IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2014-09-02

DGFT Committee Minutes

Document text

SI.No. Name<br>of the<br>representatives Name<br>of the<br>representatives Name<br>of the<br>representatives & Room No. Telephone No. Deptt.
their Designation
1. Sh K.K. Tiwari I.A 476 23063321 DHI, U.B.
2. Sh S.K.Jain, D.O. 428A 23063321 Extn.3318 DIPP, U.B.
23063166
3. Sh.<br>Kanwalinder Singh Sodhi, 736A 23063802 Extn.2459 DC(MSME),N.B.
Asstt. Dir. (Mech)
4. Sh. Parveen Sharma, Dy.DGFT 302 23061562 Extn.146 DGFT, U.B.
5. Sh. PriyaRanjan, FTDO 404 23061562 Ext.265 DGFT, U.B.
Case_No.:IO/S/SO-ALC2/2013_ PartyName:BANCO Meet No/Date: 12/80- Status:
PRODUCTS (INDIA) ALC2/2014 Deferred
LIMITED 02.09.2014
HQFile RLA File Lic.No/Date:3410036871 Defer
2 :0I_1801050100 1201_AM 14/ :34/2410401000301 AM 141 14.05.2013 Date:14.10.2014
Case No.: 16/23/S0-ALC2/201 3 Party ame:TIL LIMITED Meet NolDate: 12/80- IStatus:
ALC2/2014 Deferred
02.09.2014
HQFile IRLA File Defer
:01/80/050/004421 AM_141_ :02/24/040/000941 AM_141_ Date: 14.10.2014
.- Case No.:2/20/S0-ALC2/2013 lparty Name:L&T - MHl IMeet No/Date: 12/80- IStatus:
TURBINE GENERATORS<br>PYT.LTD. I<br>ALC2/2014<br>02.09.2014 Deferred
IHQ File - RLA File ILic.No/Date:0310753783 Defer
8 !:01/80/050/00390/AMI41 :03/95/040/00511/AM141 iI5.10.2013 IDate:14.10.2014
Case No.:3/20/S0-ALC2/2013 Case No.:3/20/S0-ALC2/2013 Party Name:L&T - MHI Meet No/Date: 12/80- Status:
TURBINE GENERATORS ALC2/2014 Deferred
PYT.LTD. 02.09.2014
HQFile RLA File Lic.No/Date:0310753791 Defer
:01/80/050/00391 I_AM_141 :03/95/040/005101 AM_141_ 15.10.2013 Date:14.10.2014
ICase No.:6S/3/S0-ALC2/2014 Party Name:ALSTOM Meet No/Date: 12/80- Status:
TRANSPORT<br>INDIA LIMITED ALC2/2014 Deferred
02.09.2014
IHQ File RLA File Lic.No/Date:0710099232 Defer
1:01/80/050/000791 AM_151_ :07/21/040/006361<br>AM_141_ 28.10.2013 Date: 14.10.2014
Case'io.:17/3/80-ALC2/2014 Party Name:NIRMA Party Name:NIRMA LIMITED Meet No/Date:12/S0- Status:
ALC2/2014 Deferred
02.09.2014
HQFile RLA File Lic.No/Date:OSI0126969 Defer
_19 _ :01/SO/OSO/0002S/AMISI :OS/24/040/003 771_AM_141 09.12.2013 Date:14.10.2014
Case No.:18/3/80-ALC2/2014 Case No.:18/3/80-ALC2/2014 Party Name:NIRMA Party Name:NIRMA LIMITED Meet No/Date:12/S0- Status:
ALC2/2014 Deferred
02.09.2014
HQ File RLA File Lic.No/Date:OSI 0 126970 Defer
20 :01/SO/OS0/000291 AM lSI :OS124/040/003761 AM_141_ 09.12.2013 Date:14.10.2014
Case No.:24/23/80-ALC2/2013 Party Name:BHARAT HEAVY Meet No/Date: 12/S0- Status:
ELECTRICALS LIMITED ALC2/2014 Deferred
02.09.2014
HQFile RLA File Lic.No/Date:0410IS2S2S Defer
21 :01/SO/OS0/00450/AM141 :04/24/040100<br>ISII AM 141 11.12.2013 Date:14.10.2014
Case No.:24/3/80-ALC2/2014 Party Name:ROSSELL Party Name:ROSSELL INDIA Meet No/Date: 12/S0- Status:
LIMITED, ALC2/2014 Deferred
02.09.2014
HQFile RLA File Lic.No/Date:071 0 I00433 Defer
22 :01/SO/OSO/0003S/AMISI :07/24/040/002631 AM 141 11.12.2013 Date:14.10.2014
Case No.:7/3/80-ALC2/2014 Party Name:TATA HITACHI Meet No/Date: 12/80· Status:
CONSTRUCTION ALC2/2014 Deferred
MACHINERY CO. LTD, 02.09.2014
HQ File RLA File Lic.No/Date:021 0 I98498 Defer
:0118010501000181_AM_151 :02/24/0401001711_AM_141 06.01.2014 Date: 14.10.20 14
Case_No.:S/3/S0-ALC2/2014_ PartyName:TAT A H[TACH[ Meet_No/Date: 12/80-_ Status:
CONSTRUCTION ALC2/20 14 Deferred
MACH[NERY<br>CO. LTD. 02.09.20[4
HQ Fi[e RLA File Lic,No/Date:021 0[98490 Defer
:01/80/050/000191 AM [51 _:02/24/040100 [ 701_AM [41 06.01.20[4 Date:[4.[0.2014
Case_No.:66/3/80-ALC2/2014_ PartyName:PUTZMEISTER Meet_No/Date: 12/80-_ Status:
CONCRETE MACHINES ALC2/2014 Deferred
PRIVATE LIMITED, 02.09.2014
HQ File RLA File Lie.NolDate: 1710005699 Defer
:01/801050100077/AMI51 :17/24/040100115/AM141 18.02.2014 Date:14.10.2014
Case_No.:67/3/80-ALC2/2014_ Party Name:PUTZMEISTER Meet_No/Date: 12/80-_ Status:
CONCRETE MACHINES ALC2/2014 Deferred
PRIVATE LIMITED, 02.09.2014
HQ File RLA File Lic.No/Date: I 710005698 Defer
_:01/8010501000781_AM 151 _: 17124/040/001141_AM 141 18.02.2014 Date:14.10.2014
Case_No.:62/3/80-ALC2/2014_ PartyName: SANSERA Meet_No/Date: 12/80-_ Status:
ENGINEERING PVT.LTD., ALC2/2014 Closed
02.09.2014
HQ File RLA File Lic.No/Date:0710102245
_:01/8010501000731_AM lSI _:07124/0401003261_AM 141 19.02.2014
Case_No.:4/26/80-ALC2/2013_ PartyName:JOHNSON Meet_No/Date: _ 12/80- Status:
MATTHEY INDIA PVT. LTD. ALC2/2014 Deferred
02.09.2014
HQ File RLA File Lic.No/Date:051 038000I Defer
_45 _ :01/801050100570/AM141 :05/23/040100483/AM141 21.02.2014 Date:14.10.2014
Case No.:46/3/80-ALC2/2014 PartyName: BOTIL OIL Meet_No/Date:_ 12/80- Status:
TOOLS INDIA PYT ALC2/2014 Deferred
LTD(FORMERLY<br>BAKER OIL 02.09.2014
HQ File RLA File Lic.No/Date:0510380277 Defer
50 :01180/0501000571 AM 151 :05/23/040/004571<br>AM 141 26.02.2014 Date:14.10.2014
Case_No.:50/3/80-ALC2/2014_ Case_No.:50/3/80-ALC2/2014_ PartyName:BOYSEN INDIA Meet No/Date: I_2180-_ Status:
LIMITED ALC2/2014 Deferred
02.09.2014
HQ File RLA File Lic.NoIDate:0510380464 Defer
52 :0_1/801050/00061/AM_ 151 :051231040/004971 AM 141 27.02.2014 Date:14.10.2014
Case_No.:5113/80-ALC2/2014_ Case_No.:5113/80-ALC2/2014_ PartyName:BOYSEN INDIA Meet_NolDate:_ I_2180-_ Status:
LIMITED ALC2/2014 Deferred
02.09.2014
53 HQ File RLA File Lic.NoIDate:0510380507 Defer
:01/801050/000621 AM 151 :05123/0401004931 AM 141 27.02.2014 Date:14.10.2014

Case_No.:55/3/S0-ALC2/2014_ PartyName:OMEGA ICEHILL<br>Meet_No/Date:_ 12/80- Status:
PRIVATE LIMITED<br>ALC2/2014 Deferred
02.09.2014
61 HQ File RLA File<br>Lic.No/Date:05 I038I 107 Defer
:0 I_18010501000661_ AM I_51_ :05/241040/004691<br>AMI_41_<br>06.03.2014 Date:14.10.2014
Decision<br>:The Committee noted that firm has not replied to deficiency letter dated 18.07.2014 and
decided to send reminder to the firm. Case is deferred to 14.10.2014.
Case_No.:63/3/80-ALC2/2014_ Case_No.:63/3/80-ALC2/2014_ Party Name:TRELLEBORG Meet No/Date: 12/80- Status:
INDUSTRIAL<br>PRODUCTS ALC2/2014 Approved
INDIA PRIVATE LTD 02.09.2014
HQ File RLA File Lic.No/Date:0710I02742
64 :01/8010501000741 AM 151 :07/24/0401004681<br>AM 141 10.03.2014
Case_No.:38/3/80-ALC2/2014_ Party Name:STANADYNE Party Name:STANADYNE Meet_No/Date:_ 12/80- Status:
AMALGAMATIONS PVT. ALC2/20<br>14 Deferred
LTD. 02.09.2014
HQ File RLA File Lic.No/Date:0410 156079 Defer
65 :0I_18010501000491_ AM 15/ :04/2410401002791<br>AM 141 11.03.2014 Date:14.10.2014
Case_No.:49/3/80-ALC2I2014_ Case_No.:49/3/80-ALC2I2014_ Party Name:DEE Meet_No/Date:_ 12/80- Status:
DEVELOPMENT ENGINEERS ALC2/2014 Deferred
LTD. 02.09.2014
HQFile RLA File Lic.No/Date:0510381683 Defer
66 :0 I_1801050100060lAM_ lSI :05/23/0401004981 AM 141 12.03.2014 Date:14.10.2014
Case No.:7113/80-ALC2/2014 Party Name:AEROTO Meet No/Date: 12/80- Status:
BOLDROCCHI INDIA PVT. ALC2/20<br>14 Deferred
LTD., 02.09.2014
HQ File RLA File Lic.No/Date:041 0 156176 Defer
68 :01/8010501000821 AM 151 :04124/0401002841 AM_141_ 12.03.2014 Date:14.10.2014
Case No.:72/3/80-ALC2/2014 Party Name:AEROTO Meet No/Date: 12/80- Status:
BOLDROCCHIINDIA PVT. ALC2/2014 Deferred
LTD., 02.09.2014
HQ File RLA File Lic.No/Date:0410156209 Defer
69 :01/801050100083/AM151 :04/24/040100289/AM141 13.03.2014 Date:14.10.2014
Case No.:40/3/80-ALC2/2014 Party Name:DOOWON Meet No/Date: 12/80- Status:
AUTOMOTIVE SYSTEMS ALC2/20<br>14 Deferred
INDIA PRIVATE LIMITED 02.09.2014
HQ File RLA File Lic.No/Date:041 0 156226 Defer
70 :01/8010501000511 AM_151_ :0412410401002871 AM_141_ 14.03.2014 Date:14.10.2014

Case_No.:6S/12/80-ALC2/2014_ Case_No.:6S/12/80-ALC2/2014_ Party Name:WUERTH Meet_No/Date:_ 12/80- Status:
ELEKTRONIK INDIA ALC2/20 14 Deferred
PRIVATE LIMITED 02.09.2014
73 HQ File RLA File Lic.NoIDate:0710I03953 Defer
:01/80/050/003141 AM 151 :07/24/040/004911<br>AM 141 06.05.2014 Date:14.10.2014
Case_No.:4/9/80-ALC2/2014_ Case_No.:4/9/80-ALC2/2014_ Party Name:FUTURE TECH Party Name:FUTURE TECH Meet No/Date:12/80- Status:
ENGINEERING PVT.LTO, ALC2/20 14 Deferred
02.09.2014
HQ File RLA File Lic.No/Date:0710I03998 Defer
74 :01/80/050/001951 AM 151 :07/24/040/000361 AM 151 09.05.2014 Date:14.10.2014
Case_No.:68/12/80-ALC2/2014_ PartyName:STERLITE PartyName:STERLITE Meet No/Date: 12/80- Status:
TECHNOLOGIES LTD. ALC2/2014 Deferred
02.09.2014
HQ File RLA File Lic.NolDate:0310781682 Defer
75 :01/80/050/00317/AM151 :03/95/040/000501 AM 151 15.05.2014 Date:14.10.2014
Case No.:4S/12/S0-ALC2/2014 Case No.:4S/12/S0-ALC2/2014 Party Name:GEA ECOFLEX Meet NolDate:12/80- Status:
INDIA PYT.LTD. ALC2/2014 Deferred
02.09.2014
HQFile RLA File Lic.No/Date:0310785591 Defer
_84 _ :01/801050100297/AM151 :03/94/0401000991 AM lSI 18.06.2014 Date:14.10.2014
Decision :The Committee decided to ask the firm to furnish information<br>in respect of 51. No.3, 4, 11
& 12<br>of Standard<br>Deficiency<br>Format export<br>productwise on the recommendation<br>of Technical
Authority, DIPP present in the meeting. Case is deferred to 14.10.2014.
Case No.:4S/12/S0-ALC2/2014 Party Name:GEA ECOFLEX Meet No/Date: 12/80- Status:
INDIA PYT.LTD. ALC2/2014 Deferred
02.09.2014
HQ File RLA File Lic.No/Date:0310785693 Defer
_85 _ _:01/8010501002941_AM lSI _:03/9410401009601_AM 141 19.06.2014 Date:14.10.2014
Case No_:SII12/S0-ALC2/2014 Party Name:GEA ECOFLEX Meet No/Date: 12/80- Status:
INDIA PYT.LTD. ALC2/2014 Deferred
02.09.2014
86 HQ File RLA File Lic.NolDate:03 I0785694 Defer
:01/8010501003001_AM_lSI :03/94/0401011761 AM 141 19.06.2014 Date:14.10.2014
under-
Export Product Inputs Material Recommendation<br>for import
Cement Shoes (i)Seamless Casing For these products there exist SION C- 1624, 1625
Float Shoes Pipe and<br>1628<br>and<br>these should also be made
Cementing Collars applicable to all OD sizes of seamless pipes.
2.<br>Length<br>of<br>relevant seamless pipe<br>may be
(ii) Components permitted<br>@1 Nos of actual length of EP+1/2
"Extra.<br>In addition to above, the OD of relevant
92 seamless pipe may be permitted as actual OD of
EP+X" Extra.
-Packers (i)Seamless Casing Length<br>of<br>relevant seamless pipe may be
-llnear Hangers Pipe permitted<br>@ 1 Nos of actual length of EP+ y,
-Fluted Casing "Extra".<br>In addition to above, the OD of relevant
-Flow Coupling seamless pipe may be permitted as actual OD of
-Anchor Tubing EP+ X" Extra.
-Lock Mandrel (ii) Components
-Splined<br>Expansion
Joint
Case_No.:8/12/80-ALC2/2014_ PartyName:ANGIPLAST MeetNo/Date: 12/S0- Status:
PRIVATE LIMITED ALC2/20 14 Deferred
02.09.2014
99 HQ File RLA File Lic.No/Oate:OSI0132579 Defer
:01/S010501002571 AM 151 :OS/24/040100 1411AM 151 03.07.2014 Date:14.10.2014
Decision<br>:The Committee noted that the firm's application has been sent to C&PC on 25.08.2014 for
examination<br>and comments and decided to wait for C&PCcomments.<br>Case is deferred to14.10.2014.
Case_No.:60/12/80-ALC2/2014_ PartyName:THERMAX LTD., MeetNo/Date: 12/S0- Status:
ALC212014 Deferred
02.09.2014
100 HQ File RLA File Lic.No/Oate:3110064523 Defer
:0 I/SOI0501003091 AM 151 :3 I_IS3/04010007S1_ AM 15! 03.07.2014 Oate:14.10.2014
Decision<br>:The Committee noted that the firm's application has been sent to DHI on 25.08.2014 for
examination<br>and comments and decided to wait for DHI comments.<br>Case is deferred to14.10.2014.
Case_No.:10/12/80-ALC2/2014_ PartyName:BIO - TECH Meet NolDate:12/S0- Status:
VISION CARE PVT.LTO ALC2/2014 Deferred
02.09.2014
HQ File RLA File Lic.No/Oate:OSI0132592 Defer
:01/S010501002591 AM 151 :OS/24/040100<br>_1421_AM 151 04.07.2014 Oate:14.10.2014
Decision<br>:The Committee noted that the firm's application has been sent to C&PC on 25.08.2014
101 for examination<br>& comments.<br>The Committee<br>further noted that<br>firm's<br>clarification<br>on type of
export (whether<br>physical export or deemed export against invalidation<br>letter to EPCGlicense) has
been sought vide DEs-I letter dated 25.08.2014 which has not been received till date and decided
the following:

.No.297
Case No. A/R-150 M/s. Pranita HQF.No.Ol/80/050/00312/ AM 13/DES. Lic. No. & date !
Engineering I
Meeting No.12/15 Solutions Pvt. RLA,No.07/24/040/00043/ AM13 0710088185
Date: 02.09.2014 Ltd., Ratifications of norms dt.14.05.2012
S.No.298
Case No. A/R-151 M/s. Pranita HQF.No.Ol/80/050/00313/ AM13/DES. Lic. No. & date
Engineering I
Meeting No.12/15 Solutions Pvt. RLA, No.07/24/040/00180/ AM 13 0710090071
Date: 02.09.2014 Ltd., Ratifications of norms dt.03.08.2012
S.No.299
Case No. A/R-152 M/s. Pranita HQF.No.Ol/80/050/00765/ AM lO/DES. Lic. No. & date
Engineering I
Meeting No.12/15 Solutions Pvt. RLA, No.07/24/040/00393/ AM10 0710070031
Date: 02.09.2014 Ltd., Ratifications of norms dt.15.02.2010
·.<br>Decision:<br>The Committee<br>noted that the firm's<br>representation<br>has been sent to MSME on 03.6.2014
for examination<br>& comments<br>and decided to remind<br>MSME for expediting their comments.<br>Case is
deferred to 14.10.2014.

.No.305
Case No. A/R-46 M/s. VEM HQF.No.01/80/050/00047<br>/ AM 14/DES. Lic. No. & date
Technologies Pvt. I
Meeting No.12/15 Ltd., Hyderabad RLA, No.09/24/040/00491/AM13 0910054874
Date: 02.09.2014 Request for revision of norms dt.31.01.2013

S.No.306
Case No. A/R-47<br>M/s. Pranita HQF.No.01/80/162/00100/<br>AM15/DES. Lic. No. & date
Engineering I
Meeting No.12/15<br>Solutions Pvt. RLA, No.07/24/040/00399/<br>AM12 0710085276
Date: 02.09.2014<br>Ltd., Request for fixation of norms dt.05.01.2012
Decision:<br>The Committee<br>noted that the firm's<br>application<br>has been sent to MSME on 11.7.2014 for
examination<br>& comments<br>followed by reminder<br>dated 22.7.2014<br>and decided to remind<br>MSME for
expediting their comments.<br>Case is deferred to 14.10.2014.

S.No.307
Case No. A/R-48<br>M/s. Pranita HQF.No.01/80/162/00101/ AM 15/DES. Lie. No. & date
Engineering I
Meeting NO.12/15<br>Solutions Pvt. RLA, No.07/24/040/00187 / AM09 0710059077
Date: 02.09.2014<br>Ltd., Request for fixation of norms dt.13.08.2008
..<br>DeCISIOn: The Committee<br>noted that the firm's<br>application<br>has been sent to MSME on 11.7.2014 for
examination<br>& comments<br>followed by reminder<br>dated 22.7.2014<br>and decided to remind<br>MSME for
expediting their comments.<br>Case is deferred to 14.10.2014.

.No.308
Case No. A/R-49 M/s. Plansee HQF.No.01/80/050/00384/ AM 14/DES. Lic. No. & date
India High I
Meeting No.12/15 Performance RLA,No.07 /24/040/00191/ AM14 0710098974
Date: 02.09.2014 Materials Pvt. Request<br>for<br>revision/amendment of dt.14.10.2013
Ltd., norms
.No.309
Case No. A/R-63 Reference HQF.No.Ol/80/050/00512/ AM 14/DES.1 Lic. No. & date
Meeting No.12/15 received from RLA, No.03/95/039/00704/ AM14 0310762323
Date: 02.09.2014 AddIDGFT, Request for amendment of norms as dt.18.12.2013
Mumbia<br>of M/s. per amendment<br>sheet No.2.
Larsen & Toubro
Ltd., Mumbai

.No.31O
Case No. A/R-64 M/s. Larsen & HQF.No.Ol/80/162/00273/ AM14/DES. Lic. No. & date
Toubro Ltd., I
Meeting No.12/15 Mumbai RLA, No.03/95/039/00002/ AMll 0310583894
Date: 02.09.2014 Request for amendment of norms. dU6.07.201O

S.No.311
Case No. A/R-65 M/s.<br>Bharat HQF.No.Ol/80/050/00268/ AM 14/DES. Lie. No. & date
Pumps & I
Meeting No.12/15 Compressors Ltd., RLA, No.06/24/040/00011/ AM14 0610033669
Date: 02.09.2014 Allahabad Request for fixation of norms. dt.27.08.2013
Decisiont Ihe Committee decided to ratify norms on the basis of recommendation of DIPPvide their ID
No. 12/120/2014-TSW/65-A/R<br>dated 02.09.2014 which are as under:-
S.No.312
I Case No. A/R-66 M/S. Godrej & HQF.No.Ol/80/162/00185/ AM 14/DES. Lic. No. & date
Boyce Mfg. Co. I
Meeting No.12/15 Ltd., Mumbai RLA, No.03/94/040/00633/ AM12 0310662514
Date: 02.09.2014 Request for fixation of norms. dt.31.10.2011
S.No.313
Case No. A/R-67 M/s.<br>Rangsons HQF.No.01/80/050/00533/ AM 13/DES. Lic. No. & date
Electronics Pvt. I
Meeting No.12/15 Ltd., RLA, NO.07/24/040/00250/ AMll 0710074552
Date: 02.09,2014 Request for fixation of norms. dt.0l.l0,201O
..<br>Decision:<br>The Committee<br>noted that according to firm's<br>e-mail dated ..<br> 7.8.2014, deficiency<br>letter has
been sent to the firm again on 13.8.2014 alongwith<br>DEIT letter dated 02.01.2014. Case is deferred to
14.10.2014.

.No.314
Case No, A/R-69 M/s. Screen-O- HQF,No.01/80/050/00414/<br>AM 13/DES. Lic. No. & date
Tex (India) Pvt. I
Meeting No.12/15 Ltd., RLA,No.08/24/040/00120/AM13 0810113162
Date: 02.09.2014 Request<br>for<br>revision/amendment of dt.06.07.2012
norms .
I.No.316
Case No. C- 01 Reference received HQ F.No.01/80/162/00031/ AM15/DES-1
Meeting No.12/15 from<br>Joint DGFT, Pune Clarification<br>of the export items does not tally with
Date: 02.09.2014 of<br>M/s. Man<br>force the description given in the DEPBrate Schedule -reg.
Trucks Pvt. Ltd., Pune
I.No.317
Case No. C- 02 M/s.<br>Carclo Technical HQ F.No.01/80/162/00058/<br>AM15/DES-1
Meeting No.12/15 Plastics Pvt. Ltd., Fixation<br>of wastage<br>norms for<br>the export product
Date: 02.09.2014 Bangalore "Steel Precison Components used in ATM Machines"
in respect of 100% EOU -reg.
I.No.318
Case No. C- 03 M/s. Metal Closures HQ F.No.01/80/162/00454/ AM13/DES-1
Meeting No.12/15 Pvt. Ltd., Bangalore Request for modification<br>of SION at SI. No. C-773 for
Date: 02.09.2014 the export<br>product<br>"Printed Lug Cap with Internal &
External<br>Coating<br>with<br>Coating<br>Lined with<br>PVC
Compound"<br>covered under Product Group

==> picture [21 x 46] intentionally omitted <==

==> picture [20 x 58] intentionally omitted <==

==> picture [62 x 4] intentionally omitted <==

==> picture [260 x 114] intentionally omitted <==

==> picture [348 x 231] intentionally omitted <==

==> picture [6 x 4] intentionally omitted <==

==> picture [5 x 7] intentionally omitted <==

s.xe. Name of import of import item Qty.<br>applied per one piece of Export: Wastage Wastage Wastage
Product<br>Automobile Exhaust Catalyst. j claimed
Of different sizes.
:<br>! I<br>. i Ceramic substrate I nil
--
.'\r:1I11oniuI111'ktatu:l.~US(ate : As per the spcci fie requirement ! 6°/[!
I 7-6°'0 approx I
. T . .c_--- - c------------ ..~ - .
! Titanium. Dio\ide i As pcrthc specit.c rcqu.rcr-icm i ;,).°0
,TiO"- \ (3) !<br>[ -<br>10<br>appro:<br>-to<br>r"' I<br>1 , _
Ludox, :\S~O (SiO?) i R3.nging fi0111 S7-116-~ ':,;ms I Not kno« n
----c-; ----- - -
i <br>! Ranuine<br>from<br>~<br>~ 21~-!7':; gms<br>__. 'OTknoxr.<br>L_

==> picture [19 x 9] intentionally omitted <==

s.xc, Name of import import item Qry. applied per one piece one piece of Export Wastage
Product<br>Automobile Exhaust Catalyst. claimed
__ --!_O=f-=d"'i<br>f",fere nt SjLt'S. ________ I<br>1 _
I. Ceramic substrate I nil
Arnmoniurn \h:t:_--l:ll:lgustate As per ihe sr.ccific requirement 6°'i,
--:--60.·,0.3PprO|
'-c-- ---- ·--··-T-----· . ---.----.--<br>..
~ 3. Titanium Dio\id~~ I As per tilt' :;pccitic requirement
(li02-W03) , - 4°0. approx
Not knoo, n
__________ I<br>L.._

==> picture [59 x 25] intentionally omitted <==

--c----~ ...--<br>-...c------:----::--=--~::_-- ...--<br>-...c------:----::--=--~::_-- ...--<br>-...c------:----::--=--~::_-- ...--<br>-...c------:----::--=--~::_-- ...--<br>-...c------:----::--=--~::_-- ...--<br>-...c------:----::--=--~::_-- ...--<br>-...c------:----::--=--~::_--
S.:\o. Name of import<br>item 1 Qty. applied per one piece of Export i Wastage
! Product<br>Automobile Exhaust Catalvst. I claimed
-,.---+ ...-..--_ .._--- ! Cllrdifferent sizes. e ~'--CC'I----
l .<br>Ceramic<br>--_.,. substrate<br>!<br>--+ I ru<br>.__<br>._<br>...~---
, .. ,,1<br>1 Ammonium<br>:\letatungustate I A~ l~,crthe,specific requirerr.ent i 6°0
!<br>F- I TitlJliunl r)il~~ide-------r I h ()approx<br>,:\s per (he ~pecific requirerr:e~t I i~-c-"--"
!IT,Oc·\O.i) .. 1"" "ITr,,,
r-- -----.-------
I :+. l.udox.<br>A.SJ() (SiO~) RJ.r'ging<br>from 87-116-+ grns 'ot known
!T--:-GJ~;~d)<br>1 O\al-a-te-=S-o")L-,t"io-n-,<br>1<br>I _<br>.<br> Rannnu<br>from ~~.>-1-75 ,<br> gms ._ T No-t-'''·,-,0-'-'-11-'
-----. .....<br>.. -----

! S.1\o. -c:-:-----;--<br>Name of import<br>item -c:-:-----;--<br>Name of import<br>item '"-'"--'-"--~,--,---<br>i Qtv.<br>applied<br>per '"-'"--'-"--~,--,---<br>i Qtv.<br>applied<br>per '"-'"--'-"--~,--,---<br>i Qtv.<br>applied<br>per one piece of Export I Wastage
I Product<br>Automobile Exhaust Catalyst. I claimed
I. Ceramic substrate I <br>! Of different<br>sizes.<br> "j-- --------------- __<br>---- -+' --:-:-_<br>nil
i :2 --.---_--<br>----<br>~mrncniuri1<br>\ktatungustak I<br>--,--------------------------------<br>I Av pcr the specific<br>rcquircn-cr.: 16%
IL_, !<br>----, 1/"0 approx<br>-------~------------
Til::lnlum Dioxide '::-;per the specific requhernc:u I<br>I I 1)-'<br> -t:o
\T,02-\03) +" 0 approx ,
-~=-c~<br>!;JJc:-;, :\5JO<br>(SiO:?) ! I~Jlnging from<br>S7-116·j ~JrlS -- I<br>,IN-ot kno« n
L__ !
V:m:JJ:-1 Oxalate Solution I R~-ing.ing from<br>~3=---1-15 ::'-1Tl'~ I Not known
i

==> picture [19 x 5] intentionally omitted <==

----:;-::---~~--- ----:;-::---~~--- ----:;-::---~~--- ----:;-::---~~--- ----:;-::---~~---
Name of import i<br>item Qry,<br>applied<br>per<br>one piece <br>Product<br>Automobile<br>Exhaust of Export<br>Catalyst. I,. <br>' \Vasta_gr<br> claimed
--1-.---~I-Ceramic substrate I<br>Of different<br>----1-1 sizes. ---------- i nil
i 2 ! Ammonium i'detatu;~-l~st;t-;-TAs<br>per the SPecificrcqu;reIllent·------
I -+ 6% approx I
_' - ----I Titanium<br>! iliOc- |Dio:--..::jde<br>03) As per the specific <br>--'-4°0 approx requirement , <br>I<br>I ..".<br>"<br>0
I 1 Ludcx, ASJ,O (SiO::2) Ranging<br>from 87 116·j ems I NOI kno« n
I
-1I Vanadvl Oxalate Solution R3:lging<br>from --'~_'"~'75 ~IT1S

==> picture [24 x 6] intentionally omitted <==

==> picture [33 x 34] intentionally omitted <==

==> picture [477 x 193] intentionally omitted <==

==> picture [77 x 78] intentionally omitted <==

**Item to be ** Exported +-i guantih~.· _
! Ciucdel Aima: 1 No.
i Raw-material<br>recommended to be Importc~d +1 Quantity
I. Relevant<br>HDPE / LOPE Granules 1.05 kg i kg content
in the export<br>product
--~-
: 2. ABS Resin<br>Granules -do-
13.<br>l<br>I 4. Medical<br>Kraft<br>40%)<br>,<br> Polyester<br>Poly Paper-([edical<br> Laminate<br>Film Grade<br>GSM<br>Soft Bli.2ter Film roo<br>+<br>----- As p-e~r-;;P~'l-Cck-Ci~n-o-"<br>'<br>Poli~:<br>"_jJ<br>-do-

PKANITA ENG:~EERfNG PKANITA ENG:~EERfNG PKANITA ENG:~EERfNG **SQL.l'T10NS ** **SQL.l'T10NS ** (P) LTD., AOVANCE AUTHORIZATION (P) LTD., AOVANCE AUTHORIZATION (P) LTD., AOVANCE AUTHORIZATION (P) LTD., AOVANCE AUTHORIZATION NO.0710c)8~1~5 NO.0710c)8~1~5
, r---r------~~--~,-----~<br>I<br>iSL.<br>iNO<br>i<br>EXP,PRODUCT PART<br>NAME<br>EXP.PRODUCT<br>PARr NUM8ER<br>I PO I<br>arYl<br>I<br>I<br>Co-related to approved he no ! RELEVA~~IMP~RT**!Imparl <br>I<br>ITEM<br>t OTY<br>i<br>(a)**<br>I ;::fI<br>a!<br>mput<br>weight TotalR~lfMP~~'<br>-,--T<<br>weight In<br>PER<br>,_I:port un t,<br>e)<br>kgs<br>EXPORT'<br>qty wt<br>II'<br>l__~_
r- :Bt~KT '.J;:::~'" .'-:~ ;L.23 ~5G317220p~-'-r
i , i ~,
-.---------------+-..-_::__;--
_2'" 5,=32C:2;:CC"'~
'ISP.r<T ::,__:E:,--'/}".::; '5C32C20'Pc
I 2 I
~;-- r;::C=~" -:,':-;:'-;:;- -~2c.25,:4.?.'LCO.)-_
3 '
!fOr<br>'r-.;:_o
I , I
lTi";-.---
I 5 i
ISh),! ST'=:=- _5235C05528j;;of'
E I
C:710034372 Ot02, 12, 11
I !BRACKET ::'l_£:C
'~3RAC;';:=T EC~( 5:-25'S;:)22CCPF 071008437201:02,12.11
I___§__; __
I~!l;:
In: '!,,-,) 1 613[ 13~
I
253'5.i 2H
I
ItlR.-v-,,::' S:! ," o 124! r:
**-2 ** I F!T~;NG<br> : :::NC-c-r- 0.Q38 i
~
..------
I, I,
22
21
0710084372 Ot.02.12 11
0710084372 01:02,12.11
1 29ISTOP,<br>DOOR (5Y:,:;2CGt.tOCDF 0710084372 Dt02.12.11
i-"+SCOC1~GOOC1~pCLCA"TO'-----iT.5-:C~52;;:r·52· ',~-:- 0710084372 01:02 12.11
I~~QJ,ICl~""'K------
c'
~ iBK<br>("1-;1:::']
132 I
:FLAP<br>DRIVE<br>BR.\C'<::-T
26,,~~~CCCO~CCOO-
! l'fTTT!NG<br>OGT3D Arc
~.37 ,
I :BRACK;::T<br>;:UI::L PE::-L.;[!...
;<br>r<br>:<br>I 3a,'==~=~=~<br>I BRACKET<br>FL.:E'~ R'OFj:..:l<br>J"<br>I<br>:BRACKET<br>Rl::"U'Oi_
401
!GRKT<br>R~:'FI.EL
41 I
I HR \C KET r: u. RE'E
42 )
!8RA.CKET<br>T:E ROD N'U'-
43 I --~-~~-----,--=-.---~<br>~ ------

~·--t-c~~-+----cc~-"---Co~-+----o~-+----co~-+--------+ ~·--t-c~~-+----cc~-"---Co~-+----o~-+----co~-+--------+ ~·--t-c~~-+----cc~-"---Co~-+----o~-+----co~-+--------+ ~·--t-c~~-+----cc~-"---Co~-+----o~-+----co~-+--------+ ~·--t-c~~-+----cc~-"---Co~-+----o~-+----co~-+--------+ ~·--t-c~~-+----cc~-"---Co~-+----o~-+----co~-+--------+ ~·--t-c~~-+----cc~-"---Co~-+----o~-+----co~-+--------+
g ;:!: N '!; ~ ~
o u ,::: 0 0
I'<br>I I
! i
I i
I I
I I
I i
I
I I

==> picture [28 x 33] intentionally omitted <==

I<br>Manufacturer<br>Year<br>fConsumption of Coating 1 Mis Crown <br>I 1009-10<br>II 511 grns. Closures<br>Pvt. <br>1010-11<br>I 528 gms, Closures<br>Pvt. <br>1010-11<br>I 528 gms, Closures<br>Pvt. <br>1010-11<br>I 528 gms, Ltd., Nashik<br>I 10-11- I2<br>587 gms,
aterials (per 1000 Lug Caps) , ,
F Value of coating materials 114,81 % i 10,8 % [12,8 %
terms of FOB value of exports [ '''~ ,~_--!

Export Item Import Items
Description Quantity Description Quantity
Lug Cap whether 1 kg 1. Prime Quality Electrolytic 1.30 Kg / Kg content
printed or plain Tin Plate (ETP) in the Export Product
(a) with Internal
Coating Lined with 2. PVC Lining Compound 1.05 kg/kg content in
PVC compound the Export Product
and
(b) External Coating. 3. Primer Lacquer for
internal<br>base coat CIF value of import
4. Adhesive Lacquer for items from 51No.3 to
internal<br>coat 6 is restricted<br>upto 5
5. External<br>base coat·white % of FOB value of
or Gold exports.
6. Varnish
Chartered Accountant),<br>consumption<br>details are as under: Chartered Accountant),<br>consumption<br>details are as under: Chartered Accountant),<br>consumption<br>details are as under: Chartered Accountant),<br>consumption<br>details are as under:
--::-------,--;,-:-;--c-:::-----:---:::-:--~<br>-.-------.-<br>!Manufacturer<br>I Mis Metal Closures<br>Pvt limited<br>lYear<br>12009-10 --pI 2°1°-11---.<br>i Consumption<br>of<br>1,_ 976 gms.<br>919 gms. m"l<br>T-:::2,,"0--:-1--:1--1:-:/:-i'<br>816 grns.
: Coating materials :
! (~er 1000 Lug Caps)-k-,<br>; (IFV,I"'oIM'OO'<br>1 ',.2% III--::-:-:-----i-::--:--::-:---___j<br>112%<br>10.2%<br>'
i materials in terms of Ii
I F~~;:lue<br>of , ~
, Manufacturer Mis Shetron Metropak<br>Pvt limited .--I
Year<br>2009-10<br>:-=-'-"-:__~--c-~-=-----.<br>Consumption<br>of<br>1080 gms. 12010-11<br>11080 gms. 120-11-12---1<br>-.--j<br>11083 gms. i
Coating materials II
(per 1000 Lug Caps)
CIF Value of coating 18.2 % I' 16.7 % 19.4 %
materials in terms of
FOB value of
exports

==> picture [17 x 21] intentionally omitted <==

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied