th8 6らももちζ661らしさハ
dらaAd h6tさ61ハgi dし161さハ
6ジ
|さtiさr"Ьζ
l SenttO the nrm on 28.12.2018.丁
he Committee decided to waitforthe reply from irm.
I Case is deferred.
Deferred
Case No.19′ 8′80‐
ALC2ノ2018
Party Name:ISGEC IMeet No/Date:12/80-
‐VVithdrawn
HEAVY ENGINEERING IALC2/2018 1
LIMI丁ED
10.01.2019
| IHQ File lRLA File lLic.No/Date:0510406768 1Date:10.01.2019
1 101/80/050/00132/AM19/ .:05/23/040/00108/AM19/ 106.06.2018 1
′90さむξお
“
十Aさё6品品血きさ:6h泊きたd“ さ6きさら
6酢 贔e66Adbハdhまさd砧まふ61品Йd6 1 1theirletter dated 13.12.2018 has informed thatthey have surrendered the above sald‖ cence to l ltheO/O Additional DGF丁,CLA,New Delhi.丁he Committee decided to wkhdraw the case from the l lagenda. | ICase is withdrawn. | ICase No.:29ノ8ノ80‐ IParty Name:SAIRA AもIA IMきも 1ヽ6′bgiさ:イウ′ё61 1bさfelた0‐ ~ | IALC2′2018 11NttER10RS PVtt LttD IALC2/2018 1 . ‐ 110.01.2019 1 1由0 1ilも‐~ ~ 1員 LA lilも …… Li:ヽ6′bら16:0416144,イblbら1さ:46:61:,610
3019199199919917恰V191 1i摯
`711919199194管
M19/ 107.06.2018 ‐
Decision:The cOmmittee considered the caseちξOまthさらしさ
hagi ttA8 1さo「さζさ
hi」七↓
861MもME
decided to ask the irm to fumish the informatiOn on following points¨
1 1.CAD drawing required forthe given expon item
9
IParty Name:PHOENIX IMeet No/Date:12/80- lFOILS PV丁.LttD. IALC2/2018 1 110.01.2019 HQ File RLA File Lic.No/Date:03 10821524 Dale:10.0 1.2019 ,.,, :01/80/050/00189/AM1 9/ :03/95/040/001 94/AM1 9/ 07 06 2018 Decision: The Committee considered the case as per agenda and noted that hard copy was not receivedfromRAandfirm'TheCommitteedecidedtoaskRAandfirmtofurnishthehardcopyof : Case is deferred.
Case No.:3ノ10′80‐
ALC2ノ2018
Case No.:49ノ8ノ80‐
ALC2′ 2018 HQ File i01/80/050/00172/AM19/
Case No.:50′ 8ノ80‐
ALC2′ 2018 HQ File :01/80/050/00173/AM19/ Case is deferred.
Case No.:2′ 10ノ80‐
ALC2′ 2018 :Party Name:∪NI VTL IMeet No/Date:12/80… ,PRECIS10N PV丁.LttD. IALC2/2018 1 10.01.2019 Party Name:∪NI VttL .Meet No/Date:12/80- PRECIS10N PVT.LttD. IALC2/2018 110.01.2019 Deferred Deferred IRLA File ‐Lic.No/Date:6510000016:Date:10.01.2019 165/24/040/00002/AM19/ 12.06.2018 1 Decision: The Committee considered the case as per the agenda. The Committee in meeting no. 10/80 dt. 16. 11 .2018 had decided to call the firm for today's meeting for a personal hearing to seek certain clarification. The firm's representative appeared for PH. Based on the comments of ^^ the representative of MSME, the Committee decided to ask the firm to furnish information on the rz following points-
- Stage wise wastage. '
- Average rate of scrap for each process.
- Physical sample of the export item. , 4. CAD design of the item.
- Why the item cannot be made from SS tubes?
- Copy of the shipping bills/ bill of entries. Case is deferred. Deferred RLA File Lic.No/Date:6510000015 1Date:10.01.20191 :65/24/040/00001/AM19/ 12.06.2018 1 1 I Decision:丁he Committee considered the case as perthe agenda.丁he Committee in meeting no.| 1 10/80 dt.16.11.2018 had decided to ca‖ the irm fortoday's meeting for a personal hearing to l l Seek Certain clarification.丁 he firrn's representat市e appeared for PH.Based on the comments of l 131:薦 閲淵TedMsM巳 he cOmmttee dedded b aまhettm b ttmbM所∝mationonhe l : 1 1・ Stage wlse wastage.
l l Seek Certain clarification.丁 he firrn's representat市e appeared for PH.Based on the comments of l 131:薦 閲淵TedMsM巳 he cOmmttee dedded b aまhettm b ttmbM所∝mationonhe l : 1 1・ Stage wlse wastage. | | 1 2.Average rate of scrap for each process. : 1 3.Physical sample ofthe expottitem. | : 1 4.CAD design ofthe item. . : 1 5。 Whythe nem cannOt be made from SS tubes? | | 1 6.Copy of the shipplng bills/bill of entrles. Party Name:CESARE BONET丁 | Meet No/Date:12/80- IDeferred ALC2/2018 1 ¶ :34
HQ Fiie :INttERNAT10NAL 10.01.2019 1 1 1PRIVAttE LIMI丁ED I : | IRLA F‖ e lLic,No/Date:3110067078 1Date:10.01.20191 :01/80/050/00188/AM19/ 1:31/83/040/00029/AM19/ 12.06.2018 1 1 Decision:丁he Corrlrnittee considered the case as per agenda and noted that hard copy was not l received from RA and irm.A letter was sent on 07.01.2019 requestlng O/o Addl.DGF丁 ,Mumbal l to furnish the hard copy of app‖ cation. Case is deferred.
Case No.:36′ 8′80‐
ALC2′ 2018 HQ File Party Name: RAttNAVEER SttAINLESS PRODUCttS (PV丁)LTD, RLA File Meet No/Date:12/80- IDeferred ALC2/2018 i Lic.No/Date:3410044246 1Date:10.01.2019 :35 :01/80/050/00159/AM19/ 1:34/24/040/00112/AM18/ 14.06.2018 1 Decision:丁he Cornrnittee considered the case as per agenda and noted that deflciency letter was sentto the irnn on 28.12.2018.丁 he Commtttee decided to waltforthe reply from lrm. Case is deferred.
Case No.:41′ 8′80‐ Party Name:UNIVERSAL IMeet No/Date:12/80¨ IApproved
ALC2/2018 CABLES LttD., IALC2/2018 1 HQ FIle IRLA File Lic.No/Date:1110028343 1Date:10.01.2019 361:911,919791991911今Vl?` ::11/24/040/00006/AM19/ 114.06.2018 1 1Decision:丁he Cornrnittee considered the case as per agenda and decided to ratify the norrns as per wrttten recommendation of MEI丁Y vide their U.0.No.17(28)/2018-lPHW dated 20.12.2018. 1丁he same is enclosed in the annexure attached. IRA concerned may take further necessary action as perthe decislon of NC. iCase No.:42ノ8ノ80‐ IParty Name:UNIVERSAL IMeet No/Date:12/80- :Approved lALC2ノ2018 1CABLES LTD., IALC2/2018 : 110.01.2019 : IHQ File lRLA F‖ e lLic.No/Date:1110028346,Date:10.01.2019 371911'9/9,9/9919,1今V19/ 111/24/040/00009/AM19/ 14.06.2018 1 :Decision:丁he Conl「nittee considered the case as per agenda and decided to ratlfy the norrns as iper W百tten recommendatlon of MEI丁Y vide their U.O.No.17(30)/2018-lPHW dated 21.12.2018. 1丁he same is enclosed in the annexure attached. :RA concerned rnay take further necessary action as perthe declsion of NC.
Case No.:43′ 8′80¨
ALC2′ 2018 HQ File Party Name:∪NIVERSAL IMeet No/Date:12/80- IApproved CABLES LttD., IALC2/2018 1 RLA File Lic.No/Date:1110028344:Date:10.01.2019 :01/80/050/00166/AM19/:11l24l040/00007/AM19/14.06.2018 Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written recommendation of MEITY vide their U.O. No. 17(31)12018-IPHW dated 20.12.2018. The same is enclosed in the annexure attached. RA concerned may take further necessary action as per the decision of NC. |〇
ICase No.:44ノ8′80‐ IParty Name:∪
NI∨ERSAL IMeet No/Date:12/80- :Approved
lALC2′ 2018 1CABLES LttD., IALC2/2018 1
1 1 110.01.2019 :
IHQ File lRLA File lLic.No/Date:1110028347,Date:10.01.2019
:01/80/050/00167/AM19/ 1:11/24/040/00010/AM19/ 14.06.2018 1
39 1Decisionl丁he Cornrnlttee considered the case as per agenda.The Cornrnittee noted that MEI丁
Y
lhas already given the wrltten cornrnents for the same export & irnport items in Licence no.
11110028344dt.14.06.18.丁herefore, the CorYlrYlittee decided to ratify the norrns as per written
recommendation of MEI丁Y vide their∪.O.No.17(31)/2018-IPHW dated 20.12.2018.The same is
enclosed in the annexure attached.
IRA concerned rnay take further necessary action as perthe decision of NC.
ICase No.:45′ 8′80‐ Party Name:∪NIVERSAL Meet No/Date:12/80¨ IApproved
lALC2′ 2018 1CABLES LttD.,
‐ALC2/2018 1
40.01.2019 1
ction as perthe decision of NC.
ICase No.:45′ 8′80‐ Party Name:∪NIVERSAL Meet No/Date:12/80¨ IApproved
lALC2′ 2018 1CABLES LttD.,
‐ALC2/2018 1
40.01.2019 1
1HQ File lRLA File lLic.No/Date:11100283451Date:10.01.2019
4011911,919,919919'1今Vl?1 1:11171191019999,1今M19/ 14.06.2018 1
1Decision:丁he Cornrnittee considered the case as per agenda and decided to ratlfy the norrns as
per wrltten recommendatlon of MEI丁Y vide their U.0.No.17(32)/2018-IPHW dated 21.12.2018.
IThe same is enclosed in the annexure attached.
IRA concerned rnay take further necessary action as perthe decision of NC.
ICase No.:4ノ8ノ80‐ IParty Name:CHIRAG Meet No/Date:12/80- IDeferred
:ALC2′2018 1∪DYOG ALC2/2018 1
1HQ Flle RLA File Lic.No/Date:05104069091
411:01/80/050/00127/AM19/ :05/23/040/00141/AM19/ 19.06.2018 1Date:10.01.2019
1Decision:丁he Cornrnittee considered the case as per agenda and noted that deficiency letter was
lsentto the firrn on 28.12.2018.The Cornrnittee declded to wait for the reply from firrTl.
