← Archive
IN FORCE Advance Authorisation

DGFT Minutes

Reliability

In force — no superseding record on file.

Document text

RATIFIED   Minutes of Meeting No.24/11 scheduled on 14.09.2010 of Norms Committee(NC­I) (DES.I Section)   The meeting No. 24/11 of the Norms Committee (NC­I) for the licensing year 2010­2011 scheduled for 14.09.2010  was  adjourned.  The  meeting  was  actually  held on 21.09.2010  under  the  Chairpersonship  of  Ms. Shubhra, Jt. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A, U.B. 23063321 Extn.3318 DHI 2. Sh  S.K. Jain,  D.O. 429A, U.B. 23063321 Extn.3318 DIPP. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A, N.B.   DC(MSME), 4. Sh. A.K. Mishra, AIA 13­A, U.B. 23063332 M/o Steel 5.  Sh. B. D. Ghosh, Jt. IA 399,U.B. 23063355 M/o Steel 6.      Sh. Rajiva Kumar, Dy. D.G.F.T 207. U.B. 23061562  Ext. 232 DGFT 7. Sh. B.K. Sachdeva, FTDO 404, U.B. 23061562 Ext.265 DGFT   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon were as under: ­ 1

Case No.:8/24/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00380/AM11/ RLA File :04/24/040/00092/AM11/ Lic.No/Date:0410116119 09.08.2010 Defer Date: 26.10.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hard copy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA (with a copy to firm) to forward the firm’s application at the earliest and forward on receipt of  the same to DIPP for examination and  comments. The case may be relisted on 26.10.2010.     2

Case No.:14/24/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00386/AM11/ RLA File :11/24/040/00020/AM11/ Lic.No/Date:1110022896 09.08.2010 Defer Date: 26.10.2010 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the consideration and to relist the case on 26.10.2010.   3

Case No.:6/24/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00378/AM11/ RLA File :04/24/040/00109/AM11/ Lic.No/Date:0410116180 11.08.2010 Defer Date: 26.10.2010 Decision  :  The  representative  of  the  DC(MSME)  informed  the  Committee  that  the  case  is  under examination.  The  Committee,  therefore,  decided  to  defer  the  consideration  and  to  relist  the  case  on 26.10.2010.

4

Case No.:15/24/80­ALC2/2010

Party Name:VINDHYA TELELINKS LTD., Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00387/AM11/ RLA File :11/24/040/00026/AM11/ Lic.No/Date:1110022927 11.08.2010 Defer Date: 26.10.2010 Decision : The committee noted that the firm’s application has been sent to DIT for their examination and Comments. It was decided to remind them to expedite their comments. The Committee, also decided to defer the consideration and to relist the case on 26.10.2010.   5

Case No.:7/24/80­ALC2/2010

Party Name:WONJIN AUTOPARTS INDIA PVT LTD Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00379/AM11/ RLA File :04/24/040/00083/AM11/ Lic.No/Date:0410116218 12.08.2010 Defer Date: 26.10.2010 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the consideration and to relist the case on 26.10.2010.   6

Case No.:1/24/80­ALC2/2010

Party Name:A RAYMOND FASTENERS INDIA PRIVATE LIMITED Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00373/AM11/ RLA File :31/24/040/00092/AM11/ Lic.No/Date:3110044476 26.08.2010 Defer Date: 26.10.2010 Decision : The Committee noted  that  the  Regional  Authority  neither  forwarded  the  hardcopy  of  firm’s copy to firm) to forward the firm’s application at the earliest and forward  the same to DHI for examination and  comments. The case may be relisted on 26.10.2010.   7

Case No.:2/24/80­ALC2/2010

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Closed HQ File :01/80/050/00374/AM11/ RLA File :34/24/040/00124/AM11/ Lic.No/Date:3410027805 27.08.2010   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to inform the concerned Regional Authority for taking appropriate decision in terms of Policy Circular No. 20 dated  05.12.2007.              The Regional Authority may take necessary action accordingly.   8

Case No.:3/24/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00375/AM11/ RLA File :07/24/040/00207/AM11/ Lic.No/Date:0710073874 27.08.2010 Defer Date: 26.10.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hard copy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA(with a copy  to  firm)  to  forward  the  firm’s  application  at  the  earliest  and    forward    the  same  to  DHI  and DC(MSME) for examination and  comments. The case may be relisted on 26.10.2010.

9

Case No.:4/24/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00376/AM11/ RLA File :07/24/040/00206/AM11/ Lic.No/Date:0710073875 27.08.2010 Defer Date: 26.10.2010 Decision :. The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s copy  to  firm)  to  forward  the  firm’s  application  at  the  earliest  and    forward  the  same  to  DHI  and DC(MSME) for examination and comments. The case may be relisted on 26.10.2010.   10

Case No.:5/24/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00377/AM11/ RLA File :05/24/040/00198/AM11/ Lic.No/Date:0510271860 31.08.2010 Defer Date: 26.10.2010 Decision : The committee handed over the firm’s application to DHI in the meeting for examination and comments.  The  Committee,  therefore,  decided  to  defer  the  consideration  and  to  relist  the  case  for  26.10.2010.   11

Case No.:9/24/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00381/AM11/ RLA File :06/24/040/00029/AM11/ Lic.No/Date:0610018941 31.08.2010 Defer Date: 26.10.2010 Decision : The Committee noted  that  the  Regional  Authority  neither  forwarded  the  hardcopy  of  firm’s copy to firm) to forward the firm’s application at the earliest and forward the same to DHI and DC(MSME) for examination and comments. The case may be relisted on 26.10.2010.   12

Case No.:10/24/80­ALC2/2010

Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00382/AM11/ RLA File :05/24/040/00208/AM11/ Lic.No/Date:0510271875 31.08.2010 Defer Date: 26.10.2010 Decision : The committee handed over the firm’s application to DIPP in the meeting for examination and comments.  The  Committee,  therefore,  decided  to  defer  the  consideration  and  to  relist  the  case  on 26.10.2010.   13

Case No.:11/24/80­ALC2/2010

Party Name:MHI­VST DIESEL ENGINES PVT.LTD, Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Closed HQ File :01/80/050/00383/AM11/ RLA File :07/24/040/00178/AM11/ Lic.No/Date:0710073944 01.09.2010   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to inform the concerned Regional Authority for taking appropriate decision in terms of Policy Circular No. 20 dated  05.12.2007.  

14

Case No.:12/24/80­ALC2/2010

Party Name:MVS ENGINEERING LTD Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00384/AM11/ RLA File :05/24/040/00201/AM11/ Lic.No/Date:0510271991 01.09.2010 Defer Date: 26.10.2010 Decision : The committee handed over the firm’s application to DIPP in the meeting for examination and comments.  The  Committee,  therefore,  decided  to  defer  the  consideration  and  to  relist  the  case  on 26.10.2010.   15

Case No.:13/24/80­ALC2/2010

Party Name:G.R.ENGINEERING PRIVATE LTD., Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00385/AM11/ RLA File :03/94/040/00489/AM11/ Lic.No/Date:0310590548 01.09.2010 Defer Date: 26.10.2010 Decision : The Committee noted  that  the  Regional  Authority  neither  forwarded  the  hardcopy  of  firm’s copy  to  firm)  to  forward  the  firm’s  application  at  the  earliest  and    forward    the  same  to  DIPP  for examination and  comments. The case may be relisted on 26.10.2010.   16

Case No.:16/24/80­ALC2/2010

Party Name:KIRLOSKAR BROTHERS LTD Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00388/AM11/ RLA File :31/24/040/00094/AM11/ Lic.No/Date:3110044571 03.09.2010 Defer Date: 26.10.2010 Decision : The Committee noted  that  the  Regional  Authority  neither  forwarded  the  hardcopy  of  firm’s copy  to  firm)  to  forward  the  firm’s  application  at  the  earliest  and  forward    the  same  to  DIPP  for examination and  comments.  The case may be relisted on 26.10.2010.   17

Case No.:17/24/80­ALC2/2010

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00389/AM11/ RLA File :03/95/040/00432/AM11/ Lic.No/Date:0310590878 03.09.2010 Defer Date: 26.10.2010 Decision : The Committee noted  that  the  Regional  Authority  neither  forwarded  the  hardcopy  of  firm’s copy  to  firm  )  to  forward  the  firm’s  application  at  the  earliest  and  forward    the  same  to  DHI  for examination and  comments.  The case may be relisted on 26.10.2010.   18

Case No.:18/24/80­ALC2/2010

Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:24/80­ ALC2/2010 14.09.2010 Status: Deferred HQ File :01/80/050/00390/AM11/ RLA File :04/24/040/00132/AM11/ Lic.No/Date:0410116988 06.09.2010 Defer Date: 26.10.2010 Decision : The Committee noted  that  the  Regional  Authority  neither  forwarded  the  hardcopy  of  firm’s copy  to  firm)  to  forward  the  firm’s  application  at  the  earliest  and  forward    the  same  to  DIPP  for examination and  comments.  The case may be relisted on 26.10.2010.

Case No. A/R­ 86

HQ F.No.01/80/50/00561/AM10/DES­I Lic. No. & Date

M/s.    Botil  Oil Tools  India  Pvt. LTd., Meeting No.24/11 RLA No.05/23/040/00110/AM10 0510253560 dt.27.11.2009 Date: 14.09.2010 Revision of norms Firm’s  representative  appeared  at  personal  hearing  and  explained  the  manufacturing  process  of  their  export product to Norms Committee.  They informed that the export product as well as corresponding inputs are as per SION C­1624 & 1628. The Committee agreed to firm’s request and decided to  ratify the norms as per SION at  Sl No.C­1624 and C­1628

Case No. A/R­ 87

M/s.    Jord Engineers  India Ltd., Vadodara HQ F.No.01/80/50/00412/AM10/DES­I Lic. No. & Date Meeting No.24/11 RLA No.34/24/040/00094/AM10 3410025191 dt.24.09.2009 Date: 14.09.2010 Ratification of norms On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on  26.10.2010: ­   1. Firm may be submit material balancing i.e. net weights of all imported and indigenous inputs in the export product.

Case No. A/R­ 88

M/s.    Cartoon Sanitation  Pvt. Ltd., Mathura (UP) HQ F.No.01/80/50/00288/AM09/DES­I Lic. No. & Date Meeting No.24/11 RLA No.06/24/040/00003/AM09 0610013314 dt.30.04.2008 Date: 14.09.2010 Revision of norms    The representative of the DIPP & DC(MSME) present in the meeting informed the case for recommendation as per decision of Sub­Committee. The Committee, after deliberating upon the case, decided to allow import item at S. No. 2  i.e  Nickel Plate as 5 MT after taking clue from SION C­789.

Case No. A/R­ 89

M/s.    The  Indure Pvt. LTd., HQ F.No.01/80/50/01047/AM09/DES­I Lic. No. & Date Meeting No.24/11 RLA No.05/24/040/00364/AM08 0510227284 dt.11.09.2008 Date: 14.09.2010 As  per  written  comments  of  DHI  communicated  vide  their  U.O.No.  3(70)/10­TSW(B)  dated  31.8.2010,  the  committee decided to ratify the norms in respect of the subject advance authorization as under:­ Export The description of export product may be suffixed as “with the Ash Slurry Disposal line of 36.3 Km length & BA Slurry line of 3.5 Km length.” Import 1. Item no 1, 3 & 7 to 11 are components & may be allowed under GN­4. 2. Item no 2­ This is spares for item no 1 & may be allowed under spares policy. 3. Item no 4­ 72,600 pieces may be allowed with out any wastage. 4. Item no 5­ 7,000 pieces may be allowed with out any wastage. 5. Item no 6­ May be deleted as justification of quantity of use has not been given.

Case No. A/R­ 90

M/s.    Larson  & Tourbo Ltd., HQ F.No.01/80/50/00742/AM10/DES­I Lic. No. & Date Meeting No.24/11 RLA No.03/95/040/00713/AM10 0310558679 dt.04.02.2010 Date: 14.09.2010 The representative of the DIPP informed the Committee that the case is under examination. The Committee, therefore, decided to defer the consideration and to relist the case on 26.10.2010.

Case No. A/R­ 91

M/s.    Micron Instruments  Pvt. LTd., HQ F.No.01/80/50/00620/AM06/DES­I Lic. No. & Date Meeting No.24/11 RLA No.05/24/040/00381/AM06 0510164401 dt.17.08.2005 Date: 14.09.2010 The representative of the DIPP present in the meeting recommended the case on repeat basis as per norms of Advance Authorization No.0510034725 dated 10.08.2004 & A.A. No.0510147353 dt.31.12.2004  both ratified in Norms Committee Meeting No. 48/07 dated 06.03.2007. The Committee, after deliberating upon the case, decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorization  on  repeat  basis  as  per  norms  of Advance Authorization  as under:­   1.      Net weight of export product may be specified as 144 Kgs. 2.      Quantity of import item may be allowed as 80 Nos. on net to net basis. However, keeping in view the manufacturing wastage due to sophisticated nature  of the product and actual realization from scrap as per Central Excise certified data, the weight of import of import item may be allowed as 430.6 Kgs inclusive of 199% wastage after taking 5% recovery from scrap.

Case No. A/R­ 92

M/s.    Alstom Projects India Ltd., Vadodara HQ F.No.01/80/50/01032/AM08/DES­I Lic. No. & Date Meeting No.24/11 RLA No.03/94/040/00922/AM08 0310453541 dt.11.12.2007 Date: 14.09.2010 The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the consideration and to relist the case for 26.10.2010.

Case No. A/R­ 93

M/s.    Tema  India LTd., HQ F.No.01/80/50/01279/AM09/DES­I Lic. No. & Date Meeting No.24/11 RLA No.03/95/040/00698/AM09 0310493987 dt.12.11.2008 Date: 14.09.2010 As per written comments of DIPP communicated vide their U.O. note dt.14.09.2010, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   1. Net empty weight of export product may be specified as 46208 Kgs. 2. Weight of import item at Sl. No.1 may be specified as 15.477 MT and this item may be allowed on net to net basis. 3. Word “Relevant” may be prefixed and words “8 to 40 mm thick” may be suffixed with the description of import item at Sl. No.2. 4. Quantity of import item at Sl.No.2 may be allowed as 13549 Kgs. inclusive of 3% wastage as applied for by the firm.

Case No. A/R­ 94

M/s.    Precihole Machine  Tools Pvt. LTd., HQ F.No.01/80/50/01325/AM09/DES­I Lic. No. & Date Meeting No.24/11 RLA No.03/95/040/00715/AM09 0310495199 dt.12.11.2008 Date: 14.09.2010   As per written comments of DHI communicated vide their U.O.No.3(33)/08­TSW(B)/437 dated 27.08.2010, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export Item 4 units of COLLAR high flow 8 EWR of weight 2471.34 kg.   Import Item

4 units round bar of 8.5 inches dia of weight 4335.69 kg.   The firm has submitted calculation of requirement supported by drawing. Wastage claimed is 75% is reasonable as there is lot of machining. With 20% recovery, firm’s entitlement comes to 3955 kg resulting in 3.6 units of round bar (60% wastage). This office recommends for import of 4 number of bars of weight 4335.69 kg as applied for.

Case No. A/R­ 95

M/s.    Resham Roosen  India  Pvt. Ltd., HQ F.No.01/85/50/00494/AM10/DES­I Lic. No. & Date Meeting No.24/11 RLA No.06/21/040/00103/AM09 0610014832 dt.23.12.2008 Date: 14.09.2010 On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case for 26.10.2010: ­   1. Information in respect of Sl.No.3,4,5 & 11 of the Standard Deficiency Format­Export product wise 2. Specific description of export products with their quantities in Nos. and weight thereof.

Case No. A/R­ 96

M/s.    The Saraswati Industrial Syndicate Ltd., HQ F.No.01/80/50/00900/AM06/DES­I Lic. No. & Date Meeting No.24/11 RLA No.05/24/040/00850/AM06 0510175546 dt.01.02.2006 Date: 14.09.2010 As per written comments of DIPP communicated vide their U.O. note dated 1.4.09.2010, the committee decided to ratify the norms in respect of the subject advance authorization as under:­   1. Quantities of import items at Sl.Nos. 34, 35, 36, 37 & 38 may be allowed as applied for i.e. 6050 Kgs., 100 KGs., 570 Kgs., 125 Kgs. and 250 Kgs respectively. 2. No  change  may  be  made  in  the  quantities  of  import  items  at  Sl.  No.1,  2  &  39  allowed  earlier  as  the wastage allowed on these items is justified after taking 1/3rd recovery from scrap.

Case No. A/R­ 97

M/s.    Larson  & Toubro Ltd., HQ F.No.01/80/50/00437/AM10/DES­I Lic. No. & Date Meeting No.24/11 RLA No.03/95/040/00424/AM10 0310540959 dt.08.10.2009 Date: 14.09.2010 The representative of the DIPP informed the Committee that the case is under examination. The Committee, therefore, decided to defer the consideration and to relist the case for 26.10.2010.

Case No. C ­ 13

M/s.    Swastik  Pipes Ltd., New Delhi HQ F.No.01/80/162/00408/AM11/DES­I Meeting No.24/11 Request  for  Clarification  in  accordance  with  the

Para 2.3 of FTP 2009­14 in respect of HBP

Date:14.09.2010 The  case  regarding  ratification  of  norms  in  respect  of  above  authorization  was  considered  by  the  Norms Committee  (NC­I)  in  its  Meeting  No.24/11  held  on  21.09.2010.  As  per  written  comments  of  DIPP communicated vide their U.O. note dt.14.09.2010, the committee decided  to clarify to firm as under:­    “3 Layer Polyethylene Coated ERW Line Pipes” are not covered under SION C­2004 for Engineering Products.   The case may be re­listed on 26.10.2010.

Case No. C ­ 14

M/s.    Kerns  Aero Products Pvt. LTd., HQ F.No.01/80/162/00423/AM11/DES­I Meeting No.24/11 Request for fixation of regular wastage norms

Date:14.09.2010   The  case  regarding  ratification  of  norms  in  respect  of  above  authorization  was  considered  by  the  Norms Committee (NC­I) in its Meeting No.24/11 held on 21.09.2010. The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the consideration and to relist the case on 26.10.2010.

Case No. C ­ 15

M/s.    Metal  Closure Pvt. Ltd., HQ F.No.01/80/162/00409/AM11/DES­I Meeting No.24/11 Request for modification of Standard Input Output Norms at Sl.No.C­773 Date:14.09.2010   On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to  EEPC  may  be  asked  to  give  information  regarding  all  industry  data.    This  information  may  be  given manufacture wise and to re­list the case on  26.10.2010.  


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6815 --apply.

Citation copied