IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2018-09-11

DGFT Committee Minutes

Document text

RATIFIED   Minutes of M.No.38/09 held on 16.12.2008 of Norms Committee (NC­I) (DES.I Section)   The meeting No.38/09 of the Norms Committee (NC­I) for the licensing year 2008­2009 was held on 16.12.2008 under the Chairmanship of Shri A. Komu, Joint Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2004–2009 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP 2. Sh. B.D. Ghosh, Jt. I.A.   23063355 M/o Steel, U.B. 3. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 5. Sh. K.K. Funda, Asstt. Director     DC(MSME) 6. Sh. Ramanand Meena, DDG & Convener NC­I 485 23061562 Ext.276 DGFT, U.B. 7. Sh. Ramavatar Meena, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­  1

Case No.:1/38/80­ALC2/2008

Party Name:ARMET ARMORED VEHICLES (INDIA) LTD. Meet No/Date:38/80­ALC2/2008 16.12.2008 Status:Case deferred HQ File :01/80/050/01500/AM09/ RLA File :06/24/040/00046/AM09/ Lic.No/Date:0610014679 27.11.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI for examination and submission of comments. The case may be relisted on 03.02.2009.   2

Case No.:2/38/80­ALC2/2008

Party Name:KIRLOSKAR PNEUMATIC CO LTD 16.12.2008 HQ File :01/80/050/01501/AM09/ RLA File :31/24/040/00227/AM09/ Lic.No/Date:3110036234 27.11.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP for examination and submission of comments. The case may be relisted on 03.02.2009.   3

Case No.:3/38/80­ALC2/2008

Party Name:TRACTOR ENGINEERS LIMITED Status:Case reverted

16.12.2008 back to RA HQ File :01/80/050/01502/AM09/ RLA File :31/21/040/00272/AM09/ Lic.No/Date:3110036235 27.11.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. The Regional Authority may take necessary action accordingly.   4

Case No.:4/38/80­ALC2/2008

Party Name:SUR HENNIG PVT. LTD., 16.12.2008 HQ File :01/80/050/01503/AM09/ RLA File :07/24/040/00498/AM09/ Lic.No/Date:0710061414 28.11.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   5

Case No.:5/38/80­ALC2/2008

Party Name:CEE DEE VACUUM EQUIPMENT PVT LTD 16.12.2008 back to RA HQ File :01/80/050/01504/AM09/ RLA File :31/24/040/00233/AM09/ Lic.No/Date:3110036254 28.11.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any     6

Case No.:6/38/80­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 16.12.2008 HQ File :01/80/050/01505/AM09/ RLA File :09/24/040/00324/AM09/ Lic.No/Date:0910036139 01.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical

7

Case No.:7/38/80­ALC2/2008

Party Name:VIRGO ENGINEERS LIMITED 16.12.2008 back to RA HQ File :01/80/050/01506/AM09/ RLA File :31/24/040/00212/AM09/ Lic.No/Date:3110036269 01.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any   8

Case No.:8/38/80­ALC2/2008

Party Name:FLOWSERVE INDIA CONTROLS PVT. LTD., 16.12.2008 back to RA HQ File :01/80/050/01507/AM09/ RLA File :32/24/040/00042/AM09/ Lic.No/Date:3210039220 01.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any     9

Case No.:9/38/80­ALC2/2008

Party Name:MIKROTEK MACHINES LTD., 16.12.2008 HQ File :01/80/050/01508/AM09/ RLA File :07/21/040/00834/AM09/ Lic.No/Date:0710061426 01.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI & DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.   10

Case No.:12/38/80­ALC2/2008

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:38/80­ALC2/2008 16.12.2008 HQ File :01/80/050/01511/AM09/ RLA File :05/24/040/00555/AM09/ Lic.No/Date:0510231891 01.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical

authority i.e DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.   11

Case No.:13/38/80­ALC2/2008

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:38/80­ALC2/2008 16.12.2008 HQ File :01/80/050/01512/AM09/ RLA File :05/24/040/00556/AM09/ Lic.No/Date:0510231892 01.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.   12

Case No.:14/38/80­ALC2/2008

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:38/80­ALC2/2008 16.12.2008 HQ File :01/80/050/01513/AM09/ RLA File :05/24/040/00561/AM09/ Lic.No/Date:0510231893 01.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.   13

Case No.:10/38/80­ALC2/2008

Party Name:EMERSON PROCESS MANAGEMENT (INDIA) PVT.LTD. 16.12.2008 HQ File :01/80/050/01509/AM09/ RLA File :03/94/040/00813/AM09/ Lic.No/Date:0310496203 02.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIT for examination and submission of comments. The case may be relisted on 03.02.2009.   14

Case No.:11/38/80­ALC2/2008

Party Name:KIRLOSKAR CHILLERS PRIVATE LIMITED 16.12.2008 HQ File :01/80/050/01510/AM09/ RLA File :31/21/040/00289/AM09/ Lic.No/Date:3110036276 02.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   15

Case No.:15/38/80­ALC2/2008

Party Name:NAGEL SPECIAL MACHINE PVT. LTD., Meet No/Date:38/80­ALC2/2008 16.12.2008

HQ File :01/80/050/01514/AM09/ RLA File :07/21/040/00841/AM09/ Lic.No/Date:0710061465 02.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI & DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.   16

Case No.:16/38/80­ALC2/2008

Party Name:HIND HIGH VACUUM COMPANY PVT LTD. 16.12.2008 HQ File :01/80/050/01515/AM09/ RLA File :07/24/040/00497/AM09/ Lic.No/Date:0710061466 02.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   17

Case No.:17/38/80­ALC2/2008

Party Name:SHAKTI PUMPS (INDIA) LTD., 16.12.2008 HQ File :01/80/050/01516/AM09/ RLA File :11/24/040/00056/AM09/ Lic.No/Date:1110019089 02.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP & DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.   18

Case No.:18/38/80­ALC2/2008

Party Name:SHAKTI PUMPS (INDIA) LTD., 16.12.2008 HQ File :01/80/050/01517/AM09/ RLA File :11/24/040/00057/AM09/ Lic.No/Date:1110019090 02.12.2008 Defer Date: 03.02.2009 Decision : The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP & DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.   19

Case No.:19/38/80­ALC2/2008

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL 16.12.2008 HQ File :01/80/050/01518/AM09/ RLA File :05/24/040/00559/AM09/ Lic.No/Date:0510231958 02.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical

    20

Case No.:20/38/80­ALC2/2008

Party Name:DENSO HARYANA PVT. LTD., 16.12.2008 HQ File :01/80/050/01519/AM09/ RLA File :05/24/040/00532/AM09/ Lic.No/Date:0510231959 02.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   21

Case No.:21/38/80­ALC2/2008

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 16.12.2008 HQ File :01/80/050/01520/AM09/ RLA File :05/24/040/00563/AM09/ Lic.No/Date:0510231960 02.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority  i.e  DIT  &  DC(MSME)  for  examination  and  submission  of  comments.  Simultaneously,  on  the  recommendation  of  the  representative  of DC(MSME)  present  in  the  meeting,  it  was  also  decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 03.02.2009.   1. Information in respect of Sl.No.8 & 9 of the Standard Deficiency Format.   22

Case No.:22/38/80­ALC2/2008

Party Name:THE PRINTERS HOUSE PVT. LTD. 16.12.2008 HQ File :01/80/050/01521/AM09/ RLA File :05/24/040/00551/AM09/ Lic.No/Date:0510231991 02.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority  i.e  DHI  &  DC(MSME)  for  examination  and  submission  of  comments.  Simultaneously,  on  the  recommendation  of  the  representative  of DC(MSME) present in the meeting, it was also decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 03.02.2009:­   1. Information in respect of Sl.No.8 & 9 of the Standard Deficiency Format.

23

Case No.:23/38/80­ALC2/2008

Party Name:TIMKEN INDIA LTD. 16.12.2008 HQ File :01/80/050/01522/AM09/ RLA File :02/24/040/00208/AM09/ Lic.No/Date:0210120599 03.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   24

Case No.:24/38/80­ALC2/2008

Party Name:JAY­EESH ENGINEERING CO. 16.12.2008 HQ File :01/80/050/01523/AM09/ RLA File :03/94/040/00807/AM09/ Lic.No/Date:0310496405 03.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI & DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.   25

Case No.:25/38/80­ALC2/2008

Party Name:HIND HIGH VACUUM COMPANY PVT LTD. 16.12.2008 back to RA HQ File :01/80/050/01524/AM09/ RLA File :07/21/040/00924/AM09/ Lic.No/Date:0710061495 03.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any     26

Case No.:26/38/80­ALC2/2008

Party Name:BIRLA ERICSSON OPTICAL LTD., 16.12.2008 HQ File :01/80/050/01525/AM09/ RLA File :11/24/040/00059/AM09/ Lic.No/Date:1110019110 04.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIT for examination and submission of comments. The case may be relisted on 03.02.2009.

27

Case No.:27/38/80­ALC2/2008

Party Name:ABB LIMITED 16.12.2008 back to RA HQ File :01/80/050/01526/AM09/ RLA File :07/24/040/00500/AM09/ Lic.No/Date:0710061544 04.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any   28

Case No.:29/38/80­ALC2/2008

Party Name:HIGHTEMP FURNACES LIMITED 16.12.2008 HQ File :01/80/050/01528/AM09/ RLA File :07/21/040/00913/AM09/ Lic.No/Date:0710061548 04.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical     29

Case No.:35/38/80­ALC2/2008

Party Name:LARSEN & TOUBRO LIMITED 16.12.2008 HQ File :01/80/050/01534/AM09/ RLA File :03/95/040/00658/AM09/ Lic.No/Date:0310496570 04.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   30

Case No.:38/38/80­ALC2/2008

Party Name:FLOWSERVE INDIA CONTROLS PVT. LTD., 16.12.2008 back to RA HQ File :01/80/050/01537/AM09/ RLA File :32/24/040/00045/AM09/ Lic.No/Date:3210039258 04.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any

  31

Case No.:28/38/80­ALC2/2008

Party Name:AUTO PARTS & ACCESSORIES 16.12.2008 HQ File :01/80/050/01527/AM09/ RLA File :04/24/040/00213/AM09/ Lic.No/Date:0410100591 05.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI & DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.     32

Case No.:30/38/80­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 16.12.2008 HQ File :01/80/050/01529/AM09/ RLA File :07/24/040/00506/AM09/ Lic.No/Date:0710061559 05.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   33

Case No.:31/38/80­ALC2/2008

Party Name:TIMKEN INDIA LTD. 16.12.2008 HQ File :01/80/050/01530/AM09/ RLA File :02/24/040/00212/AM09/ Lic.No/Date:0210120764 05.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   34

Case No.:32/38/80­ALC2/2008

Party Name:PAHARPUR COOLING TOWERS LIMITED, 16.12.2008 HQ File :01/80/050/01531/AM09/ RLA File :02/24/040/00244/AM08/ Lic.No/Date:0210120769 05.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical

35

Case No.:33/38/80­ALC2/2008

Party Name:PAHARPUR COOLING TOWERS LIMITED, 16.12.2008 HQ File :01/80/050/01532/AM09/ RLA File :02/24/040/00202/AM08/ Lic.No/Date:0210120773 05.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   36

Case No.:34/38/80­ALC2/2008

Party Name:PAHARPUR COOLING TOWERS LIMITED, 16.12.2008 HQ File :01/80/050/01533/AM09/ RLA File :02/24/040/00213/AM09/ Lic.No/Date:0210120775 05.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   37

Case No.:36/38/80­ALC2/2008

Party Name:INTERNATIONAL TUBULAR SERVICES (INDIA) PVT. LTD. 16.12.2008 back to RA HQ File :01/80/050/01535/AM09/ RLA File :03/94/040/00815/AM09/ Lic.No/Date:0310496643 05.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any   38

Case No.:37/38/80­ALC2/2008

Party Name:WHIRLPOOL OF INDIA LTD., 16.12.2008 HQ File :01/80/050/01536/AM09/ RLA File :31/24/040/00238/AM09/ Lic.No/Date:3110036334 05.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical

39

Case No.:39/38/80­ALC2/2008

Party Name:PAHARPUR COOLING TOWERS LIMITED, 16.12.2008 HQ File :01/80/050/01538/AM09/ RLA File :02/24/040/00077/AM09/ Lic.No/Date:0210120827 08.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   40

Case No.:40/38/80­ALC2/2008

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., 16.12.2008 HQ File :01/80/050/01539/AM09/ RLA File :04/24/040/00166/AM09/ Lic.No/Date:0410100653 08.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.   41

Case No.:41/38/80­ALC2/2008

Party Name:STROMAG INDIA PVT. LTD. 16.12.2008 HQ File :01/80/050/01540/AM09/ RLA File :31/21/040/00279/AM09/ Lic.No/Date:3110036348 08.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical     42

Case No.:42/38/80­ALC2/2008

Party Name:BOYSEN INDIA LIMITED 16.12.2008 HQ File :01/80/050/01541/AM09/ RLA File :05/24/040/00573/AM09/ Lic.No/Date:0510232246 08.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI & DC(MSME) for examination and submission of comments. The case may be relisted on 03.02.2009.   43

Case No.:43/38/80­ALC2/2008

Party Name:ABB LIMITED

16.12.2008 back to RA HQ File :01/80/050/01542/AM09/ RLA File :07/24/040/00507/AM09/ Lic.No/Date:0710061577 10.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any   44

Case No.:44/38/80­ALC2/2008

Party Name:ACE MANUFACTURING SYSTEMS LTD., 16.12.2008 back to RA HQ File :01/80/050/01543/AM09/ RLA File :07/24/040/00373/AM09/ Lic.No/Date:0710061604 10.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any     45

Case No.:45/38/80­ALC2/2008

Party Name:ACE MANUFACTURING SYSTEMS LTD., 16.12.2008 back to RA HQ File :01/80/050/01544/AM09/ RLA File :07/24/040/00377/AM09/ Lic.No/Date:0710061608 10.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any   46

Case No.:47/38/80­ALC2/2008

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD 16.12.2008 back to RA HQ File :01/80/050/01546/AM09/ RLA File :34/24/040/00160/AM09/ Lic.No/Date:3410022888 10.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any

  47

Case No.:49/38/80­ALC2/2008

Party Name:BLUE STAR LTD. 16.12.2008 back to RA HQ File :01/80/050/01548/AM09/ RLA File :03/94/040/00827/AM09/ Lic.No/Date:0310497122 10.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any     48

Case No.:46/38/80­ALC2/2008

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 16.12.2008 HQ File :01/80/050/01545/AM09/ RLA File :05/24/040/00584/AM09/ Lic.No/Date:0510232361 11.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIT for examination and submission of comments. The case may be relisted on 03.02.2009.   49

Case No.:48/38/80­ALC2/2008

Party Name:FLOWSERVE INDIA CONTROLS PVT. LTD., 16.12.2008 back to RA HQ File :01/80/050/01547/AM09/ RLA File :32/24/040/00046/AM09/ Lic.No/Date:3210039291 11.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any   50

Case No.:50/38/80­ALC2/2008

Party Name:THERMAX LTD., 16.12.2008 HQ File :01/80/050/01549/AM09/ RLA File :31/21/040/00295/AM09/ Lic.No/Date:3110036392 Defer Date:

11.12.2008 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   51

Case No.:51/38/80­ALC2/2008

Party Name:THERMAX LTD., 16.12.2008 HQ File :01/80/050/01550/AM09/ RLA File :31/21/040/00296/AM09/ Lic.No/Date:3110036393 11.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical   52

Case No.:52/38/80­ALC2/2008

Party Name:DELL ORTO INDIA PVT.LTD. 16.12.2008 back to RA HQ File :01/80/050/01551/AM09/ RLA File :05/24/040/00503/AM09/ Lic.No/Date:0510232407 11.12.2008   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any   53

Case No.:53/38/80­ALC2/2008

Party Name:TERUMO PENPOL LIMITED 16.12.2008 HQ File :01/80/050/01552/AM09/ RLA File :53/21/040/00007/AM09/ Lic.No/Date:5310007059 11.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e C&PC for examination and submission of comments. The case may be relisted on 03.02.2009.   54

Case No.:54/38/80­ALC2/2008

Party Name:TERUMO PENPOL LIMITED 16.12.2008 HQ File :01/80/050/01553/AM09/ RLA File :53/24/040/00009/AM09/ Lic.No/Date:5310007060 11.12.2008 Defer Date: 03.02.2009 Decision :The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional

Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e C&PC for examination and submission of comments. The case may be relisted on 03.02.2009.     Sl.No.109

Case NoA/R­30

M/s. GR Engg. Works P. Ltd., Mumbai HQ F.No.01/80/162/792/AM09/DES–I Lic. No. & Date Meeting No.38/09 RLA F.No.03/94/040/1332/AM08 0310481310        dt. 05.08.2008 Date: 16.12.2008 Ratification of norms. The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee (NC­I) in its M.No.31/09 held 04.11.2008 as per the agenda. The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1. Net Empty Export weights of 93.557 MT & 32.718 MT may be added with the quantities of export products at S.No.1 & 2 respectively (Total net empty export weight 126.275 MT). 2. Word “Relevant” may be prefixed with the description of import items at Sl. Nos. 1, 2 & 3. 3. Quantities of import items at S.No.1,2 &3 may be allowed as 1.05 Kg/ Kg. content in the export product. 4. Weight of “3.5 MT ”may be added with the quantity of import item at Sl.No.4 and quantity of this item may be allowed on net to net basis       (S.K. Jain, D.O., DIPP)  Member                ( B.D. Ghosh, Jt. IA, M/o Steel)       Member              (A.K. Mishra, AIA, MOS)  Member       (K.K. Funda, Asstt. Director)       Member         (R.N. Meena, Dy. DGFT) Convener       (A.Komu)       Chairman

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied