RATIFIED MINUTES OF MEETING NO.19/15 OF NORMS COMMITTEE-| (DES SECTION)

HELD ON 09.12.2014

Please Note

  • (i) In certain cases the decision of the Norms Committee refers to the Recommendations / Observations / Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The concerned firm may go through the same and respond accordingly.

  • (ii) Similarly, a scanned copy of the blank Standard Deficiency Format, which may find a reference in NC decisions, has also been attached in the end. This may also be referred to by the concerned firm and may be responded accordingly.

The meeting No. 19/15 of the Norms Committee (NC-I) for the licensing year 2014-2015 was held on 09.12.2014 under the Chairmanship of Dr. L.B. Singhal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter-4) of Foreign Trade Policy 2009-2014 / Handbook of Procedure Volume-t. The following Members of the Committee were present in the meeting: -

==> picture [464 x 435] intentionally omitted <==

----- Start of picture text -----<br> Sie. Name of the Member & Designation Deptt/Organisation.<br>fe Sh K.K. Tiwari L.A 23063321 DHI, U.B.<br>Sh S.K. Jain, D.O. 428A 23063321 Extn.3318] DIPP, U.B.<br>23063166<br>Sh. Kanwalinder Singh Sodhi, Asstt. | 736A 23063802 Extn.2459/ DC(MSME),N.B.<br>Dir. (Mech)<br>4 | Sh. Parveen Sharma, Dy.DGFT ae 23061562 Extn.146 | DGFT, U.B.<br>| Sh. S.Muthukumar, FTDO 23061562 Ext.265 | DGFT, U.B.<br>| -The Committee considered the individual cases of the agenda of this meeting generated through the<br>online system of NIC. The decisions taken thereon are as under:<br>Case No.:15/11/80-ALC2/2012 |Party Name: YOKOGAWA Meet No/Date:19/80- Status: .<br>INDIA LIMITED ALC2/2014 Deferred<br>09.12.2014<br>HQ File RLA File Lic.No/Date:0710088440 {Defer<br>:01/80/050/00229/AM13/ :07/21/040/00120/AM13/ 24.05.2012 Date:20.01.2015<br>Decision : The Committee noted that the firm has been asked to furnish a certificate from the duly<br>authorised officer of Directorate General of Hydro Carbons, Ministry of Petroleum and Natural Gas to<br>the effect that the said goods are required for petroleum operations vide letter dated 20.6.2014. The<br>firm had sought for 4 weeks’ time vide their mail dated 28.07.2014, followed by reminder dated<br>22.10.2014 sent to the firm. The Committee decided to reiterate its earlier decision for the necessary<br>OyRVEEN SHAARMAzal<br>DirectorateDirector Gereign trade<br>Mini [Bhawan,] merce [ New] & [ DS] indus<br>----- End of picture text -----<br>

document.| The Committee also, thatnoticl M/s GE Indian Industrial Private Ltd was issued an AA No.3110060945 dated 30.10.2013 for supply of goods in connection with petroleum operations. In this regard, the firm was requested to produce an Essentiality Certificate issued by the Dte. General of Hydro-Carbons. The Committee noticed that the firm has produced the requisite certificate issued by the Dte. General of Hydro-Carbons on 04.02.2014. The Committee decided that this position should be mentioned in the reminder to the firm. Case is deferred to 20.01.2015. Case No.:17/11/80-ALC2/2012 PartySUMIName: SYSTEMS MOTHERSON LTD MeetALC2/2014 No/Date:19/80Status:Approved HQ. File |RLA File 09.12.2014Lic.No/Date:05 10329275 2 :01/80/050/0023 1/AM13/ :05/24/040/00129/AM13/ 10.07.2012 Decision: The Committee decided to ratify norms based on the recommendations of DIPP vide their UO N.7/191/14-TSW, dt.29.10.2014 (copy to be forwarded to RA and firm).

RA may take action accordingly.

Case No.:15/26/80-ALC2/2012 |Party Name:LARSEN & Meet No/Date:19/80Status: TOUBRO LIMITED ALC2/2014 Deferred 09.12.2014 HQ File RLA File Lic.No/Date:0310722249 (Defer 01 /80/050/00576/AM 13/ :03/95/040/00791/AM13/ 29.01.2013 Date:20.01.2015 Decision : The Committee noted that the firm has been asked to furnish a certificate from the duly authorised officer of Directorate General of Hydro Carbons, Ministry of Petroleum and Natural Gas to 3 the effect that the said goods are required for petroleum operations vide letter dated 20.6.2014. The firm had sought for 4 weeks’ time vide their mail dated 28.07.2014, followed by reminder dated 22.10.2014 sent to the firm. The Committee decided to reiterate its earlier decision for the necessary document. The Committee also that M/s GE Indian Industrial Private Ltd was issued an AA No.3110060945 dated 30.10.2013 for supply of goods in connection with petroleum operations. In this regard, the firm was requested to produce an Essentiality Certificate issued by the Dte. General of Hydro-Carbons. The Committee noticed that the firm has produced the requisite certificate issued by the Dte. General of Hydro-Carbons on 04.02.2014. The Committee decided that this position should be mentioned in the reminder to the firm. Case is deferred to 20.01.2015.

==> picture [456 x 111] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/26/80-ALC2/2012 |Party Name:NETAFIM Meet No/Date:19/80- Status:<br>IRRIGATION INDIA ALC2/2014 Deferred<br>PVT.LTD. 09.12.2014<br>HQ File RLA File Lic.No/Date:3410036266 |Defer<br>4 :01/80/050/00562/AM13/ :34/24/040/00249/AM 13/ 26.02.2013 Date:20.01.2015<br>Decision: The Committee noted that the letter dated 21.10.2014 requesting for furnishing the<br>Amendment Sheet of the said AA has been sent to the RA, Baroda and decided to remind RA for their<br>reply. Case is deferred to 20.01.2015.<br>----- End of picture text -----<br>

==> picture [419 x 25] intentionally omitted <==

----- Start of picture text -----<br> 5 Case No.:41/19/80-ALC2/2014 |Party Name:VOLVO BUSES __ |Meet No/Date:19/80- Status:<br>INDIA PVT.LTD, ALC2/2014<br>----- End of picture text -----<br>

PARVEEN SHARMA Dy. Directer General Directorate General of Foreigntrede Ministry of Commerce & Indusvy Udyog Bnawan, New Delni-11

a)

| pes2.2014 Deferred HQ File RLA File Lic.No/Date:0710093996 [Defer :01/80/050/00475/AM15/ :07/21/040/01003/AM13/ 01.03.2013 Date:20.01.2015

Decision: The Committee noted that the firm’s application has been sent to the DHI for their comments on 08.12.2014 and decided to await comments of DHI. Case is deferred to 20.01.2015.

Case No.:33/8/80-ALC2/2013 |Party Name:THYSSENKRUPP |Meet No/Date:19/80Status: INDUSTRIES INDIA ALC2/2014 Deferred PVT.LTD 09.12.2014 6 HQ File RLA File Lic.No/Date:0310733011 |Defer |:01/80/050/00143/AM14/ :03/95/040/00063/AM 14/ 01.05.2013 Date:20.01.2015

Decision: The Committee noted that the 13" reminder dated 22.10.2014 has been given to EPCG Division for forwarding their inputs in respect of ratification of subject AA and decided to issue reminder for their comments. Case is deferred to 20.01.2015.

Case No.:3/6/80-ALC2/2013 |Party Name:BOTIL OIL Meet No/Date:19/80Status: TOOLS INDIA PVT ALC2/2014 Deferred LTD(FORMERLY BAKER 09.12.2014 OIL ; HQ File RLA File Lic.No/Date:05 10353884 |Defer :01/80/050/00094/AM 14/ :05/23/040/000 16/AM14/ 13.05.2013 Date:20.01.2015 Decision : The Committee noted that the firm has been asked to furnish a certificate from the duly authorised officer of Directorate General of Hydro Carbons, Ministry of Petroleum and Natural Gas to 7 |the effect that the said goods are required for petroleum operations vide letter dated 20.6.2014. The firm had sought for 4 weeks’ time vide their mail dated 28.07.2014, followed by reminder dated 22.10.2014 sent to the firm. The Committee decided to reiterate its earlier decision for the necessary document. The Committee also that M/s GE Indian Industrial Private Ltd was issued an AA No.3110060945 dated 30.10.2013 for supply of goods in connection with petroleum operations. In this regard, the firm was requested to produce an Essentiality Certificate issued by the Dte. General of Hydro-Carbons. The Committee noticed that the firm has produced the requisite certificate issued by the Dte. General of Hydro-Carbons on 04.02.2014. The Committee decided that this position should be mentioned in the reminder to the firm. Case is deferred to 20.01.2015.

||Case No.:2/13/80-ALC2/2014||PartyName:RAGHUVAMSI__|MeetNo/Date:19/80-||PartyName:RAGHUVAMSI__|MeetNo/Date:19/80-|Status:|
|---|---|---|---|---|
|||MACHINETOOLSPRIVATE||ALC2/2014|Deferred|
|||LIMITED|09.12.2014||
|8|HQFile<br> |:01/80/050/00321/AM15/|RLAFile<br>:09/24/040/00074/AM14/|Lic.No/Date:0910056105<br>23.05.2013||Defer<br>Date:20.01.2015|
||Decision: The Committee noted that the firm’s application which was sent to DIPP on 25.11.2014||||
||actually pertains to MSME/DHI and decided toforward the||same to MSME/DHI for|their comments.|
||Caseisdeferredto20.01.2015.||||

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delni-11

&

||CaseNo.:9/7/80-ALC2/2014 = |PartyName:PRANITA|CaseNo.:9/7/80-ALC2/2014 = |PartyName:PRANITA|MeetNo/Date:19/80-|Status:|
|---|---|---|---|---|
|||ENGINEERING SOLUTIONS||ALC2/2014|Deferred|
|||PRIVATE LIMITED,|09.12.2014||
|9|HQFile<br> :01/80/050/00146/AM15/|RLAFile<br>:07/24/040/00066/AM14/|Lic.No/Date:0710096215<br>26.06.2013||Defer<br>Date:20.01.2015|

Decision: The Committee noted that firm has not replied to deficiency letter dated 11.09.2014 followed by the reminder on 20.11.2014, and decided to send reminder to the firm. Case is deferred to 20.01.2015.

||CaseNo.:14/15/80-ALC2/2013||Party<br>Name: AUTOMAT<br>IRRIGATIONPVT.LTD.|MeetNo/Date:19/80-<br>ALC2/2014|Status:<br>Deferred|
|---|---|---|---|---|
||||09.12.2014||
||—_||||
||HQ File|RLA File|Lic.No/Date:0510362949|[Defer|
|10||:01/80/050/00270/AM14/|:05/23/040/00199/AM14/|20.08.2013|Date:20.01.2015|

Decision: The Committee noted that the case has been forwarded to C&PC for their comments followed by reminders the last one being sent on 21.10.2014. The Committee decided to remind C&PC for comments. Case is deferred to 20.01.2015.

|CaseNo.:16/15/80-ALC2/2013||PartyName:INDUSPRO|MeetNo/Date:19/80-|Status:|
|---|---|---|---|
||AUTOENGINEERS PVT.LTD.||ALC2/2014|Rejected|
|||09.12.2014||
|HQFile|RLA File|Lic.No/Date:05 10363605||
|:01/80/050/00272/AM14/|:05/23/040/00221/AM14/|26.08.2013||

11 |Decision: The Committee noted that firm has not replied to deficiency letter dated 13.06.2014 followed by reminder dated 28.07.2014, final reminder dated 21.10.2014 and 15 more days for also. After deliberations, the Committee decided to reject the firm’s request with the direction to pay to Custom Duty and applicable interest for regularization of the license.

RA may take action accordingly.

Case No.:54/15/80-ALC2/2013 |Party Name:SEC INDUSTRIES |Meet No/Date:19/80Status: PVT.LTD., ALC2/2014 Deferred 09.12.2014 HQ File RLA File Lic.No/Date:0910057395 |Defer 12 :01/80/050/003 10/AM14/ :09/24/040/00218/AM14/ 28.08.2013 Date:20.01.2015 Decision: The Committee noted that the firm’s application was forwarded to MSME on 20.6.2014 for their comments followed by two reminders dated 28.07.2014 & 22.10.2014. The representative of MSME sought a further copy of the application to which the Committee decided to send the same, and decided to wait for MSME comments. Case is deferred to 20.01.2015. Case No.:55/15/80-ALC2/2013 |Party Name:POLMOR STEEL Meet No/Date:19/80Status: 13) PVTLTD 09.12.2014ALC2/2014 Deferred [HQ File RLA File Lic.No/Date:0910057433 [Defer

==> picture [2 x 2] intentionally omitted <==

----- Start of picture text -----<br> ,<br>----- End of picture text -----<br>

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Ceihi-11

| |

? : |

[:01/80/050/003 11/AM14/ (:09/24/040/00249/AM14/ 30.08.2013 [Date:20.01 2015 Decision: The Committee noted that firm has not replied to deficiency letter dated 11.09.2014 followed by reminder dated 20.11.2014. After deliberations, the Committee decided to send reminder to the firm. Case is deferred to 20.01.2015.

Case No.:56/15/80-ALC2/2013 |Party Name:POLMOR STEEL (Meet No/Date:19/80Status: PVT LTD ALC2/2014 Deferred 09.12.2014 14 HQ File RLA File Lic.No/Date:0910057434 (Defer |:01/80/050/00312/AM14/ :09/24/040/00250/AM14/ 30.08.2013 Date:20.01.2015

Decision: The Committee noted that firm has not replied to deficiency letter dated 11.09.2014 followed by reminder dated 20.11.2014 and decided to send reminder to the firm. Case is deferred to 20.01.2015.

Case No.:36/15/80Party Name:BOTIL OIL Meet No/Date:19/80Status: ALC2/2013 TOOLS INDIA PVT ALC2/2014 Deferred LTD(FORMERLY BAKER 09.12.2014 OIL HQ File RLA File Lic.No/Date:0510364996 |Defer :01/80/050/00292/AM14/ :05/23/040/00225/AM14/ 09.09.2013 Date:20.01.2015

Decision : The Committee noted that the firm has been asked to furnish a certificate from the duly authorised officer of Directorate General of Hydro Carbons, Ministry of Petroleum and Natural Gas to 15 |the effect that the said goods are required for petroleum operations vide letter dated 20.6.2014. The firm had sought for 4 weeks’ time vide their mail dated 28.07.2014, followed by reminder dated 22.10.2014 sent to the firm. The Committee decided to reiterate its earlier decision for the necessary document. The Committee also that M/s GE indian industrial Private Ltd was issued an AA No.3110060945 dated 30.10.2013 for supply of goods in connection with petroleum operations. In this regard, the firm was requested to produce an Essentiality Certificate issued by the Dte. General of Hydro-Carbons. The Committee noticed that the firm has produced the requisite certificate issued by the Dte. General of Hydro-Carbons on 04.02.2014. The Committee decided that this position should be mentioned in the reminder to the firm. Case is deferred to 20.01.2015. Case No.:1/18/80-ALC2/2013 |Party Name:GREATOO Meet No/Date:19/80Status: MOLDS INDIA PRIVATE ALC2/2014 Deferred LIMITED 09.12.2014 16 [HQ File RLA File Lic.No/Date:0410149958 [Defer :01/80/050/0033 1/AM14/ :04/24/040/00123/AM14/ 17.09.2013 Date:20.01.2015

Decision: The Committee noted that the deficiency letter has been forwarded to the firm on 14.11.2014 and decided to issue reminder to the firm for reply. Case is deferred to 20.01.2015.

==> picture [420 x 134] intentionally omitted <==

----- Start of picture text -----<br> Case No.:46/15/80- Party Name:BOTIL OIL Meet No/Date:19/80- Status:<br>ALC2/2013 TOOLS INDIA PVT ALC2/2014 Deferred<br>17 LTD(FORMERLY BAKER 09.12.2014<br>OIL<br>HQ File IRLA File Lic.N €:05 10366074 [Defer<br>PARVEEN SHARMSHARMA<br>Dy. Directot oe rreignTtade<br>Directorate Genera ee & industty<br>Ministry of Comms ew Delhi-11<br>Udyog Bhawan,<br>----- End of picture text -----<br>

| iS

,

[:01/80/050/00302/AM 14/ [:05/23/040/00245/AM14/ | 19.09.2013 Date:20.01.2015 Decision : The Committee noted that the firm has been asked to furnish a certificate from the duly authorised officer of Directorate General of Hydro Carbons, Ministry of Petroleum and Natural Gas to the effect that the said goods are required for petroleum operations vide letter dated 20.6.2014. The firm had sought for 4 weeks’ time vide their mail dated 28.07.2014, followed by reminder dated 22.10.2014 sent to the firm. The Committee decided to reiterate its earlier decision for the necessary document. The Committee also that M/s GE Indian Industrial Private Ltd was issued an AA No.3110060945 dated 30.10.2013 for supply of goods in connection with petroleum operations. In this regard, the firm was requested to produce an Essentiality Certificate issued by the Dte. General of Hydro-Carbons. The Committee noticed that the firm has produced the requisite certificate issued by the Dte. General of Hydro-Carbons on 04.02.2014. The Committee decided that this position should be mentioned in the reminder to the firm. Case is deferred to 20.01.2015.

==> picture [455 x 94] intentionally omitted <==

----- Start of picture text -----<br> Case No.:34/18/80-ALC2/2013 |Party Name:LARSEN & Meet No/Date:19/80- Status:<br>TOUBRO LIMITED ALC2/2014 Deferred<br>09.12.2014<br>;<br>18 |HQ File RLA File Lic.No/Date:0310751272 |Defer<br>:01/80/050/00364/AM14/ :03/95/040/00268/AM14/ [26.09.2013 Date:20.01.2015<br>Decision: The Committee also noted that the application of the firm has been sent to DRDO on<br>24.11.2014 decided to await DRDO comments. Case is deferred to 20.01.2015.<br>----- End of picture text -----<br>

|Case No.:21/18/80-|PartyName:BOTILOIL|MeetNo/Date:19/80-|Status:|
|---|---|---|---|
|ALC2/2013|TOOLSINDIAPVT|ALC2/2014|Deferred|
||LTD(FORMERLYBAKER|09.12.2014||
||OIL|||
|HQ File|RLA File|Lic.No/Date:0510367148||Defer|
|:01/80/050/00351/AM14/|:05/23/040/00273/AM14/|30.09.2013|Date:20.01.2015|

Decision : The Committee noted that the firm has been asked to furnish a certificate from the duly authorised officer of Directorate General of Hydro Carbons, Ministry of Petroleum and Natural Gas to 19 the effect that the said goods are required for petroleum operations vide letter dated 20.6.2014. The firm had sought for 4 weeks’ time vide their mail dated 28.07.2014, followed by reminder dated 22.10.2014 sent to the firm. The Committee decided to reiterate its earlier decision for the necessary document. The Committee also that M/s GE Indian Industrial Private Ltd was issued an AA No.3110060945 dated 30.10.2013 for supply of goods in connection with petroleum operations. {In this regard, the firm was requested to produce an Essentiality Certificate issued by the Dte. General | of Hydro-Carbons. The Committee noticed that the firm has produced the requisite certificate issued by the Dte. General of Hydro-Carbons on 04.02.2014. The Committee decided that this position should be mentioned in the reminder to the firm. Case is deferred to 20.01.2015. Case No.:9/18/80-ALC2/2013 |Party Name:ALSTOM INDIA = /Meet No/Date:19/80Status: LIMITED, ALC2/2014 Deferred 09.12.2014 20 THQ File RLA File Lic.No/Date:3210068243 [Defer :01/80/050/00339/AM14/ :32/21/040/00111/AM14/ 07.10.2013 Date:20.01.2015 Decision: The Committee noted that firm has neither replied to deficiency letter dated 26.09.2014

PARVEEN SHARMA Dy. Director General Directorate Generai of ForaignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delbi- 1]

sent by DEIT directly and decided to send reminder along with the copy of aforesaid deficiency letter to the firm. Case is deferred to 20.01.2015.

Case No.:19/18/80-ALC2/2013 |Party Name: VSM VENTURE _/Meet No/Date:19/80Status: CONTROL SYSTEMS P.LTD |ALC2/2014 Rejected (09.12.2014 HQ File RLA File Lic.No/Date:05 10367680 :01/80/050/00349/AM14/ :05/24/040/00233/AM14/ [07.10.2013 91 Decision: The Committee noted that firm has not replied to DEIT deficiency letter sent directly dated 16.04.2014, followed by DGFT reminder dated 17.06.2014, e-mail dated 20.6.2014, and final reminder dated 16.09.2014 and 15 days time. After deliberations, the Committee decided to reject their case with direction to pay the Custom Duty and applicable interest for regularization of the license.

RA may take action accordingly.

==> picture [438 x 62] intentionally omitted <==

----- Start of picture text -----<br>

||||||
|---|---|---|---|---|
|Case No.:36/19/81-ALC2/2013||Party Name:SAI LINKS|Meet No/Date:19/80-|Status:|
|(INDIA) P.LTD.|ALC2/2014|Deferred|
|09.12.2014|
|HQ File|RLA|File|Lic.No/Date:3110060918||Defer|
|:01/81/050/00350/AM14/|23 1/83/040/00129/AM14/|25.10.2013|Date:20.01.2015|

----- End of picture text -----<br>

22 |Decision: The Committee noted that firm has not replied to deficiency letter dated 15.05.2014 followed by reminder dated 28.07.2014, final reminder dated 24.10.2014 and 15 days time. The Committee also noted that the e-mail reply received from the firm is incomplete and decided to issue second reminder to the firm for a full reply failing which the Committee would be constrained to reject their case with direction to pay the Custom Duty and applicable interest for regularization of the license. Case is deferred to 20.01.2015.

==> picture [457 x 221] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case|No.:31/18/80-ALC2/2013||Party Name:GE|INDIA|Meet|No/Date:19/80-|Status:|
|INDUSTRIAL PRIVATE|ALC2/2014|Deferred|
|LIMITED|09.12.2014|
|23|HQ File|RLA File|Lic.No/Date:3110060945||Defer|
||:01/80/050/0036 1/AM14/|:31/83/040/00126/AM14/|30.10.2013|Date:20.01.2015|
|Decision:|The|Committee|noted|that|firm’s|reply|dated|16.09.2014|has|been|sent|to|DHI|on|
|29.09.2014|for|comments|and|decided|to|remind|DHI|for|expediting|comments.|Case|is|deferred|to|
|20.01.2015.|
|Case No.:4/21/80-ALC2/2013||Party Name:CARDINAL|Meet|No/Date:19/80-|Status:|
|YACHTS|ALC2/2014|Deferred|
|09.12.2014|
|24||HQ|File|RLA|File|Lic.No/Date:0310756453|(Defer|
|:01/80/050/00400/AM14/|:03/94/040/005|16/AM14/|31.10.2013|Date:20.01.2015|
|Decision:|The|Committee|noted|that|deficiency|letter|of|MSME|has|been|sent|to|the|firm|on|
|26.11.2014|for their|reply.|Case|is deferred to 20.01.2015.|

----- End of picture text -----<br>

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-11

==> picture [456 x 135] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/24/80-ALC2/2013 |Party Name:ZENITH Meet No/Date:19/80- Status:<br>PRECISION PVT LTD ., ALC2/2014 Deferred<br>. [09.12.2014<br>HQ File RLA File Lic.No/Date:0710099452 |Defer<br>25 :01/80/050/00496/AM 14/ :107/24/040/00232/AM14/ 07.11.2013 Date:20.01.2015<br>Decision : The Committee noted that firm’s reply dated 02.07.2014 has been sent to MSME on<br>13.08.2014 for comments and copies of previous decisions taken by NC-I/recommendations of<br>Technical Authorities in the cases of ratification of norms of previous licenses of the firm were<br>handed over to MSME and decided to remind MSME for their comments. Case is deferred to<br>20.01.2015.<br>----- End of picture text -----<br>

|CaseNo.:20/24/80-ALC2/2013 |PartyName:ZENITH|CaseNo.:20/24/80-ALC2/2013 |PartyName:ZENITH|Meet No/Date:19/80-|Status:|
|---|---|---|---|
||PRECISIONPVTLTD.,|ALC2/2014|Deferred|
|||09.12.2014||
|.||||
|HQ File|RLA File|Lic.No/Date:0710099453||Defer|
|:01/80/050/00497/AM14/|:07/24/040/00248/AM14/|07.11.2013|Date:20.01.2015|
|26,<br>:<br>Decision : The Committee noted that firm’s reply dated 02.07.2014 has been|||sent to MSME on|
|13.08.2014 for comments and copies of previous decisions taken by NC-l/recommendations of||||
|Technical Authorities|in the cases of ratification of norms of previous licenses||of the firm were|
|handed over to MSME and decided to remind MSME for their comments. Case is deferred to||||
|20.01.2015.||||
|CaseNo.:1/21/80-ALC2/2013|PartyName:ANALYSER|MeetNo/Date:19/80-|Status:|
|---|---|---|---|
||INSTRUMENTCO.PVT.LTD.||ALC2/2014|Deferred|
|||09.12.2014||
|HQ File|RLA File|Lic.No/Date:1310045080||Defer|
|:01/80/050/00397/AM<br>14/|:13/24/040/00023/AM14/|18.11.2013|Date:20.01.2015|

==> picture [455 x 157] intentionally omitted <==

----- Start of picture text -----<br> 27 |Decision: The representative of the firm, Shri Kunj Bihari Jain, Dy.Manager (Sales) attended<br>the PH in response to the Committee letter dated 19.11.2014 and explained the points<br>raised by the representative of DIPP before the Committee. The Committee after<br>deliberations, advised the firm’s representative to send written submissions for further<br>examination of their request. Case is deferred to 20.01.2015.<br>Case No.:14/21/80-ALC2/2013 |Party Name: ALSTOM INDIA [Meet No/Date:19/80- Status:<br>LIMITED, ALC2/2014 Deferred<br>09.12.2014<br>.<br>28 HQ|:01/80/050/004 File RLA File Lic.No/Date:3210070400 {Defer<br>10/AM14/ :32/21/040/00141/AM14/ 28.11.2013 Date:20.01.2015<br>----- End of picture text -----<br>

Decision: The Committee noted that firm’s reply dated 07.04.2014 has been sent to DHI on 06.06.2014 for comments followed by reminder dated 21.10.2014 and decided to remind DHI. Case is deferred to 20.01.2015.

==> picture [421 x 38] intentionally omitted <==

----- Start of picture text -----<br> Case No.:22/21/80- Party Name:BOTIL OIL Meet No/Date:19/80- (Status:<br>29 |ALC2/2013 TOOLS INDIA PVT ALC2/2014 Deferred<br>LTD(FORMERLY BAKER 09.12.2014<br>----- End of picture text -----<br>

PARVEEN SHARMA , ; Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-41

[ , HQ File RLA File Lic.No/Date:0510372329 |Defer | :01/80/050/004[1][ 8/AM14/] :05/23/040/00343/AM14/ 29.11.2013 Date:20.01.2015 | Decision : The Committee noted that the firm has been asked to furnish a certificate from the duly authorised officer of Directorate General of Hydro Carbons, Ministry of Petroleum and Natural Gas to the effect that the said goods are required for petroleum operations vide letter dated 20.6.2014. The : firm had sought for 4 weeks’ time vide their mail dated 28.07.2014, followed by reminder dated | 22.10.2014 sent to the firm. The Committee decided to reiterate its earlier decision for the necessary : document. The Committee also that M/s GE Indian Industrial Private Ltd was issued an AA ,| thisNo.3110060945regard, the firmdatedwas30.10.2013requestedforto supplyproduceofangoodsEssentialityin connectionCertificatewithissuedpetroleumby theoperations.Dte. GeneralIn | of Hydro-Carbons. The Committee noticed that the firm has produced the requisite certificate issued by the Dte. General of Hydro-Carbons on 04.02.2014. The Committee decided that this position should be mentioned in the reminder to the firm. Case is deferred to 20.01.2015. | Case No.:17/21/80-ALC2/2013 |Party Name:DEE Meet No/Date:19/80Status: DEVELOPMENT ALC2/2014 Deferred ENGINEERS LTD. 09.12.2014 30 HQ File RLA File Lic.No/Date:0510373370 |Defer |:01/80/050/00413/AM14/ :05/23/040/00373/AM14/ 12.12.2013 Date:20.01.2015

Decision: The Committee noted that firm’s reply dated 21.10.2014 has been sent to DHI on 22.10.2014 followed by reminder 20.11.2014 for comments and decided to remind DHI. Case is deferred to 20.01.2015.

||Case No.:17/24/80-ALC2/2013||PartyName:DRIPLEXWATER||MeetNo/Date:19/80-|Status:|
|---|---|---|---|---|
|||ENGINEERING LTD.|ALC2/2014|Deferred|
||||09.12.2014||
|31||HQFile|RLA File|Lic.No/Date:0510374413||Defer|
||:01/80/050/00494/AM14/|:05/23/040/00370/AM14/|24.12.2013|Date:20.01.2015|

Decision: The Committee noted that firm’s reply dated 04.12.2014 has been sent to the DHI on 05.12.2014 for comments and decided to await comments from DHI. Case is deferred to 20.01.2015.

||————_—_—___——<br>CaseNo.:18/24/80-ALC2/2013 |PartyName:DRIPLEXWATER |Meet No/Date:19/80-<br>ENGINEERINGLTD.<br>lauczroi4<br>.<br>109.12.2014|————_—_—___——<br>CaseNo.:18/24/80-ALC2/2013 |PartyName:DRIPLEXWATER |Meet No/Date:19/80-<br>ENGINEERINGLTD.<br>lauczroi4<br>.<br>109.12.2014|Status:<br>Deferred|
|---|---|---|---|
|32||HQ File<br>RLA File<br>:01/80/050/00495/AM14/<br>:05/23/040/00371/AM14/|Lic.No/Date:0510374411<br>loa.12.2013|[Defer<br>Date:20.01.2015|
||Decision: The Committee noted that firm’s reply dated|04.12.2014 has been sent to the DHI on||
||05.12.2014 forcommentsand decided toawait commentsfrom|from DHI. Case isdeferred|to20.01.2015.|
||CaseNo.:37/24/80-ALC2/2013 |PartyName:LARSEN&|MeetNo/Date:19/80-|Status:|
||TOUBROLIMITED|ALC2/2014|Deferred|
|33|.|09.12.2014||
||HQFile<br>RLAFile<br>:01/80/050/00514/AM14/<br>103/95/040/00781/AM14/|iLic.No/Date:0310766034<br>13.01.2014|Defer<br>Date:20.01.2015,|

RVEEN SHARMA a Director General Trade . General of Foreign !€ Directorate Commerce & indust’y Mi yOo Bhawan, New Deini-1

OEEEE EEE EEE

/?

Decision: The Committee noted that the firm’s reply dated 19.08.2014 has been forwarded to DHI on 27.8.2014 followed by reminder dated 20.10.2014 and decided to remind them for comments. Case is deferred to 20.01.2015.

==> picture [456 x 217] intentionally omitted <==

----- Start of picture text -----<br> Case No.:45/24/80-ALC2/2013 |Party Name:GEA ECOFLEX [Meet No/Date:19/80- Status:<br>INDIA PVT.LTD. ALC2/2014 Deferred<br>09.12.2014<br>HQ File RLA File Lic.No/Date:0310766285 |Defer<br>:01/80/050/00522/AM14/ :03/94/040/00880/AM14/ 15.01.2014 , Date:20.01.2015<br>34 :<br>Decision : The Committee noted that firm has not replied to deficiency letter dated 30.07.2014<br>followed by reminder dated 21.10.2014 final dated 20.11.2014, e-mail on 22.11.2014 and decided to<br>await 15 days time, failing which the Committee would be constrained to reject their case with<br>direction to pay the Custom Duty and applicable interest for regularization of the license. Case is<br>deferred to 20.01.2015.<br>Case No.:1/23/80-ALC2/2013 |Party Name:APEX TEST Meet No/Date:19/80- Status:<br>TECHNOLOGIES, ALC2/2014 Deferred<br>09.12.2014<br>35 HQ File RLA File Lic.No/Date:0710101331 |Defer<br>:01/80/050/00427/AM14/ :07/24/040/003 10/AM14/ 17.01.2014 Date:20.01.2015<br>----- End of picture text -----<br>

Decision: The Committee noted that the firm’s reply dated 29.07.2014 has been forwarded to DEIT on 27.8.2014 followed by reminder on 20.11.2014 for comments, and decided to send reminder to DEIT. Case is deferred to 20.01.2015.

Case No.:46/24/80-ALC2/2013 |Party Name:GREATOO Meet No/Date:19/80Status: MOLDS INDIA PRIVATE ALC2/2014 Deferred LIMITED 09.12.2014 HQ File RLA File Lic.No/Date:0410154390 |Defer 36 :01/80/050/00523/AM14/ :04/24/040/00229/AM14/ 20.01.2014 Date:20.01.2015

Decision : The Committee noted that firm has not replied to deficiency letter dated 30.06.2014 followed by reminder dated 09.09.2014 and 20.11.2014 and decided to send final reminder to the firm failing which the Committee would be constrained to reject their case with direction to pay the Custom Duty and applicable interest for regularization of the license. Case is deferred to 20.01.2015. Case No.:21/7/80-ALC2/2014 |Party Name: DYNAMATIC Meet No/Date:19/80Status: TECHNOLOGIES LIMITED, |ALC2/2014 Deferred 09.12.2014 37 HQ File RLA File Lic.No/Date:0710101865 |Defer :01/80/050/00158/AM15/ :07/24/040/00357/AM14/ 03.02.2014 Date:20.01.2015 Decision: The Committee noted that firm has sent a letter dated requesting for fixation of norms based on the earlier norms as in AA No.0710091489, dated 22.10.2012 and decided to send the firm’s request to MSME for comments. Case is deferred to 20.01.2015.

38 Case No.:11/5/80-ALC2/2014 |Party Name: ANALYSER Meet No/Date:19/80Status: INSTRUMENT CO.PVT.LTD. {ALC2/2014 Deferred

PARVEEN SHARMA : Dy. Director Geneyel Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Dethi-11

:

a)

|||)<br>(09.12.2014||
|---|---|---|---|
||HQFile|RLA File<br>Lic.No/Date:1310046344||Defer|
||:01/80/050/00096/AM15/|:13/24/040/00056/AM 14/<br>13.03.2014|: Date:20.01.2015|
||Decision: The representative|ofthe firm, Shri Kunj Bihari Jain, Dy.Manager (Sales) attendedthe PH in||
||response to the Committee letter dated 19.11.2014 and explained the points raised by the|||
||representative of DIPP before the Committee. The Committee after deliberations, advised the|||
||firm’s representative to send written submissions forfurtherexamination oftheir request. Case|||
||isdeferred to 20.01.2015.|||
||CaseNo.:11/7/80-ALC2/2014|{|PartyName:SUTURESINDIA<br>[MeetNo/Date:19/80-|Status:|
|||PRIVATELIMITED,<br>ALC2/2014<br>09.12.2014<br>.|Deferred|
|39|HQFile<br> |:01/80/050/00148/AM15/|RLAFile<br>Lic.No/Date:0710102920<br>:07/24/040/00444/AM14/<br>14.03.2014||Defer<br>Date:20.01.2015|

Decision: The Committee noted that firm has not replied to deficiency fetter dated 22.10.2014 followed by DGFT reminders dated 20.11.2014 and e mail 08.12.2014 and decided to await reply from the firm. Case is deferred to 20.01.2015.

||CaseNo.:19/7/80-ALC2/2014||PartyName:Y-TEC INDIA|MeetNo/Date:19/80-|Status:|
|---|---|---|---|---|
|||PVT. LTD.,|ALC2/2014|Deferred|
||||09.12.2014||
|40|HQFile<br> :01/80/050/00156/AM15/|RLAFile<br>:05/24/040/00483/AM14/|jLic.No/Date:0510382361<br>21.03.2014||Defer<br>Date:20.01.2015|
||Decision: The Committee|noted that the firm’s reply|dated 10.10.2014 has been forwarded to||
||MSME on 24.10.2014 comments and decided to remind||for MSME comments. Case is deferred to||
||20.01.2015.||||
CaseNo.:5/10/80-ALC2/2014 Party Name:UNDERCARRIAGE /MeetNo/Date:19/80- Status:
ANDTRACTORPARTS ALC2/2014 Approved
PVT.LTD. 09.12.2014
HQ File RLA File Lic.No/Date:0310777600
4l :01/80/050/00201/AM15/ :03/95/040/01051/AM14/ 08.04.2014

Decision: The Committee decided to ratify the norms based on the recommendation of MSME vide their UO No.30 (118)2014-ME, dated 21.11.2014(copy to be forwarded RA and firm).

RA may take further action accordingly.

Case No.:2/7/80-ALC2/2014 |Party Name: Meet No/Date:19/80Status: DEE DEVELOPMENT ALC2/2014 Deferred ENGINEERS LTD. 09.12.2014 42 |HQ File RLA File Lic.No/Date:0510384029 |Defer :01/80/050/00139/AM15/ :05/23/040/00009/AM15/ 15.04.2014 Date:20.01.2015 Decision: The Committee noted that the firm's reply dated 21.10.2014 has been forwarded to DHI on 22.10.2014 for comments and decided to remind DHI for comments. Case is deferred to

PARVEEN SHAR Dy. Directo! Genereantrade Directorate Genera erce & industry Ministry of Comm New Delhi-t1

.

  • | 20.01.2015.

  • ‘ase No.:13/7/80-ALC2/2014 |Party Name: OMEGA ICEHILL |Meet No/Date:19/80Status: PRIVATE LIMITED ALC2/2014 Deferred 09.12.2014

  • 43 HQ File RLA File Lic.No/Date:0510384078 |Defer |:01/80/050/00150/AM15/ :05/24/040/00002/AM15/ 15.04.2014 Date:20.01.2015

Decision: The Committee noted that firm has not replied to deficiency letter dated 12.09.2014 followed by reminder dated 20.11.2014 and decided to await reply from the firm. Case is deferred to 20.01.2015.

  • (Case No.:31/7/80-ALC2/2014 |Party Name:GAS TECH Meet No/Date:19/80Status: PROCESS ENGINEERING ALC2/2014 Deferred INDIA PVT. LTD., (09.12.2014

  • HQ File RLA File Lic.No/Date:0510384861 {Defer :01/80/050/00168/AM15/ :05/23/040/00468/AM14/ 24.04.2014 Date:20.01.2015

Decision: The Committee based on the deficiency letter of DIPP dated 09.12.2014 decided to seek 44] the following information from the firm as the reply submitted by them is not complete:

  • | 1. Details of import item at SI. No. 1 as it does not appear to be a Raw material/Component for ; the export product. | 2. Details of manufacturing activities by them in their plant on import item at SI. No. 1 | '| Case is deferred to 20.01.2015.

==> picture [446 x 130] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|{Case No.:1/7/80-ALC2/2014||Party Name:AUTOMAT|Meet No/Date:19/80-|_—|Status:|
|IRRIGATION PVT. LTD.|ALC2/2014|Deferred|
|i|09.12.2014|.|
|HQ|File|RLA|File|Lic.No/Date:0510385020|{Defer|
|:01/80/050/00138/AM15/|:05/23/040/00013/AM15/|25.04.2014|Date:20.01.2015|
|Decision:|The Committee|noted|that|firm|has|not|replied|to|deficiency|letter dated|30.07.2014|sent|
|directly|followed|by|DGFT|reminder|dated|21.10.2014,|final|reminder|dated|20.11.2014|and|e-mail|
|dated|22.11.2014.|After|deliberations, the Committee|decided|to wait|15|days for firm’s|reply,|failing|
|which,|it|would|be|constrained|to|reject|their|case|with|direction|to|pay|the|Custom|Duty|and|
|applicable|interest for|regularization|of the|license.|Case|is|deferred|to 20.01.2015.|

----- End of picture text -----<br>

==> picture [457 x 114] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case|No.:12/7/80-ALC2/2014||Party Name:SPIRAL|EHL|Meet No/Date:1 9/80-|Status:|
|ENGINEERING PRIVATE|ALC2/2014|Deferred|
|LIMITED|09.12.2014|
|'/HQ|File|RLA|File|Lic.No/Date:0510385024||Defer|
|46|:01/80/050/00149/AM15/|:05/24/040/00494/AM14/|25.04.2014|Date:20.01.2015|
|||Decision:|The|Committee|noted|that the|firm|vide|email|dated|28.11.2014|informed|that|they|are|
|submitting|amendment|sheet|to the|RA and|requested|the|NC to|keep|their case|in|abeyance.|After|
|deliberations,|the Committee|decided|to await|the|amendment|sheet from the|firm.|Case|is|deferred|
|to|20.01.2015.|

----- End of picture text -----<br>

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Detni-11

Case No.:10/7/80-ALC2/2014 Party Name:SMC Meet No/Date:19/80Status: PNEUMATICS (INDIA) ALC2/2014 Deferred PRIVATE LIMITED 09.12.2014 :05/24/040/00498/AM14/ 06.05.2014 Date:20.01.2015 7[:01/80/050/00147/AM15/] HQ File RLA File Lic.No/Date:0510385912 Defer Decision: The Committee also noted that firm has not replied to deficiency letter dated 28.07.2014 followed by reminder dated 22.10.2014, final reminder dated 22.11.2014 followed by email on 08.12.2014 grant 15 days time to the firm to reply, failing which the Committee would be constrained to reject their case with direction to pay the Custom Duty and applicable interest for regularization of the license. Case is deferred to 20.01.2015.

Case No.:48/10/80-ALC2/2014 |Party Meet No/Date:19/80Status: Name: UNDERCARRIAGE ALC2/2014 Approved AND TRACTOR PARTS 09.12.2014 PVT.LTD. 48 HQ File RLA File Lic.No/Date:0310781237 |:01/80/050/00244/AM15/ :03/95/040/00117/AM15/ 09.05.2014

Decision: The Committee decided to ratify the norms based on the recommendations of MSME vide their UO Note no.30 (122)2014-ME, dated 08.12.2014(Copy to be followed to RA and firm).

==> picture [138 x 12] intentionally omitted <==

----- Start of picture text -----<br> RA may take action accordingly.<br>----- End of picture text -----<br>

==> picture [459 x 387] intentionally omitted <==

----- Start of picture text -----<br> Case No.:49/10/80-ALC2/2014 |Party Name: [UNDERCARRIAGE] [[Meet][ No/Date:19/80-] Status:<br>AND TRACTOR PARTS ALC2/2014 Approved<br>PVT.LTD. 09.12.2014<br>HQ File RLA File Lic.No/Date:0310781233<br>49 :01/80/050/00245/AM15/ :03/95/040/00118/AM15/ 09.05.2014<br>Decision: The Committee decided to ratify the norms based on the recommendations of MSME<br>vide their UO Note no.30 (123)2014-ME, dated 08.12.2014(Copy to be followed to RA and firm).<br>RA may take action accordingly.<br>Case No.:45/10/80-ALC2/2014 |Party Name:UNI VTL Meet No/Date:19/80- Status:<br>PRECISION PVT. LTD. ALC2/2014 Deferred<br>109.12.2014<br>HQ File RLA File Lic.No/Date:0310781348 |Defer<br>:01/80/050/00241/AM15/ :03/95/040/001 16/AM15/ 12.05.2014 Date:20.01.2015<br>%0 Decision: The Committee noted that firm has not replied to deficiency letter dated 23.09.2014<br>followed by reminder dated 20.11.2014 and decided to issue final reminder to the firm for reply,<br>failing which failing which the Committee would be constrained to reject their case with direction to<br>pay the Custom Duty and applicable interest for regularization of the license. Case is deferred to<br>20.01.2015.<br>[51 Case No.:3/7/80-ALC2/2014 = |Party Name:BOTIL OIL Meet No/Date:19/80- (Status:<br>rn<br>ARVEEN SHARM<br>. ‘Dy. DirectorSS Geneva Trade<br>Directorate General of Foreign<br>Ministry erce & Industry<br>Udyogof [Bhawan,] Comins ew Delhi-11<br>----- End of picture text -----<br>

&

a

==> picture [437 x 63] intentionally omitted <==

----- Start of picture text -----<br>

|||||||
|---|---|---|---|---|---|
|TOOLS INDIA PVT|ALC2/2014|Deferred|
|LTD(FORMERLY BAKER|09.12.2014|
|OIL|
|HQ|File|RLA|File|Lic.No/Date:0510386490||Defer|
|:01/80/050/00140/AM15/|:05/23/040/00458/AM14/|13.05.2014|Date:20.01.2015|

----- End of picture text -----<br>

Decision: The Committee noted that the firm has been given time for furnishing the requisite document i.e. a certificate from the duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the . said imported goods are required for petroleum operations vide letter dated 09.07.2014 which has not been received till date. The Committee decided to reiterate its earlier decision for the necessary document. The Committee decided to reiterate its earlier decision for the necessary document. The Committee also that M/s GE Indian Industrial Private Ltd was issued an AA No.3110060945 dated 30.10.2013 for supply of goods in connection with petroleum operations. tn this regard, the firm was requested to produce an Essentiality Certificate issued by the Dte. General of Hydro-Carbons. The Committee noticed that the firm has produced the requisite certificate issued by the Dte. General of Hydro-Carbons on 04.02.2014. The Committee decided that this position should be mentioned in the reminder to the firm. Case is deferred to 20.01.2015.

==> picture [451 x 62] intentionally omitted <==

----- Start of picture text -----<br>

|||||||
|---|---|---|---|---|---|
|Case No.:2/10/80-ALC2/2014||Party Name:|LARSEN&|Meet No/Date:19/80-|Status:|
|TOUBRO LIMITED|ALC2/2014|Deferred|
|09.12.2014|
|52||HQ|File|RLA File|Lic.No/Date:0310781699|‘Defer|
|:01/80/050/00198/AM15/|:03/95/040/00038/AM15/|15.05.2014|Date:20.01.2015|

----- End of picture text -----<br>

Decision: The Committee noted that the firm's reply dated 19.11.2014 was forwarded to DH! on _ [25.11.2014 for comments and decided to await comments from DHI. Case is deferred to 20.01.2015.

==> picture [455 x 93] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case No.:3/10/80-ALC2/2014|———iParty Name:LARSEN &|Meet No/Date:19/80-|Status:|
|iTOUBRO LIMITED|ALC2/2014|Deferred|
|09.12.2014|
|53||HQ File.|eliRLA|File|Lic.No/Date:0310781705tee||Defer|
|:01/80/050/00199/AMI5/|':03/95/040/00039/AM15/|15.05.2014|Date:20.01.2015|
|Decision:|The|Committee|decided|to|request|RA,|Mumbai|for|the|hardcopy|of|the|application|to|
|consider|the|firm’s|request.|Case|is deferred to|20.01.2015.|

----- End of picture text -----<br>

==> picture [455 x 106] intentionally omitted <==

----- Start of picture text -----<br> Case No.:41/10/80-ALC2/2014 |Party Name:STERICAT Meet No/Date:19/80- Status;<br>GUTSTRINGS PVT. LTD. ALC2/2014 Deferred<br>09.12.2014<br>$4 HQ File RLA File Lic.No/Date:0510386661 {Defer<br>:01/80/050/00237/AM15/ :05/24/040/00066/AM15/ 16.05.2014 Date:20.01.2015<br>Decision: The Committee noted that the firm’s reply dated 18.9.2014 has been forwarded to C&PC<br>on 07.10.2014 followed by reminder on 21.11.2014 for comments and decided to remind them for<br>_ jcomments. Case is deferred to 20.01.2015.<br>----- End of picture text -----<br>

==> picture [427 x 34] intentionally omitted <==

----- Start of picture text -----<br> [ssa No.:38/10/80-ALC2/2014 Paty Name:POLE STAR Meet No/Date:19/80- Status:<br>COILS PVT.LTD. ALC2/2014 Deferred<br>----- End of picture text -----<br>

PARVEEN SHARMA ) ; Dy. Director Genera} Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-71

}

|

;

| | ,

a)

: 01/ File ROA OLWAMIS) Liic. No/Date:03 10782136 Peter thesonsomeswaws’ent ceceived f r omom theth nec:03/95/040/00134/AM15/f i rmaeeis toincomplete, seek informationas suggestedin respect20.05.2014byY theofrepresentative sl.. nos. 4 &Wve 5 fromofDate:20.01.2015of DIPP. the firmCase asiIs deferred to 20.01.2015. Case No.:31/10/80-ALC2/2014 |Party Name:LAXMI Meet No/Date:19/80Status: ELECTRONICS MOULDS & j|ALC2/2014 Deferred PRECISION ENGG P.LTD. 09.12.2014 HQ File[15/] RrRLA Fileps0/00038/AMIS/ Lic.No/Date:071010440823.05.2014 |DeferDate:20.01.2015 56[:01/80/050/00227/AM] Decision: The Committee noted that firm has not replied to deficiency fetter dated 26.08.2014 given by C&PC directly followed by DGFT reminder dated 20.10.2014 along with copy of deficiency letter and decided to send final reminder to the firm failing which the Committee would be constrained to reject their case with direction to pay the Custom Duty and applicable interest for regularization of the license. Case is deferred to 20.01.2015.

==> picture [456 x 112] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case No.:15/7/80-ALC2/2014||Party Name:DECON INDIA|Meet No/Date: 19/80-|Status:|
|PLASTICS PVT. LTD.,|ALC2/2014|Deferred|
|09.12.2014|
|HQ File|RLA File|Lic.No/Date:3110064115|{Defer|
|57||-01/80/050/00152/AM15/|:31/83/040/00048/AM15/|26.05.2014|Date:20.01.2015|
|Decision|:|The|Committee|noted|that|the|firm’s|reply|dated|05.10.2014|has|been|forwarded|to|
|C&PC on 21.10.2014 followed by reminder on 20.11.2014|and the revised data sheet on 21.11.2014|
|and decided to await C&PC comments. Case|is deferred to 20.01.2015.|

----- End of picture text -----<br>

==> picture [452 x 69] intentionally omitted <==

----- Start of picture text -----<br>

||||||
|---|---|---|---|---|
|Case No.:14/7/80-ALC2/2014||Party Name:STANADYNE|Meet No/Date:19/80-|Status:|
|AMALGAMATIONS PVT.|ALC2/2014|Deferred|
|LTD.|(09.12.2014|
|HQ File|RLA File|Lic.No/Date:0410158212||Defer|
|58||-91/80/050/00151/AM15/|:04/24/040/00035/AM15/|27.05.2014|Date:20.01.2015|

----- End of picture text -----<br>

Decision: The Committee noted that firm has not replied to deficiency letter dated 25.08.2014 followed by reminder dated 24.10.2014 and decided to remind the firm for reply. Case is deferred to 20.01.2015.

==> picture [457 x 115] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case No.:12/10/80-ALC2/2014||Party Name:AYAAPPA CNC|[Meet No/Date: 19/80-|Status:|
|PVT.LTD,|ALC2/2014|Deferred|
|09.12.2014|
|HQ File|RLA File|Lic.No/Date:0710104531||Defer|
|59 |.91/80/050/00208/AM15/|:07/24/040/00065/AM15/|28.05.2014|Pete|012015|
|Decision: The Committee noted that the firm’s application|has been sent to MSME on 25.07.2014|
|for|comments|followed|by|reminder|dated|21.10.2014|and|decided|to|remind|the|MSME|for|
|comments.|Case|is deferred to 20.01 2015.|

----- End of picture text -----<br>

pon SUARI AR PARVEN ~eneral 4 py. O#eO Gy Fore ant ae pirectorateMgayogmistty Bhawan,0 Por ‘ merce New' ae€ -

Nee

meme

aaa

&

Case No.:13/10/80-ALC2/20: 14 Patty|Party NaName: ONENTS MeetAcoso No/Date:19/80—|Status:Deferred (BANGALORE) PVT LTD 09.12.2014 . ; : HQ i 0710104564 |Defer °° *91780/050/00209/AM15)File RLA:07/24/040/00066/AM15/ File LieNefbasorio104ser28.05.2014 | Date:20.01.2015 Decision : The Committee noted that firm has not replied to deficiency letter dated 20.10.2014 and decided to remind the firm for reply. Case is deferred to 20.01.2015. ‘ase Case No.:24/10/80-ALC2/2014No- [Party Name: Meet No/Date:19/80-___[Status: ISGEC HEAVY ALC2/2014 Deferred ENGINEERING LIMITED 09.12.2014 61 HQ File RLA File LicNo/Date:0510388030 [Defer |-01/80/050/00220/AM15/ :05/23/040/00084/AM15/ 03.06.2014 Date:20.01.2015

Decision: The Committee noted that the deficiency letter has again been sent to the firm on 20.11.2014 followed by e-mail on 22.11.2014, and decided to await reply from the firm. Case is deferred to 20.01.2015.

Case No.:47/10/80-ALC2/2014 |Party Name:ZENITH Meet No/Date:19/80Status: PRECISION PVT LTD ., ALC2/2014 Deferred * -109.12.2014 62 HQ File RLA File Lic.No/Date:0710104725 |Defer |:01/80/050/00243/AM15/ :07/24/040/00074/AM 15/ 03.06.2014 Date:20.01.2015 Decision: The Committee noted that firm has not replied to deficiency letter dated 16.09.2014 followed by e-mail dated 16.09.2014 and decided to remind the firm for reply. Case is deferred to 20.01.2015.

==> picture [456 x 331] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/10/80-ALC2/2014 |Party Name:ARIOLI Meet No/Date:19/80- Status:<br>TEXTILES MACHINERY PVT |ALC2/2014 Deferred<br>LTD 09.12.2014<br>HQ File RLA File Lic.No/Date:3410040214 (Defer<br>63 :01/80/050/00211/AM15/ :34/21/040/00090/AMI15/ —s_ [06.06.2014 Date:20.01.2015<br>Decision: The Committee noted that the firm’s application has been sent to MSME on 09.09.2014<br>for comments followed by reminder on 20.11.2014, and decided to send reminder to MSME. Case is<br>deferred 20.01.2015.<br>Case No.:6/10/80-ALC2/2014 |Party Name:FAIVELEY Meet No/Date:19/80- Status:<br>TRANSPORT RAIL ALC2/2014 Deferred<br>TECHNOLOGIES INDIA 09.12.2014<br>LIMITED<br>64 [HQ File RLA File Lic.No/Date:0410158506 |Defer<br>:01/80/050/00202/AM15/ :04/24/040/00050/AM15/ 09.06.2014 Date:20.01.2015<br>ecision: The Committee noted that firm has not replied to deficiency letter dated 08.09.2014<br>ollowed by reminder on 20.11.2014 and e-mail on 22.11.2014 and decided to send reminder to the<br>irm. Case is deferred to 20.01.2015.<br>OY birectorVEEN SHARMA General Trade<br>. neral of Foreign fa<br>Directorate Ge erce & Industiy<br>Ministry Of orin, New Delhi-tt<br>Udyog Bhawan,<br>----- End of picture text -----<br>

==> picture [654 x 796] intentionally omitted <==

----- Start of picture text -----<br> Case fy /<br>HQ File<br>65eats ay, UMiTen<br>RLA File<br>No,eine oe PartyEe RRRTOOTS akeMee,Dates14<br>(09 12.2014<br>A400,HAM Is, Status.<br>Deterrey<br>|<br>hieNe 03 107RG55- fer<br>AQ File 09,06.29," Daan ay<br>Decision: The “OMmittos NOtegUMirenthatthe firm hasSOugh, three Weex, tine for turnishing their<br>Sberations Widetoissue'eming timethe firm, Case isVferregfo2991.2015<br>66atten,"CDlias Vide the;, lette, tey 79.10.2014 but did Not furnisp, the "eply The “ommitree afte,<br>RLA File<br>[CaseNo,eer PartyEe RDTOOrs Mee;yofosAlcazg?12.2014 Date Tapp<br>5/0409, 76/AMy 5, Status.<br>Deferred<br>99.06.29;4<br>300 ae Der j<br>Pate:29 0]2015<br>HQ File f<br>H<br>CaseDec i sion. The “Ommittos NOtParty n e g that PRN the firm hasSOugh, three Week, time for "Urnishing their<br><elberation, Weidegtoissue'eMinde, tothe firm, Case is Weferre.,to20.01.2915<br>]<br>67 005095,"EDlies Vide thei, lette,Vay,5/ Wteg °9.10.2014 but dig Not furnis, the "ply The “ommittes afte,<br>RiaPRIVATCNBRFile LiMn,SOLUTION. EC‘Mee; 2/2014eater<br>|<br>09, 12.2014<br>Feta Statys. ;<br>Deferred<br>I 106.2978<br>comments Case is Feferre., to 20,91.2015 }<br>22,97.2014followedby"Minder. datey 12,09.2014 20. Lic.N, te:07]0195003 Defer<br>.<br>Pate:2991.29)5<br>68 /HQFile<br>.<br>“leasDecision. The “ommittas 0teg that the firm’, *Pblicatio, has been forwarda to Msme On<br>ij2014 angcidey to "eming MSue for<br>002164S/ /<br>RLA File<br>CaseaTLCR;NeseP. ate:IS GELIMiTEHEA ALC2729,qMeesNoe Ta<br>{<br>23/4009,6/ANyIgy 09, 12.2014 DeferredStatys,<br>:<br>M296.2014<br>/<br>2<br>200 Ta Defe,<br>69 HGFile Date:29 9,20]<br>ideg toissue "eMinde, to thefirm for Feply Case is Ceferrey to20.01.2916 A} i<br>Mire, /<br>eo,Decision The CommitrosNOtegthatfirm hasNot "€Dlieg to ficiency lette, Wateg21702014ang H<br>Ra Fig<br>Case Mee Ly Ts O14 P .owReSYSTEMS OSs:PRIVATpJSw ALC2/2914‘Mee; NODate:Tay a /<br>09,12.2014<br>an teensy, Status,<br>jo 13,20096.2014OT / Deferred /<br>Defer j/<br>05,12.2014 a ngReidey to@Waitcomment. Case isWferreg t02091.2015 S200) 39),<br>[Casee e IP, Ane RES<br>Decision. The Committas N0teg that the fitm’s Pblicatio, hasbeen forwardeg £0 Day on p<br>Prana PRIVAT. LM e c;shNo Date Tae<br>}<br>Status.<br>Deferred i<br>PARVEZ Ey SHRMA<br>Dy Directo: Ceneray ; j<br>Directorate Cenaray ofForeign, Trade<br>Ministry OfCommerce & Ndustry<br>Udyog Bhawan, New Deihi-g3<br>/<br>j<br>----- End of picture text -----<br>

&

ir LIMITED, 09.12.2014 HQ:01/80/050/00224/AM15/ File RLA:04/24/040/00066/AM15/ File Lic.No/Date:041015870117.06.2014 DeferDate:20.01.2015 Decision : The Committee noted that the firm’s reply dated 25.09.2014 has been forwarded to C&PC on 08.10.2014 for comments followed by reminder on 20.11.2014 and decided to await C&PC comments. Case is deferred to 20.01.2015.

|||CaseNo.:10/10/80-ALC2/2014 |PartyName:GREATOO<br>MeetNo/Date:19/80-|CaseNo.:10/10/80-ALC2/2014 |PartyName:GREATOO<br>MeetNo/Date:19/80-|Status:|
|---|---|---|---|---|
||||MOLDSINDIAPRIVATE<br>ALC2/2014|(Deferred|
|||.|LIMITED<br>09.12.2014||
||71|HQFile<br> :01/80/050/00206/AM15/|RLAFile<br>Lic.No/Date:0410158740<br>:04/24/040/00065/AM15/<br>18.06.2014||Defer<br>Date:20.01.2015|
|||Decision: The Committee|noted that firm has not replied to deficiency letter|dated 19.09.2014|
|||followed by reminder dated 20.11.2014 and e-mail dated 22.11.2014 and decided to issue final|||
|||remindertofirmfor reply.Case isdeferred to20.01.2015.|||
|||CaseNo.:21/10/80-ALC2/2014 |PartyName:ISGECHEAVY<br>MeetNo/Date:19/80-||Status:|
||||ENGINEERING LIMITED<br>ALC2/2014|Deferred|
||||09.12.2014||
|||.|||
|:|‘72|HQ File<br> :01/80/050/00217/AM15/|RLA File<br>Lic.No/Date:0510388787<br>:05/23/040/00121/AM15/<br>**s**<br>|18.06.2014||Defer<br>Date:20.01.2015|
|||Decision: The Committee noted thatthe firm’s reply dated 16.09.2014 has been||forwarded to DHI|
|||on 07.10.2014 forcomments followed by reminder dated 20.11.2014 and decided||to remind DHI for|
|||comments. Case isdeferred|to20.01.2015.||
|||Case No.:30/10/80-|PartyName:GEINDIA<br>MeetNo/Date:19/80-|Status:|
|||ALC2/2014|INDUSTRIAL PRIVATE<br>ALC2/2014|Deferred|
||||LIMITED<br>09.12.2014||
||73|HQFile<br> :01/80/050/00226/AM15/|RLAFile<br>Lic.No/Date:3110064422<br>:31/83/040/00042/AM15/<br>18.06.2014|[Defer<br>Date:20.01.2015|
|||Decision: The Committee noted that the firm’s reply dated 18.09.2014 has been||forwarded to DHI|
|||on 26.09.2014 forcomments followed by reminder dated 20.11.2014 and decided||to remind DHI for|
|||comments. Case isdeferred|to20.01.2015.||
|||CaseNo.:9/10/80-ALC2/2014||PartyName:DOOWON<br>MeetNo/Date:19/80-|Status:|
||||AUTOMOTIVESYSTEMS<br>ALC2/2014|Approved|
||||INDIAPRIVATELIMITED<br>(09.12.2014||
|||.|||
|||HQ File|RLA File<br>Lic.No/Date:0410158756||
|||:01/80/050/00205/AM15/|:04/24/040/00057/AM 15/<br>19.06.2014||
||14|;<br>Decision: The Committee|;<br>;<br> decided to ratify the norms based on the recommendation of DHI on||
|||repeat basis with referenceto|toAA No.0410156226, dated 14.03.2014(copyto beforwardedtoRAand||
|||firm).|||
|||RAtotakefurther action accordingly.|||
||||PARVEEN SHARMA<br>Dy. Director General<br>Directorate General of ForeignTrade<br>Ministry ofCommerce& Industry<br>UdyogBhawan,NewDelhi-11||

\ \ | | ||

| |

j |j : |

==> picture [527 x 128] intentionally omitted <==

----- Start of picture text -----<br> |<br>|<br>| (Case No.:37/10/80-ALC2/2014 |Party Name:SMC Meet No/Date:19/80- |Status:<br>: P RIVATENEUMATICS LIMITED (INDIA) ALC2/09.12. 201 44 Deferred<br>|<br>. :0510388905 |Defer<br>| 75 HQ|:01/80/050/00233/AM15/ File RLA:05/24/040/00131/AM15/ File Lic.No/Date:19.06.2014 |Date:20.01.2015—<br>Decision: The Committee noted that firm has not replied to deficiency letter dated 12.09.2014<br>followed by reminder to firm dated 20.11.2014, email dated 08.12.2014 and decided to await reply<br>from the firm. Case is deferred to 20.01.2015.<br>----- End of picture text -----<br>

==> picture [463 x 577] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/10/80-ALC2/2014 |Party Name:ISGEC HEAVY Meet No/Date:19/80- Status:<br>ENGINEERING LIMITED ALC2/2014 Approved<br>09.12.2014<br>HQ File RLA File Lic.No/Date:0510388973<br>:01/80/050/00219/AM15/ :05/23/040/00122/AM15/ 20.06.2014<br>Decision: The Committee decided to ratify the norms based on the recommendation of DIPP vide<br>their UO Note No.12/159/2014-TSW/76, dated 09.12.2014 as under.<br>1. Net Empty weight of 102.3 MT may be specified with the quantities of export product..<br>2. Word “Relevant” may be prefixed with the description of import items at SI. Nos.1,4,5 &6.<br>3. Quantities of import items at Sl.No 1,5&6 may be allowed as 1.0417 Kgs./Kg. content in<br>6 the export products as claimed by the firm.<br>4. Quantity of import item at SI. No. 2 may be allowed as 2 Nos. on net to net basis. Duty free<br>weight of this item may be allowed as 12883 Kgs. inclusive of 34.3 % wastage after taking 20<br>% recovery from scrap.<br>5. Quantity of import item at S!. No. 3 may be allowed as 502 Kgs. (2 Nos.) on net to net basis.<br>6. Quantity of import item at SI. No. 4 may be allowed as 26308 Kgs. (21108 Meters) inclusive of<br>2 % wastage. .<br>7. Quantity of import item at SI. No. 7 may be allowed on net to net basis with accountability<br>clause ;<br>8. Quantities of import items at SI. No. 8 to 14 may be allowed as applied for.<br>RA to take further action accordingly.<br>Case No.:32/10/80-ALC2/2014 |Party Name:ROTHE ERDE Meet No/Date:19/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2014 Deferred<br>09.12.2014<br>ee<br>‘ i 3110064467 |Defer<br>:<br>77 HQ File RLA File ba9s2014 3<br>Pao gor0s0/00228/AMIS/ Re fs0s0/000707AMIS/ 24.06.2014 pete 0 2015<br>Decision: The Committee noted that firm has not replied to deficiency letter dated 11.09.2014<br>followed by reminder dated 20.11.2014 and decided to issue reminder to the firm for reply. Case Is<br>deferred to 20.01.2015.<br>. :19/80- Status:<br>Case -50/10/80-ALC2/2014 [PartyName:BHARAT HEAVY [Meet NovDate:19/80-<br> No.:50/ ELECTRICALS LIMITED ALC2/2014 Deferred<br>(09.12.2014<br>cable<br>78<br>; Lic. No/Date:6 110001215 Defer<br>HQ-01/80/050/00246/AM15/ File RLA:61/24/040/00006/AM15/ File 8.07.2014 Date:20.01.2015<br>PARVEEN SHARMA<br>Dy. Directer General<br>Directorate General of ForeignTrade<br>Ministry of Commerce & Industly<br>Udyog Bhawan, New Delhi-11<br>----- End of picture text -----<br>

2=?)

&

==> picture [455 x 175] intentionally omitted <==

----- Start of picture text -----<br>

||||||||
|---|---|---|---|---|---|---|
|05.08.2014Decision:|forThe commentsCommittee followednoted|bythat reminderthe|firm’s dated 21.10.2014application|andhas|decidedbeen|forwarded to issue vernipder|
|DHI for comments.|Case|is deferred to 20.01.2015.|
|Case|No.:51/10/80-ALC-|2/2014||PartySPRINGSName:KERN-LIEBERS& STAMPINGS|ALC2/2014[Meet No/Date:19/80-|Status:Deferred|
|:|PVT.LTD,|09.12.2014|
|:|
|i|0710105948|{Defer|
|79 ‘01/80/0S0/00247/AM5/HO|File|:07/24/040/00252/AM14/RLA File|21.07.2014Nae|NO|DeleDate:20.01.2015|
|Decision: The Committee noted that firm’s application has been forwarded to MSME on 25.08.2014|
|followed|by reminders dated|20.10.2014,|19.11.2014 and decided the issue|reminder to MSME for|
|comments.|Case|is deferred to 20.01.2015.|

----- End of picture text -----<br>

Case No.:2/16/80-ALC2/2014 Party Name: WELD FUSE PVT. |Meet No/Date:19/80Status: No. LID. ALC2/2014 Deferred 09.12.2014 | 80 :01/80/050/00371/AM15/HQ File :09/24/040/00201/AM15/RLA File 23.07.2014Lic.No/Date:0910060710 PeteDate:20.01.2015 Decision: The Committee noted that hard copy of firm’s application has not been received from and _[application.reminder has Case beenis sent to RA, deferred to Hyderabad 20.01.2015. and decided to issue reminder to RA, Hyderabad for firm’s “(Case No.:52/10/80-ALC2/2014 [Party Name:CHAK RADER Meet No/Date:19/80[Starue: FARM EQUIPMENTS ALC2/2014 Deferred HQ PRIVATE LIMITED 09.12.2014 31 File RLA File Lic.No/Date:0910060730 Defer :01/80/050/00248/AM15/ :09/24/040/00138/AM 15/ 124.07.2014 Date:20.01.2015 Decision: The Committee noted that the firm’s application has been forwarded to MSME on _|MSME13.08.2014 for comments. for comment Ca s e followedis deferred by to reminder dated 20.01.2015, 21.10.2014 and decided to issue reminder to Case No.:2 1/19/80-ALC2/2014 Party Name:UNIVTL Meet No/Date:19/80Status: PRECISION PVT. LTD. ALC2/2014 Deferred 5 09.12.2014 HQ File RLA File Lic.No/Date:0310787636 Defer :01/80/050/00455/AM15/ :03/95/040/00378/AM 15/ 05.08.2014 Date:20.01.2015 Decision: The Committee noted that MSME has sought clarifications vide their deficiency letter ID Case is deferred to 20.01.2015, No.30(176)/2014-ME, dated 09.12.2014 and decided to send a copy ofthe same tothe firm for reply. Case No.:1/19/80-ALC22014 [Panty Name:ESSAR Meet No/Date:19/80IStatus, 83 PROJECTS (INDIA) LTD, ALC2/2014 Deferred :01/80/ . [otmbwovavaws (09.12.2014 . °9210041184 [Defer RAE —————— Lic. No/Date:521 | = . 0/050/00435/4M15/ *52/24/040/00026/4M15/ 07.08.2014 Date:20.01.2015 PARVEEN SHARMA . ; Dy. Director Genera! Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-14

2?

! |

Decision: The Committee noted that DIPP has sought clarifications vide their deficiency letter ID No.12/159/2014-TSW/83, dated 09.12.2014 as under and decided to send a copy of the same to the firm for reply. 1. Information in respect of Si. No. 3, 4,5 & 11 of Standard Deficiency Format, export product wise. 2. Quantities of import items from SI. No. 1 to 11 in Nos. also in addition to their weights. 3. Details of import item at SI. No. 11 and its specific use in export items. Case is deferred to 20.01.2015.

||‘CaseNo.:37/19/80-ALC2/2014||PartyName:KAMAR|MeetNo/Date:19/80-|Status:|
|---|---|---|---|---|
|||INFRASTRUCTUREPVT|ALC2/2014|Deferred|
|||LTD,|09.12.2014||
|84||HQ File|RLA File|Lic.No/Date:0310788243|(Defer|
||:01/80/050/00471/AM15/|:03/94/040/00449/AM15/|21.08.2014|Date:20.01.2015|

Decision: The Committee noted that the firm’s application has been sent to DHI on 21.11.2014 for comments and decided to await comments. Case is deferred to 20.01.2015.

||Case No.:40/19/80-ALC2/2014||PartyName:KSSABHISHEK|/|MeetNo/Date:19/80-|Status:|
|---|---|---|---|---|
|||SAFETYSYSTEMS PVT.|ALC2/2014|Deferred|
|||LTD,|09.12.2014||
|85|HQFile<br> 1.01/80/050/00474/AM15/|RLAFile<br>:05/23/040/00206/AML5/|Lic.No/Date:0510390630<br>(21.08.2014|[Defer<br>Date:20.01.2015|

Decision: The Committee noted that the firm’s application has been sent to MSME on 21.11.2014 for comments and EPCG clarification has been sought from the firm vide letter dated 20.11.2014 and decided to await comments. Case is deferred to 20.01.2015.

||CaseNo.:3/16/80-ALC2/2014||PartyName:ESSARPROJECTS||MeetNo/Date:19/80-|Status:|
|---|---|---|---|---|
|||(INDIA)LTD.|ALC2/2014|Deferred|
||||09.12.2014||
|86||HQ File<br>:01/80/050/00372/AM15/|RLAFile<br>:52/24/040/00030/AM15/|iLic.No/Date:5210041204<br>(22.08.2014||Defer<br>Date:20.01.2015|

Decision: The Committee noted that the firm’s application has been sent to DIPP on 09.12.2014 for comments and decided to await comments. Case is deferred to 20.01.2015.

Case No.:5/19/80-ALC2/2014 |Party Name:GODREJ & Meet No/Date:19/80Status: BOYCE MFG. CO. LTD., j|ALC2/2014 Approved 09.12.2014 87 HQ File RLA File Lic.No/Date:03 10788394 |:01/80/050/00439/AM15/ :03/94/040/00462/AM15/ ;26.08.2014 Decision: The Committee decided to ratify the norms based on the recommendation of DIPP vide their UO Note No.12/159/2014-TSW/87, dated 09.12.2014 as under. 1. Net Empty weight of export products may be specified as under:

ARVEEN SHARMA Dy. Director General aTrade Directorateery Generaot[Fore][ustry] Myoof[Bhawan,] COF[ New][ Delhi-11] L

&

==> picture [524 x 597] intentionally omitted <==

----- Start of picture text -----<br> No. | Weight No. Weight Weight<br>ji[1803606(Kgs.) [6350Kgs. «dT ~——~«d;s 30sKgs. SS<br>}4[3 [79628[16500 9 [31063106 7 , «14—S«Y 3 —=«*d' 09s13160Sd<br>[5__[20865030495is —*f 4950<br>1. Quantity of import item at SI. No. 1 may be allowed as 333 Nos. on net to net basis. Duty free<br>2. weight of this item may be allowed as applied for i.e. 9936 Kgs. inclusive of 3% wastage.<br>Quantity of import item at SI. No. 2 may be allowed as 49 Nos. on net to net basis. Duty free<br>weight of this item may be allowed as 90569 Kgs. inclusive of 33 % wastage after taking 20 %<br>recovery from scrap.<br>3. Quantity of import item at SI. No. 3 may be allowed as 2 Nos. on net to net basis. Duty free<br>weight of this item may be allowed as 2294 Kgs. inclusive of 72 % wastage after taking 20 %<br>recovery from scrap.<br>4. Quantity of import item at SI. No. 4 may be allowed as 71 Nos. on net to net basis. Duty free<br>5S. weight of this item may be allowed as applied for i.e. 3472 Kgs. inclusive of 3 % wastage.<br>Quantity of import item at SI. No. 5 may be allowed as 31 Nos. on net to net basis. Duty free<br>weight of this item may be allowed as 32063 Kgs. inclusive of 40.5 % wastage after taking 20 %<br>recovery from scrap.<br>6. Word “Relevant” may be prefixed with the description of import items at SI. No. 6, 7, 10 to 15,<br>19, 24 & 26.<br>7. Quantities of import items at SI. No. 6, 7,19 & 24 may be allowed as 138264 Kgs., 19916 Kgs.,<br>8. 28163 Kgs & 2664 Kgs. respectively as 1.05 Kgs./kg. content in the export products.<br>Quantity of import item at SI. No. 8 may be allowed as 11 Nos. on net to net basis. Duty free<br>; weight of this item may be allowed as applied for i.e. 13 Kgs. inclusive of 3 % wastage.<br>9. Quantity of import item at SI. No. 9 may be allowed as 5 Nos. on net to net basis. Duty free<br>10. weight of this item may be allowed as applied for i.e. 8 Kgs. inclusive of 3 % wastage.<br>Quantity of import item at SI. No. 10 may be allowed as 63602 Kgs. (66644 Meters) inclusive<br>of 2 % wastage.<br>11. Quantity of import item at SI. No. 11 may be allowed as 2108 Kgs. (2232 Meters) inclusive of<br>; 2 % wastage.<br>| 12. Quantity of import item at SI. No. 12 may be allowed as 77339 Kgs. (75836 Meters) inclusive<br>of 2 % wastage.<br>| 13. Quantity of import item at SI. No. 13 may be allowed as 283 Kgs. (170 Meters) inclusive<br>of 2 % wastage. .<br>14. Quantity of import item at S!. No. 14 may be allowed as 714 Kgs. (27 Meters) inclusive of<br>2 % wastage.<br>15. Quantity of import item at SI. No. 15 may be allowed as 862 Kgs. (556 Meters) inclusive<br>of 2 % wastage.<br>16. Quantity of import item at SI. No. 16 may be allowed as 638 Nos.(1543 Kgs. on net to net basis<br>with accountability clause.<br>17. Quantity of import item at SI. No. 17 may be allowed as 4346 Nos.(10328 Kgs. on net to net<br>basis with accountability clause.<br>----- End of picture text -----<br>

PARVEEN SHA Directon’s Giector General Ministry of Commerc gantrade Udyog Bhawan, New Delhi.

x

| |

==> picture [432 x 133] intentionally omitted <==

----- Start of picture text -----<br> 18. Quantity of import item at S!. No. 18 may be allowed as 1 No.(3 Kgs. jon net to net basis with<br>accountability clause.<br>19. Quantities of import items at SI. Nos. 20, 21 & 22 may be allowed as 2949 Kgs. each.<br>20. Quantity of import item at SI. No. 23 may be allowed as 3 Nos. on net to net basis. Duty free<br>weight of this item may be allowed as 1048 Kgs. inclusive of 35 % wastage after taking 20 %<br>recovery from scrap.<br>21. Quantity of import item at SI. No. 25 may be allowed as 28 Nos. on net to net basis. Duty free<br>weight of this item may be allowed as applied for i.e. 283 Kgs. inclusive of 3 % wastage.<br>22. Quantity of import item at SI. No. 26 may be allowed as 61.9 Kgs. (18 Meters) inclusive<br>of 2 % wastage.<br>----- End of picture text -----<br>

RA to take further action accordingly.

==> picture [434 x 65] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/19/80- Party Name:DRESSER-RAND [Meet No/Date:19/80- Status:<br>ALC2/2014 INDIA PRIVATE LIMITED = |ALC2/2014 Deferred<br>09.12.2014<br>HQ File RLA File Lic.No/Date:0310788390 [Defer<br>:01/80/050/00453/AM15/ :03/94/040/00488/AM15/ 26.08.2014 Date:20.01.2015<br>----- End of picture text -----<br>

Decision: The Committee decided to seek further information based on the deficiency letter of DIPP vide their UO Note No.12/159/2014-TSW/88, dated 09.12.2014 as under.

  • 88| 1. Information in respect of S!. No. 3, 8 & 9 of Standard Deficiency Format.-export product wise. 2. Basis/detailed calculations for the quantities of import items.

    1. Import items at SI. No. 1, 24, 47, 70, 93, 116, 141, 164, 187, 213, 236 & 259 (Engines) appears to be of Capital Goods nature and details of manufacturing activities on these items may be specified.

    2. Details of import items at SI. No. 2, 25, 48, 71, 94, 117, 142, 165, 188, 214, 237 & 260 and their specific use in export items.

Case is deferred to 20.01.2015.

  • Case No.:1/13/80-ALC2/2014 |Party Name:PRECIHOLE Meet No/Date:19/80Status: MACHINE TOOLS PVT. ALC2/2014 Deferred LTD., 09.12.2014

  • 89 |HQ File RLA File Lic.No/Date:0310788538 [Defer :01/80/050/00320/AM15/ :03/95/040/00447/AM15/ |01.09.2014 Date:20.01.2015

Decision: The Committee noted that the firm’s application has been sent to DHI on 25.11.2014 for comments and decided to issue reminder to DHI. Case is deferred to 20.01.2015.

Case No.:18/19/80-ALC2/2014 |Party Name:GODREJ & [Meet No/Date:19/80Status: BOYCE MEG. CO. LTD., ALC2/2014 Approved \09.12.2014 90 HQ File RLA File |Lic.No/Date:0310788649 |:01/80/050/00452/AM15/ :03/94/040/00504/AM15/ \02.09.2014 Decision: The Committee decided to ratify the norms based on the DIPP UO Note No.12/159/2014TSW/90, dated 09.12.2014 as under :- 1. Net Empty weight of export products at SI. No. 1, 2 & 3 may be specified as 13812 Kgs., 6567

PARVEEN SHARMA

Dy. Director General Directorate Generai of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-11

NN_ EEL a

&

. |

==> picture [442 x 106] intentionally omitted <==

----- Start of picture text -----<br> Kgs. & 2411 Kgs. respectively.<br>2. Quantity of import item at SI. No. 1 may be allowed as 39 Nos. on net to net basis. Duty free<br>3. weight of this item may be allowed as applied for i.e. 2324 Kgs. inclusive of 3% wastage.<br>Word “Relevant” may be prefixed with the description of import item at SI. No. 2 and its<br>quantity may be allowed as 16551 Kgs. inclusive of 5 % wastage.<br>4. Quantities of import items at SI. Nos. 3,4&5 may be allowed as 169 Kgs. each.<br>RA to take further action accordingly.<br>----- End of picture text -----<br>

Case No.:26/19/80-ALC2/2014 Party Name:TRANSASIA BIO [Meet No/Date:19/80Status: MEDICALS LTD. ALC2/2014 Deferred 09.12.2014 91 |HQ File RLA File Lic.No/Date:0310788599 |Defer :01/80/050/00460/AM15/ :03/95/040/00444/AM15/ 02.09.2014 Date:20.01.2015

Decision: The Committee noted that the firm’s application has been forwarded to DEIT on 03.12.2014 and decided to await comments from DEIT. Case is deferred to 20.01.2015.

Case No.:2/19/80-ALC2/2014 |Party Name:ANUPAM-MHI Meet No/Date: 1 9/80Status: INDUSTRIES LIMITED ALC2/2014 Deferred 09.12.2014 92 |HQ File RLA File Lic.No/Date:3410040509 |Defer :01/80/050/00436/AM15/:34/24/040/00136/AM15/ 04.09.2014 Date:20.01.2015 Decision:21.11.2014 andThe decidedCommittee to awaino t edcommentsthat the fromrine beycation’ Case is deferred tohas been 20.01.2015.forwarded to onrolls Case No.:20/19/80-ALC2/2014 |Party Name:GEA ECOFLEX _ [Meet No/Date:19/80Status: INDIA PVT.LTD. ALC2/2014 Deferred 09.12.2014 HQ File RLA File Lic.No/Date:0310788788 Defer 93 :01/80/050/00454/AM 15/ :03/94/040/00415/AM15/ 05.09.2014 Date:20.01.2015 Decision: The Committee decided to seek further information based on the deficiency letter of DIPP vide their UO Note No.12/159/2014-TSW/93, dated 09.12.2014 as under. 1. Information in respect of SI. No. 3, 4, 11 & 12 of Standard Deficiency Format. 2. Blank size supported by size of export item . Case is deferred to 20.01.2015.

Case No.:34/19/80-ALC2/2014 |Party Name: LARSEN & Meet No/Date:19/80Status: TOUBRO LIMITED ALC2/2014 Deferred ; 09.12.2014 94 [HQ File RLA File Lic.No/Date:0310788987 [Defer :01/80/050/00468/AM15/ :03/95/040/004 15/AM15/ 10.09.2014 Date:20.01.2015 Decision: The Committee noted that the firm’s application has been forwarded to DHI on 21.11.2014 and decided to await comments from DHI. Case is deferred to 20.01.2015.

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-11

|

|95|——————__—_____——<br>‘CaseNo.:35/19/80-ALC2/2014 |PartyName:LARSEN&<br>(Meet No/Date:19/80-<br>Status:<br>TOUBROLIMITED<br>\ALC2/2014<br>Deferred<br>(09.12.2014<br>HQFile<br>RLAFile<br>Lic.No/Date:0310788986 Pet**e**r<br> |-01/80/050/00469/AM15/<br>:03/95/040/00468/AM 15/<br>10.09.2014<br>Dat :20.01.2015|
|---|---|
||Decision: The Committee noted that the firm’s application which was sent to DHI on 21.11.2014|
||actuallypertainstoDIPPand decidedtoforwardthesametoDIPPforcomments. Case isdeferredto|
||20.01.2015.|

Case No.:36/19/80-ALC2/2014 |Party Name:LARSEN & Meet No/Date:19/80Status: TOUBRO LIMITED ALC2/2014 Deferred 09.12.2014 96 HQ File RLA File Lic.No/Date:0310788988 |Defer |:01/80/050/00470/AM15/ :03/95/040/00385/AM15/ 10.09.2014 Date:20.01.2015

Decision: The Committee noted that the firm’s application which was sent to DHI on 21.11.2014 actually pertains to DIPP and decided to forward the same to DIPP for comments. Case is deferred to 20.01.2015.

‘Case No.:10/19/80-ALC2/2014 |Party Name:BHARAT HEAVY |Meet No/Date:19/80Status: ELECTRICALS LIMITED (09.12.2014|ALC2/2014 Deferred 97 |HQ File RLA File Lic.No/Date:0710106685 |Defer :01/80/050/00444/AM15/ :07/24/040/00203/AM15/ |17.09.2014 Date:20.01.2015

Decision: The Committee noted that the firm’s application has been forwarded to DEIT on 21.11.2014 and decided to await comments from DEIT. Case is deferred to 20.01.2015.

Case No.:29/19/80-ALC2/2014 |PartyWATERName:TECHNOLOGIES.-~ LUMINOUS ,ALC22014————___—Meet No/Date:19/80Statas:Deferred PVT LTD \09.12.2014 HQ File RLA File iLic.No/Date:0510391 189 iDefer :01/80/050/00463/AM15/ :05/23/040/0023 1/AM15/ {17.09.2014 Date:20.01.2015

Decision: The Committee decided to seek further information based on the deficiency letter of DIPP vide their UO Note No.12/159/2014-TSW/98, dated 09.12.2014 as under.

  • 98| 1. Information in respect of SI. No. 8 &9 of Standard Deficiency Format.

    1. Specific nature/use of each import item viz. as Raw Material, Component, spare, Consumable or Packing material.

    2. Details of import item at SI. No. 19.

    3. Certain import items are listed at more than one place e.g. import items at SI. No. 53 to 61 are same as that at SI. No. 65 to 73 and the same may be clarified.

Case is deferred to 20.01.2015.

==> picture [426 x 125] intentionally omitted <==

----- Start of picture text -----<br> 99 Case No.:8/19/80-ALC2/2014 |PartyDEVELOPMENT Name:DEE (Meet'ALC2/2014No/Date:19/80- Status:Deferred<br>ENGINEERS LTD. '09.12.2014<br>PARVEEN SHARMA<br>Dy. Director Genere a<br>Ministry of CONT Sew Delhi-11<br>Udyog Bhawan,<br>----- End of picture text -----<br>

|

|

|| |

!

==> picture [456 x 308] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|HQ File|RLA File|Lic.No/Date:0510391193|[Defer|
|:01/80/050/00442/AMI15/|:05/23/040/00266/AM15/|18.09.2014|Date:20.01.2015|
|Decision:|The|Committee|noted|that|the|firm’s|application|was|sent|to|DHI|on|21.11.2014|and|
|decided to await comments. Case|is deferred to 20.01.2015.|
|Case No.:33/19/80-|Party|Name:|LARSEN|&|Meet No/Date: 19/80-|Status:|
|ALC2/2014|TOUBRO LIMITED|ALC2/2014|Deferred|
|HO.|File|~~|IRA File|Lic.No/Date:031078942309.12.2014|[Defer|
|100||:01/80/050/00467/AM15/|:03/95/040/00467/AM15/|18.09.2014|Date:20.01.2015|
|Decision: The|Committee|noted|that the|firm’s|application|which|was|sent|to|DHI|on|21.11.2014|
|actually|pertains to|DIPP and|decided|to forward|the same|to|DIPP|for|comments.|Case|is|deferred|
|to|20.01.2015.|
|Case No.:22/19/80-ALC2/2014||Party|Name:|TEMPCO|Meet No/Date: 19/80-|Status:|
|TTEMPERATURE|ALC2/2014|Deferred|
|MEASUREMENT PRIVATE|[09.12.2014|
|LIMITED,|
|101|TQ File|RLA File|Lic.No/Date:0710106748|(Defer|
|:01/80/050/00456/AM15/|07/24/040/00233/AM15/|24.09.2014|Date:20.01.2015|
|Decision:|The|Committee|noted|that|the|firm’s|application|was|sent|to|DIPP|on|03.12.2014|and|
|decided|to await comments.|Case|is deferred|to 20.01.2015.|

----- End of picture text -----<br>

==> picture [454 x 94] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|Case No.:23/19/80-ALC2/2014||Party|Name:|TRIVENI|Meet No/Date: 19/80-|Status:|
|MACHINE TOOLS,|ALC2/2014|Deferred|
|09.12.2014|
|102|[HQ File|RLA File|Lic.No/Date:0710106747|[Defer|
|:01/80/050/00457/AM15/|:07/24/040/00215/AM15/|24.09.2014|Date:20.01.2015|
|Decision:|The|Committee|noted|that the|firm’s|application|was|sent to MSME|on|05.12.2014|and|
|decided to await comments.|Case|is deferred to 20.01.2015.|

----- End of picture text -----<br>

==> picture [454 x 179] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
|Case No.:27/19/80-ALC2/2014||Party Name:SPRAYTEC|Meet No/Date: 19/80-|Status:|
|(INDIA) LTD.,|ALC2/2014|Deferred|
|09.12.2014|
|103||HQ File|RLA File|Lic.No/Date:0510391398|{Defer|
|:01/80/050/00461/AM15/|:05/24/040/00139/AM15/|26.09.2014|Date:20.01.2015|
|Decision:|The Committee|noted|that the|firm’s|application|was|sent to MSME|on|05.12.2014|and|
|decided|to await comments.|Case|is deferred|to 20.01.2015.|
|Case No.|:3/19/80-ALC2/2014||Party Name:ANUPAM|Meet No/Date:19/80-|Status:|
|104|.|INDUSTRIES LTD|ALC2/209.12.2|0|1414|Deferred|
|HQ File|RLA|File|Lic.No/Date:3410040597||Defer|
|:01/80/050/00437/AM15/|:34/21/040/00291/AM15/|30.09.2014|Date:20.01.2015|

----- End of picture text -----<br>

PARVEEN SHARMA __, Oy. Director Genera} Directorate General of ForeignTrad Ministry of Commerce & industry Udyog Baawan, New Dethi-14

| , | |

Decision: The Committee noted that the firm’s application was sent to DHI on 21.11.2014 for comments and decided to remind DHI for the same. Case is deferred to 20.01.2015.

Case No.:7/19/80-ALC2/2014 |Party Name:BIRLA Meet No/Date:19/80Status: FURUKAWA FIBRE OPTICS |ALC2/2014 Deferred LIMITED, 09.12.2014 105 [HQ File RLA File Lic.No/Date:1710005927 |Defer :01/80/050/00441/AM15/ :17/24/040/00084/AM15/ 30.09.2014 Date:20.01.2015 Decision: The Committee noted that the firm’s application was sent to DoT on 21.11.2014 and decided to issue reminder to them for comments. Case is deferred to 20.01.2015. Case No.:25/19/80-ALC2/2014 |Party Name:SHAKTI PUMPS __|Meet No/Date:19/80Status: (INDIA) LTD., ALC2/2014 Deferred 09.12.2014 HQ File RLA File Lic.No/Date:5610004433 |Defer :01/80/050/00459/AM15/ :56/24/040/00039/AM15/ 30.09.2014 Date:20.01.2015 Decision: The Committee decided to seek further information based on the deficiency letter of 106 |DIPP vide their UO Note No.12/159/2014-TSW/106, dated 09.12.2014as under. 1. information in respect of SI. No. 3, 4 & 5 of Standard Deficiency Format. 2. Information in respect of SI. No. 11 of Standard Deficiency Format for import items at SI. No.1, 2&5. 3. Size/Specs. of import item at SI. No. 6 and justification/basis for quantity of this item. Net length of rubber cable in export product may also be indicated. Case is deferred to 20.01.2015.

  • Case No.:30/19/80-ALC2/2014 |Party Name:NANO Meet No/Date: 19/80Status: THERAPEUTICS PVT LTD. jALC2/2014 Deferred 09.12.2014

  • 107 HQ File RLA File Lic.No/Date:5210041249 |Defer |:01/80/050/00464/AM15/ :52/24/040/00037/AM15/ 02.10.2014 Date:20.01.2015

Decision: The Committee noted that the firm’s application which was sent to DEIT on 21.11.2014 actually pertains to C&PC and decided to forward the same to C&PC for comments. Case is deferred to 20.01.2015.

Case No.:39/19/80-ALC2/2014 |Party Name: MOTHERSON Meet No/Date:19/80Status: SUMI SYSTEMS LTD., ALC2/2014 Deferred 09.12.2014 108 |HQ File RLA File Lic.No/Date:0510391465 |Defer :01/80/050/00473/AM15/ :05/24/040/00301/AM15/ 07.10.2014 Date:20.01.2015 Decision: The Committee noted that the firm’s application was sent to C&PC on 21.11.2014 for comments and decided to await comments. Case is deferred to 20.01.2015. 109 Case No.:6/19/80-ALC2/2014 |Party Name:ESSAR Meet No/Date:19/80Status: PROJECTS (INDIA) LTD. ALC2/2014 Deferred 09.12.2014 PARVEEN SHARMA . Directorate[Gor] irector[cra] Genera[of][ ForeignTrade] Ministry of Commerce & Industry Udyog Bhawan, New Delhi-14

&

j

;

| | | | | !

ko:01/80/050/00440/AM15/ File RLA52/24/040/00039/AM15/ File 08.10.2014Lic.No/Date:5210041257 Date:20.01.2015[Defer Decision: The Committee noted that the firm’s application which was sent to DIPP on 21.11.2014 actually pertains to DHI and decided to forward the same to DHI for comments. Case is deferred to 20.01.2015.

||Case No.:14/19/80-ALC2/2014 |PartyName:DOOSAN|MeetNo/Date:19/80-|Status:|
|---|---|---|---|
||POWERSYSTEMSINDIA|ALC2/2014|Deferred|
||PRIVATE LIMITED|09.12.2014||
||;|||
|110||HQFile<br>RLA File|Lic.No/Date:0410159542||Defer|
||:01/80/050/00448/AM15/<br>:04/24/040/00142/AM15/|08.10.2014|Date:20.01.2015|
||Decision: The Committee noted that the firm’s application was sent to DH! on||21.11.2014 for|
||commentsanddecided to awaitcomments.Case isdeferred to 20.01.2015.|||
||Case No.:15/19/80-ALC2/2014 |PartyName:DOOSAN|MeetNo/Date:19/80-|Status:|
||POWERSYSTEMSINDIA|ALC2/2014|Deferred|
||PRIVATELIMITED|09.12.2014||
|111||HQFile<br>RLA File|Lic.No/Date:0410159541|'|Defer|
||:01/80/050/00449/AM15/<br>:04/24/040/00141/AM15/|08.10.2014|Date:20.01.2015|
||Decision: The Committee noted that the firm’s application was sent to DHI on||21.11.2014 for|
||commentsand decided toawaitcomments. Case isdeferredto20.01.2015.|||
||CaseNo.:16/19/80-ALC2/2014 PartyName:DOOSAN<br>POWERSYSTEMS INDIA|MeetNo/Date:19/80-<br>ALC2/2014|Status:<br>Deferred|
||PRIVATE LIMITED|09.12.2014||
|112||HQFile<br>RLA File|Lic.No/Date:0410159543||Defer|
||:01/80/050/00450/AM15/<br>:04/24/040/00146/AM15/|08.10.2014|Date:20.01.2015|
||Decision: The Committee noted that the firm’s application was sent to DHI on 21.11.2014 for|||
||commentsand decided toawait comments. Case is deferred to 20.01.2015.|||
||CaseNo.:28/19/80-ALC2/2014 Party Name: VOITHHYDRO ss|MeetNo/Date:19/80-<br>PRIVATELIMITED<br>ALC2/2014<br>09.12.2014||Status:<br>Deferred|
|113|HQFile<br>RLAFile<br> :01/80/050/00462/AM15/<br>:05/24/040/00277/AM 15/|Lic.No/Date:0510391512<br>09.10.2014||Defer<br>Date:20.01.2015|
||Decision: The Committee noted thatthe firm’s application which was sent to DIPP on 03.12.2014|||
||actually pertains to DH! and decided toforward thesame to DHI forcomments. Case is deferred to|||
||20.01.2015.|||
|114|CaseNo.:38/19/80-<br>PartyName:MOBIS INDIA<br>ALC2/2014<br>LTD|MeetNo/Date:19/80-<br>ALC2/2014<br>09.12.2014|Status:<br>Deferred|
||HQ File<br>RLAFile<br>:01/80/050/00472/AM15/<br>:04/24/040/00185/AM15/|Lic.No/Date:0410159548 <br>09.10.2014|Defer<br>Date:20.01.2015|

Decision: The Committee noted that the firm’s application which was sent to DIPP on 03.12.2014 actually pertains to DH! and decided to forward the same to DHI for comments. Case is deferred to 20.01.2015.

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-11

|

Decision: The Committee noted that the firm’s application which was sent to DIPP on 21.11.2014 actually pertains to MSME and the same has been forwarded to them also and decided to await comments. Case is deferred to 20.01.2015.

==> picture [452 x 62] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||
|---|---|---|---|---|---|---|---|
|Case No.:17/19/80-ALC2/2014||Party|Name: IND-SPHINX|Meet|No/Date:|19/80-|Status:|
|PRECISION LTD.,|ALC2/2014|Deferred|
|09.12.2014|
|115|[HQ|File|RLA|File|)|Lic.No/Date:2210015101|[Defer|
|:01/80/050/00451/AM15/|:22/24/040/00056/AM15/|10.10.2014|Date:20.01.2015|

----- End of picture text -----<br>

Decision: The Committee noted that the firm’s application was sent to MSME on 21.11.2014 for

comments and decided to await comments. Case is deferred to 20.01.2015.

==> picture [451 x 59] intentionally omitted <==

----- Start of picture text -----<br>

||||||||
|---|---|---|---|---|---|---|
|Case No.:31/19/80-ALC2/2014||Party Name:NETAFIM|Meet No/Date:19/80-|Status:|
|IRRIGATION|INDIA|ALC2/2014|Deferred|
|PVT.LTD.|09.12.2014|
|116||HQ|File|RLA|File|Lic.No/Date:3410040611||Defer|
|:01/80/050/00465/AM15/|:34/24/040/00072/AM15/|14.10.2014|Date:20.01.2015|

----- End of picture text -----<br>

Decision: The Committee noted that the firm’s application was sent to C&PC on 21.11.2014 for comments and decided to await comments. Case is deferred to 20.01.2015.

==> picture [450 x 64] intentionally omitted <==

----- Start of picture text -----<br>

|||||
|---|---|---|---|
|Case No.:12/19/80-ALC2/2014||Party Name:DEE|Meet No/Date:19/80-|Status:|
|DEVELOPMENT|ALC2/2014|Deferred|
|ENGINEERS|LTD.|09.12.2014|
|W7 fe:01/80/050/00446/AM15/ File|REA:05/23/040/00303/AM15/File|Lic.No/Date:051039159415.10.2014|Date:20.01.2015|Defer|

----- End of picture text -----<br>

Decision: The Committee noted that the firm’s application was sent to DH! on 21.11.2014 for comments followed by reminder dated 03.12.2014, and decided to await comments. Case is deferred to 20.01.2015.

==> picture [455 x 106] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case No.:9/19/80-ALC2/2014||Party Name:BOTIL OIL|Meet No/Date:19/80-|Status:|
|TOOLS INDIA PVT|ALC2/2014|Deferred|
|LTD(FORMERLY BAKER|09.12.2014|
|OIL|
|:01/80/050/00443/AM15/|A File|Lic.No/Date:0510391611|jDefer|
|118 fae File|Roe:05/23/040/00299/AM15/soozsoamis)|—|LENoDaedsI03916IT16.10.2014|Date:20.01.2015|
|Decision:|The|Committee|noted|that|the|firm’s|application|was|sent|to|DHI|on|21.11.2014|for|
|comments and decided to await comments.|Case|is deferred to 20.01.2015.|

----- End of picture text -----<br>

==> picture [454 x 85] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/19/80-ALC2/2014 Party Name:DEE Meet No/Date: 19/80- Status:<br>DEVELOPMENT ALC2/2014 Deferred<br>9<br>lH:01/80/050/00445/AM15/ ENGINEERS LTD. 09.12.2014. ¢:0510391657 |Defer<br> File Rua File -i No/Dat A<br>i<br>Decisiisi o n:n: The Committee noted:05/23/040/00308/AMthat the firm’s0 15/applicationicati20.10.2014was sent to DHI on Date:20.01.201521.11.2014 for<br>----- End of picture text -----<br>

SARYEEN SHARMA Oinistryeaatoraiea oeicoctorGeneralmerce Genet?)of &Foreig indust’yrede Udyog Bhawan, New Delhi-t

|

| ] | j |

£o Be S | comments and decided to await comments. Case is deferred to 20.01.2015. Case No.:13/19/80-ALC2/2014 |Party Name:DEE Meet No/Date:19/80Status: DEVELOPMENT ALC2/2014 Deferred o|. ENGINEERS LTD. 09.12.2014 :01 /80/050/00447/AM 15/ :05/23/040/00322/AM15/ 21.10.2014 Date:20,01.2015 120 |HQ File LA File bie NovDate-0510391664 Peter

) Decision: The Committee noted that the firm's application was sent to DHI on 21.11.2014 for } comments and decided to await comments. Case is deferred to 20.01.2015. | Case No.:24/19/80-ALC2/2014 |Party Name:SHAKTI PUMPS [Meet No/Date:19/80Status: | (INDIA) LTD., ALC2/2014 Deferred . ; 09.12.2014 fae:01/80/050/00458/AM15/ File RLA:56/24/040/00042/AM15/ File Lic.No/Date:561000445021.10.2014 |DeferDate:20.01.2015 Decision: The Committee decided to seek further information based on the deficiency letter of 121 DIPP vide their UO Note No.12/159/2014-TSW/121, dated 09.12.2014 as under. 1. Information in respect of SI. No. 3, 4 & 5 of Standard Deficiency Format, export product wise. 2. Information in respect of SI. No. 11 of Standard Deficiency Format for import items at SI. No.1, 2 & 5, export product wise. 3. Size/Specs. of import item at SI. No. 6 and justification/basis for quantity of this item. Net length of rubber cable in each export product may also be indicated. Case is deferred to 20.01.2015. Case No. :32/19/80-ALC2/2014 |Party Name:KAMAL Meet No/Date:19/80Status: RUBPLAST INDUSTRIES (P) |ALC2/2014 Deferred — LTD. 09.12.2014 122 [HQ File RLA File Lic.No/Date:0510391736 |Defer :01/80/050/00466/AM15/ :05/23/040/00320/AM15/ 27.10.2014 Date:20.01.2015 Decision: The Committee noted that the firm’s application was sent to DIPP (Chemical Division) on 21.11.2014 for comments and decided to await comments. Case is deferred to 20.01.2015. S.No.463 Case No. A- 01 M/s. Analyser |HQF.No.01/80/162/00032/AM15/D | Lic. No. & date Instruments ES-| Meeting No.19/15 | Co. Pvt. Ltd., | RA.F.No.13/24/040/00281/AM14 1310044806 Date: 09.12.2014 | Kota Ratification of norms dt.17.10.2013 | (Rajasthan) Decision: The representative of the firm, Shri Kunj Bihari Jain, Dy. Manager (Sales) attended the PH in response to the Committee letter dated 19.11.2014 and explained the points raised by the representative of DIPP before the Committee. The Committee after deliberations, advised the firm’s representative to send written submissions for further examination of their request. Case is deferred to 20.01.2015. ws PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Dzini-it

3!

A

S!.No.464 Case No. A/R-61 M/s. United |HQF.No.01/80/050/00397/AM10/DES.1 Lid., Deli dt.22.00.2009 Decision : The Committee noted that the firm has been given time for furnishing the requisite document i.e. a certificate from the duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the said imported goods are required for petroleum operations vide letter dated 15.09.2014 which has not been received till date. The Committee decided to reiterate its earlier decision for the necessary document. The Committee decided to reiterate its earlier decision for the necessary document. The Committee also that M/s GE Indian Industriat Private Ltd was issued an AA No.3110060945 dated 30.10.2013 for supply of goods in connection with petroleum operations. In this regard, the firm was requested to produce an Essentiality Certificate issued by the Dte. General of Hydro-Carbons. The Committee noticed that the firm has produced the requisite certificate issued by the Dte. General of Hydro-Carbons on 04.02.2014. The Committee decided that this position should be mentioned in the reminder to the firm. Case is deferred to 20.01.2015.

S.No.465 Case No. A/R-49 | M/s. Larsen |HOF.No.01/80/050/00245/AM11/DES.| Date: Mumbai 0310567677 —09.12.2014 Amendment in quantities / addition of } dt.29.01.2010

Decision : The Committee noted that the firm has been given time for furnishing the requisite document i.e. a certificate from the duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the said imported goods are required for petroleum operations vide letter dated 09.07.2014 which has not been received till date. The Committee decided to reiterate its earlier decision for the necessary document. The Committee decided to reiterate its earlier decision for the necessary document. The Committee also that M/s GE Indian Industrial Private Ltd was issued an AA No.3110060945 dated 30.10.2013 for supply of goods in connection with petroleum operations. In this regard, the firm was requested to produce an Essentiality Certificate issued by the Dte. General of Hydro-Carbons. The Committee noticed that the firm has produced the requisite certificate issued by the Dte. General of Hydro-Carbons on 04.02.2014. The Committee decided that this position should be mentioned in the reminder to the firm. Case is deferred to 20.01.2015. S.No.466 Liebers date Date: Springs & 0710084762 09.12.2014 Stampings Request for amendment of norms dt.15.12.2011 Pvt. Ltd., Tumkur Decision : The Committee noted that firm has not replied to deficiency letter dated 08.10.2012 sent to them again on 03.01.2014 followed by reminder dated 24.06.2014, e-mail dated 26.06.2014, reminder

Dire st “eGeneratot Foreanrress Minis O eeian,New Delhi-t1

s~2.

| |

&

| | | |

van 08.09.2014, final reminder dated 20.10.2014 and 15 days time to the for reply. In spite of the above, the firm did not reply to the deficiency letter. After deliberations the Committee decided to heenicense. their case with direction to pay the Custom Duty and applicable interest for regularization of the RA to take action accordingly.

S.No.467

==> picture [455 x 121] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case|No.|A/R-}|M/s.|Brakes|[HOF.No.01/80/050/00366/AM12/DES||Lic.|No.|&|
|119|india|Ltd.,|date|
|Meeting|No.|19/15)|Chennai|RA.F.No.04/24/040/00136/AM12|0410129812|
|Date:|09.12.2014|Request|for|inclusion|of|import|item|in | dt.31.10.2011|
|norms|
|Decision:|The|Committee|noted|that|the|firm’s|request|dated|10.02.2014|has|been|sent|to|DHI|on|
|20.03.2014 for comments|followed|by|reminders|dated|17.06.2014,|08.9.2014,|20.11.2014|and|decided|
|to send|another|reminder to|DH!|for comments.|Case|is deferred|to|20.01.2015.|

----- End of picture text -----<br>

==> picture [448 x 74] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||
|---|---|---|---|---|---|---|---|---|
|S.No.468|
|Case|No.|A/R-33|M/s.|HQF.No.01/80/162/00091/AM15/DE|||Lic.|No.|& date|
|Thyssenkrupp|||S.!|
|Meeting|No.|19/15|||Industries|RA.F.No.31/21/040/001 11/AM10|3110039520|
|Date:|09.12.2014|||india|Pvt.|Ltd.,|| Request for ratification|of norms|dt.07.08.2009|

----- End of picture text -----<br>

Decision: The Committee decided to ratify norms on the basis of DHI U.O. No. 3(159)/14/TSW (B) 226 dated 04.12.2014 (copy is to be forwarded to RA and firm).

==> picture [457 x 304] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|RLA may take|necessary action accordingly.|
|S.No.469|
|Case|No.|A/R-35|Mis.|Life|Long||HOF.No.01/80/050/00482/AMO9/DE ||Lic.|No.|&|date|
|India|Ltd.,|| S.l|
|Meeting|No.|19/15|| Gurgaon|RA.F.No.05/24/040/00099/AM09|0510222158|
|Date:|09.12.2014|Description|of|import|item|not ||dt.13.06.2008|
|mentioned|in|bill|of Entry|
|Decision:|The|Committee|noted|that|firm|has|not|replied|to|deficiency|letter|dated|20.10.2014|and|
|decided|to|issue reminder to|firm for|reply. Case|is deferred|20.01.2015.|
|S.No.470|
|Case No.|A/R-57|Mis.|Thermal||HQF.No.01/80/050/0381/AM14/DES. ||Lic.|No. &|date|
|Systems|\|
|Meeting|No.|19/15|||(Hyderabad)|RA.F.No.09/24/040/00311/AM14|0910057710|
|Date:|09.12.2014|||Pvt.|Ltd.,|Request for fixation of norms|dt.25.09.2013|
|Decision:|The Committee|noted|that|firm’s reply dated|14.10.2014|has sent to|DHi on|17.11.2014 and|
|decided toawait|comments. Case is|deferred|to|20.01.2015.|of|

----- End of picture text -----<br>

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-11

  • S.No.471 Case - No. A/R-60 | M/s. — Vem | HOF.No.01/80/050/00071/AM14/DE Pvt = Ltd.,

  • Decision: The CommitteeHyderabadnoted that firm has not replied to deficiency letter dateddt.04.02.201309.09.2014 and decided to send reminder to the firm for reply. Case is deferred to 20.01.2015. $.No.472 Case No. A/R-70 | Reference HOQF.No.01/80/050/00178/AM15/DE Date: Addl.DGFT, 0310777054 09.12.2014 | Mumbai — of | Request for amendment of norms as | dt.04.04.2014 M/s. Larsen & | per amendment sheet No.1. Toubro —_Ltd., Mumbai

  • Decision: The Committee decided to modify the norms based on the recommendations of DIPP vide their U.O.No.12/159/2014-TSW/70-A/R, dated 09.12.2014(Copy to be forwarded to RA and firm). 1. Net weight of export product may be modified as 1488.988 MT. 2. Quantity of import item at SI. No. 1 may be modified as 652770 Kgs.as 1.03 Kgs./Kg. content in the export product as claimed by the firm.

    1. Quantity of import item at SI. No. 3 may be allowed as 33 Nos. on net to net basis. Duty free weight of this item may be allowed as 315220 Kgs. as 3.28 Kgs./Kg. content in the export product after taking 20 % recovery from scrap.
    1. Quantity of import item at SI. No. 4 may be allowed as 12 Nos. on net to net basis. Duty free weight of this item may be allowed as 30447 Kgs. as 1.67 Kgs./Kg. content in the export
  • RA product after taking 20 % recovery from scrap. to take further action accordingly.

==> picture [458 x 268] intentionally omitted <==

----- Start of picture text -----<br> S.No.473<br>Case No. A/R-72 Mis. HQF.No.01/80/050/00589/AM10/DE | Lic. No. & date<br>Date: Industral 0570254039<br>09.12.2014 | Syndicate Ltd., [Request for revision/amendment of dt.07.12.2009<br>Decision: The Committee decided to ratify the norms based on the recommendations of DIPP vide<br>their U.O.No.12/159/2014-TSW/72-A/R, dated 09.12.2014(Copy to be forwarded to RA and firm).<br>1. Total quantity of import items at Sl. Nos. 9 , 18, 27, 36, 45, 54 & 64 (Corropthane XT) put-<br>together may be allowed as 3441 Litres.<br>2. Total quantity of import items at SI. Nos. 10, 19, 28, 37, 46, 55 & 65 (Corropthane XT-HA ) put-<br>together may be allowed as 493 Litres.<br>RA to take further action accordingly. (7<br>‘ PARVEEN SHARMA ,<br>Dy. Director General<br>Directorate General of ForeignTrade<br>Ministry of Commerce & ladustry<br>Udyog Baawan, New Delhi-11<br>----- End of picture text -----<br>

|

! 2

==> picture [570 x 180] intentionally omitted <==

----- Start of picture text -----<br> 24 re<br>re |<br>S.No.474<br>JSW Turbine | S.!<br>and Generator 040744641<br>----- End of picture text -----<br>

==> picture [30 x 8] intentionally omitted <==

----- Start of picture text -----<br> norms<br>----- End of picture text -----<br>

| | Decision: The Committee noted that the firm’s representation has been sent to DHI on 09.09.2014 for | comments followed by reminder dated 21.11.2014 and decided to await DHI comments. Case is deferred to 20.01.2015.

S.No.475 JSW_ Turbine | S.I and Generator 0470144642 Date: 09.12.2014 | Pvt. Ltd., Request for revision/‘amendment of | dt.10.04.2013 Decision:healThe Committee notedlllthat the[his] firm’s representation has been sent to DHI on 09.09.2014gaifor comments followed by reminder dated 21.11.2014 and decided to await OHI comments. Case is deferred to 20.01.2015.

S.No.476

==> picture [443 x 41] intentionally omitted <==

----- Start of picture text -----<br> Case No. A/R-113 | M/s. Sterlite |HOF.No.01/80/050/00038/AM15/ | Lic. No. & date<br>Ltd., Mumbai 0310763380<br>----- End of picture text -----<br>

Decision: The Committee noted that the recommendation for ratification given by the DEIT vide their U.O.No.W-27/20/2014-IPHW, dated 14.10.2014 mentions the AA no.03107633789, dated 26.12.2013 whereas in the ANF No.4 the AA.Number mentioned is 0310763389 dt.26.12.2013. However, the name of the firm given in the in the ANF and the DEIT recommendation are the same. Accordingly, the Committee decided to ratify the norms based on the above recommendations of DEIT, subject to correction of the typographical! error by the DEIT.

S.No.477

==> picture [60 x 9] intentionally omitted <==

----- Start of picture text -----<br> 0510345784<br>----- End of picture text -----<br>

==> picture [72 x 11] intentionally omitted <==

----- Start of picture text -----<br> Ltd., Faridabad<br>----- End of picture text -----<br>

Decision: The Committee noted that the firm has not furnished decided to information in respect of S. No. 8 or 9 of SDF and decided to issue reminder to the firm./ to 20.01.2015.

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Biiawan, New Delhi-11

D>

| |

|

0 TBIAMIO/DES.| Lic.P No. & date02 - Ss .No.478 Case No. AR-94 BoyceMis. Godre}Mig. Co.& FOFSAF No.01/80/050/0No.03/94/040/00738)8 MG?0 a =a16403017 Meeting No. 19!45 | Ltd.,Boy Mumbai RAF No.03/94/040/012! ga/AM08 (i) dt.10.09.20069310465595 AF No.03/04/040/00180/AMIdt.19.03.2008 OE No.03/94/040/007 17/AMO (iy, 0310472348 UF No.03/94/040/01010/AM © dt.29.05.2008 AF No.03/94/040/01334/ AMDT (iv) 0310492147 Request for avisionlamendment of w tedt.23.02.2010520 Date. 09.12.2014 norms (vi) 0310466996 dt.02.04.2008 Decision: TheCommittee noted that the firm sought one month's timeto furnish their reply vide their email dated02.12.2014 and decided toawaitthe firm's reply. Case IS deferredto 20.01.2015.; $.No.479 Case No. AWR-96 | Mis. Godrej & SOF No.01780/050/00630/AM1 1 Lic. No. & date Meeting No. 7915 | BoyceLtd., MumbaiMfg. Co. | DES.SAFRequestNo.05/04/040/007 for revision of norms 13/AM 1? 0310606323dt.14.12.2010 Date: 09.12.2014 Decision: The Committee noted that the firm’s request dated 40.09.2014 has been sent to DIPP on 20.10.2014 which actually pertains to DHI and decided to send the. firm’s request to DHI. Case is deferred to 20.012015

S.No.480 Case No. A/R-106 Mis. Godrej & HOF.No.01/80/050/0051 6/AM14/ | Lic. No. & date Boyce Mfg. Co. | DES. 79/15 | Ltd., Mumbat RA F.No.03/94/040/00787/AM14 0310764594 [Mesinaate: 09.12.2014No Tore | Requestin ratification for changeof norms of NetforWeightexport | dt.06.01.2014 item at si. Nos. 4,5, 11 and 12 of norms Daaecision: The Committee decided to forward a copy of the Deideficiencydefi letter U.O.No.12/159/ass/aoie . of Standard Deficiency Format-export product TSw/A0N_ InformationR, cated 09.12.2014in respect of and S!. seekNo. information3, 4,5,11 & 14from the firm as under. wise for export items at SI. No. 1 to 15. Case is deferred to 20.01.2015.

D cctoratePARVEENGe nalSiiAR General .og Bhawan, New Delhkit

.

io)

I | | | : |

S.No.481 Case No. . A/R-107M/s. Pneumax | HQF.No.01/80/1 ‘ip on No. & Meeting No. 19/15 | Pvt ee india | ES.| Date: 09.12.2014 = F.No.05/247/00039/00001/AM1S | 0510387177 equest for ratification of norms —| dt.22.05.201 4 Decisi ated 04.04.2014, which was received lat° hen sioneen sentTheto CommitteeDIPP on 26.11.2014. noted that; theIt was firm’ss infinformed applicationby the d representatiive of the DIPP that this is an Annual AA whereirein no details of export and importi :items have been mentioned.ed. ItIt isi therefore, not possible to fix anyy N Norms. Case is deferred to 20.01.2015 S.No.482 Case No. . A/R-108 | M/S. Bharat |[HOQF.No.01/80/] 7 Heavy Electricals | DES.| 050/00819/AM10/ | Lic. No. & date — Date:eeting 09.12.2014No. 19/15, | Ltd., Ranipet aF24}040/00290/AM10| 0410112084 Decision: The Committee decided to forward es orem at.o2.03.20 U.O.No.12/159/2014-TSW/108-A/R, dated 09.12.2014 and Scorn ont DIPP deficiency ener cy Format for import item at SI. No. 2. 4. Information in respect of SI. No. 8 & 9 of Standard Deficien rorma fonv wa as under Case is deferred to 20.01.2015. S.No.483Gase No. A/R-109 Neewy ISGEC HOF No.o¥7en/0sanoissvin Lic. No. & date Meeting No. 49/15 Engineering Ltd., RA. F.No.05/23/040/00002/AM15 0510384967 Date: 09.12.2014 Yamunanagar Request for revision of norms dt.25.04.2014 Decision: The Committee noted that the firm’s request dated 12.11.2014, has been sent to DIPP on 27.11.2014 and decided to await comments. Case is deferred to 20.01.2015.

==> picture [459 x 276] intentionally omitted <==

----- Start of picture text -----<br> S.No.484<br>Case No. AIR-110 | Mis. ISGEC HOF .No.01/80/050/001 BO/AM15/ | Lic. No. & date<br>Heavy DES.|<br>Meeting i) No. 19/15 Engineering Ltd., RA F.No.05/23/040/001 27IAM14 | 051 0359006<br>Date: 09.12.2014 Yamunanagar Requestitems to befor reducedquantitiesat ofsi. importNo. 5, | dt.08.07.2013<br>45, 16, 17 and 49 of norms<br>Decision: The Committee decided to ratify the modification of norms based on the recommendations<br>of DIPP vide their U.0.No.12/ 459/2014-TSW/110-A/ R, dated 09.12.2014 as under (Copy to beforwarded<br>to RA and firm). be reduced 647.331 MT<br>"Net Fabricated weight of export item may be reduce? #8 ©<br>3. QuantitImport itemses of atimport items SI. No- 15, 16,at SI. 17 No. 5 & 19&may6 put betogeth delet d. e r may be reduced as 37955 Kgs.<br>.<br>RA to take further action accordingly.<br>EN SARRMA<br>PAR recto General sade<br>pirectorale General of Fore e ustry<br>Ministty of Commerce Selhi-'t<br>inisvog Bhawan: NON<br>----- End of picture text -----<br>

3}.

“4

$S.No.485

==> picture [438 x 56] intentionally omitted <==

----- Start of picture text -----<br>

||||||
|---|---|---|---|---|
|Case No.|A/R-111|||M/s.|ISGEC | HQF.No.01/80/050/00165/AM15/|
|Yamunanagar|dt.25.04.2014|

----- End of picture text -----<br>

Decision: The Committee noted that the firm’s request dated 12.11.2014, has been sent to DIPP on 28.11.2014 and decided to await comments. Case is deferred to 20.01.2015.

==> picture [450 x 73] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||
|---|---|---|---|---|---|---|---|---|---|
|S.No.486|
|Mis.|Man|Truck|
|Date:|India Ltd., Pune|||Request|for|clarification|of the|export|items|does|
|besiaiall09.12.2014|not|tally with|the description|given|in|the DEPB|rate|

----- End of picture text -----<br>

Decision: The Committee noted that the firm’s request dated 30.09.2014, has been sent to DHI on 25.11.2014 and decided to await comments. Case is deferred to 20.01.2015.

S.No.487

==> picture [443 x 56] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
|Case|No.|A/R-114|||M/s.|Technoweb ||HOF.No.01/80/050/00006/AM15/|||Lic.|No.|& date|
|Engineering|P.|0310771724|
|Ltd.,|Mumba|

----- End of picture text -----<br>

Decision: The Committee noted that the firm’s representation dated 19.09.2014, has been sent to C&PC on 01.12.2014 and decided to await comments. Case is deferred to 20.01.2015.

S.No.488

==> picture [444 x 48] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||
|---|---|---|---|---|---|---|---|---|---|
|Case No.|A/R-115|||M/s.|Y-Tec|India|HQF.No.01/80/050/00230/AM15/|||Lic. No.&|date|
|Gurgaon|0570361186|

----- End of picture text -----<br>

Decision: The Committee noted that the firm’s representation has been sent to DH] on 01.12.2014 and decided to await comments. Case is deferred to 20.01.2015.

==> picture [456 x 147] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|S.No.489|
|Reference|received|
|Date:|from|Addl.|DGFT, ||Clarification|against|SION|at|SI|No.|C-1647|
|09.12.2014|Kolkata|of|M/s. | Engineering|Product — reg.|
|Larsen|&|Toubro|
|Decision:|The|Committee|noted|that|the|firm|has|not|replied|to|the|deficiency|letter|sent|on|
|27.10.2014 and decided to issue reminder to|the firm. Casewa to 20.01.2015.|

----- End of picture text -----<br>

==> picture [1 x 2] intentionally omitted <==

----- Start of picture text -----<br> .<br>----- End of picture text -----<br>

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-11

3h

!

S.No.490 CaseMeeting No. C-05 M/s. British Engines |HOF.No.01/80/162/00222/AM14/DES| Date: No. 19/15 | India Pvt. Ltd., | Fixation of input output norms for the export 09.12.2014 Bangalore product “Hydraulic Motor and its parts and Multispindle automatic machines spares Valve and its parts” in respect of 100% EOU - reg. Decision: The Committee decided to forward a copy of the DH! deficiency letter U.O.No.1 (05)/13-TSW (B) 250, dated 25.11.2014 and seek information from the firm. Case is deferred to 20.01.2015.

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & lndussry Udyog Bhawan, New Delni-11

FeesWY) — a) nee"

a)

DEPARTMENT OF INDUSTRIAL POLICY & PROMOTION (TSW Section)

Subject: Ratification of the norms in respect of the advance authorization No. 0510329275 dated 10-07-2012 - M/s. Motherson Sumi Systems Ltd., New Delhi.

Ref: DGFT U.O. No. 01/80/50/231/AM 13/DES-I

for The case has been examined and based on advance authorization approved earlier the same item of export to the firm, the following norms is recommended :-

Export Item: - Interlock System (Rubber to Plastic Bonded Parts) (consisting of Plastic PartLock and Bush)

Quantity: 2,00,000 Nos.

Import item:

==> picture [529 x 309] intentionally omitted <==

----- Start of picture text -----<br> No. Item Description Quantity Recommended<br>1 NBR Black Master Batch (TC NBR Mischung)<br>2 Elastica Art Nr.- 023571<br>Body Lock (Plastic Part)<br>(T.C. Grundkorper Arretierung( KKT Art Nr-<br>70300076<br>Bush 10:02 (Plastic Part)<br>T.C. Buchse 10:02 natur KKT Art Nr-70300075<br>Sr. <br> Development Officer<br>3 Shri Priya Ranjan FTDO, DGFT 29-10-2014<br>al NP 7 | as} in pr ee. > 4} refi<br>r2 '<br>N Copy to : Shri S.K. Jain, D.O., DIPP ~<br>\ [SN] ,<br>oi RVEIN ae<br>Di wneG e “eral of Foene r eigny'<br>----- End of picture text -----<br>

| |

.

Office of the Development Commissioner Micro Small & Medium Enterprises

==> picture [76 x 77] intentionally omitted <==

----- Start of picture text -----<br> NC<br>B46 7yruy<br>4-1) 4"<br>----- End of picture text -----<br>

MECHANICAL DIVISION

Subject: Ratification of input output adhoc norms against the advance uthorization no 0410149958 dated 17.09.2013 in respect of M/s Greatoo Molds India Pvt. Ltd.

  • The following information/clarification is required from the unit-

  • e Detailed technical drawing with dimension of export product, catalogue, if any may also be furnished.

  • e Weight of export product. ee BlankWeightsize ofeachof import of the product. imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  • e Size and specification including grade, composition, range, thickness etc of the items © proposedDetailed calculation as tofor import. how the quantity of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these justification and supported by documentary evidence/drawing

  • S[y] al imported materials, wastages claimed at each stage of manufacturing with complete

  • mM/ This issues with the approval of Director (ME)

  • v/ Ceay (K.S. Sodhi)

  • . AD (ME)

  • fi ital d Shri Priya Ranjan, FIDO, DGFT Udyo Bhawan New Delhi O14 O/o The DC (MSME) ID note noVaan dated 7.11.2014

by. Director Gancret _ Directorate Genaral ef rove: 3 ee Ministry of Cornmerce & inquel Hayog Bhavan, New Dethi-i1

==> picture [518 x 171] intentionally omitted <==

----- Start of picture text -----<br> wy ‘<br>BOTIL OIL TOOLS INDIA PRIVATE LIMITER 044+<br>BOTIL/4948-5175 /0510367148/CS November24, 2014<br>Skfi Parveen Sharma Te ee<br>CPIO & Dy. Director General of Foreign Trade Soe eet<br>NormsDirectorateCommittee General- of1, Foreign Trade \ ") ree ty<br>Room No. 302, Udyog Bhawan, Ue: toy<br>NEW DELHI-110 011 SAEe em ordeo BR. F<br>Dear Sir, - oSeen<br>----- End of picture text -----<br>

Subject : Ratification of the norms in respect of Advance Authorization No. 0510367148/3/03/00 dated 30.09.2013 issued by the Office of Addl. DGFT, New Delhi, from File No. 05/23/040/00273/AM14

Reference: Your F. No. 01/80/050/00351/AM-14/DES-1

Reference our personal hearing before the Norms Committee-1 under the Chairmanship of Dr. L.B. Singhal on 19% August 2014 and subsequent correspondence resting with our letter dated 15" Sept. 2014.

Vide our above referred letter dated 15 Sept. 2014, we had requested you to kindly relook at our cases for the requirement of submission of certificate from the Office of DGHC certifying that the goods are for use in the Petroleum Operations, since TRU, Deptt. of Revenue’s OM No. 354/148/2013-TRU dated 28.02.2014 specifically referred that the certificate is required for “Seamless Pipes & Tubes manufacturing Industry in India’ and not from Oilfield Equipment manufacturing industry as a whole and BOTIL end-products neither includes the manufacture of Casing Pipes or the Tubing referred to by TRU nor do we supply the listed commodities to ONGC Ltd / Oil India Ltd under the Deemed Export Scheme. Your response to our above letter is still awaited, Would appreciate a response.

Meantime and based on our request, ONGC Ltd., had taken up the matter with the Office of DGHC for issuing the required certificates against the Orders placed by them on us for which BOTIL had obtained the duty free Advance Authorization for duty free import of essentially required components/ raw materials under Deemed Export Scheme.

ONGC Projects advise that in response to their request to DGHC for issuance of the required certificate, they have been advised by the Office of DGHC that its office does not issue the ah above certificate for items which have been already supplied or against POs which have \v already been executed. Copies of letter received from ONGC Ltd, Delhi and Mumbai along with oyerrn of DGHC message are enclosed for your reference, please Please note that the subject Advance Authorization obtained by us under Deemed Export Scheme | covered against the following Purchase Orders received from ONGC Ltd., Mumbai, and imports KS allowed as per Project Authority Certificates issued by ONGC, Mumbai, under the benefits of \ A Deemed Export Scheme: a Wy ma) 1) No. 4010072298 dated 19.08.2013 & . 2)Cc Vv 2)) No. No401006969 92 2 92 ddated 06.09.201309, _eyiet cHARAA A S 7 ZOO“OLS Ih ES Contd on Page 2... pircciciateressBy. Etrretenenpgrak ofar EOEaipFin} eyf m3)! BiltoAyh -ye\ Corporate[Office] com tow cai MM oi sin {I Mohta : Works : Minish Bay n, he NENG “yf Bidg., 4th Floor Sra an, Suespur - Pataudi Road Udy ~S[_7] 4 Ghikaiji Cama Place Dist : Gurgaon, Haryana - 122 413 attic, WSTEy cervy, New Delhi 110 066 T : +91-124-2866300 (30 Lines) LN gh, geet Sg r 28 ee a243 F : +91-124-2279382 SPEC ScT.0437 APEC 144.0084 #9 7) is De Pf a) E :: botit@vsni.com#91-11WE -| botil@bwww[b] o titindia.[tiindia] com” SrecSPEC notanee6A-1442 «APECSPEC 1907001514L-0840 25ae €aN[en] i: at[4X]

BOTIL OIL TOOLS INDIA PRIVATE LIMITED

==> picture [51 x 26] intentionally omitted <==

----- Start of picture text -----<br> Corye<br>----- End of picture text -----<br>

| Kindly appreciate that raw materials against above Advance Authorization have already been | imported and after manufacture of end-products, the entire order executed to the satisfaction of the | Project concerned, since the Orders were based on stipulated delivery schedules, which were , subject to heavy penalties in case of delay and this requirement of essentiality certificate as not clear nor was this certificate demanded by the Advance Authorization issuing authorities, ie. Office of Jt. DGFT, CLA, New Delhi, at the time of issuance of the authorizations.

We wish to assure you that in all future cases, we have taken precaution that we will not apply for Advance Authorization under Deemed Export Scheme, unless Customer furnishes DGHC certificate along with Project Authority Certificate for purchase under Deemed Export Scheme.

|

  • The ordered materials were despatched to ONGC as under: 1) Materials of P.O. No. 4010072298 were despatched on 17 Oct. 2013 under BOTIL Invoice No. 166/XOI-1651/2013 dated 17.10.2013, and

      1. Materias of P.O. No. 4010069292 were despatched on 22nd Oct. 2013 under SOTIL Invoice No. 170/XOI-1622/20i2 dated 22.10.2013 & No. 172/X01-1622/2012 dated 22.10.2013

Payments against both the Orders have been received by us.

Under the circumstances and since DGHC regretted their inability to issue the desired certificate hecause of the material already despatched az stated abeve, we request you to please waive the requirement of submission of the certificate from the office of DGHC in this instance and ratify Cae norms as applied by us and obtige so that we may submit dacuments for redemption purposes to the Addl. OGFT, CLA, New Delhi, in terms of Advance Authorization

We look forward co receive your tavourable response at the eartiest as requested above.

Thanking you,

  • Very truly yours, For BOTIL OIL TOOLS INDIA PVT.LTD., GENERAL MANAGER ey ENCL. as stated cc: The Foreign Trade Development Cfficer, DCET, Room Noa. 404, 4 Sloor, Udyog Bhavan, New Dethi-11 - Forinformation and necesszry action, please

  • cc: The jt. Secretary (TRU-1}, Tax Research Unit, Deptt. of Revenue, Ministry of Finance, North Block, New Delhi - For information, please

==> picture [416 x 77] intentionally omitted <==

----- Start of picture text -----<br> CC: The Dy. General Menager (Driting), Directorate General of Hvdrocarbons, Nowa<br>- For information, piease<br>CC: The Group General Manager (P) - HSW, ONGC Ltd, Mumbai _ ;<br>- For information, please ‘ OOSID<br>iZ~f/% OAT: in 4<br>----- End of picture text -----<br>

yuyog BN

FROM SGINGC (WELL SERVIVES 1-40+ FERC ROL DD RR sore ice ea he 2a. SUrSger p 13

©

| | | ;

:

, | : | |

==> picture [302 x 59] intentionally omitted <==

----- Start of picture text -----<br> eultce Rita! i OU AND MATURAL SiS DOTMIRG MH LED<br>iSoe BAMDEL are Rai yet<br>----- End of picture text -----<br>

PHONE NO.: - 94-22-2405778 PS8 POD, G4-22-2408SsSo0 / 24060005

  • oF Soe me ris IRs fe cH mo

  • No. MUMAWS/MFPEC/BO THEE OLA dS Dated 22/10/2014

To,

M/s BOTIL Olt Tools tiie Pvt. Utd Mohta Bldg. 4"" flowy,

4, Bhikaji Cama Pit<s, , New Delhi — 110G%::.

Sub: Request for issuanies of Essentlaity Certiicgta (00) ican Oe Re.

.

This has reference t) your letter No. BTN Gala A feat ie aba 29/9/2008 end 17/10/2014 regarding the subject instier. Along with the letlero set of doscunt. roneived from GNGC, Dethi, had been enclosed far jsagy referoice svi ss @ tyyeciaen for taking ieoosacy ettion towards issuance of EC for the POs indicated in your letter,

The matter was referred to cur Delhi of ice and it is transpired that OGNC dees not issue EC for items - which have been alreagy bean supplied cr against FO which fiat eeecy Been executed. Copy of the mail received from OGHC in this regers is enclassd for your rofcrence. Podlawiriy ore in response to issues raised in your letter:

|

  1. Out of Six POs as indicated in the letter sraingt which ml iss Sean saught fram Well Services, Muinbai, five POS maricly 4030 s88), 4ggery2s2 cio) 72445, 46010069292, and 4010078245 have been already exeeuied gral rastoriat bay bees already delivered to ONGC. Hence in view of the guidetins receivest tom DONE, mo action is due from Well Services, ONGC, Mumbai for arranging EC fromm DOD for Pega fheg Ps,

  2. For the remaining unexecutea PO / LOA, oblaning reouwad ceitivaien fom GHC for exemption of Excise Buty is under precess.

.

==> picture [87 x 44] intentionally omitted <==

----- Start of picture text -----<br> 2afiolry<br>(Jagadish Prasad)<br>LC Bn)<br>----- End of picture text -----<br>

a Copy: i) EA to GGM (P)} - Chiet Weil Services, tirihl ii) GGM (Mii) iti) GM (F&A}

Uo Lg Chowan, New Delhi-11

a)

: 4

==> picture [42 x 68] intentionally omitted <==

----- Start of picture text -----<br> sacar ste<br>ONGC<br>----- End of picture text -----<br>

OIL AND NATURAL GAS CORPORATION LIMITED CORPORATE MATERIALS MANAGEMENT ° 9™ FLOOR, Core-4, SCOPE MINAR, LAXMI NAGAR: DELHI-110092 TELEPHONE NUMBER (011)-22406457 FAX NUMBER (011)-22446494 No.[DLV/Corp-MM/BOTIL-EC/2014] Cate: 08.10.2014

To,

BOTIL OIL TOOLS INDIA PVT. LTD.

4TH FLOOR, MOHTA BUILDING, 4, BHIKAJI CAMA PLACE, NEW DELHI-110066

PH: 011-26196442/43

EMAIL:botil@vsnl.com,botil@botilindia.com Fax No: 011-26196664

vn SUB: _ Essentiality Certificates for goods already supplied/purchase orders executed REF; Your letter BOTIL/ONGC/EC/HSW/CS dated 25.08.2014 i Su,

Based on your letter referred above, ONGC had approached Directorate General of Hydrocarbons (DGH) in connection with issuance of Essentiality Certificate in respect of Corporate MM purchase orders cited in your letter. We have been informed by DGH that they do not issue EC for items which have already been supplied or against purchase orders which have already been executed (copy of communication from DGH is enclosed).

In this regard, we draw your attention to the BEC/Tender Conditions w.r-t Deemed Export Benefits which interalia stipulated that:

“Applicable documents for availing of Deemed Export Benefits (available against PEL/MI issue or renewed after 1.4.99), will be provided by ONGC on bidder's request/responsibitity.”

Accordingly, at your request, ONGC had issued the requisite Project Authority Certificate (PAC) in the format specified in Trade Policy and it is observed from your letter that BOTIL had also obtained the import licence/advance authorization from DGFT. In view of the above, we would like to state ONGC position that we do not accept any liability for reimbursement / refund of Deemed Export Benefits denied / withdrawn by the DGFT/Govt. of India for want of Essentiality Certificate from DGH, which was not sought from ONGC prior to the execution of Corp MM purchase order/supply of ordered goods/materials.

ONGC requests you to take up the matter with DGFT/ appropriate department of Govt. of India and continue your efforts for resolution of the issue. f “ , !i Sekhari Sekhar Sekhar

f “ !i Sekhari Sekhar Sekhar tal u Chief Manager (MM)

Registered Office: Jeevan fesse Towerth Indira Chowk, New Delhi-110001 ae oo ere gnTrade Disoris* oonamerce & Industry i ayog BHAWAN, New Delhi-11

a.

| : ; : F: i f . EI f : \ | ai | j | | 1 ty . 1 7

|

==> picture [100 x 63] intentionally omitted <==

----- Start of picture text -----<br>

  • -<br>5<br>Y ~<br>----- End of picture text -----<br>

Fw: Issue of EC for already executed PO RAVI ANAND, JAGDISH KUMAR, HK 30-09-2014 09:35, MANRAL NJS HUNJAN/ONGCL RAVI ANAND/ONGCL@ONGCL, JAGDISH KUMAR/ONGCL@ONGCL, HK MANRAL/ONGCL@ONGCL.

NJS Hunjan General Manager(Drilling)

To: NJS HUNJAN/ONGCL@ONGCL From: DEODAS ROY/ONGCL Date: 09/29/2014 11:43AM Cc: Y K SRIVASTAVA/ONGCL@ongcel Subject: Issue of EC for already executed PO

Dear Sir

This is with reference to the letter no. MM/P&E/D-II/EC/FE/BOTIL/2014-15 dated 05.09.2014 for issuing EC against PO which has already been executed.

in this connection, | would like to bring to your kind notice that DGH does not issue EC for items which have already been supplied or against PO which has been already been executed.

This is being submitted for kind information. Regards

zaeraRegards, aa Deodas Roy . Dy. General Manager (Drilling) (agiitran van wept te Aester & attra) Directorate General of Hydrocarbons. (Under Ministry of Petroleum & Natural Gas) PH:0120-2472197, Mo: +91964330121 ga saa at Rom afta a A oa ae ae Popa areae a al ost a amet & fay ant a ase! Please do not print this email unless it is absolutely necessary. Save paper, save trees. Disclaimer: This message is for the use of addressee and may contain legally privileged and confidential information. If the reader of this message is not the intended recipient, or employee or agent responsible for delivering the message to the recipient, you are hereby cautioned that any dissemination, distribution or copying of this communication is prohibited. If you have received this transmission in error, please delete this mail and notify us ~ immediately at “admin_ongcmail@ongce.co.in" etal Disclaimer: Woe GUMS WAI ctor GON ign trade Dye ee aral of Fore'g dusty recy Ae Senne oe BO fini tty c 2 1, Ne JeyO9 ahawa

;

|

|

| , | , | | . | | |

This message is for the use of addressee and may contain legally privileged and confidential information. If the reader of this message is not the intended recipient, or employee or agent responsible for delivering the message to the recipient, you are hereby cautioned that any dissemination, distribution or copying of this communication is prohibited. If you have received this transmission in error, please delete this mail and notify us immediately at "admin_ongcmail@ongc.co.in"

==> picture [106 x 88] intentionally omitted <==

----- Start of picture text -----<br> ~~<br>on<br>yog @kawan, New Delhi-i1<br>----- End of picture text -----<br>

| | | |

| | |

| | | |

/ -

.

.

;

dot

Office of the development Commissioner Micro small & medium Enterprises MECHANICAL DIVISION

==> picture [89 x 78] intentionally omitted <==

----- Start of picture text -----<br> fo /<br>of eth<br>Aglaakl—<br>----- End of picture text -----<br>

,

Subject: Advance authorization bearing no 0310756453 dated 31.10.13 for M/s Cardinal Yachts, Mumbai.

DGFT has forwarded application vide ID note bearing no 01/80/50/400/AM14/DES-I/1 128 dated 21.07.14 for offering comments.

To offer comments on the imported inputs requirement, the following information may be asked from unit through DGFT :-

  • e Detailed technical note on manufacturing process including the relevant flow sheet

.

  • e Weight of each export product. -

  • e Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

==> picture [511 x 94] intentionally omitted <==

----- Start of picture text -----<br> e Detailed calculation as to how the quantity of raw material proposed for import has<br>~ “ been arrived at, including the net weight of components to be manufactured out of<br>C xX these imported materials, wastages claimed at each stage of manufacturing with<br>‘Y .<br>AWASS\ complete justification and supported by documentary evidence/drawing<br>¥ \ This issues with the approval of Director (ME)<br>----- End of picture text -----<br>

==> picture [93 x 63] intentionally omitted <==

----- Start of picture text -----<br> oa<br>(K.S. Sodhi)<br>AD (ME)<br>----- End of picture text -----<br>

yee Shri S. Muthukumar, FTDO, DGFT Udyog Bhawan New Delhi yu O/o The DC (MSME) IDVee 2014-ME dated 21.11.2014 AMIN SHARMA Direct aieome Delhi-14 Mijgy99 Bhawan BS

==> picture [569 x 461] intentionally omitted <==

----- Start of picture text -----<br> MmDYNAMATIC-OLDLAND AEROSPACE™<br>A Division of Dynamatic Technologies Limited a 98 ot<br>DTL/ Aero/SC/007/2014 Aral<br>18 Nov 14 Z. |<br>Dy Dir Gen of Foreign Trade (Kind Attn: Shri Parveen Sharma), js. -7°" Wh ;<br>NC-I, ee ¢<br> Room No. 302, tee . . wr 9nd<br>Udyog Bhavan y - yon oe<br>New Delhi — 110011 ee<br>Sub: Ratification of the norms inrespect of Advance License No. 0710101865<br>dated 03.02.2014 obtained under Para 4.7 of HBP (Vol. I)<br>Respected | yan“<br>Sir, % ¢ TPE<br>De yw<br>| Ho<br>| he Reference is made to DGFT’s letter F.No. 01/80/050/00158/AM15/DES-1/1403 V<br>+} & dated 04/09/2014 on the subject. . ; ww)<br>a] ><br>3 C 2. The Advance License pertains to export product Power Cabinet and Mission<br>Cabinet for Boeing P8 A aircraft. total quantity 13 numbers each.<br>----- End of picture text -----<br>

  1. In this regard we would like to bring to your kind notice that, earlier in NC-I’s Meeting No. 5/15 dated 27/05/2014, the Committee had fixed the adhoc norms in respect of Advance Authorisation No.0710091489dated 22.10.2012 which was also for the same Export product, total quantity 11 numbers each.

  2. Boeing, USA had placed a repeat purchase order on Dynamatics for the Cabinets in Aug 2013. Since by then the norms for the earlier license 0710091489 had not been fixed, we had to raise a fresh request for Advance authorisation and same was granted vide license No. 0710101865 dated 03.02.2014.

(oy Mee of Foreign tees Dynamatic Technologies Limited miracicn © Se ntoe & industly Dynamatic Park Peenya Bangalore 560 058 India Minit 38 CON New Delt! Tel +91 80 2839 4933/34/35 Fax +91 80 2839 1517 Yayog BhaWwes www[.dynamatics.com]

Corporate Identity Number: L72200KA1973PLC002308

Innovative Aerospace Engineering Solutions

|

®[DYNAMATIC-OLDLAND][AEROSPACE™]

4

A Division of Dynamatic Technologies Limited

|

:

,

  1. A scrutiny of both licenses would reveal similar import materials in terms of specification, grade, thicknesses, components etc, the only variation being quantities as the export product quantities are more in case of subject license.

  2. In view of the above, the requirement to furnish information / details may be waived off as the case now can be classified as Norms case from non-norms case.

Thanking you,

Your faithfully,

For Dynamatic Technologies Ltd

==> picture [4 x 10] intentionally omitted <==

----- Start of picture text -----<br> /<br>----- End of picture text -----<br>

WoCadr Pavan Salikar (Retd)

GM — Supply Chain Management

==> picture [225 x 145] intentionally omitted <==

----- Start of picture text -----<br> Dynamatic — Oldland Aerosapce<br>ANO?<br>KEN)<br>CZ/BEROSPACE\O<br>Sl PETA IE<br>z BANGALOAE-3 =<br>L oy<br>fo) , C2<br>Dyce Se a Ge ie ty<br>----- End of picture text -----<br>

Dynamatic Technologies Limited Dynamatic Park Peenya Bangalore 560 058 India Tel +91 80 2839 4933 /34/35 Fax +91 80 2839 1517 www.dynamatics.com

Innovative Aerospace Engineering Solutions

Corporate Identity Number: L72200KA1973PLC002308

ee vw Cagent fo >-

Department of Industrial Policy & Promotion

==> picture [50 x 49] intentionally omitted <==

----- Start of picture text -----<br> :<br>Zyl<br>----- End of picture text -----<br>

==> picture [475 x 682] intentionally omitted <==

----- Start of picture text -----<br> af } Office of of the Development Development Commissioner =<br>ay Micro Small & Medium Enterprises Small & Medium Enterprises & Medium Enterprises Medium Enterprises Enterprises ‘<br>“ety MECHANICAL DIVISION DIVISION<br>Ry 30(291)/2011-ME<br>By a Subject: Fixation of Adhoc Adhoc norms for export of Mission Mission and Power<br>se E against advance advance authorization no 0710091489 no 0710091489 0710091489 dated 22.10.2012 22.10.2012 for M/s M/s Dynamatic<br>Bs technologies Ltd<br>. The norms may be fixed norms may be fixed may be fixed be fixed fixed as follows:-<br>EN dq e S.no | may be allowed as 61.38 kg inclusive of be allowed as 61.38 kg inclusive of allowed as 61.38 kg inclusive of as 61.38 kg inclusive of 61.38 kg inclusive of kg inclusive of inclusive of of 24% wastage wastage<br>ey : 2/3" recovery from scrap. recovery from scrap. from scrap. scrap.<br>aby * Sno 2 may be allowed as 7.2864 kg inclusive of 20%<br>Aa q ; affecting 2/3" recovery recovery from scrap.<br>Po 3 e S.no 3 may be allowed as 41.7604 kg inclusive of 23.1% 23.1%<br>igsca affecting 2/3" recovery from 2/3" recovery from recovery from from scrap.<br>ae & * S.no 4 may be allowed 4 may be allowed may be allowed be allowed allowed as 13.7984 kg inclusive of kg inclusive of inclusive of of 40% wastage. wastage.<br>eS @ e S.no 5 may be allowed as 12.232 kg inclusive of 39%<br>Bos: c. affecting 2/3" recovery 2/3" recovery recovery from scrap. scrap.<br>Ee © S.no 6 may be allowed as 13.854 kg inclusive of 23%<br>SS y affecting 2/3" recovery 2/3" recovery recovery from scrap scrap<br>ee ® S.no 8 may be allowed as may be allowed as be allowed as allowed as as 155.39 kg inclusive of kg inclusive of inclusive of of 9% wastage wastage after<br>ae<br>© S.no 7 may be allowed as 34.23 kg inclusive of 6% wastage 6% wastage wastage<br>a 7 2/3" recovery from scrap. recovery from scrap. from scrap. scrap.<br>oe f 2/3" recovery from scrap<br>ie 3 © S.no 45 may be allowed as 45 may be allowed as may be allowed as be allowed as as 10.34 kg inclusive of 40% wastage. kg inclusive of 40% wastage. inclusive of 40% wastage. of 40% wastage. 40% wastage. wastage.<br>ee ® Sno 9 to 44 may be allowed with 13.2% wastage after<br>ese 4 recovery from from scrap.<br>— EO e Sno 46 to 166 may be allowed on net to net basis with<br>Bek E clause.<br>Boe . E- This issues with the approval of issues with the approval of with the approval of the approval of approval of of Director (ME). (ME).<br>— aed a<br>peo<br>= . + FE Shri Praveen Sharma, FIDO, DGFT, Udyog Bhawan New Delhi<br>eS Og O/o The DC (MSME) UO note no 30(291) 2011-ME dated 21.2.2014<br>= a | By Byeoa ke Delni-11<br>----- End of picture text -----<br>

==> picture [315 x 52] intentionally omitted <==

----- Start of picture text -----<br>

|||||||
|---|---|---|---|---|---|
|Office of of|the Development Development|Commissioner|=|———,~ ~|.|
|Micro Small & Medium Enterprises Small & Medium Enterprises & Medium Enterprises Medium Enterprises Enterprises|‘|ee|
|MECHANICAL DIVISION DIVISION|rye MM|

----- End of picture text -----<br>

26.05.14

Subject: Fixation of Adhoc Adhoc norms for export of Mission Mission and Power Cabinets etc against advance advance authorization no 0710091489 no 0710091489 0710091489 dated 22.10.2012 22.10.2012 for M/s M/s Dynamatic technologies Ltd

  • The norms may be fixed norms may be fixed may be fixed be fixed fixed as follows:e S.no | may be allowed as 61.38 kg inclusive of be allowed as 61.38 kg inclusive of allowed as 61.38 kg inclusive of as 61.38 kg inclusive of 61.38 kg inclusive of kg inclusive of inclusive of of 24% wastage wastage after affecting 2/3" recovery from scrap. recovery from scrap. from scrap. scrap.

    • Sno 2 may be allowed as 7.2864 kg inclusive of 20% wastage after affecting 2/3" recovery recovery from scrap.
  • e S.no 3 may be allowed as 41.7604 kg inclusive of 23.1% 23.1% wastage after affecting 2/3" recovery from 2/3" recovery from recovery from from scrap.

    • S.no 4 may be allowed 4 may be allowed may be allowed be allowed allowed as 13.7984 kg inclusive of kg inclusive of inclusive of of 40% wastage. wastage. e S.no 5 may be allowed as 12.232 kg inclusive of 39% wastage after affecting 2/3" recovery 2/3" recovery recovery from scrap. scrap.
  • © S.no 6 may be allowed as 13.854 kg inclusive of 23% wastage after affecting 2/3" recovery 2/3" recovery recovery from scrap scrap

  • ® S.no 8 may be allowed as may be allowed as be allowed as allowed as as 155.39 kg inclusive of kg inclusive of inclusive of of 9% wastage wastage after affecting © S.no 7 may be allowed as 34.23 kg inclusive of 6% wastage 6% wastage wastage after affecting 2/3" recovery from scrap. recovery from scrap. from scrap. scrap. 2/3" recovery from scrap

  • © S.no 45 may be allowed as 45 may be allowed as may be allowed as be allowed as as 10.34 kg inclusive of 40% wastage. kg inclusive of 40% wastage. inclusive of 40% wastage. of 40% wastage. 40% wastage. wastage. ® Sno 9 to 44 may be allowed with 13.2% wastage after affecting 2/3" recovery from from scrap.

  • e Sno 46 to 166 may be allowed on net to net basis with accountability clause. This issues with the approval of issues with the approval of with the approval of the approval of approval of of Director (ME). (ME). 4[ye] (KSSodhi)

  • Asstt Director (ME)

P

| Sw u Office of the development Commissioner Micro small & medium Enterprises G fd. 22] Y MECHANICAL DIVISION

Subject: Advance authorisation no 0310777600 dated 08.04.2014 for the export products “Track Chain” in respect M/s Undercarriage and tractor parts pvt Ltd

  • The norms may be fixed as follows:-

  • e Sno 9 and 18 of import item may be allowed as 48510 kgs and 38461.5kgs respectively after affecting 1/3 recovery from scrap and inclusive of 38.5% wastage.

  • e Rest of the items may be allowed on net to net basis with NIL wastage and accountability clause.

This issue with the approval of Director for taking a view by NC.

==> picture [68 x 44] intentionally omitted <==

----- Start of picture text -----<br> (KS [Sodhi] vil I<br>Asst Dir (ME)<br>----- End of picture text -----<br>

i k€« Asst Dir WAG | | LEN Shri Priya Ranjan, FTDO. DGFT Udyog Bhawan New Delhi ~ Nw O/o The DC (MSME) UO note no 30(118) 2014-ME dated 21.11.14 w . NG

  • Gy. 4 me it YL

EARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade MinistryUdyog Bhawan,of Commerce New & Delhi-11Industry

9

GL

||

Department a P J+] of Industria}(TSW) Policy & Promotion 1 y NC Meeting dated 09/12/2014 - Case No. 31/7/80 (M/s Gas Tech Process Engineering India Pvt. Limited) (Advance Authorization No. 051038486] dated 24.04.2014)

[details-] submit[the][ following] Reply submitted by the firm is not complete and they may again be asked to

  • 2.1. maDe t ailserial/Componentof import itemfor theat €xportSl. product.No. 1 as it does not appear to be a Raw No. | Details of Manufacturing activities by them in their plant on import item at SI.

  • Norms committee may take a view

Norms Committee J DIPP No, 12/159/2014-TSw/4q dated 09/12/2014

2 - —= 7 (S. K. Jain) Development Officer

CPARVEEN SHARMA Dires.cfs cf Commerce sett Meyo9 Baawan, New

41/28/2014, https /Avebmail.nic.irvprint htm! Fr Parveen Sharma parveen.s@nic.in | Sent Friday,. November 28, 2014 11:24 am | To "S. Muthu Kumar" muthu.k@nic.in | Subject Fwd: Request to keep norms fixation in abeyance-Spiral EHL |

| |

==> picture [146 x 73] intentionally omitted <==

----- Start of picture text -----<br> C %<br>g= N Ue ><br>/<br>TH)2/| y<br>----- End of picture text -----<br>

, -----FromOriginal YogendraMessageMittal-----<mittalyogendra0_ 1@gmail.com> Date Fri, 28 Nov 2014 09:00:24 +0530 To parveen.s@nic.in ; Subject Request to keep norms fixation in abeyance-Spiral EHL

Dear Parveen Sir,

:

Our case for fixation of norms in respect Advance Authorisation No.0510385024 Dated:25.04.2014 issued under Para 4.7 of HBP Vol.1 has been referred by JOGFT CLA New Delhi to your office.

Since after re-examining the manufacturing formula by our technical officers at Banglore, we have decided to submit our request for amendment in subject authorisation, our case for fixation of norms may kindly be kept in abeyance.

After amendment in this authorisation, our case will again referred to your goodself for fixation of norms and at that, our : case may be decided as per regulations.”

INCONVENIENCE CAUSED IS REGRETTED.

Thanks

Regards Yogendra Mittal Finance manager Spiral EHL Engineering Pvt. Ltd. +91-98119-07896

==> picture [62 x 39] intentionally omitted <==

----- Start of picture text -----<br> a Lpa /h<br>----- End of picture text -----<br>

Said PARVEEN SHARMA Dy. Director General Directoraic General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-11

a)

==> picture [306 x 59] intentionally omitted <==

----- Start of picture text -----<br> Office of the development Commissioner7 —_——PC oa. Ug<br>Micro small & medium Enterprises G-71 Y<br>MECHANICAL DIVISION<br>----- End of picture text -----<br>

Subject: Advance authorisation no 0310781237 dated 09.05.2014 tor the export” products “Track Chain” in respect M/s Underéarriage and tractor parts pvt Ltd

As per the details submitted by the unit, the norms may be fixed as follows:-

  • e Sno 10 of import item may be allowed as 416116.332 kgs after affecting 1/3" recovery from scrap and inclusive of 33.62% wastage.

  • e Sno 9 may be allowed as applied.

  • e Rest of the items may be allowed on net to net basts with NIL wastage and accountability clause.

This issue with the approval of Director for taking a view by NC.

|

!

,

\ ENE.oy “Vy (KS Sodhi) Asst Dir (ME)

~ Shri O/6 The8 Muthukumar, DC (MSME)FTDO, UO note DGFTno 30(122) Udyog Bhawan2014-ME Newdated Delhi08.12.14

==> picture [28 x 14] intentionally omitted <==

----- Start of picture text -----<br>

oi<br>----- End of picture text -----<br>

Udyog Bhawan, New Delhi-14

“4

| |

; ; :

|

==> picture [318 x 91] intentionally omitted <==

----- Start of picture text -----<br> al<br>Office of th Commissioner oeTY) +<br>MicroMECHANICALst DIVISION. Enterprises A -[t a}<br>----- End of picture text -----<br>

Subject: Advance authorisation no 0310781233 dated 09.05.2014 for the export products “Track Chain” in respect M/s Undercarriage and tractor parts pvt Ltd

  • | : : |

  • As per the details provided by the unit, the norms may be fixed as follows:e Sno 8 of import item may be allowed as 1304783.64 kgs after affecting 1B" recovery from scrap and inclusive of 35.35% wastage.

  • e Sno 7 may be allowed as applied. e Rest of the items may be allowed on net to net basis with NIL wastage and accountability clause.

This issue with the approval of Director for taking a view by NC.

==> picture [71 x 46] intentionally omitted <==

----- Start of picture text -----<br> A an<br>(KS Sodhi)<br>Asst Dir (ME)<br>----- End of picture text -----<br>

Shri S. Muthukumar, FTDO. DGFT Udyog Bhawan New Delhi O/o The/DC (MSME) UO note no 30(123) 2014-ME dated 08.12.14

. ~ . f POHARNA 7 ~~ pvestoae Sette of Fo a RY an, NeW! Delhi-11

|

==> picture [563 x 190] intentionally omitted <==

----- Start of picture text -----<br>

  • oe /19¢] sue |Omay Z<br> BOTIL BOTIL OIL TOOLS INDIA PRIVATE LIMITED<br>° BOTIL/5225/0510386490/CS November 17, aay S)<br>Shri Priya Ranjan ORE<br>Foreign Trade Development Officer A ideo th<br>Office of Directorate General of Foreign Trade Bory t4~<br>DES-1 Section, Room No. 404, 4" Floor, - Tae F Nes:<br>Udyog Bhawan,<br>NEW DELHI-110 011<br>|<br>----- End of picture text -----<br>

Dear Sir, ‘ Subject : Ratification of the norms in respect of Advance Authorization No. 0510386490/303/00 dated 13.05.2014 issued by the Office of Addl. DGFT, New Delhi, from File No. 05/23 /040/00458/AM14

Reference: Your F. No. 01/80/050/00140/AM-15/DES-1

wee re ne ee ee ee eens

| Reference DGFT’s letter No. 01/80/50/00140/AM-15/DES-1/1842 dated 21.10.2014 (received | by us on 30.10.2014) requesting us to confirm whether the above Authorization obtained by us | is for physical exports or for Deemed Exports and to furnish certain information in case under | Deemed Export.

Please note that we have earlier provided the requested information twice, i.e. vide our letters dated 09.07.2014 and 18.09.2014, and had confirmed that subject Advance Authorization was obtained by us is under Deemed Export Scheme against a Purchase Order No. 4010072752 dated 10.09.2013 received from ONGC Ltd., Baroda, under PEL/ML issued/renewed after 01.04.1999 to ONGC Ltd., and notified by the Deptt. of Economic AD, international Competitive Bidding for ONGC Petroleum Operations covered under eligible i “ay Affairs, Ministry of Finance, vide Notification NO. 2(FT)/DEA/2000 dated 29.08.200 amended — qh y! vide Notification No. 1(FT)/DEA/2001 dated 23.05.2011 and Customs Notification No. ‘ 17/2001-Cus. dated 01.03.2011 as amended up-to-date permitting duty free imports but if procured domestically then qualify for Deemed Export benefits under Deemed Export r[e97%{_/ Scheme.reference. Copies of said letters along with receipt issued by your Office are enclosed for your Reg. for submission of certificate from authorized Officer of DGHC to the effect that the said “goods are required for use in the Petroleum Operations in areas under PEL/ML leases issued/renewed by Govt. on or after 01.04.1999", kindly note that ONGC, Vadodara, while issuing the Project Authority Certificate under the scheme have certified that “supply of goods is required in connection with Petroleum Operations undertaken under Petroleum Exploration Licenses (PEL) or Mining Leases (ML).

Further, referring to our personal hearing held on 19% August 2014 before the Norms Committee-1 under the Chairmanship of Dr. L.B. Singhal, Add}. DGFT, and as directed by Norms Committee, we had taken up with DGHC thru’ concerned ONGC Project authorities, for issuance of the required Certificate.

.

.

DGHC, in response to ONGC request for issuance of the desired certificate, have advised || ONGC that its office does not issue the certificate in cases where the supplies have been {| — _completed/executed. Copy ofletter received from ONGC Ltd, Delhi along with copy of DGHC message are enclosed for your reference, please ao corporate OfficeContd: on Pagerks2...: nt . ‘ feypots cote, VaLS Mohta‘testi Bidg., 4th Floor - hers, Kalan. Bilaspur - Patauci Road PAS Geng A Nem beni 110066 Dt GUORO’ ayerdLunes) pirecorateBy GCnevalDirec[ct] FOS eee 2 “oats. teSe Ge,ae T ; +91-11-26196442/43 Ff ; +91-124-2279382 Minisiry of COTTE get cinighet canon fe 3) rf i: $3 Bi) F : +91-11-26196664 — E:_botil@botilindia.com Udyog DREN nee aPec taGubon2 4A 5A Be a E - botii@vsni.com W . www.botilindia.com SPEC 1101-0008 SPEC 1962-0015 pe ee Ee

ia Olt TOOLS INDIA PRIVATE LIMITED

==> picture [24 x 42] intentionally omitted <==

----- Start of picture text -----<br> SS<br>----- End of picture text -----<br>

mo2on

You are perhaps aware that ONGC Orders specify delivery time limits in their Order and to meet this requirement, we imported the raw materials against subject Advance Authorization and also have already executed the entire Order to the satisfaction of the Project concerned after manufacture of the ordered material in India. Also the requirement of DGHC certificate was never raised by the Advance Authorization issuing authorities, i.e. Office of Jt. DGFT, CLA, New Delhi, prior to issuing the said Advance Authorization.

The export obligation of subject Authorization was fulfilled by us as per conditions of the Order and Advance Authorization as detailed below:

    1. Materials earmarked for ONGC Rajahmundry Project were despatched under BOTIL Invoice No. 270/XOI-1663/2013 dated 13.02.2014 for INR 12,19,850/- (equivalent to US$ 19,611.74 - Material value) thru’ M/s Omkara Transport P. Ltd., vide L.R. No.
  • . 135313 dated 15.02.2014; and

    1. Materials earmarked for ONGC Ankleshwar Project were despatched under BOTIL Invoice No. 275/XOI-1663/2013 dated 20.02.2014 for INR 145,98,512/- (equivalent to US$ 234,702.76 - Material value) thru’ M/s. Omkara Transport P. Ltd., vide L.R. No. 135215 dated 20.02.2014

Imposed obligation: INR 15,818,362/- (US$ 254,314.50) Obligation Fulfilled =: INR 15,818,362/- (US$ 254,314.50)

We also confirm that payments against above Order have been received by us.

Under the circumstances and as was indicated during personal hearing, requirementthe of DGHC certificate, in cases where supplies have already been co leted and 100% bligation fulfilled, may kindly be waived and norms, as applied for, be ratified to enable us apply for redemption against the Authorization.

We look forward to receive your favourable response at the earliest as requested above.

Thanking you,

  • Very truly yours, For BOTILOIL TOOLS ANDIA PVT LTD., if ‘yp SEL yoy

  • GENERAL MANAGERS MANAGERS 5 “6”/ CC: Shri Parveen Sharma, . CPIO & Dy. Director General of Foreign Trade, Norms Committee-1 DGFT, Room No. 302, Udyog Bhavan, New Dethi-11 - For information and necessary action, please

  • wa GENERAL MANAGERS MANAGERS 5 “6”/

==> picture [76 x 25] intentionally omitted <==

----- Start of picture text -----<br> ENCL: as stated<br>----- End of picture text -----<br>

  • CC: The Dy. General Manager (Drilling), Directorate General of Hydrocarbons, Noida - For information, please

  • CC: The Dy. General Manager (MM) ONSG, ONSG, Baroda

    • For information, please

RVEENect SHAARMAart Oy. Diol Gener Trade

: , ] | | | |

==> picture [478 x 20] intentionally omitted <==

----- Start of picture text -----<br>

  • |B? Fee a B aay fi =<br>BOTIL OIL TOOLS INDIA PRIVATE LIMITED<br>----- End of picture text -----<br>

BOTIL/5225/0510386490/CS July 09, 2014

Shri Priya Ranjan Foreign Trade Development Officer Office of Directorate General of Foreign Trade | DES-1 Section, Room No. 404, 4% Floor, : Udyog Bhawan, : NEW DELHI-110 011 , Dear Sir, | Subject : Ratification ofthe norms in respect of Advance Authorization No. 0510386490/| 3/03/00 dated 13.05.2014 issued by the Office ofAddl. DGFT, New Delhi, from File No. 05/23/040/00458/AM14 Reference: Your F. No. 01/80/050/00140/AM-15/DES-1 er Ome nenreerere—esn=

Reference DGFT’s letter No. 01/80/50/00140/AM-15/DES-1/618 dated 19.06.2014 (received by us on 27.06.2014) requesting us to confirm whether the above Authorization obtained by us for physical exports or for Deemed Exports and to furnish certain information in case under Deemed Export.

We confirm that Advance Authorization obtained by us is under Deemed Export Scheme against a Purchase Order No. 40100727 52 dated 10.09.2013 received from ONGC Ltd., Baroda, under International Competitive Bidding for their Petroleum Operations covered under eligible PEL/ML issued/renewed after 01.04.1999 to ONGC Ltd., which have been notified by the Deptt. of Economic Affairs, Ministry of Finance, vide Notification NO. 2(FT)/DEA/2000 dated 29.08.200 amended vide Notification No. 1(FT)/DEA/2001 dated 23.05.2011 and Customs Notification No. 17/2001-Cus. dated 01.03.2011 as amended up-to-date and permits duty free imports but it procured domestically then qualify for Deemed Export benefits. The requested information against above are as under:

==> picture [13 x 59] intentionally omitted <==

----- Start of picture text -----<br> A<br>-<br>.<br>----- End of picture text -----<br>

==> picture [515 x 317] intentionally omitted <==

----- Start of picture text -----<br> Name of Project Authority : Dy. General Manger (MM) ONSG<br>Oil & Natural Gas Corporation Ltd.,<br>Regional Stores,<br>Makarpura Road,<br>Baroda - 390 009<br>(Tel. No. 0265-3603504 / Fax No. 0265-2631342)<br>Main contractor : ONGC Ltd. Projects<br>Sub-Contractor N/A<br>Relevant Para of FTP : Chapter 8 (DEEMED EXPORT SCHEME)<br>pAC issued by ONGC Ltd :-—=—«ated. 08.01.2034 (copy enclosed) ea<br>ONGC [Ltd’s] , [ P.O.][ &][ Date] :. 4010072752 dateted 10.09.2013 ° ouaRhla<br>. PARVAS EENE ora GENE!ve stash ade<br>. iy, Bates Ff Foreign<br>Contd on Page 2.. Oe Teererat<br>DeEE NT of COMMA, Delhi”<br>wove: of FOP Aaust'y<br>CorporateOo Bhora Kalan, Bfespur NT<br>Mohta Bldg.At oe Gurgaon, Haryana - Palau- 122.413Road . Mi Coegg BEANEoe cae<br>Now Delhi 110 086 Ot 4 2866300 (30 Lines) pce unoou >) fa “eS £<br>T - +91-11-2619644263 F : +91-124-2279382 SPEC SCT ege «SPE 141-0040 23 % Me<br>F » 491-11-26196664 E : botit@botilindia.com sree cise Sree wane Que *S. EE SS<br>E ; botii@vsni.com W > www.botilindia.com<br>----- End of picture text -----<br>

n OIL TOOLS INDIA PRIVATE LIMITED

,

4

==> picture [32 x 38] intentionally omitted <==

----- Start of picture text -----<br> 2)<br>----- End of picture text -----<br>

,

m2

In connection with the above we wish to reiterate that the above Advance Authorization is issued under Deemed Export Scheme under the provisions of Export & Import Policy 19972002, Chapter 7 - Deemed Scheme Paras 7.3(a) and benefits Para 7.3(c), as amended upto date from time to time and Govt. of India, Ministry of Finance, Deptt of Economic Affairs Public Notice No. 2(FT)/DEA/2000 dated 29.08.2000 amended vide Notification No. 1(FT)/DEA/2001 dated 23.5.2001.

We hope the above satisfies your query. Please confirm.

Accordingly, we request you to please expedite the ratification of norms as applied by us against above Authorization.

Thanking you,

Very truly yours, , For BOTIL OIL TOOLS INDIA PVT LTD.,

LR, ot ra - “S FFESWALIA) GENERAL MANAGER Encl.: as stated

Ce: The Foreign Trade Development Officer, DGFT, Room No. 404, 4" Floor, Udyog Bhavan, New Delhi-11

  • Forinformation and necessary action, please

Direy cig Gece ci Fey JrnTrade

oF | q : BOTIL/5225/0510386490/CSs September 18, 2014 Shri Priya Ranjan Foreign Trade Development Officer Office ofDirectorate General of Foreign Trade DES-1 Section, Room No. 404, 4th Floor, Udyog Bhawan, NEW DELHI-110 Q1J : . Dear Sir, Subject : Ratification of the norms in respect ofAdvance Authorization No, 0510386490/Hg| No.3/03/00 05/23/040/00458/AM14 dated 13.05.2014 issued by the Office of Addl. DGFT, New Delhi, from File Reference: Your F, No, 01/80/050/00140/AM-15/DES-1 || Reference your letter No. 01/80/50/00140/AM-15/DES-1/1453 dated 11.09.2014 (received | by us on 16.09.2014) advising non-receipt of our response to your letter dated 19.06.2014 | requesting to confirm whether the above Authorization obtained by us for physical exports or ; for Deemed Exports and to furnish certain information in case under Deemed Export. Please note that we have already responded to your above letter dated 19.06.2014, vide our P| letter dated 09.07.2014 (receipted by your office of 14.07.2014), wherein we had confirmed to you that subject Advance Authorization obtained by us is under Deemed Export Scheme | against a Purchase Order No. 4010072752 dated 10.09.2013 received from ONGC Ltd., Baroda, under International Competitive Bidding for their Petroleum Operations covered under eligible PEL/ML issued/renewed after 01.04.1999 to ONGC Ltd., which have been notified by { the Deptt. of Economic Affairs, Ministry of Finance, vide Notification NO. 2(FT)/DEA/2000 dated q 29.08.200 amended vide Notification No, 1(FT)/DEA/2001 dated 23.05.2011 and Customs importsNotification No. 17/2001-Cus. dated 01.03.2011 as amended up-to-date and permits duty free ; said but it procured domestically then qualify for Deemed Export benefits. Copy of letter along with its enclosures is enclosed for your reference, please. | However and as per your requirement of submission of certificate issued by DGHC certifying ; that the goods are required for petroleum operations, we confirm that we have already | requested ONGC Baroda to issue the desired certificate and we assure you that the same will be furnished to you immediately upon receipt from them. | Thanking you, ) Very truly yours, \ : For BOTIL Of OLS INDIA PVT LTD., : > / pee PARVEEN SHARM ; ; Dy. Director GENers ad ! 6 piecorate General ofForen ae ry Ainistry oF Co m s! oe i- AGNERAL MANAGER) aieeyog Bhawan, New Delhi-1t Encl: as stated Corporate Office = Shoe Katen, Bilaspur Mohta Bldg. ipied Dat: Gurgson, - Pataudi Road tty ; New Delhi 110 066 T : 491-124-2866300 (30 Lines) ‘ ' : +91-11-26196442/43 Ff : 491.124-2279382Haryana - 122413 “re Ae~“ F[on] T spec sctoss? ‘SPEC 14A-00u ? Bi) F aA i ) , FE ;: botil@vsnt.com+91-11-26196664 — WE :>: www.botilindia.combotil@botilindia.com SPECSPEC 71.1044Gasedz =SPECSPEC 4l-d04s9GH4012 ANa AN iN '

|

OIL AND NATURAL GAS CORPORATION LIMITED CORPORATE MATERIALS MANAGEMENT 9™ FLOOR, Core-4, SCOPE MINAR, LAXMI NAGAR: DELHI-110092 TELEPHONE NUMBER (011)-22406457 FAX NUMBER (011)}-22446494

No. DLY/Corp-MM/BOTIL-EC/2014

Date: 08.10.2014

To,

BOTIL OIL TOOLS INDIA PVT. LTD. 4TH FLOOR, MOHTA BUILDING, 4, BHEKAJI CAMA PLACE, NEW DELHI-110066

PH: 011-26196442/43

EMAIL:botil@vsn].com,botil@botilindia.com Fax No: 011-26196664

SUB: _ Essentiality Certificates for goods already supplied/purchase orders executed

REF: Your letter BOTIL/ONGC/EC/HSWI/CS dated 25.08.2014

Sir,

Based on your letter referred above, ONGC had approached Directorate General of Hydrocarbons (DGH) in connection with issuance of Essentiality Certificate in respect of Corporate MM purchase orders cited in your letter, We have been informed by DGH that they do not issue EC for items which have already been supplied or against purchase orders which have already been executed (copy ofcommunication from DGH is enclosed).

In this regard, we draw your attention to the BEC/Tender Conditions w.r.t Deemed Export Benefits which interalia stipulated that:

“Applicable documents for availing ofDeemed Export Benefits (available against PEL/M1 issue or renewed after 1.4.99), will be provided by ONGC on bidder's request/responsibility.”

|

Accordingly, at your request, ONGC had issued the requisite Project Authority Certificate (PAC) in the format specified in Trade Policy and it is observed’ from your letter that BOTIL had also obtained the import licence/advance authorization from DGFT. In view of the above, we would like to state ONGC position that we do not accept any liability for reimbursement / refund of Deemed Export Benefits denied / withdrawn by the DGFT/Govt. of India for want of Essentiality Certificate from DGH, which was not sought from ONGC prior to the execution of Corp MM purchase order/supply of ordered goods/materials.

ONGC requests you to take up the matter with DGFT/ appropriate department of Govt. of India and continue your.efforts for resolution of the issue. q] *

==> picture [127 x 60] intentionally omitted <==

----- Start of picture text -----<br> q] *<br>i SekharSir 4<br>Chief Manager (MM)<br>----- End of picture text -----<br>

.

7

Registered Office: Jeevan Bharati Tower-HI, Indira Chowk, New vi fle paRVEEN START Te Hirectot GENS wade setaeBie Ganem FEOincuetie aeSh saute New Dell

yy

|

j | F 4 ‘ i E 4 : i :

:

Fw: Issue of EC for already executed PO ONANAND. JAGDISH KUMAR, HK 30-09-2014 09:35

NJS HUNJAN/ONGCL ; RAVI ANAND/ONGCL@ONGCL, JAGDISH KUMAR/ONGCL@ONGCL, HK | MANRALIONGCL@ONGCL

|

NJS Hunjan General Manager(Drilling) .

To: NUS HUNJAN/ONGCL@ONGCL From: DEODAS ROY/ONGCL Date: 09/29/2014 11:43AM Cc: Y K SRIVASTAVA/ONGCL@ongel Subject: issue of EC for already executed PO

.

Dear Sir This is with reference to the letter no. MM/P&E/D-II/EC/FE/BOTIL/2014-15 dated 05.09.2014 for

issuing EC against PO which has already been executed.

"In this connection, | would like to bring to your kind notice that DGH does not issue EC for items which have already been supplied or against PO which has been already been executed.

This is being submitted for kind information.

Regards

Regards, : daar wat Deodas Roy Bo Agivaetrn (atta ard) Dy. General Manager (Drilling) asgtatdat Aeacenraa (agian var opie te aeaem & aitita) Directorate General of Hydrocarbons. (Under Ministry of Petroleum & Natural Gas) PH:0120-2472197, Mo: +91964330121

au saa at quar aie a at aa aH ag faeRe HavaH a el Ost aT wart & fare arret at warsal! ' Please do not print this email unless it is absolutely necessary. Save paper, save trees. Disclaimer: This message is for the use of addressee and may contain legally privileged and confidential information. If the reader of this message is not the intended recipient, or employee or agent responsible for delivering the message to the recipient, you are hereby cautioned that any dissemination, distribution or copying of this communication is prohibited. if you have received this transmission in error, please delete this mail and notify us immediately at “admin_ongcmail@ongc.co.in" SIZE SHARMA Disclaimer:. . PAREDy. DireciorSGaneralVerne Trade Director Gencral of Foreign et Ministry of Commerce & inde) Udyog Bhawan, New Detht-

.

;

.

; This message is for the use of addressee and may contain legaliy privileged and confidential information. !f the reader of this message is not the intended recipient, or employee or agent responsible for delivering the message to the recipient, you are hereby cautioned that any dissemination, distribution or copying of this communication is prohibited. If you have received this transmission in error, please delete this mail and notify us immediately at “admin_ongcmail@ongc.co.in"

FARVEEN SHAR Davo Geneict Dy. Ooh of Foreigi'| rade Droste 9merce & Incusty

==> picture [2 x 16] intentionally omitted <==

----- Start of picture text -----<br> |<br>----- End of picture text -----<br>

Writ A a 4244 uo

Ministry of Heavy Industries & Public Enterprises Department of Heavy Industry TSW(B) Section

Subject: Application of M/s Daewon Automotives India for ratification of norms of AA no 0410158756 dt 19-06-14

DES-I, DGFT may kindly refer to the above mentioned licence of M/s Daewon Automotives India . This Office recommends import under repeat basis with AA no 0410156226 dt 14-0314.

==> picture [2 x 2] intentionally omitted <==

----- Start of picture text -----<br> .<br>----- End of picture text -----<br>

The above issues with the approval of IA(KKT).

| x 4 .Nayak | o\ Development Officer wt heh 11-11-14 NIN DGFT (FIDO , DES- I Deptt. of HI, UO No 3(74)/14-TSW(B) Sy ydated

Bot \Wi~ ;

\— . ma DolNer General feo iets of Coieorce & Industry Doon. gin Sinore cf FoveignTrece

q |

|

|

: : : ' ‘ i 1 : ; : : /

Department of Industrial Policy & Promotion (TSW)

==> picture [151 x 37] intentionally omitted <==

----- Start of picture text -----<br> ———<br>Og Abs) 2.95 -]2-°214<br>----- End of picture text -----<br>

NC Meeting dated 09/12/2014 - Case No. 23/10/80 (M/s ISGEC Heavy Engineering Limited) (Advance Authorization No. 0510388973 dated 20.06.2014)

Advance Authorisation may be ratified as under:

  1. Net Empty weight of 102.3 MT may be specified with the quantities of export product..

:

;

  1. Word “Relevant” may be prefixed with the description of import items at SI. Nos. 1,4,5 & 6.

  2. Quantities of import items at Sl.No 1,5 & 6 may be allowed as 1.0417 Kgs./Kg. content in the export products as claimed by the firm.

  3. Quantity of import item at Sl. No. 2 may be allowed as 2 Nos. on net to net basis. Duty free weight of this item may be allowed as 12883 Kgs. inclusive of 34.3 % wastage after taking 20 % recovery from scrap.

  4. Quantity of import item at Sl. No. 3 may be allowed as 502 Kgs. (2 Nos.) on net to net basis.

  5. Quantity of import item at Sl. No. 4 may be allowed as 26308 Kgs. (21108 Meters) inclusive of 2 % wastage.

  6. Quantity of import item at SI. No. 7 may be allowed on net to net basis with accountability clause

  7. Quantities of import items at SI. No. 8 to 14 may be allowed as applied for.

Norms committee may take a view

a Ayre, (S. K. Jain) Development Officer

Norms Committee I DIPP No. 12/159/2014-TSW/76 dated 09/12/2014

aRVEEN SHARMA DirectoralerarHicctor General de Ministy ¢ Conaw a raln, Newof Fog Delhi-11ety

on

| |

==> picture [149 x 32] intentionally omitted <==

----- Start of picture text -----<br> Kate<br>----- End of picture text -----<br>

OfficeMicro of thesmall development & medium CommissionerEnterprises MECHANICAL DIVISION

==> picture [63 x 25] intentionally omitted <==

----- Start of picture text -----<br> PH24 Y<br>----- End of picture text -----<br>

Subject: Fixation of Adhoc norms against advance authorisation no 0310787636 dated 05.08.14 for M/s UNI VTL Precision Pvt Ltd.

The following needs to be clarified before norms can be fixed:-

  • ¢ Detailed technical note on manufacturing process including the relevant flow sheet ¢ Weightof export product as well as import item. ¢ Detailed calculation as to how the quantity of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete

  • justification and supported by documentary evidence/drawing.

This issue with the approval of Director (ME) for taking a view by NC.

==> picture [66 x 38] intentionally omitted <==

----- Start of picture text -----<br> a| -<br>(K.S.Sodhi)<br>AD (ME)<br>----- End of picture text -----<br>

Shri $. Muthukumar , FTDO, DGFT Udyog Bhawan New Delhi O/o The DC (MSME) ID note no 30(176)/2014-ME dated 09.12.2014

by. Diener Genecer j Minieteyirectoraia General of Foreign| face Uayog of[Bhawan,] Commerce[New] 5Vernavy

'

i E ' i | : | ,

| |

Department of Industrial Policy & Promotion

(TSW)

NC Meeting dated 09/12/2014 - Case No. 1/19/80 (M/s Essar Projects (India) Ltd.) (Advance Authorization No. 5210041184 dated 07.08.2014)

Firm may be asked to submit the following information:

  1. Information in respect of Sl. No. 3, 4,5 & 11 of Standard Deficiency Format, export product wise.

  2. Quantities of import items from Sl. No. 1 to 11 in Nos. also in addition to their weights.

  3. Details of import item at SI. No. 11 and its specific use in export items.

Atietrs, ZO wae (S. K. Jain) Development Officer

Norms Committee I DIPP No. 12/159/2014-TSW/83 dated 09/12/2014

PARVEEI! SHARMA . : Dy. Dirscter General Oroc'arzie Genera! cf ForeignTrade hon oer of Commerce otayica, New&Delhi-71Industry

,

==> picture [208 x 54] intentionally omitted <==

----- Start of picture text -----<br> Wic= smay_<br>O9-) ga Y<br>----- End of picture text -----<br>

Department of Industrial Policy & Promotion (TSW)

NC Meeting dated 09/12/2014 - Case No. 5/19/80 (M/s Godrej & Boyce Manufacturing Company Limited ) (Advance Authorization No. 0310788394 dated 26.08.2014)

Advance Authorisation may be ratified as under:

==> picture [324 x 132] intentionally omitted <==

----- Start of picture text -----<br>

  1. Net Empty weight of export products may be specified as under:<br>Si. |Net Empty | SI. Net Empty | SI. Net Empty<br>No. | Weight No. | Weight No. Weight<br>}1 [180360Kgs.) [6 [635030495] (Kgs.) (Kgs.)<br>}3_|7962}4 {16500 [8[9 [3106714] [310671330495[13160<br>----- End of picture text -----<br>

  2. Quantity of import item at Sl]. No. 1 may be allowed as 333 Nos. on net to net basis. Duty free weight of this item may be allowed as applied for i.e. 9936 Kgs. inclusive of 3 % wastage.

  3. Quantity of import item at Sl]. No. 2 may be allowed as 49 Nos. on net to net basis. Duty free weight of this item may be allowed as 90569 Kgs. inclusive of 33 % wastage after taking 20 % recovery from scrap.

  4. Quantity of import item at Sl. No. 3 may be allowed as 2 Nos. on net to net basis. Duty free weight of this item may be allowed as 2294 Kgs. inclusive of 72 % wastage after taking 20 % recovery from scrap.

  5. Quantity of import item at SI. No. 4 may be allowed as 71 Nos. on net to net basis. Duty free weight of this item may be allowed as applied for i.e. 3472 Kgs. inclusive of 3 % wastage.

  6. Quantity of import item at Sl. No. 5 may be allowed as 31 Nos. on net to net basis. Duty free weight of this item may be allowed as 32063 Kgs. inclusive of 40.5 % wastage after taking 20 % recovery from scrap.

  7. Word “Relevant” may be prefixed with the description of import items at SI. No. 6, 7, 10 to 15, 19, 24 & 26.

  8. Quantities of import items at Sl. No. 6, 7, 19 & 24 may be allowed as 138264 Kgs., 19916 Kgs., 28163 Kgs & 2664 Kgs. respectively as 1.05 Kgs./kg. content in the export products.

  9. Quantity of import item at Sl. No. 8 may be allowed as 11 Nos. on net to net basis. Duty free weight of this item may be allowed as applied for i.e. 13 Kgs. inclusive of 3 % wastage.

  10. Quantity of import item at Sl. No. 9 may be allowed as 5 Nos. on net to net basis. Duty free weight of this item may be allowed as applied for i.e. 8 Kgs. inclusive of 3 % wastage.

==> picture [132 x 33] intentionally omitted <==

----- Start of picture text -----<br> Che 7 : a tied Fore'gnTrede<br>ran - be yen & Industry<br>ot btiawe Demi-71<br>----- End of picture text -----<br>

4

  1. Quantity of import item at Sl. No. 10 may be allowed as 63602 Kgs. (66644 Meters) inclusive of 2 % wastage.

  2. Quantity of import item at S1. No. 11 may be allowed as 2108 Kgs. (2232 Meters) inclusive of 2 % wastage.

  3. Quantity of import item at Sl]. No. 12. may be allowed as 77339 Kgs. (75836 Meters) inclusive of 2 % wastage.

  4. Quantity of import item at Sl. No. 13 may be allowed as 283 Kgs. (170 Meters) tnclusive of 2 % wastage.

  5. Quantity of import item at Sl. No. 14 may be allowed as 714 Kgs. (27 Meters) inclusive of 2 % wastage.

  6. Quantity of import item at SI. No. 15 may be allowed as 862 Kgs. (556 Meters) inclusive of 2 % wastage.

  7. Quantity of import item at Sl. No. 16 may be allowed as 638 Nos.(1543 Kgs. on net to net basis with accountability clause.

  8. Quantity of import item at Sl. No. 17 may be allowed as 4346 Nos.(10328 Kgs. on net to net basis with accountability clause.

  9. Quantity of import item at S!. No. 18 may be allowed as 1 No.(3 Kgs. )on net to net basis with accountability clause.

  10. Quantities of import items at SI]. Nos. 20, 21 & 22 may be allowed as 2949 Kgs. each.

  11. Quantity of import item at Sl. No. 23 may be allowed as 3 Nos. on net to net basis. Duty free weight of this item may be allowed as 1048 Kgs. inclusive of 35 % wastage after taking 20 % recovery from scrap.

  12. Quantity of import item at Sl. No. 25 may be allowed as 28 Nos. on net to net basis. Duty free weight of this item may be allowed as applied for i.e. 283 Kgs. inclusive of 3 % wastage.

  13. Quantity of import item at Sl. No. 26 may be allowed as 61.9 Kgs. (18 Meters) inclusive of 2 % wastage.

Za a Bren > (S. K. Jain) Development Officer

Norms Committee I DIPP No. 12/159/2014-TSW/87 dated 09/12/2014

nircotM nie Gora of Foreign Tra ist ot awan, New Dethi-11

a)

==> picture [13 x 9] intentionally omitted <==

----- Start of picture text -----<br> ™<br>----- End of picture text -----<br>

==> picture [93 x 31] intentionally omitted <==

----- Start of picture text -----<br> o4|l) ly<br>----- End of picture text -----<br>

,| |

Department of Industrial Policy & Promotion (TSW)

NC Meeting dated 09/12/2014 - Case No. 19/19/80 (M/s Dresser-Rand India Private Ltd.) (Advance Authorization No. 0310788390 dated 28.08.2014)

)

Firm may be asked to submit the following information:

  • I. Information in respect of Sl. No. 3, 8 & 9 of Standard Deficiency Format.export product wise.
  1. Basis/detailed calculations for the quantities of import items.

  2. Import items at Sl. No. 1, 24, 47, 70, 93, 116, 141, 164, 187, 213, 236 & 259 (Engines) appears to be of Capital Goods nature and details of manufacturing activities on these items may be specified.

  3. Details of import items at SI. No. 2, 25, 48, 71, 94, 117, 142, 165, 188, 214, 237 & 260 and their specific use in export items.

Norms Committee I DIPP No. 12/159/2014-TSW/88 dated 09/12/2014

PARVEEN SHARMA D.. Director General _ Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-11

==> picture [132 x 63] intentionally omitted <==

----- Start of picture text -----<br> Za ~~ “Que! ‘a<br>(S. K. Jain)<br>Development Officer<br>----- End of picture text -----<br>

==> picture [1 x 13] intentionally omitted <==

----- Start of picture text -----<br> |<br>----- End of picture text -----<br>

© W)ee

ago 7/ D fs /222lY

| | | | | | |

Department of Industrial Policy & Promotion

(TSW)

NC Meeting dated 09/12/2014 - Case No. 18/19/80 (M/s Godrej & Boyce Manufacturing Company Limited ) (Advance Authorization No. 0310788649 dated 02.09.2014)

Advance Authorisation may be ratified as under:

_————

  1. Net Empty weight of export products at Sl]. No. 1,2 & 3 may be specified as 13812 Kgs., 6567 Kgs. & 2411 Kgs. respectively.

  2. Quantity of import item at SI. No. 1 may be allowed as 39 Nos. on net to net basis. Duty free weight of this item may be allowed as applied for i.e. 2324 Kgs. inclusive of 3 % wastage.

  3. Word “Relevant” may be prefixed with the description of import item at SI. No. 2 and its quantity may be allowed as 16551 Kgs. inclusive of 5 % wastage.

  4. Quantities of import items at SI. Nos. 3,4 & 5 may be allowed as 169 Kgs. each.

==> picture [142 x 62] intentionally omitted <==

----- Start of picture text -----<br> an<br>Ze aati<br>(S. K, Jain)<br>Development Officer<br>----- End of picture text -----<br>

Norms Committee I DIPP No. 12/159/2014-TSW/90 dated 09/12/2014

PARVEEN SHARMA Dy. Director General Directorate General of ForeignTrade Ministry of Commerce & Industry Udyog Bhawan, New Delhi-11

mn

Dp L.

==> picture [101 x 29] intentionally omitted <==

----- Start of picture text -----<br> ~09:]2 dy<br>----- End of picture text -----<br>

Department of Industrial Policy & Promotion

(TSW)

NC Meeting dated 09/12/2014- Case No. 20/19/80 (M/s GEA Ecoflex India Pvt. Limited) (Advance Authorization No. 0310788788 dated 05.09.2014)

Firm may be asked to submit the following information:

  1. Information in respect of Sl. No. 3, 4, 11 & 12 of Standard Deficiency Format.

  2. Blank size supported by size of export item

_ -- Lo eNQtiel, (S. K. Jain) Development Officer

Norms Committee I

DIPP No. 12/159/2014-TSW/93 dated 09/12/2014

iv, Livcelor General Circciorats Gancralt of FereignTrade Ministry of Commerce & Industry Udycg Bhawan, New Delhi-11

|

|

Department of Industrial Policy & Promotion (TSW)

==> picture [128 x 62] intentionally omitted <==

----- Start of picture text -----<br> »)<br>S noqd OF<br>Fy 19-%0)<br>----- End of picture text -----<br>

NC Meeting dated 09/12/2014 - Case No. 29/19/80 (M/s Luminous Water Technologies Pvt. Limited) (Advance Authorization No. 0510391189 dated 17.09.2014)

Firm may be asked to submit the following details:

  1. Information in respect of Sl. No. 8 & 9 of Standard Deficiency Format. 2. Specific nature/use of each import item viz. as Raw Material, Component, spare, Consumable or Packing material.

  2. Details of import item at Sl. No. 19.

  3. Certain import items are listed at more than one place e.g. import items at Sl. No. 53 to 61 are same as that at Sl. No. 65 to 73 and the same may be clarified.

ZZ — a pede (S. K. Jain) Development Officer

Norms Committee I

DIPP No. 12/159/2014-TSW/98 dated 09/12/2014

==> picture [125 x 13] intentionally omitted <==

----- Start of picture text -----<br> SESS Fst<br>----- End of picture text -----<br>

Department of Industrial Policy & Promotion

SF ‘ 2 ly

(TSW)

NC Meeting dated 09/12/2014 - Case No. 25/19/80 (M/s Shakti Pumps (India) Limited) (Advance Authorization No. 5610004433 dated 30.09.2014)

Firm may be asked to submit the following details: eee

|

  1. Information in respect of SI. No. 3, 4 & 5 of Standard Deficiency Format. 2. Information in respect of SI. No. 11 of Standard Deficiency Format for import items at Sl. No.1, 2 & 5.

  2. Size/Specs. of import item at Sl. No. 6 and justification/basis for quantity of this item. Net length of rubber cable in export product may also be indicated. may take a view te Za an Ae. N (S. K. Jain)

Development Officer

Norms Committee I DIPP No. 12/159/2014-TSW/106 = dated 09/12/2014

MayOY newian, New Delhi-11

,

StL—

, | |

==> picture [111 x 32] intentionally omitted <==

----- Start of picture text -----<br> ono 1287<br>----- End of picture text -----<br>

Department of Industrial Policy & Promotion (TSW)

NC Meeting dated 09/12/2014 - Case No. 24/19/80 (M/s Shakti Pumps (India) Limited) (Advance Authorization No. 5610004450 dated 21.10.2014)

Firm may be asked to submit the following details:

<_

  1. Information in respect of SI. No. 3, 4 & 5 of Standard Deficiency Format, export product wise.

  2. Information in respect of Sl. No. 11 of Standard Deficiency Format for import items at SI. No.1, 2 & 5, export product wise.

  3. Size/Specs. of import item at SI]. No. 6 and justification/basis for quantity of this item. Net length of rubber cable in each export product may also be indicated.

Norms committee may take a view

==> picture [147 x 56] intentionally omitted <==

----- Start of picture text -----<br> Za a Zn y ,<br>(S. K. Jain)<br>Development Officer<br>----- End of picture text -----<br>

Norms Committee I DIPP No. 12/159/2014-TSW/121 = dated 09/12/2014

— ao LIC:LUT:791:O0GSP December 08, 2014 The Directorate General of Foreign Trade IEC: 0388024011 _ (DES 1) Udyog Bhavan, ) a Maulana Azad Road, New Delhi - 110 011 a i i ad xe ° Dear Sir, ; , Amendment in Ratification of the norms in La 0310557677respect of datedAdvance29.01.2010Authorisation No. .sx | oe Your File No, 01/80/50/00245/AM11/DES-| . In continuation to our earlier letter dated 22.10.2014 submitted to your office, we hereby submit a copy of M/s ONGC’s Fax Message dated 05.12.2014 detailing their inability to recommend issuance of such a certificate from DGH. We request vour kind consideration for the explanation furnished by our customer M/s ONGC vide their above cited Fax message. In view of the above, we now sincerely request you to issue amendment of ratified norms which in turn will help us to obtain necessary license redemption from the Regional Authority. Awaiting a favourable reply, Thanking you, we remain, Yours faithfully ; . for Larsen & Toubro Limited ( Shailesh Agrawal ) Deputy General Manager 1) Copy of M/s ONGC's Fax Message dated 05.12.2014. Yi yi CO ey Dee Larsen & Toubro Limited Cape g eee Corporate Office, New Delhi : Registered Office Ambadeep Building (9th Floor), 14, Kasturba Gandhi Marg, New Delhi-1 10001. INDIA L&T House, N. M. Marg Tel: +91 11 4150 8888 Fax: +91 11 4150 9979 www.Larsentoubro com Ballard Estate CIN No. £99999MH1 946PLC004768 Mumbai - 400 001. INDIA

==> picture [53 x 84] intentionally omitted <==

----- Start of picture text -----<br> ay .<br>ip<br>°<br>----- End of picture text -----<br>

==> picture [581 x 707] intentionally omitted <==

----- Start of picture text -----<br> | ty<br>i:| Sitvetatelt | OFFSHORE _ NAME:PROJECT | MHNPGC<br>Wa WORKS) FAK MESSAGE BAM<br>| | | DIVISION : | -<br>poncck : | |<br>| 44, High, ONGC Office Complex, ' q99. fn a | |<br>j | Bandra- Sion, Link Road, :Tel.No. 022-24089466, $969222286 |<br>| | Mumbai-400 017, | i: | jaishanker_g@ongc.co.in;<br>-. Fax No.022-2408 8500 Pema _| gishanker@gmail.com |<br>From: G. Jaishanker | File Ref. | MR/ES/OW/MHN-PGC/OWC-330/2014 |<br>a DGM (M)/PC-MHN-PGC : Date . 05.12.2014 |<br> To: Ms4th Ft l &Toor, HydrocarbenNorth Block-ll,EngineeringSaki Vihar Road,Limited |<br>=. Powal, Mumbai - 400 072 : |<br>_71| Attn: Mr. Ashish Shukla, PM-MHN-PGC |<br>“1 (Pax No, +91~ 22. 67058095/8099 | [<br>|t<br>|'Sub: MHN-PGC Module Project — issue of Essentiality Certificate |<br>| Ref ; LTHE Letter ref no, COW-0855 dt.11.10.2014 & COW-0860 dt. 24.11.2014 |<br>| LTHE's request for issuance of Certificate from DGH as above has been reviewed internally, & foliowing are |<br>| the observations:<br>! (i) As per Contract, tha PEL/ML was issued before 07.04.1999 and accordingly EPCG License was<br>obtainec by ONGC. No exemption of Excise duty was available under customs notification i<br>i ne,12/2012 (earlier 21/2002)<br>| (i) L&T had clearad the goods on payment of Excise duty & same was claimed as refund by ONGC after<br>| undertaking to fulfill export obligation as a condition of EPCG License. |<br>(ii) Purther, ell correspondences from DGFT/Excise authorities de not indicata the requirement ofsucha |<br>certificate towards ONGC’s EPCG License. |<br>{<br>| Hence, the certificate from DGH cannot be requested under the above netification. |<br>{ <br>A GC<br>G. aishanker<br>OGM (M), PC-MHNPGC |<br>FORMAT NO<br>Minisiry of Cominere 5 yaa lrace<br>----- End of picture text -----<br>

5

==> picture [151 x 85] intentionally omitted <==

----- Start of picture text -----<br> SB (<br>an:<br>C2<br>me —35<br>Se<br>or os“| |e ly<br>----- End of picture text -----<br>

Department of Heavy Industry TSW(B) Section

Subject: Application of M/S Thyssenkrupp Industries for ratification of norms AA no 3110039520 dt 07-08-09

DES-I, DGFT may kindly refer to the above mentioned licence of Based on the information submitted, this Office recommends the following. Export Internal Coal Handling system with mandatory spares Import There are total 74 items which consists of components & spares. Components may be allowed under GN-4 with accountability clause. Spares may be allowed as per spares policy.

The above issues with the approval of Industrial Advisor (KKT).

==> picture [47 x 42] intentionally omitted <==

----- Start of picture text -----<br> mie<br>y al v<br>----- End of picture text -----<br>

==> picture [77 x 49] intentionally omitted <==

----- Start of picture text -----<br> chy 9" 4<br>ur\v<br>----- End of picture text -----<br>

WE

: B.C.Nayak Development Officer 04-12-14

DGFT, FTDO, DES-I | Deptt. of HI, UO No3(159)/14/TSW(B) L26 dated aia aeneneae? . |

==> picture [139 x 114] intentionally omitted <==

----- Start of picture text -----<br> 7)<br>SW YQ .<br><<<br>hs)-- Jo<br>Stopes relly<br>----- End of picture text -----<br>

Department of Industrial Policy & Promotion (TSW)

NC Meeting dated 09/12/2014 - Case No. A/R-70 (M/s Larsen & Toubro (Advance Authorization No. 0310777054 dated 04.04.2014)

Limited)

Norms may be modified as under:

  1. Net weight of export product may be modified as 1488.988 MT. 2. Quantity of import item at Sl.No. 1 may be modified as 652770 Kgs. as 1.03 Kgs./Kg. content in the export product as claimed by the finn.

  2. Quantity of import item at SI. No. 3 may be allowed as 33 Nos. on net to net basis. Duty free weight of this item may be allowed as 315220 Kgs. as 3.28 Kgs./Kg. content in the export product after taking 20 % recovery from scrap.

  3. Quantity of import item at S$]. No. 4 may be allowed as 12 Nos. on net to net basis. Duty free weight of this item may be allowed as 30447 Kgs. as 1.67 Kgs./Kg. content in the export product after taking 20 % recovery from scrap.

Norms committee may take a view

Norms Committee I DIPP No. 12/159/2014-TSW/70-A/R_ dated 09/12/2014

==> picture [140 x 55] intentionally omitted <==

----- Start of picture text -----<br> = Rie fem<br>(S. K. Jain)<br>Development Officer<br>----- End of picture text -----<br>

Direcincie Csnera. Of itery

Department of Industrial Policy & Promotion

==> picture [134 x 90] intentionally omitted <==

----- Start of picture text -----<br> CMYTS [A] Five<br>AIR IQ<br>OT +1] 1-20) y<br>----- End of picture text -----<br>

(TSW)

NC Meeting dated 09/12/2014 - Case No. A/R-72 (M/s The Saraswati Industrial Syndicate Limited )(Advance Authorization No. 0510254039 dated 07.12.2009)

Based on the detailed calculations and justification submitted by the firm for the requirement of Corrothane, following modifications may be carried out in the ratified norms:

  1. Total quantity of import items at Sl. Nos. 9 , 18, 27, 36, 45, 54 & 64 (Corropthane XT) put-together may be allowed as 3441 Litres.

  2. Total quantity of import items at SI. Nos. 10 , 19, 28, 37, 46, 55 & 65 (Corropthane XT-HA ) put-together may be allowed as 493 Litres.

Norms committee may take a view Za[[_]]

Za[[_]][eS] Le (S. K. Jain) Development Officer

Norms Committee I DIPP No. 12/159/2014-TSW/72-A/R_ dated 09/12/2014

mteyed 3 souran New D ain in4 4 °

|

==> picture [539 x 211] intentionally omitted <==

----- Start of picture text -----<br> i)<br>: Arif? -<br>:. alike [iso fn a fg<br>ommunications and Information Technology a<br>Minist Government of India FJ 2a) Yy<br>Department of Electronics and Information Technology on<br>ST— . ElectronicsNew Niketan, Delhi-110003 6, CGO Complexare usaboaa<br>Sub: Ratification of norms in terms of Para 4.7 of HBP. (Vol.1) in respect of Advance .<br>Authorization No.03107633789 dated 26.12.2013 issued in favour of M/s. Sterlite<br>Technologies Ltd. Maharashtra yi<br>----- End of picture text -----<br>

Reference DGFT I.D. No. 01/80/50/0038/AM15/DES-1/98 dated 24.4.2014 vide which comments of this Department have been sought on the above mentioned application of M/s. Sterlite Technologies Ltd. Maharashtra for export of “Fibre Optical Fibre Unarmoured Cable”.

  1. The FOB value of export is Rs.80,019,408.39 (US$ 1,288,557.31)) and CIF value of import is Rs 57,379,504.46 (US$ 909,342.39).

  2. The application has been examined in the Department of Information Technology from technical angle. The import items are required for manufacturing the export product. This Department recommends ratification of norms of advance authorization as per the details given in the Annexure ‘A’ inclusive of the wastage mentioned therein.

==> picture [362 x 50] intentionally omitted <==

----- Start of picture text -----<br> srand era© : .<br>(Asha*Nangia)<br>cee mee ren Director<br>Te Tel. No.24301268<br>----- End of picture text -----<br>

Shri Priya Ranjan, FTDO, O/o DGFT, Udyog Bhavan, New Delhi DIT U.O. No. W-27/20/2014-IPHW dated 14.10.2014

Dy. DESO! Eoreign tte - artqrate Generel © Ingucty >f | Ucyog Bhawe \ See

.

  1. iF

|

;

URE ‘A’

==> picture [417 x 343] intentionally omitted <==

----- Start of picture text -----<br>

||||||
|---|---|---|---|---|
|S.No.|Wastage|Quantity|
|Recommended|Recommended|
|fe|||Single Mode Optical Fibre|116048.6|
|Polybutylene|Terpthalate|(PBT)|20607.49|
|4,|Thixotropic|Jelly|2%|7752.68|
|Compound(Filling/Flooding)|
|5.|Water Bl;ocking Tape 0.25mm|2%|19032.00|
|thickness|
|eo|High Density Polyethylene (HDPE)|23731.44|
|Aramid Yarn/Aramid|Filament Yarn|$45.2|
|9,|Water Blocking Rib Cord/Aramid|1%|199.93|
|Rib|Cord|
|fe|Hot Foil Marking Tape White/Black|394.8|

----- End of picture text -----<br>

Directorate Goewits fo fe (NCUY Mistysett of aween,© yamerce Now Delhi-NAalhi-

12/4/2014 NIC Messenger Express & fof Y4 fs a lk ' Welcome Muthukumar Sundaram, FTDx#Help C0. I. Folders Inbox Sent Trash Drafts Addresses Options oD muthu.k@nic.in: Inbox Cop Re— eeeB® B&Bae AY @ ren 19 Aol. Compose Reply Reply All Forward Delete Printable Add Addresses Previous Next Close | c eveee gewoon , Sent Tuesday, December 2, 2014 4:41 pm To "S. Muthu Kumar" <muthu. k@nic.in> ; Subject Fwd: REQUEST FOR TIME TO REPLY (GODREJ & BOYCE MFG CO LTD) I ——— Original Message —— From Adil Mehta adilsha@godrej.com Date Tue, 02 Dec 2014 13:58:06 +0530 . To parveen.s@nic.in Subject REQUEST FOR TIME TO REPLY (GODREJ & BOYCE MFG CO LTD) . Dear sir, ° Sub: RATIFICATION OF NORMS IN RESPECT OF: % 1)ADV. AUTH NO:0310403017 DT. 10-9-2006 is 2)ADV AUTH NO: 0310465595 DT. 19-3-2008 5 3)ADV AUTH NO: 0310472348 DT. 29-5-2008 : 4)ADV AUTH NO: 0310492142 DT. 27-10-2008 £ 5)ADV AUTH NO: 0310561529 DT. 23-2-2010 (Qiv FA 6)ADV AUTH NO: 0310466996 DT. 2-4-2008. lg Sn OBTAINED UNDER PARA 4.7 OF HBP (VOL-1) (te 8 DGFT FILE NO: 01/80/050/00818/AM10/DES-1/2209 DT. 20-11-2014 S MEETING NO: 16/15 DT. 28-10-2014. - We refer to our captioned six Advance Authorizations against which ratification b details are reqd. to be submitted. * As certain drawings/diagrams with related information are required to be submitted in all a the six cases,we request The Honourable Norms Committee to grant us time of one : : month to reply for the same. a We thank you for the same and regret the inconvenience. - ThankingYours faithfully you \ a: For Godrej & Boyce Mfg. Co. Ltd a RNP tre gel RAs ls Adil Mehta CAN as CORIO! a ll Corporate Procurement Dept. NiSwee acesa pgew Denk MB-

TEL: 022-67963210

MOB;9833877535

.

https:/Avebmail.nic.irven/mail html ?lang=en

1/2

|

==> picture [401 x 102] intentionally omitted <==

----- Start of picture text -----<br> PA<br>Sin URd!Y<br>Department ple = RTE Toe<br>of Industrial Policy & Promotion dD t 4) 1 n20)<br>(TSW) }<br>----- End of picture text -----<br>

NC Meeting dated 09/12/2014 - Case No. A/R-106 (M/s Godrej & Boyce Manufacturing Company Limited ) (Advance Authorization No. 0310764594 dated 06.01.2014)

As there is a substantial reduction in weights of export items, firm may be asked to submit the following information:

  1. Information in respect of SI. No. 3, 4, 5, 11 & 14 of Standard Deficiency Format-export product wise for export items at S]. No. 1 to 15.

==> picture [143 x 54] intentionally omitted <==

----- Start of picture text -----<br> ZA —— irn oreo) Nn<br>(S. K. Jain)<br>Development Officer<br>----- End of picture text -----<br>

Norms Committee I DIPP No. 12/159/2014-TSW/106-A/R_ dated 09/12/2014

Dir: on Gee ci Forcign'rade Miaisy of Commerce & iat Udyog Bhawan, wow Deihi-1)

oy

| S noyge” Department of Industrial Policy & Promotion iy 08 (TSW) TE ” NC Meeting dated 09/12/2014 - Case No. A/R-108 (M/s Bharat Heavy ElectricalsOH 41] 2- daly Limited ) (Advance Authorization No. 0410112044 dated 02.03.2011)

  • Firm may be asked to submit the following information: —
  1. Information in respect of S!. No. 8 & 9 of Standard Deficiency Format for import item at SI. No. 2.

==> picture [79 x 18] intentionally omitted <==

----- Start of picture text -----<br> Za ae tmCe<br>----- End of picture text -----<br>

.

(S. K. Jain) Development Officer

Norms Committee I DIPP No. 12/159/2014-TSW/108-A/R dated 09/12/2014

Directorateinictrs Goneral ci Foreae Minty Of[naan,] COMME!Ce[New] G[ Delhi-14] Huse

.

|

==> picture [393 x 87] intentionally omitted <==

----- Start of picture text -----<br> Srey<br>Department of Industrial Policy & Promotion aT a a<br>(TSW) i [>Dely<br>----- End of picture text -----<br>

NC Meeting dated 09/12/2014 - Case No. A/R-110 (M/s ISGEC Heavy Engineering Limited) (Advance Authorization No. 0510359006 dated 08.07.2013)

Norms may be modified as under:

  1. Net Fabricated weight of export item may be reduced as 547.331 MT. 2. Quantities of import items at Sl. No. 5 & 6 put together may be reduced as 37955 Kgs.

  2. Import items at Sl. No. 15, 16, 17 & 19 may be deleted.

==> picture [151 x 53] intentionally omitted <==

----- Start of picture text -----<br> Zo vn talias ~~<br>(S. K. Jain)<br>Development Officer<br>----- End of picture text -----<br>

Norms Committee I DIPP No. 12/159/2014-TSW/110-A/R dated 09/12/2014

/

Dirececle Gansta: ot roreigaTrase ini Commerceawian, New Delhi-1t Minis & Industy

£1 we Snip AE ANC 5 Ge 404 “7 gat

4

| | |

Ministry of Heavy Industries & Public Enterprises Department of Heavy Industry TSW(B) Section

Subject: Application of M/S British Engines India for fixation of wastage norms.

DES-I, DGFT may kindly refer to the above mentioned request of M/S British Engines India. The firm’s reply of dated 3005-14 has been examined. The firm has sought clarification if it has to submit information for indigenous items also. It may be clarified that the firm has to submit information/calculation for all the raw material whether imported or indigenous whose wastage norms is to be fixed. ee ” ‘— oOThe above issues withee . the approval of IA(KKT). >, (c.Nayaee1/// Development, Officer 24-11-14 x > FIDO, DES-I, DGFT as Deptt. of HI, UO No 1(05)/13-TSW(B) 2S dated

Udyeg BRE

is \M cM Y

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied