Minutes of Meeting No.09/15 scheduled on 22.07.2014 of Norms Committee(NC-i}

.

{DES.1 Section) ,

The meeting No. 09/15 of the Norms Committee (NC-I} for the licensing year 2014-2015 was - held on22.07.2014 under the Chairmanship of Or. L.8, Singhal, Additional Oirector General of Foreign ; Trade to consider the applications under Duty Exemption / Remission Schemes {Chapter-4} of Foreign Trade Policy 2009-2014 f Handbook of Procedure Volume-l. The following Members of the Committee were present in the meeting: -

==> picture [397 x 473] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|SLNo.|||Name|of|the|representatives|&|| RoomNo.|| Telephone|No.|Deptt.|||
|i:|their Designation|||a|
||bpewreeensnrntrnsnns~ Shtetera GK. Tiwari LArrvmanani tenant| 476|wa|23063321errant Extn.3369|| DHt, ULB,ee||
|ea|Sh|§.%.|Jain,|DQ,|428A|1|23063321|Extn.|3318|||DIPP,|ULB.|i|
|SS3:|"|S|h,h.|KaKa|nwalind|erer|SiSi|ng|hh|SoSo|dh|i,i,|||736A73GA|11|2306380|20|Extn.2459Ean|dase|T|D|CiC|M|SME},MLB.EME NE|
|;|||Asstt.|Dir, (Mech)|i||i|
|14,|||Sb.|Parveen Sharma,|Dy.DGFT|302|23061562|Extn.146|||DGFT,|ULB.|{||
|Pore|erennreneennet|anemnnfgertiiennnnet rnnntapternmnnene|
|{-The Committee considered the individual cases of the agenda of|this meeting generated through|the|
|online system|of NIC.|The|decisions|token thereon are as|under:|
|“ALCZ/2014|IRRIGATION|INDIA PYTLLTD.,|.ALC2/2G14|:|Approved|
|22.07.2014|
|-2|#01/80/050/00495/AM12/HO File|-RLA134/24/040/00186/AM12/File|Lic.|No/Date:3410032547‘44.12.2044|-|
|-|Decision ‘The Committee decided to ratify norms on the basis of CRPC CLM. No. 46011/55/2010-PC-IL.|
|-dated|18.7.2014|(Copy|Is to|be|forwarded|to|RA and|firsn},|
|"ORLA may take|necessary|action|accordingly.|
|-|Case No.:17/8/80-|Party Name:BHARAT HEAVY ‘Meet No/Date:9/80-|‘Status:|
|ALC2/2013|-ELECTRICALS|LIMITED|‘ALC2/2014|Oeferred|:|
|Qe|.|22.07.2014|
|HQ Eile|RLA|File|/—|Lic.No/Date:0410145648|Defer|
|__701/80/030/00127/AM14/|—:04/24/040/00253/AM13/|30.04.2013|‘Date:02.09.2014|||
|PARVEEN SManis|
|poe Seneral of ForsinnTradg|
|Udyog Bhanen,|Hane Datnt|-|

----- End of picture text -----<br>

.

  • ‘Decision:The Committee noted that the firm’s reply dated 10.06.2014has been sent to DH! on. : -20.6.2014 for examination & comments which is under their examination and decided to remind: ' [DHHfor expediting their comments. Case is deferred to 02.09.2014. Case No.:10/8/80Party Name:BANCO "Meet No/Date:9/80Status: > (ALC2/2013 ‘PRODUCTS (INDIA) LIMITED -ALC2/2014 ‘Deferred : fide tamn Be ; ae ‘lie No/Date:3410036871 0pagan : ~ OL/BO/0S0/00120/AM14/ :34/24/040/00030/AM14/ 14.05.2013 —Date:02.09,2014" - Decision; The Committeenoted that the firm’s application has been sent toMSME on 30.6.2014 for > cexamination & comments which is under their examination and decided to remind M&ME for: expediting their comments. Case is deferred to 02.02.2014. 3 oes ee grace sincMETSO ~~ Inger NojtieresS 800 Gstaes77777 : ALC2/2023 ‘MINERALS (INDIA) PVT.LTD. ALC2/2014 ‘Deferred E 22.07.2014 gtafiie RUA File Lie. Mo/Date:0510357008 Defer ~ 701/80/050/00121/AM14/ —.:05/24/040/00074/AM14/ 13.06.2013 ‘Date:02.09.2014 : ‘Decision ‘The Committee nated that the firm's reply dated 09.12.2013 has been sent to DHI again on : '10.6.2014 for examination & comments which is under their examination and decided to remind OH! | for expediting their comments. Case is deferred to 02.09,2014. :

==> picture [404 x 262] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|i Case|No:eT|“Party|Namesbee|sss|st|“fies|meee—|on, ey|
|ALC2/2013|“DEVELOPMENT|ENGINEERS|(ALC2/2014|Deferred|;|
|af|‘UTD.|22.07.2014|
|5|amet|1|er|et|
|:|sOL/80/0S0/00203/AM14/|05/23/04 0/00004/AMI4/|17.06.2013|‘Dare:02.09.2014:|
|;|Decision|‘The|Committee|nated|that the|firm's|reply dated 19.07.2014has|been|received|and|decided|.|
|:|to send|the same|to|DHI|for examination|and comments.|Case|is deferred|to 02.09.2014.|
|ee|an TonnwameaGekwekinn|IMeet|No/a|ase|nin|
|:|ALC2/2013|INDUSTRIES|LIMITED|‘ALC2/2014|‘Deferred|
|22.07.2014|
|6 HO|File|RUAFIe|“Uic.No/Date:3410037482Defer|
|_|01/80/050/00220/aM14/|—:34/24/040/00080/AM14/|25.07.2013|Date02.09.2014|
|©|Decision|:The|Committee|noted|that|firm|has|not|replied|to deficiency|letter|dated|30.06.2014|and.|
|:|‘decided|to send|reminder to the|firm.|Case|is deferred|to 02.09.2014.|
|~~|Case Nows12/13/80-|—==——PartyName:MOTHERSON|Meet No/Date:9/0-|Status:|
|ALC2/2013|SUMI SYSTEMS|LTD,|ALC2/2014|Approved|
|HO File|RLA|File|~|“Lic.No/Date:0510361154|

----- End of picture text -----<br>

re Dinctorsle Genaval of Forgign Trade

| {01/a0/080/00217/anaiay :05/34/oa0o0157/annay”<7" eee ie enn ' (Decision :The Committee decided to ratify norms on the basis of C&PC O.M. Mo. 46011/61/2013-PCHW dated 02.7.2014 (Copy is to be forwarded to RA and firrn}. ;

==> picture [395 x 126] intentionally omitted <==

----- Start of picture text -----<br> | CRLA may take necessary action accordingly. ae,<br>r aadwe" eee—iaoen ian :<br>_ ALC2Z/2013 EMISSIONS SYSTEMS INDIA ALC2/2014 ‘Deferred<br>af , PVT.LTD 22.07.2014 |<br>g HO File RLAFiIe ‘Lic.No/Date:0510361728 Defer<br>:01/80/050/00213/AM14/ 105/23/040/00160/AM14/ 02.08.2013 ‘Date:02,09.2014 |<br>: ‘DecisionTSWiB} :The Committee decidedto ask firm to furnish information as per DH UO Note no, 3{83)/ 13-:<br>’ dated 09.07.2014 (Copy of the said cormmunication to be forwarded alongwith DHI letter:<br>-dated 29.11.2013 to firm). Case is deferred t0 02.09.2014. ;<br>----- End of picture text -----<br>

==> picture [2 x 2] intentionally omitted <==

----- Start of picture text -----<br> ,<br>----- End of picture text -----<br>

==> picture [396 x 340] intentionally omitted <==

----- Start of picture text -----<br>

  • ‘EaseETT a honsetnsee ve aeName:BRAKES INDIA” (Meet No/Date:9/80. cm —— re :<br>‘ALC2/2013 LIMITED, ALC2/2014 Approved ;<br>. 23.07.2014 :<br>BS) 901/80/050/00229/AM14/HO Fle 04PLA/24/040/00084/AM14/Piles 02.08.2013Lie. No/BateOd LOlag44s |:<br>|: datedDecision30.6.2014The Committee(Copy to bedecidedforwardedto ratifyto RA andnorms onfirma}. the basis of DHI UO. No, 3(67}/11-TSW(B}? :<br>RLA may take necessary action accardingly. ;<br>Case No.:16/23/80- ‘Party NamecTil LIMITED Meet No/Date:9/80- ‘Status: ;<br>ALC2/2013 ALC2/2014 Deferred<br>/10 HQ File RLA File Lic. No/Bate 9210194860 Defer<br>101/80/050/00442/AM14/ —:02/24/040/00094/AM14/ 27.09.2013 ‘Date-02.09.2014<br>‘Decision ‘The Committee noted thet the-firm’s application has been sent to DHI again on 10,6,.2014:<br>_ for examination & comments which is under their examination and decided to remind DHI for<br>‘expediting their comments, Case is deferred to 02.09.2014.<br>,<br>. — sangre ot eve eae eeem rT er i ‘Peet veloute eis . ,<br>ALC2/2013 SCONCRETE MACHINES ‘ALC2/2014 Rejected —<br>- ‘PRIVATE LIMITED, 22.07.2014<br>“gy HO File RLAFie Lic.No/Date:1710005527 -<br>~~ 701/80/050/00467/AM14/ ——-:17/24/040/00069/AM14/ 01.10.2013<br>“Decision :The Committee noted that firm has not replied to deficiency letter dated 28.02.2014:<br>‘followed by reminder dated 08.04.2014 final reminder dated 66.08.2014 and after that decided to:<br> await 15 days more to receive reply from the firm. The Committee further noted that DGFT has not:<br>----- End of picture text -----<br>

==> picture [72 x 13] intentionally omitted <==

----- Start of picture text -----<br> PARVEEN SHARMA<br>----- End of picture text -----<br>

_ received reply of the firmand decided torejecttheir case with the directionto pay the Custom Duty: | cand applicable interest for regularization of the license.

"RA may take necessary action accordingly.

Case No.:2/20/80= PartyName&T-MHI Meet No/Date:9/80Status: > JALC2/2043 ‘TURBINE GENERATORS ALC2/2014 ‘Deferred : fi ‘PVT.LTD. 22.07.2014 : ‘ i ‘HQ File RLA File ‘Lic. No/Date:0310753783 Defer 2" :01/80/050/00390/AM14/ 203/95/040/00511/AM14/ 15.10.2013 ‘Date:02.09.2014 Decision ‘The Committee noted that the firm’s application has been sent to DHI again on 044.2014: for examination & comments followed by reminders dated 03.06.2014 & 18.07.2014 and decided to: » wemind DHI again for expediting their comments, Case is deferred to 02.09.2014. : Case No.:3/20/80«Party Name:L&T- MM! «= “Meet No/Date:9/80- — Status: ‘ALC2/2013 ‘TURBINE GENERATORS ALCZ/2014 Deferred qa hfe = RLAFle ‘Lic, No/Date:0310753791. Defer "'101/80/050/00391/AM14/ 03/95/040/00510/AM14/ 15.10.2013 ‘Date:02.09.2014:

==> picture [395 x 314] intentionally omitted <==

----- Start of picture text -----<br> ‘Decision ‘The Committee noted that the firm's application has been sent to BHI again on 04.4,2014 :<br>> ‘for examination & comments followed by reminders dated 03.06.2014 & 18.07.2014 and decided ta:<br>> Await for DHI camments. Case is deferred to 02.09.2014. :<br>ee cacheae seaman any Nager “Wheat7ns ssunetaans :<br>ALC2/20148 TRANSPORT INDIA LIMITED ALC2/2014 Deferred :<br>HQ File -RLA File Lic.No/Date:0710099232 Defer<br>- 01/80/050/00079/AM15/ :07/21/040/00636/AM14/ 28.10.2013 ‘Date:02.09.2014.<br>Decision :The Committee noted that firm has not replied to deficiency letter dated 03.06.2014<br>followed by reminder dated 18.07.2014 and decided to send final reminder to the firm for expediting:<br>: their reply failing which the Committee would be constrained to reject their case with direction to:<br>» ipay the Custom Duty and applicable interest for regularization of the license. Case is deferred to:<br>eee eat — ee eer er aeaaaTae “eegernesense<br>> :ALC2/2013 COMSTRUCTION ALC2/2014 Deferrad<br>; MACHINERY CO, UTD, 22.07.2014 :<br>4s ‘HQ File ORLA File. ~'Lic.No/Date:0210195980 Defer<br>“7 :01/80/050/00452/AM14/ :02/24/040/00114/AM14/ (04.11.2013 = Date:02.09.2014.<br>Decision :‘The Committee noted that the firm’s reply has been sent to DHI again on 26.5.2014 for.<br>examination & comments followed by reminder dated 18.07.2014 and decided to wait for DH.<br>> comments. Case is deferred to 02.09.2014. i<br>: ao\bNy<br>----- End of picture text -----<br>

,

ey voces a gear aldPTTCeige—msanaae — -ALC2/2014 (INDIA) LTD -ALC2/2014 Deferred i | 22.07.2014 RO File RAFI SSSS~SC«CR ieNo/Date0510371213Defer 16 101/80/050/00030/AM15/ 05/24/040/00274/AM14/ 18.11.2013 ‘Date:02.09.20 Ld: _ Oecision :The Committee noted that firm has not replied to deficiency letter dated 15.05.2014: followed by reminder dated 18.07.2014 and decided to send final reminder to the firm for expediting | their reply failing which the Committee would be constrained to reject their case with direction to: "pay the Custom Duty and applicable interest for reguladzation of the license. Case jis deferred to: 02.09.2014.

_ Case No.:50/23/80Party Name:SHAKTI PUMPS Meet No/Date:9/80- ‘Status: i ‘ALC2/2013 {INDIA} LTD., “ALC2/2014 ‘Deferred : a 22.07.2014 CHO Fite RLA File . ‘Lic. No/Date:5610003237 ‘Defer : 17 OL/BO/OS0/00476/AMI4) — :56/24/040/00026/AM14/ :21,11.2043 ‘Date:02,09.2014: | Decision :‘The Committee noted that firm has not replied to the deficiency letter dated 09.04.2014: followed by reminder dated 06.06.2014, final reminder dated 08.7.2014 and decided to await 15: | days more to receive reply from the firm failing which the Committee would be constrained to reject. | itheir case with direction to pay the Custom Duty and applicable interest for regularization of the’ ‘ficense.Case is deferred to 02.09.2014. ;

==> picture [396 x 281] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Case No44/3/80-|Party Name:DYNAMATIC|Meet|No/Date:9/80.|Status;|
|||ALCZ/2024|‘TECHNOLOGIES|LIMITED,|—_ALC2/2014|Deferred|
|i|;|22.07.2014|
|18 HO|File|ORLA File|Lie,|No/Date:0710099970 Defer|
|»|:01/80/050/00055/AM15/|107/24/040/002|75/ANML4/|26.11.2013|‘Date:02.09,.2014-|
|:|Decision|‘The|Committee|noted|that|firm|has|not|replied|to|the|deficiency|letter|dated|30.06.2014.|
|>|cand|decided|to|send|reminder|to|the firm|.Case|is|deferred|to 02.09.2014.|
|Case No.:39/23/80-|Party Name:SATTVA ETECH|Meet|No/Date:9/80-|Status;|
|:|‘BLC2/2013|INDIA PRIVATE LIMITED|ALC2/2014|‘Deferred|:|
|a9 HQ Fite|)|RLA|File|Lic,|No/Date:0710100031|Defer|.|
|~~|:01/80/050/00465/AM14/|—|:07/24/040/00276/AM14/|27.11.2013|_|Date:02.09.2014|
|||Decision|:The Committee|noted|that|the firm’s application|has been sent to|DEIT|again|on 30.12.2014|
|jor|examination|&|coramests|followed|by|reminder|dated|09.4.2014-&|18.07.2014|and|decided|to-|
|- boc|Noahal or|eae|Cree|.saannaa|ier cere|,|
|ALC2/2013|ANDIA PVT.|LTD.,|ALC2/2014|Deferred|
|‘Vag isl|

----- End of picture text -----<br>

iid Fiese SERSEEE SESS RUA a peromeartaeasn “ieeNO TTE ae as : :01/80/050/00389/AM14/ :61/24/040/00058/AM14/ 03.12.2013 ‘Date:02.09.2014 Decision ‘The Committee noted that hard copy offirm’s application has not been received and a. : detter dated 17.01.2014 has been given to RA and firm followed by two reminders dated 09.4.2014: and 06.06.2014 to them for expediting the hard copy of firm’s application and decided to remind RA: again for expediting the firm’s application. Case is deferred te 02.09.2014.

r Fae re ee arty NamesHElVOET een fitect NDSSS! sn tana cece “4 > ALC2/2013 RUBBER AND PLASTIC ‘ALC2/2014 Deferred : : : TECHNOLOGIES INDHA PAL 22.07.2014 : HORE RLAFIIe ==--———sLic. No/Date:3110061381 Defer » 104/80/050/00449/AhA14/ 131/83/040/00105/AM14/ 05.12.2013 ‘Date:02.09.2014 : jad Decision ‘The Committee noted that firm has not replied to the deficiency letter dated 13.03.2014 | given by C&PC directly followed by DGFT reminder dated 03.06.2014 alongwith copy of deficiency : letter given by C&PC, final reminder dated 16.7.2014, e-mail message dated 21.7.2014 and decided. : ‘to wait for 15 days more ta receive reply from the firm failing which the Cornmittes would be : ‘constrained to reject their case with direction to pay the Custam Outy and applicable interest for . regularization of the license.Case is deferred to 02.09.2014.

==> picture [395 x 352] intentionally omitted <==

----- Start of picture text -----<br> eryan arty En tan soccer enerercnrnanorsain, “ihe[a=oa<br>: ALC2/2013 ‘Name: MARINEFRONTIERS ALC2/2014 “Approved<br>fo: PVT, LTD. 22.07.2014 :<br>- HQFile = RLAFFil@ Lic gfDate:0310760784 | “e<br>(22 201/80/050/00472/AM14/ 03/95/040/00699/AM14/ OS.12.2013<br>- Decision<br>dated [30.6.2014] ‘The Committee [(Copy] [to] [be] decided [ forwarded] to ratify [to] norms [RA][ and] on [firm).] the basis ofDC(IMSME) UO. No. 30(126)/13-ME_<br>-RLA may take necessary action accordingly.<br>= oySa rE,goa arty NamesNlRia enemaieee‘atea/eoe ere :tatamesses |<br>» Aic2/2014 AUIMITED ALC2/2014 ‘Deferred :<br>HO File . ‘RLA File Lie, NofDate:0810126969 ‘Defer<br>23 201/80/O50/00028/AM15/‘Decision ‘The Committee noted-:08/24/040/00377/AM14/that the firm’s application09.12.2013has been forwardedDate:02.09.2014to C&PC on.|<br>» 24.04.2014 and firm's application and relevant documents alongwith reminder dated 30.5.2044 have:<br>: ‘been sent to them again followed by reminder dated 18.7.2014 for expediting their comments and<br>: decided to wait for their comments. Case is deferred to 02,9,2014. ‘<br>54 €252 No.:18/3/80- Party Name:NIRMA Meet No/Date:9/80- Status;<br>* ALC2/2014 UMITED ALC2/2014 Deferred ;<br>| galsil<br>Usyog Ghawan, Mew fatiet<br>----- End of picture text -----<br>

HQ File” — RLA File Lic.No/Date:0810126970 Defer _ 01/80/050/00029/AM15/ :08/24/040/00376/AM14/ 09.12.2013 Date:02.09.2014 > Decision ‘The Committee noted that the firm’s application has been forwarded to C&PC on: (24.04.2014 and firm’s application and relevant documents alongwith reminder dated 30.5.2014 have: ‘been sent to then again followed by reminder dated 18.7.2014 for axpediting their cormments and’ _ decided to wait for their comments. Case is deferred to 02.4.2014. _ ALC2/2013Case No.:24/23/80Party NameBHARAT“ELECTRICALS LIMITEDHEAVY ALC2/2014Meet No/Date:9/20._ Status:‘Deferred : ok : (22.07.2014 ae HO File LA File ‘Lic.No/Date:0410152825 ‘Defer “" DecisionOL/B0/OSG/004S0/aMIas ..04/24/040/00181/AMAa/ 11.12.2013 ‘Datex02.09.2014_ ‘The Committee noted that the firm has sought time till 31.7.2014 vide their e-mail dated ..02.7.2014 for furnishing their reply and decided to grant them time for the aforesaid purpose. Case_ "Case No.24/3/80Party Name:ROSSELLINDIA Meet No/Date:9/80. Status: ALC2/2014 LIRUTED, ALCB/2044 Deferred : oO : 22.07.2014 : 9g HO File CRLAFHe ‘Lic.No/Date:0710100433 Defer “OL/80/050/00035/4M15/ :07/24/040/00263/AM14/ 41.12.2013 Date:02.09,2014 - : ‘Decision :The Committee decided to ask firm to furnish. inforriation as per BEIT letter nO. © 147(12)/2014-IPHW dated 03.7.2014 (Copy of the said communication to be forwarded to firra}, Case: | ds deferred to 02.09.2014. _ Case No.:3/6/80- —PartyName:SHRENO == Meet No/Oate:9/80Status: ALC2/2014 LHVITED ALC2/2014 ‘Deferred -_ 22.07.2014 : . HO File RIA File ‘Lic.No/Date:3410038721 Defer : 27 01/80/050/00136/AM15/Decision :34/24/040/00230/AM14/ 13.12.2013 ‘Date:02.09.2014| | Baroda and‘Thea Committeeletter dated noted18.7.2014 that hardhas been copysent toof firrn’s them applicationin this regard.has not The beenCommittee receiveddecided from RA,ta:: remind RA, Barodafor forwarding the same and send the copy of communication which would be’ Jade to RA in this regard to firm also for their information. Case is deferred to 02.09.2014. i oorea a aeok a ae AE AHORA aonsmoltsa ae Sule bocce ; h e ALC2/2013 DEVELOPMENT‘LTD. ENGINEERS ALC2/2014 ‘Deferred d 28 . 22.07.2014 hg File ORLA File ‘Lic. No/Date:0510373563 Defer — OLYSOUSU/O0429/AMId/ :05/23/040/00372/AMI14/ 16.12.2013 Bate:02.09.2014_ Becision ‘The Committee noted that firm has not replied to deficiency letter dated 18,07,2014 and

==> picture [397 x 602] intentionally omitted <==

----- Start of picture text -----<br> : reeerees Seana?Ee firm. Case is deterred to 62.08.2044. aa oo 4<br>f x =oeie rece ~~ pargyTe facetaber ogoT ee<br>: (&LC2/2013 ‘ELECTRICALS LIMITED ‘ALC2/2014 “Deferred<br>Do: 22.07.2014<br>_ fide<br>01 /80/050/00451/AM14/cosas vp iesteseesee RA:04/24/040/00199/AM14/pap comers *etNo/bateOaiOisaiia17.12.2013 Defer‘Date:02,09.2014soe«<br>Decision :The Committee nated that the firm’s reply received through e-mail dated 14.7.2014 has<br>> ‘been sent to DHI on 18.7.2044 for examination & comments and decided to wait for DHI camments. ;<br>' Case is deferred to 02.09.2014. :<br>ee Saitry aterae i iecunaiban sae. 2 ‘BeatSarre<br>: (BLC2/2014 ELECTRONICS LTD. -ALC2/2014 Deferred<br>a: 22.07.2014<br>7 ii Fie” SURE a, oe Liciio/Date:0810373913 outer ce cote 3<br>"01/80/050/00034/AM15/ :05/24/040/00338/AM14/ 181220130 — Bate:02.09.2014<br>| Decision :The Committee noted that the firm’s application has been sent toDEITon 24.4.2014 for,<br>| cexamination & comments followed by reminder 18.07.2014 and decided to wait for DEIT comments.<br>» Case is deferred to 02.09.2014.<br>7 Case No,:28/3/80- Party Name:TRANSASIA BIC Meet No/Date:9/80- Status:<br>ALC2/2014 SMEDICALS LTD, ALC2/2014 ‘Deferred :<br>_ - (22.07.2014 —<br>HO File RLA File ‘Lic.No/Date:0310762929Defer<br>3 1 01/80/050/00039/AM15/ :03/95/040/00741/4M14/ 23.12.2013 “Date:02.09.2044 |<br> Decision :The Committee noted that firmhas not replied to deficiency letter dated09.06.2014given<br>‘by DENT directly followed by DGFT reminder dated 16.06.2014 and decided to send final reminder to:<br>. ithe firm for expediting their reply failing which the Committee would be constrained to reject their:<br>: ‘case with direction to pay the Custom Duty and applicable interest for regularization of the license. |<br>: Case is deferred to 02.09.2014,<br>—-Real cpescnamrinens :aniiboeae “Teeae eee7 acai |<br>: (ALC2/2014 TECHNOLOGIES LTD, ALC2/2014 Deferred<br>HQ File RLAFile ‘lic.No/Date:0310763389 Defer<br>33 '01/80/050/00038/AM15/ ::03/95/040/00659/AM14/ (26.12.2013 ‘Date:02.09.2014 -<br>Decision :The Committee noted that firm has not replied to the deficiency letter dated 16.05.2014:<br>given by OEIT directly followed by DGFT reminder dated 06.06.2014, final reminder dated 17.7.2014:<br>: and decided to await 15 days more to receive reply from the firm failing which the Committee would<br>. ‘be constrained to reject their case with direction to pay the Custom Duty and applicable interest for:<br>regularization of the license.Case is deferred to 02.09.2014. !<br>Ministry of Goramerce & inelusiry<br>----- End of picture text -----<br>

: _ ces sroncoanasemecoeen (arty NamecTHERMAX LTD, (ost No/ostea/60. Shataa: reguutyaasenenet : -ALC2/2014 : ALC2/2014 Deferred 22.07.2014 ~~ 301/80/050/00016/AM15S/ :31/83/040/00174/AM14/ 27.12.2013 ‘Date:02.09.2014_ Decision ‘The Committee noted that the firm’s reply dated 14.07.2014 has been sent to DH} on. 217.2014 for examination & comments and decided to wait for DHI comments. Case is deferred to: - 02.09.2044. : . Case No.:7/3/80Party NamesTATA HITACHI ‘Meet No/Date:3/80Status: ; _ ALC2/2014 (CONSTRUCTION ALC2/2014 Deferred eee (MACHINERY CO.LTD, 22.07.2014 a ‘ag HO File RLAFiIe ‘Lic.No/Date:0210198498 Defer ~ 301/80/050/00018/AM15/ —:02/24/040/00171/AM14/ 06.01.2014 ‘Date:02.09.2014 ‘Decision ‘The Committee noted that firm has not replied to deficiency letter dated 03.06.2014 : followed by reminder 18.07.2044 and decided to wait for fires’: reply. Case is. deferred ta: =coe CT a cot eenSantee soe se ny ce epee eas i ‘ALC2/2014 CONSTRUCTION ALC2/2014 ‘Deferred ‘MACHINERYCO, LTD, 22.07, 2014 35 HO Fite ' RLA File ~ Lic. No/Date:0210198490 ‘Defer : 3O1/8C/050/00019/AMA1S/ 02/24/040/00170/AM14/ 06.01.2014 ‘Date;02,09.2014: | ‘Decision ‘The Committee noted that firm has not replied to deficiency letter dated 03.06.2014: : followed by reminder 18.07.2014 and decided to wait for firm’s reply, Case is deferredto 02.09.2014 - Genes" eamaT adGbendaeoe: , ; ALC2/2014 ‘CONSTRUCTION ALC2/2014 Deferred _ ae (MACHINERY CO, LTD, (22.07.2014 ‘gg HO File RLA Fite ‘Lic, No/Date:0210198493 Defer ” OL /SO/R50/00020/AMI5/ SOQ/2d/O40/O01SB/AM14/ “06.02.2014 Date:02 09.2014 ‘Decision ‘The Committee seted that firm has not replied to deliency letter dated 03.06.2014 jollowed by reminder 18.07.2014 and decided to wait for firm’s reply. Case is deferred to.

==> picture [395 x 125] intentionally omitted <==

----- Start of picture text -----<br> vmome — Saapnamapowne her SS sachs ai a. esprensa<br>37 :HQFile —RLAFIIe = Lic.No/Date:0510375759 Defer<br>_ ‘Decision18.07.2014‘Thefor examinationCommittee andnoted commentsthat the andfirm’sdecidedapplicationto wait for theirhas been camments.forwardedCaseto.is CRPC deferredon :<br>ii FL, y .<br>‘ Folg 4<br>----- End of picture text -----<br>

==> picture [401 x 604] intentionally omitted <==

----- Start of picture text -----<br>

  • ito 02.9.2014,<br>‘Case No.:10/3/80- ‘Party Name:TATA HITACHI] ‘Meet No/Date:9/80- Status:<br> ALC2/2014 CONSTRUCTION -ALC2/2014 Deferred<br>Bo MACHINERY CO.LTD, = 22.07.2014<br>;ig ‘HQ'301/80/050/00021/AM15/ File 'RLA :02/24/040/00178/AM14/ File ‘Lic. °16,01.2014No/Date:0210198878 Defer‘Date:02.09,2014:<br>' [Decision -The Committee noted that firm has not replied to deficiency letter dated 03.06.2014<br>followed by reminder 18.07.2014 and decided to wait for firm’s reply, Case is deferred to:<br>02.09.2014.<br>> Case No.112/3/80- ‘Party Name:HITAISHI KK ‘Meet No/Date:9/80- ‘Status:<br>" cALC2/201a ‘MANUFACTURING ‘ALC2/2014 ‘Deferred :<br>— COMPANY PRIVATE 22.07.2014 :<br>oo: LIMITED, :<br>39 HQ File RLA File ‘Lic.No/Date:0210199203 Defer<br>- :01/80/050/00023/AMI5/ ':02/24/040/00180/AM14/ 23.01.2014 ‘Date:02.09.2014|<br>: ‘Decision <The Committes noted that the firmn’s application has been forwarded to MSME on:<br>' 25.04.2014 for examination and comments followed by reminder dated 18.7.2014 and decided to:<br>"wait for their comments, Case is deferred to 02.9.2014.<br>Case No.:41/3/80-ALC2/2014 |Party Name:LARSEN& “Meet No/Date:9/80- Status:<br>Pt “TOUBRO LIMITED “ALC2/2014 “Approved |<br>. AHO File “RLA File ‘Lig. No/Date:03 10768433 |<br>» :101/80/050/00052/AM15/ :03/95/040/00857/AM14/ 29.01.2014 :<br>' Decision :The Committee decided to ratify norms on the basis of DIPP I.D. No. 12/104/2014-TSW/40<br>: ‘dated 22.07.2014 which are as under: :<br>| 1. Net Fabricated weights of 104.086 MT, 54.678 MT, 77.173 MT, 55.877 MT, 90.356 MT,<br>27.948 MT & 27.948 MYT may be specified with the quantities of export products at Si. No. 1:<br>; ta? respectively. :<br>: 2. List of import items may be revised as per the revised list submitted by the firm vide their:<br>AQ : letter dated 18 July, 2014 (copy enclosed).<br>: | 3. Import item at Sl1 shall be of relevant grade and thickness as contained in the export:<br>i 3 products. i<br>: 4, Quantityin the exportof imppr o ductsrt item after at SL1/3" No. recovery 1 may be allowed from serap. as 373068 Kgs as 1.105 Kgs./kg, content.|<br>> | 5. Quantity of import item at Sl. No. 2 may be allowed as 212 Nos. on net to net basis. Duty free.<br>Eg weight of this item may be allowed as 69739 Kgs, Inclusive of 3.44 % wastage as claimed by.<br>Pg the firm. : :<br>' + 6 Quantity of import itern at SL No. 3 may-be allowed as 32 Nos. (271.2 Kgs.} on net to net basis.<br>ot with accountability clause.<br>-, - F Importitems at Si.No.4&5 may be deleted as per revised list of import items. :<br>: : § Quantities of import items at SI. No, 6, 7 & 8 (welding Consumables) may be allowed as 6495<br>=~<br>: 3B ee | PARVEEN SHARMA<br>a, Udyeg Bhawan, New Delhi<br>----- End of picture text -----<br>

:

: sees Re ee ee ee le — 4 AR AO Re ORLA may take necessary action accordingly. may take necessary action accordingly. take necessary action accordingly. necessary action accordingly. action accordingly. accordingly. Case No.:42/3/80-ALC2/2014 Party Name:DICKINSON No.:42/3/80-ALC2/2014 Party Name:DICKINSON Party Name:DICKINSON Name:DICKINSON “Meet No/Date:9/80- No/Date:9/80FOWLER PT. LTD. ALCZ/2014 ;

  • ORLA may take necessary action accordingly. may take necessary action accordingly. take necessary action accordingly. necessary action accordingly. action accordingly. accordingly. . Case No.:42/3/80-ALC2/2014 Party Name:DICKINSON No.:42/3/80-ALC2/2014 Party Name:DICKINSON Party Name:DICKINSON Name:DICKINSON “Meet No/Date:9/80- No/Date:9/80Status: FOWLER PT. LTD. ALCZ/2014 Approved

  • ; ; 22.07.2014 . .

  • HQ File -RLA File. Lic. No/Date:0710101899 © : _ 301/80/050/00053/AM15/ —:07/24/040/00394/AM14/ 04.02.2014 | Decision ‘The Committee decided to ratify norms on the basis of DIPP 1.D. No, 12/104/2014-TSW/a1 | ‘dated 22.07.2014 which are as under: ’ 1. Import items from Si No. 1 to 55 may be allowed on net to net basis with accoumabuity - - 2. Tenport items at SL No. 56 & $7 may be allowed on net to net basis as claimed by the firm. _,. 3 fmpart items from Si. Nos, 58 to 79 may be allowed on net to net basis with accountability oh clause. - > | 4, Import items from Si, No, 80 to 82. may be allowed as 1.04 Cubic Mtr./Cubie Mtr. content in’ EO the export products as claimed by the applicant. : 5. import items from Si No. 83 to 110 may be allowed as 1.02 Mtr./Mtr. content in the export: Do: products. : - & clause,Import items from SL No. 114 to 117 may be allowed on net to net basis with accountability: : 7. Irnportitern at Si, No, 118 may be allowed on net to net basis as claimed by the firm.

  • i 8. import items at Sl No. 119 &120 may be allowed on net to net basis with accountability : io: clause. : | RLA may take necessary action accordingly. Case No.:15/3/80-ALC2/2014 ‘Party Name:POLY MEDICURE Meet No/Date:9/80Status: : . LTO. ALOR I2074 Approved

  • | HQ File RUA File ‘Lic.No/Date:0510378996 | . A2 :01/80/050/00026/AM15/ — :05/24/040/00424/AM14/ 11.02.2014 : Dacision :The Committee decided to ratify norms on the basis of CRPC O.M. No. 4601 1/106/2009 -! ‘PC dated 11.6.2014 (Copy is to be forwardad to RA and firm). ;

  • ' RUA may take necessary action accordingly. -eeaar so nnesennn Gaitj WamectEANOP ai IMaet Wo/Dateanaay caida ALC2/2014 ‘ENGINEERING UMITED ALCZ/2014 ‘Deferred :

  • D4 : 22.07.2014 AS harie RLA File —Lie.No/Date:0810128805 Defer * 201/80/050/00045/AM15/ 208/24/040/00486/AM14/ 11.02.2014 ‘Date:02.09,2014: ‘Decision :The Committee noted that firm has not replied to deficiency letter dated 03,05.2014 °

_ follawed by reminder 18.07.2014 and decided to wait for firm's reply. Case is deferred to: 02.09.2014. . . ‘Case Mo.:35/3/80‘Party Name:THE ANUP ‘Meat No/Date:9/80‘Status: : ‘ALCZ/2024 ENGINEERING UMITED ALC2/7044 ‘Deterread HO File RLA File Lic.No/Date:0810128806 Defer gq 01/80/050/00046/AMiS/ —:08/24/040/00490/AM14/ 11.02.2014 Date:02.09.2014. | ‘Decision ‘The Committee noted that firm has not replied to deficiency letter dated 03.06.2014 | | followed by reminder 18.07.2014 and the firm in response of the aforesaid deficiency letter the firm has requested for the grant of 45 days time for furnishing their reply vide their letter dated: :02.7.2014.The Committee decided togrant them 45 days time for furnishing their reply, Case is deferred to 02.09.2014.

  • Case No.:3/26/80Party Name:ALPINE COILS Meet No/Date:9/80“Status: | ALC2/2023 LLP ALC2/2014 Deferred 22.07.2014

  • . HO File ‘RLA File Lic. No/Date:0410155295 ‘Deter 45 :01/80/050/00569/AM14/ :04/24/040/00254/AM14/ 17.02.2014 ‘Date:02.09.2014. ‘Decision ‘The Committee noted that firm has not replied to deficiency Jetter dated 04.04.2014

  • : followed by reminder 18.07.2014. The Committee further noted thet the firm has sought 45 days’ ‘time ta furnish their reply vide their fetter dated 02.7.2014 and decided grant them 45 days* time for:

  • s furnishing their reply, Case is deferred to 02.09.2014, : Case No.:10/26/20‘Party Name:ISGEC HEAVY (Meet No/Date:3/80Status: ALC2/2013-_ ‘ENGINEERING LIMITED ALC2/2014 Approved © 22.07.2014 :

  • / CHO File RLA Fle Lit. No/Gate 051037 O86 78 - 701/80/050/00876/AM14/ 108/23/040/00476/AMI4/ 18.02.2014 > ‘Decision :The Committee decided to ratify norms on the basis of DIPP LD, No. 12/104/2014-TSW/46 | dated 22.07.2014 which are as under: ° i ' 4. Net Empty weights of 92.608 MT, 105 MYT, 235.94 MT, 110.85 MT, 59 MT & 49.86 MT may a be specified with the quantities of export products.at SI. No. 1 to 6 respectively, : : ‘4g. 2. Word “Relevant” say $e prefixed with the dascription of import items at Sl Nos. 1, 7, 8&9. : . : 3. Quantity of impart iteni at $1. No 1 may be allowed as 263034Kgs, (235391 Meters} inclusive u : # of 2 % wastage. ;

  • : > 4. Quantity of import item at SL No. 2 may be allowed as 8 Nos. on net to net basis. Duty free: 2 weightas claimed of thisby the itemfirm. may be allowed as applied for i.e. 46234 Kes, inclusive of 4.17 % wastage i : : & Quantity of import item at SL No. 3 may be allowed as 2 Nos. on net to net basis. Duty free: a weight of this item may be allowed as 3734 Kgs, inclusive of 46.8 % wastage after 20% om recovery from scrap. 2 » > @ Quantity of import item at 5}, No. 4 may be allowed as 2 Nos. on net to net basis. Duty free. / weight of this item may be allowed as 4587 Kgs. inclusive of 33.6 % wastage after 20% 3 ‘ Dyish 4

  • a recovery frora scrap. 5; 7. Quantity of import item at SL. No. § may be allowed as 2 Nos. on net to net basis. Duty free: weight of this item may be allowed as 9560 Kes. inclusive of 37.2 % wastage after 20 MH

  • — recovery from scrap. / ; 8. Quantity of import tem at SL No. 6 may be allowed as 8 Nos. on net to net basis. Duty free: ia weight of this item may be allowed as 36344 Kgs. inclusive of 47.2 % wastage after 20 % : -_ recovery from scrap. : _ 9. Quantities of import items at SI. No. 7,8 &9 may be allowed as 1.0417 Kes./ Kg. content in: : the export products as claimed by the firm. . © > 10. Total quantity of import items at SL. No.7, 8 & 9 put together may be restricted as 94408 Kas. - _ 11, Quantity of import item at SL No, 10 may be allowed as 1 No. on net to net basis. Duty free: weight of this iter may be allowed as 4070 Kgs. inclusive of 37.5 % wastage after 20 %:

  • 4 OE recovery fram scrap. ! 12. Quantity of import item at S|. No. 11 may be allowed as 2 Nos. on net to net basis. Duty free: : | weight of this item may be allowed as applied for i.¢. 6290 Kgs. inclusive of 4.17 % wastage DG as claimed by the firm. Db 43, Quantity of import item at SL No. 12 may be allowed as 6 Nos. an net to net basis, Duty freefo2 weightas claimedof thisby theiternfiemmay be allowed as applied for Le. 12094 Kgs. inclusive of 4.17 % wastage|: . : 44 Quantities of import items at $1 No. 13, 14 & 15 may be allowed as applied for i.e. 90 Kes.,’ af 2500 Kgs. & 2500 Kgs. respectively . RLA may ta ke necessary action accordingly. :

  • Case No.339/3/80Party Name: TATA HITACHI ‘Meet No/Date:3/80‘Status: : -ALc2/2014 CONSTRUCTION ‘ALC2/2014 ‘Deferred MACHINERY CO. LTD, 22.07.2014 :

  • 47 HO, File RLA File ‘Lic. No/ Date 0210200159 Gefer - 1101 /80/050/00050/AM15/ 02/24/040/00199/AM 14/ :18.02,2014 ‘Date:02.09,2014 i Decision : The Committee noted that firm has not replied to deficiency letter dated 03.06.2014: | followed by reminder 18.07.2014 and decided to wait for firm’s reply. Case is deferred to: (02.09.2014.

Case No65/3/86Party NamePUTZMEISTER Meet No/fate:9/80‘Status: : _ ALC2/2014 CONCRETE MACHINES ALC2/2014 Deferred na a ‘PRIVATE LIMITED, 22.07.2014 HO File RLA File -Lic.No/Date:1710005700 Defer 48 01/80/050/00076/AM15/_ 317/24/040/00116/AM14/ 18.02.2014 ‘Date:02.09.2014‘Decision ‘The Committee noted that firm has neither replied to deficiency letter dated 16.05.2014 - ‘followed by reminder dated 18.7.2014 nor sent clarification an type of export (whether physical: ‘export or deemed export against invalidation letter to EPCG license) which has been sought vide: > ‘DES-t letter dated 24.04.2014 followed by reminder dated 18.07.2014 and decided to wait for firm's: ' reply. Case is deferred to 02.09.2014,

==> picture [71 x 32] intentionally omitted <==

----- Start of picture text -----<br> \ Late<br>PARVEEN stiamss,<br>----- End of picture text -----<br>

ee [ae peeaee ag ee yer‘eiano” Sep vs > GALC2 {7014 CONCRETE MACHINES ALC2 #2014 Deferred 3 ieee” seu casas vv vase ALA File reeacinen URINE: neem ee CSRESS Deter v2 ig ©01/80/050/00077/AM15/ 417/24/040/00115/AM14/ 18.02.2014 _ _ Date:02.09.2014 | : Decision :The Committee noted that firm has neither replied to deficiency letter dated 16.05.2014. ‘followed by reminder dated 18.7,.2014 nor sent clarification on type of export (whether physical: ‘export or deemed export against invalidation letter to EPCG license) which has been sought videDES-( letter dated 24.04.2014 followed by reminder dated 18.07.2014 and decided to wait for firm's . reply. Case is deferred to 02.09.2014. : oe iis eT a — ‘Party Name:PUTZMEISTER [Meet No/bate:9/80. Status” at -ALC2/2014 CONCRETE MACHINES ALC2/2014 Deferred 2 3 "PRIVATE LIMITED, 22.07.2014 : i : iQ te” sveenemmeunmanmnaan Veen seve ‘LicNo/Date:37 10008608 ‘beter a 60 201/80/050/00078/AM15/ 217/24/040/001 14/AM14/ 18.02.2014 ‘Date02.09.2014 : : Decision The ‘Cornmittee noted that firm has neither replied to deficiency letter dated 16.05.2014: ' ‘followed by reminder dated 18.7.2014 nor sent clarification on type of export (whether physical’ . lexpert or deemed export against invalidation letter to EPCG license) which hag been sought vide : | creply.-DES-E letterCase datedis deferred24.04.2044to 02.09.2014.followed by reminder dated 18.07.2014 and decided to wait for fiem’s |

==> picture [397 x 257] intentionally omitted <==

----- Start of picture text -----<br> -as So ee tne Seer “3“Tenia eae cose :<br>ALT2/2044 ‘ENGINEERING PYT.LTO., ‘ALC2/2014 Deferred<br>22.07,2014<br>SLHQFie = = REA File Uic.No/Date:0710102245 Defer<br>: :01/80/050/00073/AM15/ 107/24/040/00326/AM14/ 19.02.2014 oo _Date:02.09.2014.<br>: Decision ‘The Committee noted that firm has not replied to deficiency letter dated 09.07,2014 and<br>decided to remind firm for expediting their reply. Case is deferred to 02.09.2014,<br>- Case No.:4/26/20- Party Name JOHNSON ‘Meet No/Date:9/B0- ‘Status: ,<br>. ALCZ/2013 IMATTHEY INDIA PVT. LTD. -ALC2/2074 ‘Deferred<br>22.07.2014<br>: 0 ss ccearanceensa urns re ee svt ‘Lic No/bate:0810380001 |efar ce a<br>:52 :01/80/050/00570/AM14/ 05/23/040/00483/AM14/ 21.02.2014 Date:07.09.2014 i<br>followed by reminder dated 18.07.2014.The Committee further noted that the firm has sought for:<br>: ‘one month time for furnishing the requisite information vide their letter dated 07.07.2014 and:<br>decided to wait for firmn’s reply. Case is deferred to 02.09.2014. :<br>= caemaar’ seven Baryoanee ery ws iioa :<br>~" ALC2/2013 'MATTHEY INDIA PVT, LTD. (ALC2/2014 Deferred<br>----- End of picture text -----<br>

HO| 301/80/050/00571/AM14/ File RLA:05/23/040/00485/AM14/ File Lic. Mo/Date:051038000321.02.2014 _ Pate:02.09.2014Defer

‘Decision :The Committee noted that firm has not replied to deficiency letter dated 01.05.2014. followed by reminder dated 18.07.2014 The Committee further noted that the firm has sought for. " cane month time for furnishing the requisite information vide their letter dated 07.07.2014 and. ' -decided to wait for firm's reply. Case is deferred to 02.09.2014,

i ants acepeyee a “pai NaMSJORNEEN’ Mioek oibacc are operas a (ALCZ/2013 /MATTHEY INDIA PYT, LTO. ALC2/2014 Deferred . CHO Fe RLA File ‘Lic. No/Date:0510380000 ‘Defer ‘84 201 /80/050/00572/AM14/ 3:05/23/040/004982/AMI14/ 21.02.2014 ‘Date:02.09,2014: Decision <The Committee nated that firm has not replied to deficiency letter dated 01.05.2014 : : ‘followed by reminder dated 18.07.2014. The Committee further noted that the firm has sought for: | lone month time for furnishing the requisite information vide thelr letter dated 07.07.2014 and: decided to wait for firmn’s reply. Case is deferred to 02.09.2014, : » onvonanne ~Wearty NemelOenON” oe siresicISRETES se stBagge ALC2/2013 UMATTHEY INDIA PVT. LTD. ALC2/2014 Deferred : a 22.07 2014 : 85 01 /80/O50/00573/AWIL4/ 105/23/040/00484/AM14/ 21.02, 2014 Gate:02,09. 2014 |

‘Decision The Committee noted that firm has not replied to deficiency letter dated 01.05.2014: ; followed by reminder dated 18.07.2014. The Committee further noted that the firm bas sought for: | one month time for furnishing the requisite information vide their letter dated 07.07.2014 and: "decided to wait for firm’s reply. Case is deferred to 02.09.2014.

Case No.8/26/80‘Party Name JOHNSON - Meet No/Date:9/80Status: » ALCL/2013 MATTHEY INDIA PVT. LTD. ALC2/2014 ‘Deferred er i ce 22,07, 2014 ee HQ File . RLA File - Lic.No/Date:0510380004 Deter a 56 :01/80/050/00574/AM14/ :05/23/040/00486/AM14/ (21,02,2014 ‘Bate:02.09.2014 . ‘Decision The Committee noted that firm has rot replied to deficiency letter dated 01,05.2014: followed by reminder dated 18.07.2014. The Committee further noted that the firm has sought for: ° cone month time tor furnishing the requisite information vide their letter dated O7.07.2014and: ‘decided to wait for firm’s reply. Case is deferred to 62.09.2014. : ; “Case No.:46/3/80. ‘Party Name :BOTIL GIL Miser No/Date:9/80‘Status: py ALC2/2014 ‘TOOLS INDIA PVT ALC2/2014 Deferred ce ‘LTD(FORMERLY BAKER OIL 22.07.2014 : : HQ Fite — RLAFle Lic. No/Date:0510380277 Deter

  • 101/80/050/00057/AM15/ :05/23/040/00457/AM 14f 26.02.2014 = Date:02.09.2014 Decision ‘The Committee noted that the DHI has furnished their inputs vide communication dated. (08.07.2014. The Committee considered the firm’s reply and decided to send a clarification letter to. : ithe firm in respect of the issues raised by the firm in their reply.Case is deferred to 02.9.2014 ; "Case No,:4/3/80PartyName:MOTHESSON “Meet No/Date:d/80Status: _ “ALC2/2014 ‘SUMI SYSTEMS LTD., ALC2/2014 Deferred i (22.07.2014 4 s tid gyre enemas1 ae * ic No/Date-0810380N88 (Deter sonnet : “* 3101/80/050/00015/AM15/ :05/24/040/00454/AM14/ 27.02.2014 ‘Date:02.09.2014 "Decision :The- Committee noted that the firm's application has been forwarded to C&PC on: . 26.04.2014 followed by reminder dated 03.6.2014 and decided to wait for their comments. Case is: deferred to 02.9.2014.

.

: - ¢porea eee Estyaon rereSGReer ne Satuane : » ALC2/2014 ‘LIMITED ALC2/2014 ‘Deferred ‘ -_ 22.07.2014 ; 59 me te rscmmnrccmi “mee ccc Taser eter” eerenae © 701/80/0S0/00061/AM15/ .05/23/040/00497/AM14/ 27.02.2034 ‘Date:02.09.2014 | | Decision :The Committee noted that firm has not replied to deficiency letter dated 09.06.2014 and. _ ‘decided to wait for firm’s reply. Case is deferred to 02.09.2014. Case No.:51/3/80Party Name:BOYSEN INDIA Meet No/Date:9/80- Status: 4 - ALC2/2014 ‘UMITED ALC2/2014 Deferred DG 7 22.07.2014 : 60 iQ ie coconuts “BLA Fite sxastagoinrtnte soepecenna ices) bore ana pupigermcanasma > ‘Decision-201/80/050/00062/AML5/ :05/23/040/00493/AM14/ (27.02.2014 ‘Date:02,.08.2014| :The Committee noted that firm has not replied to deficiency letter dated 09.06.2014 and: . decided to wait for firm’s reply. Case is deferred to 02.09.2014. i : ” Gase Nowa/S/80. eenSee None USEst iMicet No/bate:9/30caeeee— - -ALC2/2014 AERONAUTICS LTD, “ALC2/2014 “Deferred 22.07.2014 oo BO File —RLAFIIe = Lie. NofDate:0710102484 Defer - 101/80/050/00014/AM15/ 107 /24/040/00347/AM14/ 28.02.2014 Date:02.09.2014 . 61» Decision :The Committee decided to ask the following informationfrom the firm on the basis of DIPP_ ‘UO Note No. 12/104/2014-T5W/61 dated 22.07.2014: St 1. Information in respect of SI. No. 3, 4 & 11 of Standard Deficiency Format, export product a, wise. : ; 2. Cutting allowance and any other allowance / wastage, export product wise. ; 4, 3. Consolidated requirement of each raw material based on the raw material reauirement for: = 4 one unit af export product. a (Selahy _PARVEEN SHARMA

==> picture [397 x 348] intentionally omitted <==

----- Start of picture text -----<br> | Cosel deferred 10 02.00.2038,_ :en AeeS amnael<br>‘Case No.:43/3/80- Party Name:BOYSEN INDIA ‘Meet No/Date:9/80- ‘Status:<br>- ALC2/2014 LUVHTED ALCZ/2014 ‘Deferred :<br>_ 22.07.2014 .<br>gz HO File _ RLAFIIe Lit, No/Date:0510380537 Defer<br>: °:01/80/050/00054/4M15/ :05/23/040/00495/AM14/ 28.02.2014 ‘Date:02.09,2014 |<br>> (Pecision :‘The Committee noted that firm's application has been sent to MSME 16.04.2014 for:<br>‘examination & comments followed by reminder dated 18.07.2014 and decided to walt for MSME-<br>- ‘Sormments, Case is deferred to 02.09.2014.<br>“eseg eae fete party NemeTTOSHIBA ISW iMeet No/batess/B0.=e a<br>‘ ALC2/2013 ‘POWER SYSTEM PRIVATE |ALC2/2014 ‘Deferred<br>i 4 ae LNVITED (22.07.2014<br>gg 101/80/050/00567/AM14/HO File RLA104/24/040/00213/AM14/File : ~03.03.2014Lic.No/Bate:0410155774 Defer“Oate:02,09.2014<br>- Decision :The Committee noted that firm's application has been sent to DHI 04.06.2014 for:<br>cexarination & comments and decided to remind DH] for expediting their cornrments. Cage is:<br>- omnes” — aoa <ree ae<br>ALC2/2014 'MEDICURE LTD, ALC2/2014 ‘Approved<br>HO File ORLA File . Lic. No/Date:0510380666 .<br>,_ PCI‘Decisiondated‘The11.6.2014 (CopyCommittee decidedto be forwardedto ratify normsta RA andon thefirm). basisofCRPC O.M. No. 46011/106/2008- -<br>----- End of picture text -----<br>

==> picture [396 x 217] intentionally omitted <==

----- Start of picture text -----<br> RIA may take necessary action accordingly. :<br>Case No.:60/3/80-ALC2/2014 ‘Party Name:POLY MEDICURE Meet No/Date:9/80- Status:<br>LT, ALC2/2014 ‘Approved<br>a 22.07.2014 :<br>CHO.65 Fle - RLA File Lic. No/Date:0510380665_ .<br>:01/80/050/00071/AM iS/ 105/24/080/00847/AM14/ 03,04.2044<br>: ‘Decision ‘The Committee decided to ratify narms on the basis of C&PC O.M. No. 48011/106/2009-<br>PCH dated 11.6.2024 (Copy is to be forwarded to RA and firm). i<br>> ORLA may take necessary action accordingly. :<br>gg C88 No.134/3/20- Party Name:BANGALORE -MeetNo/Date9/80- Status;<br>- ALC2/2014 VALVES PVT, LTD., ALC2/2014 Deferred ;<br>ole)<br>----- End of picture text -----<br>

==> picture [398 x 545] intentionally omitted <==

----- Start of picture text -----<br> ge 22.07.2014<br>‘HO, File (RLA File ‘Lic. No/Date:0710102615 Defer :<br>01/80/050/00025/AM15/ :07/24/040/00436/AM14/ 05.03.2014 ‘Date:02.09.2014:<br>: Decision :The Committee noted that firm has not replied to deficiency letter dated 30.06.2014 and<br>_ decided to wait for firm’s reply. Case is deferred to 02.09.2014,<br>' Case No,:45/3/80-ALC2/2014 ‘Party Name ISGEC HEAVY ‘Meet No/Date:9/80- ‘Status: :<br>& ENGINEERING LIMITED “ALCB/2014 Approved<br>: HO File RLA File Lic. No/Date:0510380928 -<br>' 201/80/050/00056/AM15/ 305/23/040/00S00/AM14/ 05.03.2014<br>- Decision :The Committee decided to ratify norms on the basis of DIPP LD. No. 12/104/2014-TSW/67<br>| ‘dated 22.07.2044 which are as under: :<br>"4,: MetMYT Eripty17.4 MT,weights33.2 MT &of 192 daMYT.MT273mayMY,be specified144 MT, 448.56with theMT,quantities33 MT, 25.8of exportMIT, products76.3 MT, at834° Si<br> o : No. 11011 respectively, .<br>_: : 2, Word “Relevant” may be prefixed with the description of import items at SI. Nos. 1 ta 8 ,10ta i<br>12, 14 to 16 & 21.<br>: | 3. Quantities of import ftems at SI. No. 1, 3, 6, 7, 8, 10, 11, 12, 14, 15 B16 may be allowed as.<br>| 1.0417 Kgs./ Kg. content in the export products as claimed by the firm, i<br>. ' 4. ofQuantity2 % wastage. of import item at SL No 2 may be allowed as 203891 kes. (163945.4 Meters) inclusive:<br>: | 5, Quantity of import item at SI. No 4 may be allowed as 14136Kgs. (10409 Meters) inclusive af:<br>- 2 % wastage.<br>__:G7)§ Quantity of import item at SL No. S$ may be allowed as 3 Nos. on net to net basis. Duty free-<br>weight of this item ray be allowed as 36258 Kgs. inchusive of inclusive of 47 9 wastage after:<br>20% recovery frora scrap, :<br>- - 2, Quantity of import item at Sl. No. 9 may be allowed as 7 Nos. on net to net basis. Duty free :<br>DS weight of this item may be allowed as applied for ie. 16944 Kgs. inclusive of 4.17 % wastage |<br>as claimed by the firm, :<br>:/ 8. Quantity of import item at SL No. 13 may be allowed as 6 Nos. on net to net basis. Duty free:<br>ae weight of this item may be allowed as 34144 Kgs. inclusive of inclusive of 42 °% wastage after:<br>:: ; &. Quantities20 % recavery ofimportfrom hemsscrap. at SL. No. 17 & 18 may be allowed as applied: for i.e. 4300 Kes. each, :;<br>| | 40. Quantities of import items at SI. No, 19 & 20 may be allowed as applied for i.e, 1500 Kgs. each. |<br>a | 11. Quantity of import item at SI. No 24 may be allowed as 9243kgs. (9713.4 Meters) inclusive of.<br>>: 2 % wastage. 1<br>12, Quantity of import item at SL No. 22 may be allowed as 2 Nos. on net to net basis. Duty free<br>weight of this item may be allowed as 8566 ps. inclusive of inclusive of 13. % wastage after.<br>20% recovery from seran.<br>DG> : 413. Quantity of import item at Sl. No. 23 may be allowed as4 Nos. on net to net basis. Duty free.<br>a claimedweight ofby this the itemfirm. may be allowed as applied for Le. 9492 Kgs. inclusive of 4.17 % wastage as:<br>- [RLA may take necessary action accordingly, Ne<br>PPh RY<br>----- End of picture text -----<br>

oe eeSposa Prenatal ject Nojbatcaree. foneee | (ALC2/2014 ‘SVESSELS LIMITED ALC2/2014. Deferred ; oe ; 22.07.2014 HOFile = —————sFRLA File Lie. No/Date:3410039435 ‘Defer : _ 104/80/050/00041/AM15/ 34/24/040/00286/AM14/ 06.03.2014 Gate:02,09,2014‘Decision <The Committee decidedto ask the following information from the firm on the basis of DIFP: . 68 ‘UO Note_ 1. As No.per application, 12/104/2014-TSW/68net weight datedof 2 Nos.22.07of,2014-- CoKe drums is 1140.252 MT, whereas,; now the : ig weight of two equipment has been indicated as 1107.985 MT and the same may be clarified, - |. 2, Ust of import items and their quantities now indicated in material calculation sheet do not: bo match with the list of import items and the same may be corrected, | 3. No basis has been given for the wastage claimed on import items and quantity of welding. bog consumables, Accordingly information In respect of SI. No. 4, 5, 11 & 14 of Standard Deficiency: Case tsFormat,deferredexportto 02.09.2014. product wise may be submitted, : Case No.33/3/80‘Party Name:ZENITH “Meet No/Date:9/80‘Status: i -ALC2/2014 PRECISION PVT LTD ., ‘ALC2/2014 Deferred : HO (22.07,2014 ' 69[701/80/050/00044/AM1S/] File RLA-07/24/0d0/00446/aM14/ File 06.03.2014‘Lic.No/Date:0710102672 Defer‘Date:02.09.2014. Gecision The Cormmittee noted thet the firm has nor replied Lo the deticiency letter dated G2.7.2014 _ which has also been sent through e-mail on 21.7.2014, The Committee further noted that firms. F clarification on type of export (whether physical export or deemed export against invalidation letter to EPCG license) has been sought vide DES-/ letter dated 21.07.2014 which has not been received | _ and decided to remind firm for expediting their reply. Caseis deferred to 02.09.2014. | ‘Case No.54/3/80Party Name:MAGNET| Meet No/Date:9/80“Status: . ALCZ/2014 MARELU UM ELECTRONIC ALC2/2014 ‘Deferred : co SYSTEMS PYT.LTD., 22.07,2014 : . 7p (HO File RLA File ‘Lic.No/Date:0510381100 Defer “ 301/80/050/00065/AM15/ 105/24/040/00458/AM14/ (06.03.2014 ‘Date:02 09,2014 - : Decision <The Committee noted that the firm has not replied to the deficiency letter dated | 106,05.2014given by DEIT directly followed by OGFT reminder dated 18.07, 201dalongwith copy of. | aforesaid deficiency letter and decided to wait for Tirm’s reply. Case is deferred to 02.09.2014, Case No.:55/3/86‘Party Name:OMEGA ICEHILL Meet No/Date:9/80- ‘Status: . ALCZ/2014 PRIVATE LIMITED ALC2/2014 ‘Deferred - ee 22.07.2014 : Ha File RLA File -—ikic.No/Date:0510381107 Defer : | 201/80/050/00066/AM15/ :05/24/040/00469/AM14/ 06.03.2014 =-———Dates02.09.2014 Decision :The Committee noted that firm has not replied to deficiency letter dated 18.07.2014 and:

i: \

Vdyag Bhawan, New Delt) 1

==> picture [400 x 538] intentionally omitted <==

----- Start of picture text -----<br> ' pyeumene eaeoncpen aoee a ae 7 coc susnanastance "<br>= ase Wo. 87/a" ‘Fav ione ease oe ‘Weacy a<br>: (AlC2s2014 GUTSTRINGS PVT. LTD. ‘ALC2/ 2014 ‘Deferred :<br>ge : (22.07.2014<br>jp li Ble easements a ‘ee AERMETGNIRNOR CTR ‘vie Nofbate:0840361108 eter —<br>“© .01/80/050/00068/AM15/ 05/24/040/00463/AM14/ 06.03.2014 —— Date:02.09,2014<br>Decision :The Committee noted that the firm’s reply dated 25.6.2014 has been forwarded to CRPC.<br>followed by reminder dated 02.7.2014 for expediting their comments and decided to send reminder:<br>: ‘to CRPC. Case is deferred to 02.9,.2014. :<br>“Case No.:69/3/80- Party Name:MERSEN INDIA ‘Meet No/Oate:9/80- “Status: :<br>> (ALC2/2014 -PYT LTO ALCZ/2014 ‘Deferred<br>_ i ae a 77nn lic No/Datewoai01ss921 beter |<br>“* .04/80/050/00080/AM15/ 704/24/040/00275/AM14/ 06.03.2014 ‘Date:02.09.2014 |<br>Decision :The Committee noted that firm has notrepliedto deficiency letter dated 17.07.2014.<br>followed by e-mail dated 21.7.2014 and decided ta wait for firm’s reply, Case is deferred ta<br>02.09.2014.<br>:GS=e GOARELLEBORE Iect No/bate-s/B0” ~ iste stress !<br>— ALC2/2014 ANOUSTRIAL PRODUCTS ALC2/2014 ‘Deferred "<br>INDIA PRIVATE LTD 22.07.2014 i<br>gq HO File REA File Lic.No/Date:0710102742 Defer -<br>“"301/80/050/00074/AM15/ :07/24/040/00468/AM14/ 10.03.2014 ‘Date:02.09.2014:<br>- ‘Decision:The Committee noted that the firm's reply dated 12.6.2014 has been forwardedto:<br>- I DIPP{(Sh. Nand Lal, Sr. 0.0.) on 017.2014 and decided to send reminder to DIPP(Sh, Nand Lal, Sia<br>: 3D.0.) for expediting DIPP comments. Case is deferred to 02.9.2014.<br>Case No.:38/3/80- =—-—PartyName:STANADYNE Meet No/Date:9/80- Status;<br>» ALC2/2014 AMALGAMATIONS PVT. “ALC2/2014 ‘Deferred<br>¢ ATO. (22.07.2014 :<br>pee a file ORES suena ifaneipsie canineses<br>- SOU/SO/OR0/O0D49/AM15/ :04/24/040/00279/AM14/ 11.03.2014 ‘Date:02.09.2014:<br>_ Decision :The Committee noted thatthe firm’s application has been forwarded toDH! on 18.7.2014.<br>: for examination & comments and decided towait for DHI comments. Case is deferred to 02.9.2014.<br>aEgoesmn inane iMeet WoeT lll Seay<br>- ALC2/2044 DEVELOPMENT ENGINEERS ‘ALC2/2014 ‘Deferred<br>16 “TD: 22.07.2014 .<br>: HQ File RUA File ~~ Lic.No/Date:0510381683 Defer<br>: 304/80/050/00060/AM15/ :05/23/040/00498/AM14/ (12.03.2014 ‘Date:02.09.2014.<br>----- End of picture text -----<br>

followedDecision:The Committee noted that firm has not repliedto deficiency letter dated 18.07.2014. : by e-mail dated 21.7.2014 and decided to wait for firm’s rently. Case is deferred to 02.09.2044. : Case No.:58/3/80-ALC2/2014 Party Neme:POLY MEDICURE Meet No/Date:9/80Status: 2% ATO. ‘ALC2/2014 Approved — fd Oo : 22.07.2014 | HQFile RA File " Lic.No/Date:0510381645 — . ‘77 OL/80/050/00069/AM1S/ —:05/2a/040/00474/AM14/ 12.03.2014 , ‘Decision :The Committee decided to ratify norms on the basis of C&PC O.M. No. 46011/106/2009. - P-L dated 02.7.2014 (Copy is to be forwarded to RA and fires). : | ORLA raay take necessary action accordinghy, » CaseNo:70/3/80Party Name:ISGEC HEAVY Meet No/Date:9/80Status: - ALC2/2014 ENGINEERING LIMITED ‘ALC2/2014 Deferred : i 22.07.2014 : # HO File” . RLA File ) ‘Lic. Mo/Date:0510381563 Defer JOD /BOOSIYODURT/AMIS 5/23/0400 /00504/ANIT4/ 12.03.2014 ‘DPate:02.09.2014 | . Decision <The Committee noted that firm has not replied to deficiency letter dated 18.07.2014. . followed by e-mail dated 21,7.2014 and decided to wait for firm‘s reply. Case is deferred to: 02.09.2014 ee os ;“aese——— “e iamcnnnaSe SlaneRe eraigan ela | ALOR /204 -BOLDROCCHI INDIA PVT, ALC2/2014 ‘Deferred . 2S ATD., 22.07.2014 gg HO File ALA File Lic.No/Date:0410156176 Defer _ :01/80/050/00082/AM15/ :04/24/040/00284/AM14/ 42.03.2014 ‘Date:02.09,2014 : » ‘Decision :The Committee noted that firm has not replied to deficiency letter dated 18.07.2014. | followed02.09.2014,by e-mail dated 21,7.2014 and decided to wait for fire’s reply. Case is deferred to. . Case No.:72/3/80Party Name:AEROTO Meet No/Date:9/80Status; ALCZ/2014 BOLDRGCCHI INDIA PYT, ALCQ/2014 Oeferred ; go HO File . RLA File . “/Lic.No/Date:0410156209 ‘Defer “:01/80/050/00083/AM15/ =104/24/040/00289/AM14/ $13.03,2014 ‘Date:02.09,2014 : | Decision ‘The Committee noted that firm has not replied to deficiency letter dated 18.07.2014: followed by e-mail dated 21.7.2014 and decided to wait for firm’s reply, Case is deferred to: 02.09.2014.

==> picture [114 x 10] intentionally omitted <==

----- Start of picture text -----<br> Okectorals General of ForaignTrade<br>----- End of picture text -----<br>

  • ncayao1a oR OEE RE AUTOMOTIVE SysTEMs micaeia ee anced — , Do: ANDIA PRIVATE LIMITED (22.07.2014 : | gueee al 7— {ic No/bate:b#10186i06 [beter oe — ' SOL/BO/OSO/O0051/AMI5/ 04/24/040/00287/AM14/ (14.03.2014 Date:02.09.2014| _ Decision :The Committee noted that firm has not replied to deficiency . :fallowed by e-mail dated 17.7.2014 and decided to wait for firm’s reply.letterCasedatedis deferred07.07.2014:ta: 02.05.2014. : oon ee a SAV SRSEIDE RRR a geT ; _ ALC2/2014 ‘BERGEMANN INDIA ALC2/2014 ‘Deferred rf PRIVATE LIMITED 7 22.07.2014 i j 82 HQ File (RLAFIe “Lic. No/Date:0510384544. Defer 4 : '01/80/050/00194/AM15/ :05/23/040/00017/AM15/ 122,04,2024 ‘Date:02.09.2014" "Decision ‘The Committee noted that the firm's application has been forwardedto DH} on 18.7.2014 - for examination & comments and decided te wait for DMI comments. Case is deferred te G2 4314.

==> picture [397 x 359] intentionally omitted <==

----- Start of picture text -----<br>

  • =kye a * arty NamastuTin FE” = “Wieet wry ‘Satur ve<br>| ALC2/2014 PROTECTION INDUSTRIES “ALC2/2014 ‘Deferred :<br>Bi ‘LIMITED 22.07.2014<br>Ls Ha Fileparis unmucaormannscemegamgnceameana "ig hig/bate 0310778860 ica<br>- -LOL/BAJOSOVOOLOR/AMIS/ O38/85/0d0/000S27AM15/ 29.04.2014 Date2OF 2044 -<br>_ Decision :The Committee noted that the firm's application has been forwarded to DIPP on 24.7.2014<br>: for examination & comments and decided to wait for DIPP comments. Case is deferred to 02.9.2014,<br>r nara specuerenave ye (Party Nam“ae “Weer No/bate'9/é0.” ‘Status: conan<br>: ALC2/2014 ENGINEERING PVT.LTD, “ALC2/2014 Deferred<br>a 0 pageant EW gggressonesacnancee “Vie No/bate:6710103908 Deter satsl<br>: , -01/80/050/00195/AM15/ :07/24/040/00036/AM15/ 09.05.2014 ‘Date:02.09.2014 -<br>‘Decision :The Committee noted that the hard copy of the firm’s application has not been received|<br>> ‘and decided to ask RA, Bangalore to furnish the hard copy of application, Case is deferred to.<br>02.9.2014. :<br>Case No.:1/6/80-ALC2/2014 Party Name:MHI-VST DIESEL MeetNo/Date:9/80- Status:<br>1<br>E ‘ENGINES PVT.LTD, ALC2/2014 ‘Approved —<br>: 22.07.2014<br>85 ::01/80/050/00134/AM15/ 907/24/040/00042/4M15/ (21.05.2014<br>| Decision :The Committee decided to ratify norms of subject AA on GN-4 basis as per DHI written<br>_ communication dated 22.67.2014. j<br>RLA may take necessary action accordingly, 0.<br>PARVEEN SHARMA<br>----- End of picture text -----<br>

==> picture [397 x 598] intentionally omitted <==

----- Start of picture text -----<br> Ae casansia/efeualeERaN eaa iiis.“eae :<br>S| ENGINES PVT.LTD, ALC2/2014 ‘Approved<br>Dd 22.07.2014<br>: tia ae ee asrt me es | ; |<br>86 :01/80/050/00135/AM15/ —:07/24/040/00041/AM1S/ 21.05.2014<br>: Decision‘communication:The Committeedated 22.07.2014. decided ta ratify norms of subject AA on GN-4 basis as per OH written:<br>ORLA may take necessary action accardingly.<br>Case Now14/6/80-ALC2/2014 Party Name:ANGIPLAST Meet No/Date:9/80- Status:<br>yu PRIVATE LIMITED ALC2/2014 Closed<br>HO File RLA File ‘Lic.No/Date-0810131838 - ;<br>Decision ‘The Committee noted that O/a RA, Ahmedabad has informed that the subject AA has been<br>issued on repeat basis (NC Meeting No. 8/80 dated 10.7.2012} and decided to close the case, :<br>RA may take necessary action accordingly, . :<br>Case No2/9/80- Ss PartyName:POLY “Meet No/Date:9/80- Status:<br>- -ALC2/2014 AMEDICURE LTD, ALC2/2014 ‘Deferred ;<br> ' 22.07, 2014<br>gg HOFile . RLAFII@ =——SCLic.N/Date 0510388532 Defer .<br>~ ” 102/80/050/00193/AM15/ 20S/24/040/00102/AM15/ “10.06.2014 ‘Date:02.09.2014 -<br>Decision ; The Committee nated that the firm’s application fias bean forwarded to C&PC on<br>_—-21.7.2014 for examination & comments and decided towait for C&PC comments, Case is deferred to-<br>| 02.9.2014,<br>. . :<br>Case No:5/9/80- Party Name:PLANSEE INDIA Meet No/Date:9/80- Status:<br>ALCZ/2014 HIGH PERFORMANCE ALC2/2014 Deferred ;<br>sg MATERIALS PVT LTD 22.07.2014<br>89.HO| File a RLAFiie "Lic. No/Date:0710105663‘Defer<br>101/80/050/00196/AM1S/ :07/24/040/00127/AM15/ 11.07.2014 S Date02.09.2014.<br>Decision :The Committee noted that the hard copy of firm’s application has not been received and:<br>decided to ask RA, Bangalore to furnish the hard copy of application. Case is deferred to 02.59.2014.<br>So 216<br>/Case No. A/R10 | M/s. Minda Sai | HOF.No.01/80/050/00903/AMOB/DES. [Lic No.@ date<br>| Meeting No.09/15 | , RA.F.No.03/95/040/00474/AMO8 | 0310440650<br>parveen SHARMA<br>Diaclorate General of Foreign Trade<br>MinistryUdyog of [Bhawarl,] Commerce [ Maw][ Deets] &indusir’<br>----- End of picture text -----<br>

Decision ; The Committee noted that the firrn’s reply dated 11.6.2014 has been forwarded to DHI on 04.7.2014 for examination & comments and decided to wait for DHI comments. Case is deferred to 02.9.2014.

==> picture [391 x 86] intentionally omitted <==

----- Start of picture text -----<br> S.No.217<br>Case No, A/R-G7 | M/s. —-BIO-TechHQF.No.01/80/050/00559/AM13/DES.| | lic. No. &date |<br>| Date: 22.07.2014 | | Request for revision of norms | dt.18,06.2012<br>Decision : The Committee decided ta ratify norms on the basis of CRPC OM. No. 46011/36/2011-PGl<br>dated 21.7.2014 (Copy is ta ba forwarded to RA and firm).<br>----- End of picture text -----<br>

==> picture [391 x 78] intentionally omitted <==

----- Start of picture text -----<br> RLA may take necessary action accordingly. ;<br>S.No.21&<br>/ Case No. A/R-70 | M/s. Gastek | HOF,No.01/80/050/00509/AMO7/DES. | Lic No. & date |<br>"Meeting No.09/15 Ltd., New Delhi = RLA,No.05/24/040/00346/AMO7 |OS10188500 |<br>----- End of picture text -----<br>

Decision : The Committee noted that firm has not replied to deficiency fetter dated 16.07.2014 follewed by e-mail dated 21.7.2014 and decided to wait for firm’s reply. Case is deferred to 02.09.2014,

S.No.219

/ Meeting No,09/15 | Ltd, Sundergarh, | RLA, No.23/24/040/00001/AM13 7310003202 Date: 22.07.2014 | Orissa | Request Decision : The Committee noted that firm has not repliedfor fixationto deficiencyof normsletter~~ dated |21.01.2 dt.10. 0 147,2012which has been sent to them again 06.5.2014 followed by reminder dated 16.7.2014, e-mail dated 21.7.2014 and decided to wait for firm's reply. Case is deferred to 02.09.2014,

§.N0,220 i|CaseMeetingNo.No.09/15A/R-147_|| TechnologiesM/s. Fenix ProcessPvt. || HiRLA,[OF.No.01/80/050/00135/AM14/DES.1] No.31/83/040/00013/AM14 |13120058143 tic. No. &date||

Decision : The Committee noted that firm has not replied to the deficiency letter dated 04.04.2014 followed by reminder dated 03.06.2014, e-mail dated 04.6.2014, final reminder dated 16.7.2014 followed by e-mail dated 21.7,.2014 and decided to await for 15 days more to receive reply from the firm failing which the Committee would be constrained to reject their case with direction to nay the Custom Duty and applicable interest for regularization of the license, Case is deferred to 02.09.2014.

$.No.224 : ||iCaseMeeting No. No.09/15A/R-149 || M/s. Engineering~~ Pranita |RLA, HOF.No.01/80/050/00083/AM14/0ES.1 No.07/24/040/00503/AM13_ ~~»| Lic:-0710094700 No. & date || Date; 22.07.2014 | Solutions Pvt. Ltd... | Ratifications of norms ~__| ot.08,04.2013 Decision : The Committee noted that the firm's reply dated 09.4.2014 has been forwarded to MSME on 02.5.2014 for examination & comments followed by reminder dated 1?.7.2014 and decided to wait for

$.No.222 . [ Case No. A/R-150 |M/s. Pranita | | HOF.No.01/30/050/00312/AM13/DES.(Lic. No, & date | | Date:Meeting22.07.2014No.09/15 || SolutionsEngineeringPvt. ttd., ||Ratifications RLA, No.07/24/040/00083/AMi3ofnorms SSSR| 071008818544,08.2022 02.5.2014 for examination & comments followed by reminder dated 17.7.2014 and decided to wait for MSME comments. Case is deferred to 02.9.2014. . $.N6.223 Case No. A/R151 | M/s. Pranita | HOF.No.01/80/050/00313/AM13/DES1 | Uc. NocB date | Meeting No.09/15 | Engineering | RLA, No.07/2a/oa0/o0180/AMi3 ‘| a7 10080071 “Date:22.07.2014| Solutions Pvt, Ltd., [Ratification ofnorms SS t.03,08.2012 | Dacision: The Committee noted that the firm's reply dated 69.4.2014 has beenforwardedto MEME on 02.5,2014 tor examination & comments followed by reminder dated 17.7.2014 and decided to wait for MSME comments. Case is deferred to 02.9.2014, S.No 224 "Meeting(Case No. A/R-152 [M/s Pranita |HQF.No.01/80/050/0076S/AMIO/DES]T LicNo. & date | Date: No.09/15 | Engineering | RUA, No.b7/24/0a0/00383/aMii0 ~~ O7i0070031 22.07.2014 Solutions Pvt. Ltd., | Ratifications ofnorms SSS dt.15.02.2010 | Decision: The[Committee] notedthat the fim’$representationhas been forwarded to MSME[on] 03.6.2014 for examination & comments and decided to wait for MSME comments. Case is deferred to 02.9,2014, $.Mo,225 3 "Meeting(Case No,A/R153| M/s.—~-«&PSK| HOF.No.01/80/080/00s8a/Annia/DE:St |tic. No. &date| No.09/15 | Engineering Pvt. RLA, No.07/24/0a0/a0ai0/aM13 0710092988 Secision : The Committee noted that firm has not replied to deficiency letter dated 02.05.2014 followed by reminder dated 17.7.2014 and decided to wait for firm's reply, Case js deferred to G2.05.2014. ; iCase No A/R-155 | M/s. Plast” Tech | HOF.NNo.01/80/050/0012 2/AMI4/DES.1| Lic. No. & date| , 3 _ PARVEEN SHARMA” , Deectorate General ol Foregn Tada

==> picture [390 x 229] intentionally omitted <==

----- Start of picture text -----<br> / MeetingDate: 22.07.2014No.09/15_ | Engineering | RLA,Ratifications No.04/24/040/00030/AM14_—— of norms 0410146308dt.47.05.2013 |<br>Decision : The Committee decided to ratify norms on the basis of C&PC O.M. No. 46011/22/2013-PC-]!<br>dated 11.6.2014 {Copy is to be forwarded to RA and firm),<br>RLA may take necessary action accordingly.<br>$.Noa.227<br>'(CaseMeetingNo, No.08/15A/R-29 || M/s.ToubroLarsenLtd.,& || HQF.No.01/80/050/00149/AM14/DES.1_RLA,No.03/95/040/00055/aM14——~«| |0310734097 tic. No. & date |<br>Date: 22.07.2014 | Mumbai | Request for revision of norms ——SS—=| dt. 13.05.2013<br>Decision : The Committee decided to ask the followinginformationfrom the firm on the basis ofDIPE<br>UO Note No. 12/104/2014-TSW/29-A/R dated 22.07.2014:-<br>1. Quantity of import item at Si. No. 1 {Alloy Steel Plates) has been reduced after taking 1/3”<br>recovery from the scrap generated during the rnanufacturing operations.<br>2. For quantity of import item at Si. No. @ (Paint/Rust Preventive/ Thinner/Primer}, detailed<br>justification /basis for its quantity may be submitted supported by details of area to be painted<br>and quantity of paint etc. required per unit area supported by technical data sheet of the paint.<br>Case is deferred to 02.09.2014, :<br>----- End of picture text -----<br>

==> picture [177 x 7] intentionally omitted <==

----- Start of picture text -----<br> $.NO.228 :<br>----- End of picture text -----<br>

Decision : The Committee noted that the firm's representation has been forwarded to DH! on 05.86.2014 for examination & comments and after deliberation with Technical Authorities present in the meeting, the Cammmittes decided to reiterate its earlier decision.

RA may take necessary action accordingly,

==> picture [405 x 106] intentionally omitted <==

----- Start of picture text -----<br> S.NO.229<br>(Case No. A/R-40 | M/s. BoshionHOF.No.01/80/050/00326/AM14/DES1| | Lic No.& dateT<br>Date: 22.07.2014| Solutions Pvt. Ltd., [Request for fixation ofnorms dt.08.08.2013<br>Decision : The Committee noted that the firm’s reply dated 26.05.2014 has been examined by TA, DIPP<br>who has informed Committee that the firm has not submitted the required information and decided to<br>ask the following information from the firm on the basis of DIPP UO Note No, 12/104/2014-TSW/d0-A/R<br>dated 22.07, 2014:-<br>----- End of picture text -----<br>

  • i. Infermation in respect of SI. No. 3 of Standard Geficiency Format for the water treatment equipment contained in the export product.
  1. Information in respect of SI. No. 6, 8 &9 of Standard Deficiency Format.

  2. Information In respect af SI No. Lt of Standard Deficiency Format for import items at Sl. No 14 & 18 to 20. As

  3. Details of import items at SI. No 4 & 8 i.e. whether Pressure Tubes or Pressure vessels and their use in export product. Case ts deferred to 02.69.2014. : | Meeting No.09/15 | Industries {india) | RLA, No.04/24/040/00001/AM12 | 0410123667 | Date: 22.07.2014 | Pvt. Ltd, Chennai | Request for fixation of norms | dt.29,04.2011 Decision : The Committee noted that the firm’s request dated 10.4 2014 has been forwarded to MSME on 087.2018 for examination & carmments and decided to remind MISME for expediting ‘their corments, Case is deferred to 02.9,2014, : 5.No.231 |Case| No. A/R-42 | M/s. Graziano | HOF.No.01/80/050/00260/AMA4/DES.T | tic, No. & date | | Date:Meeting22.07.2014No.09/15 || TransmissioniPvt. Ltd, Gautamindia | RLA,Request No.05/23/040/00248/AM1a forfixationof norms 0510365514lt .13.09.2013

Decision: The Committee noted that the firm's request dated 25.6.2014 has been forwarded to MSME on O9.7.2014 for examination & comments and decided to remind MSME for expediting their comments. Case is deferred to 02.59.2014.

  • §.No.232 [CaseMeetingBate:No, A/R-43No.09/15|M/s.| receivedReferencefram RA, RUA, |HQF.No.01/80/050/00363/AM14/DES! No.03/95/040/00447/AM14~~ |F0310751300 Lic. No. & date | 22.07.2014 | Mumbai of M/s. Request for amendment of norms as | dt.26.09.2013 |

  • Decision: | Ltd, Mumbai | | A/R dated 22.07.2014The Committeewhichdecidedare as tounder: madify norms on the basis of DIPP 1D. No. 12/104/2014-TSW/431. Description of import items at SI. No. 6, 7 & 8 may be amended as per Licence Amendment Sheet No. 2 dated 26.05.2014.

    1. import items at SL No. 6, 7 && shall be of relevant erade and dia. as contained in the export 3 enews of import items at Si. No. 6,7 &8 shall remain the same as ratified by NC in meeting No. 21/80 dated 07.01.2014.

RLA may take necessary action accordingly.

==> picture [391 x 103] intentionally omitted <==

----- Start of picture text -----<br> §.No.233<br>Case No. A/R-4S | M/s.“Baxter (ladia) | HOF. No.01/80/050/00202/AMA4/DES. | Lic. No. date |<br>_ Meeting No.09/15 | Pvt. Ltd., | RLA,No.05/23/040/G0090/AMi4‘(| 0510357232<br>| Date: 22.07.2014 | Gurgaon(Haryana) [Request for amendment / revision of | dt.17.06.2013<br>i<br>Vscfas<br>----- End of picture text -----<br>

  • Dacision : The Committee decided to modify norms on the basis of DIPP LD. No. 12/104/2014-TSW/aaAJR dated 22.07.2014 which are as andes: 1. Description of import items at SL Na, 8, 9,10 & 16 may be amended as requested by the firm vide their letter dated 21/05/2014 {copy enclosed).

    1. “UOM" of import item at SL. No. 9 be changed as “Meters” and accordingly quantity of this item may be allowed as 408051 meters as 1.02 mtr./mtr. content in the export products at SI). No. 1 & 2,
    1. “UOM”" of import item at Si. Ne. 16 be changed as “Meters” and accordingly quantity of this item may be allowed as 121444 meters as 1.02 mtr./mtr. content in the export products at Sh No. 38 4,

==> picture [160 x 10] intentionally omitted <==

----- Start of picture text -----<br> RLA may take necessary action accordingly.<br>----- End of picture text -----<br>

==> picture [412 x 444] intentionally omitted <==

----- Start of picture text -----<br> S.No.234<br>Case| No. A/R-45 _| M/s. GEI Industrial | HOF No.01/80/050/00437/AM13/0651 [te No. & date |<br>| MeetingDate:22.07.2014 No.09/15 || SystemsBhopal Ltd., || RLA, No.11/24/040/00024/AM12 | 1110027289<br>Decision Request for fixation ofnorms | #t.19.10.2012<br>A/R Gated:22.07.2014The Committeewhich decidedare as under:to ratify norms onthe basis of DIPP 1.5. No. 13/104/2014-1SW/4s,<br>1. Net empty weights of export products may be specified as given below:<br>— | WEIMT) | | Export | No. | WLOMT) | Export<br>[1 p38 iB 1 WMT28 a as [22 = WMT2% |<br>4. Import item at SL No. 1 shall be of relevant grade and thickness as contained in<br>the expert products<br>2. Import item at SI. No, 3. shall be of relevant grade and dia. ag contained in the<br>export products.<br>3. Word “Relevant” may be prefixed with the description of import item at SE No. 4,<br>5&6,<br>4. Quantity of import itern at SL No 1 may be allowed as 1,05 Kges./Kg. content in the<br>export products.<br>S. import items at Sl.No 2,5%09, 11 &12 may be allowed on net to net basis with<br>accountability clause.<br>6. Quantities of impart items at 51. No 3& 4 may be allowed as 1.02 Kes./Ke. content ;<br>in the export products,<br>7. Quantity of import item at SL No. 10 may be allowed as applied for being 1% of<br>FOB vaiue af exparts<br>RLA may take necessary action accordingly. ?My \y 4<br>Untred Bhawan, Mew Dageu- 1%<br>----- End of picture text -----<br>

(Case3.800.235No. a/R-a6 | M/s. VEM | HOF.No.01/80/050/00047/AM14/DES.1| Lic. No. & date: _ | Meeting No,09/15 | Technologies Pvt. | RLA, No.09/24/040/00491/AM13 (0910054874 | Date: 22.07.2014 | Ltd., Hyderabad =| Request for revision of norms | dt.34.01.2013 | 15.07.2014 for examination & comments and copy of ratification letter dated 25.03.2014 (as sought by firm) along with MSME U.O. note No.30{58}/13-ME-dated 20.01.2014 have been sent to the firm and RA both alongwith letter dated 15.07.2014 followed by e-mail dated 21.07.2014 in this regard. Case is deferred to 02.9.2014. 5.Mo.236 CaseNo.(Meeting A/R-A7 TMs. Pranita | HOF.No.01/80/162/00100/AM15/0ES.1| Lic. No.& date | | Date: 22.07.20140.09/15 || SolutionsEngineeringPvt.Ltd, || RequestRLA, No.07/24/040/00399/AM12_——|for fixation of norms _ | (0710085276dt.05.01.2012 | Decision : The Committee noted that the firm's application has been forwarded to MSME on 11.7.2014 for examination & comments and decided to remind MSME for expediting their cornments. Case is deferred to 02.59.2014, |CaseNo. AfR48 M/s, Pranita |HQF.No.01/80/162/00101/AMI5/DES.1| Lic. No. & date | Decision| MeetingDate:22.07.2014: No.09/15The Committee|| SolutionsEngineeringnoted thatPvt, Ltd.,the firm’s|| RLA,Requestapplication No.07/2a/0a0/00187/AMOSfor ficationhas ofnormsbeen forwarded to|MSME'0710089077dt,13.08,2008on 11.7.2014 for examination & comments and decided to remind MSME for expediting their comments. Case is deferred to 02.9.2014.

|“CaseMeetingNo, No.09/15A/R-49 || HighM/s, PlanseePerformanceindia |[HQF.No.01/80/050/0038a/aM14/DES.| RLA,No.07/24/040/00191/AMia| Lic. No. & date | Date:22.07.2014| Materials Pvt. Ltd., [Request forrevisionfamendment|of | 0710059077dt.13.08.2008 | CUPP on 09.7 2014 for exarnination & comments and decided to remind DIPP for expediting their comments. Case is deferred to 02.9.2014. SI.No.239 [CaseNo.| C-12 — M/s.[ Tyco Electronics | HQF.No.01/80/162/00361/AM14/DES| Meeting No.09/15 | Corporation india Pvt. | Fixation of Scrap/Wastage norms Of 100% EOU for | PARVEEN SHARMA Ministry of Gormmerce & industry Udyog Bhawan, New Dalit

(Date: 22.07.2014 "TL, Bangalore the export product “Connectors, Pars of Connectors Decision | Terminals & Contacts for Wires & Cables ete.” ~reg. | : The Committee |noted that the firm has informed vide their MME e-mail dated 11.07.2014 that report. Inspection Report is under consideration and requested to hold the matter tiff the receipt of The Committee decided to grant them time. Case is deferred to 02.9,2014. SLNO. 240 CaseNo. C=61 | Reference received | HQ F.No.01/80/162/00031/AM15/DES«I _| ' Meeting No.09/15 J from Joint DGFT, Pune Clarification of the export items does not tally with i Date: 22.07.2014 of M/s. Man force | the description given in the DEP rate Schedule ~reg. | Decision : The Committee noted‘that firm has not replied to deficiency letter daled 30.06 348 and ' decided to send reminderto the firm. Case is deferred to 02.09.2014, SLNG.244 Date: 22.07.2014 Bangalore | “Steel Precison Components used in ATM Machines” | Decision : The Committee decided to bak ihe. in respect of 100% EOU -reg. UO following information from thefirm on the basis of DIPE Note No. 12/104/2014-TS/C-02 dated 22.07. 2014+ 4. information in respect of SI, No, 3,4 & 14 of Standard Deficiency Format for each of six components(export products} 2. Input raw material, namely, Steal bar, blank size and weight thereof supported by size of Case is deferredcomponentto 02.09.2014, to be mantfactured — component wise.

SILNo.242

Meeting No.09/15"| Pyt. Ltd., Bangalore Request for modification of SION at SL. No. C-773 for | Date: 22.07.2014 | the export product “Printed Lug Cap with Internal & | 7 | External Coating with Coating Lined with PVC Decision » Compound” covered under Product Group : The Committee noted tharthe firm's request dated 06.6.2014 hasbeen forwarded to DiPP on 11.7,2014 for examination & comments and decided to remind DIPP for expediting their comments. Case is deferred to 02.9.2014.

Fiteak | Chectorste Gueewzrnd ox MyreigaTrule Binistey of Cocqnee & industry .

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied