Raĕfied Minutes of Meeting No.02/15 scheduled on 15.04.2014 (actually held on 28.04.2014) of Norms Committee(NCI) (DES.I Section) The meeĕng No. 02/15 of the Norms Commiĥee (NC‐I) for the licensing year 2014‐2015 which was scheduled to be held on 15.04.2014, was actually held on 28.04.2014 under the Chairmanship of Dr. L.B. Singhal, Addiĕonal Director General of Foreign Trade to consider the applicaĕons under Duty Exempĕon / Remission Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I. The following Members of the Commiĥee were present in the meeĕng: ‐ Sl.No. Name of the representaĕves & their Designaĕon Room No. Telephone No. Depĥ. 1. Sh K.K. Tiwari I.A 476 23063321 DHI, U.B. 2. Sh S.K. Jain, D.O. 428A 23063321 Extn.3318 23063166 DIPP, U.B. 3. Sh. Kanwalinder Singh Sodhi, Assĥ. Dir. (Mech) 736A 23063802 Extn.2459 DC(MSME),N.B. 4. Sh. Parveen Sharma, Dy.DGFT 302 23061562 Extn.146 DGFT, U.B. 5. Sh. PriyaRanjan, FTDO 404 23061562 Ext.265 DGFT, U.B. I ‐The Commiĥee considered the individual cases of the agenda of this meeĕng generated through the online system of NIC. The decisions taken thereon are as under: 1
Case No.:16/6/80ALC2/2012
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00081/AM13/ RLA File :31/21/040/00050/AM10/ Lic.No/Date:3110038576 28.05.2009 Defer Date:27.05.2014 Decision :The Commiĥee noted that the Jt. DGFT, Pune has been reminded to send the status of the case i.e. firm’s request for merger of two advance authorizaĕons (AA No. 3110038171 dated 20.4.2009 and AA No. 3110038576 dated 28.05.2009) vide leĥer dated 31.03.2014 but they have not furnished any informaĕon in this regard and decided to remind Jt. DGFT, Pune again. The Commiĥee further noted that the firm has also been asked to explain the background of the merger of the said two AAs for further examinaĕon of the case on the basis of the DHI comments vide leĥer dated 31.3.2014 but the firm has not responded to the aforesaid leĥer. The Commiĥee also decided to send reminder to RA and final reminder to the firm.Case is deferred to 27.05.2014. 2
Case No.:1/25/80ALC2/2012
Party Name:RANGSONS ELECTRONICS PVT LTD Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00533/AM13/ RLA File :07/24/040/00250/AM11/ Lic.No/Date:0710074552 01.10.2010 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm has not replied to deficiency leĥer dated 02.01.2014 sent to them by DIT directly followed by DGFT reminder dated 28.02.2014, final reminder dated 28.3.2014 and decided to await 15 days more for receiving of their reply failing which the Commiĥee would be constrained to reject their case with direcĕon to pay the Custom Duty and applicable interest for regularizaĕon of the license. Case is deferred to 27.05.2014.
Case No.:4/19/85ALC3/2011
Party Name:BOOM SYSTEMS PVT. LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred
3 HQ File :01/85/050/00097/AM12/ RLA File :05/23/040/00156/AM12/ Lic.No/Date:0510297632 26.07.2011 Defer Date:13.05.2014 Decision : The Commiĥee noted that the firm’s reply has been forwarded to DHI on 19.12.2013 for examinaĕon and decided to call for the firm’s representaĕve/technical and design expert to explain their case before Commiĥee by granĕng ‘Personal Hearing’ on 15.04.2014 to the firm on the recommendaĕon of Technical Authority and the informaĕon in this regard has been sent as the meeĕng was postponed, the firm was invited for PH on 13.05.2014. 4
Case No.:8/14/80ALC2/2011
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00262/AM12/ RLA File :05/24/040/00182/AM12/ Lic.No/Date:0510300205 24.08.2011 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s reply has been forwarded to C&PC and 8th reminder dated 28.3.2014 has been sent to them for expediĕng their comments but the same have not been received and decided to send another reminder.Case is deferred to 27.05.2014. 5
Case No.:23/9/80ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00203/AM13/ RLA File :09/24/040/00136/AM13/ Lic.No/Date:0910053032 13.06.2012 Defer Date:27.05.2014 Decision : The Commiĥee noted that the said case has been sent to EPCG Division for their inputs/ comments which has not been received so far and decided to send another reminder to EPCG Division for expediĕng their inputs. Case is deferred to 27.05.2014. 6
Case No.:12/15/80ALC2/2012
Party Name:TRANSASIA BIO MEDICALS LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00347/AM13/ RLA File :03/95/040/00235/AM13/ Lic.No/Date:0310701463 10.07.2012 Defer Date:27.05.2014 Decision : The Commiĥee noted that DIT has sought some clarificaĕon in this case which has been forwarded to them on 30.1.2014 alongwith the firm’s reply dated 30.10.2013 which is under examinaĕon DIT and a reminder dated 28.3.2014 has been sent to DIT for expediĕng their comments. The Commiĥee further noted that the DIT has reminded firm for expediĕng the requisite informaĕon vide their leĥer No. 17(114)/2012‐IPHW dated 16.4.2014.. The Commiĥee decided to send reminder to firm. Case is deferred to 27.05.2014. 7
Case No.:34/24/80ALC2/2012
Party Name:CICB CHEMICON PRIVATE LIMITED, Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00514/AM13/ RLA File :07/24/040/00192/AM13/ Lic.No/Date:0710090176 09.08.2012 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 09.09.2013 sent to them again on 08.1.2014 followed by reminder dated 28.3.2014 alongwith copy of Deficiency Leĥer, further communicaĕon dated 28.3.2014 and decided to give final reminder failing which the Commiĥee would be constrained to reject their case with direcĕon to pay the Custom Duty and applicable interest for regularizaĕon of the license. Case is deferred to 27.05.2014.
Case No.:6/7/80ALC2/2013
Party Name:ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred
8 HQ File :01/80/050/00100/AM14/ RLA File :07/21/040/00366/AM13/ Lic.No/Date:0710090351 23.08.2012 Defer Date:27.05.2014 Decision :The Commiĥee noted that the firm has sought ĕme ĕll 30.4.2014 for furnishing their reply vide their e‐ mail dated 03.03.3014. The Commiĥee further noted that the firm has requested for the grant of 30‐45 days ĕme vide their leĥer dated 26.03.2014 and decided to grant them ĕme ĕll 10.5.2014 for furnishing their reply. Case is deferred to 27.05.2014. 9
Case No.:18/15/80ALC2/2012
Party Name: ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00353/AM13/ RLA File :07/21/040/00397/AM13/ Lic.No/Date:0710090531 31.08.2012 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm has sought ĕme ĕll 20.3.2014 for furnishing their reply vide their e‐ mail dated 03.03.3014. The Commiĥee further noted that the firm has requested for the grant of 30‐45 days ĕme vide their leĥer dated 26.03.2014 and decided to grant them ĕme ĕll 10.5.2014 for furnishing their reply. Case is deferred to 27.05.2014. 10
Case No.:5/18/80ALC2/2012
Party Name:LUDOWICI MINING PROCESS INDIA PVT LTD Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00373/AM13/ RLA File :04/24/040/00132/AM13/ Lic.No/Date:0410140287 05.10.2012 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm has not replied to deficiency leĥer dated 11.11.2013 sent to them by C&PC directly followed by DGFT reminder dated 10.02.2014, final reminder dated 28.3.2014 and decided to await 15 days more for receiving of their reply failing which the Commiĥee would be constrained to reject their case with direcĕon to pay the Custom Duty and applicable interest for regularizaĕon of the license. Case is deferred to 27.05.2014. 11
Case No.:41/24/80ALC2/2012
Party Name:POLY MEDICURE LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00521/AM13/ RLA File :05/24/040/00356/AM13/ Lic.No/Date:0510341782 27.12.2012 Defer Date:27.05.2014 Decision :The Commiĥee noted that the firm’s reply has been forwarded to C&PC and 2nd reminder has been issued to them for expediĕng their comments but the same have not been received. The Commiĥee further decided to send another reminder to C&PC.Case is deferred to 27.05.2014. 12
Case No.:20/24/80ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00500/AM13/ RLA File :61/24/040/00050/AM13/ Lic.No/Date:6110000908 09.01.2013 Decision :The Commiĥee decided to raĕfy norms on the basis of DHI U. O. No. 3(15)/13‐TSW(B) dated 06.3.2014 (Copy is to be forwarded to RA and firm). RLA may take necessary acĕon accordingly.
Case No.:3/7/80ALC2/2013
Party Name: BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred
13 HQ File :01/80/050/00097/AM14/ RLA File :09/24/040/00544/AM13/ Lic.No/Date:0910055381 13.03.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm has not replied to deficiency leĥer dated 18.11.2013 followed by reminder dated 02.01.2014 and final reminder dated 14.01.2014. The Commiĥee further noted that copy of leĥer dated 18.11.2013 and 02.01.2014 has been again sent to them vide leĥer dated 09.4.2014 as per the request made by them through their e‐mail message dated 18.3.2014 and decided to send reminder to the firm. Case is deferred to 27.5.2014. 14
Case No.:31/8/80ALC2/2013
Party Name:SHIRODKAR PRECI COMP PRIVATE LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00141/AM14/ RLA File :31/83/040/00002/AM14/ Lic.No/Date:3110057929 15.04.2013 Decision : The Commiĥee decided to raĕfy norms on the basis of DIPP U.O. Note No. 12/52/2014‐TSW/14 dated 22.04.2014 which are as under: 1. Net weight of export products may be specified as 116.5 Kgs. 2. Quanĕĕes of import items at Sl. No. 1, 3 & 4 may be allowed as 68.5Kgs., 173 Kgs. & 44 Kgs. respecĕvely a├er taking 50 % recovery from scrap. 3. Quanĕĕes of import items at Sl. No. 2 & 7 may be allowed as applied for i.e. 2000 Nos. each on net to net basis with accountability clause. 4. Quanĕĕes of import items at Sl. No. 5 & 6 may be allowed as applied for i.e. 1000 Nos. each on net to net basis with accountability clause. 15
Case No.:27/8/80ALC2/2013
Party Name: SHIRODKAR PRECI COMP PRIVATE LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00137/AM14/ RLA File :31/83/040/00005/AM14/ Lic.No/Date:3110057984 17.04.2013 Decision : The Commiĥee decided to raĕfy norms on the basis of DIPP U.O. Note No. 12/52/2014‐TSW/15 dated 22.04.2014 which are as under: 1. Net weight of export products may be specified as 531.3 Kgs. 2. Quanĕĕes of import items at Sl. No. 1, 4 & 5 may be allowed as 207.9 Kgs., 672.8 Kgs. & 335.2 Kgs. respecĕvely a├er taking 50 % recovery from scrap. 3. Quanĕĕes of import items at Sl. No. 2 & 3 may be allowed as applied for i.e. 5775 Nos. each on net to net basis with accountability clause. 4. Quanĕty of import item at Sl. No. 6 may be allowed as applied for i.e. 23100 Nos. on net to net basis with accountability clause. 16
Case No.:15/7/80ALC2/2013
Party Name:LURGI INDIA COMPANY PVT.LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00109/AM14/ RLA File :05/23/040/00004/AM14/ Lic.No/Date:0510352785 30.04.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm’s reply has been sent to DIPP on 25.03.2014 which is under their examinaĕon and decided to await comments of DIPP. Case is deferred to 27.05.2014.
17
Case No.:4/25/80ALC2/2013
Party Name:SANATHAN ALLIED INDUSTRIES Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00528/AM14/ RLA File :09/24/040/00038/AM14/ Lic.No/Date:0910055922 02.05.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm’s reply has been sent to DHI on 22.04.2014 which is under their examinaĕon and decided to await comments of DHI. Case is deferred to 27.05.2014. 18
Case No.:6/10/80ALC2/2013
Party Name:LICRA GREEN TECHNOLOGIES Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00161/AM14/ RLA File :07/24/040/00019/AM14/ Lic.No/Date:0710095521 22.05.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm’s reply has been sent to MSME on 10.02.2014 which is under their examinaĕon and decided to await comments of MSME. Case is deferred to 27.05.2014. 19
Case No.:23/13/80ALC2/2013
Party Name:ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00228/AM14/ RLA File :07/21/040/00068/AM14/ Lic.No/Date:0710095554 23.05.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm has submiĥed revised Appendix 11A & 34 which has been sent to DHI on 31.03.2014 for their examinaĕon/comments. The Commiĥee further noted that the comments of DHI has not been received and decided to await comments of DHI. Case is deferred to 27.05.2014. 20
Case No.:23/10/80ALC2/2013
Party Name:THERMAX LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00178/AM14/ RLA File :31/83/040/00045/AM14/ Lic.No/Date:3110058550 30.05.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm’s reply has been sent to DHI on 31.03.2014 which is under their examinaĕon and decided to await comments of DHI. Case is deferred to 27.05.2014. 21
Case No.:25/10/80ALC2/2013
Party Name:THERMAX LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00180/AM14/ RLA File :31/83/040/00044/AM14/ Lic.No/Date:3110058551 30.05.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm’s reply has been sent to DHI on 31.03.2014 which is under their examinaĕon and decided to await comments of DHI. Case is deferred to 27.05.2014. 22
Case No.:2/25/80ALC2/2013
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00526/AM14/ RLA File :09/24/040/00070/AM14/ Lic.No/Date:0910056185 30.05.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that deficiency leĥer(D/L) dated 14.3.2014 and reminder dated 28.3.2014 sent to the firm has been returned by the postal department with the remarks ‘le├’. The commiĥee further noted that a├er the receipt of D/L and reminder sent to the firm through e‐mail on 22.04.2014, the firm’s representaĕve has
informed DES‐I that the firm’s address has been changed and assured that firm’s reply/requisite informaĕon would be sent soon The Commiĥee decided the following : (i) to ask firm to send their correct correspondence address& (ii) to send another reminder alongwith D/L; both(i) & (ii) through e‐mail. Case is deferred to 27.05.2014. 23
Case No.:3/25/80ALC2/2013
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00527/AM14/ RLA File :09/24/040/00069/AM14/ Lic.No/Date:0910056186 30.05.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that deficiency leĥer dated 14.3.2014 and reminder dated 28.3.2014 sent to the firm has been returned by the postal department with the remarks ‘le├’. The commiĥee further noted that a├er the receipt of D/L and reminder sent to the firm through e‐mail on 22.04.2014, the firm’s representaĕve has informed DES‐I that the firm’s address has been changed and assured that firm’s reply/requisite informaĕon would be sent soon. The Commiĥee decided the following : (iii) to ask firm to send their correct correspondence address& (iv) to send another reminder alongwith D/L; both(i) & (ii) through e‐mail. 24
Case No.:27/10/80ALC2/2013
Party Name:SPARKLINE EQUIPMENTS PVT.LTD, Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00182/AM14/ RLA File :31/83/040/00040/AM14/ Lic.No/Date:3110059032 20.06.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm has not replied to deficiency leĥer dated 12.02.2014 followed by reminder dated 31.3.2014 and decided to send final reminder to them failing which the Commiĥee would be constrained to reject their case with direcĕon to pay the Custom Duty and applicable interest for regularizaĕon of the license. Case is deferred to 27.05.2014. 25
Case No.:22/10/80ALC2/2013
Party Name:RUD INDIA CHAIN PVT. LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00177/AM14/ RLA File :03/95/040/00254/AM14/ Lic.No/Date:0310739683 01.07.2013 Decision :The Commiĥee decided to raĕfy norms on the basis of DHI U. O. No. 3(54)/12‐TSW(B)/ dated 27.3.2014 (Copy is to be forwarded to RA and firm). 26
Case No.:10/15/80ALC2/2013
Party Name:ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00266/AM14/ RLA File :07/21/040/00090/AM14/ Lic.No/Date:0710096369 02.07.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that firm has submiĥed revised Appendix 11A & 34 which has been sent to DHI on 31.03.2014 for their examinaĕon/comments. The Commiĥee further noted that the comments of DHI has not been received and decided to await comments of DHI. Case is deferred to 27.05.2014.
Case No.:11/15/80ALC2/2013
Party Name:ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:2/80 ALC2/2014 Status: Deferred
27 15.04.2014 HQ File :01/80/050/00267/AM14/ RLA File :07/21/040/00126/AM14/ Lic.No/Date:0710096370 02.07.2013 Defer Date:27.05.2014 Decision :The Commiĥee noted that the firm has sought ĕme ĕll 28.02.2014 for furnishing their reply vide their leĥer dated 30.12.2013 but their reply has not been received. The Commiĥee decided to give reminder to the firm. 28
Case No.:44/10/80ALC2/2013
Party Name: BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL) Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00199/AM14/ RLA File :05/23/040/00113/AM14/ Lic.No/Date:0510358721 04.07.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that PC‐VI secĕon has inĕmated vide their OM No. 01/92/180/MISC./AM‐13/PC‐ VI/11 dated 11.04.2014 that the issue of producĕon/requirement of Essenĕality Cerĕficate from the Directorate General of Hydro Carbons was taken up with the Tax Research Unit(TRU), Department of Revenue, Ministry of Finance who have inĕmated vide O.M. No. 354/148/2013‐TRU dated 28.2.2014 that under Noĕficaĕon No. 12/2012‐CE dated 17.03.2012 (Sl No. 336 of the Table) all goods supplied against ICB are exempt from excise duty subject to the condiĕon that the said goods are exempted from the duĕes of customs leviable under the First Schedule to the Customs Tariff Act 1975 and the addiĕonal duty leviable under Secĕon 3 of the said Customs Tariff Act when imported into India. It has been further inĕmated that under Noĕficaĕon No. 12/2012‐Customs dated 17.03.2012 (Sl No. 356 of the Table) goods specified in the list 13 and imported in connecĕon with petroleum operaĕons are exempt from BCD and CVD subject to fulfilment of the condiĕon No. 41 of the said noĕficaĕon. Condiĕon No. 41 has several provisions, one of them being producĕon of an essenĕality cerĕficate from DG,
and CVD subject to fulfilment of the condiĕon No. 41 of the said noĕficaĕon. Condiĕon No. 41 has several provisions, one of them being producĕon of an essenĕality cerĕficate from DG, Hydrocarbons. The TRU have also clarified that in order to avail of central excise exempĕon vide S. No. 336 of the Noĕficaĕon No. 12/2012‐CE dated 17.03.2012, the domesĕc supplies shall be required to fulfil condiĕon No. 41 which include producĕon of a cerĕficate from a duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the said goods are required for petroleum operaĕons. Accordingly the Commiĥee decided to request the firm to produce a cerĕficate from a duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the said goods are required for petroleum operaĕons Case is deferred to 27.05.2014. 29
Case No.:22/13/80ALC2/2013
Party Name: JIMIT MEDICO SURGICALS Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Rejected HQ File :01/80/050/00227/AM14/ RLA File :08/24/040/00164/AM14/ Lic.No/Date:0810122898 17.07.2013 Decision :The Commiĥee noted that firm has not replied to deficiency leĥer dated 31.10.2013 sent by C&PC directly followed by DGFT reminder dated 09.12.2013, final reminder dated 15.01.2014 and a├er that decided to await 15 days more to receive reply from the firm. The Commiĥee further noted that DGFT has not received reply of the firm and decided to reject their case with the direcĕon to pay the Custom Duty and applicable interest for regularizaĕon of the license. RA may take necessary acĕon accordingly. 30
Case No.:1/16/80ALC2/2013
Party Name:DOSHION VEOLIA WATER SOLUTIONS PVT.LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Rejected HQ File :01/80/050/00326/AM14/ RLA File :08/24/040/00430/AM13/ Lic.No/Date:0810123622 08.08.2013 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 02.01.2014 followed by DGFT reminder dated 10.02.2014, final reminder dated 28.03.2014 and a├er that decided to await 15 days more to
receive reply from the firm. The Commiĥee further noted that DGFT has not received reply of the firm and decided to reject their case with the direcĕon to pay the Custom Duty and applicable interest for regularizaĕon of the license. RA may take necessary acĕon accordingly. 31
Case No.:57/15/80ALC2/2013
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Rejected HQ File :01/80/050/00313/AM14/ RLA File :09/24/040/00246/AM14/ Lic.No/Date:0910057354 26.08.2013 Decision : The Commiĥee noted that deficiency leĥer dated 01.11.2013 followed by reminder dated 17.12.2013, final reminder dated 30.1.2014 and a├er that decided to await 15 days more to receive reply from the firm. The Commiĥee further noted that DGFT has not received reply of the firm and decided to reject their case with the direcĕon to pay the Custom Duty and applicable interest for regularizaĕon of the license. RA may take necessary acĕon accordingly. 32
Case No.:50/15/80ALC2/2013
Party Name: TERACOM LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00306/AM14/ RLA File :05/24/040/00199/AM14/ Lic.No/Date:0510364316 03.09.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s reply has been sent to DIT on 31.3.2014 which is under their examinaĕon and decided to send reminder to them for expediĕng their comments. Case is deferred to 27.05.2014. 33
Case No.:1/2/80ALC2/2014
Party Name: THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00001/AM15/ RLA File :09/24/040/00263/AM14/ Lic.No/Date:0910057521 10.09.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DHI on 09.4.2014 for examinaĕon/comments which is under their examinaĕon and decided to await their comments. Case is deferred to 27.05.2014. 34
Case No.:9/19/80ALC2/2013
Party Name: THERMALSYSTEMS (HYDERABAD) P.LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00381/AM14/ RLA File :09/24/040/00311/AM14/ Lic.No/Date:0910057710 25.09.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 06.01.2014 sent followed by reminder dated 10.02.2014, final reminder dated 28.03.2014 further communicaĕon on 22.4.2014 and decided to await 15 days more for receiving of their reply failing which the Commiĥee would be constrained to reject their case with direcĕon to pay the Custom Duty and applicable interest for regularizaĕon of the license. Case is deferred to 27.05.2014. 35
Case No.:10/19/80ALC2/2013
Party Name: NSK ABC BEARINGS LIMITED, Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00382/AM14/ RLA File :04/24/040/00138/AM14/ Lic.No/Date:0410150484 03.10.2013 Defer Date:27.05.2014
Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 31.3.2014 and decided to send reminder to them. Case is deferred to 27.05.2014. 36
Case No.:11/19/80ALC2/2013
Party Name: NSK ABC BEARINGS LIMITED, Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00383/AM14/ RLA File :04/24/040/00139/AM14/ Lic.No/Date:0410150663 07.10.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 31.3.2014 and decided to send reminder to them. Case is deferred to 27.05.2014. 37
Case No.:12/19/80ALC2/2013
Party Name: PLANSEE INDIA HIGH PERFORMANCE MATERIALS PVT LTD Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00384/AM14/ RLA File :07/24/040/00191/AM14/ Lic.No/Date:0710098974 14.10.2013 Decision : The Commiĥee decided to raĕfy norms of subject Advance Authorisaĕon by taking clue from SION C‐ 227, on the basis of DIPP U.O. Note No. 12/52/2014‐TSW/37 dated 04.03.2014 which are as under: 1. Quanĕĕes of import items at Sl. No. 1 & 2 may be allowed as 1.10 Kgs./Kg. content in the export products. 38
Case No.:15/19/80ALC2/2013
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00387/AM14/ RLA File :34/24/040/00097/AM14/ Lic.No/Date:3410038311 22.10.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to C&PC on 09.12.2013 for examinaĕon/comments which is under their examinaĕon and decided to remind C&PC for expediĕng their comments. Case is deferred to 27.05.2014.
Case No.:7/19/80ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00379/AM14/ RLA File :05/23/040/00302/AM14/ Lic.No/Date:0510369372 25.10.2013 Decision : The Commiĥee decided to raĕfy norms on the basis of DIPP U.O. Note No. 12/52/2014‐TSW/14 dated 22.04.2014 which are as under: 1. Net Fabricated weight of 838.316 MT may be specified with the quanĕty of export product at Sl. No.1. 2. Word “Relevant” may be prefixed with the descripĕon of import items at Sl. Nos. 1, 5, 6, 10 to 16, 19 & 23. 3. Quanĕty of import item at Sl. No. 1 may be allowed as 1.0417 Kgs./ Kg. content in the export product as claimed by the firm. 4. Quanĕty of import item at Sl. No. 2 may be allowed as 8 Nos. on net to net basis. Duty free weight of this item may be allowed as 42807 Kgs. inclusive of 7 % wastage a├er 20 % recovery from scrap. 5. Quanĕty of import item at Sl. No. 3 may be allowed as 17 Nos. on net to net basis. Duty free weight of this item may be allowed as 57683 Kgs. inclusive of 2 % wastage as claimed by the firm. 6. Quanĕty of import item at Sl. No. 4 may be allowed as 3 Nos. on net to net basis. Duty free weight of this item may be allowed as applied for i.e. 1500 Kgs. inclusive of 1 % wastage as claimed by the firm. 7. Quanĕĕes of import items at Sl. No. 5 & 6 may be allowed as 1.0417 Kgs./ Kg. content in the export products as claimed by the firm. 8. Total quanĕty of import items at Sl. No. 5 & 6 put together may be restricted as 24928 Kg.
5 & 6 may be allowed as 1.0417 Kgs./ Kg. content in the export products as claimed by the firm. 8. Total quanĕty of import items at Sl. No. 5 & 6 put together may be restricted as 24928 Kg.
39 9. Quanĕĕes of import items at Sl. No. 7, 8 & 9 may allowed as 2 Nos. 1 No. & 1 No. respecĕvely on net to net basis. Duty free weight of these items may be allowed as applied for inclusive of 4.17 % wastage as claimed by the firm. 10. Quanĕty of import item at Sl. No. 10 may be allowed as 294 Kgs(0.18 Meters) inclusive of 2 % wastage. 11. Quanĕĕes of import items at Sl. No. 11, 12, 13, 15 & 16 may allowed as 7948 Kg., 6000 Kgs. ,5986 Kgs., 11676 Kgs. & 2973 Kgs. respecĕvely as 1.0417 Kgs./ Kg. content in the export product as claimed by the firm. 12. Quanĕty of import item at Sl. No. 14 may allowed as 154994 Kgs. as 1.0452 Kgs./ Kg. content in the export product as claimed by the firm. 13. Quanĕty of import item at Sl. No. 17 may be allowed as 86 Nos. on net to net basis. Duty free weight of this item may be allowed as 3935 Kgs. inclusive of 2 % wastage as claimed by the firm. 14. Quanĕty of import item at Sl. No. 18 may be allowed as 11 Nos. on net to net basis. Duty free weight of this item may be allowed as 1716 Kgs. inclusive of 2 % wastage as claimed by the firm. 15. Quanĕty of import item at Sl. No. 19 may be allowed as 11007 Kgs(11276 Meters) inclusive of 2 % wastage. 16. Import items at Sl. No 20, 22, 25 & 26 may be allowed on net to net basis with accountability clause.
No. 19 may be allowed as 11007 Kgs(11276 Meters) inclusive of 2 % wastage. 16. Import items at Sl. No 20, 22, 25 & 26 may be allowed on net to net basis with accountability clause. 17. Quanĕty of import item at Sl. No. 21 may be allowed as 4 Nos. on net to net basis. Duty free weight of this item may be allowed as 2986 Kgs. inclusive of 2 % wastage as claimed by the firm. 18. Quanĕty of import item at Sl. No. 23 may be allowed on net to net basis as claimed by the firm. 19. Quanĕty of import item at Sl. No. 24 may be allowed as 4 Nos.(1000 Kgs.) on net to net basis. 20. Quanĕty of import item at Sl. No. 27 may be allowed as applied for being within 0.5 % of FOB value of exports. 21. Quanĕĕes of import items at Sl. No. 28, 29 & 30 may be allowed as applied for i.e. 14500 Kgs. each . 22. Import items at Sl. No. 31&32 may be allowed on net to net basis with accountability clause. 40
Case No.:4/19/80ALC2/2013
Party Name: JBM KANEMITSU PULLEYS PRIVATE LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00376/AM14/ RLA File :05/23/040/00313/AM14/ Lic.No/Date:0510370156 01.11.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DHI on 05.12.2013 for examinaĕon/comments which is under their examinaĕon and decided to remind DHI for expediĕng their comments. 41
Case No.:8/19/80ALC2/2013
Party Name: BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00380/AM14/ RLA File :05/23/040/00310/AM14/ Lic.No/Date:0510370619 08.11.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that PC‐VI secĕon has inĕmated vide their OM No. 01/92/180/MISC./AM‐13/PC‐ VI/11 dated 11.04.2014 that the issue of producĕon/requirement of Essenĕality Cerĕficate from the Directorate General of Hydro Carbons was taken up with the Tax Research Unit(TRU), Department of Revenue, Ministry of Finance who have inĕmated vide O.M. No. 354/148/2013‐TRU dated 28.2.2014 that under Noĕficaĕon No. 12/2012‐CE dated 17.03.2012 (Sl No. 336 of the Table) all goods supplied against ICB are exempt from excise duty subject to the condiĕon that the said goods are exempted from the duĕes of customs leviable under the First Schedule to the Customs Tariff Act 1975 and the addiĕonal duty leviable under Secĕon 3 of the said Customs Tariff Act when imported into India. It has been further inĕmated that under Noĕficaĕon No. 12/2012‐Customs dated 17.03.2012 (Sl No. 356 of the Table) goods specified in the list 13 and imported in connecĕon with petroleum operaĕons are exempt from BCD and CVD subject to fulfilment of the condiĕon No. 41 of the said noĕficaĕon. Condiĕon No. 41 has several provisions, one of them being producĕon of an essenĕality cerĕficate from DG,
and CVD subject to fulfilment of the condiĕon No. 41 of the said noĕficaĕon. Condiĕon No. 41 has several provisions, one of them being producĕon of an essenĕality cerĕficate from DG, Hydrocarbons. The TRU have also clarified that in order to avail of central excise exempĕon vide S. No. 336 of the
Noĕficaĕon No. 12/2012‐CE dated 17.03.2012, the domesĕc supplies shall be required to fulfil condiĕon No. 41 which include producĕon of a cerĕficate from a duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the said goods are required for petroleum operaĕons. Accordingly the Commiĥee decided to request the firm to produce a cerĕficate from a duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the said goods are required for petroleum operaĕons Case is deferred to 27.05.2014. 42
Case No.:13/19/80ALC2/2013
Party Name: STERICAT GUTSTRINGS PVT. LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00385/AM14/ RLA File :05/24/040/00249/AM14/ Lic.No/Date:0510370609 08.11.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 10.3.2014 issued by C&PC directly and decided to send reminder to them. Case is deferred to 27.05.2014. 43
Case No.:10/2/80ALC2/2014
Party Name: BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00010/AM15/ RLA File :07/24/040/00292/AM14/ Lic.No/Date:0710100276 06.12.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DHI on 15.04.2014 for 44
Case No.:33/25/80ALC2/2013
Party Name: ZENITH PRECISION PVT LTD ., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00557/AM14/ RLA File :07/24/040/00291/AM14/ Lic.No/Date:0710100457 11.12.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has neither replied the DES‐I leĥer dated 28.02.2014 issued to them for clarifying type of export (whether physical export or deemed export against invalidaĕon leĥer to EPCG license) followed by reminder dated 28.3.2014 nor forwarded the requisite informaĕon sought vide deficiency leĥer dated 03.04.2014. The Commiĥee further noted that the firm has requested for the grant of 15 days ĕme vide their leĥer dated 21.04.2014 and decided to grant them ĕme ĕll 05.5.2014 for furnishing their reply. Case is deferred to 27.05.2014. 45
Case No.:15/25/80ALC2/2013
Party Name: DIABU DIAMOND TOOLS (INDIA) PVT LTD Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00539/AM14/ RLA File :07/21/040/00739/AM14/ Lic.No/Date:0710100662 18.12.2013 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to MSME on 28.02.2014 for examinaĕon/comments which is under their examinaĕon and decided to remind MSME for expediĕng their comments. Case is deferred to 27.05.2014. 46
Case No.:25/25/80ALC2/2013
Party Name: GANDIKOTA THERMO CONTROLS PVT LTD Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00549/AM14/ RLA File :09/24/040/00472/AM14/ Lic.No/Date:0910058650 19.12.2013 Defer Date:27.05.2014
Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 03.4.2014 and decided to send reminder to them. Case is deferred to 27.05.2014. 47
Case No.:1/22/80ALC2/2013
Party Name:SCREENO TEX(INDIA) PVT.LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00426/AM14/ RLA File :08/24/040/00436/AM14/ Lic.No/Date:0810127774 07.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that hard copy of firm’s applicaĕon has been received and decided to send the same to MSME for their examinaĕon & comments. Case is deferred to 27.05.2014. 48
Case No.:34/25/80ALC2/2013
Party Name: ZENITH PRECISION PVT LTD ., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00558/AM14/ RLA File :07/24/040/00322/AM14/ Lic.No/Date:0710101167 07.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has neither replied the DES‐I leĥer dated 28.02.2014 issued to them for clarifying type of export (whether physical export or deemed export against invalidaĕon leĥer to EPCG license) followed by reminder dated 28.3.2014 nor forwarded the requisite informaĕon sought vide deficiency leĥer dated 03.04.2014. The Commiĥee noted that the firm has sought 15 days’ ĕme for furnishing their reply/requisite informaĕon vide their leĥer dated 21.4.2014 and decided to grant 15 days’ ĕme for forwarding their reply/requisite informaĕon. Case is deferred to 27.05.2014. 49
Case No.:11/25/80ALC2/2013
Party Name: ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00535/AM14/ RLA File :07/21/040/00854/AM14/ Lic.No/Date:0710101246 10.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm has not clarified the type of export (whether physical export or deemed export against invalidaĕon leĥer to EPCG license) sought vide leĥer dated 28.3.2014 and DHI has requested to ask the firm to furnish some informaĕon vide their U.O. No. 3(32)/13‐TSW(B) dated 16.4.2014 and decided to send deficiency leĥer on the basis of the aforesaid communicaĕon of DHI. Case is deferred to 27.05.2014. 50
Case No.:35/25/80ALC2/2013
Party Name: ZENITH PRECISION PVT LTD ., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00559/AM14/ RLA File :07/24/040/00325/AM14/ Lic.No/Date:0710101261 13.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has neither replied the DES‐I leĥer dated 28.02.2014 issued to them for clarifying type of export (whether physical export or deemed export against invalidaĕon leĥer to EPCG license) followed by reminder dated 28.3.2014 nor forwarded the requisite informaĕon sought vide deficiency leĥer dated 03.04.2014. The Commiĥee further noted that the firm has sought 15 days’ ĕme for furnishing their reply/requisite informaĕon vide their leĥer dated 21.4.2014 and decided to grant 15 days’ ĕme for forwarding their reply/requisite informaĕon. Case is deferred to 27.05.2014.
Case No.:36/25/80ALC2/2013
Party Name: ZENITH PRECISION PVT LTD ., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00560/AM14/ RLA File :07/24/040/00339/AM14/ Lic.No/Date:0710101249 13.01.2014 Defer Date:27.05.2014
51 Decision : The Commiĥee noted that firm has neither replied the DES‐I leĥer dated 28.02.2014 issued to them for clarifying type of export (whether physical export or deemed export against invalidaĕon leĥer to EPCG license) followed by reminder dated 28.3.2014 nor forwarded the requisite informaĕon sought vide deficiency leĥer dated 03.04.2014. The Commiĥee further noted that the firm has sought 15 days’ ĕme for furnishing their reply/requisite informaĕon vide their leĥer dated 21.4.2014 and decided to grant 15 days’ ĕme for forwarding their reply/requisite informaĕon. Case is deferred to 27.05.2014. 52
Case No.:31/25/80ALC2/2013
Party Name: BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00555/AM14/ RLA File :09/24/040/00511/AM14/ Lic.No/Date:0910058926 15.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DHI on 28.02.2014 for 53
Case No.:37/25/80ALC2/2013
Party Name:UNITED MANUFACTURING CO. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00561/AM14/ RLA File :05/24/040/00379/AM14/ Lic.No/Date:0510376277 16.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 03.04.2014 and decided to send reminder to them. Case is deferred to 27.05.2014. 54
Case No.:24/25/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00548/AM14/ RLA File :05/23/040/00417/AM14/ Lic.No/Date:0510376515 20.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm’s applicaĕon has been sent to DHI on 28.02.2014 which is under their examinaĕon and the firm has not furnished the clarificaĕon on type of export (whether physical export or deemed export against invalidaĕon leĥer to EPCG license) as asked vide DES‐I leĥer dated 28.03.2014 followed by further communicaĕon dated 28.03.2014 and decided the following: (i) to await comments of DHI; (ii) to send reminder to the firm for expediĕng their reply. 55
Case No.:42/25/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00566/AM14/ RLA File :04/24/040/00227/AM14/ Lic.No/Date:0410154551 23.01.2014 Decision : The Commiĥee decided to raĕfy norms on the basis of DHI U. O. No. 3(05)/14‐TSW(B)/ dated 07.03.2014 (Copy is to be forwarded to RA and firm).
Case No.:23/25/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred
56 HQ File :01/80/050/00547/AM14/ RLA File :05/23/040/00416/AM14/ Lic.No/Date:0510376999 24.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DHI on 28.02.2014 for 57
Case No.:17/25/80ALC2/2013
Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00541/AM14/ RLA File :05/24/040/00407/AM14/ Lic.No/Date:0510377258 27.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to C&PC on 28.02.2014 for examinaĕon/comments which is under their examinaĕon and decided to remind C&PC for expediĕng their comments. Case is deferred to 27.05.2014. 58
Case No.:26/25/80ALC2/2013
Party Name:AIRPACK COMPRESSOR TEKNOLOGIES PVT LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00550/AM14/ RLA File :05/23/040/00427/AM14/ Lic.No/Date:0510377245 27.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 28.03.2014 followed by e‐mail dated 28.03.2014 and decided to send reminder to them. Case is deferred to 27.05.2014. 59
Case No.:2/2/80ALC2/2014
Party Name:GODREJ& BOYCE MFG. CO. LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00002/AM15/ RLA File :03/94/040/00933/AM14/ Lic.No/Date:0310767987 27.01.2014 Decision : The Commiĥee decided to raĕfy norms on the basis of DIPP U.O. Note No. 12/52/2014‐TSW/59 dated 22.04.2014 which are as under: 1. Net Empty weights of 76.168 MT, 75.8 MT, 118.45 MT, 177.445 MT, 162.9 MT & 97.76 MT may be specified with the quanĕĕes of export products at Sl. No. 1 to 6 respecĕvely. 2. Quanĕty of import item at Sl. No. 1 may be allowed as 22 Nos. on net to net basis. Duty free weight of this item may be allowed as 33128 Kgs. inclusive of 29.3 % wastage a├er taking 20 % recovery from scrap. 3. Quanĕty of import item at Sl. No. 2 may be allowed as 6 Nos. on net to net basis. Duty free weight of this item may be allowed as applied for i.e. 39798 Kgs. inclusive of 3 % wastage. 4. Quanĕty of import item at Sl. No. 3 may be allowed as 19 Nos. on net to net basis. Duty free weight of this item may be allowed as 7640 Kgs. inclusive of 30.7 % wastage a├er taking 20 % recovery from scrap. 5. Quanĕty of import item at Sl. No. 4 may be allowed as 7 Nos. on net to net basis. Duty free weight of this item may be allowed as applied for i.e. 104 Kgs. inclusive of 3 % wastage. 6. Quanĕty of import item at Sl. No. 5 may be allowed as 39 Nos. on net to net basis. Duty free weight of this
is item may be allowed as applied for i.e. 104 Kgs. inclusive of 3 % wastage. 6. Quanĕty of import item at Sl. No. 5 may be allowed as 39 Nos. on net to net basis. Duty free weight of this item may be allowed as 12242 Kgs. inclusive of 33.2% wastage a├er taking 20 % recovery from scrap. 7. Word “Relevant” may be prefixed with the descripĕon of import items at Sl. No. 6 to 13. 8. Quanĕty of import item at Sl. No. 6 may be allowed as 168942 Kgs. inclusive of 5 % wastage a├er 1/3rd recovery from scrap. 9. Quanĕty of import item at Sl. No. 7 may be allowed as 20168 Kgs. inclusive of 8.3 % wastage a├er 1/3rd recovery from scrap. 10. Quanĕty of import item at Sl. No. 8 may be allowed as applied for i.e. 176 Kgs. inclusive of 3 % wastage . 11. Quanĕty of import item at Sl. No. 9 may be allowed as 39036 Kgs. inclusive of 6.3 % wastage a├er 1/3rd recovery from scrap.
12. Quanĕty of import item at Sl. No. 10 may be allowed as 139150 Kgs. (151063 Meters) inclusive of 2 % wastage. 13. Quanĕty of import item at Sl. No. 11 may be allowed as 143812 Kgs. (121037 Meters) inclusive of 2 % wastage. 14. Quanĕty of import item at Sl. No. 12 may be allowed as 14415 Kgs. inclusive of 5 % wastage. 15. Quanĕty of import item at Sl. No. 13 may be allowed as 41185 Kgs. (43158 Meters) inclusive of 2 % wastage. 16. Quanĕĕes of import items at Sl. Nos. 14, 15 & 16 may be allowed as 6936 Kgs. each.
of import item at Sl. No. 13 may be allowed as 41185 Kgs. (43158 Meters) inclusive of 2 % wastage. 16. Quanĕĕes of import items at Sl. Nos. 14, 15 & 16 may be allowed as 6936 Kgs. each. 17. Quanĕĕes of import items at Sl. Nos. 17, 18 & 19 may be allowed as 2178 Kgs., 1902 Kgs & 1902 Kgs. respecĕvely. 60
Case No.:32/25/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00556/AM14/ RLA File :09/24/040/00326/AM14/ Lic.No/Date:0910059091 28.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DHI on 28.02.2014 for 61
Case No.:38/25/80ALC2/2013
Party Name:ESSAR PROJECTS (INDIA) LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00562/AM14/ RLA File :52/24/040/00044/AM14/ Lic.No/Date:5210040638 28.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 28.03.2014 followed by e‐mail dated 28.03.2014 and decided to send reminder to them. Case is deferred to 27.05.2014 62
Case No.:1/25/80ALC2/2013
Party Name:ALSTOM INDIA LIMITED, Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00525/AM14/ RLA File :32/21/040/00177/AM14/ Lic.No/Date:3210072580 30.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 04.04.2014 and decided to send reminder to them. Case is deferred to 27.05.2014 63
Case No.:12/25/80ALC2/2013
Party Name:BLISS ANAND PVT.LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00536/AM14/ RLA File :05/23/040/00425/AM14/ Lic.No/Date:0510377954 31.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 28.03.2014 followed by further communicaĕon dated 28.03.2014 and decided to send reminder to them. Case is deferred to 27.05.2014 64
Case No.:13/25/80ALC2/2013
Party Name: BOYSEN INDIA LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00537/AM14/ RLA File :05/23/040/00432/AM14/ Lic.No/Date:0510377960 31.01.2014 Defer Date:27.05.2014
Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 03.04.2014 and decided to send reminder to them. Case is deferred to 27.05.2014 65
Case No.:14/25/80ALC2/2013
Party Name: BECTON DICKINSON INDIA PRIVATE LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00538/AM14/ RLA File :05/23/040/00435/AM14/ Lic.No/Date:0510377931 31.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm applicaĕon has been sent to C&PC on 28.02.2014 and CLA, New Delhi has forwarded amendment sheet vide their leĥer dated 31.01.2014 which has also been forwarded to C&PC dated 13.03.2014 and decided to remind C&PC for expediĕng their comments. Case is deferred to 27.05.2014 66
Case No.:28/25/80ALC2/2013
Party Name:BECTON DICKINSON INDIA PRIVATE LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00552/AM14/ RLA File :05/23/040/00434/AM14/ Lic.No/Date:0510377945 31.01.2014 Defer Date:27.05.2014 Decision: The Commiĥee noted that firm applicaĕon has been sent to C&PC on 28.02.2014 for examinaĕon & comments but their comments has not been received ĕll date and decided to remind C&PC for expediĕng their comments. Case is deferred to 27.05.2014 67
Case No.:30/25/80ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00554/AM14/ RLA File :05/23/040/00447/AM14/ Lic.No/Date:0510377899 31.01.2014 Defer Date:27.05.2014 Decision : The Commiĥee decided to ask the firm to furnish the following informaĕon according to DIPP ID Note No. 12/52/2014‐TSW/67 dated 22.04.2014: 1. Informaĕon in respect of Sl. No. 3, 4, 5, 11 & 14 of Standard Deficiency Format, export product wise. 2. Quanĕty of import item at Sl. No. 3 in meters also in addiĕon to its weight. 68
Case No.:40/25/80ALC2/2013
Party Name:ESSAR PROJECTS (INDIA) LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00564/AM14/ RLA File :52/24/040/00046/AM14/ Lic.No/Date:5210040685 04.02.2014 Decision : The Commiĥee decided to raĕfy norms on the basis of DC (MSME) I. D. Note No. 30(04)/2014‐ME dated 28.03.2014 (Copy is to be forwarded to RA and firm). 69
Case No.:19/25/80ALC2/2013
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00543/AM14/ RLA File :07/24/040/00396/AM14/ Lic.No/Date:0710101974 05.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee decided to ask the firm to furnish the following informaĕon according to DIPP ID Note No. 12/52/2014‐TSW/69 dated 22.04.2014: 1. Details of import items from Sl. Nos. 1 to 5(Sketches) and their specific use in the export products.
2. Informaĕon in respect of Sl. No. 3, 6, 8, 9 & 11 of Standard Deficiency Format. 3. Detailed calculaĕons/basis for the quanĕĕes of import items. 70
Case No.:41/25/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00565/AM14/ RLA File :04/24/040/00234/AM14/ Lic.No/Date:0410154869 05.02.2014 Decision : The Commiĥee decided to raĕfy norms on the basis of DHI U. O. No. 3(05)/14‐TSW(B) dated 07.3.2014 (Copy is to be forwarded to RA and firm). 71
Case No.:22/25/80ALC2/2013
Party Name:KSS ABHISHEK SAFETY SYSTEMS PVT. LTD, Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00546/AM14/ RLA File :05/23/040/00426/AM14/ Lic.No/Date:0510378560 06.02.2014 Decision : The Commiĥee decided to raĕfy norms on the basis of DC (MSME) U.O. Note No. 30(1)/2014‐ME dated 14.03.2014 (Copy is to be forwarded to RA and firm). 72
Case No.:39/25/80ALC2/2013
Party Name:GLOVIS INDIA (P) LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00563/AM14/ RLA File :04/24/040/00239/AM14/ Lic.No/Date:0410154966 06.02.2014 Decision : The Commiĥee decided to raĕfy norms on the basis of DHI U. O. No. 3(43)/14‐TSW(B) dated 17.04.2014 (Copy is to be forwarded to RA and firm). 73
Case No.:29/25/80ALC2/2013
Party Name: ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00553/AM14/ RLA File :05/23/040/00464/AM14/ Lic.No/Date:0510378593 07.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 28.03.2014 followed by e‐mail dated 28.03.2014 and decided to send reminder to them. Case is deferred to 27.05.2014
Case No.:18/25/80ALC2/2013
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00542/AM14/ RLA File :05/23/040/00451/AM14/ Lic.No/Date:0510378995 11.02.2014 Defer Date:27.05.2014
74 Decision : The Commiĥee noted that PC‐VI secĕon has inĕmated vide their OM No. 01/92/180/MISC./AM‐13/PC‐ VI/11 dated 11.04.2014 that the issue of producĕon/requirement of Essenĕality Cerĕficate from the Directorate General of Hydro Carbons was taken up with the Tax Research Unit(TRU), Department of Revenue, Ministry of Finance who have inĕmated vide O.M. No. 354/148/2013‐TRU dated 28.2.2014 that under Noĕficaĕon No. 12/2012‐CE dated 17.03.2012 (Sl No. 336 of the Table) all goods supplied against ICB are exempt from excise duty subject to the condiĕon that the said goods are exempted from the duĕes of customs leviable under the First Schedule to the Customs Tariff Act 1975 and the addiĕonal duty leviable under Secĕon 3 of the said Customs Tariff Act when imported into India. It has been further inĕmated that under Noĕficaĕon No. 12/2012‐Customs dated 17.03.2012 (Sl No. 356 of the Table) goods specified in the list 13 and imported in connecĕon with petroleum operaĕons are exempt from BCD and CVD subject to fulfilment of the condiĕon No. 41 of the said noĕficaĕon. Condiĕon No. 41 has several provisions, one of them being producĕon of an essenĕality cerĕficate from DG,
and CVD subject to fulfilment of the condiĕon No. 41 of the said noĕficaĕon. Condiĕon No. 41 has several provisions, one of them being producĕon of an essenĕality cerĕficate from DG, Hydrocarbons. The TRU have also clarified that in order to avail of central excise exempĕon vide S. No. 336 of the Noĕficaĕon No. 12/2012‐CE dated 17.03.2012, the domesĕc supplies shall be required to fulfil condiĕon No. 41 which include producĕon of a cerĕficate from a duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the said goods are required for petroleum operaĕons. Accordingly the Commiĥee decided to request the firm to produce a cerĕficate from a duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the said goods are required for petroleum operaĕons Case is deferred to 27.05.2014. 75
Case No.:27/25/80ALC2/2013
Party Name: BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00551/AM14/ RLA File :05/23/040/00455/AM14/ Lic.No/Date:0510378994 11.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that PC‐VI secĕon has inĕmated vide their OM No. 01/92/180/MISC./AM‐13/PC‐ VI/11 dated 11.04.2014 that the issue of producĕon/requirement of Essenĕality Cerĕficate from the Directorate General of Hydro Carbons was taken up with the Tax Research Unit(TRU), Department of Revenue, Ministry of Finance who have inĕmated vide O.M. No. 354/148/2013‐TRU dated 28.2.2014 that under Noĕficaĕon No. 12/2012‐CE dated 17.03.2012 (Sl No. 336 of the Table) all goods supplied against ICB are exempt from excise duty subject to the condiĕon that the said goods are exempted from the duĕes of customs leviable under the First Schedule to the Customs Tariff Act 1975 and the addiĕonal duty leviable under Secĕon 3 of the said Customs Tariff Act when imported into India. It has been further inĕmated that under Noĕficaĕon No. 12/2012‐Customs dated 17.03.2012 (Sl No. 356 of the Table) goods specified in the list 13 and imported in connecĕon with petroleum operaĕons are exempt from BCD and CVD subject to fulfilment of the condiĕon No. 41 of the said noĕficaĕon. Condiĕon No. 41 has several provisions, one of them being producĕon of an essenĕality cerĕficate from DG,
and CVD subject to fulfilment of the condiĕon No. 41 of the said noĕficaĕon. Condiĕon No. 41 has several provisions, one of them being producĕon of an essenĕality cerĕficate from DG, Hydrocarbons. The TRU have also clarified that in order to avail of central excise exempĕon vide S. No. 336 of the Noĕficaĕon No. 12/2012‐CE dated 17.03.2012, the domesĕc supplies shall be required to fulfil condiĕon No. 41 which include producĕon of a cerĕficate from a duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the said goods are required for petroleum operaĕons. Accordingly the Commiĥee decided to request the firm to produce a cerĕficate from a duly authorised officer of the Directorate General of Hydro Carbons in the Ministry of Petroleum and Natural Gas, Government of India, to the effect that the said goods are required for petroleum operaĕons Case is deferred to 27.05.2014. 76
Case No.:7/25/80ALC2/2013
Party Name: SCREENOTEX (INDIA) PVT.LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00531/AM14/ RLA File :08/24/040/00508/AM14/ Lic.No/Date:0810128956 18.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that hard copy of firm’s applicaĕon has been received and decided to send the same to MSME for their examinaĕon & comments. Case is deferred to 27.05.2014.
77
Case No.:4/2/80ALC2/2014
Party Name: THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00004/AM15/ RLA File :03/95/040/00907/AM14/ Lic.No/Date:0310770845 18.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DHI on 09.04.2014 for 78
Case No.:5/25/80ALC2/2013
Party Name: SOGEFI MNR FILTRATION INDIA PVT LTD, Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00529/AM14/ RLA File :07/24/040/00376/AM14/ Lic.No/Date:0710102212 19.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that a leĥer dated 28.03.2014 has been issued to RA, Bangalore for forwarding the hard copy of firm’s applicaĕon which has not been received ĕll date and decided to send another reminder to RA, Bangalore for expediĕng the hard copy of firm’s applicaĕon. Case is deferred to 27.05.2014. 79
Case No.:6/25/80ALC2/2013
Party Name: DIAMOND METAL SCREENS (P) LTD Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Approved HQ File :01/80/050/00530/AM14/ RLA File :07/24/040/00423/AM14/ Lic.No/Date:0710102214 19.02.2014 Decision : The Commiĥee decided to raĕfy norms on the basis of DIPP U.O. Note No. 12/52/2014‐TSW/79 dated 22.04.2014 which are as under: 1. Word “relevant” may be prefixed with the descripĕon of import items from Sl. No. 1 to 4. 2. Quanĕĕes of import items at Sl. No. 1 & 2 may be allowed as 26414 Kgs. & 3520 Kgs. respecĕvely as 1.10 Kgs./Kg. content in the export products at Sl. No. 1 & 2 respecĕvely a├er taking 1/3rd recovery from scrap. 3. Quanĕĕes of import items at Sl. No. 3 & 4 may be allowed as applied for i.e. 10400 Kgs. & 31200 Kgs. respecĕvely as 1.04 Kgs./Kg. content in the export products at Sl. No. 3 & 4 respecĕvely. 80
Case No.:6/2/80ALC2/2014
Party Name: TECHNOWEB TEXTILE ENGINEERING PVT. LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00006/AM15/ RLA File :03/95/040/00936/AM14/ Lic.No/Date:0310771124 20.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to C&PC & DIPP both on 09.04.2014 for examinaĕon/comments which actually pertains to C&PC and decided to remind C&PC for expediĕng their comments. Case is deferred to 27.05.2014 81
Case No.:8/2/80ALC2/2014
Party Name: BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00008/AM15/ RLA File :04/24/040/00223/AM14/ Lic.No/Date:0410155406 20.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DHI on 15.04.2014 for
Case is deferred to 27.05.2014 82
Case No.:7/2/80ALC2/2014
Party Name: TRANSASIA BIO MEDICALS LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00007/AM15/ RLA File :03/95/040/00849/AM14/ Lic.No/Date:0310771504 24.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DIT on 09.04.2014 for examinaĕon/comments which is under their examinaĕon and decided to remind DIT for expediĕng their comments. Case is deferred to 27.05.2014 83
Case No.:11/2/80ALC2/2014
Party Name:NIKHTISH ENTERPRISES Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00011/AM15/ RLA File :31/83/040/00208/AM14/ Lic.No/Date:3110062747 24.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DIPP on 22.04.2014 which actually pertains to MSME/DHI and decided to send the same to MSME/DHI for their examinaĕon/comments. Case is deferred to 27.05.2014 84
Case No.:5/2/80ALC2/2014
Party Name: PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Withdrawn HQ File :01/80/050/00005/AM15/ RLA File :03/95/040/00947/AM14/ Lic.No/Date:0310772092 26.02.2014 Decision : The Commiĥee noted that the RA, Mumbai has inĕmated that the norms of subject AA has been fixed on repeat basis vide their leĥer dated 27.02.2014 and decided to withdraw the case. RLA may take necessary acĕon accordingly. 85
Case No.:9/2/80ALC2/2014
Party Name: DECON INDIA PLASTICS PVT. LTD., Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00009/AM15/ RLA File :31/83/040/00231/AM14/ Lic.No/Date:3110062832 26.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that firm’s applicaĕon has been sent to C&PC on 16.04.2014 which is under their examinaĕon and the firm has not furnished the clarificaĕon on type of export (whether physical export or deemed export against invalidaĕon leĥer to EPCG license) as asked vide DES‐I leĥer dated 16.04.2014 and decided the following: (i) to await comments of C&PC; (ii) to send reminder to the firm for expediĕng their reply. 86
Case No.:3/2/80ALC2/2014
Party Name: L&TMHI BOILERS PVT. LTD. Meet No/Date:2/80 ALC2/2014 15.04.2014 Status: Deferred HQ File :01/80/050/00003/AM15/ RLA File :03/95/040/00888/AM14/ Lic.No/Date:0310772317 27.02.2014 Defer Date:27.05.2014 Decision : The Commiĥee noted that the firm’s applicaĕon has been sent to DHI on 07.04.2014 for Case is deferred to 27.05.2014
S.No.34
Case No. A ‐ 02
M/s. Larsen & Toubro Ltd., Mumbai HQF.No.01/80/162/00273/AM14/DES‐I Lic. No. & date Meeĕng No.02/15 RA.F.No.03/95/039/00002/AM11 0310583894 dt.16.07.2010 Date: 15.04.2014 Request for fixaĕon of norms for Annual requirement under para 4.24(v) Decision : The Commiĥee decided to modify norms on the basis of DHI U. O. No. 3(71)/13‐TSW(B) dated 05.03.2014 (Copy is to be forwarded to RA and firm). S.No.35
Case No. A ‐ 03
M/s. L & T‐MHI Boilers Pvt. Ltd., Mumbai HQF.No.01/80/162/00348/AM14/DES‐I Lic. No. & date Meeĕng No.02/15 RA.F.No.03/95/039/00004/AM11 0310760909 dt.06.12.2013 Date: 15.04.2014 Request for fixaĕon of norms for Annual requirement under para 4.24(v) Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 25.04.2014 and decided to send reminder to them. Case is deferred to 27.05.2014 S.No.36
Case No. A/R‐
138 M/s. Dynamaĕc Technologies Ltd., Bangalore HQF.No.01/80/050/00460/AM11/DES‐I Lic. No. & date Meeĕng No.02/15 RA.F.No.07/24/040/00189/AM11 0710074081 dt.06.09.2010 Date: 15.04.2014 Fixaĕon of norms Decision : The Commiĥee noted that the firm’s reply has been sent to MSME on 10.02.2014 for examinaĕon/comments which is under their examinaĕon and decided to remind MSME for expediĕng their comments. Case is deferred to 27.05.2014 S.No.37
Case No. A/R‐42
M/s. Bharat Heavy Electricals Limited, Hyderabad HQF.No.01/80/050/00773/AM11/DES‐I Lic. No. & date Meeĕng No.02/15 RA.F.No.09/24/040/00380/AM11 0910044575 dt.06.12.2010 Date: 15.04.2014 Raĕficaĕon of norms Decision : The Commiĥee noted that the case has been forwarded to EPCG Division for their inputs/comments and 8th reminder dated 03.4.2014 has been issued to them decided to remind EPCG Division again for expediĕng their comments. Case is deferred to 27.05.2014 S.No.38
Case No. A/R‐93
M/s. Thermax Ltd., HQF.No.01/80/050/01550/AM09/DES‐I Lic. No. & date Meeĕng No.02/15 RA.F.No.31/24/040/00296/AM09 3110036393 dt.11.12.2008 Date: 15.04.2014 Request for modificaĕon of norms Decision : The Commiĥee decided to reject the firm’s request on the basis of DHI U. O. No. 3(22)/10‐TSW(B) dated 27.03.2014 (Copy is to be forwarded to RA and firm). S.No.39
Case No. A/R‐114
M/s. Godrej & Boyce Co. Ltd., Mumbai HQF.No.01/80/050/01085/AM12/DES.I Lic. No. & date Meeĕng No.02/15 RA.F.No.03/94/040/01092/AM08 0310460269 dt.06.02.2008 Date: 15.04.2014 Amendment of norms Decision : Based on DIPP U.O. Note No. 12/52/2014‐TSW/114‐A/R dated 22.04.2014, the Commiĥee noted that the firm has actually imported forgings covered in import item at Sl. No. 5 in raw condiĕon i.e. without machining and drilling and decided that its quanĕty may be allowed as under:
Quanĕty of import item at Sl. No. 5 may be allowed as 19 Nos. on net to net basis. Duty free weight of this item may be allowed as 103002 Kgs. inclusive of 60 % wastage a├er taking 20 % recovery from scrap. (Copy is to be forwarded to firm and RA) S.No.40
Case No. A/R‐74
M/s. Dynamaĕc Technologies Ltd., Bangalore HQF.No.01/80/050/00464/AM13/DES.I Lic. No. & date Meeĕng No.02/15 RLA, No.07/21/040/00507/AM13 0710091489 dt.22.10.2012 Date: 15.04.2014 Request for fixaĕon of norms Decision : The Commiĥee noted that the firm’s reply has been sent to MSME on 13.03.2014 for examinaĕon/comments which is under their examinaĕon and decided to remind MSME for expediĕng their comments. Case is deferred to 27.05.2014 S.No.41
Case No. A/R‐
122 M/s. ISGEC Heavy Engineering Ltd., Yamunanagar HQF.No.01/80/050/00107/AM14/DES‐I Lic. No. & date Meeĕng No.02/15 RA.F.No.05/23/040/00032/AM14 0510353880 dt.13.05.2013 Date: 15.04.2014 Request for revision of norms Decision : The Commiĥee decided to modify norms on the basis of DIPP U.O. Note No. 12/52/2014‐TSW/122‐A/R dated 22.04.2014 which are as under: Quanĕty of import item at Sl. No. 3 may be allowed as 17 Nos. on net to net basis. Duty free weight of this item may be allowed as 59387 Kgs. inclusive of 2 % wastage as claimed by the firm. S.No.42
Case No. A/R‐
123 M/s. Modine Thermal Systems Pvt. Ltd., Kancheepuram(TN) HQF.No.01/80/050/00043/AM14/DES‐I Lic. No. & date Meeĕng No.02/15 RA.F.No.04/24/040/00261/AM14 0410143937 dt.06.03.2013 Date: 15.04.2014 Request for revision of norms Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 28.03.2014 followed by further communicaĕon dated 28.03.2014 and decided to send reminder to them. Case is deferred to 27.05.2014 S.No.43
Case No. A/R‐
124 M/s. Modine Thermal Systems Pvt. Ltd., Kancheepuram(TN) HQF.No.01/80/050/00042/AM14/DES‐I Lic. No. & date Meeĕng No.02/15 RA.F.No.04/24/040/00260/AM14 0410143936 dt.06.03.2013 Date: 15.04.2014 Request for revision of norms Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 28.03.2014 followed by further communicaĕon dated 28.03.2014 and decided to send reminder to them. Case is deferred to 27.05.2014 S.No.44
Case No. A/R‐125
M/s. Tema India Ltd., Mumbai HQF.No.01/80/050/00185/AM14/DES‐I Lic. No. & date Meeĕng No.02/15 RA.F.No.03/95/040/00187/AM14 0310737757 dt.14.06.2013 Date: 15.04.2014 Request for revision of norms Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 31.03.2014 and decided to send reminder to them. Case is deferred to 27.05.2014
S.No.45
Case No. A/R‐98
M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00573/AM11/DES.I Lic. No. & date Meeĕng No.02/15 RA.F.No.09/24/040/00223/AM11 0910043468 dt.09.09.2010 Date: 15.04.2014 Fixaĕon of Norms Decision : The Commiĥee noted that the case has been forwarded to EPCG Division for their inputs/comments and 8th reminder dated 03.4.2014 has been issued to them decided to remind EPCG Division again for expediĕng their comments. Case is deferred to 27.05.2014 No.46
Case No. A/R‐118
M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00495/AM11/DES.I Lic. No. & date Meeĕng No.02/15 RA.F.No.09/24/040/00169/AM11 0910043002 dt.06.08.2010 Date: 15.04.2014 Fixaĕon of Norms Decision : The Commiĥee noted that the case has been forwarded to EPCG Division for their inputs/comments and 8th reminder dated 03.4.2014 has been issued to them decided to remind EPCG Division again for expediĕng their comments. Case is deferred to 27.05.2014 S.No.47
Case No. A/R‐140
M/s. Alstom Projects India Ltd., Mumbai HQF.No.01/80/050/01450/AM04/DES.I Lic. No. & date Meeĕng No.02/15 RA.F.No.03/24/042/00205/AM04 0310247081 dt.12.01.2004 Date: 15.04.2014 Fixaĕon of norms Decision : The Commiĥee noted that the case has been forwarded to EPCG Division for their inputs/comments and 6th reminder dated 02.4.2014 has been issued to them decided to remind EPCG Division again for expediĕng their comments. Case is deferred to 27.05.2014 S.No.48
Case No. A/R‐11
M/s. TRF Ltd., Kolkata HQF.No.01/80/050/00053/AM12/DES.I Lic. No. & date Meeĕng No.02/15 RA.F.No.02/24/040/00223/AM11 0210156321 dt.18.03.2011 Date: 15.04.2014 Raĕficaĕon of norms Decision : The Commiĥee noted that a leĥer dated 04.4.2014 has been sent to the firm for providing requisite informaĕon as per deficiency leĥer dated 08.03.2014 but no reply/requisite informaĕon has been received from the firm ĕll date and decided to send reminder to them. Case is deferred to 27.05.2014. S.No.49
Case No. A/R‐12
M/s. TRF Ltd., Kolkata HQF.No.01/80/050/00052/AM12/DES.I Lic. No. & date Meeĕng No.02/15 RA.F.No.02/24/040/00224/AM11 0210156322 dt.18.03.2011 Date: 15.04.2014 Raĕficaĕon of norms Decision : The Commiĥee noted that a leĥer dated 04.4.2014 has been sent to the firm for providing requisite informaĕon as per deficiency leĥer dated 25.07.2011 but no reply/requisite informaĕon has been received from the firm ĕll date and decided to send reminder to them. Case is deferred to 27.05.2014. S.No.50
Case No. A/R‐13
M/s. TRF Ltd., Kolkata HQF.No.01/80/050/00639/AM11/DES.I Lic. No. & date Meeĕng No.02/15 RA.F.No.02/24/040/00122/AM11 0210150220 dt.04.11.2010 Date: 15.04.2014 Raĕficaĕon of norms Decision : The Commiĥee noted that a leĥer dated 04.4.2014 has been sent to the firm for providing requisite informaĕon as per deficiency leĥer dated 25.07.2011 but no reply/requisite informaĕon has been received from the firm ĕll date and decided to send reminder to them. Case is deferred to 27.05.2014. S.No.51
Case No. A/R‐14
M/s. Netaffim Irrigaiton India Pvt. Ltd., Vadodara HQF.No.01/80/050/00305/AM14/DES.I Lic. No. & date Meeĕng No.02/15 RA.F.No.34/24/040/00102/AM14 3410037946 dt.16.09.2013 Date: 15.04.2014 Revision / amendment of norms Decision : The Commiĥee noted that the firm’s representaĕon has been sent to C&PC on 26.03.2014 for examinaĕon/comments which is under their examinaĕon and decided to remind C&PC for expediĕng their comments.
Case is deferred to 27.05.2014 S.No.52
Case No. A/R‐15
M/s. Pranita Engineering Soluĕons Pvt. Ltd., Bangalore HQF.No.01/81/050/00026/AM10/DES.I Lic. No. & date Meeĕng No.02/15 RA.F.No.07/24/040/00039/AM10 0710064492 dt.04.05.2009 Date: 15.04.2014 Raĕficaĕon of norms Decision : The Commiĥee noted that a leĥer dated 31.3.2014 has been sent to the firm for providing requisite informaĕon as per deficiency leĥer dated 14.10.2009 but no reply/requisite informaĕon has been received from the firm ĕll date and decided to send reminder to them. Case is deferred to 27.05.2014. S.No.53
Case No.C‐07
M/s. Tara Aerospace Systems Ltd., Hyderabad HQ F.No.01/80/162/00249/AM14/DES‐I Meeĕng No.02/15 Date: 15.04.2014 Request for fixaĕon of input output wastage norms for the export product “Helicopter Cabin Kits, Design, Development and Manufacturing of Parts and Accessories for Civilian Aircra├” in respect of 100% EOU – reg. Decision : The Commiĥee noted that the firm’s reply dated 10.3.2014 has been sent to DIPP on 18.03.2014 for examinaĕon/comments which is under their examinaĕon and decided to remind DIPP for expediĕng their comments. S.No.54
Case No.C‐08
M/s. MSS India Pvt. Ltd., Nasik HQ F.No.01/80/162/00320/AM14/DES‐I Meeĕng No.02/15 Date: 15.04.2014 Request for fixaĕon of input output norms for the export product “Small fabricated items, Fabricated bus bars, Press work items, Braided connectors, Laminated connectors, Cast connector, Switch fuse unit HSN, Bolted/ Moulded Connector, Moulded Components, DC Bus bars, Machined & Forged Components, Baĥery Charger/Transformer, Electrical Parts Make of Ferrous & Non Ferrous Material (Viz. Copper, Brass, Aluminium, Steel, Monel, Inconel and Lead etc.), Cast Pillars, Electrical & Auto Assemblies, Plate contacts” in respect of 100% EOU – reg. Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 28.03.2014 followed by e‐mail dated 28.03.2014 and decided to send reminder to them. Case is deferred to 27.05.2014 S.No.55
Case No.C‐10
M/s. Pesco Beam Environmental Soluĕons Pvt. Ltd., Kancheepuram HQ F.No.01/80/162/00311/AM14/DES‐I Meeĕng No.02/15 Date: 15.04.2014 Request for fixaĕon of input output norms in respect of manufacture and export of Used Oil Refinery Machinery System – reg. Decision : The Commiĥee noted that the firm’s reply dated 09.4.2014 has been sent to DIPP on 22.04.2014 for examinaĕon/comments which is under their examinaĕon and decided to await their comments. Case is deferred to 27.05.2014 S.No.56
Case No.C‐11
M/s.Tayota Kirloskar Auto Parts Ltd., Karnataka HQ F.No.01/80/171/00441/AM14/DES‐I Meeĕng No.02/15 Date: 15.04.2014 Request for fixaĕon of wastage norms in respect of 100% EOU – reg. Decision : The Commiĥee noted that firm has not replied to deficiency leĥer dated 10.02.2014 and decided to send reminder to them. Case is deferred to 27.05.2014
S.No.57
Case No. A ‐ 01
M/s. Analyser Instruments Co. Pvt. Ltd., Kota (Rajasthan) HQF.No.01/80/162/00032/AM15/DES‐I Lic. No. & date Meeĕng No.02/15 RA.F.No.13/24/040/00281/AM14 1310044806 dt.17.10.2013 Date: 15.04.2014 Raĕficaĕon of norms Decision : The Commiĥee decided to ask the firm to furnish the following informaĕon according to DIPP ID Note No. 12/52/2014‐TSW/A‐01 dated 22.04.2014: 1. Informaĕon in respect of Sl. No. 3, 6, 8 & 9 of Standard Deficiency Format‐export product wise. 2. Details of manufacturing operaĕons on import items at Sl. No 17 to 24. 3. Difference in export items at Sl. No 4 to 11 with corresponding import items at Sl. No 17 to 24
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6710 --apply.