DGFT Committee Minutes
Case No.:12/3/80ALC2/2011
Party Name:CHANG YUN INDIA LTD., Meet No/Date:3/80ALC2/2012 01.05.2012 Status: Deferred HQ File :01/80/050/00017/AM12/ RLA File :05/23/040/00022/AM12/ Lic.No/Date:0510288459 20 04 2011 Defer Date 12 06 2012 RATIFIED Minutes of Meeting No.03/13 scheduled on 01.05.2012 of Norms Committee (NCI) (DES.I Section) The meeting No. 03/13 of the Norms Committee (NCI) for the licensing year 201213 was held on 01.05.2012 under the Chairmanship of Sh. N.P.S. Monga, Additional Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure VolumeI. The following Members of the Committee were present in the meeting: Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh K. K.Tiwari. I.A. 476 23062622 DHI, U.B. 2. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 4. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B. I The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: 1
Case No.:2/27/80ALC2/2011
Party Name: INVENSYS INDIA PVT., LTD., 01.05.2012 Status: Approved HQ File :01/80/050/00535/AM12/ RLA File :03/94/040/00884/AM10/ Lic.No/Date:0310558330 03.02.2010 Decision : As per the written comments of DIT received vide their UO Note No.17(24)/2012IPHW dated 18.04.2012, the Committee decided to ratify the norms in respect of the subject advance authorization on net to net basis with accountability clause. The RLA may take necessary action accordingly. 2
Case No.:27/27/80ALC2/2011
Party Name: INVENSYS INDIA PVT. LTD., 01.05.2012 Status: Approved HQ File :01/80/050/00560/AM12/ RLA File :03/94/040/00893/AM11/ Lic.No/Date:0310610310 10.01.2011 Decision : As per the written comments of DIT received vide their UO Note No.17(23)/2012IPHW dated 18.04.2012 and decided to ratify the norms in respect of the subject advance authorization on net to net basis with accountability clause. 3
Case No.:31/39/80ALC2/2010
Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00833/AM11/ RLA File :31/24/040/00249/AM11/ Lic.No/Date:3110046929 15.02.2011 Defer Date 12.06.2012. Decision : Based on e.mail dated 24.2.2012 received from RA, Pune informing that advance authorization was issued as per GN4. The Committee decided to close the case in its meeting held on 20.3.2012. Subsequently, it was observed that item no. 2 & 6 are related to ‘Oil Product’ which may not be ratified under GN 4. The Committee in its meeting held on 1.5.2012, therefore, decided to inform the same to RA and request for 4 sets of firm’s application to the Committee for examination. The case is to be relisted on 15.06.2012. 4
Case No.:47/39/80ALC2/2010
Party Name: BOTIL OIL TOOLS INDIA PVT LTD 01.05.2012 Status: Approved HQ File :01/80/050/00849/AM11/ RLA File :05/23/040/00328/AM11/ Lic.No/Date:0510284479 22.02.2011 Decision : The Committee decided to ratify the norms of the subject authorization based on SubCommittee Report dated 31.3.2012(copy enclosed). 5
Case No.:48/39/80ALC2/2010
Party Name:BOTIL OIL TOOLS INDIA PVT LTD 01.05.2012 Status: Approved HQ File :01/80/050/00850/AM11/ RLA File :05/23/040/00330/AM11/ Lic.No/Date:0510284482 22.02.2011 Decision : The Committee decided to ratify the norms of the subject authorization based on SubCommittee Report dated 31.3.2012(copy enclosed). 6
Case No.:14/2/80ALC2/2011
Party Name:BOTIL OIL TOOLS INDIA PVT LTD 01.05.2012 Status: Approved HQ File :01/80/050/00935/AM11/ RLA File :05/23/040/00367/AM11/ Lic.No/Date:0510286717 23.03.2011 Decision : The Committee decided to ratify the norms of the subject authorization based on SubCommittee Report dated 31.3.2012(copy enclosed). 7
Case No.:13/5/80ALC2/2011
Party Name:TDW INDIA LTD., 01.05.2012 Status: Rejected HQ File :01/80/050/00049/AM12/ RLA File :34/24/040/00338/AM11/ Lic.No/Date:3410029836 01.04.2011 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dt.16.01.2012 and subsequent reminder 05.03.2012 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.
8 20.04.2011 12.06.2012. Decision : The Committee noted that DC( MSME) vide U.O.No.30/(137)11ME dated 29.03.2012 observed as follows: “It may be seen from the samples provided by the unit that unit is importing copper alloy rings to manufacture synchronizer rings, of different size/models, as per the advance authorisation. Various operation like forging, facing and threading etc. are being carried out on these. The unit is exporting three different typed synchronizer rings having different weight of blank as well of finished product. However the weight as shown in the advance authorisation/application and as shown in the reply differs together, which may be seen from the table below. s.no Export Product Wt of E.P in Kg as in authorisation Nos of Export product Wt per piece as shown in reply Total wt as arrived in Kg 01 Synchroniser Ring 10766 140000. 76.84 10,757.6 02 Synchroniser Ring 4508 140000 32.19 4506.6 03 Synchroniser Ring 11869.2 210000 56.488 11862.5 The Committee decided to seek a clarification along with information from the firm. The case is to be relisted on 12.06.2012. 9
Case No.:1/9/81ALC2/2011
Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. 01.05.2012 Status: Approved HQ File :01/81/050/00051/AM12/ RLA File :05/23/040/00054/AM12/ Lic.No/Date:0510290928 18.05.2011 Decision : Based on the written comments of C&PC received vide their O.M.No.46011/67/2010PC.II dated 02.04.2012 and decided to ratify the norms in respect of the subject advance authorization as under: Items to be exported Quantity Part of automobile: Connector Assembly 1 No. Raw–material Recommended for Import Quantity 1) Raw material recommended for one kg of Relevant Nylon Resin Content in export product i) Relevant Polyamide (Nylon)Resin ii) Master Batch 2. Relevant Metallic/nonmetallic components / parts 1.047 kg. 0.003 Kg. Net to Net RLA may take necessary action accordingly. 10
Case No.:9/11/80ALC2/2011
Party Name:ICEM ENGINEERING COMPANY PRIVATE LIMITED, 01.05.2012 Status: Deferred HQ File :01/80/050/00221/AM12/ RLA File :03/94/040/00270/AM12/ Lic.No/Date:0310638600 24.06.2011 Defer Date 12.06.2012. Decision : The Committee noted that the firm vide their email dated 30.4.2012 has requested for postponement of P.H. to 15.06.2012 instead of 01.05.2012. The Committee therefore decided to call the firm for PH on 12.06.2012 and to relist the case on 12.06.2012. 11
Case No.:24/11/80ALC2/2011
Party Name: POLMOR STEEL PVT LTD 01.05.2012 Status: Approved HQ File :01/80/050/00236/AM12/ RLA File :09/24/040/00140/AM12/ Lic.No/Date:0910047329 28.06.2011 Decision : :Based on the written comments of DC(MSME) received vide their UO Note No. 30(113) 2011ME dated 29.02.2012 and decided to ratify the norms in respect of the subject advance authorization as under: 1. Primary parts for battery box as per Annexure A of application to be allowed on NettoNet basis, without any wastage. 2. Item of import at Sl No 2 Welding Wire MIG wire to be allowed within 2% of weight of plates to be welded quantities of import to be amended as 292 Kg. 3. Item of import at Sl No 3 Abrasive Disc Dia 125mm, 40 grit to be allowed within 2% of FOB. 12
Case No.:17/8/80ALC2/2011
Party Name:BOTIL OIL TOOLS INDIA PVT LTD 01.05.2012 Status: Approved HQ File :01/80/050/00165/AM12/ RLA File :05/23/040/00127/AM12/ Lic.No/Date:0510295211 30.06.2011 Decision : The Committee decided to ratify the norms of the subject authorization based on SubCommittee Report dated 31.3.2012(copy enclosed). 13
Case No.:25/11/80ALC2/2011
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:3/80ALC2/2012 01.05.2012 Status: Deferred HQ File :01/80/050/00237/AM12/ RLA File :07/24/040/00104/AM12/ Lic.No/Date:0710080361 04.07.2011 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s reply dt.16.04.2012 sent to DIPP for examination and comments and the case is to be relisted on 12.06.2012. 14
Case No.:13/11/80ALC2/2011
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00225/AM12/ RLA File :09/24/040/00173/AM12/ Lic.No/Date:0910047823 22.07.2011 Defer Date 12.06.2012. Decision : The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 12.06.2012.
Case No.:8/14/80ALC2/2011
Party Name:MOTHERSON SUMI SYSTEMS LTD 01 05 2012 Status: Deferred
15 01.05.2012 Deferred HQ File :01/80/050/00262/AM12/ RLA File :05/24/040/00182/AM12/ Lic.No/Date:0510300205 24.08.2011 Defer Date 12.06.2012. Decision : The Committee observed that the comments called for from C&PC on 16.4.2012 are yet to be received. The Committee, therefore, decided to send D.O. reminder from DDG asking them to them for expediting their comments. The case may be relisted on 12.06.2012. 16
Case No.:11/14/80ALC2/2011
Party Name:HITTCO TOOLS LTD 01.05.2012 Status: Deferred HQ File :01/80/050/00265/AM12/ RLA File :07/24/040/00203/AM12/ Lic.No/Date:0710081769 25.08.2011 Defer Date 12.06.2012. Decision : The Committee noted that the firm has furnished an incomplete reply vide letter dated 27.02.2012 and did not furnish the following information: i) Export and Import Quantity in Nos. separately, ii) Sl.No.5&11 of SDF The Committee, therefore decided to ask the firm to appear in Personal Hearing along with above details to explain the case. The case is to be relisted on 12.06.2012. 17
Case No.:12/17/80ALC2/2011
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00331/AM12/ RLA File :61/24/040/00030/AM12/ Lic.No/Date:6110000675 29.08.2011 Defer Date 12.06.2012. Decision : The Committee noted that the case was referred to PIC for advice. The case is to be relisted on 12.06.2012. 18
Case No.:13/17/80ALC2/2011
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00332/AM12/ RLA File :61/24/040/00031/AM12/ Lic.No/Date:6110000676 29.08.2011 Defer Date 12.06.2012. Decision : The Committee noted that the case was referred to PIC for advice. The case is to be relisted on 12.06.2012. 19
Case No.:7/17/80ALC2/2011
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00326/AM12/ RLA File :04/24/040/00171/AM12/ Lic.No/Date:0410128753 30.09.2011 Defer Date 12.06.2012. Decision : The Committee noted that the firm has not replied to this office letter dated 04.04.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012. 20
Case No.:30/17/80ALC2/2011
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00349/AM12/ RLA File :11/24/040/00013/AM12/ Lic.No/Date:1110025819 30.09.2011 Defer Date 12.06.2012. Decision : The Committee noted that the firm has not replied to this office letter dated 04.04.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012. 21
Case No.:3/20/80ALC2/2011
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED 01.05.2012 Status: Rejected HQ File :01/80/050/00388/AM12/ RLA File :05/24/040/00229/AM12/ Lic.No/Date:0510304366 30.09.2011 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply to this office letter dt.07.03.2012 and subsequent reminder dated 12.04.2012 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. 22
Case No.:15/17/80ALC2/2011
Party Name:LARSEN & TOUBRO LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00334/AM12/ RLA File :03/95/040/00493/AM12/ Lic.No/Date:0310658143 05.10.2011 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012 and decided to ratify the norms in respect of the subject advance authorization as under: 1. Net export weight of 988 MT to be specified with the quantity of export product. 2. Import item at Sl. No. 1 shall be of relevant grade and thickness as contained in the export product. 3. Import item at Sl. No. 2 shall be of relevant grade and dia. as contained in the export product. 4. Quantity of import item at from Sl. No 1 to be allowed as 249732 Kgs. inclusive of a wastage of 5 %. 5. Quantity of import item at Sl. No 2 to be allowed as 180 Mtrs. (14220 Kgs.) inclusive of a wastage of 0.97 % as claimed by the firm. 6. Quantity of import item at Sl. No. 3 to be allowed as applied for i.e. 340000 Kgs. on net to net basis with accountability clause. 23
Case No.:16/17/80ALC2/2011
Party Name:LARSEN & TOUBRO LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00335/AM12/ RLA File :03/95/040/00494/AM12/ Lic.No/Date:0310658156 05.10.2011 Decision : The Committee deliberated the written comments of DIPP received vide their UO Note dated 01.05.2012 and decided to ratify the norms in respect of the subject advance authorization as under: 1. Net export weight of 494 MT to be specified with the quantity of export product. 2. Import item at Sl. No. 1 shall be of relevant grade and thickness as contained in the export product. 3. Import item at Sl. No. 2 shall be of relevant grade and dia. as contained in the export product. 4. Quantity of import item at from Sl. No 1 to be allowed as 124866 Kgs. inclusive of a wastage of 5 %. 5. Quantity of import item at Sl. No 2 to be allowed as 90 Mtrs. (7110 Kgs.) inclusive of a wastage of 0.97 % as claimed by the firm. 6. Quantity of import item at Sl. No. 3 to be allowed as applied for i.e. 170000 Kgs. on net to net basis with accountability clause.
24
Case No.:1/20/80ALC2/2011
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00386/AM12/ RLA File :05/24/040/00235/AM12/ Lic.No/Date:0510304889 11.10.2011 Defer Date 12.06.2012. Decision : The representative of DIPP informed the Committee that online data is not matching with the details submitted by the firm in the application Form. The Committee, therefore, decided to ask RA verify online details with the Application and inform the committee for further examination by DIPP The case is to be relisted on 12.06.2012. 25
Case No.:29/17/80ALC2/2011
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00348/AM12/ RLA File :05/23/040/00226/AM12/ Lic.No/Date:0510305028 12.10.2011 Defer Date 12.06.2012. Decision : The Committee noted that the case was referred to PIC for advice. The case is to be relisted on 12.06.2012. 26
Case No.:2/17/80ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., 01.05.2012 Status: Approved HQ File :01/80/050/00321/AM12/ RLA File :03/94/040/00605/AM12/ Lic.No/Date:0310661481 21.10.2011 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012 and decided to ratify the norms in respect of the subject advance authorization as under: 1. Net weight of 23.2 MT to be specified with the quantity of export product. 2. Quantity of import item at Sl. No. 1 to be allowed as 7294 Kgs. inclusive of 29.8 % wastage after 20 % recovery. 3. Quantities of import items at Sl. Nos. 2, 3 & 4 (Welding Consumables) to be allowed as 139 Kgs. each. 27
Case No.:17/20/80ALC2/2011
Party Name:LARSEN & TOUBRO LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00402/AM12/ RLA File :03/95/040/00463/AM12/ Lic.No/Date:0310663388 03.11.2011 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012 and decided to ratify the norms in respect of the subject advance authorization as under: 1. Net empty weights of 820 MT, 74.5 MT & 180 MT to be specified with the quantities of export products at Sl. No. 1, 2 & 3 respectively. 2. Import items at Sl. Nos. 1 & 2 shall be of relevant grade and thickness as contained in the export product 3. Import item at Sl. No. 4 shall be of relevant grade and dia. as contained in the export product. 4. Quantities of import items at from Sl. No. 1 & 2 to be allowed as applied for i.e. 570000 Kgs. & 108000 Kgs. respectively inclusive of a wastage of 5 %. 5. Weights of 115.1 MT, 18.24 MT, 6 MT, 2 MT, 2.4 MT & 4.74 MT to be specified with the quantities of import items at Sl. Nos. 3, 5, 6, 7, 10 & 12 respectively. 6. Import items at Sl. No. 3, 5, 6, 7, 10, 11, 12 & 13 to be allowed on net to net basis with accountability clause. 7. Quantity of import item at Sl. No. 4 to be allowed as 43422 Mtrs. (281 MT) inclusive of a wastage of 2%. 8. Import items at Sl. No. 8 & 9 to be allowed upto 2 % of FOB value of exports. 9. Quantities of import items at Sl. No. 14, 15, 16 & 17 (welding Consumables) to be allowed as 2000 Kgs., 8300 Kgs., 21720 & 23720 Kgs. respectively. 28
Case No.:24/27/80ALC2/2011
Party Name:INDIAN TECHNOMETAL COMPANY LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00557/AM12/ RLA File :05/23/040/00289/AM12/ Lic.No/Date:0510307109 03.11.2011 Defer Date 12.06.2012. Decision : The Committee decided to send D.O. letter from DDG to RA with a copy to the firm asking them to forward copy of application at the earliest. The case may be relisted on12.06.2012. 29
Case No.:15/20/80ALC2/2011
Party Name: GODREJ & BOYCE MFG. CO. LTD., 01.05.2012 Status: Approved HQ File :01/80/050/00400/AM12/ RLA File :03/94/040/00702/AM12/ Lic.No/Date:0310664727 14.11.2011 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Net empty export weights of 21.4 MT, 8.875 MT, 4.695 MT, 25.5 MT, 25.5 MT, 23.8 MT, 11.5 MT & 11.5 MT to be specified with the quantities of export products from Sl. No. 1 to 8 respectively. 2. Word “Relevant” to be prefixed with the descriptions of import items at Sl. No.1 & 3 to 7. 3. Quantity of import item at Sl. No. 1 to be allowed as applied for i.e. 295.92 Kgs.inclusive of 5 % wastage. 4. Quantity of import item at Sl.No.2 to be allowed as 16 Nos. on net to net basis. However, duty free weight of this item to be allowed as 12506 Kg inclusive of 5 % wastage 5. Quantity of import item at Sl. No. 3 to be allowed as 297.08 Kgs. (7.224 Mtrs.) inclusive of 5 % wastage. 6. Quantity of import item at Sl. No. 4 to be allowed as 43109 Kgs. inclusive of 80.8 % wastage after 1/3rd recovery. 7. Quantity of import item at Sl. No. 5 to be allowed as 26815 Kgs. inclusive of 11 % wastage after 1/3rd recovery. 8. Quantity of import item at Sl. No. 6 to be allowed as 12585 Kgs.(7964 Mtrs.) inclusive of 2 % wastage. 9. Quantity of import item at Sl. No. 7 to be allowed as 25380 Kgs.(27069 Mtrs.) inclusive of 2 % wastage. 10. Quantities of import items at Sl. Nos. 8, 9, 10, 11, 12 & 13 ( Welding Consumables) to be allowed as 152 Kgs., 844 Kgs., 844 Kgs., 152 Kgs., 304 Kgs. & 844 Kgs. respectively 30
Case No.:41/27/80ALC2/2011
Party Name:WELD FUSE PVT. LTD . 01.05.2012 Status: Deferred HQ File :01/80/050/00574/AM12/ RLA File :09/24/040/00356/AM12/ Lic.No/Date:0910049698 14.11.2011 Defer Date 12.06.2012.
Decision : The Committee noted that a copy of firm’s reply dt.24.04.2012 has been sent to DIPP for examination and comments and the case is to be relisted on 12.06.2012. 31
Case No.:22/20/80ALC2/2011
Party Name:J PAN TUBULAR COMPONENTS PVT.LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00407/AM12/ RLA File :05/23/040/00300/AM12/ Lic.No/Date:0510307950 15.11.2011 Defer Date: 29.05.2012 Decision : The Committee noted that firm vide letter dated 06.03.2012 has furnished an incomplete reply. The Committee decided to ask the firm to appear in Personal Hearing along with full facts and complete reply to explain the case. The case is to be relisted on 29.05.2012. 32
Case No.:31/20/80ALC2/2011
Party Name:LARSEN & TOUBRO LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00416/AM12/ RLA File :03/95/040/00627/AM12/ Lic.No/Date:0310665598 17.11.2011 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms in respect of the 1. Net empty weight of 450 MT to be specified with the quantity of export product. 2. Import items at Sl. Nos. 1, 2, 3 & 4 shall be of relevant grade and thickness as contained in the export product 3. Import item at Sl. No. 7 shall be of relevant grade and dia. as contained in the export product. 4. Quantities of import items at from Sl. No. 1, 2 & 3 to be allowed as applied for i.e. 255000 Kgs., 100000 Kgs. & 18000 Kgs. respectively inclusive of a wastage of 5 %. 5. Quantity of import item at Sl. No. 4 to be allowed as 9810 Kgs. inclusive of a wastage of 3 %. 6. Quantity of import item at Sl. No. 5 to be allowed as under on net to net basis: Hemispherical Heads: 2 Nos. (11900 Kgs.) Test Coupons: 2 Nos. (100 Kgs.) 7. Weights of 43.565 MT, 4 MT, 8.81 MT, 1 MT, 6 MT & 3 MT to be specified with the quantities of import items at Sl. Nos. 6, 8, 9, 10, 11 & 12 respectively. 8. Import items at Sl. No. 6, 8, 9, 10, 11 & 12 to be allowed on net to net basis with accountability clause. 9. Quantity of import item at Sl. No. 7 to be allowed as 120 Mtrs. (7 MT) inclusive of a wastage of 2%. 10. Import item at Sl. No. 10 to be supplied alongwith the export product. 11. Quantities of import items at Sl. No. 13, 14 & 15 (welding Consumables) to be allowed as applied for i.e. 5712 Kgs., 8000 Kgs. & 8000 Kgs. respectively. 33
Case No.:25/20/80ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00410/AM12/ RLA File :05/23/040/00296/AM12/ Lic.No/Date:0510308687 21.11.2011 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms in respect of the 1. Net empty weight of 477.5 MT to be specified with the quantity of export product. 2. Quantity of import item at Sl. No. 1 to be allowed as 406.78 MT inclusive of 5 % wastage. 3. Quantity of import item at Sl. No. 2 to be allowed as applied for i.e. 50 MT inclusive of 2.67 % wastage. 4. Quantity of import item at Sl. No. 3 to be allowed as 10.87 MT inclusive of 5 % wastage. 5. Quantity of import item at Sl. No. 4 to be allowed as 4 MT ( 7 Nos.) on net to net basis. 6. Quantity of import item at Sl. No. 5 to be allowed as 2 MT ( 3 Nos.) on net to net basis. 7. Quantities of import items at Sl. No. 6 & 7 (welding Consumables) to be allowed as applied for i.e. 23000 Kgs. each 34
Case No.:23/20/80ALC2/2011
Party Name:KEBURGMANN FLEXIBLES INDIA PVT.LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00408/AM12/ RLA File :04/24/040/00234/AM12/ Lic.No/Date:0410130688 22.11.2011 Defer Date 12.06.2012. Decision : On the recommendation of DIPP representative, the Committee decided to call for following information/clarification from the firm and to relist the case on 12.06.2012: 1. The firm has applied for two advance Authorizations for export of Nonmetallic Expansion Joints with little difference of import description in two authorizations. The details are as under: i) Advance authorization No. 0410110 339 dated 22.12.2009 ii) Advance authorization No. 0410130668 dated 22.11.2011. In the both cases deficiency letter was issued vide letter dated 12.3.2012, the firm has given their reply referring authorization No. 2 . However, in reply import description given for first four items (Sl.No.1 to 4) is not matching with referred Authorizations. It appears that that reply is for Authorization no.1 above. The firm may confirm the above, giving weight of import items of all types of fibre glass fabric. PFA foil and thread fibre separately for both the above authorizations indicating correct Authorization Number. 35
Case No.:36/27/80ALC2/2011
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00569/AM12/ RLA File :09/24/040/00333/AM12/ Lic.No/Date:0910049962 29.11.2011 Defer Date 12.06.2012 Decision : The Committee noted that the firm has not replied vide this office letter dated 04.04.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012
Case No.:8/20/80ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., 01.05.2012 Status: Approved HQ File :01/80/050/00393/AM12/ RLA File :03/94/040/00768/AM12/ Lic.No/Date:0310668917 05.12.2011 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms in respect of the 1. Net empty export weights of 125 MT & 102 MT to be specified with the quantities of export products at Sl. No. 1 & 2 respectively. 2. Quantity of import item at Sl. No. 1 to be allowed as 1145 Kgs (303 Nos.) on net to net basis.
36 . Qua t ty o po t te at S . No. to be a owed as 5 gs (303 Nos.) o et to et bas s. 3. Quantity of import item at Sl.No.2 to be allowed as 34 Nos. on net to net basis. However, duty free weight of this item to be allowed as 7535 Kg inclusive of 5 % wastage 4. Quantity of import item at Sl. No. 3 to be allowed as 43.11 Kgs (55 Nos.) on net to net basis. 5. Word “Relevant” to be prefixed with the description of import item at Sl. No.4 and its quantity to be allowed as 214621 Kgs. inclusive of 10 % wastage after 1/3rd recovery. 6. Quantity of import items at Sl. No. 5 (Welding Strip) to be allowed as 12424 Kgs. 7. Quantities of import items at Sl. Nos. 6, 7 & 8 (Welding Consumables) to be allowed as 4325 Kgs. each. 8. Quantities of import items at Sl. Nos. 9, 10 & 11 (Welding Consumables) to be allowed as 1106 Kgs., 13831 Kgs. & 1397 Kgs. respectively. 37
Case No.:9/20/80ALC2/2011
Party Name:RADIANT INDUSTRIES 01.05.2012 Status: Deferred HQ File :01/80/050/00394/AM12/ RLA File :31/83/040/00182/AM12/ Lic.No/Date:3110051726 07.12.2011 Defer Date 12.06.2012 Decision : The representative of DHI has informed that informed that they have not received firm’s reply dated15.04.2011. The Committee decided to again forward the same to DHI for examination and Comments. The case is to be relisted on 12.06.2012. 38
Case No.:10/20/80ALC2/2011
Party Name: GODREJ & BOYCE MFG. CO. LTD., 01.05.2012 Status: Approved HQ File :01/80/050/00395/AM12/ RLA File :03/94/040/00763/AM12/ Lic.No/Date:0310668956 07.12.2011 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms in respect of the 1. Net empty export weights of 169 MT to be specified with the quantity of each export product at Sl. No. 1, 2, 3 & 4 respectively. 2. Word “Relevant” to be prefixed with the descriptions of import items at Sl. No.1 & 4. 3. Quantity of import item at Sl. No. 1 to be allowed as 354556 Kgs. inclusive of 10 % wastage after 1/3rd recovery 4. Quantity of import item at Sl. No. 2 to be allowed as 5964 Kgs (300 Nos.) on net to net basis. 5. Quantity of import item at Sl.No.3 to be allowed as 248 Nos. on net to net basis. However, duty free weight of this item to be allowed as 68288 Kg inclusive of 5 % wastage 6. Quantity of import item at Sl. No. 4 to be allowed as 276188 Kgs. inclusive of 9.7 % wastage after 1/3rd recovery. 7. Quantities of import items at Sl. No. 5 & 8 ( Welding Consumables) to be allowed as 4576 Kgs. each. 8. Quantities of import items at Sl. Nos. 6, 7 & 9 ( Welding Consumables) to be allowed as applied for i.e. 13036 Kgs. each. 39
Case No.:13/20/80ALC2/2011
Party Name:UNI VTL ENGINEERING PVT. LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00398/AM12/ RLA File :03/95/040/00726/AM12/ Lic.No/Date:0310669540 08.12.2011 Defer Date 12.06.2012. Decision : The Committee noted that the firm has not replied vide this office letter dated 30.04.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012. 40
Case No.:28/27/80ALC2/2011
Party Name:GL&V INDIA PRIVATE LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00561/AM12/ RLA File :31/83/040/00183/AM12/ Lic.No/Date:3110051791 08.12.2011 Decision : Based on the written comments of DC(MSME) received vide their UO Note No. 30(145) 2011ME dated 26.03.2012, the Committee decided to ratify the norms under GN4 on nettonet basis with accountability clause. 41
Case No.:35/27/80ALC2/2011
Party Name:WELD FUSE PVT. LTD . 01.05.2012 Status: Deferred HQ File :01/80/050/00568/AM12/ RLA File :09/24/040/00407/AM12/ Lic.No/Date:0910050090 08.12.2011 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s reply dt.24.04.2012 send to DIPP for examination and comments and the case is to be relisted on 12.06.2012. 42
Case No.:40/27/80ALC2/2011
Party Name:HTD HEAT TRACE(INDIA)PVT LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00573/AM12/ RLA File :09/24/040/00403/AM12/ Lic.No/Date:0910050100 08.12.2011 Defer Date 15.06.2012. Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 12.06.2012: 1. Information in respect of Sl. No. 3 & 11 of Standard Deficiency Format. 2. Detailed calculations/basis for the quantities of import items 43
Case No.:35/20/80ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., 01.05.2012 Status: Approved HQ File :01/80/050/00420/AM12/ RLA File :03/94/040/00799/AM12/ Lic.No/Date:0310671299 16.12.2011 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms in respect of the 1. Net empty export weights of 4780 Kgs., 4780 Kgs., 3820 Kgs. & 3820 Kgs. to be specified with the quantities of export products at Sl. No. 1. 2, 3 & 4 respectively. 2. Quantity of import item at Sl.No.1 to be allowed as 108 Nos. on net to net basis. However, duty free weight of this item to be allowed as 6701 Kg inclusive of 5 % wastage 3. Quantity of import item at Sl. No. 2 to be allowed as 502 Kgs (11.652 Mtrs.) .
Q y p g ( ) 4. Word “Relevant” to be prefixed with the descriptions of import items at Sl. No.3 & 4. 5. Quantity of import item at Sl. No. 3 to be allowed as 8224 Kgs. inclusive of 5.9 % wastage after 1/3rd recovery. 6. Quantity of import item at Sl. No. 4 to be allowed as applied for i.e. 1560 Kgs. inclusive of 2.1 % wastage. 7. Quantity of import item at Sl. No.5 to be allowed as 90 Kgs (2 Nos.) on net to net basis. 8. Quantity of import item at Sl. No.7 to be allowed as 640 Kgs (4 Nos.) on net to net basis. 9. Quantities of import items at Sl. Nos. 6, 11 & 12 (Welding Consumables) to be allowed as 590 Kgs. each. 10. Quantities of import items at Sl. Nos. 8 10 & 13 (Welding Consumables) to be allowed as 144 Kgs. each. 11. Quantity of import item at Sl. Nos. 9 (Welding Electrodes) to be allowed as 1176 Kgs. 44
Case No.:61/2/80ALC2/2012
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00025/AM13/ RLA File :09/24/040/00432/AM12/ Lic.No/Date:0910050612 04.01.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 26.04.2012 and case under examination with DHI. The case is to be re listed on 12.06.2012. 45
Case No.:14/27/80ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00547/AM12/ RLA File :05/23/040/00384/AM12/ Lic.No/Date:0510313896 09.01.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 12.06.2012. 46
Case No.:22/27/80ALC2/2011
Party Name:BHARAT PUMPS & COMPRESSORS LTD 01.05.2012 Status: Deferred HQ File :01/80/050/00555/AM12/ RLA File :06/24/040/00053/AM12/ Lic.No/Date:0610025465 11.01.2012 Defer Date 12.06.2012. Decision : The Committee noted that the firm has not replied vide this office letter dated 09.04.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012. 47
Case No.:23/27/80ALC2/2011
Party Name:BHARAT PUMPS & COMPRESSORS LTD 01.05.2012 Status: Deferred HQ File :01/80/050/00556/AM12/ RLA File :06/24/040/00054/AM12/ Lic.No/Date:0610025466 11.01.2012 Defer Date 12.06.2012 Decision : The Committee noted that the firm has not replied vide this office letter dated 09.04.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012 48
Case No.:62/2/80ALC2/2012
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00026/AM13/ RLA File :09/24/040/00437/AM12/ Lic.No/Date:0910050738 11.01.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 26.04.2012 and case under examination with DHI. The case is to be re listed on 12.06.2012. 49
Case No.:17/27/80ALC2/2011
Party Name:BOYSEN INDIA LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00550/AM12/ RLA File :05/23/040/00399/AM12/ Lic.No/Date:0510314287 12.01.2012 Defer Date 12.06.2012. Decision : The Committee noted that a reminder has been sent to the RA (with a copy to the firm) vide e.mail dated 25.4.2012 to forward the firm’s application at the earliest. The Committee decided to again remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 12.06.2012. 50
Case No.:5/27/80ALC2/2011
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. 01.05.2012 Status: Approved HQ File :01/80/050/00538/AM12/ RLA File :05/23/040/00401/AM12/ Lic.No/Date:0510314430 13.01.2012 Decision : Based on the written comments of DC(MSME) received vide their UO Note No. 30(160) 2011ME dated 20.4.2012, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Relevant Import item at Sl No 1 to be allowed on nettonet basis, with accountability clause. 2. Import of item at Sl No 2 and 3 to be recommended on net content basis without any wastage i.e 1Kg/Kg content in export product . 51
Case No.:21/27/80ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00554/AM12/ RLA File :05/23/040/00398/AM12/ Lic.No/Date:0510314528 13.01.2012 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms in respect of the 1. Net empty weight of 81.783 MT to be specified with the quantity of export product. 2. Word “Relevant” to be prefixed with the description of import items at Sl. No.1 and its quantity to be allowed as applied for i.e. 70 MT inclusive of 4.17 % wastage. 3. Import item from Sl. No. 2 to 4 to be allowed on net to net basis with accountability clause.
52
Case No.:2/24/80ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00476/AM12/ RLA File :03/94/040/00885/AM12/ Lic.No/Date:0310677027 17.01.2012 Defer Date 12.06.2012. Decision : The Committee noted that the firm has not replied vide this office letter dated 09.04.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012 53
Case No.:45/27/80ALC2/2011
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00578/AM12/ RLA File :04/24/040/00264/AM12/ Lic.No/Date:0410132883 17.01.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.03.2012 and case is under examination with DHI. The case is to be relisted on 12.06.2012. 54
Case No.:13/27/80ALC2/2011
Party Name:INJECTOPLAST PVT.LTD 01.05.2012 Status: Approved HQ File :01/80/050/00546/AM12/ RLA File :06/24/040/00058/AM12/ Lic.No/Date:0610025576 18.01.2012 Decision : Based on the written comments of C&PC received vide their O.M.No.46011/09/2006PC.II dated 16.04.2012, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Item to be Exported Quantity BOOT ADAPTOR 1 Number Rawmaterial recommended to be Imported Quantity THERMOPLASTIC ELASTOMER (TPE) 1.05 kg/kg. content in export product 55
Case No.:3/24/80ALC2/2011
Party Name:GL&V INDIA PRIVATE LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00477/AM12/ RLA File :31/83/040/00209/AM12/ Lic.No/Date:3110052550 20.01.2012 Decision : Based on the written comments of DC(MSME) received vide their UO Note No. 30(132) 2011ME dated 27.4.2012, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Total weight of Export product to be allowed at 14,086 Kg. 2. Item of import at Sl no 1 & 2 being used as components to be allowed on Net to net basis with accountability clause. 3. Item of import at Sl no 3 of Import to be allowed as 6835 Kg, with 10% wastage, and after taking onethird recovery. 4. Item No 4 of import to be allowed as 148 Kg. 56
Case No.:63/2/80ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:3/80 ALC2/2012 01.05.2012 Status: Deferred HQ File :01/80/050/00027/AM13/ RLA File :09/24/040/00502/AM12/ Lic.No/Date:0910050888 20.01.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 26.04.2012 and case is under examination with DHI. The case is to be relisted on 12.06.2012. 57
Case No.:6/27/80ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00539/AM12/ RLA File :05/23/040/00411/AM12/ Lic.No/Date:0510315336 23.01.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DIPP/DHI on 11.04.2012. The Committee decided to again forward the firm’s application to DIPP for examination and comments. The case is to be relisted on 15.06.2012. 58
Case No.:46/27/80ALC2/2011
Party Name:CETHAR LIMITED 01.05.2012 Status: Rejected HQ File :01/80/050/00579/AM12/ RLA File :04/24/040/00282/AM12/ Lic.No/Date:0410133046 23.01.2012 Decision : On recommendation of DHI, the Committee decided to reject the case on the ground that the firm’s request is not eligible in terms of Policy Circular No. 50 dated 28.12.2011. 59
Case No.:4/27/80ALC2/2011
Party Name:POLY MEDICURE LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00537/AM12/ RLA File :05/24/040/00369/AM12/ Lic.No/Date:0510315548 24.01.2012 Defer Date 12.06.2012 Decision : The Committee observed that the comments called for from C&PC on 04.4.2012 are yet to be received. The Committee, therefore, decided to send D.O. reminder from DDG to them for expediting their comments. The case may be relisted on 12.06.2012 60
Case No.:11/27/80ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00544/AM12/ RLA File :05/23/040/00407/AM12/ Lic.No/Date:0510315464 24.01.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to h i l h i f i i d b i i f h b li d
technical authority for examination and submission of comments. The case may be relisted on 12.06.2012 61
Case No.:5/24/80ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00479/AM12/ RLA File :03/94/040/00930/AM12/ Lic.No/Date:0310678658 25.01.2012 Defer Date 12.06.2012. Decision : The Committee noted that the firm has not replied vide this office letter dated 13.04.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012. 62
Case No.:12/27/80ALC2/2011
Party Name:GLOBE HIFABS 01.05.2012 Status: Deferred HQ File :01/80/050/00545/AM12/ RLA File :05/23/040/00425/AM12/ Lic.No/Date:0510316020 01.02.2012 Defer Date 12.06.2012 Decision : The Committee noted that the firm has not replied vide this office letter dated 20.04.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012. 63
Case No.:34/27/80ALC2/2011
Party Name:NASH INDUSTRIES 01.05.2012 Status: Deferred HQ File :01/80/050/00567/AM12/ RLA File :07/24/040/00436/AM12/ Lic.No/Date:0710085938 02.02.2012 Defer Date 12.06.2012 Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 12.06.2012: 1. Information in respect of Sl. No. 3,4,5 & 11 of Standard Deficiency Format as per export product wise. 64
Case No.:32/27/80ALC2/2011
Party Name:INJECTOPLAST PVT.LTD 01.05.2012 Status: Approved HQ File :01/80/050/00565/AM12/ RLA File :06/24/040/00061/AM12/ Lic.No/Date:0610025767 03.02.2012 Decision : Based on the written comments of D/o C&PC received vide their O.M.No.46011/09/2006PC.II dated 16.04.2012, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Item to be Exported Quantity ADAPTOR GIi 1700/BOOT TPE G1311 1 Number Rawmaterial recommended to be Imported Quantity THERMOPLASTIC ELASTOMER (TPE) 1.05 kg/kg. content in export product 65
Case No.:18/27/80ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00551/AM12/ RLA File :05/23/040/00426/AM12/ Lic.No/Date:0510316755 07.02.2012 Defer Date 12.06.2012 Decision : The Committee noted that the firm has not replied vide this office letter dated 13.4.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012. 66
Case No.:10/27/80ALC2/2011
Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY 01.05.2012 Status: Approved HQ File :01/80/050/00543/AM12/ RLA File :05/23/040/00402/AM12/ Lic.No/Date:0510316909 08.02.2012 Decision : Based on the written comments of DIT received vide their UO Note No.17(23)/2012IPHW dated 18.04.2012, the committee decided to ratify the norms of advance authorization as applied for by the firm inclusive 1% of wastage. 67
Case No.:60/2/80ALC2/2012
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00024/AM13/ RLA File :09/24/040/00548/AM12/ Lic.No/Date:0910051171 08.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 26.04.2012 and case is under examination with DHI. The case is to be relisted on 12.06.2012. 68
Case No.:19/27/80ALC2/2011
Party Name:DHARAM STAINLESS STEEL PVT LTD 01.05.2012 Status: Deferred HQ File :01/80/050/00552/AM12/ RLA File :05/23/040/00333/AM12/ Lic.No/Date:0510317062 09.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that the firm has not replied vide this office letter dated 13.4.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012. 69
Case No.:46/2/80ALC2/2012
Party Name:METSO PAPER INDIA PVT.LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00010/AM13/ RLA File :05/24/040/00409/AM12/ Lic.No/Date:0510317706 14.02.2012 Defer Date 12.06.2012. Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to ask the firm furnish quantity in numbers in place of sets and names instead of codes of parts and to relist the case on 12.06.2012.
70
Case No.:15/27/80ALC2/2011
Party Name:MOTHERSON SUMI SYSTEMS LTD 01.05.2012 Status: Deferred HQ File :01/80/050/00548/AM12/ RLA File :05/24/040/00423/AM12/ Lic.No/Date:0510317789 15.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 27.03.2012 and case is under examination with DHI. The case is to be relisted on 12.06.2012. 71
Case No.:43/27/80ALC2/2011
Party Name:TERUMO PENPOL LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00576/AM12/ RLA File :53/24/040/00017/AM12/ Lic.No/Date:5310014710 15.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that the is case under examination with C&PC. The case is to be relisted on 12.06.2012. 72
Case No.:54/2/80ALC2/2012
Party Name:DRIPLEX WATER ENGINEERING LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00018/AM13/ RLA File :05/23/040/00450/AM12/ Lic.No/Date:0510317886 15.02.2012 Defer Date 12.06.2012. Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to ask the firm furnish quantity in numbers in place of sets, EP Rating ,arrangement Drawing and Resin. The case is to be relisted on 12.06.2012. 73
Case No.:56/2/80ALC2/2012
Party Name:METSO PAPER INDIA PVT.LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00020/AM13/ RLA File :05/24/040/00420/AM12/ Lic.No/Date:0510317786 15.02.2012 Defer Date 12.06.2012. Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to ask the firm furnish quantity in numbers in place of sets and names of parts instead of codes and to relist the case on 12.06.2012 74
Case No.:9/27/80ALC2/2011
Party Name:ECHAAR EQUIPMENTS PVT.LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00542/AM12/ RLA File :03/94/040/01018/AM12/ Lic.No/Date:0310682257 16.02.2012 Defer Date 12.06.2012 Decision : The Committee noted that the firm has not replied vide this office letter dated 13.4.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 15.06.2012. 75
Case No.:47/27/80ALC2/2011
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00580/AM12/ RLA File :04/24/040/00290/AM12/ Lic.No/Date:0410133870 16.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 26.04.2012 and case is under examination with DHI. The case is to be relisted on 12.06.2012. 76
Case No.:52/2/80ALC2/2012
Party Name:ISGEC HEAVY ENGINEERING LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00016/AM13/ RLA File :05/23/040/00456/AM12/ Lic.No/Date:0510318045 16.02.2012 Defer Date 12.06.2012. Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 12.06.2012: 1. Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Formatexport product wise. 2. Quantities of import items from Sl. Nos. 2 to 9 in Nos. also in addition to their weights. 3. Quantity of import item at Sl. No. 10, 11 & 12 in meters also in addition to their weights. 77
Case No.:3/27/80ALC2/2011
Party Name:KILBURN ENGINEERING LTD 01.05.2012 Status: Deferred HQ File :01/80/050/00536/AM12/ RLA File :03/94/040/01008/AM12/ Lic.No/Date:0310682458 17.02.2012 Defer Date 12.06.2012 Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 12.06.2012: 1. Information in respect of Sl. No. 3,4,5 & 11 of Standard Deficiency Format. 78
Case No.:44/27/80ALC2/2011
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:3/80ALC2/2012 01.05.2012 Status: Approved HQ File :01/80/050/00577/AM12/ RLA File :04/24/040/00310/AM12/ Lic.No/Date:0410133974 21.02.2012 Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms as per SION C1742. 79
Case No.:48/27/80ALC2/2011
Party Name:SUNDRAM FASTENERS LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00581/AM12/ RLA File :04/24/040/00288/AM12/ Lic.No/Date:0410133976 21.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 11.04.2012 and case is under examination with DHI. The case is to be relisted on 12.06.2012.
Case No.:45/2/80ALC2/2012
Party Name:G & T OIL STATES INDUSTRIES PRIVATE LIMITED 01.05.2012 Status: Deferred
80 HQ File :01/80/050/00009/AM13/ RLA File :03/94/040/01042/AM12/ Lic.No/Date:0310683065 22.02.2012 Defer Date 12.06.2012. Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 12.06.2012: 1. Information in respect of Sl. No. 4,5 & 11 of Standard Deficiency Format. 2. Copy of Advance Authorization 3. Appendix 11 A & arrangement Drawing. 81
Case No.:48/2/80ALC2/2012
Party Name:GODREJ & BOYCE MFG. CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00012/AM13/ RLA File :03/94/040/00980/AM12/ Lic.No/Date:0310683397 24.02.2012 Defer Date 15.06.2012. Decision : The Committee noted that firm’s application has already been sent to DHI/DIPP on 23.04.2012. The Committee decided to again forward the same to DIPP for examination and Comments. The case is to be relisted on 12.06.2012. 82
Case No.:50/2/80ALC2/2012
Party Name:LARSEN & TOUBRO LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00014/AM13/ RLA File :03/95/040/00929/AM12/ Lic.No/Date:0310683744 27.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 23.04.2012. The Committee decided to forward the firm’s application to DIPP, as it pertains to them. The case is to be relisted on 12.06.2012. 83
Case No.:67/2/80ALC2/2012
Party Name:VIDEOCON INDUSTRIES LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00031/AM13/ RLA File :03/95/040/00977/AM12/ Lic.No/Date:0310683639 27.02.2012 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms against Advance Authorization as per SION at Sl. No. C1995 for Engineering products. 84
Case No.:68/2/80ALC2/2012
Party Name:WELD FUSE PVT. LTD . 01.05.2012 Status: Deferred HQ File :01/80/050/00032/AM13/ RLA File :09/24/040/00584/AM12/ Lic.No/Date:0910051473 27.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DIPP on 26..04.2012 and the case is under examination with DIPP. The case is to be relisted on 12.06.2012. 85
Case No.:69/2/80ALC2/2012
Party Name:GEI INDUSTRIAL SYSTEMS LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00033/AM13/ RLA File :11/24/040/00018/AM12/ Lic.No/Date:1110026905 28.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DIPP on 26..04.2012 and the case is under examination with DIPP. The case is to be relisted on 12.06.2012. 86
Case No.:51/2/80ALC2/2012
Party Name:LARSEN & TOUBRO LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00015/AM13/ RLA File :03/95/040/00953/AM12/ Lic.No/Date:0310683916 29.02.2012 Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms as per SION C1742. 87
Case No.:65/2/80ALC2/2012
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00029/AM13/ RLA File :07/24/040/00481/AM12/ Lic.No/Date:0710086689 29.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 26.04.2012. The Committee decided to forward the firm’s application to MIT as it pertains to them. The case is to be relisted on 12.06.2012. 88
Case No.:71/2/80ALC2/2012
Party Name:AIR LIQUIDE ENGINEERING INDIA PVT LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00035/AM13/ RLA File :09/24/040/00558/AM12/ Lic.No/Date:0910051540 29.02.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 23.04.2012. The Committee decided to forward the firm’s application to DIPP as it pertains to them, as it pertains to them. The case is to be relisted on 12.06.2012. 89
Case No.:79/2/80ALC2/2012
Party Name:BHARAT PUMPS & COMPRESSORS LTD 01.05.2012 Status: HQ File :01/80/050/00043/AM13/ RLA File :06/24/040/00066/AM12/ Lic.No/Date:0610026089 01.03.2012 Approved Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms as per General Note4 for Engineering products in respect of the subject advance authorization. 90
Case No.:49/2/80ALC2/2012
Party Name:GEA ECOFLEX INDIA PVT.LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00013/AM13/ RLA File :03/94/040/01065/AM12/ Lic.No/Date:0310684475 02.03.2012 Defer Date 12.06.2012.
Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 23.04.2012. The Committee decided to forward the firm’s application to DIPP as it pertains to them, as it pertains to them. The case is to be relisted on 12.06.2012. 91
Case No.:64/2/80ALC2/2012
LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00028/AM13/ RLA File :11/24/040/00057/AM12/ Lic.No/Date:1110026911 02.03.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 23.04.2012 and the case is under examination with DHI. The case is to be relisted on 12.06.2012. 92
Case No.:75/2/80ALC2/2012
Party Name:FOWLER WESTRUP (INDIA) PVT LTD ., 01.05.2012 Status: Deferred HQ File :01/80/050/00039/AM13/ RLA File :07/24/040/00493/AM12/ Lic.No/Date:0710086774 05.03.2012 Defer Date 12.06.2012. Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 12.06.2012: 1. Information in respect of Sl. No. 4,5 & 11 of Standard Deficiency Format. 93
Case No.:47/2/80ALC2/2012
Party Name:ISGEC HEAVY ENGINEERING LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00011/AM13/ RLA File :05/23/040/00477/AM12/ Lic.No/Date:0510319555 06.03.2012 Defer Date 12.06.2012. Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 12.06.2012: 1. Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Formatexport product wise. 2. Quantity of import item from Sl. No. 3 in Nos. also in addition to its weight. 94
Case No.:55/2/80ALC2/2012
Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY 01.05.2012 Status: Deferred HQ File :01/80/050/00019/AM13/ RLA File :05/23/040/00470/AM12/ Lic.No/Date:0510319710 06.03.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to MIT on 26.04.2012 and the case is under examination with MIT. The case is to be relisted on 12.06.2012. 95
Case No.:72/2/80ALC2/2012
Party Name:AIR LIQUIDE ENGINEERING INDIA PVT LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00036/AM13/ RLA File :09/24/040/00537/AM12/ Lic.No/Date:0910051622 07.03.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 23.04.2012. The Committee decided to forward the firm’s application to DIPP as it pertains to them. The case is to be relisted on 12.06.2012. 96
Case No.:73/2/80ALC2/2012
Party Name:AIR LIQUIDE ENGINEERING INDIA PVT LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00037/AM13/ RLA File :09/24/040/00588/AM12/ Lic.No/Date:0910051628 07.03.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 23.04.2012. The Committee decided to forward the firm’s application to DIPP as it pertains to them. The case is to be relisted on 12.06.2012. 97
Case No.:57/2/80ALC2/2012
Party Name:EURO LABS 01.05.2012 Status: Deferred HQ File :01/80/050/00021/AM13/ RLA File :03/94/040/00990/AM12/ Lic.No/Date:0310685534 09.03.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DC(MSME) on 26.04.2012 and the case is under examination with DC(MSME . The case is to be relisted on 12.06.2012 98
Case No.:33/27/80ALC2/2011
Party Name:PRIJAI COOLTECH PVT. LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00566/AM12/ RLA File :03/95/040/01036/AM12/ Lic.No/Date:0310685704 12.03.2012 Defer Date 12.06.2012. Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 12.06.2012: 1. Information in respect of Sl. No. 5 & 11 of Standard Deficiency Format. 99
Case No.:53/2/80ALC2/2012
Party Name:ISGEC HEAVY ENGINEERING LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00017/AM13/ RLA File :05/23/040/00498/AM12/ Lic.No/Date:0510319881 12.03.2012 Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms as per SION C1647. The RLA may take necessary action accordingly 100
Case No.:70/2/80ALC2/2012
Party Name:MICRON INSTRUMENTS PVT LTD 01.05.2012 Status: Approved HQ File :01/80/050/00034/AM13/ RLA File :05/24/040/00442/AM12/ Lic.No/Date:0510319830 12.03.2012 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms in respect of the subject advance authorization on repeat basis as per Advance Authorization No. 0510299295 dated 11.08.2011 ratified in Norms Committee Meeting No. 2/80
100 j p p g dated 17/04/2012 and as under: 1. Net weight of export product to be specified as 178.2 Kgs. 2. Quantity of import item to be allowed as 1420 Kgs. inclusive of 697 % wastage after taking 6% recovery from scrap. 101
Case No.:74/2/80ALC2/2012
Party Name:EMMVEE SOLAR SYSTEMS PVT LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00038/AM13/ RLA File :07/24/040/00505/AM12/ Lic.No/Date:0710086964 13.03.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to DIPP on 23.04.2012. The Committee decided to forward the firm’s application to DC(MSME) as it pertains to them. The case is to be relisted on 12.06.2012. 102
Case No.:49/27/80ALC2/2011
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00582/AM12/ RLA File :31/82/040/00402/AM12/ Lic.No/Date:3110053387 14.03.2012 Defer Date 12.06.2012. Decision : The Committee noted that the application of the firm has been received and decided to forward the same to DIT for examination and comments. The case is to be relisted on 12.06.2012. 103
Case No.:58/2/80ALC2/2012
Party Name:LARSEN & TOUBRO LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00022/AM13/ RLA File :03/95/040/00920/AM12/ Lic.No/Date:0310686877 19.03.2012 Defer Date 12.06.2012. Decision : The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 12.06.2012. 104
Case No.:77/2/80ALC2/2012
Party Name:INGERSOLLRAND (INDIA) LIMITED 01.05.2012 Status: Approved HQ File :01/80/050/00041/AM13/ RLA File :03/94/040/01088/AM12/ Lic.No/Date:0310687297 21.03.2012 Decision : Based on the written comments of DIPP received vide their UO Note dated 01.05.2012, the Committee decided to ratify the norms in respect of the 1. Description, quantity and net weight of export products to be specified as under: Sl. No. Description Quantity ( in Nos.) Net export weight (MT) 1 Air Compressors Model: 15T2 120 27.36 Model: 15T 50 12 Model: 2340 500 24.5 Model: 2475 2200 143 Model: 2545 500 50 Model: 2545cr 300 30.3 Model: 7100 300 52.5 Model: 3000 40 10.24 Model: 7T2 20 3.44 Model: SS3 1500 34.5 Model: SS5 1100 48.4 Model: TS5 1100 49.5 Total 7730 485.74 2 Vacuum Pumps Model: V255 30 2.49 2. Quantities of import items from Sl. No 1 to 21, 23 to 42, 45 to 54 & 56 to 61 to be allowed on net to net basis with accountability clause. 3. Quantities of Gasket material/ sheet at Sl. No. 22, 43 & 44 of the list of import items to be allowed as 1.65 sq. mtrs/ sq mtrs content in the Export product. 4. Quantity of Aluminium Alloy Ingot at import items Sl. No. 55 to be allowed as 1.06 Kgs./ Kg. content in the export product 105
Case No.:78/2/80ALC2/2012
Party Name:H.L.EQUIPMENTS 01.05.2012 Status: Deferred HQ File :01/80/050/00042/AM13/ RLA File :52/24/040/00053/AM12/ Lic.No/Date:5210038067 21.03.2012 Defer Date 12.06.2012. Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 12.06.2012: 1. Information in respect of Sl. No. 4, 5 & 11 of Standard Deficiency Formatexport product wise. 106
Case No.:83/2/80ALC2/2012
Party Name:INJECTOPLAST PVT.LTD 01.05.2012 Status: Approved HQ File :01/80/050/00047/AM13/ RLA File :06/24/040/00068/AM12/ Lic.No/Date:0610026317 21.03.2012 Decision : The Committee decide to ratify the norms of the subject advance authorization as per comments in AA No. 0610025767 dated 03.02.2012 as under : Item to be exported Quantity ADAPTOR Gli 1700/BOOT TPE G1311 1 Number Rawmaterial recommended to be imported Quantity THERMOPLASTIC ELASTOMER (TPE) 1.05 kg/kg. content in export d t
ELASTOMER (TPE) product The RA may take necessary action accordingly. 107
Case No.:84/2/80ALC2/2012
Party Name:INJECTOPLAST PVT.LTD 01.05.2012 Status: Approved HQ File :01/80/050/00048/AM13/ RLA File :06/24/040/00069/AM12/ Lic.No/Date:0610026316 21.03.2012 Decision : The Committee decide to ratify the norms of the subject advance authorization as under : Item to be exported Quantity ADAPTOR Gli 1700/BOOT TPE G1311 1 Number Rawmaterial recommended to be imported Quantity THERMOPLASTIC ELASTOMER (TPE) 1.05 kg/kg. content in export product The RA may take necessary action accordingly. 108
Case No.:85/2/80ALC2/2012
Party Name:INJECTOPLAST PVT.LTD 01.05.2012 Status: Deferred HQ File :01/80/050/00049/AM13/ RLA File :06/24/040/00072/AM12/ Lic.No/Date:0610026318 21.03.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to D/o C&PC on 23.04.2012 and the case is under examination with D/o C&PC. The case is to be relisted on 12.06.2012. 109
Case No.:76/2/80ALC2/2012
Party Name:COOLDECK AQUA SOLUTIONS PVT. LTD. 01.05.2012 Status: Deferred HQ File :01/80/050/00040/AM13/ RLA File :03/94/040/00886/AM12/ Lic.No/Date:0310687589 22.03.2012 Defer Date 12.06.2012. Decision : The Committee noted that a copy of firm’s application has been sent to D/o C&PC on 23.04.2012 and the case is under examination with C&PC. The case is to be relisted on 12.06.2012. 110
Case No.:59/2/80ALC2/2012
Party Name:TERUMO PENPOL LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00023/AM13/ RLA File :53/24/040/00021/AM12/ Lic.No/Date:5310014856 23.03.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 12.06.2012. 111
Case No.:40/2/80ALC2/2012
Party Name:TELCO CONSTRUCTION EQUIPMENT CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00004/AM13/ RLA File :03/95/040/00876/AM12/ Lic.No/Date:0310690133 10.04.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 112
Case No.:41/2/80ALC2/2012
CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00005/AM13/ RLA File :03/95/040/00909/AM12/ Lic.No/Date:0310690153 10.04.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 113
Case No.:42/2/80ALC2/2012
CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00006/AM13/ RLA File :03/95/040/00899/AM12/ Lic.No/Date:0310690158 10.04.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 114
Case No.:43/2/80ALC2/2012
CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00007/AM13/ RLA File :03/95/040/01113/AM12/ Lic.No/Date:0310690286 11.04.2012 Defer Date 12.06.2012 Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 115
Case No.:44/2/80ALC2/2012
CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00008/AM13/ RLA File :03/95/040/01120/AM12/ Lic.No/Date:0310690293 11.04.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 116
Case No.:80/2/80ALC2/2012
CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00044/AM13/ RLA File :03/95/040/01026/AM12/ Lic.No/Date:0310690503 12.04.2012 Defer Date 12.06.2012. D i i Th C itt d id d t i d th RA ( ith t th fi ) t f d th fi ’ li ti t th li t d i t f d th t
Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 117
Case No.:81/2/80ALC2/2012
CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00045/AM13/ RLA File :03/95/040/01033/AM12/ Lic.No/Date:0310690511 12.04.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 118
Case No.:82/2/80ALC2/2012
CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00046/AM13/ RLA File :03/95/040/01068/AM12/ Lic.No/Date:0310690518 12.04.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 119
Case No.:1/3/80ALC2/2012
CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00050/AM13/ RLA File :03/95/040/01110/AM12/ Lic.No/Date:0310690682 13.04.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 120
Case No.:2/3/80ALC2/2012
CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00051/AM13/ RLA File :03/95/040/00978/AM12/ Lic.No/Date:0310690699 13.04.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 121
Case No.:3/3/80ALC2/2012
CO. LTD., 01.05.2012 Status: Deferred HQ File :01/80/050/00052/AM13/ RLA File :03/95/040/00854/AM12/ Lic.No/Date:0310690701 13.04.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to 122
Case No.:4/3/80ALC2/2012
Party Name:FINE PAC STRUCTURES PRIVATE LIMITED 01.05.2012 Status: Deferred HQ File :01/80/050/00053/AM13/ RLA File :31/83/040/00260/AM12/ Lic.No/Date:3110053821 18.04.2012 Defer Date 12.06.2012. Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to S.No.05
Case No. A 15
M/s. Delphi Automotive Systems Pvt. Ltd., Noida F.No. 01/80/50/ 00495/AM11/DES.I Lic.No. & Date Meeting No.03/13 RA F.No.05/88/040/00721/AM03 0510081234 dt.21.02.2003 Date: 01.05.2012 Ratification of norms Based on Written Comments of DHI vide their UO note No. 23/0311TSW(B)/107 dt.23.03.2012, the Committee decided to ratify the norms of the subject authorization as as under: S.No. Item No. Qty. Recommended 1. Items except item no.9&21 To be allowed under GN4 on net to net basis. 2. Item No.21 ( Bray Oil) To be allowed on net to net basis without any wastage. Export product will contain 2000 liters of bray oil. 3. Item No.9 ( Grease ) Item No. 9 & 21 to be allowed within 1.5 % of FOB value of export S.No.24
Case No. A/R 117
M/s. Thermax Ltd., F.No. 01/80/50/01034/AM09/DES.I Lic.No. & Date Meeting No.03/13 RA F.No.31/21/040/00296/AM09 3110035317 dt.09.09.2008 Date: 01.05.2012 Ratification of norms The Committee noted that a copy of firm’s reply has been sent to DHI on 25.04.2012 and the case is under examination with DHI. The case is to be relisted on 12.06.2012 S.No.25
Case No. A/R 173
M/s. Thermax Ltd., F.No. 01/80/50/01550/AM09/DES.I Lic.No. & Date Meeting No.03/13 RA F.No.31/24/040/00296/AM09 3110036393 dt.09.09.2008 Date: 01.05.2012 Ratification of norms The Committee noted that a copy of firm’s reply has been sent to DHI on 25.04.2012 and the case is under examination with DHI. The case is to be relisted on 12.06.2012. S.No.26
Case No. A/R28
M/s. Brakes India Limited, Chennai HQF.No.01/80/050/01124/AM08/DES.I Lic. No. & date Meeting No.03/13 RA.F.No.04/24/040/00263/AM08 0410093871 dt.15.02.2008 Date: 01.05.2012 Revision of norms Based on written Comments of DHI vide their UO note No. 3(58)/08TSW(B)/106 dt.21.03.2012, the Committee decided to ratify the norms of the subject authorization
as under: Item No. Name Qty. Recommended 24. Wolfakrote paste 50 Kg. 25. Sphrol grease 80 Kg 26. Kuber 37.9 Kg. 27. Castrol 5905 250 kg( 50% of requirement as no calculation 28 Al Alloy ingot Nil as no calculation has been furnished by the firm S.No.27
Case No. A/R
68 M/s. GEA BGR Energy System India Ltd., Chennai HQF.No.01/80/050/01097/AM08/DES.I Lic. No. & date Meeting No.03/13 RA.F.No.04/24/040/00325/AM08 0410092981 dt.02.01.2008 Date: 01.05.2012 Ratification of norms The Committee noted that firm’s reply dated 26.04.2012 was received and to be sent to DHI for examination and comments. The case is to be relisted on 12.06.2012 S.No.28
Case No. A/R
144 M/s. Alstom Projects India Ltd., Vadodara HQF.No.01/80/050/00134/AM11/DES.I Lic. No. & date Meeting No.03/13 RA.F.No.03/94/040/01139/AM10 0310567657 dt.31.03.2010 Date: 01.05.2012 Fixation of Norms The Committee noted that the firm vide their email dated 27.4.2012 has requested for postponement of P.H. to 12.06.2012 instead of 01.05.2012. The Committee therefore decided to grant a final chance for PH to firm on 12.6.2012 and to relist the case on 12.06.2012. S.No.29
Case No. A/R
147 M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli HQF.No.01/80/050/00550/AM11/DES.I Lic. No. & date Meeting No.03/13 RA.F.No.04/24/040/00204/AM11 0410118772 dt.10.11.2010 Date: 01.05.2012 Fixation of Norms Based on written Comments of DHI vide their UO note No. 3(40)/2010TSW(B)/ dt.01.05.2012, the Committee decided to ratify the norms of the subject authorization as under: 1. Export Product: 700 MW Steam Generator (4 Nos) (Total Wt: 875.16 MT) Rajasthan Atomic Power Project Input Sl No of the list Item Total Quantity in MT including (% wastage) 51 Incoloy800 U tubes 118.28 (2%) 52 SS/CS Flats 20.06 (10%) 53 SS Plates (2 to 30 mm) 37.27 (35%) 54 Plates (16Mo3) (30 to 60 mm) 263 (85.5%) 55 CS Pipes 0.969 (2%) 56 Welding wire/rod/Flux 7.0 (total) 59 SS Tubes 1.2 (2%) 2. Sl. No 41 and 44 to 50 to be deleted as they are being indigenously procured. 3. Sl.No.5,7,8,10,14,16,23,25,26 and 27 are test plates and allowed as per IBR. 4. Sl. No.: 57 is a component and Sl.No42,43,58 are pipe fitting which are to be on net to net basis with accountability clause. 5. Rest of the items are rough forgings (Gross wt: 467.14 MT, Net Wt: 432.27 MT, 8% machining wastage) which are to be allowed on net to net number basis. Total number of items is 59. S.No.30
Case No. A/R
148 M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli HQF.No.01/80/050/00651/AM11/DES.I Lic. No. & date Meeting No.03/13 RA.F.No.04/24/040/00205/AM11 0410118773 dt.10.11.2010 Date: 01.05.2012 Fixation of Norms Based on written comments of DHI vide their UO note No.3(40)/2010TSW(B)/dt.01.05.2012, the Committee decided to ratify the norms of the subject authorization as under: 1. Export Product: 700 MW Steam Generator (4 Nos) (Total Wt: 884.8 MT) Kakrapar Atomic Power Project Input Sl No of the list Item Total Quantity in MT including (% wastage) 38 Incoloy800 U tubes 118.28 (2%) 39 SS/CS Flats 20.06 (10%) 40 SS Plates (2 to 30 mm) 37.27 (35%) 41 Plates (16Mo3) (30 to 60 mm) 263 (85.5%) 42 CS Pipes 0.969 (2%) 43 Welding wire/rod/Flux 7.0 (total) 46 SS Tubes 1.2 (2%)
2. Sl No 28, 31 to 37 may be deleted as they are being indigenously procured. 3. Sl No: 6, 7, 8, 10, 11, 12 and 13 are test plates which are allowed as per IBR. 4. Sl No:44 is a component and 29,30,45 are pipe fitting which are to be allowed on net to net basis with accountability clause. 5. Rest of the items are rough forgings to be allowed on net to net number basis with 30% machining wastage. (Total number of items is 46). RLA may take necessary action accordingly. S.No.32
Case No. A/R
112 M/s. Bharat Heavy Electricals Ltd., Noida HQF.No.01/80/050/00575/AM10/DES.I Lic. No. & date Meeting No.03/13 RA.F.No.05/23/040/00117/AM10 0510253818 dt.02.12.2009 Date: 01.05.2012 Fixation of Norms The Committee noted that the case has been referred to PIC for advise. The case is to be relisted on 12.06.2012 S.No.33
Case No. A/R31
M/s. KernLiebers Springs & Stampings Pvt. Ltd., Karnataka HQF.No.01/80/050/01630/AM09/DES.I Lic. No. & date Meeting No.03/13 RA.F.No.07/24/040/00531/AM09 0710062052 dt.26.12.2008 Date: 01.05.2012 Revision of norms The Committee reviews the case. Based on the comments of the representative of DHI, the Committee decided not to change wastage allowed earlier. S.No.34
Case No. A/R70
M/s. Kern Liebers Springs & Stampings Pvt. Ltd., Tumkur HQF.No.01/80/050/00593/AM09/DES.I Lic. No. & date Meeting No.03/13 RA.F.No.07/24/040/00008/AM09 0710057064 dt.23.04.2008 Date: 01.05.2012 Revision of norms The Committee reviews the case. Based on the comments of the representative of DHI, the Committee decided not to change wastage allowed earlier. S.No.35
Case No. A/R
154 Reference received from Jt.DGFT, CLA, New Delhi of M/s. Gestek Engineering Pvt. Ltd., New Delhi HQF.No.01/80/050/01125/AM07/DES.I Lic. No. & date Meeting No.03/13 RA.F.No.05/24/040/00812/AM07 0510196934 dt.28.12.2006 Date: 01.05.2012 Revision of Norms The Committee noted the RA letter No.05/24/40/812/AM07/CLAZALC1/846557 dated 24.11.2011 and decided to advise RA that for redemption of Advance Authorization, the export product shown in the shipping bills and import items shown in the bill of Entry should match as per ALC decision. RA may take necessary action accordingly. S.No.35 Case No. A/R167 Reference received from ECAI of M/s. Malwa Strips Pvt. Ltd., Dewas(MP) HQF.No.01/80/11/11/201112/ECA I/DES.I Lic. No. & date Meeting No.03/13 RA.F.No.03/86/040/00090/Am06 03103345535 dt.15.06.2005 Date: 01.05.2012 Clarification of description of export product obligation and actual exports are same and description in the same. The Committee considered the case and decided to send the firm’s application to all Technical Authorities for examination and comments. The case is to be relisted on 12.06.2012 S.No.36
Case No.A/R53
M/s. Andritz Hydro Pvt. Ltd., Palwal (Har.) HQ F.No.01/80/050/00009/AM12/ DESI Lic.No. & Date Meeting No.03/13 RA F.No.05/23/040/00009/AM12 0510287936 dt.11.04.2011 Date: 01.05.2012 Ratification of Norms Based on written Comments of DHI received vide their UO note No. 3(83)/09TSW/139 dt.16.04.2012, the Committee decided to ratify the norms of the subject authorization as under: 1. Export Product: 3X67 MW. Hydro Single Stage Vertical Shaft Pelton Turbine System with MIV, Governor etc. – 03 Nos. for Kashang,HP 2. Inputs: Sl No Item Quantity (% wastage) allowed For (net weight MT to be mentioned in AA) 3 to 11 Steel Plate (P355N) 25 to 90mm thick 102.8 MT (20%) Distributor ( 87 ) 4849 Steel Plate (P355N) 30/130mm thick 14.2 MT (14%) Connecting Pipe (13.4) 6970 MIV Test Dome Allowed as applied by the firm All other upto 90 Components To be allowed on Net to net (nil wastage) basis 3. S.No.43 and 7172 are not covered, under para 4.1.3 of FTP. Hence to be deleted. 4. S.No 2 and 91 to 135 are spares and to be allowed as per spars policy. RLA may take necessary action accordingly S.No.37
Case No.A/R03
M/s. The Indure P. Ltd. New Delhi HQ F.No.01/81/162/611/AM12/ DESI Lic.No. & Date Meeting No.03/13 RA F.No.05/88/040/0403/AM00 0510016315 dt.03.04.2000 Date: 01.05.2012 Ratification of Norms Based on written comments of DHI vide their UO note No. 3(40)/2010TSW(B)/ dt.01.05.2012, the Committee decided to ratify the norms of the subject authorization as under:
u de : 1. Export Product: 2X500 MW (BOP)Dry Fly Ash Extraction system Anpara B (JBIC). 2. Inputs: Item Quantity Air Compressors(oil free screw type) 06 Numbers – to be allowed on net to net basis with accountability clause. Vacuum pump 06 Numbers to be allowed on net to net basis with accountability clause. Seals,Bearings of above & Filter Bags Mandatory spares as per FT policy RLA may take necessary action accordingly S.No.38
Case No.A/R03
M/s. The Indure P. Ltd. New Delhi HQ F.No.01/81/162/2236/AM02/DES.II/ DES.I Lic.No. & Date Meeting No.03/13 RA F.No.05/88/040/05 47/AM001 0510034034 dt.21.03.2012 Date: 01.05.2012 Ratification of Norms Based on written Comments of DHI received vide their UO note No. 3(52)/12TSW(B)/149 dt.18.04.2012 and decided to ratify the norms of the subject authorization as under: Export Product: 2X300 MW (BOP) Ash handling system Phalai Vietnam Programmable logic controller(PLC) 01 set – to be allowed on net to net basis with accountability clause. Components of slurry pump 10 sets to be allowed on net to net basis with accountability clause. Bearings 22 Numbers to be allowed on net to net basis with accountability clause. RLA may take necessary action accordingly S.No.39
Case No.A/R53
M/s. Andritz Hydro Pvt. Ltd., Palwal (Har.) HQ F.No.01/80/050/00864/AM12/ DESI Lic.No. & Date Meeting No.03/13 RA F.No.05/23/040/00340/AM12 0510284704 dt.01.03.2011 Date: 01.05.2012 Ratification of Norms Based on written Comments of DHI received vide their UO note No. 3(83/09TSW(B)/140 dt.12.04.2012, the Committee decided to ratify the norms of the subject authorization as under: 1. Export Product: 3X40 MW. Hydro Francis Turbine System with MIV, Governor etc. for Rangit Stage IV Sikkim 03Numbers. 2. Inputs: Sl No. of list dt 5.9.11 Item Quantity per set allowed (% wastage) For (net weight) 24 to 42 Steel Plate (P355N) 10130mm thick 179.6 MT with 30% wastage. Spiral Case & Stay ring (139.8 MT) 43 Steel Plate (CrNiMo13 4) 25mm thick 3 MT with 18% wastage. Draft Tube (10.7MT) 68 69 Biresin Depac 450 Kg 50 Kg Filler & Grease As applied for 3. SNo.1 to 23, 44, 46 to 110 except 88, to91 are allowed on net to net basis with accountability clause. 4. S.No 45, 88,89,91 are not covered, under para 4.1.3 of FTP. Hence, deleted. 5. S.No.111 to 134 are Spares – to be allowed as per spares Policy RLA may take necessary action accordingly Sl.No.32
Case No. C 16
M/s. Birla Precision Technologies Ltd., Aurangabad HQ F.No.01/80/162/00608/AM11/ DESI Meeting No.03/13 Fixation of input output norms for the export product “Tool Holder” in respect of 100% EOU Date:01.05.2012 The Committee noted that DHI vide their Office Note No.1(8)10/TSB08 dated 24.04.2012 has requested to provide them a copy of ad hoc norms approved by the Development Commissioner of the EOU along with specific of which the finished product is made and decided to obtain the same from the Development Commissioner of EOU. The case is to be relisted on 12.06.2012. Sl.No.33
Case No.C01
M/s. Snecma Hal Aerospace Ltd., HQ F.No.01/80/162/00681/AM11/DES.I Meeting No.03/13 Date: 01.05.2012 Fixation of SION for Export Product “(Fluid System) – Air Crafts Part. The Committee noted that the firm has not replied vide this office letter dated 11.04.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relisted on 12.06.2012. S.No.34
Case No.C24
M/s. Indo Schottle Auto Parts Pvt. Ltd.,, HQ F.No.01/80/162/00532 /AM12/DES.I Meeting No.03/13 Date: 01.05.2012 Request for fixation of input output norms in respect of 100% EOUs for the export product “Central Housing Cover; Collar Thrust; Coupling Injector Plunger Assembly; Fitting High Pressure Fuel; Guide Pin; Housing Injector Spring; Link Injector Plunger; Plunger Tappet; Sleeve; Spool; Bushing; Oil Seal Plate etc.” Based on written Comments of DHI, the Committee decided to ratify the adhoc norms on repeat basis as per NC decision in case No.C06 of Meeting No.01/12 dated 05.04.2011. RLA may take necessary action accordingly
S.No.35
Case No.C38
M/s. Brady Company India Pvt. Ltd., Bangalore HQ F.No.01/80/162/01100/AM11/DES.I Meeting No.03/13 Date: 01.05.2012 Fixation of Input Output Norms for the export product “High Performance Electronic Trackers and Diecuts Parts” under 100% EOU – reg. The Committee noted that comments of C&PC received vide O.M. No.46011/48/2011PC.II dated 19.04.2012 and decided to obtain comments / requisite information from the firm for further examination. The case is to be relisted on 12.06.2012. S.No.35
Case No.C39
Reference received from PC4(B) of M/s. MultiServe Rolls Limited, Kolkata HQ F.No.01/94/180/00422/AM12/PC4(B)/DES.I Meeting No.03/13 Date: 01.05.2012 Clarification as whether the export product “Adamite Quality Roll” is covered under DEPB Sl. No. 571 of product Group “Engineering” (Product Code : 61) – reg. The Committee noted that a copy of firm’s application has been sent to M/o Steel on 09.04.2012 and case under examination with M/o Steel. The Committee decided to send a reminder and relist the case on 12.06.2012 *****
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.