RATIFIED   Minutes of Meeting No.23/12 scheduled on 31.01.2012 of Norms Committee (NC­I) (DES.I Section)   The meeting No. 23/12 of the Norms Committee (NC­I) for the licensing year 2011­2012 was held on 31.01.2012 under the Chairmanship of Sh. N.P.S. Monga, Additional  Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting:­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Dept. 1. Sh. K.K. Tiwari, IA   23062622 DHI 2. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 3. Sh. K.C. Raju, FTDO 404 23061562 Extn.265 DGFT, U.B.   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: ­ 1

Case No.:30/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred HQ File :01/80/050/00832/AM11/ RLA File :03/95/040/00765/AM11/ Lic.No/Date:0310609444 05.01.2011 Defer Date:06.03.2012 Decision :The Committee noted that a copy of firm’s reply dt.28.01.2012 forwarded to DHI for examination and comments and case is to be re­listed on 06.03.2012.   2

Case No.:3/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred HQ File :01/80/050/00805/AM11/ RLA File :03/95/040/00774/AM11/ Lic.No/Date:0310610650 12.01.2011 Defer Date:06.03.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 06.03.2012.   3

Case No.:13/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred HQ File :01/80/050/00815/AM11/ RLA File :03/95/040/00824/AM11/ Lic.No/Date:0310610931 13.01.2011 Defer Date:06.03.2012 Decision : The Committee noted that a copy of firm’s reply dt.21.01.2012 forwarded to DHI for examination and comments and case is to be re­listed on 06.03.2012.   4

Case No.:42/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred HQ File :01/80/050/00844/AM11/ RLA File :03/95/040/00874/AM11/ Lic.No/Date:0310616717 18.02.2011 Defer Date:06.03.2012 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee, therefore, decided to defer the case and to re­list the case on 06.03.2012.  

Case No.:31/40/80­ALC2/2010

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred

5 HQ File :01/80/050/00881/AM11/ RLA File :03/95/040/00926/AM11/ Lic.No/Date:0310620641 10.03.2011 Defer Date:06.03.2012 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,   6

Case No.:23/5/80­ALC2/2011

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred HQ File :01/80/050/00059/AM12/ RLA File :03/95/040/00090/AM12/ Lic.No/Date:0310630441 10.05.2011 Defer Date:06.03.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee,   7

Case No.:3/9/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred HQ File :01/80/050/00170/AM12/ RLA File :03/95/040/00166/AM12/ Lic.No/Date:0310640468 05.07.2011 Defer Date:06.03.2012 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,   8

Case No.:15/11/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred HQ File :01/80/050/00227/AM12/ RLA File :03/95/040/00283/AM12/ Lic.No/Date:0310643331 20.07.2011 Defer Date:06.03.2012 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,   9

Case No.:34/14/80­ALC2/2011

Party Name: LARSEN & TOUBRO LIMITED Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred HQ File :01/80/050/00288/AM12/ RLA File :03/95/040/00346/AM12/ Lic.No/Date:0310649471 19.08.2011 Defer Date:06.03.2012 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,   10

Case No.:37/14/80­ALC2/2011

Party Name: LARSEN & TOUBRO LIMITED Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred HQ File :01/80/050/00291/AM12/ RLA File :03/95/040/00394/AM12/ Lic.No/Date:0310650993 30.08.2011 Defer Date:06.03.2012 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,   11

Case No.:19/17/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Deferred HQ File :01/80/050/00338/AM12/ RLA File :03/95/040/00425/AM12/ Lic.No/Date:0310657607 03.10.2011 Defer Date:06.03.2012

Decision :The  Committee  noted  that  the  firm  has  not  replied  vide  this  office    letter  dated  13.01.2012  for  furnishing  the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.   12

Case No.:16/20/80­ALC2/2011

Party Name: LARSEN & TOUBRO LIMITED Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Approved HQ File :01/80/050/00401/AM12/ RLA File :03/95/040/00595/AM12/ Lic.No/Date:0310664152 09.11.2011   Decision : The Committee deliberated the written comments of DHI  received  vide their UO Note No.3(80)/11­TSW(B)/37 dated 18.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­ Export Product(EP) The total weight of the EP is 96.168 MT and the same is already incorporated in the licence. Import   1. Item No. 1­ (Aloy Steel) – The quantity of seamless pipe to be allowed is  363 Meters. (51.14 MT). The weight along with length to be incorporated in the licence. 2. Item No. 2­ (Carbon Steel) – The quantity of seamless pipe to be allowed is 167 meters/ (31.5 MT). The weight along with   length to be incorporated in the licence. 3. Item No. 3­ The word “Finished” to be prefixed to the description of import & the same to be incorporated in the licence. The quantity of import to be restricted to 9490 Kg & the same to be incorporated in the licence along with quantity of import in numbers. The item to be allowed under GN­4  with accountability clause. 4. Item No. 4 & 5 – The import weight of item No. 4 at 50 Kg and import item No.5 at 131.47 Kg to be incorporated in the licence & allowed under GN­4 with accountability clause.   The RLA may take necessary action accordingly.   13

Case No.:32/20/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:23/80­ ALC2/2011 31.01.2012 Status: Approved HQ File :01/80/050/00417/AM12/ RLA File :03/95/040/00648/AM12/ Lic.No/Date:0310665958 18.11.2011   Decision : The Committee deliberated the written comments of DHI  received  vide their UO Note No.3(80)/11­TSW(B)/36 dated 13.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­ Export Product(EP) The total weight of the EP is 2597.7 MT and the same to be incorporated in the licence. Import   1. Item No. 1­ Pipe Fittings – The firm proposes to import 1116 numbers & there is no wastage on the same. It to be allowed under GN­4. However import weight is 650 MT to be incorporated in the licence. 2. Item No. 2 is Forged components – The word “Finished” to be prefixed to the description of import & the same to be incorporated in the licence. The quantity o fimport to be restricted to 60 MT & the same to be incorporated along with quantum of import in numbers. The item to be allowed under GN­4 as applied for. 3. Item No. 3­ The quantity of pipe to be allowed is 3198 meters. (1980.6 MT) with 2 % wastage (The firm had applied for 4% wastage). The weight along with length to be incorporated in the licence. 4. Item No. 4 to  6 – These are welding materials. The firm proposes to import total 20 MT which is within 1% to total Steel imported. Import allowed as applied for by the firm.    

Case No.:29/27/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved

14 HQ File :01/80/050/00426/AM11/ RLA File :03/95/040/00354/AM11/ Lic.No/Date:0310593772 24.09.2010 Decision : As per recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms as per SION C­1742. Item No.1 – 1.05 kg/kg content, Item No.3 and 5 – 1.02 kg/kg content, Item No.2,4,6 – net to net with accountability clause and Item No.7,8,9 (welding materials) to be allowed as applied by the firm.     15

Case No.:30/27/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00427/AM11/ RLA File :03/95/040/00360/AM11/ Lic.No/Date:0310593860 24.09.2010 Defer  Date: 06.03.2012 Decision : As per DHI written comments received vide UO No. TSW(B).F.No. 3(3)/2011/TSW(B)/446 dated 10.8.2011, the Committee decided to ratify norms of the subject Authorization as under: S.No. Item Qty Recommended 1. CS Plates 2365 MT with 8% net wastage and 1/3rd recovery 2. AS Plates 57.5 MT with net wastage of 9.3% with 1/3rd recovery 3. SS Plates 57.706 MT with net wastage of 1.99% 4. SS Pipes 1317.99 MT and the length in mts to be incorporated in the licence with 2% wastage. 5. Forged components As applied for without any wastage. Weight 286.6 MT to be incorporated in the licence along with quantity in Nos. 6. Hemispherical Ellipsoidal Dished end – 18 Nos. Dished end ­ 06Nos. 7. Components To be allowed under GN­4 8 to 10 Welding materials 27,558 Kgs 11 Cutting tools Rs.165 lakhs, being less than that permitted in SION C­1647                                                                                                     16

Case No.:2/32/80­

ALC2/2010 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00543/AM11/ RLA File :03/95/040/00446/AM11/ Lic.No/Date:0310600429 08.11.2010   Decision : As per recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms as per SION C­1742.     17

Case No.:25/35/80­ALC2/2010 Party Name:L&T ­ MHI

TURBINE GENERATORS PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00652/AM11/ RLA File :03/95/040/00545/AM11/ Lic.No/Date:0310601333 15.11.2010 Defer  Date: 06.03.2012 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,  

Case No.:30/7/80­ALC2/2011

Party Name: L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred

18 HQ File :01/80/050/00136/AM12/ RLA File :03/95/040/00945/AM11/ Lic.No/Date:0310620136 08.03.2011 Defer Date: 06.03.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee,   19

Case No.:35/7/80­ALC2/2011

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00141/AM12/ RLA File :03/95/040/00125/AM12/ Lic.No/Date:0310633816 31.05.2011 Defer Date: 06.03.2012 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,   20

Case No.:13/7/80­ALC2/2011

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00119/AM12/ RLA File :03/95/040/00126/AM12/ Lic.No/Date:0310635194 09.06.2011 Defer Date: 06.03.2012 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,   S.No.539

Case No.  A/R­82

M/s.  Bharat  Heavy Electricals  Ltd., Trichirapalil HQF.No.01/80/050/00371/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00111/AM11 0410116559 dt.24.08.2010 Date: 31.01.2012 Fixation of Norms   The Committee noted that the case is under examination of DHI and decided to defer the case.     S.No.540

Case No.  A/R­83

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00054/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00536/AM10 0910041410 dt.23.03.2010 Date: 31.01.2012 Fixation of Norms       S.No.541

Case No.  A/R­84

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00182/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00048/AM10 0910038038 dt.28.05.2009 Date: 31.01.2012 Fixation of Norms       S.No.542

Case  No.    A/R­

85 M/s.  Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00207/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00060/AM11 0410114911 dt.24.06.2010 Date: 31.01.2012 Fixation of Norms   As per written comments of DHI, the Committee decided to ratify the norms of subject Authorization as per comments of AA No.0410115603. Items at S.No.15,17,18 are to be deleted. Sr.No.26(Floor Grill), Sr.No.27 (Thermocouple extension) are to be

allowed on net to net basis with accountability clause.     S.No.543

Case No.  A/R­86

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/01661/AM09/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00377/AM09 0910036659 dt.09.01.2009 Date: 31.01.2012 Fixation of Norms     S.No.544

Case No.  A/R­87

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00043/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00552/AM10 0910041731 dt.20.04.2010 Date: 31.01.2012 Fixation of Norms   As  per  written  comments  of  DHI,  the  Committee  decided  to  ratify  the  norms  of  subject  Authorization    on  repeat  basis  as  per comments of AA No.0910041410.       S.No.545

Case No.  A/R­88

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/01436/AM08/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00556/AM07 0910030003 dt.16.04.2007 Date: 31.01.2012 Fixation of Norms       S.No.546

Case No.  A/R­89

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00055/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00510/AM07 0910041253 dt.09.03.2010 Date: 31.01.2012 Fixation of Norms       S.No.547

Case No.  A/R­90

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/01784/AM09/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00408/AM09 0910037050 dt.12.02.2009 Date: 31.01.2012 Fixation of Norms       S.No.548

Case No.  A/R­91

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00404/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00155/AM11 0910042828 dt.22.07.2010 Date: 31.01.2012 Fixation of Norms       S.No.549

Case No.  A/R­92

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00403/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00087/AM11 0910042297 dt.11.06.2010 Date: 31.01.2012 Fixation of Norms

  S.No.550

Case No.  A/R­98

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00573/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00223/AM11 0910043468 dt.09.09.2010 Date: 31.01.2012 Fixation of Norms       S.No.551

Case No.  A/R­99

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00739/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00267/AM10 0910039619 dt.15.10.2009 Date: 31.01.2012 Fixation of Norms       S.No.552

Case  No.    A/R­

100 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00052/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00423/AM10 0910040811 dt.03.02.2010 Date: 31.01.2012 Fixation of Norms       S.No.553

Case  No.    A/R­

101 M/s.  Bharat  Heavy Electricals  Ltd., Chennai HQF.No.01/80/050/00720/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00233/AM11 0410119698 dt.13.12.2010 Date: 31.01.2012 Fixation of Norms   The Committee decided to ratify the norms of subject Authorization as per DHI written comments received vide UO Note No.3(39)/10­TSW(B)/245 dated 28.04.2011. Item 5 is to be allowed within 1% of the weight of the pipes. Item No.6&7 is to be allowed on net to net basis with accountability clause.       S.No.554

Case  No.    A/R­

102 M/s.  Bharat  Heavy Electricals  Ltd., Chennai HQF.No.01/80/050/01191/AM09/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00280/AM09 0410035658 dt.16.10.2008 Date: 31.01.2012 Fixation of Norms       S.No.555

Case  No.    A/R­

103 M/s.  Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00451/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00161/AM10 0410108588 dt.15.10.2009 Date: 31.01.2012 Fixation of Norms   As per written comments of DHI, the Committee decided to ratify the norms as per SION C­1742. AS and SS Plates too in line with CS plates. CS rounds in line with Tubes. Forgings and Components are to be allowed on net to net basis with accountability clause.  

S.No.556

Case  No.    A/R­

104 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00388/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00151/AM10 0910039051 dt.20.08.2008 Date: 31.01.2012 Fixation of Norms       S.No.557

Case  No.    A/R­

105 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00752/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00356/AM10 0910040183 dt.07.12.2009 Date: 31.01.2012 Fixation of Norms       S.No.558

Case  No.    A/R­

106 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00740/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00215/AM10 0910039330 dt.22.09.2009 Date: 31.01.2012 Fixation of Norms       S.No.559

Case  No.    A/R­

107 M/s.  Bharat  Heavy Electricals  Ltd., Chennai HQF.No.01/80/050/00078/AM06/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/042/00102/AM05 0410069858 dt.25.04.2005 Date: 31.01.2012 Fixation of Norms       S.No.560

Case  No.    A/R­

108 M/s.  Bharat  Heavy Electricals  Ltd., Ranipet HQF.No.01/80/050/00494/AM08/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00201/AM08 0410091443 dt.09.10.2007 Date: 31.01.2012 Fixation of Norms   The Committee decided to ratify the norms of subject authorization as per written comments of DHI received vide UO No.3(29)/09­ TSW(B)/624 dated 18.10.2011 as under: Export: The description of export product to be amended and their weight incorporated as given below: 1.             ESP­4 Numbers – 4205 MT. 2.             APH­2Numbers – 721MT. 3.             FAN­8 Numbers­325MT. 4.             Dampers & Gates­(24+26) – 180MT.                 The total export weight is 5431 MT & the same to be incorporated in the license. Import: There are 26 items which consists raw material & components. Item No Name Qty recommended 1 CS plate 400 MT with 3% wastage as applied for 2. Haste Alloy Sheet 2.91  MT  with  1%  wastage  (It  is  a nonferrous item)

SS Wires 12 MT with 1% wastage as applied for. 4. CS Pipe 782.5  MT  with  1%  wastage  as applied for Upto  No.26 except No.20 Components To be allowed under GN4 20 Aluminium blades The word ‘finished” may be prefixed & to be allowed under GN4.     S.No.561

Case  No.    A/R­

109 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabd HQF.No.01/80/050/00242/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00114/AM11 0910042665 dt.08.07.2010 Date: 31.01.2012 Fixation of Norms       S.No.562

Case  No.    A/R­

110 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabd HQF.No.01/80/050/00497/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00197/AM10 0910039077 dt.27.08.2009 Date: 31.01.2012 Fixation of Norms       S.No.563

Case  No.    A/R­

111 M/s.  Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00659/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00240/AM10 0410110329 dt.22.12.2009 Date: 31.01.2012 Fixation of Norms   As per written comments of DHI, the Committee decided to ratify the norms as per SION C­1742. ­ AS plates, SS plates in line with CS Plates – 1.05 kg/kg content. ­ CS rounds in line with CS Pipes – 1.02 kg/kg content. ­ Forgings and Components on net to net basis with accountability clause. Items at Sr.No.12,13 are to be deleted.     S.No.564

Case  No.    A/R­

112 M/s.  Bharat  Heavy Electricals  Ltd., Noida HQF.No.01/80/050/00575/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.05/23/040/00117/AM10 0510253818 dt.02.12.2009 Date: 31.01.2012 Fixation of Norms       S.No.565

Case  No.    A/R­

113 M/s.  Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00607/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00202/AM10 0410109872 dt.02.12.2009 Date: 31.01.2012 Fixation of Norms   As per written comments of DHI, the Committee decided to ratify the norms as per SION C­1742.

­ AS plates, SS plates in line with CS Plates ­ 1.05 kg/kg content. ­ CS rounds in line with CS Pipes – 1.02 kg/kg content. ­ Forgings and Components on net to net basis with accountability clause. Items at Sr.No.11 is to be deleted.     S.No.566

Case  No.    A/R­

114 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00387/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/99455/AM09 0910037412 dt.17.03.2009 Date: 31.01.2012 Fixation of Norms       S.No.567

Case  No.    A/R­

115 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/01580/AM09/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00351/AM09 0910036322 dt.16.12.2008 Date: 31.01.2012 Fixation of Norms       S.No.568

Case  No.    A/R­

116 M/s.  Bharat  Heavy Electricals  Ltd., Trichirapalli HQF.No.01/80/050/00641/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00223/AM10 0410110394 dt.23.12.2009 Date: 31.01.2012 Fixation of Norms   The Committee decided to ratify the norms of subject Authorization as per DHI written comments in Authorization No.0410121550.     S.No.569

Case  No.    A/R­

117 M/s.  Bharat  Heavy Electricals  Ltd., Noida HQF.No.01/80/050/00088/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.05/24/040/00732/AM09 0510241368 dt.13.05.2009 Date: 31.01.2012 Fixation of Norms       S.No.570

Case  No.    A/R­

118 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00495/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00169/AM11 0910043002 dt.06.08.2010 Date: 31.01.2012 Fixation of Norms       S.No.571

Case  No.    A/R­

119 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00494/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00176/AM11 0910043125 dt.17.08.2010 Date: 31.01.2012 Fixation of Norms

    S.No.572

Case  No.    A/R­

120 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00176/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00473/AM09 0910037585 dt.31.03.2009 Date: 31.01.2012 Fixation of Norms       S.No.573

Case  No.    A/R­

121 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00053/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00506/AM10 0910041252 dt.09.03.2010 Date: 31.01.2012 Fixation of Norms       S.No.574

Case  No.    A/R­

122 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/01505/AM09/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00324/AM09 0910036139 dt.01.12.2008 Date: 31.01.2012 Fixation of Norms       S.No.575

Case  No.    A/R­

123 M/s.  Bharat  Heavy Electricals  Ltd., Haridwar HQF.No.01/80/050/00837/AM09/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.61/24/040/00028/AM09 6110000209 dt.08.08.2008 Date: 31.01.2012 Fixation of Norms   The Committee decided to ratify the norms of subject Authorization as per DHI written comments in respect of  AA No.6110000286.     S.No.576

Case  No.    A/R­

124 M/s.  Bharat  Heavy Electricals  Ltd., Noida HQF.No.01/80/050/00678/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.61/24/040/00116/AM10 0510253815 dt.02.12.2009 Date: 31.01.2012 Fixation of Norms       S.No.577

Case  No.    A/R­

125 M/s.  Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00585/AM11/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00214/AM11 0410119184 dt.25.11.2010 Date: 31.01.2012 Fixation of Norms   The Committee decided to ratify the norms of subject Authorization as per DHI written comments in respect of AA No.0410121550.  

S.No.578

Case  No.    A/R­

126 M/s.  Bharat  Heavy Electricals  Ltd., Chennai HQF.No.01/80/050/00077/AM06/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/040/00101/AM05 0410069856 dt.25.04.2005 Date: 31.01.2012 Fixation of Norms       S.No.579

Case  No.    A/R­

127 M/s.  Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00004/AM04/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.04/24/042/00044/AM04 0410056010 dt.16.04.2004 Date: 31.01.2012 Fixation of Norms     S.No.580

Case  No.    A/R­

128 M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad HQF.No.01/80/050/00180/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.09/24/040/00004/AM10 0910037842 dt.06.05.2009 Date: 31.01.2012 Fixation of Norms     S.No.581

Case  No.    A/R­

129 M/s.  Bharat  Heavy Electricals  Ltd., Haridwar HQF.No.01/80/050/00537/AM09/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.61/24/040/00029/AM09 6110000255 dt.05.12.2008 Date: 31.01.2012 Fixation of Norms   The Committee decided to ratify the norms of subject Authorization as per DHI written comments in respect of AA No.6110000286.     S.No.582

Case  No.    A/R­

131 M/s.  Bharat  Heavy Electricals  Ltd., Noida HQF.No.01/80/050/00678/AM10/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.05/23/040/00116/AM10 0510253815 dt.02.12.2009 Date: 31.01.2012 Fixation of Norms     S.No.583

Case  No.    A/R­

132 M/s.  Bharat  Heavy Electricals  Ltd., Haridwar HQF.No.01/80/050/00608/AM09/DES.I Lic. No. & date Meeting No.23/12 RA.F.No.61/24/040/00034/AM09 6110000253 dt.05.12.2008 Date: 31.01.2012 Fixation of Norms   The Committee decided to ratify the norms of subject Authorization as per DHI written comments in respect of AA No.6110000286.  


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.