‐Case is deferred.
| ICase No.:38ノ
8ノ80‐ IParty Name:AYYAPPA IMeet No/Date:12/80… IDeferred l
‐ IALC2′2018 1CNC PV丁.LttD, IALC2/2018 1 1
‐10.01.2019 1 1
1HQ File lRLA F‖ e lLic.No/Date:0710113468 Date:10.01.20191
421i011'919'9/90191/今YlP/ 197(1119191999791今V19/ 21.06.2018 ‐
|
01.2019 1 1
1HQ File lRLA F‖ e lLic.No/Date:0710113468 Date:10.01.20191
421i011'919'9/90191/今YlP/ 197(1119191999791今V19/ 21.06.2018 ‐
|
IDecision:丁he CorTlrnittee considered the case as per agenda and noted that deficiency letter wasl
lsent to the firm on 12.11.2018.No inforrnation has been received so far.lt was decided to sendl
inal reminderto furnish the requisite information within 1 5 days falling whlch case will be raected.:
ICase is deferred.
,Case No.:12′ 8′80‐
‐Party Name:ULTRA Meet No/Date:12/80- IDeferred l
lALC2ノ2018 1ENGINEERS
‐ALC2/2018 1 1
10,01.2019 1 1
43 1HQ File lRLA F‖ e lLic.No/Date:3110067088 1Date:10.01.20191
101/80/050/00135/AM19/ 1:31/83/040/00043/AM19/ 125.06.2018 1 :
:Decision:丁he CorYlrnittee considered the case as per the agenda and obseⅣed that the case:
IWaS diSCussed ln Meeting No.10/80-ALC2/2018 dated 06.12.2018 wherein the party hadl
ll
' appeared on PH and had explained its case. The party has claimed different wastage on each of the export item whereas the representative of DHI suggested same wastage for each type. :Therefore, the Committee had decided to first examine tl're matter on file. On discussion in the meeting, it was decided that the representative of DHI may review the given application. Note to , be sent to DHI for review. I I , Case is deferred. | ICase No.:58ノ 8ノ80" 1 1ALC2ノ2018 1 1HQ File l l:01/80/050/00181/AM19/ 1441 :45
Case No.:3′ 8ノ80‐
ALC2′ 2018 HQ File :01/80/050/00126/AM19/
Case No.114ノ8′80‐
ALC2′ 2018 HQ File :01/80/050/00137/AM19/
Case No.:15′ 8ノ80‐
ALC2ノ2018 HQ File :01/80/050/00138/AM19/ Case is deferred, 48 Case No.:16/8/80- IParty Name:HEURttEY IPEttROCHEM INDIA IPRIVAttE LIMI丁ED IRLA File i:34/24/040/00092/AM19/ Meet No/Date:12/80- :Deferred ALC2/2018 1 Lic,No/Date:3410044279 1Date:10.01.2019 26.06.2018 1 Deferred Deferred Meet No/Date:12/80¨ IDeferred Decision: The Committee considered the case as per agenda and noted that the firm's reply was sent to DIPP on 07.01 .2019. The Committee decided to also send the firm's reply to Consuliant (Tech-3) for examination. Case is deferred. Decision: The Committee considered the case as per agenda and noted that deficiency letter was sent to the firm on 12.11.2018. No information has been received so far. lt was decided to send final remindertofurnish the requisite information within 15 days failing which case will be rejected. Case is deferred. IParty Name:VICttoRA IMeet No/Date:12/80¨ IAUttO PV丁.LttD IALC2/2018 1 110.01.2019 RLA F‖ e lLic.No/Date10510407035 1Date:10.01.20191 :05/24/040/00172/AM19/ 102.07.2018 : | Party Name:BHARA丁 IMeet No/Date:12/80- EXPORttS IALC2/2018 110.01.2019 Deferred RLA File lLlc.No/Date:0510407065 1Date:10.01.2019 :05/23/040/00161/AM19/ 104.07.2018 1 :46 Decision: The Committee considered the case as per agenda and noted that deficiency letter was sent to the firm on 28.12.20'18.The Committee decided to wait for the reply from firm. Case is deferred. IParty Name:SEBROS IMeet NoノDate:12/80-
e as per agenda and noted that deficiency letter was sent to the firm on 28.12.20'18.The Committee decided to wait for the reply from firm. Case is deferred. IParty Name:SEBROS IMeet NoノDate:12/80- lND∪SttRIES PV丁.LTD., IALC2/2018 1 110.01.2019 RLA File lLic,No/Date:0510407110 1Date:10.01.2019 :05/24/040/00185/AM19/ 106.07.2018 1 47 Decision: The Committee considered the case as per agenda and noted that the copy of application was sentto MSME on 11.09.2018. However, no reply has been received from MSME till date. Committee decided to remind MSME to expedite their comments. Party Name: SMC lλ , ¨ ″
ALC2′ 2018 PNE∪
MA丁ICS(INDIA) IALC2/2018 1
1PRIVAttE LIMI丁ED 10.01.2019 1
HQ File lRLA File lLlc.No/Date:0510407130 1Date:10.01.2019
:01/80/050/00139/AM19/ ‐:05/24/040/00207/AM19/ 109,07.2018 :
Decision:丁he Cornrnittee considered the case as per agenda and noted that deficiency letter was
sentto the firm on 28.12.2018.The Committee decided to waitforthe reply from irm.
Case is deferred.
| ICase No.120′
8′80‐ IParty Name:APAR IMeet No/Date:12/80- IDeferred
i lALC2′2018 1NDUSttRIES LIMI丁ED
‐ALC2/2018
1 1HQ F‖ e lRLA F‖ e lLic.No/Date:0310822226 1Date:10.01.2019
,91911'γ 9'919911,管V191_|:9,191191919919?怜M19/ 111・07.2018 1
1 1Decision:丁he CornrTlittee considered the case as per agenda and noted thatthe firrn's reply
l dated 01・11.2018 was sentto MElttY on 22.11.2018.However,no comments have been received
7.2018 1
1 1Decision:丁he CornrTlittee considered the case as per agenda and noted thatthe firrn's reply
l dated 01・11.2018 was sentto MElttY on 22.11.2018.However,no comments have been received
l yet.丁he Committee decided to send reminder MEI丁
Y to expedite their comments.
1 1Case is deferred.
| ICase No.118′
8′80" IParty Name:ULttRA IMeet No/Date:12/80- Deferred l
l lALC2′2018
‐ENGINEERS IALC2/2018 1
‐
110.01.2019 1 1
1 1HQ File RLA File lLic.No/Date:3110067111 1Date:10.01.20191
: 101/80/050/00141/AM19/ :31/83/040/00053/AM19/ 12.07.2018 1 ‐
| IDecision: 丁he Cornrrlittee consldered the case as per the agenda and obseⅣed that the casel
1501Was diSCussed in Meeting No.10/80-ALC2/2018 dated 06.12.2018 wherein the pany hadl
l appeared On PH and had explained its case.The party has clalmed different wastage on each o「
| lthe expott item whereas the representat市e of DHl suggested same wastage for each type.|
l l丁herefore,the CorYlrrlittee had decided to first exarnine the matter on f‖
e.
ferent wastage on each o「
| lthe expott item whereas the representat市e of DHl suggested same wastage for each type.|
l l丁herefore,the CorYlrrlittee had decided to first exarnine the matter on f‖
e. On discussion in thel
: lmeeting,it was decided that the representative of DHl may review the given application.Note tol
l be sentto DHlfor review.
I Case is deferred.
| :Case No.119ノ
8ノ80‐
‐Party Namei CL&∨
INDIA IMeet No/Date:12/80¨ IDeferred l
l lALC2ノ2018
‐PRIVAttE LIMI丁ED IALC2/2018 1 1
'10.01.2019 1 1
1HQ File lRLA File Lic.No/Date:3110067112,Date:10.01.20191
511:911,0/9,9/99147/今v19/ .:,11,,/0101999,11今V19/ 12.07.2018 1 i
lDecision:丁he Cornrnlttee considered the case as per agenda and noted that deficiency letter wasl
lsent to the firrn on 12.11.2018.No inforrYlation received so far.lt was decided to send finall
lremindertofumishtherequisneinfOrmationwlhin15daysfailingwhichcasewillbereieCted. :
ICase is deferred. 1
1Case No.:28′ 8′80‐ IParty Name:SttERLI丁E IMeet No/Date:12/80- IDeferred l
lALC2ノ2018 1丁ECHNOLOGIES LttD.
・ALC2/2018 1 1
521 1 10.01.2019 : :
IHQ F‖ e lRLA F‖ e ‐Lic.No/Date:0310822298 1Date:10.01.20191
1:01/80/050/00151/AM19/ 1:03/95/040/00314/AM19/ 13.07.2018 : |
lら
: : IHQ F‖ e lRLA F‖ e ‐Lic.No/Date:0310822298 1Date:10.01.20191 1:01/80/050/00151/AM19/ 1:03/95/040/00314/AM19/ 13.07.2018 : | lら
Decision: The Committee considered the case as per agenda and noted that the firm's reply was sentto MEITY on 05.12.2018. However, no comments received. The Committee decided to send reminder LD. note to MEITY. Case is deferred. IParty Name:S AND P iMeet No/Datei12/80- IENttERPRISES IALC2/2018 1 110.01.2019 HQ File RLA File Lic.No/Date:04'101645'14 rDate:10.01 .2019 :01/80/050/00136/AM19/ :041241040/00088/AM19/',20.07.2018 53 ,Decision: The Committee considered the case as per agenda and noted that deficiency letter was rsent to the firm on 12.11.2018. No information received so far. It was decided to send final , reminder to furnish the requisite information within 15 days failing which case will be rejected. Case is deferred.
Case No.:13′ 8′80‐
ALC2′ 2018 Deferred IParty Name:ALLEVARD IMeet No/Date:12/80- IApproved l lAI S∪SPENS10NS IALC2/2018 1 1 'PRIVAttE LIMI丁 ED 10.01.2019 1 1 HQ File :RLA File Lic.No/Date:3110067120 Date:10.01.2019 uo :01/80/050/0 01441Nlln/r1gl :311831040/00059/AM 1 9/ '20.07 .2018 Decision: The Committee considered the case as per agenda and decided to ratify the norms as 'per written recommendation of DHI vide their U.O. No. DES-1/ASPL/STAB-1-2018-HEl dated 10.12,2018.TheSameisenclosedintheanneXUreattached. RA concerned may take further necessary action as per the decision of NC.
Case No.121′ 8′80‐
ALC2′ 2018
Case No.:46′ 8′80‐
ALC2′ 2018
Case No.:26′ 8′80‐
ALC2′ 2018 HQ FIle Party Name:SHAK丁| IMeet No/Date:12/80- ‐Deferred PUMPS(INDIA)LttD., IALC2/2018 ‐ IHQ File lRLA F‖ e lLic.No/Date:1110028358 1Date:10.01.20191 551:01/80/050/00169/AM19/ 111ノ24/040/00012/AM19/ 120.07.2018 1 1 1Decision:丁he Committee considered the case as per agenda and noted that deiciency letter was l sentto the lrm on 28.12.2018.丁he Commntee decided to waitforthe reply from lrm. : I Case ls deferred, Party Name:SttERLI丁巨 IMeet No/Date:12/80- IDeferred 丁ECHNOLOGIES LTD. IALC2/2018 1 ‐Lic No/Date:0310822557 Defer RLA FIle 56 ::01/80/050/00149/AM19/ :03/95/040/00348/AM'19/ 24 07 2018 Date:10-01 .2019 Decision: The Committee considered the case as per agenda and noted that the firm's rapplication was sent to MEITY on 1 1 .09.1 2.2A18. However, no comments received. The ;Committee decided to send reminder l.D. note to MEITY. Case is deferred. ′多千
RLA File Lic.No/Date:0310822555 Defer St :01/80/050/00150/AM19/ :03/95/0401003621AM19/ 24.07.2018 Date:10.01.2019 Decision: The Committee considered the case as per agenda and noted that the firm's reply was sent to MEITY on 05.12.2018. However, no comments received. The Committee decided to send reminder l.D. note to MEITY. Case is deferred.
Case No.:27′ 8ノ80‐
ALC2′ 2018 HQ File
Case No.:4′ 10ノ80¨
ALC2ノ2018 HQ File
Case No.:22′ 8′80‐
ALC2ノ2018 HQ File
Case No.:54ノ8ノ80…
ALC2ノ2018 HQ File Party Name:SttERLITE ‐Meet No/Date:12/80- TECHNOLOGIES LTD. IALC2/2018 110.01.2019 LIMI丁ED RLA File Deferred Lic.No/Date:0410164525 1Date:10.01.2019 Party Namei BHARAT IMeet No/Date:12/80- IDeferred HEA∨Y ELECttRICALS ALC2/2018 1 :01 /80/050/001 90/AM 1 9/ .041241040/00061 /AM 1 9/ 24.07 .2018 Decision: The Committee considered the case as per agenda and noted that hard copy was not received from RA and firm. A letter was sent to the O/o Addl. DGFT, Chennai on 07.0'1 .2019 requesting them to furnish the hard copy of application. Case is deferred. Deferred RLA File Lic.No/Date:3110067126 1Date:10.01.2019 101/80/050/00145/AM19/ 131/83/040/00063/AM19/ 126.07.2018 1 1Decision: 丁he Cornrnittee considered the case as per the agenda and obseⅣed that the case 591Was discussed in Meeting No. 10/80¨ ALC2/2018 dated 06.12.2018 whereln the party had lappeared on PH and had explained its case.The party has clairned different wastage on each of lthe eXpon item whereas the representative of DHl suggested same wastage for each type. 1丁herefore, the Cornrnittee had decided to first exarnine the matter on f‖ e, On discussion ln the rneeting, it was declded that the representative of[DHl rnay review the glven appllcation.Note to be sentto DHlfor review. ICase is deferred. Party Name:ULttRA IMeet No/Date:12/80- ENGINEERS IALC2/2018 10.01.2019 Party Name:ULTRA IMeet No/Date:12/80- IDeferred ENGINEERS IALC2/2018 1 RLA File Lic.No/Date:3110067142 1Defer
ttRA IMeet No/Date:12/80-
ENGINEERS IALC2/2018
10.01.2019
Party Name:ULTRA IMeet No/Date:12/80- IDeferred
ENGINEERS IALC2/2018 1
RLA File
Lic.No/Date:3110067142 1Defer
:01/80/050/00177/AM19/ ::31/83/040/00078/AM19/ 116.08.2018
Date:10.01.2019
Decision:丁he Commntee cOnsidered the case as per the agenda and obseⅣed that the case:
601Was diSCussed in Meeting No.10/80-ALC2/2018 dated 06.12.2018 wherein the panソ hadl
appeared on PH and had explained its case.丁he party has claimed different wastage on each ofl
lthe eXpon item whereas the representatⅣe of DHl suggested same wastage for each type.|
1丁herefore,the Cornrnittee had decided to first exarYline the matter on file, On discussion in thel
‐meeting,it was decided that the representative of DHl may review the given applicatiOn.Note tol
be sentto DHlfor review. |
ICase is deferred.
Party Name:∪LTRA
‐Meet No/Date:12/80¨ ‐Deferred
611Case No.155′ 8′80‐
|ダ
he given applicatiOn.Note tol
be sentto DHlfor review. |
ICase is deferred.
Party Name:∪LTRA
‐Meet No/Date:12/80¨ ‐Deferred
611Case No.155′ 8′80‐
|ダ
:ALC2′2018 ENGINEERS ALC2/2018 10.01.2019 HQ File niA file Lic.No/Date:31'10067 144 Date:10.01 .2019 :0'1/80/050/001 78lAM19l :311831040/00079/AM1 9/ I 6.08.2018 Decision: The Committee considered the case as per the agenda and observed that the case was discussed in Meeting No. 10/80-ALC212018 dated 06.12.2018 wherein the party had appeared on PH and had explained its case. The party has claimed different wastage on each of the export item whereas the representative of DHI suggested same wastage for each type. Therefore, the Committee had decided to first examine the matter on file. On discussion in the rneeting, it was decided that the representative of DHI may review the given application. Note to be sent to DHI for review. Case is deferred. IHQ F‖e ‐RLA File lLic.No/Date:3110067145 :01/80/050/00179/AM19/ .:31/83/040/00080/AM19/ 16.08.2018 Decision: The Committee considered the case as per the agenda and observed that the case ,62 was discussed in Meeting No. 10/80-ALC2t2O18 dated 06.12.2018 wherein the party had : aPPeared on PH and had explained its case. The party has claimed different wastage on each of the export item whereas the representative of DHI suggested same wastage for each type. Therefore, the Committee had decided to first examine the matter on file.
claimed different wastage on each of the export item whereas the representative of DHI suggested same wastage for each type. Therefore, the Committee had decided to first examine the matter on file. On discussion in the meeting, it was decided that the representative of DHI may review the given application. Note to ; Ue sent to DHI for review.
Case No.:56ノ8′80‐
ALC2ノ2018 | ICase is deferred. ‐ ICase No.:63′ 8′80¨ | IALC2/2018
Case No.:57′ 8′80‐
ALC2′ 2018 IParty Name:ULttRA IENGINEERS IParty Name:ULTRA IENGINEERS Party Name: ALC2/2018 10,01.2019 Meet No/Date:12/80¨ Deferred 163 Meet No/Date:12/80- IDeferred ALC2/2018 1 10.01.2019 HQ File RLA File ii".ruo/O"te:3110067143 Date:10.01 .2019 :0'1/80/050/00186/AM1 9/'.31 t83lO4OtOOO77 tAMl 9/ 1 6.08.201 8 Decision: The Committee considered the case as per the agenda and observed that the case was discussed in Meeting No. 10/80-ALC212018 dated 06.12.2018 wherein the party had appeared on PH and had explained its case. The party has claimed different wastage on each of the export item whereas the representative of DHI suggested same wastage for each type. Therefore, the Committee had decided to first examine the matter on file. On discussion in the meeting, it was decided that the representative of DHI may review the given application. Note to be sent to DHI for review. Case is deferred. IVALVEWORKS INDIA IALC2/2018 1PRIVAttE LIMI丁ED 10.01.2019 HQ File RLA File Lic.No/Date:3110067146 Date:10.01 .2019 Uo , :01/80/050/001 80/AM 1 9/ :311831040/00084/AM 1 9/ 17 .08.2018 Decision: The Committee considered the case as per the agenda and observed that the :application has been sent to DIPP on 07.01 .2019.11 was decided to also forward the complete set of application to Consultant (Tech-3) for examination. Case is deferred. lι
Case No.:27′ 12′ 80‐
ALC2′ 2018 HQ File | ICase No.128ノ 12′ 80‐ | IALC2′2018 : IHQ File 1661:01/80/050/00301/AM19/
Case No.:3ノ12ノ80‐
ALC2′ 2018 HQ File Case is deferred.
Case No.:4ノ12′80‐
ALC2′ 2018 IParty Name:SttERLI丁E I丁ECHNOLOGIES LttD. IRLA File ‐Pany Name:BIRLA IPRECIS10N Party Name:BIRLA PRECISiON Approved Meet No/Date:12/80- IDeferred : ALC2/2018 1 1 Meet No/Date:12/80- IDeferred ALC2/2018 Meet No/Date:12/80- IDeferred ALC2/2018 1 ILic.No/Date:0310823985 1Date:10.01.20191 :01/80/050/00300/AM19/ 103/95/040/00625/AM19/ 125,09.2018 1 Decision:丁he Cornrnittee considered the case as per agenda and noted thatthe l.D.note was sentto MEI丁Y on 02.01.2019.丁he Committee decided to wait for corTlments. Case is deferred. Party Name:PERMANEN丁 IMeet No/Date:12/80- :MAGNEttS LIMI丁ED IALC2/2018 10.01.2019 RLA File Lic.No/Date:0310824253 Date: :03/95/040/00661/AM19/ 105.10.2018 110.01.2019 . Decision: The Committee considered the case as per agenda. Based on the recommendations of , the representative of MSME the Committee decided to ratify the norms as applied. : RA concerned may take further necessary action as per the decision of NC. 167 1丁ECHNOLOGIES LttD., 10.01.2019 1 IRLA File Lic.No/Date:0310824314‐ Date:10.01.2019i :01/80/050/00276/AM19/ :03/94/040/00599/AM19/ 109・10.2018 1 1 1Decision:丁he Committee considered the case as per agenda.As perthe recommendation of : representative of MSA/1E the Cornrnittee decided to ask the firm to furnish the inforrTlation on the l fo‖ owing points― 1 1.Detalltechnical drawings with dimension of each export product,Catalogue,lf any,may l l also be furnished l il.
