IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2010-07-27

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.17/11 held on 27.07.2010 of Norms Committee (NC­I) (DES.I Section)     The meeting No. 17/11 of the Norms Committee (NC­I) for the licensing year 2010­2011 was held on 27.07.2010 under the Chairmanship of Sh. V.K. Srivastava, Addl. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Aggarwal 3rd Floor   D/o C&PC 5. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 6.  Sh. B. D. Ghosh, Jt. IA 399 23063355 M/o Steel, U.B 7.      Sh. Rajinder Pal  Singh, Dy. D.G.F.T 486 23061562  Ext. 345 DGFT, UB 8. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­ 1

Case No.:31/30/80­ALC2/2008

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/01161/AM09/ RLA File :09/24/040/00467/AM08/ Lic.No/Date:0910035538 07.10.2008 Defer Date:24.08.2010 Decision : The Committee considered the case as per agenda. The Committee directed to forward a copy of firm’s reply to DHI. and to relist the case on 24.08.2010.   2

Case No.:32/30/80­ALC2/2008

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/01162/AM09/ RLA File :09/24/040/00468/AM08/ Lic.No/Date:0910035539 07.10.2008 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The Committee directed to forward a copy of firm’s reply to DHI. and to relist the case on 24.08.2010.   3

Case No.:28/42/80­ALC2/2008

Party Name:THERMAX LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/01652/AM09/ RLA File :31/21/040/00319/AM09/ Lic.No/Date:3110036852 02.01.2009 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The representative of the DHI informed the Committee that they have not received reply of the firm.  The Committee directed to forward a copy of firm’s reply to DHI. and to relist the case on 24.08.2010.

4

Case No.:2/1/80­ALC2/2009

Party Name:TERUMO PENPOL LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/01825/AM09/ RLA File :53/24/040/00012/AM09/ Lic.No/Date:5310007800 16.03.2009 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The Committee observed that the comments called  for  from  C&PC  are  yet  to  be  received.    The Committee,  therefore,  decided  to  remind  them  for expediting their comments. The case may be re­listed on 24.08.2010.   5

Case No.:14/14/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00184/AM10/ RLA File :61/24/040/00012/AM10/ Lic.No/Date:6110000320 19.06.2009 Defer Date:24.08.2010 Committee  that  the  case  was  under  their  examination.  The  Committee,  therefore,  decided  to  defer  the consideration and to relist the case on 24.08.2010.   6

Case No.:1/17/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LTD, Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00224/AM10/ RLA File :04/24/04000079/AM10/ Lic.No/Date:0410106106 14.07.2009 Defer Date:17.08.2010 consideration and to relist the case on 17.08.2010.   7

Case No.:16/17/80­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00239/AM10/ RLA File :03/94/040/00300/AM10/ Lic.No/Date:0310529264 16.07.2009 Defer Date:24.08.2010   8

Case No.:13/25/80­ALC2/2009

Party Name: AKSH OPTI­FIBRE LTD. Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00371/AM10/ RLA File :05/23/040/00039/AM10/ Lic.No/Date:0510249115 11.09.2009 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda.  The Committee observed that the comments called  for  from  DIT  are  yet  to  be  received.  The  Committee,  therefore,  decided  to  remind  them  for expediting their comments. The case may be relisted on 24.08.2010.  

Case No.:11/28/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00429/AM10/ RLA File :31/24/040/00124/AM10/ Lic.No/Date:3110040186 07.10.2009 Defer Date:24.08.2010

9 Decision : The committee considered the case as per agenda. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information despite reminder.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for  expediting  the  said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 24.08.2010.   10

Case No.:2/33/80­ALC2/2009

Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00468/AM10/ RLA File :07/24/040/00258/AM10/ Lic.No/Date:0710067933 30.10.2009 Defer Date:24.08.2010   11

Case No.:7/33/80­ALC2/2009

Party Name:ECOCAT INDIA PVT.LTD. Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00473/AM10/ RLA File :05/23/040/00087/AM10/ Lic.No/Date:0510251883 04.11.2009 Defer Date:24.08.2010 Decision : The representative of the DHI informed the Committee that the case was under study.  The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010   12

Case No.:18/41/80­ALC2/2009

Party Name:KE­BURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00639/AM10/ RLA File :04/24/040/00247/AM10/ Lic.No/Date:0410110339 22.12.2009 Defer Date:24.08.2010 Decision  :  The  committee  considered  the  case  as  per  agenda.  The  representative  of  the  DC(MSME) informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010.   13

Case No.:13/41/80­ALC2/2009

Party Name:BACHMANN INDUSTRIES INDIA LTD Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Approved HQ File :01/80/050/00634/AM10/ RLA File :05/23/040/00134/AM10/ Lic.No/Date:0510255171 23.12.2009

