DGFT Committee Minutes
RATIFIED Minutes of MeeƟng No.06/13 scheduled on 12.06.2012 of Norms CommiƩee(NC‐I) (DES.I SecƟon) The meeƟng No. 06/13 of the Norms CommiƩee (NC‐I) for the licensing year 2012‐2013 actually was held on 12.06.2012 under the Chairmanship of Sh. N.P.S. Monga, AddiƟonal Director General of Foreign Trade to consider the applicaƟons under Duty ExempƟon / Remission Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I. The following Members of the CommiƩee were present in the meeƟng: ‐ Sl.No Name of the representaƟves & their DesignaƟon Room No. Telephone No. DepƩ. 1. Sh K.K. Tiwari I.A 476 23063321 Extn. DHI, U.B. 2. Sh. K. K. Sinha, IA 341 DIPP U.B. 3. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 4. Sh. K.K. Funda, AssƩ. Dir. (Mech) 736A DC(MSME),N.B. 5. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 6. Sh. Hari Om, FTDO 404 23061562 Ext.265 DGFT, U.B. I ‐The CommiƩee considered the individual cases of the agenda of this meeƟng generated through the online system of NIC. The decisions taken thereon are as under: ‐ 1
Case No.:32/6/80‐ALC2/2012
Party Name:LIEBHERR MACHINE TOOLS (I) PVT LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00097/AM13/ RLA File :07/21/040/00626/AM09/ Lic.No/Date:0710060178 26.09.2008 Decision :On the recommendaƟon of DHI representaƟve present in the meeƟng, the CommiƩee decided to raƟfy the norms in respect of the subject advance authorizaƟon as per GN‐4 for Engineering Products. The RA may take necessary acƟon accordingly. 2
Case No.:15/6/80‐ALC2/2012
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00080/AM13/ RLA File :31/21/040/00004/AM10/ Lic.No/Date:3110038171 20.04.2009 Defer Date:24.07.2012 Decision :The representaƟve of the DHI informed the CommiƩee that the case is under examinaƟon. The CommiƩee, therefore, decided to defer the case and to re‐list the case on 24.07.2012. 3
Case No.:16/6/80‐ALC2/2012
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00081/AM13/ RLA File :31/21/040/00050/AM10/ Lic.No/Date:3110038576 28.05.2009 Defer Date:24.07.2012 Decision : The representaƟve of the DHI informed the CommiƩee that the case is under examinaƟon. The
Case No.:31/39/80‐ALC2/2010
Status:
4 Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Deferred HQ File :01/80/050/00833/AM11/ RLA File :31/24/040/00249/AM11/ Lic.No/Date:3110046929 15.02.2011 Defer Date:24.07.2012 Decision :The CommiƩee observed that Item No.2 & 6 of subject authorizaƟon are “Oil” products which cannot be raƟfied under GN4 and RA, Pune was asked vide leƩer dated 22.5.2012 to forward complete set of firm’s applicaƟon to the CommiƩee for examinaƟon. The CommiƩee noted that reply from RA is awaited and therefore, decided to send a reminder to RA for sending four sets of applicaƟon for Norms CommiƩee to take a decision in this maƩer. The case is to be re‐listed on 24.07.2012. 5
Case No.:12/3/80‐ALC2/2011
Party Name:CHANG YUN INDIA LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00017/AM12/ RLA File :05/23/040/00022/AM12/ Lic.No/Date:0510288459 20.04.2011 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. 6
Case No.:9/11/80‐ALC2/2011
Party Name:ICEM ENGINEERING COMPANY PRIVATE LIMITED, Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00221/AM12/ RLA File :03/94/040/00270/AM12/ Lic.No/Date:0310638600 24.06.2011 Defer Date:24.07.2012 Decision : The firm’s representaƟve Shri Mangesh Kamble, Manager – Business Development has aƩended the Personal Hearing and explained the details of the case. The CommiƩee decided to advise to the firm to furnish product‐wise details so as to examine the case. The case is to be re‐listed on 24.07.2012. 7
Case No.:25/11/80‐ALC2/2011
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00237/AM12/ RLA File :07/24/040/00104/AM12/ Lic.No/Date:0710080361 04.07.2011 Decision : Based on the wriƩen comments of DIPP received vide their UO Note dated12.06.2012, the CommiƩee decided to raƟfy the norms in respect of the subject advance authorizaƟon as under:‐ 1. Net weight of 11000 Kgs. to be specified with the quanƟty of export product. 2. QuanƟƟes of import items at Sl. Nos. 3, 12 & 13 to be allowed as 59.4 Mtrs., 29.2 Mtrs.& 29.2 Mtrs. respecƟvely inclusive of 2 % wastage. 3. QuanƟƟes of import items at Sl. Nos. 50 to 57 to be allowed as 3.06 Mtrs., 100 Mtrs., 55 Mtrs., 61.6 Mtrs., 22.5 Mtrs., 30.6 Mtrs., 12.3 Mtrs. & 10.2 Mtrs. respecƟvely inclusive of 2 % wastage. 4. QuanƟƟes of import items at Sl. Nos. 78 & 79 to be allowed as 344.7 Kgs. & 64.2 Kgs. respecƟvely inclusive of 2 % wastage. 5. “UOM of import item at Sl. No. 88 as per Amendment Sheet No. 1 to be corrected as “Meters” and its quanƟty to be allowed as 1.02 Mtrs./Mtr. content in the Export product. 6. Rest of the import items to be allowed on net to net basis with accountability clause. The RLA may take necessary acƟon accordingly.
8
Case No.:13/11/80‐ALC2/2011
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00225/AM12/ RLA File :09/24/040/00173/AM12/ Lic.No/Date:0910047823 22.07.2011 Defer Date:24.07.2012 9
Case No.:8/14/80‐ALC2/2011
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00262/AM12/ RLA File :05/24/040/00182/AM12/ Lic.No/Date:0510300205 24.08.2011 Defer Date:24.07.2012 Decision :The CommiƩee noted that a DO leƩer has been issued to C&PC from DDG on 24.05.2012 and comments are yet to be received. The CommiƩee, therefore, decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 10
Case No.:11/14/80‐ALC2/2011
Party Name:HITTCO TOOLS LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00265/AM12/ RLA File :07/24/040/00203/AM12/ Lic.No/Date:0710081769 25.08.2011 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not aƩended the Personal Hearing and they have furnished a reply vide leƩer dated 01.06.2012 and decided to send a copy of firm’s reply to DHI for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 11
Case No.:12/17/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00331/AM12/ RLA File :61/24/040/00030/AM12/ Lic.No/Date:6110000675 29.08.2011 Defer Date:24.07.2012 Decision : The CommiƩee noted that the PIC agenda along with main file has been sent to PRC/PIC SecƟon on 18.05.2012 for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 12
Case No.:13/17/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00332/AM12/ RLA File :61/24/040/00031/AM12/ Lic.No/Date:6110000676 29.08.2011 Defer Date:24.07.2012 Decision : The CommiƩee noted that the PIC agenda along with main file has been sent to PRC/PIC SecƟon on 18.05.2012 for examinaƟon and comments. The case is to be re‐listed on 24.07.2012.
Case No.:7/17/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00326/AM12/ RLA File :04/24/040/00171/AM12/
13 Lic.No/Date:0410128753 30.09.2011 Decision :Based on the wriƩen comments of DHI received vide their UO Note No.3(49)/2011‐TSW(B)/207 dated 01.06.2012, the CommiƩee decided to raƟfy the norms in respect of the subject advance authorizaƟon as under:‐ 1. Export Product : 3 x 600 MW Steam Generator (wt: 29350 MT per set) kakrapar for Bara TPS 2. Inputs Sl. No. of list Items Per unit QuanƟty in MT including (% wastage) 1. CS Plates (20‐155 mm) 553 (3%) 2. AS Plates/Flats 708 (0.7%) 3. AS Rounds 193 (2%) 4. CS Tubes Seamless CS Hollows(mother pipe) CS Pipes Seamless 994 (1.7%) 245 (20%) – as per C594 445 (2%) 5 AS Tube Seamless AS Pipes Seamless 1482 (2%) 631 (2%) 6. SS Tube Seamless 419 (0.7%) 7 CasƟngs/Forgings 110.71(1.75%) 1024 Nos. 8. Welding Wire Electrode Cobalt Powder Flux 42 4 2 2 3. Item at S.No. 13 – Furnace Maintenance Plaƞorm ‐ is deleted. 4. Balance items to be on net to net basis with nil wastage. 14
Case No.:30/17/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00349/AM12/ RLA File :11/24/040/00013/AM12/ Lic.No/Date:1110025819 30.09.2011 Defer Date:24.07.2012 Decision :Based on the wriƩen comments of DHI received vide their UO Note No.3(40)/2011‐TSW(B) dated 12.06.2012, the CommiƩee decided to raƟfy the norms in respect of the subject advance authorizaƟon as under:‐ 1. Export Product : [BF Valve, RE Joint, Surface Condenser] Total weight 1474.60 MT for 2 x 500 MW NTPL TuƟcorin 2. Inputs: Sl No. Item Total QuaniƩy in MT including wastage 1. CS Plates 212 (27%) 3. Item No. 2 : Self LubricaƟng [Ferroform] tubes : 90 kg to be allowed with nil wastage 4. Item No. 3 : Titanium cladded tube plates (6136 x 4096 x (34+6 mm) 8 Nos. to be allowed on net to net basis.
15
Case No.:1/20/80‐ALC2/2011
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00386/AM12/ RLA File :05/24/040/00235/AM12/ Lic.No/Date:0510304889 11.10.2011 Defer Date:24.07.2012 Decision : The CommiƩee noted that a set of applicaƟon has been received from RA[CLA] vide leƩer No.05/24/40/235/AM‐12/CLA dated 28.5.2012 and decided to send the same to DIPP for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 16
Case No.:29/17/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00348/AM12/ RLA File :05/23/040/00226/AM12/ Lic.No/Date:0510305028 12.10.2011 Defer Date:24.07.2012 Decision : The CommiƩee noted that the PIC agenda along with main file has been sent to PRC/PIC SecƟon on 18.05.2012 for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 17
Case No.:24/27/80‐ALC2/2011
Party Name:INDIAN TECHNOMETAL COMPANY LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00557/AM12/ RLA File :05/23/040/00289/AM12/ Lic.No/Date:0510307109 03.11.2011 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm’s applicaƟon has been sent to MSME on 11.06.2012 and case is under examinaƟon with MSME. The case is to be re‐listed on 24.07.2012. 18
Case No.:41/27/80‐ALC2/2011
Party Name:WELD FUSE PVT. LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00574/AM12/ RLA File :09/24/040/00356/AM12/ Lic.No/Date:0910049698 14.11.2011 Decision : Based on the wriƩen comments of DIPP received vide their UO Note dated12.06.2012, the CommiƩee 1 Net weight of export product at Sl. No. 1 to be specified as “25500 Kgs. containing 13978 Kgs. of Galvanised wire”. 2. Net weight of export product at Sl. No. 2 to be specified as “53336 Kgs. containing 29896 Kgs. of Galvanised wire”. 3. Word ‘Relevant” may be prefixed with the descripƟon of import items at Sl. No.1 & 2 and their quanƟƟes to be allowed as applied for i.e. 14114 Kgs. & 30132 Kgs. respecƟvely inclusive of 1 % wastage.
Case No.:23/20/80‐ALC2/2011
Party Name:KE‐BURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred
19 HQ File :01/80/050/00408/AM12/ RLA File :04/24/040/00234/AM12/ Lic.No/Date:0410130688 22.11.2011 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 and 08.06.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. 20
Case No.:36/27/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00569/AM12/ RLA File :09/24/040/00333/AM12/ Lic.No/Date:0910049962 29.11.2011 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm reply dt.09.06.2012 to be forwarded to DHI for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 21
Case No.:9/20/80‐ALC2/2011
Party Name:RADIANT INDUSTRIES Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00394/AM12/ RLA File :31/83/040/00182/AM12/ Lic.No/Date:3110051726 07.12.2011 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 04.06.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. 22
Case No.:13/20/80‐ALC2/2011
Party Name:UNI VTL ENGINEERING PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00398/AM12/ RLA File :03/95/040/00726/AM12/ Lic.No/Date:0310669540 08.12.2011 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 30.04.2012 and 22.05.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. 23
Case No.:35/27/80‐ALC2/2011
Party Name:WELD FUSE PVT. LTD . Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00568/AM12/ RLA File :09/24/040/00407/AM12/ Lic.No/Date:0910050090 08.12.2011 Decision :Based on the wriƩen comments of DIPP received vide their UO Note dated12.06.2012, the CommiƩee 1 Net weight of export product at Sl. No. 1 to be specified as “62982 Kgs. containing 35292 Kgs. of Galvanised wire”. 2. Net weight of export product at Sl. No. 2 to be specified as “58282 Kgs. containing 22873 Kgs. of Galvanised wire”. 3. Net weight of export product at Sl. No. 3 to be specified as “34308 Kgs. containing 17006 Kgs. of Galvanised wire”.
4. Net weight of export product at Sl. No. 4 to be specified as “30555 Kgs. containing 16026 Kgs. of Galvanised wire”. 5. Word ‘Relevant” to be prefixed with the descripƟon of import items at Sl. No.1, 2, 3 & 4 and their quanƟƟes to be allowed as applied for i.e. 35655 Kgs. , 23104 Kgs., 17177 Kgs. & 16188 Kgs. respecƟvely inclusive of 1 % wastage. 24
Case No.:40/27/80‐ALC2/2011
Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00573/AM12/ RLA File :09/24/040/00403/AM12/ Lic.No/Date:0910050100 08.12.2011 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. 25
Case No.:61/2/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00025/AM13/ RLA File :09/24/040/00432/AM12/ Lic.No/Date:0910050612 04.01.2012 Defer Date:24.07.2012 26
Case No.:14/27/80‐ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00547/AM12/ RLA File :05/23/040/00384/AM12/ Lic.No/Date:0510313896 09.01.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 20.04.2012 and decided to forward a copy of firm’s applicaƟon to DIPP for examinaƟon and comments, case pertains to them. The case is to be re‐listed on 24.07.2012. 27
Case No.:22/27/80‐ALC2/2011
Party Name:BHARAT PUMPS & COMPRESSORS LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00555/AM12/ RLA File :06/24/040/00053/AM12/ Lic.No/Date:0610025465 11.01.2012 Decision Based on the wriƩen comments of DIPP received vide their UO Note dated12.06.2012, the CommiƩee 1. QuanƟty of import item at Sl. No. 1 to be allowed as 12 Nos. on net to net basis with accountability clause. 2. QuanƟƟes of import items at Sl. No. 2 & 3 to be allowed as applied for i.e. 4 Nos. each on net to net basis with accountability clause. 3. QuanƟƟes of import items at Sl. No. 4, 5 & 6 to be allowed as per policy for spares.
28
Case No.:23/27/80‐ALC2/2011
Party Name:BHARAT PUMPS & COMPRESSORS LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00556/AM12/ RLA File :06/24/040/00054/AM12/ Lic.No/Date:0610025466 11.01.2012 Decision : Based on the wriƩen comments of DIPP received vide their UO Note dated12.06.2012, the CommiƩee 1. QuanƟty of import item at Sl. No. 1to be allowed as 12 Nos. on net to net basis with accountability clause. 2. QuanƟƟes of import items at Sl. No. 2 & 3 to be allowed as applied for i.e. 4 Nos. each on net to net basis with accountability clause. 3. QuanƟƟes of import items at Sl. No. 4, 5 & 6 to be allowed as per policy for spares. 29
Case No.:62/2/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00026/AM13/ RLA File :09/24/040/00437/AM12/ Lic.No/Date:0910050738 11.01.2012 Defer Date:24.07.2012 30
Case No.:17/27/80‐ALC2/2011
Party Name:BOYSEN INDIA LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00550/AM12/ RLA File :05/23/040/00399/AM12/ Lic.No/Date:0510314287 12.01.2012 Decision : Based on the wriƩen comments of DHI received vide their UO Note dated 12.06.2012, the CommiƩee decided to raƟfy the norms on repeat basis as per comments in Advance AuthorizaƟon No.0510282928 dated 17.04.2011. The RA may take necessary acƟon accordingly. 31
Case No.:2/24/80‐ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00476/AM12/ RLA File :03/94/040/00885/AM12/ Lic.No/Date:0310677027 17.01.2012 Decision : Based on the wriƩen comments of DIPP received vide their UO Note dated12.06.2012, the CommiƩee 1. Net empty export weights of 137 MT, 137 MT, 83.85 MT & 51.553 MT to be specified with the quanƟƟes of export products at Sl. No. 1 to 4 respecƟvely. 2. QuanƟty of import item at Sl. No. 1 to be allowed as 24 Nos. on net to net basis. However, duty free weight of this item to be allowed as 51180 Kg inclusive of 35 % wastage aŌer 20 % recovery. 3. Word “Relevant” to be prefixed with the descripƟons of import items at Sl. No. 2 & 3. 4. QuanƟty of import item at Sl. No. 2 to be allowed as 127991 Kgs. inclusive of 23.8 % wastage aŌer 1/3rd recovery.
5. QuanƟty of import item at Sl. No. 3 to be allowed as 256149 Kgs. ( 213695 Mtrs.) inclusive of 2 % wastage. 6. QuanƟƟes of import items at Sl. Nos. 4, 5 & 6 ( Welding Consumables) to be allowed as 2611 Kgs. each. 32
Case No.:45/27/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00578/AM12/ RLA File :04/24/040/00264/AM12/ Lic.No/Date:0410132883 17.01.2012 Defer Date:24.07.2012 Decision : The representaƟve of the DHI informed the CommiƩee that the case is under examinaƟon. The 33
Case No.:63/2/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00027/AM13/ RLA File :09/24/040/00502/AM12/ Lic.No/Date:0910050888 20.01.2012 Defer Date:24.07.2012 Decision : The representaƟve of the DHI informed the CommiƩee that the case is under examinaƟon. The 34
Case No.:6/27/80‐ALC2/2011
ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00539/AM12/ RLA File :05/23/040/00411/AM12/ Lic.No/Date:0510315336 23.01.2012 Defer Date:24.07.2012 Decision :As per DIPP UO note dated 12.06.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. InformaƟon in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format‐export product wise. 2. QuanƟƟes of import items from Sl. Nos. 3, 4 & 5 in Nos. also in addiƟon to their weights. 35
Case No.:4/27/80‐ALC2/2011
Party Name:POLY MEDICURE LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00537/AM12/ RLA File :05/24/040/00369/AM12/ Lic.No/Date:0510315548 24.01.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that a DO leƩer from DDG has been issued to C&PC on 29.05.2012 and the case is under examinaƟon with C&PC. The case is to be re‐listed on 24.07.2012. 36
Case No.:11/27/80‐ALC2/2011
ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00544/AM12/ RLA File :05/23/040/00407/AM12/ Lic.No/Date:0510315464 24.01.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 20.04.2012 and decided to forward a copy of firm’s applicaƟon to DIPP for examinaƟon and comments. The case is to be re‐listed on
24.07.2012. 37
Case No.:5/24/80‐ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00479/AM12/ RLA File :03/94/040/00930/AM12/ Lic.No/Date:0310678658 25.01.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. 38
Case No.:12/27/80‐ALC2/2011
Party Name:GLOBE HI‐FABS Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00545/AM12/ RLA File :05/23/040/00425/AM12/ Lic.No/Date:0510316020 01.02.2012 Decision :Based on the wriƩen comments of DC(MSME) received vide their UO Note No.30(147)2011‐ME dated 23.05.2012, the CommiƩee decided to raƟfy the norms on Net‐to‐Net basis without any wastage and with accountability clause. The RA may take necessary acƟon accordingly. 39
Case No.:34/27/80‐ALC2/2011
Party Name:NASH INDUSTRIES Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00567/AM12/ RLA File :07/24/040/00436/AM12/ Lic.No/Date:0710085938 02.02.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that a copy of firm’s reply dated 04.06.2012 has been sent to DHI on 08.06.2012 and decided to forward the same to DIPP for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 40
Case No.:49/6/80‐ALC2/2012
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00114/AM13/ RLA File :07/24/040/00450/AM12/ Lic.No/Date:0710086045 06.02.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 30.05.2012 and case is under examinaƟon with DHI. The case is to be re‐listed on 24.07.2012. 41
Case No.:18/27/80‐ALC2/2011
ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00551/AM12/ RLA File :05/23/040/00426/AM12/ Lic.No/Date:0510316755 07.02.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that firm’s reply dated 22.05.2012 is incomplete since they have not furnished the required net weight of dish ends and test coupons separately. (DHI UO note No.3(10)/2012‐TSW(B)/230 dated 13.06.2012) The CommiƩee, therefore, decided to ask the firm to furnish the same at the earliest to examine the case further. The case is to be re‐listed on 24.07.2012.
