DGFT Minutes
In force — no superseding record on file.
RATIFIED Minutes of Meeting No.13/12 scheduled on 20.09.2011 of Norms Committee(NCI) (DES.I Section) The meeting No. 20/12 of the Norms Committee (NCI) for the licensing year 20112012 was held on 20.09.2011 under the Chairmanship of Sh. N.P.S. Monga, Additional Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure VolumeI. The following Members of the Committee were present in the meeting: Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A DC(MSME),N.B. 4. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 5. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B. I –The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: At the outset, the Chairman reminded that all members of the Committee to send a soft copy of their D.L./comments/remarks either in floppy/CD/or by email (bk. sachdeva@nic.in) immediately after the meeting of NCI. He also advised all members to return the draft Minutes with in two days of their receipt. This would facilitate preparation and ratification of Minutes and reduce the time gap in communication of decisions to firms/R.As. 1
Case No.:2/33/80ALC2/2009
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00468/AM10/ RLA File :07/24/040/00258/AM10/ Lic.No/Date:0710067933 30.10.2009 Decision :As per the written comments of DHI received vide their U.O. Note No.3(155)/09TSW(B)485 dated 06.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: (i) Import item timbers to be allowed as per packing policy. (ii) All other import items allowed on net to net basis without any wastage with accountability clause. The RLA may take necessary action accordingly. 2
Case No.:18/41/80ALC2/2009
Party Name:KEBURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00639/AM10/ RLA File :04/24/040/00247/AM10/ Lic.No/Date:0410110339 22.12.2009 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 01.11.2011.
3
Case No.:16/42/80ALC2/2009
Party Name:KOMET PRECISION TOOLS INDIA PVT LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00662/AM10/ RLA File :07/24/040/00381/AM10/ Lic.No/Date:0710069369 11.01.2010 Defer Date:01.11.2011 Decision : The Committee observed DHI’S deficiency letter dated 05.09.2011 has been issued to the firm on 14.09.2011. The Committee, therefore, decided to issue a final reminder to the firm to reply to the deficiency letter dated 14.09.2011 failing which their case will be rejected. The case may be relisted on 01.11.2011. 4
Case No.:21/11/80ALC2/2010
Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00167/AM11/ RLA File :05/23/040/00006/AM11/ Lic.No/Date:0510264179 12.05.2010 Decision : As per the written comments of C&PC received vide their O.M No. 46011/78/2010PCII dated 07.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Item to be Exported Quantity Plastic Airvent/ Ventury/ Screen Filter/ DBC Filter 1 No. Rawmaterial Recommended for Import Quantity/kg 1. Relevant Polypropylene Granules 2. Relevant Nylon 66 Resin/Granules 3. Relevant SS Mesh (30 Mesh/120 Mesh) 4. Relevant SS Sheets 5. Relevant Discs 1.05 kg/kg content in the export product 1.05 kg/kg content in the export product 1.03 kg/kg content in the export product 1.03 kg/kg content in the export product Net to Net 5
Case No.:22/11/80ALC2/2010
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00168/AM11/ RLA File :07/24/040/00033/AM11/ Lic.No/Date:0710071546 14.05.2010 Decision : As per the written comments of DHI received vide their U.O. Note No.3(155)/09TSW(B)485 dated 06.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: (i) Import item timbers to be allowed as per packing policy. (ii) All other import items allowed on net to net basis without any wastage with accountability clause.
Case No.:19/18/80ALC2/2010
Party Name:STARION INDIA P.LTD Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred
6 HQ File :01/80/050/00272/AM11/ RLA File :31/24/040/00028/AM11/ Lic.No/Date:3110043412 31.05.2010 Defer Date:01.11.2011 Decision : The Committee observed that the firm’s has not replied to the DIT’s letter dated 28.10.2011 and their reminder dated 24.01.2011 with regard to details of final product, usage of import material in the export product, justification for the wastage of each items in the manufacturing process as the wastage seems to be on the higher side. The Committee, therefore, decided to issue a final reminder to the firm for expediting the said information to DIT and this office failing which their case will be rejected without any further notice. The case may be relisted on 01.11.2011. 7
Case No.:27/11/80ALC2/2010
Party Name:FREEDOM OPTHALMIC PRIVATE LIMITED, Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00173/AM11/ RLA File :04/24/040/00036/AM11/ Lic.No/Date:0410114329 07.06.2010 Defer Date:01.11.2011 Decision : The Committee noted that the firm’s reply has been sent to C&PC on 23.08.2011. It is therefore decided to remind C&PC again to offer their comments and to relist the case on 01.11.2011. 8
Case No.:15/18/80ALC2/2010
Party Name:INDUS PRO AUTO ENGINEERS PVT.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00268/AM11/ RLA File :05/23/040/00054/AM11/ Lic.No/Date:0510266316 17.06.2010 Defer Date:01.11.2011 Decision : The Committee deliberated the comments of DHI received vide their U.O. Note No. 3/(85)10 TSW(B)/480 dated 05.09.2011 and decided to inform the firm that the reply date 12.05.2011 received from the firm is incomplete. The Committee, therefore decided to send a final reminder to the firm to furnish the specific reply to DHIdeficiency letter dated 15.04.2011 failing which their case will be rejected. The case may be relisted on 01.11.2011. 9
Case No.:45/18/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00298/AM11/ RLA File :06/24/040/00018/AM11/ Lic.No/Date:0610018429 07.07.2010 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from Min. of Defence are yet to be received. The Committee, therefore, decided to remind them for expediting their comments within 15 days failing which Norms Committee will ratify the norms as applied for by the firm. The case may be relisted on 01.11.2011. 10
Case No.:47/18/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00300/AM11/ RLA File :06/24/040/00017/AM11/ Lic.No/Date:0610018428 07.07.2010 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from Min. of Defence are yet to be received. The Committee, therefore, decided to remind them for expediting their comments within 15 days failing which Norms Committee will ratify the norms as applied for by the firm. The case may be relisted on 01.11.2011.
11
Case No.:21/18/80ALC2/2010
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00274/AM11/ RLA File :61/24/040/00029/AM11/ Lic.No/Date:6110000472 15.07.2010 Defer Date:01.11.2011 Decision : The Committee deliberated the written comments of DHI received vide their U.O. Note No.3(69)/10TSW(B)534 dated 15.09.2011 and decided to ask DHI to reexamine their comments with reference to import item No. 137;139 to 141; 146 to 148 in respect of the subject advance authorization, if necessary after obtaining further information/details from the firm. The case may be relisted on 01.11.2011. 12
Case No.:29/22/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00340/AM11/ RLA File :06/24/040/00022/AM11/ Lic.No/Date:0610018565 21.07.2010 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from Min. of Defence are yet to be received. The Committee, therefore, decided to remind them for expediting their comments within 15 days failing which Norms Committee will ratify the norms as applied for by the firm. The case may be relisted on 01.11.2011. 13
Case No.:30/22/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00341/AM11/ RLA File :06/24/040/00023/AM11/ Lic.No/Date:0610018566 21.07.2010 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from Min. of Defence are yet to be received. The Committee, therefore, decided to remind them for expediting their comments within 15 days failing which Norms Committee will ratify the norms as applied for by the firm. The case may be relisted on 01.11.2011. 14
Case No.:37/18/80ALC2/2010
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00290/AM11/ RLA File :03/95/040/00200/AM11/ Lic.No/Date:0310584600 22.07.2010 Decision : As per the written comments of DHI received vide their U.O. Note No.3(3)/11TSW(B)520 dated 14.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as per their written comments. Copy of DHI U.O. note referred to above may be forwarded to firm & R.A. 15
Case No.:33/35/80ALC2/2010
Party Name:SHETRON METROPAK PVT.LTD, Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00660/AM11/ RLA File :07/21/040/00279/AM11/ Lic.No/Date:0710073152 23.07.2010 Defer Date:01.11.2011
15 Decision : The Committee noted that R.A. has informed vide their letter dated 22.08.2011 that they have issued above said advance authorization under SION C777 Engineering Product. However, the Committee observed that SION C777 does not pertain to the export/import items under subject advance authorization. Therefore, Committee decided to inform the R.A. about it and request them to clarify. The case may deferred and to relist the case on 01.11.2011. 16
Case No.:8/21/81ALC2/2010
Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/81/050/00123/AM11/ RLA File :05/24/040/00172/AM11/ Lic.No/Date:0510270168 10.08.2010 Defer Date:01.11.2011 Decision : The Committee observed that the firm has not replied to DIT’s deficiency letter 10.02.2011 and subsequent its reminder 08.09.2011 regarding to description of export product, usage of import items in the export product and justification for the wastage of raw material involved in the manufacturing process. The Committee, therefore, decided to issue final reminder to the firm for expediting the said information to DIT & this office failing which their case will be rejected without any further notice. The case may be relisted on 01.11.2011. 17
Case No.:46/22/80ALC2/2010
Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00357/AM11/ RLA File :05/24/040/00178/AM11/ Lic.No/Date:0510270834 18.08.2010 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 01.11.2011. 18
Case No.:51/22/80ALC2/2010
Party Name:PURVA OVERSEAS Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00362/AM11/ RLA File :13/24/040/00018/AM11/ Lic.No/Date:1310033038 20.08.2010 Defer Date:01.11.2011 Decision : The Committee noted that the firm’s reply (Revised Appending 11A) dated 11.07.2011 has been sent to DHI on 23.08.2011 for examination and comments. The case may be relisted on 01.11.2011. 19
Case No.:32/29/80ALC2/2010
Party Name:XYTEL INDIA PVT.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Rejected HQ File :01/80/050/00467/AM11/ RLA File :31/24/040/00108/AM11/ Lic.No/Date:3110044548 01.09.2010 Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 15.07.2011 and subsequent reminder 25.08.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. C 33/29/ 0 A C2/2010 A / 13/80 S
20
Case No.:33/29/80ALC2/2010
Party Name:XYTEL INDIA PVT.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Rejected HQ File :01/80/050/00468/AM11/ RLA File :31/24/040/00114/AM11/ Lic.No/Date:3110044621 07.09.2010 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 15.07.2011 and subsequent reminder 25.08.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. 21
Case No.:24/29/80ALC2/2010
Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00459/AM11/ RLA File :03/94/040/00501/AM11/ Lic.No/Date:0310591600 08.09.2010 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 01.11.2011. 22
Case No.:31/29/80ALC2/2010
Party Name:ATHENA INDIA HITECH COMPONENTS PVT.LTD, Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00466/AM11/ RLA File :07/24/040/00211/AM11/ Lic.No/Date:0710074162 14.09.2010 Decision : As per the written comments of DC(MSME) received vide their U.O. Note No.30(171)2010 ME dated 01.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: (i) The import item Asbestos free Gaskets Sheets is allowed at 2.36 kg/kg content in export product with 136% wastage. 23
Case No.:29/29/80ALC2/2010
Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00464/AM11/ RLA File :11/24/040/00038/AM11/ Lic.No/Date:1110023211 16.09.2010 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 01.11.2011. 24
Case No.:12/27/80ALC2/2010
Party Name:AIR LIQUIDE ENGINEERING INDIA PVT LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00409/AM11/ RLA File :09/24/040/00253/AM11/ Lic.No/Date:0910043538 17.09.2010 Defer Date:01.11.2011 D i i Th C i d h h fi h d f f l h i id
Decision :The Committee noted that the firm has requested for postponement of personal hearing vide their letter dated 14.09.2011. The Committee, therefore, decided to advise the firm to appear before NC on 01.11.2011 to explain their case in person along with information sought from them and to obtain the facts of the case. The case may be relisted on 01.11.2011. 25
Case No.:29/27/80ALC2/2010
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00426/AM11/ RLA File :03/95/040/00354/AM11/ Lic.No/Date:0310593772 24.09.2010 Defer Date:01.11.2011 Decision :The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 01.11.2011. 26
Case No.:30/27/80ALC2/2010
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00427/AM11/ RLA File :03/95/040/00360/AM11/ Lic.No/Date:0310593860 24.09.2010 Defer Date:01.11.2011 Decision : The Committee deliberated the written comments of DHI received vide their U.O. Note No.3(3)/2011TSW(B)446 dated 10.08.2011 and decided to ask the DHI to give justification for recommendations pertaining to item No. 6; & 8 to 10 in respect of the subject advance authorization . The case may be relisted on 01.11.2011. 27
Case No.:2/29/80ALC2/2010
Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00437/AM11/ RLA File :03/94/040/00586/AM11/ Lic.No/Date:0310594220 28.09.2010 Decision : As per the written comments of DIT received vide their U.O. Note No.17(60)/2010IPHW dated 08.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization on net to net basis with accountability clause. 28
Case No.:6/35/80ALC2/2010
Party Name:GATRAY ENVIROTECH SYSTEMS Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00633/AM11/ RLA File :31/24/040/00144/AM11/ Lic.No/Date:3110045144 20.10.2010 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from Ministry of Defence are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 01.11.2011. 29
Case No.:13/35/80
ALC2/2010 Party Name:OGNIBENE INDIA PRIVATE LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Rejected HQ File :01/80/050/00640/AM11/ RLA File :31/24/040/00139/AM11/ Lic.No/Date:3110045249 27.10.2010 D i i Th C itt d id d t j t th th d th t th fi did t f i h l
29 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 15.07.2011 and subsequent reminder 19.08.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. 30
Case No.:4/33/81ALC2/2010
Party Name:KERNLIEBERS(INDIA) PRIVATE LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/81/050/00321/AM11/ RLA File :07/24/040/00271/AM11/ Lic.No/Date:0710075144 29.10.2010 Decision : As per the written comments of DHI received vide their U.O. Note No.3(46)/08TSW(B)540 dated 16.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as per their written comments. Copy of DHI U.O. note referred to above may be forwarded to firm & R.A. 31
Case No.:29/35/80ALC2/2010
Party Name:SECO TOOLS INDIA PVT. LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00656/AM11/ RLA File :31/24/040/00141/AM11/ Lic.No/Date:3110045365 03.11.2010 Decision : As per the written comments of DC(MSME) received vide their U.O. Note No.30(49)2011 ME dated 27.07.2011 and taking clue from C1613, the Committee decided to ratify the norms of import in respect of the subject advance authorization as under: (i) Imported item Granulated Hard Metal Powder is allowed at 1.05 kg/kg weight in export product with 5% wastage 32
Case No.:22/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00649/AM11/ RLA File :04/24/040/00194/AM11/ Lic.No/Date:0410118622 04.11.2010 Defer Date:01.11.2011 Decision : The representative of the firm Shri R. Narayanan, Senior Manager, Senior Manager (Foreign Exchange & TRPO) and Sh. C. Kathirvelyu, Sr. Deputy General Manager (Product Engg.(FB) appeared before the Committee for personal hearing and explained their case. Regarding item No. 13 they explained that imported tools will be transferred to their customer subsequently. The Committee therefore agreed to allow the item. Regarding item No. 31 & 32 the Committee directed the firm to furnish relevant details/calculation within one week time for examination & comments of DHI. The Committee, therefore, decided to defer the case and to relist the case on 01.11.2011.
Case No :2/32/80 ALC2/2010
Part Name:LARSEN & TOUBRO Meet No/Date:13/80 Status:
33
Case No.:2/32/80ALC2/2010
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00543/AM11/ RLA File :03/95/040/00446/AM11/ Lic.No/Date:0310600429 08.11.2010 Defer Date:01.11.2011 Decision : The Committee noted that DHI vide their U.O. Note No. 3(34)/10TSW(B) dated 09.09.11 has informed that the firm has furnished incomplete reply. The firm has not furnished the information as at Sl. No. 4 & 5 of SDL and the wastage calculation has also given for the raw material. Only statement has been given. The justification of quantity of import of refractory material has also not been given. The Committee, therefore, decided to ask the firm to furnish the above information failing which their case will be rejected without further notice. The case will be relisted on 01.11.2011. 34
Case No.:1/32/80ALC2/2010
Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00542/AM11/ RLA File :04/24/040/00202/AM11/ Lic.No/Date:0410118694 09.11.2010 Decision :As per the written comments of DIPP received vide their U.O. Note dated 20.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Total net empty weight of export products to be specified as 630 MT. 2. Word “relevant” to be prefixed with the descriptions of import items at Sl. Nos. 3, 4, 6 & 7. 2. Weights of 10500 Kgs., 1400 Kgs. & 900 kgs, to be added with the quantities of import items at Sl.No.1, 5 & 8 respectively. 3. Quantity of import item at Sl. No 1 to be allowed on net to net basis with accountability clause. Import of spare blades to be allowed as per policy for spares. 4. Quantities of import item at Sl. No 2, 5 & 8 to be allowed on net to net with accountability clause. 6. Quantity of import item at Sl. No 3 to be allowed as 12906 Nos (103248 Kgs) on net to net basis with accountability clause. 7. Quantity of import item at Sl. No 4 to be allowed as 1472 Nos (15898 Kgs) on net to net basis with accountability clause. 8. Quantity of import item at Sl. No 6 to be allowed as 20 Mtrs. (40 Kgs) on net to net basis. 9. Quantity of import item at Sl. No 7 to be allowed as 7568 Kgs inclusive of 3 % wastage as claimed by the firm. 35
Case No.:18/1/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00901/AM11/ RLA File :04/24/040/00208/AM11/ Lic.No/Date:0410118788 11.11.2010 Decision : As per the written comments of DIPP received vide their U O Note dated 20 09 2011 the
Decision : As per the written comments of DIPP received vide their U.O. Note dated 20.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Net weight of export product to be specified as 7119 Kgs. 2. Weights of 6558 Kgs., 431 Kgs. & 130 kgs, to be added with the quantities of import items at Sl.No.1, 2 & 3 respectively. 3. Names & specific quantities of import items at Sl No.1,2 & 3 to be obtained from the firm and incorporated in Advance Authorization by RA. 4. Quantities of import items to be allowed as per General Note4 for the Engineering products. 36
Case No.:25/35/80ALC2/2010
Party Name:L&T – MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00652/AM11/ RLA File :03/95/040/00545/AM11/ Lic.No/Date:0310601333 15.11.2010 Defer Date:01.11.2011 Decision :The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 01.11.2011. 37
Case No.:28/35/80ALC2/2010
Party Name:RATHI TRANSPOWER PVT.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Rejected HQ File :01/80/050/00655/AM11/ RLA File :31/21/040/00245/AM11/ Lic.No/Date:3110045618 25.11.2010 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 15.07.2011 and subsequent reminder 19.08.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. 38
Case No.:53/35/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00680/AM11/ RLA File :61/24/040/00067/AM11/ Lic.No/Date:6110000536 01.12.2010 Defer Date:01.11.2011 Decision : The representative of the firm Shri S.C. Goel, Addl. General Manager (MM – Import and Excise Group) appeared before the Committee for personal hearing and explained their case. The Committee directed them to furnish detailed information/ calculation of items Sl. No. 12, 44, 118,122, 200, 201 & 204 within one week for examination & comments of DHI. The Committee, therefore, decided to defer the case and to relist the case on 01.11.2011. 39
Case No.:45/35/80ALC2/2010
Party Name:BOSCH LIMITED, Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00672/AM11/ RLA File :07/24/040/00332/AM11/ Lic.No/Date:0710075865 07.12.2010 Defer Date:01.11.2011 Decision : The Committee noted the comments of DHI received vide their U O Note No 3(04)/11
Decision : The Committee noted the comments of DHI received vide their U.O. Note No. 3(04)/11 TSW(B)/535 dated 15.09.11 informing that the firm has furnished incomplete reply vide its letter dated 30.07.2011. The firm has not furnished the dimensional Drawing of Valve piece of export product no. 2. The Committee, therefore, decided to ask the firm to furnish the above information failing which their case will be rejected without further notice. The case will be relisted on 01.11.2011. 40
Case No.:36/35/80ALC2/2010
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00663/AM11/ RLA File :05/23/040/00263/AM11/ Lic.No/Date:0510279826 20.12.2010 Defer Date:01.11.2011 Decision : The Committee noted that DHI has informed vide their U.O. Note No. 3(143)/10TSW(B) /567 dated 22.09.2011 that export product is ceramic based catalyst and pertain to Chemical Wing of DIPP. The Committee, therefore, decided to forward the firm’s application etc. to DIPP (Chemical Wing) and to relist the case on 01.11.2011. 41
Case No.:44/35/80ALC2/2010
Party Name:EUROFLEX TRANSMISSIONS(INDIA) PVT.LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00671/AM11/ RLA File :09/24/040/00418/AM11/ Lic.No/Date:0910044876 24.12.2010 Defer Date:01.11.2011 Decision : The Committee observed that the firm has not replied to this office letter dated 02.09.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 01.11.2011. 42
Case No.:48/35/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00675/AM11/ RLA File :31/24/040/00191/AM11/ Lic.No/Date:3110046138 27.12.2010 Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as per the written comments of DHI received vide their U.O. Note No.3(14)10TSW(B)547 dated 19.09.2011, Copy of DHI U.O. note referred to above may be forwarded to firm & R.A. 43
Case No.:49/35/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00676/AM11/ RLA File :31/24/040/00192/AM11/ Lic.No/Date:3110046140 27.12.2010 Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as
Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as per the written comments of DHI received vide their U.O. Note No.3(14)10TSW(B)548 dated 19.09.2011. Copy of DHI U.O. note referred to above may be forwarded to firm & R.A. 44
Case No.:67/35/80ALC2/2010
Party Name:J.D. JONES & CO. PVT. LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00694/AM11/ RLA File :02/24/040/00175/AM11/ Lic.No/Date:0210152785 29.12.2010 Defer Date:01.11.2011 Decision : The Committee noted that the firm’s application has been sent to DC(MSME) on 10.03.2011 for examination & comments. The Committee, therefore, decided to defer the case and to relist the case on 01.11.2011. 45
Case No.:23/36/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00722/AM11/ RLA File :61/24/040/00072/AM11/ Lic.No/Date:6110000544 04.01.2011 Defer Date:01.11.2011 Decision : The representative of the firm Shri S.C. Goel, Addl. General Manager (MM – Import and Excise Group) appeared before the Committee for personal hearing and explained their case. The firm furnished specific use of item No. 176 & item No. 200. The Committee decided to forward the reply of the firm to DHI for examination and comments. The case may be relisted on 01.11.2011. 46
Case No.:27/1/80ALC2/2011
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00910/AM11/ RLA File :06/24/040/00051/AM11/ Lic.No/Date:0610020480 07.01.2011 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from Min. of Defence are yet to be received. The Committee, therefore, decided to remind them for expediting their comments within 15 days failing which Norms Committee will ratify the norms as applied for by the firm. The case may be relisted on 01.11.2011. 47
Case No.:4/38/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00774/AM11/ RLA File :11/24/040/00060/AM11/ Lic.No/Date:1110023887 10.01.2011 Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as per the written comments of DHI received vide their U.O. Note 3(80)/10TSW(B) dated 22.07.2011, Copy of DHI U.O. note referred to above may be forwarded to firm & R.A.
Case No.:2/38/80ALC2/2010
Party Name:JMT AUTO LIMITED Meet No/Date:13/80 Status:
48
Case No.:2/38/80 ALC2/2010
Party Name:JMT AUTO LIMITED., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00772/AM11/ RLA File :02/24/040/00166/AM11/ Lic.No/Date:0210153535 14.01.2011 Defer Date:01.11.2011 Decision :The representative of the DIPP informed the Committee that they have received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 01.11.2011. 49
Case No.:21/1/80ALC2/2011
Party Name:WPIL LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00904/AM11/ RLA File :02/24/040/00165/AM11/ Lic.No/Date:0210153749 19.01.2011 Decision : As per the written comments of DIPP received vide their U.O. Note dated 20.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Net Export weight of 275.916 MT & 30 MT to be specified with the quantities of export products at Sl. No. 1 & 2 respectively. 2. Word “Relevant” to be prefixed with the description of import items at Sl. Nos. 1 to 14. 3. Quantity of import item at Sl.No.1 to be allowed as applied for i.e. 3.69 MT inclusive of a wastage of 2.1 %. 4. Quantity of import item at Sl.No.2 to be allowed as applied for i.e. 1.975 MT inclusive of a wastage of 4.6 %. 5. Quantity of import item at Sl.No.3 to be allowed as applied for i.e. 1.235 MT inclusive of a wastage of 2.9 %. 6. Quantity of import item at Sl.No.4 to be allowed as applied for i.e. 7.85 MT on net to net basis. 7. Quantity of import item at S.No.5 to be allowed as applied for i.e. 17.25 MT inclusive of a wastage of 4.1 %. 8. Quantities of import items from Sl.No. 6 to 11 to be allowed as applied for i.e. 5.276 MT, 11.75 MT, 7.31 MT, 11.97 MT, 5.785 MT& 5.868 MT respectively inclusive of a wastage of 0.42 %. 9. Quantity of import item at S.No.12 to be allowed as applied for i.e. 9.015 MT inclusive of a wastage of 4.4 %.
MT, 11.97 MT, 5.785 MT& 5.868 MT respectively inclusive of a wastage of 0.42 %. 9. Quantity of import item at S.No.12 to be allowed as applied for i.e. 9.015 MT inclusive of a wastage of 4.4 %. 10. Quantity of import item at S.No.13 to be allowed as applied for i.e. 17.91 MT inclusive of a wastage of 0.7 %. 11. Quantity of import item at S.No. 14 to be allowed as applied for i.e. 10.185 MT inclusive of a wastage of 1.2 %. 50
Case No.:14/38/80ALC2/2010
Party Name:VASUNDRA MANUFACTURING SYSTEMS PVT.LTD, Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00784/AM11/ RLA File :07/21/040/00786/AM11/ Lic.No/Date:0710077109 03.02.2011 Defer Date:01.11.2011 Decision :On the recommendation of the representative of DC(MSME) present in the meeting the
Decision :On the recommendation of the representative of DC(MSME) present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 01.11.2011: 1. End Use/Literature/Technical Specifications of the Export product. 2. Different between the export and import item. 3. Process of manufacturing to manufacture export product indicating use of other inputs. 4. Manufacturing Operations to be carried out on imported inputs. 51
Case No.:16/38/80ALC2/2010
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00786/AM11/ RLA File :05/23/040/00309/AM11/ Lic.No/Date:0510283074 03.02.2011 Defer Date:01.11.2011 Decision : The representative of the DHI informed the Committee that they have received the firm’s reply on 23.08.2011 and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 01.11.2011. 52
Case No.:17/38/80ALC2/2010
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00787/AM11/ RLA File :05/24/040/00361/AM11/ Lic.No/Date:0510283097 04.02.2011 Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as per the written comments of DHI received vide their U.O. Note No.3(34)/09TSW(B)521 dated 14.09.2011. Copy of DHI U.O. note referred to above may be forwarded to firm & R.A. 53
Case No.:43/1/80ALC2/2011
Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00926/AM11/ RLA File :22/24/040/00090/AM11/ Lic.No/Date:2210010955 04.02.2011 Defer Date:01.11.2011 Decision : The representative of the DHI informed the Committee that they have received the firm’s reply on 23.08.2011 and case is under study. The Committee, therefore, decided to defer the consideration and to 54
Case No.:19/38/80ALC2/2010
Party Name:EURO LABS Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00789/AM11/ RLA File :03/94/040/00918/AM11/ Lic.No/Date:0310614574 07.02.2011 Decision : The Committee deliberated the written comments of DC(MSME) received vide their U O
Decision : The Committee deliberated the written comments of DC(MSME) received vide their U.O. Note No.30(11)/2011ME dated 23.08.2011 and decided to ratify the norms of import in respect of the subject advance authorization as under (i) The export product allowed is Magnesium Turnings (Catalyst). (ii) Import inputs allowed with 1% wastage. 55
Case No.:24/38/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00794/AM11/ RLA File :04/24/040/00263/AM11/ Lic.No/Date:0410121384 08.02.2011 Defer Date:01.11.2011 Decision : The Committee deliberated the written comments of DHI received vide their U.O. Note No.3(29)/09TSW(B)539 dated 16.09.2011. It is observed that DHI recommended deletion of Item No. 50 as it is Engg. Drawing and 24,35, 48,51,53 & 54 as they are tools and Capital Goods. The Committee, therefore, decided to ask DHI to furnish justification of their recommendation related to import item No. 50, 24,35,38,51,53 & 54 particular which of the item are Capital goods for further discussion in the next meeting. The case may be relisted on 01.11.2011. 56
Case No.:31/38/80ALC2/2010
Party Name:STARION INDIA P.LTD Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00801/AM11/ RLA File :31/24/040/00239/AM11/ Lic.No/Date:3110046834 09.02.2011 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 01.11.2011. 57
Case No.:32/38/80ALC2/2010
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00802/AM11/ RLA File :03/94/040/00930/AM11/ Lic.No/Date:0310615112 09.02.2011 Defer Date:01.11.2011 Decision :On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 01.11.2011: 1. Information in respect of Sl. No. 3, 4, 5, & 11 of Standard Deficiency Format. 2. Detailed calculations for the quantity of import item supported by length and number of tubes in the export product. 58
Case No.:17/1/80ALC2/2011
Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00900/AM11/ RLA File :03/95/040/00899/AM11/ Lic.No/Date:0310615206 10.02.2011 Decision : The Committee deliberated the details of the import & export items and decided to ratify the
Decision : The Committee deliberated the details of the import & export items and decided to ratify the norms in respect of the subject advance authorization as per GN4 (Engineering Product) on net to net basis with accountability clause. 59
Case No.:22/1/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00905/AM11/ RLA File :04/24/040/00244/AM11/ Lic.No/Date:0410121548 11.02.2011 Defer Date:01.11.2011 Decision : The Committee noted that the firm application has been sent to DHI on 24.08.2011 for examination and comments. The committee decided to defer the case and to relist the case on 01.11.2011. 60
Case No.:32/1/80ALC2/2011
Party Name:PSK ENGINEERING PVT LTD Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00915/AM11/ RLA File :07/24/040/00449/AM11/ Lic.No/Date:0710077436 18.02.2011 Defer Date:01.11.2011 Decision :The Committee observed that the firm has not replied to this office letter dated 19.08.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 01.11.2011. 61
Case No.:31/1/80ALC2/2011
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00914/AM11/ RLA File :07/24/040/00465/AM11/ Lic.No/Date:0710077482 21.02.2011 Defer Date:01.11.2011 Decision : The Committee discussed the request of DC(MSME) visit to the firm and decided to call the firm for P.H. to explain their case in person along with their technical export and full facts of the case. The case may be relisted on 01.11.2011. 62
Case No.:4/1/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00886/AM11/ RLA File :04/24/040/00298/AM11/ Lic.No/Date:0410122003 28.02.2011 Defer Date:01.11.2011 Decision :On the recommendation of the representative of DHI present in the meeting, the Committee 01.11.2011: 1. Information in respect of Sl.No.5,9, & 11 of the Standard Deficiency Format export product wise 2. The details of the Auxiliaries to be exported with quantity in number + weight & steam generating capacity 3. Inputs required for the manufacture of Auxiliaries 4. Length and weight of different type of pipes like seamless, welded pipes separately for each type of steel types like carbon steel and alloy steel
Case No.:30/7/80ALC2/2011
Party Name:L&T MHI TURBINE Meet No/Date:13/80 Status:
63 y GENERATORS PVT.LTD. ALC2/2011 20.09.2011 Deferred HQ File :01/80/050/00136/AM12/ RLA File :03/95/040/00945/AM11/ Lic.No/Date:0310620136 08.03.2011 Defer Date:01.11.2011 Decision : On the recommendation of the DHI vide their U.O. Note No. 3(58)/08TSW(B)/524 dated 14.09.2011, the Committee decided to call for the following information/clarification from the firm and to 1. Information in respect of Sl.No. 9 & 11 of the Standard Deficiency Format. Calculation should be supported by drawing in English & proper size of raw material & not oversize raw material. 2. The details of the Associated Auxiliaries with their weight & raw material and components required for the same. 3. Total CIF values of paints, thinner and primers etc. proposed for import 4. Raw material weight and finished weight of castings and forgings proposed for import. 5. Break up all import items in sets to numbers. 64
Case No.:1/1/80ALC2/2011
Party Name:MHIVST DIESEL ENGINES PVT.LTD, Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00883/AM11/ RLA File :07/24/040/00492/AM11/ Lic.No/Date:0710078026 14.03.2011 Defer Date:01.11.2011 Decision : The Committee noted that the firm application has been sent to DHI on 24.08.2011 for examination and comments. The committee decided to defer the case and to relist the case on 01.11.2011. 65
Case No.:6/1/80ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00888/AM11/ RLA File :03/94/040/00831/AM11/ Lic.No/Date:0310621241 15.03.2011 Defer Date:01.11.2011 Decision : The representative of DIPP informed the Committee that firm’s reply is incomplete and sought further information as per 4,5 & 11 of the Standard Deficiency Format. The Committee, therefore, decided to seek this information and to relist the case on 01.11.2011. 66
Case No.:12/1/80ALC2/2011
Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00894/AM11/ RLA File :05/24/040/00419/AM11/ Lic.No/Date:0510286112 15.03.2011 Defer Date:01.11.2011 Decision : The representative of the DHI informed the Committee that they have received the firm’s reply on 23.08.2011 and case is under study. The Committee, therefore, decided to defer the consideration and to 67
Case No.:28/7/80ALC2/2011
Party Name:PRIJAI HEAT EXCHANGERS PVT. LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00134/AM12/ RLA File :03/95/040/01024/AM11/ Lic.No/Date:0310622823 23.03.2011 Defer Date:01.11.2011 Decision : The Committee observed that the firm has not replied to this office letter dated 26.08.2011
p calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 01.11.2011. 68
Case No.:7/7/80ALC2/2011
Party Name:MUBEA AUTOMOTIVE INDIA PRIVATE LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Rejected HQ File :01/80/050/00113/AM12/ RLA File :31/24/040/00286/AM11/ Lic.No/Date:3110047773 08.04.2011 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 15.07.2011 and subsequent reminder dated 19.08.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. 69
Case No.:16/10/80ALC2/2011
Party Name:THE TATA POWER COMPANY LTD Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00211/AM12/ RLA File :07/24/040/00012/AM12/ Lic.No/Date:0710078667 19.04.2011 Defer Date:01.11.2011 Decision : The Committee noted that a deficiency letter has been sent by DIT to the firm on 12.09.2011 to furnish the requisite information. It is therefore decided to await the firm’s reply and to relist the case on 01.11.2011. 70
Case No.:8/7/80ALC2/2011
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00114/AM12/ RLA File :05/24/040/00041/AM12/ Lic.No/Date:0510290250 10.05.2011 Decision : The Committee decided to ratify the norms in respect of the subject advance authorization as per the written comments of DHI received vide their U.O. Note No.3(34)/09TSW(B)522 dated 14.09.2011. Copy of DHI U.O. note referred to above may be forwarded to firm & R.A. 71
Case No.:42/7/80ALC2/2011
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00148/AM12/ RLA File :31/83/040/00002/AM12/ Lic.No/Date:3110048061 10.05.2011 Defer Date:01.11.2011 Decision : The Committee decided to forward a copy of firm’s reply dated 15.09.2011 to DHI for examination and comments. The case may be relisted on 01.11.2011. 72
Case No.:32/7/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00138/AM12/ RLA File :11/24/040/00009/AM12/ Lic.No/Date:1110024726 Defer
72 11.05.2011 Date:01.11.2011 Decision :The representative of the DHI informed the Committee that they have received the firm’s reply on 07.09.2011 and case is under study. The Committee, therefore, decided to defer the consideration and to 73
Case No.:10/7/80ALC2/2011
Party Name:MACAWBER BEEKAY PVT.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00116/AM12/ RLA File :05/24/040/00046/AM12/ Lic.No/Date:0510290507 12.05.2011 Defer Date:01.11.2011 Decision :The representative of the DHI informed the Committee that they have received the firm’s reply on 23.08.2011and case is under study. The Committee, therefore, decided to defer the consideration and to 74
Case No.:37/7/80ALC2/2011
Party Name:KERNLIEBERS SPRINGS & STAMPINGS PVT.LTD, Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00143/AM12/ RLA File :07/24/040/00002/AM12/ Lic.No/Date:0710079300 19.05.2011 Decision : As per the written comments of DHI received vide their U.O. Note No.3(46)/08TSW(B)541 dated 16.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization on repeat basis as per Advance Authorization License No. 0710068448 dt 20112009 approved by NC in its meeting No. 40/11 held on 220311. 75
Case No.:15/7/80ALC2/2011
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00121/AM12/ RLA File :04/24/040/00046/AM12/ Lic.No/Date:0410124251 20.05.2011 Defer Date:01.11.2011 Decision : The Committee noted that the firm has sought time for 15 days for submission of documents vide their email dated 08.09.2011. The Committee decided that to await the firm’s reply and to relist the case on 01.11.2011. 76
Case No.:16/7/80ALC2/2011
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00122/AM12/ RLA File :04/24/040/00045/AM12/ Lic.No/Date:0410124249 20.05.2011 Defer Date:01.11.2011 Decision : The Committee noted that the firm has sought time for 15 days for submission of documents vide their email dated 08.09.2011. The Committee decided that to await the firm’s reply and to relist the case on 01.11.2011. 77
Case No.:36/7/80ALC2/2011
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00142/AM12/ RLA File :04/24/040/00051/AM12/ Lic.No/Date:0410124216 Defer
77 20.05.2011 Date:01.11.2011 Decision : The Committee noted that the firm has sought time for 15 days for submission of documents vide their email dated 08.09.2011. The Committee decided that to await the firm’s reply and to relist the case on 01.11.2011. 78
Case No.:2/10/80ALC2/2011
Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00197/AM12/ RLA File :03/94/040/00034/AM12/ Lic.No/Date:0310633321 27.05.2011 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 01.11.2011. 79
Case No.:3/10/80ALC2/2011
Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00198/AM12/ RLA File :03/94/040/00035/AM12/ Lic.No/Date:0310633340 27.05.2011 Defer Date:01.11.2011 Decision :The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 01.11.2011. 80
Case No.:17/7/80ALC2/2011
Party Name:EASTERN EQUIPMENT AND ENGINEERS PRIVATE LIMITED. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00123/AM12/ RLA File :02/24/040/00031/AM12/ Lic.No/Date:0210159701 31.05.2011 Defer Date:01.11.2011 Decision : The Committee decided to forward a copy of firm’s reply to DIPP for examination and comments. The case may be relisted on 01.11.2011. 81
Case No.:35/7/80ALC2/2011
Party Name:L&T – MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00141/AM12/ RLA File :03/95/040/00125/AM12/ Lic.No/Date:0310633816 31.05.2011 Defer Date:01.11.2011 Decision : On the recommendation of the DHI vide their U.O. Note No. 3(58)/08TSW(B)/524 dated 14.09.2011, the Committee decided to call for the following information/clarification from the firm and to 1. Information in respect of Sl. No. 9 & 11 of the Standard Deficiency Format. Calculation should be supported by drawing in English & proper size of raw material & not oversize raw material. 2. The details of the Associated Auxiliaries with their weight & raw material and components required for the same. 3. Total CIF values of paints, thinner and primers etc. proposed for import 4. Raw material weight and finished weight of castings and forgings proposed for import. 5. Break up all import items in sets to numbers.
Case No.:1/7/80ALC2/2011
Party Name:THERMAL SYSTEMS Meet No/Date:13/80 Status:
82 (HYDERABAD) P.LTD., ALC2/2011 20.09.2011 Deferred HQ File :01/80/050/00107/AM12/ RLA File :09/24/040/00119/AM12/ Lic.No/Date:0910046990 03.06.2011 Defer Date:01.11.2011 Decision :On the recommendation of the representative of DHI present in the meeting, the Committee 01.11.2011: 1. Information in respect of Sl.No.3, 4, 8 & 11 of the Standard Deficiency Format. 2. Specific item of export. 83
Case No.:2/7/80ALC2/2011
Party Name:DENSO HARYANA PVT. LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00108/AM12/ RLA File :05/23/040/00066/AM12/ Lic.No/Date:0510292671 06.06.2011 Defer Date:01.11.2011 Decision : The Committee noted written comments of DHI received vide their U.O. Note No.3(11)/08 TSW(B)482 dated 05.09.2011 and decided to ask the firm to furnish the information of S.No.11 Standard Deficiency Format in respect of import item at Sl. No.7. The case may be relisted on 01.11.2011. 84
Case No.:11/7/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00117/AM12/ RLA File :04/24/040/00065/AM12/ Lic.No/Date:0410124734 08.06.2011 Defer Date:01.11.2011 Decision : On the recommendation of the representative of DHI present in the meeting, the Committee 01.11.2011: 1. Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format for each export product separately 2. Quantity of seamless and welded pipes separately both in weight and length for each type of steel i.e. CS, AS and SS. 3. Specific items manufactured from the raw materials proposed for import indicating their gross weight and net weight 85
Case No.:12/7/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00118/AM12/ RLA File :04/24/040/00067/AM12/ Lic.No/Date:0410124735 08.06.2011 Defer Date:01.11.2011 Decision : On the recommendation of the representative of DHI present in the meeting, the Committee
01.11.2011: 1. Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format for each export product separately. 2. Quantity of seamless and welded pipes separately both in weight and length for each type of steel i.e. CS, AS and SS. 3. Specific items manufactured from the raw materials proposed for import indicating their gross weight and net weight. 86
Case No.:14/10/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00209/AM12/ RLA File :61/24/040/00012/AM12/ Lic.No/Date:6110000627 08.06.2011 Defer Date:01.11.2011 Decision : On the recommendation of the representative of DHI present in the meeting, the Committee 01.11.2011: 1. Information in respect of Sl.No.4, 5, 9 & 11 of the Standard Deficiency Format export product wise. 2. Input weight of each casting/ forging and corresponding finished weight. (Itemwise). 3. Use of each component proposed for import in the manufacture of export product. 4. Identification of insulating material proposed for import & their total price. 5. The firm may indicate if any license of above rating has been issued/ratified. 87
Case No.:13/7/80ALC2/2011
Party Name:L&T – MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00119/AM12/ RLA File :03/95/040/00126/AM12/ Lic.No/Date:0310635194 09.06.2011 Defer Date:01.11.2011 Decision : On the recommendation of the DHI vide their U.O. Note No. 3(58)/08TSW(B)/524 dated 14.09.2011, the Committee decided to call for the following information/clarification from the firm and to 1. Information in respect of Sl.No. 9 & 11 of the Standard Deficiency Format. Calculation should be supported by drawing in English & proper size of raw material & not oversize raw material. 2. The details of the Associated Auxiliaries with their weight & raw material and components required for the same. 3. Total CIF values of paints, thinner and primers etc. proposed for import 4. Raw material weight and finished weight of castings and forgings proposed for import. 5. Break up all import items in sets to numbers. 88
Case No.:18/7/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00124/AM12/ RLA File :04/24/040/00317/AM11/ Lic.No/Date:0410124882 13.06.2011 Defer Date:01.11.2011 Decision :On the recommendation of the representative of DHI present in the meeting, the Committee
88 decided to call for the following information/clarification from the firm and to relist the case on 01.11.2011: 1. Information in respect of Sl.No.5,9, & 11 of the Standard Deficiency Format export product wise 2. The details of the Auxiliaries to be exported with quantity in number + weight & steam generating capacity 3. Inputs required for the manufacture of Auxiliaries 4. Length and weight of different type of pipes like seamless, welded pipes separately for each type of steel types like carbon steel and alloy steel 5. Use & justification of quantity of import of item no. 6 of import. 89
Case No.:19/7/80ALC2/2011
Party Name:PRANAV VIKAS (INDIA) LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00125/AM12/ RLA File :05/24/040/00090/AM12/ Lic.No/Date:0510293230 13.06.2011 Defer Date:01.11.2011 Decision : The Committee observed that the firm has not replied to this office letter dated 19.08.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 01.11.2011. 90
Case No.:1/10/80ALC2/2011
Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00196/AM12/ RLA File :03/94/040/00231/AM12/ Lic.No/Date:0310635806 13.06.2011 Defer Date:01.11.2011 Decision :The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 01.11.2011. 91
Case No.:20/7/80ALC2/2011
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00126/AM12/ RLA File :05/23/040/00102/AM12/ Lic.No/Date:0510293271 14.06.2011 Defer Date:01.11.2011 Decision :The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 01.11.2011.
Case No.:24/7/80ALC2/2011
Party Name:SDL AUTO P.LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Approved HQ File :01/80/050/00130/AM12/ RLA File :05/24/040/00094/AM12/ Lic.No/Date:0510293520 15.06.2011 Decision : As per the written comments of DC(MSME) received vide their U.O. Note No.30(45)/2011 d d h i d id d if h i f h bj d
92 ME dated 29.08.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Sl.No. Export Product Wastage allowed after 1/3rd recovery Qty of Imported input 1. Baffle Side Outlet2000 Nos 1605774A 203% 3,424.00 kg 2. Baffle Side Outlet300 Nos 1605776A 57% 1,452.00 kg 3. Inner End plate 3200 Nos 1606021 A 50% 12,888.00 kg 4. Baffle3000 Nos 1605943A 71% 14,266.00 kg 5. Boden10000 Nos 240609 45% 5,640.00 kg 6. Shell4500 Nos 242878 51% 7,373.00 kg 7. Innenschalen500 –Nos 180347 37% 208.00 kg 8. Innenschalen500 –Nos 180348 37% 208.00 kg 9. Innenschalen500 –Nos 180349 37% 208.00 kg TOTAL quantityof Import 45,667.00 kg 93
Case No.:25/7/80ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00131/AM12/ RLA File :03/94/040/00192/AM12/ Lic.No/Date:0310636369 15.06.2011 Defer Date:01.11.2011 Decision : The Committee decided to forward a copy of firm’s reply dated 16.09.2011 to DIPP for examination and comments. The case may be relisted on 01.11.2011. 94
Case No.:15/10/80ALC2/2011
Party Name:LALITHA & COMPANY PAPER PRODUCTS PVT LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00210/AM12/ RLA File :09/24/040/00067/AM12/ Lic.No/Date:0910047134 15.06.2011 Defer Date:01.11.2011 Decision :On the recommendation of the representative of DIPP present in the meeting, the Committee 01.11.2011: 1. Complete manufacturing process for ‘Cut Rubber Blanket’ using ‘Rubber Blanket for Printing Use’ indicating wastage generated in each stage of manufacture. Dimension of each ‘Cut Rubber Blanket’ for printing use may also be indicated. 2. Justification for the quantity of import item i.e. 612.00 Sq. meter of ‘Rubber Blanket For Printing Use’ for the manufacture of 765.00 Sq. meter of ‘Cut Rubber Blanket’. 95
Case No.:26/7/80ALC2/2011
Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00132/AM12/ RLA File :05/24/040/00079/AM12/ Lic.No/Date:0510293596 16.06.2011 Defer Date:01.11.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received. The i h f d id d i d h f di i h i h b li d
Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 01.11.2011. 96
Case No.:27/7/80ALC2/2011
Party Name:GLOBAL OPHTHALMIC PRIVATE LIMITED Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Rejected HQ File :01/80/050/00133/AM12/ RLA File :04/24/040/00044/AM12/ Lic.No/Date:0410125060 17.06.2011 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 15.07.2011 and subsequent reminder 19.08.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. 97
Case No.:5/13/80ALC2/2011
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:13/80 ALC2/2011 20.09.2011 Status: Deferred HQ File :01/80/050/00250/AM12/ RLA File :05/24/040/00170/AM12/ Lic.No/Date:0510299733 17.08.2011 Defer Date:01.11.2011 Decision : The Committee noted that the firm’s application has been forwarded to DIPP on 14.09.2011. However the Committee decided to forward a copy of firm’s application to DHI for examination and comments as the matter pertain to them. The case may be relisted on 01.11.2011. S.No.15
Case No. A01
M/s. Motherson Sumi Systems Ltd., New Delhi HQF.No.01/80/162/00503/AM12/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.05/24/040/00219/AM08 0510204921dt.14.06.2007 Date: 20.09.2011 Revision of norms As per the written comments of DHI received vide their U.O. Note No.3(61)10TSW(B)512 dated 14.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization on repeat basis as per Advance Authorization License No. 0510261287 dt 26032010 approved by NC in its meeting No. 26/11 held on 28092010. S.No.16
Case No. A02
M/s. Plant Engineering Service, Chennai HQF.No.01/80/162/00504/AM12/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.04/24/040/00198/AM11 0410118711dt 09.11.2010 Date: 20.09.2011 Revision of norms As per the written comments of DHI received vide their U.O. Note No.3(165)09TSW(B)532 dated 15.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Export Product: Rack LHD/RHD …. 414 MT (200,000 Nos.) Imports:
1. Rack Bar Blank ……….454.50 MT (197,590 Nos.) 2. Broach Tool (consumables) 32 Nos. (3% of FOB value) S.No.274
Case No. A/R63
M/s. Thyssenkrup Industries India Ltd., F.No.01/80/50/ 01852/AM09/DES.I Lic.No. & Date Meeting No. 13/12 RA F.No.31/21/040/00399/Am09 3110037568 dt.03.03.2009 Date: 20.09.2011 Ratification of norms The Committee noted that case has been examined on the file. After deliberating the details of the case. The Committee decided to merge the Advance Authorization No. 3110037568 dated 03.03.2009 with Advance Authorization No. 3110039814 dated 02.09.2009. Based on the written comments of DHI received vide their U.O. Note No. 3(127)/09TSW(B)/73 dated 20.01.2011, the Committee decided to ratify the norms as under: Export Export product to be amended as “Coal Handling plant for Durgapur Thermal Power Station (2X500MW)” Import (i) Item No. 1 to 34 and 3637 are components and to be allowed under GN4 (ii) Import No. 35 & 38 are spares and to be allowed as per spares policy. (iii) List of Items as submitted by the firm vide letter dated 29.12.2010 is at Annexure. S.No.275
Case No. A/R
136 M/s. Bharat Heavy Electricals Ltd., Haridwar HQ F.No.01/80/50/00319/AM10/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.61/24/040/00020/AM10 6110000343 dt.19.08.2009 Date: 20.09.2011 The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 01.11.2011. S.No.276
Case No. A/R
132 M/s. Enmas GB Power Systems Projects Ltd., Chennai HQ F.No.01/80/050/00102/AM10/DES.I HQ F.No.01/80/050/00365/AM10/DESI Lic. No. & date Meeting No. 13/12 RA.F.No.04/24/040/00323/Am08 0410104770 dt.21.05.2009 & 0410107592 dt.07.09.2009 Date: 20.09.2011 The Committee noted that case has been examined on the file. After deliberating the details of the case, the Committee decided to merge the Advance Authorization No. 0410104770 dated 21.05.2009 with Advance Authorization No. 0410107592 dated 07.09.2008. Based on the written comments of DHI received vide their U.O. Note No. 3(166)/09TSW(B)/458 dated 08.09.2010, the Committee decided to ratify the norms as under: Export (i) Export product: 55 TPH BFB Boilder (ii) Total export weight to be 1013 MT to be incorporated in the license.
Import: (i) Wastage of 3% on plates and 2% wastage on beams, channel, tubes, angles are allowed in import of tubes. (ii) The wastage is allowed on total utilized quantity on the consolidated list of item enclosed at Annexure (6 pages). S.No.277
Case No.A/R143
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/050/00594/AM08/ DESI Lic.No. & Date Meeting No. 13/12 RA F.No.04/24/040/00276/AM08 0410092211 dt.20.11.2007 Date: 20.09.2011 The Committee deliberated the issue and decided in principle to merge the multiple licenses issued to the firm. However, it has been decided to write to all concerned R.As. not to issue multiple licences for a single export product in future. The Committee also decided to send a consolidated list of export & import items to be merged under each license to DIPP for examination and comments. The case may be relisted on 01.11.2011. S.No.278
Case No.A/R144
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/050/00338/AM09/ DESI Lic.No. & Date Meeting No. 13/12 RA F.No.04/24/040/00404/AM08 0410094622 dt.19.03.2008 Date: 20.09.2011 The Committee deliberated the issue and decided in principle to merge the multiple licenses issued to the firm. However it has been decided to write to all concerned R.As. not to issue multiple licences for a single export product in future. The Committee also decided to send a consolidated list of export & import items to be merged under each license to DIPP for examination and comments. The case may be relisted on 01.11.2011. S.No.279
Case No.A/R145
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/162/00884/AM08/ DESI Lic.No. & Date Meeting No. 13/12 RA F.No.04/24/040/00163/AM08 0410090764 dt.29.08.2007 Date: 20.09.2011 The Committee deliberated the issue and decided in principle to merge the multiple licenses issued to the firm. However it has been decided to write to all concerned R.As. not to issue multiple licences for a single export product in future. The Committee also decided to send a consolidated list of export & import items to be merged under each license to DIPP for examination and comments. The case may be relisted on 01.11.2011. S.No.280
Case No.A/R146
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/050/00178/AM08/ DESI Lic.No. & Date Meeting No. 13/12 RA F.No.04/24/040/00086/AM08 0410089961 dt.14.06.2007 Date: 20.09.2011 The Committee deliberated the issue and decided in principle to merge the multiple licenses issued to the firm. However it has been decided to write to all concerned R.As. not to issue multiple licences for a single export product in future. The Committee also decided to send a consolidated list of export & import items to be merged under each license to DIPP for examination and comments. The case may be relisted on 01.11.2011.
u de eac ce se to o e a at o a d co e ts. e case ay be e sted o 0 . . 0 . S.No.281
Case No.A/R147
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/050/00617/AM09/ DESI Lic.No. & Date Meeting No. 13/12 RA F.No.04/24/040/00032/AM08 0410096034 dt.26.05.2008 Date: 20.09.2011 The Committee deliberated the issue and decided in principle to merge the multiple licenses issued to the firm. However it has been decided to write to all concerned R.As. not to issue multiple licences for a single export product in future. The Committee also decided to send a consolidated list of export & import items to be merged under each license to DIPP for examination and comments. The case may be relisted on 01.11.2011. S.No.282
Case No.A/R148
M/s. Diamond Engineering (Chennai) Pvt. Ltd., Chennai HQ F.No.01/80/050/00832/AM09/ DESI Lic.No. & Date Meeting No. 13/12 RA F.No.04/24/040/00115/AM09 0410097812 dt.07.08.2008 Date: 20.09.2011 The Committee deliberated the issue and decided in principle to merge the multiple licenses issued to the firm. However it has been decided to write to all concerned R.As. not to issue multiple licences for a single export product in future. The Committee also decided to send a consolidated list of export & import items to be merged under each license to DIPP for examination and comments. The case may be relisted on 01.11.2011. S.No.283
Case No. A/R
188 M/s. Ingersoll Rand (India) Ltd., Mumbai HQF.No.01/80/162/00453/AM01/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.03/24/040/00396/AM04 0310045622 dt.18.07.2000 Date: 20.09.2011 Request for restoration of import items under Sl. No.16, 17(a) (b) and (c) and 19 of ratification As per the written comments of DIPP received vide their U.O. Note dated 20.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Words “containing 26.579 MT of Aluminium Alloy and 16.580 MT of Copper Tubes to be suffixed quantity of export products”. 2.Quantity of import item at Sl. No. 16 (Aluminium Alloy) to be allowed as 26.579 MT on net to net basis as claimed by the firm. 3.Quantities of import item at Sl. Nos. 17 (Copper Tubes) to be allowed as under on net to net basis as claimed by the firm. 17(a): 1539.02 Kgs 17(b): 759 Kgs 17(c): 6294.5 Kgs 17(a): 7988 Kgs 4. Quantity of import item at Sl. Nos.19 (Gasket Sheets) to be allowed as 1.04 Sq.Mtrs./Sq. mtr. content in the export products as claimed by the firm. S.No.284
Case No. A/R
01 M/s. Bharat Heavy Electricals Ltd., HQF.No.01/80/050/00419/AM10/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.11/24/040/00016/AM10 1110021021 dt.08.09.2009
Date: 20.09.2011 The representative of the firm Shri Faresh Khan KH., Engineer (Material Service) appeared before the Committee for personal hearing and informed that the requisite information sought by DHI has been submitted by them. The Committee, therefore, decided to await the comments of DHI and to relist the case on 01.11.2011. S.No.285
Case No. A/R13
M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00785/AM10/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.03/94/040/00986/AM10 0310561988 dt.25.02.2010 Date: 20.09.2011 The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 15.07.2011 and subsequent reminder 19.08.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. S.No.286
Case No. A/R
18 M/s. Theyssenkrup Industries India Pvt. LTd., Pune HQF.No.01/80/050/00022/AM11/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.31/24/040/00198/AM10 3110041936 dt.15.02.2010 Date: 20.09.2011 The Committee noted that the firm’s representation has been sent to DHI on 26.08.2011 for examination and comments. The Committee, therefore, decided to defer the consideration and to relist the case on 01.11.2011. S.No.287
Case No. A/R
20 M/s. Marks Pryor Marketing Technology Pvt. LTd., HQF.No.01/80/050/00827/AM10/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.31/24/040/00213/AM10 3110042306 dt.10.03.2010 Date: 20.09.2011 The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 01.11.2011. S.No.288
Case No. A/R
23 M/s. Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/00232/AM11/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.61/24/040/00024/AM11 6110000457 dt.17.06.2010 Date: 20.09.2011 The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 01.11.2011. S.No.289
Case No. A/R
26 M/s. The Saraswati Indsutrial Syndicates Ltd., HQF.No.01/80/050/00589/AM10/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.05/24/040/00387/AM10 0510254039 dt.07.12.2009
Date: 20.09.2011 As per the written comments of DIPP received vide their U.O. Note dated 20.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Quantities of import items at Sl. Nos. 9 & 10 to be allowed as applied for i.e. 100 ltrs. & 15 ltrs. respectively. 2. Quantities of import items at Sl. Nos. 18 & 19 put together to be allowed as 574 ltrs. 3. Quantities of import items at Sl. Nos. 27 & 28 put together to be allowed as 574 ltrs. 4. Quantities of import items at Sl. Nos. 36 & 37 to be allowed as applied for i.e. 240 ltrs. & 35 ltrs. respectively. 5. Quantities of import items at Sl. Nos. 45 & 46 put together to be allowed as 574 ltrs. 6. Quantities of import items at Sl. Nos. 54 & 55 put together to be allowed as 574 ltrs. 7. Quantities of import items at Sl. Nos. 64 & 65 put together to be allowed as 469 ltrs. 8. Total weights of import items at Sl. No. 7, 16, 25, 34, 43, 52 & 62 put together to be specified as 51231 Kgs. S.No.290
Case No. A/R33
M/s. Teksons Ltd., HQF.No.01/80/050/00046/AM10/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.03/95/040/00757/AM07 0310399654 dt.15.09.2006 Date: 20.09.2011 As per the written comments of DHI received vide their U.O. Note No. 3(42)/09TSW(B)/531 dated 07.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization under SION C1891 except Item No. 4 & 6 of import which are not covered under the SION. S.No.291
Case No. A/R34
M/s. The Saraswati Industrial Syndicate Ltd., HQF.No.01/80/050/00062/AM11/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.05/24/040/00019/AM11 0510262876 dt.23.04.2010 Date: 20.09.2011 As per the written comments of DIPP received vide their U.O. Note dated 20.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Net empty weight of 119.6 MT & 119.6 MT to be specified with the quantities of export products at Sl.No. 1 & 2 respectively. 2. Quantities of import items at Sl. Nos. 2 & 13 put together to be allowed as 76302 Kgs. inclusive 9.3 % wastage as applied for. 3. Quantities of import items at Sl. Nos. 4 & 15 put together to be allowed as 2750 Kgs. 4. Quantities of import items at Sl. Nos. 6 & 17 put together to be allowed as 5750 Kgs. 5. Quantity of import item at Sl. No. 10 to be allowed as 30 Nos. ( 8053 Kgs.) on net to net basis. S.No.292
Case No. A/R
58 M/s. Elecon Engineering HQF.No.01/80/162/0000518/AM11/DES.I Lic. No. & date
g g Co. Ltd., Gujarat Meeting No. 13/12 RA.F.No.34/82/042/00007/AM04 3410008330 dt.29.08.2003 Date: 20.09.2011 The Committee decided to forward a copy of firm’s reply dated 19.09.2011to DHI for examination and comments. The case may be relisted on 01.11.2011. S.No.293
Case No. A/R
59 M/s. Apex Test Technologies, Bangalore HQF.No.01/80/050/0000864/AM11/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.05/23/040/00340/AM11 0710069015 dt.21.12.2009 Date: 20.09.2011 The Committee deliberated the written comments of DC(MSME) received vide their U.O. Note No.30(96)2009ME dated 06.09.2011and decided to advise the firm to appear before the NC to explain their case regarding actual wastage of import item No. 7, 8 & 9 along with all required details sought by DC(MSME) earlier (this office letter No. 01/80/050/0000864/AM11/DES.I dated 30.04.2011 refers) in person along with technical expert and full facts of the case. The case may be relisted on 01.11.2011. S.No.294
Case No. A/R
62 M/s. Macmet India Limited, Kolkata HQF.No.01/80/050/0000478/AM09/DES.I HQF.No.01/80/050/0000479/AM09/DES.I HQF.No.01/80/050/0000480/AM09/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.02/24/040/00030/AM09 RA.F.No.02/24/040/00031/AM09 RA.F.No.02/24/040/00032/AM09 0210113456 dt.11.06.2008; 0210113457 dt.11.06.2008 and 0210113458 dt.11.06.2008 Date: 20.09.2011 Ratification of norms As per the written comments of DHI received vide their U.O. Note No.3(62)09TSW(B)475 dated 01.09.2011, the Committee decided to ratify the norms of import of 250 sponge rubber balls per unit of export product (condenser tube cleaning system). The imports are ratified subject to accountability in the export product in respect of above mentioned three subject advance authorizations. S.No.295
Case No. A/R
63 M/s. The Saraswati Industrial Syndicate Ltd., New Delhi HQF.No.01/81/050/00052/AM08/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.05/24/040/01081/AM07 0510202875 dt.24.04.2007 Date: 20.09.2011 Revision of norms The Committee noted that DHI requested the Committee vide their U.O. Note No. 3/41/10TSW(B)/546 dated 16.09.2011 for detail background of the firm’s request along with the decision of the N.C. along with the details of the deficiency letters if any issued by DGFT/NC. The Committee decided to forward the same to DHI and to S.No.296
Case No. A/R81
M/s. IDMC Limited, Anand, Gujarat HQF.No.01/80/050/00011/AM09/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.34/24/040/00093/AM05 3410011527 dt.20.09.2004 Date: 20.09.2011 On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for
the following information/clarification from the firm and to relist the case on 01.11.2011: 1. Information in respect of Sl.No.3, 4, 5 and 11 of the Standard Deficiency Format export product wise. S.No.297
Case No. A/R
82 M/s. Bharat Heavy Electricals Ltd., Trichirapalil HQF.No.01/80/050/00371/AM11/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.04/24/040/00111/AM11 0410116559 dt.24.08.2010 Date: 20.09.2011 The Committee noted that the firm’s representation has been sent to DHI on 13.09.2011 for examination and comments. The committee decided to defer the case and to relist the case on 04.10.2011 S.No.298
Case No. A/R
83 M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00054/AM10/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.09/24/040/00536/AM10 0910041410 dt.23.03.2010 Date: 20.09.2011 S.No.299
Case No. A/R
84 M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00182/AM10/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.09/24/040/00048/AM10 0910038038 dt.28.05.2009 Date: 20.09.2011 S.No.300
Case No. A/R
85 M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli HQF.No.01/80/050/00207/AM11/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.04/24/040/00060/AM11 0410114911 dt.24.06.2010 Date: 20.09.2011 S.No.301
Case No. A/R
86 M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/01661/AM09/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.09/24/040/00377/AM09 0910036659 dt.09.01.2009 Date: 20.09.2011 S.No.302
Case No. A/R
87 M/s. Bharat Heavy Electricals Ltd., H d b d HQF.No.01/80/050/00043/AM11/DES.I Lic. No. & date i A 09/24/040/00 2/A 10 0910041 31
Hyderabad Meeting No. 13/12 RA.F.No.09/24/040/00552/AM10 0910041731 dt.20.04.2010 Date: 20.09.2011 S.No.303
Case No. A/R
88 M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/01436/AM08/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.09/24/040/00556/AM07 0910030003 dt.16.04.2007 Date: 20.09.2011 S.No.304
Case No. A/R
89 M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00055/AM10/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.09/24/040/00510/AM07 0910041253 dt.09.03.2010 Date: 20.09.2011 S.No.305
Case No. A/R
90 M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/01784/AM09/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.09/24/040/00408/AM09 0910037050 dt.12.02.2009 Date: 20.09.2011 S.No.306
Case No. A/R
91 M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00404/AM11/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.09/24/040/00155/AM11 0910042828 dt.22.07.2010 Date: 20.09.2011 S.No.308
Case No. A/R93
M/s. The Saraswati Industrial Syndicate Ltd., HQF.No.01/80/050/00331/AM11/DES.I Lic. No. & date Meeting No. 13/12 RA.F.No.05/24/040/00176/AM11 0510270623 dt.16.08.2010 Date: 20.09.2011 On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 01.11.2011: 1. Information in respect of Sl.No.5 of the Standard Deficiency Format. S N 72
S.No.72
Case No. C 14
M/s. MSS India Pvt. Ltd., F.No. 01/80/162/ 00143/AM11/DES.I Meeting No. 13/12 Fixation of adhoc wastage norms for “Small fabricated items, Fabricated bus bars, Press work items, Braided connectors, laminated connectors, Cast connectors, Switch fuse unit HSN, Bolled / Moulded Connector, Moulded Components, DC Busbars. Machined & Forged Components. Battery Charger / Transformer”. Date: 20.09.2011 The Committee deliberated the report of the 3 member team which visited the firm’s manufacturing unit and decided to ratify adhoc wastage norms for “Small fabricated items, Fabricated bus bars, Press work items, Braided connectors, laminated connectors, Cast connectors, Switch fuse unit HSN, Bolled / Moulded Connector, Moulded Components, DC Busbars. Machined & Forged Components. Battery Charger / Transformer” during the years 200607, 20072008, 20082009, 20092010 and 20102011. List of items enclosed from Annexure I to V The Regional Authority may take necessary action accordingly. S.No.73
Case No.C04
M/s. Kusalava International Ltd., HQ F.No.01/80/162/00021/AM10/DES.I Meeting No. 13/12 Date: 20.09.2011 Fixation of Standard Input Output Norms (SION) for the export of “Cylinder Liners” The Committee noted that the firm has sought time for submission of documents vide their letter dated 2011. The Committee decided that to await the firm’s reply and to relist the case on 01.11.2011. S.No.74
Case No. C01
M/s. BOSCH Limited, Bangalore F.No.01/80/162/1193/AM09/DES.I Meeting No. 13/12 Fixation of SION for the export product “Common Rail Injector Parts” Date: 20.09.2011 The Committee noted that the firm’s reply has been sent to DHI on 24.08.2011. The decided to defer the case and to relist the case on 01.11.2011. S.No.75
Case No. C 19
M/s. MSS India Pvt. Ltd., F.No.01/80/162/ 00419/AM11/DES.I Meeting No. 13/12 Fixation of adhoc wastage norms for “Small fabricated items, Fabricated bus bars, Press work items, Braided connectors, Laminated connectors, Cast connectors, Switch fuse unit HSN, Bolled / Moulded Connector, Moulded Components, DC Bus bars. Machined & Forged Components. Battery Charger / Transformer, electrical parts Make of Ferrous & Non Ferrous Material (Viz. Copper, Brass, Aluminium, Steel, Monel, Inconel and Lead etc.), Cast Pillars, Electricals & Auto Assemblies, Plate contacts”. Date: 20.09.2011 The Committee deliberated the report of the 3 member team which visited the firm’s manufacturing unit and decided to ratify adhoc wastage norms for “Small fabricated items, Fabricated bus bars, Press work items, Braided connectors, laminated connectors, Cast connectors, Switch fuse unit HSN, Bolled / Moulded Connector, Moulded Components, DC Busbars. Machined & Forged Components. Battery Charger / Transformer” during the years 200607, 20072008, 20082009, 20092010 and 20102011. List of items enclosed from Annexure I to V The Regional Authority may take necessary action accordingly. S 6
S.No.76
Case No. C 03
M/s. PTC Industries Ltd., F.No.01/80/162/00535/AM11/DES.I Meeting No. 13/12 Clarification on admissibility of DEPB benefit against export product “Hatch used in Barges is covered under DEPB Sl.No.530B of product Code 61. Date: 20.09.2011 The Committee noted that Ministry of Steel (Tech. Wing) has informed vide their U.O.No.2(14)/2011TW dated 21.09.2011 that since DEPB Scheme is going to end on 30.09.2011, they have no comments at this stage. The Committee, therefore, decided to remind DHI and DC(MSME) offer their comments of DIPP’s written comments. The Case may be relisted on 01.11.2011. S.No.77
Case No. C 04
M/s. International Tubular Services (India) Pvt. LTd., Taloja F.No.01/80/162/00007/AM12/DES.I Meeting No. 13/12 Fixation of wastage norms for the export product “4 ¾ Energie Jar (Parts of Oil Field Equipment / Drilling Machinery) and components in respect of 100% EOU Date: 20.09.2011 The Committee noted that M/s ITS India Pvt. Ltd. has informed vide letter dated that they are in a process of collecting the data from their representative department and they will submit the requisite information with in 15 days for fixation of wastage norms. The Committee, therefore, decided to await the firm’s reply and to relist the case on 011.11.2011. S.No.78
Case No. C 05
M/s. Brady Company India Pvt. Ltd., F.No.01/80/162/01100/AM11/DES.I Meeting No. 13/12 Fixation of SION for the export product “High Performance Electronic Trackers and DieCuts parts” in respect of 100% EOU. Date: 20.09.2011 The Committee decided to forward a copy of firm’s reply dated 09.09.2011 to C&PC for examination and comments. The case may be relisted on 01.11.2011. S.No.79
Case No. C 07
M/s. BOSCH Limited, Bangalore HQF.No.01/80/162/00683/AM10/DES.I Meeting No. 13/12 Request for fixation of SION for the export product “Viz. Common Rail Pump” Date: 20.09.2011 The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 01.11.2011. S.No.80
Case No. C 08
M/s. Ultra Engineers, Pune HQF.No.01/80/162/00262/AM12/DES.I Meeting No. 13/12 Fixation of wastage norms for special Brand Rate Duty Draw Back against deemed export” Date: 20.09.2011 The Committee noted that the firm’s application has been returned by DHI as the subject matter does not pertains to them. The Committee, therefore, decided the firm’s application may be sent to DIPP for examination and comments. The case may be relisted on 01.11.2011. S.No.81
Case No. C 09
M/s. Ultra Engineers, Pune HQF.No.01/80/162/00263/AM12/DES.I Meeting No. 13/12 Fixation of wastage norms for special Brand Rate Duty Draw Back against deemed export” Date: 20.09.2011 The Committee noted that the firm’s application has been returned by DHI as the subject matter does not pertains to them. The Committee, therefore, decided the firm’s application may be sent to DIPP for i i d Th b li d 01 11 2011
examination and comments. The case may be relisted on 01.11.2011. S.No.82
Case No. C 10
M/s. Ultra Engineers, Pune HQF.No.01/80/162/00249/AM12/DES.I Meeting No. 13/12 Fixation of wastage norms for special Brand Rate Duty Draw Back against deemed export” Date: 20.09.2011 The Committee noted that the firm’s application has been returned by DHI as the subject matter does not pertains to them. The Committee, therefore, decided the firm’s application may be sent to DIPP for examination and comments. The case may be relisted on 01.11.2011. S.No.83
Case No. C 20
M/s. ITS India Pvt. LTd., Taloja (Mahrashtra) HQF.No.01/80/162/00287/AM12/DES.I Meeting No. 13/12 Fixation of input output norms for the export product “6 ½ Energie Jar (Parts of Oil Field Equipment/ Drilling Machinery) and components thereof”. Date: 20.09.2011 On the recommendation of the representative of DHI present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 01.11.2011: 1. Information in respect of Sl.No.5, 8 & 11 of the Standard Deficiency Format (Calculation of wastage should be supported by legible drawing with wastage at each stage of manufacture. Volume based calculation from drawing dimension may be given.) 2. The export weight in the present case is 1175 kg against the export weight of 1200 kg for the licence No. 0310504031 dated. 280109. 3. The items in both the requests are also not matching. There are more items in the present case. S.No.84
Case No. C 21
M/s. ITS India Pvt. Ltd., Taloja (Mahrashtra) HQF.No.01/80/162/00234/AM12/DES.I Meeting No. 13/12 Fixation of adhoc norms under para 6.8(e) of FTP 2009 14 for the export product “ 8” Energie Energizaer (Parts of Oil field Equipment / Drilling Machinery) and components thereof”. Date: 20.09.2011 On the recommendation of the representative of DHI present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 01.11.2011: 1. Information in respect of Sl.No.5, 8 & 11 of the Standard Deficiency Format (Calculation of wastage should be supported by legible drawing with wastage at each stage of manufacture. Volume based calculation from drawing dimension may be given.) 2. The export weight in the present case is 1850 kg against the export weight of 1775 kg for the lic no 0310528364 dated. 100709. 3. The items in both the requests are also not matching. There are more items in the present case.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.