DGFT Minutes
In force — no superseding record on file.
Ra៝�fied Minutes of Meeting No.19/14 scheduled on 10.12.2013 of Norms Committee(NCI) (DES.I Section) The mee៝�ng No. 19/14 of the Norms Commiោ�ee (NC‐I) for the licensing year 2012‐2013 was held on 10.12.2013 under the Chairmanship of Dr. L.B. Singhal, Addi៝�onal Director General of Foreign Trade to consider the applica៝�ons under Duty Exemp៝�on / Remission Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I. The following Members of the Commiោ�ee were present in the mee៝�ng: ‐ Sl.No Name of the representa៝�ves & their Designa៝�on Room No. Telephone No. Depោ�. 1. Sh K.K. Tiwari I.A 476 23063321 DHI, U.B. 2. Sh S.K. Jain, D.O. 428A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Assោ�. Dir. (Mech) 736A 23063802 Extn.2459 DC(MSME),N.B. 4. Sh. Parveen Sharma, Dy.DGFT 302 23061562 Extn.146 DGFT, U.B. 5. Sh. Priya Ranjan, FTDO 404 23061562 Ext.265 DGFT, U.B. I ‐The CommiƩee considered the individual cases of the agenda of this meeƟng generated through the online system of NIC. The decisions taken thereon are as under: 1
Case No.:16/6/80ALC2/2012
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00081/AM13/ RLA File :31/21/040/00050/AM10/ Lic.No/Date:3110038576 28.05.2009 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s reply dated 01.11.2013 has been sent to DHI on 13.11.2013 which is under their examina៝�on and decided to await their comments. Case is deferred to 21.01.2014. 2
Case No.:8/14/80ALC2/2011
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00262/AM12/ RLA File :05/24/040/00182/AM12/ Lic.No/Date:0510300205 24.08.2011 Defer Date:21.01.2014 Decision :The Commiោ�ee noted that the 8th reminder dated 19.11.2013 has been sent to C&PC for their comments. A separate consolidated list has also been handed over personally to TA, C&PC by DDG(PS) for the pending cases. Case is deferred to 21.01.2014. 3
Case No.:23/9/80ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00203/AM13/ RLA File :09/24/040/00136/AM13/ Lic.No/Date:0910053032 13.06.2012 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm is making supply to invalida៝�on leោ�er against EPCG scheme and the maោ�er was referred to EPCG Division for clarifica៝�on which is awaited. It has further noted that a self‐contained note for resolving the issue is also submiោ�ed by DES‐I which is under considera៝�on and decided to wait for EPCG Division’s comments/decision of authori៝�es on submiោ�ed self‐contained note. Case is deferred to 21.01.2014.
Case No.:12/15/80ALC2/2012
Party Name:TRANSASIA BIO MEDICALS LTD. Meet No/Date:19/80 ALC2/2013 Status: Deferred
4 10.12.2013 HQ File :01/80/050/00347/AM13/ RLA File :03/95/040/00235/AM13/ Lic.No/Date:0310701463 10.07.2012 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm has sent informa៝�on to DES‐ I & DIT directly vide their leោ�er dated 04.11.2013 and decided to await their comments. Case is deferred to 21.01.2014. 5
Case No.:34/24/80ALC2/2012
Party Name:CICB CHEMICON PRIVATE LIMITED, Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00514/AM13/ RLA File :07/24/040/00192/AM13/ Lic.No/Date:0710090176 09.08.2012 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s vide their reply dated 23.10.2013 has sought a copy of Deficiency Leោ�er dated 09.09.2013 and decided to send the same to the firm. Case is deferred to 21.01.2014. 6
Case No.:6/7/80ALC2/2013
Party Name:ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00100/AM14/ RLA File :07/21/040/00366/AM13/ Lic.No/Date:0710090351 23.08.2012 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s reply dated 14.11.2013 has been sent to DHI on 25.11.2013 which is under their examina៝�on and decided to await their comments. Case is deferred to 21.01.2014. 7
Case No.:18/15/80ALC2/2012
Party Name:ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00353/AM13/ RLA File :07/21/040/00397/AM13/ Lic.No/Date:0710090531 31.08.2012 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s reply dated 14.11.2013 has been sent to DHI on 25.11.2013 which is under their examina៝�on and decided to await their comments. Case is deferred to 21.01.2014. 8
Case No.:5/18/80ALC2/2012
Party Name:LUDOWICI MINING PROCESS INDIA PVT LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00373/AM13/ RLA File :04/24/040/00132/AM13/ Lic.No/Date:0410140287 05.10.2012 Defer Date:21.01.2014 Decision : Based on C&PC leោ�er No. 46011/80/2013‐PC‐II dated 11.11.2013 addressed to the firm ( copy of it is marked and send to O/o DGFT) for seeking certain informa៝�on and explana៝�on directly, the Commiោ�ee decided to await reply of firm and comments of C&PC thereupon. Case is deferred to 21.01.2014. 9
Case No.:11/24/80ALC2/2012
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Rejected HQ File :01/80/050/00491/AM13/ RLA File :03/95/040/00710/AM13/ Lic.No/Date:0310717487 18.12.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 25.9.2013 followed by reminders dated 10.10.2013, final reminder dated 18.11.2013 and further communica៝�on dated 02.12.2013 and decided to await 15 days more to receive reply from the firm. The Commiោ�ee further noted that DGFT has not received reply of the firm and decided to reject their case with the direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license.
RLA may take necessary ac៝�on accordingly. 10
Case No.:41/24/80ALC2/2012
Party Name:POLY MEDICURE LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00521/AM13/ RLA File :05/24/040/00356/AM13/ Lic.No/Date:0510341782 27.12.2012 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm’s applica៝�on has been sent to C&PC on 13.2.2013 which is under examina៝�on C&PC and decided to remind them. Case is deferred to 21.01.2014. 11
Case No.:20/24/80ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00500/AM13/ RLA File :61/24/040/00050/AM13/ Lic.No/Date:6110000908 09.01.2013 Defer Date:21.01.2014 Decision :The Commiោ�ee noted that the case is under examina៝�on DHI and decided to await comments of DHI. Case is deferred to 21.01.2014. 12
Case No.:4/7/80ALC2/2013
Party Name:WUERTH ELEKTRONIK INDIA PRIVATE LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved HQ File :01/80/050/00098/AM14/ RLA File :07/24/040/00457/AM13/ Lic.No/Date:0710094150 11.03.2013 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/12 dated 10.12.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Quan៝�៝�es of import items from Sl. No. 1 to 3 may be allowed on net to net basis with accountability clause. Accordingly, quan៝�ty of import item at Sl. No. 3 may be reduced to 24960 Nos. 2. Quan៝�៝�es of import items from Sl. No. 4 to 10 may be allowed as 1.05 Sq mtrs./Sq.mtrs. content in the export product. 3. Import items at Sl. Nos. 11 & 12 may be allowed on net to net basis 13
Case No.:3/7/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00097/AM14/ RLA File :09/24/040/00544/AM13/ Lic.No/Date:0910055381 13.03.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 18.11.2013 and decided to send reminder. Case is deferred to 21.01.2014. 14
Case No.:4/10/80ALC2/2013
Party Name:ENERTECH ENGINEERING PVT LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00159/AM14/ RLA File :09/24/040/00626/AM13/ Lic.No/Date:0910055860 25.04.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 25.9.2013 followed by reminders dated 18.11.2013 and dated 26.11.2013 and decided to send final reminder for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014.
15
Case No.:15/7/80ALC2/2013
Party Name:LURGI INDIA COMPANY PVT.LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00109/AM14/ RLA File :05/23/040/00004/AM14/ Lic.No/Date:0510352785 30.04.2013 Defer Date:21.01.2014 Decision : Based on the DIPP U.O. Note No.12(107)/2013‐TSW/15 dated 10.12.2013, the Commiោ�ee decided to ask the following informa៝�on from the firm: 1. Informa៝�on in respect of Sl. No. 9 of Standard Deficiency Format. 2. Detailed calcula៝�ons/basis for the quan៝�ty of import item at Sl. No. 22(Molecular Sieve). 3. Import item at Sl. No. 25 appears to be of capital Goods nature and therefore, details of manufacturing ac៝�vi៝�es proposed to be undertaken on this item may be indicated. Case is deferred to 21.01.2014. 16
Case No.:1/7/80ALC2/2013
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00095/AM14/ RLA File :05/24/040/00036/AM14/ Lic.No/Date:0510353484 08.05.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 10.9.2013 followed by reminder dated 18.11.2013, further communica៝�on dated 02.12.2013 and decided to send final reminder for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014. 17
Case No.:16/7/80ALC2/2013
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00110/AM14/ RLA File :05/24/040/00037/AM14/ Lic.No/Date:0510353487 08.05.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 10.9.2013 followed by reminders dated 18.11.2013, further communica៝�on dated 02.12.2013 and decided to send final reminder for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014. 18
Case No.:11/7/80ALC2/2013
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Closed HQ File :01/80/050/00105/AM14/ RLA File :05/24/040/00035/AM14/ Lic.No/Date:0510353739 10.05.2013 Decision : The Commiោ�ee noted that the firm has surrendered the AA unu៝�lised and informed about the same vide their leោ�er dated 19.11.2013 and decided to close the case.
Case No.:7/10/80ALC2/2013
Party Name:HASSIA PACKAGING PVT. LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00162/AM14/ RLA File :31/83/040/00026/AM14/ Lic.No/Date:3110058411 21.05.2013 Defer Date:21.01.2014
19 Decision : Based on the MSME U.O. Note No. 30(53)/13‐ME dated 02.08.2013, the commiោ�ee decided to ask the firm to furnish following informa៝�on for considera៝�on of their request (copy of the I.D. note is to be forwarded to Firm and RA): 1. Size , Specifica៝�ons and Technical Literature on the export product. 2. Difference between Export product and imported input. 3. Diagram of export product showing the placement of imported input. 4. Process of manufacturing to be carried out on imported input as it is shown as raw material. Case is deferred to 21.01.2014. 20
Case No.:6/10/80ALC2/2013
Party Name:LICRA GREEN TECHNOLOGIES Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00161/AM14/ RLA File :07/24/040/00019/AM14/ Lic.No/Date:0710095521 22.05.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s reply has been sent to MSME on 19.11.2013 which is under their examina៝�on and decided to await their comments. Case is deferred to 21.01.2014. 21
Case No.:13/10/80ALC2/2013
Party Name:NASH INDUSTRIES (I) PVT LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00168/AM14/ RLA File :07/24/040/00051/AM14/ Lic.No/Date:0710095583 27.05.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 10.9.2013 followed by reminder dated 18.11.2013, further communica៝�on dated 02.12.2013 and decided to send final reminder for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014. 22
Case No.:23/10/80ALC2/2013
Party Name:THERMAX LTD., Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00178/AM14/ RLA File :31/83/040/00045/AM14/ Lic.No/Date:3110058550 30.05.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 10.9.2013 followed by reminder dated 18.11.2013, further communica៝�on dated 02.12.2013 and decided to send final reminder for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014. 23
Case No.:25/10/80ALC2/2013
Party Name:THERMAX LTD., Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00180/AM14/ RLA File :31/83/040/00044/AM14/ Lic.No/Date:3110058551 30.05.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 10.9.2013 followed by reminder dated 18.11.2013, further communica៝�on dated 02.12.2013 and decided to send final reminder for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014.
Case No.:18/10/80ALC2/2013
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved
24 HQ File :01/80/050/00173/AM14/ RLA File :03/95/040/00184/AM14/ Lic.No/Date:0310736870 06.06.2013 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/24 dated 10.12.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Net empty weight of 3432.8 MT may be specified with the quan៝�ty of export product. 2. List of import items may be revised as per the revised list submiោ�ed by the firm vide their leោ�er dated 24th October, 2013(copy enclosed). 3. Import items at Sl. 1 & 2 shall be of relevant grade and thickness as contained in the export product. 4. Quan៝�ty of import item at Sl. No. 1 may be allowed as 2561148 Kgs inclusive of 12.8 % wastage a�er 1/3rd recovery from scrap. 5. Quan៝�ty of import item at Sl. No. 2 may be allowed as 65265 Kgs inclusive of 1.67 % wastage as claimed by the firm. 6. Quan៝�ty of import item at Sl. No. 3 may be allowed as 524 Nos. on net to net basis. Duty free weight of this item may be allowed as 969844 Kgs inclusive of 0.28 % wastage as claimed by the firm. 7. Quan៝�ty of import item at Sl. No. 4 may be allowed as 4 Nos.(1300 Kgs.) on net to net basis. 8. Quan៝�៝�es of import items at Sl. No. 5, 6 & 7 (welding Consumables) may be allowed as 77200 Kgs. , 60257 Kgs. & 60257 Kgs. respec៝�vely. 9. Import items at Sl. No 8 & 9 put together may be allowed within 2% of FOB value of exports.
7 (welding Consumables) may be allowed as 77200 Kgs. , 60257 Kgs. & 60257 Kgs. respec៝�vely. 9. Import items at Sl. No 8 & 9 put together may be allowed within 2% of FOB value of exports. 10. Import item at Sl. No. 10 shall be of relevant grade and dia. as contained in the export product. 11. Quan៝�ty of import item at Sl. No.10 may be allowed as 25.76 Meters(10.985 MT ) inclusive of a wastage of 2 %. 12. Import item at Sl. No.11 may be deleted as requested by the firm. 25
Case No.:29/10/80ALC2/2013
Party Name:PRIJAI HEAT EXCHANGERS PVT. LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved HQ File :01/80/050/00184/AM14/ RLA File :03/95/040/00156/AM14/ Lic.No/Date:0310737293 12.06.2013 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/25 dated 10.12.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Net weights of export product may be specified as 34880 Kgs.. 2. Word “Relevant ” may be prefixed with the descrip៝�on of import item at Sl. No.1 and its quan៝�ty may be allowed as 1.01 Kgs./Kg. content in the export products as per SION C‐1175. 3. Word “Relevant ” may be prefixed with the descrip៝�on of import item at Sl. No.2 and its quan៝�ty may be allowed as 1.02 Kgs./Kg. content in the export products as per SION C‐1175. 26
Case No.:16/10/80ALC2/2013
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00171/AM14/ RLA File :03/95/040/00178/AM14/ Lic.No/Date:0310737324 13.06.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 10.09.2013 followed by reminder dated 18.11.2013 and decided to send final reminder for expedi៝�ng their reply failing which the
Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014. 27
Case No.:21/10/80ALC2/2013
Party Name:UNI VTL PRECISION PVT. LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00176/AM14/ RLA File :03/95/040/00212/AM14/ Lic.No/Date:0310737939 17.06.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 16.08.2013 followed by reminder dated 10.10.2013 and decided to send final reminder for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014. 28
Case No.:46/10/80ALC2/2013
Party Name:SHAKTI PUMPS (INDIA) LTD., Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved HQ File :01/80/050/00201/AM14/ RLA File :56/24/040/00007/AM14/ Lic.No/Date:5610002310 17.06.2013 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/28 dated 10.12.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Net weights of 52.241 MT, 59.091 MT, 68.066 MT & 75.215 MT may be specified with the quan៝�៝�es of export products at Sl. No. 1, 2, 3 & 4 respec៝�vely. 2. Word “Relevant” may be prefixed with the descrip៝�ons of import items at Sl. No. 1 to 5. 3. Quan៝�ty of import item at Sl. No. 1 may be allowed as 6930 Kgs. inclusive of 5 % wastage. 4. Quan៝�ty of import item at Sl. No. 2 may be allowed as 708 Kgs. inclusive of 18 % wastage a�er 1/3rd recovery from scrap. 5. Quan៝�៝�es of import item at Sl. No. 3 & 4 may be allowed as 183400 Kgs. & 33250 Kgs. respec៝�vely as per SION C‐1519. 6. Quan៝�ty of import item at Sl. No. 5 may be allowed as 30726 Kgs. inclusive of 20 % wastage a�er 20 % recovery from scrap. 7. Words “4Cx2.5 Sq.mm” may be suffixed with the descrip៝�on of import item at Sl. No. 6 and its quan៝�ty may be allowed as applied for i.e.16400 Meters on net to net basis. 8. Import items at Sl. Nos. 7 to 12 ,14 & 15 may be allowed as applied for i.e. 4000 Nos. each on net to net basis with accountability clause. 9. Quan៝�ty of import item at Sl. No. 13 may be allowed on net to net basis as claimed by the firm. 29
Case No.:27/10/80ALC2/2013
Party Name:SPARKLINE EQUIPMENTS PVT.LTD, Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00182/AM14/ RLA File :31/83/040/00040/AM14/ Lic.No/Date:3110059032 20.06.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 10.9.2013 followed by reminder dated 18.11.2013, further communica៝�on dated 02.12.2013 and decided to send final reminder for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014.
Case No.:8/10/80ALC2/2013
Party Name:MODINE THERMAL SYSTEMS PVT. LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved
30 HQ File :01/80/050/00163/AM14/ RLA File :04/24/040/00038/AM14/ Lic.No/Date:0410147388 24.06.2013 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/30 dated 10.12.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on on repeat basis as per firm’s Advance Authoriza៝�on No. 0410143937 dated 06.03.2013 ra៝�fied in Norms Commiោ�ee Mee៝�ng No. 17/80 dated 12/11/2013. 31
Case No.:9/10/80ALC2/2013
Party Name:MODINE THERMAL SYSTEMS PVT. LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved HQ File :01/80/050/00164/AM14/ RLA File :04/24/040/00037/AM14/ Lic.No/Date:0410147387 24.06.2013 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/31 dated 10.12.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on on repeat basis as per firm’s Advance Authoriza៝�on No. 0410143936 dated 06.03.2013 ra៝�fied in Norms Commiោ�ee Mee៝�ng No. 17/80 dated 12/11/2013. 32
Case No.:15/10/80ALC2/2013
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved HQ File :01/80/050/00170/AM14/ RLA File :03/95/040/00190/AM14/ Lic.No/Date:0310738812 24.06.2013 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/32 dated 10.12.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Net Fabricated weight of 2457.831 MT may be specified with the quan៝�ty of export product. 2. Import items at Sl. 1 & 2 shall be of relevant grade and thickness as contained in the export product and may be allowed as 1.03 Kgs./Kg. content in the export product as claimed by the firm. 3. Quan៝�ty of import item at Sl. No. 3 may be allowed as 12 Nos. on net to net basis. Duty free weight of this item may be allowed as 654458 Kgs inclusive of 115 % wastage a�er 20% recovery from scrap. 4. Quan៝�ty of import item at Sl. No. 4 may be allowed as 4 Nos. on net to net basis. Duty free weight of this item may be allowed as 23923 Kgs inclusive of 43 % wastage a�er 20% recovery from scrap. 5. Quan៝�ty of import item at Sl. No. 5 may be allowed as 8 Nos.(144907 Kgs.) on net to net basis. 6. Quan៝�ty of import item at Sl. No. 6 may be allowed as 70 Nos.(18253 Kgs.). 7. Quan៝�ty of import item at Sl. No. 7 may be allowed as 12 Nos.(128902 Kgs.) on net to net basis. 8. Words” 50.8 mm (OD)x2.11 mm Thk(Nom)” may be suffixed with the descrip៝�on of import item at Sl. No.8 and its quan៝�ty may be allowed as 259796 Meters (656078 Kgs.) inclusive of 2 % wastage.
. Words” 50.8 mm (OD)x2.11 mm Thk(Nom)” may be suffixed with the descrip៝�on of import item at Sl. No.8 and its quan៝�ty may be allowed as 259796 Meters (656078 Kgs.) inclusive of 2 % wastage. 9. Words” 31.75 mm (OD)x 1.65 mm Thk(Nom)” may be suffixed with the descrip៝�on of import item at Sl. No.9 and its quan៝�ty may be allowed as 14713 Meters (18374 Kgs.) inclusive of 2 % wastage. 10. Words” 46.20 mm (OD)x 36.68 mm (ID)” may be suffixed with the descrip៝�on of import item at Sl. No.10 and its quan៝�ty may be allowed as 11091 Meters (51494 Kgs.) inclusive of 2 % wastage 11. Quan៝�៝�es of import items from Sl. No. 11 to 16 (welding Consumables) may be allowed as applied for. 12. Quan៝�ty of import item at Sl. No. 17 (Flux) may be allowed as 85170 Kgs. 13. Weights of import items at Sl. No. 18,19 ,21 &22 may be specified as 3 MT, 1 MT , 1 MT & 6 MT respec៝�vely. 14. Quan៝�៝�es of import items at Sl. No. 18,19, 21 &22 may be allowed on net to net basis with accountability clause. 15. Import item at Sl. No 20 may be allowed within 1% of FOB value of exports. 16. Import item at Sl. No.22 to be supplied with the export products.
33
Case No.:32/10/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00187/AM14/ RLA File :05/23/040/00115/AM14/ Lic.No/Date:0510358118 26.06.2013 Defer Date:21.01.2014 Decision : On the recommenda៝�on of the DHI representa៝�ve present in the mee៝�ng, the Commiោ�ee decided to invite the firm for a ‘Personal Hearing’ to explain the nature and technical details of the import and export items in its different Advance Authorisa៝�ons. The firm may also explain the stepwise manufacturing process including the wastages involved and also the difference in the import and export items. The firm may, therefore, appear for ‘Personal Hearing’ on 24.12.2013 before the Norms Commiោ�ee‐1 alongwith the person having technical knowledge on the items involved. 34
Case No.:33/10/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00188/AM14/ RLA File :05/23/040/00114/AM14/ Lic.No/Date:0510358117 26.06.2013 Defer Date:21.01.2014 Decision : On the recommenda៝�on of the DHI representa៝�ve present in the mee៝�ng, the Commiោ�ee decided to invite the firm for a ‘Personal Hearing’ to explain the nature and technical details of the import and export items in its different Advance Authorisa៝�ons. The firm may also explain the stepwise manufacturing process including the wastages involved and also the difference in the import and export items. The firm may, therefore, appear for ‘Personal Hearing’ on 24.12.2013 before the Norms Commiោ�ee‐1 alongwith the person having technical knowledge on the items involved. 35
Case No.:35/10/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00190/AM14/ RLA File :05/23/040/00116/AM14/ Lic.No/Date:0510358114 26.06.2013 Defer Date:21.01.2014 Decision : On the recommenda៝�on of the DHI representa៝�ve present in the mee៝�ng, the Commiោ�ee decided to invite the firm for a ‘Personal Hearing’ to explain the nature and technical details of the import and export items in its different Advance Authorisa៝�ons. The firm may also explain the stepwise manufacturing process including the wastages involved and also the difference in the import and export items. The firm may, therefore, appear for ‘Personal Hearing’ on 24.12.2013 before the Norms Commiោ�ee‐1 alongwith the person having technical knowledge on the items involved. 36
Case No.:24/10/80ALC2/2013
Party Name:THERMAX LTD., Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00179/AM14/ RLA File :31/83/040/00050/AM14/ Lic.No/Date:3110059102 27.06.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 10.9.2013 followed by reminder dated 18.11.2013, further communica៝�on dated 02.12.2013 and decided to send final reminder for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014.
Case No.:22/10/80ALC2/2013
Party Name:RUD INDIA CHAIN PVT. LTD. Meet No/Date:19/80 ALC2/2013 Status: Deferred
37 10.12.2013 HQ File :01/80/050/00177/AM14/ RLA File :03/95/040/00254/AM14/ Lic.No/Date:0310739683 01.07.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm’s reply dated 25.10.2013 has been forwarded to DHI on 18.11.2013 which is under DHI examina៝�on and decided to await their comments. Case is deferred to 21.01.2014. 38
Case No.:31/10/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00186/AM14/ RLA File :05/23/040/00139/AM14/ Lic.No/Date:0510358720 04.07.2013 Defer Date:21.01.2014 Decision : On the recommenda៝�on of the DHI representa៝�ve present in the mee៝�ng, the Commiោ�ee decided to invite the firm for a ‘Personal Hearing’ to explain the nature and technical details of the import and export items in its different Advance Authorisa៝�ons. The firm may also explain the stepwise manufacturing process including the wastages involved and also the difference in the import and export items. The firm may, therefore, appear for ‘Personal Hearing’ on 24.12.2013 before the Norms Commiោ�ee‐1 alongwith the person having technical knowledge on the items involved. 39
Case No.:44/10/80ALC2/2013
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00199/AM14/ RLA File :05/23/040/00113/AM14/ Lic.No/Date:0510358721 04.07.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the maោ�er is under examina៝�on of PC‐VI sec៝�on and decided to await comments. Case is deferred to 21.01.2014. 40
Case No.:34/10/80ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00189/AM14/ RLA File :05/23/040/00127/AM14/ Lic.No/Date:0510359006 08.07.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 09.09.2013 followed by reminders dated 18.11.2013 and dated 26.11.2013 decided to send final reminder for expedi៝�ng their reply failing which the Commiោ�ee would be constrained to reject their case with direc៝�on to pay the Custom Duty and applicable interest for regulariza៝�on of the license. Case is deferred to 21.01.2014. 41
Case No.:39/10/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00194/AM14/ RLA File :05/23/040/00144/AM14/ Lic.No/Date:0510359603 12.07.2013 Defer Date:21.01.2014 Decision : On the recommenda៝�on of the DHI representa៝�ve present in the mee៝�ng, the Commiោ�ee decided to invite the firm for a ‘Personal Hearing’ to explain the nature and technical details of the import and export items in its different Advance Authorisa៝�ons. The firm may also explain the stepwise manufacturing process including the wastages involved and also the difference in the import and export items. The firm may, therefore, appear for ‘Personal Hearing’ on 24.12.2013 before the Norms Commiោ�ee‐1 alongwith the person having technical knowledge on the items involved.
Case No.:1/10/80ALC2/2013
Party Name:GL&V INDIA PRIVATE LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved
42 HQ File :01/80/050/00156/AM14/ RLA File :31/83/040/00072/AM14/ Lic.No/Date:3110059471 18.07.2013 Decision : Based on the MSME U.O. Note No. 30(60)/13‐ME dated 11.11.2013, the commiោ�ee decided to ra៝�fy norms (Copy of wriោ�en comments is to be forwarded to firm and RLA). 43
Case No.:4/16/80ALC2/2013
Party Name:SCREENOTEX (INDIA) PVT.LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved HQ File :01/80/050/00329/AM14/ RLA File :08/24/040/00184/AM14/ Lic.No/Date:0810123416 31.07.2013 Decision : Based on the MSME U.O. Note No. 30(96)/13‐ME dated 06.11.2013, the commiោ�ee decided to ra៝�fy norms (Copy of I.D. note is to be forwarded to firm and RLA). 44
Case No.:1/16/80ALC2/2013
Party Name:DOSHION VEOLIA WATER SOLUTIONS PVT.LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00326/AM14/ RLA File :08/24/040/00430/AM13/ Lic.No/Date:0810123622 08.08.2013 Defer Date:21.01.2014 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/44 dated 10.12.2013, the Commiោ�ee decided to ask the following informa៝�on from the firm: 1. Informa៝�on in respect of Sl. No. 3, 6, 8 & 9 of Standard Deficiency Format. 2. Informa៝�on in respect of Sl. No. 11 of Standard Deficiency Format for import items at Sl. No 14 & 18 to 20. 3. Details of import items at Sl. No 4 & 5 i.e. whether Pressure Tubes or Pressure vessels and their use in export product. Case is deferred to 21.01.2014. 45
Case No.:2/16/80ALC2/2013
Party Name:LUBI INDUSTRIES LLP. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00327/AM14/ RLA File :08/24/040/00203/AM14/ Lic.No/Date:0810123951 21.08.2013 Defer Date:21.01.2014 Decision : Based on the DIPP representa៝�ve comments present in the mee៝�ng, the Commiោ�ee decided to ask the firm to send informa៝�on in respect of Sl. No. 4, 5 & 11 of Standard Deficiency Format export productwise . Case is deferred to 21.01.2014. 46
Case No.:5/16/80ALC2/2013
Party Name:NASH INDUSTRIES (I) PVT LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00330/AM14/ RLA File :07/24/040/00157/AM14/ Lic.No/Date:0710097637 21.08.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DIPP on 22.11.2013 but TA, DIPP present in the mee៝�ng has informed that they have not received the same and decided to send firm’s applica៝�on again to DIPP. Case is deferred to 21.01.2014.
Case No.:1/13/80ALC2/2013
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Withdrawn
47 HQ File :01/80/050/00206/AM14/ RLA File :05/24/040/00164/AM14/ Lic.No/Date:0510363820 27.08.2013 Decision : The Commiោ�ee noted the informa៝�on sent by CLA, Delhi that the license was issued under para 4.7.1 and norms already fixed have been used for the license therefore the case need not be considered by the NC vide their e‐mail dated 11.11.2013 and decided to closed the case. 48
Case No.:2/13/80ALC2/2013
Party Name:PLANSEE INDIA HIGH PERFORMANCE MATERIALS PVT LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Closed HQ File :01/80/050/00207/AM14/ RLA File :07/24/040/00142/AM14/ Lic.No/Date:0710097965 03.09.2013 Decision :The Commiោ�ee noted that the RA, Bangalore, vide their leោ�er dated 25.10.2013 has informed NC that norms of AA have been fixed on repeat basis, consequently, they have not forwarded hard copy of applica៝�on and decided to close this case. 49
Case No.:16/19/80ALC2/2013
Party Name:WELD FUSE PVT. LTD . Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00388/AM14/ RLA File :09/24/040/00291/AM14/ Lic.No/Date:0910057672 24.09.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DIPP on 09.12.2013 which is under their examina៝�on and EPCG clarifica៝�on has been sought from the firm vide leោ�er dated 09.12.2013. The commiោ�ee decided to await comments of DIPP and firm’s clarifica៝�on on aforesaid maោ�er. Case is deferred to 21.01.2014. 50
Case No.:9/19/80ALC2/2013
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00381/AM14/ RLA File :09/24/040/00311/AM14/ Lic.No/Date:0910057710 25.09.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 09.12.2013 which is under their examina៝�on decided to await comments of DIPP. Case is deferred to 21.01.2014. 51
Case No.:10/19/80ALC2/2013
Party Name:NSK ABC BEARINGS LIMITED, Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00382/AM14/ RLA File :04/24/040/00138/AM14/ Lic.No/Date:0410150484 03.10.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DIPP on 09.12.2013 which is under their examina៝�on decided to await comments of DIPP. Case is deferred to 21.01.2014. 52
Case No.:11/19/80ALC2/2013
Party Name:NSK ABC BEARINGS LIMITED, Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00383/AM14/ RLA File :04/24/040/00139/AM14/ Lic.No/Date:0410150663 07.10.2013 Defer Date:21.01.2014
Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DIPP on 09.12.2013 which is under their examina៝�on decided to await comments of DIPP. Case is deferred to 21.01.2014. 53
Case No.:12/19/80ALC2/2013
Party Name:PLANSEE INDIA HIGH PERFORMANCE MATERIALS PVT LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00384/AM14/ RLA File :07/24/040/00191/AM14/ Lic.No/Date:0710098974 14.10.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DIPP on 09.12.2013 which is under their examina៝�on decided to await comments of DIPP. Case is deferred to 21.01.2014. 54
Case No.:5/19/80ALC2/2013
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved HQ File :01/80/050/00377/AM14/ RLA File :05/24/040/00255/AM14/ Lic.No/Date:0510368882 21.10.2013 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/54 dated 10.12.2013, the Commiោ�ee decided that norms of subject AA may be ra៝�fied on repeat basis, as per firm’s Advance Authoriza៝�on No. 0510295994 dated 07.07.2011 ra៝�fied in Norms Commiោ�ee Mee៝�ng No. 09/12 dated 26/07/2011 and as under: 1. Net weight of export product may be specified as 549 Kgs. 2. Quan៝�ty of import item may be allowed as 2305.8 Kgs. inclusive of 320% wastage a�er taking 6% recovery from scrap 55
Case No.:14/19/80ALC2/2013
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00386/AM14/ RLA File :34/24/040/00107/AM14/ Lic.No/Date:3410038312 22.10.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to C&PC on 09.12.2013 which is under their examina៝�on decided to await comments of C&PC. Case is deferred to 21.01.2014. 56
Case No.:15/19/80ALC2/2013
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00387/AM14/ RLA File :34/24/040/00097/AM14/ Lic.No/Date:3410038311 22.10.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to C&PC on 09.12.2013 which is under their examina៝�on decided to await comments of C&PC. Case is deferred to 21.01.2014. 57
Case No.:7/19/80ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00379/AM14/ RLA File :05/23/040/00302/AM14/ Lic.No/Date:0510369372 25.10.2013 Defer Date:21.01.2014 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/57 dated 10.12.2013, the Commiោ�ee decided to ask the following informa៝�on from the firm: 1. Informa៝�on in respect of Sl. No. 3, 4, 5, 11 & 14 of Standard Deficiency Format. 2. Quan៝�៝�es of import items at Sl. Nos. 2 to 4,7,8,9, 17,18 &21 in Nos. also in addi៝�on to their weights.
3. Quan៝�៝�es of import items at Sl. No. 10 & 19 in meters also in addi៝�on to its weight. 4. Jus៝�fica៝�on/basis for its quan៝�ty of import item at Sl. No. 24. 5. Details of manufacturing ac៝�vi៝�es proposed to be undertaken on import items at Sl. No 31 & 32. Case is deferred to 21.01.2014. 58
Case No.:4/19/80ALC2/2013
Party Name:JBM KANEMITSU PULLEYS PRIVATE LIMITED Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00376/AM14/ RLA File :05/23/040/00313/AM14/ Lic.No/Date:0510370156 01.11.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 05.12.2013 which is under their examina៝�on and EPCG clarifica៝�on has been sought from the firm vide leោ�er dated 06.12.2013. The commiោ�ee decided to await comments of DHI and firm’s clarifica៝�on on aforesaid maោ�er. Case is deferred to 21.01.2014. 59
Case No.:6/19/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00378/AM14/ RLA File :05/23/040/00316/AM14/ Lic.No/Date:0510370132 01.11.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 05.12.2013 which is under their examina៝�on and EPCG clarifica៝�on has been sought from the firm vide leោ�er dated 06.12.2013. The commiោ�ee decided to await comments of DHI and firm’s clarifica៝�on on aforesaid maោ�er. Case is deferred to 21.01.2014. 60
Case No.:3/19/80ALC2/2013
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00375/AM14/ RLA File :05/23/040/00167/AM14/ Lic.No/Date:0510370386 06.11.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 05.12.2013 which is under their examina៝�on and EPCG clarifica៝�on has been sought from the firm vide leោ�er dated 06.12.2013. The commiោ�ee decided to await comments of DHI and firm’s clarifica៝�on on aforesaid maោ�er. Case is deferred to 21.01.2014. 61
Case No.:8/19/80ALC2/2013
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00380/AM14/ RLA File :05/23/040/00310/AM14/ Lic.No/Date:0510370619 08.11.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 05.12.2013 which is under their examina៝�on and EPCG clarifica៝�on has been sought from the firm vide leោ�er dated 06.12.2013. The commiោ�ee decided to await comments of DHI and firm’s clarifica៝�on on aforesaid maោ�er. Case is deferred to 21.01.2014. 62
Case No.:13/19/80ALC2/2013
Party Name:STERICAT GUTSTRINGS PVT. LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00385/AM14/ RLA File :05/24/040/00249/AM14/ Lic.No/Date:0510370609 08.11.2013 Defer Date:21.01.2014 Decision : The Commiោ�ee noted that the firm’s applica៝�on has been sent to C&PC on 09.12.2013 which is under their examina៝�on decided to await comments of C&PC. Case is deferred to 21.01.2014.
63
Case No.:1/19/80ALC2/2013
Party Name:MODINE THERMAL SYSTEMS PVT. LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Approved HQ File :01/80/050/00373/AM14/ RLA File :04/24/040/00153/AM14/ Lic.No/Date:0410151844 12.11.2013 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/63 dated 10.12.2013, the Commiោ�ee decided that the subject AA may be ra៝�fied on repeat basis as per firm’s Advance Authoriza៝�on No. 0410143936 dated 06.03.2013 ra៝�fied in Norms Commiោ�ee Mee៝�ng No. 17/80 dated 12/11/2013. 64
Case No.:2/19/80ALC2/2013
Party Name:MODINE THERMAL SYSTEMS PVT. LTD. Meet No/Date:19/80 ALC2/2013 10.12.2013 Status: Deferred HQ File :01/80/050/00374/AM14/ RLA File :04/24/040/00154/AM14/ Lic.No/Date:0410151845 12.11.2013 Defer Date:21.01.2014 Decision : Based on DIPP U.O.No. 12/107/2013‐TSW/64 dated 10.12.2013, the Commiោ�ee decided may be ra៝�fied on repeat basis as per firm’s Advance Authoriza៝�on No. 0410143937 dated 06.03.2013 ra៝�fied in Norms Commiោ�ee Mee៝�ng No. 17/80 dated 12/11/2013. S.No.423
Case No. A 02
M/s. Larsen & Toubro Ltd., Mumbai HQF.No.01/80/162/00273/AM14/DESI Lic. No. & date Meeting No.19/14 RA.F.No.03/95/039/00002/AM11 0310583894 dt.16.07.2010 Date: 10.12.2013 Request for fixation of norms for Annual requirement under para 4.24 Decision: The Commiោ�ee noted that the firm’s applica៝�on has been sent to DHI on 26.11.2013 which is under their examina៝�on decided to await comments of DHI. Case is deferred to 21.01.2014. S.No.424
Case No. A/R
138 M/s. Dynamatic Technologies Ltd., Bangalore HQF.No.01/80/050/00460/AM11/DESI Lic. No. & date Meeting No.19/14 RA.F.No.07/24/040/00189/AM11 0710074081 dt.06.09.2010 Date: 10.12.2013 Fixation of norms Decision: The Commiោ�ee noted that the firm’s reply dated 05.12.2013 has been sent to DHI on 06.12.2013 which is under their examina៝�on decided to await comments. Case is deferred to 21.01.2014. S.No.425
Case No. A/R07
M/s. Precise Process Con troll, Baroda HQF.No.01/80/050/00932/AM07/DESI Lic. No. & date Meeting No.19/14 RA.F.No.34/24/040/00265/AM07 3410018138 dt.21.02.2007 Date: 10.12.2013 Fixation of norms Decision: Based on DIT U.O.No. W‐27/41/2013‐IPHW dated 21.11.2013, the commiោ�ee decided to ra៝�fy norms (Copy of aforesaid U.O. note is to be forwarded to firm and RLA). S.No.426
Case No. A/R42
M/s. Bharat Heavy Electricals Limited, Hyderabad HQF.No.01/80/050/00773/AM11/DESI Lic. No. & date Meeting No.19/14 RA.F.No.09/24/040/00380/AM11 0910044575 dt.06.12.2010 Date: 10.12.2013 Ratification of norms Decision: The Commiោ�ee noted that the firm is making supply to invalida៝�on leោ�er against EPCG scheme and the maោ�er was referred to EPCG Division for clarifica៝�on which is awaited. It has further noted that a self‐contained note for��
resolving the issue is also submiោ�ed by DES‐I which is under considera៝�on and decided to wait for EPCG Division’s comments/decision of authori៝�es on submiោ�ed self‐contained note. Case is deferred to 21.01.2014. S.No.427
Case No. A/R45
M/s. Brakes India Ltd., Chennai HQF.No.01/80/050/01124/AM08/DESI Lic. No. & date Meeting No.19/14 RA.F.No.04/24/040/00263/AM08 0410093871 dt.15.02.2008 Date: 10.12.2013 Request for revision / amendment of norms Decision: The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 26.11.2013 which is again sent to firm on 06.12.2013 and decided to send reminder. Case is deferred to 21.01.2014. S.No.428
Case No. A/R
51 M/s. Indian Technometal Co. Ltd., New Delhi HQF.No.01/80/050/00557/AM12/DESI Lic. No. & date Meeting No.19/14 RA.F.No.05/23/040/00289/AM12 0510307109 dt.03.11.2011 Date: 10.12.2013 Request for revision of norms Decision: The Commiោ�ee noted that firm has informed by e‐mail dated 29.10.2013 reques៝�ng for postponement of their Personal Hearing due to Deepawali Fes៝�val and commiោ�ee decided to give opportunity to aោ�end Personal Hearing alongwith facts of their case on 10.12.2013 at 2.30 PM in Room No.11, Udyog Bhawan, New Delhi. The firm has not turned up. The commiោ�ee decided to maintain status quo for the norms given by the NC in its mee៝�ng held on 16.4.2013. S.No.429
Case No. A/R
79 M/s. E.S. Lighting Technologies (P) Ltd., Faridabad HQF.No.01/80/050/00066/AM11/DESI Lic. No. & date Meeting No.19/14 RA.F.No.05/23/040/00205/AM10 0510260440 dt.15.03.2010 Date: 10.12.2013 Request for completion of export obligation Decision: Based on the DHI U.O. note No. 3(82)/13‐TSW(B)/271 dated 11.11.13 , the Commiោ�ee observed that there is nothing technical in the reply and decided to reject the case (Copy of aforesaid U.O. note is to be forwarded to firm and RLA). S.No.430
Case No. A/R80
M/s. GEA BGR Energy System India Ltd., Chennai HQF.No.01/80/050/00461/AM10/DESI Lic. No. & date Meeting No.19/14 RA.F.No.04/24/040/00169/M10 0410108791 dt.23.10.2009 Date: 10.12.2013 Decision: The Commiោ�ee noted that the firm’s reply dated 28.11.2013 has been sent to DHI on 06.12.2013 which is under their examina៝�on decided to await comments of DHI. Case is deferred to 21.01.2014. S.No.431
Case No. A/R82
M/s. Larsen & Toubro Limited, Mumbai HQF.No.01/80/050/01146/AM08/DESI Lic. No. & date Meeting No.19/14 RA.F.No.03/95/040/01133/AM08 0310464682 dt.12.03.2008 Date: 10.12.2013 Decision: The Commiោ�ee noted that the firm has not replied to deficiency leោ�er dated 18.11.2013 and decided to send reminder to the firm in respect of D/L. Case is deferred to 21.01.2014. S.No.432
Case No. A/R87
M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00487/AM13/DESI Lic. No. & date Meeting No.19/14 RA.F.No.03/94/040/00650/AM13 0310715387 dt.21.11.2012 Date: 10.12.2013 Decision: The Commiោ�ee noted that the firm’s request dated 28.10.2013 has been sent to DIPP on 27.11.2013 which is under their examina៝�on decided to await comments of DIPP. Case is deferred to 21.01.2014. S.No.433
Case No. A/R88
M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00155/AM14/DESI Lic. No. & date Meeting No.19/14 RA.F.No.03/94/040/00085/AM14 0310735100 dt.21.05.2013 Date: 10.12.2013 Decision: The Commiោ�ee noted that the firm’s request dated 28.10.2013 has been sent to DIPP on 27.11.2013 which is under their examina៝�on decided to await comments of DIPP. Case is deferred to 21.01.2014. S.No.434
Case No. A/R89
M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00053/AM14/DESI Lic. No. & date Meeting No.19/14 RA.F.No.03/94/040/01077/AM13 0310729870 dt.28.03.2013 Date: 10.12.2013 Decision: The Commiោ�ee noted that the firm’s request dated 28.10.2013 has been sent to DIPP on 27.11.2013 which is under their examina៝�on decided to await comments of DIPP. Case is deferred to 21.01.2014. S.No.435
Case No. A/R90
M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00154/AM14/DESI Lic. No. & date Meeting No.19/14 RA.F.No.03/94/040/00074/AM14 0310734939 dt.20.05.2013 Date: 10.12.2013 Decision: The Commiោ�ee noted that the firm’s request dated 28.10.2013 has been sent to DIPP on 27.11.2013 which is under their examina៝�on decided to await comments of DIPP. Case is deferred to 21.01.2014. S.No.436
Case No. A/R91
M/s. L & TMHI Boilers Pvt. Ltd., Mumbai HQF.No.01/80/050/00024/AM14/DESI Lic. No. & date Meeting No.19/14 RA.F.No.52/24/040/00053/AM13 5210039563 dt.13.03.2013 Date: 10.12.2013 Request for amendment of norms Decision: Based on the DHI U.O. note No. Nil dated 10.12.13 , the Commiោ�ee decided to ra៝�fy the norm of subject AA as under : AA No. Repeat/SION/GN4 5210039563 Sl. No. 10 – may be deleted S. No. 9 – net to net with accountability may be allowed. S.No.437
Case No. A/R
92 M/s. G.R. Engineering Pvt. Ltd., Mumbai HQF.No.01/80/050/00245/AM14/DESI Lic. No. & date Meeting No.19/14 RA.F.No.03/94/040/00181/AM14 O310742466 dt.23.07.2013 Date: 10.12.2013 Request for inclusion of additional import item “Welding Electrodes/MIG Wire” as item No.4 of import. Decision: Based on DIPP U.O. No. 12/107/2013‐TSW/92‐A/R dated 10/12/2013, the Commiោ�ee decided that norms of subject AA may be ra៝�fied as under: “Quan៝�ty of addi៝�onal import item no. 4, namely, Welding Electrodes/MIG Wire may be allowed as 6.085 MT. (it is per៝�nent to men៝�on here that this import item is not included in Advance Authoriza៝�on, therefore, the case may be decided as per policy )” S.No.438
Case No. A/R93
M/s. Thermax Ltd., HQF.No.01/80/050/01550/AM09/DESI Lic. No. & date Meeting No.19/14 RA.F.No.31/24/040/00296/AM09 3110036393 dt.11.12.2008 Date: 10.12.2013 Request for modification of norms Decision: The Commiោ�ee noted that the firm’s representa៝�on has been sent to DHI on 22.11.2013 which is under their examina៝�on decided to await comments of DHI. Case is deferred to 21.01.2014.
S.No.439
Case No.C08
M/s. M+Acer Automotive Systems Pvt. Ltd., Bangalore HQ F.No.01/80/162/00269/AM13/DESI Meeting No.19/14 Date: 10.12.2013 Fixation of input output norms for the export product “Solenoid” in respect of 100% EOU – reg. Decision: The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 18.11.2013 and decided to send reminder. Case is deferred to 21.01.2014. S.No.440
Case No.C06
M/s. Eastern Machine Elements Pvt. Ltd., Maraimalai Nagar HQ F.No.01/80/162/00138/AM14/DESI Meeting No.19/14 Date: 10.12.2013 Request for fixation of input output norms for the export product “Bushes” in respect of 100% EOU – reg. Decision: Based on the MSME U.O. note No. 30(25)/13‐ME dated 01.8.2013, the Commiោ�ee decided to ra៝�fy the norm of subject AA (Copy of aforesaid U.O. note is to be forwarded to firm and RLA). S.No.441
Case No.C07
M/s. Tata Aerospace Systems Ltd., Hyderabad HQ F.No.01/80/162/00249/AM14/DESI Meeting No.19/14 Date: 10.12.2013 Request for fixation of input output wastage norms for the export product “Helicopter Cabin Kits, Design, Development and Manufacturing of Parts and Accessories for Civilian Aircraft” in respect of 100% EOU – reg. Decision: The Commiោ�ee noted that the firm’s applica៝�on dated 20.6.2013 has been sent to DHI & MSME on 10.09.2013 and TA, DHI & TA, MSME have suggested to call the firm for ‘Personal Hearing’. The Commiោ�ee decided to give the firm ‘Personal Hearing on 21.01.2014. Case is deferred to 21.01.2014. S.No.442
Case No. A/R94
M/s. Boysen India Ltd., Greater Noida HQF.No.01/80/050/00550/AM12/DESI Lic. No. & date Meeting No.19/14 RA.F.No.05/23/040/00399/AM12 0510314287 dt.12.01.2012 Date: 10.12.2013 Decision: Based on the DHI U.O. note No. Nil dated 10.12.2013 , the Commiោ�ee decided to ra៝�fy the norm of subject AA as under : “repeat of 8% as earlier recommended in AA 0510299447”. S.No.443
Case No. A/R95
M/s. Alstom Projects India Ltd., Mumbai HQF.No.01/80/050/01874/AM09/DESI Lic. No. & date Meeting No.19/14 RA.F.No.03/94/040/01068/AM09 0310510897 dt.09.03.2009 Date: 10.12.2013 Decision: The Commiោ�ee noted that the firm’s request dated 08.11.2013 has been sent to DHI on 29.11.2013 which is under their examina៝�on decided to await comments of DHI. Case is deferred to 21.01.2014. S.No.444
Case No. A/R96
M/s. Alstom Projects India Ltd., Vadodara HQF.No.01/80/050/00134/AM11/DESI Lic. No. & date Meeting No.19/14 RA.F.No.03/94/040/01139/AM10 0310567657 dt.31.03.2010 Date: 10.12.2013 Request for fixation of norms Decision: The Commiោ�ee noted that the firm’s request dated 27.11.2013 received via e‐mail has been sent to DHI on 02.12.2013 which is under their examina៝�on decided to await comments of DHI. Case is deferred to 21.01.2014. S.No.445
Case No. A/R97
M/s. GEA BGR Energy System India Ltd., Chennai HQF.No.01/80/050/01095/AM08/DESI Lic. No. & date Meeting No.19/14 RA.F.No.04/24/040/00364/AM08 0410093855 dt.13.02.2008 Date: 10.12.2013 Decision: The Commiោ�ee noted that the firm’s request dated 21.10.2013 has been sent to DHI on 02.12.2013 which is under their examina៝�on decided to await comments of DHI. Case is deferred to 21.01.2014.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6701 --apply.