d to ask the firm to furnish the inforrTlation on the l fo‖ owing points― 1 1.Detalltechnical drawings with dimension of each export product,Catalogue,lf any,may l l also be furnished l il. Weight of each Export Product i l 蘭.Weight of each ofthe imponed and indigenous input,separately for each product,forthe l ‐ purpose of material balancing.Net weight(Gross weight minus wastage)for each l l imponed and indigenous inputin the expon product may be indicated.Net weight along : ‐ with detalls of otherimported inputto be used in the resultant product and soughtto be l l imported/procured from sources otherthan the license,if any,may also be lndicated. | iv. Starting from the specification ofthe export product,basic calculation as to how of raw l material proposed forimpott has been arr市ed at,including the net weight of components i to be manufactured out ofthese imponed matettals,wastages claimed at each stage of i manufacturing with complete iustinCatiOn and supponed by dOcumentary l evidence/drawings etc i :68 ‐ 丁ECHNOLOGIES LttD., 10.01.2019 1 1 HQ File lRLA F‖ e lLic.No/Date:0310824317 1Date:10.01.20191 :01/80/050/00277/AM19/ 103/94/040/00600/AM19/ 109.10.2018 1 : Decision:丁he Cornrnittee considered the case as per agenda.As perthe recornrnendation of l representative of MSA/1E the CornrYlittee decided to ask the firm to furnish the inforrnation on the l
Decision:丁he Cornrnittee considered the case as per agenda.As perthe recornrnendation of l representative of MSA/1E the CornrYlittee decided to ask the firm to furnish the inforrnation on the l fo‖ owing points― |.Detalltechnical drawings with dimension of each export product,Catalogue,lf any,may l |千
also be furnished ii. Weight of each Export Product iii. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procuredfromSourceSotherthanthelicense,ifany,mayalsobeindicated. iv.Startingfromthespecificationoftheexportproduct,basiccalculationastohowofraw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc Case is deferred
Case No.:5ノ12ノ80‐
ALC2′2018 | ICase No.112′12′ 80‐ 1 :ALC2′2018 1 1HQ File l :01/80/050/00285/AM19/ IParty Name:BIRLA IPRECIS10N IParty Name:BIRLA ,PRECIS10N :丁ECHNOLOGIES LttD., Meet No/Date:12/80- IDeferred l ALC2/2018 1 1 10.01.2019 1 1 Lic.No/Date:0310824375 1Date:10.01.20191 11.10.2018 1 1 ALC2/2018 10.01.2019 :丁ECHNOLOGIES LttD., HQ File ,RLA File :01/80/050/00278/AM19/ 1:03/94/040/00598/AM19/ | IDecision:丁he Cornrrlittee considered the case as per agenda.As perthe recornrnendation of i lrepresentative of MSME the Committee decided to ask the lrm to furnish the information on the : fOl10Wing points― i : i.Detalltechnical drawings with dlmension of each export product,Catalogue,if any,may l l alSO be furnished ● I航 :離寵 =扁 属躙 and ind∝m鵬 呻眈中 dtt fOr each pro山¨ 樋 : l purpose Of material balancing.Net welght(Gross weight minus wastage)for each : l irnported and indigenous inputin the export product may be indicated.Net weight along l l wtth detalls of otherimponed inputto be used in the resultant product and soughtto be l l irnported/procured frorn sources otherthan the license,if any,may also be indicated. : 1 市.Starting from the specricatiOn ofthe export product,basic calculation as to how of raw l l material proposed forimpon has been arrived at,including the net weight of components i l tO be manufactured out ofthese imponed materials,wastages claimed at each stage of l l manufacturing with complete justricat10n and supponed by doCumentary
ing the net weight of components i l tO be manufactured out ofthese imponed materials,wastages claimed at each stage of l l manufacturing with complete justricat10n and supponed by doCumentary : l eVidence/drawings etc l lCase is deferred. IRLA FIle lLic.No/Date:0310824374 1:03/94/040/00597/AM19/ 11.10.2018 IDate:10.01.2019 IDecision:丁he Cornrnittee considered the case as per agenda.As perthe recornrnendation of lrepresentative of MSME the Committee decided to ask the irm to furnish the information on the fo‖ owing points― 701 i. Deta‖ technlcal drawlngs with dirnension of each export product,Catalogue,if any,may l also be furnished l ‖。 Weight of each Export Product l i‖ . Welght of each ofthe imported and indigenous input,separately for each product,for the , purpOSe of material balancing.Net weight(Gross weight minus wastage)for each l irnpOrted and indigenous inputin the export product may be indicated.Net weight along l With deta‖ s of otherimported inputto be used in the resultant product and soughtto be l irnpOrted/procured frorn sources otherthan the license,if any,may also be indicated. : iV.Starting from the spec1lcation ofthe export product,basic calculation as to how of raw l matettal proposed forimport has been arrived at,including the net welght of components 19 ^
to be manufaciured oJt of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc Case is deferred.
Case No.:22′ 12′80‐ :Party Namei CPS OIL& :Meet Noノ
Date:12ノ80- IDeferred ALC2′2018 1GAS EQUIPMENttS PV丁 :ALC2/2018 : LttD RLA File Lic.No/Date:0310824383 1Date110.01.2019 Meet No/Date:12/80- ALC2/2018 10.01.2019 HQ File 711:01/80/050/00295/AM19/ ::03/94/040/00630/AM19/ 11.10.2018 1 1Decision:丁he Cornrnittee consldered the case as per agenda and noted thatthe hard copy of lappllCation is not received.Letterto the concerned RA to be lssued. ‐Case is deferred. Party Name:」AICO IMeet No/Date:12/80- IDeferred ENttERPRISE LLP IALC2/2018 1 RLA File Llc,No/Date:0310824420:Date:10.01.2019 72 :01/80/050/00274/AM19/ 1:03/94/040/00612/AM19/ 12.10.2018 1 Decision:The Cornrnittee consldered the case as per agenda and noted thatthe hard copy of app‖ cation is not received.Letterto the concerned RA to be issued. ICase is deferred. I Case No.:34′ 12′ 80‐ IParty Name:A∪丁OCOMP IMeet No/Date:12/80- ldeferred l : ALC2′2018 1CORPORAT10N PANSE IALC2/2018 1 1 1 1PRIVATE LIMI丁ED 10.01.2019 1 1 1 1HQ Flle lRLA File Lic.No/Date:3110067200 1Date:10.01.20191 173 :01/80/050/00307/AM19/ 131/83ノ 040/00111/AM19/ 15.10.2018 1 1 1 ‐Decision:丁he Cornrnittee considered the case as per agenda and noted thatthe complete set of l l lappliCation sentto DHl on 07.01.2019.The Comrnittee decided to wak for comments from DHI. | ‐ ICase is deferred
Case No.:1ノ12ノ80‐
ALC2′ 2018 HQ File
Case No.:23′ 12′80‐
ALC2′ 2018 Party Name:GENERAL INSttR∪MENttS CONSOR丁IUM SOLE PROP.K∪LKARNI 14肌 刷凡5餅00296ハMl餅 11乳 7&90064餅AM19 1よ ・ 摺児lξ Ю310824478■ =.20191 ' Decision:丁 he Committee considered the case as per agenda and noted thatthe hard copy of l i appliCatlon is not received.Letterto the concerned RA to be issued l l lCase is deferred. t■
Party Name:NIDEC INDIA ‐Meet No/Date:12/80- PRIVAttE LIMI丁ED ‐ALC2/2018 110.01.2019 HQ File RLA File Lic.No/Date:051040g'160 Date: 75:0'1/80/050i00286/AM19/ .05124t040/00408/AM19/ 22.10.2018 10.01 .2019 application sent to DIPP on 02.01.2019. The Committee decided to wait for comments from Dlpp. Case is deferred ‐Case No.:13′ 12ノ80‐ ALC2ノ2018
Case No.:6ノ12/80‐
ALC2′ 2018 HQ File
Case No.115ノ12′ 80‐
ALC2ノ2018
‐Case No.:16ノ12ノ80‐
ALC2′2018
PRIVAttE LIMI丁ED
RLA File
Lic.No/Date:0310824676 1Date:
Deferred
Deferred
Party Name:GALA IMeet No/Date:12/80… IDeferred
PRECIS10N ttECHNOLOGY IALC2/2018 1
, u ,.01/80/050/0 02791AM19t :03t94t040/00660/AM 1 9/
2s.10 .2018
10.01.2019
Decision: The Committee considered the case as per tne agenda and noted that the application
was sent to DIPP on 04.01 .2019.11 was decided to also fonrrard the complete set of appiication to
Consultant (Tech-3) for examination.
Case is deferred.
Party Name:MicRON IMeet No/Date:12/80- Deferred
lNSTR∪MENttS PVT LttD IALC2/2018 1
IHQ File lRLA File lLic.No/Date:0510408224 1Date: |
77911'919991997,,管Vl?4_ 19,4711919199"子
`AM19/ 125,10.2018 1lo.ol.20191
Decision:丁he Commntee considered the case as per the agenda and noted thatthe applicationl
lwas sentto DIPP on 04.01.2019.lt was decided to also forward the complete set of applicationtol
lConsultant(丁ech-3)as well fOr examination.
ICase is deferred.
Party Name:MlcRON IMeet No/Date:12/80-
lNSttRUMENttS PVtt LttD IALC2/2018
110.01.2019
| ‐‐
‐
‐
‐ _
‐
IHQ File lRLA File
lLic.No/Date:0510408225 1Date: :
781型響γ999P,7,?管Vlツ 19γζγ91999,P,管Ml釘 2■lo2018 1lo釧.2∝91
Decision:丁he Committee cOnsidered the case as per the agenda and noted thatthe applicationl
was sentto DIPP On 07.01.2019.‖ was dedded to aにo foMard the comttete set of ap口iCa暫On tol
2018 1lo釧.2∝91 Decision:丁he Committee cOnsidered the case as per the agenda and noted thatthe applicationl was sentto DIPP On 07.01.2019.‖ was dedded to aにo foMard the comttete set of ap口iCa暫On tol ConsuLant(丁ech… 3)as well fOr examination. ICase is deferred.
Case No.:32ノ12ノ80‐ IParty Namei NIPHA IMeet No/Date:12/80-
ALC2ノ2018 1EXPORttS PRIVAttE IALC2/2018 LIMI丁ED 10.01.2019 19凛WiⅧ電器鷺きよ織TT蝋Fll嵐lЁ基“。 nthel:』l:T品 | | lthe representative of MsME the Committee decided to seek clariication from the irm on thel l fOI10Wing points― | 1 1・ Weight of each type of blade to be exponed. | ′。
Case is deferred.
Case No.114ノ12ノ80‐
ALC2′ 2018 Case is deferred
Case No.:31′ 12′80ロ
ALC2′ 2018
Case No.:33′ 12′ 80‐
ALC2′ 2018
Case No.136′ 12′ 80‐
ALC2′ 2018 HQ File
Case No.:7′ 12′80‐
ALC2′ 2018 HQ File :01/80/050/00280/AM19/ Party Name:SAIRA ASIA INttER10RS PVtt LTD RLA File IMeet No/Date:12/80- IDeferred l lALC2/2018 1 1 110.01.2019 1 1 ちよ ・ 糊 ]F卸 0044∞51鴇 .矧91 the agenda.Based on the comments onl to seek clarification frorTl the firm on the l Party Name:SPIROttECH IMeet No/Date:12/80- :Deferred HEAtt EXCHANGERS PV丁.IALC2/2018 : LttD. 10.01.2019 IHQ File RLA File Lic.No/Date:0510408254 1Date: 80‐ :01/80/050/00287/AM19/ :05/24/040/00415/AM19/ 126.10.2018 10.01.2019 1Decision:丁he CornrTlittee consldered the case as per agenda and noted thatthe complete set of lappliCation sentto DIPP on 07.01.2019.丁he Committee decided to waltfor comments from DIPP. Party Name:SttEEL .Meet No/Date:12/80¨ SttRIPS WHEELS LttD. :ALC2/2018 110.01.2019 HQ Fite RLA File Lic.No/Date:301 0104482 Date: 81 ::0'1/80/050/00304/AM'19/ .30t24t040i00033/AM19i 29.10.2018 .10.01 .2019 application sent to DHI on 07.01.2019. The Committee decided to wait for comments from DHl. Case is deferred Party Namei SttEEL SttRIPS IMeet No/Date:12/80¨ IDeferred WHEELS LttD. IALC2/2018 : HQ File RLA File Lic.No/Date:3010104483:Date: 82 :01/80/050/00306/AM19/ .30t24t040/00034/AM'19/ 29.10.2018 r10.01 .2019 application sent to DHI on 07.01 .2019.
LS LttD. IALC2/2018 : HQ File RLA File Lic.No/Date:3010104483:Date: 82 :01/80/050/00306/AM19/ .30t24t040/00034/AM'19/ 29.10.2018 r10.01 .2019 application sent to DHI on 07.01 .2019. The Committee decided to wait for comments from DHl. Case is deferred 一 d ¨ e 一 f e 一 一 83 :01/80/050/00309/AM19/ 134/24/040/00263/AM19/ IDecision: 丁he CornrYlittee considered the case as per lthe representatlve of MSME,the Committee decided fo‖ owing polnts― ‐ 1.CAD drawlng requlred i Case ls deferred. Party Name: CUPRO IMeet No/Date:12/80- :Approved 丁∪BES ENttERPRISES IALC2/2018 : PVT.LttD. 110.01.2019 1 RLA File lLic.No/Date:0310824800 1Date: .:03ノ94/040/00668/AM19/ 130.10.2018 110.01.2019 Decision: The Committee considered the case as per agenda and observed that the applicant is using indigenous inputs also. Based on the recommendation of the Consultant ( Tech-1), the Committee decided to ratify the norms as under - 84 又 |
( ・ L lmport ltem 1 may be allowed as 10.575 MT. RA concerned may take further necessary action as per the decision of NC.
Case No.:19ノ12′ 80…
ALC2ノ2018 HQ File Party Namei VVINttAGE IMeet No/Date:12/80- lDeferred ENGINEERS& ALC2/2018 CONSULttANttS PV丁.LTD.110.01.2019 RLA File Lic.No/Date:0510408273 1Date: 85 :01/80/050/00292/AM19/ :05/24/040/00420/AM19/ 130.10.2018 10.01.2019 Decision:丁he Cornrnittee considered the case as per agenda and noted thatthe complete set of application sent to R/1SME on 02.01.2019.丁 he Comrnittee declded to waitfor comments from MSME. Case is deferred RLA File Lic.No/Date:0410164844:Date: 1861:01/80/050/00290/AM19/ :04/24/040/00164/AM19/ 102.11.2018 10.01.2019 Decision: The Committee considered the case as per the agenda. Committee decided to fonryard the complete set of application to DHI for examination. Case is deferred.
Case No.:17ノ12/80‐
ALC2′2018 HQ File
Case No.:25ノ12′ 80‐
ALC2′ 2018 HQ File
Case No.:9ノ12ノ80‐
ALC2′ 2018 HQ File
Case No.:20′ 12′ 80‐
ALC2ノ2018 Party Name:DOOWON IMeet No/Date:12/80- IDeferred AU丁OMOTIVE SYSttEMS IALC2/2018 1 1NDIA PRIVAttE LIMI丁ED 110.01.2019 1 Party Name:PHOENIX IMeet No/Date:12/80- IApproved FOILS PV丁.LttD. IALC2/2018 1 ‐10.01.2019 1 Party Name:BONATRANS IMeetNo/Date:12/80- IDeferred lNDIA PRIVAttE LIMI丁ED IALC2/2018 1 Party Name:MINDA SILCA IMeet No/Date:12/80- IDeferred ENGINEERING PRiVAttE IALC2/2018 1 2λ RLA File Lic.No/Date:0310824898 1Date: :01/80/050/00298/AM19/ :03/95/040/00805/AM19/ 105,11.2018 110.01.2019 1Decision:丁he Cornrnittee considered the case as perthe agenda.Based on the recornrnendation 10fthe representative of AЛ SME,the Corrlrnittee decided to apply repeat norrns as ratified under 871‖ CenCe nO.0310808945 dt.03.11.2016.丁 he deta‖s ofthe same are as fO‖ ows― 1 1・ lmpOn ltem shall be ofrelevant grade as contained in the expon prOducts. 1 2.Quantity ofimport at SI.No.1(relevant Hot rolled/cold rolled Stainless steel wide , COilS/Strlps)may be allowed as under一 l i. For wide Coils:as l.08 kgs/kg contentin the expott prOduct as claimed by the lrm l aS per sioN C-2008. l ii.
Stainless steel wide , COilS/Strlps)may be allowed as under一 l i. For wide Coils:as l.08 kgs/kg contentin the expott prOduct as claimed by the lrm l aS per sioN C-2008. l ii. For stripsi as l.065 kgs/kg cOntentin the export product. :RA concerned may take further necessary action as perthe decision of NC. RLA File 881:01/80/050/00282/AM19/ :03/94/040/00675/AM19/ 106.11.2018 10.01.2019 Decision:丁he Cornrnittee considered the case as per agenda and noted thatthe complete set of application senttO DHl on 07.01.2019.丁he Comrnittee decided to waitfor comments frorn DHI. Case is deferred 89 ILic.No/Date:0310824925 1Date:
LIMI丁ED 10.01.2019 HQ F‖ e lRLA FIle :Lic.No/Date:0510408370 1Date: | :01/80/050/00293/AM19/ 1:05/24/040/00433/AM19/ 112.11.2018 110.01.20191 Decision: 丁he CornrTlittee considered the case as per the agenda.Based on the cornrrlents oni the representatlve of MSME the CorTlrnittee decided to seek clarification fronl the firm on thel fo‖ owing points一
- Content of Plastic&steelin the exportltems(PlastiC Head Keys) | | The Case stands deferred.
Case No.:29′ 12′ 80‐
ALC2ノ2018 HQ FIle
Case No.:8′ 12ノ80‐
ALC2′ 2018 HQ File
Case No.:18′ 12′ 80‐
ALC2′ 2018 HQ File :01/80/050/00291んへM19/ Case is deferred.
Case No.:26′ 12′ 80‐
ALC2′ 2018 HQ File LIMI丁ED RLA File Party Name:VICttORA AUttO PV丁.LttD RLA File Lic.No/Date:3110067234 1Date: IMeet No/Date:12/80- IDeferred lALC2/2018 1 1Lic.No/Date:0510408463 1Date: Party Name:ALLEVARD IAI IMeet No/Date:12/80¨ Deferred S∪SPENS10NS PRI∨AttE ALC2/2018 901:01/80/050/00302/AM19ノ :31/83/040/00125/AM19ノ 115.11.2018 10.01.2019 1 application sent to DHI on 07.01 .2019. The Committee decided to wait for comments from DHl. Case is deferred. Party Name:MUDHRA FINE IMeet No/Date:12/80- IDeferred BLANC PRIVAttE LttD IALC2/2018 1 110.01.2019 ‐ RLA File ILic.No/Date:0410164884 1Datei … : 911:01/80/050/00281/AM19/ 104/24/040/00165/AM19ノ 116.11.2018 110.01.2019 application sent to DHI on 04.01.2019. The Committee decided to wait for comments from DHl. Case is deferred :05/24/040/00447/AM19/ 119.11.2018 10.01.2019 92 Decision: The Committee considered the case as per the agenda. Based on the comments the representative of MSME the Committee decided to seek clarification from the firm on following points - Stage wise wastage with justification. n e O i n Party Name:L&丁―MHPS IMeet No/Date:12/80- lDeferred BOILERS PVT LTD IALC2/2018 1 '10.01.2019 1 RLA F‖ e lLic.No/Date:0310825106 1Date: 193 :01/80/050/00299/AM19/ :03/95/040/00792/AM19/ 19.11.2018 10.01.2019 application sent to DHI on 07.01 .2019. The Committee decided to wait for comments from DHl. Case is deferred 23
Case No.:35′ 12′ 80‐
ALC2′ 2018 HQ File
Case No.:10′ 12ノ80‐
ALC2ノ2018 HQ FIle
Case No.:11′ 12/80‐
ALC2ノ2018 HQ File
Case No.:30ノ12′ 80¨
ALC2ノ2018 HQ File PRIVAttE LIMI丁ED RLA File Lic.No/Date:3110067246 1Date: Lic.No/Date:04101 64952 1Date: Party Name:AUttOCOMP IMeet No/Date:12/80- lDeferred CORPORA丁10N PANSE IALC2/2018 1 941:01/80/050/00308/AM19/ :31/83/040/00132/AM19/ 127.11.2018 110.01.2019 1Decision:丁he Corrlrnittee considered the case as per agenda and noted thatthe complete set of lapplication sentto DHl on 07.01.2019.丁 he Comnnittee decided to waitfor comments from DHI. ICase is deferred Deferred RLA File Llc.No/Date:0410164931:Date: 951:01/80/050/00283/AM19/ 1:04/24/040/00190/AM19/ 129.11.2018 10.01.2019 application sent to DHI on 07.01 .2019. The Committee decided to wait for comments from DHl. Case is deferred
Case No.:21ノ12ノ80‐
ALC2ノ2018 HQ File RLA File Lic.No/Date:0510408730 1Date: ,u :0'l/80/050/002941AM191 :051241040/00488/AM19/ 30.i 1 .2oi1 10.01.2019 Decision: The Committee considered the case as per the agenda and noted that the application has been sent to DHI on 07.01.2019. The Committee decided to also fonrrard the complete set of application to Consultant (Tech-3) for examination. Case is deferred. Party Name:MUDHRA FINE IMeet No/Date:12/80- BLANC PRIVAttE LttD IALC2/2018 110.01.2019 Party Name:MICRON IMeet No/Date:12/80- :Deferred lNSTRUMENttS PVtt LTD ‐ALC2/2018 1 Party Name:D00WON IMeet No/Date:12/80- lDeferred AU丁OMOTIVE SYSttEMS IALC2/2018 : INDIA PRIVAttE LIMI丁ED 110.01.2019 : IRLA File n :01/80/050/002841AM191 :04124t040/00194tAM19t 06.12.2018 10.01.2019 Decision:丁he Corrlrnlttee considered the case as per the agenda and noted that the application has been sentto DIPP on 07.01.2019,丁he Cornrnittee decided to also fon″ard the complete set of appllcation to Consultant(丁ech-3)for eXamination. Case is deferred. Party Name:CML B10ttECH.Meet No/Date:12/80- IDeferred PRI∨AttE LIMI丁ED, ‐ALC2/2018 1 RLA File Lic.No/Date:1010060084 1Date: 198911'919,9199,9,管V17 :10/24/040/00045/AM19/ 112.12.2018 10.01.2019 Decision:丁he Cornrnittee considered the case as per the agenda and noted that the applicatiOn has been sentto MsME on 02.01.2019.丁he Cornrnittee decided to also fon″ ard the complete set of app‖ cation to Consultant(丁ech-1)for eXarnination. Case is deferred. 2り
and noted that the applicatiOn has been sentto MsME on 02.01.2019.丁he Cornrnittee decided to also fon″ ard the complete set of app‖ cation to Consultant(丁ech-1)for eXarnination. Case is deferred. 2り
The Comnnittee ended with the Vote oftthanks to the Chair. ′ダ
睦…フb
θ
l>
llヽ
lCごtin」No ll18()→liC`1101' 1 __._..‐
' 1
・ |卜)魚し:1'こ111511・ 11に
lsC NO 13 3 81にAl′ ■
1(ι lll l
H‖ JC MlnnlDL・r
」PttЮ
' fk′
切へ
Jしい
~
C‐
“
涎~ぁ
可
?り
“
%
‖ ハ田c Nmmb∝ 16,2Ю
仲
〃
―
・
ち
l iccncc Nunabcr i 6510()()01
()11ヽcc()1`lsst:c i()11ヽ
cc of
lI:(` 1 0788013(
Nanlc i l)IAヽ
401
「 1響藉幽麒習 脚
ぃ
Jh…
:Aふ
mc;1鮮mc面市川Cm面釧 6と
1
ヽPI)llcali()n13asis i lt`
I)ort(:
淋‖
|‖卜比∝ 1榊楓鷲
)岬s t五
撫ヴ
…Ψ…誌湖
I講ド
l淵η句レ
電
t(r . l.rport u'isc Inrport ltern l)etails
xport Sl.Ntl
||`('― |ヽ1(`212018
16112()18
贈I
itC:11をl:‐ k`
:
1)t!lc1ltl l1 1018
1)1:l,c Ncヽ、1)olhi
DIRE(′ 1()RATE(lEヽERAI′ 0「IfOItEIGヽ
1`R.ヽ1)1:
DES4.7A(〕Eヽ1),ヽ
][tior,r ]li'tt'tn l<,
l[r c;
l)etails
xport Sl.Ntl
||`('― |ヽ1(`212018
16112()18
贈I
itC:11をl:‐ k`
:
1)t!lc1ltl l1 1018
1)1:l,c Ncヽ、1)olhi
DIRE(′ 1()RATE(lEヽERAI′ 0「IfOItEIGヽ
1`R.ヽ1)1:
DES4.7A(〕Eヽ1),ヽ
][tior,r ]li'tt'tn l<,
l[r c;
][:u s:rii: oo
]l
r ut,,ri[:.78i.())s o(l
S.K l)anrltrlhi
l.rccncc Assislant.r (lotrsolc Operator
n
D
I
‐
‐
‐
剛
絆
F
8
、
t
一
α
A
I
‐
¨
m
ヽ
い
t
l
l
一
ヽ
ぃ
い
卜
帳
一
ヽ
に
>
t
l
一
饉
ヾ
た
0
ア
、
ヽ
ド
k
「
・
●
一
0
ヽ
(
「
は
ヽ
い
一
―
‐
Q
‐
6
tlrir.,,.burli henelitr is to bc aruilcrl (not to be filk'rl if l)ra$back bcnctits arc not bcing claimcrl) : \ot availablc.
lft'asc tt., i,] I s()- \1.( I 11)ll(
m
い
縞
'i'i,',' ,,- \U t/,S{), \t L'l l1)ili
]lL.rir, r7 l() l(ll8
l[C'ttt" St' l-r -] S{)-AI L'l l()lli
.I
l;:"r/r-'rr
., 11 i -'lr)lS
][l )iric{)'/()5 ]0 lt{
][t"" l" I] I s()-'\i'( I -l()l3
:, r -'{, i
hrrp:/,/l0.21 .70.149/homcpagc/htmliiars/dgflol)llCl'rin1.asp',?id 20ltl-l l-29 l0:35:49.... 2L)11112018
l.Qttr_u
t* -) ttV?f
′争ど2、
ルツ。。
ィ/4_卜
f
/ rc- -- l2o-
Q_λ Ч61
|
´
t、一
~S`ヽヘ
`颯_
,
I I r-:.
\itr v
31み。
3177
´
_
(l:l:ζ :ιノ
V
2ヽ>Q
′っf。
|マユマ ー
'702.ζ
lゞfも
.Ч
)5〔η _
(5, ′‐
f。
ryy^w f'n zs-J^'/^ 4
e-''tr/'Y+ {-r
Ct 24 rlo? a/) ;
'/vC @
tL dua {o lt
€
ヽ l Mべ6ヽ■86J弔_o出。■1辻B,(D 戦 ヽ `::2二 fF,2111 GOVERNMttNT OFINDIA MINISttRY OF COMMERCE&INDUSttRY DEPARttMEN丁OF COMMERCE DIRECttORAttE GENERAL OF FOREIGN ttRADE DES.lSEC丁10N,R00M No.404,4th Floor,uDYOG BHAWAN: NEvV PELHl-110011:website http:ノノ dgft.9ov.in
Subject: Ratification of Norrns against Adv. Authorization No. 0510406631 dated
28.05.2018 issued under Para 4.7(of HBP(VOl.1)tO M/S.Lifelong Meditech Ltd. 一regarding. Please refer tO this Office l.D. not of even no.01ノ 80/50/00108/AM19ノDES‐1/322 datod 6.8.2018(copy enc10sed)on the subject noted above. 2. Consultant(Sh.Shaish Kumar)iS requested to examine the case and provide their corrlrnents in the rnatter for consideration ofthe case before NC. Encl.a.a 側D q呵 Asstt.D.G.F丁 for Director General of Foreig,丁rade 丁el.:23061562 Ext.265 E‐mail:ncl.dgionic,:n Shri Shaish Kumar,Consultant,丁ech―lDGF丁(chehiCaりUdyog,Bhawan,New Delhi-1lo oll. DcF丁lD,No.01ノ80/050/00108ノAM19/DES― 1/ F二 ゞ ″″ 助趾冽リり/ C^",U b-"Afr<9 uh fifu) h'?'{W otaY"- ry th^t C ル 0ダリ´こ 認湖測h&Ft 銚ング′ウ晰 /"or tl" I fe,t No ff nqMb*"| 0
,トナおに持』h作予つ可弥アoL_ムトだ。‐臭ζ “ ヽ ( υ ‐ 、 ハ ヽ ・ 語無 Govermment oflndia ffirqrrffiffifirdil{ Ministry of Electronics & Information Technology ― ,6趙寸鈴誦哺爾,で飾語110003 Electronics Niketun,6, C G O Complex, New Delhi-110003 Website : www. meity. gov.in ffi ye:)t?::?:lt'* m 13.11.2018 SubieCt:RatirlcatiOn of norms in terms of Para 4。 7 of HBP.〔Vol口1〕in respect of Advance Authorization No。■110028338 dated 28.05.20■8 issuedin favour of M/s.Birla Cable Ltd。,Bhopal This refer to DGFT I. D. No. 07/80/50/1.1.4/AM19/DES-7/299 dated 31'.07.2018 seeking comments of this Ministry on the above mentioned application of M/s. Birla Cable Ltd., Bhopal for export of " Optical Fibre Aerial Cable". 2.
. 07/80/50/1.1.4/AM19/DES-7/299 dated 31'.07.2018 seeking comments of this Ministry on the above mentioned application of M/s. Birla Cable Ltd., Bhopal for export of " Optical Fibre Aerial Cable". 2. The application has been examined in the Ministry of Electronics and Information Technology from technical angle. The import items are required for manufacturing the export product. This Ministry recommends Ratification of norms of advance authorization as per the details in Annexure. Encl :- As above 〔 Saurabh Ranian〕 Scientist― C Tel:-24301264 Email― saurabhranian@meity.gov.in Shri S.K.Panigrahi′ FTDO,0/o DGFT′ Udyog Bhavan,New Delhi MeitY U.0,No.17〔21〕/2018-IPHW dated 13.11.2018 ELECTRON!CS IND:A BIrim饉鵬 昨 之 ・ g6qqFFm*ok
一 ヽ 一 ( ′ ヽ ヽ Annexure L:CNO.1110028338 年哺ル 1 1人ュめ|パ 9ノ|″し ル|こバ°′ lnput UOM Qtv app‖ ed in DGFT Wastage claimed Wastage allowed e 的 c o m m nd ed e Optical Fibre KM 17630。19 5% 4% 17462.32 Polythene KG 8201.858 5% 2% 7967.53 PBT Kg 4355.092 5% 2% 4230.68 Cable Filling Compound KG 1751.452 5% 2% 1701.43
laimed Wastage allowed e 的 c o m m nd ed e Optical Fibre KM 17630。19 5% 4% 17462.32 Polythene KG 8201.858 5% 2% 7967.53 PBT Kg 4355.092 5% 2% 4230.68 Cable Filling Compound KG 1751.452 5% 2% 1701.43
議ぽ爺鎌Ψ ・ ― 輛 Minist理F of Electronics dL Informadon Technology ― ,6オ寸論誦哺爾,で嫌爺-110003 Electronics Niketan,6,C G O Cottph率,New Delhi‐110003 Websit∝… =面eltyOg~in sqr fiel)/zo1a-rpHw No........... Authorization No.1110028343 dated 14。06.2018 Cables Ltd.,BhOpal m Date.…。 .ζlll■、 919, HBP. (Vol.l) in respect of Advance issued in favour of M/s. Universal This refer to DGFT I. D. No. 01./80/so/t64/AM1.g/DES-1,/387 dared Lr.09.z01B seeking comments of this Ministry on the above mentioned application of M/s. universal Cables Limited, Bhopal for export of " Optical Fibre Cable Multi Loose Tube Micro Cable pA Micro Cable,,. 2' The application has been examined in the Ministry of Electronics and Information Technology from technical angle. The import items are required for manufacturing the export product' This Ministry recommends Ratification of norms of advance authorization as per the details given below:- ヽ舞 〔Saurabh Ranjan〕 Scientist_c TeII-24301264 Email‐ saurabhranjan@meity.gOv.in Mよ〃出1焉:じ呂携』 `l牌 蹄肥』ヂl努:1営 ew Ddh PowerTO Empower 之 ・ ELECTRON:CS iND!A 酬b綸 雌 Mirrim chilE Import Item Total Quantity Recommended 0ptical Fibre Cable 9680.49 glrrrEqFfir*ok
1呵g。山 「′ ・口 '‐ ノ truLc ‖ul ― ,6趙寸鈴誦哺園,で飾辞110003 Electronics Niketan,6,C G O Colllplex,New Delhi‐ 110003 Website:… emeity.go■in 17〔30〕/2018-IPHW 神雌 .ζ‖li9聟 N
Subject: Ratification of norms in terms of Para 4.7 of HBP. (Vol.l) in respect of Advance
Authorization No.1110028346 dated L4.06.2018 issued in favour of M/s. Universal Cables Ltd., Bhopal This refer to DGFT I. D. No. 01,/80/50/1.65/AM19lDES-1/390 dated 1,1,.09.2018 seeking comments of this Ministry on the above mentioned application of M/s. Universal Cables Limited, Bhopal for export of " Optical Fibre Cable". 2. The application has been examined in the Ministry of Electronics and Information Technology from technical angle. The import items are required for manufacturing the export product. This Ministry recommends Ratification of norms of advance authorization as per the details given below:- Import ltem UOM Wastage Total Quantity Recommended Optical Fibre Cable Km 4% 52968。12 〔Saurabh Ranian〕 Scientist¨ C Tel:-24301264 Email― saurabhranian@meity.gov.in Md.Moin Afaque′ FTDO′ 0/o DGFT′ Udyog Bhavan′ New Delhi MeitY U.0.No.17〔30〕/2018-IPHW dated 21.12.2018 之 ・ ELECTRON:CS IND:A 3irrin饉Millin chfiN O^ U..,^r- Sl, Na ,6 7T r{t{iT Trfil-{ Government of India ffiefugnffiffifrrmq Ministry of Electronics & Information Technology gtri[qqFrailTd{
,Ⅲ…t鳳ギ 議ぽ爺鎌Ψ ¶ず潮 ― ,6趙寸鈴誦哺関,で熊辞110003 Electronics Niketan,6,C G O Conlplex,New Delhi‐ 110003 Website:… .meity.go■in TT@IT N,.. 1 Z-r.?. L l.?.0..!9.: I.H w
Subject: Ratification of norms in terms of para 4.2
Advance Authorization No.1110 OZB344 dated M/s. Universal Cables Ltd., Bhopal ffi-q, Date... 20.12.2018 of HBP口〔 VOl・■〕in respect of 14口06口2018 issued in favour of This refer to DGFT I. D. No. 01,/80 /50 /L66/AM19/DES-1/389 dated 1L.09.201,8 seeking comments of this Ministry on the above mentioned appiication of M/s. Universal Cables Limited, Bhopal for export of " 0ptical Fibre Cable Multi Loose Tube Micro Cable PA". 2. The application has been examined in the Ministry of Electronics and Information Technology from technical angle. The import items are required for manufacturing the export product. This Ministry recommends Ratification of norms of advance authorization as per the details given below:- Import Item UOM Wastage Total Quantity Recommended Optical Fibre Cable Km 4% 8873.78 〔 Saurabh Ranian〕 Scientist― c Tel:-24301264 Email…saurabhranian@meity.gov.in Mdo Moin Afaque′ FTDO,0/O DGFT′ Udyog Bhavan′ New Delhi MeitY U.0。 No.17〔31〕/2018-IPHW dated 20.12,2018 之 ・ ELECTRONICS iNDiA 酬b― s筋″商chilB glrqiqqFFEr*st{
≦♭卜″ D′ 1重堅二 「37 / ク予S~L Government oflndia 鎌 響 ・ ― 赫 ― ,6オ爺粛誦哺園′で嫌爺-110003 Electronics Niketan,6,C G O Colllplex,New Delhi-110003 Website:― ‐ meity.go■in :ス ・ 1 甲嗜ヽH"W側露)0潰 : 柿 Date.… 2L1212p10.… … . ● ELECTRONICS:NDiA B:l:ion tts Milrion c■ 「 氏。 "17(111″9聟iFIW
Subject: Ratification of norms in terms of Para 4.7 of HBP. (Vol.1) in respect of
Advance Authorization No.lLL0028344 dated 14.06.2018 issued in favour of M/s. Universal Cables Ltd., Bhopal This refer to DGFT I. D. No.01/80/50/1,66/AMlg/DES-1,/3Bgdated L7.0g.201,.8 seeking comments of this Ministry on the above mentioned application of M/s. Universal Cables Limited, Bhopal for export of " 0ptical Fibre Cable Multi Loose Tube Micro Cable PA". 2. The application has been examined in the Ministry of Electronics and Information Technology from technical angle. The import items are required for manufacturing the export product. This Ministry recommends Ratification of norms of advance authorization as per the details given below:- Iniport ltem UOM Wastage Total Quantity Recommended Optical Fibre Cable Km 4% 8873.78 〔 Saurabh Ranian〕 Scientist― C Tel:-24301264 Email―saurabhranian@meity.govoin Mdo Moin Afaque′ FTDO′ 0/O DGFT,Udyog Bhavan′ Nel″ Delhi MeitY U.0.No.17〔31)/2018-IPHW dated 20.12.2018 か臨 η ハ 三 =RL
.78 〔 Saurabh Ranian〕 Scientist― C Tel:-24301264 Email―saurabhranian@meity.govoin Mdo Moin Afaque′ FTDO′ 0/O DGFT,Udyog Bhavan′ Nel″ Delhi MeitY U.0.No.17〔31)/2018-IPHW dated 20.12.2018 か臨 η ハ 三 =RL
\r qrffiH[.El.{ Government of India ― ,6オ奇鍮誦哺爾,で飾辞110003 Electronics Niketrn,6, C G O Complex, New Delhi-110003 Website : www.meity.gov.in N 請‖翌Ψ .…… Orn Urz'..^- 51, I9o- L# 4O 議ぽ齢鎌Ψ ¶ ― 赫 Ministry of Electronics dL Information Technology uct41 17〔32)/2018¨ IPHW Subiect Ratification of norms in terms of Para 4.7 of HBP. Oof,1) in respect of Advance Authorization No.1110028345 dated 14.06.2018 issued in favour of M/s. universal cabres Ltd., Bhopal This refer to DGFTI. D. No.01/80/50/168/AM1g/DEs-1/388 dated 11.09.2018 seeking comments ofthis Ministry on the above mentioned application of M/s. Universal Cables Limited, Bhopal for export of .,optical Fibre Cable Multi Loose Tube Micro Cable pA Micro Cable,,. 2 The application has been examined in the Ministry of Electronics and tnformation Technology from technical angle. The import items are required for manufacturing the export product. This Ministry recommends Ratification ofnorms ofadvance authorization as per the details given below:_ Import Item UOM Wastage Total Quantity Recommended 61. / }-Optical Fibre Cable Multi loose Tube Micro Cable PA micro cable BX1,z Km 4% 8873.78 [Saurabh Ranjan) Scientist-C Tel:-24301264 E mail - sau ra b hranj an @ m ei ty. gov.
Quantity Recommended 61. / }-Optical Fibre Cable Multi loose Tube Micro Cable PA micro cable BX1,z Km 4% 8873.78 [Saurabh Ranjan) Scientist-C Tel:-24301264 E mail - sau ra b hranj an @ m ei ty. gov. i n Md.MOin Afaque′ FTDO′ 0/O DGFT′ Udyog Bhavan,New Delhi MeitY U.0。 No。17〔32〕/2018-IPHw dated 21.12.2018 PowerTo Empower ELECTRONICS:NDiA 3irrim Lds ttl商ChilF 之 ・ g.5,i[,ErtrFrmT**r
⌒ い1多 SubleCt: AA No 3110067120 datod 20.07.2018 of MノsA‖ ovardial,Puno l〕atol 12/10/1809:34 AM lo K「'SI「19h<rlCl dgft@rliC.in> 「「Orγl: ‖ ||卜!1)ivisiorl.1)HI::くdivhci dhi(Dgov irl> Ⅳlinistry of卜leavy lndustriesだ貶Public lilltcrpriscs I)epartincnt ol)IIcavy lndustr)′ IIIEI I)ivlslon O「FICE MEMORANDUⅣ I SuhiCCt:D(〕 I」l`lD-01/80/050/00144/AM19/DES-1/439 datcd:20.H.2018 /ヽ/ヽ]No 3110067120 datcd 20.07.2018 ofM/sノ ヽHcvardiai,Ptlllc l)1lS-l rna)'consider perccntagc wastagc and inputs as clailllcd b)applicant、、/hich rangc llon´10.1ツ() lo O.31ン6 fiDr itcinl -6 and nil 、vastage for item 7-8 in appcndi、 41:()「thc AA application 、 vitll accotintability. (K.K.′ liwari) industria1/ヽdviscr I)v.1)(]lf'1・,I)l〕S-1 1)cptt.ofI11,tJO NoI)F〕S-1/ASPI_ィ/S′「A13-1-2018-Hl〕 l datcd 10.12.2018 Wl[ぃもぃしら卜 pO・ぢヤ
cndi、 41:()「thc AA application 、 vitll accotintability. (K.K.′ liwari) industria1/ヽdviscr I)v.1)(]lf'1・,I)l〕S-1 1)cptt.ofI11,tJO NoI)F〕S-1/ASPI_ィ/S′「A13-1-2018-Hl〕 l datcd 10.12.2018 Wl[ぃもぃしら卜 pO・ぢヤ
F千~… ~ ‐ ´__ン M、、s121ぃ肝ぃ7d当16尋崚 田 「 て百呻 て ・ 乖Iw輌面‐ 可呵剛 館 町 ¬ lTFkT T「きI`針れlld劇 蒻て可-1,3FtQ刊可 … 可0404`ゴ哺百衡可 詢可噸′て同 帥 :一 ゴン研即 201)‐20あう可4.7あ (項即π 司てゴ‖ |・1でえや命含繭 命PR 釘阿キ刊J猫硼鰤 ¬可■o.0.3.l…0.…32.И ..】.0..Q.… …悴河怖13.1.1.191.ユ9.1.g 轟 Hュぃ脳 .… ∫∬ 黒 [慕 .柵 織 :轟
尋
飲
玉爺浄
諭W哺
ヨておw町→~命爺)さ13■可さ稀HIボUG諭針l GⅨ
I
弱駅鋪Rて哺
命針ぃ面
懸輔T菌哺1甲F輔
瞑繭
司剥い
耐哺
諭鮮摘ラ|。.■
'1「
.′ .7¨ :..識舗雨命釧輔
赫
青録釈含瓢劇|、1111
爛●l d CID・T戯
師
′f商
赫
硼
:23064562回
265
キ油:ncl.dЁ■@Ы
C・h
粛命ず。赫輔′ゴ謝稀wl●ф
lヽ`ボTU油衡甲′ф‖くl可0476′ U油叩″
可ぜ衡爺-110011
、
・
粛市細爺雨′0.ご"爺謝稀綸
マイモ●百可斜甲.まれ叩
でヽ計-110011
球研轟覆luri総′
l‐t師鋪
l―
)`耐
暉′ギ熊al
可粛J!マH¬虐聞′響
含む師′w町頭蒻爺哺m′ 爺甜鋪―
側′
ギ衡爺
|
5。
ォ
奇てF瓦
‖|、′舎ポ
柿
6)′ 03Ta齢
夕■
ゴ柿.0師
銭
爺
町可′ゼ
厳
爺
l
イ1精E卓囀窯|ボ鮮二′ | :
′頭・寸・ヤ
す
田/∞つ
イコ′°4T~///覆マ
1二
'1ノ
[F:弔
:‐す
ψ
'
は翠鋒輛
)
1.
2.
3.
4.
彼
ら解ブリい″ルt 一
(
t0 s7(fif
ωlマ
虐聞′響 含む師′w町頭蒻爺哺m′ 爺甜鋪― 側′ ギ衡爺 | 5。 ォ 奇てF瓦 ‖|、′舎ポ 柿 6)′ 03Ta齢 夕■ ゴ柿.0師 銭 爺 町可′ゼ 厳 爺 l イ1精E卓囀窯|ボ鮮二′ | : ′頭・寸・ヤ す 田/∞つ イコ′°4T~///覆マ 1二 '1ノ [F:弔 :‐す ψ ' は翠鋒輛 ) 1. 2. 3. 4. 彼 ら解ブリい″ルt 一 ( t0 s7(fif ωlマ
しヽお 87 11_iRI]〔:TOなくA■L GllヽER REIGN TRADE りIIS・1.7 AGENDA 52/52A,1lANUBHAI DESAI ROAD, SHOP NO.13)lSLAⅣIPt」RA STREET U;ilGX;, r z, s o - n i- c 2 /2 0 1 1 -- " : . 1p ti ; :t-?"iLqf--. y.Z,Z::ig1 LcZ?"o- 19 -- -*J 01/80/050/00298/AⅣ(19′'Dated:31.12.2018 03/95/040/008051民卜/119/Datcd:31.10。2018 0310824898 Dated:05。11.2018 0fЯ cc ofJt.E)ircctor(3enera1 0f Forcign Tradeヽ41inlbai 0305025716 :PHOE卜lIX F01LS PV丁.LTD. HQ File Numbel・ RLA File Number Licellce Nulη bcr Oftticc of lsstlc lEC Nalnc Address PIN l`ype of`Liccncc Applic試lon Basis Statt13 of Expo■er Exportcr Type Expol・t Pl・()duct Group CI17 Vallle ofthe Licence CI「FCC FOB Value FOB「CC L′lUMBAI.ンlAIIARASHTRA 4()('004 Advallcc Licence with AU C()nditiOn Export 01‐der ヽ4anufacturcr Exporter Private Lil■ited ENGINEERING PRODUCTS Rs.7,927,440.001」SS 107,127.57 107,127.57 US Dollars Rs。99909っ300.00 LISS 133,909。46 133っ909。46 US Dollars :` ~~ヽ 1 ヽ 15ι Details Ofitem to be exported/supplied摯】 … … … ` 1 : | ド制…υ添滋曹薔↓スぱご 1ヽ員入ヽζ FER I 二_螢 躙 だヽ高轟ぎじ 11lEI:~:U薔』濡 ‐3■薔iおII蔓い1,19,111,11'全11'PIl'11111:… .=……
解 “ ル ** au ]loras?ef *r/ ,,11< 多 イ b90930)001習鷲11
Ofitem to be exported/supplied摯】 … … … ` 1 : | ド制…υ添滋曹薔↓スぱご 1ヽ員入ヽζ FER I 二_螢 躙 だヽ高轟ぎじ 11lEI:~:U薔』濡 ‐3■薔iおII蔓い1,19,111,11'全11'PIl'11111:… .=……
解 “ ル ** au ]loras?ef *r/ ,,11< 多 イ b90930)001習鷲11
ゞ1・N亀8斗 FτヽCり`1 OLLED/ LD ROLLED TAINLESS Lヽ/1DE 721934 90 34000.0 7,927,440。 107,127. 57 US 180,046. PS CKNESS 0。18ⅣIM TO 5.00ヽ4M GRADE 16/316L)(PRI ME) llars TOti7,927,440. 107,127. 7 al lT.Dctails of other materials to be used in the export product and sought to be imported/procured from sources other than the Authorisation on which drawback benefits is to be availed (not to be filled if Drawback benefits are not being claimed) : Not available. Remarks : Date:01 .0 1 .2019 Place:New Delhi S.K Panigrahi Licence Assistant/ Console Operator 16A. Export wise Import Item Details pOrt SioNo llmpOrt SI.No oM iCIFIn Rs IIr In(Foreign CurrencY) 107127.57/US Dollars 4000.000ミK.G 17927440.00 1 :1 134000.000、卜.tJ 1/イ41 TOtali7,927,440.001107,127.57
()fllce of Directorate(3eneral of「 orcign ri、radc Ncw I)clhi-0 I)agc I ol'I 声 A(〕TI()NI)ETAHノS 〔〕21sc Numbcr:27/21/80- AIノ(〕2/2016 l)arty Namc : PIIOE,NIX I"OILS l'}V'l'. l,'l'l). (lurrent Case Status : (lase Approved HQ lrilC No: O1/80/050/00487/AN/117/ 1)atei 04.Ol.2017 IノA File No:03/95/040/00596/AM17/ latc:24.10.2016 I′ iccncc No:0310808945 1)atc:()3 11.2016 :17.012017 ng l)atci 1 7.Ol.2017 Ⅳlcctin2 No:21/80-AIJ(〕2/2016 Dccision:Thc committce dccidcd to ratifb/thc norms bascd upon thc writtcn commcnts ofl)II)I)vidc I) No. 121412017-TSW 192 dated 17 .01.2017 on repeat basis as undcr:- I .
lcctin2 No:21/80-AIJ(〕2/2016 Dccision:Thc committce dccidcd to ratifb/thc norms bascd upon thc writtcn commcnts ofl)II)I)vidc I) No. 121412017-TSW 192 dated 17 .01.2017 on repeat basis as undcr:- I . lmport itcm shall be of rclcvant grade as contained in thc crport products- 2. eualtiry oi'import itcm at S1. No. 1 ( Itelcvant IIol Itollccl/(lolcl ltollccl Stainlcss Stccl r,r'iclc :oils/Strips) may bc allowed as undcr. i) Wide tluilg as 1.08 Kgs./Kg. content in the exporl procluct as claitncd by thc Irrm. as pcr SION ii) Strips: as 1.065 Kgs./Kg. content in thc cxport product. may take lurther necessary action accordingly. htrp:;110.21.70.149/homepage/htmt/jars/dgflOl)BCPrint.asp?id 2019-01-16'I6:01:55.6090..- 111612019
Pagc I ol'4 ら1・N。・87 10,01・)‐ヽョ 01/80/050/00487/AM17/1)atcd:04.01.2017 03/95/040/00596/ノヘM17/1)atcd:24.10.2016 0310808945 Datcd:03.ll.2016 ()FAcc 01`Jt.1)ircctor(〕cncral ol` 1く` ol・Cign l`radc Muinlbai 0305025716 PHOliNIX「()IIノS PVT.Iシ |`1). 52/52A,NANUBHAII)I:sAIItOAI). SIIOP NO.13,ISIノAMPtJIttt Sri`RI:l:′ I MUMBAIっMAHARASHTRA 400004 Advancc I′ iccncc with AU(〕()ndition lうxport()rdcr Manu■LCturCr[]xportcr Privatc Iソilllited ENGINI」l]RING PRODUC′ I`S Its.4,443,120.00 tJSS 65。340.00 65ぅ340.00L」S DoHars Rs.53236,000.00 USS 77,0()().00 77.000.00 tJS I〕OHars I IQ 1:ile NLrmbcr I{l-A Irilc NLrmbcr Liccncc NLunbcr Ol'llcc ol'Issuc I I)(l N arlc Address I)IN ′ 「)pc()1` I′ iccncc ApplicatiOn Basis Status ol`l]xpol‐ tcr l]xportcr´ l`ype lixport Pr()dtict(〕 r()し:p 〔〕 Ilく`Valuc ofthc Iフiccncc (〕I卜` 1マ(〕(〕 I「()13 Valuc lr()I〕 Iギ(〕(〕 ・ H ヽ ミ ) 一 鵬 隔
I′ iccncc ApplicatiOn Basis Status ol`l]xpol‐ tcr l]xportcr´ l`ype lixport Pr()dtict(〕 r()し:p 〔〕 Ilく`Valuc ofthc Iフiccncc (〕I卜` 1マ(〕(〕 I「()13 Valuc lr()I〕 Iギ(〕(〕 ・ H ヽ ミ ) 一 鵬 隔 障 肺 一 一 ・ 0 ・ 一 〇 0 1 ‐ 5 。 S I . 一 ‐ ・ ‐ 6 . ん DIRE(〕TOlむゝ′ I・E(】ENERAIン0「IFORい〕 I(〕N DES 4.7A(〕ENl)A )Iンロロ““‐‐“口鰤"ロロロ‐饉口“■" Dccisiotr :'l'he collttttittee decided to ratity the rronns basecl Llpon the r,rritten colnlnents of DIIrP vide ID No. I214l20l7-l-SW l92 dated 17.01.2017 on repeat basis as under:- l. Irnport item shall be ol'relevapt grade ats colrtailted irt the export prodr-rcts.2. Quantity of irnport itent at Sl. No. I ( Itelevant Hot Rollecl/Cold Rolled Stainless Steel wide coils/Strips) may be allorved as under: (i) Wicle Coils: as 1.08 Kgs./Kg. corttcnt irr thc cxpott product as claimcd by thc flnr. as pcr SION C-2008. (ii) Strips: as 1.065 Kgs,/Kgl,-.,r_:t.1rt irr the e,rportpr'9dt1ct. RA may_ !1\e furthe.r necessarl ucrion accorclingly. http:l110.21.70.149/homepage/html/jars/dgfiODBCPrint.asp?icl 20t9-01-1616:02:34.0780... U16l20t()
Kgs,/Kgl,-.,r_:t.1rt irr the e,rportpr'9dt1ct. RA may_ !1\e furthe.r necessarl ucrion accorclingly. http:l110.21.70.149/homepage/html/jars/dgfiODBCPrint.asp?icl 20t9-01-1616:02:34.0780... U16l20t()
暉 J4 ・ ‖バ SI.No. I′「CHS (〕odc Irlport Item Narnc. ty UOM CIIギ(Rs.) :,II・` (〕urrcncy) :,):::Pti.rr ll, i,.,.,iti,g riacr.r- i'jt;;,,,,,, llruo,v/va,r 1 72193490 ll I()′ 1・ R()Iノ Iンl]1)/ (〕()IンI) R()IノIンl〕I) S′ 1`AINIノ I:〕SS S′ 1`1うEL WIDE COILS, S71`ItII)S ′ I`lHCKNESS O.18MM′ I`() 5.00MM ((〕ItADIJ 304/304L) (PRIME) 23760.000 K。(〕 4,443っ120.00 65.340.00 US I)oHal・s l,310,720.4011Qty 'I'otal 4,443,120.00 65.340.00 SI.No lrxport Sl.No Import Sl.No Qty UOM IlデIn Rs I lr I n(lrorcign (-'r-rrrcncy) l | l 23760.000 K.G 3120.00 65340.00/tJS I)oHal・s 'l'otal ,443,120.00 5.340.00 l6A. Flxport wise Import ltem l)etails lT.Dctails ofothcr matcrials to be usod in thc cxport product and sought to be imported/procurcd liom sources olhcr than the Authorisation on which drawback bcnclils is to bc availod (nol to bc lilled if l)rawback bcnclits arc not bcing claimed) : Not availablc. llcmarks : hnp:l110.21.70.149/homepagelhtml/jars/dgftOD}lCPrint.asp?id 2019,01-1616:02:114.07t|0 111612019
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6823 --apply.