← Archive
IN FORCE Advance Authorisation

DGFT Minutes

Reliability

In force — no superseding record on file.

Document text

RATIFIED   Minutes of Meeting No.19/12 scheduled on 13.12.2011 of Norms Committee(NC­I) (DES­I Section)   The meeting No.19/12 of the Norms Committee (NC­I) for the licensing year 2011­2012 was held on 13.12.2011  under  the  Chairmanship  of  Sh.  N.P.S.  Monga,  Additional    Director  General  of  Foreign  Trade  to consider  the  applications  under  Duty  Exemption  /  Remission  Schemes  (Chapter­4)  of  Foreign  Trade  Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 5. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: ­ 1

Case No.:18/41/80­ALC2/2009

Party Name:KE­BURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00639/AM10/ RLA File :04/24/040/00247/AM10/ Lic.No/Date:0410110339 22.12.2009 Defer Date:24.01.2012 Decision : The Committee noted that a D.O.letter has been sent to C&PC on 21.12.2011 for expediting their comments.  The Committee, therefore, decided to await the comments of C&PC for expediting their comments and to re­list the case on 24.01.2012.   2

Case No.:16/42/80­ALC2/2009

Party Name:KOMET PRECISION TOOLS INDIA PVT LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00662/AM10/ RLA File :07/24/040/00381/AM10/ Lic.No/Date:0710069369 11.01.2010   Decision : The representative of the firm Sh.  Puneet Kapoor, National Sales Manager appeared before the Committee for personal hearing and explained their case.  The Committee after deliberating the details of the case, decided to ratify the norms in respect of the subject advance authorization on net to net basis with accountability clause.   The RLA may take necessary action accordingly.   3

Case No.:19/18/80­ALC2/2010

Party Name:STARION INDIA P.LTD Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00272/AM11/ RLA File :31/24/040/00028/AM11/ Lic.No/Date:3110043412 31.05.2010 Defer Date:24.01.2012 Decision  :The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  03.12.2011  to  DIT  for examination and comments.  The case may be re­listed on 24.01.2012.

Case No.:15/18/80­ALC2/2010

Status:

4 Party Name:INDUS PRO AUTO ENGINEERS PVT.LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Deferred HQ File :01/80/050/00268/AM11/ RLA File :05/23/040/00054/AM11/ Lic.No/Date:0510266316 17.06.2010 Defer Date:24.01.2012 Decision : The Committee noted that  the firm has given complete reply to deficiency letters of DHI. The Committee decided to advise the firm to appear before the NC to explain their case in person particularly with reference to calculation/justification of requirement of import of Vinyl Sheeting Sherra Black Skin.  The case may be re­listed on 24.01.2012.   5

Case No.:45/18/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00298/AM11/ RLA File :06/24/040/00018/AM11/ Lic.No/Date:0610018429 07.07.2010 Defer Date:24.01.2012 Decision : The Committee noted that a D.O.letter has been sent to Min. of Defence on 17.11.2011 for expediting  their  comments.    The  Committee,  therefore,  decided  to  send  the  reminder  to  Ministry  of Defence for expediting their comments and to re­list the case on 24.01.2012.   6

Case No.:47/18/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00300/AM11/ RLA File :06/24/040/00017/AM11/ Lic.No/Date:0610018428 07.07.2010 Defer Date:24.01.2012 Decision : The Committee noted that a D.O.letter has been sent to Min. of Defence on 17.11.2011 for expediting  their  comments.    The  Committee,  therefore,  decided  to  send  the  reminder  to  Ministry  of Defence for expediting their comments and to re­list the case on 24.01.2012.   7

Case No.:21/18/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00274/AM11/ RLA File :61/24/040/00029/AM11/ Lic.No/Date:6110000472 15.07.2010 Defer Date:24.01.2012 Decision : The Committee noted that the firm has not submitted proper justification for the import quantity for item no 139 to 141.  It has only given statement of requirement.  The Committee therefore, decided to ask the firm to give calculation of requirement of each raw material from the dimension angle  and to re­list the case on 24.01.2012.   8

Case No.:29/22/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00340/AM11/ RLA File :06/24/040/00022/AM11/ Lic.No/Date:0610018565 21.07.2010 Defer Date:24.01.2012 Decision : The Committee noted that a D.O.letter has been sent to Min. of Defence on 17.11.2011 for expediting  their  comments.    The  Committee,  therefore,  decided  to  send  the  reminder  to  Ministry  of Defence for expediting their comments and to re­list the case on 24.01.2012.

Case No.:30/22/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred

9 HQ File :01/80/050/00341/AM11/ RLA File :06/24/040/00023/AM11/ Lic.No/Date:0610018566 21.07.2010 Defer Date:24.01.2012 Decision : The Committee noted that a D.O.letter has been sent to Min. of Defence on 17.11.2011 for expediting  their  comments.    The  Committee,  therefore,  decided  to  send  the  reminder  to  Ministry  of Defence for expediting their comments and to re­list the case on 24.01.2012.   10

Case No.:33/35/80­ALC2/2010

Party Name:SHETRON METROPAK PVT.LTD, Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Closed HQ File :01/80/050/00660/AM11/ RLA File :07/21/040/00279/AM11/ Lic.No/Date:0710073152 23.07.2010   Decision :The Committee noted that R.A. has informed vide their letter dated 23.11.2011 subject  advance authorization has been issued under SION C­773 of Engineering product and not C­777.  The Committee, therefore, decided to take note of the intimation and decided to close the case on the part NC.     11

Case No.:8/21/81­ALC2/2010

Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/81/050/00123/AM11/ RLA File :05/24/040/00172/AM11/ Lic.No/Date:0510270168 10.08.2010   Decision : As per the written comments of  DIT  received  vide their U.O. Note No.17(18)/2011­IPHW dated    31.10.2011,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization as under:­         1. Import item at S.No.1 to 11, 14 & 16 to 22   :   On net to net basis with  accountability                                                                                   clause       2. Import item at S.No.12, 13 & 15            As applied for by the firm inclusive of                                                                           wastage of 2%     12

Case No.:46/22/80­ALC2/2010

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00357/AM11/ RLA File :05/24/040/00178/AM11/ Lic.No/Date:0510270834 18.08.2010   Decision : As per the written comments of  DIT  received  vide their U.O. Note No.17(75)/2011­IPHW dated    25.11.2011,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization on net to net basis with accountability clause.     13

Case No.:24/29/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00459/AM11/ RLA File :03/94/040/00501/AM11/ Lic.No/Date:0310591600 08.09.2010 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  15.11.2011  to  DIT  for

14

Case No.:29/29/80­ALC2/2010

Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Rejected HQ File :01/80/050/00464/AM11/ RLA File :11/24/040/00038/AM11/ Lic.No/Date:1110023211 16.09.2010   Decision  :The  Committee  decided  to  reject  the  case  on  the  ground  that  the  firm  did  not  furnish  any reply10.10.2011  and subsequent this office reminder’s dated 14.11.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     15

Case No.:12/27/80­ALC2/2010

Party Name:AIR LIQUIDE ENGINEERING INDIA PVT LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00409/AM11/ RLA File :09/24/040/00253/AM11/ Lic.No/Date:0910043538 17.09.2010   Decision :As per the written comments of  DIPP  received  vide their U.O. Note dated 18.12.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Net empty weight of export product to be specified as 274.68 MT. 2. Quantity of import item at Sl. No. 1 to be corrected as “1 No.” 3. Weights of import items at Sl. No. 1, 2, 3 & 4 to be specified as  940 Kgs., 3300 Kgs., 550 Kgs. & 275 Kgs. respectively 4. Import items at Sl. No 1, 2, 3 & 4 to be allowed on net to net basis. 5. Import items from Sl. No. 5 to 7, 13 to 16, 18, 19, 21 & 23 to be deleted as the same have not been imported/ required by the firm. 6. Weights of import items at Sl. No. 8, 9 & 10 to be specified as  560 Kgs., 1260 Kgs. & 450 Kgs. respectively. 7. Import items at Sl. No  8, 9 & 10 to be allowed on net to net basis. 8. Description  of  import  item  at  Sl.  No.  11  to  be  modified  as  “Relevant  Carbon  Steel Plates/Channels/Angles/Flats/Rods/Hollow  Sections”  and  its  quantity  to  be  modified  as  94  MT. Quantity of this item to be allowed as under:             (i)  Carbon Steel Plates: 1.05 Kgs./Kg. content in the export product            (ii) Carbon Steel Channels/Angles/Flats/Rods/Hollow Sections: 1.02 Kgs./Kg.                          content in the  export product

teel Plates: 1.05 Kgs./Kg. content in the export product            (ii) Carbon Steel Channels/Angles/Flats/Rods/Hollow Sections: 1.02 Kgs./Kg.                          content in the  export product 9. Quantities of import items at Sl. No. 12, 17 & 20 to be allowed on net to net basis with accountability clause. 10. Weights of import items at Sl. No. 22 & 24 to be specified as  3540 Kgs. & 2062 Kgs. respectively 11. Quantity of import items at Sl. No. 22 & 24  to be allowed on net to net basis.     16

Case No.:29/27/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00426/AM11/ RLA File :03/95/040/00354/AM11/ Lic.No/Date:0310593772 24.09.2010 Defer Date:24.01.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 24.01.2012.

Case No.:30/27/80­ALC2/2010

Status:

17 Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Deferred HQ File :01/80/050/00427/AM11/ RLA File :03/95/040/00360/AM11/ Lic.No/Date:0310593860 24.09.2010 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  08.12.2011  to  DHI  for   18

Case No.:6/35/80­ALC2/2010

Party Name:GATRAY ENVIROTECH  SYSTEMS Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00633/AM11/ RLA File :31/24/040/00144/AM11/ Lic.No/Date:3110045144 20.10.2010 Defer Date:24.01.2012 Decision : The Committee noted that a D.O.letter has been sent to Min. of Defence on 17.11.2011 for expediting  their  comments.    The  Committee,  therefore,  decided  to  send  the  reminder  to  Ministry  of Defence for expediting their comments and to re­list the case on 24.01.2012.   19

Case No.:22/35/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00649/AM11/ RLA File :04/24/040/00194/AM11/ Lic.No/Date:0410118622 04.11.2010 Defer Date:24.01.2012 Decision : The Committee noted that the firm reply dated 27.09.2011 already been sent to DHI 11.10.2011.     Keeping  in  view  the  firm’s  reply,  the  Committee  decided  to  request  DHI  to  re­examine  their  written comments received vide I.D. Note dated 28.07.2011 with respect to S. No. 11 & 13 (Item  No. 13, 31 & 32) and to re­list the caser on 24.01.2012.   20

Case No.:2/32/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00543/AM11/ RLA File :03/95/040/00446/AM11/ Lic.No/Date:0310600429 08.11.2010 Defer Date:24.01.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 15.11.2011 and the case is under examination of DHI. The case may be re­listed on  24.01.2012.   21

Case No.:25/35/80­ALC2/2010

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00652/AM11/ RLA File :03/95/040/00545/AM11/ Lic.No/Date:0310601333 15.11.2010 Defer Date:24.01.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 24.01.2012.   22

Case No.:53/35/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00680/AM11/ RLA File :61/24/040/00067/AM11/ Lic.No/Date:6110000536 01.12.2010 Defer Date:24.01.2012 Decision  :  The  Committee  noted  that  the  firm  reply  dated  27.09.2011  already  been  sent  to  DHI 11.10.2011.   Keeping in view the firm’s reply, the Committee decided to request DHI to re­examine their

written comments received vide I.D. Note dated 13.07.2011 with respect to S. No.2, 4, 8, 11, 31 & 34 (Items No. 12, 44, 118,122, 200, 201 & 204) and to re­list the case on 24.01.2012.   23

Case No.:45/35/80­ALC2/2010

Party Name:BOSCH LIMITED, Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00672/AM11/ RLA File :07/24/040/00332/AM11/ Lic.No/Date:0710075865 07.12.2010 Defer Date:24.01.2012 Decision  :  The  Committee  noted    that  the  firm’s  reply  dated  24.10.2011  has  been  sent  to  DHI  on 15.11.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  24.01.2012.   24

Case No.:36/35/80­ALC2/2010

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00663/AM11/ RLA File :05/23/040/00263/AM11/ Lic.No/Date:0510279826 20.12.2010 Defer Date:24.01.2012 Decision  :The  Committee  noted  the  deficiency  raised  by  DC(MSME)  vide  their  U.O.  Note  No. 30(93)2011­ME dated 07.12.2011 and decided to seek the clarification/details from the firm.  The case may be re­listed on 24.01.2012.   25

Case No.:44/35/80­ALC2/2010

Party Name:EUROFLEX TRANSMISSIONS(INDIA) PVT.LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00671/AM11/ RLA File :09/24/040/00418/AM11/ Lic.No/Date:0910044876 24.12.2010   Decision : As per the written comments of  DHI  received  vide their U.O. Note No.3(37)11­TSW(B)373 dated  13.07.2011,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization  as under:­ Export:­(Transmission Shaft Coupling)   Total  weight of  9570 kg to be incorporated in the licence.   Import:­ (Cold Rolled Stainless Steel Sheet)         To be allowed at 15024 kg including net wastage of 57% with 1/3rd recovery.     26

Case No.:67/35/80­ALC2/2010

Party Name:J.D. JONES & CO. PVT. LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00694/AM11/ RLA File :02/24/040/00175/AM11/ Lic.No/Date:0210152785 29.12.2010   Decision : Based on recommendation of DC(MSME), the Committee decided to ratify the norms in respect of the subject advance authorization on repeat basis as per AA No. 02101446504 dated 13.08.2010 Meeting No.37/11 dated 08.02.2010.

Case No.:23/36/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 Status: Deferred

27 13.12.2011 HQ File :01/80/050/00722/AM11/ RLA File :61/24/040/00072/AM11/ Lic.No/Date:6110000544 04.01.2011 Defer Date:24.01.2012 Decision : The Committee also noted that DHI has been requested vide this I.D. Note dated 24.11.2011 to re­examine their written comments dated 13.07.2011.  The firm reply dated 27.09.2011 already been sent to DHI 11.10.2011. The Committee decided to again remind DHI to offer their comments and to re­list the caser on 24.01.2012.   28

Case No.:27/1/80­ALC2/2011

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00910/AM11/ RLA File :06/24/040/00051/AM11/ Lic.No/Date:0610020480 07.01.2011 Defer Date:24.01.2012 Decision : The Committee noted that a D.O.letter has been sent to Min. of Defence on 17.11.2011 for expediting  their  comments.    The  Committee,  therefore,  decided  to  send  the  reminder  to  Ministry  of Defence for expediting their comments and to re­list the case on 24.01.2012.   29

Case No.:14/38/80­ALC2/2010

Party Name:VASUNDRA MANUFACTURING SYSTEMS PVT.LTD, Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00784/AM11/ RLA File :07/21/040/00786/AM11/ Lic.No/Date:0710077109 03.02.2011 Defer Date:24.01.2012 Decision  :  The  Committee  noted  the  deficiency  raised  by  DC(MSME)  vide  their  U.O.  Note No.30(66)2011­ME dated 07.12.2011 and decided to seek the clarification/details from the firm.  The case may be re­listed on 24.01.2012.   30

Case No.:16/38/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00786/AM11/ RLA File :05/23/040/00309/AM11/ Lic.No/Date:0510283074 03.02.2011 Defer Date:24.01.2012 Decision :The Committee noted  that the firm’s reply dated 25.11.2011 has been sent to DHI on 05.12.2011 and the case is under examination of DHI.  The case may be re­listed on  24.01.2012.   31

Case No.:43/1/80­ALC2/2011

Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00926/AM11/ RLA File :22/24/040/00090/AM11/ Lic.No/Date:2210010955 04.02.2011 Defer Date:24.01.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 24.01.2012.   32

Case No.:31/38/80­ALC2/2010

Party Name:STARION INDIA P.LTD Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00801/AM11/ RLA File :31/24/040/00239/AM11/ Lic.No/Date:3110046834 09.02.2011 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  03.12.2011  to  DIT  for

33

Case No.:22/1/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00905/AM11/ RLA File :04/24/040/00244/AM11/ Lic.No/Date:0410121548 11.02.2011 Defer Date:24.01.2012 Decision  :  The  Committee  noted  the  written  comments  of    DHI    received    vide  their  U.O.  Note  No. 3(40)10­TSW(B)641 dated 24.10.2011 for ratification of norms on repeat basis as per AA No.0410121550 dated 11.02.11 which is yet to be ratified.  The Committee, therefore, decided to defer and  to re­list  the case on 24.01.2012.   34

Case No.:32/1/80­ALC2/2011

Party Name:PSK ENGINEERING PVT LTD Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00915/AM11/ RLA File :07/24/040/00449/AM11/ Lic.No/Date:0710077436 18.02.2011 Defer Date:24.01.2012 Decision :  As  per  DIPP  U.O.  Note  dated  18.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  24.01.2012.   1.      Name &  quantity of each export product. 2.      Information in respect of Sl. No.3, 4, 5 & 11 of Standard Deficiency Format.­export product wise.   35

Case No.:31/1/80­ALC2/2011

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00914/AM11/ RLA File :07/24/040/00465/AM11/ Lic.No/Date:0710077482 21.02.2011   Decision : The representative of the firm Sh. A. Srinivasa Rao, Director appeared before the Committee for personal hearing and explained their case. The Committee deliberated the details of the case and decided to agree with the written comments of DC(MSME)  received  vide their U.O. Note No.30(02)2011­ME dated 07.12.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­     S.No. Export Product Srl  no  of imported  Raw material  in import list Recommended  qty  of imported  Raw  Material after recovery in Kg 01 Upper Deflector 01 138.90 02 Mounting Angle 02 142.40 03 Strut Doubler 03 8.97 04 Strut Doubler 04 69.64 05 Wiper post Deflector 05 954.00 06 Splice Plate LH 06 4.39 07 Splice Plate RH 07 4.39 08 Deflector Channel 08 305.42 09 Painter W/S post DEF 09 1179.00 10 W/w Post deflector RH 10 1179.00 11 Step Deflector 11 1765.00 12 L/G Joint Deflector 12 130.50 13 Insert 13 2.60 14 Bracket Left 14 145.57

15 Bracket Right 15 145.67 16 Bracket AFT RH 16 33.58 17 Angle armour CH 17 124.32 18 Def Inboard Armour CH 18 301.46 19 Bracket AFT RH 19 33.58 20 Lever detail 20 13.05 21 Stop detail 21 103.73 22 Cap 22 57.31 23 PIN 23 0.59     36

Case No.:4/1/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00886/AM11/ RLA File :04/24/040/00298/AM11/ Lic.No/Date:0410122003 28.02.2011 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  02.12.2011  to  DHI  for   37

Case No.:30/7/80­ALC2/2011

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00136/AM12/ RLA File :03/95/040/00945/AM11/ Lic.No/Date:0310620136 08.03.2011 Defer Date:24.01.2012 Decision  :The  Committee  noted    that  the  firm’s  reply  dated  02.11.2011  has  been  sent  to  DHI  on 18.11.2011.  The Committee, therefore, decided to send R.A. amend sheet also to DHI and to re­list the case on  24.01.2012.   38

Case No.:6/1/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Rejected HQ File :01/80/050/00888/AM11/ RLA File :03/94/040/00831/AM11/ Lic.No/Date:0310621241 15.03.2011   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 05.10.2011 and subsequent reminder dated 14.11.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     39

Case No.:12/1/80­ALC2/2011

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00894/AM11/ RLA File :05/24/040/00419/AM11/ Lic.No/Date:0510286112 15.03.2011 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  08.12.2011  received  on 13.12.2011 to DHI for examination and comments.  The case may be re­listed on 24.01.2012.

Case No.:16/10/80­ALC2/2011

Party Name:THE TATA POWER COMPANY LTD Meet No/Date:19/80­ ALC2/2011 Status: Rejected

40 13.12.2011 HQ File :01/80/050/00211/AM12/ RLA File :07/24/040/00012/AM12/ Lic.No/Date:0710078667 19.04.2011   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with  reference  to  DIT’s  letter  dated  12.09.2010  their  reminder  dated  11.10.2011  and  this  office  final reminder dated 15.11.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     41

Case No.:32/7/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00138/AM12/ RLA File :11/24/040/00009/AM12/ Lic.No/Date:1110024726 11.05.2011 Defer Date:24.01.2012 Decision : The Committee observed that the firm has not replied to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information failing  which    their  case  will  be  rejected  without  any  further  notice.    The  case  may  be  re­listed  on 24.01.2012.   42

Case No.:10/7/80­ALC2/2011

Party Name:MACAWBER BEEKAY PVT.LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00116/AM12/ RLA File :05/24/040/00046/AM12/ Lic.No/Date:0510290507 12.05.2011   Decision : As per the written comments of  DHI  received  vide their U.O. Note No.3(37)11­TSW(B)670 dated  11.11.2011,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization  as under:­   Export        1 set of Fly Ash Handling plant to be allowed Import 1. Item no 1 & 3­ To be allowed under GN­4. 2. Item no 2­ Seamless pipe­ To be allowed on net to net basis with out any wastage with accountability clause.     43

Case No.:15/7/80­ALC2/2011

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00121/AM12/ RLA File :04/24/040/00046/AM12/ Lic.No/Date:0410124251 20.05.2011 Defer Date:24.01.2012 Decision :The  Committee  noted  that  the  firm  has  sought  time  vide  their  letter  dated  05.12.2011.    The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 24.01.2012.

Case No.:16/7/80­ALC2/2011

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred

44 HQ File :01/80/050/00122/AM12/ RLA File :04/24/040/00045/AM12/ Lic.No/Date:0410124249 20.05.2011 Defer Date:24.01.2012 Decision : The Committee noted that the firm has sought time vide their letter dated 05.12.2011.  The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 24.01.2012.   45

Case No.:36/7/80­ALC2/2011

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00142/AM12/ RLA File :04/24/040/00051/AM12/ Lic.No/Date:0410124216 20.05.2011 Defer Date:24.01.2012 Decision: As per DHI U.O. Note No. 3(74)/10­TSW(B) dated 08.11.2011, the Committee decided to ask the firm to furnish representative calculation for item no 4( PL­SS­SA240­32205­10 THK) of weight 1680 kg. The calculation should be supported by drawing with dimensions highlighted and to re­list the case on 24.01.2012.   46

Case No.:2/10/80­ALC2/2011

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00197/AM12/ RLA File :03/94/040/00034/AM12/ Lic.No/Date:0310633321 27.05.2011 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  29.111.2011  to  DIT  for   47

Case No.:3/10/80­ALC2/2011

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00198/AM12/ RLA File :03/94/040/00035/AM12/ Lic.No/Date:0310633340 27.05.2011 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  30.11.2011  to  DIT  for   48

Case No.:35/7/80­ALC2/2011

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00141/AM12/ RLA File :03/95/040/00125/AM12/ Lic.No/Date:0310633816 31.05.2011 Defer Date:24.01.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 18.11.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  24.01.2012.   49

Case No.:1/7/80­ALC2/2011

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00107/AM12/ RLA File :09/24/040/00119/AM12/ Lic.No/Date:0910046990 03.06.2011 Defer Date:24.01.2012 Decision : The Committee noted that firm has sought time for 30 days vide their letter dated 22.11.2011.  The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 24.01.2012.

Case No.:2/7/80­ALC2/2011

Party Name:DENSO HARYANA PVT. LTD., Meet No/Date:19/80­ ALC2/2011 Status: Deferred

50 13.12.2011 HQ File :01/80/050/00108/AM12/ RLA File :05/23/040/00066/AM12/ Lic.No/Date:0510292671 06.06.2011 Defer Date:24.01.2012 Decision  :  The  Committee  noted    that  the  firm’s  reply  dated  24.10.2011  has  been  sent  to  DHI  on 16.11.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  24.1.2012.   51

Case No.:11/7/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00117/AM12/ RLA File :04/24/040/00065/AM12/ Lic.No/Date:0410124734 08.06.2011 Defer Date:24.01.2012 Decision  :  The  Committee  noted    that  the  firm’s  reply  has  been  sent  to  DHI  on  21.11.2011.    The Committee, therefore, decided to defer the case and to re­list the case on  24.1.2012.   52

Case No.:12/7/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00118/AM12/ RLA File :04/24/040/00067/AM12/ Lic.No/Date:0410124735 08.06.2011 Defer Date:24.01.2012 Decision  :  The  Committee  noted    that  the  firm’s  reply  has  been  sent  to  DHI  on  21.11.2011.    The Committee, therefore, decided to defer the case and to re­list the case on  24.1.2012.   53

Case No.:14/10/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00209/AM12/ RLA File :61/24/040/00012/AM12/ Lic.No/Date:6110000627 08.06.2011 Defer Date:24.01.2012 Decision  :  The  Committee  noted    that  the  firm’s  reply  has  been  sent  to  DHI  on  31.10.2011.    The Committee, therefore, decided to defer the case and to re­list the case on  24.1.2012.   54

Case No.:13/7/80­ALC2/2011

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00119/AM12/ RLA File :03/95/040/00126/AM12/ Lic.No/Date:0310635194 09.06.2011 Defer Date:24.01.2012 Decision  :  The  Committee  noted    that  the  firm’s  reply  dated  14.11.2011  has  been  sent  to  DHI  on 28.11.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  24.1.2012.   55

Case No.:18/7/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00124/AM12/ RLA File :04/24/040/00317/AM11/ Lic.No/Date:0410124882 13.06.2011 Defer Date:24.01.2012 Decision  :The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  12.12.2011  to  DHI  for   56

Case No.:19/7/80­ALC2/2011

Party Name:PRANAV VIKAS (INDIA) LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00125/AM12/ RLA File :05/24/040/00090/AM12/

Lic.No/Date:0510293230 13.06.2011 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  08.12.2011  to  DIPP  for   57

Case No.:1/10/80­ALC2/2011

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00196/AM12/ RLA File :03/94/040/00231/AM12/ Lic.No/Date:0310635806 13.06.2011 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  15.11.2011  to  DIT  for   58

Case No.:20/7/80­ALC2/2011

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00126/AM12/ RLA File :05/23/040/00102/AM12/ Lic.No/Date:0510293271 14.06.2011 Defer Date:24.01.2012 Decision  :  The  Committee  noted    that  the  firm’s  reply  dated  20.11.2011  has  been  sent  to  DHI  on 05.12.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  24.1.2012.   59

Case No.:25/7/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00131/AM12/ RLA File :03/94/040/00192/AM12/ Lic.No/Date:0310636369 15.06.2011   Decision : As per the written comments of  DIPP  received  vide their U.O. Note dated 18.12.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1.           Net empty export weights of 123.95 MT & 123.95 MT to be specified with the quantities of export products at  Sl. No. 1  & 2  respectively. 2.      Weights of  3840 Kgs. & 13567 Kgs. to specified with the quantities of import items at Sl. No. 1 & 2 respectively and the same may be allowed on net to net basis. 3.      Quantity of import item at Sl. No. 3 to be allowed as 393 Kgs  (2286 Nos.) on net to net  basis. 4.      Words “ Tees /Reducers/Caps” to be deleted from the description of import item at Sl. No. 4 and its quantity may be allowed as 2 Nos. on net to net basis. However, duty free weight of this item to be allowed as  31 Kg inclusive of  5 % wastage. 5.      Word “Relevant” to be prefixed with the descriptions of import items at Sl. No. 5, 6 & 7. 6.      Quantities of import items at Sl. No. 5 & 6 to be allowed as applied for inclusive of 3 % wastage. 7.      Quantity of import item at Sl. No. 7 to be allowed as 4402 Kgs.(460.6 Mtrs.) inclusive of 2 % wastage. 8.      Weights of  1380 Kgs., 2025 Kgs., 630 & 331 Kgs. to specified with the quantities of import items

of import item at Sl. No. 7 to be allowed as 4402 Kgs.(460.6 Mtrs.) inclusive of 2 % wastage. 8.      Weights of  1380 Kgs., 2025 Kgs., 630 & 331 Kgs. to specified with the quantities of import items at Sl. No. 8, 9 10 & 12 respectively and the same to be allowed on net to net basis. 9.      Quantity of import item at Sl. No.11 to be allowed on net to net basis with accountability clause. 10.  Quantities of import items at Sl.Nos. 13, 14 & 15 ( Welding Consumables)  to be allowed as 2790 Kgs. each.

Case No.:15/10/80­ALC2/2011

Party Name:LALITHA & COMPANY PAPER PRODUCTS PVT LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred

60 HQ File :01/80/050/00210/AM12/ RLA File :09/24/040/00067/AM12/ Lic.No/Date:0910047134 15.06.2011 Defer Date:24.01.2012 Decision :  As  per  DIPP  U.O.  Note  dated  18.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  24.01.2012.           1.  Complete manufacturing process “Cut Rubber Blanket”  using “Rubber Blanket for Printing Use”, indicating wastage at each stage of manufacture.  Total weight of  the import item i.e. “Rubber Blanket for Printing use” may be indicated.  Dimension of each ““Cut Rubber Blanket” including weight of each “Cut Rubber Blanket” may also be forwarded.         2.  Quantity of production of  “Cut Rubber Blanket”  of similar dimension & weight as the present export product, vis­à­vis consumption of “Rubber Blanket” for Printing Use” and other indigenous inputs  as  raw  material,  if  any,  in  the  past  3  years,  year  wise  duly  certified  by  a  Chartered Accountant.    61

Case No.:26/7/80­ALC2/2011

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00132/AM12/ RLA File :05/24/040/00079/AM12/ Lic.No/Date:0510293596 16.06.2011   Decision : As per the written comments of  DIT  received  vide their U.O. Note No.17(55)/2011­IPHW dated    28.11.2011,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization on net to net basis with accountability clause.     62

Case No.:41/7/80­ALC2/2011

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00147/AM12/ RLA File :05/23/040/00111/AM12/ Lic.No/Date:0510293870 20.06.2011 Defer Date:24.01.2012 Decision  :  The  Committee  noted    that  the  firm’s  reply  has  been  sent  to  DHI  on  05.12.2011.    The   63

Case No.:9/13/80­ALC2/2011

Party Name:A RAYMOND FASTENERS INDIA PRIVATE LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00254/AM12/ RLA File :31/83/040/00046/AM12/ Lic.No/Date:3110048833 23.06.2011   Decision : As per the written comments of  C&PC  received  vide their O.M. No.46011/83/2011­PC­II dated    02.11.2011,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization  as under:­   Item to be Exported Quantity Automotive Fastners 1 kg Raw­material Recommended for Import Quantity Polyacetal Fastners 1.03  kg/kg  content  in  the  export product  

64

Case No.:2/13/80­ALC2/2011

Party Name:RAJ ENGINEERING CO Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00247/AM12/ RLA File :03/95/040/00153/AM12/ Lic.No/Date:0310639510 30.06.2011 Defer Date:24.01.2012 Decision  :  The  Committee  noted  that  the  firm  has  sought  time  for  one  month  vide  their  letter  dated 08.12.2011.    The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information failing  which    their  case  will  be  rejected  without  any  further  notice.    The  case  may  be  re­listed  on 24.01.2012.   65

Case No.:7/10/80­ALC2/2011

Party Name:PRANAV VIKAS (INDIA) LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00202/AM12/ RLA File :05/24/040/00138/AM12/ Lic.No/Date:0510297044 20.07.2011 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  08.12.2011  to  DIPP  for   66

Case No.:8/10/80­ALC2/2011

Party Name:NEUMAN & ESSER ENGINEERING (INDIA) PVT LTD Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00203/AM12/ RLA File :31/82/040/00099/AM12/ Lic.No/Date:3110049329 20.07.2011 Defer Date:24.01.2012 Decision  :The  Committee  noted    that  the  firm’s  reply  has  been  sent  to  DIPP  on  28.11.2011.    The Committee decided to advise the firm to appear before the NC to explain their case in person regarding manufacturing activities involved in the project. The case may be re­listed on 24.01.2012.   67

Case No.:17/10/80­ALC2/2011

Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00212/AM12/ RLA File :05/24/040/00151/AM12/ Lic.No/Date:0510297654 26.07.2011   Decision : As per the written comments of  DIT  received  vide their U.O. Note No.17(71)/2011­IPHW dated    31.10.2011,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization as under:­                1. Import item at S.No.1­13, 16­18, 20­21        :      On net to net basis with                                                                                             accountability clause          2. Import item at S.No.14, 15 & 19                   :      As applied for by the firm                                                                                            inclusive of 2% wastage     68

Case No.:3/13/80­ALC2/2011

Party Name:J PAN TUBULAR COMPONENTS PVT.LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00248/AM12/ RLA File :05/23/040/00167/AM12/ Lic.No/Date:0510298976 08.08.2011 Defer Date:24.01.2012 Decision :  As  per  DIPP  U.O.  Note  dated  18.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  24.01.2012:­

1.       List of  export items  with their respective quantities. 2.      Specific list of import items alongwith  their quantities. 3.      Basis for the requirement of import items alongwith a tabular  statement giving net content of import items in different export products.   69

Case No.:6/13/80­ALC2/2011

Party Name:TITANIUM TANTALUM PRODUCTS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00251/AM12/ RLA File :04/24/040/00141/AM12/ Lic.No/Date:0410127136 16.08.2011   Decision : As per the written comments of  DIPP  received  vide their U.O. Note dated 18.12.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Net empty export weights of 2364 Kgs., 3144 Kgs., 20556 Kgs., 22800 Kgs., & 5928 Kgs. to be specified with the quantities of export products at Sl. No. 1, 2, 3, 4 & 5 respectively. 2. Word “relevant” to be prefixed with the description of import items at Sl. Nos. 1, 2, 11 & 12. 3. Quantity of  import  item at  S.No.1  to  be  allowed  as  applied  for  i.e.  24038    Kgs.  inclusive  of  2% wastage. 4. Quantity of import item at S.No.2 to be allowed as 6624  Kgs. inclusive of 5 % wastage. 5. Weights of 1200 Kgs., 1775 Kgs., 3003 Kgs., 2859 Kgs., 750 Kgs., 629 Kgs., 5224 Kgs, 4473 Kgs., 1660 Kgs. & 2068 Kgs. to be specified with the quantities of import items  from Sl. No. 3 to 10, 13 & 14 respectively. 6. Import items from  Sl. No 3 to 10, 13 & 14 to be allowed on net to net basis. 7. Quantity of import item at S.No.11 to be allowed as 41 Mtrs. (95 Kgs.) inclusive of 2% wastage. 8. Quantity of import item at S.No. 12 to be allowed as 1.02 Kgs./Kg  content in the export products. 9. Quantity of import item at Sl. No. 15 to be allowed as 919 Kgs.     70

Case No.:4/13/80­ALC2/2011

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00249/AM12/ RLA File :05/24/040/00169/AM12/ Lic.No/Date:0510299731 17.08.2011 Defer Date:24.01.2012 Decision :The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information failing  which    their  case  will  be  rejected  without  any  further  notice.    The  case  may  be  re­listed  on 24.01.2012.   71

Case No.:5/13/80­ALC2/2011

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00250/AM12/ RLA File :05/24/040/00170/AM12/ Lic.No/Date:0510299733 17.08.2011 Defer Date:24.01.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  09.12.2011  to  DHI  for

Case No.:4/19/80­ALC2/2011

Party Name:TITANIUM TANTALUM PRODUCTS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00372/AM12/ RLA File :04/24/040/00129/AM12/ Lic.No/Date:0410127409 25.08.2011 Defer Date:24.01.2012

72 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on  24.01.2012: ­   1.      Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format export product wise..   73

Case No.:5/19/80­ALC2/2011

Party Name:TITANIUM TANTALUM PRODUCTS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00373/AM12/ RLA File :04/24/040/00132/AM12/ Lic.No/Date:0410127411 25.08.2011 Defer Date:24.01.2012 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on  24.01.2012: ­             1.   Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format export  product wise..   74

Case No.:1/19/80­ALC2/2011

Party Name:SOLOGUARD MEDICAL DEVICES PVT LTD Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00369/AM12/ RLA File :04/24/040/00161/AM12/ Lic.No/Date:0410127648 30.08.2011 Defer Date:24.01.2012 Decision :The Committee noted that the firm’s application has been sent to C&PC  on 09.12.2011  for examination and comments. The Committee decided to defer the case and to re­list the case on 24.01.2012.   75

Case No.:3/19/80­ALC2/2011

Party Name:WOORY AUTOMOTIVES INDIA PVT LTD Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00371/AM12/ RLA File :04/24/040/00152/AM12/ Lic.No/Date:0410128357 21.09.2011   Decision : As per the written comments of  DIPP  received  vide their U.O. Note dated 18.12.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Quantities of import items from  Sl. No.1 to 9 & 11 to be allowed on net to net basis with accountability clause. 2. Quantity of import item at  Sl. No.10 to be allowed as applied for being about 0.67 % of  FOB value of exports.     76

Case No.:2/19/80­ALC2/2011

Party Name:SREE ATREYA ENTERPRISES Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00370/AM12/ RLA File :04/24/040/00170/AM12/ Lic.No/Date:0410128603 27.09.2011 Defer Date:24.01.2012 Decision :The Committee noted that the firm’s application has been forwarded to DIPP on 05.12.2011  and decided  to forward a copy of firm’s application to DHI as the case  pertain to them.  The case may be re­ listed on 24.01.2012 .

Case No.:9/19/80­ALC2/2011

Party Name:MICRO TECH.CNC PRIVATE LIMITED Meet No/Date:19/80­ ALC2/2011 Status: Deferred

77 13.12.2011 HQ File :01/80/050/00377/AM12/ RLA File :07/24/040/00237/AM12/ Lic.No/Date:0710082914 29.09.2011 Defer Date:24.01.2012 Decision : The Committee noted that the firm’s application has been forwarded to DIPP on 05.12.2011  and decided  to forward a copy of firm’s application to DHI as the case  pertain to them.  The case may be re­ listed on 24.01.2012 .   78

Case No.:15/19/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00383/AM12/ RLA File :05/24/040/00234/AM12/ Lic.No/Date:0510304857 10.10.2011 Defer Date:24.01.2012 Decision : The Committee noted  that the firm’s application has been sent to C&PC on 09.12.2011.  The   79

Case No.:1/16/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00318/AM12/ RLA File :03/94/040/00499/AM12/ Lic.No/Date:0310659138 12.10.2011 Defer Date:24.01.2012 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on  24.01.2012: ­               1. Information in respect of Sl.No. 3,4,5 11& 13 of the Standard Deficiency Format .   80

Case No.:2/16/80­ALC2/2011

Party Name:PREMIER INDUSTRIAL CORPORATION LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Transferred HQ File :01/80/050/00319/AM12/ RLA File :03/95/040/00533/AM12/ Lic.No/Date:0310659679 14.10.2011   Decision : The Committee noted that the Chapter “72”  pertains to NC­II and decided to transfer the case to NC­II.   81

Case No.:6/19/80­ALC2/2011

Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00374/AM12/ RLA File :05/23/040/00265/AM12/ Lic.No/Date:0510305825 18.10.2011 Defer Date:24.01.2012 Decision  :As  per  DIPP  U.O.  Note  dated  18.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  24.01.2012.   1.      Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format­export product wise. 2.      Quantities of import items from Sl. Nos. 8, 9, 10  & 11  in Nos. also in addition to their weights.

Case No.:8/19/80­ALC2/2011

Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00376/AM12/ RLA File :05/24/040/00255/AM12/ Lic.No/Date:0510306670 25.10.2011

82 Decision : As per the written comments of  DIPP  received  vide their U.O. Note dated 18.12.2011, the Committee decided to ratify the norms on repeat basis in respect of the subject advance authorization  as under:­   1. Net weight of export product may be specified as 720.1 Kgs. 2. Quantity of import item may be allowed as 3154 Kgs. inclusive of 338% wastage after taking 6% recovery from scrap.   83

Case No.:10/19/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00378/AM12/ RLA File :07/24/040/00252/AM12/ Lic.No/Date:0710083574 27.10.2011 Defer Date:24.01.2012 Decision : The Committee noted  that the firm’s application has been sent to DIT on 05.12.2011.  The   84

Case No.:16/19/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00384/AM12/ RLA File :05/24/040/00252/AM12/ Lic.No/Date:0510307049 02.11.2011 Defer Date:24.01.2012 Decision : The Committee noted  that the firm’s application has been sent to DHI on 09.12.2011.  The   85

Case No.:17/19/80­ALC2/2011

Party Name:TERUMO PENPOL LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Revert back HQ File :01/80/050/00385/AM12/ RLA File :53/24/040/00014/AM12/ Lic.No/Date:5310014041 03.11.2011   Decision : The Committee decided to revert back the case to R.A. to consider the case as per SION H ­67  for engineering product.     86

Case No.:12/19/80­ALC2/2011

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Approved HQ File :01/80/050/00380/AM12/ RLA File :04/24/040/00224/AM12/ Lic.No/Date:0410130238 11.11.2011   Decision : Based on recommendation of DC(MSME), the Committee decided  to ratify the norms in respect of  the subject advance authorization on repeat basis as per firm Advance Authorization No.  0410120014 dated 21.12.2010 ratified in Norms Committee Meeting No.14/12 held on 04.10.2011.

Case No.:7/19/80­ALC2/2011

Party Name:ACE MANUFACTURING SYSTEMS LTD., Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Revert back HQ File :01/80/050/00375/AM12/ RLA File :07/24/040/00311/AM12/ Lic.No/Date:0710083899 15.11.2011

87 Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee therefore  presumed  the  subject  Authorization  may  have  been  issued  under  GN­4.  The  Committee accordingly decided to revert back the case to the concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dated 05.12.2007. The Regional Authority may take necessary action accordingly.   88

Case No.:11/19/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00379/AM12/ RLA File :04/24/040/00222/AM12/ Lic.No/Date:0410130298 15.11.2011 Defer Date:24.01.2012 Decision : The Committee noted  that the firm’s application has been sent to DHI on 05.12.2011.  The   89

Case No.:13/19/80­ALC2/2011

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00381/AM12/ RLA File :05/24/040/00279/AM12/ Lic.No/Date:0510308223 17.11.2011 Defer Date:24.01.2012 Decision : The Committee noted  that the firm’s application has been sent to DHI on 05.12.2011.  The   90

Case No.:14/19/80­ALC2/2011

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:19/80­ ALC2/2011 13.12.2011 Status: Deferred HQ File :01/80/050/00382/AM12/ RLA File :05/24/040/00280/AM12/ Lic.No/Date:0510308225 17.11.2011 Defer Date:24.01.2012 Decision : The Committee noted  that the firm’s application has been sent to DHI on 05.12.2011.  The   S.No.477

Case  No.    A/R­

136 M/s. Bharat Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/50/00319/AM10/DES.I Lic. No. & date Meeting No. 19/12 RA.F.No.61/24/040/00020/AM10 6110000343 dt.19.08.2009 Date: 13.12.2011 Ratification of norms   The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 24.01.2012.   S.No.478

Case  No.    A/R­

18 M/s. Theyssenkrup Industries  India Pvt. LTd., Pune HQF.No.01/80/050/00022/AM11/DES.I Lic. No. & date Meeting  No. 19/12 RA.F.No.31/24/040/00198/AM10 3110041936 dt.15.02.2010 Date: 13.12.2011   The Committee noted  that the firm’s reply has been sent to DHI on 22.11.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  24.01.2012.   S.No.479

Case  No.    A/R­

20 M/s.  Marks  Pryor Marketing Technology  Pvt. LTd., HQF.No.01/80/050/00827/AM10/DES.I Lic. No. & date Meeting  No. 19/12 RA.F.No.31/24/040/00213/AM10 3110042306 dt.10.03.2010   Date: 13.12.2011   The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 24.01.2012.   S.No.480

Case  No.    A/R­

23 M/s.  Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/00232/AM11/DES.I Lic. No. & date Meeting  No. 19/12 RA.F.No.61/24/040/00024/AM11 6110000457 dt.17.06.2010   Date: 13.12.2011   The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 24.01.2012.   S.No.481

Case  No.   A/R­

58 M/s.  Elecon Engineering Co.  Ltd., Gujarat HQF.No.01/80/162/0000518/AM11/DES.I Lic. No. & date Meeting  No. 19/12 RA.F.No.34/82/042/00007/AM04 3410008330 dt.29.08.2003 Date: 13.12.2011   The  Committee  noted  that  all  details  sought  by  DHI  were  sent  to  them  on  02.12.2011  for  examination  and comments. The case may be re­listed on 24.01.2012.   S.No.482

Case  No.    A/R­

63 M/s.  The Saraswati Industrial Syndicate  Ltd., New Delhi HQF.No.01/81/050/00052/AM08/DES.I Lic. No. & date Meeting  No. 19/12 RA.F.No.05/24/040/01081/AM07 0510202875 dt.24.04.2007 Date: 13.12.2011 Revision of norms   The Committee noted  that the firm’s reply has been sent to DHI on 07.11.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  24.11.2012.   S.No.483

Case No.  A/R­81

M/s.  IDMC Limited,  Anand, Gujarat HQF.No.01/80/050/00011/AM09/DES.I Lic. No. & date Meeting No. 19/12 RA.F.No.34/24/040/00093/AM05 3410011527 dt.20.09.2004 Date: 13.12.2011     As per the written comments of  DIPP  received  vide their U.O. Note dated 18.12.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Net empty weights of 3345 Kgs., 149 Kgs., 115 Kgs. &6908 Kgs. to be specified with the quantities of export products at Sl. No. 1, 2, 3 & 4 respectively. 2.      Quantities of import items at Sl. No. 1 to 5  to be allowed as 1.05 Kgs./Kg  content in the export products. 3.      Import items from Sl. No. 6 to 10 to be allowed on net to basis with accountability clause.     S.No.484

Case  No.    A/R­

139 M/s.  Cartoon Sanitation Pvt. Ltd., Mathura(UP) HQF.No.01/80/050/00824/AM11/DES.I Lic. No. & date Meeting  No. 19/12 RA.F.No.06/24/040/00056/AM11 0610020559 dt.12.01.2011 Date: 13.12.2011   The Committee decided to forward a copy of firm’s reply dated 09.12.2011 to DIPP for examination and comments.  The case may be re­listed on 24.01.2012.   S.No.485

Case  No.    A/R­

140 M/s.  G.B. Engineering  Pvt. LTd., Tiruchirapalli HQF.No.01/80/050/00682/AM11/DES.I Lic. No. & date Meeting  No. 19/12 RA.F.No.04/24/040/00196/AM11 0410119183 dt.25.11.2010 Date: 13.12.2011   The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  20.12.2011  to  DHI  for  examination  and comments.  The case may be re­listed on 24.01.2012.   S.No.486

Case  No.    A/R­

141 M/s.  Atherm Thermal  Solutions India  Pvt.  Ltd., Bangalore HQF.No.01/80/050/00882/AM11/DES.I Lic. No. & date Meeting  No. 19/12 RA.F.No.07/24/040/00463/AM11 0710077971 dt.10.03.2011 Date: 13.12.2011   The Committee noted that to a copy of firm’s e­mail reply has been forwarded to DC(MSME) for examination and comments.  The case may be re­listed on 24.01.2011.   S.No.487

Case  No.    A/R­

153 M/s.  Maini Precision  Products Pvt. Ltd., Bangalore HQF.No.01/80/050/00147/AM06/DES.I Lic. No. & date Meeting  No. 19/12 RA.F.No.07/24/040/00091/AM06 0710037715 dt.09.05.2005 Date: 13.12.2011   As  per  DIPP  U.O.  Note    dated  13.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  24.01.2012: ­   1. Information in respect of Sl. No. 3, 4 & 11 of Standard Deficiency Format. 2. Input raw material blank size and weight without cutting allowance – export product wise.       3.   Cutting allowance and any other allowance / wastage export product wise.   S.No.143

Case No. C­01

M/s.  BOSCH  Limited, Bangalore  F.No.01/80/162/1193/AM09/DES.I Meeting No. 19/12 Fixation  of  SION  for  the  export  product  “Common  Rail Injector Parts” Date: 13.12.2011   The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  10.12.2011  to  DHI  for  examination  and comments.  The case may be re­listed on 24.01.2012.   S.No.144

Case No. C­ 04

M/s.  International  Tubular Services  (India)  Pvt.  LTd., Taloja  F.No.01/80/162/00007/AM12/DES.I Meeting No. 19/12 Fixation of wastage norms for the export product “4 ¾ Energie Jar (Parts of Oil Field Equipment  /  Drilling  Machinery)  and components in respect of 100% EOU Date: 13.12.2011

The Committee noted  that the firm’s reply has been sent to DHI on 11.10.2011 and the case is under their examination.  The case may be re­listed on  24.01.2012.       S.No.145

Case No. C­ 05

M/s.  Brady  Company  India Pvt. Ltd.,  F.No.01/80/162/01100/AM11/DES.I Meeting No. 19/12 Fixation of SION for the export product “High Performance Electronic  Trackers  and  Die­Cuts  parts”  in  respect  of  100% EOU. Date: 13.12.2011   Based on the written comments of C&PC vide their O.M. No. 46011/48/2011 dated 02.11.2011, the Committee decided to reject the case on the ground that the firm did not furnish the requisite information with reference to their letter dated 01.06.2011 & dated 10.08.2011 and subsequent reminder dated 09.09.2011 from this office calling for requisite information, in the absence of which, it was not possible to decide the requirement of inputs.     S.No.146

Case No.  C ­ 07

M/s.  BOSCH Limited, Bangalore HQF.No.01/80/162/00683/AM10/DES.I Meeting No. 19/12 Request for fixation of SION for the export product “Viz. Common Rail Pump” Date: 13.12.2011     The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 24.01.2012.   S.No.147

Case No.  C ­ 08

M/s.  Ultra  Engineers, Pune HQF.No.01/80/162/00262/AM12/DES.I Meeting No. 19/12 Fixation  of  wastage  norms  for  special  Brand  Rate  Duty Draw Back against deemed export” Date: 13.12.2011   The Committee noted  that the firm’s reply has been sent to DIPP on 09.12.2011.  The Committee, therefore,   S.No.148

Case No.  C ­ 09

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00263/AM12/DES.I Meeting No. 19/12 Fixation  of  wastage  norms  for  special  Brand  Rate Duty Draw Back against deemed export” Date: 13.12.2011     S.No.149

Case No.  C ­ 10

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00249/AM12/DES.I Meeting No. 19/12 Fixation  of  wastage  norms  for  special  Brand  Rate Duty Draw Back against deemed export” Date: 13.12.2011     S.No.150

Case No.  C ­ 20

M/s.  ITS  India  Pvt. LTd.,  Taloja (Mahrashtra) HQF.No.01/80/162/00287/AM12/DES.I Meeting No. 19/12 Fixation of input output norms for the export product “6 ½  Energie Jar (Parts of Oil Field Equipment/ Drilling Machinery) and components thereof”. Date: 13.12.2011

The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  02.12.2011  to  DHI  for  examination  and comments.  The case may be re­listed on 24.01.2012.   S.No.151

Case No.  C ­ 21

M/s.  ITS  India  Pvt. Ltd.,  Taloja (Mahrashtra) HQF.No.01/80/162/00234/AM12/DES.I Meeting No. 19/12 Fixation  of  ad­hoc  norms  under  para  6.8(e)  of  FTP 2009­14 for the export product “ 8” Energie Energizaer (Parts of Oil field Equipment / Drilling Machinery) and components thereof”. Date: 13.12.2011     The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  02.12.2011  to  DHI  for  examination  and comments.  The case may be re­listed on 24.01.2012.   S.No.152

Case No.  C ­ 23

Reference  received from  PC­VI  of  M/s. Getrag Hi­Tech Gears Pvt.  TLd., Bhiwani(Rajasthan) HQF.No.01/80/92/180/NORMS/AM12/PC­VI/DES.I Meeting No. 19/12 Fixation of input output wastage norms for eh export product  “Timing  Gears”  in  respect  of  LOP  NO.03­ 129/99­100%EOU. Date: 13.12.2011   The Committee noted  that the firm’s representation has been sent to DHI on 19.10.2011.  The Committee, therefore, decided to defer the case and to re­list the case on 24.01.2012.   S.No.153

Case No.  C ­ 24

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00635/AM12/DES.I Meeting No. 19/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 13.12.2011     S.No.154

Case No.  C ­ 25

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00637/AM12/DES.I Meeting No. 19/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 13.12.2011     S.No.155

Case No.  C ­ 26

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00638/AM12/DES.I Meeting No. 19/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 13.12.2011     S.No.156

Case No.  C ­ 27

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00639/AM12/DES.I Meeting No. 19/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 13.12.2011

  S.No.157

Case No.  C ­ 28

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00640/AM12/DES.I Meeting No. 19/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 13.12.2011     S.No.158

Case No.  C ­ 29

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00636/AM12/DES.I Meeting No. 19/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 13.12.2011     S.No.159

Case No.  C ­ 30

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00634/AM12/DES.I Meeting No. 19/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 13.12.2011    


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6646 --apply.

Citation copied