Decision  :  The  committee  considered  the  case  as  per  agenda.  As  per  the  written  comments  of  DIPP communicated vide their note  dated 06.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.Net weight of  export product may be specified as 107.5 MT. 2.Quantities of import items at Sl. No. 1 & 5 may be allowed as applied for inclusive of 5 % wastage. 3.Quantities of import items at Sl. No. 2, 3 6, 7 & 9  may be allowed as      applied for inclusive of 3% wastage. 4.Quantity of import item at Sl. No. 4 may be allowed as 370 Kgs for inclusive of 5 % wastage.       5.Net weights of import items  at Sl. Nos. 8, 10 & 11 may be specified as 2480    Kgs., 120 Kgs., & 48 Kgs respectively and the same may be allowed on net to net basis with accountability clause.   The Regional Authority may take necessary action accordingly.    14

Case No.:19/41/80­ALC2/2009

Party Name:PLAST TECH ENGINEERING Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00640/AM10/ RLA File :04/24/040/00216/AM10/ Lic.No/Date:0410110358 23.12.2009 Defer Date:24.08.2010 reminder. The Committee, therefore, decided to issue  again final reminder to the firm for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 24.08.2010.   15

Case No.:6/41/80­ALC2/2009

Party Name:SATA VIKAS INDIA PRIVATE LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00627/AM10/ RLA File :05/24/040/00426/AM10/ Lic.No/Date:0510255235 24.12.2009 Defer Date:24.08.2010 reminder. The Committee, therefore, decided to issue again final reminder to the firm for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 24.08.2010.   16

Case No.:9/41/80­ALC2/2009

Party Name:UNITED DRILLING TOOLS LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00630/AM10/ RLA File :05/24/040/00422/AM10/ Lic.No/Date:0510255294 29.12.2009 Defer Date:24.08.2010  

Case No.:11/41/80­ALC2/2009

Party Name:UNITED ENGINEERING (EASTERN)CORPN., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00632/AM10/ RLA File :02/24/040/00196/AM10/ Lic.No/Date:0210135971 01.01.2010 Defer Date:24.08.2010

17 Decision : The committee considered the case as per agenda. The Committee observed that no reply of the reminder. The Committee, therefore, decided  to  issue  final  reminder  to  the  firm  for  expediting  the  said   18

Case No.:22/41/80­ALC2/2009

Party Name:ARMOR PLAST LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00643/AM10/ RLA File :07/24/040/00368/AM10/ Lic.No/Date:0710069234 04.01.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The representative of the DIPP informed the   19

Case No.:10/49/80­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00779/AM10/ RLA File :02/24/040/00176/AM10/ Lic.No/Date:0210136339 11.01.2010 Defer Date:24.08.2010   20

Case No.:19/5/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00052/AM11/ RLA File :09/24/040/00423/AM10/ Lic.No/Date:0910040811 03.02.2010 Defer Date:24.08.2010 reminder. The Committee, therefore, decided  to  issue  final  reminder  to  the  firm  for  expediting  the  said information within a period of 15 days from the date of issue of communication otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 24.08.2010.   21

Case No.:1/49/80­ALC2/2009

Party Name:KIDDE INDIA LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00770/AM10/ RLA File :03/94/040/00925/AM10/ Lic.No/Date:0310560868 18.02.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda.  The Committee observed that same items of import are appearing at more than one place in the list of items of  import e.g. S.No. 1 and 8; 2 and 9 etc.  It was decided to call for clarification from firm and relist on 24.08.2010.  

Case No.:4/49/80­ALC2/2009

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00773/AM10/ RLA File :09/24/040/00458/AM10/ Lic.No/Date:0910040992 18.02.2010 Defer Date:24.08.2010

22 Decision : The committee considered the case as per agenda. The Committee observed that no reply of the   23

Case No.:7/49/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00776/AM10/ RLA File :31/24/040/00229/AM10/ Lic.No/Date:3110042047 19.02.2010 Defer Date:24.08.2010   24

Case No.:9/49/80­ALC2/2009

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00778/AM10/ RLA File :34/24/040/00200/AM10/ Lic.No/Date:3410026452 22.02.2010 Defer Date:24.08.2010   25

Case No.:13/49/80­ALC2/2009

Party Name:MIKROTEK MACHINES LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00782/AM10/ RLA File :07/24/040/00443/AM10/ Lic.No/Date:0710070171 23.02.2010 Defer Date:24.08.2010 Decision  :  The  committee  considered  the  case  as  per  agenda.  The  committee  noted  that  the  Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and  submission  of comments. The case may be relisted on 24.08.2010.   26

Case No.:14/49/80­ALC2/2009

Party Name:MIKROTEK MACHINES LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00783/AM10/ RLA File :07/24/040/00400/AM10/ Lic.No/Date:0710070172 23.02.2010 Defer Date:24.08.2010

27

Case No.:20/49/80­ALC2/2009

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00789/AM10/ RLA File :07/24/040/00460/AM10/ Lic.No/Date:0710070294 01.03.2010 Defer Date:24.08.2010   28

Case No.:20/5/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00053/AM11/ RLA File :09/24/040/00506/AM10/ Lic.No/Date:0910041252 09.03.2010 Defer Date:24.08.2010 firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to write to the Executive Director with a copy to Chief Managing Director of the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 24.08.2010.   29

Case No.:22/5/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00055/AM11/ RLA File :09/24/040/00510/AM10/ Lic.No/Date:0910041253 09.03.2010 Defer Date:24.08.2010 firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to write to the Executive Director with a copy to Chief Managing Director of the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained. The case may be relisted on 24.08.2010.   30

Case No.:23/5/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00056/AM11/ RLA File :06/24/040/00047/AM10/ Lic.No/Date:0610017458 18.03.2010 Defer Date:24.08.2010 Decision : The Committee considered the case as per agenda. The Committee observed that no reply of the   31

Case No.:21/5/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00054/AM11/ RLA File :09/24/040/00536/AM10/ Lic.No/Date:0910041410 23.03.2010 Defer Date:24.08.2010

Decision : The Committee considered the case as per agenda. The Committee observed that no reply of the reminder. The Committee, therefore, decided  to  issue  final  reminder  to  the  firm  for  expediting  the  said   32

Case No.:14/11/80­ALC2/2010

Party Name:CORE METAL KRAFTS LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00160/AM11/ RLA File :22/24/040/00056/AM10/ Lic.No/Date:2210009813 25.03.2010 Defer Date:24.08.2010   33

Case No.:32/5/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00065/AM11/ RLA File :05/23/040/00225/AM10/ Lic.No/Date:0510261296 26.03.2010 Defer Date:24.08.2010   34

Case No.:36/5/80­ALC2/2010

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00069/AM11/ RLA File :05/23/040/00214/AM10/ Lic.No/Date:0510261354 29.03.2010 Defer Date:24.08.2010   35

Case No.:34/5/80­ALC2/2010

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00067/AM11/ RLA File :05/23/040/00232/AM10/ Lic.No/Date:0510261727 05.04.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The Committee observed that the comments called  for  from  M/o  Mines  are  yet  to  be  received  inspite  of  repeated  reminder  dated    09.7.10.    The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 24.08.2010.  

Case No.:3/5/80­ALC2/2010

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred

36 HQ File :01/80/050/00036/AM11/ RLA File :05/24/040/00500/AM10/ Lic.No/Date:0510262366 13.04.2010 Defer Date:24.08.2010     37

Case No.:6/5/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00039/AM11/ RLA File :31/24/040/00002/AM11/ Lic.No/Date:3110042881 15.04.2010 Defer Date:24.08.2010   38

Case No.:17/11/80­ALC2/2010

Party Name:RINAC INDIA LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00163/AM11/ RLA File :07/24/040/00485/AM10/ Lic.No/Date:0710070940 15.04.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda.The representative of the DIIP informed the   39

Case No.:5/5/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00038/AM11/ RLA File :34/24/040/00096/AM10/ Lic.No/Date:3410026835 16.04.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The Committee observed that the comments called  for  from  C&PC  are  yet  to  be  received.  The  Committee,  therefore,  decided  to  remind  them  for expediting their comments. The case may be relisted on 24.08.2010.   40

Case No.:9/5/80­ALC2/2010

Party Name:MAG ENGINEERING PVT LTD Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00042/AM11/ RLA File :07/21/040/00006/AM11/ Lic.No/Date:0710070974 16.04.2010 Defer Date:24.08.2010 Committee that they have not received the firm’s application  and decided by the committee forward  the  copy  of  firm’s  application    to DHI  for  examination  and  submission  their  comments.  The  case  may  be relisted on  24.08.2010.   41

Case No.:15/11/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00161/AM11/ RLA File :34/24/040/00229/AM09/ Lic.No/Date:3410026834 16.04.2010 Defer Date:24.08.2010

Decision : The committee considered the case as per agenda. The Committee observed that the comments called for from C&PC/DC(MSME) are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 24.08.2010.   42

Case No.:16/11/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00162/AM11/ RLA File :34/24/040/00217/AM09/ Lic.No/Date:3410026833 16.04.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The Committee observed that the comments called for from DC(MSME)/C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 24.08.2010.   43

Case No.:10/5/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00043/AM11/ RLA File :09/24/040/00552/AM10/ Lic.No/Date:0910041731 20.04.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. On the recommendation of the representative of  the  DHI    present  in  the  meeting.    It  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and  decided to defer  the consideration  and  to  relist the case on 24.08.201:­      1. Specific model & specifications of export item with details of spares.    2. Input Weight of each casting/ forging and corresponding finished weight.    3. Use of each component proposed for import in the manufacture of export product    4. Break up items proposed for import in sets to number.    5.  Serial no 4,5,9 & 11 of SDL export product wise     44

Case No.:11/5/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00044/AM11/ RLA File :05/24/040/00014/AM11/ Lic.No/Date:0510262671 20.04.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. On the recommendation of the representative of the DIPP present tin the meeting and decided to called for the following information / clarification from the firm:­    1. Sl. No.3,4,5, 11 & 13 export product wise.   The case may be relist on 24.08.2010.   45

Case No.:15/5/80­ALC2/2010

Party Name:SOUTHERN LUBRICATION (P) LTD., Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00048/AM11/ RLA File :07/24/040/00012/AM11/ Lic.No/Date:0710071058 20.04.2010 Defer Date:24.08.2010

firm had been received by this office in response to this office letter calling for certain information. The Committee,  therefore,  decided  to  remind  again  finally  the  firm  for  expediting  the  said  information otherwise  their  case  will  be  rejected  without  any  further  chance  and  no  further  representation  will  be entertained.   The case may be re­listed on 24.08.2010.   46

Case No.:16/5/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00049/AM11/ RLA File :53/24/040/00001/AM11/ Lic.No/Date:5310010393 21.04.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The Committee observed that the comments called  for  from  C&PC  are  yet  to  be  received.  The  Committee,  therefore,  decided  to  remind  them  for expediting their comments. The case may be relisted on 24.08.2010.     47

Case No.:17/5/80­ALC2/2010

Party  Name:PRABHA  EXPORTS(P) LTD Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Approved HQ File :01/80/050/00050/AM11/ RLA File :03/95/040/00045/AM11/ Lic.No/Date:0310570582 21.04.2010   Decision  :  The  committee  considered  the  case  as  per  agenda.  As  per  the  written  comments  of    DIPP communicated  vide  their  U.O.  Note  No.  DIPP/TSW/DES­I/17/11/47  dated  27.7.2010,  the  Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1.  Quantity of import item at Sl. No. 7  may be allowed as 554480 Meters on net to net basis as applied for by the firm.  2.  Import items at Sl. No. 10 & 14 may be allowed as applied for i.e.    1321640 Meters & 376250 Meters respectively on net to net basis. 3.      Quantity of import item at Sl. No. 21  may be allowed as 270648 Meters on net to net basis as applied for by the firm. 4.      Quantity of import item at Sl. No. 27  may be allowed as 300825 Meters on net to net basis as applied for by the firm. 5.      Rest of the import items from Sl. No. 1 to 6, 8, 9, 11 to 13, 15 to 20, 22 to 26 & 28 to 32 may be allowed on net to net basis with accountability clause. The Regional Authority may take necessary action accordingly.   48

Case No.:26/5/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00059/AM11/ RLA File :31/24/040/00010/AM11/ Lic.No/Date:3110042986 23.04.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda.  The representative of the DHI informed the Committee  that  the  case  was  under  their examination.    The  Committee,  therefore,  decided  to  defer  the consideration and to relist the case 24.07.2010.  

Case No.:29/5/80­ALC2/2010

Party  Name:THE  SARASWATI INDUSTRIAL SYNDICATE LTD. Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00062/AM11/ RLA File :05/24/040/00019/AM11/ Lic.No/Date:0510262876 23.04.2010 Defer Date:24.08.2010

49 Decision : The committee considered the case as per agenda.  The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 24.8.2010.   50

Case No.:30/5/80­ALC2/2010

Party  Name:METSO  PAPER  INDIA PVT.LTD. Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00063/AM11/ RLA File :05/24/040/00028/AM11/ Lic.No/Date:0510262877 23.04.2010 Defer Date:24.08.2010 firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 24.8.2010.   51

Case No.:25/5/80­ALC2/2010

Party  Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00058/AM11/ RLA File :31/24/040/00009/AM11/ Lic.No/Date:3110042996 26.04.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The Committee was informed that the firm vide their letter dated 14.7.2010 has requested for deletion of item No. 25 of import list involving cif  value of  Rs.  105,35,00,000/­  (US$  2,25,83,065.38)  on  the  ground  that  the  said  item  will  be  procured domestically.  The  Committee agreed to firm’s request with the condition that there shall be no change in original value addition and on the recommendation of the representative of the DHI present in the meeting and decided to call for the following information / clarification from the firm:­ 1. Specific item of export with complete specification. 2. Sl. No. 4,5, & 11 for each export product. 3. Use of each component of import. 4. Input weight of each forging and corresponding finished weight.   The case may be relist on 24.08.2010.   52

Case No.:37/5/80­ALC2/2010

Party  Name:TERUMO  PENPOL LIMITED Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00070/AM11/ RLA File :53/24/040/00003/AM11/ Lic.No/Date:5310010400 27.04.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The Committee observed that the comments called for from Technical Authority i.e. C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 24.08.2010.  

Case No.:41/5/80­ALC2/2010

Party Name:KINECO PVT. LTD. Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00074/AM11/ RLA File :17/24/040/00055/AM10/ Lic.No/Date:1710003301 28.04.2010 Defer Date:24.08.2010

53 Decision : The committee considered the case as per agenda. On the recommendation of the representative of the DHI present tin the meeting and decided to called for the following information / clarification from the firm:­   1.      Use of item of export. 2.      Sl no 3,4,5 and 11 of SDL export product wise.   The case may be re­listed on 24.08.2010.   54

Case No.:19/11/80­ALC2/2010

Party  Name:ELECTROMECH MATERIAL  HANDLING SYSTEMS(I) PVT LTD Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00165/AM11/ RLA File :31/21/040/00038/AM11/ Lic.No/Date:3110043162 10.05.2010 Defer Date:24.08.2010 firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 24.8.2010.   55

Case No.:20/11/80­ALC2/2010

Party  Name:LABEX  K.K. INTERNATIONAL Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00166/AM11/ RLA File :05/23/040/00032/AM11/ Lic.No/Date:0510263965 10.05.2010 Defer Date:24.08.2010   56

Case No.:18/11/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00164/AM11/ RLA File :31/24/040/00019/AM11/ Lic.No/Date:3110043194 11.05.2010 Defer Date:24.08.2010  

Case No.:2/11/80­ALC2/2010

Party  Name:GEA  BGR  ENERGY SYSTEM INDIA LIMITED Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00148/AM11/ RLA File :04/24/040/00026/AM11/ Lic.No/Date:0410113745 12.05.2010 Defer Date:24.08.2010

57 Decision : The committee considered the case as per agenda. On the recommendation of the representative of the DHI present tin the meeting and decided to called for the following information / clarification from the firm:­   1. Sl no 8, & 11 of SDL. 2.  Use of components proposed for import 3. Use of item no 7 of import with justification of quantity of import.   The case may be re­listed on 24.08.2010.   58

Case No.:3/11/80­ALC2/2010

Party  Name:GEA  BGR  ENERGY SYSTEM INDIA LIMITED Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00149/AM11/ RLA File :04/24/040/00012/AM11/ Lic.No/Date:0410113741 12.05.2010 Defer Date:17.08.2010 Decision : The committee considered the case as per agenda. On the recommendation of the representative of the DHI present tin the meeting and decided to called for the following information / clarification from the firm:­       1. Sl no 8 & 11 of SDL.   The case may be re­listed on 17.08.2010   59

Case No.:4/11/80­ALC2/2010

Party  Name:GEA  BGR  ENERGY SYSTEM INDIA LIMITED Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00150/AM11/ RLA File :04/24/040/00011/AM11/ Lic.No/Date:0410113742 12.05.2010 Defer Date:17.08.2010 Decision : The committee considered the case as per agenda. On the recommendation of the representative of the DHI present in the meeting and decided to called for the following information / clarification from the firm:­   1. Sl no 8, & 11 of SDL. 2.  Use of components proposed for import 3. use of item no 7 of import with justification of quantity of import. 4. Input weight & finished weight of item no 4 of import.   The case may be re­listed on 17.08.2010   60

Case No.:5/11/80­ALC2/2010

Party  Name:GEA  BGR  ENERGY SYSTEM INDIA LIMITED Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00151/AM11/ RLA File :04/24/040/00027/AM11/ Lic.No/Date:0410113743 12.05.2010 Defer Date:17.08.2010

Decision : The committee considered the case as per agenda. On the recommendation of the representative of the DHI present tin the meeting and decided to called for the following information / clarification from the firm:­   1. Sl no 8, & 11 of SDL. 2. Use of components proposed for import 3. Use of item no 7 of import with justification of quantity of import.   The case may be re­listed on 17.08.2010   61

Case No.:21/11/80­ALC2/2010

Party  Name:AUTOMAT IRRIGATION PVT. LTD. Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00167/AM11/ RLA File :05/23/040/00006/AM11/ Lic.No/Date:0510264179 12.05.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. The representative of the C&PC informed the consideration and to relist the case on 24.08.2010   62

Case No.:22/11/80­ALC2/2010

Party  Name:DICKINSON  FOWLER PVT. LTD. Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00168/AM11/ RLA File :07/24/040/00033/AM11/ Lic.No/Date:0710071546 14.05.2010 Defer Date:24.08.2010 Committee that the case was under their examination. The Committee, therefore, decided to defer the   63

Case No.:1/11/80­ALC2/2010

Party  Name:TERUMO  PENPOL LIMITED Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00147/AM11/ RLA File :53/24/040/00005/AM11/ Lic.No/Date:5310010493 26.05.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda.  The Committee observed that the comments called for from Technical Authority i.e. C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 24.08.2010.   64

Case No.:6/11/80­ALC2/2010

Party  Name:BHARAT  HEAVY ELECTRICALS LIMITED Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00152/AM11/ RLA File :04/24/040/00033/AM11/ Lic.No/Date:0410114086 28.05.2010 Defer Date:24.08.2010 consideration and to relist the case on 24.08.2010  

Case No.:7/11/80­ALC2/2010

Party Name:THERMAX LTD., Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00153/AM11/ RLA File :31/24/040/00031/AM11/ Lic.No/Date:3110043398 28.05.2010 Defer Date:24.08.2010

65 Decision : The committee considered the case as per agenda. On the recommendation of the representative of  the  DHI  present  in  the  meeting.  It  was  decided  by  the  Norms  Committee  to  call  for  the  following information  /  clarification  from  the  firm  and  decided  the  consideration  of  the  case  and  relist  on 24.08.2010:­   1. Sl no 5,9 & 11 of SDL. 2. Net weight & gross weight of item no 3 of import. 3. Break up different types of pipes in to seamless & ERW and the respective quantity in length & weight.   66

Case No.:8/11/80­ALC2/2010

Party  Name:IPG  PHOTONICS (INDIA) PVT LTD., Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00154/AM11/ RLA File :07/24/040/00036/AM11/ Lic.No/Date:0710071849 28.05.2010 Defer Date:24.08.2010   67

Case No.:9/11/80­ALC2/2010

Party  Name:TERUMO  PENPOL LIMITED Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00155/AM11/ RLA File :53/24/040/00007/AM11/ Lic.No/Date:5310010532 28.05.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda.  The Committee observed that the comments called for from Technical Authority i.e. C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on  24.8.2010   68

Case No.:11/11/80­ALC2/2010

Party  Name:UNITED  DRILLING TOOLS LTD., Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00157/AM11/ RLA File :05/24/040/00073/AM11/ Lic.No/Date:0510265196 01.06.2010 Defer Date:24.08.2010   69

Case No.:23/11/80­ALC2/2010

Party  Name:MICROFINISH VALVES PRIVATE LIMITED Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00169/AM11/ RLA File :07/24/040/00495/AM10/ Lic.No/Date:0710071958 02.06.2010 Defer Date:24.08.2010

70

Case No.:25/11/80­ALC2/2010

Party  Name:MOTHERSON  SUMI SYSTEMS LTD Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00171/AM11/ RLA File :05/24/040/00072/AM11/ Lic.No/Date:0510265356 02.06.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda. On the recommendation of the representative of the DHI present tin the meeting and decided to called for the following information / clarification from the firm:­   Sl. No. 3,4,5 & 11 of SDL Export product wise.   The case may be re­listed on 17.08.2010   71

Case No.:26/11/80­ALC2/2010

Party  Name:TERUMO  PENPOL LIMITED Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00172/AM11/ RLA File :53/24/040/00008/AM11/ Lic.No/Date:5310010549 04.06.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda.  The Committee observed that the comments called for from Technical Authority i.e. C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 24.08.2010   72

Case No.:27/11/80­ALC2/2010

Party  Name:FREEDOM OPTHALMIC PRIVATE LIMITED, Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00173/AM11/ RLA File :04/24/040/00036/AM11/ Lic.No/Date:0410114329 07.06.2010 Defer Date:24.08.2010 earliest and on receipt forward the same to technical authority (DCMSME) for examination and submission of comments. The case may be relisted on 24.08.2010.    73

Case No.:28/11/80­ALC2/2010

Party  Name:THE  SARASWATI INDUSTRIAL SYNDICATE LTD. Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00174/AM11/ RLA File :05/24/040/00094/AM11/ Lic.No/Date:0510265718 08.06.2010 Defer Date:24.08.2010 Decision : The committee considered the case as per agenda.   The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 24.08.2010.  

Case No.:29/11/80­ALC2/2010

Party  Name:MIKROTEK MACHINES LTD., Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred

74 HQ File :01/80/050/00175/AM11/ RLA File :07/24/040/00047/AM11/ Lic.No/Date:0710072103 08. 06.2010 Defer Date:24.08.2010   75

Case No.:30/11/80­ALC2/2010

Party  Name:MIKROTEK MACHINES LTD., Meet  No/Date:17/80­ ALC2/2010 27.07.2010 Status: Deferred HQ File :01/80/050/00176/AM11/ RLA File :07/24/040/00048/AM11/ Lic.No/Date:0710072107 08.06.2010 Defer Date:24.08.2010 S.No.132

Case No. A/R­63

M/s.  Thyssenkrup Industries India Ltd.,  F.No. 01/80/50/ 01852/AM09/DES.I Lic.No. & Date Meeting No. 17/11 RA F.No.31/21/040/00399/Am09 3110037568 dt.03.03.2009 Date: 27.07.2010 Ratification of norms   The committee considered the case as per agenda. The representative of the DHI informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010.   S.No.133

Case No. A/R­64

M/s.  Mahati Electrics  F.No. 01/85/50/ 00005/AM09/DES.I Lic.No. & Date Meeting No. 17/11 RA F.No.31/24/040/00308/AM08 3110032430 dt.23.01.2008 Date: 27.07.2010   The committee considered the case as per agenda. As per the written comments of  DHI  communicated vide their U.O. Note3(26)/09­TSW)B) dated 27.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   Export The  description  of  export  product  may  be  amended  to  “Power  Generation  set  for  Kumbhi  Hydro  Electric Project” & the same may be incorporated in the license. Import   1.      The firm has not given break up of import quantities in set to numbers.  Quantity of import may be allowed in numbers instead of sets. 2.      Item No. 41 & 42 may be deleted as the firm has not given the details of the same. 3.      All other items may be allowed under GN­4.   The Regional Authority may take necessary action accordingly.   S.No.134

Case No. A/R­65

M/s.  Mahati Electrics  F.No. 01/85/50/ 00003/AM09/DES.I Lic.No. & Date Meeting No. 17/11 RA F.No.31/24/040/00304/AM08

3110032429 dt.23.01.2008 Date: 27.07.2010   The committee considered the case as per agenda. As per the written comments of  DIPP  communicated vide their U.O. Note3(26)/09­TSW)B) dated 27.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   Export   The description of export product may be amended to “Power Generation set for Kadavi Hydro Electric Project” &  the same may be incorporated in the license.       Import   1. The firm has not given break up of import quantities in set to numbers.  Quantity of    import may be allowed in numbers instead of sets.       2.  Item No. 41 & 42 may be deleted as the firm has not given the details of the same.       3.  All other items may be allowed under GN­4.   The Regional Authority may take necessary action accordingly.   S.No.135    

Case No. A/R­66

M/s.  GEA  BGR Energy  System India Ltd.,  F.No. 01/80/50/ 01283/AM09/DES.I Lic.No. & Date Meeting No. 17/11 RA F.No.04/24/040/00196/AM09 0410099962 dt.12.11.2008 Date: 27.07.2010   The committee considered the case as per agenda. The representative of the DHI informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010   S.No.136

Case No.A/R­46

M/s.  Bharat Heavy Electricals  Ltd., Hyderabad HQ F.No.01/80/162/01436/AM08/DES­I Lic. No. & Date Meeting No. 17/11 RLA No.09/24/040/00556/AM07   0910030003 dt.16.04.2007 Date: 27.07.2010   The committee considered the case as per agenda. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 24.08.2010.   S.No.137

Case No.A/R­20

M/s.  Bharat Heavy  Electricals Ltd., Bhopal HQ F.No.01/80/50/1779/AM09/DES–I   Lic. Nos. & Date Meeting No. 17/11 RLA F.No.11/24/040/00076/AM09 1110019584 dt.10.02.2009 Date: 27.07.2010   The committee considered the case as per agenda. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 24.08.2010.

S.No.138

Case No.A/R­22

M/s.  Minda  Silca Engg. Ltd., HQ F.No.01/80/5 0/00995/AM09/DES–I Lic. Nos. & Date Meeting No. 17/11 RLA F.No.05/24/040/00941/AM09   0510217932 dt.14.03.2008 Date: 27.07.2010   The committee considered the case as per agenda. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to again remind finally the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The  case  may  be re­listed on 24.08.2010.   S.No.139

Case No.A/R­23

M/s.  Kilburn Engg. Ltd., HQ F.No.01/80/50/00341/AM09/DES–I   Lic. Nos. & Date Meeting No. 17/11 RLA F.No.03/94/040/01309/AM08 0310465801 dt.19.03.2008 Date: 27.07.2010   The committee considered the case as per agenda. The representative of the DHI informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010   S.No.140

Case No.A/R­24

M/s.  Kilburn Engg. Ltd., HQ F.No.01/80/50/00484/AM09/DES–I   Lic. Nos. & Date Meeting No. 17/11 RLA F.No.03/94/040/00281/AM09 0310474390 dt.12.06.2008 Date: 27.07.2010   The committee considered the case as per agenda. The representative of the DHI informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010.   S.No.141

Case No.A/R­25

M/s.  Minda  Sai Ltd., Mumbai HQ F.No.01/80/50/00755/AM08/DES–I   Lic. Nos. & Date Meeting No. 17/11 RLA F.No.05/24/040/00147/AM08 0510204041 dt.24.05.2007 Date: 27.07.2010   The  committee  considered  the  case  as  per  agenda.  The  representative  of  the  DC(MSME)  informed  the consideration and to relist the case on 24.08.2010   S.No.142

Case No.A/R­26

M/s.  Kilburn Engg. Ltd., HQ F.No.01/80/50/01257/AM09/DES–I   Lic. Nos. & Date Meeting No. 17/11 RLA F.No.03/94/040/00757/AM09 0310492847 dt.04.11.2008 Date: 27.07.2010   The committee considered the case as per agenda. The representative of the DHI informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010       S.No.143

Case No.A/R­28

M/s.  Larson  & Toubro LTd., HQ F.No.01/80/162/00301/AM08/DES–I   Lic. Nos. & Date Meeting No. 17/11 RLA F.No.04/24/040/00223/AM08 0410091098 dt.18.09.2007 Date: 27.07.2010   The committee considered the case as per agenda. The representative of the DHI informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010   S.No.144

Case No.A/R­29

M/s. Metso Paper India Pvt. LTd., HQ F.No.01/80/50/01625/AM09/DES–I   Lic. Nos. & Date Meeting No. 17/11 RLA F.No.05/24/040/00635/AM09 0510233403 dt.29.12.2008 Date: 27.07.2010   The committee considered the case as per agenda. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 24.08.2010.       S.No.145

Case No.A/R­30

M/s. Metso Paper India Pvt. LTd., HQ F.No.01/80/50/01308/AM09/DES–I   Lic. Nos. & Date Meeting No. 17/11 RLA F.No.05/24/040/00535/AM09 0510231137 dt.19.11.2008 Date: 27.07.2010   The committee considered the case as per agenda. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 24.08.2010.       S.No.146

Case No.A/R­33

M/s.  Bharat Heavy  Electricals LTd., Chennai HQ F.No.01/80/50/01081/AM09/DES–I   Lic.  Nos.  & Date Meeting No. 17/11 RLA F.No.04/24/040/00113/AM09 0410098647 dt.17.09.2008 Date: 27.07.2010   The committee considered the case as per agenda. As per the written comments of DHI  communicated vide their U.O. Note3(158)/09­TSW)B) dated 07..05.2010, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   EXPORT 1.The  description  of  the  export  product  may  be  modified  to  “piping  components  for  1X250  MW  Steam generator & turbo generator set for  Budge Budge Generating station”.  Total export weight is 2425  MT & the same may be incorporated in the licence. IMPORT 1.Item no 1­ (Carbon Steel)360 MT may be allowed  with 2% wastage as applied by the firm. 2. Item no 2­ (Alloy Steel) 350 MT may be allowed  with 2% wastage as applied by the firm. 3. Item no 3­ (Alloy Steel) 4 MT may be allowed  with 2% wastage as applied by the firm. 4.Item no­4­ The total weight is 55 MT & the same may be incorporated in the licence. The item may be allowed  under  GN­4  as  applied  for.  The  word  “Finished  Forging”  may  be  suffixed  to  the  description  of

import item. Item  no­5­  Welding  electrodes­  The  firm  has  applied  for  2  MT.  Quantity  applied  is  with  in  the  norms normally allowed. We may recommend import as applied for. Item no 6 & 7­ may be allowed as applied for. However weight 8 MT & 16 MT may be incorporated in the licence for item no 6 & 7 respectively   The Regional Authority may take necessary action accordingly.  

Case No.A/R­75

M/s.  Dee Development Engineers  Pvt. LTd., HQ F.No.01/80/50/00160/AM08/DES–I   Lic.  Nos.  & Date Meeting No. 17/11 RLA F.No.05/24/04000175/AM08 0510204393 dt.01.06.2007 Date: 27.07.2010 Deletion of condition in MTR / No. in different advance authorizations   The committee considered the case as per agenda. The representative of the DIPP informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010   S.No.25

Case No.C­35

 M/s. Panch Ratna Fastners (P). Ltd; HQ F.No.01/80/162/1316/AM09/DES.I Meeting No. 17/11 Date: 27.07.2010 Alleged  swindling  of  several  crores  of  Govt. revenue –DEPB.   The committee considered the case as per agenda.  The Committee observed that the required information has neither  been  received  from  the  complainant  nor  from  EEPC  to  enable  the  NC  to  examine  the  issue.    The Committee therefore, decided to remind the complainant and the EEPC for expediting the said information.  The case may be re­listed on 24.08.2010    S.No.26

Case No. C­20

M/s.  BOSCH  Limited, Bangalore  HQ F.No.01/80/162/00683/AM10/DES­I Meeting No. 17/11 Fixation of SION Date: 27.07.2010 The committee considered the case as per agenda. The Committee observed that the required information has neither  been  received  from  the  complainant  nor  from  EEPC  to  enable  the  NC  to  examine  the  issue.    The Committee therefore, decided to remind the complainant and the EEPC for expediting the said information.  The case may be re­listed on 24.08.2010        S.No.27

Case No.C­04

  M/s.  Kusalava International LTd., HQ F.No.01/80/162/00021/AM10/DES.I Meeting No. 17/11 Date: 27.07.2010 Fixation of Standard Input Output Norms (SION) for the export of “Cylinder Liners” The committee considered the case as per agenda. The Committee observed that the required information has neither  been  received  from  the  complainant  nor  from  EEPC  to  enable  the  NC  to  examine  the  issue.    The Committee therefore, decided to remind the complainant and the EEPC for expediting the said information.  The case may be re­listed on 24.08.2010                                                                          *****

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied