DGFT Committee Minutes
RATIFIED Minutes of Mee២�ng No.09/13 scheduled on 24.07.2012 of Norms Commiee(NC‐I) (DES.I Sec២�on) The mee២�ng No. 09/13 of the Norms Commiee (NC‐I) for the licensing year 2012‐2013 was held on 24.07.2012 under the Chairmanship of Sh. L.B. Singhal, Addi២�onal Director General of Foreign Trade to consider the applica២�ons under Duty Exemp២�on / Remission Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I. The following Members of the Commiee were present in the mee២�ng: ‐ Sl.No Name of the representa២�ves & their Designa២�on Room No. Telephone No. Department 1. Sh K.K. Tiwari I.A 476 23063321 Extn. DHI, U.B. 2. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Ass. Dir. (Mech) 736A DC(MSME),N.B. 4. Sh. Parveen Sharma, Dy.DGFT 306 23061563 Extn. DGFT, U.B. 5. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B. I ‐The Commiee considered the individual cases of the agenda of this mee២�ng generated through the online system of NIC. The decisions taken thereon are as under: ‐ 1
Case No.:15/6/80‐ALC2/2012
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00080/AM13/ RLA File :31/21/040/00004/AM10/ Lic.No/Date:3110038171 20.04.2009 Decision : Based on DHI wrien comments received vide UO No. 3(127)/09/TSW(B)/234 dated 15.6.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on under GN4 with accountability clause. RLA may take necessary ac២�on accordingly. 2
Case No.:16/6/80‐ALC2/2012 Party Name:THYSSENKRUPP
INDUSTRIES INDIA PVT.LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00081/AM13/ RLA File :31/21/040/00050/AM10/ Lic.No/Date:3110038576 28.05.2009 Defer Date:04.09.2012 Decision : On the recommenda២�on of DHI representa២�ve present in the mee២�ng, the Commiee decided to seek clarifica២�on from firm on the use of import item. The case is to be relisted on 4.9.2012. 3
Case No.:31/39/80‐
ALC2/2010 Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00833/AM11/ RLA File :31/24/040/00249/AM11/ Lic.No/Date:3110046929 15.02.2011 Defer Date:04.09.2012 Decision : The Commiee noted that copy of firm’s applica២�on has not been received from RA and decided to remind RA to send 4 sets of firm’s applica២�on for considera២�on in NC. The case is to be relisted on 4.9.2012.
4
Case No.:12/3/80‐ALC2/2011 Party Name:CHANG YUN
INDIA LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00017/AM12/ RLA File :05/23/040/00022/AM12/ Lic.No/Date:0510288459 20.04.2011 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of MSME and decided to await comments. The case is to be relisted on 4.9.2012. 5
Case No.:9/11/80‐ALC2/2011 Party Name:ICEM
ENGINEERING COMPANY PRIVATE LIMITED, Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00221/AM12/ RLA File :03/94/040/00270/AM12/ Lic.No/Date:0310638600 24.06.2011 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DIPP and decided to await 6
Case No.:13/11/80‐ALC2/2011
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00225/AM12/ RLA File :09/24/040/00173/AM12/ Lic.No/Date:0910047823 22.07.2011 Decision : Based on DHI wrien comments received vide leer No. 3(42)/2010‐TSW(B) V‐4/248 dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: Export Product: Drive Turbine, LP/HP Heater etc. Total Weight : 329.14 MT Inputs: Sr.No. of the list Total Quan២�ty in MT including (% wastage) 3 5.84 (27%) 4 4.73 (10%) 9 1.16 (10%) 10 5.87 (258%) 11 0.073 (2%) 12 0.154(10%) 25 0.08(2%) 26 1.134(5%) 91 10(1%) 92 0.30(1.35%) 100 128 (20%) Rest of the items is to be allowed on net to net basis with accountability clause.
Case No.:8/14/80‐ALC2/2011 Party Name:MOTHERSON
SUMI SYSTEMS LTD Meet No/Date:9/80‐ ALC2/2012 Status: Deferred
7 24.07.2012 HQ File :01/80/050/00262/AM12/ RLA File :05/24/040/00182/AM12/ Lic.No/Date:0510300205 24.08.2011 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of C&PC and decided to await 8
Case No.:11/14/80‐
ALC2/2011 Party Name:HITTCO TOOLS LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00265/AM12/ RLA File :07/24/040/00203/AM12/ Lic.No/Date:0710081769 25.08.2011 Defer Date:04.09.2012 Decision : The Commiee noted that the firm has not aended personal hearing and also not provided exact calcula២�ons of items of import. Therefore, the Commiee decided to once again advise the firm to furnish detailed calcula២�ons within 15 days failing which their case will be rejected. The case is to be relisted on 4.9.2012 9
Case No.:12/17/80‐
ALC2/2011 ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00331/AM12/ RLA File :61/24/040/00030/AM12/ Lic.No/Date:6110000675 29.08.2011 Defer Date:04.09.2012 Decision : The Commiee noted that this case is referred to PIC and decided to await decision. The case is to be relisted on 4.9.2012. 10
Case No.:13/17/80‐
ALC2/2011 ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00332/AM12/ RLA File :61/24/040/00031/AM12/ Lic.No/Date:6110000676 29.08.2011 Defer Date:04.09.2012 Decision : The Commiee noted that this case is referred to PIC and decided to await decision. The case is 11
Case No.:1/20/80‐ALC2/2011 Party Name:SMC
PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00386/AM12/ RLA File :05/24/040/00235/AM12/ Lic.No/Date:0510304889 11.10.2011 Defer Date:04.09.2012 Decision : The Commiee decided to send DIPP deficiency to firm for furnishing informa២�on. The case is 12
Case No.:29/17/80‐
ALC2/2011 ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00348/AM12/ RLA File :05/23/040/00226/AM12/ Lic.No/Date:0510305028 12.10.2011 Defer Date:04.09.2012
Decision : The Commiee noted that this case is referred to PIC and decided to await decision. The case is 13
Case No.:24/27/80‐
ALC2/2011 Party Name:INDIAN TECHNOMETAL COMPANY LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00557/AM12/ RLA File :05/23/040/00289/AM12/ Lic.No/Date:0510307109 03.11.2011 Defer Date:04.09.2012 Decision : The Commiee noted that firm has not replied to this office leer dated 14.7.2012 and decided to remind them for expedi២�ng the reply failing which the case will be rejected. The case is to be relisted on 4.9.2012. 14
Case No.:23/20/80‐
ALC2/2011 Party Name:KE‐BURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00408/AM12/ RLA File :04/24/040/00234/AM12/ Lic.No/Date:0410130688 22.11.2011 Defer Date:04.09.2012 Decision : The Commiee noted that firm has furnished reply vide leer dated 14.7.2012 and decided to forward copy to DIPP for examina២�on and comments. The case is to be relisted on 4.9.2012. 15
Case No.:36/27/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00569/AM12/ RLA File :09/24/040/00333/AM12/ Lic.No/Date:0910049962 29.11.2011 Decision : Based on DHI wrien comments received vide leer No. 3(75)/2012‐TSW(B) dated nil, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: Export Product : 2X500 MW Drive Turbine, etc for Tu២�corin Power Project. Total Weight:1129 MT. Inputs Sr. No. Quan២�ty per unit in MT (% wastage) 9 0.986 (10%) 65 5.3 (1%) 66 0.24 (2%) 75 95.7(5%) 76 5.96(5%) 77 5.87(258%) 78 0.147(2%) 79 1.056(10%) 80 0.2(1%) 81 0.352(10%) 82 4.31(10%) There are total 167 items. Rest of the inputs are to be allowed with accountability clause and NIL wastage.
16
Case No.:9/20/80‐ALC2/2011 Party Name:RADIANT
INDUSTRIES Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00394/AM12/ RLA File :31/83/040/00182/AM12/ Lic.No/Date:3110051726 07.12.2011 Defer Date:04.09.2012 Decision : The Commiee noted that firm has furnished reply vide leer dated 16.7.2012 and decided to forward copy to DHI for examina២�on and comments. The case is to be relisted on 4.9.2012. 17
Case No.:13/20/80‐ALC2/2011
Party Name:UNI VTL ENGINEERING PVT. LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00398/AM12/ RLA File :03/95/040/00726/AM12/ Lic.No/Date:0310669540 08.12.2011 Decision : Based on MSME wrien comments received vide UO note No. 30(138)2011‐ME dated 12.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: (1) Import of Relevant Synchronizer Rings blanks to be allowed in numbers on Net to net Basis. (2) Duty free import weight of Item of import at srl no 01 to be allowed with 33% wastage aer taking 2/3rd recovery and therefore the wt of import to be allowed as 7960 Kg. (3) Duty free import weight of Item of import at srl no 02 to be allowed with 33% wastage aer taking 2/3rd recovery and therefore the wt of import to be allowed as 858 Kg. (4) Duty free import weight of Item of import at srl no 03 to be allowed with 33% wastage aer taking 2/3rd recovery and therefore the wt of import to be allowed as 866 Kg. (5) Import of wax paper to be allowed as per the packing policy. Accordingly, import item to be allowed as under: Import item Qty Allowed Duty free import weight Srl no in nos allowed 01 114000 7960 Kg 02 16368 858 Kg 03 16625 866 Kg 04 ‐ As per packing policy. 18
Case No.:40/27/80‐ALC2/2011
Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00573/AM12/ RLA File :09/24/040/00403/AM12/ Lic.No/Date:0910050100 08.12.2011 Decision : Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: 1. Words “1 set comprising of 26 Hea២�ng modules, Hea២�ng Area 4.321 Sq.Mtrs.” to be suffixed with the descrip២�on of export product. 2. Net Weight of export products to be specified as 20919 Kgs. 3. Quan២�២�es of import items from Sl. Nos. 1 to 20 to be allowed on net to net basis as claimed by the firm.
19
Case No.:61/2/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00025/AM13/ RLA File :09/24/040/00432/AM12/ Lic.No/Date:0910050612 04.01.2012 Decision : Based on DHI wrien comments received vide leer No. 3(70)/2012‐TSW(B) dated 24.7.2012, the Commiee decided to ra២�fy norms of subject Authoriza២�on as under: Export Product: 2X525 Drive Turbine, LP/HP Heater, Deaerator, Drain Cooler etc total Weight: 1280.6 MT Inputs: Sr.No. of AA Total Quan២�ty in MT (% of wastage) 3 165.50(5%) 4 6(5%) 10 1(10% 11 5.87(258%) 12 0.15(2%) 13 1.09(5%) 31 0.2(1%) 32 0.35(10%) 33 22(5%) 73 10.27(5%) Rest of the items is to be allowed on net to net basis with accountability clause. 20
Case No.:14/27/80‐
ALC2/2011 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00547/AM12/ RLA File :05/23/040/00384/AM12/ Lic.No/Date:0510313896 09.01.2012 Defer Date:04.09.2012 Decision : Based on DIPP leer dated 24.7.2012, the Commiee decided to seek informa២�on from firm on the following and to relist the case on 4.9.2012: 1. Informa២�on in respect of Sl. No. 3, 4, 5 & 11 of Standard Deficiency Format‐export product wise. 2. Quan២�២�es of import items from Sl. Nos. 3, 4, 5 & 6 in Nos. also in addi២�on to their weights. 21
Case No.:62/2/80‐ALC2/2012 Party Name:BHARAT HEAVY
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00026/AM13/ RLA File :09/24/040/00437/AM12/ Lic.No/Date:0910050738 11.01.2012 Defer Date:04.09.2012
Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 22
Case No.:45/27/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Closed HQ File :01/80/050/00578/AM12/ RLA File :04/24/040/00264/AM12/ Lic.No/Date:0410132883 17.01.2012 Decision : The Commiee noted that firm vide leer dated 19.7.2012 informed that the subject authoriza២�on was returned to RA, Chennai vide leer dated 16.3.2012 for cancella២�on. The Commiee, therefore, decided to close the case and also inform RA. 23
Case No.:63/2/80‐ALC2/2012 Party Name:BHARAT HEAVY
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00027/AM13/ RLA File :09/24/040/00502/AM12/ Lic.No/Date:0910050888 20.01.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 24
Case No.:6/27/80‐ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00539/AM12/ RLA File :05/23/040/00411/AM12/ Lic.No/Date:0510315336 23.01.2012 Decision : Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: 1. Net empty weights of 95 MT, 402 MT, 67.6 MT & 63 MT to be specified with the quan២�២�es of export products at Sl. No. 1, 2, 3 & 4 respec២�vely. 2. Word “Relevant” to be prefixed with the descrip២�on of import items at Sl. Nos. 1 & 2. 3. Quan២�ty of import item at Sl. No. 1 to be allowed as applied for i.e. 518.8 MT inclusive of 2 % wastage. 4. Quan២�ty of import item at Sl. No. 2 to be allowed as applied for i.e. 59.13 MT inclusive of 1 % wastage 5. Quan២�២�es of import items at Sl. No. 3, 4 & 5 to be specified as 2 Nos., 41 Nos. & 5 Nos. respec២�vely in addi២�on to their weights. 6. Quan២�២�es of import items at Sl. No. 3, 4 & 5 to be allowed on net to net basis. 7. Quan២�២�es of import items at Sl. No. 6, 7, 8 & 9 (Welding Consumables) to be allowed as applied for i.e. 14060 Kgs., 11600 Kgs., 20 Kgs. & 11350 Kgs. respec២�vely.
25
Case No.:11/27/80‐
ALC2/2011 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00544/AM12/ RLA File :05/23/040/00407/AM12/ Lic.No/Date:0510315464 24.01.2012 Defer Date:04.09.2012 Decision : Based on DIPP leer dated 24.7.2012, the Commiee decided to seek informa២�on from firm on the following and to relist the case on 4.9.2012: 1. Informa២�on in respect of Sl. No. 3, 4, 5 & 11 of Standard Deficiency Format‐export product wise. 2. Quan២�ty of import item at Sl. No. 1 in meters also in addi២�on to its weight. 3. Quan២�២�es of import items from Sl. Nos. 2 & 3 in Nos. also in addi២�on to their weights. 26
Case No.:4/27/80‐ALC2/2011
Party Name:POLY MEDICURE LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00537/AM12/ RLA File :05/24/040/00369/AM12/ Lic.No/Date:0510315548 24.01.2012 Decision : Based on C&PC wrien comments received vide leer No. 46011/52/2009‐PC‐II dated 19.6.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: Item to be Exported Quan២�ty Single Blood Bag / Double Blood Bag / Triple Blood Bag / Quadruple Blood Bag 1 Kg Raw material Recommended for Import Quan២�ty 1. PVC Sheet 1.25 kg/kg of PVC sheet contained in the export product. 2.Relevant Needle‐Stainless Steel Net + 2% wastage 3. Adenine Net + 5% wastage 4. Blood Bag Labels Net + 5% wastage 5. Poly Carbonate 1.05 kg/kg content in the export product 6. P.P. Granules 1.05 kg/kg content in the export product 7. For 1 kg compounds/parts made of PVC Compound: (i) PVC Resin (ii) Di‐Octyl Phthalate/Hexamoll Dinch (iii) Epoxidised Soylabean Oil (iv) Calcium Zinc Stabilizer (v) Calcium Stearate 0.692 kg 0.324 kg 0.032 kg 0.010 kg 0.0005 kg 8. Polyester Polylaminate Film As per Packing Policy 9. Aluminium Pouch As per Packing Policy
Case No.:5/24/80‐ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved
27 HQ File :01/80/050/00479/AM12/ RLA File :03/94/040/00930/AM12/ Lic.No/Date:0310678658 25.01.2012 Decision : Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: 1. Net empty export weight of 9245 Kgs. to be specified with the quan២�ty of export product. 2. Quan២�ty of import item at Sl. No. 1 to be allowed as 10 Nos. on net to net basis. However, duty free weight of this item to be allowed as 2668 Kg inclusive of 27.7 % wastage aer 20 % recovery. 3. Words” Relevant” to be prefixed with the descrip២�on of import item at Sl.No. 2 and its quan២�ty to be allowed as 1243 Kg inclusive of 58.2 % wastage aer 1/3rd recovery. 4. Quan២�២�es of import items at Sl. No. 3, 4 & 5 (Welding Consumables) to be allowed as 53 kgs. each. 28
Case No.:34/27/80‐
ALC2/2011 Party Name:NASH INDUSTRIES Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00567/AM12/ RLA File :07/24/040/00436/AM12/ Lic.No/Date:0710085938 02.02.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DIPP and decided await comments. The case is to be relisted on 4.9.2012. 29
Case No.:49/6/80‐ALC2/2012 Party Name:DICKINSON
FOWLER PVT. LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00114/AM13/ RLA File :07/24/040/00450/AM12/ Lic.No/Date:0710086045 06.02.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided await comments. The case is to be relisted on 4.9.2012. 30
Case No.:18/27/80‐
ALC2/2011 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00551/AM12/ RLA File :05/23/040/00426/AM12/ Lic.No/Date:0510316755 07.02.2012 Defer Date:04.09.2012 Decision : On the recommenda២�on of DHI, the Commiee decided to seek informa២�on from firm as per Sr.No.4,5,11 of Standard Deficiency Format. The case is to be relisted on 4.9.2012.
Case No.:50/6/80‐ALC2/2012 Party Name:GL&V INDIA
PRIVATE LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred
31 HQ File :01/80/050/00115/AM13/ RLA File :31/83/040/00222/AM12/ Lic.No/Date:3110052788 07.02.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the firm has not replied to this office leer dated 10.7.2012 and decided to remind the firm for expedi២�ng their reply. The case is to be relisted on 4.9.2012. 32
Case No.:60/2/80‐ALC2/2012 Party Name:BHARAT HEAVY
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00024/AM13/ RLA File :09/24/040/00548/AM12/ Lic.No/Date:0910051171 08.02.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided await comments. The case is to be relisted on 4.9.2012. 33
Case No.:19/27/80‐ALC2/2011
Party Name:DHARAM STAINLESS STEEL PVT LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00552/AM12/ RLA File :05/23/040/00333/AM12/ Lic.No/Date:0510317062 09.02.2012 Decision : Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as per SION at Sl. No. C‐819 for Engineering products. 34
Case No.:46/2/80‐ALC2/2012
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00010/AM13/ RLA File :05/24/040/00409/AM12/ Lic.No/Date:0510317706 14.02.2012 Decision : Based on DHI wrien comments dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on on net to net basis with accountability clause. 35
Case No.:15/27/80‐
ALC2/2011 Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00548/AM12/ RLA File :05/24/040/00423/AM12/ Lic.No/Date:0510317789 15.02.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s applica២�on to C&PC for examina២�on and
Case No.:43/27/80‐
ALC2/2011 Party Name:TERUMO PENPOL LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred
36 HQ File :01/80/050/00576/AM12/ RLA File :53/24/040/00017/AM12/ Lic.No/Date:5310014710 15.02.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s applica២�on to C&PC for examina២�on and 37
Case No.:54/2/80‐ALC2/2012
Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00018/AM13/ RLA File :05/23/040/00450/AM12/ Lic.No/Date:0510317886 15.02.2012 subject authoriza២�on as under: Item No. 1 to 5 – To be allowed on net to net basis with accountability clause. Quan២�ty in numbers also to be men២�oned. Item No.6 – 29340 Kg. Item No.7 – 20590 Kg. 38
Case No.:56/2/80‐ALC2/2012
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00020/AM13/ RLA File :05/24/040/00420/AM12/ Lic.No/Date:0510317786 15.02.2012 Decision : Based on DHI wrien comments dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on on net to net basis with accountability clause. 39
Case No.:47/27/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00580/AM12/ RLA File :04/24/040/00290/AM12/ Lic.No/Date:0410133870 16.02.2012 Decision : Based on DHI wrien comments received vide leer No. 3(95)/2012‐TSW(B) dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: Export Product : Auxd For 2X500 MW Shree Mauda TPP (Wt 10821 MT per unit) Inputs: Sr.No. Per unit quan២�ty in MT including (% wastage). 1 508 (3%) 2 449(2.9%) 3 2(3%) 4 389(2%) 5 SS wire 27(2%), SS Rounds 8(4%) Item No. 23 to be deleted. Remaining items are to be allowed with accountability clause and NIL wastage.
40
Case No.:52/2/80‐ALC2/2012 Party Name:ISGEC HEAVY
ENGINEERING LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00016/AM13/ RLA File :05/23/040/00456/AM12/ Lic.No/Date:0510318045 16.02.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s reply dated 16.7.2012 to DIPP for examina២�on and comments. The case is to be relisted on 4.9.2012. 41
Case No.:9/27/80‐ALC2/2011 Party Name:ECHAAR
EQUIPMENTS PVT.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00542/AM12/ RLA File :03/94/040/01018/AM12/ Lic.No/Date:0310682257 16.02.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 42
Case No.:3/27/80‐ALC2/2011 Party Name:KILBURN
ENGINEERING LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00536/AM12/ RLA File :03/94/040/01008/AM12/ Lic.No/Date:0310682458 17.02.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DIPP and decided to await 43
Case No.:10/6/80‐ALC2/2012 Party Name:PRECISION
AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00075/AM13/ RLA File :31/82/040/00351/AM12/ Lic.No/Date:3110053033 20.02.2012 Defer Date:04.09.2012 Decision : The Commiee noted that firm has not replied to leer dated 6.7.2012 and decided to remind them for expedi២�ng the reply, failing which the case will be reject. The case is to be relisted on 4.9.2012. 44
Case No.:45/2/80‐ALC2/2012 Party Name:G & T OIL STATES
INDUSTRIES PRIVATE LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00009/AM13/ RLA File :03/94/040/01042/AM12/ Lic.No/Date:0310683065 22.02.2012 Defer Date:04.09.2012 Decision : The Commiee noted that firm has not replied to leer dated 25.5.2012 and reminder dated 10.7.2012 and decided to remind them for expedi២�ng the reply, failing which the case will be rejected. The case is to be relisted on 4.9.2012.
Case No.:9/6/80‐ALC2/2012
Status:
45 Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Deferred HQ File :01/80/050/00074/AM13/ RLA File :31/82/040/00354/AM12/ Lic.No/Date:3110053097 22.02.2012 Defer Date:04.09.2012 them for expedi២�ng the reply, failing which the case will be rejected. The case is to be relisted on 4.9.2012. 46
Case No.:50/2/80‐ALC2/2012 Party Name:LARSEN &
TOUBRO LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00014/AM13/ RLA File :03/95/040/00929/AM12/ Lic.No/Date:0310683744 27.02.2012 Defer Date:04.09.2012 47
Case No.:68/2/80‐ALC2/2012
Party Name:WELD FUSE PVT. LTD . Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00032/AM13/ RLA File :09/24/040/00584/AM12/ Lic.No/Date:0910051473 27.02.2012 Decision : Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: 1 Net weight of export product to be specified as “113.43 MT containing 59.5 MT of Galvanised wire”. 2. Word ‘Relevant” to be prefixed with the descrip២�on of import item and its quan២�ty to be allowed as applied for i.e. 60100.42 Kgs. inclusive of 1 % wastage. 48
Case No.:7/6/80‐ALC2/2012
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00072/AM13/ RLA File :31/82/040/00366/AM12/ Lic.No/Date:3110053156 27.02.2012 Defer Date:04.09.2012 49
Case No.:6/6/80‐ALC2/2012
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00071/AM13/ RLA File :31/82/040/00381/AM12/ Lic.No/Date:3110053223 29.02.2012 Defer Date:04.09.2012
50
Case No.:65/2/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00029/AM13/ RLA File :07/24/040/00481/AM12/ Lic.No/Date:0710086689 29.02.2012 Decision : Based on DE&IT wrien comments received vide UO No. 17(57)/2012‐IPHW dated 27.6.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on on net to net basis with accountability clause. 51
Case No.:71/2/80‐ALC2/2012 Party Name:AIR LIQUIDE
ENGINEERING INDIA PVT LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00035/AM13/ RLA File :09/24/040/00558/AM12/ Lic.No/Date:0910051540 29.02.2012 Defer Date:04.09.2012 Decision : The Commiee noted that firm has not replied to leer dated 10.7.2012 and decided to remind 52
Case No.:8/6/80‐ALC2/2012
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00073/AM13/ RLA File :31/82/040/00371/AM12/ Lic.No/Date:3110053224 29.02.2012 Defer Date:04.09.2012 53
Case No.:18/6/80‐ALC2/2012 Party Name:BHARAT HEAVY
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00083/AM13/ RLA File :09/24/040/00585/AM12/ Lic.No/Date:0910051583 02.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 54
Case No.:64/2/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00028/AM13/ RLA File :11/24/040/00057/AM12/ Lic.No/Date:1110026911 02.03.2012 Decision : Based on DHI wrien comments received vide leer No.3(59)/2012 TSW(B) dated 23.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: Export Product : 2X250 MW Steam Turbine for Bhavnagar TPP (Total Weight : 1186.2 MT) Inputs:
Sr. No. of AA Total Quan២�ty in MT including (% wastage) 11 108(27%) There are total 12 items. Remaining items are with accountability clause and nil wastage. 55
Case No.:75/2/80‐ALC2/2012 Party Name:FOWLER
WESTRUP (INDIA) PVT LTD ., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00039/AM13/ RLA File :07/24/040/00493/AM12/ Lic.No/Date:0710086774 05.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that firm has not replied to leer dated 22.5.2012 and reminder dated 10.7.2012 and decided to again remind them for expedi២�ng the reply, failing which the case will be rejected. The case is to be relisted on 4.9.2012. 56
Case No.:47/2/80‐ALC2/2012 Party Name:ISGEC HEAVY
ENGINEERING LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00011/AM13/ RLA File :05/23/040/00477/AM12/ Lic.No/Date:0510319555 06.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that firm has not replied to leer dated 22.5.2012 and reminder dated 6.7.2012 and decided to again remind them for expedi២�ng the reply, failing which the case will be rejected. The case is to be relisted on 4.9.2012. 57
Case No.:47/6/80‐ALC2/2012 Party Name:BHARAT HEAVY
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00112/AM13/ RLA File :61/24/040/00077/AM12/ Lic.No/Date:6110000793 06.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 58
Case No.:55/2/80‐ALC2/2012
Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00019/AM13/ RLA File :05/23/040/00470/AM12/ Lic.No/Date:0510319710 06.03.2012 Decision : Based on DE&IT wrien comments received vide UO No. 17(56)/2012‐IPHW dated 6.6.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as applied for by the party inclusive of 5% wastage.
Case No.:72/2/80‐ALC2/2012 Party Name:AIR LIQUIDE
ENGINEERING INDIA PVT LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred
59 HQ File :01/80/050/00036/AM13/ RLA File :09/24/040/00537/AM12/ Lic.No/Date:0910051622 07.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that firm has not replied to leer dated 10.7.2012 and decided to remind 60
Case No.:73/2/80‐ALC2/2012 Party Name:AIR LIQUIDE
ENGINEERING INDIA PVT LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00037/AM13/ RLA File :09/24/040/00588/AM12/ Lic.No/Date:0910051628 07.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that firm has not replied to leer dated 10.7.2012 and decided to remind 61
Case No.:57/2/80‐ALC2/2012
Party Name:EURO LABS Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00021/AM13/ RLA File :03/94/040/00990/AM12/ Lic.No/Date:0310685534 09.03.2012 Decision : Based on MSME wrien comments received vide UO note No. 30(163)2011‐ME dated 10.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on on repeat basis with 1% wastage as per comments in Advance Authoriza២�on No.0310614574 dated 7.2.2011. 62
Case No.:33/27/80‐
ALC2/2011 Party Name:PRIJAI COOLTECH PVT. LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00566/AM12/ RLA File :03/95/040/01036/AM12/ Lic.No/Date:0310685704 12.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DIPP and decided to await 63
Case No.:74/2/80‐ALC2/2012 Party Name:EMMVEE SOLAR
SYSTEMS PVT LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00038/AM13/ RLA File :07/24/040/00505/AM12/ Lic.No/Date:0710086964 13.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that firm has not replied to leer dated 10.7.2012 and decided to remind 64
Case No.:20/6/80‐ALC2/2012
Party Name:UEM INDIA PVT.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00085/AM13/ RLA File :05/24/040/00440/AM12/ Lic.No/Date:0510320150 14.03.2012
Decision : The Commiee deliberated the case and decided to ra២�fy the norms of subject authoriza២�on under GN4. 65
Case No.:49/27/80‐
ALC2/2011 Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00582/AM12/ RLA File :31/82/040/00402/AM12/ Lic.No/Date:3110053387 14.03.2012 Defer Date:04.09.2012 66
Case No.:78/2/80‐ALC2/2012 Party Name:H.L.EQUIPMENTS Meet No/Date:9/80‐
ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00042/AM13/ RLA File :52/24/040/00053/AM12/ Lic.No/Date:5210038067 21.03.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s reply dated 20.7.2012 to DIPP for examina២�on and comments. The case is to be relisted on 4.9.2012. 67
Case No.:85/2/80‐ALC2/2012
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00049/AM13/ RLA File :06/24/040/00072/AM12/ Lic.No/Date:0610026318 21.03.2012 Decision : Based on C&PC wrien comments received vide leer No. 46011/169/2004‐PC‐II dated 18.6.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: Item to be Exported Quan២�ty Handle Asst Handle Asst LH / Handle ASY BK DRI/S / Handle ASY BDY SD DS PLEASE/CAP HDNLI/S ASST ATT HLE/CVR ASST STRP RET 1 No Raw Material to be allowed for import Quan២�ty PVC COMPOUND 1.05 kg/kg content in the export product Polypropylene Granules 1.05 kg/kg content in the export product Relevant HEX Flange Bolt Net to Net Relevant Retainer Washer Net to Net 68
Case No.:28/6/80‐ALC2/2012
Party Name:HMT MACHINE TOOLS LIMITED, Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00093/AM13/ RLA File :09/24/040/00619/AM12/ Lic.No/Date:0910051867 22.03.2012
subject authoriza២�on on net to net basis with accountability clause. 69
Case No.:76/2/80‐ALC2/2012 Party Name:COOLDECK AQUA
SOLUTIONS PVT. LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00040/AM13/ RLA File :03/94/040/00886/AM12/ Lic.No/Date:0310687589 22.03.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s reply dated 11.7.2012 to C&PC for examina២�on and comments. The case is to be relisted on 4.9.2012. 70
Case No.:26/6/80‐ALC2/2012 Party Name:J PAN TUBULAR
COMPONENTS PVT.LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00091/AM13/ RLA File :05/23/040/00497/AM12/ Lic.No/Date:0510320889 23.03.2012 Defer Date:04.09.2012 71
Case No.:59/2/80‐ALC2/2012
Party Name:TERUMO PENPOL LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00023/AM13/ RLA File :53/24/040/00021/AM12/ Lic.No/Date:5310014856 23.03.2012 Decision : Based on C&PC wrien comments received vide OM No. 46011/21/2009‐PC‐II dated 18.6.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: Item to be Exported : Blood Bags Quan២�ty: 01 No. Raw Material for Import Quan២�ty 1 PVC compound 1.10 kg/kg content in export product 2 Relevant Stainless Steel Needle Assembly Net + 3% wastage 3 Evident Paper Net + 5% wastage 4 Aluminium foil Cover Net + 1% wastage 5 Relevant Plasma Cap (Rubber Cap) Net + 1% wastage 6 Relevant Luer Adapter Net + 1% wastage 7 Relevant Oxyzen Absorber Net + 1% wastage 8 Relevant Y Tube Net + 1% wastage 9 Relevant Thermal Transfer Ribbon Net + 1% wastage 10 Relevant Big Beak Off Valve Assembly Net + 1% wastage 11 Relevant Y Connector Net + 1% wastage 12 Relevant So Shell Filter (CRC Filter) Net + 1% wastage 13 Relevant Stamping Foil Tape Net + 1% wastage 14 Relevant Tube Holder Net + 1% wastage
72
Case No.:21/6/80‐ALC2/2012
Party Name:MVS ENGINEERING LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00086/AM13/ RLA File :05/24/040/00460/AM12/ Lic.No/Date:0510320999 26.03.2012 Decision : Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: 1. Words “ Containing 2760 Kgs. of Carbon Molecular Sieves” to be suffixed with a descrip២�on of export product. 2. Quan២�ty of import item to be allowed as applied for i.e. 2760 Kgs. on net to net basis. 73
Case No.:24/6/80‐ALC2/2012 Party Name:LARSEN &
TOUBRO LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00089/AM13/ RLA File :03/95/040/01000/AM12/ Lic.No/Date:0310687710 26.03.2012 Defer Date:04.09.2012 Decision : On the recommenda២�on of DIPP representa២�ve present in the mee២�ng, the Commiee decided to seek informa២�on from firm as per Sr.No.4,5,11&13 of Standard Deficiency Format. The case is to be relisted on 4.9.2012. 74
Case No.:66/6/80‐ALC2/2012 Party Name:VULCAN
INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00131/AM13/ RLA File :34/24/040/00297/AM12/ Lic.No/Date:3410033688 27.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided await comments. The case is to be relisted on 4.9.2012. 75
Case No.:16/9/80‐ALC2/2012 Party Name:HTD HEAT
TRACE(INDIA)PVT LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00196/AM13/ RLA File :09/24/040/00637/AM12/ Lic.No/Date:0910051929 28.03.2012 Defer Date:04.09.2012 Decision : Based on DIPP leer dated 24.7.2012, the Commiee decided to request the firm to furnish informa២�on on the following and to relist the case on 4.9.2012: 1. Informa២�on in respect of Sl. No. 3 & 11 of Standard Deficiency Format. 2. Detailed calcula២�ons/basis for the quan២�២�es of import items.
Case No.:17/5/81‐ALC2/2012
Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved
76 HQ File :01/81/050/00084/AM13/ RLA File :05/23/040/00531/AM12/ Lic.No/Date:0510321258 28.03.2012 subject authoriza២�on on net to net basis for item No.1 to 17. The Commiee further decided to allow import item No.18 at 1.02 kg/kg content and Item No.19 at 1.05 kg/kg content. 77
Case No.:22/6/80‐ALC2/2012 Party Name:MVS
ENGINEERING LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00087/AM13/ RLA File :05/24/040/00466/AM12/ Lic.No/Date:0510321214 28.03.2012 Defer Date:04.09.2012 Decision : Based on DIPP leer dated 24.7.2012, the Commiee decided to ask the firm to furnish informa២�on on the following and to relist the case on 4.9.2012: 1. Details of manufacturing ac២�vity on import items. 2. Import items and quan២�២�es thereof being imported as spares. 78
Case No.:4/6/80‐ALC2/2012
Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00069/AM13/ RLA File :05/23/040/00528/AM12/ Lic.No/Date:0510321260 28.03.2012 Decision : Based on DE&IT wrien comments received vide UO No. 17(61)/2012‐IPHW dated 14.6.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as applied for by the party inclusive of 1% wastage. 79
Case No.:54/6/80‐ALC2/2012 Party Name:BHARAT HEAVY
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00119/AM13/ RLA File :09/24/040/00615/AM12/ Lic.No/Date:0910051930 28.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 80
Case No.:69/6/80‐ALC2/2012 Party Name:AUTOMAT
IRRIGATION PVT. LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00134/AM13/ RLA File :05/23/040/00538/AM12/ Lic.No/Date:0510321283 28.03.2012 Defer Date:04.09.2012 Decision : On the recommenda២�on of DIPP representa២�ve present in the mee២�ng, the Commiee decided to seek informa២�on from firm as per Sr.No.3,4,5,11 of Standard Deficiency Format. The case is to be
81
Case No.:29/6/80‐ALC2/2012 Party Name:BALAJI PRESSURE
VESSELS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00094/AM13/ RLA File :09/24/040/00643/AM12/ Lic.No/Date:0910051947 29.03.2012 Defer Date:04.09.2012 Decision : The Commiee noted that firm has not replied to this office leer dated 10.7.2012 and decided to remind the firm for expedi២�ng their reply. The case is to be relisted on 4.9.2012. 82
Case No.:35/6/80‐ALC2/2012
Party Name:WELD FUSE PVT. LTD . Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00100/AM13/ RLA File :09/24/040/00650/AM12/ Lic.No/Date:0910051943 29.03.2012 Decision : Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: 1 Net weight of export product at Sl. No. 1 to be specified as “68617 Kgs. containing 34012 Kgs. of Galvanised wire”. 2. Net weight of export product at Sl. No. 2 to be specified as “14360 Kgs. containing 8049 Kgs. of Galvanised wire”. 3. Net weight of export product at Sl. No. 3 to be specified as “13336 Kgs. containing 5234 Kgs. of Galvanised wire”. 4. Word ‘Relevant” to be prefixed with the descrip២�on of import items at Sl. No. 1, 2 & 3 and their quan២�២�es to be allowed as applied for i.e. 34352.81 Kgs., 8129.34 Kgs. & 5286.6 Kgs. respec២�vely inclusive of 1 % wastage. 83
Case No.:44/6/80‐ALC2/2012
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00109/AM13/ RLA File :34/24/040/00299/AM12/ Lic.No/Date:3410033742 29.03.2012 subject authoriza២�on on net to net basis with accountability clause.
Case No.:45/6/80‐ALC2/2012
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved
84 HQ File :01/80/050/00110/AM13/ RLA File :34/24/040/00300/AM12/ Lic.No/Date:3410033743 29.03.2012 subject authoriza២�on on net to net basis with accountability clause. 85
Case No.:39/6/80‐ALC2/2012 Party Name:KRAMSKI
STAMPING AND MOLDING INDIA PRIVATE LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00104/AM13/ RLA File :04/24/040/00318/AM12/ Lic.No/Date:0410135264 30.03.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s applica២�on to MSME for examina២�on and 86
Case No.:25/6/80‐ALC2/2012 Party Name:LARSEN &
TOUBRO LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00090/AM13/ RLA File :03/95/040/01052/AM12/ Lic.No/Date:0310689351 02.04.2012 Defer Date:04.09.2012 Decision : On the recommenda២�on of DIPP representa២�ve present in the mee២�ng, the Commiee decided to seek informa២�on from firm as per Sr.No.4,5,11&13 of Standard Deficiency Format. The case is to be 87
Case No.:3/6/80‐ALC2/2012
Party Name:BOYSEN INDIA LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00068/AM13/ RLA File :05/23/040/00542/AM12/ Lic.No/Date:0510321695 03.04.2012 subject authoriza២�on on repeat basis as per decision in Authoriza២�on No.510282928 dated 17.4.2011. 88
Case No.:36/6/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00101/AM13/ RLA File :04/24/040/00321/AM12/ Lic.No/Date:0410135327 04.04.2012 Decision : On the recommenda២�on of DHI representa២�ve present in the mee២�ng, the Commiee decided to ra២�fy norms of subject authoriza២�on on repeat basis as per decision in Authoriza២�on No.410116559 dated 24.8.2010.
Case No.:11/6/80‐ALC2/2012
Status:
89 Party Name:POLY MEDICURE LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Approved HQ File :01/80/050/00076/AM13/ RLA File :05/24/040/00473/AM12/ Lic.No/Date:0510321942 10.04.2012 Decision : Based on C&PC wrien comments received vide leer No. 46011/106/2009‐PC‐II dated 25.6.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: Item to be exported Quan២�ty Endotracheal Tube (Oral or Nasal, Cuffed/Plain, size 2 mm to 10 mm) 1 No Raw material to be allowed for import Quan២�ty 1. Relevant Endotracheal Tube (Oral or Nasal, Cuffed/Plain Size 2 mm to 10 mm) Net + 2% wastage 2. PP Granules 1.05 kg/kg content in export product 3. Medical Kra Paper As per packing policy 4. Polyester Poly Laminate Film As per packing policy 90
Case No.:40/2/80‐ALC2/2012
Party Name:TELCO CONSTRUCTION EQUIPMENT CO. LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00004/AM13/ RLA File :03/95/040/00876/AM12/ Lic.No/Date:0310690133 10.04.2012 Decision : Based on DHI wrien comments dated 24.7.2012, the Commiee decided to ra២�fy subject authoriza២�on under GN4 with accountability clause. RLA to take necessary ac២�on accordingly. 91
Case No.:41/2/80‐ALC2/2012
Party Name:TELCO CO. LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00005/AM13/ RLA File :03/95/040/00909/AM12/ Lic.No/Date:0310690153 10.04.2012 Decision : Based on DHI wrien comments dated 24.7.2012, the Commiee decided to ra២�fy subject 92
Case No.:42/2/80‐ALC2/2012
Party Name:TELCO CO. LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00006/AM13/ RLA File :03/95/040/00899/AM12/ Lic.No/Date:0310690158 10.04.2012 Decision : Based on DHI wrien comments dated 24.7.2012, the Commiee decided to ra២�fy subject
93
Case No.:42/6/80‐ALC2/2012 Party Name:VIJAYJYOT SEATS
PVT. LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00107/AM13/ RLA File :34/24/040/00274/AM12/ Lic.No/Date:3410033796 10.04.2012 Defer Date:04.09.2012 Decision : On the recommenda២�on of DIPP representa២�ve present in the mee២�ng, the Commiee decided to seek informa២�on from the firm as per Sr. No.3,4,5&11 of Standard Deficiency Format. The case is to be 94
Case No.:43/6/80‐ALC2/2012
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00108/AM13/ RLA File :34/24/040/00001/AM13/ Lic.No/Date:3410033799 10.04.2012 subject authoriza២�on on net to net basis with accountability clause. RLA may take necessary ac២�on accordingly 95
Case No.:41/6/80‐ALC2/2012 Party Name:VIJAYJYOT SEATS
PVT. LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00106/AM13/ RLA File :34/24/040/00276/AM12/ Lic.No/Date:3410033806 11.04.2012 Defer Date:04.09.2012 Decision : Based on DIPP leer dated 24.7.2012, the Commiee decided to ask the firm to furnish informa២�on on the following and to relist the case on 4.9.2012: 1. Name(s) & quan២�២�es of Sheet Metal Component Part(s) proposed to be exported. 2. Informa២�on in respect of Sl. No. 3, 4, 5, 11 & 11A of Standard Deficiency Format‐ export product wise. 96
Case No.:43/2/80‐ALC2/2012
Party Name:TELCO CO. LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00007/AM13/ RLA File :03/95/040/01113/AM12/ Lic.No/Date:0310690286 11.04.2012 Decision : Based on DHI wrien comments dated 24.7.2012, the Commiee decided to ra២�fy subject
97
Case No.:44/2/80‐ALC2/2012
Party Name:TELCO CO. LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00008/AM13/ RLA File :03/95/040/01120/AM12/ Lic.No/Date:0310690293 11.04.2012 Decision : Based on DHI wrien comments dated 24.7.2012, the Commiee decided to ra២�fy subject 98
Case No.:46/6/80‐ALC2/2012 Party Name:BHARAT HEAVY
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00111/AM13/ RLA File :61/24/040/00001/AM13/ Lic.No/Date:6110000809 11.04.2012 Defer Date:04.09.2012 Decision : The Commiee noted that Exportwise import item details do not exist in the online data and decided to seek clarifica២�on from RA, Dehradum and advise them to forward four sets of applica២�on. The case is to be relisted on 4.9.2012. 99
Case No.:17/6/80‐ALC2/2012
Party Name:TERUMO PENPOL LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00082/AM13/ RLA File :53/24/040/00001/AM13/ Lic.No/Date:5310014913 12.04.2012 Decision : Based on C&PC wrien comments received vide OM No. 46011/21/2009‐PC‐II dated 18.6.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: Item to be Exported : Blood Bags Quan២�ty: 01 No. Raw Material for Import Quan២�ty 1 PVC compound 1.10 kg/kg content in export product 2 Relevant Stainless Steel Needle Assembly Net + 3% wastage 3 Evident Paper Net + 5% wastage 4 Aluminium foil Cover Net + 1% wastage 5 Relevant Plasma Cap (Rubber Cap) Net + 1% wastage 6 Relevant Luer Adapter Net + 1% wastage 7 Relevant Oxyzen Absorber Net + 1% wastage 8 Relevant Y Tube Net + 1% wastage 9 Relevant Thermal Transfer Ribbon Net + 1% wastage 10 Relevant Big Beak Off Valve Assembly Net + 1% wastage 11 Relevant Y Connector Net + 1% wastage 12 Relevant So Shell Filter (CRC Filter) Net + 1% wastage 13 Relevant Stamping Foil Tape Net + 1% wastage 14 Relevant Tube Holder Net + 1% wastage
Case No.:4/9/80‐ALC2/2012
Party Name:BOSCH LIMITED, Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00184/AM13/ RLA File :07/24/040/00464/AM12/ Lic.No/Date:0710088082 08.05.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 132
Case No.:53/6/80‐
ALC2/2012 ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00118/AM13/ RLA File :61/24/040/00003/AM13/ Lic.No/Date:6110000812 09.05.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 133
Case No.:65/6/80‐ALC2/2012
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00130/AM13/ RLA File :34/24/040/00032/AM13/ Lic.No/Date:3410034097 09.05.2012 Decision : Based on the DHI wrien comments dated 24.7.2012, the Commiee decided to ra២�fy the norms of subject authoriza២�on on net to net basis with accountability clause. 134
Case No.:74/6/80‐
ALC2/2012 Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00139/AM13/ RLA File :05/23/040/00034/AM13/ Lic.No/Date:0510324258 09.05.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s applica២�on to DIPP for examina២�on and 135
Case No.:75/6/80‐ALC2/2012
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00140/AM13/ RLA File :05/23/040/00031/AM13/ Lic.No/Date:0510324406 10.05.2012 Decision : Based on the DHI wrien comments dated 24.7.2012, the Commiee decided to ra២�fy the norms of subject authoriza២�on as under: Item No.1 – 1.05 kg/kg content. Item No.2 to 5 – To be allowed on net to net basis with accountability clause.
136
Case No.:59/6/80‐
ALC2/2012 Party Name:AQUASUB ENGINEERING Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00124/AM13/ RLA File :32/24/040/00004/AM13/ Lic.No/Date:3210054368 11.05.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s applica២�on to DIPP for examina២�on and 137
Case No.:27/9/80‐ALC2/2012
Party Name:WELD FUSE PVT. LTD . Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00207/AM13/ RLA File :09/24/040/00007/AM13/ Lic.No/Date:0910052615 15.05.2012 Decision : Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: 1 Net weight of export product at Sl. No. 1 to be specified as “16942 Kgs. containing 8398 Kgs. of Galvanised wire”. 2. Net weight of export product at Sl. No. 2 to be specified as “5878 Kgs. containing 3295 Kgs. of Galvanised wire”. 3. Net weight of export product at Sl. No. 3 to be specified as “5532 Kgs. containing 2171 Kgs. of Galvanised wire”. 4. Word ‘Relevant” to be prefixed with the descrip២�on of import items at Sl. No. 1, 2 & 3 and their quan២�២�es to be allowed as applied for i.e. 8482.18 Kgs., 3327.8 Kgs. & 2192.96 Kgs. respec២�vely inclusive of 1 % wastage. 138
Case No.:67/6/80‐
ALC2/2012 Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00132/AM13/ RLA File :05/24/040/00480/AM12/ Lic.No/Date:0510324856 15.05.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s applica២�on to MSME for examina២�on and 139
Case No.:34/6/80‐ALC2/2012
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00099/AM13/ RLA File :03/94/040/00032/AM13/ Lic.No/Date:0310695454 21.05.2012 Decision : On the recommenda២�on of DHI representa២�ve present in the mee២�ng, the Commiee decided to ra២�fy norms of subject authoriza២�on under GN4.
140
Case No.:40/6/80‐
ALC2/2012 Party Name:KONECRANES INDIA PRIVATE LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00105/AM13/ RLA File :31/82/040/00032/AM13/ Lic.No/Date:3110054378 22.05.2012 Decision : Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on as under: 1. Advance Authoriza២�on to be ra២�fied as per GN‐4 of Engineering Products. 2. The Commiee decided to delete import items at S.No.7, 14, 21, 28, 35, 42, 55, 68, 81, 88, 95, 102, 109, 116, 129, 142 & 155 as same are not allowed as per Policy. 141
Case No.:70/6/80‐
ALC2/2012 Party Name:THE INDURE PVT. LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00135/AM13/ RLA File :05/24/040/00020/AM13/ Lic.No/Date:0510325671 23.05.2012 Defer Date:04.09.2012 Decision : On the recommenda២�on of DHI representa២�ve present in the mee២�ng, the Commiee decided to seek informa២�on from firm to split quan២�ty of items indicated at Sr. No.2 and placement of these in engineering drawing plus PAC/scope of supply. The case is to be relisted on 4.9.2012. 142
Case No.:14/9/80‐
ALC2/2012 Party Name:BHARAT PUMPS & COMPRESSORS LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00194/AM13/ RLA File :06/24/040/00008/AM13/ Lic.No/Date:0610027244 24.05.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DIPP and decided to await 143
Case No.:24/9/80‐
ALC2/2012 ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00204/AM13/ RLA File :09/24/040/00104/AM13/ Lic.No/Date:0910052753 24.05.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 144
Case No.:25/9/80‐
ALC2/2012 ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00205/AM13/ RLA File :09/24/040/00086/AM13/ Lic.No/Date:0910052763 24.05.2012 Defer Date:04.09.2012
Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 145
Case No.:48/6/80‐
ALC2/2012 Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00113/AM13/ RLA File :03/94/040/00088/AM13/ Lic.No/Date:0310696095 24.05.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of applica២�on to DIPP for examina២�on and 146
Case No.:5/9/80‐ALC2/2012
Party Name:KIRLOSKAR BROTHERS LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00185/AM13/ RLA File :31/82/040/00003/AM13/ Lic.No/Date:3110054446 25.05.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of applica២�on to DIPP for examina២�on and 147
Case No.:26/9/80‐
ALC2/2012 Party Name:WELD FUSE PVT. LTD . Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00206/AM13/ RLA File :09/24/040/00080/AM13/ Lic.No/Date:0910052812 29.05.2012 Defer Date:04.09.2012 Decision : On the recommenda២�on of DIPP representa២�ve present in the mee២�ng, the Commiee decided to seek informa២�on from firm as per Sr.No.4&5 of Standard Deficiency Format. The case is to be 148
Case No.:18/9/80‐ALC2/2012
Party Name:BERCO UNDERCARRIAGES (INDIA) PVT LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00198/AM13/ RLA File :09/24/040/00046/AM13/ Lic.No/Date:0910052843 30.05.2012 Decision : On the recommenda២�on of DHI representa២�ve present in the mee២�ng, the Commiee decided to ra២�fy norms of subject authoriza២�on on net to net basis with accountability clause. 149
Case No.:21/9/80‐
ALC2/2012 Party Name:BAXTER (INDIA) PVT.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00201/AM13/ RLA File :05/23/040/00065/AM13/ Lic.No/Date:0510326473 01.06.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DIPP and decided to await
150
Case No.:22/9/80‐
ALC2/2012 Party Name:KEWAUNEE SCIENTIFIC CORPORATION INDIA PRIVATE LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00202/AM13/ RLA File :07/21/040/00103/AM13/ Lic.No/Date:0710088739 05.06.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of MSME and decided to await 151
Case No.:76/6/80‐
ALC2/2012 Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00141/AM13/ RLA File :31/82/040/00078/AM13/ Lic.No/Date:3110054605 05.06.2012 Defer Date:04.09.2012 Decision : The Commiee decided to remind RA, Pune to forward 4 sets of firm’s applica២�on for considera២�on. The case is to be relisted on 4.9.2012. 152
Case No.:8/9/80‐ALC2/2012
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00188/AM13/ RLA File :05/23/040/00066/AM13/ Lic.No/Date:0510326638 05.06.2012 Decision : Based on wrien comments of DHI dated 24.1.2012, the Commiee decided to ra២�fy the subject Authoriza២�on based on Sub‐Commiee report as under: Export Product Inputs material Import to be allowed ‐Packers ‐Blanking Plug ‐ Sliding/Separa២�on Sleeve ‐Expansion Joint (i) Seamless Casing Pipe (ii) Components Length of relevant seamless pipe to be allowed @1Nos of actual length of EP+ ½” Extra. In addi២�on to above, the OD of relevant seamless pipe to be allowed as actual OD of EP+ ¼” Extra. The Components are to be allowed on net to net basis with accountability clause. 153
Case No.:9/9/80‐ALC2/2012
Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00189/AM13/ RLA File :05/24/040/00067/AM13/ Lic.No/Date:0510326672 05.06.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s applica២�on to MSME for examina២�on and comments. The Commiee also decided to seek informa២�on from firm as per Sr.No.3,4,5&11 of Standard Deficiency Format. The case is to be relisted on 4.9.2012. Status:
154
Case No.:29/9/80‐
ALC2/2012 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Deferred HQ File :01/80/050/00209/AM13/ RLA File :03/95/040/00163/AM13/ Lic.No/Date:0310697695 06.06.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI/DIPP and decided to await 155
Case No.:30/9/80‐
ALC2/2012 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00210/AM13/ RLA File :03/95/040/00162/AM13/ Lic.No/Date:0310697694 06.06.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI/DIPP and decided to await 156
Case No.:31/9/80‐
ALC2/2012 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00211/AM13/ RLA File :03/95/040/00115/AM13/ Lic.No/Date:0310697691 06.06.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DIPP and decided to await 157
Case No.:28/9/80‐
ALC2/2012 Party Name:VAG VALVES (INDIA) PVT.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00208/AM13/ RLA File :09/24/040/00092/AM13/ Lic.No/Date:0910053011 12.06.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of frm’s applica២�on to DIPP for examina២�on and 158
Case No.:6/9/80‐ALC2/2012
Party Name:DAEWON INDIA AUTOPARTS PVT LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00186/AM13/ RLA File :04/24/040/00035/AM13/ Lic.No/Date:0410137245 12.06.2012 Defer Date:04.09.2012 Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 159
Case No.:23/9/80‐ALC2/2012 Party Name:BHARAT HEAVY
ELECTRICALS LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00203/AM13/ RLA File :09/24/040/00136/AM13/ Lic.No/Date:0910053032 13.06.2012 Defer Date:04.09.2012
Decision : The Commiee noted that the case is under examina២�on of DHI and decided to await 160
Case No.:15/9/80‐ALC2/2012
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00195/AM13/ RLA File :05/23/040/00080/AM13/ Lic.No/Date:0510327264 14.06.2012 Decision : On the recommenda២�on of MSME representa២�ve present in the mee២�ng, the Commiee decided to ra២�fy norms of subject authoriza២�on on repeat basis as per comments in Authoriza២�on No.0510303170 dated 20.9.2011. 161
Case No.:7/9/80‐ALC2/2012
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Approved HQ File :01/80/050/00187/AM13/ RLA File :05/24/040/00085/AM13/ Lic.No/Date:0510327344 14.06.2012 Decision : Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on on repeat basis as per decision in Advance Authoriza២�on No.0510312193 dated 23.12.2011: 1. Net weight of export product to be specified as 1309.1 Kgs. 2. Quan២�ty of import item to be allowed as 5733.9 kgs. inclusive of 338% wastage aer taking 6% recovery from scrap. 162
Case No.:10/9/80‐ALC2/2012 Party Name:METSO
MINERALS (INDIA) PVT.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00190/AM13/ RLA File :05/24/040/00099/AM13/ Lic.No/Date:0510328067 22.06.2012 Defer Date:04.09.2012 Decision : The Commiee observed that in this case the export and import items are same and there is no manufacturing ac២�vity involved. The Commiee, therefore, decided to seek clarifica២�on from the firm. The case is to be relisted on 4.9.2012. 163
Case No.:11/9/80‐ALC2/2012 Party Name:METSO
MINERALS (INDIA) PVT.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00191/AM13/ RLA File :05/24/040/00100/AM13/ Lic.No/Date:0510328068 22.06.2012 Defer Date:04.09.2012 Decision : The Commiee observed that in this case the export and import items are same and there is no manufacturing ac២�vity involved. The Commiee, therefore, decided to seek clarifica២�on from the firm. The case is to be relisted on 4.9.2012.
164
Case No.:12/9/80‐ALC2/2012 Party Name:METSO
MINERALS (INDIA) PVT.LTD. Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00192/AM13/ RLA File :05/24/040/00101/AM13/ Lic.No/Date:0510328069 22.06.2012 Defer Date:04.09.2012 Decision : The Commiee observed that in this case the export and import items are same and there is no manufacturing ac២�vity involved. The Commiee, therefore, decided to seek clarifica២�on from the firm. The case is to be relisted on 4.9.2012. 165
Case No.:13/9/80‐ALC2/2012 Party Name:INDIA
INTERNATIONAL HOUSE LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00193/AM13/ RLA File :05/23/040/00104/AM13/ Lic.No/Date:0510328272 25.06.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s applica២�on to MSME for examina២�on and 166
Case No.:20/9/80‐ALC2/2012 Party Name:MOTHERSON
SUMI SYSTEMS LTD Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00200/AM13/ RLA File :05/24/040/00112/AM13/ Lic.No/Date:0510328602 29.06.2012 Defer Date:04.09.2012 Decision : The Commiee decided to forward copy of firm’s applica២�on to C&PC for examina២�on and 167
Case No.:1/9/80‐ALC2/2012
Party Name:TRANTER INDIA PRIVATE LIMITED Meet No/Date:9/80‐ ALC2/2012 24.07.2012 Status: Deferred HQ File :01/80/050/00181/AM13/ RLA File :31/83/040/00066/AM13/ Lic.No/Date:3110054924 06.07.2012 Defer Date:04.09.2012 Decision : The Commiee noted that copy of firm’s applica២�on has not been received and decided to await the same. The case is to be relisted on 4.9.2012. S.No.106
Case No. A/R‐
117 M/s. Thermax Ltd., F.No. 01/80/50/01034/AM09/DES.I Lic.No. & Date Mee២�ng No.09/13 RA F.No.31/21/040/00296/AM093110035317 dt.09.09.2008 Date: 24.07.2012 Ra២�fica២�on of norms The Commiee noted that firm has not replied to this office reminder leer dated 6.7.2012 asking for certain informa២�on. The Commiee, therefore, decided to once again remind the firm for expedi២�ng the said informa២�on failing which their case will be rejected. The case is to be relisted on 4.9.2012. S.No.107
Case No. A/R‐
173 M/s. Thermax Ltd., F.No. 01/80/50/01550/AM09/DES.I Lic.No. & Date Mee២�ng No.09/13 RA F.No.31/24/040/00296/AM093110036393 dt.09.09.2008 Date: 24.07.2012 Ra២�fica២�on of norms The Commiee noted that firm has not replied to this office reminder leer dated 6.7.2012 asking for certain informa២�on. The Commiee, therefore, decided to once again remind the firm for expedi២�ng the said informa២�on failing which their case will be rejected. The case is to be relisted on 4.9.2012. S.No.108
Case No. A/R‐
68 M/s. GEA BGR Energy System India Ltd., Chennai HQF.No.01/80/050/01097/AM08/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.04/24/040/00325/AM08 0410092981 dt.02.01.2008 Date: 24.07.2012 Ra២�fica២�on of norms The Commiee noted that firm has not replied to this office leer dated 6.7.2012 asking for certain informa២�on. The Commiee, therefore, decided to remind the firm for expedi២�ng the said informa២�on failing which their case will be rejected. The case is to be relisted on 4.9.2012. S.No.109 Case No. A/R‐144 M/s. Alstom Projects India Ltd., Vadodara HQF.No.01/80/050/00134/AM11/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.03/94/040/01139/AM10 0310567657 dt.31.03.2010 Date: 24.07.2012 Fixa២�on of Norms The representa២�ve of the firm Shri Subodh Kumar Arora, Head‐Indirect Taxa២�on and Shri Soumabha Pal, Engineer‐Methods and Process Industrial Engineering (Power Systems) aended personal hearing and explained that they have obtained two Advance Authoriza២�ons. Subsequently, they have made import against one authoriza២�on and exported against second authoriza២�on. The Commiee advised the firm to approach RA for clubbing of both authoriza២�on as per Policy. S.No.110 Case No. A/R‐112 M/s. Bharat Heavy Electricals Ltd., Noida HQF.No.01/80/050/00575/AM10/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.05/23/040/00117/AM10 0510253818 dt.02.12.2009 Date: 24.07.2012 Fixa២�on of Norms The Commiee noted that this case is referred to PIC and decided to await decision. The case is to be relisted
RA.F.No.05/23/040/00117/AM10 0510253818 dt.02.12.2009 Date: 24.07.2012 Fixa២�on of Norms The Commiee noted that this case is referred to PIC and decided to await decision. The case is to be relisted on 4.9.2012. S.No.111 Case No. A/R‐167 Reference received from ECA‐I of M/s. HQF.No.01/80/11/11/2011‐ 12/ECA‐I/DES.I Lic. No. & date
Malwa Strips Pvt. Ltd., Dewas(MP) Mee២�ng No.09/13 RA.F.No.03/86/040/00090/Am06 03103345535 dt.15.06.2005 Date: 24.07.2012 Clarifica២�on of descrip២�on of export product obliga២�on and actual exports are same and descrip២�on in the same. The Commiee noted that this case has been referred to TAs for comments. The case is to be relisted on 4.9.2012. S.No.112 Case No. A/R‐102 M/s.Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/01790/AM09/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.61/24/040/00069/AM09 6110000286 dt.06.02.2009 Date: 24.07.2012 Ra២�fica២�on of norms The Commiee noted that this case is under examina២�on of C&PC and decided to await comments. The case is S.No.113 Case No. A/R‐37 M/s.Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/00143/AM11/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.61/24/040/00016/AM09 6110000447 dt.13.05.2010 Date: 24.07.2012 Revision of norms Based on DHI wrien comments received vide leer No. 3(69)/2010‐TSW(B)/237 dated 20.6.2012 and UO No. 3(22)/10‐TSW(B)/39 dated 24.1.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on on
ien comments received vide leer No. 3(69)/2010‐TSW(B)/237 dated 20.6.2012 and UO No. 3(22)/10‐TSW(B)/39 dated 24.1.2012, the Commiee decided to ra២�fy norms of subject authoriza២�on on repeat basis as per decision in AA No.6110000286 dated 6.2.2009. Inputs at Sr.No.7 and 76 of the list to be allowed with accountability clause and nil wastage. Item No.206 is not covered under Para 4.1.3.1 of FTP. S.No.114 Case No. A/R‐09 M/s.Bharat Heavy Electricals Ltd., Bhopal HQF.No.01/80/050/00774/AM11/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.11/24/040/00060/AM11 1110023887 dt.10.01.2011 Date: 24.07.2012 Fixa២�on of norms The Commiee noted that this case is under examina២�on of DHI and decided to await comments. The case is to be relisted on 4.9.2012. S.No.115 Case No. A/R‐12 M/s. FRICK India Ltd., New Delhi HQF.No.01/80/050/00405/AM12/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.05/23/040/00269/AM12 0510306601 dt.25.01.2011
4.9.2012. S.No.115 Case No. A/R‐12 M/s. FRICK India Ltd., New Delhi HQF.No.01/80/050/00405/AM12/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.05/23/040/00269/AM12 0510306601 dt.25.01.2011
Date: 24.07.2012 Fixa២�on of norms The representa២�ve of the firm Shri Rajan Iyer, Vice President and Shri K.K. Sharma, Commercial Manager aended personal hearing and explained the detailed manufacturing process involved in the inputs and export product. The Commiee decided to ra២�fy norms of subject authoriza២�on under GN4 with accountability clause. S.No.116 Case No. A/R‐14 M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00317/AM12/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.03/94/040/00446/AM12 0310654528 dt.19.09.2011 Date: 24.07.2012 Request for revision / amendment norms The Commiee noted that this case is under examina២�on of DIPP and decided to await comments. The case is S.No.117 Case No. A/R‐23 M/s. Minda Silca Engineering Ltd., Noida HQF.No.01/80/050/00995/AM09/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.05/24/040/00941/AM08 0510217932 dt.14.03.2008 Date: 24.07.2012 Request for fixa២�on of norms The Commiee decided to forward copy of firm’s applica២�on to MSME for examina២�on and comments. The case is to be relisted on 4.9.2012. S.No.118 Case No. A/R‐24 M/s. Larsen & Toubro Ltd., Mumbai HQF.No.01/80/050/00231/AM09/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.03/95/040/00309/AM12 0310644742 dt.27.07.2011 Date: 24.07.2012 Request for amendment / inclusion addi២�onal inputs in the subject
0/00231/AM09/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.03/95/040/00309/AM12 0310644742 dt.27.07.2011 Date: 24.07.2012 Request for amendment / inclusion addi២�onal inputs in the subject advance authoriza២�on. Based on DIPP wrien comments received vide leer dated 24.7.2012, the Commiee decided to modify norms of subject authoriza២�on as under: 1. Quan២�ty of import item at Sl.No.1 to be reduced to 602127 Kgs inclusive of 3% wastage. 2. Quan២�ty of import item at Sl.No.7 to be modified as 18540 Sets (9000 Kgs) and the same to be allowed on net to net basis with accountability clause. 3. Addi២�onal import item (Sl.No.19) to be allowed as under on net to net basis: Sl.No. Item Descrip២�on Quan២�ty 19 Rolled Shell 2 Nos (73885 Kgs) S.No.119 Case No. A/R‐25 M/s. Bharat Heavy HQF.No.01/80/050/00677/AM11/DES.I Lic. No. & date
ELectricals Ltd., Bhopal Mee២�ng No.09/13 RA.F.No.11/24/040/00028/AM11 1110023053 dt.27.08.2010 Date: 24.07.2012 Request for revision /amendment of norms. The Commiee noted that this case is under examina២�on of DHI and decided to await comments. The case is to be relisted on 4.9.2012. S.No.120 Case No. A/R‐26 M/s. Bharat Heavy ELectricals Ltd., Bhopal HQF.No.01/80/050/00139/AM12/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.11/24/040/00004/AM12 1110024727 dt.11.05.2011 Date: 24.07.2012 Request for revision /amendment of norms. The Commiee noted that this case is under examina២�on of DHI and decided to await comments. The case is to be relisted on 4.9.2012. S.No.121 Case No. A/R‐27 M/s. Ohsung Electronics
t of norms. The Commiee noted that this case is under examina២�on of DHI and decided to await comments. The case is to be relisted on 4.9.2012. S.No.121 Case No. A/R‐27 M/s. Ohsung Electronics India Pvt. Ltd., Pune HQF.No.01/80/050/00429/AM10/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.31/24/040/00124/AM10 3110040186 dt.07.10.2009 Date: 24.07.2012 Request for revision of norms. The Commiee noted that this case is under examina២�on of DIPP and decided to await comments. The case is S.No.122 Case No. A/R‐28 Reference received from Jt.DGFT, Pune of M/s. Shree Electricals, Pune HQF.No.01/80/050/00975/AM08/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.31/24/040/00155/AM06 3110031243 dt.22.10.2007 Date: 24.07.2012 Revision of norms The Commiee noted that this case is under examina២�on of DIPP and decided to await comments. The case is S.No.123 Case No. A/R‐29 M/s. SMC Pneuma២�cs (India) Pvt. Ltd., HQF.No.01/80/050/00036/AM12/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.05/24/040/00035/AM12 0510289309 dt.02.05.2011 Date: 24.07.2012 Ra២�fica២�on of norms. The Commiee noted that this case is under examina២�on of DIPP and decided to await comments. The case is
.F.No.05/24/040/00035/AM12 0510289309 dt.02.05.2011 Date: 24.07.2012 Ra២�fica២�on of norms. The Commiee noted that this case is under examina២�on of DIPP and decided to await comments. The case is
S.No.124 Case No. A/R‐30 M/s. Starion India Pvt. Ltd., Pune HQF.No.01/80/050/00210/AM10/DES.I Lic. No. & date Mee២�ng No.09/13 RA.F.No.31/24/040/00051/AM10 3110035836 dt.20.10.2008 Date: 24.07.2012 Ra២�fica២�on / revision of norms of this AA and 7 others AAs. The Commiee noted that this case is under examina២�on of DE&IT and decided to await comments. The case is Sl.No.125
Case No. C ‐ 16
M/s. Birla Precision Technologies Ltd., Aurangabad HQ F.No.01/80/162/00608/AM11/ DES‐I Mee២�ng No.09/13 Fixa២�on of input output norms for the export product “Tool Holder” in respect of 100% EOU Date: 24.07.2012 The Commiee noted that firm has not replied to this office leer dated 6.7.2012 asking for furnishing certain informa២�on and decided to once again remind them to expedite their reply failing which the case will be rejected. The case is to be relisted on 4.9.2012. Sl.No.126
Case No.C‐01
M/s. Snecma Hal Aerospace Ltd., HQ F.No.01/80/162/00681/AM11/DES.I Mee២�ng No.09/13 Date: 24.07.2012 Fixa២�on of SION for Export Product “(Fluid System) – Air Cras Part. The Commiee noted that firm has not replied to this office leer dated 6.7.2012 asking for furnishing certain informa២�on and decided to once again remind them to expedite their reply failing which the case will be rejected. The case is to be relisted on 4.9.2012. S.No.127
Case No.C‐38
M/s. Brady Company India Pvt. Ltd., Bangalore HQ F.No.01/80/162/01100/AM11/DES.I Mee២�ng No.09/13 Date: 24.07.2012 Fixa២�on of Input Output Norms for the export product “High Performance Electronic Trackers and Die‐cuts Parts” under 100% EOU – reg. The Commiee noted that firm’s revised applica២�on has been received through Cochin SEZ and decided to forward copy of the same to C&PC for examina២�on and comments. The case is to be relisted on 4.9.2012. S.No.128
Case No.C‐39
Reference received from PC‐ 4(B) of M/s. Mul២�‐Serve Rolls Limited, Kolkata HQ F.No.01/94/180/00422/AM12/PC‐ 4(B)/DES.I Mee២�ng No.09/13 Date: 24.07.2012 Clarifica២�on as whether the export product “Adamite Quality Roll” is covered under DEPB Sl. No. 571 of product Group “Engineering” (Product Code : 61) – reg. The Commiee noted that this case is under examina២�on of DIPP and decided to await comments. The case is