DGFT Committee Minutes
RATIFIED Minutes of MeetingNo.11/11 held on 15.06.2010 of Norms Committee (NCI) (DES.I Section) The meeting No. 11/11 of the Norms Committee (NCI) for the licensing year 20092010 was held on 29.06.2010 under the Chairmanship of Shri V.K. Srivastava, Addl. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure VolumeI. The following Members of the Committee were present in the meeting: Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA M/o Steel, U.B. 5. Sh. B. D. Ghosh, Jt. IA 399 23063355 M/o Steel, U.B 6. Sh. Rajiva Kumar 207 23061562 Ext. 232 DGFT, UB 7. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B. The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and manual cases and the decision taken thereon were as under: 1
Case No.:7/45/80ALC2/2009
Party Name:COOKSON INDIA PVT. LTD. Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Approved HQ File :01/80/050/00694/AM10/ RLA File :04/24/040/00264/AM10/ Lic.No/Date:0410110983 21.01.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The representative of the DIPP present in the meeting recommended that the norms be ratified. The Committee, therefore, decided to ratify the norms in respect of the subject advance authorization on repeat basis vide AA No.0410107040 dt.19.08.2009. The Regional Authority may take necessary action accordingly. 2
Case No.:23/45/80ALC2/2009
Party Name:CAMFIL FARR AIR FILTRATION INDIA LTD Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Approved HQ File :01/80/050/00710/AM10/ RLA File :05/23/040/00174/AM10/ Lic.No/Date:0510257198 29.01.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The DC(MSME) furnished their comments in this case vide their UO Note No.30(90)2008ME dated 10.06.2010 recommending the norms. The committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with DC(MSME) comments. The Regional Authority may take necessary action accordingly. 3
Case No.:14/11/80ALC2/2010
Party Name:CORE METAL KRAFTS LTD., Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00160/AM11/ RLA File :22/24/040/00056/AM10/ Lic.No/Date:2210009813 25 03 2010 Defer Date: 27 07 2010
25.03.2010 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The representative of the DHI informed the committee that the firm’s application was under their study. The Committee, therefore, decided to defer the case and to relist it on 27.07.2010. 4
Case No.:17/11/80ALC2/2010
Party Name:RINAC INDIA LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00163/AM11/ RLA File :07/24/040/00485/AM10/ Lic.No/Date:0710070940 15.04.2010 Defer Date: 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case on 27.07.2010: 1. Use of import items at Sl. No.7 & 8 and basis / Justification for the quantities of these items. 5
Case No.:15/11/80ALC2/2010
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00161/AM11/ RLA File :34/24/040/00229/AM09/ Lic.No/Date:3410026834 16.04.2010 Defer Date: 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The representative of the DC(MSME) to defer the consideration and to relist the case on 27.07.2010. 6
Case No.:16/11/80ALC2/2010
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00162/AM11/ RLA File :34/24/040/00217/AM09/ Lic.No/Date:3410026833 16.04.2010 Defer Date: 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The representative of the DC(MSME) 7
Case No.:19/11/80ALC2/2010
Party Name:ELECTROMECH MATERIAL HANDLING SYSTEMS(I) PVT LTD Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00165/AM11/ RLA File :31/21/040/00038/AM11/ Lic.No/Date:3110043162 10.05.2010 Defer Date: 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case on 27.07.2010: (i) Information in respect of Sl. No. 3, 4, 5 & 11 of Standard Deficiency Format. (ii) List of import items with their quantities contained in one Crane Kit.
Case No.:20/11/80ALC2/2010
Party Name:LABEX K.K. INTERNATIONAL Meet No/Date:11/80 ALC2/2010 15 06 2010 Status: Deferred
8 15.06.2010 HQ File :01/80/050/00166/AM11/ RLA File :05/23/040/00032/AM11/ Lic.No/Date:0510263965 10.05.2010 Defer Date: 27.07.2010 9
Case No.:18/11/80ALC2/2010
Party Name:ULTRA ENGINEERS Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00164/AM11/ RLA File :31/24/040/00019/AM11/ Lic.No/Date:3110043194 11.05.2010 Defer Date: 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forwarded the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 27.07.2010. 10
Case No.:2/11/80ALC2/2010
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00148/AM11/ RLA File :04/24/040/00026/AM11/ Lic.No/Date:0410113745 12.05.2010 Defer Date: 27.07.2010 11
Case No.:3/11/80ALC2/2010
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00149/AM11/ RLA File :04/24/040/00012/AM11/ Lic.No/Date:0410113741 12.05.2010 Defer Date: 27.07.2010 12
Case No.:4/11/80ALC2/2010
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00150/AM11/ RLA File :04/24/040/00011/AM11/ Lic.No/Date:0410113742 12.05.2010 Defer Date: 27.07.2010
Case No.:5/11/80ALC2/2010
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred
13 15.06.2010 HQ File :01/80/050/00151/AM11/ RLA File :04/24/040/00027/AM11/ Lic.No/Date:0410113743 12.05.2010 Defer Date: 27.07.2010 14
Case No.:21/11/80ALC2/2010
Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00167/AM11/ RLA File :05/23/040/00006/AM11/ Lic.No/Date:0510264179 12.05.2010 Defer Date: 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The representative of the DIPP informed the committee that the firm’s application may be transferred to C&PC or DC(MSME) for comments. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010. 15
Case No.:22/11/80ALC2/2010
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00168/AM11/ RLA File :07/24/040/00033/AM11/ Lic.No/Date:0710071546 14.05.2010 Defer Date: 27.07.2010 16
Case No.:1/11/80ALC2/2010
Party Name:TERUMO PENPOL LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00147/AM11/ RLA File :53/24/040/00005/AM11/ Lic.No/Date:5310010493 26.05.2010 Defer Date: 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The Committee noted that firm’s application was received from RA and referred to C&PC for examination and submission of comments. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010. 17
Case No.:6/11/80ALC2/2010
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00152/AM11/ RLA File :04/24/040/00033/AM11/ Lic.No/Date:0410114086 28.05.2010 Defer Date: 27.07.2010 18
Case No.:7/11/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00153/AM11/ RLA File :31/24/040/00031/AM11/ Lic.No/Date:3110043398 28.05.2010 Defer Date: 27.07.2010
18 informed the committee that the firm’s application has not been received. The Committee, therefore, decided to forward the firm application to them for examination and to relist the case on 27.07.2010. 19
Case No.:8/11/80ALC2/2010
Party Name:IPG PHOTONICS (INDIA) PVT LTD., Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00154/AM11/ RLA File :07/24/040/00036/AM11/ Lic.No/Date:0710071849 28.05.2010 Defer Date: 27.07.2010 the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 27.07.2010. 20
Case No.:9/11/80ALC2/2010
Party Name:TERUMO PENPOL LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00155/AM11/ RLA File :53/24/040/00007/AM11/ Lic.No/Date:5310010532 28.05.2010 Defer Date: 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The Committee noted that firm’s application was received from RA and referred to C&PC for examination and submission of comments. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010. 21
Case No.:10/11/80ALC2/2010
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Approved HQ File :01/80/050/00156/AM11/ RLA File :05/24/040/00075/AM11/ Lic.No/Date:0510265105 01.06.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010, the representative of the DIPP present in the meeting recommended the case on repeat basis as per Advance Authorization No. 0510259916 dated 05.03.2010 ratified in Norms Committee Meeting No. 6/80 dated 11.5.2010. The Committee, after deliberating the case, decided to ratify the norms (on repeat basis) as under: (i) Net weight of export product may be specified as 638.4 Kgs. (ii) Quantity of import item may be allowed as 2681.3 Kgs. inclusive of 320% wastage after taking 6% recovery from scrap as per decision taken by NC in its meeting dated 11.08.2009. The Regional Authority may take necessary action accordingly. 22
Case No.:11/11/80ALC2/2010
Party Name:UNITED DRILLING TOOLS LTD., Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00157/AM11/ RLA File :05/24/040/00073/AM11/ Lic.No/Date:0510265196 01.06.2010 Defer Date: 27.07.2010
, , py pp the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 27.07.2010. 23
Case No.:13/11/80ALC2/2010
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00159/AM11/ RLA File :31/21/040/00074/AM11/ Lic.No/Date:3110043449 01.06.2010 Defer Date: 27.07.2010 the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 27.07.2010. 24
Case No.:23/11/80ALC2/2010
Party Name:MICROFINISH VALVES PRIVATE LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00169/AM11/ RLA File :07/24/040/00495/AM10/ Lic.No/Date:0710071958 02.06.2010 Defer Date: 27.07.2010 the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 27.07.2010. 25
Case No.:25/11/80ALC2/2010
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00171/AM11/ RLA File :05/24/040/00072/AM11/ Lic.No/Date:0510265356 02.06.2010 Defer Date: 27.07.2010 26
Case No.:24/11/80ALC2/2010
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Approved HQ File :01/80/050/00170/AM11/ RLA File :03/95/040/00132/AM11/ Lic.No/Date:0310577229 03.06.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. On the basis of written recommendation of DIPP, the Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as under: 1. Net empty export weight of 395.3 MT may be specified with the quantity of export product. 2. Word “Relevant” may be prefixed with the descriptions of import items at S.Nos. 1 & 2. 3 Q i f i i Sl N 1 b ll d li d f i 351356 K i l i f 3 %
3. Quantity of import item at Sl.No. 1 may be allowed as applied for i.e. 351356 Kgs. inclusive of 3 % wastage. 4. Quantity of import item at Sl.No. 2 may be allowed as 43327 Kgs. inclusive of 12 % wastage as applied for. 5. Weights of 15.3 MT & 0.5 MT may be specified with the quantities of import items at S.Nos. 3 & 6 respectively and the same may be allowed on net to net basis. 6. Quantities of import items at S.Nos. 4 & 5 may be allowed as applied for i.e. 18269 Kgs. each. 7. Import item at Sl. No. 6 to be supplied alongwith the export product. 8. Import of components may be allowed with accountability clause The Regional Authority may take necessary action accordingly. 27
Case No.:12/11/80ALC2/2010
Party Name: VIDEOCON INDUSTRIES LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Approved HQ File :01/80/050/00158/AM11/ RLA File :03/95/040/00105/AM11/ Lic.No/Date:0310577462 04.06.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. On the recommendation of DIPP, the Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as under: 1. Word “SKD” may be deleted from the description of export product. 2. Quantities of import items from Sl. No. 1 to 6 may be allowed as per GN4 The Regional Authority may take necessary action accordingly. 28
Case No.:26/11/80ALC2/2010
Party Name: TERUMO PENPOL LIMITED Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00172/AM11/ RLA File :53/24/040/00008/AM11/ Lic.No/Date:5310010549 04.06.2010 Defer Date: 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The Committee noted that firm’s application was received from RA and referred to C&PC for examination and submission of comments. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010. 29
Case No.:27/11/80ALC2/2010
Party Name:FREEDOM OPTHALMIC PRIVATE LIMITED, Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00173/AM11/ RLA File :04/24/040/00036/AM11/ Lic.No/Date:0410114329 07.06.2010 Defer Date: 27.07.2010 the earliest and on receipt forward the same to technical authority i.e. DC(MSME) for examination and submission of comments. The case may be relisted on 27.07.2010.
Case No.:28/11/80ALC2/2010
Party Name:THE SARASWATI Meet No/Date:11/80 Status:
30 INDUSTRIAL SYNDICATE LTD. ALC2/2010 15.06.2010 Deferred HQ File :01/80/050/00174/AM11/ RLA File :05/24/040/00094/AM11/ Lic.No/Date:0510265718 08.06.2010 Defer Date: 27.07.2010 Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. On the recommendation of DIPP, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case on 27.07.2010: 1. Information in respect of Sl.No.3,4, 5,11 & 13 of the Standard Deficiency Format export product wise. 31
Case No.:29/11/80ALC2/2010
Party Name: MIKROTEK MACHINES LTD., Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00175/AM11/ RLA File :07/24/040/00047/AM11/ Lic.No/Date:0710072103 08.06.2010 Defer Date: 27.07.2010 the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 27.07.2010. 32
Case No.:30/11/80ALC2/2010
Party Name:MIKROTEK MACHINES LTD., Meet No/Date:11/80 ALC2/2010 15.06.2010 Status: Deferred HQ File :01/80/050/00176/AM11/ RLA File :07/24/040/00048/AM11/ Lic.No/Date:0710072107 08.06.2010 Defer Date: 27.07.2010 the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 27.07.2010.
Case No. A/R63
M/s. Thyssenkrup Industries India Ltd., F.No. 01/80/50/ 01852/AM09/DES.I Lic.No. & Date Meeting No. 11/11 RA F.No.31/21/040/00399/Am09 3110037568 dt.03.03.2009 Date: 15.06.2010 Ratification of norms The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The representative of the DHI informed the committee that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.
Case No. A/R64
M/s. Mahati Electrics F.No. 01/85/50/ 00005/AM09/DES.I Lic.No. & Date Meeting No. 11/11 RA F.No.31/24/040/00308/AM08 3110032430 dt.23.01.2008 Date: 15.06.2010 Ratification of norms The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The representative of the DHI informed that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.
Case No. A/R65
M/s. Mahati F.No. 01/85/50/ 00003/AM09/DES.I Lic.No. & Date
Electrics Meeting No. 11/11 RA F.No.31/24/040/00304/AM08 3110032429 dt.23.01.2008 Date: 15.06.2010 Ratification of norms The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The representative of the DHI informed that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.
Case No. A/R66
M/s. GEA BGR Energy System India Ltd., F.No. 01/80/50/ 01283/AM09/DES.I Lic.No. & Date Meeting No. 11/11 RA F.No.04/24/040/00196/AM09 0410099962 dt.12.11.2008 Date: 15.06.2010 Ratification of norms The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NCI) in its Meeting No.11/11 held on 29.06.2010. The representative of the DHI informed that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010. ********
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.