IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2010-07-27

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.16/11 due for 20.07.2010 was actually held on 27.07.2010  Norms Committee (NC­I) (DES.I Section)   The  meeting  No.  16/11  of  the  Norms  Committee  (NC­I)  for  the  licensing  year  2010­2011  due  for 20.07.2010 was actually held on 27.07.2010 under the Chairmanship of Shri V.K. Srivastava,  Addl.  Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of  Foreign  Trade  Policy  2009–2014  /  Handbook  of  Procedure  Volume­I.    The  following  Members  of  the Committee were present in the meeting: ­   Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429 A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Aggarwal,     Deptt.  of  C&CP, Shastri Bhavan 5. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 6. Sh. B.D. Ghosh, Jt.IA 399 23063355 M/o Steel, U.B. 7. Sh. Rajinder Pal Singh  Dy.DGFT, 486 23061562 Extn.345 DGFT, U.B. 8. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­ 1

Case No.:65/22/80­ALC2/2008

Party Name:THERMAL SYSTMES (HYDERABAD) P. LTD. Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00876/AM09/ RLA File :09/24/040/00192/AM09/ Lic.No/Date:0910035094 19.08.2008 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.  The  representative  of  the  DHI informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   2

Case No.:15/15/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00199/AM10/ RLA File :04/24/040/00293/AM09/ Lic.No/Date:0410103657 03.04.2009 Defer Date:24.08.2010 Norms Committee (NC­I) in its Meeting No.16/11 held on 27.07.2010. The Committee observed that no reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information despite reminder. The Committee, therefore, decided to write to Executive Director with a copy to Chief Managing Director of  the firm for final reminder for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 24.08.2010.

3

Case No.:1/7/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00068/AM10/ RLA File :03/95/040/00983/AM09/ Lic.No/Date:0310517989 01.05.2009 Defer Date:24.08.2010         Norms Committee (NC­I) in its Meeting No.16/11 held on 27.07.2010.  The Committee noted that the reply of the firm has been received. The firm has also requested for amendment of quantity of import of certain items vide their letter dated 25.6.2010.  The Committee agreed the firm request, subject to final ratification of norms by Norms Committee. The case may be re­examine. The Committee, therefore, decided to defer the consideration and to relist the case on 10.08.2010.   4

Case No.:23/21/80­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00305/AM10/ RLA File :03/94/040/00396/AM10/ Lic.No/Date:0310533764 13.08.2009 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.The  representative  of  the  DHI informed  the  Committee    that  the  reply  of  the  firm  has  not  been  received.  The  Committee,  therefore, directed  to  forward  a  copy  of  firm  to  DHI  for  examination  &  comments  and  to  relist  the  case  on 24.08.2010.  

Case No.:37/21/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Approved HQ File :01/80/050/00319/AM10/ RLA File :61/24/040/00020/AM09/ Lic.No/Date:6110000343 19.08.2009

5 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.16/11 held on 27.07.2010. As per the written comments of  DHI communicated vide their U.O. Note  No.  3(60)/09­TSW(B)  dated  14.7.2010,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization  as under:­   Description of export products may be modified as follows and incorporated in the licence. 1.             Steam Turbine and their auxiliaries   2 Set (1446 MT) 2.             Condenser and their auxiliaries          2 Set (970 MT) 3.             Generator and their auxiliaries            6 Set (1668 MT) Imports: The recommendation is based on per set basis. 1. Item no 1 to 10 except item no 3­ Imports may be allowed as applied for as either qty is small or there can be no recovery from the wastage. 2. Item no 3­ Forging for 2L& 2R­ 255 numbers & Forging for 3L& 3R­ 256 numbers. 3. Item no 11­ “Finished” may be suffixed to the description. 4. Item no 12 to 42­ Components& may be allowed under GN­4. 5. Item no 43 , 50 &157­ The firm has not given calculation of requirement. Hence may be deleted. 6. Item no 44 to 57 except item no 50­ These are BOI items & may be allowed under GN­4. 7. Item no 58 & 66­ The item may be deleted as weight has not been given. 8. Item no 59­ May be allowed under GN­4. 9. Item no 60­ Quantity may be amended to 2,000 number of weight 3.15 MT. 10. Item no 61­ Quantity may be amended to 2,000 number of weight 7 MT. 11. Item no 62 & 63­ may be allowed under GN­4. 12. Item no 64­ The firm has given calculation for 15 Mt & the same may be allowed. Item no 146 may be deleted as the firm has asked either of the two items. 13.  Item no 65 & 67­ May be allowed as of low quantity. 14.  Item no 68 & 69­ The firm has stated that the net weight is 118.16 MT. With 20% wastage the entitlement comes to 141.8 MT & the same may be recommended. 15. Item no 70 to 78 ­ may be allowed as applied for as there can be no recovery. 16. Item no 79 to 112­ May be allowed under GN­4. 17. Item no 113 to 145­ These are insulating material & may be allowed with in 7% of sale value of generator. 18.  Item no 147 to 154­ These are components & may be allowed under GN­4. 19.  Item no 155­This item is used for manufacture of turbine, condenser & Generator. Total quantity allowed is 1450 MT with 10% wastage.( Quantity allowed is total & not per set) 20.  Item no 156­ 10.2 MT may be allowed with 10% wastage as requested by the firm during application. 21. Item no 158 & 159­ may be allowed as applied for. 22.  Item no 160­ 9.6 MT may be allowed with 10% wastage as requested by the firm during application. 23.  Item no 161 to 164­ Welding material. The firm has not given the calculation of requirement or weight of the welding material. Hence may be deleted. 24. Item no 165 to 174­ These are spares. May be allowed as per spares policy.   The Regional Authority may take necessary action accordingly.    

Case No.:12/33/80­ALC2/2009

Party Name:KERN­LIEBERS (INDIA) PRIVATE LIMITED Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Approved HQ File :01/80/050/00478/AM10/ RLA File :07/24/040/00283/AM10/ Lic.No/Date:0710067999 04.11.2009

6 Norms Committee (NC­I) in its Meeting No.16/11 held on 27.07.2010. As per the written comments of  DHI communicated vide their U.O. Note  No. 3(46)/08­TSW(B) dated 02.7.2010, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   Export       1. The total export weight is 14253 kg & the same may be incorporated in the    licence. Import   1.  Item no 1 to 3­ Quantity applied may be allowed with 1% wastage as requested by the firm. 2.      Item no­ this is a consumable. The same may be allowed with in 6% of FOB value of exports. The Regional Authority may take necessary action accordingly.   7

Case No.:4/16/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00245/AM11/ RLA File :03/95/040/00712/AM10/ Lic.No/Date:0310557677 29.01.2010 Defer Date:24.08.2010 Norms Committee (NC­I) in its Meeting No.16/11 held on 27.07.2010. As per the written comments of  DIPP  communicated  vide  their  U.O.  Note    No.  DIPP/TSW/DES­I/16/11/07  dated  27.07.2010,  the Committee decided to call the following information and defer the consideration and to relist the case on 24.08.2010:­   1.  RA may be requested to revise the list of import items in the Advance Authorisation as per the revise list submitted by the firm vide their letter dated 12th  June,  2010,  within  the  existing  cif  value  of imports, subject to final fixation of norms by the Norms Committee. 2. Firm may also be requested to submit the information in respect of S.No. 4, 5, 11  & 13 of Standard Deficiency Format,  for the revise items of imports, export product wise. 3. Specific use of  import items at Sl. No 79 and 98  with  basis/justification for the quantities of these  items.   8

Case No.:25/51/80­ALC2/2009

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY OF AKSH OPTIFIBRE LTD.,) Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00816/AM10/ RLA File :05/23/040/00188/AM10/ Lic.No/Date:0510259390 24.02.2010 Defer Date:24.08.2010 Norms Committee (NC­I) in its Meeting No.16/11 held on 27.07.2010. The Committee observed that the comments called for from DIT are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 24.08.2010.   9

Case No.:9/13/80­ALC2/2010

Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00185/AM11/ RLA File :03/95/040/00002/AM11/ Lic.No/Date:0310568211 06.04.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.  The  representative  of  the  DHI informed the Committee that the case was under their submission. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010.

10

Case No.:15/13/80­

ALC2/2010 Party Name:KOHLI AUTOMOBILES PVT. LTD. Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Approved HQ File :01/80/050/00191/AM11/ RLA File :05/23/040/00024/AM11/ Lic.No/Date:0510263255 28.04.2010   Norms Committee (NC­I) in its Meeting No.16/11 held on 27.07.2010.  As per the written comments of  DC(MSME) communicated vide their U.O. Note No. 30(126)/2010­ME dated 05.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization  as per GN­4.   The Regional Authority may take necessary action accordingly.   11

Case No.:12/16/80­ALC2/2010

Party Name:WOLFRA­ TECH PVT LTD Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00253/AM11/ RLA File :07/24/040/00020/AM11/ Lic.No/Date:0710071685 20.05.2010 Defer Date:24.08.2010 Norms Committee (NC­I) in its Meeting No.16/11 held on 27.07.2010. As per the written comments of DIPP, communicated vide their U.O. Note dated 27.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. For export product at Sl. No.1, import item  at Sl. No. 1 may be allowed as per SION C­227. 2.  For export product at Sl. No.2, quantity of import item  at Sl. No. 2 may be allowed as applied for i.e. 110 Kgs after taking clue form SION C­227.   The Regional Authority may take necessary action accordingly.   12

Case No.:6/16/80­ALC2/2010

Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00247/AM11/ RLA File :03/95/040/00109/AM11/ Lic.No/Date:0310576011 26.05.2010 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.    The  representative  of  the  DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010.   13

Case No.:7/16/80­ALC2/2010

Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00248/AM11/ RLA File :03/95/040/00153/AM11/ Lic.No/Date:0310576218 26.05.2010 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.  The  representative  of  the  DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 24.08.2010.

14

Case No.:8/16/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00249/AM11/ RLA File :04/24/040/00034/AM11/ Lic.No/Date:0410114137 31.05.2010 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.    The  representative  of  the  DHI informed  the  Committee  they  have  not  received  the  hard  copy  of  firm’s  application.    The  Committee handedover the firm’s application to DHI for examination & comments.    The  case  may  be  re­listed  on 24.08.2010.   15

Case No.:5/16/80­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00246/AM11/ RLA File :03/95/040/00108/AM11/ Lic.No/Date:0310577443 04.06.2010 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.  On  the  recommendation  of  the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information from the firm and to re­list the case on  24.08.2010:­                1. Sl. No. 3,4,5 & 11 of SDL   16

Case No.:11/16/80­ALC2/2010

Party Name:TCF NADI INDUSTRIAL FANS PRIVATE LTD., Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00252/AM11/ RLA File :04/24/040/00059/AM11/ Lic.No/Date:0410114808 22.06.2010 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.  The  Committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA with a copy to the firm to forward the firm’s application at the earliest and on receipt forward the same to Technical Authority  for  examination  and submission of comments.  The case may be relisted on 24.08.2010.   17

Case No.:1/16/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00242/AM11/ RLA File :09/24/040/00114/AM11/ Lic.No/Date:0910042665 08.07.2010 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.  The  Committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA with a copy to the firm to forward the firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  Technical  Authority  for  examination  and submission of comments.  The case may be relisted on 24.08.2010.  

Case No.:2/16/80­ALC2/2010

Party Name:M M AQUA TECHNOLOGIES LTD. Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred

18 HQ File :01/80/050/00243/AM11/ RLA File :05/24/040/00084/AM11/ Lic.No/Date:0510267884 09.07.2010 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.  The  Committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA with a copy to the firm to forward the firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  Technical  Authority  for  examination  and submission of comments.  The case may be relisted on 24.08.2010.   19

Case No.:3/16/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00244/AM11/ RLA File :06/24/040/00020/AM11/ Lic.No/Date:0610018454 09.07.2010 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.  The  Committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA with a copy to the firm to forward the firm’s application at  the  earliest  and  on  receipt  forward  the  same  to  Technical  Authority  for  examination  and submission of comments.  The case may be relisted on 24.08.2010.   20

Case No.:9/16/80­ALC2/2010

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00250/AM11/ RLA File :34/24/040/00061/AM11/ Lic.No/Date:3410027466 09.07.2010 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.  The  Committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA with a copy to the firm to forward the firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  Technical  Authority  for  examination  and submission of comments.  The case may be relisted on 24.08.2010.   21

Case No.:10/16/80­ALC2/2010 Party Name:WEATHERFORD

DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:16/80­ ALC2/2010 20.07.2010 Status: Deferred HQ File :01/80/050/00251/AM11/ RLA File :34/24/040/00075/AM11/ Lic.No/Date:3410027467 09.07.2010 Defer Date:24.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.16/11  held  on  27.07.2010.  The  Committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA with a copy to the firm to forward the firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  Technical  Authority  for  examination  and submission of comments.  The case may be relisted on 24.08.2010. S.No.131

Case No. A/R­69

M/s.  Netafin Irrigation India Ltd.,  F.No. 01/80/50/ 01857/AM09/DES.I Lic.No. & Date Meeting No. 16/11 RA F.No.34/24/040/00192/AM09 3410023781 dt.20.03.2009 Date: 20.07.2010 Ratification of norms The  case  regarding  ratification  of  norms  in  respect  of  above  authorization  was  considered  by  the  Norms Committee (NC­I) in its Meeting No.16/11 held on 27.07.2010. The Committee observed that the comments

called for from DC (MSME) are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 24.08.2010.


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied