← Archive
IN FORCE Advance Authorisation

DGFT Minutes

Reliability

In force — no superseding record on file.

Document text

Ratified   Minutes of Meeting No.04/13 scheduled on 15.05.2012 of Norms Committee(NC­I) (DES.I Section)   The meeting No. 04/13 of the Norms Committee (NC­I) for the licensing year 2011­2012 was held on 15.05.2012  under  the  Chairmanship  of  Sh.  N.P.S.  Monga,  Additional    Director  General  of  Foreign  Trade  to consider  the  applications  under  Duty  Exemption  /  Remission  Schemes  (Chapter­4)  of  Foreign  Trade  Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh K.K. Tiwari I.A 476 23063321 Extn. DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 5. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B.   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: ­ 1

Case No.:31/23/80­ALC2/2009

Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00353/AM10/ RLA File :07/24/040/00651/AM09/ Lic.No/Date:0710066776 02.09.2009 Defer Date:26.06.2012 Decision :The Committee noted that RA, Bangalore has not replied to this office letter dated 05.03.2012 and decided to issue a DO reminder from DDG to clarify the details of both advance authorizations to process the case further. The case is to be re­listed on 26.06.2012.   2

Case No.:21/39/80­ALC2/2009

Party Name:VEM TECHNOLOGIES P.LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18.12.2009 Defer Date:26.06.2012 Decision  :  The  Committee  noted  the  reply  received  from  Dept  of  Defence  Production  vide  OM No.803/2011/D(EPC)  dated  16.4.2012  and  decided  to  send  a  copy  to  PC­IV  for  examination  and comments. The case is to be re­listed on 26.06.2012.   3

Case No.:18/15/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00225/AM11/ RLA File :04/24/040/00061/AM11/ Lic.No/Date:0410114584 15.06.2010 Defer Date:26.06.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 26.06.2012.

Case No.:32/31/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred

4 HQ File :01/80/050/00510/AM11/ RLA File :06/24/040/00028/AM11/ Lic.No/Date:0610018929 30.08.2010 Defer Date:26.06.2012 Decision  :  The  Committee  noted  the  reply  received  from  Dept  of  Defence  Production  vide  OM No.803/2011/D(EPC)  dated  16.4.2012  and  decided  to  send  a  copy  to  PC­IV  for  examination  and comments. The case is to be re­listed on 26.06.2012.   5

Case No.:26/40/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00876/AM11/ RLA File :09/24/040/00553/AM11/ Lic.No/Date:0910045827 07.03.2011   Decision  :  Based  on  the  written  comments  of  DHI    received    vide  their  UO  Note  No.3(42)/2010­ TSW(B)/Vol.­15 dated 15.05.2012, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Export Product : 2 x 150 MW STG, HE, HP 803 Bowl Mills (10 Nos) (wt: 562 MT per unit) for OPG Gujarat   2. Inputs   Sl. No. Item Quantity  in  MT  including  (% wastage) per set   For Steam Turbine   8 AS Rounds 10.37 (5%) 33 CS Pipes 7.65 (2%) 34 CS Plates 35.02 (5%) 127 SQ Wire 39.39 (1%) 128 SS Flats 20.43 (258%) 129 SS Pipes 7.65 (2%) 130 SS Rounds 1.76 (5%) 131 SS Strips 0.153 (2%)   For Heat Exchanger   203 CS Pipes 4.81 (2%) 204 CS Plates 30.11 (6%) 209 SS Pipes 0.208 (2%)   For generator   176 I beam profile 1.98 (2%) 67 Scraper fin profile 0.1 (2%) 68 Silver  Bearing  Copper Strip 7.86 (1%)   3. Sl. No. 165, 168, 169, 173 to 175, 179 to 181, 184 to 186, 190 and 191 are insulating materials and allowed at 2% of FOB value of the Generator. 4. Rest of the inputs are components to be allowed under net to net basis. 5. Bowl Mills – to be allowed  on net to net basis.   The RLA may take necessary action accordingly.   6

Case No.:28/40/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00878/AM11/ RLA File :05/23/040/00348/AM11/

Lic.No/Date:0510285314 08.03.2011 Defer Date:26.06.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 26.06.2012.   7

Case No.:2/6/80­ALC2/2011

Party Name:THE TATA POWER COMPANY LTD Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00079/AM12/ RLA File :07/21/040/00953/AM11/ Lic.No/Date:0710078147 21.03.2011 Defer Date:26.06.2012 Decision : The Committee noted that the comments called for from MIT are yet to be received and decided to send reminder to them for furnish their comments. The case is to be re­listed on 26.06.2012.   8

Case No.:29/3/80­ALC2/2011

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00034/AM12/ RLA File :05/24/040/00011/AM12/ Lic.No/Date:0510288857 27.04.2011   Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms on net­to­net basis.     9

Case No.:29/6/80­ALC2/2011

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00106/AM12/ RLA File :03/95/040/00177/AM12/ Lic.No/Date:0310634527 06.06.2011 Defer Date:26.06.2012 Decision :The Committee noted that a reminder letter issued  to the firm on 09.05.2012 and decided to await reply from the firm. The case is to be re­listed on 26.06.2012.   10