42
Case No.:50/6/80‐ALC2/2012
Party Name:GL&V INDIA PRIVATE LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00115/AM13/ RLA File :31/83/040/00222/AM12/ Lic.No/Date:3110052788 07.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that DC (MSME) vide UO No. 30(175) 2011‐ME dated 12.6.2012 has raised some deficiency. The CommiƩee, therefore, decided to ask the firm to provide these informaƟon within 15 days. The case is to be re‐listed on 24.07.2012. 43
Case No.:60/2/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00024/AM13/ RLA File :09/24/040/00548/AM12/ Lic.No/Date:0910051171 08.02.2012 Defer Date:24.07.2012 44
Case No.:19/27/80‐ALC2/2011
Party Name:DHARAM STAINLESS STEEL PVT LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00552/AM12/ RLA File :05/23/040/00333/AM12/ Lic.No/Date:0510317062 09.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing 45
Case No.:46/2/80‐ALC2/2012
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00010/AM13/ RLA File :05/24/040/00409/AM12/ Lic.No/Date:0510317706 14.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing 46
Case No.:15/27/80‐ALC2/2011
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00548/AM12/ RLA File :05/24/040/00423/AM12/ Lic.No/Date:0510317789 15.02.2012 Defer Date:24.07.2012
Case No.:43/27/80‐ALC2/2011
Party Name:TERUMO PENPOL LIMITED Meet No/Date:6/80‐ ALC2/2012 Status: Deferred
47 12.06.2012 HQ File :01/80/050/00576/AM12/ RLA File :53/24/040/00017/AM12/ Lic.No/Date:5310014710 15.02.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the comments called for from C&PC are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 48
Case No.:54/2/80‐ALC2/2012
Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00018/AM13/ RLA File :05/23/040/00450/AM12/ Lic.No/Date:0510317886 15.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing 49
Case No.:56/2/80‐ALC2/2012
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00020/AM13/ RLA File :05/24/040/00420/AM12/ Lic.No/Date:0510317786 15.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing 50
Case No.:9/27/80‐ALC2/2011
Party Name:ECHAAR EQUIPMENTS PVT.LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00542/AM12/ RLA File :03/94/040/01018/AM12/ Lic.No/Date:0310682257 16.02.2012 Defer Date:24.07.2012 Decision :As per DHI UO note No.3/62/12‐TSW(B)/216 dated 05.06.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. InformaƟon in respect of Sl.No.5 & 11 of the Standard Deficiency Format, export product wise(Volumetric CalculaƟon). 2. The Specific use of the export product in the wind mill. The firm may highlight the exact placement of each export product in the leveled diagram of windmill. 51
Case No.:47/27/80‐ALC2/2011
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00580/AM12/ RLA File :04/24/040/00290/AM12/ Lic.No/Date:0410133870 16.02.2012 Defer Date:24.07.2012
Case No.:52/2/80‐ALC2/2012
ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred
52 HQ File :01/80/050/00016/AM13/ RLA File :05/23/040/00456/AM12/ Lic.No/Date:0510318045 16.02.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm has sought Ɵme vide their leƩer dated 31.05.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. 53
Case No.:3/27/80‐ALC2/2011
Party Name:KILBURN ENGINEERING LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00536/AM12/ RLA File :03/94/040/01008/AM12/ Lic.No/Date:0310682458 17.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing 54
Case No.:10/6/80‐ALC2/2012
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00075/AM13/ RLA File :31/82/040/00351/AM12/ Lic.No/Date:3110053033 20.02.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the comments called for from DIT are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 55
Case No.:48/27/80‐ALC2/2011
Party Name:SUNDRAM FASTENERS LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00581/AM12/ RLA File :04/24/040/00288/AM12/ Lic.No/Date:0410133976 21.02.2012 Decision :Based on the wriƩen comments of DIPP received vide their UO Note dated 12.06.2012, the CommiƩee 1. Net weight of export products at Sl. No. 1 & 2 to be specified as 18480 Kgs. & 16500 Kgs. respecƟvely. 2. QuanƟty of import item at Sl. No. 1 to be allowed as 28248 Kgs. inclusive of 52.9 % wastage aŌer taking 20 % recovery. 3. QuanƟty of import item at Sl. No. 2 to be allowed as 27300 Kgs. inclusive of 65.5 % wastage aŌer taking 20 % recovery. 56
Case No.:45/2/80‐ALC2/2012
Party Name:G & T OIL STATES INDUSTRIES PRIVATE LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00009/AM13/ RLA File :03/94/040/01042/AM12/ Lic.No/Date:0310683065 22.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has sought Ɵme vide their leƩer dated 09.06.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012.
57
Case No.:9/6/80‐ALC2/2012
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00074/AM13/ RLA File :31/82/040/00354/AM12/ Lic.No/Date:3110053097 22.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the comments called for from DIT are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 58
Case No.:48/2/80‐ALC2/2012
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00012/AM13/ RLA File :03/94/040/00980/AM12/ Lic.No/Date:0310683397 24.02.2012 Decision :Based on the wriƩen comments of DIPP received vide their UO Note dated 12.06.2012, the CommiƩee 1. Net empty export weights of 85 MT, 19.1 MT, 19.6 MT, 11.2 MT, 20.3 MT & 27.7 MT to be specified with the quanƟƟes of export products at Sl. No. 1 to 6 respecƟvely. 2. QuanƟty of import item at Sl. No. 1 to be allowed as 5 Nos. on net to net basis. However, duty free weight of this item to be allowed as 262 Kg inclusive of 5 % wastage. 3. QuanƟty of import item at Sl. No. 2 to be allowed as 9 Nos. on net to net basis. However, duty free weight of this item to be allowed as 20860 Kg inclusive of 5 % wastage. 4. QuanƟty of import item at Sl. No. 3 to be allowed as 49 Nos. on net to net basis. However, duty free weight of this item to be allowed as 11426 Kg inclusive of 5 % wastage. 5. QuanƟty of import item at Sl. No. 4 to be allowed as 28 Nos. on net to net basis. However, duty free weight of this item to be allowed as 10845 Kg inclusive of 5 % wastage. 6. QuanƟty of import item at Sl. No. 5 to be allowed as 1 No. on net to net basis. However, duty free weight of this item to be allowed as 8885 Kg inclusive of 5 % wastage. 7. Word “Relevant” to be prefixed with the descripƟons of import items at Sl. No. 6, 7 & 8. 8. QuanƟty of import item at Sl. No. 6 to be allowed as 304 Kgs. ( 8.43 Mtrs.) inclusive of 2 % wastage. 9. QuanƟty of import item at Sl. No. 7 to be allowed as 49424 Kgs. inclusive of 7.9 % wastage aŌer 1/3rd recovery. 10. QuanƟty of import item at Sl. No. 8 to be allowed as 86253 Kgs. inclusive of 5.6% wastage aŌer 1/3rd recovery 11. QuanƟƟes of import items at Sl. Nos. 9, 10 & 11 ( Welding Consumables) to be allowed as 2899 Kgs. each. 59
Case No.:50/2/80‐ALC2/2012
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00014/AM13/ RLA File :03/95/040/00929/AM12/ Lic.No/Date:0310683744 27.02.2012 Defer Date:24.07.2012 Decision :As per DIPP UO note dated 12.06.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case 24.07.2012: ‐ 1. Net weight of indigenous items in the export product. 2. For import item at Sl. No.2, requirement of number of plates for the manufacture of Baffle segments supported by the dimensions of Baffle segments. 3. JusƟficaƟon/basis for the quanƟty of “Test coupons” at import item at Sl. No. 7.
4. QuanƟty of “Test coupons” at import item at Sl. No. 8 in Nos. and weight and jusƟficaƟon/basis for the quanƟty of “Test coupons”. 60
Case No.:68/2/80‐ALC2/2012
Party Name:WELD FUSE PVT. LTD . Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00032/AM13/ RLA File :09/24/040/00584/AM12/ Lic.No/Date:0910051473 27.02.2012 Defer Date:24.07.2012 Decision : On the recommendaƟon of DIPP representaƟve present in the meeƟng, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. InformaƟon in respect of Sl.No.4 & 5 of the Standard Deficiency Format, export product wise. 61
Case No.:7/6/80‐ALC2/2012
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00072/AM13/ RLA File :31/82/040/00366/AM12/ Lic.No/Date:3110053156 27.02.2012 Defer Date: Decision : The CommiƩee noted that the comments called for from DIT are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 62
Case No.:69/2/80‐ALC2/2012
Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00033/AM13/ RLA File :11/24/040/00018/AM12/ Lic.No/Date:1110026905 28.02.2012 Decision :Based on the wriƩen comments of DIPP received vide their UO Note dated 12.06.2012, the CommiƩee 1. Import item at Sl. No. 1 to be of relevant grade and thickness as contained in the export products 2. Import item at Sl. No. 3 to be of relevant grade and dia. as contained in the export products. 3. QuanƟƟy of import item at from Sl. No 1 to be allowed as applied for i.e. 5.076 MT inclusive of a wastage of 5 %. 4. Weights of 396 Kgs., 174 Kgs. & 1044 Kgs. to be specified with the quanƟƟes of import items at Sl. Nos. 2, 5 & 6 respecƟvely and the same to be allowed on net to net basis. 5. QuanƟty of import item at Sl. No. 3 to be allowed as 8.312 MT inclusive of a wastage of 2%. 6. QuanƟty of import item at Sl. No. 4 to be allowed as 4.805 MT inclusive of a wastage of 3 %. 7. Import item at Sl. Nos. 7 to be allowed on net to net basis with accountability clause. 8. QuanƟty of import item at Sl. No. 8 to be allowed within 2 % of FOB value of exports. 63
Case No.:65/2/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00029/AM13/ RLA File :07/24/040/00481/AM12/ Lic.No/Date:0710086689 29.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DIT on 21.05.2012 and therefore decided to send a reminder DIT to expedite their comments. The case is to be re‐listed on 24.07.2012.
64
Case No.:71/2/80‐ALC2/2012
Party Name:AIR LIQUIDE ENGINEERING INDIA PVT LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00035/AM13/ RLA File :09/24/040/00558/AM12/ Lic.No/Date:0910051540 29.02.2012 Defer Date:24.07.2012 Decision : As per DIPP UO note dated 12.06.2012, the CommiƩee decided to call for the following 1. InformaƟon in respect of Sl. No. 3, 6, 8 & 9 of Standard Deficiency Format. 2. Basis/JusƟficaƟon for the quanƟty of import item at Sl. No. 21. 65
Case No.:6/6/80‐ALC2/2012
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00071/AM13/ RLA File :31/82/040/00381/AM12/ Lic.No/Date:3110053223 29.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the comments called for from DIT are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 66
Case No.:8/6/80‐ALC2/2012
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00073/AM13/ RLA File :31/82/040/00371/AM12/ Lic.No/Date:3110053224 29.02.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the comments called for from DIT are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 67
Case No.:49/2/80‐ALC2/2012
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00013/AM13/ RLA File :03/94/040/01065/AM12/ Lic.No/Date:0310684475 02.03.2012 Decision :Based on the wriƩen comments of DIPP received vide their UO Note dated 12.06.2012, the CommiƩee 1. QuanƟty of import item to be allowed as 67025 Kgs. inclusive of wastage of 9.7 % aŌer taking 1/3rd recovery. 68
Case No.:64/2/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00028/AM13/ RLA File :11/24/040/00057/AM12/ Lic.No/Date:1110026911 02.03.2012 Defer Date:24.07.2012
69
Case No.:18/6/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00083/AM13/ RLA File :09/24/040/00585/AM12/ Lic.No/Date:0910051583 02.03.2012 Defer Date:24.07.2012 Decision : The representaƟve of the DHI informed the CommiƩee that the case is under examinaƟon. The 70
Case No.:75/2/80‐ALC2/2012
Party Name:FOWLER WESTRUP (INDIA) PVT LTD ., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00039/AM13/ RLA File :07/24/040/00493/AM12/ Lic.No/Date:0710086774 05.03.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. 71
Case No.:47/2/80‐ALC2/2012
ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00011/AM13/ RLA File :05/23/040/00477/AM12/ Lic.No/Date:0510319555 06.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing 72
Case No.:55/2/80‐ALC2/2012
Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00019/AM13/ RLA File :05/23/040/00470/AM12/ Lic.No/Date:0510319710 06.03.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that a copy of firm’s reply dated 18.05.2012 has been sent to DIT for examinaƟon and comments and case is under examinaƟon with DIT. The case is to be re‐listed on 24.07.2012. 73
Case No.:47/6/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00112/AM13/ RLA File :61/24/040/00077/AM12/ Lic.No/Date:6110000793 06.03.2012 Defer Date:24.07.2012
Case No.:72/2/80‐ALC2/2012
Party Name:AIR LIQUIDE ENGINEERING INDIA PVT LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00036/AM13/ RLA File :09/24/040/00537/AM12/ Lic.No/Date:0910051622 07.03.2012 Defer Date:24.07.2012
74 Decision :As per DIPP UO note dated 12.06.2012, the CommiƩee decided to call for the following 1. InformaƟon in respect of Sl.No.3, 6, 8 & 9 of the Standard Deficiency Format. 2. InformaƟon in respect of Sl. No. 11 of Standard Deficiency Format for import item at Sl. No. 15. For net weight of components to be manufactured from this import item details of components with net weights thereof may be indicated 75
Case No.:73/2/80‐ALC2/2012
Party Name:AIR LIQUIDE ENGINEERING INDIA PVT LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00037/AM13/ RLA File :09/24/040/00588/AM12/ Lic.No/Date:0910051628 07.03.2012 Defer Date:24.07.2012 Decision : As per DIPP UO note dated 12.06.2012, the CommiƩee decided to call for the following 1. InformaƟon in respect of Sl. No. 3, 6, 8 & 9 of Standard Deficiency Format. 2. InformaƟon in respect of Sl. No. 11 of Standard Deficiency Format for import item at Sl. No. 17. For net weight of components to be manufactured from this import item details of components with net weights thereof may be indicated. 76
Case No.:57/2/80‐ALC2/2012
Party Name:EURO LABS Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00021/AM13/ RLA File :03/94/040/00990/AM12/ Lic.No/Date:0310685534 09.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 and 08.06.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. 77
Case No.:33/27/80‐ALC2/2011
Party Name:PRIJAI COOLTECH PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00566/AM12/ RLA File :03/95/040/01036/AM12/ Lic.No/Date:0310685704 12.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm has not replied to this office leƩer dated 21.05.2012 for furnishing 78
Case No.:74/2/80‐ALC2/2012
Party Name:EMMVEE SOLAR SYSTEMS PVT LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00038/AM13/ RLA File :07/24/040/00505/AM12/ Lic.No/Date:0710086964 13.03.2012 Defer Date:24.07.2012 Decision : As per DC(MSME) UO note No.30(165) 2011‐ME dated 01.06.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. Process of manufacturing the export product.
2. Process to be carried out on import item listed at Sl. No. 15 and 17 and where 1% wastage has been claimed. 79
Case No.:1/6/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00066/AM13/ RLA File :04/24/040/00326/AM12/ Lic.No/Date:0410134719 13.03.2012 Decision :Based on the wriƩen comments of DHI received vide their UO Note dated 12.06.2012, the CommiƩee decided to raƟfy the norms as per SION C‐1647 and balance items are as under:‐ 1. Item Nos. 1,2,3 – To be allowed at 1.02 kg/kg content. 2. Item No. 5 – As applied for. 3. Item Nos. 4, 6 to 11 – To be allowed on Net to Net basis with accountability clause. 80
Case No.:49/27/80‐ALC2/2011
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00582/AM12/ RLA File :31/82/040/00402/AM12/ Lic.No/Date:3110053387 14.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the comments called for from DIT are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 81
Case No.:20/6/80‐ALC2/2012
Party Name:UEM INDIA PVT.LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00085/AM13/ RLA File :05/24/040/00440/AM12/ Lic.No/Date:0510320150 14.03.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 25.05.2012 and decided to send a copy of firm’s applicaƟon to DIPP for examinaƟon and comments, the case pertains to them. The case is to be re‐ listed on 24.07.2012. 82
Case No.:58/2/80‐ALC2/2012
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00022/AM13/ RLA File :03/95/040/00920/AM12/ Lic.No/Date:0310686877 19.03.2012 Decision : Based on the wriƩen comments of DHI received vide their UO Note dated 12.06.2012 and taking clue from SION C1647, the CommiƩee decided to raƟfy the norms as under:‐ 1. Item Nos. 1,3 – To be allowed at 1.02 kg/kg content. 2. Item No. 2 – To be allowed at 1.05 kg/kg content. 3. Item No. 4, 5 – As applied for. 4. Item Nos. 6 – To be allowed as applied for.
83
Case No.:27/6/80‐ALC2/2012
ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00092/AM13/ RLA File :05/23/040/00504/AM12/ Lic.No/Date:0510320414 19.03.2012 Decision : Based on the wriƩen comments of DHI received vide their UO Note dated 12.06.2012 and taking clue from SION C‐1647, the CommiƩee decided to raƟfy the norms as under:‐ 1. Item Nos. 1 – To be allowed at 1.05 kg/kg content. 2. Item No. 2 to 13 – To be allowed on Net to Net with accountability. 84
Case No.:78/2/80‐ALC2/2012
Party Name:H.L.EQUIPMENTS Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00042/AM13/ RLA File :52/24/040/00053/AM12/ Lic.No/Date:5210038067 21.03.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm has not replied to this office leƩer dated 22.05.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. 85
Case No.:85/2/80‐ALC2/2012
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00049/AM13/ RLA File :06/24/040/00072/AM12/ Lic.No/Date:0610026318 21.03.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the comments called for from C&PC are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 86
Case No.:76/2/80‐ALC2/2012
Party Name:COOLDECK AQUA SOLUTIONS PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00040/AM13/ RLA File :03/94/040/00886/AM12/ Lic.No/Date:0310687589 22.03.2012 Defer Date:24.07.2012 Decision :As per C&PC UO note No.46011/61/2012‐P‐II dated28.05.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. Technical specificaƟons, % composiƟon (by weight) along with specific end use/applicaƟon and the copy of export order for the export product i.e. PVC DRIFT ELIMINATOR WITH BLADE SPACER may be furnished. 2. The item of export indicated is in Sq. Mtr. and the raw material applied is in weight. The weight per Sq. Mtr of the export product and raw material quanƟƟes on weight to weight basis may be furnished. 3. Details and quanƟty of other indigenous inputs to be used in the manufacture of the export product may be indicated. 4. Detailed manufacturing process along with jusƟficaƟon for wastage at each stage and also on each of the raw material may be furnished. 5. Complete material balance indicaƟng input and output material at each stage of manufacturing process. 6. Standard/authenƟc technical literature in support of the raw material requirement / formulaƟon for the manufacture of export product.
7. Details of producƟon of export product under reference (Both in Sq. Meter and weight) and corresponding consumpƟon of raw material in the year 2009‐10, 2010‐11 and 2011‐12 duly cerƟfied by CA may be furnished. If the producƟon has not commenced in the past, the details from commencement of producƟon may be furnished duly cerƟfied by CA. 8. Any other relevant informaƟon. 9. Small sample of the export product. 87
Case No.:28/6/80‐ALC2/2012
Party Name:HMT MACHINE TOOLS LIMITED, Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00093/AM13/ RLA File :09/24/040/00619/AM12/ Lic.No/Date:0910051867 22.03.2012 Defer Date: Decision :The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 25.05.2012 for examinaƟon and comments and case is under examinaƟon with DHI. The case is to be re‐listed on 24.07.2012. 88
Case No.:59/2/80‐ALC2/2012
Party Name:TERUMO PENPOL LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00023/AM13/ RLA File :53/24/040/00021/AM12/ Lic.No/Date:5310014856 23.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee decided to remind the RA (with a copy to the firm) to forward the firm’s applicaƟon at the earliest and on receipt forward the same to technical authority for examinaƟon and submission of comments. The case may be re‐listed on 24.07.2012. 89
Case No.:26/6/80‐ALC2/2012
Party Name:J PAN TUBULAR COMPONENTS PVT.LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00091/AM13/ RLA File :05/23/040/00497/AM12/ Lic.No/Date:0510320889 23.03.2012 Defer Date:24.07.2012 Decision :As per DIPP UO note dated 12.06.2012, the CommiƩee decided to call for the following 1. Specific list of export items with their respecƟve quanƟƟes. 2. Specific list of import items alongwith their quanƟƟes. 3. InformaƟon in respect of Sl. No. 3, 4, 5 & 11 of Standard Deficiency Format‐export product wise. 4. Basis for the requirement of import items alongwith a tabular statement giving net content of import items in different export products. 90
Case No.:21/6/80‐ALC2/2012
Party Name:MVS ENGINEERING LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00086/AM13/ RLA File :05/24/040/00460/AM12/ Lic.No/Date:0510320999 26.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 25.05.2012 and decided to send a copy of firm’s applicaƟon to DIPP for examinaƟon and comments, the case pertains to them. The case is to be re‐ listed on 24.07.2012.
Case No.:24/6/80‐ALC2/2012
Status:
91 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Deferred HQ File :01/80/050/00089/AM13/ RLA File :03/95/040/01000/AM12/ Lic.No/Date:0310687710 26.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 25.05.2012 and decided to send a copy of firm’s applicaƟon to DIPP for examinaƟon and comments, the case pertains to them. The case is to be re‐ listed on 24.07.2012. 92
Case No.:66/6/80‐ALC2/2012
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00131/AM13/ RLA File :34/24/040/00297/AM12/ Lic.No/Date:3410033688 27.03.2012 Decision : On the recommendaƟon of DHI representaƟve present in the meeƟng, the CommiƩee decided to raƟfy norms of subject authorizaƟon under GN4 with accountability clause. RLA may take necessary acƟon accordingly. 93
Case No.:4/6/80‐ALC2/2012
Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00069/AM13/ RLA File :05/23/040/00528/AM12/ Lic.No/Date:0510321260 28.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DIT on 11.06.2012 and case is under examinaƟon with DIT. The case is to be re‐listed on 24.07.2012. 94
Case No.:19/6/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00084/AM13/ RLA File :04/24/040/00344/AM12/ Lic.No/Date:0410135129 28.03.2012 Decision : Based on the wriƩen comments of DHI received vide their UO Note dated 12.06.2012 and taking clue from SION C‐1647, the CommiƩee decided to raƟfy the norms as under:‐ 1. Item Nos. 1,2,3 – To be allowed at 1.02 kg/kg content. 2. Item No. 5 – As applied for 3. Item Nos. 4,6 to 11 – To be allowed on Net to Net with accountability. 95
Case No.:22/6/80‐ALC2/2012
Party Name:MVS ENGINEERING LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00087/AM13/ RLA File :05/24/040/00466/AM12/ Lic.No/Date:0510321214 28.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 25.05.2012 and decided to send a copy of firm’s applicaƟon to DIPP for examinaƟon and comments, the case pertains to them. The case is to be re‐
listed on 24.07.2012. 96
Case No.:54/6/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00119/AM13/ RLA File :09/24/040/00615/AM12/ Lic.No/Date:0910051930 28.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 11.06.2012 and case is under examinaƟon with DHI. The case is to be re‐listed on 24.07.2012. 97
Case No.:69/6/80‐ALC2/2012
Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00134/AM13/ RLA File :05/23/040/00538/AM12/ Lic.No/Date:0510321283 28.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DIPP on 11.06.2012 and case is under examinaƟon with DIPP. The case is to be re‐listed on 24.07.2012. 98
Case No.:29/6/80‐ALC2/2012
Party Name:BALAJI PRESSURE VESSELS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00094/AM13/ RLA File :09/24/040/00643/AM12/ Lic.No/Date:0910051947 29.03.2012 Defer Date:24.07.2012 Decision : As per DHI UO note No.3(67)/12‐TSW(B)/235 dated 15.06.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. ClarificaƟon how one number each of import item No. 1 & 2 will be used to manufacture two numbers of export product. 2. Placement of import item along with catalogue of export product. 99
Case No.:35/6/80‐ALC2/2012
Party Name:WELD FUSE PVT. LTD . Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00100/AM13/ RLA File :09/24/040/00650/AM12/ Lic.No/Date:0910051943 29.03.2012 Defer Date:24.07.2012 Decision :On the recommendaƟon of DIPP representaƟve present in the meeƟng, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. InformaƟon in respect of Sl.No.4 & 5 of the Standard Deficiency Format, export product wise. 100
Case No.:44/6/80‐ALC2/2012
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00109/AM13/ RLA File :34/24/040/00299/AM12/ Lic.No/Date:3410033742 29.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DIPP on 25.05.2012 and case is under examinaƟon with DIPP. The case is to be re‐listed on 24.07.2012.
101
Case No.:45/6/80‐ALC2/2012
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00110/AM13/ RLA File :34/24/040/00300/AM12/ Lic.No/Date:3410033743 29.03.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DIPP on 25.05.2012 and case is under examinaƟon with DIPP. The case is to be re‐listed on 24.07.2012. 102
Case No.:37/6/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00102/AM13/ RLA File :04/24/040/00353/AM12/ Lic.No/Date:0410135251 30.03.2012 Decision :Based on the wriƩen comments of DHI received vide their UO Note No.3(73)/2012‐TSW(B) dated 12.06.2012, the CommiƩee decided to raƟfy the norms in respect of the subject advance authorizaƟon as under:‐ 1. Export Product : 4 x 250 MW Shree Singaji TPP (Wt 5819 MT per unit) Dampers/Gate (34/34) ESP(2), I.D. Fans (8) per Boiler 2. Inputs : Sl. No. Item Total QuanƟty in MT including (% wastage) 1 CS Coil/Plates 3616 (3%) 2 AS Plate 654.80 (2.7%) 3 Haste Alloy Sheet 6(2%) 4 CS Pipes Seamless 930 (2%) 5. SS Wire/ Rounds 76.5 (2.5%) 3. Item 23 – To be allowed with accountability clause. 4. Remaining items are allowed with accountability clause and nil wastage. 103
Case No.:38/6/80‐ALC2/2012
Party Name:BRAKES INDIA LIMITED, Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00103/AM13/ RLA File :04/24/040/00284/AM12/ Lic.No/Date:0410135253 30.03.2012 Decision : Based on the wriƩen comments of DHI received vide their UO Note No.3(67)/11‐TSW(B)/227 dated 12.06.2012, the CommiƩee decided to raƟfy the norms in respect of the subject advance authorizaƟon as per GN‐ 4 for Engineering Products.
Case No.:39/6/80‐ALC2/2012
Party Name:KRAMSKI STAMPING AND MOLDING INDIA PRIVATE LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred
104 HQ File :01/80/050/00104/AM13/ RLA File :04/24/040/00318/AM12/ Lic.No/Date:0410135264 30.03.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm’s applicaƟon has been sent to DIPP on 25.05.2012 and case is under examinaƟon with DIPP. The case is to be re‐listed on 24.07.2012. 105
Case No.:25/6/80‐ALC2/2012
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00090/AM13/ RLA File :03/95/040/01052/AM12/ Lic.No/Date:0310689351 02.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 25.05.2012 and therefore decided to send a copy of firm’s applicaƟon to DIPP for examinaƟon and comments, the case pertains to them. The case is to be re‐listed on 24.07.2012. 106
Case No.:3/6/80‐ALC2/2012
Party Name:BOYSEN INDIA LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00068/AM13/ RLA File :05/23/040/00542/AM12/ Lic.No/Date:0510321695 03.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 25.05.2012 for examinaƟon and comments and case is under examinaƟon with DHI. The case is to be re‐listed on 24.07.2012. 107
Case No.:36/6/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00101/AM13/ RLA File :04/24/040/00321/AM12/ Lic.No/Date:0410135327 04.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 25.05.2012 for examinaƟon 108
Case No.:40/2/80‐ALC2/2012
Party Name:TELCO CONSTRUCTION EQUIPMENT CO. LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00004/AM13/ RLA File :03/95/040/00876/AM12/ Lic.No/Date:0310690133 10.04.2012 Decision : On the recommendaƟon of DHI representaƟve present in the meeƟng, the CommiƩee decided to raƟfy norms of subject authorizaƟon under GN4 with accountability clause. RLA may take necessary acƟon accordingly. 109
Case No.:41/2/80‐ALC2/2012
Party Name:TELCO LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00005/AM13/ RLA File :03/95/040/00909/AM12/ Lic.No/Date:0310690153 10.04.2012
Decision : On the recommendaƟon of DHI representaƟve present in the meeƟng, the CommiƩee decided to raƟfy norms of subject authorizaƟon under GN4 with accountability clause. RLA may take necessary acƟon accordingly. 110
Case No.:42/2/80‐ALC2/2012
Party Name:TELCO LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00006/AM13/ RLA File :03/95/040/00899/AM12/ Lic.No/Date:0310690158 10.04.2012 Decision : On the recommendaƟon of DHI representaƟve present in the meeƟng, the CommiƩee decided to raƟfy norms of subject authorizaƟon under GN4 with accountability clause. RLA may take necessary acƟon accordingly. 111
Case No.:11/6/80‐ALC2/2012
Party Name:POLY MEDICURE LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00076/AM13/ RLA File :05/24/040/00473/AM12/ Lic.No/Date:0510321942 10.04.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that comments called for from C&PC are yet to be received and decided to remind to expedite their comments. The case is to be re‐listed on 24.07.2012. 112
Case No.:42/6/80‐ALC2/2012
Party Name:VIJAYJYOT SEATS PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00107/AM13/ RLA File :34/24/040/00274/AM12/ Lic.No/Date:3410033796 10.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DIPP on 11.06.2012 for examinaƟon and comments and case is under examinaƟon with DIPP. The case is to be re‐listed on 24.07.2012. 113
Case No.:43/6/80‐ALC2/2012
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00108/AM13/ RLA File :34/24/040/00001/AM13/ Lic.No/Date:3410033799 10.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 25.05.2012 for examinaƟon 114
Case No.:43/2/80‐ALC2/2012
Party Name:TELCO LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00007/AM13/ RLA File :03/95/040/01113/AM12/ Lic.No/Date:0310690286 11.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 11.06.2012 for examinaƟon
115
Case No.:44/2/80‐ALC2/2012
Party Name:TELCO LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00008/AM13/ RLA File :03/95/040/01120/AM12/ Lic.No/Date:0310690293 11.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 11.06.2012 for examinaƟon 116
Case No.:41/6/80‐ALC2/2012
Party Name:VIJAYJYOT SEATS PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00106/AM13/ RLA File :34/24/040/00276/AM12/ Lic.No/Date:3410033806 11.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DIPP on 11.06.2012 for examinaƟon and comments and case is under examinaƟon with DIPP. The case is to be re‐listed on 24.07.2012. 117
Case No.:46/6/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00111/AM13/ RLA File :61/24/040/00001/AM13/ Lic.No/Date:6110000809 11.04.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that import export data does not exist in the on line data and decided to remind RA to seek clarificaƟon from RA, Dehradun along with four sets of firm’s applicaƟon. The case is to be re‐listed on 24.07.2012. 118
Case No.:80/2/80‐ALC2/2012
Party Name:TELCO LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00044/AM13/ RLA File :03/95/040/01026/AM12/ Lic.No/Date:0310690503 12.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 11.06.2012 for examinaƟon 119
Case No.:81/2/80‐ALC2/2012
Party Name:TELCO CONSTRUCTION EQUIPMENT CO. LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00045/AM13/ RLA File :03/95/040/01033/AM12/ Lic.No/Date:0310690511 12.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 11.06.2012 for examinaƟon 120
Case No.:82/2/80‐ALC2/2012
Party Name:TELCO LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00046/AM13/ RLA File :03/95/040/01068/AM12/ Lic.No/Date:0310690518 12.04.2012 Defer Date:24.07.2012
Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 11.06.2012 for examinaƟon 121
Case No.:17/6/80‐ALC2/2012
Party Name:TERUMO PENPOL LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00082/AM13/ RLA File :53/24/040/00001/AM13/ Lic.No/Date:5310014913 12.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that comments called for from C&PC are yet to be received and decided to remind to expedite their comments. The case is to be re‐listed on 24.07.2012. 122
Case No.:23/6/80‐ALC2/2012
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00088/AM13/ RLA File :05/24/040/00005/AM13/ Lic.No/Date:0510322088 12.04.2012 Decision :Based on the wriƩen comments of DIPP received vide their UO Note dated 12.06.2012, the CommiƩee decided to raƟfy the norms on repeat basis as per Advance AuthorizaƟon No. 0510299295 dated 11.08.2011 raƟfied in Norms CommiƩee MeeƟng No. 02/80 dated 17/04/2012 as under:‐ 1. Net weight of export product to be specified as 653.6 Kgs. 2. QuanƟty of import item to be allowed as 5209 Kgs. inclusive of 697 % wastage aŌer taking 6% recovery from scrap. 123
Case No.:1/3/80‐ALC2/2012
Party Name:TELCO CONSTRUCTION EQUIPMENT CO. LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00050/AM13/ RLA File :03/95/040/01110/AM12/ Lic.No/Date:0310690682 13.04.2012 Decision : On the recommendaƟon of DHI representaƟve present in the meeƟng, the CommiƩee decided to raƟfy norms of subject authorizaƟon under GN4 with accountability clause. RLA may take necessary acƟon accordingly. 124
Case No.:2/3/80‐ALC2/2012
Party Name:TELCO LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00051/AM13/ RLA File :03/95/040/00978/AM12/ Lic.No/Date:0310690699 13.04.2012 Decision : On the recommendaƟon of DHI representaƟve present in the meeƟng, the CommiƩee decided to raƟfy norms of subject authorizaƟon under GN4 with accountability clause. RLA may take necessary acƟon accordingly.
Case No.:3/3/80‐ALC2/2012
Party Name:TELCO Meet No/Date:6/80‐ ALC2/2012 Status: Approved
125 LTD., 12.06.2012 HQ File :01/80/050/00052/AM13/ RLA File :03/95/040/00854/AM12/ Lic.No/Date:0310690701 13.04.2012 Decision : On the recommendaƟon of DHI representaƟve present in the meeƟng, the CommiƩee decided to raƟfy norms of subject authorizaƟon under GN4 with accountability clause. RLA may take necessary acƟon accordingly. 126
Case No.:2/6/80‐ALC2/2012
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00067/AM13/ RLA File :03/95/040/00923/AM12/ Lic.No/Date:0310690717 13.04.2012 Defer Date:24.07.2012 Decision :As per DIPP UO note dated 12.06.2012, the CommiƩee decided to call for the following 1. Net weight of indigenous items in the export product. 2. Basis for size of Clad Plate ( import item at Sl. No.2) required for the manufacture “Dished End & Toricone”, supported by the dimensions of “Dished End & Toricone”. 3. Weight of “Test coupons” at import item at Sl. No. 4 with jusƟficaƟon/basis for the quanƟty of “Test coupons”. 127
Case No.:55/6/80‐ALC2/2012
Party Name:TEXMACO RAIL & ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00120/AM13/ RLA File :02/24/040/00244/AM12/ Lic.No/Date:0210176496 13.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 04.06.2012 for examinaƟon 128
Case No.:5/6/80‐ALC2/2012
Party Name:ADORE MEDI PRIVATE LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00070/AM13/ RLA File :05/23/040/00529/AM12/ Lic.No/Date:0510322243 16.04.2012 Defer Date:24.07.2012 Decision :As per DC(MSME) UO note No.30(167) 2011‐ME dated 01.06.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. Drawing size and SpecificaƟon / Photo / Literature of Export Product indicaƟng details / size & specificaƟon of raw material used in its manufacturing. 2. Size/SpecificaƟons of imported inputs, jusƟfying its quanƟty. 3. Process to be carried out on import items and details of wastage involved stepwise. 4. Details of raw material required for each export product, with material balancing. 129
Case No.:61/6/80‐ALC2/2012
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred
HQ File :01/80/050/00126/AM13/ RLA File :07/24/040/00014/AM13/ Lic.No/Date:0710087715 16.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 04.06.2012 for examinaƟon 130
Case No.:63/6/80‐ALC2/2012
Party Name:AYAAPPA CNC PVT.LTD, Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00128/AM13/ RLA File :07/24/040/00013/AM13/ Lic.No/Date:0710087693 16.04.2012 Defer Date:24.07.2012 Decision : As per DC(MSME) UO note No.30(167) 2011‐ME dated 11.06.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. Name and weight of each export components. 2. Use of relaƟve raw material and its jusƟficaƟon for selecƟon in respect of size/SpecificaƟon and weight. 3. Process of manufacturing and stepwise wastage there in 4. Sample calculaƟon of weight of raw material. 5. Wastage jusƟficaƟon and scrap recovery and its uses. 6. InformaƟon in a tabulated form to calculate wastage. 131
Case No.:64/6/80‐ALC2/2012
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00129/AM13/ RLA File :07/24/040/00012/AM13/ Lic.No/Date:0710087716 16.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 04.06.2012 for examinaƟon 132
Case No.:14/6/80‐ALC2/2012
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00079/AM13/ RLA File :05/24/040/00015/AM13/ Lic.No/Date:0510322347 17.04.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that case is under examinaƟon with C&PC and decided to send a copy of firm’s applicaƟon to DIPP for examinaƟon and comments, case pertains to them. The case is to be re‐listed on 24.07.2012. 133
Case No.:33/6/80‐ALC2/2012
Party Name:POLY MEDICURE LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00098/AM13/ RLA File :05/24/040/00002/AM13/ Lic.No/Date:0510322342 17.04.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that comments called for from C&PC are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012.
Case No.:4/3/80‐ALC2/2012
Party Name:FINE PAC STRUCTURES PRIVATE LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred
134 HQ File :01/80/050/00053/AM13/ RLA File :31/83/040/00260/AM12/ Lic.No/Date:3110053821 18.04.2012 Defer Date:24.07.2012 Decision :On the recommendaƟon of DIPP representaƟve present in the meeƟng, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. InformaƟon in respect of Sl.No.4, 5 & 11 of the Standard Deficiency Format, export product wise. 135
Case No.:71/6/80‐ALC2/2012
Party Name:DONALDSON INDIA FILTER SYSTEMS PVT. LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00136/AM13/ RLA File :05/23/040/00534/AM12/ Lic.No/Date:0510322518 19.04.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm’s applicaƟon has been to DIPP on 04.06.2012 for examinaƟon and comments and therefore decided to send a copy of firm’s applicaƟon to C&PC, as the case pertains to them. The case is to be re‐listed on 24.07.2012. 136
Case No.:72/6/80‐ALC2/2012
Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00137/AM13/ RLA File :05/23/040/00014/AM13/ Lic.No/Date:0510322527 19.04.2012 Defer Date:24.07.2012 Decision :On the recommendaƟon of DIPP representaƟve present in the meeƟng, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. InformaƟon in respect of Sl.No.3, 4, 5 & 11 of the Standard Deficiency Format, export product wise. 137
Case No.:12/6/80‐ALC2/2012
Party Name:SIMMTRONICS SEMICONDUCTORS LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00077/AM13/ RLA File :05/24/040/00016/AM13/ Lic.No/Date:0510322931 23.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that comments called for from DIT are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 138
Case No.:13/6/80‐ALC2/2012
Party Name:SIMMTRONICS SEMICONDUCTORS LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00078/AM13/ RLA File :05/24/040/00026/AM13/ Lic.No/Date:0510322937 23.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that comments called for from DIT are yet to be received and decided to remind them to expedite their comments. The case is to be re‐listed on 24.07.2012. 139
Case No.:31/6/80‐ALC2/2012
Party Name:AKSH TECHNOLOGIES LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00096/AM13/ RLA File :05/23/040/00006/AM13/ Lic.No/Date:0510322974 23.04.2012 Defer Date:24.07.2012
Decision :The CommiƩee noted that the firm’s applicaƟon has been sent to DIT on 25.05.2012 for examinaƟon and comments and case is under examinaƟon with DIT. The case is to be re‐listed on 24.07.2012. 140
Case No.:60/6/80‐ALC2/2012
Party Name:WOLFRA‐ TECH PVT LTD Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00125/AM13/ RLA File :07/24/040/00391/AM12/ Lic.No/Date:0710087878 23.04.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DIPP on 11.06.2012 for examinaƟon and comments and case is under examinaƟon with DIPP. The case is to be re‐listed on 24.07.2012. 141
Case No.:68/6/80‐ALC2/2012
Party Name:LION HOLDINGS PRIVATE LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00133/AM13/ RLA File :05/23/040/00015/AM13/ Lic.No/Date:0510323034 24.04.2012 Defer Date:24.07.2012 Decision :As per DC(MSME) UO note No.30(176)/09‐ME dated 12.06.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. Weight of each export product. 2. Weight of all the components separately (for all the items) indicaƟng its raw material, both imported & indigenous. 3. Material Balancing showing weight of export product Vs total component’s weight. 4. Details drawing of export item with component diagram and list. 5. Drawing of imported inputs. 142
Case No.:30/6/80‐ALC2/2012
Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00095/AM13/ RLA File :05/23/040/00021/AM13/ Lic.No/Date:0510323233 26.04.2012 Defer Date:24.07.2012 Decision :On the recommendaƟon of DIPP representaƟve present in the meeƟng, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. InformaƟon in respect of Sl.No.3,4,5 & 11 of the Standard Deficiency Format, export product wise. 143
Case No.:56/6/80‐ALC2/2012
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00121/AM13/ RLA File :03/95/040/00003/AM13/ Lic.No/Date:0310692322 26.04.2012 Decision : Based on the wriƩen comments of DHI received vide their UO Note dated 12.06.2012 and taking clue from SION C 1647, the CommiƩee decided to raƟfy the norms as under:‐ 1. Item Nos. 1,2 – To be allowed at 1.02 kg/kg content. 2. Item No. 3 – To be allowed on Net to Net with accountability.
144
Case No.:57/6/80‐ALC2/2012
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00122/AM13/ RLA File :03/95/040/01098/AM12/ Lic.No/Date:0310692831 30.04.2012 Decision :Based on the wriƩen comments of DIPP received vide their UO Note dated 12.06.2012, the CommiƩee 1. Net empty weight of export product to be specified as 148 MT. 2. Import item at Sl. No. 1 to be of relevant grade and thickness as contained in the export product 3. Import item at Sl. No. 3 to be of relevant grade and dia. as contained in the export product. 4. QuanƟty of import item at from Sl. No 1 to be allowed as applied for i.e. 42000 Kgs.inclusive of a wastage of 5 %. 5. QuanƟty of import item at Sl. No. 2 to be allowed as 64 Nos. on net to net basis. However, duty free weight of this item to be allowed as 63.75 MT inclusive of 16.5 % wastage aŌer taking 20 5 recovery. 6. QuanƟty of import item at Sl. No. 3 to be allowed as 48862.18 Mtrs. (48 MT) inclusive of a wastage of 2%. 7. Weights of 3 MT & 3 MT to be specified with the quanƟƟes of import items at Sl. Nos. 4 & 5 respecƟvely and the same to be allowed on net to net basis. 8. QuanƟty of import item at Sl. No. 6 to be allowed. on net to net basis with accountability clause. 9. QuanƟƟes of import items at Sl. Nos. 7, 8 & 9 (welding Consumables) to be allowed as applied for i.e. 800 Kgs., 1200 Kgs. & 1200 Kgs. respecƟvely. 145
Case No.:51/6/80‐ALC2/2012
Party Name:STYL RITE OPTICAL INDUSTRIES Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00116/AM13/ RLA File :03/95/040/00007/AM13/ Lic.No/Date:0310693117 02.05.2012 Defer Date:24.07.2012 Decision :As per DC(MSME) UO note No.30(174) 20110ME dated 11.06.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and to re‐list the case on 24.07.2012: ‐ 1. Size and complete specificaƟon of each export product. 2. Process of manufacturing to be carried out on imported input. 3. Size and specificaƟon of both imported input. 146
Case No.:52/6/80‐ALC2/2012
Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00117/AM13/ RLA File :03/94/040/00042/AM13/ Lic.No/Date:0310693354 03.05.2012 Defer Date:24.07.2012 Decision :The CommiƩee Noted that the firm’s applicaƟon has been sent to DIPP on 04.06.2012 for examinaƟon and comments and case is under examinaƟon with DIPP. The case is to be re‐listed on 24.07.2012. 147
Case No.:73/6/80‐ALC2/2012
ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00138/AM13/ RLA File :05/23/040/00005/AM13/ Lic.No/Date:0510323889 03.05.2012 Defer Date:24.07.2012
Decision : The CommiƩee Noted that the firm’s applicaƟon has been sent to DHI on 04.06.2012 for examinaƟon and comments and therefore decided to send a copy of firm’s applicaƟon to DIPP for examinaƟon, case pertains to them. The case is to be re‐listed on 24.07.2012. 148
Case No.:62/6/80‐ALC2/2012
Party Name:BOSCH LIMITED, Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Approved HQ File :01/80/050/00127/AM13/ RLA File :07/24/040/00465/AM12/ Lic.No/Date:0710088039 04.05.2012 Decision : Based on the wriƩen comments of DHI received vide their UO Note dated 12.06.2012, the CommiƩee decided to raƟfy the norms for subject Advance AuthorizaƟon as under:‐ 1. Item Nos. 1 – To be allowed on Net to Net numbers with accountability. 2. Item No. 3 – To be allowed limited to 2% of FOB. 149
Case No.:58/6/80‐ALC2/2012
Party Name:KOPPERN MACO SERVICES PVT. LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00123/AM13/ RLA File :02/24/040/00004/AM13/ Lic.No/Date:0210177267 07.05.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that The firm’s applicaƟon has been sent to DHI on 04.06.2012 for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 150
Case No.:53/6/80‐ALC2/2012
ELECTRICALS LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00118/AM13/ RLA File :61/24/040/00003/AM13/ Lic.No/Date:6110000812 09.05.2012 Defer Date:24.07.2012 Decision :The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 11.06.2012 for examinaƟon and decided to forward a copy of firm’s applicaƟon to DIPP for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 151
Case No.:65/6/80‐ALC2/2012
Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00130/AM13/ RLA File :34/24/040/00032/AM13/ Lic.No/Date:3410034097 09.05.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 11.06.2012 for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 152
Case No.:74/6/80‐ALC2/2012
ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00139/AM13/ RLA File :05/23/040/00034/AM13/ Lic.No/Date:0510324258 09.05.2012 Defer Date:24.07.2012
Decision : The CommiƩee noted that the firm’s applicaƟon to be sent to DIPP, as case pertains to DIPP, for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 153
Case No.:75/6/80‐ALC2/2012
ENGINEERING LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00140/AM13/ RLA File :05/23/040/00031/AM13/ Lic.No/Date:0510324406 10.05.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 04.06.2012 for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 154
Case No.:59/6/80‐ALC2/2012
Party Name:AQUASUB ENGINEERING Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00124/AM13/ RLA File :32/24/040/00004/AM13/ Lic.No/Date:3210054368 11.05.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon to be sent to DIPP, as case pertains to DIPP, for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 155
Case No.:67/6/80‐ALC2/2012
Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00132/AM13/ RLA File :05/24/040/00480/AM12/ Lic.No/Date:0510324856 15.05.2012 Defer Date:24.07.2012 Decision : The CommiƩee noted that the firm’s applicaƟon has been sent to DHI on 04.06.2012 for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. 156
Case No.:34/6/80‐ALC2/2012
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00099/AM13/ RLA File :03/94/040/00032/AM13/ Lic.No/Date:0310695454 21.05.2012 Defer Date:24.07.2012 Decision : The CommiƩee decided to remind the RA (with a copy to the firm) to forward the firm’s applicaƟon at the earliest and on receipt forward the same to technical authority for examinaƟon and submission of comments. The case may be re‐listed on 24.07.2012. 157
Case No.:40/6/80‐ALC2/2012
Party Name:KONECRANES INDIA PRIVATE LIMITED Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00105/AM13/ RLA File :31/82/040/00032/AM13/ Lic.No/Date:3110054378 22.05.2012 Defer Date:24.07.2012 Decision : The CommiƩee decided to remind the RA (with a copy to the firm) to forward the firm’s applicaƟon at the earliest and on receipt forward the same to technical authority i.e. DIPP for examinaƟon and submission of comments. The case may be re‐listed on 24.07.2012.
Case No.:70/6/80‐ALC2/2012
Party Name:THE INDURE PVT. LTD Meet No/Date:6/80‐ ALC2/2012 Status: Deferred
158 12.06.2012 HQ File :01/80/050/00135/AM13/ RLA File :05/24/040/00020/AM13/ Lic.No/Date:0510325671 23.05.2012 Defer Date:24.07.2012 Decision :The CommiƩee Noted that the firm’s applicaƟon has been sent to DHI on 04.06.2012 for examinaƟon and comments. the case is to be re‐listed on 24.07.2012. 159
Case No.:48/6/80‐ALC2/2012
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:6/80‐ ALC2/2012 12.06.2012 Status: Deferred HQ File :01/80/050/00113/AM13/ RLA File :03/94/040/00088/AM13/ Lic.No/Date:0310696095 24.05.2012 Defer Date:24.07.2012 Decision : The CommiƩee decided to remind the RA (with a copy to the firm) to forward the firm’s applicaƟon at the earliest and on receipt forward the same to technical authority i.e. DIPP for examinaƟon and submission of comments. The case may be re‐listed on 24.07.2012. S.No.53
Case No. A/R‐ 117 M/s.
Thermax Ltd., F.No. 01/80/50/01034/AM09/DES.ILic.No. & Date MeeƟng No.06/13 RA F.No.31/21/040/00296/AM09 3110035317 dt.09.09.2008 Date: 12.06.2012 RaƟficaƟon of norms The CommiƩee noted that the firm has not replied to this office leƩer dated 04.06.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. S.No.54
Case No. A/R‐ 173 M/s.
Thermax Ltd., F.No. 01/80/50/01550/AM09/DES.ILic.No. & Date MeeƟng No.06/13 RA F.No.31/24/040/00296/AM09 3110036393 dt.09.09.2008 Date: 12.06.2012 RaƟficaƟon of norms The CommiƩee noted that the firm has not replied to this office leƩer dated 04.06.2012 for furnishing the informaƟon. The CommiƩee, therefore, decided to remind the firm for expediƟng the said informaƟon failing which their case will be rejected without any further noƟce. The case is to be re‐listed on 24.07.2012. S.No.55
Case No. A/R‐68
M/s. GEA BGR Energy System India Ltd., Chennai HQF.No.01/80/050/01097/AM08/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.04/24/040/00325/AM08 0410092981 dt.02.01.2008 Date: 12.06.2012 RaƟficaƟon of norms As per DHI UO note No.3(74)/10‐TSW(B)/233 dated 12.06.2012, the CommiƩee decided to call for the following 1. The firm to furnish part name & calculaƟon for item at Sl. No. 2,4 & 12 of the calculaƟon statement given. 2. The weights given in their reply at 06.07.2011 are not matching with the reply given by leƩer of dated 26.04.2012. S.No.56
Case No. A/R‐
144 M/s. Alstom Projects India HQF.No.01/80/050/00134/AM11/DES.I Lic. No. & date
Ltd., Vadodara MeeƟng No.06/13 RA.F.No.03/94/040/01139/AM10 0310567657 dt.31.03.2010 Date: 12.06.2012 FixaƟon of Norms The firm’s representaƟve Shri Subodh Kumar Arora, Head – Indirect TaxaƟon has aƩended the Personal Hearing and informed that their technical person was not available and has requested for another opportunity for Personal Hearing. The CommiƩee decided to grant the firm a final opportunity for personal hearing in the month of July’2012. The case is to be re‐listed on 24.07.2012. S.No.57
Case No. A/R‐
112 M/s. Bharat Heavy Electricals Ltd., Noida HQF.No.01/80/050/00575/AM10/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.05/23/040/00117/AM10 0510253818 dt.02.12.2009 Date: 12.06.2012 FixaƟon of Norms The CommiƩee noted that the PIC agenda along with main file has been sent to PRC/PIC SecƟon on 18.05.2012 for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. S.No.58 Case No. A/R‐167 Reference received from ECA‐I of M/s. Malwa Strips Pvt. Ltd., Dewas(MP) HQF.No.01/80/11/11/2011‐12/ECA‐ I/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.03/86/040/00090/Am06 03103345535 dt.15.06.2005 Date: 12.06.2012 ClarificaƟon of descripƟon of export product obligaƟon and actual exports are same and descripƟon in the same. The CommiƩee noted that the firm’s request has been sent to all technical authoriƟes on 22.05.2012 except MSME. M/o Steel has returned the same on 24.05.2012 and informed that the maƩer not concerned with M/o Steel. The CommiƩee, therefore, decided to remind all the Technical AuthoriƟes for expediƟng their comments. The case is to be re‐listed on 24.07.2012. S.No.58A
Case No. A/R‐
102 M/s.Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/01790/AM09/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.61/24/040/00069/AM09 6110000286 dt.06.02.2009 Date: 12.06.2012 RaƟficaƟon of norms The CommiƩee noted that the DO leƩer from DDG issued on 07.06.2012 for their comments and reply is sƟll awaited. The case is t be re‐listed on 24.07.2012. S.No.58B
Case No. A/R‐
37 M/s.Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/00143/AM11/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.61/24/040/00016/AM09 6110000447 dt.13.05.2010
Date: 12.06.2012 Revision of norms The CommiƩee noted that the DO leƩer from DDG issued on 07.06.2012 for their comments and reply is sƟll awaited. The case is t be re‐listed on 24.07.2012. S.No.59
Case No. A/R‐
09 M/s.Bharat Heavy Electricals Ltd., Bhopal HQF.No.01/80/050/00774/AM11/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.11/24/040/00060/AM11 1110023887 dt.10.01.2011 Date: 12.06.2012 FixaƟon of norms The CommiƩee noted that the firm’s request dated 10.04.2012 has been sent to DHI on 06.06.2012 for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. S.No.60
Case No. A/R‐
10 M/s. Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/00825/AM11/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.61/24/040/00078/AM11 6110000557 dt.03.02.2011 Date: 12.06.2012 FixaƟon of norms Based on the wriƩen comments of DHI received vide their UO Note No. 03(69)/10‐TSW(B)/416 dated 01.08.2011, the CommiƩee decided to raƟfy the norms on repeat basis as per Advance AuthorizaƟon No.6110000544 dated 04.01.2011 and import to be allowed proporƟonally to the export.. The RA may take necessary acƟon accordingly. S.No.61
Case No. A/R‐
11 M/s. Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/00819/AM11/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.61/24/040/00074/AM11 6110000553 dt.25.01.2011 Date: 12.06.2012 FixaƟon of norms Based on the wriƩen comments of DHI received vide their UO Note No. 03(69)/10‐TSW(B)/416 dated 01.08.2011, the CommiƩee decided to raƟfy the norms on repeat basis as per Advance AuthorizaƟon No.6110000544 dated 04.01.2011. Import to be allowed proporƟonally to the export.. The RA may take necessary acƟon accordingly. S.No.61A
Case No. A/R‐
12 M/s. FRICK India Ltd., New Delhi HQF.No.01/80/050/00405/AM12/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.05/23/040/00269/AM12 0510306601 dt.25.01.2011 Date: 12.06.2012 FixaƟon of norms
The CommiƩee noted that the firm’s request has been sent to DIPP on 07.06.2012. AŌer detailed discussion, the CommiƩee decided to ask the firm to appear in Personal Hearing to explain the ground of the export item is capital goods nature. The case is to be re‐listed on 24.07.2012. S.No.61B
Case No. A/R‐
13 M/s. Larsen & Toubro Ltd., Mumbai HQF.No.01/80/050/00437/AM11/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.03/95/040/00424/AM10 0310540959 dt.08.10.2008 Date: 12.06.2012 Request for amendment in descripƟon of export product Based on the wriƩen comments of DIPP received vide their UO Note dated 12.06.2012, the CommiƩee decided to raƟfy the norms the subject Advance AuthorizaƟon as under:‐ The descripƟon of export product to be modified as “Coke Drum ( R2200001 A/B/C/D) ” The RA may take necessary acƟon accordingly. S.No.61C
Case No. A/R‐
14 M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00317/AM12/DES.I Lic. No. & date MeeƟng No.06/13 RA.F.No.03/94/040/00446/AM12 0310654528 dt.19.09.2011 Date: 12.06.2012 Request for revision / amendment norms The CommiƩee noted that the firm’s request has been sent to DIPP on 07.06.2012 for examinaƟon and comments. The case is to be re‐listed on 24.07.2012. Sl.No.62
Case No. C ‐ 16
M/s. Birla Precision Technologies Ltd., Aurangabad HQ F.No.01/80/162/00608/AM11/ DES‐I MeeƟng No.06/13 FixaƟon of input output norms for the export product “Tool Holder” in respect of 100% EOU Date: 12.06.2012 As per DHI UO note No.1(8)/10/TSW(B)/213 dated 05.06.2012, the CommiƩee decided to call for the following informaƟon/clarificaƟon from the firm and forwarded a copy of DGFT leƩer dated 25.05.2012 to them for examinaƟon to re‐list the case on 24.07.2012: ‐ 1. Firm to be furnish a copy of ad‐hoc norms approved by the Development Commissioner of the EOU along with the specific metal of which the finished product is made. Sl.No.63
Case No.C‐01
M/s. Snecma Hal Aerospace Ltd., HQ F.No.01/80/162/00681/AM11/DES.I MeeƟng No.06/13 Date: 12.06.2012 FixaƟon of SION for Export Product “(Fluid System) – Air CraŌs Part. As per DC(MSME) UO note No.30(99) 2011‐ME dated 17.05.2012, the CommiƩee decided to call for the following 1. Firm to be furnish clear picture of the export product, its weight in kg,
2. Process of manufacturing being carried out on the pipes (Raw material used) and the net weight of export product. 3. The wastage may only be calculated aŌer having above details in respect of all export product. S.No.64
Case No.C‐38
M/s. Brady Company India Pvt. Ltd., Bangalore HQ F.No.01/80/162/01100/AM11/DES.I MeeƟng No.06/13 Date: 12.06.2012 FixaƟon of Input Output Norms for the export product “High Performance Electronic Trackers and Die‐cuts Parts” under 100% EOU – reg. The CommiƩee noted that C&PC deficiency leƩer dated 19.04.2012 has been sent to firm on 22.05.2012 and reply is sƟll awaited. The case is to be re‐listed on 24.07.2012. S.No.65
Case No.C‐39
Reference received from PC‐4(B) of M/s. MulƟ‐Serve Rolls Limited, Kolkata HQ F.No.01/94/180/00422/AM12/PC‐4(B)/DES.I MeeƟng No.06/13 Date: 12.06.2012 ClarificaƟon as whether the export product “Adamite Quality Roll” is covered under DEPB Sl. No. 571 of product Group “Engineering” (Product Code : 61) – reg. The CommiƩee noted that firm’s request has been sent to M/o Steel on 09.04.2012. Ministry of Steel informed on 08.06.2012, that the item “Steel Rolls” is covered under the purview of DIPP. The CommiƩee, therefore, decided to forward the firm’s request to DIPP for examinaƟon and comments. The case is to be re‐listed on 24.07.2012.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.