Case No.:26/9/80­ALC2/2011

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00194/AM12/ RLA File :05/23/040/00132/AM12/ Lic.No/Date:0510296453 13.07.2011 Defer Date:26.06.2012 Decision : The Committee noted that the comments called for from MIT are yet to be received and decided to send reminder to them for furnish their comments. The case is to be re­listed on 26.06.2012.   11

Case No.:1/18/80­ALC2/2011

Party Name:ASAHITEC STENCILS P.LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00355/AM12/ RLA File :04/24/040/00183/AM12/ Lic.No/Date:0410128353 21.09.2011   Decision :Based on the written comments of DC(MSME) received  vide their UO Note No. 30(96) 2011­ ME dated 09.04.2012, the Committee decided to ratify the norms on net to net basis with accountability clause. However,  Sl. No.8, Epoxy AB Glue to be allowed as applied for.  

12

Case No.:14/18/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00368/AM12/ RLA File :04/24/040/00146/AM12/ Lic.No/Date:0410128602 27.09.2011 Defer Date:26.06.2012 Decision : The Committee noted that the firm has not replied  vide this office  letter dated 10.05.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be re­listed on 26.06.2012.   13

Case No.:3/18/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00357/AM12/ RLA File :04/24/040/00095/AM12/ Lic.No/Date:0410129108 11.10.2011 Defer Date:26.06.2012 Decision : The Committee noted that the firm has not replied  vide this office  letter dated 10.05.2012 for information failing which their case will be rejected without any further notice. The case is to be re­listed on 26.06.2012.   14

Case No.:9/18/80­ALC2/2011

Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00363/AM12/ RLA File :05/24/040/00251/AM12/ Lic.No/Date:0510305773 18.10.2011 Defer Date:26.06.2012 Decision :The Committee noted that a copy of firms reply dated 23.03.2012 has been sent to Sh. S.S. Bose, DO, DIPP on 09.05.2012 for examination and comments. The case is to be re­listed on 26.06.2012.   15

Case No.:8/18/80­ALC2/2011

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00362/AM12/ RLA File :05/24/040/00249/AM12/ Lic.No/Date:0510306346 21.10.2011   Decision : As per written comments of DHI received vide letter dated 17.4.2012, the Committee decided to ratify  the  subject  authorization  on  repeat  basis  as  per  comments  of  Authorization  No.510258405  dated 12.2.2010 and allow 100% wastage per kg of Flat Steel Key.   RLA may take necessary action accordingly.   16

Case No.:6/21/80­ALC2/2011

Party Name:SATTVA ETECH INDIA PRIVATE LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00426/AM12/ RLA File :07/24/040/00296/AM12/ Lic.No/Date:0710083749 04.11.2011 Defer Date:26.06.2012 Decision :The Committee noted that the comments called for from MIT are yet  to be received and decided to remind them to expediting their comments. The case is to be re­listed on 26.06.2012.

Case No.:4/18/80­ALC2/2011

Party Name:COMAU INDIA P.LTD, Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00358/AM12/ RLA File :31/82/040/00187/AM12/

17 Lic.No/Date:3110051335 08.11.2011 Defer Date:26.06.2012 Decision :The Committee noted that the firm reply dated 19.04.2012 is incomplete and the firm did not furnish  description  of  all  items  with  justification.  Therefore  the  Committee  decided  to  ask  the  firm  to appear in Personal Hearing (PH) on 26.06.2012 alongwith details of inputs with description /specification  and justification for import of item 62 – Robots. The case is to be re­listed on 26.06.2012.   18

Case No.:8/21/80­ALC2/2011

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00428/AM12/ RLA File :07/24/040/00331/AM12/ Lic.No/Date:0710084167 22.11.2011 Defer Date:26.06.2012 Decision : The Committee noted that reminder has been issued to the firm on 09.05.2012 and decided to await the firms reply. The case is to be re­listed on 26.06.2012.   19

Case No.:15/25/80­ALC2/2011

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00494/AM12/ RLA File :07/24/040/00346/AM12/ Lic.No/Date:0710084374 02.12.2011 Defer Date:26.06.2012 Decision : The Committee noted that reminder has been issued to the firm on 09.05.2012 and decided to await the firms reply. The case is to be re­listed on 26.06.2012.   20

Case No.:16/25/80­ALC2/2011

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00495/AM12/ RLA File :34/24/040/00186/AM12/ Lic.No/Date:3410032547 14.12.2011 Defer Date:26.06.2012 Decision :The Committee noted that the comments called for from the C&PC are yet to be received and case is under examination with C&PC. The Committee, therefore decided to remind them for expediting their comments. The case is to be re­listed on 26.06.2012.   21

Case No.:27/45/81­ALC2/2011

Party Name:KERN­LIEBERS SPRINGS & STAMPINGS PVT.LTD, Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/81/050/00443/AM12/ RLA File :07/24/040/00367/AM12/ Lic.No/Date:0710084702 15.12.2011 Defer Date:26.06.2012 Decision :The Committee noted that the case has been transferred from DES­II section (NC­II) and that  the firm’s application has been sent to DHI on 22.03.2012. However, the Committee decided to send a copy of firm application to MSME for examination and comments, as the case pertains to them. The case is to be re­listed on 26.06.2012.   22

Case No.:31/25/80­ALC2/2011

Party Name:DAYCO VIKAS POWER TRANSMISSION PVT. LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00510/AM12/ RLA File :05/23/040/00348/AM12/ Lic.No/Date:0510311317 15.12.2011 Defer Date:26.06.2012 Decision :The  Committee  noted  that  a  copy  of  firms  reply  dated  27.03.2012  has  been  sent  to  DHI  on 09.05.2012 for examination and comments. The case is to be re­listed on 26.06.2012.

Case No.:4/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:4/80­ ALC2/2012 Status: Approved

23 15.05.2012 HQ File :01/80/050/00483/AM12/ RLA File :07/24/040/00364/AM12/ Lic.No/Date:0710084747 16.12.2011   Decision :Based on the written comments of DIT received  vide their UO Note No.17(21)/2012­IPHW dated 02.04.2012, the Committee  decided to ratify the norms on net to net basis with accountability clause.     24

Case No.:34/45/81­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/81/050/00450/AM12/ RLA File :11/24/040/00042/AM12/ Lic.No/Date:1110026417 20.12.2011 Defer Date:26.06.2012 Decision  :  The  Committee  noted  that  a  copy  of  firm  reply  dt.13.06.2012  to  forward  to  DIPP  for examination and comments. The case is to be re­listed on 26.06.2012.   25

Case No.:13/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00492/AM12/ RLA File :11/24/040/00046/AM12/ Lic.No/Date:1110026418 20.12.2011 Defer Date:26.06.2012 Decision : The Committee noted that the firm has not replied  vide this office  letter dated 10.05.2012 for information failing which their case will be rejected without further notice. The case is to be re­listed on 26.06.2012.   26

Case No.:14/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00493/AM12/ RLA File :11/24/040/00037/AM12/ Lic.No/Date:1110026416 20.12.2011 Defer Date:26.06.2012 Decision : The Committee noted that the firm has not replied  vide this office  letter dated 10.05.2012 for information failing which their case will be rejected without further notice. The case is to be re­listed on 26.06.2012.   27

Case No.:25/25/80­ALC2/2011

Party Name:WELD FUSE PVT. LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00504/AM12/ RLA File :09/24/040/00424/AM12/ Lic.No/Date:0910050303 20.12.2011   Decision : Based on the written comments of DIPP received  vide their UO Note dated 15.05.2012,  the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Net weight of export product to be specified as “40942 Kgs. containing 20294 Kgs. of Galvanised wire” 2. Word “Relevant” to be prefixed with the description of import item at Sl. No. 1 and its quantity to be allowed as applied for i.e. 20948 inclusive of 1% wastage.  

28

Case No.:26/25/80­ALC2/2011

Party Name:GLOBE HI­FABS Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00505/AM12/ RLA File :05/23/040/00358/AM12/ Lic.No/Date:0510311818 20.12.2011 Defer Date:26.06.2012 Decision : The Committee noted that reminder has been issued to the firm on 10.05.2012 and decided to await the firms reply. The case is to be re­listed on 26.06.2012.   29

Case No.:40/25/80­ALC2/2011

Party Name:VITROMED HEALTHCARE Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00519/AM12/ RLA File :05/24/040/00287/AM12/ Lic.No/Date:0510311874 20.12.2011 Defer Date:26.06.2012 Decision : The Committee noted that the comments called for from the C&PC are yet to be received and case is under examination with C&PC. The Committee, therefore decided to remind them for expediting their comments. The case is to be re­listed on 26.06.2012.   30

Case No.:3/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00482/AM12/ RLA File :07/24/040/00337/AM12/ Lic.No/Date:0710084945 22.12.2011   Decision : Based on the written comments of DIT received  vide their UO Note No.17(22)/2012­IPHW dated 02.04.2012, the Committee decided to ratify the norms on net to net basis with accountability clause.     31

Case No.:7/25/80­ALC2/2011

Party Name:H.L.EQUIPMENTS Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00486/AM12/ RLA File :52/24/040/00044/AM12/ Lic.No/Date:5210037543 27.12.2011   Decision :Based on the written comments of DIPP received  vide their UO Note dated 15.05.2012, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Net weights of 75.6 MT, 7.5 MT & 19.3 MT  to  be specified with quantities of export products at Sl. No. 1, 2 & 3 respectively. 2. Word ‘Relevant” to be prefixed  with the description of import items at      Sl. No. 1, 2 & 4. 3. Quantity of import item at Sl. No. 1 to be allowed as 15107  Kgs inclusive of    5 % wastage. 4.  Quantity of import item at Sl. No. 2 to be allowed as 208 Kgs. inclusive of 2 % wastage. 5.  Quantity of import item at Sl. No. 3 to be allowed as 325 Kgs. 6. Quantity of import item at Sl. No. 4 to be allowed as 2016 Kgs. on net to net basis.     32

Case No.:9/25/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00488/AM12/ RLA File :03/95/040/00690/AM12/ Lic.No/Date:0310673188 28.12.2011 Defer Date:26.06.2012

Decision  :As  per  DIPP  UO  note  dated  15.05.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  26.06.2012: ­   1. Quantities of Test Coupons at Sl. No. 4 & 5 of list of import items in nos. and Kgs. 2. Justification for the quantities of Test Coupons.

Case No.:10/25/80­ALC2/2011

Party Name:GENSER AEROSPACE & INFORMATION TECHNOLOGIES P.LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00489/AM12/ RLA File :07/24/040/00393/AM12/ Lic.No/Date:0710085074 29.12.2011 Defer Date:26.06.2012 Decision  :  The  Committee  noted  that  the  firm  has  replied  to  this  office    letter  dated  10.05.2012  for information failing which their case will be rejected without any further notice. The case is to be re­listed on 26.06.2012.   34

Case No.:37/25/80­ALC2/2011

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00516/AM12/ RLA File :05/23/040/00368/AM12/ Lic.No/Date:0510312789 29.12.2011   Decision  :Based  on  the  recommendation  of  DC(MSME)  representative  present  in  the  meeting,  the Committee decided to ratify the norms on repeat basis as per comments in AA Nos. 0510299788 dated 18.08.2011 and 0510299789 dated 18.08.2011, at 1.07 kg/kg content of antimony in antimony concentrate.     35

Case No.:8/25/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00487/AM12/ RLA File :03/95/040/00749/AM12/ Lic.No/Date:0310673619 30.12.2011 Defer Date:26.06.2012 Decision :The Committee noted that a copy of firm’s reply dated 30.03.2012 has  been  sent to DHI on 09.05.2012 and case is under examination with DHI. The case is to be re­listed on 26.06.2012.   36

Case No.:6/25/80­ALC2/2011

Party Name:AUROLAB Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00485/AM12/ RLA File :35/24/040/00029/AM12/ Lic.No/Date:3510036982 02.01.2012 Defer Date:26.06.2012 Decision :The Committee noted that the comments called for from C&PC are yet to be received and case is under  examination  with  C&PC.  The  committee  therefore  decided  to  remind  them  to  expediting  their comments. The case is to be re­listed on 26.06.2012.

Case No.:39/25/80­ALC2/2011

Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00518/AM12/ RLA File :05/23/040/00374/AM12/ Lic.No/Date:0510313236 03.01.2012   Decision :Based on the written comments of DIPP received  vide their UO Note dated 15.05.2012, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­

37   1.      Net empty weight of 25 MT & 25 MT to be specified with the quantities of export products at Sl. No. 1 & 2 respectively. 2.      Word “Relevant” to be prefixed with the description of import items at Sl. Nos. 1 & 5. 3.      Quantity of import item at Sl. No. 1 to be allowed as 9800 Kgs. inclusive of 12.8 % wastage after 1/3rd recovery. 4.      Quantity of import item at Sl. No. 2 to be allowed as 2 Nos. on net to net basis. However, duty free weight of this item to be allowed as 4518 Kg inclusive of 20.7 % wastage after 20 % recovery. 5.      Quantity of import item at Sl. No. 3 to be allowed as 2 Nos. on net to net basis. However, duty free weight of this item to be allowed as 3312 Kg inclusive of 54.9 % wastage after 20 % recovery. 6.      Quantity of import item at Sl. No. 4 to be allowed as 2 Nos. on net to net basis. However, duty free weight of this item to be allowed as 2946 Kg inclusive of 54.2 % wastage after 20 % recovery. 7.      Quantity of import item at Sl. No. 5 to be allowed as 18580 Kgs. (24167.6 Mtrs.) on net to net basis as claimed by the applicant.     38

Case No.:22/25/80­ALC2/2011

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00501/AM12/ RLA File :06/24/040/00055/AM12/ Lic.No/Date:0610025438 10.01.2012   Decision :Based on the written comments of C&PC received  vide their OM No.46011/169/2004­PC­II dated  09.04.2012,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization  as under:­   Item to be exported Quantity 1.  For  1  kg  weight  of  Parts/Components  of Polypropylene Impact Co­polymer 1 No. (i)                                 Polypropylene  Impact  Co­ polymer (ii)               Master Batch/ Color Concentrate 1.03 kg 0.02 kg 2. For 1 kg Weight of Parts/ Components of Polyamide 66 Resin   (i)                 Polyamide 66 Resin (ii)               Master Batch. Color Concentrate 1.03 kg 0.02 kg 3. M6 Screw Net to Net     39

Case No.:19/25/80­ALC2/2011

Party Name:CANALAIR AIR SOLUTIONS PRIVATE LIMITED, Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00498/AM12/ RLA File :32/21/040/00113/AM12/ Lic.No/Date:3210052122 11.01.2012 Defer Date:26.06.2012 Decision  :As  per  DIPP  UO  note  dated  15.05.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  26.06.2012: ­   1.      Details of manufacturing  activities/operations involved 2.      Information in respect of Sl. No.11 of Standard Deficiency Format for import item at Sl. No.1. For net weight of components to be manufactured from this import item, details of components with net weights thereof may be indicated

3.      Detailed calculations for the quantity of import item at Sl. No. 2 supported by the length and number of tubes in the export product namely, Automatic Rotary Filter.   40

Case No.:18/25/80­ALC2/2011

Party Name:DELKOR TECHNIK INDIA P.LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00497/AM12/ RLA File :07/24/040/00409/AM12/ Lic.No/Date:0710085428 12.01.2012 Defer Date:26.06.2012 Decision :The Committee noted that DL has been issued to the firm on 10.05.2012 and decided to await reply of the firm. The case is to be re­listed on 26.06.2012.   41

Case No.:35/25/80­ALC2/2011

Party Name:OM METALS INFRAPROJECTS LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00514/AM12/ RLA File :05/24/040/00353/AM12/ Lic.No/Date:0510314332 12.01.2012 Defer Date:26.06.2012 Decision :The Committee noted that a copy of reply dated 24.04.2012 has been sent to DHI on 09.05.2012 and case is under examination with DHI. The case is to be re­listed on 26.06.2012.   42

Case No.:3/51/81­ALC2/2011

Party Name:AUTO COMP INDIA PVT. LTD Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/81/050/00490/AM12/ RLA File :31/83/040/00206/AM12/ Lic.No/Date:3110052368 13.01.2012 Defer Date:26.06.2012 Decision :The Committee noted that case has been  transfer from DES­II Section (NC­II) and  a copy of firm’s application has been forwarded to DHI for examination and comments. The case is to be re­listed on 26.06.2012.   43

Case No.:1/25/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00480/AM12/ RLA File :03/94/040/00914/AM12/ Lic.No/Date:0310679315 31.01.2012 Defer Date:26.06.2012 Decision  :  The  Committee  noted  that  the  firm  has  not  replied  this  office    letter  dated  10.05.2012  for information failing which their case will be rejected without any further notice. The case is to be re­listed on 26.06.2012.   44

Case No.:41/25/80­ALC2/2011

Party Name:ZIEMANN INDIA PRIVATE LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00520/AM12/ RLA File :31/83/040/00221/AM12/ Lic.No/Date:3110052821 07.02.2012 Defer Date:26.06.2012 Decision  :  The  Committee  noted  that  the  firm  has  not  replied  this  office    letter  dated  10.05.2012  for information failing which their case will be rejected without any further notice. The case is to be re­listed on 26.06.2012.

Case No.:42/25/80­ALC2/2011

Party Name:TEMA INDIA LIMITED Meet No/Date:4/80­ ALC2/2012 Status: Deferred

45 15.05.2012 HQ File :01/80/050/00521/AM12/ RLA File :03/95/040/00930/AM12/ Lic.No/Date:0310680916 08.02.2012 Defer Date:26.06.2012 Decision  :  The  Committee  noted  that  the  firm  has  not  replied  this  office    letter  dated  09.05.2012  for information failing which their case will be rejected without any further notice. The case is to be re­listed on 26.06.2012.   46

Case No.:43/25/80­ALC2/2011

Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00522/AM12/ RLA File :31/83/040/00218/AM12/ Lic.No/Date:3110052856 08.02.2012 Defer Date:26.06.2012 Decision : The Committee noted that RA has not replied this office letter dated 09.05.2012 and decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be re­ listed on 26.06.2012.   47

Case No.:8/1/80­ALC2/2012

Party Name:SAGE METALS LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00590/AM12/ RLA File :05/24/040/00396/AM12/ Lic.No/Date:0510317514 13.02.2012 Defer Date:26.06.2012 Decision : The Committee noted that RA has not replied this office letter dated 09.05.2012 and decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be re­ listed on 26.06.2012.   48

Case No.:7/1/80­ALC2/2012

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Approved HQ File :01/80/050/00589/AM12/ RLA File :05/23/040/00437/AM12/ Lic.No/Date:0510317713 14.02.2012   Decision :Based on the written comments of DC(MSME) received  vide their UO Note No.30(162)2011­ ME dated 02.05.2012, the Committee decided to ratify the norms at 1.07 Kg/Kg content of antimony in antimony concentrate, on repeat basis  as  per comments in AA Nos. 0510299788  dated  18.08.2011 and 0510299789 dated 18.08.2011.     49

Case No.:1/1/80­ALC2/2012

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00583/AM12/ RLA File :31/82/040/00406/AM12/ Lic.No/Date:3110053404 15.03.2012 Defer Date:26.06.2012 Decision : The Committee noted that the comments called for from MIT are yet to be received and the case is under examination with MIT. The Committee decided to remind them to expedite their comments. The case is to be re­listed on 26.06.2012.

Case No.:2/1/80­ALC2/2012

Status:

50 Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Deferred HQ File :01/80/050/00584/AM12/ RLA File :31/82/040/00385/AM12/ Lic.No/Date:3110053407 15.03.2012 Defer Date:26.06.2012 Decision : The Committee noted that the comments called for from DIT are yet to be received and the  case is under examination with DIT. The Committee decided to remind them to expedite their comments. The case is to be re­listed on 26.06.2012.   51

Case No.:3/1/80­ALC2/2012

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00585/AM12/ RLA File :03/95/040/01039/AM12/ Lic.No/Date:0310686540 15.03.2012 Defer Date:26.06.2012 Decision : The Committee noted that the firm has not replied to this office  letter dated 09.05.2012 for information failing which their case will be rejected without any further notice. The case is to be re­listed on 26.06.2012.    52

Case No.:4/1/80­ALC2/2012

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00586/AM12/ RLA File :31/82/040/00395/AM12/ Lic.No/Date:3110053419 19.03.2012 Defer Date:26.06.2012 Decision : The Committee noted that the comments called for from MIT are yet to be received and the  case is under examination with DIT. The Committee decided to remind them to expedite their comments. The case is to be re­listed on 26.06.2012.   53

Case No.:5/1/80­ALC2/2012

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00587/AM12/ RLA File :31/82/040/00393/AM12/ Lic.No/Date:3110053435 20.03.2012 Defer Date:26.06.2012 Decision : The Committee noted that the comments called for from MIT are yet to be received and the  case is under examination with MIT. The Committee decided to remind them to expedite their comments. The case is to be re­listed on 26.06.2012.   54

Case No.:6/1/80­ALC2/2012

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00588/AM12/ RLA File :31/82/040/00410/AM12/ Lic.No/Date:3110053447 21.03.2012 Defer Date:26.06.2012 Decision : The Committee noted that the comments called for from MIT are yet to be received and the  case is under examination with MIT. The Committee decided to remind them to expedite their comments. The case is to be re­listed on 26.06.2012.

Case No.:9/1/80­ALC2/2012

Party Name:PERMANENT MAGNETS LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00591/AM12/ RLA File :03/95/040/01065/AM12/

55 Lic.No/Date:0310687321 21.03.2012 Defer Date:26.06.2012 Decision :On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  26.06.2012: ­   1. Information in respect of Sl.No.3, 4, 5 & 11  of the Standard Deficiency Format.   56

Case No.:10/1/80­ALC2/2012

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00592/AM12/ RLA File :31/82/040/00401/AM12/ Lic.No/Date:3110053492 26.03.2012 Defer Date:26.06.2012 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 26.06.2012.   57

Case No.:1/4/80­ALC2/2012

Party Name:NEON INNOVATIVE PVT. LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00054/AM13/ RLA File :03/95/040/00049/AM13/ Lic.No/Date:0310691652 23.04.2012 Defer Date:   58

Case No.:2/4/80­ALC2/2012

Party Name:PERMANENT MAGNETS LIMITED Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00055/AM13/ RLA File :03/95/040/00018/AM13/ Lic.No/Date:0310691668 23.04.2012 Defer Date:   59

Case No.:3/4/80­ALC2/2012

Party Name:TELCO CONSTRUCTION EQUIPMENT CO. LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00056/AM13/ RLA File :03/95/040/00019/AM13/ Lic.No/Date:0310691949 24.04.2012 Defer Date:   60

Case No.:4/4/80­ALC2/2012

Party Name:TELCO CONSTRUCTION EQUIPMENT CO. LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00057/AM13/ RLA File :03/95/040/00015/AM13/ Lic.No/Date:0310691954 24.04.2012 Defer Date:

  61

Case No.:5/4/80­ALC2/2012

Party Name:TELCO CONSTRUCTION EQUIPMENT CO. LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00058/AM13/ RLA File :03/95/040/00017/AM13/ Lic.No/Date:0310691960 24.04.2012 Defer Date:   62

Case No.:6/4/80­ALC2/2012

Party Name:FENIX PROCESS TECHNOLOGIES PVT.LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00059/AM13/ RLA File :31/83/040/00012/AM13/ Lic.No/Date:3110053907 24.04.2012 Defer Date:   63

Case No.:7/4/80­ALC2/2012

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00060/AM13/ RLA File :03/94/040/01151/AM12/ Lic.No/Date:0310692031 25.04.2012 Defer Date: Decision  :The  Committee  noted  that  the  firm’s  application  has  been  sent  to  DIPP  on  11.05.2012  for examination  and  comments  and  case  is  under  examination  with  DIPP.  The  case  is  to  be  re­listed  on 26.06.2012.   64

Case No.:8/4/80­ALC2/2012

Party Name:UNI VTL ENGINEERING PVT. LTD. Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00061/AM13/ RLA File :03/95/040/00053/AM13/ Lic.No/Date:0310692316 26.04.2012 Defer Date:   65

Case No.:9/4/80­ALC2/2012

Party Name:GRIND MASTER MACHINES PVT.LTD., Meet No/Date:4/80­ ALC2/2012 15.05.2012 Status: Deferred HQ File :01/80/050/00062/AM13/ RLA File :03/94/040/00067/AM13/ Lic.No/Date:0310692741 30.04.2012 Defer Date: S.No.06

Case  No.    A  ­

09 M/s.  Jhagadia Copper Ltd.,   HQ F.No.01/80/162/00542/AM10/DES.I Lic.No. & Date

Meeting No.04/13  RA.F.No.34/24/039/00001/AM10 3410024795 dt.29.07.2009 Date: 15.05.2012 Ratification of norms   The  Committee  noted  that  the  firm  has  not  attended  PH.  However,  the  Committee  decided  to  give  a  final opportunity to the firm to attend Personal Hearing on 26.06.2012 to explain the details of the case in person. The case is to be re­listed on 26.06.2012.   S.No.07

Case No.  A ­ 14

M/s.  Larson  & Toubro Ltd.,   HQ F.No.01/80/162/00522/AM11/DES.I Lic.No. & Date Meeting No.04/13  RA.F.No.03/95/039/00004/AM10 0310541346 dt.12.10.2009 Date: 15.05.2012 Ratification of  norms   Based  on  the  written  comments  of  DHI  received    vide  their  UO  Note  No.  3(3)/11­TSW(B)/146  dated 17.04.2012, the Committee  decided to ratify the norms in respect of the subject Annual Advance Authorization  as under:­   1. Export Item   Ship Lift Transfer System – 1 set consisting of 1a. Hoists and accessories – 54 set 1b. Platform and accessories – 1 set 1c. Transfer System and accessories – 1 set 1d. Trolly and accessories – 60 set 1e. Control system – 1 set The total export weight 9838.7 MT (include spares) & the same to be incorporated in the licence.   2. Inputs   Sl. No. Item No. Item Recommendations 1. 1 CS Plate To  be  allowed  at  1.05  kg/  kg content in the export product 2. 2 Structural Section To  be  allowed  at  1.02  kg/  kg content in the export product 3. 3 Forged Components To  be  allowed  under  GN4 however, import weight 99 MT to be incorporated in the licence. 4. 11 Pipes To  be  allowed  at  1.02  kg/  kg content in the export product. 5. 14 Wire Rope on  net  to  net  basis  with accountability clause. 6. 18 Paints To be allowed within 2% of FOB Value of export. 7. 34 Wood To  be  allowed  at  1.02  kg/  kg content in the export product. 8. 4­10,  12  and 13, 15­17, 19­ 33, 35­38 Components To be allowed under GN 4.   The RA may take necessary action accordingly.

S.No.08

Case No.  A ­ 03

M/s.  Larson  & Toubro  Ltd., Mumbai   HQ F.No.01/80/162/00845/AM12/DES.I Lic.No. & Date Meeting No.04/13  RA.F.No.03/95/039/00001/AM12 0310643682 dt.21.07.2011 Date: 15.05.2012 Fixation  of  norms  for  annual requirement   The Committee noted that the letter dated 14.05.2012 received from the firm requesting to allow the submission of information before making the “Shipment” in terms of Para 4.24A(v) of HBP 2009­14 and decided to close the case. The firm may again make an application before making “Shipment” under Para 4.24A(v) of HBP Vol.­ I 2009­14.   The RA may take necessary action accordingly.   S.No.09

Case  No.    A  ­

16 M/s.  VA  Tech Escher  Wyss Flovel  Ltd., Faridabad   HQ F.No.01/80/050/00925/AM12/DES.I Lic.No. & Date Meeting No.04/13  RA.F.No.05/24/040/00940/Am07 0510100700 dt.20.02.2007 Date: 15.05.2012 Fixation of norms   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The Committee, therefore, decided to defer the case and to re­list the case on 26.06.2012.   S.No.10

Case No. A ­ 17

M/s.  VA  Tech Escher  Wyss Flovel  Ltd., Faridabad   HQ F.No.01/80/050/00927/AM12/DES.I Lic.No. & Date Meeting No.04/13  RA.F.No.05/24/040/00       /Am07 0510199824 dt.21.02.2007 Date: 15.05.2012 Fixation of norms   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The Committee, therefore, decided to defer the case and to re­list the case on 26.06.2012.   Sl.No.36

Case No.A/R­161

M/s. Thermax Ltd., HQ  F.No.01/80/050/01549/AM09/ DES­I Lic.No. & Date Meeting No.04/13 RA F.No.31/21/040/00295/AM09 3110036392 dt.11.12.2008 Date: 15.05.2012 Ratification of norms   Based on  the written comments of DHI received  vide their UO Note No.3(14)/10­TSW(B) dated 27.04.2012, the Committee decided to allow import item No.5 (file) at 76 MT with 5% wastage as applied by the firm. However, the Committee decided to maintain deletion of import item No. 14 as the firm informed vide their letter dated 06.03.2012 for deleting the same.   The RA may take necessary action accordingly.   S.No.37

Case No.A/R­57

M/s. Thermax Limited HQ  F.No.01/81/050/00310/AM06/ DES­I Lic.No. & Date Meeting No.04/13 RA F.No.31/24/040/00017/AM06 3110021206 dt.14.07.2005 Date: 15.05.2012 Revision of norms The Committee noted the written comments of DHI received vide their UO Note No.3(14)/10­TSW(B)/179  dated  07.05.2012  and  decided  to  allow  Sl.  No.  14  at  24  MT  of  refractory  material.  However,  thickness  of

refractory is 400 mm & density is 240 kg/meter cube to be incorporated in the license. The export weight is 671.37 MT to be incorporated in the license.     S.No.38

Case No.A/R­153

M/s.  Thermax Ltd., HQ F.No.01/81/162/00480/AM07/ DES­I Lic.No. & Date Meeting No.04/13 RA F.No.31/24/040/00186/AM07 3110026329 dt.04.09.2006 Date: 15.05.2012 Ratification  of  Norms   As  per  DHI  UO  note  No.3(14)/10­TSW(B)/178  dated  07.05.2012,  the  Committee  decided  to  call  for  the following information/clarification from the firm and to re­list the case on  26.06.2012: ­   1. The firm to give break up each item of import, net weight & gross weight of import.   S.No.39

Case No. A/R­ 168 M/s.

Godrej  & Boyce  Mfg.  Co. Ltd., Mumbai  F.No. 01/80/50/ 01741/AM09/DES.I Lic.No. & Date Meeting No.04/13 RA F.No.03/94/040/00798/AM09 0310497146 dt.10.12.2008 Date: 15.05.2012 Ratification of norms   The Committee decided to forward a copy of firms application to DIPP along with firm’s reply, as the case pertains to them. The case is to be re­listed on 26.06.2012.   S.No.40

Case No.A/R­01

M/s.  Larsen  & Toubro  Limited, Kanchipuram HQ F.No.01/80/162/01163/AM09/ DES­I Lic.No. & Date Meeting No.04/13 RA F.No.04/21/040/00103/AM12 0410124806 dt.10.06.2011 Date: 15.05.2012 Request  for  amendment  in  description of import item in advance authorization.   The Committee noted that the firm’s request has been sent to DHI for examination and comments and the case is under examination with DHI. However, the Committee also  decided to send a copy of firm’s request to M/o Steel for examination. The case is to be re­listed on 26.06.2012.   S.No.41

Case No.A/R­04

M/s.  Netafim Irrigation  India Ltd., Mumbai  HQ F.No.01/80/050/00162/AM11/ DES­I Lic.No. & Date Meeting No.04/13 RA F.No.34/24/040/00217/AM09 3410026833 dt.16.04.2010 Date: 15.05.2012 Ratification  of norms   The Committee noted that the comments called for from C&PC are yet to be received and therefore decided to send reminder to them for expediting their comments. The case is to be re­listed on 26.06.2012.     Sl.No.37

Case No. C­ 18

M/s.  Pipavav  Shipyards Ltd., Amreli F.No. 01/81/80/162/00612/AM11/DES.I Meeting No.04/13 Fixation  of  input  output  norms  in  respect  of 100% EOU for the export product “ Ship, Cargo Ships, Barges & Vessels for Transport, Factory Ship, Life Boats, Hulls and Vessels falls under Chapter 89 of ITC(HS) – reg. Date: 15.05.2012   The Committee noted that the case is under examination with M/o Shipping and therefore decided to issued a DO letter from DDG for their comments. The case is to be re­listed on 26.06.2012.   Sl.No.38

Case No.  C – 18

M/s.  Bhukanvala Diamond  Systems Pvt. Ltd., Navsari HQ F.No.01/80/162/00056/AM12/DES­I Meeting No.04/13 Request for fixation of Standard Input Output Norms (SION)  for  the  export  product  “Die  Sets  and  PVC Blister Moulds” in respect of 100% EOU Date: 15.05.2012

The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 26.06.2012.   Sl.No.39

Case No.  C – 33

M/s.  M+Acer  Automotive Systems  Pvt.  Ltd., Bangalore HQ F.No.01/80/162/00914/AM12/DES­I Meeting No.04/13 Fixation  of  Scrap/Wastage  norms  for  the  export product “Level Indicator Assembly” in respect  of 100% EOU. Date: 15.05.2012   The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 26.06.2012.   Sl.No.40

Case No.  C – 01

M/s.  Terumo  Penpol  Ltd., Trivandrum HQ F.No.01/80/050/00258/AM12/DES­I RA’s F. No.53/24/040/00011/AM12 Meeting No.04/13 Modification  of  SION  as  per  Para  4.9  of  HBP (Vol.­I) Date: 15.05.2012   The  Committee  noted  that  the  firm  has  not  replied  to  this  office  letter  dated  04.05.2012  for  furnishing  the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice. The case is to be re­listed on 26.06.2012.   Sl.No.41

Case No.  C – 36

M/s. PTC Industries Ltd., HQ F.No.01/80/162/00535/AM11/DES­I Meeting No.04/13 Clarification  on  admissibility  of  DEPB  benefit against export product “Hatch” used in Barges is covered  under  DEPB  Sl.No.530B  of    product code 61 – reg. Date: 15.05.2012   Based on comments received from IIT, Kanpur and DIPP comments received vide UO No. 12/9/2011­TSW/21 dated 26.03.2012, the Committee decided that the product “Hatch” is made by “Cold Forging Process”. PC[IV­ B] Section may take necessary action accordingly.   Sl.No.42

Case No.  C – 02

M/s. LEO Primecomp Pvt. Ltd., Puducherry HQ F.No.01/80/162/01253/AM12/DES­I   Meeting No.04/13 Request  of  input  output  norms  for  the  export product  “Automated  Teller  Machined”  in  respect of 100% EOU – reg. Date: 15.05.2012   As  per  DIPP  UO  note  dated  15.05.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on 26.06.2012: ­   1. A  copy  of  Ad­hoc  wastage  norms  fixed  by  the  O/o  Development  Commissioner,  MSEZ  along  with  a copy    of    Inspection  report  submitted  by  MSME­Development  Institute,  Chennai  to  Development Commissioner, Madras Special Economic Zone.


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6658 --apply.

Citation copied